DAFTAR ISI
SPESIFIKASI MATERIAL
PEKERJAAN :
TABANAN - BALI
PEMILIK :
BAB I
SPESIFIKASI MATERIAL
1 Panel TR
- Komponen utama Schneider - original
PT. Prima Karunia Kreasi /
- Pembuat
PT. Nirwana Cipta Kreasi
NYY, NYFGBY,
2 Kabel TR Supreme / Voksel
NYM, NYYHY
3 Penangkal Petir
- Tipe Splitzen dia.3/4”
4 Konduit
- Tipe Hight Impact Ega / Boss
- Material PVC
5 Lampu - Lampu
- Armature Philips / Artolite
- Bohlam Philips
A INTERNET
1 Hub Switch
- Tipe Managable POE TP-Link / Dlink / Ubiquiti
2 Access Point
Ubiquiti Unifi / Tp – Link /
- Tipe Ceiling
Dlink
3 Outlet Data
- Tipe Floor Schneider S-Flexi / Legrand
- Tipe Wall Schneider Vivace / Legrand
5 Konduit
- Tipe Hight Impact Ega / Boss
- Material PVC
B MATV
2 Outlet TV
- Tipe Floor Schneider S-Flexi / Legrand
- Tipe Wall Schneider Vivace / Legrand
C TATA SUARA
6 Konduit
- Tipe Hight Impact Ega / Boss
- Material PVC
D CCTV
1 Monitor Samsung / LG
6 Konduit
- Tipe Hight Impact Ega / Boss
- Material PVC
A AIR BERSIH
1 Water Tank
- Tipe Plastik Tank Profile Tank / Mpoin
2 Pompa Sumur
- Tipe Jet Pump Grundfos / DAB / Wilo
3 Pompa Booster
(Package)
- Tipe Centrifugal End Grundfos / DAB / Wilo
Suction
4 Pompa Garden
- Tipe Semi Jet Pump Grundfos / DAB / Wilo
5 Pompa Sumpit
- Tipe Summersible Pump Grundfos / DAB / Wilo
7 Valve-Valve
- Tipe Screw Kitz / Toyo
- Bodi Brass
B AIR PANAS
1 Water Heater
- Tipe Heat Pump Wika
2 Pompa Return
- Tipe Inline Pump Grundfos / DAB / Wilo
4 Valve-Valve
- Tipe Screw Kitz / Toyo
- Bodi Brass
1 STP Biotech
5 P-trap PVC
D AIR HUJAN
1 Pompa Sumpit
- Tipe Summersible Pump Grundfos / DAB / Wilo
E KOLAM RENANG
4 Pompa Sumpit
- Tipe Summersible Pump Grundfos / DAB / Wilo
6 Valve – Valve
- Bodi PVC Astral / Arita / Onda
2 AC Cassette
- Control Non Inverter Mitsubishi / Daikin /
- Indoor Tipe Ceiling Cassette Samsung
3 Pipa Refrigerant
- Tipe ASTM B280 Denji / Kembla
(Straight Length)
4 Pipa Drain
- Tipe PVC AW Rucika / Maspion
5 Isolasi Pipa
- Isolasi Refrigerant Tebal min. 13 mm Armaflex / Aeroflex
- Isolasi Drain Tebal min. 9 mm Armaflex / Aeroflex
PERHITUNGAN TEKNIS
PEKERJAAN :
TABANAN - BALI
PEMILIK :
BAB II
PERHITUNGAN TEKNIS
- Watt/M² = 3,6
Note :
- CU 50 – 65 % Coefisien Of Utilization
- LLF 0,7 – 0,8 Light Loss Factor
- Pijar 11~18 Lumen/watt
- Halogen 16~20 Lumen/watt
- TL Inc. Ballast 50~80 Lumen/watt
- LED 100~160 Lumen/watt
- Mercury Inc. Ballast 30~60 Lumen/watt
- Halide 80~100 Lumen/watt
- Sodium 120~140 Lumen/watt
FAKTOR
BEBAN TYPE KHA AKTUAL
NO PANEL KABEL FEEDER REDUKSI KETERANGAN
TERPASANG PEMASANGAN (A) KHA
SIRKIT
NYY 4 x 25 mm² +
1 KWH – P. First Floor
BC 25 mm²
NYY 4 x 4 mm² +
2 P. First Floor – FB. 2ND Floor
BC 6 mm²
NYY 4 x 4 mm² +
3 P. First Floor – FB. Roof
BC 6 mm²
NYFGBY 4 x 6
4 P. First Floor – P. Pool Pump
mm² + BC 6 mm²
P. First Floor – P. Clean Water NYFGBY 4 x 4
5
Pump mm² + BC 6 mm²
Note :
NO PERHITUNGAN SKEMATIK
2 DARI KWH KE SDP. LANTAI 1
- DAYA KWH = 16.500 VOLTAMPERE P= 16.500 VA
- PANJANG KABEL = 3 METER V= 220 VA
ARUS MAKSIMUM
𝑃 = 25,1 AMPERE KWH L= 3 M
𝐼=
dV = 0,08 %
3𝑥𝑣
SESUAI DENGAN TABEL KHA KABEL DIPILIH
LUAS PENAMPANG KABEL PER PHASE
A = 10 MM2
BERDASARKAN PERHITUNGAN
SDP
1,732 𝑥 𝐿 𝑥 𝐼 𝑥 𝐶𝑜𝑠φ
𝛥𝑣 =
𝑅𝑥𝐴
𝛥𝑣 = 0,19 VOLT
`
𝛥𝑣 = 0,08 %
3 DARI SDP. LANTAI 1 KE DP. R. PENYIMPANAN
- DAYA DP = 361 VOLTAMPERE P= 361 VA
- PANJANG KABEL = V= 220 VA
43 METER
ARUS MAKSIMUM
𝑃 = 1,6 AMPERE
L= 43 M
𝐼= dV = 0,23 %
𝑣
SESUAI DENGAN TABEL KHA KABEL DIPILIH
DP
LUAS PENAMPANG KABEL PER PHASE
A = 4 MM2
BERDASARKAN PERHITUNGAN
2 𝑥 𝐿 𝑥 𝐼 𝑥 𝐶𝑜𝑠φ
𝛥𝑣 =
𝑅𝑥𝐴
𝛥𝑣 = 0,50 VOLT
𝛥𝑣 = 0,23 %
NO PERHITUNGAN SKEMATIK
2 DARI KWH KE SDP. LANTAI 1
- DAYA KWH = 16.500 VOLTAMPERE P= 16.500 VA
- PANJANG KABEL = 3 METER V= 220 VA
ARUS MAKSIMUM
𝑃 = 25,1 AMPERE KWH L= 3 M
𝐼=
dV = 0,08 %
3𝑥𝑣
SESUAI DENGAN TABEL KHA KABEL DIPILIH
LUAS PENAMPANG KABEL PER PHASE
A = 10 MM2
BERDASARKAN PERHITUNGAN
SDP
1,732 𝑥 𝐿 𝑥 𝐼 𝑥 𝐶𝑜𝑠φ
𝛥𝑣 =
𝑅𝑥𝐴
𝛥𝑣 = 0,19 VOLT
𝛥𝑣 = 0,08 %
3 DARI SDP. LANTAI 1 KE DP. R. PENYIMPANAN
- DAYA DP = 361 VOLTAMPERE P= 361 VA
- PANJANG KABEL = V= 220 VA
43 METER
ARUS MAKSIMUM
𝑃 = 1,6 AMPERE
L= 43 M
𝐼= dV = 0,23 %
𝑣
SESUAI DENGAN TABEL KHA KABEL DIPILIH
DP
LUAS PENAMPANG KABEL PER PHASE
A = 4 MM2
BERDASARKAN PERHITUNGAN
2 𝑥 𝐿 𝑥 𝐼 𝑥 𝐶𝑜𝑠φ
𝛥𝑣 =
𝑅𝑥𝐴
𝛥𝑣 = 0,50 VOLT
𝛥𝑣 = 0,23 %
4 TOTAL TEGANGAN SUSUT STANDAR PUIL 2011
𝛥𝑣 TOTAL = 0,69 VOLT 𝛥𝑣 TOTAL MAKS. = 8,80 VOLT
= 0,31 % MAKS. = 4,00 %
SESUAI STANDAR
b. Konstruksi Bangunan
KONTRUKSI BANGUNAN INDEKS B HASIL
Seluruh bangunan terbuat dari logam (mudah menyalurkan
listrik) 0
c. Tinggi Bangunan
TINGGI BANGUNAN (M) INDEKS C HASIL
SAMPAI DENGAN 6 0
12 2 2
17 3
25 4
35 5
50 6
70 7
100 8
140 9
200 10
d. Situasi Bangunan
KONTRUKSI BANGUNAN INDEKS B HASIL
Di tanah datar pada semua ketinggian 0 0
Di kaki bukit sampai tiga perempat tinggi bukit atau di
1
penggunungan sampai 1000 m
DI puncak gunung atau pengunungan lebih dari 1000 m 2
e. Pengaruh Kilat
HARI GURUH PER TAHUN INDEKS B HASIL
2 0
4 1
8 2
16 3
32 4
64 5
128 6
256 7 7
f. Perkiraan Biaya
Ae = A x B + 6 x H x (A+B) + 9 x 3,14 x H2
Ae = 7.921 M²
Radii
A. CCTV
a. Spesifikasi Kamera 1
Dari data diperoleh :
Image sensor size = 1/3 inch
Panjang lensa focal = 2,8 mm
Sudut pandang lensa = 109,0 derajat
Resolusi kamera = 1,3 megapiksel
A = 3,7 m
Area pantau kamera adalah
B = 10,4 m
Nilai piksel per meter pada jarak target
R = 125,308 piksel/meter
diperoleh kategori MENGENALI objek
b. Spesifikasi Kamera 2
Dari data diperoleh :
Image sensor size = 1/3 inch
Panjang lensa focal = 3,6 mm
Sudut pandang lensa = 74,0 derajat
Resolusi kamera = 1,3 megapiksel
= 6.000 GB
= 6,0 TB
7
Garden 7 77 3 230 0,22992
TOTAL 0,23
Evaporation (20%) 0,05
GRAND TOTAL 0,28
ROUNDED 0,50
Diameter ( D ) = 1,00 m
Kedalaman yang direncanakan ( H ) = 2,50 m
Luas alas sumur ( Ah ) = 0,79 m2
Luas dinding sumur ( Av ) = 7,85 m2
Luas total sumur ( A rsp ) = 8,64 m2
Koefisien permeabilitas tanah ( Kh ) = 16,00 cm/jam
= 3,84 m/hari
Koefisien permeabilitas tanah ( Kv=2kh ) = 32,00 cm/jam
= 7,68 m/hari
Koefisien permeabilitas tanah ( K rerata ) = 7,33 m/hari
VI. Menghitung Volume resapan sumur:
AREA
106 5" 2%
186 8" 2%
LUAS UKURAN
TALANG SLOPE
AREA
86 5" 2%
114 5" 2%
LUAS
UKURAN PIPA SLOPE
AREA
244 4" 2%
1156 8" 2%
BANGUNAN B - LANTAI 2 - -
R. RAPAT 1 32 500 15.900 1 18.090 18.090 SPLIT WALL
R. RAPAT 2 21 500 10.500 1 12.200 12.200 SPLIT WALL
R. MANAGER 30 500 15.000 1 18.090 18.090 SPLIT WALL
R. STAFF ADMINISTRASI 19 500 9.700 1 8.900 8.900 SPLIT WALL