Neraca Massa Proses III-1

BAB III
NERACA MASSA PROSES

Kapasitas Produksi = 40000 ton/tahun


= 1 tahun = 330 hari = 121.2121 ton/hari
= 1 hari = 24 jam = 5050.5051 kg/jam
1) Hammer Mill (C-120)
masuk (kg/jam) Keluar (kg/jam)
dari gudang :   ke Rotary Kiln :  
CaCO3 = 6629.4400 CaCO3 = 6629.4400
MgCO3 = 83.5644 MgCO3 = 83.5644
SiO2 = 62.6733 SiO2 = 62.6733
H2O = 188.0198 H2O = 188.0198
Sub Total 6963.6974 Sub Total 6963.6974
       
Recycle :   Recycle :  
CaCO3 = 736.6044 CaCO3 = 736.6044
MgCO3 = 9.2849 MgCO3 = 9.2849
SiO2 = 6.9637 SiO2 = 6.9637
H2O = 20.8911 H2O = 20.8911
Sub Total 773.7442 Sub Total 773.7442
       
Total   7737.4416       7737.4416

2) Rotary Kiln (B-220)


Pra-Rencana Pabrik Kalsium Hidroksida dari Kalsium Karbonat dengan proses
Kalsinasi
Neraca Massa Proses III-2

masuk (kg/jam) keluar (kg/jam)


  ke cyclone :      
CaCO3 6629.4400 CO2(g) 2958.2276
MgCO3 83.5644 H2O(g) 188.0198
SiO2 62.6733 CaO(s) 37.1482
H2O 188.0198 MgO(s) 0.3996
  SiO2(s) 0.6267
  Flue gas 12919.7192
udara 12220.8199   16104.1412
Fuel Oil 698.899295 ke pneumatic conveyor :  
  CaO(s) 3677.6699
  MgO(s) 39.5591
  SiO2(s) 62.0465
    3779.2755
Total :   19883.4167 Total :   19883.4167

3) Cyclone (H-225)
masuk (kg/jam) keluar (kg/jam)
            Top produk      
CO2(g) 2958.2276 CO2(g) 2958.2276
H2O(g) 188.0198 H2O(g) 188.0198
CaO(s) 37.1482 CaO(s) 0.3715
MgO(s) 0.3996 MgO(s) 0.0040
SiO2(s) 0.6267 SiO2(s) 0.0063
Flue gas 12919.7192 Flue gas 12919.7192
      16066.3484
       
    Bottom produk :  
    CaO(s) 36.7767
    MgO(s) 0.3956
    SiO2(s) 0.6205
      37.7927553
                       
Total :   16104.1412 Total :   16104.1412

4) Pneumatic Conveyor (J-231)

Pra-Rencana Pabrik Kalsium Hidroksida dari Kalsium Karbonat dengan proses


Kalsinasi
Neraca Massa Proses III-3

masuk (kg/jam) keluar (kg/jam)


dari Rotary Kiln :     ke Rotary Cooler :    
CaO(s) 3677.6699 CaO(s) 3714.4466
MgO(s) 39.5591 MgO(s) 39.9547
SiO2(s) 62.0465 SiO2(s) 62.6670
       
dari Cyclone :      
CaO(s) 36.7767    
MgO(s) 0.3956    
SiO2(s) 0.6205    
                       
Total :   3817.0683 Total :   3817.0683

5) Rotary Cooler (B-230)


masuk (kg/jam) keluar (kg/jam)
dari belt conveyor (kiln) : ke cyclone :      
CaO(s) 3714.4466 CaO(s) 37.1445
MgO(s) 39.9547 MgO(s) 0.3995
SiO2(s) 62.6670 SiO2(s) 0.6267
    Udara 18371.7087
      18409.8794
udara 18371.7087    
    ke pneumatic conveyor :  
    CaO(s) 3677.3021
    MgO(s) 39.5551
    SiO2(s) 62.0403
      3778.8976
                       
Total :   22188.7770 Total :   22188.7770

6) Cyclone (H-234)

Pra-Rencana Pabrik Kalsium Hidroksida dari Kalsium Karbonat dengan proses


Kalsinasi
Neraca Massa Proses III-4

masuk (kg/jam) keluar (kg/jam)


dari
cooler :       top produk      
CaO(s) 37.1445 CaO(s) 0.3714
MgO(s MgO(s
) 0.3995 ) 0.0040
SiO2(s) 0.6267 SiO2(s) 0.0063
    Udara 18371.7087
    18372.0904
       
Bottom produk
udara 18371.7087 :  
    CaO(s) 36.7730
MgO(s
    ) 0.3956
    SiO2(s) 0.6204
      37.788976
     
Total Total
:   18409.8794 :   18409.8794

7) Pneumatic Conveyor (J-235)


masuk (kg/jam) keluar (kg/jam)
dari Rotary ke
Cooler :   Hydrator :      
CaO(s 3677.30 CaO(s 3714.07
) = 21 ) = 52
MgO( MgO(
s) = 39.5551 s) = 39.9507
SiO2(s SiO2(s
) = 62.0403 ) = 62.6607
       
dari
Cyclone :      
CaO(s
) = 36.7730    
MgO(
s) = 0.3956    
SiO2(s
) = 0.6204    
                       
Total   3816.68 Total   3816.68

Pra-Rencana Pabrik Kalsium Hidroksida dari Kalsium Karbonat dengan proses


Kalsinasi
Neraca Massa Proses III-5

: 66 : 66

8) Hydrator (R-210)
masuk (kg/jam) keluar (kg/jam)
dari conveyor :     ke RDVF :      
CaO(s) 3714.0752 Ca(OH)2 4906.1820
MgO(s) 39.9507 Mg(OH)2 57.7858
SiO2(s) 62.6607 SiO2 62.6607
       
H2O 15266.7463 H2O 14056.8043
                       
total   19083.4329   total 19083.4329

9) Rotary Drum Vacum Filter (H-310)


masuk (kg/jam) keluar (kg/jam)
dari Hydrator :     ke rotary dryer :    
Ca(OH)2 4906.1820 Ca(OH)2 4906.1820
Mg(OH)2 57.7858 Mg(OH)2 57.7858
SiO2 62.6607 SiO2 62.6607
H2O 14056.8043 H2O 251.3314
       
air pencuci 1908.3433 air buangan 15713.8162
                       
total   20991.7762 total   20991.7762

10) Belt Conveyor (J-311)


masuk (kg/jam) keluar (kg/jam)
dari RDVF :       ke Rotary Dryer :    
Ca(OH)2 4906.1820 Ca(OH)2 4906.1820
Mg(OH)2 57.7858 Mg(OH)2 57.7858
SiO2 62.6607 SiO2 62.6607

Pra-Rencana Pabrik Kalsium Hidroksida dari Kalsium Karbonat dengan proses


Kalsinasi
Neraca Massa Proses III-6

H2O   251.3314 H2O   251.3314


      5277.9600       5277.9600

11) Rotary Dryer (B-320)


masuk (kg/jam) keluar (kg/jam)
feed masuk :       ke conveyor :      
Ca(OH)2 4906.1820 Ca(OH)2 4857.1202
Mg(OH)2 57.7858 Mg(OH)2 57.2080
SiO2 62.6607 SiO2 62.0341
H2O 251.3314 H2O 25.1331
       
15540.161
udara panas 3 ke cyclone :
    Ca(OH)2 49.0618
    Mg(OH)2 0.5779
    SiO2 0.6266
    H2O 226.1983
    udara 15540.1613
                       
20818.121
total   3 total   20818.1213

12) Cyclone (H-324)


masuk (kg/jam) keluar (kg/jam)
dari Dryer :       top produk      
Ca(OH)2 49.0618 Ca(OH)2 0.4906
Mg(OH)2 0.5779 Mg(OH)2 0.0058
SiO2 0.6266 SiO2 0.0063
H2O 226.1983 H2O 226.1983
    udara 15540.1613
       
udara 15540.1613 Bottom produk :  
    Ca(OH)2 48.5712

Pra-Rencana Pabrik Kalsium Hidroksida dari Kalsium Karbonat dengan proses


Kalsinasi
Neraca Massa Proses III-7

    Mg(OH)2 0.5721
    SiO2 0.6203
      49.76362
     
Total :   15816.6259 Total :   276.4646

13) Belt Conveyor (J-325)


masuk (kg/jam) keluar (kg/jam)
dari Rotary
Dryer :     ke Cooler :      
Ca(OH) 4857.12 Ca(OH) 4905.69
2 = 02 2 = 14
Mg(OH Mg(OH
)2 = 57.2080 )2 = 57.7800
SiO2 = 62.0341 SiO2 = 62.6545
H2O = 25.1331 H2O = 25.1331
dari Cyclone :      
Ca(OH)
2 = 48.5712    
Mg(OH
)2 = 0.5721    
SiO2 = 0.6203    
                       
5051.25 5051.25
Total :   90 Total :   90

14) Rotary Cooler (B-330)


masuk (kg/jam) keluar (kg/jam)
dari belt conveyor (Dryer) : ke cyclone :      
Ca(OH)2 4905.6914 Ca(OH)2 49.0569
Mg(OH)2 57.7800 Mg(OH)2 0.5778
SiO2 62.6545 SiO2 0.6265
H2O 25.1331 H2O 0.2513
    udara 8151.0401
udara 8151.0401   8201.5527
    ke belt conveyor :  

Pra-Rencana Pabrik Kalsium Hidroksida dari Kalsium Karbonat dengan proses


Kalsinasi
Neraca Massa Proses III-8

    Ca(OH)2 4856.6345
    Mg(OH)2 57.2022
    SiO2 62.0279
    H2O 24.8818
                  4975.8646
Total :   13202.2991 Total :   21403.8518

15) Cyclone (H-333)


masuk (kg/jam) keluar (kg/jam)
dari Cooler :       top produk      
Ca(OH)2 49.0569 Ca(OH)2 0.4906
Mg(OH)2 0.5778 Mg(OH)2 0.0058
SiO2 0.6265 SiO2 0.0063
H2O 0.2513 H2O 0.2513
    udara 8151.0401
      8151.7940
udara 8151.0401 Bottom produk :  
    Ca(OH)2 48.5663
    Mg(OH)2 0.5720
    SiO2 0.6203
      49.7586
     
Total :   8201.5527 Total :   8201.5527

16) Belt Conveyor (J-334)


masuk (kg/jam) keluar (kg/jam)
dari Rotary Cooler :   keluar Conveyor :    
Ca(OH)2 4856.6345 Ca(OH)2 4905.2008
Mg(OH)2 57.2022 Mg(OH)2 57.7743
SiO2 62.0279 SiO2 62.6482
H2O 24.8818 H2O 24.8818

Pra-Rencana Pabrik Kalsium Hidroksida dari Kalsium Karbonat dengan proses


Kalsinasi
Neraca Massa Proses III-9

dari Cyclone :      
Ca(OH)2 48.5663    
Mg(OH)2 0.5720    
SiO2 0.6203    
                       
Total :   5050.5051 Total :   5050.5051

17) Ball Mill (C-340)


masuk (kg/jam) Keluar (kg/jam)
dari
Conveyor :   ke Package  
4905.200 4905.200
Ca(OH)2 8 Ca(OH)2 8
Mg(OH)2 57.7743 Mg(OH)2 57.77425
SiO2 62.6482 SiO2 62.6482
H2O 24.8818 H2O 24.8818
5050.505 5050.505
Sub Total = 1 Sub Total = 1
       
Recycl Recycl
e:   e:  
Ca(OH)2 490.5201 Ca(OH)2 490.5201
Mg(OH)2 5.7774 Mg(OH)2 5.7774
SiO2 6.2648 SiO2 6.2648
H2O 2.4882 H2O 2.4882
Sub Total = 505.0505 Sub Total = 505.0505
       
5555.555 5555.555
Total   6 Total   6