TUGAS SISTEM PENYEDIAAN AIR MINUM

Dosen Pengampu :
Ir. I Gusti Ngurah Kerta Arsana, M.T
Sagung Putri Chandra Astiti, S.T., M.Si.

Oleh :
Ayu Bintang Isti Priyahita Raharja

2105561036

Mata Kuliah :
Sistem Penyediaan Air Minum

PROGRAM STUDI TEKNIK LINGKUNGAN


FAKULTAS TEKNIK
UNIVERSITAS UDAYANA
2022

1
DAFTAR ISI

BAB I.............................................................................................................................. 1
URAIAN RINGKAS SPAM ................................................................................................ 1
1.1 Pengertian Sistem Penyediaan Air Minum ....................................................................... 1
1.2 Persyaratan Sistem Penyediaan Air Minum (SPAM) ......................................................... 2
1.2.1 Persyaratan Kualitas ........................................................................................................................2
1.2.2 Persyaratan Kuantitas......................................................................................................................2
1.2.3 Persyaratan Kontinuitas ..................................................................................................................3
1.2.4 Persyaratan Keterjangkauan ...........................................................................................................3
1.3 Standar Kebutuhan Air Minum ........................................................................................ 3
1.4 Kriteria Perencanaan ....................................................................................................... 4
1.4.1 Unit Air Baku ....................................................................................................................................4
1.4.2 Unit Transmisi ..................................................................................................................................5
1.4.3 Unit Produksi ...................................................................................................................................5
1.4.4 Unit Distribusi ..................................................................................................................................5
1.4.5 Unit Pelayanan ................................................................................................................................5
1.5 Periode Perencanaan ....................................................................................................... 5
1.6 Proyeksi Jumlah Penduduk .............................................................................................. 6
1.6.1 Metode Aritmatik ............................................................................................................................6
1.6.2 Metode Geometri ............................................................................................................................6
1.6.3 Metode Least Square.......................................................................................................................6
1.7 Sistem Jaringan Perpipaan ............................................................................................... 7
1.7.1 Jaringan Pipa Transmisi ...................................................................................................................7
1.7.2 Jaringan Pipa Distribusi....................................................................................................................7

BAB II............................................................................................................................. 8
DATA TEKNIS PERENCANAAN ......................................................................................... 8
BAB III............................................................................................................................ 8
ANALISIS KEBUTUHAN AIR DAN BANGUNAN PENUNJANG ............................................. 9
3.1 Proyeksi Jumlah Penduduk ............................................................................................... 9
3.1.1 Metode Aritmatik ...........................................................................................................................10
3.1.2 Metode Geometrik .........................................................................................................................10
3.1.3 Metode Least Square .....................................................................................................................10
3.1.4 Pemilihan Metode Proyeksi Jumlah Penduduk ..............................................................................12
3.2 Proyeksi Kebutuhan Air ...................................................................................................15
3.2.1 Proyeksi Kebutuhan Air Minum Desa A ..........................................................................................17
3.2.2 Proyeksi Kebutuhan Air Minum Desa B ..........................................................................................20
3.2.3 Proyeksi Kebutuhan Air Minum Desa C ..........................................................................................23
3.2.4 Proyeksi Kebutuhan Air Minum Desa D..........................................................................................26
3.2.5 Proyeksi Kebutuhan Air Minum Desa E ..........................................................................................29
3.2.6 Proyeksi Kebutuhan Air Minum Desa F ..........................................................................................32
3.2.7 Proyeksi Kebutuhan Air Minum Desa G .........................................................................................35
3.3 Kapasitas Reservoir .........................................................................................................38
3.3.1 Volume Reservoir ...........................................................................................................................38
3.3.2 Dimensi Masing – Masing Reservoir...............................................................................................39
3.4 Bangunan Penunjang .................................................................................................40
1
3.4.1 Bak Pelepas Tekan (BPT).................................................................................................................40
3.4.2 Kebutuhan Aksesoris ......................................................................................................................41
3.4.3 Kebutuhan Pompa ..........................................................................................................................42
BAB IV ......................................................................................................................... 44
ANALISIS HIDRAULIKA.................................................................................................. 44
4.1 Estimasi Dimensi Pipa ......................................................................................................44
4.2 Kehilangan Energi ............................................................................................................47
4.2.1. Kehilangan Energi Utama /Mayor (Hf) ..........................................................................................47
4.2.2. Kehilangan Energi Minor ...............................................................................................................48
4.2.3 Kehilangan Energi Minor (Hm) .......................................................................................................48
4.3 Profil Hidraulis .................................................................................................................51
4.4 Analisis Hidraulika pada Sistem Jaringan Pipa dengan WaterNet .....................................53
4.5 Hasil Analisis Hidraulika pada Sistem Jaringan Pipa dengan WaterNet (Aliran Constant) .53
4.5.1 Data Node.......................................................................................................................................54
4.5.2 Data Pipa ........................................................................................................................................54
4.5.3 Data Tangki .....................................................................................................................................55

BAB V .......................................................................................................................... 56
PENUTUP ..................................................................................................................... 56
5.1 Kesimpulan .....................................................................................................................56
DAFTAR PUSTAKA ........................................................................................................ 57

2
BAB I
URAIAN RINGKAS SPAM

1.1 Pengertian Sistem Penyediaan Air Minum


Berdasarkan Peraturan Pemerintah Republik Indonesia No 122 Tahun 2015 Tentang
Sistem Penyediaan Air Minum diuraikan sebagai berikut:
1. Air baku merupakan air yang berasal dari sumber permukaan, air tanah, air hujan dan
air laut yang memenuhi baku mutu tertentu sebagai air baku untuk air minum.
2. Air minum adalah air minum rumah tangga yang melalui proses pengolahan atau tanpa
proses pengolahan yang memenuhi syarat kesehatan dan dapat langsung diminum.
3. Penyediaan air minum merupakan kegiatan penyediaan air minum untuk memenuhi
kebutuhan masyarakat agar mendapatkan kehidupan yang sehat, bersih dan produktif.
4. Sistem penyediaan air minum (SPAM) adalah satu kesatuan sarana dan prasarana
penyediaan air minum.
5. Penyelenggaraan SPAM adalah serangkaian kegiatan dalam melaksanakan
pengembangan dan pengelolaan sarana dan prasarana yang mengikuti proses dasar
manajemen untuk penyediaan air minum kepada masyarakat.
6. Pengembangan SPAM adalah kegiatan yang dilakukan terkait dengan ketersediaan
sarana dan prasarana SPAM dalam rangka memenuhi kuantitas, kualitas, dan
kontinuitas air minum yang meliputi pembangunan baru, peningkatan dan perluasan.
7. Pengelolaan SPAM adalah kegiatan yang dilakukan terkait dengan kemanfaatan fungsi
sarana dan prasarana SPAM yang terbangun, yang meliputi operasi dan pemeliharaan,
perbaikan, peningkatan sumber daya manusia, serta kelembagaan.
Selain itu juga terdapat beberapa sumber landasan hukum yang diterapkan dalam
Sistem Penyediaan Air Minum adalah sebagai berikut:
1. Undang-Undang Republik Indonesia No.17 Tahun 2019 tentang Sumber Daya Air
2. Permen PUPR No.26/PRT/M/2016 tentang Prosedur Operasional Standar Pengelolaan
Sistem Penyediaan Air Minum
3. Peraturan Pemerintah PU No.07/PRT/M/2013 tentang Pedoman Pembinaan
Penyelenggaraan Sistem Penyediaab Air Minum (SPAM) oleh Badan Usaha dan
Masyarakat untuk memenuhi kebutuhan sendiri

1
1.2 Persyaratan Sistem Penyediaan Air Minum (SPAM)

1.2.1 Persyaratan Kualitas


Persyaratan kualitas air minum menurut keputusan Menteri Kesehatan RI adalah sebagai
berikut:
1. Persyaratan Fisik
Syarat fisik air yang layak dikonsumsi adalah jernih atau tidak keruh, karena air yang
keruh adalah air yang di dalamnya terdapat butiran koloid yang berasal dari tanah liat.
Semakin keruh air maka semakin banyak kandungan koloid di dalamnya. Kemudian
tidak berwarna, air yang digunakan sehari-hari terutama untuk minum itu harus jernih.
Karena apabila air itu berwarna berarti air tersebut mengandung bahan-bahan lain yang
dapat mengganggu kesehatan. Syarat fisik air layak konsumsi selanjutnya adalah tidak
berasa/tawar. Persyaratan fisik yang lain adalah tidak berbau, air yang baik adalah air
yang tidak berbau saat dicium baik dari jarak yang jauh maupun dari jarak yang dekat.
2. Persyaratan Kimia
Persyaratan kimia pertama yang harus dipenuhi adalah berdasarkan kandungan pH atau
tingkat keasamannya. PH sangat penting dalam proses pemurnian air karena keasaman
air sering dihasilkan oleh gas oksida yang terlarut dalam air, terutama karbon dioksida.
Efek kesehatan adalah penyimpangan dari baku mutu air minum pH di bawah 6,5 dan di
atas 9,2 yang dapat mengakibatkan terjadinya transformasi beberapa senyawa kimia
menjadi zat beracun yang sangat berbahaya bagi kesehatan. Yang kedua adalah
kesadahan, ada dua jenis kesadahan yaitu kesadahan sementara dan kesadahan non-
karbonat atau kesadahan permanen. Konsentrasi kalsium dalam air minum di bawah 75
mg/l dapat menyebabkan penyakit tulang rapuh, sedangkan konsentrasi di atas 200 mg/l
dapat menyebabkan korosi pipa air. Persyaratan kimia lainnya adalah kandungan besi
dalam air. Air yang mengandung besi akan menguning dan menimbulkan rasa logam
pada air. Batas maksimum logam besi yang ada dalam air adalah 0,1 mg/l. Selain besi,
kandungan aluminium tidak ditemukan dalam air, batas maksimumnya adalah 0,2 mg/l
3. Persyaratan Biologi
Syarat air layak konsumsi berdasarkan mikrobiologinya adalah air yang tidak
mengandung kuman yang dapat menyebabkan penyakit berbahaya seperti tifus, infeksi,
kolera, dan lainnya.

1.2.2 Persyaratan Kuantitas


Persyaratan kuantitas untuk penyediaan air bersih yang dimaksud adalah dengan

2
melihat dari banyaknya air baku yang tersedia dan dapat digunakan untuk memenuhi
kebutuhan daerah pelayanan beserta jumlah penduduk yang akan dilayani. Kuantitas air
dapat ditinjau sesuai standar debit air baku yang akan dialirkan ke konsumen sesuai
dengan jumlah kebutuhan air bersih. Berdasarkan Peraturan Menteri Dalam Negeri
Nomor 23 tahun 2006 tentang Pedoman Teknis dan tata Cara Pengaturan Tarif Air
Minum, dikatakan standar kebutuhan pokok air sebesar 60 liter/orang/hari.

1.2.3 Persyaratan Kontinuitas


Kontinuitas ketersediaan air bersih merupakan pertimbangan penting dalam
perencanaan sistem penyediaan air minum. Air Minum diupayakan harus dapat
melayani dengan kestabilan debit tanpa terhalang cuaca dan musim. Namun kondisi ini
masih belum dapat diupayakan di Indonesia karena beberapa hal, maka penulis
menawarkan alternatif kontinuitas lain. Artinya bahwa air minum harus tersedia 24 jam
sehari atau kapanpun ketika dibutuhkan terutama pada saat jam aktivitas yaitu 06:00-
17:00.

1.2.4 Persyaratan Keterjangkauan


Keterjangkauan yang dimaksud adalah sumber air yang mudah dijangkau dan
didapatkan oleh penduduk di daerah pelayanan sehingga pelayanan dapat diteruskan
sampai jangka waktu yang ditentukan.

1.3 Standar Kebutuhan Air Minum


Kebutuhan air bersih suatu daerah Ibu Kota Kecamatan (IKK) dianalisa
berdasarkanbeberapa pertimbangan, antara lain:
A. Jumlah penduduk saat perencanaan sampai dengan 12 tahun perencanaan.
B. Target perencanaan yaitu menemukan proyeksi kebutuhan air minum di wilayah
perencanaan melalui tahap penentuan kapasitas reservoir dan bangunan penunjang yang
dibutuhkan sesuai dengan anjuran pemerintah.
C. Jenis pelayanan dan satuan kebutuhan air untuk:
1) Keperluan rumah tangga
2) Fasilitas perdagangan, sosial, maupun industri.
3) dan beberapa kebutuhan khusus lainnya.
4) Kebutuhan air suatu daerah bisa bervariasi sesuai kebutuhan rata-rata dan
puncak.
Kehilangan air yang dapat disebabkan oleh faktor teknis yang meliputi kebocoran pipa,

3
kerusakan meter air dan faktor alat lain, maupun non teknis meliputi kesalahan
perancangan alat hitung dan lain-lain.

1.4 Kriteria Perencanaan


Perencanaan Sistem Penyediaan Air Minum yang dilakukan melalui sistem jaringan
perpipaan terdiri atas beberapa unit penyusun yaitu unit air baku, unit produksi, unit distribusi,
dan unit pelayanan. Berikut adalah skema unit- unit sistem penyediaan air minum (SPAM) :

1.4.1 Unit Air Baku


Menurut Permen PUPR 27 Tahun 2016, unit air baku adalah sarana dan prasarana
pengambilan dan/atau penyedia air baku, meliputi bangunan penampungan air, bangunan
pengambilan/penyadapan, alat pengukuran, dan 12 peralatan pemantauan, sistem
pemompaan, dan/atau bangunan sarana pembawa serta perlengkapannya.
A. Sumber Air
Air baku adalah air yang disalurkan selama penyediaan air bersih/konsumsi yang
harus memenuhi baku mutu tertentu sebagai bahan baku air bersih/konsumsi. Air baku
dapat diperoleh dari sejumlah sumber air seperti air hujan, tanah, sungai dan air
permukaan.
B. Air permukaan
Air permukaan adalah air yang berada di permukaan bumi dan tidak meresap ke
dalam tanah. Air sungai merupakan sumber air alternatif yang lebih mudah diperoleh
karena aksesnya yang mudah dan dekat dengan pemukiman masyarakat.
C. Air hujan
Air baku yang diambil dari air hujan sering digunakan sebagai suplemen daripada
sumber utama. Oleh karena itu, penggunaannya sebagai sumber air baku terbatas pada
daerah yang curah hujannya tinggi.
D. Air tanah
Air tanah merupakan air yang terdapat dalam lapisan tanah. Lapisan yang
dimaksud disebut akuifer, yang mampu menampung air dalam kuantitas besar. Pada
beberapa daerah tertentu air tanah sering dimanfaatkan sebagai sumber air baku
mengingat kuantitasnya besar. Kuantitas dan kontinuitas air tanah dipengaruhi oleh
luasnya daerah resapan, sehingga berkurangnya ruang resapan mengakibatkan kuantitas
dan kontinuitasnya juga berkurang.

4
1.4.2 Unit Transmisi
Transmisi Unit transmisi berfungsi untuk menyalurkan air hasil olahan dari unit
produksi ke reservoir atau untuk menyalurkan aliran air baku ke unit produksi. Saluran
transmisi terbagi menjadi dua jenis aliran diantaranya
a. Saluran transmisi untuk aliran bebas/tidak bertekanan. Saluran ini terdiri dari
beberapa macam bentuk, diantaranya open canals, aquaduct, tunnels, dan lain
sebagainya.
b. Saluran transmisi untuk aliran bertekanan.

1.4.3 Unit Produksi


Perencanaan teknis pengembangan SPAM unit produksi disusun berdasarkan
kajian kualitas air yang akan diolah, dimana kondisi rata-rata dan terburuk yang mungkin
terjadi dijadikan sebagai acuan dalam penetapan proses pengolahan air yang kemudian
dikaitkan dengan sasaran standar kualitas air minum yang akan dicapai. Rangkaian
proses pengolahan air umumnya terdiri dari satuan operasi dan satuan proses untuk
memisahkan material kasar, material tersuspensi, material terlarut, proses netralisasi dan
proses desinfeksi. Unit produksi dapat terdiri dari unit koagulasi, flokulasi, sedimentasi,
filtrasi, netralisasi, dan desinfeksi (Permen PUPR No 27 Tahun 2016).

1.4.4 Unit Distribusi


Tujuan pengoprasian unit distribusi ini untuk mengalirkan air hasil olahan
keseluruh jaringan distribusi sampai disemua unit pelayanan sesuai dengan strander
pelayanan yang telah di tetapkan baik dari segi kuantitas, kualitas, kontinuitas, dan
keterjangkauan, yang memberikan jaminan pengaliran 24 jam per hari.

1.4.5 Unit Pelayanan


Pengoprasian unit pelayanan meliputi kegiatan pelayanan untuk domestik yaitu,
sambungan rumah, sambungan halaman, hidram umum dan terminal air, nondomestic
yaitu industry kecil, industry besar, restoran, hotel, perkantoran, rumah sakit, dan hidran
kebakaran.

1.5 Periode Perencanaan


Periode perencanaan rencana induk pengembangan SPAM adalah 15 tahun. Rencana
induk pengembangan SPAM harus dikaji ulang setiap 5 tahun atau dapat dirubah bila ada hal-
hal khusus dengan memperhatikan pertimbangan penataan ruang wilayah nasional, provinsi,
kabupaten, dan kota.

5
1.6 Proyeksi Jumlah Penduduk
Pertumbuhan penduduk adalah perubahan atau pertambahan jumlah penduduk di sebuah
wilayah tertentu pada waktu tertentu, dari waktu sebelumnya. Perubahan Penduduk ini
dipengaruhi oleh kelahiran, kematian, dan migrasi. Perhitungan proyeksi jumlah penduduk
dilakukan untuk memprediksi kebutuhan air di masa yang akan dating. Beberapa metodenya,
antara lain:

1.6.1 Metode Aritmatik


Metode ini adalah metode paling baik untuk perhitungan waktu jangka pendek.
Persamaan nya adalah: Pn = Po + (r.n)
Dimana:
Pn : jumlah penduduk pada tahun ke-n (jiwa)
Po : jumlah penduduk pada tahun awal (jiwa)
n : periode waktu proyeksi
r : rata-rata pertumbuhan penduduk per tahun (jiwa)

1.6.2 Metode Geometri


Metode ini menganggap bahwa perkembangan atau jumlah penduduk akan
bertambah secara otomatis dengan sendirinya dan tidak memperhatikan penurunan
jumlah penduduk. Persamaan yang digunakan adalah:
Pn = Po (1 + r) n
Dimana:
Pn : jumlah penduduk pada tahun ke-n (jiwa)
Po : jumlah penduduk pada tahun awal (jiwa)
n : periode waktu proyeksi
r : rata-rata pertumbuhan penduduk per tahun (jiwa)

1.6.3 Metode Least Square


Metode ini merupakan metode regresi untuk mendapatkan hubungan antara sumbu
Y dan sumbu X dimana Y adalah jumlah penduduk dan X adalah tahunnya dengan cara
menarik garis linier antara data-data tersebut dan meminimumkan jumlah pangkat dua
dari masing-masing penyimpangan jarak data-data dengan garis yang dibuat. Persamaan
yang digunakan adalah:
Pn = a + (b.n)
Dimana:
Pn : Jumlah penduduk tahun ke-n (jiwa)

6
n : beda tahun yang dihitung tahun awal
a dan b: konstanta dimana:
(∑#)%∑& ' ()(∑&)(∑#)
a= * .(∑& ' ))(∑&)'

* .(∑& .#))(∑&)(∑#)
b= * .(∑& ' ))(∑&)'

1.7 Sistem Jaringan Perpipaan


Dalam sebuah sistem penyediaan air minum terdapat dua buah jaringan perpipaan yang
mengalirkan air dari sumber air sampai ke daerah pelayanan yaitu:

1.7.1 Jaringan Pipa Transmisi


Jaringan pipa transmisi merupakan jaringan perpipaan yang membawa air baku dari
tempat pengambilan menuju unit produksi dan membawa air hasil olahan unit produksi
menuju reservoir.

1.7.2 Jaringan Pipa Distribusi


Jaringan pipa distribusi berfungsi untuk mengalirkan air dari unit produksi
pelanggan. Jenis pipa yang biasanya digunakan sebagai pipa transmisi air baku maupun
pipa distribusi air minum, antara lain:
1. Pipa Plastik (PVC)
2. Pipa HDPE (High Density Polyetylene)
3. Pipa Besi Galvanis (Galvanized Iron Pipe)
4. Pipa Besi Tuang (Cost Iron)
5. Pipa

7
BAB II
DATA TEKNIS PERENCANAAN

Suatu Ibu Kota Kecamatan (IKK) ingin membangun Sistem Penyediaan Air
Minum (SPAM) dengan data teknis sebagai berikut :

1. Elevasi Sumber Air Type I : + 330 dpl


2. Reservoir Transmisi : berada di Sta 0 + 00
3. Panjang pipa dari sumber mata air dengan Rsv. Transmisi : 1050 m
4. Wilayah pelayanan : 7 (tujuh) daerah Perdesaan
5. Unit produksi : Reservoir I dan Reservoir II
6. Pipa Transmisi : PN 10 – PN 12
7. Pipa Distribusi : PN (6 – 8)
8. Sistim pengaliran dari sumber Mata Air ke rsv. Transmisi : pompa
9. Sistem pengaliran dari Rsv. Transmisi – R. Distribusi : gravitasi
10. System pengaliran Distribusi : gravitasi
11. Bangunan Penunjang : BPT/PRV dan Aksesoris Pipa
(gate valve, wash out, air valve)
12. Data Jumlah penduduk wilayah perencanaan :
Jumlah Penduduk (jiwa)
Wilayah
2017 2018 2019 2020 2021

Desa A 2145 2335 2578 2765 2925

Desa B 1638 1733 1745 1790 1815

Desa C 1738 1822 1869 2022 2208

Desa D 1838 1933 1945 2090 2115

Desa E 2245 2335 2478 2565 2625

Desa F 1638 1722 1769 1822 1908

Desa G 1738 1933 1945 2090 2115

Tabel 2.1 Jumlah Penduduk Wilayah Perencanaan


13. Konsumsi Air Rumah Tangga : 115- liter/orang/hari
14. Periode perencanaan : 15 tahun
BAB III

8
ANALISIS KEBUTUHAN AIR DAN BANGUNAN PENUNJANG

3.1 Proyeksi Jumlah Penduduk


Data jumlah penduduk dan pertumbuhan penduduk Kecamatan (IKK) dapat
dilihat pada tabel berikut.

Jumlah Penduduk
No Wilayah Satuan 2017 2018 2019 2020 2021
1 Desa A Jiwa 2145 2335 2578 2765 2925
2 Desa B Jiwa 1638 1733 1745 1790 1815
3 Desa C Jiwa 1738 1822 1869 2022 2208
4 Desa D Jiwa 1838 1933 1945 2090 2115
5 Desa E Jiwa 2245 2335 2478 2565 2625
6 Desa F Jiwa 1638 1722 1769 1822 1908
7 Desa G Jiwa 1738 1933 1945 2090 2115
Jumlah Jiwa 12.980 13.813 14.329 15.144 15.711
Pertumbuhan % - 0,06 0,03 0,05 0,03
Penduduk
Tabel 3.1 Jumlah Penduduk Masing – Masing Desa

Dari tabel diatas diperoleh :

a. Pertumbuhan penduduk rata-rata dari tahun 2017-2021 adalah :

-.)-/ .2.3..)./.456
Ka = = = 683 :;<=/?=ℎAB
0.)0/ /6/.)/6.3

b. Presentase pertambahan penduduk rata-rata per tahun :

6,6DE6,6FE6,62E6,6F
r= G
= 4,25 %

9
3.1.1 Metode Aritmatik
Dengan mengacu pada jumlah data penduduk tahun 2021, maka dilakukan
pendekatan perhitungan mundur dengan metode aritmatik pada jumlah penduduk
per tahun dari tahun 2021-2017 sebagai berikut :

Pn = Po + Ka (Tn – To)

Dimana,

P0 = N2021 = 15.711

P= = 683 jiwa/tahun
Maka didapat,
N2017 = 15.711 + 683 (2017-2021)

= 13.159 jiwa

3.1.2 Metode Geometrik


Dengan mengacu pada jumlah data penduduk tahun 2021, maka dilakukan
pendekatan perhitungan mundur dengan metode geometrik pada jumlah penduduk
per tahun dari tahun 2021-2017 sebagai berikut :

Pn = Po ( 1 + S )n
Dimana,
N0 = N2021 = 15.711

r = 4,25% = 0,0425%
Maka didapat,
P2017 = Po / ( 1 + r )n
= 15.892 / ( 1 + 0,0425)(2021−2017)
= 13.059 jiwa

3.1.3 Metode Least Square


Dengan mengacu pada jumlah data penduduk tahun 2021, maka dilakukan
pendekatan perhitungan mundur dengan metode least square pada jumlah penduduk
per tahun dari tahun 2021-2017 sebagai berikut :

10
NB = = + (W. X)

Dimana,
(∑Y)%∑Z[ ()(∑Z)(∑Y)
a= \ .(∑Z[ ))(∑Z)[

\ .(∑Z .Y))(∑Z)(∑Y)
b=
\ .(∑Z[ ))(∑Z)[

Untuk mencari nilai a dan b, terlebih dahulu dilakukan perhitungan untuk mencari
nilai x dan y yang ditampilkan pada tabel berikut.

Tahun Jumlah
Tahun ke x.y
Penduduk ][
(x) (y)
2017 1 12.980 12.980 1
2018 2 13.813 27.626 4
2019 3 14.329 42.987 9
2020 4 15.144 60.576 16
2021 5 15.711 78.555 25
Jumlah 15 71.977 222.72 55
4
Mean 3 14.329 42.987 11
Tabel 3.2 Proyeksi Penduduk Metode Least Square

Sehingga :

* .(∑& .#))(∑&)(∑#) 2.(///.3/G)).2(3..433)


b= = = 679,3
* .(∑& ' ))(∑&)' 2(22))(.2)'

a = ^̇ − W. Ẋ
Maka didapat :
= 14.329 – 679,3 (3)

= 12.291,1

Maka Didapat :
P2017 =12.291,1 + 679,3 x (2017 − 2017)
= 12,291 jiwa

11
3.1.4 Pemilihan Metode Proyeksi Jumlah Penduduk
Berikut ini merupakan hasil proyeksi perhitungan mundur jumlah
penduduk dari masing – masing metode :

Tahun Statistik Hasil Perhitungan Mundur


Jumlah Aritmatik Geometrik Least Square
(x)
Penduduk (y)
2017 12.980 13.159 13.301 12.291
2018 13.813 13.662 13.867 12.974
2019 14.329 14.345 14.456 13.650
2020 15.144 15.028 15.070 14.329
2021 15.711 15.711 15.711 15.008
Tabel 3.3 Data Proyeksi Penduduk Menggunakan 3 Metode

Dari ketiga hasil perhitungan mundur diatas, selanjutnya dihitung nilai


standar deviasi dari ketiga metode tersebut dengan rumus :

∑(ij)i)'
S=h *
dimana n < 15

Hasil perhitungan selengkapnya dapat dilihat pada tabel berikut.

A. Standar Deviasi dari Hasil Perhitungan Metode Aritmatik


Statistik Hasil
Tah Jumlah Perhitungan
Tahu kl − (kl − kmno\)[
n un Pendud Aritmatik kmno\
ke uk (yi)
(x) (y)
2017 1 12.980 13.159 -1.236 1.527.696
2018 2 13.813 13.662 -733 537.289
2019 3 14.329 14.345 -50 2.500
2020 4 15.144 15.028 633 400.689
2021 5 15.711 15.711 1.316 1.731.856
Juml - 71.977 - - 4.200.030
ah
Mean - 14.395 - - -
S - - - 916,5

Tabel 3.4 Standar Deviasi Metode Aritmatik

12
A. Standar Deviasi dari Hasil Perhitungan Metode Geometrik
Statistik Hasil
Tahu Jumlah Perhitungan
Tahun kl − (kl −
n ke Penduduk Geometrik kmno\ kmno\)[
(x) (y) (yi)
2017 1 12.980 13.301 -1.094 1.196.836
2018 2 13.813 13.867 -528 278.784
2019 3 14.329 14.456 61 3.721
2020 4 15.144 15.070 675 455.625
2021 5 15.711 15.711 1.316 1.731.856
Jumlah - 71.977 - - 3.666.822
Mean - 14.395 - - -
S - - - 856,3
Tabel 3.5 Standar Deviasi Metode Geometrik

B. Standar Deviasi dari Hasil Perhitungan Metode Least Square


Statistik Hasil
Tahun Jumlah Perhitungan
Tahun kl − (kl −
ke (x) Penduduk Least kmno\ kmno\)[
(y) Square (yi)
2017 1 12.980 12.291 -2.104 4.426.816
2018 2 13.813 12.974 -1.421 2.019.241
2019 3 14.329 13.650 -745 555.025
2020 4 15.144 14.329 -3 9
2021 5 15.711 15.008 613 375.769
Jumlah - 71.977 - - 7.376.860
Mean - 14.395 - - -
S - - - 1.214,6
Tabel 3.6 Standar Deviasi Metode Least Square

13
Dari hasil perhitungan standar deviasi ketiga metode proyeksi, didapat
standar deviasi dengan metode Geometrik yang mempunyai nilai terkecil yaitu
856,3 sehingga metode proyeksi untuk jumlah penduduk yang digunakan adalah
metode geometrik. Perkiraan jumlah penduduk 15 tahun mendatang dengan metode
geometrik dapat dilihat pada tabel berikut.
Perkiraan Jumlah
Tahun
Penduduk (Jiwa)
2022 16.378
2023 17.074
2024 17.799
2025 17.830
2026 18.587
2027 19.376
2028 20.199
2029 21.057
2030 21.951
2031 22.883
2032 23.855
2033 24.868
2034 25.924
2035 27.025
2036 28.173
Tabel 3.7 Perkiraan Jumlah Penduduk 15 Tahun Mendatang

14
3.2 Proyeksi Kebutuhan Air
Dalam perencanaan suatu sistem penyediaan air minum, proyeksi kebutuhan air
dihitung berdasarkan proyeksi jumlah penduduk, pemakaian air domestik dan non domestik,
kehilangan air dan fluktuasi pemakaian air. Penyediaan air baku di daerah studi direncanakan
untuk memenuhi kebutuhan air baku meliputi air bersih untuk masing-masing desa.
Pemakaian air digunakan sebagai gambaran untuk menetapkan kebutuhan air setiap
orang per liter per hari pada masing-masing layanan di Kecamatan (IKK). Standar
perencanaan konsumsi air yang digunakan sebesar 125 liter/orang/hari untuk Kabupaten
(IKK) dari Desa A-Desa G sesuai pada tabel.
Estimasi kebutuhan air bersih dapat ditentukan sebagai berikut :
a. Jumlah Penduduk Kecamatan (IKK) yang terlayani adalah 95 % dari jumlah
penduduk Kecamatan (IKK) total.
b. Pemakaian air yang digunakan yaitu 115 liter/orang/hari sesuai dengan standar
yang telah ditetapkan.
c. Kehilangan air diasumsikan 20% dari jumlah kebutuhan non domestik.
Proyeksi kebutuhan air bersih direncanakan sampai tahun 2036 yang dihitung
berdasarkan jumlah penduduk Kecamatan (IKK) meliputi jumlah penduduk Desa A,
Desa B, Desa C, Desa D, Desa E, Desa F, Desa G..

15
Jumlah
Penduduk Proyeksi Penduduk Metode Geometrik (Jiwa)
No Desa
(jiwa)
2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036

1 Desa A 2925 3142 3375 3626 3895 4184 4495 4829 5188 5573 5987 6425 6903 7416 7967 8559
2 Desa B 1815 1860 1906 1953 2002 2052 2103 2155 2209 2264 2320 2378 2437 2498 2560 2642

3 Desa C 2208 2335 2469 2609 2690 2759 2918 3086 3264 3452 3651 3865 4088 4324 4573 4837

4 Desa D 2115 2195 2278 2365 2455 2548 2645 2746 2850 2958 3070 3187 3308 3434 3565 3701
5 Desa E 2625 2714 2806 2901 2999 3101 3206 3315 3428 3574 3695 3820 3950 4084 4223 4367
6 Desa F 1908 1988 2062 2138 2217 2299 2384 2472 2564 2659 2758 2860 2966 3076 3190 3308
7 Desa G 2115 2214 2318 2426 2540 2659 2783 2913 3049 3192 3342 3499 3663 3835 4015 4203

Jumlah 15711 16448 17214 18018 18798 19602 20534 21516 22552 23672 24823 26034 27315 28667 30093 31617

Tabel 3.8 Proyeksi Penduduk 15 Tahun Kedepan Menggunakan Metode Geometrik

16
3.2.1 Proyeksi Kebutuhan Air Minum Desa A

No Keterangan Satuan Jumlah


1 Total Pengguna (P) jiwa 2.925
2 Pengguna Terlayani (P1) P1 = 75% x P
jiwa 2,194
3 Kebutuhan Air Domestik (D1)
""$%/'()/* l/dt 3,70
!" = +,×./00 × 1"

4 Kebutuhan Air Non Domestik (D2)


D2 = 20 % x D1 l/dt 0,74
5 Kehilangan Air (H)
H = 20% x (D1+ D2) l/dt 0,89
6 Kebutuhan Air Rata-Rata (D)
D = D1+ D2 + H l/dt 5,33
7 Kebutuhan Air Hari Maksimum (Hari Max)
Hari Max = 1,15 x D l/dt 6,13
8 Kebutuhan Air Jam Puncak Jam
Puncak = 1,75 x D l/dt 9,33
Tabel 3.9 Proyeksi Kebutuhan Air Minum Desa A 2022

17
No Keterangan Satuan
Tahun Proyeksi

2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036
A Pengguna

1 Jumlah jiwa
2925 3142 3375 3626 3895 4184 4495 4829 5188 5573 5987 6425 6903 7416 7967
Pengguna
2 Tingkat %
Pelayanan 75 75 75 75 85 85 85 85 95 95 95 95 95 95 95
3 Pengguna jiwa
Terlayani 2,194 2,357 2,531 2,720 3,311 3,556 3,821 4,105 4,929 5,294 5,688 6,104 6,558 7,045 7,569
B Kebutuhan
Domestik
1 Pemakaian l/h
per orang 115 115 115 115 115 115 115 115 115 115 115 115 115 115 115

2 Kebutuhan l/dt
Domestik 2.92 3.14 3.37 3.62 4.41 4.73 5.09 5.46 6.56 7.05 7.57 8.12 8.73 9.38 10.07

C Kebutuhan
Non
Domestik
(0.2 dari l/dt
kebutuhan 0.58 0.63 0.67 0.72 0.88 0.95 1.02 1.09 1.31 1.41 1.51 1.62 1.75 1.88 2.01
domestik)
D Kebutuhan
Air Total
(D1 + D2) l/dt 3.50 3.76 4.04 4.34 5.29 5.68 6.10 6.56 7.87 8.46 9.08 9.75 10.47 11.25 12.09
E Kehilangan
Air

18
Kehilangan %
20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
Air
Jumlah l/dt
Kehilangan 0.70 0.75 0.81 0.87 1.06 1.14 1.22 1.31 1.57 1.69 1.82 1.95 2.09 2.25 2.42
Air
F Kebutuhan
Air Rata-
Rata
(D1+D2+H) l/dt 4.20 4.52 4.85 5.21 6.35 6.82 7.32 7.87 9.45 10.15 10.90 11.70 12.57 13.50 14.51
G Kebutuhan
Hari
Maksimum
Faktor
1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15
Koefisien
Kebutuhan l/dt
4.84 5.19 5.58 5.99 7.30 7.84 8.42 9.05 10.86 11.67 12.54 13.45 14.45 15.53 16.68
Air
H Kebutuhan
Jam
Puncak
Faktor
1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75
Koefisien
Kebutuhan l/dt
7.36 7.90 8.49 9.12 11.10 11.93 12.82 13.77 16.53 17.76 19.08 20.47 22.00 23.63 25.39
Air

Tabel 3.10 Proyeksi Kebutuhan Air Minum Desa A 15 tahun

19
3.2.2 Proyeksi Kebutuhan Air Minum Desa B

No Keterangan Satuan Jumlah


1 Total Pengguna (P) jiwa 1.815
2 Pengguna Terlayani (P1) P1 = 75% x P
jiwa 1,361
3 Kebutuhan Air Domestik (D1)
""$%/'()/* l/dt 2,29
!" = +,×./00 × 1"

4 Kebutuhan Air Non Domestik (D2)


D2 = 20 % x D1 l/dt 0,45
5 Kehilangan Air (H)
H = 20% x (D1+ D2) l/dt 0,55
6 Kebutuhan Air Rata-Rata (D)
D = D1+ D2 + H l/dt 3,29
7 Kebutuhan Air Hari Maksimum (Hari Max)
Hari Max = 1,15 x D l/dt 3,78
8 Kebutuhan Air Jam Puncak Jam
Puncak = 1,75 x D l/dt 5,75
Tabel 3.11 Proyeksi Kebutuhan Air Minum Desa B 2022

20
No Keterangan Satuan
Tahun Proyeksi

2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036
A Pengguna

1 Jumlah jiwa
1815 1860 1906 1953 2002 2052 2103 2155 2209 2264 2320 2378 2437 2498 2560
Pengguna
2 Tingkat %
Pelayanan 75 75 75 75 85 85 85 85 95 95 95 95 95 95 95
3 Pengguna jiwa
Terlayani 1,361 1,395 1,430 1,465 1,702 1,744 1,788 1,832 2,099 2,151 2,204 2,259 2,315 2,373 2,432
B Kebutuhan
Domestik
1 Pemakaian l/h
per orang 115 115 115 115 115 115 115 115 115 115 115 115 115 115 115

2 Kebutuhan l/dt
Domestik 1.81 1.86 1.90 1.95 2.26 2.32 2.38 2.44 2.79 2.86 2.93 3.01 3.08 3.16 3.24

C Kebutuhan
Non
Domestik
(0.2 dari l/dt
kebutuhan 0.36 0.37 0.38 0.39 0.45 0.46 0.48 0.49 0.56 0.57 0.59 0.60 0.62 0.63 0.65
domestik)
D Kebutuhan
Air Total
(D1 + D2) l/dt 2.17 2.23 2.28 2.34 2.72 2.79 2.86 2.93 3.35 3.44 3.52 3.61 3.70 3.79 3.88
E Kehilangan
Air

21
Kehilangan %
20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
Air
Jumlah l/dt
Kehilangan 0.43 0.45 0.46 0.47 0.54 0.56 0.57 0.59 0.67 0.69 0.70 0.72 0.74 0.76 0.78
Air
F Kebutuhan
Air Rata-
Rata
(D1+D2+H) l/dt 2.61 2.67 2.74 2.81 3.26 3.34 3.43 3.51 4.02 4.12 4.22 4.33 4.44 4.55 4.66
G Kebutuhan
Hari
Maksimum
Faktor
1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15
Koefisien
Kebutuhan l/dt
3.00 3.07 3.15 3.23 3.75 3.84 3.94 4.04 4.63 4.74 4.86 4.98 5.10 5.23 5.36
Air
H Kebutuhan
Jam
Puncak
Faktor
1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75
Koefisien
Kebutuhan l/dt
4.57 4.68 4.79 4.91 5.71 5.85 6.00 6.14 7.04 7.21 7.39 7.58 7.77 7.96 8.16
Air
Tabel 3.12 Proyeksi Kebutuhan Air Minum Desa B 15 Tahun

22
3.2.3 Proyeksi Kebutuhan Air Minum Desa C

No Keterangan Satuan Jumlah


1 Total Pengguna (P) jiwa 2.208
2 Pengguna Terlayani (P1) P1 = 75% x P
jiwa 1,656
3 Kebutuhan Air Domestik (D1)
""$%/'()/*
!" = +,×./00 × 1" l/dt 2,79

4 Kebutuhan Air Non Domestik (D2)


D2 = 20 % x D1 l/dt 0,56
5 Kehilangan Air (H)
H = 20% x (D1+ D2) l/dt 0,67
6 Kebutuhan Air Rata-Rata (D)
D = D1+ D2 + H l/dt 4,02
7 Kebutuhan Air Hari Maksimum (Hari Max)
Hari Max = 1,15 x D l/dt 4,62
8 Kebutuhan Air Jam Puncak Jam
Puncak = 1,75 x D l/dt 7,03

Tabel 3.13 Proyeksi Kebutuhan Air Minum Desa C 2022

23
No Keterangan Satuan
Tahun Proyeksi

2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036
A Pengguna

1 Jumlah jiwa
2208 2335 2469 2609 2690 2759 2918 3086 3264 3452 3651 3865 4088 4324 4573
Pengguna
2 Tingkat %
Pelayanan 75 75 75 75 85 85 85 85 95 95 95 95 95 95 95
3 Pengguna jiwa
Terlayani 1,656 1,751 1,852 1,957 2,287 2,345 2,480 2,623 3,101 3,279 3,468 3,672 3,884 4,108 4,344
B Kebutuhan
Domestik
1 Pemakaian l/h
per orang 115 115 115 115 115 115 115 115 115 115 115 115 115 115 115

2 Kebutuhan l/dt
Domestik 2.20 2.33 2.46 2.60 3.04 3.12 3.30 3.49 4.13 4.36 4.62 4.89 5.17 5.47 5.78

C Kebutuhan
Non
Domestik
(0.2 dari l/dt
kebutuhan 0.44 0.47 0.49 0.52 0.61 0.62 0.66 0.70 0.83 0.87 0.92 0.98 1.03 1.09 1.16
domestik)
D Kebutuhan
Air Total
(D1 + D2) l/dt 2.65 2.80 2.96 3.13 3.65 3.75 3.96 4.19 4.95 5.24 5.54 5.86 6.20 6.56 6.94
E Kehilangan
Air

24
Kehilangan %
20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
Air
Jumlah l/dt
Kehilangan 0.53 0.56 0.59 0.63 0.73 0.75 0.79 0.84 0.99 1.05 1.11 1.17 1.24 1.31 1.39
Air
F Kebutuhan
Air Rata-
Rata
(D1+D2+H) l/dt 3.17 3.36 3.55 3.75 4.38 4.49 4.75 5.03 5.94 6.29 6.65 7.04 7.44 7.87 8.33
G Kebutuhan
Hari
Maksimum
Faktor
1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15
Koefisien
Kebutuhan l/dt
3.65 3.86 4.08 4.31 5.04 5.17 5.47 5.78 6.83 7.23 7.65 8.09 8.56 9.05 9.58
Air
H Kebutuhan
Jam
Puncak
Faktor
1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75
Koefisien
Kebutuhan l/dt
5.55 5.87 6.21 6.56 7.67 7.87 8.32 8.80 10.40 11.00 11.63 12.32 13.03 13.78 14.57
Air
Tabel 3.13 Proyeksi Kebutuhan Air Minum Desa C 15 Tahun

25
3.2.4 Proyeksi Kebutuhan Air Minum Desa D

No Keterangan Satuan Jumlah


1 Total Pengguna (P) jiwa 2115
2 Pengguna Terlayani (P1) P1 = 75% x P
jiwa 1,586
3 Kebutuhan Air Domestik (D1)
""$%/'()/* l/dt 2,67
!" = +,×./00 × 1"

4 Kebutuhan Air Non Domestik (D2)


D2 = 20 % x D1 l/dt 0,53
5 Kehilangan Air (H)
H = 20% x (D1+ D2) l/dt 0,64
6 Kebutuhan Air Rata-Rata (D)
D = D1+ D2 + H l/dt 3,84
7 Kebutuhan Air Hari Maksimum (Hari Max)
Hari Max = 1,15 x D l/dt 4,42
8 Kebutuhan Air Jam Puncak Jam
Puncak = 1,75 x D l/dt 6,72

Tabel 3.14Proyeksi Kebutuhan Air Minum Desa D 2022

26
No Keterangan Satuan
Tahun Proyeksi

2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036
A Pengguna

1 Jumlah jiwa
2115 2195 2278 2365 2455 2548 2645 2746 2850 2958 3070 3187 3308 3434 3565
Pengguna
2 Tingkat %
Pelayanan 75 75 75 75 85 85 85 85 95 95 95 95 95 95 95
3 Pengguna jiwa
Terlayani 1,586 1,646 1,709 1,774 2,087 2,166 2,248 2,334 2,708 2,810 2,917 3,028 3,143 3,262 3,387
B Kebutuhan
Domestik
1 Pemakaian l/h
per orang 115 115 115 115 115 115 115 115 115 115 115 115 115 115 115

2 Kebutuhan l/dt
Domestik 2.11 2.19 2.27 2.36 2.78 2.88 2.99 3.11 3.60 3.74 3.88 4.03 4.18 4.34 4.51

C Kebutuhan
Non
Domestik
(0.2 dari l/dt
kebutuhan 0.42 0.44 0.45 0.47 0.56 0.58 0.60 0.62 0.72 0.75 0.78 0.81 0.84 0.87 0.90
domestik)
D Kebutuhan
Air Total
(D1 + D2) l/dt 2.53 2.63 2.73 2.83 3.33 3.46 3.59 3.73 4.32 4.49 4.66 4.84 5.02 5.21 5.41
E Kehilangan
Air

27
Kehilangan %
20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
Air
Jumlah l/dt
Kehilangan 0.51 0.53 0.55 0.57 0.67 0.69 0.72 0.75 0.86 0.90 0.93 0.97 1.00 1.04 1.08
Air
F Kebutuhan
Air Rata-
Rata
(D1+D2+H) l/dt 3.04 3.16 3.27 3.40 4.00 4.15 4.31 4.47 5.19 5.39 5.59 5.80 6.02 6.25 6.49
G Kebutuhan
Hari
Maksimum
Faktor
1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15
Koefisien
Kebutuhan l/dt
3.50 3.63 3.77 3.91 4.60 4.77 4.96 5.14 5.97 6.19 6.43 6.67 6.93 7.19 7.46
Air
H Kebutuhan
Jam
Puncak
Faktor
1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75
Koefisien
Kebutuhan l/dt
5.32 5.52 5.73 5.95 7.00 7.26 7.54 7.83 9.08 9.43 9.78 10.16 10.54 10.94 11.36
Air
Tabel 3.15 Proyeksi Kebutuhan Air Minum Desa D 15 Tahun

28
3.2.5 Proyeksi Kebutuhan Air Minum Desa E

No Keterangan Satuan Jumlah


1 Total Pengguna (P) jiwa 2625
2 Pengguna Terlayani (P1) P1 = 75% x P
jiwa 1,969
3 Kebutuhan Air Domestik (D1)
""$%/'()/*
!" = +,×./00 × 1" l/dt 3,32

4 Kebutuhan Air Non Domestik (D2)


D2 = 20 % x D1 l/dt 0,67
5 Kehilangan Air (H)
H = 20% x (D1+ D2) l/dt 0,80
6 Kebutuhan Air Rata-Rata (D)
D = D1+ D2 + H l/dt 4,79
7 Kebutuhan Air Hari Maksimum (Hari Max)
Hari Max = 1,15 x D l/dt 5,50
8 Kebutuhan Air Jam Puncak Jam
Puncak = 1,75 x D l/dt 8,38
Tabel 3.16 Proyeksi Kebutuhan Air Minum Desa E 2022

29
No Keterangan Satuan
Tahun Proyeksi

2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036
A Pengguna

1 Jumlah jiwa
2625 2714 2806 2901 2999 3101 3206 3315 3428 3574 3695 3820 3950 4084 4223
Pengguna
2 Tingkat %
Pelayanan 75 75 75 75 85 85 85 85 95 95 95 95 95 95 95
3 Pengguna jiwa
Terlayani 1,969 2,036 2,105 2,176 2,549 2,636 2,725 2,818 3,257 3,395 3,510 3,629 3,753 3,880 4,012
B Kebutuhan
Domestik
1 Pemakaian l/h
per orang 115 115 115 115 115 115 115 115 115 115 115 115 115 115 115

2 Kebutuhan l/dt
Domestik 2.62 2.71 2.80 2.90 3.39 3.51 3.63 3.75 4.33 4.52 4.67 4.83 4.99 5.16 5.34

C Kebutuhan
Non
Domestik
(0.2 dari l/dt
kebutuhan 0.52 0.54 0.56 0.58 0.68 0.70 0.73 0.75 0.87 0.90 0.93 0.97 1.00 1.03 1.07
domestik)
D Kebutuhan
Air Total
(D1 + D2) l/dt 3.14 3.25 3.36 3.48 4.07 4.21 4.35 4.50 5.20 5.42 5.61 5.80 5.99 6.20 6.41
E Kehilangan
Air

30
Kehilangan %
20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
Air
Jumlah l/dt
Kehilangan 0.63 0.65 0.67 0.70 0.81 0.84 0.87 0.90 1.04 1.08 1.12 1.16 1.20 1.24 1.28
Air
F Kebutuhan
Air Rata-
Rata
(D1+D2+H) l/dt 3.77 3.90 4.03 4.17 4.89 5.05 5.22 5.40 6.24 6.51 6.73 6.96 7.19 7.44 7.69
G Kebutuhan
Hari
Maksimum
Faktor
1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15
Koefisien
Kebutuhan l/dt
4.34 4.49 4.64 4.80 5.62 5.81 6.01 6.21 7.18 7.48 7.74 8.00 8.27 8.55 8.84
Air
H Kebutuhan
Jam
Puncak
Faktor
1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75
Koefisien
Kebutuhan l/dt
6.60 6.83 7.06 7.30 8.55 8.84 9.14 9.45 10.92 11.39 11.77 12.17 12.59 13.01 13.46
Air

Tabel 3.17 Proyeksi Kebutuhan Air Minum Desa E 15 Tahun

31
3.2.6 Proyeksi Kebutuhan Air Minum Desa F

No Keterangan Satuan Jumlah


1 Total Pengguna (P) jiwa 1908
2 Pengguna Terlayani (P1) P1 = 75% x P
jiwa 1,431
3 Kebutuhan Air Domestik (D1)
""$%/'()/*
!" = +,×./00 × 1" l/dt 2,41

4 Kebutuhan Air Non Domestik (D2)


D2 = 20 % x D1 l/dt 0,48
5 Kehilangan Air (H)
H = 20% x (D1+ D2) l/dt 0,58
6 Kebutuhan Air Rata-Rata (D)
D = D1+ D2 + H l/dt 3,47
7 Kebutuhan Air Hari Maksimum (Hari Max)
Hari Max = 1,15 x D l/dt 3,99
8 Kebutuhan Air Jam Puncak Jam
Puncak = 1,75 x D l/dt 6,98

Tabel 3.18 Proyeksi Kebutuhan Air Minum Desa F 2022

32
No Keterangan Satuan
Tahun Proyeksi

2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036
A Pengguna

1 Jumlah jiwa
1908 1988 2062 2138 2217 2299 2384 2472 2564 2659 2758 2860 2966 3076 3190
Pengguna
2 Tingkat %
Pelayanan 75 75 75 75 85 85 85 85 95 95 95 95 95 95 95
3 Pengguna jiwa
Terlayani 1,431 1,491 1,547 1,604 1,884 1,954 2,026 2,101 2,436 2,526 2,620 2,717 2,818 2,922 3,031
B Kebutuhan
Domestik
1 Pemakaian l/h
per orang 115 115 115 115 115 115 115 115 115 115 115 115 115 115 115

2 Kebutuhan l/dt
Domestik 1.90 1.98 2.06 2.13 2.51 2.60 2.70 2.80 3.24 3.36 3.49 3.62 3.75 3.89 4.03

C Kebutuhan
Non
Domestik
(0.2 dari l/dt
kebutuhan 0.38 0.40 0.41 0.43 0.50 0.52 0.54 0.56 0.65 0.67 0.70 0.72 0.75 0.78 0.81
domestik)
D Kebutuhan
Air Total
(D1 + D2) l/dt 2.29 2.38 2.47 2.56 3.01 3.12 3.24 3.36 3.89 4.03 4.18 4.34 4.50 4.67 4.84
E Kehilangan
Air

33
Kehilangan %
20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
Air
Jumlah l/dt
Kehilangan 0.46 0.48 0.49 0.51 0.60 0.62 0.65 0.67 0.78 0.81 0.84 0.87 0.90 0.93 0.97
Air
F Kebutuhan
Air Rata-
Rata
(D1+D2+H) l/dt 2.74 2.86 2.96 3.07 3.61 3.75 3.88 4.03 4.67 4.84 5.02 5.21 5.40 5.60 5.81
G Kebutuhan
Hari
Maksimum
Faktor
1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15
Koefisien
Kebutuhan l/dt
3.15 3.29 3.41 3.53 4.15 4.31 4.47 4.63 5.37 5.57 5.78 5.99 6.21 6.44 6.68
Air
H Kebutuhan
Jam
Puncak
Faktor
1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75
Koefisien
Kebutuhan l/dt
4.80 5.00 5.19 5.38 6.32 6.55 6.80 7.05 8.17 8.47 8.79 9.11 9.45 9.80 10.16
Air
Tabel 3.19 Proyeksi Kebutuhan Air Minum Desa F 15 Tahun

34
3.2.7 Proyeksi Kebutuhan Air Minum Desa G

No Keterangan Satuan Jumlah


1 Total Pengguna (P) jiwa 2115
2 Pengguna Terlayani (P1) P1 = 75% x P
jiwa 1,586
3 Kebutuhan Air Domestik (D1)
""$%/'()/*
!" = +,×./00 × 1" l/dt 2,67

4 Kebutuhan Air Non Domestik (D2)


D2 = 20 % x D1 l/dt 0,53
5 Kehilangan Air (H)
H = 20% x (D1+ D2) l/dt 0,64
6 Kebutuhan Air Rata-Rata (D)
D = D1+ D2 + H l/dt 3,84
7 Kebutuhan Air Hari Maksimum (Hari Max)
Hari Max = 1,15 x D l/dt 4,42
8 Kebutuhan Air Jam Puncak Jam
Puncak = 1,75 x D l/dt 6,72
Tabel 3.20 Proyeksi Kebutuhan Air Minum Desa G 2022

35
No Keterangan Satuan
Tahun Proyeksi

2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036
A Pengguna

1 Jumlah jiwa
2115 2214 2318 2426 2540 2659 2783 2913 3049 3192 3342 3499 3663 3835 4015
Pengguna
2 Tingkat %
Pelayanan 75 75 75 75 85 85 85 85 95 95 95 95 95 95 95
3 Pengguna jiwa
Terlayani 1,586 1,661 1,739 1,820 2,159 2,260 2,366 2,476 2,897 3,032 3,175 3,324 3,480 3,643 3,814
B Kebutuhan
Domestik
1 Pemakaian l/h
per orang 115 115 115 115 115 115 115 115 115 115 115 115 115 115 115

2 Kebutuhan l/dt
Domestik 2.11 2.21 2.31 2.42 2.87 3.01 3.15 3.30 3.86 4.04 4.23 4.42 4.63 4.85 5.08

C Kebutuhan
Non
Domestik
(0.2 dari l/dt
kebutuhan 0.42 0.44 0.46 0.48 0.57 0.60 0.63 0.66 0.77 0.81 0.85 0.88 0.93 0.97 1.02
domestik)
D Kebutuhan
Air Total
(D1 + D2) l/dt 2.53 2.65 2.78 2.91 3.45 3.61 3.78 3.95 4.63 4.84 5.07 5.31 5.56 5.82 6.09
E Kehilangan
Air

36
Kehilangan %
20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
Air
Jumlah l/dt
Kehilangan 0.51 0.53 0.56 0.58 0.69 0.72 0.76 0.79 0.93 0.97 1.01 1.06 1.11 1.16 1.22
Air
F Kebutuhan
Air Rata-
Rata
(D1+D2+H) l/dt 3.04 3.18 3.33 3.49 4.14 4.33 4.53 4.75 5.55 5.81 6.09 6.37 6.67 6.98 7.31
G Kebutuhan
Hari
Maksimum
Faktor
1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15
Koefisien
Kebutuhan l/dt
3.50 3.66 3.83 4.01 4.76 4.98 5.21 5.46 6.38 6.68 7.00 7.33 7.67 8.03 8.41
Air
H Kebutuhan
Jam
Puncak
Faktor
1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75
Koefisien
Kebutuhan l/dt
5.32 5.57 5.83 6.10 7.24 7.58 7.93 8.31 9.72 10.17 10.65 11.15 11.67 12.22 12.79
Air

Tabel 3.21 Proyeksi Kebutuhan Air Minum Desa G 15 Tahun

37
3.3 Kapasitas Reservoir
Perencanaan Sistem Penyediaan Air Minum (SPAM) di wilayah perencanaan dilakukan
dengan sistem penampungan pada Reservoir. Kapasitas Reservoir ditentukan oleh beberapa
faktor, yakni debit sumber mata air dan kebutuhan air harian maksimum. Kapasitas Reservoir
yang akan direncanakan digunakan untuk menampung kapasitas produksi air yang telah
disesuaikan dengan proyeksi kebutuhan air sesuai dengan tahun rencana. Kapasitas Reservoir
dihitung berdasarkan jumlah kebutuhan hari maksimum pada desa wilayah perencanaan
menggunakan rumus sebagai berikut:
15 − 20% × (24 × 3600) dt4hr × K
V= 7
1000 m 4lt
Dimana:
V = volume reservoir rencana (m3)
K = kebutuhan air hari maksimum (l/detik)

3.3.1 Volume Reservoir


Ø Reservoir Transmisi
Perhitungan volume reservoir Transmisi yang meliputi semua Desa di tahun
2036. Wilayah perencanaan Desa A, B, C, D, E, F, G dengan total kebutuhan
air harian maksimum 63,01 lt/dt memerlukan Reservoir dengan kapasitas :

15% × (24 × 3600) dt4hr × 63,01
V= 7 = 816,60 m7 ≈ 800 <7
1000 m 4lt

20% × (24 × 3600) dt4hr × 63,01


V= 7 = 1.088,81 m7 ≈ 1100 <7
1000 m 4lt
Volume Reservoir berkisar antara 816,60 – 1.088,81 m3 disesuaikan dengan
ukuran dimensi reservoir.
Ø Reservoir Distribusi I
Perhitungan volume reservoir distribusi I meliputi wilayah perencanaan Desa A,
B, C, D dengan total kebutuhan air harian maksimum 39,08 lt/dt memerlukan
Reservoir dengan kapasitas :

15% × (24 × 3600) dt4hr × 39,08


V= 7 = 506,47 m7 ≈ 500 <7
1000 m 4lt

38
20% × (24 × 3600) dt4hr × 39,08
V= 7 = 675,30 m7 ≈ 700 <7
1000 m 4lt
Volume Reservoir berkisar antara 506,47 – 675,30 m3 disesuaikan dengan
ukuran dimensi reservoir.
Ø Reservoir Distribusi II
Perhitungan volume reservoir distribusi II wilayah perencanaan Desa E, F, G
dengan total kebutuhan air harian maksimum 23,93 lt/dt memerlukan Reservoir
dengan kapasitas :
15% × (24 × 3600) dt4hr × 23,93
V= 7 = 310,13m7 ≈ 300 <7
m
1000 4lt

20% × (24 × 3600) dt4hr × 23,93


V= 7 = 413,51 m7 ≈ 400 7
m
1000 4lt
Volume Reservoir berkisar antara 310,13 – 413,51 m3 disesuaikan dengan
ukuran dimensi reservoir.

3.3.2 Dimensi Masing – Masing Reservoir

Dimensi reservoir dapat dihitung setelah mendapat volume masing-masing


reservoir. Standar tinggi reservoir adalah 2,5 s.d. 3 meter. Rumus untuk menghitung
dimensi reservoir:
A
@ =
B

dimana : A = luas dasar reservoir (m2)


V = volume rencana reservoir (m3)
h = tinggi reservoir (m)
Ø Dimensi Reservoir Transmisi
Perhitungan dimensi Reservoir Transmisi yang meliputi Desa A , Desa B, Desa
C, Desa D, Desa E, Desa F, dan Desa G

Volume reservoir Transmisi = 1088,81 m3 ≈ 1000 m3

Tinggi reservoir yang diambil = 2.5 meter


Maka:
D FGGG
C = E = = 440
H.I
dengan P = L = 20,9 meter

39
Ø Dimensi Reservoir Distribusi I
Perhitungan dimensi reservoir distribusi I yang meliputi Desa A, Desa B, Desa
C, dan Desa D
Volume reservoir distribusi I = 675,30 m3 ≈ 700 m3
Tinggi reservoir yang diambil = 2.5 meter

Maka:
D KGG
C = J = H.I
= 280

dengan P = L = 16,7 meter


Ø Dimensi Reservoir Distribusi II
Perhitungan dimensi reservoir distribusi II yang meliputi Desa E, Desa F, dan
Desa G
Volume reservoir distribusi I = 413,51 m3 ≈ 400 m3
Tinggi reservoir yang diambil = 2.5 meter
Maka:
D LGG
C = J = H.I
= 160
dengan P = L = 12 meter

3.4 Bangunan Penunjang

3.4.1 Bak Pelepas Tekan (BPT)


BPT digunakan untuk menghindari tekanan yang berlebih, sehingga ketika Bak
pelepas tekan ditempatkan di titik-titik tertentu pada pipa transmisi, yang mempunyai
beda tinggi antara 60 meter sampai 100 meter, terhadap titik awal transmisi tergantung
dari jenis pipa yang digunakan. BPT berfungsi untuk menghilangkan tekanan berlebih
yang terdapat pada aliran yang dapat menyebabkan pipa pecah.

• Perencanaan BPT Untuk Sistem Cabang Type I

• Sumber mata air Sta 0+00 terletak pada elevasi +310


Karena pipa transmisi mampu menerima tekanan hidraulik sebesar 12 bar (120
mka) maka sebaiknya menaruh Bak Pelepas Tekan (BPT) dibawah 12 bar (120 mka).
Dalam perencanaan ini, penempatan BPT diambil setiap 100 – 120 mka (10 bar – 12
bar).
• Penempatan BPT pertama diletakkan pada elevasi +273 (3+110)
(15 − 20)% N O N 24 N 3600
M=
1000

40
0,2 N (63,01) N 24 N 3600
M =
1000

M = 1088,81 <7 ≈ 1088 m3

3.4.2 Kebutuhan Aksesoris


Dalam sistem pipa transmisi terdapat aksesoris pipa, antara lain air valve, gate
valve, dan wash out sebagai mana fungsinya telah dijelaskan. Dalam perencanaan
ini aksesoris pipa akan dipasang pada elevasi-elevasi berikut ini. Agar memenuhi
syarat bahwa air valve harus diletakan di posisi punggung suatu jaringan perpipaan
(144 lebar bentang jembatan) dan diletakkan setiap 750 – 1000 meter sepanjang
jalur pipa dari Reservoir Transmisi menuju masing-masing desa pelayanan. Berikut
adalah rincian pemasangan air valve:Pemasangan Air Valve dari STA 0 – STA 4+700:
• Pemasangan air valve I pada STA 0 + 750.
• Pemasangan air valve II pada STA 1 + 550.
• Pemasangan air valve III pada STA 2 + 300 ( punggung elevasi )
• Pemasangan air valve IV pada STA 2 + 950.
• Pemasangan air valve V pada STA 3 + 115 ( jembatan pipa )
• Pemasangan air valve VI pada STA 3 + 865.
• Pemasangan air valve VII pada STA 4 + 650.
Ø Pemasangan Air Valve sepanjang Daerah Pelayanan Desa A, B, C, D
• 2 buah Air Valve pada STA 4+700 menuju Reservoir Distribusi I
• 2 buah Air Valve pada Reservoir Distribusi I menuju STA 8+200
Ø Pemasangan Air Valve sepanjang Daerah Pelayanan Desa E, F, G
• 3 buah Air Valve pada STA 4 + 700 menuju Reservoir Distribusi II
• 2 buah Air Valve pada Reservoir Distribusi II menuju STA 10+800
Ø Pemasangan wash out
Pada jaringan perpipaan ini dibutuhkan 1 buah wash out yang dipasang pada
titik awal jembatan dengan rincian sebagai berikut:
• Pemasangan wash out pertama pada STA 3+115.
Ø Pemasangan Gate Valve
Pada jaringan perpipaan ini dibutuhkan get valve dengan rincian sebagai
berikut:
1. Pada Reservoir
- Reservoar Transmisi : STA 0 + 00
- Reservoar Distribusi I : STA 6 + 500
- Reservoar Distribusi II : STA 8 + 800
41
2. Pada percabangan
- Cabang pada STA 4 + 700
- Cabang pada STA 8 + 200
- Cabang pada STA 10 + 800

3.4.3 Kebutuhan Pompa


Volume Reservoar Transmisi = 1088 m3

Untuk memenuhi reservoar waktu yang diperlukan tidak boleh lebih dari 8 jam maka
kapasitas pompa yang harus disediakan adalah :

Reservoar Transmisi = 10 – 12 bar

Yang dipakai = 12 bar


FHG
= F.F
Mka = 109 Mka

Penempatan BPT < 109 Mka

Pompa (Q) = 60 l/dt dalam 1 jam


PG Q 7PGG
= FGGG
= 216 <7

Volume reservoir = 1088 <7

OP Pompa = antara 6-8 jam


R STUTSRVWS
= X

FGYY Z[
= HFP Z[
= 5,03 jam ( memenuhi standar operasioal)

Ø Kehilangan Energi Mayor


X
Hf = ( G,HKYI Q \J] Q ^_,`[ )F,YI x L

G,GP
Hf = ( G,HKYI Q FHG Q G,7_,`[ )F,YI x 1050

Hf = 3.348

Ø Kehilangan Energi Minor


X G,GP
V = a = G,FHP = 0,476 l/dt

R_
Hm = 8 x (Koef 45°) x Hb

42
G,LKP_
Hm = 8 x (0,4) x H Q c,YF

Hm = 0,0229

Ø Head Pompa

Head Pompa = Beda elevasi + Kehilangan Energi Mayor + Kehilangan Energi Minor
= 65 + 3.348 + 0,229
= 68,57 m
Ø Daya Pompa
X Q E Q d
P= KI Q e

G,GP Q PY,IK Q FGIG


P= KI Q G,c
= 64 Hp

Daya yang dibutuhkan untuk memompa air dari sumber mata air ke pipa transmisi
sebesar 64 Hp

43
BAB IV
ANALISIS HIDRAULIKA

4.1 Estimasi Dimensi Pipa


Estimasi dimensi pipa dilakukan sebelum merencanakan suatu jaringan pemipaan yang
bertujuan untuk mencari besar diameter pipa. Perhitungan ini juga dilakukan agar diameter
yang dipergunakan efektif untuk mengalirkan air sesuai dengan debit rencana. Oleh karena
itu, dalam pengerjaan tugas akhir ini juga dilakukan perhitungan estimasi dimensi sebagai
berikut. Untuk menghitung segmen pipa dari Sumber Mata Air ke Reservoir Transmisi
diketahui data sebagai berikut :
• Elevasi Sumber Mata Air = +310 m
• Elevasi Reservoir Transmisi = +375 m
• Panjang = 1050 m
• Debit = 0,06301 <7 /gh
• Koefisien Kekasaran (C) = 120 (galvanized iron)
Selanjutnya untuk menghitung estimasi dimensi pipa digunakan persamaan
Hazen-William sebagai berikut

Q = 0,27853 . i . jH,P7 . k G,IL


Keterangan :

Q = Debit aliran (m3/detik)

C = Koefisien kekasaran Hazen William, untuk pipa Galvanized Iron, nilai C = 120

D = Diameter pipa (m)

S = Slope pipa (Beda tinggi / panjang pipa)

Besar debit yang digunakan pada perhitungan estimasi diameter pipa


merupakan hasil perhitungan kapasitas harian maksimum yang dapat dilihat pada tabel
berikut.

Desa
Kapasitas
A B C D E F G
Hari Maksimum
(2036) 16,68 5,36 9,58 7,46 8,84 6,68 8,41

Tabel 4.1 Kapasitas Hari Maksimum Tahun 2036

44
Diameter pipa dirancang agar dapat mengalirkan air dengan kecepatan rencana (V
rencana) = 1,0 s.d. 1,5 m/dt. Gambar skema dari jaringan perpipaan pada pedesaan Type I
dapat dilihat pada Gambar.

Estimasi Diameter Pipa sebelum BPT

Pada perencanaan ditetapkan :

Debit (Q) = 66,03 l/dt = 0,06301 m3/dt

Koefisien (C) = 120 (Galvanized Iron)

Identifikasi Pipa

Elevasi Awal = +375 (STA 0+000)

Elevasi Akhir = +280 (STA 1+700)

Jarak = 1,7 km = 1700 m


7KIlHYG
Slope = FKGG
= 0,05588 m = 0,056 m

Sehingga, estimasi diameter pipa dapat dihitung dengan :


X
D = ( G,HKYI Q \ Q m n,op )G,,7Y

G,GP7GF
D = ( G,HKYI Q FHG Q G,GPHn,op )G,7Y

D = 0,163 ( Digunakan pipa dengan diameter 0,3 meter)

Berdasarkan perhitungan diatas, dicari diameter pipa yang digunakan agar sesuai
dengan ketentuan – ketentuan. Estimasi diameter pipa untuk Type I selanjutnya akan
ditampilkan pada tabel berikut :
45
Kecepatan
Beda Perbedaan Koef. Diameter
Elevasi Panjang Debit (Q) Pengaliran (V)
No Segmen Pipa Tinggi Tekanan Hazen- Slope Dalam
(m) (m³/dt) m/dt
(m) (P) William
STA 0 STA 0 + 1 Hitung Use Hitung Use
1 SMA - Reservoir Transmisi 310 375 1050 65 -65 0.06301 120 0.062 3.01 0.891 0.163 0.3
Reservoir Transmisi - STA
2 1+700 375 280 1700 95 95 0.06301 120 0.056 2.89 0.891 0.167 0.3
3 STA 1+700 - STA 2+200 280 303 500 23 -23 0.06301 120 0.046 2.67 0.891 0.173 0.3
4 STA 2+200 - BPT 303 277 1050 26 26 0.06301 120 0.025 2.07 0.501 0.197 0.4
5 BPT - STA 3+500 277 259 250 18 18 0.06301 120 0.072 3.21 0.891 0.158 0.3
6 STA 3+500 - STA 4+700 259 207 1200 52 52 0.06301 120 0.043 2.60 0.891 0.176 0.3
STA 4+700 - Reservoir
7 Distribusi 1 207 205 1800 2 2 0.03908 120 0.001 0.52 0.311 0.310 0.4
Reservoir Distribusi 1 - STA
8 8+200 205 172 1700 33 33 0.03908 120 0.019 1.67 0.553 0.173 0.3
STA 8+200 - P1 172 154 800 18 18 0.01668 120 0.023 1.45 0.531 0.121 0.2
P1 - P2 154 125 2200 29 29 0.00536 120 0.013 0.88 0.171 0.088 0.2
P2-P3 125 122 1200 3 3 0.00958 120 0.003 0.51 0.305 0.154 0.2
STA 8+200 - P4 172 131 1800 41 41 0.00746 120 0.023 1.20 0.237 0.089 0.2
P4 - P3 131 122 1500 9 9 0.00958 120 0.006 0.74 0.305 0.129 0.2
STA 4+700 - Reservoir
9 Distribusi 2 207 195 4100 12 12 0.02393 120 0.003 0.68 0.190 0.211 0.4
Reservoir Distribusi 2 - STA
10+800 195 165 2000 30 30 0.02393 120 0.015 1.34 0.339 0.151 0.3
STA 10+800 - P5 165 142 1500 23 23 0.00841 120 0.015 1.05 0.268 0.101 0.2
P5 - P7 142 127 2300 15 15 0.00668 120 0.007 0.70 0.213 0.110 0.2
STA 10+800 - P6 165 127 2200 38 38 0.00884 120 0.017 1.11 0.281 0.101 0.2
Tabel 4.1 Estimasi Diameter Pipa

46
4.2 Kehilangan Energi
Pada aliran air dikenal persamaan energi (persamaan Bernoully) dan persamaan
kontinuitas. Persamaan Bernoully secara umum ditulis kembali sebagai berikut:
! &' ! &'
+ $ + () = " + $ + () + ℎ,
"

Dengan :
P = tekanan
z = tinggi datum
V = kecepatan rata-rata aliran dalam pipa
g = percepatan gravitasi bumi
he = kehilangan tinggi tenaga
- = berat per unit volume
hf = kehilangan tinggi tenaga karena gesekan
hs = kehilangan tinggi tenaga sekunder (turbulensi lokal)

4.2.1. Kehilangan Energi Utama /Mayor (Hf)


Perhitungan kehilangan energi dilakukan menggunakan persamaan Hazen-
Williams berikut.
Q = 0,2785 x C x .(,01 2 3 4,56
Dengan :
Q = debit aliran (m3/detik)
C = koefisien kekasaran Hazen-William (C = 120, untuk pipa Galvanized Iron)
D = diameter pipa (m)
S = slope pipa (beda tinggi/panjang, m)
Kehilangan Energi Mayor
7
Hf = ( 4,(895 : ;<= : >',?@ )B,95 x L

4,40
Hf = ( 4,(895 : B(4 : 4,6',?@ )B,95 x 1700

Hf = meter
Perhitungan kehilangan energi mayor untuk Type I selanjutnya akan ditampilkan
dalam tabel.

47
4.2.2. Kehilangan Energi Minor
Kehilangan energi minor tidak selalu lebih kecil dibandingkan dengan
kehilangan energi mayor. Kehilangan energi yang disebabkan akibat pipa dengan
sambungan dan belokan memiliki kemungkinan nilai lebih besar dibandingkan
kehilangan energi akibat gesekan. Kehilangan energi minor secara matematis dapat
ditulis sebagai berikut:
7' &'
Hm = k ( C' ) DEDF GH = I ( )

Dengan :
k = koefisien kehilangan energi mayor
v = kecepatan aliran
Koefisien tergantung pada bentuk fisik belokan, penyempitan, katup dan aksesoris pipa
lainnya. Harga k ini biasanya berkisar antara 0 sampai 1.

4.2.3 Kehilangan Energi Minor (Hm)

(021,5 + (1020,4) + (520,3) + 4,0B0'


Hm = J R 2 ( : S,9B
(020,9) + (020,9) + (120,15)
Hm = 0,109
Perhitungan kehilangan energi minor untuk Type I selanjutnya akan ditampilkan dalam
tabel.

48
Kecepatan Kehil.
Beda Perbedaan Debit Koef. Diameter Kehil.
Panjang Pengaliran (V) Luas (A) m² Energi
Tinggi Tekanan (Q) Hazen- Slope Dalam Sf Energi
(m) m/dt Minor
(m) (P) (m³/dt) William Mayor (Hf)
Hitung Use Hitung Use Hitung Use (Hm)
1050 65 -65 0.06301 120 0.062 3.01 0.891 0.163 0.3 0.021 0.071 0.0032 3.348 0.229
1700 95 95 0.06301 120 0.056 2.89 0.891 0.167 0.3 0.022 0.071 0.0032 5.420 0.178
500 23 -23 0.06301 120 0.046 2.67 0.891 0.173 0.3 0.024 0.071 0.0032 1.594 0.178
1050 26 26 0.06301 120 0.025 2.07 0.501 0.197 0.4 0.030 0.126 0.0008 0.826 0.056
250 18 18 0.06301 120 0.072 3.21 0.891 0.158 0.3 0.020 0.071 0.0032 0.797 0.356
1200 52 52 0.06301 120 0.043 2.60 0.891 0.176 0.3 0.024 0.071 0.0032 3.826 0.182
1800 2 2 0.03908 120 0.001 0.52 0.311 0.310 0.4 0.076 0.126 0.0003 0.585 0.009
1700 33 33 0.03908 120 0.019 1.67 0.553 0.173 0.3 0.023 0.071 0.0013 2.240 0.027
800 18 18 0.01668 120 0.023 1.45 0.531 0.121 0.2 0.012 0.031 0.0020 1.569 0.065
2200 29 29 0.00536 120 0.013 0.88 0.171 0.088 0.2 0.006 0.031 0.0002 0.528 0.016
1200 3 3 0.00958 120 0.003 0.51 0.305 0.154 0.2 0.019 0.031 0.0007 0.844 0.032
1800 41 41 0.00746 120 0.023 1.20 0.237 0.089 0.2 0.006 0.031 0.0004 0.797 0.016
1500 9 9 0.00958 120 0.006 0.74 0.305 0.129 0.2 0.013 0.031 0.0007 1.054 0.006
4100 12 12 0.02393 120 0.003 0.68 0.190 0.211 0.4 0.035 0.126 0.0001 0.538 0.022
2000 30 30 0.02393 120 0.015 1.34 0.339 0.151 0.3 0.018 0.071 0.0005 1.063 0.025
1500 23 23 0.00841 120 0.015 1.05 0.268 0.101 0.2 0.008 0.031 0.0006 0.829 0.022
2300 15 15 0.00668 120 0.007 0.70 0.213 0.110 0.2 0.010 0.031 0.0004 0.830 0.004
2200 38 38 0.00884 120 0.017 1.11 0.281 0.101 0.2 0.008 0.031 0.0006 1.333 0.020
Tabel 4.2 Kehilangan Energi Mayor

49
Jumlah (Unit) ACC Kecepatan
Hm
No Segmen Pipa Bend 90 Bend 45 Bend 22,5 Wash Out Air Valve Gate Valve (V)
1.5 0.4 0.3 0.9 0.9 0.15 (m/dt) (m)
1 SMA - Reservoir Transmisi 0 10 5 0 0 1 0.891 0.229
2 Reservoir Transmisi - STA 1+700 0 5 5 0 1 0 0.891 0.178
3 STA 1+700 - STA 2+200 0 5 5 0 1 0 0.891 0.178
4 STA 2+200 - BPT 0 5 5 0 1 0 0.501 0.056
5 BPT - STA 3+500 0 10 10 1 1 0 0.891 0.356
6 STA 3+500 - STA 4+700 0 6 1 0 2 0 0.891 0.182
7 STA 4+700 - Reservoir Distribusi 1 0 1 1 0 1 1 0.311 0.009
8 Reservoir Distribusi 1 - STA 8+200 0 1 1 0 1 1 0.553 0.027
STA 8+200 - P1 0 6 4 1 0 0 0.531 0.065
P1 - P2 1 15 10 0 0 1 0.171 0.016
P2-P3 0 12 6 0 0 1 0.305 0.032
STA 8+200 - P4 0 10 2 1 0 0 0.237 0.016
P4 - P3 0 2 1 0 0 1 0.305 0.006
STA 4+700 - Reservoir Distribusi 2 1 6 5 0 7 1 0.190 0.022
9 Reservoir Distribusi 2 - STA 10+800 0 3 1 1 2 1 0.339 0.025
STA 10+800 - P5 1 7 6 0 0 0 0.268 0.022
P5 - P7 0 1 1 1 0 0 0.213 0.004
STA 10+800 - P6 0 10 3 0 0 0 0.281 0.020
Tabel 4.3 Kebutuhan Aksesoris

50
4.3 Profil Hidraulis
Profil hidraulis merupakan profil yang menggambarkan letak ketinggian pipa dengan garis
hidraulisnya pada setiap titik di jalur perpipaan. Profil hidraulis digambarkan dengan
menetapkan sumbu absis untuk panjang pipa dan sumbu ordinat untuk letak pipa atau
konturdan ketinggian hidraulisnya. Profil hidraulis juga menunjukkan kehilangan energi utama
(mayor), kehilangan energi sekunder (minor) dan sisa tekanan yang terdapat di masing-masing
segmen pipa.

51
Kecepatan
Diameter Kehil. Kehil.
Elevasi Debit Pengaliran (V) Tinggi Sisa Kualitas Kuantitas
Panjang Dalam Energi Energi
No Segmen Pipa (Q) m/dt Tekanan Tekanan Pipa Pipa
(m) Mayor Minor
STA STA (m³/dt) (m) (mka) (bar) Hitung
Hitung Use Hitung Use (Hf) (Hm)
0 0+1
SMA - Reservoir
1 Transmisi 310 375 1050 0.06301 3.01 0.891 0.163 0.3 3.348 0.229 65 61.423 10 7
Reservoir Transmisi -
2 STA 1+700 375 280 1700 0.06301 2.89 0.891 0.167 0.3 5.420 0.178 95 89.402 10 11
STA 1+700 - STA
3 2+200 280 303 500 0.06301 2.67 0.891 0.173 0.3 1.594 0.178 23 21.228 10 3
4 STA 2+200 - BPT 303 277 1050 0.06301 2.07 0.501 0.197 0.4 0.826 0.056 26 25.118 10 3
5 BPT - STA 3+500 277 259 250 0.06301 3.21 0.891 0.158 0.3 0.797 0.356 18 16.847 10 2
STA 3+500 - STA
6 4+700 259 207 1200 0.06301 2.60 0.891 0.176 0.3 3.826 0.182 52 47.992 5 6
STA 4+700 -
7 Reservoir Distribusi 1 207 205 1800 0.03908 0.52 0.311 0.310 0.4 0.585 0.009 2 1.406 5 0
Reservoir Distribusi 1
8 - STA 8+200 205 172 1700 0.03908 1.67 0.553 0.173 0.3 2.240 0.027 33 30.733 5 4
STA 8+200 - P1 172 154 800 0.01668 1.45 0.531 0.121 0.2 1.569 0.065 18 16.367 5 2
P1 - P2 154 125 2200 0.00536 0.88 0.171 0.088 0.2 0.528 0.016 29 28.456 5 3
P2-P3 125 122 1200 0.00958 0.51 0.305 0.154 0.2 0.844 0.032 3 2.124 5 0
STA 8+200 - P4 172 131 1800 0.00746 1.20 0.237 0.089 0.2 0.797 0.016 41 40.188 4 5
P4 - P3 131 122 1500 0.00958 0.74 0.305 0.129 0.2 1.054 0.006 9 7.940 4 1
STA 4+700 -
9 Reservoir Distribusi 2 207 195 4100 0.02393 0.68 0.190 0.211 0.4 0.538 0.022 12 11.440 4 1
Reservoir Distribusi 2
- STA 10+800 195 165 2000 0.02393 1.34 0.339 0.151 0.3 1.063 0.025 30 28.911 4 3
STA 10+800 - P5 165 142 1500 0.00841 1.05 0.268 0.101 0.2 0.829 0.022 23 22.149 4 3
P5 - P7 142 127 2300 0.00668 0.70 0.213 0.110 0.2 0.830 0.004 15 14.166 4 2
STA 10+800 - P6 165 127 2200 0.00884 1.11 0.281 0.101 0.2 1.333 0.020 38 36.647 4 4

Tabel 4.4 Profil Hidraulis

52
4.4 Analisis Hidraulika pada Sistem Jaringan Pipa dengan WaterNet

Membuat jaringan pipa pada titik – titik elevasi yang diketahui dan yang sesuai dengan
perencanaan seperti :
- Dimensi pipa yang digunakan
- Mengetahui berapa besar kehilangan energi pada jaringan pipa yang direncanakan
- Mengetahui berapa banyak penggunaan pompa dan katup
- Mengetahui fluktuasi air pada reservoir pada jam pelayanan

4.5 Hasil Analisis Hidraulika pada Sistem Jaringan Pipa dengan WaterNet (Aliran
Constant)

Tabel 4.5 Skema Jaringan Pipa Type I dalam kondisi Constant

53
4.5.1 Data Node

Gambar 4.6 Data Node

4.5.2 Data Pipa

Gambar 4.6 Data Pipa

54
4.5.3 Data Tangki
• Reservoir Transmisi
Bentuk Tangki : Uniform
Luas tampang = 250 m2
Elevasi Maksimum = 312.5 m
Elevasi Minimum = 308.5 m
Elevasi Simulasi = 310 m
• Bak Pelepas Tekan I
Bentuk Tangki : Uniform
Luas tampang = 55,4 m2
Elevasi Maksimum = 279.5 m
Elevasi Minimum = 275.5 m
Elevasi Simulasi = 277 m
• Reservoir I
Bentuk Tangki : Uniform
Luas tampang = 150 m2
Elevasi Maksimum = 207.5 m
Elevasi Minimum = 203.5 m
Elevasi Simulasi = 205 m
• Reservoir II
Bentuk Tangki : Uniform
Luas tampang = 100 m2
Elevasi Maksimum = 209.5 m
Elevasi Minimum = 207.5 m
Elevasi Simulasi = 207 m

55
BAB V

PENUTUP

5.1 Kesimpulan

Adapun yang dapat disimpulkan dari tugas ini adalah


1) Proyeksi Kebutuhan di Desa A, Desa B, Desa C, Desa D, Desa E, Desa F dan Desa
G berturut-turut adalah 16,68 l/dt, 5,36 l/dt, 9,58 l/dt, 7,46 l/dt, 8,84 l/dt, 6,68 l/dt,
8,41 l/dt.
2) Kapasitas Reservoar Transmisi, Reservoar Distribusi 1 dan Reservoar Distribusi 2
dari perencanaan sistem penyediaan air minum pedesaan tipe I berturut-turut adalah
1100 m3, 700 m3 dan 400 m3.
3) Head pompa dan daya pompa berturut turut pada skema sistem penyediaan air minum
pedesaan tipe I didapat sebesar 68,57 m dan 64 Hp
4) Estimasi diameter awal pipa berdasarkan persamaan Hazen-William, Kehilangan
energy (Mayor/Minor) dari perencanaan sistem penyediaan air minum pedesaan tipe
I adalah seperti pada table 4.2 pada BAB IV.
5) Perencanaan jaringan perpipaan transmisi dan distribusi utama dengan menggunakan
program WaterNet adalah seperti pada gambar 5.1 pada BAB V.
6) Gambar reservoir dan bangunan penunjang pada persencanaan sistem penyediaan air
minum pedesaan tipe I ini adalah seperti pada gambar pada lampiran.
7) Gambar potongan memanjang jalur pipa transmisi dan distribusi utama lengkap
dengan tipikal perletakan pipa adalah seperti pada gambar pada lampiran.

56
DAFTAR PUSTAKA

Buku ajar mata kuliah Sistem Penyedian Air Minum (SPAM) tahun 2014

Republik Indonesia. 2005. Peraturan Pemerintah No. 16 tentang Pengembangan Sistem


Penyediaan Air Minum. Jakarta: Sekretariat Negara

Republik Indonesia. 2007. Peraturan Mentri Pekerjaan Umum tentang Penyelenggaraan


Pengembangan Sistem Penyediaan Air Minum. Jakarta: Sekretariat Negara

57
LAMPIRAN

UNIV. UDAYANA
SKEMA RENCANA, AKSESORIS DAN BANGUNAN PENUNJANG SPAM FAK. TEKNIK
PS. TEKNIK
LINGKUNGAN
Reservoir Transmisi
EL+375 TUGAS :
SISTEM PENYEDIAAN AIR MINUM
Dpipa = 300 mm
SMT/TH : III / 2022
Lpipa = 1700 m

STA 1+700 NO. KETERANGAN PARAF


EL +280
Dpipa = 300 mm
Lpipa = 500 m

STA 2+200
EL +303

Dpipa = 400 mm
Lpipa = 1050 m
KETERANGAN
BPT
STA 3+100 AIR VALVE

EL +277
WASH OUT
Dpipa = 300 mm
Lpipa = 250 m GATE VALVE
NAMA GAMBAR :
STA 3+500
EL +207
SKEMA PERENCANAAN PIPA
PEMASANGAN AKSESORIS
Dpipa = 300 mm
Lpipa = 1200 m DAN BPT
STA 6+500 Dpipa =400 mm
Lpipa = 1800 m
Dpipa =400 mm STA 8+800
Lpipa = 4100 m

STA 4+700
Reservoir Distribusi I EL +207 Reservoir Distribusi II
EL +205 EL +195
DOSEN PEMBIMBING :

SKEMA RENCANA SPAM


NTS Ir. I Gusti Ngurah Kerta Arsana, MT
NIP. 196410131991031002

MAHASISWA :

AYU BINTANG ISTI PRIYAHITA RAHARJA


NIM. 2105561036

58
UNIV. UDAYANA
FAK. TEKNIK
PS. TEKNIK
LINGKUNGAN

TUGAS :
SISTEM PENYEDIAAN AIR MINUM
SMT/TH : III / 2022

NO. KETERANGAN PARAF

PROFIL HIDRAULIS
SEGMEN PIPA 1

NO. LBR : 1 JML. LBR : 2

SKALA : 1 : 300 TGL :


Profil Hidraulis Segmen Pipa 2
(RESERVOIR TRANSMISI - ELV. +280 - ELV. +303 - BPT - ELV. +207) DOSEN PEMBIMBING :

Skala 1 : 300
Ir. I Gusti Ngurah Kerta Arsana, MT
NIP. 196410131991031002

MAHASISWA :

AYU BINTANG ISTI PRIYAHITA RAHARJA


NIM. 2105561036

59
UNIV. UDAYANA
FAK. TEKNIK
PS. TEKNIK
LINGKUNGAN

TUGAS :
SISTEM PENYEDIAAN AIR MINUM
SMT/TH : III / 2022

NO. KETERANGAN PARAF

Profil Hidraulis Segmen Pipa 2


(ELV. +235 - RESERVOIR I)
Skala 1 : 300

NO. LBR : 1 JML. LBR : 2

SKALA : 1 : 300 TGL :

DOSEN PEMBIMBING :

Ir. I Gusti Ngurah Kerta Arsana, MT


NIP. 196410131991031002

MAHASISWA :
Profil Hidraulis Segmen Pipa 3
(ELV. +235 - Reservoir II)
Skala 1 : 300
AYU BINTANG ISTI PRIYAHITA RAHARJA
NIM. 2105561036

60
UNIV. UDAYANA

Reservoir FAK. TEKNIK


PS. TEKNIK
LINGKUNGAN

TUGAS :
SISTEM PENYEDIAAN AIR MINUM
SMT/TH : III / 2022

NO. KETERANGAN PARAF

DOSEN PEMBIMBING :

Ir. I Gusti Ngurah Kerta Arsana, MT


NIP. 196410131991031002

MAHASISWA :

AYU BINTANG ISTI PRIYAHITA RAHARJA


NIM. 2105561036

61
UNIV. UDAYANA
FAK. TEKNIK
PS. TEKNIK
LINGKUNGAN

TUGAS :
SISTEM PENYEDIAAN AIR MINUM
SMT/TH : III / 2022

NO. KETERANGAN PARAF

DENAH TIE BEAM DAN


PENUNLANGAN PLAT
BAWAH

NO. LBR : 1 JML. LBR : 1

SKALA : 1 : 300 TGL : 17-12-2022

DOSEN PEMBIMBING :

Ir. I Gusti Ngurah Kerta Arsana, MT


NIP. 196410131991031002
DENAH TIE BEAM DAN MAHASISWA :
PENUNLANGAN PLAT BAWAH
AYU BINTANG ISTI PRIYAHITA RAHARJA
NIM. 2105561036

62
UNIV. UDAYANA
FAK. TEKNIK
PS. TEKNIK
LINGKUNGAN

TUGAS :
SISTEM PENYEDIAAN AIR MINUM
SMT/TH : III / 2022

NO. KETERANGAN PARAF

PEMASANGAN KATUP UDARA, GATE


VALVE, CHECK VALVE DAN
BUTTERFLY VALVE

NO. LBR : 1 JML. LBR : 1

SKALA : 1 : 300 TGL : 17-12-2022

DOSEN PEMBIMBING :

Ir. I Gusti Ngurah Kerta Arsana, MT


NIP. 196410131991031002
PEMASANGAN KATUP UDARA, GATE VALVE
MAHASISWA :
CHECK VALVE DAN BUTTERFLY VALVE
AYU BINTANG ISTI PRIYAHITA RAHARJA
NIM. 2105561036

63
UNIV. UDAYANA
FAK. TEKNIK
PS. TEKNIK
LINGKUNGAN

TUGAS :
SISTEM PENYEDIAAN AIR MINUM
SMT/TH : III / 2022

NO. KETERANGAN PARAF

NO. LBR : 1 JML. LBR : 1

SKALA : 1 : 300 TGL : 17-12-2022

DOSEN PEMBIMBING :

Ir. I Gusti Ngurah Kerta Arsana, MT


NIP. 196410131991031002

MAHASISWA :
PEMASANGAN PIPA AYU BINTANG ISTI PRIYAHITA RAHARJA
NIM. 2105561036

64
UNIV. UDAYANA
FAK. TEKNIK
PS. TEKNIK
LINGKUNGAN

TUGAS :
SISTEM PENYEDIAAN AIR MINUM
SMT/TH : III / 2022

NO. KETERANGAN PARAF

NO. LBR : 1 JML. LBR : 1

SKALA : 1 : 300 TGL : 17-12-2022

DOSEN PEMBIMBING :

Ir. I Gusti Ngurah Kerta Arsana, MT


NIP. 196410131991031002

MAHASISWA :

AYU BINTANG ISTI PRIYAHITA RAHARJA


NIM. 2105561036

65
UNIV. UDAYANA
FAK. TEKNIK
PS. TEKNIK
LINGKUNGAN

TUGAS :
SISTEM PENYEDIAAN AIR MINUM
SMT/TH : III / 2022

NO. KETERANGAN PARAF

NO. LBR : 1 JML. LBR : 1

SKALA : 1 : 300 TGL : 17-12-2022

DOSEN PEMBIMBING :

Ir. I Gusti Ngurah Kerta Arsana, MT


NIP. 196410131991031002

WASH OUT MAHASISWA :


AYU BINTANG ISTI PRIYAHITA RAHARJA
NIM. 2105561036

66
UNIV. UDAYANA
FAK. TEKNIK
PS. TEKNIK
LINGKUNGAN

TUGAS :
SISTEM PENYEDIAAN AIR MINUM
SMT/TH : III / 2022

NO. KETERANGAN PARAF

NO. LBR : 1 JML. LBR : 1

SKALA : 1 : 300 TGL :

DOSEN PEMBIMBING :

Ir. I Gusti Ngurah Kerta Arsana, MT


NIP. 196410131991031002

MAHASISWA :
TIPIKAL PEMASANGAN PIPA AYU BINTANG ISTI PRIYAHITA RAHARJA
NIM. 2105561036

67
UNIV. UDAYANA
FAK. TEKNIK
PS. TEKNIK
LINGKUNGAN

TUGAS :
SISTEM PENYEDIAAN AIR MINUM
SMT/TH : III / 2022

NO. KETERANGAN PARAF

NO. LBR : 1 JML. LBR : 1

SKALA : 1 : 300 TGL :

DOSEN PEMBIMBING :

Ir. I Gusti Ngurah Kerta Arsana, MT


NIP. 196410131991031002

MAHASISWA :

POTONGAN A-A & POTONGAN B-B


AYU BINTANG ISTI PRIYAHITA RAHARJA
RESERVOIR 150 M3 NIM. 2105561036

68
UNIV. UDAYANA
FAK. TEKNIK
PS. TEKNIK
LINGKUNGAN

TUGAS :
SISTEM PENYEDIAAN AIR MINUM
SMT/TH : III / 2022

NO. KETERANGAN PARAF

DENAH BAK PELEPAS


TEKAN

NO. LBR : 1 JML. LBR : 1

SKALA : 1 : 300 TGL : 17-12-2022

DOSEN PEMBIMBING :

Ir. I Gusti Ngurah Kerta Arsana, MT


NIP. 196410131991031002

MAHASISWA :
DENAH BAK PELEPAS TEKAN
AYU BINTANG ISTI PRIYAHITA RAHARJA
NIM. 2105561036

69
UNIV. UDAYANA
FAK. TEKNIK
PS. TEKNIK
LINGKUNGAN

TUGAS :
SISTEM PENYEDIAAN AIR MINUM
SMT/TH : III / 2022

NO. KETERANGAN PARAF

NO. LBR : 1 JML. LBR : 1

SKALA : 1 : 300 TGL : 17-12-2022

DOSEN PEMBIMBING :

Ir. I Gusti Ngurah Kerta Arsana, MT


NIP. 196410131991031002
POT I-I DAN II-II DETAIL PENULANGAN
MAHASISWA :
AYU BINTANG ISTI PRIYAHITA RAHARJA
NIM. 2105561036

70
UNIV. UDAYANA
FAK. TEKNIK
PS. TEKNIK
LINGKUNGAN

TUGAS :
SISTEM PENYEDIAAN AIR MINUM
SMT/TH : III / 2022

NO. KETERANGAN PARAF

DENAH RESERVOIR
DAN RUMAH POMPA

NO. LBR : 1 JML. LBR : 1

SKALA : 1 : 300 TGL : 17-12-2022

DOSEN PEMBIMBING :

Ir. I Gusti Ngurah Kerta Arsana, MT


NIP. 196410131991031002

MAHASISWA :
DENAH RESERVOIR DAN RUMAH POMPA AYU BINTANG ISTI PRIYAHITA RAHARJA
NIM. 2105561036

71
72
73