Anda di halaman 1dari 14

Alamat : Jl. Mastrip No.

164, Krajan Timur, Sumbersari,


Kec. Sumbersari, Kabupaten Jember, Jawa Timur 68121

DETAIL ENGINEERING DESIGN

PEKERJAAN :
PENGADAAN INSTALASI PENGOLAHAN AIR LIMBAH (IPAL)
POLITEKNIK NEGERI JEMBER

TAHUN ANGGARAN 2022


S_20
DAFTAR ISI HAL

1. LAYOUT BANGUNAN DAN JARINGAN PIPA ............................................................. 1


2. LAYOUT TAMAN IPAL ............................................................................................. 2
3. LAYOUT IPAL ......................................................................................................... 3
4. FLOW SCHEMATIC DIAGRAM IPAL........................................................................... 4
5. DENAH DAN TAMPAK DUDUKAN BIOREAKTOR....................................................... 5
6. BAK KONTROL......................................................................................................... 6
7. PONDASI BIOREAKTOR ........................................................................................... 7
8. EQUALISASI............................................................................................................. 8
9. PONDASI HEAVY METAL PRECIPITATOR (HMP) ...................................................... 9
10. KOLAM INDIKATOR & KLORINASI............................................................................ 10
11. CANOPY.................................................................................................................. 11
12. PAGAR HARMONIKA............................................................................................... 12
POLITEKNIK NEGERI JEMBER

PEKERJAAN

PENGADAAN INSTALASI PENGOLAHAN AIR LIMBAH


(IPAL)

A3
FINE SCREEN BAR SCREEN

PONDASI
DUDUKAN MESIN
IPAL

EQUALISASI

POLITEKNIK NEGERI JEMBER

LAYOUT TAMAN IPAL PEKERJAAN

SCALE : 1 : 35

PENGADAAN INSTALASI PENGOLAHAN AIR LIMBAH


(IPAL)

A3
OUTPUT

FINE SCREEN BAR SCREEN

DARI SUMBER LIMBAH


PONDASI
DUDUKAN MESIN
IPAL

EQUALISASI

POLITEKNIK NEGERI JEMBER


LAYOUT IPAL
PEKERJAAN
SCALE : 1 : 40

PENGADAAN INSTALASI PENGOLAHAN AIR LIMBAH


(IPAL)

A3
SCHEMATIC FLOW DIAGRAM IPAL

SHOWER

LIMBAH DARI
CLOSET

WASTAFEL

BAK KONTROL
WC SEPTICTANK
LIMBAH DARI
WC,
WASTAFEL
LIMBAH CAIR
KAMAR MANDI

WATER
FLOW METER

PENYARING KANDUNGAN LIMBAH


DETERGENT (CREASE TRAP)
WATER
FLOW METER VALVE
BAK KONTROL
UNIT PENGOLAHAN CHLORINATOR
KANDUNGAN KE SALURAN
LIMBAH LAUNDRY DETERGENT DALAM LIMBAH CAIR BAR SCREN FINE SCREN
KOTA

BAR SCREN & INLET PUMP KOLAM IKAN /


EKUALISASI BIOREAKTOR
FINE SCREN INDIKATOR
INLET DARI SLUDGE

PONDASI PTB KITCHEN (GRASE TRAPE)

BAK KONTROL
UNIT PENGOLAHAN
KANDUNGAN
MINYAK/LEMAK DALAM LIMBAH CAIR
LIMBAH KITCHEN
22,35

200
75 75
ml 100 100

BAK KONTROL
ml ml 100 100

BAK KONTROL +
ml 25 ml 25

UNIT PENYERAP KANDUNGAN


POMPA
LOGAM BERAT DALAM LIMBAH
LABORATORIUM
LIMBAH
LABORATORIUM

POLITEKNIK NEGERI JEMBER

PEKERJAAN

PENGADAAN INSTALASI PENGOLAHAN AIR LIMBAH


(IPAL)

A3
3700
1600

1600
520
DENAH DUDUKAN BIOREKTOR
540
SCALE : 1 ; 25 TAMPAK SAMPING KIRI
SCALE : 1 ; 35

POLITEKNIK NEGERI JEMBER

PEKERJAAN

PENGADAAN INSTALASI PENGOLAHAN AIR LIMBAH


(IPAL)
TAMPAK DEPAN TAMPAK SAMPING KANAN
SCALE : 1 ; 35
SCALE : 1 ; 35

A3
700
150 400 150
700

Pas. Batu Bata 75 75 400 75 75


B

75
Fin.Plester
Penutup Plat Beton

150

75
Ukr. 550x550x80
A A

400

400
700

700
75
PIPA PVC Ø 4"

150

75
B
LAYOUT BAK KONTROL 75 75 TAMPAK ATAS BAK KONTROL
SCALE : 1 : 20 SCALE : 1 : 20

80
Besi Ø8 - 100 Besi Ø8 - 100
Penutup Plat Beton
Penutup Plat Beton Ukr. 550x550x80 Penutup Plat Beton
550 550
Ukr. 550x550x80 Ukr. 550x550x80
+ 0.100 + 0.100
M.T.A ± 0.000 M.T.A ± 0.000
Tanah Urug Tanah Urug

,6
01
PIPA PVC Ø 4" PIPA PVC Ø 4"

Ø1
Tanah Asli / Tanah Asli /
Existing Existing
Pas. Batu Bata - 0.700 Pas. Batu Bata - 0.700
Fin.Plester - 0.800 Fin.Plester - 0.800
- 0.850 - 0.850
Cor Beton Cor Beton
Pasir Urug 150 400 150 Pasir Urug 150 400 150
Tanah Asli 700 Tanah Asli 700
Dipadatkan Dipadatkan
POTONGAN A-A POTONGAN B-B
SCALE : 1 : 20 SCALE : 1 : 20

BAK KONTROL POLITEKNIK NEGERI JEMBER


SCALE : 1 : 20 DIM 400x400 ALL'S BMR-C

PEKERJAAN

PENGADAAN INSTALASI PENGOLAHAN AIR LIMBAH


(IPAL)

A3
4100
3700
1550 1550
200 200 200
B
200
Soof 200 x 300 6Ø12

200
A A Ø8-200

300
2000
1200
1600
D

200
DETAIL SLOOF
SCALE : 1 : 15

520
B
TAMPAK ATAS PONDASI C C
SCALE : 1 : 25

DETAIL A
D
540

3700
+ 0.200 + 0.200
+ 0.100 + 0.100
± 0.000 ± 0.000
- 0.100 - 0.100

- 0.700 - 0.700
- 0.800 - 0.800
300 300 300 300 300
600 1150 600 1150 600 600 800 600
4100 2000

POTONGAN B-B
POTONGAN A-A SCALE : 1 : 25
SCALE : 1 : 25

Sloof Uk. 20x30 cm


520 Sloof 300x200
Besi 6Ø12 Besi 6Ø12 Cor Beton
Pas.Batu kali Pas. Batu Bata Sengkang Ø8-200
+ 0.200 Sengkang Ø8-200 Urugan Sirtu
Cor Beton Stek Besi + 0.200
+ 0.100 Stek Besi
Cor Beton Ø8-200 L.500mm + 0.100
Pas. Batu Bata ± 0.000 Ø8-200 L.500mm
± 0.000
+ 0.200 - 0.100
Tanah Urug + 0.100
± 0.000 - 0.300
- 0.400
- 0.500 Tanah Asli
- 0.300 Tanah Asli
Lantai Kerja Tanah Urug Tanah Urug
- 0.400
Urugan Sirtu
- 0.500 Stek Besi
Ø8-200 L.500mm
- 0.900
Lantai Kerja Pondasi. Batu Kali Pondasi. Batu Kali POLITEKNIK NEGERI JEMBER
540
Urugan Sirtu Urugan Sirtu - 1.000
Urugan Sirtu
POTONGAN C-C 300
Tanah Asli 300 PEKERJAAN
SCALE : 1 : 15
Dipadatkan
600 600

DETAIL A
PENGADAAN INSTALASI PENGOLAHAN AIR LIMBAH
POTONGAN D-D SCALE : 1 : 30
(IPAL)
SCALE : 1 : 15

A3
B
Besi Ø8 - 100
Tutup Plat Beton t=80mm
Pipa 4"
+ 0.100
A A 1500 ± 0.000
150 525 150 525 - 0.110
150

150
C FINE SCREEN BAR SCREEN C
- 0.850

500
800
2855
- 0.950
- 1.000

150
150 500 150
D 800

DENAH POTONGAN D
SCALE : 1 : 25 SCALE : 1 : 25
Besi Ø8 - 100
Tutup Plat Beton t=80mm

Pipa 4" + 0.10


± 0.00
- 0.11
OUTLET Ø 4" INLET Ø 4"
700 1498 1497 700
Tanah Urug
4395
FINE SCREN BAR SCREN
Pas. Batu Bata
B Fin. Plester aci
Lantai Rabat Beton - 0.85
TAMPAK ATAS EQUALISASI Pasir Urug
SCALE : 1 : 30 - 0.95
Tanah Asli
- 0.100

150 525 150 525 150


1500

POTONGAN C-C
SCALE : 1 : 25

2855 4395
Besi Ø 8 - 200
Besi Ø 8 - 200 400 400 400
400 315 200 Cor Beton
+ 0.100
+ 0.100
± 0.000
± 0.000
5 5 5
16 16 16
Ø1 Ø1 Ø1
INLET Ø 4"
OUTLET Ø 4"

Tanah Urug
Tanah Urug
Lantai Kerja
Lantai Kerja Pasir Urug - 1.200
Pasir Urug - 1.200
Tanah Asli - 1.250
Tanah Asli - 1.250 - 1.300
- 1.300
3895
2355

POTONGAN B-B POTONGAN A-A POLITEKNIK NEGERI JEMBER


SCALE : 1 : 30 SCALE : 1 : 30

PEKERJAAN

PENGADAAN INSTALASI PENGOLAHAN AIR LIMBAH


(IPAL)

A3
1550
1200
150 900 150

200
B
Soof 150 x 150 Rabat Beton 150
Pasir Urug + 0.150

150
+ 0.050
± 0.000
Tanah Urug

1150
A A

800
500
Pondasi Batu
Pasir Urug - 0.400

150
Tanah Asli - 0.450
150 500
Ø8 - 150
B 4Ø10
DETAIL PONDASI

150
DENAH DUDUKAN HMP SCALE : 1 : 20
SCALE : 1 : 20

DETAIL SLOOF
SCALE : NTS

1200 800
150 900 150 150 500 150
+ 0.150 + 0.150
+ 0.050 + 0.050
± 0.000 ± 0.000
Rabat Beton Rabat Beton
Pasir Urug Pasir Urug

- 0.400 - 0.400
- 0.450 - 0.450

500 550 500 500 150 500


1550 1150

POTONGAN A - A POTONGAN B - B
SCALE : 1 : 20
SCALE : 1 : 20

POLITEKNIK NEGERI JEMBER

PEKERJAAN

PONDASI HEAVY METAL PRECIPITATOR (HMP)


PENGADAAN INSTALASI PENGOLAHAN AIR LIMBAH
SCALE : 1 : 25 (IPAL)

A3
340 340 Pas. Batu Bata
Fin. Cat + 1.000

+ 0.800
2300 300
500 375 300 450 300 375 + 0.550

C D Tutup Plat besi


siku 40.40mm
+ 0.250

260 300

950
A A

500
± 0.000

250
1000

1000

350

200
B B - 0.350

500

440
- 0.500

Pas. Batu Bata - 0.550


Trasram Fin. Cat
C D Cor Beton
460 260 360 260 460 Pasir Urug t=5cm
500 1800 Tanah Dipadatkan
500 150 1500 150
DENAH KOLAM INDIKATOR 2300
SCALE : 1 : 40
POTONGAN A-A
SCALE : 1 : 40

340 340
340 340 Pas. Batu Bata + 1.000 + 1.000
+ 1.000 Fin. Cat + 1.000
+ 0.800
+ 0.800 + 0.800
300
+ 0.600
+ 0.550 + 0.550
200

+ 0.550 Tutup Plat besi


siku 40.40mm
+ 0.250 + 0.250
+ 0.250 + 0.250
260 360 260
950

± 0.000 ± 0.000
± 0.000 ± 0.000
350

- 0.220
- 0.350

950
- 0.350
950

- 0.500
- 0.500
Pas. Batu Bata - 0.550
Pas. Batu Bata - 0.550
Trasram Fin. Cat
Trasram Fin. Cat
- 0.850 150 290 150 260 150 Cor Beton
- 0.850 Cor Beton
Pasir Urug t=5cm
Pasir Urug t=5cm 1000
Tanah Dipadatkan
Tanah Dipadatkan 500 500
500 150 1500 150
2300

POTONGAN B-B POTONGAN C-C POTONGAN D-D


SCALE : 1 : 40 SCALE : 1 : 40
SCALE : 1 : 40

TAMPAK DEPAN
SCALE : 1 : 40

POLITEKNIK NEGERI JEMBER

KOLAM INDIKATOR DAN KLORINASI PEKERJAAN

SCALE : 1 : 40 ALL'S BMR

PENGADAAN INSTALASI PENGOLAHAN AIR LIMBAH


(IPAL)

A3
hollow zingalum
40x40mm + 3.900

+ 3.500

+ 3.300
+ 3.260

hollow
hollow 40x40mm
hollow
40x40mm
40x40mm

± 0.200

± 0.000

DENAH CANOPY
SCALE : 1 ; 50

TAMPAK SAMPING KIRI


SCALE : 1 ; 50

hollow
zingalum 40x40mm
zingalum hollow
+ 3.900
+ 3.900 40x40mm

+ 3.500
+ 3.500
+ 3.300
+ 3.300
+ 3.260
+ 3.260

hollow hollow
40x40mm 40x40mm

POLITEKNIK NEGERI JEMBER

PEKERJAAN

± 0.200
± 0.200
± 0.000 PENGADAAN INSTALASI PENGOLAHAN AIR LIMBAH
± 0.000
(IPAL)

TAMPAK DEPAN
SCALE : 1 ; 50
TAMPAK SAMPING KIRI
1 ; 50 SCALE :

A3
Pengaku Besi Ø8 DETAIL A
Pipa Besi Ø11/2" DETAIL B + 1.350
+ 1.300

Plate t=5mm
Nuts 12mm
Kunci Gembok
Kawat Harmonika
Kawat Harmonika Kawat Harmonika
Pengaku Besi Ø 8
Kait Harmonika DETAIL KUNCI PAGAR
SCALE : 1 : 10

Pipa Besi Ø11/2" Pipa Besi Ø11/2"

Pipa Besi Ø2" Pipa Besi Ø2" + 0.300


Pasangan Bata merah + 0.150
Cor Beton ± 0.000
Lantai Kerja
Tanah Asli - 0.200
Dipadatkan
- 0.300
- 0.350
300 2200 300 300

DETAIL A
TAMPAK MUKA DALAM Besi Ø8 SCALE : 1 : 20

SCALE : 1 : 20
Pipa Besi Ø11/2"
Las Titik

+ 1.350 + 1.350
+ 1.300 + 1.300

DETAIL B
SCALE : 1 : 20

Pengaku Besi Ø 8
Kawat Harmonika Pipa Besi Ø 2"

Pipa Besi Ø11/2" Pipa Besi Ø 11/2"

Pipa Besi Ø2" + 0.300 + 0.300


+ 0.150 Pasangan Bata merah + 0.150
± 0.000 Cor beton ± 0.000
Lantai Kerja
Cor Beton - 0.150
- 0.200 Tanah Asli
Pasir Urug Dipadatkan
- 0.300 - 0.200
Tanah Asli
Dipadatkan
- 0.350 150
300 2200 300 250
POLITEKNIK NEGERI JEMBER
TAMPAK PINTU PAGAR
SCALE : 1 : 20 PEKERJAAN

TAMPAK SAMPING PENGADAAN INSTALASI PENGOLAHAN AIR LIMBAH


SCALE : 1 : 20 (IPAL)

A3

Anda mungkin juga menyukai