Anda di halaman 1dari 21

library.uns.ac.id digilib.uns.ac.

id

PERENCANAAN STRUKTUR DAN RENCANA


ANGGARAN BIAYA GEDUNG MESS
KARYAWAN TIGA LANTAI KOTA SURAKARTA

TUGAS AKHIR

Disusun Sebagai Salah Satu Syarat Memperoleh Gelar Ahli Madya (A.Md.)
pada Program Studi DIII Teknik Sipil
Sekolah Vokasi Universitas Sebelas Maret Surakarta

Disusun Oleh :

RIEDWAN MAULLANA
NIM. I 8518023
RIZKY ADE FIRMANSYAH
NIM. I 8518024

PROGRAM STUDI DIII TEKNIK SIPIL


SEKOLAH VOKASI
UNIVERSITAS SEBELAS MARET
SURAKARTA
commit to user
2021

i
library.uns.ac.id digilib.uns.ac.id

STRUCTURE AND BUDGET PLANNING OF


THREE-STORY EMPLOYEES MESS BUILDING
IN SURAKARTA

FINAL ASSIGNMENT

Proposed as One of the Requirements Obtaining an Ahli Madya (A.Md.)


On Diploma III Civil Engineering Study Program

Arranged by:

RIEDWAN MAULLANA
NIM. I8518023

RIZKY ADE FIRMANSYAH


NIM. I8518024

DIPLOMA III CIVIL ENGINEERING STUDY PROGRAM


SCHOOL OF VOCATIONAL
SEBELAS MARET UNIVERSITY
SURAKARTA
commit to user
2021

ii
library.uns.ac.id digilib.uns.ac.id

HALAMAN PERSETUJUAN

PERENCANAAN STRUKTUR DAN RENCANA ANGGARAN BIAYA


GEDUNG MESS KARYAWAN TIGA LANTAI KOTA SURAKARTA

Disusun Oleh:

RIEDWAN MAULLANA
NIM. I8518023

RIZKY ADE FIRMANSYAH


NIM. I8518024

Telah disetujui untuk dipertahankan dihadapan tim penguji pendadaran D III


Teknik Sipil Sekolah Vokasi Universitas Sebelas Maret

Surakarta, Juni 2021


Dosen Pembimbing

Wibowo, S.T., DEA.


commit to
NIP. 19681007 user 1 001
199502

iii
library.uns.ac.id digilib.uns.ac.id

commit to user
library.uns.ac.id digilib.uns.ac.id

MOTTO

“Keringat dan air mata adalah anak sungai yang akan terus mengangkut sampan
impianku. Di atasnya, ku tompangkan impian-impian manis banyak orang. Sebab
sampan ini terlalu luas jika hanya dihuni impianku sendiri.”
- Firman Nofeki -

"Jangan bersedih atas apa yang telah berlalu, kecuali kalau itu bisa membuatmu
bekerja lebih keras untuk apa yang akan datang."
- Umar Bin Khattab -

PERSEMBAHAN

Tugas Akhir ini dipersembahkan kepada:

Orang tua dan keluarga tercinta,terima kasih untuk doa yang tak pernah
putus, kasih sayang yang tak akan mungkin terbalaskan dan bantuan moral
maupun materil yang selalu disediakan. Terima kasih untuk cinta,
pengorbanan, kesabaran, bimbingan, serta telah membesarkan penulis.

Untuk Bapak Wibowo, S.T.,DEA selaku dosen pembimbing yang telah


sabar membimbing penulis selama Tugas Akhir ini berlangsung.

Untuk sahabat yang telah banyak membantu penulis serta rekan-rekan D3


Teknik Sipil Bangunan Gedung 2018 yang telah banyak memberi
dukungan, pengalaman, dan kenangan selama menempuh pendidikan di
D3 Teknik Sipil UNS.

Untuk pihak-pihak yang tidak bisa penulis sebutkan satu persatu.


Terima kasih atas dukungannya.
Semoga Tuhan membalas dengan kebaikan.

commit to user

v
library.uns.ac.id digilib.uns.ac.id

PENGANTAR

Segala puji syukur penulis panjatkan kepada Allah SWT, yang telah melimpahkan
rahmat, taufik serta hidayah-Nya sehingga penulis dapat menyelesaikan Tugas
Akhir ini dengan judul Perencanaan Struktur dan Rencana Anggaran Biaya
Gedung Mess Karyawan Tiga Lantai Kota Surakarta dengan baik. Dalam
penulisan Tugas Akhir ini, penulis banyak menerima bimbingan, bantuan dan
dorongan yang sangat berarti dari berbagai pihak. Dalam kesempatan ini penulis
ingin menyampaikan terima kasih kepada:

1. Slamet Jauhari Legowo, S.T., M.T., selaku Kepala Program Studi DIII
Teknik Sipil Universitas Sebelas Maret Surakarta.
2. Wibowo, S.T., DEA selaku Dosen Pembimbing Tugas Akhir yang telah
memberikan bimbingan selama proses penyusunan Tugas Akhir ini.
3. Dr. Endah Safitri, S.T., M.T. dan Ahmad Utanaka, S.ST., M.T. selaku Dosen
penguji sidang pendadaran.
4. Rekan-rekan DIII Teknik Sipil angkatan 2018 yang telah membantu
terselesaikannya Tugas Akhir ini.
5. Semua pihak yang telah membantu terselesaikannya Tugas Akhir ini.

Penulis menyadari bahwa dalam penyusunan Tugas Akhir ini masih jauh dari
kesempurnaan dan banyak terdapat kekurangan. Kritik dan saran yang membawa
kearah perbaikan dan bersifat membangun sangat penulis harapkan. Semoga
Tugas Akhir ini dapat memberikan manfaat bagi penulis khususnya dan pembaca
pada umumnya.

Surakarta, Juni 2021

commit to user Penulis

vi
library.uns.ac.id
Tugas Akhir digilib.uns.ac.id
Perencanaan Struktur dan Rencana Anggaran Biaya Gedung Mess Karyawan
Tiga Lantai Kota Surakarta
Daftar Isi
DAFTAR ISI

HALAMAN JUDUL .................................................................................. i

HALAMAN PERSETUJUAN .................................................................... iii

HALAMAN PENGESAHAN .................................................................... iv

MOTTO DAN PERSEMBAHAN .............................................................. v

PENGANTAR ............................................................................................ vi

DAFTAR ISI .............................................................................................. vii

DAFTAR GAMBAR .................................................................................. xiii

DAFTAR TABEL ...................................................................................... xviii

NOTASI DAN SIMBOL ............................................................................ xx

BAB 1 PENDAHULUAN

1.1 Latar Belakang ................................................................................ 1

1.2 Maksud dan Tujuan ......................................................................... 2

1.3 Kriteria Perencanaan ....................................................................... 2

1.4 Peraturan-Peraturan yang Digunakan ............................................... 3

1.5 Gambar Rencana Bangunan ............................................................ 3

BAB 2 DASAR TEORI

2.1 Dasar Perencanaan .......................................................................... 5

2.1.1 Jenis Pembebanan ........................................................................... 5

2.1.2 Sistem Kerja Beban ......................................................................... 7

2.1.3 Provisi Keamanan untuk Beton ....................................................... 7


commit to user
2.2 Perencanaan Atap ............................................................................ 10

vii
library.uns.ac.id
Tugas Akhir digilib.uns.ac.id
Perencanaan Struktur dan Rencana Anggaran Biaya Gedung Mess Karyawan
Tiga Lantai Kota Surakarta
Daftar Isi
2.3 Perencanaan Pelat Lantai ................................................................. 12

2.4 Perencanaan Tangga ........................................................................ 13

2.5 Perencanaan Portal .......................................................................... 14

2.5.1 Perencanaan Balok .......................................................................... 14

2.5.2 Perencanaan Kolom......................................................................... 16

2.6 Perencanaan Pondasi ....................................................................... 18

BAB 3 PERENCANAAN PELAT

3.1 Gambaran Umum ............................................................................ 21

3.2 Dasar Perencanaan .......................................................................... 21

3.3 Diagram Alir ................................................................................... 22

3.4 Perencanaan Pelat Atap ................................................................... 23

3.4.1 Hitungan Pelat Atap ........................................................................ 23

3.4.2 Hitungan Pembebanan Pelat Atap.................................................... 23

3.4.3 Hitungan Momen Pelat Atap ........................................................... 24

3.4.4 Penulangan Pelat Atap..................................................................... 24

3.4.5 Rekapitulasi Penulangan Pelat Atap ................................................ 31

3.5 Perencanaan Pelat Lantai ................................................................. 32

3.5.1 Hitungan Pelat Lantai ...................................................................... 32

3.5.2 Hitungan Pembebanan Pelat Lantai ................................................. 32

3.5.3 Hitungan Momen Pelat Lantai ......................................................... 33

3.5.4 Penulangan Pelat Lantai ................................................................. 34

3.5.5 Rekapitulasi Penulangan Pelat Lantai .............................................. 40

3.6 Rekapitulasi Penulangan Pelat ......................................................... 40


commit to user

viii
library.uns.ac.id
Tugas Akhir digilib.uns.ac.id
Perencanaan Struktur dan Rencana Anggaran Biaya Gedung Mess Karyawan
Tiga Lantai Kota Surakarta
Daftar Isi
BAB 4 PERENCANAAN TANGGA

4.1 Gambaran Umum ............................................................................ 41

4.2 Dasar Perencanaan .......................................................................... 41

4.3 Diagram Alir .................................................................................. 42

4.4 Perencanaan Pelat Tangga .............................................................. 43

4.4.1 Hitungan Tebal Pelat Equivalen ...................................................... 43

4.4.2 Hitungan Pembebanan ..................................................................... 44

4.5 Hitungan Tulangan Tangga dan Bordes ........................................... 45

4.5.1 Hitungan Gaya Dalam Tangga......................................................... 45

4.5.2 Hitungan Tulangan Lentur............................................................... 46

4.6 Perencanaan Balok Bordes .............................................................. 50

4.6.1 Pembebanan Balok Bordes .............................................................. 50

4.6.2 Hitungan Tulangan Lentur............................................................... 51

4.6.3 Hitungan Tulangan Geser ................................................................ 55

4.7 Perencanaan Pondasi Tangga........................................................... 56

4.7.1 Perencanaan Kapasitas Dukung Pondasi .......................................... 57

4.7.2 Hitungan Tulangan Lentur............................................................... 58

4.8 Rekapitulasi Penulangan Tangga ..................................................... 59

BAB 5 PERENCANAAN BALOK ANAK

5.1 Gambaran Umum ............................................................................ 60

5.2 Dasar Perencanaan .......................................................................... 60

5.3 Diagram Alir .................................................................................. 61

5.4 Hitungan Lebar Equivalen .............................................................. 62


commit to user
5.5 Hitungan Perencanaan Balok Anak ................................................. 63

ix
library.uns.ac.id
Tugas Akhir digilib.uns.ac.id
Perencanaan Struktur dan Rencana Anggaran Biaya Gedung Mess Karyawan
Tiga Lantai Kota Surakarta
Daftar Isi
5.5.1 Hitungan Pembebanan Balok Anak ................................................. 63

5.5.2 Hitungan Tulangan Balok Anak ...................................................... 65

5.6 Rekapitulasi Penulangan Balok Anak .............................................. 72

BAB 6 PERENCANAAN STRUKTUR PORTAL

6.1 Gambaran Umum ............................................................................ 73

6.2 Dasar Perencanaan .......................................................................... 73

6.3 Diagram Alir ................................................................................... 74

6.4 Pembebanan .................................................................................... 75

6.4.1 Perencanaan Dimensi ...................................................................... 75

6.5 Denah Pembebanan Tributari Area .................................................. 76

6.5.1 Denah Pembebanan Tributari Area Balok Anak dan Portal .............. 76

6.5.2 Hitungan Luas Equivalen untuk Pelat .............................................. 77

6.6 Pembebanan Balok Portal ................................................................ 78

6.7 Pembebanan Sloof ........................................................................... 81

6.8 Analisis Struktur ............................................................................. 83

6.8.1 Pembebanan pada Struktur Rangka ................................................. 83

6.8.2 Gaya Momen pada Struktur Rangka ................................................ 84

6.8.3 Gaya Geser pada Struktur Rangka ................................................... 85

6.8.4 Gaya Aksial pada Struktur Rangka .................................................. 86

6.9 Analisis Penampang ........................................................................ 87

6.9.1 Hitungan Tulangan Balok Portal...................................................... 87

6.9.1.1 Hitungan Balok Induk ..................................................................... 87

6.9.1.2 Hitungan Sloof ................................................................................ 90


commit to user
6.9.2 Hitungan Tulangan Kolom .............................................................. 94

x
library.uns.ac.id
Tugas Akhir digilib.uns.ac.id
Perencanaan Struktur dan Rencana Anggaran Biaya Gedung Mess Karyawan
Tiga Lantai Kota Surakarta
Daftar Isi
6.10 Rekapitulasi Penulangan Struktur Portal .......................................... 103

BAB 7 PERENCANAAN PONDASI

7.1 Dasar Perencanaan ......................................................................... 104

7.1.1 Denah Pondasi ................................................................................ 104

7.1.2 Data Perencanaan Pondasi ............................................................... 104

7.2 Perencanaan Pondasi 1 .................................................................... 105

7.2.1 Perencanaan Kapasitas Dukung Pondasi .......................................... 105

7.2.2 Kekuatan Geser ............................................................................... 106

7.2.3 Hitungan Tulangan Lentur............................................................... 108

7.3 Perencanaan Pondasi 2 .................................................................... 109

7.3.1 Tegangan Tanah yang Timbul pada Pondasi .................................... 109

7.3.2 Kekuatan Geser ............................................................................... 111

7.3.3 Hitungan Tulangan Lentur............................................................... 113

7.4 Rekapitulasi Hitungan Pondasi ........................................................ 116

BAB 8 RENCANA ANGGARAN BIAYA

8.1 Rencana Anggaran Biaya ............................................................... 117

8.2 Hitungan Volume Pekerjaan ............................................................ 117

8.1.1 Pekerjaan Persiapan ........................................................................ 117

8.1.2 Pekerjaan Tanah .............................................................................. 117

8.1.2.1 Tanah Galian ................................................................................... 117

8.1.2.2 Urugan Pasir Bawah Pondasi........................................................... 118

8.1.2.3 Urugan Pasir Bawah Lantai ............................................................ 118


commit to user
8.1.2.4 Timbunan Tanah ............................................................................. 118

xi
library.uns.ac.id
Tugas Akhir digilib.uns.ac.id
Perencanaan Struktur dan Rencana Anggaran Biaya Gedung Mess Karyawan
Tiga Lantai Kota Surakarta
Daftar Isi
8.1.2.5 Pengangkutan Tanah ke Luar Proyek ............................................... 119

8.1.3 Pekerjaan Pondasi ........................................................................... 119

8.1.3.1 Lantai Kerja Bawah Pondasi............................................................ 119

8.1.3.2 Footplate ......................................................................................... 119

8.1.3.3 Kolom Pedestal .............................................................................. 120

8.1.3.4 Sloof ............................................................................................... 120

8.1.4 Pekerjaan Struktur ........................................................................... 120

8.1.5 Pekerjaan Pasangan ......................................................................... 123

8.1.6 Pekerjaan Lantai dan Keramik ......................................................... 125

8.1.7 Pekerjaan Kusen, Daun Pintu, dan Jendela ...................................... 125

8.1.8 Pekerjaan Plafond............................................................................ 126

8.1.9 Pekerjaan Pengecatan ...................................................................... 126

8.1.10 Pekerjaan Listrik ............................................................................. 128

8.1.11 Pekerjaan Sanitasi ........................................................................... 128

8.2 Rincian Rencana Anggaran Biaya ................................................... 129

8.3 Rekapitulasi Rencana Anggaran Biaya ............................................ 133

PENUTUP ................................................................................................... 134

DAFTAR PUSTAKA .................................................................................. 135

LAMPIRAN

commit to user

xii
library.uns.ac.id
Tugas Akhir digilib.uns.ac.id
Perencanaan Struktur dan Rencana Anggaran Biaya Gedung Mess Karyawan
Tiga Lantai Kota Surakarta
Daftar Gambar
DAFTAR GAMBAR

Gambar 1.1 Denah Lantai 1 ......................................................................... 3

Gambar 1.2 Denah Lantai 2 ......................................................................... 4

Gambar 1.3 Denah Lantai 3 ......................................................................... 4

Gambar 2.1 Diagram Interaksi Kolom ........................................................ 18

Gambar 3.1 Denah Pelat Atap ...................................................................... 21

Gambar 3.2 Denah Pelat Lantai ................................................................... 21

Gambar 3.3 Diagram Alir Hitungan Pelat ................................................... 22

Gambar 3.4 Pelat Tipe E2 ............................................................................ 24

Gambar 3.5 Perencanaan Tinggi Efektif ..................................................... 26

Gambar 3.6 Pelat Tipe D ............................................................................... 33

Gambar 3.7 Perencanaan Tinggi Efektif ..................................................... 35

Gambar 4.1 Denah Tangga ........................................................................... 41

Gambar 4.2 Diagram Alir Hitungan Tulangan dan Beban

di Tangga dan Bordes ............................................................... 42

Gambar 4.3 Tebal Ekuivalen ......................................................................... 43

Gambar 4.4 Joint Reaction Tangga di SAP 2000 ....................................... 45

Gambar 4.5 Gaya Momen Struktur Tangga di SAP 2000 .......................... 45

Gambar 4.6 Gaya Geser Struktur Tangga di SAP 2000 ............................. 46

Gambar 4.7 Rencana Balok Bordes ............................................................. 50

Gambar 4.8 Diagram Gaya Momen Aksial Balok Bordes ......................... 51

Gambar 4.9 commit


Diagram SFD (Geser) to user
Balok Bordes ....................................... 55

xiii
library.uns.ac.id
Tugas Akhir digilib.uns.ac.id
Perencanaan Struktur dan Rencana Anggaran Biaya Gedung Mess Karyawan
Tiga Lantai Kota Surakarta
Daftar Gambar
Gambar 4.10 Pondasi Tangga ........................................................................ 56

Gambar 5.1 Area Pembebanan Balok Anak ................................................ 60

Gambar 5.2 Diagram Alir Perencanaan Balok Anak .................................. 62

Gambar 5.3 Lebar Equivalen Trapesium ..................................................... 62

Gambar 5.4 Lebar Equivalen Segitiga .......................................................... 59

Gambar 5.5 Pembebanan Balok Anak ......................................................... 64

Gambar 5.6 Momen Maksimal Lapangan ................................................... 66

Gambar 5.7 Joint Reactions Balok Anak ..................................................... 66

Gambar 5.8 Gaya Geser Balok Anak .......................................................... 66

Gambar 5.9 Penulangan Balok Anak ........................................................... 70

Gambar 5.10 Detail Penulangan Balok Anak ............................................... 72

Gambar 5.11 Detail Penulangan Balok Kantilever ....................................... 72

Gambar 6.1 Perencanaan Struktur Portal .................................................... 73

Gambar 6.2 Diagram Alir Perencanaan Struktur Portal ............................. 74

Gambar 6.3 Area Pembebanan Balok Anak ................................................ 76

Gambar 6.4 Area Pembeban Balok Induk ................................................... 76

Gambar 6.5 Lebar Ekuivalen Balok Induk As A 1-2 ................................. 78

Gambar 6.6 Tipe Sloof .................................................................................. 81

Gambar 6.7 Pembebanan Balok Induk Arah X............................................ 83

Gambar 6.8 Pembebanan Balok Induk Arah Y............................................ 83

Gambar 6.9 Gaya Momen Balok Induk Arah X .......................................... 84

Gambar 6.10 Gaya Momen Balok Induk Arah Y ......................................... 84

Gambar 6.11 Gaya Geser Balokcommit to user


Induk Arah X ............................................ 85

xiv
library.uns.ac.id
Tugas Akhir digilib.uns.ac.id
Perencanaan Struktur dan Rencana Anggaran Biaya Gedung Mess Karyawan
Tiga Lantai Kota Surakarta
Daftar Gambar
Gambar 6.12 Gaya Geser Balok Induk Arah Y ............................................ 85

Gambar 6.13 Gaya Aksial Balok Induk dan Kolom Arah X ....................... 86

Gambar 6.14 Gaya Aksial Balok Induk dan Kolom Arah Y ....................... 86

Gambar 6.15 Potongan Tumpuan Balok Induk.............................................. 87

Gambar 6.16 Potongan Tumpuan Sloof ........................................................ 90

Gambar 6.17 Gaya Aksial Kolom .................................................................. 94

Gambar 6.18 Gaya Geser Kolom ................................................................... 94

Gambar 6.19 Potongan Tumpuan Kolom ...................................................... 94

Gambar 6.20 Penampang Kolom Kondisi Keruntuhan Seimbang .............. 96

Gambar 6.21 Penampang Kolom Kondisi Keruntuhan Tekan ..................... 97

Gambar 6.22 Penampang Kolom Kondisi Keruntuhan Tarik ...................... 99

Gambar 6.23 Diagram Interaksi Kolom ......................................................... 101

Gambar 6.24 Detail Penulangan Sloof ........................................................... 103

Gambar 6.25 Detail Penulangan Balok Induk ................................................ 103

Gambar 6.26 Detail Penulangan Kolom ......................................................... 103

Gambar 7.1 Denah Pondasi ........................................................................... 104

Gambar 7.2 Penampang Kritis Geser Satu Arah.......................................... 106

Gambar 7.3 Penampang Kritis Geser Dua Arah .......................................... 107

Gambar 7.4 Perencanaan Pondasi Footplate Menerus ................................ 109

Gambar 7.5 Diagram Gaya Lintang dan Momen......................................... 110

Gambar 7.6 Penampang Kritis Geser Satu Arah.......................................... 111

Gambar 7.7 Penampang Kritis Geser Dua Arah .......................................... 112

Gambar 7.8 Penampang Kritiscommit to user


untuk Perencanaan Lentur ........................ 115

xv
library.uns.ac.id
Tugas Akhir digilib.uns.ac.id
Perencanaan Struktur dan Rencana Anggaran Biaya Gedung Mess Karyawan
Tiga Lantai Kota Surakarta
Daftar Gambar
Gambar 6.5 Pembebanan Balok Induk Tipe 3-3-7-7 .................................. 102

Gambar 6.6 Denah Ring Balk ...................................................................... 106

Gambar 6.7 Denah Sloof ............................................................................... 108

Gambar 6.8 Pembebanan Balok As A 1-11 ................................................ 111

Gambar 6.9 Pembebanan Balok As 2 A-D .................................................. 112

Gambar 6.10 Reaksi Tumpuan Balok Anak .................................................. 112

Gambar 6.11 Momen Lapangan Sloof As 8 A-D .......................................... 113

Gambar 6.12 Momen Tumpuan Sloof As 9 A-D .......................................... 113

Gambar 6.13 Gaya Geser Sloof As 9 A-D .................................................... 114

Gambar 6.14 Momen LapanganBalok Induk As 6 A-D ............................... 118

Gambar 6.15 Momen Tumpuan Balok Induk As 4 A-D .............................. 118

Gambar 6.16 Gaya Geser Balok Induk As 4 A-D ........................................ 119

Gambar 6.17 Momen Lapangan Ring Balk As 9 A-D ................................. 123

Gambar 6.18 Momen Tumpuan Ring Balk As D 1-11 .................................. 123

Gambar 6.19 Gaya Geser Ring Balk As D 1-11 ........................................... 124

Gambar 6.20 Gaya Aksial Kolom K1 As 8 A-D .......................................... 128

Gambar 6.21 Momen Kolom K1 As 6 A-D .................................................. 128

Gambar 6.21 Gaya Geser Kolom K1 As 6 A-D ........................................... 129

Gambar 7.1 Denah Pondasi .......................................................................... 133

Gambar 7.2 Penampang Kritis Geser Satu Arah ........................................ 135

Gambar 7.3 Penampang Kritis Geser Dua Arah .......................................... 136

Gambar 7.4 Penampang Kritis untuk Perencanaan Lentur ......................... 138

Gambar 7.5 Penampang Kritiscommit to user


Geser Satu Arah ........................................ 141

xvi
library.uns.ac.id
Tugas Akhir digilib.uns.ac.id
Perencanaan Struktur dan Rencana Anggaran Biaya Gedung Mess Karyawan
Tiga Lantai Kota Surakarta
Daftar Gambar
Gambar 7.6 Penampang Kritis Geser Dua Arah ......................................... 142

commit to user

xvii
library.uns.ac.id
Tugas Akhir digilib.uns.ac.id
Perencanaan Struktur dan Rencana Anggaran Biaya Gedung Mess Karyawan
Tiga Lantai Kota Surakarta
Daftar Tabel

DAFTAR TABEL

Tabel 2.1 Beban Hidup .......................................................................... 6

Tabel 2.2 Koefisien Reduksi Beban Hidup ............................................. 7

Tabel 2.3 Kombinasi Faktor Beban Kuat Perlu (U) ................................ 8

Tabel 2.4 Faktor Reduksi Kekuatan (ϕ) .................................................. 9

Tabel 2.5 Tebal Pelindung Beton untuk Tulangan Baja ......................... 10

Tabel 3.1 Hitungan Momen Pelat Atap .................................................. 25

Tabel 3.2 Hitungan Momen Pelat Lantai ................................................ 34

Tabel 3.3 Rekapitulasi Penulangan Pelat ................................................ 40

Tabel 4.1 Rekapitulasi Penulangan Pelat Tangga ................................... 59

Tabel 4.2 Rekapitulasi Tulangan Balok Bordes ...................................... 59

Tabel 4.3 Rekapitulasi Tulangan Pondasi Tangga .................................. 59

Tabel 5.1 Hitungan Lebar Equivalen ...................................................... 63

Tabel 5.2 Rekapitulasi Perhitungan Gaya Dalam Batang Balok ............. 67

Tabel 5.3 Rekapitulasi Penulangan Balok Anak ..................................... 72

Tabel 6.1 Hitungan Lebar Ekuivalen Balok Induk ................................. 77

Tabel 6.2 Hitungan Pembebanan Balok Induk ....................................... 80

Tabel 6.3 Hitungan Pembebanan Sloof .................................................. 82

Tabel 6.4 Nilai Pn dan Mn Kondisi Keruntuhan Tekan .......................... 99

Tabel 6.5 Nilai Pn dan Mn Kondisi Keruntuhan Tarik ........................... 100

Tabel 6.6 Nilai Pn dan Mn untuk Membuat Diagram Interaksi ............... 101

Tabel 6.7 Rekapitulasi Penulangan Sloof dan Balok Induk..................... 103

Tabel 6.8 Rekapitulasi Penulangan Kolom ............................................. 103


commit to user

xviii
library.uns.ac.id
Tugas Akhir digilib.uns.ac.id
Perencanaan Struktur dan Rencana Anggaran Biaya Gedung Mess Karyawan
Tiga Lantai Kota Surakarta
Daftar Tabel

Tabel 7.1 Hasil Reaksi Joint pada Frame Pondasi 2 ............................... 109

Tabel 7.2 Hasil Reaksi Joint pada Frame Pondasi 2 ............................... 111

Tabel 7.3 Rekapitulasi Hasil Hitungan Pondasi ...................................... 116

Tabel 8.1 Reakpitulasi Volume Pekerjaan Beton Struktur ...................... 123

Tabel 8.2 Rekapitulasi Volume Pekerjaan Pasangan Dinding ................. 124

Tabel 8.3 Rekapitulasi Volume Pekerjaan Lantai dan Keramik .............. 125

Tabel 8.4 Rekapitulasi Volume Pekerjaan Kusen, Daun Pintu,

dan Jendela ............................................................................ 125

Tabel 8.5 Rekapitulasi Volume Pekerjaan Listrik ................................... 128

Tabel 8.6 Rekapitulasi Volume Pekerjaan Sanitasi ................................. 128

Tabel 8.7 Rincian Rencana Anggaran Biaya .......................................... 129

Tabel 8.8 Rekapitulasi Rencana Anggaran Biaya ................................... 133

commit to user

xix
library.uns.ac.id
Tugas Akhir digilib.uns.ac.id
Perencanaan Struktur dan Rencana Anggaran Biaya Asrama Gedung Mess Karyawan
Tiga Lantai Kota Surakarta
Daftar Notasi dan Simbol

DAFTAR NOTASI DAN SIMBOL

As’ = Luas tulangan tekan (mm2)

As = Luas tulangan tarik (mm2)

b = Lebar penampang (mm)

D = Diameter tulangan ulir (mm)

d = Tinggi efektif (mm)

E = Modulus elastisitas (m)

e = Eksentrisitas (m)

f’c = Kuat tekan beton (MPa)

fy = Kuat leleh (MPa)

H = Tinggi total komponen struktur (cm)

h = Lebar penampang (mm)

M = Harga momen (kgm)

Mu = Momen berfaktor (kgm)

Nu = Beban aksial berfaktor (kg)

P = Gaya aksial (kg)

q = Beban merata (kg/m)

S = Spasi dari tulangan (mm)

V = Gaya geser (kg)

Vu = Gaya geser berfaktor (kg)

W = Beban angina (kg)

ϕ = Faktor reduksi untuk beton

ρ = Ratio tulangan tarik (As/bd)


commit to user

xx
library.uns.ac.id
Tugas Akhir digilib.uns.ac.id
Perencanaan Struktur dan Rencana Anggaran Biaya Asrama Gedung Mess Karyawan
Tiga Lantai Kota Surakarta
Daftar Notasi dan Simbol

Ø = Diameter tulangan polos (mm)

σ = Tegangan yang terjadi (kg/cm3)

commit to user

xxi

Anda mungkin juga menyukai