PERENCANAAN STRUKTUR DAN RENCANA ANGGARAN


BIAYA GEDUNG PERKULIAHAN
TIGA LANTAI

TUGAS AKHIR

Disusun Sebagai Salah Satu Syarat Memperoleh Gelar Ahli Madya (A.Md) pada
Program Studi Diploma III Teknik Sipil
Sekolah Vokasi Universitas Sebelas Maret Surakarta

Disusun Oleh :

GIGIH PUTRA AMIN PAMBUDI


NIM. I8718016

NANDA GALUH KAMESWARA


NIM. I8518019

PROGRAM STUDI DIPLOMA III TEKNIK SIPIL


SEKOLAH VOKASI UNIVERSITAS SEBELAS MARET
SURAKARTA
commit to user
2021

i
library.uns.ac.id digilib.uns.ac.id

STRUCTURE AND BUDGET PLANING OF


THREE-STORY LECTURER BUILDING

FINAL PROJECT

Written to fulfill a requirement of obtain Ahli Madya (A.Md) in a Diploma Study


Program of Civil Engineering Department of Vocational School of
Sebelas Maret University Surakarta

By :

GIGIH PUTRA AMIN PAMBUDI


NIM. I8718016

NANDA GALUH KAMESWARA


NIM. I8518019

CIVIL ENGINEERING UNDERGRADUATE STUDY


PROGRAM CIVIL ENGINEERING DEPARTMENT OF
VOCATIONAL SCHOOL SEBELAS MARET UNIVERSITY
SURAKARTA
commit to user
2021

ii
library.uns.ac.id digilib.uns.ac.id

commit to user
library.uns.ac.id digilib.uns.ac.id

commit to user
library.uns.ac.id digilib.uns.ac.id

PERENCANAAN STRUKTUR DAN RENCANA ANGGARAN


BIAYA GEDUNG PERKULIAHAN
TIGA LANTAI

TUGAS AKHIR

Disusun Sebagai Salah Satu Syarat Memperoleh Gelar Ahli Madya (A.Md) pada
Program Studi Diploma III Teknik Sipil
Sekolah Vokasi Universitas Sebelas Maret Surakarta

Disusun Oleh :

GIGIH PUTRA AMIN PAMBUDI


NIM. I8718016

NANDA GALUH KAMESWARA


NIM. I8518019

PROGRAM STUDI DIPLOMA III TEKNIK SIPIL


SEKOLAH VOKASI UNIVERSITAS SEBELAS MARET
SURAKARTA
commit to user
2021

i
library.uns.ac.id
Tugas Akhir digilib.uns.ac.id
Perencanaan Struktur dan Rencana Anggaran Biaya Gedung Perkuliahan Tiga Lantai
Pengantar

PENGANTAR

Puji syukur kehadirat Allah SWT yang telah melimpahkan rahmat dan hidayah-
Nya, sehingga penyusun dapat menyelesaikan Tugas Akhir dengan baik. Tugas
Akhir ini disusun sebagai salah satu syarat untuk menempuh ujian Ahli Madya pada
Program Diploma III Teknik Sipil Bangunan Gedung Universitas Sebelas Maret
Surakarta.

Selama penulisan Tugas Akhir ini, penulis banyak menerima bimbingan, bantuan
dan dorongan dari berbagai pihak. Dalam kesempatan ini penulis ingin
menyampaikan terima kasih kepada:

1. Pimpinan Program Studi Diploma III Teknik Sipil Sekolah vokasi Universitas
Sebelas Maret Surakarta beserta staf.
2. Bapak Widi Hartono, S.T., M.T selaku Dosen Pembimbing Tugas Akhir.
3. Teman-teman DIII Teknik Sipil Bangunan Gedung dan Infrastruktur
Perkotaan 2018 yang selalu memeberi dukungan, bantuan, dan semangat.
4. Rekan-rekan DIII Teknik Sipil dan semua pihak yang telah membantu
terselesainya Tugas Akhir ini.

Penyusun menyadari bahwa Tugas Akhir ini masih banyak terdapat kekurangan dan
kesalahan, untuk itu kritik dan saran yang bersifat membangun senantiasa penyusun
harapkan dari semua pihak. Akhir kata, semoga Tugas Akhir ini dapat memberikan
manfaat bagi penyusun khususnya dan pembaca pada umumnya.

Surakarta, Juni 2021

Penyusun

commit to user

v
library.uns.ac.id
Tugas Akhir digilib.uns.ac.id
Perencanaan Struktur dan Rencana Anggaran Biaya Rusunawa Empat Lantai
Daftar Isi

DAFTAR ISI

HALAMAN JUDUL ...................................................................................... i

HALAMAN PERSETUJUAN ...................................................................... ii

HALAMAN PENGESAHAN ........................................................................ iii

MOTTO DAN PERSEMBAHAN ................................................................. iv

PENGANTAR ................................................................................................ v

DAFTAR ISI ................................................................................................... vi

DAFTAR GAMBAR ...................................................................................... xii

DAFTAR TABEL .......................................................................................... xv

DAFTAR NOTASI DAN SIMBOL .............................................................. xvii

BAB 1 PENDAHULUAN

1.1. Latar Belakang ................................................................................... 1

1.2. Maksud dan Tujuan............................................................................ 2

1.3. Kriteria Perencanaan .......................................................................... 2

1.4. Peraturan-Peraturan yang Digunakan ................................................ 2

BAB 2 DASAR TEORI

2.1. Bangunan Gedung ............................................................................. 3

2.2. Dasar Perencanaan ............................................................................. 3

2.2.1. Jenis Pembebanan .............................................................................. 3

2.2.2. Provisi Keamanan Beton....................................................................


commit to user 5

vi
library.uns.ac.id
Tugas Akhir digilib.uns.ac.id
Perencanaan Struktur dan Rencana Anggaran Biaya Rusunawa Empat Lantai
Daftar Isi

2.3. Perencanaan Pelat Lantai ................................................................... 8

2.4. Perencanaan Tangga .......................................................................... 9

2.5. Perencenaan Portal ............................................................................. 11

2.6 Perencanaan Pondasi .......................................................................... 16

BAB 3 PERENCANAAN PELAT

3.1. Denah Pelat ........................................................................................ 19

3.2 Diagram Alir ...................................................................................... 22

3.3 Data Perencanaan ............................................................................... 23

3.4 Perencanaan Pelat .............................................................................. 24

3.4.1 Perencanaan Pelat Atap...................................................................... 24

3.4.2 Perencanaan Pelat Kanopi.................................................................. 30

3.4.3 Perencanaan Pelat Lantai ................................................................... 36

BAB 4 PERENCANAAN TANGGA

4.1. Dasar Perencanaan ............................................................................. 43

4.2 Perencanaan Pelat Tangga Umum ..................................................... 45

4.2.1 Peritungan Tebal Pelat ....................................................................... 45

4.2.2 Perhitungan Pembebanan Tangga ...................................................... 46

4.2.3 Perhitungan Penulangan Tangga........................................................ 47

4.2.4 Perhitungan Tulangan Pelat Tangga dan Bordes ............................... 47

4.2.4.1 Perhitungan Tulangan Tumpuan ........................................................ 47

4.2.4.2 Perhitungan Tulangan Lapangan ....................................................... 48


commit to user
4.3 Dasar Perencanaan Tangga Darurat ................................................... 49

vii
library.uns.ac.id
Tugas Akhir digilib.uns.ac.id
Perencanaan Struktur dan Rencana Anggaran Biaya Rusunawa Empat Lantai
Daftar Isi

4.3.1 Gambaran Umum ............................................................................... 49

4.3.2 Data Perencanaan Tangga .................................................................. 50

4.4 Perencanaan Pelat Tangga Darurat .................................................... 51

4.4.1 Peritungan Tebal Pelat ....................................................................... 51

4.4.2 Perhitungan Pembebanan Tangga ...................................................... 52

4.4.3 Perhitungan Penulangan Tangga........................................................ 53

4.4.4 Perhitungan Tulangan Pelat Tangga dan Bordes ............................... 53

4.4.4.1 Perhitungan Tulangan Tumpuan ........................................................ 53

4.4.4.2 Perhitungan Tulangan Lapangan ....................................................... 54

4.4.5 Perhitungan Balok Bordes ................................................................. 55

4.4.5.1 Perhitungan Pembebanan Balok Bordes ............................................ 55

4.4.5.2 Perhitungan Penulangan Balok Bordes .............................................. 56

4.5 Rekapitulasi Penulangan Perencanaan Tangga .................................. 59

BAB 5 PERENCANAAN STRUKTUR PORTAL

5.1. Perencanaan Struktur Portal ............................................................... 60

5.2. Diagram Alir ...................................................................................... 61

5.3 Pembebanan ....................................................................................... 62

5.3.1. Perencanaan Dimensi ......................................................................... 62

5.3.2. Denah Pembebanan Tributari Area .................................................... 63

5.3.2.1 Denah Pembebanan Tributari Area Balok Anak dan Portal .............. 63

5.3.2.2 Hitungan Luas Equivalen untuk Pelat................................................ 65

5.3.3 Pembebanan Balok Portal .................................................................. 66


commit to user

viii
library.uns.ac.id
Tugas Akhir digilib.uns.ac.id
Perencanaan Struktur dan Rencana Anggaran Biaya Rusunawa Empat Lantai
Daftar Isi

5.3.4 Pembebanan Ring Balok .................................................................... 69

5.3.5 Pembebanan Sloof ............................................................................. 70

5.4 Analisis Struktur ................................................................................ 71

5.4.1. Pembebanan pada Struktur Rangka ................................................... 71

5.4.2 Gaya Momen pada Struktur Rangka .................................................. 72

5.4.3 Gaya Geser Struktur Rangka ............................................................. 73

5.4.4 Gaya Aksial pada Struktur Rangka .................................................... 74

5.5 Analisis Penampang ........................................................................... 75

5.5.1. Hitungan Tulangan Balok Portal ....................................................... 75

5.5.1.1 Hitungan Balok Induk As 5 D-F ........................................................ 75

5.5.2 Hitungan Tulangan Kolom ................................................................ 81

5.6 Rekapitulasi Penulangan Struktur Portal ........................................... 86

BAB 6 PERENCANAAN PONDASI

6.1. Dasar Perencanaan ............................................................................. 87

6.1.1 Denah Pondasi ................................................................................... 87

6.1.2 Data Perencanaan Pondasi ................................................................. 87

6.2 Perencanaan Pondasi 1 ....................................................................... 88

6.2.1 Kontrol Tegangan yang Timbul pada Tanah ..................................... 88

6.2.2 Kekuatan Geser .................................................................................. 90

6.2.3 Perhitungan Tulangan Lentur ............................................................ 91

6.3 Perencanaan Pondasi 2 ....................................................................... 94

6.3.1 Kontrol Tegangan Tanah yang Timbul .............................................. 94


commit to user

ix
library.uns.ac.id
Tugas Akhir digilib.uns.ac.id
Perencanaan Struktur dan Rencana Anggaran Biaya Rusunawa Empat Lantai
Daftar Isi

6.3.2 Perhitungan Tulangan Geser .............................................................. 95

6.3.3 Perhitungan Tulangan Lentur ............................................................ 97

6.4 Rekapitulasi Hitungan Perencanaan Pondasi ..................................... 98

BAB 7 RENCANA ANGGARAN BIAYA

7.1. Rekapitulasi Harga ............................................................................. 99

7.2. Rencana Anggaran Biaya (RAB) ....................................................... 100

7.3. Rekapitulasi Analisis Harga Satuan ................................................... 108

7.4. AHSP (Analisa Harga Satuan Pekerjaan) .......................................... 109

7.5. Harga Material, Upah, dan Sewa Alat ............................................... 133

7.6. Hitungan Volume Pekerjaan ............................................................. 142

7.6.1. Pekerjaan Persiapan ........................................................................... 142

7.6.2. Pekerjaan Tanah ................................................................................. 143

7.6.3. Pekerjaan Pondasi .............................................................................. 144

7.6.4. Pekerjaan Struktur .............................................................................. 146

7.6.5. Pekerjaan Pasangan ............................................................................ 148

7.6.6. Pekerjaan Lantai dan Keramik ........................................................... 150

7.6.7. Pekerjaan Kusen................................................................................. 150

7.6.8. Pekerjaan Plafond .............................................................................. 151

7.6.9. Pekerjaan Pengecetan......................................................................... 152

7.6.10. Pekerjaan Listrik ............................................................................... 153

7.6.11. Pekerjaan Sanitasi .............................................................................. 154

commit to user

x
library.uns.ac.id
Tugas Akhir digilib.uns.ac.id
Perencanaan Struktur dan Rencana Anggaran Biaya Rusunawa Empat Lantai
Daftar Isi

PENUTUP ....................................................................................................... xix

DAFTAR PUSTAKA ..................................................................................... xx

LAMPIRAN

commit to user

xi
library.uns.ac.id
Tugas Akhir digilib.uns.ac.id
Perencanaan Struktur dan Rencana Anggaran Biaya Rusunawa Empat Lantai
Daftar Gambar

DAFTAR GAMBAR

Gambar 2.1 Balok Menerus Satu Sisi dan Balok Menerus Dua Sisi ......... 12

Gambar 3.1 Denah Pelat Lantai 1 .............................................................. 19

Gambar 3.2 Denah Pelat Lantai 2 ............................................................. 20

Gambar 3.3 Denah Pelat Atap.................................................................... 21

Gambar 3.4 Diagram Alir Peritungan Pelat ............................................... 22

Gambar 3.5 Pelat Tipe D Skema II ........................................................... 25

Gambar 3.6 Perencanaan Tinggi Efektif .................................................... 26

Gambar 3.7 Pelat Tipe K Skema II ............................................................ 31

Gambar 3.8 Perencanaan Tinggi Efektif .................................................... 32

Gambar 3.9 Pelat Tipe G Skema II ........................................................... 37

Gambar 4.1 Tampak Atas Rencana Tangga Umum .................................. 43

Gambar 4.2 Tebal Equivalen’ .................................................................... 45

Gambar 4.3 Hasil BMD Struktur Tangga dengan SAP 2000 .................... 47

Gambar 4.4 Tampak Atas Rencana Tangga Darurat ................................. 49

Gambar 4.5 Tebal Equivalen’ .................................................................... 51

Gambar 4.6 Hasil BMD Struktur Tangga dengan SAP 2000 .................... 53

Gambar 4.7 Rencana Balok Bordes ........................................................... 55

Gambar 5.1 Perencanaan Struktur Portal ................................................... 60

Gambar 5.2 Diagram Alir Perencanaan Struktur Portal ............................ 61

Gambar 5.3 Area Pembebanan Balok Anak .............................................. 63

Gambar 5.4 Area Pembebanancommit


Balok Induk
to user.............................................. 64

xii
library.uns.ac.id
Tugas Akhir digilib.uns.ac.id
Perencanaan Struktur dan Rencana Anggaran Biaya Rusunawa Empat Lantai
Daftar Gambar

Gambar 5.5 Lebar Equivalen Balok Induk As 3 B-D ................................ 66

Gambar 5.6 Tipe Ring Balok ..................................................................... 69

Gambar 5.7 Tipe Sloof ............................................................................... 70

Gambar 5.8 Pembebanan Terbesar Balok Memanjang .............................. 71

Gambar 5.9 Pembebanan Terbesar Balok Melintang ................................ 71

Gambar 5.10 Gaya Momen Terbesar Balok Memanjang ............................ 72

Gambar 5.11 Gaya Momen Terbesar Balok Melintang ............................... 72

Gambar 5.12 Gaya Geser Terbesar Balok Memanjang ............................... 73

Gambar 5.13 Gaya Geser Terbesar Balok Melintang .................................. 73

Gambar 5.14 Gaya Aksial Terbesar Balok Memanjang .............................. 74

Gambar 5.15 Gaya Aksial Terbesar Balok Melintang ................................. 74

Gambar 5.16 Penampang Balok Induk BI -1 ............................................... 77

Gambar 5.17 Bidang Aksial Kolom ............................................................. 81

Gambar 5.18 Bidang Aksial Kolom ............................................................. 82

Gambar 5.19 Bidang Geser Kolom .............................................................. 82

Gambar 5.20 Bidang Geser Kolom .............................................................. 83

Gambar 6.1 Denah Pondasi ........................................................................ 87

Gambar 6.2 Perencanaan Pondasi Footplate Menerus ............................... 88

Gambar 6.3 Diagram Gaya Lintang dan Momen ....................................... 90

Gambar 6.4 Penampang Kritis Geser Satu Arah ....................................... 95

Gambar 6.5 Penampang Kritis Geser Dua Arah ........................................ 95

Gambar 7.1 Denah Lantai 1 ....................................................................... 142

Gambar 7.2 Detail Pondasi FP 1 ................................................................ 143


commit to user

xiii
library.uns.ac.id
Tugas Akhir digilib.uns.ac.id
Perencanaan Struktur dan Rencana Anggaran Biaya Rusunawa Empat Lantai
Daftar Gambar

Gambar 7.3 Denah Pondasi ........................................................................ 144

Gambar 7.4 Denah Sloof............................................................................ 145

Gambar 7.5 Detail Kolom .......................................................................... 146

Gambar 7.6 Detail Tangga Darurat ............................................................ 147

Gambar 7.7 Denah Lantai 2 ....................................................................... 148

Gambar 7.8 Denah Kusen Lantai 1 ............................................................ 150

Gambar 7.9 Denah Instalasi Listrik Lantai 1 ............................................. 153

Gambar 7.10 Denah Sanitasi Lantai 1 ......................................................... 154

commit to user

xiv
library.uns.ac.id
Tugas Akhir digilib.uns.ac.id
Perencanaan Struktur dan Rencana Anggaran Biaya Rusunawa Empat Lantai
Daftar Tabel

DAFTAR TABEL

Tabel 2.1 Beban Hidup Terdistribusi Merata Minimum .......................... 5

Tabel 2.2 Kombinasi Faktor Beban Kuat Perlu (U) ................................. 6

Tabel 2.3 Faktor Reduksi Kekuatan (ϕ) ................................................... 6

Tabel 2.4 Tebal Pelindung Beton untuk Tulangan Baja .......................... 7

Tabel 2.5 Tinggi Minimum Balok ............................................................ 12

Tabel 3.1 Geometri Pelat Atap ................................................................. 23

Tabel 3.2 Geometri Pelat Kanopi ............................................................. 23

Tabel 3.3 Geometri Pelat Lantai ............................................................... 23

Tabel 3.4 Hitungan Momen Pelat Atap .................................................... 25

Tabel 3.5 Hitungan Momen Pelat Kanopi ................................................ 31

Tabel 3.6 Hitungan Momen Pelat Lantai.................................................. 38

Tabel 3.7 Rekapitulasi Penulangan Pelat ................................................. 42

Tabel 4.1 Rekapitulasi Penulangan Pelat Tangga dan Balok Bordes ....... 59

Tabel 5.1 Hitungan Lebar Ekuivalen Balok Induk ................................... 66

Tabel 5.2 Hitungan Pembebanan Balok Induk Memanjang ..................... 67

Tabel 5.3 Hitungan Pembebanan Balok Induk Melintang ....................... 68

Tabel 5.4 Rekapitulasi Penulangan Sloof,Balok Induk, Balok Atap, dan


Kolom ........................................................................................ 86

Tabel 6.1 Hasil Reaksi Joint pada Frame Pondasi 1................................. 88

Tabel 6.2 Dimensi Pondasi Gabungan ..................................................... 89

Tabel 6.3 Hasil Reaksi Joint pada Frame Pondasi 1................................. 90


commit to user

xv
library.uns.ac.id
Tugas Akhir digilib.uns.ac.id
Perencanaan Struktur dan Rencana Anggaran Biaya Rusunawa Empat Lantai
Daftar Tabel

Tabel 6.4 Dimensi Pondasi Setempat ....................................................... 94

Tabel 6.5 Hasil Hitungan Perencanaan Pondasi ....................................... 98

Tabel 7.1 Volume Pekerjaan Beton Struktur ............................................ 148

Tabel 7.2 Pembebanan Balok Induk Memanjang ..................................... 149

Tabel 7.3 Volume Pekerjakaan Lantai dan Keramik ................................ 150

Tabel 7.4 Volume Pekerjaan Kusen ......................................................... 151

Tabel 7.5 Volume Pekerjaan Listrik ......................................................... 153

Tabel 7.6 Volume Pekerjaan Sanitasi ....................................................... 154

commit to user

xvi
library.uns.ac.id
Tugas Akhir digilib.uns.ac.id
Perencanaan Struktur dan Rencana Anggaran Biaya Rusunawa Empat Lantai
Daftar Notasi dan Simbol

DAFTAR NOTASI DAN SIMBOL

As’ = Luas tulangan tekan (mm2)

As = Luas tulangan tarik (mm2)

b = Lebar penampang (mm)

D = Diameter tulangan ulir (mm)

d = Tinggi efektif (mm)

E = Modulus elastisitas (m)

e = Eksentrisitas (m)

f’c = Kuat tekan beton (MPa)

fy = Kuat leleh (MPa)

H = Tinggi total komponen struktur (cm)

h = Lebar penampang (mm)

M = Harga momen (kgm)

Mu = Momen berfaktor (kgm)

Nu = Beban aksial berfaktor (kg)

P = Gaya aksial (kg)

q = Beban merata (kg/m)

S = Spasi dari tulangan (mm)

V = Gaya geser (kg)

Vu = Gaya geser berfaktor (kg)

W = Beban angina (kg)

ϕ = Faktor reduksi untuk betoncommit to user

xvii
library.uns.ac.id
Tugas Akhir digilib.uns.ac.id
Perencanaan Struktur dan Rencana Anggaran Biaya Rusunawa Empat Lantai
Daftar Notasi dan Simbol

ρ = Ratio tulangan tarik (As/bd)

Ø = Diameter tulangan polos (mm)

σ = Tegangan yang terjadi (kg/cm3)

commit to user

xviii