Panduan Metode Pelaksanaan Pekerjaan

Pelaksanaan
Pekerjaan

Persiapan Tanah Dasar

I. VOLUME & ALAT


1. Total volume pekerjaan = 69.036,1 m³
2. Peralatan yang digunakan
ͻ 4 unit Excavator SK 210 LC + 8 unit Dump Truck Nissan 220 PS
ͻ 1 unit Bulldozer D65P-7
ͻ 2 unit Sheep Foot Roller SV512 D
ͻ 4 unit Vibro Roller SV512
konstruksi jalan rigid pavemENT

II. PEMADATAN TANAH

WƌŽĚƵŬƟǀŝƚĂƐWĞŵĂĚĂƚĂŶƚĂŶĂŚ͗ϭ͘ϰϵϲ͕ϵϲŵϯͬŚĂƌŝ

III. QUALITY CONTROL


Kadar Air
Nilai California Bearing Ratio
(CBR)

Density
Existing = CBR < 5,2%.

DĞŵƉĞƌďĂŝŬŝďĞďĞƌĂƉĂƐŝĨĂƚƚĞŬŶŝŬƚĂŶĂŚ͘
Pemadatan Manfaat ϭ͘DĞŵƉĞƌďĂŝŬŝŬƵĂƚŐĞƐĞƌƚĂŶĂŚ͘
2. Mengurangi kompresibilitas yaitu
ŵĞŶŐƵƌĂŶŐŝƉĞŶƵƌƵŶĂŶŽůĞŚďĞďĂŶ͘
3. Mengurangi permeabilitas.
Pengujian ϰ͘DĞŶŐƵƌĂŶŐŝƐŝĨĂƚŬĞŵďĂŶŐͲƐƵƐƵƚƚĂŶĂŚ͘

Proctor Sand Cone

Syarat = CBR > 6%.

152
Bagian IV | KONSTRUKSI JALAN TOL
PT BRANTAS ABIPRAYA (PERSERO) 1
Metode Pelaksanaan Pekerjaan Panduan
Pelaksanaan
Pekerjaan
3.1. Proctor
Acuan
SNI 03-1743-1989
“METODE PENGUJIAN KEPADATAN BERAT UNTUK TANAH”

Proctor
ĂĚĂůĂŚ ƉĞŶŐƵũŝĂŶ ŬĞŬƵĂƚĂŶ LJĂŶŐ ŵĞŵďĂŶĚŝŶŐŬĂŶ ŬĞŬƵĂƚĂŶ ĚĂLJĂ ĚƵŬƵŶŐ ĚĂƌŝ ƐƵĂƚƵ ŵĂƚĞƌŝĂů ƚĞƌŚĂĚĂƉ
ŵĂƚĞƌŝĂůƐƚĂŶĚĂƌLJĂŶŐďĞƌƵƉĂďĂƚƵƉĞĐĂŚĚĞŶŐĂŶŐƌĂĚĂƐŝďĂŝŬ

Tujuan
ƵŶƚƵŬŵĞŶŐĞƚĂŚƵŝŬĞŬƵĂƚĂŶLJĂŶŐĚŝŚĂƐŝůŬĂŶŽůĞŚƐŝĨĂƚŬŽŚĞƐŝĨƐƵĂƚƵŵĂƚĞƌŝĂů

Metode
ͻ dĂŶĂŚĚŝƉĂĚĂƚŬĂŶĚĂůĂŵƐĞďƵĂŚƐŝůŝŶĚĞƌ͘
ͻ dĂŶĂŚĚŝĐĂŵƉƵƌĂŝƌĚĞŶŐĂŶŬĂĚĂƌLJĂŶŐďĞƌďĞĚĂͲďĞĚĂĚĂŶŬĞŵƵĚŝĂŶĚŝƉĂĚĂƚŬĂŶ͘
ͻ ŝůĂŬƵŬĂŶĚĂůĂŵϯůĂƉŝƐĂŶ;ĚĞŶŐĂŶƚĞďĂůƟĂƉůĂƉŝƐцϭinchiĂƚĂƵϭͬϯďĂŐŝĂŶƐŝůŝŶĚĞƌͿ
ͻ :ƵŵůĂŚƚƵŵďƵŬĂŶϮϱdžƐĞƟĂƉůĂƉŝƐĂŶ
ͻ Berat penumbuk (HammerͿϱ͕ϱůď;ŵĂƐƐĂсϮ͕ϱŬŐͿ
ͻ dŝŶŐŐŝũĂƚƵŚƐĞƟŶŐŐŝϭϮinchi;ϯϬϰ͕ϴŵŵͿ͘

3.2. Sand Cone


Acuan
SNI 03-2828-1992
“METODE PENGUJIAN KEPADATAN LAPANGAN DENGAN ALAT KONUS PASIR”

Sand Cone
ĂĚĂůĂŚƉĞƌƐĞŶƚĂƐĞƉĞƌďĂŶĚŝŶŐĂŶĂŶƚĂƌĂŬĞƉĂĚĂƚĂŶƚĂŶĂŚĚŝůĂƉĂŶŐĂŶ;ȖĚůĂƉͿĚĞŶŐĂŶŬĞƉĂĚĂƚĂŶstandar,
ƐĞďĂŐĂŝŬĞƉĂĚĂƚĂŶƐƚĂŶĚĂƌĂĚĂůĂŚȖd maksimum

Tujuan
hŶƚƵŬŵĞŶŐĞƚĂŚƵŝ ŬĞƉĂĚĂƚĂŶƚĂŶĂŚĚŝůĂƉĂŶŐĂŶ;ȖĚůĂƉĂŶŐĂŶͿ ĚĞŶŐĂŶĂĐƵĂŶďĞƌĂƚŝƐŝ ďĂƐĂŚ;ȖŵͿĚĂŶ
ŬĂĚĂƌĂŝƌ;ǁͿƚĂŶĂŚ͘

Metode
ȖP  DWDXȖP 

ȖGlapangan 
153
Bagian IV | KONSTRUKSI JALAN TOL
PT BRANTAS ABIPRAYA (PERSERO) 2
Panduan Metode Pelaksanaan Pekerjaan
Pelaksanaan
Pekerjaan

Ulasan Khusus
PENANGANAN PROBLEMA PEMBANGUNAN
INFRASTRUKTUR TRANSPORTASI
PADA TANAH LEMPUNG LUNAK
1. Pendahuluan

^ĞŬŝƚĂƌϮϬũƵƚĂŚĞŬƚĂƌĂƚĂƵůĞďŝŚĚĂƌŝϭϬйůƵĂƐĚĂƌĂƚĂŶĚŝ/ŶĚŽŶĞƐŝĂŵĞƌƵƉĂŬĂŶƚĂŶĂŚůƵŶĂŬLJĂŶŐƚĞƌĚŝƌŝ
ĚĂƌŝƚĂŶĂŚůĞŵƉƵŶŐůƵŶĂŬ;ƐŽŌĐůĂLJƐŽŝůͿĚĂŶƚĂŶĂŚŐĂŵďƵƚ;ƉĞĂƚƐŽŝůͿ͘dĂŶĂŚůĞŵƉƵŶŐůƵŶĂŬĚŝ/ŶĚŽŶĞƐŝĂ
ďĞƌĂĚĂĚŝƐĞƉĂŶũĂŶŐƉĂŶƚĂŝƵƚĂƌĂWƵůĂƵ:ĂǁĂ͕ƉĂŶƚĂŝƟŵƵƌWƵůĂƵ^ƵŵĂƚĞƌĂ͕ƉĂŶƚĂŝďĂƌĂƚ͕ƐĞůĂƚĂŶĚĂŶƟŵƵƌ
WƵůĂƵ<ĂůŝŵĂŶƚĂŶ͕ƉĂŶƚĂŝƐĞůĂƚĂŶWƵůĂƵ^ƵůĂǁĞƐŝƐĞƌƚĂƉĂŶƚĂŝďĂƌĂƚĚĂŶƐĞůĂƚĂŶWƵůĂƵWĂƉƵĂƐĞƉĞƌƟLJĂŶŐ
ditunjukkan pada Gambar 1.
konstruksi jalan rigid pavemENT

Medan

Sumatra Kalimantan
Palembang Balikpapan

Sulawesi Irian Jaya

Jakarta
Surabaya
Java

͗ůŽŬĂƐŝƚĂŶĂŚůĞŵƉƵŶŐůƵŶĂŬ
'ĂŵďĂƌϭ͘WĞƚĂůŽŬĂƐŝƚĂŶĂŚůĞŵƉƵŶŐůƵŶĂŬ

hŶƚƵŬ ƉĞŵďĂŶŐƵŶĂŶ ǁŝůĂLJĂŚ ĚĂŶ ŵĞŵďƵŬĂ ŬĞƚĞƌŝƐŽůĂƐŝĂŶ ĚĂĞƌĂŚ Ěŝ /ŶĚŽŶĞƐŝĂ ŵĂŬĂ ƟĚĂŬ ŵĞŶƵƚƵƉ
ŬĞŵƵŶŐŬŝŶĂŶŝŶĨƌĂƐƚƌƵŬƚƵƌƚƌĂŶƐƉŽƌƚĂƐŝŚĂƌƵƐĚŝďĂŶŐƵŶƉĂĚĂĚĂĞƌĂŚͲĚĂĞƌĂŚLJĂŶŐŬŽŶĚŝƐŝůĂƉŝƐĂŶƚĂŶĂŚ
ĚĂƐĂƌŶLJĂďĞƌƵƉĂƚĂŶĂŚůĞŵƉƵŶŐůƵŶĂŬƚĞƌƐĞďƵƚ͘DĞŶŐŝŶŐĂƚĂĚĂŶLJĂƉƌŽďůĞŵĂƉĞŵďĂŶŐƵŶĂŶŝŶĨƌĂƐƚƌƵŬƚƵƌ
ƉĂĚĂ ƚĂŶĂŚ ůĞŵƉƵŶŐ ůƵŶĂŬ LJĂŶŐ ĐƵŬƵƉ ďĞƌƉĞŶŐĂƌƵŚ ƉĂĚĂ ŬĞĂǁĞƚĂŶ ŬŽŶƐƚƌƵŬƐŝ ŵĂŬĂ ŚĂƌƵƐ ĚŝůĂŬƵŬĂŶ
penanganan sebelum konstruksi infrastruktur transportasi dibangun. Tujuannya agar infrastruktur
ƚƌĂŶƐƉŽƌƚĂƐŝƐĞƉĞƌƟũĂůĂŶ͕ďĂŶĚĂƌƵĚĂƌĂĚĂŶƉĞůĂďƵŚĂŶƟĚĂŬƌƵƐĂŬƐĞďĞůƵŵƵŵƵƌLJĂŶŐĚŝƌĞŶĐĂŶĂŬĂŶ͘

2. Problema Tanah Lempung Lunak

WƌŽďůĞŵĂ ƵƚĂŵĂ ƉĞŵďĂŶŐƵŶĂŶ ŝŶĨƌĂƐƚƌƵŬƚƵƌ ƚƌĂŶƐƉŽƌƚĂƐŝ ƉĂĚĂ ƚĂŶĂŚ ůĞŵƉƵŶŐ ůƵŶĂŬ ĂĚĂůĂŚ ƚĂŶĂŚ
ĚĂƐĂƌŶLJĂ LJĂŶŐ ŵĞŵƉƵŶLJĂŝ ĚĂLJĂ ĚƵŬƵŶŐ ƌĞůĂƟĨ ƌĞŶĚĂŚ ĚĂŶ ƉĞŵĂŵƉĂƚĂŶŶLJĂ LJĂŶŐ ƌĞůĂƟĨ ďĞƐĂƌ ƐĞƌƚĂ
ďĞƌůĂŶŐƐƵŶŐƌĞůĂƟĨůĂŵĂ͘ƉĂďŝůĂƚĂŶƉĂĚŝůĂŬƵŬĂŶƉĞƌďĂŝŬĂŶƉĂĚĂƚĂŶĂŚĚĂƐĂƌŶLJĂƚĞƌůĞďŝŚĚĂŚƵůƵŵĂŬĂ
infrastruktur transportasi yang dibangun berpotensi akan mengalami kerusakan sebelum mencapai umur
konstruksi yang direncanakan.

Narasumber : PT. Teknindo Geosistem Unggul

154
Bagian IV | KONSTRUKSI JALAN TOL
PT BRANTAS ABIPRAYA (PERSERO) 3
Metode Pelaksanaan Pekerjaan Panduan
Pelaksanaan
Pekerjaan

Gambar 2 Gambar 3

Gambar 4 Gambar 5

Gambar 6 Gambar 7

Keterangan Gambar :
Gambar 2. Kerusakan jalan perkerasan lentur
Gambar 3. Kerusakan jalan perkerasan kaku
Gambar 4. Kerusakan konstruksi jalan
Gambar 5. Kerusakan oprit jembatan
Gambar 6. Kerusakan konstruksi jembatan
'ĂŵďĂƌϳ͘<ĞƌƵƐĂŬĂŶƟŵďƵŶĂŶďĂĚĂŶũĂůĂŶ

WĂĚĂ'ĂŵďĂƌϮƐĂŵƉĂŝĚĞŶŐĂŶ'ĂŵďĂƌϳĚŝƚƵŶũƵŬŬĂŶĐŽŶƚŽŚͲĐŽŶƚŽŚŬĞƌƵƐĂŬĂŶďĂŶŐƵŶĂŶŝŶĨƌĂƐƚƌƵŬƚƵƌ
ƚƌĂŶƐƉŽƌƚĂƐŝLJĂŶŐĚŝďĂŶŐƵŶƉĂĚĂƚĂŶĂŚůĞŵƉƵŶŐůƵŶĂŬ͘WĂĚĂ'ĂŵďĂƌϮĚŝƚƵŶũƵŬŬĂŶĐŽŶƚŽŚŬĞƌƵƐĂŬĂŶ
jalan perkerasan lentur ;ŇĞdžŝďůĞ ƉĂǀĞŵĞŶƚͿ͘ WĂĚĂ 'ĂŵďĂƌ ϯ ĚŝƚƵŶũƵŬŬĂŶ ĐŽŶƚŽŚ ŬĞƌƵƐĂŬĂŶ ũĂůĂŶ
perkerasan kaku ;ƌŝŐŝĚƉĂǀĞŵĞŶƚͿ͘WĂĚĂ'ĂŵďĂƌϰĚŝƚƵŶũƵŬŬĂŶĐŽŶƚŽŚŬĞƌƵƐĂŬĂŶŬŽŶƐƚƌƵŬƐŝũĂůĂŶ͘WĂĚĂ

155
Bagian IV | KONSTRUKSI JALAN TOL
PT BRANTAS ABIPRAYA (PERSERO) 4
Panduan Metode Pelaksanaan Pekerjaan
Pelaksanaan
Pekerjaan

'ĂŵďĂƌϱĚŝƚƵŶũƵŬŬĂŶĐŽŶƚŽŚŬĞƌƵƐĂŬĂŶŽƉƌŝƚũĞŵďĂƚĂŶ͘WĂĚĂ'ĂŵďĂƌϲĚŝƚƵŶũƵŬŬĂŶĐŽŶƚŽŚŬĞƌƵƐĂŬĂŶ
ŬŽŶƐƚƌƵŬƐŝ ũĞŵďĂƚĂŶ͘ WĂĚĂ 'ĂŵďĂƌ ϳ ĚŝƚƵŶũƵŬŬĂŶ ĐŽŶƚŽŚ ŬĞƌƵƐĂŬĂŶ ďĂĚĂŶ ũĂůĂŶ͘ ϯ͘ WĞŶĂŶŐĂŶĂŶ dĂŶĂŚ
Lempung Lunak
WĂĚĂdĂďĞůϭĚŝƚƵŶũƵŬŬĂŶďĞďĞƌĂƉĂŵĞƚŽĚĞƉĞƌďĂŝŬĂŶƚĂŶĂŚĚŝŵĂŶĂƵŶƚƵŬƚĂŶĂŚůĞŵƉƵŶŐůƵŶĂŬŵĞƚŽĚĞ
ƉĞƌďĂŝŬĂŶLJĂŶŐƚĞƌƐĞĚŝĂĂĚĂůĂŚpreloading ;ǁŝƚŚǀĞƌƟĐĂůĚƌĂŝŶͿ, stone column, freezing dan ƐƵďƐƟƚƵƟŽŶ.
ĂƌŝŬĞĞŵƉĂƚŵĞƚŽĚĞƚĞƌƐĞďƵƚĂƉĂďŝůĂĚŝƉŝůŝŚďĞƌĚĂƐĂƌŬĂŶdĂďĞůϮŵĂŬĂŵĞƚŽĚĞpreloading ;ǁŝƚŚǀĞƌƟĐĂů
ĚƌĂŝŶͿŵĞƌƵƉĂŬĂŶƉŝůŝŚĂŶLJĂŶŐďŝƐĂĚŝƉĞƌƚĂŶŐŐƵŶŐũĂǁĂďŬĂŶ͘

dĂďĞůϭ͘ĞďĞƌĂƉĂŵĞƚŽĚĞƉĞƌďĂŝŬĂŶƚĂŶĂŚ
METODE PERBAIKAN TANAH DASAR
TYPE OF SOIL GROUND IMPROVMENT OBJECTIVES
GROUND IMPROVEMENT
METHOD ENVIRONMENTAL LIQUEFACTION
GRANULAR COHESIVE BEARING CAPACITY SETTLEMENT CONTROL LATERAL STABILITY
CONTROL RESISTANCE
sŝďƌŽĐŽŵƉĂĐƟŽŶ √ - √ √ - - √
LJŶĂŵŝĐŽŵƉĂĐƟŽŶ √ - √ √ - √ √
ůĂƐƟŶŐ √ - √ √ - - √
ŽŵƉĂĐƟŽŶ'ƌŽƵƟŶŐ √ - - √ - - -
WƌĞůŽĂĚŝŶŐͬsĞƌƟĐĂůƌĂŝŶƐ - √ √ √ - - -
Electro-osmosis - √ √ √ - - -
konstruksi jalan rigid pavemENT

sĂĐƵƵŵŽŶƐŽůŝĚĂƟŽŶ - √ √ √ - - -
>ŝŐŚƚǁĞŝŐŚƚ&ŝůů √ √ √ - - -
DĞĐŚĂŶŝĐĂů^ƚĂďŝůŝnjĂƟŽŶ √ - √ √ √ - -
Soil Nailing √ - - - √ - -
^ŽŝůŶĐŚŽƌŝŶŐ √ - - - √ - -
Micropiles √ - √ √ √ - -
Stone Columns - √ √ √ √ - √
&ŝďĞƌZĞŝŶĨŽƌĐĞŵĞŶƚ √ - √ √ √ - -
WĞƌŵĞĂƟŽŶ'ƌŽƵƟŶŐ √ - √ √ - √ -
:Ğƚ'ƌŽƵƟŶŐ √ √ √ √ √ √ √
ĞĞƉ^ŽŝůDŝdžŝŶŐ √ - √ √ √ √ √
Lime Columns - √ √ √ √ √ √
&ƌĂĐƚƵƌĞ'ƌŽƵƟŶŐ - √ √ √ - √ -
'ƌŽƵŶĚ&ƌĞĞnjŝŶŐ √ √ - - √ √ -
sŝƚƌŝĮĐĂƟŽŶ √ √ - - - √ -
ůĞĐƚƌŽŬŝŶĞƟĐdƌĞĂƚŵĞŶƚ - √ - √ - √ -
ůĞĐƚƌŽŚĞĂƟŶŐ - √ - √ - √ -
ŝŽƚĞĐŚŶŝĐĂů^ƚĂďŝůŝnjĂƟŽŶ √ - - - √ √ -

dĂďĞůϮ͘WĞŵŝůŝŚĂŶŵĞƚŽĚĞƉĞƌďĂŝŬĂŶƚĂŶĂŚ
VARIABEL PEMILIHAN METODE PERBAIKAN TANAH
Soil Gravel Coarse Sand &ŝŶĞ^ĂŶĚ Silt Clay Organic Feeble Means Important
10 2 1 0,2 0,1 0,02 0,01 0,002 0,001 0,0002 Soil
Contractor Time Environment ZĞůĂƟǀĞ
Methode ;ŝŵĞŶƐŝŽŶĂƚŵŵͿ YƵĂůŝĮĐĂƟŽŶ džĞĐƵƟŽŶ Impact Cost

Preloading

- Soil weight only

ͲtŝƚŚǀĞƌƟĐĂůĚƌĂŝŶ

- Electro Osmose
ůĞĐƚƌŽŽŶƐŽůŝĚĂƟŽŶ

Stone Coloumn
Cement Coloumn
Freezing

LJŶĂŵŝĐŽŵƉĂĐƟŽŶ
With Horizontal Drain
Explosive
sŝďƌŽŇŽƚĂƟŽŶ
/ŵƉƌĞŐŶĂƟŽŶ
^ƵďƟƚƵƟŽŶ

Narasumber : PT. Teknindo Geosistem Unggul


156
Bagian IV | KONSTRUKSI JALAN TOL
PT BRANTAS ABIPRAYA (PERSERO) 5
Metode Pelaksanaan Pekerjaan Panduan
Pelaksanaan
Pekerjaan

4. Metode Preloading dengan PVD

Pada metode preloading dengan PVD ;ƉƌĞĨĂďƌŝͲĐĂƚĞĚǀĞƌƟĐĂůĚƌĂŝŶͿ͕ƉĞƌďĂŝŬĂŶƚĂŶĂŚĚŝůĂŬƵŬĂŶĚĞŶŐĂŶĐĂƌĂŵĞůĞƚĂŬŬĂŶ


beban ;ƉƌĞůŽĂĚͿ ƉĂĚĂ  ƚĂŶĂŚ ĚĂƐĂƌ ƐĞƐƵĂŝ ĚĞŶŐĂŶ ďĞďĂŶ ŬĞƌũĂ ;ǁŽƌŬ ůŽĂĚͿ yang direncanakan. Durasi pembebanan
ĚŝůĂŬƵŬĂŶƐĂŵƉĂŝŬŽŶƐŽůŝĚĂƐŝƚĂŶĂŚĚĂƐĂƌŵĞŶĐĂƉĂŝĚĞƌĂũĂƚŬŽŶƐŽůŝĚĂƐŝLJĂŶŐĚŝƌĞŶĐĂŶĂŬĂŶ͘ƉĂďŝůĂĚĞƌĂũĂƚŬŽŶƐŽůŝĚĂƐŝ
ƚĂŶĂŚ ĚĂƐĂƌ ƚĞůĂŚ ŵĞŶĐĂƉĂŝ ƉĂĚĂ ĚĞƌĂũĂƚ LJĂŶŐ ĚŝƌĞŶĐĂŶĂŬĂŶ ŵĂŬĂ preload dibongkar dan konstruksi dimulai
pelaksanaannya. Ilustrasi metode preloading dengan PVD ditunjukkan pada Gambar 8.

PERBAIKAN TANAH METODE PRELOADING DENGAN PVD

Gambar 8. Prinsip preloading dengan PVD

WĞƌďĂŝŬĂŶƚĂŶĂŚůĞŵƉƵŶŐůƵŶĂŬŵĞƚŽĚĞpreloadingĚĞŶŐĂŶWsŵĞƌƵƉĂŬĂŶƐĂƚƵƐŝƐƚĞŵƉĞƌďĂŝŬĂŶƚĂŶĂŚLJĂŶŐƚĞƌĚŝƌŝ
dari pekerjaan preload, PVD, horizontal drain ĚĂŶ ŝŶƐƚƌƵŵĞŶ ŐĞŽƚĞŬŶŝŬ ƐĞƉĞƌƟ LJĂŶŐ ĚŝƚƵŶũƵŬĂŶ 'ĂŵďĂƌ ϵ͘ Preload
ďĞƌĨƵŶŐƐŝƵŶƚƵŬŵĞŵĂŵƉĂƚŬĂŶƚĂŶĂŚĚĂƐĂƌ͘WsďĞƌĨƵŶŐƐŝƵŶƚƵŬŵĞŵƉĞƌĐĞƉĂƚƉƌŽƐĞƐƉĞŵĂŵƉĂƚĂŶƚĂŶĂŚ͘Horizontal
drainďĞƌĨƵŶŐƐŝƵŶƚƵŬŵĞŶŐĂůŝƌŬĂŶĂŝƌƉŽƌŝĚĂƌŝWsŬĞĂƌĂŚŚŽƌŝnjŽŶƚĂůŬĞůƵĂƌƟŵďƵŶĂŶpreload. Instrumen geoteknik
ďĞƌĨƵŶŐƐŝƵŶƚƵŬŵĞŵĂŶƚĂƵƉƌŽƐĞƐĚĂŶŵĞŶŐĞƚĂŚƵŝŬŝŶĞƌũĂŚĂƐŝůƉĞƌďĂŝŬĂŶƚĂŶĂŚLJĂŶŐƚĞůĂŚĚŝůĂŬƵŬĂŶ͘

PERBAIKAN TANAH LUNAK METODE PRELOADING DENGAN PVD

Gambar 9. Sistem preloading dengan PVD

157
Bagian IV | KONSTRUKSI JALAN TOL
PT BRANTAS ABIPRAYA (PERSERO) 6
Panduan Metode Pelaksanaan Pekerjaan
Pelaksanaan
Pekerjaan

WĞƌďĂŝŬĂŶƚĂŶĂŚůĞŵƉƵŶŐůƵŶĂŬŵĞƚŽĚĞpreloadingĚĞŶŐĂŶWsŵĞƌƵƉĂŬĂŶƐĂƚƵƐŝƐƚĞŵƉĞƌďĂŝŬĂŶƚĂŶĂŚLJĂŶŐƚĞƌĚŝƌŝ
dari pekerjaan preload, PVD, horizontal drain ĚĂŶ ŝŶƐƚƌƵŵĞŶ ŐĞŽƚĞŬŶŝŬ ƐĞƉĞƌƟ LJĂŶŐ ĚŝƚƵŶũƵŬĂŶ 'ĂŵďĂƌ ϵ͘ Preload
ďĞƌĨƵŶŐƐŝƵŶƚƵŬŵĞŵĂŵƉĂƚŬĂŶƚĂŶĂŚĚĂƐĂƌ͘WsďĞƌĨƵŶŐƐŝƵŶƚƵŬŵĞŵƉĞƌĐĞƉĂƚƉƌŽƐĞƐƉĞŵĂŵƉĂƚĂŶƚĂŶĂŚ͘Horizontal
drainďĞƌĨƵŶŐƐŝƵŶƚƵŬŵĞŶŐĂůŝƌŬĂŶĂŝƌƉŽƌŝĚĂƌŝWsŬĞĂƌĂŚŚŽƌŝnjŽŶƚĂůŬĞůƵĂƌƟŵďƵŶĂŶpreload. Instrumen geoteknik
ďĞƌĨƵŶŐƐŝƵŶƚƵŬŵĞŵĂŶƚĂƵƉƌŽƐĞƐĚĂŶŵĞŶŐĞƚĂŚƵŝŬŝŶĞƌũĂŚĂƐŝůƉĞƌďĂŝŬĂŶƚĂŶĂŚLJĂŶŐƚĞůĂŚĚŝůĂŬƵŬĂŶ͘

PROSES PEKERJAAN PERBAIKAN TANAH LUNAK


METODE PRELOADING DENGAN PVD

INPUT AKTIVITAS OUTPUT


TANAH KOMPRESIBLE PERBAIKAN TANAH TANAH NON-KOMPRESIBLE
(MUDAH MAMPAT) (PERCEPAT MAMPAT) (SELESAI MAMPAT)

TES DATA TANAH DASAR ͻ PVD ͻ 'Z&/<DKE/dKZ/E'


ͻ Sondir ͻ PHD - ^ĞƩůĞŵĞŶƚWůĂƚĞ
ͻ SPT ͻ MONITORING  ͲWŶĞƵŵĂƟĐWŝĞnjŽŵĞƚĞƌ
ͻ Undisturb Sample ͻ PRELOADING - Inclinometer
- Volumetri & Gravimetri - Tinggi Timbunan ͻ EVALUASI AHLI GEOTEKNIK
- Analisa Ayakan & Hidrometri - ^ĞƩůĞŵĞŶƚWůĂƚĞ ͻ TES DATA TANAH DASAR
- Oedometri Konsolidasi - WŶĞƵŵĂƟĐWŝĞnjŽŵĞƚĞƌ - Sondir
konstruksi jalan rigid pavemENT

ͻ ^ƚĂƟĮŬĂƐŝ>ĂƉŝƐĂŶdĂŶĂŚ - Inclinometer - SPT


TES DATA TANAH TIMBUNAN ͻ TES PIEZOCONE

Gambar 10. Proses preloading dengan PVD

WĂĚĂƉĞƌďĂŝŬĂŶƚĂŶĂŚůĞŵƉƵŶŐůƵŶĂŬŵĞƚŽĚpreloadingĚĞŶŐĂŶWs͕ŝŶƉƵƚŶLJĂĂĚĂůĂŚƚĂŶĂŚLJĂŶŐŵƵĚĂŚŵĂŵƉĂƚ
;ĐŽŵƉƌĞƐŝďůĞ ƐŽŝůͿ͕ ƐĞůĂŶũƵƚŶLJĂ ĚŝůĂŬƵŬĂŶ ĂŬƟǀŝƚĂƐ ƉĞƌĐĞƉĂƚĂŶ ƉĞŵĂŵƉĂƚĂŶ ;ĐŽŶƐŽůŝĚĂƟŽŶ ĂĐĐĞůĞƌĂƟŽŶͿ dan
ŵĞŶŐŚĂƐŝůŬĂŶoutputďĞƌƵƉĂƚĂŶĂŚLJĂŶŐƉĞŵĂŵƉĂƚĂŶŶLJĂƐƵĚĂŚƐĞůĞƐĂŝ;ŶŽŶͲĐŽŵƉƌĞƐƐŝďůĞƐŽŝůͿ.

hŶƚƵŬŵĞŵĂŶƚĂƵƉƌŽƐĞƐĚĂŶŵĞŶŐĞƚĂŚƵŝŚĂƐŝůƉĞƌďĂŝŬĂŶƚĂŶĂŚůĞŵƉƵŶŐůƵŶĂŬŵĞƚŽĚpreloading dengan PVD perlu


ĂĚĂŶLJĂŝŶƐƚƌƵŵĞŶƚĂƐŝŐĞŽƚĞŬŶŝŬ͘'ƌĂĮŬŚĂƐŝůƉĞŵĂŶƚĂƵĂŶŝŶƐƚƌƵŵĞŶŐĞŽƚĞŬŶŝŬĚŝƚƵŶũƵŬŬĂŶ'ĂŵďĂƌϭϭ͘^ĞƩůĞŵĞŶƚƉůĂƚĞ
ďĞƌĨƵŶŐƐŝƵŶƚƵŬŵĞŶŐĞƚĂŚƵŝĚĞƌĂũĂƚŬŽŶƐŽůŝĚĂƐŝLJĂŶŐƐƵĚĂŚƚĞƌĐĂƉĂŝĚĂŶŵĞŶŐĞƚĂŚƵŝĞƐƟŵĂƐŝǁĂŬƚƵŬĂƉĂŶŬŽŶƐŽůŝĚĂƐŝ
dengan derajat tertentu akan dicapai. WŶĞƵŵĂƟĐ ƉŝĞnjŽŵĞƚĞƌ ƵŶƚƵŬ ŵĞŶŐĞƚĂŚƵŝ ŐĞũĂůĂ ĂŬĂŶ ƚĞƌũĂĚŝ ŬĞůŽŶŐƐŽƌĂŶ
ƟŵďƵŶĂŶƉƌĞůŽĂĚĚĂŶŵĞŶŐĞƚĂŚƵŝĚĞƌĂũĂƚŬŽŶƐŽůŝĚĂƐŝLJĂŶŐƐƵĚĂŚƚĞƌĐĂƉĂŝ͘InclinometerƵŶƚƵŬŵĞŶŐĞƚĂŚƵŝŐĞũĂůĂĂŬĂŶ
ƚĞƌũĂĚŝŬĞůŽŶŐƐŽƌĂŶƟŵďƵŶĂŶpreloadĚĂŶŵĞŵĂƐƟŬĂŶďĂŚǁĂƉĞŶƵƌƵŶĂŶƚĂŶĂŚƚĞƌũĂĚŝĂŬŝďĂƚƉĞŵĂŵƉĂƚĂŶŬŽŶƐŽůŝĚĂƐŝ
dan bukan akibat adanya gerakan ůĂƚĞƌĂů;ůĂƚĞƌĂůĚŝƐƉůĂĐĞŵĞŶƚͿƉĂĚĂƚĂŶĂŚĚĂƐĂƌ͘

PEMANTAUAN KINERJA PERBAIKAN TANAH


METODE PRELOADING DENGAN PVD

GRAFIK MONITORING GRAFIK MONITORING GRAFIK MONITORING


SETTLEMENT PLATE PNEUMATIC PIEZOMETER INCLINOMETER

1 1 1
DERAJAT KONSOLIDASI MONITOR GEJALA MONITOR GEJALA
YANG SUDAH TERCAPAI TIMBUNAN LONGSOR TIMBUNAN LONGSOR
2 2 2
ESTIMASI WAKTU DERAJAT KONSOLIDASI PENURUNAN TANAH
KONSOLIDASI SELESAI YANG SUDAH TERCAPAI AKIBAT KONSOLIDASI

Gambar 11. Pemantauan kinerja

Narasumber : PT. Teknindo Geosistem Unggul

158
Bagian IV | KONSTRUKSI JALAN TOL
PT BRANTAS ABIPRAYA (PERSERO) 7
Metode Pelaksanaan Pekerjaan Panduan
Pelaksanaan
Pekerjaan

4.1. Pekerjaan PVD

DĂƚĞƌŝĂůWsLJĂŶŐĚŝŐƵŶĂŬĂŶƵŶƚƵŬŵĞůĂŬƵŬĂŶƉĞŬĞƌũĂĂŶƉĞƌďĂŝŬĂŶƚĂŶĂŚůĞŵƉƵŶŐůƵŶĂŬŵĞƚŽĚĞƉƌĞůŽĂĚŝŶŐĚĞŶŐĂŶ
WsĂĚĂůĂŚƐĞƉĞƌƟLJĂŶŐĚŝƚƵŶũƵŬŬĂŶƉĂĚĂ'ĂŵďĂƌϭϮ͘^ĞĚĂŶŐŬĂŶƉĞŵĂƐĂŶŐĂŶWsĚŝůĂŬƵŬĂŶƐĞƉĞƌƟĚŝƚƵŶũƵŬŬĂŶƉĂĚĂ
Gambar 13, Gambar 14 dan Gambar 15.

Gambar 12 Gambar 13

Gambar 14 Gambar 15

Keterangan Gambar :
Gambar 12. Material PVD
Gambar 13. Pemasangan PVD cara ƐƚĂƟƐ
Gambar 14. Pemasangan PVD cara hidrolis
Gambar 15. Pemasangan PVD cara highspeed

4.2. Pekerjaan Horizontal Drain

Material horizontal drain yang digunakan bisa menggunakan pasir, kerikil, pipa berlubang yang dibungkus
ŶŽŶͲǁŽǀĞŶ ŐĞŽƚĞdžƟůĞ atau PHD ;ƉƌĞͲĨĂďƌŝĐĂƚĞĚ ŚŽƌŝnjŽŶƚĂů ĚƌĂŝŶͿ͘ <ĞĚƵĂ ŵĂƚĞƌŝĂů LJĂŶŐ ĚŝƐĞďƵƚ ƚĞƌĂŬŚŝƌ
ƚĞƌƐĞďƵƚ ĚŝŐƵŶĂŬĂŶ ƉĂĚĂ ĚĂĞƌĂŚͲĚĂĞƌĂŚ LJĂŶŐ ŬĞƚĞƌƐĞĚŝĂĂŶ ƉĂƐŝƌ ĚĂŶͬĂƚĂƵ ŬĞƌŝŬŝů ƐƵůŝƚ ĚŝƉĞƌŽůĞŚ ĂƚĂƵ
ŵĂŚĂůŚĂƌŐĂŶLJĂ͘DĂƚĞƌŝĂůW,ĚŝƚƵŶũƵŬŬĂŶƉĂĚĂ'ĂŵďĂƌϭϲ͘W,ŝŶŝƉĞƌƚĂŵĂŬĂůŝĚŝŐƵŶĂŬĂŶĚŝ/ŶĚŽŶĞƐŝĂ
ƉĂĚĂƚĂŚƵŶϮϬϬϱĚŝ^ĂŵĂƌŝŶĚĂ͘

159
Bagian IV | KONSTRUKSI JALAN TOL
PT BRANTAS ABIPRAYA (PERSERO) 8
Panduan Metode Pelaksanaan Pekerjaan
Pelaksanaan
Pekerjaan

Gambar 16 Gambar 17
konstruksi jalan rigid pavemENT

Gambar 18 Gambar 19

Keterangan Gambar :
Gambar 16. Material PHD
'ĂŵďĂƌϭϳ͘WĞŵĂƐĂŶŐĂŶW,ĂůƚĞƌŶĂƟĨͲϭ
'ĂŵďĂƌϭϴ͘WĞŵĂƐĂŶŐĂŶW,ĂůƚĞƌŶĂƟĨͲϮ
'ĂŵďĂƌϭϵ͘WĞŵĂƐĂŶŐĂŶW,ĂůƚĞƌŶĂƟĨͲϯ

dĞƌĚĂƉĂƚďĞďĞƌĂƉĂĂůƚĞƌŶĂƟĨƉĞŵĂƐĂŶŐĂŶW,͘WĂĚĂ'ĂŵďĂƌϭϳĚŝƚƵŶũƵŬŬĂŶĂůƚĞƌŶĂƟĨĚŝŵĂŶĂůĂũƵƌW,
ĚŝƉĂƐĂŶŐ ƉĂĚĂ ƐĞƟĂƉ ϭ ƵũƵŶŐ Ws͘ WĂĚĂ 'ĂŵďĂƌ ϭϴ ĚŝƚƵŶũƵŬŬĂŶ ĂůƚĞƌŶĂƟĨ ĚŝŵĂŶĂ ůĂũƵƌ W, ĚŝƉĂƐĂŶŐ
ƉĂĚĂƐĞƟĂƉϮƵũƵŶŐWs͘WĂĚĂ'ĂŵďĂƌϭϵĚŝƚƵŶũƵŬŬĂŶĂůƚĞƌŶĂƟĨĚŝŵĂŶĂW,ĚŝƉĂƐĂŶŐƉĂĚĂĂƌĂŚůĞďĂƌ
dan panjang area.

4.3. Pekerjaan Instrumen Geoteknik

WĂĚĂƉĞŬĞƌũĂĂŶƉĞƌďĂŝŬĂŶƚĂŶĂŚůĞŵƉƵŶŐůƵŶĂŬŵĞƚŽĚĞpreloading dengan PVD biasanya instrumen


ŐĞŽƚĞŬŶŝŬLJĂŶŐĚŝŐƵŶĂŬĂŶĂĚĂůĂŚƐĞƩůĞŵĞŶƚƉůĂƚĞ͕ƉŶĞƵŵĂƟĐƉŝĞnjŽŵĞƚĞƌdan inclinometer.

4.3.1. ^ĞƩůĞŵĞŶƚWůĂƚĞ

Yang dimaksud dengan material ƐĞƩůĞŵĞŶƚƉůĂƚĞĂĚĂůĂŚƐĞƉĞƌƟLJĂŶŐĚŝƚƵŶũƵŬŬĂŶ'ĂŵďĂƌϮϬ͘WĞŵĂƐĂŶŐĂŶ


ƐĞƩůĞŵĞŶƚƉůĂƚĞďĞƌĨƵŶŐƐŝƵŶƚƵŬŵĞŶŐĞƚĂŚƵŝƉĞŶƵƌƵŶĂŶLJĂŶŐƚĞƌũĂĚŝƉĂĚĂƉĞƌŵƵŬĂĂŶƚĂŶĂŚƐĞƉĞƌƟLJĂŶŐ
ditunjukkan pada Gambar 21.

Narasumber : PT. Teknindo Geosistem Unggul

160
Bagian IV | KONSTRUKSI JALAN TOL
PT BRANTAS ABIPRAYA (PERSERO) 9
Metode Pelaksanaan Pekerjaan Panduan
Pelaksanaan
Pekerjaan

Gambar 20 Gambar 21

Keterangan Gambar :
Gambar 20. Material ƐĞƩůĞŵĞŶƚƉůĂƚĞ
Gambar 21. Pemasangan ƐĞƩůĞŵĞŶƚƉůĂƚĞ

Untuk monitoring ƐĞƩůĞŵĞŶƚ ƉůĂƚĞ digunakan Auto Level ƐĞƉĞƌƟ 'ĂŵďĂƌ ϮϮ͘ ĞƌĚĂƐĂƌŬĂŶ ĚĂƚĂ ŚĂƐŝů
monitoring ƐĞƩůĞŵĞŶƚƉůĂƚĞƉĂĚĂ'ĂŵďĂƌϮϯƐĞůĂŶũƵƚŶLJĂĚĂƉĂƚĚŝďƵĂƚŐƌĂĮŬŚƵďƵŶŐĂŶĂŶƚĂƌĂƉĞŶƵƌƵŶĂŶ
ƚĂŶĂŚĚĂƐĂƌĚĂŶǁĂŬƚƵƐĞƉĞƌƟƉĂĚĂ'ĂŵďĂƌϮϰ͘

Gambar 22 Gambar 23 Gambar 24

Keterangan Gambar :
Gambar 22. Alat monitoring ƐĞƩůĞŵĞŶƚƉůĂƚĞ
Gambar 23. Monitoring ƐĞƩůĞŵĞŶƚƉůĂƚĞ
'ĂŵďĂƌϮϰ͘'ƌĂĮŬŵŽŶŝƚŽƌŝŶŐƐĞƩůĞŵĞŶƚƉůĂƚĞ

4.3.2. WŶĞƵŵĂƟĐWŝĞnjŽŵĞƚĞƌ

Yang dimaksud dengan material ƉŶĞƵŵĂƟĐ ƉŝĞnjŽŵĞƚĞƌ ĂĚĂůĂŚ ƐĞƉĞƌƟ ĚŝƚƵŶũƵŬŬĂŶ ƉĂĚĂ 'ĂŵďĂƌ Ϯϱ͘
Pemasangan ƉŶĞƵŵĂƟĐƉŝĞnjŽŵĞƚĞƌďĞƌĨƵŶŐƐŝƵŶƚƵŬŵĞŶŐĞƚĂŚƵŝƉĞƌƵďĂŚĂŶƚĞŬĂŶĂŶĂŝƌƉŽƌŝƉĂĚĂƚĂŶĂŚ
ĚĂƐĂƌƐĞƉĞƌƟLJĂŶŐĚŝƚƵŶũƵŬŬĂŶƉĂĚĂ'ĂŵďĂƌϮϲ͘

161
Bagian IV | KONSTRUKSI JALAN TOL
PT BRANTAS ABIPRAYA (PERSERO) 10
Panduan Metode Pelaksanaan Pekerjaan
Pelaksanaan
Pekerjaan

Gambar 25 Gambar 26 Gambar 27

Keterangan Gambar :
Gambar 25. Material ƉŶĞƵŵĂƟĐƉŝĞnjŽŵĞƚĞƌ
Gambar 26. Pemasangan ƉŶĞƵŵĂƟĐƉŝĞnjŽŵĞƚĞƌ
Gambar 27. Alat monitoring ƉŶĞƵŵĂƟĐƉŝĞnjŽŵĞƚĞƌ
konstruksi jalan rigid pavemENT

Gambar 28 Gambar 29 Gambar 30

Gambar 31 Gambar 32 Gambar 33

Gambar 34

Keterangan Gambar :
Gambar 28. Monitoring ƉŶĞƵŵĂƟĐƉŝĞnjŽŵĞƚĞƌ
'ĂŵďĂƌϮϵ͘'ƌĂĮŬŵŽŶŝƚŽƌŝŶŐƉŶĞƵŵĂƟĐƉŝĞnjŽŵĞƚĞƌ
Gambar 30. Material inclinometer
Gambar 31. Pemasangan inclinometer
Gambar 32. Alat monitoring inclinometer
Gambar 33. Alat monitoring inclinometer
'ĂŵďĂƌϯϰ͘'ƌĂĮŬŵŽŶŝƚŽƌŝŶŐinclinometer
Narasumber : PT. Teknindo Geosistem Unggul

162
Bagian IV | KONSTRUKSI JALAN TOL
PT BRANTAS ABIPRAYA (PERSERO) 11
Metode Pelaksanaan Pekerjaan Panduan
Pelaksanaan
Pekerjaan

Untuk monitoring ƉŶĞƵŵĂƟĐƉŝĞnjŽŵĞƚĞƌ menggunakan ƌĞĂĚŽƵƚĞƉĞƌƟ yang ditunjukkan pada Gambar 27.
ĞƌĚĂƐĂƌŬĂŶĚĂƚĂŚĂƐŝůŵŽŶŝƚŽƌŝŶŐƉŶĞƵŵĂƟĐƉŝĞnjŽŵĞƚĞƌƉĂĚĂ'ĂŵďĂƌϮϴĚĂƉĂƚĚŝďƵĂƚŐƌĂĮŬŚƵďƵŶŐĂŶ
ĂŶƚĂƌĂƚĞŬĂŶĂŶĂŝƌƉŽƌŝĚĂŶǁĂŬƚƵƐĞƉĞƌƟƉĂĚĂ'ĂŵďĂƌϮϵ͘

4.3.3. /ŶĐůŝŶŽŵĞƚĞƌ

Yang dimaksud dengan material inclinometerĂĚĂůĂŚƐĞƉĞƌƟLJĂŶŐĚŝƚƵŶũƵŬŬĂŶ'ĂŵďĂƌϯϬWĞŵĂƐĂŶŐĂŶ


inclinometerďĞƌĨƵŶŐƐŝƵŶƚƵŬŵĞŶŐĞƚĂŚƵŝĂĚĂŶLJĂĚĞĨŽƌŵĂƐŝůĂƚĞƌĂůƉĂĚĂƚĂŶĂŚĚĂƐĂƌƐĞƉĞƌƟƉĂĚĂ'ĂŵďĂƌ
31. Material pipa inclinometer.

ĞƌĚĂƐĂƌŬĂŶĚĂƚĂŚĂƐŝůŵŽŶŝƚŽƌŝŶŐinclinometerƉĂĚĂ'ĂŵďĂƌϯϮĚŝďƵĂƚŐƌĂĮŬŚƵďƵŶŐĂŶĂŶƚĂƌĂĚĞĨŽƌŵĂƐŝ
ĚĂŶ ǁĂŬƚƵ ƐĞƉĞƌƟ ƉĂĚĂ 'ĂŵďĂƌ ϯϯ 'ƌĂĮŬ ƉĂĚĂ 'ĂŵďĂƌ ϯϯ ƚĞƌƐĞďƵƚ ŵĞƌƵƉĂŬĂŶ ĚĂƚĂ ŬĞůƵĂƌĂŶ ĚĂƌŝ
ƉƌŽƐĞƐƉĂŬĞƚƉƌŽŐƌĂŵŬŽŵƉƵƚĞƌ͘ĞƌĚĂƐĂƌŬĂŶŐƌĂĮŬƚĞƌƐĞďƵƚĚĂƉĂƚĚŝůĂŬƵŬĂŶĞǀĂůƵĂƐŝƵŶƚƵŬŵĞŶŐĞƚĂŚƵŝ
ŬĞŵƵŶŐŬŝŶĂŶ ƚĞƌũĂĚŝŶLJĂ ŬĞůŽŶŐƐŽƌĂŶ ƟŵďƵŶĂŶ ƚĂŶĂŚ ĚĂŶ ŐĂŶŐŐƵĂŶ ƉĂĚĂ ďĂŶŐƵŶĂŶ LJĂŶŐ ďĞƌĂĚĂ Ěŝ
sekitarnya.

5. Kesimpulan

hŶƚƵŬ ƉĞŵďĂŶŐƵŶĂŶ ǁŝůĂLJĂŚ ĚĂŶ ŵĞŵďƵŬĂ ŬĞƚĞƌŝƐŽůĂƐŝĂŶ ĚĂĞƌĂŚ Ěŝ /ŶĚŽŶĞƐŝĂ͕ ƟĚĂŬ ŵĞŶƵƚƵƉ
ŬĞŵƵŶŐŬŝŶĂŶŝŶĨƌĂƐƚƌƵŬƚƵƌƚƌĂŶƐƉŽƌƚĂƐŝŚĂƌƵƐĚŝďĂŶŐƵŶƉĂĚĂĚĂĞƌĂŚͲĚĂĞƌĂŚLJĂŶŐŬŽŶĚŝƐŝůĂƉŝƐĂŶƚĂŶĂŚ
ĚĂƐĂƌŶLJĂďĞƌƵƉĂƚĂŶĂŚůĞŵƉƵŶŐůƵŶĂŬ͘,ĂůƚĞƌƐĞďƵƚďĞƌĚĂƐĂƌŬĂŶĨĂŬƚĂďĂŚǁĂƐĞŬŝƚĂƌϮϬũƵƚĂŚĞŬƚĂƌĂƚĂƵ
ůĞďŝŚĚĂƌŝϭϬйůƵĂƐĚĂƌĂƚĂŶĚŝ/ŶĚŽŶĞƐŝĂŵĞƌƵƉĂŬĂŶƚĂŶĂŚůƵŶĂŬLJĂŶŐƚĞƌĚŝƌŝĚĂƌŝƚĂŶĂŚůĞŵƉƵŶŐůƵŶĂŬ
;ƐŽŌ ĐůĂLJ ƐŽŝůͿ ĚĂŶ ƚĂŶĂŚ ŐĂŵďƵƚ ;ƉĞĂƚ ƐŽŝůͿ͘ ^ĞďĂŐĂŝ ŬŽŶƐĞŬƵĞŶƐŝŶLJĂ ŵĂŬĂ ŚĂƌƵƐ ĚŝůĂŬƵŬĂŶ ƉĞƌďĂŝŬĂŶ
ƚĂŶĂŚĚĂƐĂƌƚĞƌůĞďŝŚĚĂŚƵůƵƐĞďĞůƵŵŬŽŶƐƚƌƵŬƐŝŝŶĨƌĂƐƚƌƵŬƚƵƌƚƌĂŶƐƉŽƌƚĂƐŝĚŝůĂŬƐĂŶĂŬĂŶ͘

ƉĂďŝůĂƟĚĂŬĚŝůĂŬƵŬĂŶƉĞƌďĂŝŬĂŶƉĂĚĂƚĂŶĂŚĚĂƐĂƌŶLJĂƚĞƌůĞďŝŚĚĂŚƵůƵŵĂŬĂŝŶĨƌĂƐƚƌƵŬƚƵƌƚƌĂŶƐƉŽƌƚĂƐŝ
yang dibangun berpotensi akan mengalami kerusakan sebelum mencapai umur konstruksi yang
ĚŝƌĞŶĐĂŶĂŬĂŶ͘ ,Ăů ŝŶŝ ŵĞŶŐŝŶŐĂƚ ďĂŚǁĂ ƚĂŶĂŚ ůĞŵƉƵŶŐ ůƵŶĂŬ ŵĞŵŝůŝŬŝ ĚĂLJĂ ĚƵŬƵŶŐ LJĂŶŐ ƌĞŶĚĂŚ ĚĂŶ
ƉĞŵĂŵƉĂƚĂŶLJĂŶŐƌĞůĂƟĨďĞƐĂƌƐĞƌƚĂďĞƌůĂŶŐƐƵŶŐƌĞůĂƟĨůĂŵĂ͘

^ĂůĂŚƐĂƚƵŵĞƚŽĚĞLJĂŶŐĚĂƉĂƚĚŝŐƵŶĂŬĂŶƵŶƚƵŬŵĞůĂŬƵŬĂŶƉĞƌďĂŝŬĂŶƚĂŶĂŚůĞŵƉƵŶŐůƵŶĂŬĂĚĂůĂŚŵĞƚŽĚĞ
preloading ĚĞŶŐĂŶ Ws͘ WĞƌďĂŝŬĂŶ ƚĂŶĂŚ ůĞŵƉƵŶŐ ůƵŶĂŬ ŵĞƚŽĚĞ preloading dengan PVD merupakan
ƐŝƐƚĞŵƉĞƌďĂŝŬĂŶƚĂŶĂŚLJĂŶŐƚĞƌĚŝƌŝĚĂƌŝƉĞŬĞƌũĂĂŶpreload, PVD, horizontal drain dan instrumen geoteknik.
DĞƚŽĚĞƚĞƌƐĞďƵƚƚĞůĂŚďĂŶLJĂŬĚŝĂƉůŝŬĂƐŝŬĂŶƉĂĚĂƉƌŽLJĞŬͲƉƌŽLJĞŬƉĞŵďĂŶŐƵŶĂŶŝŶĨƌĂƐƚƌƵŬƚƵƌƚƌĂŶƐƉŽƌƚĂƐŝ
di Indonesia.

Narasumber : PT. Teknindo Geosistem Unggul

163
Bagian IV | KONSTRUKSI JALAN TOL
Sumber : Buku Panduan Pelaksanaan Pekerjaan Untuk Kontraktor Bagian IV 12