Diketahui: Rencana Project Peledakan : 60 hari
Ditanyakan :
1. Geometri Peledakan.
2. Panjang terowongan yang akan diledakkan.
3. Jumlah Bahan Peledak termasuk berat AN dan FO, agar tercapai
keadaan ZOB maka AN dan FO harus 94,5% dan 5,5%.
SUPERGEN ITNY
KSM BROWN COSMIC
HIMPUNAN MAHASISWA TEKNIK PERTAMBANGAN
INSTITUT TEKNOLOGI NASIONAL YOGYAKARTA
Penyelesaian Studi Kasus
Tinggi Abutment : 2.45m
Lebar Tunnel : 2.499 m
Tinggi Tunnel : 3.5 m
1. Geometri Peledakan
a. Kedalaman Lubang Ledak
L = 0,15 + 34,1 (Φ) – 39,4 (Φ)2
= 0,15 + 34,1 (0,195) – 39,4 (0,195)2
= 5,3 meter
b. Cut
1) Cut 1
a = 1,5 θ W1 = a √
= 1,5 x (0,195) = 0,2925 m x √
= 0,2925 meter = 0,4136 meter
2) Cut 2
B1 = W 1 = 0,4136 meter W 2 = 1,5 W 1 √
C–C = 1,5 W1 = 1,5 x (0,4136) x √
= 1,5 x (0,4136) = 0,877 meter
= 0,62 meter
3) Cut 3
B2 = W 2 = 0,877 meter W 3 = 1,5 W 2 √
C–C = 1,5 W2 = 1,5 x (0,877) x √
= 1,5 x (0,877) = 1,86 meter
= 1,3155 meter
c. Stemming Cut
Cut 1 = 0,5 a = 0,5 × 0,2935 m = 0,146 meter
Cut 2 = 0,5 B1 = 0,5 × 0,4136 m = 0,207 meter
Cut 3 = 0,5 B2 = 0,5 × 0,877 m = 0,438 meter
d. Part of Time Around Blast Hole
1) Floor
Burden =1B =1 x 0,877 meter = 0,877 meter
Spacing = 1,1 B = 1,1 x 0,877 meter = 0,9647 meter
Stemming = 0,2 B = 0,2 x 0,877 meter = 0,1754 meter
2) Wall
SUPERGEN ITNY
KSM BROWN COSMIC
HIMPUNAN MAHASISWA TEKNIK PERTAMBANGAN
INSTITUT TEKNOLOGI NASIONAL YOGYAKARTA
Burden = 0,9 B = 0,9 x 0,877 meter = 0,7893 meter
Spacing = 1,1 B = 1,1 x 0,877 meter = 0,9647 meter
Stemming = 0,5 B = 0,5 x 0,877 meter = 0,4385 meter
3) Roof
Burden = 0,9 B = 0,9 x 0,877 meter = 0,7893 meter
Spacing = 1,1 B = 1,1 x 0,877 meter = 0,9647 meter
Stemming = 0,5 B = 0,5 x 0,877 meter = 0,4385 meter
4) Stopping
a) Upwards
Burden = 1B =1 x 0,877 meter = 0,877 meter
Spacing = 1,1 B = 1,1 x 0,877 meter = 0,9647 meter
Stemming = 0,5 B = 0,5 x 0,877 meter = 0,4385 meter
b) Horizontal
Burden = 1B =1 x 0,877 meter = 0,877 meter
Spasi = 1,1 B = 1,1 x 0,877 meter = 0,9647 meter
Stemming = 0,5 B = 0,5 x 0,877 meter = 0,4385 meter
c) Downwards
Burden =1B =1 x 0,877 meter = 0,877 meter
Spasi = 1,2 B = 1,2 x 0,877 meter = 1,0524 meter
Stemming = 0,5 B = 0,5 x 0,877 meter = 0,4385 meter
e. Jumlah Lubang Ledak
4) Stopping :
SUPERGEN ITNY
KSM BROWN COSMIC
HIMPUNAN MAHASISWA TEKNIK PERTAMBANGAN
INSTITUT TEKNOLOGI NASIONAL YOGYAKARTA
1) PC Cut 1 = L – TCut 1
= 5,3 – 0,146
= 5,154 meter
2) PC Cut 2 = L – TCut 2
= 5,3 – 0,207
= 5,093 meter
3) PC Floor = L – TFloor
= 5,3 – 0,1754
= 5,1246 meter
4) PC Wall = L – TWall
= 5,3 – 0,4385
= 4,86 meter
5) PC Roof = L – TRoof
= 5,3 – 0,4385
= 4,86 meter
6) PC Upwards = L – TUpwards
= 5,3 – 0,4385
= 4,86 meter
7) PC Horizontal = L – THorizontal
= 5,3 – 0,4385
= 4,86 meter
8) PC Downwards = L – TDownwards
= 5,3 – 0,4385
= 4,86 meter
SUPERGEN ITNY
KSM BROWN COSMIC
HIMPUNAN MAHASISWA TEKNIK PERTAMBANGAN
INSTITUT TEKNOLOGI NASIONAL YOGYAKARTA
Kemajuan peledakan I = 89 % × L
= 89 % × 5,3 m
= 4,717 m
x = 60 x 2 = 120 round
Panjang terowongan = 120 x 4,717 m = 566,04 m
SUPERGEN ITNY
KSM BROWN COSMIC
HIMPUNAN MAHASISWA TEKNIK PERTAMBANGAN
INSTITUT TEKNOLOGI NASIONAL YOGYAKARTA
a. Loading Density
LD = π D2 × ρ ANFO x 1000
= 2,487 kg/m
b. Jumlah Bahan Peledak (E)
1) Cut 1
E = PC × LD × n
= (L – TCut 1) × LD × n
= (5,3 – 0,146) × 2,487 kg/m × 4
= 51,272 kg
2) Cut 2
E = (L – TCut 2) × LD × n
= (5,3 – 0,207) × 2,487 kg/m × 4
= 50,665 kg
3) Floor
E = (L – TFloor) × LD × n
= (5,3 – 0,1754 ) × 2,487 kg/m × 1
= 12,74488 kg
4) Wall
E = (L – TWall) × LD × n
= (5,3 – 0,4385) × 2,487 kg/m × 4
= 48,3622 kg
5) Roof
E = (L – TRoof) × LD × n
= (5,3 – 0,4385) × 2,487 kg/m × 2
= 24,1811 kg
6) Stopping
a) Upwards
E = (L – TUpwards) × LD × n
= (5,3 – 0,4385) × 2,487 kg/m × 1
= 12,09055 kg
b) Horizontal
E = (L – THorizontal) × LD × n
= (5,3 – 0,4385) ×2,487 kg/m × 1
SUPERGEN ITNY
KSM BROWN COSMIC
HIMPUNAN MAHASISWA TEKNIK PERTAMBANGAN
INSTITUT TEKNOLOGI NASIONAL YOGYAKARTA
= 12,09055 kg
c) Downwards
E = (L – TDownwards) × LD × n
= (5,3 – 0,4385) × 2,487 kg/m × 4
= 48,3622 kg