I.

+PENDAHULUAN
1.1 Treatment Crew adalah peserta Green Line IQC Convention dari area Green Line A2 Plating Department Front Of Line.

1.2 Profil Treatment Crew

Nama Tim : Treatment Crew

Department : AEE – A2 Plating

Tanggal dibentuk : ………………………….

Lama bekerja : …………………………..

Jumlah Pertemuan : …………………………..

Lama Tiap Pertemuan : ……………………………

Kehadiran : …………………………

Lama Proyek : ………………………....

1.3 Tugas dan Kewajiban

No Nama Posisi Tanggung Jawab


1 Agus Nuryanto Advocate
2 Achmad Denanda F.P Facilitator Process Engineer Dept. A2 Plating
3 Friza Sutanto Ketua Process Technician Group D area kerja A2 Plating
4 Dedy Slamet Riyadi Anggota PM Technician area kerja A2 Plating
5 Ginanjar Putra P Anggota Line Technician Group A area kerja A2 Plating
6 Agus Salim Anggota Leader Production Group C area kerja A2 Plating
7 Ryan Alsova Anggota Unloading Operator Group C area kerja A2 Plating
II. SELECTION
2.1 Project Selection
Pemilihan project diambil dimana hasil yang didapat berdasarkan hasil diskusi dari tim. Project yang dipilih harus memiliki manfaat bagi
perushaan yang berhubungan dengan criteria yang telah kami tentukan. Kriteria kriteria tersebut adalah :
A. Menjaga dan meningkatkan kualitas Produk (Quality)
B. Mengurangi down time proses produksi (Down time)
C. Menguntungkan pelanggan (internal/eksternal) (Costumer Satisfaction)
D. Mengurangi biaya produksi akibat GTR (Cost Saving)

Terdapat beberapa calon tema project yang berhasil di kumpulkan dan telah kami buat dalam matrik diagram sebagai dasar pemilihan
project dari team kami yaitu :

KriteriaPenilaian Total Nilai Ranking


No Tema Project
A B C D
1 Unloading Pusher A Wrong pushed ketika mendorong L/F kedalam magazine
2 Excessive plating disebabkan Lifter A error pada unloading
3 GTR (Get Trouble Report) yang banyak dari A2 Plating diakibatkan gel
contamination akibat kualitas DI Water pada proses rinsing yang kurang bersih
4 Tidak Stabilnya Sensor Fiber C pada unloading ketika mendeteksi incoming
material menyebabkan jamming
5 Tingginya Down Time Machine dikarenakan interbus (PC15 Error)

Rating SkalaPenilaian

Tidak memenuhi Kurang memenuhi kriteria Memenuhi kriteria Memenuhi criteria dengan Memenuhi criteria dengan
kriteria baik baik

Memenuhi criteria dengan


Denganmenggunakankriteriadanskala yang telahditentukandiatas, maka treatment crew memutuskantemasangat
project yang
baik
akandilaksanakanadalahtema yang paling banyak total nilainya yaitu :

“GTR yang banyakdari A2 Plating diakibatkan gel contamination akibatkualitas DI Water pada proses rinsing yang kurangbersih”

2.2 Pengenalan Masalah dan Alasan PemilihanTema


Proses Electroplating Strip Lead frame di area A2 Plating digambarkan oleh gambar ilustrasi berikut
DI Rinse Loading
Unloading A2 Treatment Activation
Hot DI Water Water
Drying T
O
P

V
I
E
W
Prosess Flow

``````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````
Unloading Loading
`````````````````````````````````````````````````````````````````````
S
I
D
E

V
I
E
W

Proses Rinsing menggunakan DI Water


Activation Prosess (HF/MSA )
A2 Treatment Proses (Electroplating prosess)
Hot DI Water prosess
Drying
DI Water merupakan kepanjangan De-Ionized water, yakni Air Suling dengan tingkat kemurnian tinggi yang dapat diperoleh dengan melakukan
penyulingan ulang air biasa. DI Water pada A2 Plating berperan sebagai cairan yang berfungsi membersihkan L/F dari kotoran organik maupun
membilas L/F dari bekas larutan kimia.Secara garis besar di A2 Plating peran DI Water sangat berpengaruh terhadap Quality material itu sendiri

Kebersihan dan tingkat konduktifitas DI Water pada storage tank harus pada kondisi bersih untuk menghindari kontaminasi dari partikel lain.
Storage tank dan Pipe Line Supply DI Water juga harus dijaga kebersihannya. Incoming Material Leadframe mengandung beberapa kotoran
organik maupun metallic yang menempel pada Leadframe. Pada saat Rinsing kotoran organic di bersihkan menggunakan air DI Water,
Di Area A2 Plating 80% pembilasan dan pembersihan material pada proses rinsing menggunakan DI Water, bahkan untuk melarutkan cairan
kimia masih memerlukan DI Water..

Alasan utama tim memilih tema project diatas adalah disebabkan oleh tingginya GTR after A2 Plating pada bulan juni 2014 tentang Gel
Contamination issue hal ini disebabkan karena pencucian pada waktu proses rinsing yang kurang bersih sehingga material dengan partikel asing.
Salah satu masalah penyebab gel contamination issue adalah tidak adanya filter pada jalur supply DI Water . Latar belakang dipilih project ini
dapat diilustasikan seperti dibawah ini.
Tanggal 15 Juni telah ditemukan wire contamination pada second shift dan night shift di Meco#2 dan berimbas pada reject material
begitu juga GTR yang disebabkan oleh perforna mesin meco#2.

Meco #2 di Eskalasi pada tanggal 16 Juni 2014 dari status lampu hijau ke status
lampu merah dikarenakan wire contamination . Investigasi pada meco #2 dilakukan
untuk mencari akar masalah penyebab wire contamination. Ditemukan banyak
endapan kotoran pada pipa saluran dari tank DI Water 2-1 Rinse menuju ke process
cell.

2.3 Jadwal Kegiatan