XA = 858246
YA = 520028
X1 = 858490
Y1 = 520040
X2 = 858683
Y2 = 520184
XB = 858938
YB = 520250
Penentuan Titik koordinat
A XA = 858246
YA = 520028
P1 X1 = 858490
Y1 = 520040
P2 X2 = 858683
Y2 = 520184
B XB = 858938
YB = 520250
= √ 193 2 + 144 2
= √ 37249 + 20736
= √ 57985
= 240.80 meter
= √ 255 2 + 66 2
= √ 65025 + 4356
= √ 69381
= 263.40 meter
Penentuan Sudut Putar
Tikungan 1
Sudut P1 = Arc Tan YA - Y1 ± Arc Tan Y1 - Y2
XA - X1 X1 - X2
= Arc Tan 520028 - 520040 ± Arc Tan 520040 - 520184
858246 - 858490 858490 - 858683
= Arc Tan ( 0.049 ) ± Arc Tan ( 0.746 )
= 2.81556 ± 36.727134
-= 33.91 ˚
Tikungan 2
Sudut P2 = Arc Tan Y1 - Y2 ± Arc Tan Y2 - YB
X1 - X2 X2 - XB
= Arc Tan 520040 - 520184 ± Arc Tan 520184 - 520250
858490 - 858683 858683 - 858938
= Arc Tan ( 0.746 ) ± Arc Tan ( 0.259 )
= 36.7271 ± 14.511
= 22.22 ˚
Perhitungan Tikungan PI1
- Tipe Tikungan : F-C
- Klasifikasi Jalan : Kolektor II B
- Kecepatan Rencana (VR) : 50 km/jam
- Kemiringan melintang maksimum (e maks) : 10 %
- Kemiringan melintang normal (en) : 2%
- Lebar Perkerasan (Bn) : 7 Meter
- Sudut Tikungan (∆) : 33.91 ⁰
- Jari-jari Rencana (Rc) : 409 Meter
- Jari-jari minimum (Rmin) : 80 Meter
Asumsi Awal Jenis Tikungan : F-C
Dari tabel binamarga, dengan e maks = 10% dan VR = 50 km/jam diperoleh data sebagai berikut :
- Rc : 409 Meter
- Ls : 45 Meter
- Dmaks : 18.85 %
- D : 3.5 %
- e : 3.5 %
Tc = Rc x tan x 1/2 x ∆
= 409 x tan x 1/2 x 33.91 ⁰
= 124.70 meter
Ec = Tc x tan x 1/4 x ∆
= 124.70 x tan x 1/4 x 33.91 ⁰
= 18.59 meter
Lc = 0.01745 x ∆ Rc
= 0.01745 x 33.91 ⁰ x 409
= 242.03 meter
Dari tabel binamarga, dengan e maks = 10% dan VR = 50 km/jam diperoleh data sebagai berikut :
- Rc : 318 Meter
- Ls : 45 Meter
- Dmaks : 18.85 %
- D : 4.5 %
- e : 4.3 % 7.525
Cek nilai P :
P > 0.2
0.2649 > 0.2 oke
Cek nilai e :
e > 4%
4.3 % > 4% oke
: 45 - 45 3
- 318 x sin 4.056
40 x 318 2
: 22.485 Meter
: 45 2
45 x ( 1 - )
40 x 318 2
: 44.977 Meter
6 #x## Rc
: 45 2
6 x 318
: 1.061 Meter
RATA-RATA 15
Klasifikasi
medan
B
B
B
B
B
B
G
B
G
B
B
B
B
B
G
B
Perhitungan Jarak Pandang Henti (JPH)
JPH PI 1
Diketahui :
VR : 50 km/jam
Waktu Reaksi (t) : 2.5 detik
Koefisien Gesekan (f) : 0.16
Dmin untuk V=50 : 55 meter
Penyelesaian :
JPH : ( 0.278 x VR x t ) + ( VR2 )
254 x f
: 96.27
Penyelesaian :
JPH : ( 0.278 x VR x t ) + ( VR2 )
254 x f
: 96.27
Penyelesaian :
t1 : 2.12 + 0.026 x VR
: 2.12 + 0.026 x 50
: 3.42 detik
t2 : 6.56 + 0.048 x VR
: 6.56 + 0.048 x 50
: 8.96 detik
a: 2.052 + 0.0036 x VR
: 2.052 + 0.0036 x 50
: 2.232 km/jam
d1 : 0.278 x t1 ( VR - m + a x t1 )
2
: 0.278 x 3.42 ( 50 - 15 + 2.232 x 3.42 )
2
: 36.905 meter
d2 : 0.278 x VR x t2
: 0.278 x 50 x 8.96
: 124.54 meter
d3 : 30 meter
d4 : 2 x d2
3
: 2 x 124.54
3
: 83.029 meter
JPM : d1 + d2 + d3 + d4
: 36.905 + 124.54 + 30 + 83.029
: 274.479 meter
Penyelesaian :
t1 : 2.12 + 0.026 x VR
: 2.12 + 0.026 x 50
: 3.42 detik
t2 : 6.56 + 0.048 x VR
: 6.56 + 0.048 x 50
: 8.96 detik
a: 2.052 + 0.0036 x VR
: 2.052 + 0.0036 x 50
: 2.232 km/jam
d1 : 0.278 x t1 ( VR - m + a x t1 )
2
: 0.278 x 3.42 ( 50 - 15 + 2.232 x 3.42 )
2
: 36.905 meter
d2 : 0.278 x VR x t2
: 0.278 x 50 x 8.96
: 124.54 meter
d3 : 30 meter
d4 : 2 x d2
3
: 2 x 124.54
3
: 83.029 meter
JPM : d1 + d2 + d3 + d4
: 36.905 + 124.54 + 30 + 83.029
: 274.479 meter
Penyelesaian :
Rc = Rc - 1 x Bn + 1x b
2 2
= 409 - 1 x 7 + 1x 2.5
2 2
= 406.75 Meter
B =√ ( √ Rc2 - ( P + A )2 + 1 x b )2 + ( P + A )2 - √ Rc2 - ( P +A )2 + 1 xb
2 2
=√ { √ 409 2 - ( 6.5 + 1.5 )2 + 1 x 2.5 }2 + ( 6.5 + 1.5 )2 - √ 409 2 - ( 6.5 + 1.5 )2 + 1 x 2.5
2 2
= 2.578 Meter
Z = 0.105 x VR
√ Rc
= 0.105 x 50
√ 409
= 0.260 meter
Bt = n x ( B + C ) + Z
= 2x ( 2.58 + 1 ) + 0.260
= 7.416 meter
∆b = Bt - Bn
= 7.42 - 7
= 0.42 meter
Penyelesaian :
Rc = Rc - 1 x Bn + 1x b
2 2
= 239 - 1 x 7 + 1x 2.5
2 2
= 236.75 Meter
B =√ ( √ Rc2 - ( P + A )2 + 1 x b )2 + ( P + A )2 - √ Rc2 - ( P +A )2 + 1 xb
2 2
=√ { √ 239 2 - ( 6.5 + 1.5 )2 + 1 x 2.5 }2 + ( 6.5 + 1.5 )2 - √ 239 2 - ( 6.5 + 1.5 )2 + 1 x 2.5
2 2
= 2.633 Meter
Z = 0.105 x VR
√ Rc
= 0.105 x 50
√ 239
= 0.340 meter
Bt = n x ( B + C ) + Z
= 2x ( 2.63 + 1 ) + 0.340
= 7.606 meter
∆b = Bt - Bn
= 7.61 - 7
= 0.61 meter
Penyelesaian :
Rc = Rc - 1 x Bn + 1x b
2 2
= 318 - 1 x 7 + 1x 2.5
2 2
= 315.75 Meter
B =√ ( √ Rc2 - ( P + A )2 + 1 x b )2 + ( P + A )2 - √ Rc2 - ( P +A )2 + 1 xb
2 2
=√ { √ 318 2 - ( 6.5 + 1.5 )2 + 1 x 2.5 }2 + ( 6.5 + 1.5 )2 - √ 318 2 - ( 6.5 + 1.5 )2 + 1 x 2.5
2 2
= 2.6 Meter
Z = 0.105 x VR
√ Rc
= 0.105 x 50
√ 318
= 0.294 meter
Bt = n x ( B + C ) + Z
= 2x ( 2.60 + 1 ) + 0.294
= 7.495 meter
∆b = Bt - Bn
= 7.49 - 7
= 0.49 meter
Sta A : 0 + 000
VR = 60 km/jam
Perhitungan :
d1 = ( STA PPV 2) - ( STA PPV 1)
= ( 0 + 500) - ( 0 + 130)
= 370 meter
A= ( g1 - g2 )
= ( 3.8 ) - ( -0.7 )
= 4.5 %
Menentukan Lv
Jh = ( 0.278 x VR x 2.5 ) + VR2
254 x fm
= ( 0.278 x 60 x 2.5 ) + 60 2
254 x 0.35
= 82.19 meter
x1 = 1 x 75.36
4
= 18.84 meter
x2 = 1 x 75.36
2
= 37.68 meter
x3 = 3 x 75.36
4
= 56.52 meter
Y1 = 4.45 x ( x 12 )
200 x Lv
= 4.45 x ( 354.91 )
200 x 75.36
= 1579.52
15071
= 0.10 meter
Y2 = 4.45 x ( x 22 )
200 x Lv
= 4.45 x ( 1419.65 )
200 x 75.36
= 6318.10
15071
= 0.42 meter
Ev = 4.45 x 75.36
800
= 335.37076
800
= 0.42 meter
Penentuan Elevasi
Elevasi PLV = Elevasi PPV 1 ± g1 ( 1 Lv )
2
= 185.00 - ( 0.038 ) ( 1 x 75.36 )
2
= 183.57 meter
VR = 60 km/jam
Perhitungan :
d1 = ( STA PPV 1) - ( STA A)
= ( 0 + 130) - ( 0 + 000)
= 130 meter
A= ( g2 - g3 )
= ( -3.8 ) - ( 3.8 )
= 7.6 %
Menentukan Lv
Jh = ( 0.278 x VR x 2.5 ) + VR2
254 x fm
= ( 0.278 x 60 x 2.5 ) + 60 2
254 x 0.35
= 82.19 meter
x1 = 1 x 129.19
4
= 32.30 meter
x2 = 1 x 129.19
2
= 64.60 meter
x3 = 3 x 129.19
4
= 96.89 meter
Y1 = 7.63 x ( x1 2 )
200 x Lv
= 7.63 x ( 1043.17 )
200 x 129.19
= 7959.35
25839
= 0.31 meter
Y2 = 7.63 x ( x2 2 )
200 x Lv
= 7.63 x ( 4172.69 )
200 x 129.19
= 31837.39
25839
= 1.23 meter
Ev = 7.63 x 129.19
800
= 985.733
800
= 1.23 meter
Penentuan Elevasi
Elevasi PLV = Elevasi PPV 2 ± g2 ( 1 Lv )
2
= 171 - ( -0.038 ) ( 1 x 129.19 )
2
= 173.48 meter
VR = 50 km/jam
Perhitungan :
d1 = ( STA PPV 3) - ( STA PPV 2)
= ( 0 + 500) - ( 0 + 130)
= 370 meter
A= ( g3 - g4 )
= ( 3.8 ) - ( 842.8 )
= 846.6 %
Menentukan Lv
Jh = ( 0.278 x VR x 2.5 ) + VR2
254 x fm
= ( 0.278 x 50 x 2.5 ) + 50 2
254 x 0.35
= 62.87
x1 = 1 x Lv
4
= 1 x 9841.44
4
= 2460.36 meter
x2 = 1 x Lv
2
= 1 x 9841.44
2
= 4920.72 meter
x3 = 3 x Lv
4
= 3 x 9841.44
4
= 7381.08 meter
Y1 = A x ( x12 )
200 x Lv
= 846.6 x ( 6053374.26 )
200 x 9841.44
= 2603.77 meter
Y2 = A x ( x22 )
200 x Lv
= 846.6 x ( 24213497.04 )
200 x 9841.44
= 10415.09 meter
Ev = A x Lv
800
= 846.6 x 9841.44
800
= 10415.09 meter
Penentuan Elevasi
Elevasi PLV = Elevasi PPV 2 ± g3 ( 1 Lv )
2
= 185 - ( 0.038 ) ( 1 x 9841.44 )
2
= -1.19 meter
VR = 50 km/jam
Perhitungan :
d1 = ( STA PPV 4) - ( STA PPV 3)
= ( 0 + 580.63) - ( 0 + 449.5)
= 80.63 meter
A= ( g3 - g4 )
= ( 842.8 ) - ( -6.8 )
= 849.70 %
Menentukan Lv
Jh = ( 0.278 x VR x 2.5 ) + VR2
254 x fm
= ( 0.278 x 50 x 2.5 ) 50 2
254 x 0.35
= 62.87
x1 = 1 x 8417.80
4
= 2104.45 meter
x2 = 1 x 8417.80
2
= 4208.90 meter
x3 = 3 x 8417.80
4
= 6313.35 meter
Y1 = A x ( x 12 )
200 x Lv
= 849.70 x ( 4428706.67 )
200 x 8417.80
= 2235.179 meter
Y2 = A x ( x 22 )
200 x Lv
= 849.70 x ( 17714826.69 )
200 x 8417.80
= 8940.72 meter
Ev = A x Lv
800
= 849.70 x 8417.80
800
= 8940.72 meter
Penentuan Elevasi
Elevasi PLV = Elevasi PPV 3 ± g3 ( 1 Lv )
2
= 864.588 - ( 8.428 ) ( 1 x 8417.80 )
2
= -34610.01 meter
Perhitungan Drainase
Perhitungan
xa = Σxi
n
= 1212
10
= 121.2 mm
Sd = √Σ(xi-xa)2
n
= √6439.14
10
= 80.24
10
= 8.02 mm
Periode ulang (T) = 5 Tahun
n = 10
Yt = 1.4999 ( Tabel )
Yn = 0.5128 ( Tabel )
Sn = 1.0206 ( Tabel )
Sd
xt = xa + ( ) + ( Yt - Yn )
Sn
8.024
= 121,2 + ( ) + ( 1,4999 - 0,5128 )
1.0206
= 130.0496 mm
0.013
t aspal = ( 2/3 . 3.28 . 3.5 ) 0.167
0.02
= 0.94 menit
0.10
t bahu = ( 2/3 . 3.28 . 1.5 ) 0.167
0.04
= 1.09 menit
0.02
t tanah = ( 2/3 . 3.28 . 50 ) 0.167
0.09
= 1.39 menit
= 3.42 menit
L
t2 =
60 . V
739.38
=
60 ( 1.10 )
= 11.203 menit
maka :
tc = t1 + t2
= 3,422 + 11,203
= 14.625 menit
maka :
C1.A1+C2.A2+C3.A3
C =
A1+A2+A3
= 0.697
= 0,0407 km2
Q = 1/3.6 ( C.I.A )
Q
Fd =
V
1.19
=
1.10
= 1.08 m
m = 1 ( Tabel )
Syarat :
b + 2md
= d m²+1
2
b + 2(1)d
= d 1² +1
2
b = 0,828 d
Fe = d ( b + nd )
= d ( 0,828 d + 1.5d )
= 2,328 d²
Fe = Fd
2,328 d² = 1.081
d = 0,681 m
b = 0,828 (0,681)
= 0,565 m
W = 0.5 d
= 0.5 ( 0,681 )
= 0.5837112 m
Dimensi Penampang Saluran Drainase
W = 0,584 m
d = 0,681 m
b = 0,565 m
Karena drainase pada hasil perhitungan diatas tidak dapat diterapkan dilapangan,
maka diambil ukuran penampang sebagai berikut :
m1
m1
m 0.5
Perhitungan Drainase
∑xi
xa =
n
1212
=
10
= 121.2 mm
∑ (xi-xa)²
sd =
n
6439.140
=
10
= 25.375
Yt = 1.4999 ( Tabel )
Yn = 0.5128 ( Tabel )
Sn = 1.0206 ( Tabel )
sd
xt = xa + ( ) + ( Yt - Yn )
Sn
25.375
= 121,2 + ( ) + ( 1,4999 - 0,5128 )
1.0206
= 147.0504 mm
Berdasarkan peta topografi, maka jarak tempuh, beda tinggi, dan luas
derah yang mempengaruhi dapat ditentukan, seperti tergambar dibawah ini :
Dimana :
L1 = Permukaan jalan aspal, lebar 3.5m kemiringan 2 %
L2 = Bahu jalan tanah berbutir halus dan padat, lebar 2 m kemiringan 4 %
L3 = Bagian luar jalan dengan panjang maxsimum 50 m, dengan kondisi
hutan dan kemiringan tanah sepanjang 50 m =1 : 2 = 0.005
L = Panjang jalan, yaitu 531.14 m
V = Saluran direncanakan terdiri dari tanah asli, lempung padat dengan
kecepatan alairan air yang diizinkan 1.10 m/detik.
90% . xt
I =
4
90% . 147,05
=
4
= 33.086335 mm/jam
= 0.9430 menit
0.10
t bahu = ( 2/3 . 3.28 . 1.5 ) 0.167
0.06
= 1.0500 menit
0.02
t tanah = ( 2/3 . 3.28 . 100 ) 0.167
0.005
= 1.9914 menit
= 3.984 menit
L
t2 =
60 . V
624.993
=
60 ( 1.10 )
= 9.470 menit
maka :
tc = t1 + t2
= 3,984 + 9,47
= 13.454 menit
Dari penarikan kurva basis dengan cara memplotkan dari harga Tc = 13,454
lengkung rencana, dengan harga Tc = 15.325 didapat Imax = 151 mm/jam
maka :
C1.A1+C2.A2+C3.A3
C =
A1+A2+A3
= 0.699
= 0,0653 km2
Q = 1
/3.6 ( C.I.A )
= 1.9136938 m3/detik
Q
Fd =
V
1.9136938
=
1.10
= 1.7397217 m
m = 1 ( Tabel )
Syarat :
b + 2md
= d m²+1
2
b + 2(1)d
= d 1² +1
2
b = 0,828 d
Fe = d ( b + nd )
= d ( 0,828 d + 1.5d )
= 2,328 d²
Fe = Fd
2,328 d² = 1.740
d = 0,864 m
b = 0,828 (0,864)
= 0,716 m
W = 0.5 d
= 0.5 ( 0,864 )
= 0.6574145 m
W = 0,657 m
d = 0,864 m
b = 0,716 m
Karena drainase pada hasil perhitungan diatas tidak dapat diterapkan dilapangan,
maka diambil ukuran penampang sebagai berikut :
m1
m1
m1
m 0.5
Perencanaan gorong-gorong untuk membuang air dari selokan sampai ke jurang
F = 1x θ x sin θ x D2
8
= 1x 4.5 x sin 4.5 x D2
8
= 0.685 D2
Fd = 0.82 M2
F = Fd
0.685 D2 = 0.82 M2
D= √ 1.197
= 1.09 m dipakai D = 120 cm
ρ= 1 x θ x D
2
= 1 x 4.5 x 1.2
2
= 2.7 meter
R= F
ρ
= 0.986
2.7
= 0.365 meter
Gorong-gorong terbuat dari beton dengan n = 0.014 dan kecepatan yang diizinkan = 1.5 m/dt
So = V x n 2
R 2/3
= 1.5 x 0.014 2
0.365 2/3
= 0.0017
= 0.17 %
PERHITUNGAN KUBIKASI DENGAN METODE LUAS
CL
1 6 7 8 9 10 11 12
2 3 4 5
Pilih !
1 Persegi
2 Segitiga
3 Trapesium
Perhitungan Kubikasi ( Dengan Metode Luas )
No Dimensi Luas
Sta Ket
Pias (m) (m2)
2 1 ( 0.13 x 3.97 ) / 2 0.248
3 2 ( 0.13 + 3.14 ) / 2 x 0.25 0.408
3 3 ( 2.14 + 3.16 ) / 2 x 0.50 1.323
3 4 ( 1.16 + 3.16 ) / 2 x 0.25 0.539
3 5 ( 0.81 + 3.16 ) / 2 x 1.50 2.970
3 6 ( 0.70 + 1.81 ) / 2 x 3.50 4.375
10 + 500 Galian
3 7 ( 0.70 + 2.05 ) / 2 x 3.50 4.795
3 8 ( 1.05 + 2.50 ) / 2 x 1.50 2.655
3 9 ( 1.50 + 3.51 ) / 2 x 0.25 0.625
3 10 ( 3.51 + 1.52 ) / 2 x 0.50 1.255
3 11 ( 1.53 + 1.52 ) / 2 x 0.25 0.380
2 12 ( 1.39 x 1.53 ) / 2 1.056
Total Galian 20.628
No Dimensi Luas
Sta Ket
Pias (m) (m2)
2 1 ( 2.20 x 1.21 ) / 2 1.322
3 2 ( 2.13 + 1.22 ) / 2 x 0.25 0.418
3 3 ( 2.22 + 1.24 ) / 2 x 0.50 0.863
3 4 ( 1.26 + 1.24 ) / 2 x 0.25 0.311
3 5 ( 0.92 + 1.26 ) / 2 x 1.50 1.628
3 6 ( 0.87 + 0.92 ) / 2 x 3.50 3.115
10 + 550 Galian
3 7 ( 0.87 + 1.23 ) / 2 x 3.50 3.658
3 8 ( 1.23 + 1.69 ) / 2 x 1.50 2.183
3 9 ( 1.69 + 2.70 ) / 2 x 0.25 0.548
3 10 ( 2.70 + 2.73 ) / 2 x 0.50 1.355
3 11 ( 1.74 + 2.73 ) / 2 x 0.25 0.558
2 12 ( 3.77 x 1.74 ) / 2 3.266
Total Galian 19.222
No Dimensi Luas
Sta Ket
Pias (m) (m2)
2 1 ( 0.89 x 0.57 ) / 2 0.250
3 2 ( 0.57 + 1.60 ) / 2 x 0.25 0.270
3 3 ( 1.60 + 1.67 ) / 2 x 0.50 0.815
3 4 ( 0.70 + 1.67 ) / 2 x 0.25 0.295
3 5 ( 0.49 + 0.70 ) / 2 x 1.50 0.885
3 6 ( 0.87 + 0.73 ) / 2 x 3.50 2.783
10 + 600 Timbunan
3 7 ( 0.73 + 1.37 ) / 2 x 3.50 3.658
3 8 ( 1.37 + 1.96 ) / 2 x 1.50 2.490
3 9 ( 1.96 + 2.99 ) / 2 x 0.25 0.618
3 10 ( 2.99 + 3.06 ) / 2 x 0.50 1.510
3 11 ( 2.09 + 3.06 ) / 2 x 0.25 0.643
2 12 ( 3.55 x 2.09 ) / 2 3.696
Total Timbunan 17.911
No Dimensi Luas
Sta Ket
Pias (m) (m2)
2 1 ( 3.53 x 1.13 ) / 2 1.983
2 2 ( 2.73 x 2.13 ) / 2 2.895
2 3 ( 2.83 x 3.83 ) / 2 5.403
3 4 ( 0.43 + 1.33 ) / 2 x 3.50 3.063
3 5 ( 3.33 + 2.03 ) / 2 x 1.50 4.013
10 + 650 Timbunan
3 6 ( 2.03 + 3.08 ) / 2 x 0.25 0.638
3 7 ( 3.08 + 3.18 ) / 2 x 0.50 1.563
3 8 ( 2.23 + 3.18 ) / 2 x 0.25 0.675
2 9 ( 4.36 x 2.23 ) / 2 4.845
Total Timbunan 25.076
No Dimensi Luas
Sta Ket
Pias (m) (m2)
2 1 ( 2.82 x 3.29 ) / 2 4.624
3 2 ( 2.29 + 1.25 ) / 2 x 0.25 0.441
3 3 ( 1.16 + 1.25 ) / 2 x 0.50 0.600
3 4 ( 3.12 + 3.16 ) / 2 x 0.25 0.784
2 5 ( 1.12 x 3.23 ) / 2 1.798
2 10 + 700 Galian 6 ( 1.33 x 2.60 ) / 2 1.719
3 7 ( 2.60 + 3.40 ) / 2 x 3.50 10.483
3 8 ( 1.40 + 3.80 ) / 2 x 3.50 9.083
3 9 ( 1.65 + 3.80 ) / 2 x 1.50 4.080
2 10 ( 4.03 x 1.65 ) / 2 3.311
Total Galian 36.921
No Dimensi Luas
Sta Ket
Pias (m) (m2)
2 1 ( 0.18 x 0.10 ) / 2 0.008
3 2 ( 0.10 + 1.09 ) / 2 x 0.25 0.148
3 3 ( 1.07 + 1.09 ) / 2 x 0.50 0.538
Timbunan
3 4 ( 0.06 + 1.07 ) / 2 x 0.25 0.140
2 5 ( 0.14 x 0.06 ) / 2 0.004
3 Total Timbunan 0.837
10 + 750
2 6 ( 1.42 x 1.45 ) / 2 1.022
3 7 ( 2.45 + 1.78 ) / 2 x 3.50 7.385
3 8 ( 1.71 + 10.78 ) / 2 x 3.50 21.840
Galian
3 9 ( 1.36 + 1.71 ) / 2 x 1.50 2.295
2 10 ( 1.15 x 1.36 ) / 2 0.776
Total Galian 33.318
No Dimensi Luas
Sta Ket
Pias (m) (m2)
2 1 ( 2.84 x 1.96 ) / 2 2.771
3 2 ( 1.96 + 1.96 ) / 2 x 0.25 0.489
1 3 4.96 x 0.53 2.601
3 4 ( 3.96 + 4.96 ) / 2 x 0.25 1.114
3 5 ( 3.57 + 3.96 ) / 2 x 1.50 5.640
3 6 ( 3.38 + 3.57 ) / 2 x 3.50 12.145
10 + 800 Galian
3 7 ( 3.38 + 3.59 ) / 2 x 3.50 12.180
3 8 ( 3.59 + 4.00 ) / 2 x 1.50 5.685
3 9 ( 4.00 + 3.00 ) / 2 x 0.25 0.874
1 10 3.00 x 0.53 1.572
3 11 ( 3.00 + 3.00 ) / 2 x 0.25 0.749
10 + 800 Galian
No Dimensi Luas
Sta Ket
Pias (m) (m2)
2 1 ( 2.63 x 2.33 ) / 2 3.052
3 2 ( 1.33 + 2.33 ) / 2 x 0.25 0.456
3 3 ( 1.33 + 2.33 ) / 2 x 0.25 0.456
3 4 ( 2.90 + 3.33 ) / 2 x 1.50 4.665
3 5 ( 2.73 + 2.90 ) / 2 x 3.50 9.835
3 10 + 900 Galian 6 ( 2.73 + 2.90 ) / 2 x 3.50 9.835
3 7 ( 2.90 + 3.33 ) / 2 x 1.50 4.665
3 8 ( 3.33 + 4.33 ) / 2 x 0.25 0.956
1 9 1.33 x 0.53 0.696
3 10 ( 3.33 + 1.33 ) / 2 x 0.25 0.581
2 11 ( 2.63 x 1.33 ) / 2 1.739
Total Galian 36.936
No Dimensi Luas
Sta Ket
Pias (m) (m2)
2 1 ( 0.69 x 0.36 ) / 2 0.122
3 2 ( 0.36 + 1.36 ) / 2 x 0.25 0.214
1 3 1.36 x 0.53 0.711
3 4 ( 0.36 + 1.36 ) / 2 x 0.25 0.214
2 Timbunan 10 ( 1.39 x 0.40 ) / 2 0.274
3 11 ( 0.40 + 1.40 ) / 2 x 0.25 0.224
3 13 ( 0.40 + 1.40 ) / 2 x 0.25 0.224
10 + 950
2 14 ( 0.77 x 0.40 ) / 2 0.151
3 Total Timbunan 2.133
2 6 ( 0.23 x 0.09 ) / 2 0.010
3 7 ( 0.09 + 0.28 ) / 2 x 3.50 0.630
3 Galian 8 ( 0.07 + 0.28 ) / 2 x 3.50 0.595
2 9 ( 0.17 x 0.07 ) / 2 0.005
Total Galian 1.240
No Dimensi Luas
Sta Ket
Pias (m) (m2)
2 1 ( 0.72 x 0.37 ) / 2 0.130
3 2 ( 0.37 + 1.37 ) / 2 x 0.25 0.216
3 3 ( 1.36 + 1.37 ) / 2 x 0.50 0.680
2 10 ( 1.39 x 0.30 ) / 2 0.204
3 Timbunan 11 ( 0.30 + 1.29 ) / 2 x 0.25 0.198
1 12 1.29 x 0.53 0.675
3 13 ( 0.29 + 1.29 ) / 2 x 0.25 0.196
11 + 000
2 14 ( 0.54 x 0.29 ) / 2 0.076
3 Total Timbunan 2.376
2 6 ( 0.31 x 0.11 ) / 2 0.016
3 7 ( 0.11 + 0.33 ) / 2 x 3.50 0.753
3 Galian 8 ( 0.15 + 0.33 ) / 2 x 3.50 0.823
2 9 ( 0.50 x 0.15 ) / 2 0.036
Total Galian 1.627
No Dimensi Luas
Sta Ket
Pias (m) (m2)
2 1 ( 3.52 x 1.74 ) / 2 3.049
3 2 ( 1.74 + 2.74 ) / 2 x 0.25 0.559
3 3 ( 2.73 + 2.74 ) / 2 x 0.50 1.365
3 4 ( 1.73 + 2.73 ) / 2 x 0.25 0.556
3 5 ( 1.28 + 1.73 ) / 2 x 1.50 2.250
3 6 ( 1.08 + 1.32 ) / 2 x 3.50 4.183
11 + 050 Galian
3 7 ( 1.08 + 1.25 ) / 2 x 3.50 4.060
3 8 ( 1.25 + 1.63 ) / 2 x 1.50 2.153
3 9 ( 1.63 + 2.63 ) / 2 x 0.25 0.531
3 10 ( 2.62 + 2.63 ) / 2 x 0.50 1.310
3 11 ( 1.62 + 2.62 ) / 2 x 0.25 0.529
2 12 ( 3.15 x 1.62 ) / 2 2.540
Total Galian 23.084
No Dimensi Luas
Sta Ket
Pias (m) (m2)
2 1 ( 6.33 x 2.59 ) / 2 8.175
3 2 ( 2.59 + 3.57 ) / 2 x 0.25 0.769
3 3 ( 3.52 + 3.57 ) / 2 x 0.50 1.770
3 4 ( 2.50 + 3.52 ) / 2 x 0.25 0.751
3 5 ( 1.42 + 2.50 ) / 2 x 1.50 2.933
3 6 ( 1.43 + 1.42 ) / 2 x 3.50 4.970
11 + 100 Timbunan
3 7 ( 1.30 + 1.43 ) / 2 x 3.50 4.760
3 8 ( 1.30 + 1.56 ) / 2 x 1.50 2.138
3 9 ( 1.56 + 2.54 ) / 2 x 0.25 0.511
3 10 ( 2.49 + 2.54 ) / 2 x 0.50 1.255
3 11 ( 1.47 + 2.49 ) / 2 x 0.25 0.494
2 12 ( 2.46 x 1.47 ) / 2 1.798
Total Timbunan 30.323
No Dimensi Luas
Sta Ket
Pias (m) (m2)
2 1 ( 7.03 x 3.41 ) / 2 11.960
3 2 ( 3.41 + 1.41 ) / 2 x 0.25 0.601
3 3 ( 1.40 + 1.41 ) / 2 x 0.50 0.700
3 4 ( 1.40 + 1.40 ) / 2 x 0.25 0.349
3 5 ( 0.98 + 3.40 ) / 2 x 1.50 3.278
3 6 ( 0.73 + 2.98 ) / 2 x 3.50 6.475
11 + 150 Galian
3 7 ( 0.73 + 2.88 ) / 2 x 3.50 6.300
3 8 ( 0.88 + 3.26 ) / 2 x 1.50 3.098
3 9 ( 1.26 + 1.26 ) / 2 x 0.25 0.314
3 10 ( 2.25 + 1.26 ) / 2 x 0.50 0.875
3 11 ( 1.25 + 1.26 ) / 2 x 0.25 0.313
2 12 ( 2.30 x 1.25 ) / 2 1.429
Total Galian 35.690
No Dimensi Luas
Sta Ket
Pias (m) (m2)
2 1 ( 0.05 x 0.05 ) / 2 0.001
3 2 ( 0.53 + 0.93 ) / 2 x 1.50 1.088
3 3 ( 1.01 + 1.13 ) / 2 x 3.50 3.728
3 4 ( 0.63 + 1.03 ) / 2 x 1.50 1.238
3 11 + 200 Timbunan 5 ( 0.91 + 1.26 ) / 2 x 3.50 3.780
3 6 ( 1.03 + 1.23 ) / 2 x 3.50 3.938
3 7 ( 1.03 + 1.23 ) / 2 x 3.50 3.938
3 8 ( 0.63 + 1.03 ) / 2 x 1.50 1.238
2 9 ( 1.83 x 0.63 ) / 2 0.570
Total Timbunan 19.517
No Dimensi Luas
Sta Ket
Pias (m) (m2)
2 1 ( 3.89 x 2.55 ) / 2 4.944
3 2 ( 1.55 + 2.55 ) / 2 x 0.25 0.511
3 3 ( 2.55 + 2.56 ) / 2 x 0.50 1.275
3 4 ( 1.56 + 2.56 ) / 2 x 0.25 0.514
3 5 ( 1.18 + 1.56 ) / 2 x 1.50 2.048
3 6 ( 1.03 + 1.18 ) / 2 x 3.50 3.850
11 + 250 Timbunan
3 7 ( 1.03 + 1.28 ) / 2 x 3.50 4.025
3 8 ( 1.28 + 1.70 ) / 2 x 1.50 2.228
3 9 ( 1.70 + 2.70 ) / 2 x 0.25 0.549
3 10 ( 2.70 + 2.71 ) / 2 x 0.50 1.350
3 11 ( 1.71 + 2.71 ) / 2 x 0.25 0.551
2 12 ( 3.59 x 1.71 ) / 2 3.056
Total Galian 24.900
No Dimensi Luas
Sta Ket
Pias (m) (m2)
2 1 ( 2.89 x 1.55 ) / 2 2.229
3 2 ( 1.55 + 2.55 ) / 2 x 0.25 0.511
3 3 ( 2.55 + 2.56 ) / 2 x 0.50 1.275
3 4 ( 1.56 + 2.56 ) / 2 x 0.25 0.514
3 5 ( 1.18 + 1.56 ) / 2 x 1.50 2.048
3 6 ( 1.03 + 1.18 ) / 2 x 3.50 3.850
11 + 027.919 Timbunan
3 7 ( 1.03 + 1.28 ) / 2 x 3.50 4.025
3 8 ( 1.28 + 1.70 ) / 2 x 1.50 2.228
3 9 ( 1.70 + 2.70 ) / 2 x 0.25 0.549
3 10 ( 2.70 + 2.71 ) / 2 x 0.50 1.350
3 11 ( 1.71 + 2.71 ) / 2 x 0.25 0.551
2 12 ( 3.59 x 1.71 ) / 2 3.056
Total Galian 22.185
Perhitungan Kubikasi ( Dengan Metode Luas )
No Dimensi Luas
Sta Ket
Pias (m) (m2)
1 ( 0.37 x 1.65 ) / 2 0.307
2 ( 1.65 + 1.87 ) / 2 x 0.50 0.881
3 ( 0.99 + 1.87 ) / 2 x 0.25 0.357
4 ( 1.14 + 1.74 ) / 2 x 1.50 2.158
5 ( 1.94 + 3.41 ) / 2 x 3.50 9.367
0 + 000 Galian 6 ( 3.43 + 5.06 ) / 2 x 3.50 14.853
7 ( 4.86 + 5.59 ) / 2 x 1.50 7.832
8 ( 5.44 + 6.55 ) / 2 x 0.25 1.498
9 ( 6.55 + 6.77 ) / 2 x 0.50 3.329
10 ( 5.88 + 6.77 ) / 2 x 0.25 1.581
11 ( 8.64 x 2.72 ) / 2 11.760
Total Galian 53.924
No Dimensi Luas
Sta Ket
Pias (m) (m2)
1 ( 8.73 x 2.75 ) / 2 11.996
2 ( 4.00 + 4.65 ) / 2 x 1.50 6.486
3 ( 2.22 + 3.80 ) / 2 x 3.50 10.526
Timbunan
4 ( 0.49 + 2.22 ) / 2 x 3.50 4.737
5 ( 1.49 x 0.63 ) / 2 0.466
0 + 050
Total Timbunan 34.212
6 ( 1.05 x 0.23 ) / 2 0.122
7 ( 1.05 + 1.28 ) / 2 x 0.50 0.582
Galian
8 ( 1.50 x 0.31 ) / 2 0.233
Total Galian 0.937
No Dimensi Luas
Sta Ket
Pias (m) (m2)
1 ( 1.46 x 1.65 ) / 2 1.205
2 ( 1.46 + 2.55 ) / 2 x 0.25 0.501
3 ( 2.55 + 2.74 ) / 2 x 0.50 1.323
4 ( 1.84 + 2.74 ) / 2 x 0.25 0.572
5 ( 1.99 + 2.50 ) / 2 x 1.50 3.362
6 ( 2.70 + 4.01 ) / 2 x 4.55 15.253
0 + 100 Galian
7 ( 4.01 + 5.02 ) / 2 x 3.50 15.811
8 ( 4.82 + 5.45 ) / 2 x 1.50 7.706
9 ( 5.30 + 6.40 ) / 2 x 0.25 1.462
10 ( 6.40 + 6.59 ) / 2 x 0.50 3.246
11 ( 5.68 + 6.59 ) / 2 x 0.25 1.534
12 ( 8.24 x 2.76 ) / 2 11.363
Total Galian 63.339
No Dimensi Luas
Sta Ket
Pias (m) (m2)
1 ( 2.24 x 0.81 ) / 2 0.903
2 ( 0.90 + 1.89 ) / 2 x 0.25 0.349
3 ( 1.86 + 1.89 ) / 2 x 0.50 0.939
4 ( 0.85 + 1.86 ) / 2 x 0.25 0.340
5 ( 0.72 + 0.85 ) / 2 x 1.50 1.178
6 ( 0.83 + 1.07 ) / 2 x 3.50 3.313
0 + 150 Galian
7 ( 0.58 + 0.83 ) / 2 x 3.50 2.462
8 ( 0.37 + 0.38 ) / 2 x 1.50 0.562
9 ( 0.22 + 1.21 ) / 2 x 0.25 0.178
10 ( 1.18 + 1.21 ) / 2 x 0.50 0.596
11 ( 1.18 x 0.29 ) / 2 0.172
Total Galian 10.992
No Dimensi Luas
Sta Ket
Pias (m) (m2)
1 ( 1.87 x 0.76 ) / 2 0.711
Timbunan 2 ( 0.71 + 0.93 ) / 2 x 1.50 1.226
3 ( 2.77 x 0.50 ) / 2 0.691
Total Timbunan 2.628
4 ( 4.35 x 0.85 ) / 2 1.856
0 + 200 5 ( 0.67 + 1.01 ) / 2 x 1.50 1.257
6 ( 0.86 + 1.90 ) / 2 x 0.25 0.345
Galian 7 ( 1.90 + 2.00 ) / 2 x 0.50 0.975
8 ( 1.04 + 2.00 ) / 2 x 0.25 0.380
9 ( 1.81 x 0.74 ) / 2 0.670
Total Galian 5.484
No Dimensi Luas
Sta Ket
Pias (m) (m2)
1 ( 2.98 x 0.94 ) / 2 1.405
2 ( 0.69 + 1.18 ) / 2 x 1.50 1.404
Timbunan
3 ( 0.49 x 1.16 ) / 2 0.284
Total Timbunan 3.093
4 ( 6.46 x 2.73 ) / 2 8.804
0 + 250 5 ( 2.53 + 3.14 ) / 2 x 1.50 4.252
6 ( 2.99 + 4.08 ) / 2 x 0.25 0.884
Galian 7 ( 4.08 + 4.27 ) / 2 x 0.50 2.087
8 ( 3.36 + 4.27 ) / 2 x 0.25 0.953
9 ( 4.60 x 1.50 ) / 2 3.456
Total Galian 20.437
No Dimensi Luas
Sta Ket
Pias (m) (m2)
1 ( 0.45 x 0.11 ) / 2 0.025
2 ( 0.27 + 0.66 ) / 2 x 1.50 0.696
3 ( 0.86 + 1.86 ) / 2 x 3.50 4.765
4 ( 1.86 + 3.00 ) / 2 x 3.50 8.501
0 + 300 Galian 5 ( 2.80 + 3.32 ) / 2 x 1.50 4.585
6 ( 3.17 + 4.24 ) / 2 x 0.25 0.926
7 ( 4.24 + 4.39 ) / 2 x 0.50 2.159
8 ( 3.47 + 4.39 ) / 2 x 0.25 0.983
9 ( 4.58 x 1.55 ) / 2 3.552
Total Galian 26.190
No Dimensi Luas
Sta Ket
Pias (m) (m2)
1 ( 1.60 x 0.66 ) / 2 0.530
2 ( 0.58 + 0.78 ) / 2 x 1.50 1.026
Timbunan
3 ( 2.50 x 0.38 ) / 2 0.472
Total Timbunan 2.027
4 ( 4.60 x 0.69 ) / 2 1.597
0 + 350
5 ( 0.50 + 0.83 ) / 2 x 1.50 0.996
6 ( 0.68 + 1.72 ) / 2 x 0.25 0.299
Galian 7 ( 1.72 + 1.81 ) / 2 x 0.50 0.881
8 ( 0.85 + 1.81 ) / 2 x 0.25 0.332
9 ( 2.92 x 0.76 ) / 2 1.112
Total Galian 5.217
No Dimensi Luas
Sta Ket
Pias (m) (m2)
1 ( 2.92 x 1.19 ) / 2 1.742
2 ( 1.32 + 1.53 ) / 2 x 1.50 2.139
3 ( 0.54 + 1.12 ) / 2 x 3.50 2.900
Timbunan
4 ( 3.33 x 0.53 ) / 2 0.883
6 ( 0.73 x 0.16 ) / 2 0.058
Total Timbunan 7.723
0 + 400
5 ( 0.23 x 0.04 ) / 2 0.004
7 ( 0.79 x 0.17 ) / 2 0.068
8 ( 0.03 + 1.07 ) / 2 x 0.25 0.137
Galian
9 ( 1.07 + 1.16 ) / 2 x 0.50 0.559
10 ( 1.26 x 0.28 ) / 2 0.178
Total Galian 0.946
No Dimensi Luas
Sta Ket
Pias (m) (m2)
1 ( 1.85 x 0.75 ) / 2 0.694
2 ( 0.68 + 0.91 ) / 2 x 1.5 1.196
Timbunan
3 ( 2.90 x 0.48 ) / 2 0.691
Total Timbunan 2.581
4 ( 4.22 x 0.83 ) / 2 1.752
0 + 450 5 ( 0.65 + 0.99 ) / 2 x 1.5 1.226
6 ( 0.84 + 1.89 ) / 2 x 0.25 0.341
Galian 7 ( 1.89 + 1.98 ) / 2 x 0.5 0.968
8 ( 1.03 + 1.98 ) / 2 x 0.25 0.377
9 ( 1.80 x 0.73 ) / 2 0.656
Total Galian 5.320
No Dimensi Luas
Sta Ket
Pias (m) (m2)
1 ( 1.64 x 0.68 ) / 2 0.555
2 ( 0.61 + 0.81 ) / 2 x 1.5 1.069
Timbunan
3 ( 2.81 x 0.41 ) / 2 0.574
Total Timbunan 2.198
4 ( 4.23 x 0.78 ) / 2 1.641
0 + 500 5 ( 0.58 + 0.89 ) / 2 x 1.5 1.099
6 ( 0.74 + 1.78 ) / 2 x 0.25 0.315
Galian 7 ( 1.78 + 1.87 ) / 2 x 0.5 0.913
8 ( 0.91 + 1.87 ) / 2 x 0.25 0.347
9 ( 3.08 x 0.81 ) / 2 1.255
Total Galian 5.569
No Dimensi Luas
Sta Ket
Pias (m) (m2)
1 ( 2.16 x 1.45 ) / 2 1.568
2 ( 2.05 + 3.14 ) / 2 x 0.25 0.648
3 ( 3.14 + 3.31 ) / 2 x 0.50 1.610
4 ( 2.39 + 3.31 ) / 2 x 0.25 0.712
5 ( 2.54 + 2.99 ) / 2 x 1.50 4.148
6 ( 3.19 + 4.31 ) / 2 x 3.50 13.124
0 + 520 Galian
7 ( 4.31 + 5.57 ) / 2 x 3.50 17.290
8 ( 5.37 + 5.94 ) / 2 x 1.50 8.479
9 ( 5.79 + 6.88 ) / 2 x 0.25 1.583
10 ( 6.88 + 7.05 ) / 2 x 0.50 3.480
11 ( 6.13 + 7.05 ) / 2 x 0.25 1.647
12 ( 8.49 x 2.89 ) / 2 12.260
Total Galian 66.549
Tabel Kubikasi Sta 0+000 s/d Sta 0+520
Tabel Galian
Luas Rata-rata Jarak
Sta Luas Galian (m2) Volume (m3)
(m2) (m)
0+000 53.924
27.430 50 1371.52
0+050 0.937
32.138 50 1606.88
0+100 63.339
37.166 50 1858.28
0+150 10.992
8.238 50 411.90
0+200 5.484
12.960 50 648.02
0+250 20.437
23.314 50 1165.68
0+300 26.190
15.704 50 785.18
0+350 5.217
3.081 50 154.07
0+400 0.946
3.133 50 156.64
0+450 5.320
5.445 50 272.23
0+500 5.569
36.059 20 721.18
0+520 66.549
Jumlah 9151.58
Tabel Timbunan
Luas Timbunan Luas Rata-rata Jarak
Sta Volume (m3)
(m2) (m2) (m)
0+050 34.212
18.420 50 921.000
0+200 2.628
2.860 50 143.019
0+250 3.093
2.560 50 127.994
0+350 2.027
4.875 50 243.760
0+400 7.723
5.152 50 257.606
0+450 2.581
2.389 50 119.466
0+500 2.198
Jumlah 1812.845