DATA-DATA PERENCANAAN
Kelas jalan adalah kelas IIB, menurut Peraturan No.3 tahun 1970 PU Bina Marga
bahwa kelas jalan IIA ( jalan raya sekunder )meliputi :
o Kecepatan rencana (Vr) = 80 km/jam
o Klasifikasi medan = berbukit
o Volume lalu lintas harian rata-rata (LHR) = 6.000 - 20.000 Smp
o Lebar daerah penguasaan minimal = 40 m
o Lebar perkerasan = 2 x 3.50 m
o Lebar Median minimum = 1.50 m
o Lebar bahu = 2.5 m
o Lereng melintang perkerasan =2%
o Lereng melintang bahu =4%
o Kemiringan tikungan maximum (emaks) = 10 %
o Jari-jari lengkung minimum (Rmin) = 210
o Landai maximum =6%
o Jarak pandang henti (JPH) = 115 m
o Jarak pandang menyiap (JPM) = 520 m
o Rmin1 dimana kemiringan tikungan tidak diperlukan = 1600 m
o Rmin2 dimana harus menggunakan busur peralihan = 1100 m
o Landai relatif maximum tepi perkerasan = 1/200
XPI1 −XA
1. A – PI1 = Arc tg YPI1−YA
(−7 )−(−266 )
= Arc tg (29 )−(110 )
259
= Arc tg −81 = -720 38’ 0.17”
a A – PI1 = 180 -720 38’ 0.17”
= 1070 21’ 59.8”
XPI 2−XPI1
2. a PI1 – PI2 = Arc tg YPI2−YPI1
(228 )−(−7 )
= Arc tg (115 )−(29 )
235
= -690 21' 27 . 2”
= Arc tg 86
XB−XPI2
3. a PI2 – B = Arc tg YB−YPI2
440−228
= Arc tg (57 )−(115)
212
= -74 0 41' 56. 96”
= Arc tg −58
a PI2 – B = 1800– a
a PI2 – B = 1800– 740 41’ 56.96”
a PI2 – B = 1050 18’ 3.04”
d A - PI1 = 271 m
d PI1-PI2 = 250.24 m
d PI2- B = 219.79 m
PERENCANAAN ALIGMENT
Perhitungan Tikungan I
o d A-PI1 = 271 m
o d PI1-PI2 = 250.24 m
o 1 = 380 0’ 32.6”
Dari table Peraturan Perencanaan Geometrik Jalan Raya diperoleh data-data sebagai
berikut :
V = 80 km/jam
Rmin = 210 m
R1 = 1600 m
R2 = 1100 m
e max = 10 %
Untuk Tmax diambil harga terkecil, maka Tmax = 250.24 m.
(230 + 0.4525)
¿¿
1
Cos 38° 0' 32.6} } - 230} {¿
2
=
= 13.73 m
C = D1 – 2S
= 380 0’ 32.6” – 2 x 6.288
= 250 25’ 59”
θC
x2π R
= 360
Lc
L = Lc + 2 Ls
= 102.02 m + 2 x 50 = 202.02 m
L < 2 Ts
Kesimpulan ; Metode Spiral Circle Spiral (SCS) dapat digunakan pada tikungan I
Perhitungan Tikungan II
T2 = R tg ½ D2 £ Tmax
= 1600 tg ½ 350 57’ 5.4”
= 519.12 m > Tmax = 219.79 m ……… tidak memenuhi
(230 + 0.4525)
¿¿
1
Cos 35° 57' .5.4} } - 230} {¿
2
=
= 12.27 m
C = D2 – 2S
= 350 57’ 5.4” – 2 x 6.288
= 230 22’ 31.8”
θC
x2π R
= 360
Lc
L = Lc + 2 Ls
= 93.78 m + 2 x 50 = 193.78 m
L < 2 Ts
Kesimpulan ; Metode Spiral Circle Spiral (SCS) dapat digunakan pada tikungan II
Skets Tikungan I
Diketahui ; A = 1.20 m
P = 6.10 m
n =2
c = 0.80 m
bo = 2.25 m
Rumus : B = n (b’ + c) + (n – 1) Td + z
V = 80 km/jam
R = 230 m
n = 2 diambil 2 jalur
Lebar truk = 2.25 m
Rumus ;
B = n (b’ + c) + (n – 1) Td + z
b” = R – √ R2−P2
√ 2302−6 .10 2
= 230 –
√ 2302+1.2 (2 x 6.10+1.2)−230
=
= 0.034 m
V
z = 0.034 √ R
80
=0 .17 m
√230
= 0.034
W = B – Bn
Bn = n x b
= 2 x 3.50 = 7
b” = R – √ R2−P2
√ 2302−6 .10 2
= 230 –
√ 2302+1.2 (2 x 6.10+1.2)−230
=
= 0.034 m
V
z = 0.034 √ R
80
=0 .17 m
√230
= 0.034
W = B – Bn
Bn = n x b
= 2 x 3.50 = 7
Xb
XL = Cb + ( Ca – Cb )
X
Dimana :
Xl : Jarak elevasi tanah asli.
X : Jarak antar kontur.
Ca : Kontur atas.
Cb : Kontur bawah.
Xb : Jarak antar center line dengan kontur bawah.
1.7
STA=240+ ( 242−240 )=240 . 944
o 3.6
0.2
ST 1=238+ ( 240−238 )=238. 571
o 0.7
0.2
ST 2=240+ ( 242−240 )=240 . 800
o 0.5
.0.1
ST 3=242+ ( 244−242 )=242 .286
o 0 .7
0. 1
TS 1=246 + ( 248−246 ) =246 .118
o 1. 2
0.9
ST 4=246+ (248−246 )=247 .500
o 1. 2
0. 8
ST 5=248 + ( 248−248 )=248 . 667
o 2.4
1. 5
ST 6=248+ ( 248−248 )=248 .811
o 3. 7
0 .1
ST 7=248+ ( 250−248 )=248 . 889
o 0. 9
0. 7
ST 9=248+ ( 250−248 )=249 .555
o 0. 9
0. 1
ST 10=246 + ( 248−246 ) =246 .125
o 1.6
2. 0
ST 11=246+ (248−246 )=247 . 600
o 2. 5
4.8
ST 12=246+ ( 248−246 )=247 . 714
o 5. 6
3 .7
ST 13=246 + ( 248−246 ) =242. 609
o 4.6
1 .1
ST 14=246+ ( 248−246 )=247 . 051
o 5 .9
2. 3
ST 15=246 + ( 248−246 )=246 . 575
o 8. 0
1 .1
ST 16=246+ (248−246 )=246 .234
o 9.4
0.5
ST 1=246+ ( 248−246 ) =246 .094
o 10. 6
0 .3
TS 2=244+ ( 246−244 )=244 .194
o 3 .1
1. 0
ST 17=242+ ( 244−242 )=242. 213
o 9.4
1 .3
ST 18=242+ ( 244−242 )=243 . 000
o 2 .6
0.5
ST 19=242+ ( 244−242 )=242. 233
o 9.3
0. 4
ST 20=240+ ( 242−240 )=240 . 727
o 1 .1
0.9
ST 21=238+ ( 240−238 ) =239. 800
o 1.0
0.4
ST 22=238+ ( 240−238 )=239 . 600
o 0 .5
0 .2
ST 23=238+ ( 240−238 )=239. 000
o 0. 4
0 .3
ST 24=242+ ( 244−242 ) =242. 139
o 4.3
2 .1
ST 25=242+ ( 244−242 )=242 . 954
o 4.4
3.2
ST 26=242+ ( 244−242 ) =243 .729
o 3.7
2.6
ST 27=242+ ( 244−242 ) =243 .000
o 5.2
2.0
ST 28=242+ ( 244−242 )=242. 588
o 6.8
1.1
ST 29=242+ ( 244−242 )=242. 265
o 8.3
1. 1
ST 2=244 + ( 244−244 )=244 . 000
o 1. 1
0 .1
ST 30=244+ ( 244−242 )=244 .143
o 7 .0
1. 1
ST 31=244 + ( 244−244 )=244 .263
o 3.8
3. 1
STB=244 + ( 244−244 )=244 .534
o 5.8
q1 = + 3.18 %
q2 = - 2.8 %
A = q2 – q1
= -2.827 – 3.181 = - 6.008 Lengkung vertical cembung
A = - 6.008
V = 120 km/jam Lv = 210 m (Dari grafik V PPGJR berdasarkan JPH)
A . Lv 6.008 x 210
= = 1.577 m
800 800
Maka Ev =
A . Xn2
Yn =
2 Lv
Δn = q x Xn
Xn = 0.1 Lv
2 = 3.181 % x 42 m = 1.336 m
6 .008 % x (42 ¿2
= 0.252 m ¿
Y2 = 2 x 210
Maka Elevasi 2 = Elevasi BVC1 + 2
= 244.06 m + 1.336 m = 245.396m
Elevasi 2’ = Elevasi 2 – Y2
= 245.396 m – 0.252 m = 245.144 m
Untuk 0.3 Lv X3 = 0.3 x 210 m = 63 m
3 = 3.181 % x 63 m = 2.00 m
6 .008 % x (63 ¿2
= 0. 567 m ¿
Y3 = 2 x 210
Maka Elevasi 3 = Elevasi BVC1 + 3
= 244.06 m + 2.00 m = 246.06 m
Elevasi 3’ = Elevasi 3 – Y3
= 246.06 m – 0.567 m = 245.492 m
A . Xn2
Yn =
2 Lv
Δn = q x Xn
Xn = 0.1 Lv
6.008 % x (82¿ 2
= 0. 96 m¿
Y4 = 2 x 210
Maka Elevasi 4 = Elevasi EVC1 + 4
= 244.032 m + 2.318 m = 241.714 m
Elevasi 4’ = Elevasi 4 – Y4
= 241.714 m – .0.96 m = 240.754 m
Untuk 0,5 Lv X5 = 0.5 x 210 m = 105 m
5 = 2.827 % x 105 m = 2.968 m
6 .008 % x (105¿ 2
= 1 .577 m¿
Y5 = 2 x 210
Maka Elevasi 5 = Elevasi EVC1 + 5
= 244.032 m + 2.968 m = 247.000 m
Elevasi 5’ = Elevasi 5 – Y5
= 247.000 m – 1.577 m = 245.823 m
Elevasi 5 = Elevasi PVC1 = 245.823 m ………. o.k
q2 = - 0.9 %
q3 = + 0.962 %
A = q3 – q2
= 0.962 – (-0.9) = 1.862 % Lengkung vertical cembung
A = 1.862
V = 80 km/jam Lv = 60.000 m (Dari grafik iii PPGJR berdasarkan JPH)
A . Lv 1.862 x 60
= = 0.139 m
Maka Ev = 800 800
1971 - 1700
x 100% = 13.75
1971
Kenderaan berat =
Dari grafik VI, korelasi antara DDT dengan CBR, dengan CBR 6 % maka didapat
besarnya harga DDT adalah 5.01 kg/cm2.
h. Mencari ITP
LER = 168.06
DDT (daya dukung tanah ) = 5.01 kg/cm2
Faktor regional (FR) = 2.0
Klasifikasi jalan Arteri dengan IPt = 2.0 dan Ipo = 3.5 – 3.9
ITP = a1 D1 + a2 D2 + a3 D3
= (0.40.D1) + (0.14 x 20 cm) + (0.12 x10)
7.8 = D1.0.4+ 2.8 cm + 1.2
7.8 - 4
= 9.5≈ 10 cm
D1 = 0,4
(1+i )n −1
e 2
R = log (1+i)
(1+6 % )15−1
e
= log (1+6 % ) = 24.138
JKN = 365 x JKNH x R
= 365 x 1971 x 24.138 = 17365239.3 kenderaan
JSKN = 365 x 554 x 24.138 = 4880944.98 sumbu
FD = 0.5(2 jalur 2 arah ) Tabel 2 , Standart Konstruksi Bangunan Indonesia
( SKBI )
FK = 1.1 ( Peranan Jalan Arteri ) Tabel 3, SKBI
Keterangan :
RD = Roda depan RGB = Roda ganda belakang
RB = Roda belakang STRT = Sumbu tunggal roda tunggal
BS = Beban sumbu RGD = Roda ganda depan
STRG = Sumbu tunggal roda ganda
b. Kombinasi persentase konfigurasi/ beban sumbu dan jumlah repetisi selama umur
rencana.
Beban
Konfigurasi
Sumbu % Konfigurasi Sumbu Jumlah Repetisi selama UR Repetisi
Sumbu
(Ton)
STRT 3 175/554 x 100 = 31.60 % 31.60 % x 4880944.98 x 0.5 771189.3068
STRG 5 175/554 x 100 = 31.60 % 31.60 % x 4880944.98 x 0.5 771189.3068
STRT 5 75/554 x 100 = 13.55 % 13.55 % x 4880944.98 x 0.5 330684.0224
STRG 8 75/554 x 100 = 13.55 % 13.55 % x 4880944.98 x 0.5 330684.0224
STRT 6 15/554 x 100 = 2.71 % 2.71 % x 4880944.98 x 0.5 66136.7912
STDRG 14 15/554 x 100 = 2.71 % 2.71 % x 4880944.98 x 0.5 66136.7912
STRT 6 6/554 x 100 = 1.1 % 1.1 % x 4880944.98 x 0.5 26845.1974
STDRG 14 6/554 x 100 = 1.1 % 1.1 % x 4880944.98 x 0.5 26845.1974
STRT 5 6/554 x 100 = 1.1 % 1.1 % x 4880944.98 x 0.5 26845.1974
STRT 5 6/554 x 100 = 1.1 % 1.1 % x 4880944.98 x 0.5 26845.1974
Jumlah
Beban Beban Repetisi Tegangan Repetisi
Konfiguras Perbandingan
Sumbu FK Sumbu Beban yang Beban % Rasio
i Sumbu Tegangan
(Ton) (3) Rencana (5) terjadi Izin (9)
(1) (7)
(2) (4) (6) (8) (5/8)x100
2x3 6/MR
61.60<100 %
Dengan CBR subgrade 6 %, diperoleh k gabungan sebesar 4.2 kg/cm 3, lapisan pondasi
digunakan Sirtu dengan F = 1.2 ( Tabel 6 SKBI ).
Koefisien E = 8000 – 20000 Psi table iv Perencanaan Perkerasan Kaku (PPK).
Bila k = 17 kg/cm3 tanah dasar baik/bagus.
k = 8 kg/cm3 tanah dasar sedang
k = 3 kg/cm3 tanah dasar jelek
Maka untuk k = 4.2 kg/cm3 masih termasuk tanah jelek. Dengan k 4.2 kg/cm 3 dan E
maka dari grafik 3 PPK diperoleh tebal pondasi = 12 cm.
[
100 ft
Ps = fy − n.ft
]
(1.3−(0.2F ))
Ps =
[
100 x 20
3200 − 19 x 20 ]
(1.3−(0,2 x 1.2))
= 0.71 %
As = Ps x penampang plat
= 0.71 % x 100 x 18 = 12.78 cm2/m’
Amin = 0.65 % x 100 x 18 = 11.70 cm2/m’
A = As = 12.78 cm2/m’
A = 16 – 125 mm = 1608 mm2
2. Tulangan melintang
1200 x 1.2x 7 x 0.18
As = 1850 = 0.98 %
Amin = 0.1 x 100 x 18 = 1.8 cm2/m’
A =Amin = 1.8 cm2/m’
A = 6 – 150 mm = 188 mm2
Ec = 16600 √ σbk
2. 16
√σbk
fb = d
2. 16
√350
= 1. 6 = 25.27 kg/cm2
202
2 −6
Lcr = 6(0 . 00893) (2. 5 )(25 . 27 )(400 . 10 x 310557 .563−20 )
= 126.969 cm < Lcr max = 150 cm Tulangan aman terhadap Lcr
Gambar Penulangan