PERHITUNGAN JARAK
PERHITUNGAN JALAN
A 19400 28700
1 15200 23100
2 13700 19500
B 15100 15200
1’ 10650 12300
C 8600 9500
Perhitungan Jarak
= 7000 m
= 3900 m
= 4522,16 m
= 5311,54 m
= 3470,23 m
&
SUDUT LUAR
Sudut Luar
PERHITUNGAN ALINYEMEN
HORIZONTAL
Perhitungan
fm = −0,00065 𝑥 𝑉R + 0,192
= −0,00065 𝑥 70 + 0,192
= 0,1465
V R2
RMin =
127 x (eMax +fm)
702
=
127 x (0,1+0,147)
= 156,20 m
Tabel 2.1 Panjang lengkung peralihan (Ls) minimum dan super elevasi (e), yang dibutuhkan
untuk jalan antar kota.
Penyelesaian :
e <6%
e = 0,055% ; Rc = 477 Ls = 60m
1
Tc = Rc x tan Δ1
2
= 59,31 m
1
Ec = Tc x tan Δ1
4
= 3,69 m
Δ1 X π x Rc
Lc =
180°
14,25 x 3,14 x 477
= = 118,57 𝑚
180
Fp = 0,314
VR2
Jh = 0,694 𝑥 𝑉R + 0,004 𝑥
fp
702
= 0,694 𝑥 70 + 0,004 𝑥
0,314
= 111,00 m
90° x Jh
E = 𝑅𝑐 𝑥 { 1 − 𝐶𝑜𝑠 ( )}
π x Rc
90° x 111,00
= 477 𝑥 {1 − 𝐶𝑜𝑠 ( )}
3,14 x 477
= 3,22 m
Perhitungan
fm = −0,00065 𝑥 𝑉R + 0,192
= −0,00065 𝑥 70 + 0,192
= 0,1465
V R2
RMin =
127 x (eMax +fm)
702
=
127 x (0,1+0,147)
= 156,20 m
Tabel 2.1 Panjang lengkung peralihan (Ls) minimum dan super elevasi (e), yang dibutuhkan
untuk jalan antar kota.
Penyelesaian :
e <5%
e = 0,055 = 0,6% ; Rc = 477 Ls = 60 m
90 x Ls
Ꝋs =
π x Rc
90 x 60
=
3,14 x 477
= 3,60°
Δc = Δ – 2 x Ꝋs
= 8,36 – 2 x 3,60°
= 1,16°
Δc X π x Rc
Lc =
180°
Lt = Lc + 2 x Ls
= 9,65+ 2 x 60
= 129,65 m
2
P = Ls — 𝑅𝑐 𝑥 [1 − 𝐶𝑜𝑠 (Ꝋ 𝑠)]
6 x Rc
602
= — 477 𝑥 [1 − 𝐶𝑜𝑠 (3,6)]
6 x 477
= 0,316 m
Ls3
k = 𝐿𝑠 − — 𝑅𝑐 𝑥 𝑆𝑖𝑛 (Ꝋ 𝑠)
40 x Rc2
603
= 60 − — 477 𝑥 𝑆𝑖𝑛 (3,6)
40 x 4772
= 30,04 m
1
Ts = (Rc + P) x Tan ( Δ2 ) + k
2
= 64,92 m
Es = Cos (1Δ ) – Rc
Rc+P
477 ,316
= 1 - 477
Cos ( X 8,36)
2
= 1,58 m
Fp = 0,314
VR2
Jh = 0,694 𝑥 𝑉R + 0,004 𝑥
fp
702
= 0,694 𝑥 70 + 0,004 𝑥
0,314
= 111,00 m
90° x Jh
E = 𝑅𝑐 𝑥 { 1 − 𝐶𝑜𝑠 ( )}
π x Rc
90° x 111,00
= 477 𝑥 {1 − 𝐶𝑜𝑠 ( })
3,14 x 477
= 3,22 𝑚
Perhitungan
fm = −0,00065 𝑥 𝑉R + 0,192
= −0,00065 𝑥 70 + 0,192
= 0,1465
V R2
RMin =
127 x (eMax +fm)
702
=
127 x (0,1+0,147)
= 156,20 m
Tabel 2.1 Panjang lengkung peralihan (Ls) minimum dan super elevasi (e), yang dibutuhkan
untuk jalan antar kota.
Penyelesaian :
e <5%
e = 0,055 = 0,6% ; Rc = 477 Ls = 60m
1
Tc = Rc x tan Δ3
2
= 186,21 m
1
Ec = Tc x tan Δ3
4
= 35,05 m
Δc X π x Rc
Lc =
180°
Fp = 0,314
VR2
Jh = 0,694 𝑥 𝑉R + 0,004 𝑥
fp
702
= 0,694 𝑥 70 + 0,004 𝑥
0,314
= 111,00 m
90° x Jh
E = 𝑅𝑐 𝑥 { 1 − 𝐶𝑜𝑠 ( )}
π x Rc
90° x 111,00
= 477 𝑥 {1 − 𝐶𝑜𝑠 ( })
3,14 x 477
= 3,22 𝑚
Perhitungan
fm = −0,00065 𝑥 𝑉R + 0,192
= −0,00065 𝑥 70 + 0,192
= 0,1465
V R2
RMin =
127 x (eMax +fm)
702
=
127 x (0,1+0,147)
= 156,20 m
Tabel 2.1 Panjang lengkung peralihan (Ls) minimum dan super elevasi (e), yang dibutuhkan
untuk jalan antar kota.
Penyelesaian :
e <6%
e = 0,055 = 0,6% ; Rc = 477 Ls = 60m
1
Tc = Rc x tan Δ4
2
= 86,16 m
1
Ec = Tc x tan Δ4
4
= 7,78 m
Δ4 X π x Rc
Lc =
180°
20,7 x 3,14 x 477
= = 172,24 𝑚
180
Fp = 0,314
VR2
Jh = 0,694 𝑥 𝑉R + 0,004 𝑥
fp
702
= 0,694 𝑥 70 + 0,004 𝑥
0,314
= 111,00 m
90° x Jh
E = 𝑅𝑐 𝑥 { 1 − 𝐶𝑜𝑠 ( )}
π x Rc
90° x 111,00
= 477 𝑥 {1 − 𝐶𝑜𝑠 ( })
3,14 x 477
= 3,22 m
PERENCANAAN PELEBARAN
PERKERASAN PADA TIKUNGAN
Vr : 70 kmÚjam
R : 477 m
Lebar Perkerasan Perjalur : 3,25 m
Jumlah Jalur (N) : 2 Lajur
Lebar Perkerasan Jalur Lurus (Bn) : 6,5 m
Lebar Kendaraan Rencana (µ) : 2,6 m
Jarak Gandar Kendaraan (L) : 7,6 m
Tonjolan Depan Kendaraan (A) : 2,1 m
Penyelesaian :
Vr
Z = 0,105 𝑥
√R
70
= 0,105 𝑥 = 0,336 m
√477
U = µ + R - √𝑅2 − 𝐿2
= 2,6 + 477 - √4772 − 72
= 2,65 m
Fa = √𝑅2 + 𝐴 (2𝐿 + 𝐴) – R
=√4772 + 2,1 (7,6 + 2,1) – 477
= 0,021 m
Wc = N (µ + C) + (N – 1) x Fa + Z
= 2 ( 2,6 +1) + (2 – 1) x 0,021 + 0,336
= 7,557 m
W = wc – Bn
= 7,557 – 6,5
= 1,057 m
PERHITUNGAN
Keterangan:
1. Garis Hijau: Kontur Asli
2. Garis Merah : Galian
3. Garis Kuning : Timbunan
GALIAN
1 66 3 1 198
2 66 3 0,5 99
TIMBUNAN
1 28 3 1 84
2 10 1 1 10
Penyelesaian:
F. Lepas = 1
F. Padat = 1
PERENCANAAN ALINYEMEN
VERTIKAL
g0 =0%
g1 = 9,00–6,00 𝑥100% = 4,54%
66
Syarat Kenyamanan
Keluwesan Bentuk
Lv = 0,6 x VR
= 0,6 x 70
= 42 m
Syarat Drainase
Lv = 40 x A
= 40 x 4,54
= 181,6 m
Diambil Lv = 181,6 m
A x Lv
EV =
800
4,54 x 181,6
=
800
= 1,03 m
Elevasi dan Stasioning
PVI = STA + 117
Elv. +9
PLV = STA = STA PVI – (1 𝑥 𝑉𝑟)
2
= + 117 – (1 𝑥 70)
2
= +82
Elevasi = Elevasi PVI + g0. (1 𝑥 𝑉𝑟)
2
= +9 + 0% (1 𝑥 70)
2
= +9
S : STA = STA PV1 = +117
= 82 + (1 𝑥 70)
2
= +117
Elevasi = Elevasi PV1 + g (1 𝑥 𝑉𝑟)
2
= +9 + 4,54% (1 𝑥 70)
2
= +10,58
g2 = 0%
A = {g1 – g0} = {4,54 – 0} = 4,54%
Syarat Kenyamanan
Vr = 70 km/jam
Keluwesan Bentuk
Lv = 0,6 x VR
= 0,6 x 70
= 42 m
Syarat Drainase
Lv = 40 x A
= 40 x 4,54
= 181,6 m
Diambil Lv = 181,6 m
A x Lv
EV =
800
4,54 x 181,6
=
800
= 1,03 m
Elevasi dan Stasioning
PVI = STA + 143
Elv. +9
PLV = STA = STA PVI – (1 𝑥 𝑉𝑟)
2
= +108
Elevasi = Elevasi PVI + g1. (1 𝑥 𝑉𝑟)
2
= +9 + 4,54% (1 𝑥 70)
2
= +10,58
S : STA = STA PV1 = +108
Elevasi = Elevasi PV1 + EV
= +9 + 1,03
= +10,03
PTV : STA = STA PV1 + (1 𝑥 𝑉𝑟)
2
= 108 + (1 𝑥 70)
2
= +143
Elevasi = Elevasi PV1 + g0 (1 𝑥 𝑉𝑟)
2
= +9 + 0% (1 𝑥 70)
2
= +9
PERHITUNGAN DATA
LALU LINTAS
Truk tempel/semi trailer truck, 5 as 31 ton (5+61/2. 61/2+ 61/2. 61/2) 102 115
= 538,56
LER = LET x UR
10
= 538,56 x 5
10
= 269,28
PERHITUNGAN CBR
= 8,4%
Nilai Jumlah Nilai CBR yang Persen (%) nilai CBR yang
CBR sama atau lebih besar sama atau lebih besar
8 8 8/8x100% = 100%
9 6 6/8x100% = 75%
10 5 5/8x100% = 62,5%
11 3 3/8x100% = 37,5%
12 2 2/8x100% = 25%
Maka :
PERHITUNGAN LAPISAN
PERKERASAN
362+301+242+124+115+98+4
=
2655 + ZKendaraan Berat
𝑥100%
1288
= 𝑥100%
2655 + 1288
= 1288 𝑥100%
3943
Kelandaian I (6%)
Dipakai = 2,5
Nilai Ipo ditentukan dari bahan perkerasan yang digunakan, dimana bahan perkerasan yang
digunakan adalah laston. Karena merupakan jalan baru, sehingga nilai Ipo > 3,9 – 3,5
Nilai LER5 = 269,28 x 2,5 = 673,2 Nilai Ipt5 = 2,0 (Rentang 2,0 – 2,5)
UR = 5 tahun
D1 = 10 Sirtu Klas B = 10 cm
ANALISA SARINGAN
Saraingan
Presentase Berat Agregat yang Lolos Ayakan
Gradasi Proporsi
2'' 1'' 0,75 No. 4 No. 10 No. 40 No. 200
Fraksi I 21,24 21,24 14,230 5,834628 1,77956 0,31142 0,03425 0,00106
Fraksi II 78,76 78,76 38,986 12,67051 2,54677 0,28523 0,01426 0,00035
Fraksi III 0 0 0 0 0 0 0 0
Campuran 100 53,217 18,50514 4,32633 0,59666 0,04851 0,00141
PERHITUNGAN
KEBUTUHAN BAHAN
KESIMPULAN
&
SARAN
1. Jalan yang direncanakan merupakan jalan Kolektor Primer (jalan antar kota) Dengan lebar 2
x 3,25m, dan dengan kecepatan rencana 70 km/jam.
a. Pada PI 1 di rencanakan jenis tikungan full circle dengan jari-jari lengkung 477m , sudut
luar PI 1 sebesar 14,25°
b. Pada PI 2 di rencanakan jenis tikungan spiral-circle-spiral dengan jari- jari lengkung 477m
, sudut luar PI 2 sebesar 8,36°
c. Pada PI 3 di rencanakan jenis tikungan full circle dengan jari-jari lengkung 409m , sudut
luar PI 3 sebesar 42,65°
d. Pada PI 4 di rencanakan jenis tikungan full circle dengan jari-jari lengkung 409m , sudut
luar PI 4 sebesar 20,7°
2. Pada alinyemen vertical jalan ini terdapat 2PVI. Untuk mendapatkan keseimbangan antara
galian dan timbunan
3. Perkerasan jalan ini menggunakan jenis perkerasan lentur berdasarkan volume LHR yang ada
dengan :
a. Jenis Bahan yang dipakai adalah :
Surface Coarse : Laston MS 744
Base Coarse : Laston MS 590
Sub Base Coarse : Sirtu Kelas B
b. Dengan perhitungan didapat dimensi tebal dari masing-masing lapisan
Surface Coarse : 10 cm
Base Coarse : 10 cm
Sub Base Coarse : 10 cm
1. Perencanaan geometrik jalan sebaiknya dilakukan berdasarkan data hasil survey langsung di
lapangan agar diperoleh perencanaan yang optimal.
2. Perencanaan perkerasan jalan sebaiknya menggunakan data selengkap mungkin baik data
lalu lintas maupun data lainnya agar pembangunan dapat berjalan dengan optimal.
3. Bagi tenaga kerja harus mendapatkan asuransi kecelakaan diri dan jaminan keselamatan dan
Kesehatan kerja mengingat pelaksanaan proyek adalah pekerjaan dengan resiko kecelakaan
yang tinggi.
TUGAS BESAR
PERENCANAAN PERKERASAN JALAN
Disusun Oleh:
TUGAS BESAR
Disusun oleh :
Tugas Besar ini disusun sebagai salah satu syarat untuk mengikuti program Praktek Kerja
Nyata di Fakultas Teknik Jurusan Sipil Universitas Muhammadiyah Malang.
Hari :
Tanggal :
Tempat :
Mengetahui,
Dosen Pembimbing
Tugas akhir ini disusun sebagai syarat untuk mengikuti program Praktek Kerja Nyata di
Fakultas Teknik Jurusan Sipil pada Universitas Muhammadiyah Malang.
Akhirnya penyusun berharap semoga laporan ini dapat berguna bagi penyusun pada
khususnya dan pembaca pada umumnya. Penyusun berharap akan adanya kritik, saran dan
masukan yang bersifat membangun demi kesempurnaan laporan praktikum ini ini.
Malang,
DAFTAR ISI
LEMBAR PENGESAHAN.................................................................................. ii