Tc = Rc . Tan . ½ . 𝛥
= 59,041 m
Ec = Tc . Tan .¼ . 𝛥
= 2,897 m
Lc = 𝛥.2. π. Rc
360◦
= 11,24.2. π. 600
360◦
= 117,705
75
Gambar 3. 9 Tikungan 1
77
Tikungan 2
Jenis Tikungan Spiral – Circle -Spiral (SCS) Dengan :
• Kecepatan Renacana (V) : 60 Km/Jam
• Miring Tikungan Normal (en) :2%
• Miring Tikungan Maksimum (emaks) : 10 %
•R : 200 m
• Δ (Bearing) : 26,38’
• Koefisien gesek (fm) fm = 0,192 - 0,00065 . V ( kecepatan < 80 Km/jam )
• Ls’ (Lengkung Peralihan fiktif) = 60 m ( Tabel Metoda Bina Marga) Penyelesaian :
VR2
Rmin =
127+(𝑒𝑚𝑎𝑘𝑠+𝑓𝑚 )
= 115 m
602
= 60 (1- )
40. 200²
= 59,865
Ys = Ls²
6.Rc
= 60²
6.200
=3
θs = 90
3,14 .
𝐿𝑠
= 3,14 .
90 60 = 8,598
𝑅 200
40 . 𝑅
𝐿𝑠 3
K = 𝑙𝑠 −
2
- R . Sin θs
603
= 60 -
40 . 2002 - 200 . Sin 8,598 = 29,964
= 77,153
( ∆ − 2 .θs) ( 26,38−2 .8,598)
Lc = 180 𝜋. R= 180 . 3,14 . 200= 32,058 m
Rc+P
Es = 𝐶𝑂𝑆1 Δ 200+1,352 − 200 = 6,807
2 − 𝑅 = 𝐶𝑂𝑆1 26,38
2
LTotal = Lc+2Ls =32
32,058 +2.60 =152,058
79
Gambar 3. 11 tikungan 2
81
Gambar 3. 13 Tikungan 3
83
Tikungan 4
Jenis Tikungan Spiral – Circle -Spiral (SCS)
Dengan :
Kecepatan Renacana (V) : 60 Km/Jam
Miring Tikungan Normal (en) :2%
Miring Tikungan Maksimum (emaks) : 10 %
R : 115 m
Δ (Bearing) : 26,40°
Koefisien gesek (fm) fm = 0,192 - 0,00065 . V ( kecepatan < 80
Km/jam )
fm = 0,192 - 0,00065 . 70 km/jam = 0,1465
Ls’ (Lengkung Peralihan fiktif) = 60 m ( Tabel Metoda Bina
Marga) Penyelesaian :
2
X = Ls ( 1 - 𝐿𝑠
602
40 . 𝑅 ) = 60 ( 1 - ) = 59,10 m
2 6 . 200
𝐿𝑠2 602
Y = 6. 𝑅 = 6.200
= 3,00
θs = 90
.
𝐿𝑠 90
= 3,14 .
60 = 8,594
3,14 𝑅 200
𝐿𝑠2 602
P= 6𝑅 – R ( 1 – COS θs) = - 205 ( 1 – Cos 8,594 ) = 0,754406 m
6.200
𝐿𝑠 3
K = 𝑙𝑠 −
40 . 𝑅 2 - R . Sin θs
603
= 60 -
40 . 2002 - 200 . Sin 8,594= 29,9786
= 77,065
( ∆ − 2 .θs) ( 26,40−2 .8,594)
Lc = 180 𝜋. R= 180 . 3,14 . 205 = 32,155 m
R+P
Es = 𝐶𝑂𝑆1 Δ − 200
200+0,754406 = 6,202 m
2 − 𝑅 = 𝐶𝑂𝑆1 34,03
2
85
Tabel 1. 7 hasil perhitungan tikungan 4
Gambar 3. 15 Tikungan 4