PERHITUNGAN SLAB LANTAI JEMBATAN

STUDIO PERANCANGAN II
NAMA : SHEVA AKBAR R. NAMA : ROY MARKCELLINO
NIM : 195060107111035 NIM : 195060107111029
A. DATA SLAB LANTAI JEMBATAN

Tebal slab lantai jembatan ts = 0.20 m


Tebal lapisan aspal + overlay ta = 0.05 m
Tebal genangan air hujan th = 0.05 m
Jarak antara balok prategang s= 1.70 m
Lebar jalur lalu-lintas b1 = 9.00 m
Lebar trotoar b2 = 1.00 m
Lebar total jembatan b= 11.00 m
Panjang bentang jembatan L= 50.00 m

B. BAHAN STRUKTUR

Mutu beton : K - 350


Kuat tekan beton fc' = 0.83 * K / 10 = 29.05 MPa
Modulus elastik Ec = 4700 * √ fc' = 25332 MPa
Angka poisson u= 0.2
Modulus geser G = Ec / [2*(1 + u)] = 10555 MPa
Koefisien muai panjang untuk beton, a = 1.0E-05 / ºC
Mutu baja :
Untuk baja tulangan dengan Ø > 12 mm : U - 39
Tegangan leleh baja, fy =U*10 = 390 MPa
Untuk baja tulangan dengan Ø ≤ 12 mm : U - 24
Tegangan leleh baja, fy = U*10 = 240 MPa

Specific Gravity kN/m3


Berat beton bertulang wc = 25.00
Berat beton tidak bertulang (beton rabat) w'c = 24.00
Berat aspal wa = 22.00
Berat jenis air ww = 9.80
Berat baja ws = 77.00

Page 4 SLAB
I. ANALISIS BEBAN SLAB LANTAI JEMBATAN

1. BERAT SENDIRI (MS)

Faktor beban ultimit : KMS = 1.3


Ditinjau slab lantai jembatan selebar, b= 1.00 m
Tebal slab lantai jembatan, h = ts = 0.20 m
Berat beton bertulang, wc = 25.00 kN/m3
Berat sendiri, QMS = b * h * wc QMS = 5.000 kN/m

2. BEBAN MATI TAMBAHAN (MA)

Faktor beban ultimit : KMA = 2.0


NO JENIS TEBAL BERAT BEBAN
(m) (kN/m3) kN/m
1 Lapisan aspal + overlay 0.05 22.00 1.100
2 Air hujan 0.05 9.80 0.490
Beban mati tambahan : QMA = 1.590 kN/m

2. BEBAN TRUK "T" (TT)

Faktor beban ultimit : KTT = 2.0


Beban hidup pada lantai jembatan berupa beban roda ganda oleh Truk (beban T) yang
besarnya, T= 112.5 kN
Faktor beban dinamis untuk pembebanan truk diambil, DLA = 0.3
Beban truk "T" : PTT = ( 1 + DLA ) * T = 146.250 kN

Page 5 SLAB
T

4. BEBAN ANGIN (EW)

Faktor beban ultimit : KEW = 1.2


Beban garis merata tambahan arah horisontal pada permukaan lantai jembatan akibat
angin yang meniup kendaraan di atas jembatan dihitung dengan rumus :

TEW = 0.0012*Cw*(Vw)2 kN/m


dengan,
Cw = koefisien seret = 1.20
Vw = Kecepatan angin rencana = 35 m/det
TEW = 0.0012*Cw*(Vw)2 = 1.764 kN/m

Bidang vertikal yang ditiup angin merupakan bidang samping kendaraan dengan tinggi
2.00 m di atas lantai jembatan. h= 2.00 m
Jarak antara roda kendaraan x= 1.75 m
Transfer beban angin ke lantai jembatan, PEW = [ 1/2*h / x * TEW ]
PEW = 1.008 kN

Page 6 SLAB
5. PENGARUH TEMPERATUR (ET)

Faktor beban ultimit : KET = 1.2


Untuk memperhitungkan tegangan maupun deformasi struktur yang timbul akibat penga-
ruh temperatur, diambil perbedaan temperatur yang besarnya setengah dari selisih
antara temperatur maksimum dan temperatur minimum rata-rata pada lantai jembatan.
Temperatur maksimum rata-rata Tmax = 40 C
Temperatur minimum rata-rata Tmin = 15 C
∆T = ( Tmax - Tmin ) / 2
Perbedaan temperatur pada slab, ∆T = 12.5 ºC
Koefisien muai panjang untuk beton, a = 1.0E-05 / ºC
Modulus elastis beton, Ec = 25332084 kPa

6. MOMEN PADA SLAB LANTAI JEMBATAN

Formasi pembebanan slab untuk mendapatkan momen maksimum pada bentang me-
nerus dilakukan seperti pd gambar.
Momen maksimum pd slab dihitung
berdasarkan metode one way slab
dengan beban sebagai berikut :

QMS 5.000 kN/m


QMA 1.590 kN/m
PTT 146.250 kN
PEW 1.008 kN
∆T 12.5 C

Koefisien momen lapangan dan momen tumpuan untuk bentang menerus dengan be-
ban merata, terpusat, dan perbedaan temperatur adalah sebagai berikut :

k = koefisien momen s= 1.70 m Dihitung dari As


Untuk beban merata Q : M = k * Q * s2
Untuk beban terpusat P : M=k*P*s
Untuk beban temperatur, DT : M = k * a * DT * Ec * s3

Page 7 SLAB
Momen akibat berat sendiri (MS) :
2
Momen tumpuan, MMS = 0.0833 * QMS * s = 1.204 kNm
2
Momen lapangan, MMS = 0.0417 * QMS * s = 0.603 kNm
Momen akibat beban mati tambahan (MA) :
2
Momen tumpuan, MMA = 0.1041 * QMA * s = 0.478 kNm
2
Momen lapangan, MMA = 0.0540 * QMA * s = 0.248 kNm
Momen akibat beban truck (TT) :
Momen tumpuan, MTT = 0.1562 * PTT * s = 38.835 kNm
Momen lapangan, MTT = 0.1407 * PTT * s = 34.982 kNm
Momen akibat beban angin (EW) :
Momen tumpuan, MEW = 0.1562 * PEW * s = 0.268 kNm
Momen lapangan, MEW = 0.1407 * PEW * s = 0.241 kNm
Momen akibat temperatur (ET) :
Momen tumpuan, MET = 5.62E-07 * a * DT * Ec * s3 = 0.009 kNm
Momen lapangan, MEW = 2.81E-06 * a * DT * Ec * s3 = 0.044 kNm

6.1. MOMEN SLAB

No Jenis Beban Faktor daya keadaan M tumpuan M lapangan


Beban layan ultimit (kNm) (kNm)
1 Berat sendiri KMS 1.0 1.3 1.204 0.603
2 Beban mati tambahan KMA 1.0 2.0 0.478 0.248
3 Beban truk "T" KTT 1.0 2.0 38.835 34.982
4 Beban angin KEW 1.0 1.2 0.268 0.241
5 Pengaruh temperatur KET 1.0 1.2 0.009 0.044

Page 8 SLAB
6.2. KOMBINASI-1

No Jenis Beban Faktor M tumpuan M lapangan Mu tumpuan Mu lapangan


Beban (kNm) (kNm) (kNm) (kNm)
1 Berat sendiri 1.3 1.204 0.603 1.565 0.783
2 Beban mati tambahan 2.0 0.478 0.248 0.957 0.496
3 Beban truk "T" 2.0 38.835 34.982 77.670 69.963
4 Beban angin 1.0 0.268 0.241 0.268 0.241
5 Pengaruh temperatur 1.0 0.009 0.044 0.009 0.044
Total Momen ultimit slab, Mu = 80.468 71.528

6.3. KOMBINASI-2

No Jenis Beban Faktor M tumpuan M lapangan Mu tumpuan Mu lapangan


Beban (kNm) (kNm) (kNm) (kNm)
1 Berat sendiri 1.3 1.204 0.603 1.565 0.783
2 Beban mati tambahan 2.0 0.478 0.248 0.957 0.496
3 Beban truk "T" 1.0 38.835 34.982 38.835 34.982
4 Beban angin 1.2 0.268 0.241 0.321 0.289
5 Pengaruh temperatur 1.2 0.009 0.044 0.010 0.052
Total Momen ultimit slab, Mu = 41.688 36.603

7. PEMBESIAN SLAB

7.1. TULANGAN LENTUR NEGATIF

Momen rencana tumpuan : Mu = 80.468 kNm


Mutu beton : K- 350 Kuat tekan beton, fc ' = 29.05 MPa
Mutu baja : U - 39 Tegangan leleh baja, fy = 390 MPa
Tebal slab beton, h= 200 mm
Jarak tulangan terhadap sisi luar beton, d' = 40 mm
Modulus elastis baja, Es Es = 2.00E+05
Faktor bentuk distribusi tegangan beton, b1 = 0.85
rb = b 1* 0.85 * fc’/ fy * 600 / ( 600 + fy ) = 0.032616
Rmax = 0.75 * rb * fy * [1 – ½*0.75* rb * fy / ( 0.85 * fc’ ) ] = 7.697275
Faktor reduksi kekuatan lentur, f = 0.80
Momen rencana ultimit, Mu = 80.468 kNm
Tebal efektif slab beton, d = h - d' = 160 mm
Ditinjau slab beton selebar 1 m, b= 1000 mm
Momen nominal rencana, Mn = Mu / f = 100.585 kNm
Faktor tahanan momen, Rn = Mn * 10-6 / ( b * d2 ) = 3.92912
Rn < Rmax (OK)

Page 9 SLAB
Rasio tulangan yang diperlukan :
r = 0.85 * fc’ / fy * [ 1 -  * [1 – 2 * Rn / ( 0.85 * fc’ ) ] = 0.01104
Rasio tulangan minimum, r min = 0.5 / fy = 0.00090
Rasio tulangan yang digunakan, r= 0.01104
As = r * b * d =
2
Luas tulangan yang diperlukan, 1765.85 mm
Diameter tulangan yang digunakan, D 19 mm
Jarak tulangan yang diperlukan, s = p / 4 * D2 * b / As = 160.562 mm
Digunakan tulangan, D 19 - 150
As = p / 4 * D2 * b / s = 1890 mm2
Tulangan bagi / susut arah memanjang diambil 50% tulangan pokok.
As' = 50% * As = 883 mm2
Diameter tulangan yang digunakan, D 16 mm
Jarak tulangan yang diperlukan, s = p / 4 * D2 * b / As = 227.722 mm
Digunakan tulangan, D 16 - 200
As' = p / 4 * D2 * b / s = 1005 mm2
7.2. TULANGAN LENTUR POSITIF

Momen rencana lapangan : Mu = 71.528 kNm


Mutu beton : K- 350 Kuat tekan beton, fc ' = 29.05 MPa
Mutu baja : U - 39 Tegangan leleh baja, fy = 390 MPa
Tebal slab beton, h= 200 mm
Jarak tulangan terhadap sisi luar beton, d' = 35 mm
Modulus elastis baja, Es Es = 2.00E+05
Faktor bentuk distribusi tegangan beton, b1 = 0.85
rb = b 1* 0.85 * fc’/ fy * 600 / ( 600 + fy ) = 0.032616
Rmax = 0.75 * rb * fy * [1 – ½*0.75* rb * fy / ( 0.85 * fc’ ) ] = 7.697275
Faktor reduksi kekuatan lentur, f = 0.80
Momen rencana ultimit, Mu = 71.528 kNm
Tebal efektif slab beton, d = h - d' = 165 mm
Ditinjau slab beton selebar 1 m, b= 1000 mm
Momen nominal rencana, Mn = Mu / f = 89.409 kNm
Faktor tahanan momen, Rn = Mn * 10-6 / ( b * d2 ) = 3.28409
Rn < Rmax (OK)
Rasio tulangan yang diperlukan :
r = 0.85 * fc’ / fy * [ 1 -  * [1 – 2 * Rn / ( 0.85 * fc’ ) ] = 0.00907
Rasio tulangan minimum, r min = 0.5 / fy = 0.00128
Rasio tulangan yang digunakan, r= 0.00907
As = r * b * d =
2
Luas tulangan yang diperlukan, 1496.63 mm
Diameter tulangan yang digunakan, D 16 mm
Jarak tulangan yang diperlukan, s = p / 4 * D2 * b / As = 134.343 mm
Digunakan tulangan, D 16 - 100
As = p / 4 * D2 * b / s = 2011 mm2
Tulangan bagi / susut arah memanjang diambil 50% tulangan pokok.
As' = 50% * As = 748 mm2
Diameter tulangan yang digunakan, D 13 mm
Jarak tulangan yang diperlukan, s = p / 4 * D2 * b / As = 177.375 mm
Digunakan tulangan, D 13 - 150
As' = p / 4 * D2 * b / s = 885 mm2

Page 10 SLAB
8. KONTROL LENDUTAN SLAB

Mutu beton : K- 350 Kuat tekan beton, fc ’ = 29.05 MPa


Mutu baja : U- 39 Tegangan leleh baja, fy = 390 MPa
Modulus elastis beton, Ec = 4700*√ fc' = 25332.08 MPa
Modulus elastis baja, Es = 200000 MPa
Tebal slab, h= 200 mm
Jarak tulangan terhadap sisi luar beton, d' = 40 mm
Tebal efektif slab, d = h - d' = 160 mm
Luas tulangan slab, As = 1890 mm2
Panjang bentang slab, Lx = 1.70 m = 1700 mm
Ditinjau slab selebar, b= 1.00 m = 1000 mm
Beban terpusat, P = TTT = 146.250 kN
Beban merata, Q = PMS + PMA = 6.590 kN/m
Lendutan total yang terjadi ( dtot ) harus < Lx / 240 = 7.083 mm
Ig = 1/12 * b * h3 = 6.67E+08 mm
3
Inersia brutto penampang plat,
Modulus keruntuhan lentur beton, fr = 0.7 * √ fc' = 3.772864 MPa
Nilai perbandingan modulus elastis, n = E s / Ec = 7.90
2
n * As = 14923.3 mm
Jarak garis netral terhadap sisi atas beton,
c = n * As / b = 14.923 mm
Inersia penampang retak yang ditransformasikan ke beton dihitung sbb. :
Icr = 1/3 * b * c3 + n * As * ( d - c )2 = 3.15E+08 mm
4

yt = h / 2 = 100 mm
Momen retak : Mcr = fr * Ig / yt = 2.52E+07 Nmm
Momen maksimum akibat beban (tanpa faktor beban) :
Ma = 1/8 * Q * Lx2 + 1/4 * P *Lx = 64.537 kNm
Ma = 6.45E+07 Nmm
Inersia efektif untuk perhitungan lendutan,
Ie = ( Mcr / Ma )3 * Ig + [ 1 - ( Mcr / Ma )3 ] * Icr = 3.36E+08 mm
4

Q= 6.590 N/mm P= 146250 N


Lendutan elastis seketika akibat beban mati dan beban hidup :
de = 5/384*Q*Lx4 / ( Ec*Ie ) +1/48*P*Lx3 / ( Ec*Ie ) = 1.843 mm

Rasio tulangan slab lantai jembatan :


r = As / ( b * d ) = 0.011814
Faktor ketergantungan waktu untuk beban mati (jangka waktu > 5 tahun), nilai :
z= 2.0
l = z / ( 1 + 50*r ) = 1.2573
Lendutan jangka panjang akibat rangkak dan susut :
dg = l * 5 / 384 * Q * Lx4 / ( Ec * Ie ) = 0.106 mm

Lendutan total pada plat lantai jembatan :


Lx / 240 = 7.083 mm
dtot = de + dg = 1.949 mm < Lx/240 (aman) OK

Page 11 SLAB
9. KONTROL TEGANGAN GESER PONS

Mutu Beton : K - 350 Kuat tekan beton, fc ' = 29.05 MPa


Kuat geser pons yang disyaratkan, fv = 0.3 * √ fc' = 1.617 MPa
Faktor reduksi kekuatan geser, Ø = 0.60
Beban roda truk pada slab, PTT = 146.250 kN = 146250 N
h = 0.20 m a= 0.30 m
ta = 0.05 m b= 0.50 m
u = a + 2 * ta + h = 0.6 m = 600 mm
v = b + 2 * ta + h = 0.8 m = 800 mm
Tebal efektif plat, d= 160 mm
2
Luas bidang geser : Av = 2 * ( u + h ) * d = 448000 mm
Gaya geser pons nominal, Pn = Av * fv = 724389.8 N
f * Pn = 434633.9 N
Faktor beban ultimit, KTT = 2.0
Beban ultimit roda truk pada slab, Pu = KTT * PTT = 292500 N
Kontrol Pu < f * Pn 292,500 < 434,634 AMAN (OK)

GAMBAR PENULANGAN

Page 12 SLAB
II. PERHITUNGAN SLAB TROTOAR

1. BERAT SENDIRI TROTOAR

Jarak antara tiang railing :


L= 1.50 m
Berat beton bertulang :
3
wc = 25.00 kN/m

Lebar Trotoar (b2)


1 m

Berat sendiri Trotoar untuk panjang L = 1.50 m


NO b h Shape L Berat Lengan Momen
(m) (m) (m) (kN) (m) (kNm)
1 0.85 0.30 1 2.00 12.750 0.425 5.419
2 0.15 0.30 0.5 2.00 1.125 0.900 1.013
3 1.46 0.10 0.5 2.00 3.650 0.487 1.776
4 0.20 0.40 0.5 2.00 2.000 0.983 1.967
5 0.11 0.40 1 2.00 2.200 1.405 3.091
6 0.15 0.40 0.5 2.00 1.500 1.510 2.265
7 0.26 0.25 0.5 0.15 0.122 1.130 0.138
8 0.15 0.25 0.5 0.15 0.070 1.075 0.076
9 0.15 0.55 1 0.15 0.309 1.535 0.475
10 1.16 0.20 1 2.00 11.600 0.580 6.728
11 SGP 3" dengan berat/m = 0.63 4 2.52 1.535 3.868
Total : 37.847 26.815
Berat sendiri Trotoar per m lebar PMS = 18.923 MMS = 13.407

Page 13 SLAB
2. BEBAN HIDUP PADA PEDESTRIAN

Beban hidup pada pedestrian per meter lebar tegak lurus bidang gambar :
NO Jenis Beban Gaya Lengan Momen
(kN) (m) (kNm)
1 Beban horisontal pada railing (H 1) 0.75 1.300 0.975
2 Beban horisontal pada kerb (H2) 1.50 0.400 0.600
3 Beban vertikal terpusat (P) 20.00 0.500 10.000
4 Beban vertikal merata = q * b2 5.00 0.500 2.500
Momen akibat beban hidup pada pedestrian : MTP = 14.075

3. MOMEN ULTIMIT RENCANA SLAB TROTOAR

Faktor beban ultimit untuk berat sendiri pedestrian KMS = 1.3


Faktor beban ultimit untuk beban hidup pedestrian KTP = 2.0
Momen akibat berat sendiri pedestrian : MMS = 13.407 kNm
Momen akibat beban hidup pedestrian : MTP = 14.075 kNm
Momen ultimit rencana slab trotoar : Mu = KMS * MMS + KTP * MTP
Mu = 45.580 kNm

ReadyMix fc 24.90
4. PEMBESIAN SLAB TROTOAR

Mutu beton : K- 350 Kuat tekan beton, fc ' = 29.05 MPa


Mutu baja : U- 39 Tegangan leleh baja, fy = 390 MPa
Tebal slab beton, h= 300 mm
Jarak tulangan terhadap sisi luar beton, d' = 30 mm
Modulus elastis baja, Es = 2.00E+05
Faktor bentuk distribusi tegangan beton, b1 = 0.85
rb = b 1* 0.85 * fc’/ fy * 600 / ( 600 + fy ) = 0.032616
Rmax = 0.75 * rb * fy * [1 – ½*0.75* rb * fy / ( 0.85 * fc’ ) ] = 7.697275
Faktor reduksi kekuatan lentur, f = 0.80
Faktor reduksi kekuatan geser, f = 0.60
Momen rencana ultimit, Mu = 45.580 kNm
Tebal efektif slab beton, d = h - d' = 270 mm
Ditinjau slab beton selebar 1 m, b= 1000 mm
Momen nominal rencana, Mn = Mu / f = 56.974 kNm
Faktor tahanan momen, Rn = Mn * 10-6 / ( b * d2 ) = 0.78154
Rn < Rmax (OK)

Page 14 SLAB
Rasio tulangan yang diperlukan :
r = 0.85 * fc’ / fy * [ 1 -  * [1 – 2 * Rn / ( 0.85 * fc’ ) ] = 0.00204
Rasio tulangan minimum, r min = 0.5 / fy = 0.00128
Rasio tulangan yang digunakan, r= 0.00204
As = r * b * d =
2
Luas tulangan yang diperlukan, 549.91 mm
Diameter tulangan yang digunakan, D 13 mm
Jarak tulangan yang diperlukan, s = p / 4 * D2 * b / As = 241.370 mm
Digunakan tulangan, D 13 - 200
As = p / 4 * D2 * b / s = 664 mm2
Untuk tulangan longitudinal diambil 50% tulangan pokok.
2
As' = 50% * As = 274.96 mm
Diameter tulangan yang digunakan, D 13 mm
Jarak tulangan yang diperlukan, s = p / 4 * D2 * b / As = 482.740 mm
Digunakan tulangan, D 13 - 450
As' = p / 4 * D2 * b / s = 295 mm2

III. PERHITUNGAN TIANG RAILING

1. BEBAN TIANG RAILING

Jarak antara tiang railing, L= 1.5 m


Beban horisontal pada railing. H1 = 0.750 kN/m
Gaya horisontal pada tiang railing, HTP = H1 * L = 1.125 kN
Lengan terhadap sisi bawah tiang railing, y= 0.8 m
Momen pada pada tiang railing, MTP = HTP * y = 0.9 kNm
Faktor beban ultimit : KTP = 2.0
Momen ultimit rencana, Mu = KTP * MTP = 1.8 kNm
Gaya geser ultimit rencana, Vu = KTP * HTP = 2.3 kN

2. PEMBESIAN TIANG RAILING

2.1. TULANGAN LENTUR

Mutu beton : K- 350 Kuat tekan beton, fc ' = 29.05 MPa


Mutu baja : U- 24 Tegangan leleh baja, fy = 240 MPa
Tebal tiang railing, h= 150 mm
Jarak tulangan terhadap sisi luar beton, d' = 35 mm
Modulus elastis baja, Es Es = 2.00E+05
Faktor bentuk distribusi tegangan beton, b1 = 0.85
rb = b 1* 0.85 * fc’/ fy * 600 / ( 600 + fy ) = 0.062466
Rmax = 0.75 * rb * fy * [1 – ½*0.75* rb * fy / ( 0.85 * fc’ ) ] = 8.68391
Faktor reduksi kekuatan lentur, f = 0.80
Faktor reduksi kekuatan geser, f = 0.60
Momen rencana ultimit, Mu = 1.800 kNm
Tebal efektif tiang railing, d = h - d' = 115 mm
Lebar tiang railing, b= 150 mm
Momen nominal rencana, Mn = Mu / f = 2.250 kNm
Faktor tahanan momen, Rn = Mn * 10-6 / ( b * d2 ) = 1.13422
Rn < Rmax (OK)

Page 15 SLAB
Rasio tulangan yang diperlukan :
r = 0.85 * fc’ / fy * [ 1 -  * [1 – 2 * Rn / ( 0.85 * fc’ ) ] = 0.00484
Rasio tulangan minimum, r min = 1.4 / fy = 0.00583
Rasio tulangan yang digunakan, r= 0.00583
As = r * b * d =
2
Luas tulangan yang diperlukan, 100.63 mm
Diameter tulangan yang digunakan, D 13 mm
Jumlah tulangan yang diperlukan, n = As / ( p / 4 * D2 ) = 0.758

Digunakan tulangan, 4 D 13

2.2. TULANGAN GESER

Gaya geser ultimit rencana, Vu = 2.25 kN


Gaya geser ultimit rencana, Vu = 2250 N
Vc = (√ fc') / 6 * b * d = 2727 N SYARAT
f * Vc = 1636 N Perlu tulangan geser
f * Vs = Vu - f * Vc = 614 N
Vs = 1023 N
Digunakan sengkang berpenampang : 2 f 6
Luas tulangan geser sengkang,
Av = p / 4 * f2 * 2 = 56.55 mm2
Jarak tulangan geser (sengkang) yang diperlukan :
S = Av * fy * d / Vs = 1526 mm
Digunakan sengkang, 2 f 6 - 150
GAMBAR PENULANGAN

Page 16 SLAB
IV. PERHITUNGAN PLAT INJAK (APPROACH SLAB)

1. PLAT INJAK ARAH MELINTANG JEMBATAN

1.1. BEBAN TRUK "T" (TT)

Faktor beban ultimit : KTT = 2.0


Beban hidup pada plat injak berupa beban roda ganda oleh Truk (beban T) yang
besarnya, T= 112.5 kN
Faktor beban dinamis untuk pembebanan truk diambil, DLA = 0.3
Beban truk "T" : TTT = ( 1 + DLA ) * T = 146.250 kN

1.2. MOMEN PADA PLAT INJAK

Tebal plat injak, h= 0.30 m


Tebal lapisan aspal, ta = 0.05 m
Lebar bidang kontak roda truk, b= 0.50 m
b' = b + ta = 0.55 m
Mutu Beton : K- 350
Kuat tekan beton, fc’ = 29.05 MPa
Momen max. pada plat injak akibat beban roda dihitung dengan rumus :
Mmax = TTT / 2 * [ 1 - ( r * √2 / l )0.6 ]
dengan, l = [ Ec* h3 / { 12 * ( 1 - u2 ) * ks } ]0.25
u = angka Poisson, u= 0.15
3
ks = standard modulus of soil reaction, ks = 81500 kN/m
2
Ec = modulus elastik beton = 25332.08 MPa Ec = 25332084 kN/m
r = Lebar penyebaran beban terpusat, r = b' / 2 = 0.275 m
l = [ Ec* h3 / { 12 * ( 1 - u2 ) * ks } ]0.25 = 0.91970 m
Mmax = TTT / 2 * [ 1 - ( r * √2 / l )0.6 ] = 22.68827 kNm
Momen ultimit plat injak arah melintang jembatan :
Mu = KTT * Mmax = 45.377 kNm

Page 17 SLAB
1.3. PEMBESIAN PLAT INJAK ARAH MELINTANG JEMBATAN

Mutu beton : K- 350 Kuat tekan beton, fc ' = 29.05 MPa


Mutu baja : U- 24 Tegangan leleh baja, fy = 240 MPa
Tebal plat injak, h= 300 mm
Jarak tulangan terhadap sisi luar beton, d' = 30 mm
Modulus elastis baja, Es = 2.00E+05
Faktor bentuk distribusi tegangan beton, b1 = 0.85
rb = b 1* 0.85 * fc’/ fy * 600 / ( 600 + fy ) = 0.062466
Rmax = 0.75 * rb * fy * [1 – ½*0.75* rb * fy / ( 0.85 * fc’ ) ] = 8.68391
Faktor reduksi kekuatan lentur, f = 0.80
Faktor reduksi kekuatan geser, f = 0.60
Momen rencana ultimit, Mu = 45.377 kNm
Tebal efektif plat injak, d = h - d' = 270 mm
Ditinjau plat injak selebar 1 m, b= 1000 mm
Momen nominal rencana, Mn = Mu / f = 56.721 kNm
Faktor tahanan momen, Rn = Mn * 10-6 / ( b * d2 ) = 0.77806
Rn < Rmax (OK)
Rasio tulangan yang diperlukan :
r = 0.85 * fc’ / fy * [ 1 -  * [1 – 2 * Rn / ( 0.85 * fc’ ) ] = 0.00329
Rasio tulangan minimum, r min = 0.5 / fy = 0.00208
Rasio tulangan yang digunakan, r = 0.00329
As = r * b * d =
2
Luas tulangan yang diperlukan, 889.56 mm
Diameter tulangan yang digunakan, D 16 mm
Jarak tulangan yang diperlukan, s = p / 4 * D2 * b / As = 226.023 mm
Digunakan tulangan, D 16 - 200
As = p / 4 * D2 * b / s = 1005 mm2

2. PLAT INJAK ARAH MEMANJANG JEMBATAN

2.1. BEBAN TRUK "T" (TT)

Faktor beban ultimit : KTT = 2.0


Beban hidup pada plat injak berupa beban roda ganda oleh Truk (beban T) yang
besarnya, T= 112.5 kN
Faktor beban dinamis untuk pembebanan truk diambil, DLA = 0.3
Beban truk "T" : TTT = ( 1 + DLA ) * T = 146.250 kN

Page 18 SLAB
2.2. MOMEN PADA PLAT INJAK

Tebal plat injak, h= 0.30 m


Tebal lapisan aspal, ta = 0.05 m
Lebar bidang kontak roda truk, a= 0.30 m
a' = a + ta = 0.35 m
Mutu Beton : K- 350
Kuat tekan beton, fc’ = 29.05 MPa
Momen max. pada plat injak akibat beban roda dihitung dengan rumus :
Mmax = TTT / 2 * [ 1 - ( r * √2 / l )0.6 ]
dengan, l = [ Ec* h3 / { 12 * ( 1 - u2 ) * ks } ]0.25
u = angka Poisson, u= 0.15
3
ks = standard modulus of soil reaction, ks = 81500 kN/m
2
Ec = modulus elastik beton = 25332.08 MPa Ec = 25332084 kN/m
r = Lebar penyebaran beban terpusat, r = b' / 2 = 0.175 m
l = [ Ec* h3 / { 12 * ( 1 - u2 ) * ks } ]0.25 = 0.91970 m
Mmax = TTT / 2 * [ 1 - ( r * √2 / l )0.6 ] = 30.66016 kNm
Momen ultimit plat injak arah melintang jembatan :
Mu = KTT * Mmax = 61.320 kNm

2.3. PEMBESIAN PLAT INJAK ARAH MEMANJANG JEMBATAN

Mutu beton : K- 350 Kuat tekan beton, fc ' = 29.05 MPa


Mutu baja : U - 24 Tegangan leleh baja, fy = 240 MPa
Tebal plat injak, h= 300 mm
Jarak tulangan terhadap sisi luar beton, d' = 30 mm
Modulus elastis baja, Es = 2.00E+05
Faktor bentuk distribusi tegangan beton, b1 = 0.85
rb = b 1* 0.85 * fc’/ fy * 600 / ( 600 + fy ) = 0.062466
Rmax = 0.75 * rb * fy * [1 – ½*0.75* rb * fy / ( 0.85 * fc’ ) ] = 8.68391
Faktor reduksi kekuatan lentur, f = 0.80
Faktor reduksi kekuatan geser, f = 0.60
Momen rencana ultimit, Mu = 61.320 kNm
Tebal efektif plat injak, d = h - d' = 270 mm
Ditinjau plat injak selebar 1 m, b= 1000 mm
Momen nominal rencana, Mn = Mu / f = 76.650 kNm
Faktor tahanan momen, Rn = Mn * 10-6 / ( b * d2 ) = 1.05145
Rn < Rmax (OK)
Rasio tulangan yang diperlukan :
r = 0.85 * fc’ / fy * [ 1 -  * [1 – 2 * Rn / ( 0.85 * fc’ ) ] = 0.00448
Rasio tulangan minimum, r min = 0.5 / fy = 0.00208
Rasio tulangan yang digunakan, r = 0.00448
As = r * b * d =
2
Luas tulangan yang diperlukan, 1209.19 mm
Diameter tulangan yang digunakan, D 16 mm
Jarak tulangan yang diperlukan, s = p / 4 * D2 * b / As = 166.278 mm
Digunakan tulangan, D 16 - 150
As = p / 4 * D2 * b / s = 1340 mm2

Page 19 SLAB
GAMBAR POTONGAN MEMANJANG JEMBATAN

Page 20 SLAB
PERHITUNGAN GIRDER JEMBATAN

NAMA : SHEVA AKBAR R. NAMA : ROY MARKCELLINO


NIM : 195060107111035 NIM : 195060107111029
A. DATA STRUKTUR ATAS

Panjang Bentang Jembatan L= 50 m


Lebar Jalan (Jalur Lalu Lintas) B1= 9m
Lebar Trotoar B2= 1m
Lebar Total Jembatan B=B1 + 2*B2= 11 m
Jarak antara Girder s= 1.7 m
Dimensi Girder
Panjang bentang girder L= 50 m
Lebar Sisi Bawah b= 0.7 m
Tinggi Total h= 2.3 m
Lebar Badan bw= 0.25 m
c1= 0.225 m
c2= 0.225 m
Dimensi Diafragma
Lebar Diafragma bd= 1.45 m
Tinggi Diafragma hd= 1.95 m
Tebal Slab Lantai Jembatan ts= 0.2 m
Tebal Lapisan Aspal ta= 0.05 m
Tinggi genangan air hujan th= 0.05 m
Tinggi Bidang Samping ha= 3.7 m
Jumlah Balok Diafragma Sepanjang L nd 4 bh
Jarak antar Balok Diafragma Sd = L / (nd-1) 16.66666667 m
Dibulatkan menjadi 17 m
B. BAHAN STRUKTUR

Mutu Beton : K- 350


Kuat tekan Beton fc` =0.83*K/10 = 29.05 Mpa
Modulus Elastik Ec = 4700 * √fc` = 25332.0844 MPa
Angka poison υ = 0.2
Modulus geser G =Ec/[2*(1+u)] = 10555.03517
Koef muai panjang beton α= 0.00001
Mutu Baja :
Untuk baja tulangan dengan Dia > 12 mm U 39
Tegangan Leleh baja fy = U *10 = 390 MPa
Untuk baja tulangan dengan Dia < 12 mm U 24
Tegangan Leleh Baja fy = U *10 = 240 MPa
Spesific Gravity
Berat beton bertulang Wc = 25 kN/m3
Berat beton tidak bertulang (beton rabat) W'c = 24 kN/m3
Berat aspal Wa = 22 kN/m3
Berat jenis air Ww = 9.8 kN/m3
Berat Baja Ws = 77 kN/m3
C. ANALISIS BEBAN
1.BERAT SENDIRI (MS)

Faktor beban ultimit Kms 1.3


Berat sendiri ( self weight ) adalah berat bahan dan bagian jembatan yang merupakan elemen
struktural, ditambah dengan elemen non-struktural yang dipikulnya dan bersifat tetap. Beban
berat sendiri balok diafragma pada Girder dihitung sbb.

Panjang bentang Girder L= 50 m


Berat satu balok diafragma Wd = Bd*(hd-ts)*s*wc = 107.84375 kn/m
Jumlah balok diafragma sepanjang bentang L, nd = 4
Beban diafragma pada girder Qd = nd * Wd / L = 8.6275 kn/m

No Jenis Lebar Tebal Berat Beban


(m) (m) (kn/m3) kn/m
1 Plat Lantai 1.7 0.2 25 8.5
2 Girder Bagian 2 0.25 1.45 25 9.0625
3 Girder Bagian 3 0.225 0.275 25 1.546875
4 Girder bagian 4 0.225 0.225 25 1.265625
5 Diafragma Qd = 8.6275
QMS = 29.0025
Gaya geser dan Momen pada T-Girder akibat berat sendiri (MS)
Vms = 1/2 * Qms * L = 725.0625 kn
Mms = 1/8 *Qms * L^2 = 9063.28125 knm

2. BEBAN MATI TAMBAHAN


Faktor beban ultimit : KMA 2
Beban mati tambahan ( superimposed dead load ), adalah berat seluruh bahan yang
menimbulkan suatu beban pada jembatan yang merupakan elemen non-struktural, dan
mungkin besarnya berubah selama umur jembatan. Jembatan dianalisis harus mampu
memikul beban tambahan seperti :

1) Penambahan lapisan aspal (overlay) dikemudian hari


2) Genangan air hujan jika sistem drainase tidak bekerja dengan baik

Panjang Girder L= 50

No Jenis Lebar Tebal Berat Beban


(m) (m) (kn/m3) kn/m
1 Lapisan Aspal 1.7 0.05 22 1.87
2 Air hujan 1.7 0.05 9.8 0.833
QMA = 2.703

Gaya geser dan Momen pada T-Girder akibat berat sendiri (MS)
Vms = 1/2 * Qms * L = 67.575 kn
Mms = 1/8 *Qms * L^2 = 844.6875 knm
3.BEBAN LALU LINTAS
3.1 BEBAN LAJUR "D" (TD)

Faktor beban ultimit : KTD = 2

Beban kendaraan yg berupa beban lajur "D" terdiri dari beban terbagi rata /BTR (Uniformly
Distributed Load), UDL dan beban garis (Knife Edge Load), KEL seperti pd Gambar 1. UDL
mempunyai intensitas q (kPa) yg besarnya tergantung pd panjang bentang L yg dibebani lalu-
lintas seperti Gambar dibawah ini atau dinyatakan dengan rumus sebagai berikut :

Memakai L > 30 m
Untuk panjang bentang L= 50 m
q= 7.2 kPa
KEL mempunyai batas p= 49 kN/m
Faktor beban dinamis (Dinamic Load Allowance) untuk KEL diambil sebagai berikut :

Jarak antara Girder s= 1.7 meter


Untuk panjang bentang L= 50 meter
DLA = 0.4
Beban lajur pada Girder QTD = q *s = 12.24 kn/m
PTD = (1 + DLA) * p * s = 116.62 kn

Gaya geser dan momen pada T-Girder akibat beban lajur "D" "
VTD = 1/2 * (QTD * L + PTD) = 364.31 kN
MTD = 1/8 QTD * L^2 + 1/4 * PTD*L = 5282.75 kNm
3.2 BEBAN TRUK "T" (TT)

Faktor beban ultimit : K TT = 2


Beban hidup pada lantai jembatan berupa beban roda ganda oleh Truk (beban T) yang
besarnya,
T= 100 KN
Faktor beban dinamis untuk pembebanan truk diambil,
DLA = 0.4
Beban truk "T" P TT = ( 1 + DLA ) * T = 140 kN

a 5 meter
b 4 meter
L 50 meter

Gaya Geser (kN) Momen (kNm)


p y v V*p p x m m*P
P TT 1 50 1 1 1 25 12.5 12.5
P TT 1 41 0.82 0.82 1 5 2.5 2.5
1/4 P TT 0.25 46 0.92 0.23 0.25 4 2 0.5
Σ(v*p)= 2.05 Σ(m*p)= 15.5

Gaya geser dan momen pada T-Gider akibat beban truk "T" :
VTT = Σ ( v * p ) * PTT = 287 kn
MTT = Σ ( m * p ) * PTT = 2170 knm
Gaya geser dan momen yang terjadi akibat pembebanan lalu-lintas, diambil yang memberikan
pengaruh terbesar terhadap T-Girder di antara beban "D" dan beban "T".

Gaya geser maksimum akibat beban "T", VTT = 287 kn


Momen maksimum akibat beban "D", MTT = 2170 knm
4. GAYA REM
Faktor beban ultimit : KTB 2

Pengaruh pengereman dari lalu-lintas diperhitungkan sebagai gaya dalam arah memanjang,
dan dianggap bekerja pada jarak 1.80 m di atas lantai jembatan. Besarnya gaya ) sebagai
berikut :
rem arah memanjang jembatan tergantung panjang total jembatan (Lt) sebagai berikut :

Memakai L < 80 m
Panjang Bentang Girder L= 50 m
Jumlah Girder n_girder = 6
Gaya Rem HTB = 250 kN
Jarak Antar Girder s= 1.7
Gaya Rem untuk Lt < 80 m TTB = HTB / n_girder = 41.66666667

Gaya rem juga dapat diperhitungkan sebesar 5% beban lajur "D" tanpa faktor beban

Gaya rem, TTb = 5% beban lajur "D" tanpa faktor beban dinamis,
Qtd = q * s = 12.24 kn/m
Ptd = P * s = 83.3 kN
TTB = 0.05 * (Qtd*L + PTD) = 34.765 kN

Diambil gaya rem, TTB = 41.66666667 kn


Lengan terhadap titik berat balok y=1.8 + ta + h / 2 = 3 m
M = TTB * y = 125 kNm
Gaya Geser dan momen maksimum pada balok akibat gaya rem
VTB = M / L = 2.5 kN
MTB = 1/2 * M = 62.5 kNm
5. BEBAN ANGIN

Faktor Beban Ultimit KEW = 1.2

Gaya angin tambahan arah horisontal pada permukaan lantai jembatan akibat beban angin
yang meniup kendaraan di atas lantai jembatan dihitung dengan rumus :

TEW = 0.0012 * Cw * (VW)2 . (kn/m2) Cw = 1.2

Kecepatan angin rencana, Vw = 35 m/det


Kecepatan angin rencana dapat dilihat pada tabel dibawah ini :

Beban angin tambahan yang meniup bidang samping kendaraan :


TEW = 1.764 kN/m

Bidang vertikal yang ditiup angin


merupakan bidang samping kendaraan
dengan tinggi 2 meter diatas lantai
jembatan h= 2 meter
Jarak antar roda kendaraan x= 1.75 meter

Beban akibat transfer beban angin ke lantai jembatan


Qew = 1/2 * (h/x) * Tew = 1.008

Panjang bentang Girder L= 50

VEW = 1/2 * QEW * L = 25.2 kN


MEW = 1/8 * QEW * L^2 = 315 kNm
6. PENGARUH TEMPERATUR

Faktor Beban Ultimit KEW = 1.2


Gaya geser dan momen pada Girder akibat pengaruh temperatur, diperhitungkan terhadap
gaya yang timbul akibat pergerakan temperatur (temperatur movement) pada tumpuan
(elastomeric bearing) dengan perbedaan temperatur sebesar :

Tmax = 40C dan Tmin = 15C ∆T = ( Tmax - Tmin ) / 2 T= 12.5 `C


Koefisien muai panjang untuk beton α= 0.00001 /`C
Panjang bentang Girder L= 50 m
Shear stiffnes oe elastomeric bearing k= 15000 kN/m
Temperatur movement δ = α * ΔT * L = 0.00625 m
Gaya akibat temperatur movement Fet = k * δ = 93.75 kN

Tinggi girder h= 2.3 m


Eksentrisitas e= 0.75
Momen akibat pengaruh temperatur M=FET * e = 70.3125 knm
Gaya geser dan momen pada Girder akibat pengaaruh temperatur (ET)
VET = M/ L = 1.40625 kn
MET = M = 70.3125 kNm
7. BEBAN GEMPA

Faktor Beban Ultimit KEW = 1


Gaya gempa vertikal pada girder dihitung dengan menggunakan percepatan vertikal ke bawah
minimal sebesar 0.10 * g ( g = percepatan gravitasi ) atau dapat diambil 50% koefisien gempa
horisontal statik ekivalen

Koefisien beban gempa horisontal KH = c * s

KH = Koefisien beban gempa horisontal,


C = Koefisien geser dasar untuk wilayah gempa, waktu getar, dan kondisi tanah
setempat
S=
Faktor tipe struktur yg berhubungan dengan kapasitas penyerapan energi gempa

Waktu getar struktur dihitung dengan rumus

Wt = Berat total yang berupa Berat sendiri dan beban mati tambahan
Kp = = kekakuan struktur yang merupakan gaya horisontal yang diperlukan
untuk menimbulkan satu satuan lendutan
g = Percepatan Gravitasi bumi (9.81 m/det^2) 9.81 m/det2

Berat Total yang berupa berat sendiri dan beban mati tambahan
Wt = Pms + Pma =
Berat Sendiri Qms = 29.0025 kn/m
Beban mati tambahan Qma = 2.703 kN/m
Panjang Bentang L= 50 meter
Berat Total Wt = ( Qms + Qma) * L = 1585.275 knN
Ukuran girder b= 0.7 m h= 2.3 m
Mome inersia penampang Girder I = 1/12 *b*h^3 = 0.709741667 m4
Modulus Elastik beton Ec = 25332.0844 Mpa
EC = 25332084.4 Kpa
Kelakuan Lentur Girder Kp = 48 * Ec * I/L^3 = 6904.026548 kN/m
Waktu Getar T = 2 * п * √[Wt / (g*Kp)] = 0.960785011 detik
Kondisi tanah dasar termasuk sedang (medium) Lokasi di wilayah gempa 3
Koefisien geser dasar C= 0.18
Untuk struktur jembatan dengan daerah sendi plastis beton beton bertulang, maka faktor tipe
struktur dihitung dengan rumus S = 1.0 * F
dengan F = 1.25 - 0.025 * n dan F harus diambil > 1
F = Faktor perangkaan
n = Jumlah sendi plastis yang menahan deformasi struktur
untuk nilai, n = 1 maka ;
F = 1.25 - 0.025 * n = 1.225
Faktor tipe struktur S = 1.0 * F = 1.225
Koefisien gempa horisontal Kh = C * S = 0.2205
Koefisien gempa vertikal Kv = 50 % Kh = 0.11025 > 0.1
diambil koefisien gempar vertikal Kv = 0.11025
Gaya gempa vertikal Teq = Kv * Wt = 174.7765688 kn

Beban Gempa Vertikal Qeq = Teq / L = 3.495531375 kN/m


Gaya geser dan momen pada Girder akibat gempa vertikal (EQ)
Veq = 1/2 * Qeq * L = 87.38828438 kN
Meq = 1/8 * Qeq * L^2 = 21.84707109 kNm
8. KOMBINASI BEBAN ULTIMIT

KOMBINASI MOMEN ULTIMIT KOMB-1 KOMB-2 KOMB-3


No Jenis Beban Faktor M Mu Mu Mu
1 Berat sendiri (MS) 1.3 9063.2813 11782.27 11782.26563 11782.27
2 B. Mati tamb (MA) 2 844.6875 1689.375 1689.375 1689.375
3 B.Lalu lintas(TD/TT) 2 5282.75 10565.5 10565.5 10565.5
4 Gaya rem (TB) 2 62.5 125 125
5 Beban angin (EW) 1.2 315 378
6 Temperatur (ET) 1.2 70.3125 84.375
7 Beban gempa (Eq) 1 21.847071 21.84707
24540.14 24246.51563 24058.99

KOMBINASI GAYA GESER ULTIMIT KOMB-1 KOMB-2 KOMB-3


No Jenis Beban Faktor M Mu Mu Mu
1 Berat sendiri (MS) 1.3 725.0625 942.5813 942.58125 942.5813
2 B. Mati tamb (MA) 2 67.575 135.15 135.15 135.15
3 B.Lalu lintas(TD/TT) 2 287 574 574 574
4 Gaya rem (TB) 2 2.5 5 5
5 Beban angin (EW) 1.2 25.2 30.24
6 Temperatur (ET) 1.2 1.40625 1.6875
7 Beban gempa (Eq) 1 87.388284 87.38828
1686.971 1658.41875 1739.12

Momen ultimit rencana Girder Mu = 24540.14063 kNm


Gaya Geser ultimit rencana Girder Vu = 1739.119534 kN
9. PEMBESIAN T-GIRDER
9.1. TULANGAN LENTUR
Momen rencana ultimit Girder 24540.14063
Mutu beton : K-350 Kuat tekan beton = fc` = 29.05 Mpa
Mutu baja tulangan U-39 Kuat leleh baja = fy = 390 MPa
Tebal slab beton ts = 200 mm
Lebar badan girder bw = 250 mm
tinggi Girder h= 2300 mm
Lebar sayap T-Girder diambil nilai yang terkecil dari L/4 = 12500 mm
s= 1700 mm
12 * ts = 2400 mm
Diambil lebar efektif sayap T-Girder beff = 1700 mm
Jarak pusat tulangan terhadap sisi luar beton d` = 140 mm
Modulus Elastis baja, Es = 200000 MPa
Faktor bentuk distribusi tegangan beton β= 0.85
ρb = β1 * 0.85 * fc`/fy * 600/(600+fy) = 0.032616356
Rmax = 0.75 * ρb * fy* [1-1/2*0.75*ρb*fy/(0.85*fc`)] = 7.697274664
Faktor reduksi kekuatan lentur = ф = 0.8

Tinggi Efektif T-Girder d = h-d` = 2160 mm


Momen nominal rencana Mn = Mu / ф = 30675.17578
Faktor tahanan momen Rn = Mn * 10^6 / (beff*d^2) = 3.867502797
Rn < Rn max (ok)
Rasio tulangan yang diperlukan :
ρ = 0.85 * fc` / fy * [1 - √[1-2*Rn/(0.85*fc)] = 0.010845588
Rasio tulangan minimum ρmin = 1.4/fy = 0.003589744
Rasio tulangan yang digunakan adalah 0.010845588
Luas tulangan yang diperlukan As = ρ * beff *d = 39825.00074
Dicoba tulangan diameter D= 32 mm
As1 = 1/4 * 3.14 *D^2 = 1608.495439
n= As/As1 = 24.759163
25 D 32 mm
As = As1 * n = 40212.38597
Tebal selimut beton, td = 20 mm
Diameter sengkang yang digunakan ds = 12 mm
Jumlah tulangan tiap baris nt = 8
Jarak bersih tulangan
Xs = (b-nt*D-2*td-2*ds)/(nt-1) = 57.5
XS > 1.5D (OK)
Untuk menjamin agar Girder bersifat daktail, maka tuangan tekan diambil 30 %
tulangan tarik sehingga :
As` = 30 % * As = 12063.71579
Jumlah tulangan tekan yang diperlukan
n`=As` / As1 = 7.5
digunakan tulangan 8 D 32
9.2. KONTROL KAPASITAS MOMEN ULTIMIT

Tebal slab beton ts = 200 mm


Lebar Efektif Sayap beff = 1400 mm
Lebar badan girder b= 700 mm
Tinggi Girder h= 2300 mm

Baris Juml Tul y n*y


n (mm)
1 4 57 228
2 8 92 736
3 2 143 286
14 1250

Letak titik berat tulangan tarik terhadap sisi bawah T-Girder,


d` = Σ n*y /Σn= 89.28571429 mm
Tinggi efektif T-Girder d = h-d` = 2210.714286 mm
Luas Tulangan As = 40212.38597 mm2
Kuat tekan beton fc` = 29.05 MPa
Kuat leleh baja fy = 390 MPa
Untuk garis netral berada didalam sayap T-Girder Cc > Ts
Gaya internal tekan beton pada sayap
Cc = 0.85 * fc` * beff * ts = 6913900 N
Gaya internal tarik baja tulangan Ts = As * fy = 15682830.53 N
CC > Ts garis netral didalam sayap
a = As * fy / (0.85 * fc` * beff ) = 453.6609013
Jarak garis netral terhadap sisi atas c = a / β = 533.7187074
Regangan pada baja tulangan tarik, εs = 0.003*(d-c)/c = 0.009426289
< 0.03 ( OK )
Momen Nominal Mn = As * fy * (d-a/2)*10^6 = 31112.91397 kNm
ф Mn = 24890.33118 kNm
Mu = 24540.14063

ф Mn>Mu Aman (OK)


9.3. TULANGAN GESER
Gaya geser ultimit rencana Vu = 1739.119534
Mutu beton : K- 350 fc` = 29.05 MPa
Mutu baja tulangan U - 24 fy = 240 Mpa
Faktor reduksi kekuatan geser ф= 0.75
Lebar badan girder bw = 250 mm
Tinggi efektif girder d = 2210.714286 mm
Kuat geser nominal beton Vc=(√fc`)/6*bw*d*10^-3 = 496.4716389 kn
ф Vc = 372.3537292 kn
Perlu tulangan geser
ф * Vs = Vu - ф * Vc = 1366.765805 kn
Gaya geser yang dipikul tulangan geser, Vs = 1822.354407 kn
Kontrol dimensi girder terhadap kuat geser maksimum
Vsmax = 2/3 * √fc` * [bw * d]*10^-3 = 1985.886556 kn
Vs < Vsmax
dimensi balok memenuhi persyaratan kuat geser (OK)

Coba digunakan sengkang 2 ø 12


berpenampang
Luas tulangan sengkan Av = π/4 *D^2*n = 226.1946711 mm
Jarak tulangan geser (sengkang )yang dibutuhkan
S=Av * fy * d/Vs = 65.85570255
Digunakan sengkan 2 ø 12 - 100
Pada badan girder dipasang tulangan susut minimal rasio tulangan
ρsh = 0.0014
Ash = ρsh * bw * d = 773.75 mm2
Diamter tulangan yang digunakan D 13 mm2
Jumlah tulangan susut yang diperlukan n = Ash / (π/4*D^2) = 5.829402945
Digunakan tulangan 6 D 13

9.4 LENDUTAN BALOK


Mutu beton : K- 350 fc` = 29.05 MPa
Mutu baja tulangan U - 24 fy = 240 Mpa
Modulus Elastis beton Ec = 4700 * √fc` = 25332.0844 MPa
Modulus Elastis baja Es = 200000 MPa
Tinggi balok h= 2.3 m
lebar balok b= 0.7 m
Jarak tulangan terhadap sisi uar beton d`= 0.14 m
Tinggi efektif balok d=h-d`= 2.16 m
Luas tulangan balok As = 0.040212386 m2
inersia bruto penampang balok = Ig=1/12 * b*h^3 = 0.709741667 m4
Modulus keruntuhan lentur beton fr = 0.7 * √fc`*10^3 = 3772.863634
Nilai perbandingan modulus elastis n=Es / Ec = 7.895126072
n*As = 0.317481857 mm
Jarakt garis netral terhadap sisi atas beton c = n * As / b = 0.45354551 m
Inersia penampang retak yang ditransformasikan keton dihitung sbb :
Icr = 1/3 * b*c^3 + n*As*(d-c)^2 = 0.946272063
Yt = h / 2 = 1.15
Momen retak Mcr = fr * Ig / Yt = 2328.485673 Nmm
Momen akibat beban mati dan beban hidup (Md+l)
No Jenis Beban Momen
1 Berat sendiri (MS) 725.0625
2 Beban mati tambahan (MA) 67.575
3 Beban lalu lintas (TD/TT) 287
4 Gaya rem (TB) 2.5
Md+L = 1082.1375 knM
Inersia efektif untuk perhitungan lendutan
Ie = (Mcr / Md+l)^3 * Ig + [1 -(Mcr / Md+l)^3]*Icr = -1.41018933 m4
Panjang bentang balok L= 18 m
9.4.1 LENDUTAN AKIBAT BERAT SENDIRI (MS)
Beban akibat berat sendiri Qms = 29.0025
Lendutan akibat berat sendiri (MS)
δMS = 5/384 * QMS * L^4 / (Ec * Ie) = -0.00110973 m

9.4.2 LENDUTAN AKIBAT BEBAN MATI TAMBAHAN (MA)


Beban akibat beban mati tambahan, Qma = 2.703
Lendutan akibat beban mati tambahan,
δMS = 5/384 * QMS * L^4 / (Ec * Ie) = -0.00010343 m

9.4.3 LENDUTAN AKIBAT BEBAN LAJUR "D" (TD)


Beban Lajur "D" ; Beban terpusat (Ptd) = 116.62 kn
Beban merata (Qtd) = 12.24 kn/m
Lendutan akibat beban lajur 'D' (TD) ;
δtd = 1/48 * Ptd * L^3/(EC*Ie) + 5/384*Qtd*L^4/(Ec * Ie)= -0.00086498 m

9.4.4 LENDUTAN AKIBAT GAYA REM (TB)


Momen akibat gaya rem, MTB = 125 knm
Lendutan akibat gaya rem (TB)
δTB = 0.0642 * Mtb * L^2 / (Ec * Ic) = -7.2785E-05 mm

9.4.5 LENDUTAN AKIBAT BEBAN ANGIN (EW)


Beban akibat transfer beban angin pada kendaraan Qew = 1.008 kn/m
Lendutan akibat beban angin (EW) :
δMS = 5/384 * QMS * L^4 / (Ec * Ie) = -3.8569E-05 m

9.4.6 LENDUTAN AKIBAT PENGARUH TEMPERATUR (ET)


Momen akibat temperatur movement; Met = 70.3125 knm
Lendutan akibat pengaruh temperatur
δTB = 0.0642 * Mtb * L^2 / (Ec * Ic) = -4.0942E-05 m

9.4.6 LENDUTAN AKIBAT BEBAN GEMPA (EQ)


Beban gempa vertikal Qeq = 3.495531375
Lendutan akibat beban angin (EW) :
δMS = 5/384 * QMS * L^4 / (Ec * Ie) = -0.00013375 m

9.5. KONTROL LENDUTAN BALOK

Komb-1 Komb-2 Komb-3


No Jenis Beban
δ (m) δ (m) δ (m)
1 Berat Sendiri (MS) -0.0011097 -0.00111 -0.00110973
2 Beban mati tambahan (MA) -0.0001034 -0.0001 -0.00010343
3 Beban lajur "D" (T) -0.000865 -0.00086 -0.00086498
4 Gaya rem (TB) -7.278E-05 -7.3E-05
5 Beban angin (EW) -3.857E-05
6 Pengaruh temperatur (ET) -4.1E-05
7 Beban gempa -0.00013375
-0.0021895 -0.00219 -0.00221189
L / 240 0.075 < OK OK OK
10. BALOK DIAFRAGMA
10.1. BEBAN PADA BALOK DIAFRAGMA

Distribusi beban lantai pada balok diafragma adalah sebagai berikut :


Ukuran balok diafragma,
Lebar bd = 1.45 m
Tinggi hd = 1.95 m
Panjang bentang balok diafragma
s= 1.7 m

Berat sendiri (MS)


Lebar Tebal Berat Beban
No Jenis
(kn/m3) (kn/m)
1 Plat lantai 1.7 0.2 25 8.5
2 Balok diafragma 1.45 0.3 25 10.875
Qms = 19.375
Gaya geser dan momen akibat berat sendiri
Vms = 1/2 * Qms * S = 16.46875
Qms = 1/2 * Qms * S^2 = 4.666145833

Berat sendiri (MS)


Lebar Tebal Berat Beban
No Jenis
(kn/m3) (kn/m)
1 Lap Aspal + overlay 1.7 0.05 22 1.87
2 Air hujan 1.7 0.05 9.8 0.833
Qms = 2.703

Gaya geser dan momen akibat berat sendiri


Vms = 1/2 * Qms * S = 2.29755 kn
Qms = 1/2 * Qms * S^2 = 0.6509725 knm
Beban truk "T" (TT) ;
Beban hidup pada lantai jembatan berupa beban roda ganda oleh truk (beban T)
yang besarnya
T= 100 kN
Faktor beban dinamis untuk pembebanan truk diambil DLA = 0.4
Beban truk "T" PTT = (1+DLA)*T = 140 kN
Gaya geser dan momen akibat beban 'T'
Vtt = 1/2 *Ptt = 70 kN
Mtt = 1/8 * Ptt * S = 29.75 kNm

Kombinasi Beban Ultimit


Faktor
No Jenis Beban V M Vu Mu
Beban
1 Berat Sendiri (MS) 1.3 16.46875 4.666146 21.409375 6.06599
2 Beb. M tamb (MA) 2 2.703 0.650973 5.406 1.301945
3 Beb. Truk 'T' 2 70 29.75 140 59.5
166.815375 66.86793

10.2. MOMEN DAN GAYA GESER RENCANA BALOK DIAFRAGMA

Momen Ultimit rencana balok diafragma Mu = 66.86793458 kNm


Gaya geser ultimit rencana balok diafragma Vu = 166.815375 kN
11. PEMBESIAN BALOK DIAFRAGMA
11.1 TULANGAN LENTUR

Momen rencana ultimit Girder 66.86793458 KnM


Mutu beton : K-350 Kuat tekan beton = fc` = 29.05 Mpa
Mutu baja tulangan U-39 Kuat leleh baja = fy = 390 MPa
Lebar Balok b=bd = 1450 mm
Tinggi balok h = hd = 1950 mm
Jarak pusat tulangan terhadap sisi luar beton d` = 50 mm
Modulus Elastis Baja Es = 200000 MPa
Fakt tor bentuk distribusi tegangan beton β= 0.85
ρb = β1 * 0.85 * fc`/fy * 600/(600+fy) = 0.032616356
Rmax = 0.75 * ρb * fy* [1-1/2*0.75*ρb*fy/(0.85*fc`)] = 7.697274664

Faktor reduksi kekuatan lentur = ф = 0.8

Tinggi Efektif balok d = h-d` = 1900 mm


Momen nominal rencana Mn = Mu / ф = 83.58491823
Faktor tahanan momen Rn = Mn * 10^6 / (beff*d^2) = 0.015968081
Rn < Rmax (OK)
Rasio tulangan yang diperlukan :
ρ = 0.85 * fc` / fy * [1 - √[1-2*Rn/(0.85*fc)] = 4.0957E-05
Rasio tulangan minimum ρmin = 1.4/fy = 0.003589744
Rasio tulangan yang digunakan adalah ρ= 4.0957E-05
Luas tulangan yang diperlukan As = ρ * beff *d = 112.8366558 mm2
Dicoba tulangan diameter D= 13 mm

As1 = 1/4 * 3.14 *D^2 = 132.7322896 mm2


n= As/As1 = 0.850107055
1 D 13

11.2. TULANGAN GESER

Gaya geser ultimit rencana Vu = 166.815375


Mutu beton : K- 350 fc` = 29.05 MPa
Mutu baja tulangan U - 24 fy = 240 Mpa
Faktor reduksi kekuatan geser ф= 0.75
Lebar badan Balok bw = 1450 mm
Tinggi efektif balok d= 1900 mm
Kuat geser nominal beton Vc=(√fc`)/6*bw*d*10^-3 = 2474.818884 kn
ф Vc = 1856.114163 kn
Tidak perlu dihitung tulangan gesernya
ф * Vs = Vu - ф * Vc = -1689.29879 kn
Gaya geser yang dipikul tulangan geser, Vs = -2252.39838 kn
Kontrol dimensi girder terhadap kuat geser maksimum
Vsmax = 2/3 * √fc` * [bw * d]*10^-3 = 9899.275535 kn
Vs < Vsmax
dimensi balok memenuhi persyaratan kuat geser (OK)

Digunakan sengkang 2 ø 10
berpenampang
Luas tulangan sengkan Av = π/4 *D^2*n = 157.0796327 mm
Jarak tulangan geser (sengkang )yang dibutuhkan
S=Av * fy * d/Vs = -31.8009074
Digunakan sengkan 2 ø 10 - 100
PERHITUNGAN ABUTMENT JEMBATAN GIRDER

Panjang Bentang Jembatan 50 m (INPUT DATA)

HT = 7.20 m P (t) Kelas


B1 = 1.50 m 10.0 Kelas I BM100
B2 = 0.40 m 7.0 Kelas II BM70
B3 = 0.80 m 5.0 Kelas III BM50
B4 = 1.85 m 3.5 Kelas IV BM35
B5 = 1.50 m
0.0 Kelas V 500 kg/m2
B6 = 1.85 m
BT = 5.20 m
H1 = 1.20 m
H1 max = 1.20 m
H2 = 4.50 m
H3 = 0.50 m Beban Desain untuk Parapet
H4 = 1.00 m Beban roda T-Load
H5 = 1.50 m T = 10.0 ton
H6 = 0.50 m Lebar kontak T-load
H10 = 5.70 m a = 0.20 m
ho = 2.50 m Lebar jalan efektif = 3.00 m
Lebar penyangga BL = 6.00 m Ketebalan perkerasan = 0.05 m
Dukungan dari Parapet = 0.75 m
Rh1 = 0.60 m Dengan Pelat Benturan? Yes
Rb1 = 0.75 m (Input Yes or No)
Hw1 = 2.47 m Lebar Korbel LP= 0.30 m
Hw2 = 3.82 m Ketebalan Pelat Benturan = 0.30 m
Slope = 0.0 slope 1:n Panjang pelat Benturan 3.00 m
(jika tidak ada tanah di sisi kaki, masukkan "0") Kedalaman tanah di atas Pelat 0.60 m
Berat Satuan
Tanah 1.80 t/m3
Tanah (jenuh) 2.00 t/m3
Beton 2.40 t/m3

Reaksi Superstruktur
Normal Vn=Rd+Rl 137.96 ton
Seismik Ve=Rd 71.27 ton
He= 12.83 ton (He=2 kh Rd, for fixed bearing)
Jenis bantalan Movable (He=kh Rd, for movable bearing)
(Input Fixed or Movable)
Surcharge Load/beban merata 0.70 t/m2

Parameters
q: Beban merata (t/m2) 0.70
q' : Beban merata di atas tanah (t/m2) (=0) 0.00
g: Satuan berat tanah (t/m3) 1.80
w: sudut permukaan tanah (derajat) 0.00
f: sudut gesekan internal (derajat) 30.00
d 1: Sudut gesekan antara tanah/Earth dengan dinding/wall (derajat) normal 20.00 (=2/3f)
d 2: Sudut gesekan antara tanah dengan tanah (derajat) normal 0.00
d E1: Sudut gesekan antara tanah dengan dinding (derajat) seismik 15.00 (=1/2f)
d E2: Sudut gesekan antara tanah dengan tanah (derajat) seismik 24.20
b: sudut dinding (derajat) 0.00
c: Kohesi tanah (T/m2) (tidak dihitung/dipertimbangkan) 0.00
kh : 0.18
Uc: Koefisien angkat 1.00
f: Koefisien Gesekan =Tan f b = 0.80
N-SPT : 50.00
Qa : Daya dukung yang diijinkan normal t/m2 20.83 ( max. 20.83 t/m2 for soil foundation)
Qae: Daya dukung yang diijinkan seismic t/m2 31.25 ( max. 31.25 t/m2 for soil foundation)

Kondisi Normal Kondisi seismik


Kekuatan Desain Beton sc kgf/m2 175 175
Koefisien regangan rangkak (beton) 0.0035 0.0035
Beton tulangan
Tegangan Ijin
Concrete sca kgf/m2 60 90
Re-Bar ssa kgf/m2 1850 2775
Shearing ta kgf/m2 (concrete) 5.5 8.25
tma kgf/m2 (stirrup) 14 21
Titik Penguatan Bar
ssy kgf/cm2 3000 3000
Modulus Young (bilah penguat) 2100000 2100000
Rasio Modulus Young n 24 16
PERHITUNGAN STABILITAS
Jenis Abutment BM-100
Tipe Superstruktur T-Beam
B1 B2

Rb1

H1
Rh1

H5

B3 H6
H10

HT H2
ho

H3

H4

B4 B5 B6

BT

Tipe Superstruktur T-Beam Unit :m


Dimensi Lebar Support
HT B1 B2 B3 B4 B5 B6 BT H1 H2 H3 H4 H5 H6 H10 ho Abutment BL dari Parapet
7.20 1.50 0.40 0.40 1.85 1.50 1.85 5.20 1.20 4.50 0.50 1.00 1.00 0.40 5.70 3.10 6.00 0.75
H1 max 1.20
Hw1 Hw2 Rh1 Rb1 Lebar pelat benturan/impact plate (korbel), Lp= 0.30 m Ketebalan pelat benturan Ft = 0.30 m
2.47 3.82 0.60 0.75

PEMBAGIAN BERAT ABUTMENT


B1 B2

Bimp
15

H1 1.20 10 16
1 11
17
18

3 H5 19
2
4.50 12
4 21 20
1: 0
22' H6
HT H10 0.78
22
B3
7.20 5.70
H2 0.00 0.00
5
ho
4.50 13

2.32 3.10

0.00

5' 23

Hw1
14 7 8
6
2.47 0.50
9
Hw2
1.00 3.82

5.20
BT
B4 B5 B6

1.85 1.50 1.85


PEMBEBANAN DAN MOMEN

Luas Beban Beban Jarak dari A Momen


No. Satuan Vertikal X Y X Y
m2 t/m3 t/m m m t.m/m t.m/m
Body 1 0.480 2.40 1.152 3.550 6.600 4.090 7.603
2 2.100 2.40 5.040 2.600 5.300 13.104 26.712
3 0.400 2.40 0.960 3.550 5.500 3.408 5.280
4 0.080 2.40 0.192 3.483 4.533 0.669 0.870
5 4.650 2.40 11.160 2.600 3.050 29.016 34.038
5' 0.000 2.40 0.000 3.350 2.533 0.000 0.000
6 0.463 2.40 1.110 1.233 1.167 1.369 1.295
7 0.750 2.40 1.800 2.600 1.250 4.680 2.250
8 0.463 2.40 1.110 3.967 1.167 4.403 1.295
9 5.200 2.40 12.480 2.600 0.500 32.448 6.240
10 0.090 2.40 0.216 3.900 6.750 0.842 1.458
11 0.045 2.40 0.108 3.850 6.500 0.416 0.702
Sub-total 14.720 35.328 94.445 87.744
Total 88.32 211.968 566.67 526.46
Soil
Toe 12 0.000 1.80 0.000 1.233 0.000 0.000 0.000
13 0.000 1.80 0.000 0.925 1.500 0.000 0.000
14 0.000 1.80 0.000 0.617 1.333 0.000 0.000
13' 0.000 2.00 0.000 0.925 1.500 0.000 0.000
14' 0.463 2.00 0.925 0.617 1.333 0.570 1.233
Sub-total 0.463 0.925 0.570 1.233
Total 2.775 5.550 3.423 7.400

Heel 10 0.090 0.00 0.000 3.900 6.500 0.000 0.000


11 0.045 0.00 0.000 3.850 6.500 0.000 0.000
15 0.870 1.80 1.566 4.475 7.050 7.008 11.040
16 0.225 1.80 0.405 4.625 6.750 1.873 2.734
17 0.225 1.80 0.405 4.625 6.450 1.873 2.612
18 0.045 1.80 0.081 3.950 6.400 0.320 0.518
19 1.450 1.80 2.610 4.475 5.450 11.680 14.225
20 0.580 1.80 1.044 4.475 4.800 4.672 5.011
21 0.080 1.80 0.144 3.617 4.733 0.521 0.682
22 1.443 1.80 2.597 4.275 4.210 11.104 10.935
22' 0.620 1.80 1.116 3.617 3.567 11.104 10.935
23 4.292 2.00 8.584 4.275 2.660 36.697 22.833
23' 0.463 2.00 0.925 4.583 1.167 4.240 1.079
Sub-total 10.43 19.48 91.09 82.60
Total 62.57 116.86 546.54 495.63
Distance for Heel Reaction Cal
Jarak Momen
X Y X Y
m m t.m/m t.m/m
1.30 0.00
1.35 0.00
1.1 1.76
1.3 0.52 Xo=SMx/SV Yo=SMy/SV
1.3 0.52
Body 2.673 m 2.484 m
0.6 0.05
1.1 2.94 Soil Toe 0.617 m 1.333 m
1.1 1.17 Heel 4.677 m 4.241 m
0.3 0.04
0.9 2.40
0.3 0.30
0.9 7.94
1.2 1.14
11.56 18.77 Sub-total

Xo=SMx/SV 0.96386 m
Berat Satuan
Tanah 1800 kg/m3
Tanah (jenuh) 2000 kg/m3 Total Surcharge Load/beban merata (t) 7.77
Beton 2400 kg/m3 Acting Point (m) 4.475

Canal Slope/kemiringan kanal 0 Slope 1:n


Reaksi
Normal Vn= Rd+Rl= 137.96 ton Hn=0
Seismic Ve= =Rd= 71.27 ton
He= 12.83 ton
Surcharge Load : qs= 0.70 t/m2

TEKANAN TANAH
qs
q

H1 qa1
1.20

3.38

H10
HT 5.70 H2
7.20
4.50

2.47 H3 3.82
0.50
H4
1.00
qw2 qa2 qa3
qu1
qu2
5.20
BT
Parameter
qs : beban merata (t/m2) 0.7
q' : beban merata (t/m2) (=0) 0.0
g: Satuan berat tanah (t/m3) 1.8
g sat: satuan berat tanah (t/m3) 2
w: sudut permukaan tanah (derajat) 0.0
f: sudut gesekan internal (derajat) 30.0
d 1: Sudut gesekan antara tanah dengan dinding (derajat) normal 20.0 (=2/3f)
d 2: Sudut gesekan antara tanah dengan tanah (derajat) normal 0
d E1: Sudut gesekan antara tanah dengan dinding (derajat) seismik 15 (=1/2f)
d E2: Sudut gesekan antara tanah dengan tanah (derajat) seismik 24.2
b: sudut dinding (derajat) 0.0
c: Kohesi tanah (T/m2) (tidak dihitung/dipertimbangkan) 0.0
kh : 0.18

w: Sudut permukaan tanah (radian) 0.000


f: Sudut gesekan internal (radian) 0.524
d 1: Sudut gesekan antara tanah dengan dinding (radian) normal 0.349
d 2: Sudut gesekan antara tanah dengan tanah (radian) normal 0.000
d E1: Sudut gesekan antara tanah dengan dinding (radian) seismik 0.262
d E2: Sudut gesekan antara tanah dengan tanah (radian) seismik 0.422
b: sudut dinding (radian) 0.000
a: tan-1 kh (radian) 0.178
d E: Kondisi Seismik Sudut Gesekan Internal f/2(radian) 0.262
Uc: uplift coefficient/koef. Angkat 1.0
Calculation
Analisis stabilitas a = tan-1 kh = 10.20397
0 o
normal (1) sin ( b + a ) = 0.177153
24.2 o
seismic (2) sin ( f ) = 0.5
Analisis struktural (3) sin (1) / (2) = 0.354306
Wall 2/3 f = 20 o
normal (4) sin -1 (3) = 20.75092
1/2 f = 15 o
seismic (5) sin ( a + (4)) = 0.514363
(6) cos ( a + (4)) = 0.857573
(7) (2) x ((5)/1-(2) x (6)= 0.450237
tan -1 (7) = 24.23903

Tekanan Tanah
Kondisi Normal Kondisi Seismik

Deskripsi Deskripsi
Pa : Tekanan tanah aktif (t/m2/m) 17.718 Pea : Tekanan tanah aktif (t/m2/m) 21.093
Ka 1: koefisien dari tekanan tanah aktif, tanah dengan tanah 0.333 Kea1 : koefisien tekanan tanah aktif 0.438
Ka 2: koefisien dari tekanan tanah aktif, dinding dengan tanah 0.297 0.433
y: Vertical acting point/arah vertikal 2.483 y: Vertical acting point/arah vertikal 2.366
X: Horizontal acting point/arah horizontal = BT 5.2 X: Horizontal acting point/arah horizontal = BT 5.2
PV : Tekanan vertikal = Pa sin d 0 PV : Tekanan vertikal = Pea sin d E 8.647
PH : Tekanan horizontal = Pa cos d 17.718 PH : Tekanan horizontal = Pea cos d E 19.24

qa1 = 0.333 x 0.70 = 0.233 qa1 = 0.438 x 0.00 = 0.000


qa2 = 0.333 x 3.38 x 1.80 = 2.028 qa2 = 0.438 x 3.38 x 1.80 = 2.667
qa3 = 0.333 x 3.82 x 2.00 = 2.547 qa3 = 0.438 x 3.82 x 2.00 = 3.349
qw2 = -2.467 x 1.00 = -2.467 qw2 = -2.467 x 1.00 = -2.467
qu1 = -2.47 x 1.0 = -2.47 qu1 = -2.47 x 1.0 -2.47
qu2 = -3.82 x 1.0 = -3.82 qu2 = -3.82 x 1.0 -3.82
Kondisi Normal Kondisi Seismik

No. Deskripsi H Y HY No. Deskripsi H Y HY


Pa1 = 0.233 x 7.200 = 1.680 3.600 6.048 Pa1= 0.000 x 7.200 = 0.000 3.600 0.000
Pa2 = 2.028 x 3.380 x 0.500 = 3.427 4.947 16.954 Pa2 = 2.667 x 3.380 x 0.500 = 4.508 4.947 22.297
Pa2' = 2.028 x 3.820 = 7.747 1.910 14.797 Pa2' = 2.667 x 3.820 = 10.189 1.910 19.460
Pa3 = 2.547 x 3.820 x 0.500 = 4.864 1.273 6.194 Pa3 = 3.349 x 3.820 x 0.500 = 6.397 1.273 8.146
Total (Pa) 17.718 2.483 43.992 Total 21.093 2.366 49.903
Pw2 = -2.467 x 2.467 x 0.500 = -3.043 0.822 -2.502 Pw2 = -2.467 x 2.467 x 0.500 = -3.043 0.822 -2.502
Total -3.043 0.822 -2.502 Total -3.043 0.822 -2.502

No. Deskripsi V X VX No. Deskripsi V X VX


Pu1 = -2.467 x 5.200 x 0.500 = -6.414 1.733 -11.118 Pu1 = -2.47 x 5.200 x 0.500 = -6.414 1.733 -11.118
Pu2 = -3.820 x 5.200 x 0.500 = -9.932 3.467 -34.431 Pu2 = -3.82 x 5.200 x 0.500 = -9.932 3.467 -34.431
Total -16.346 2.787 -45.549 Total -16.346 2.787 -45.549

ANALISIS STABILITAS

Kasus 1 Kondisi Normal


1 Moment and Acting Point
Description Beban V Beban H Jarak (m) Momen (t.m)
V (t) H (t) X Y Mx My
Body 211.97 2.67 2.48 566.59 0.00
Soil Toe 5.55 0.62 1.33 3.42 0.00
Heel 116.86 4.68 4.24 546.57 0.00
Reaction (bridge) 137.96 0.00 2.60 6.00 358.70 0.00
Tekanan Tanah 0.00 106.31 5.20 2.48 0.00 263.95
Tekanan hidrostatik 0.00 (18.26) 0.82 (15.01)
Tekanan angkat (98.08) 2.79 (273.29)
Surcharge Load/beban merata 7.77 0.00 4.48 0.00 34.77 0.00
S 382.04 88.05 1236.77 248.93

Combined Acting Point


Xo=(SMx-SMy)/SV 2.586 m

Eccentric Distance/Jarak Eksentrisitas


e=(BT/2-Xo) 0.014 m

Momen Lentur M =SV x e 5.46 t.m


2 Analisis Stabilitas

2.1 Overturning/guling
e<=(BT/6) e= 0.014 m BT/6 is larger than e? OK
BT/6= 0.867 m

2.2 Sliding
Koefisien Gesekan =Tan f b = 0.80
Shearing registance force at base
Hu=V . Tan f b 305.63 tf
Safety Rate against sliding
Fs=Hu/H 3.471 Fs is larger than 2.0 ? OK
2.3 Settlement

Allowale bearing capacity Qa 20.83 tf/m2


Reaction from the Foundation /pondasi
V 6M
Q max(min) = ±
BL × BT BL × BT 2
Reaksi pondasi maksimum Q max
Q max = 12.447 tf/m2 Qmax is smaller than Qa? OK

Reaksi pondasi minimum Q max


Q min = 12.043 tf/m2

Kasus 2 Kondisi Seismik

1 Moment and Acting Point

Deskripsi Beban V Beban H Jarak (m) Momen (t.m)


V (t) H (t) X Y Mx My
Body 211.97 38.15 2.67 2.48 566.6 94.78
Soil Toe 5.55 0.62 1.33 3.42 0.00
Heel 116.9 21.04 4.68 4.24 546.6 89.2
Reaction (bridge) 71.27 12.83 2.60 6.60 185.31 84.67
Tekanan Tanah 51.88 115.44 5.20 2.37 269.8 273.1
Tekanan hidrostatik (18.26) 0.82 (2.50)
Tekanan angkat (98.08) 2.79 (45.55)
Surcharge Load/beban merata 0.00 0.00 5.20 2.48 0.00 0.00
S 359.5 169.20 1526 539.3
Combined Acting Point
Xo=(SMx-SMy)/SV 2.745 m

Eccentric Distance/Jarak Eksentrisitas


e=(BT/2-Xo) -0.145 m

Momen Lentur M =SV x e -52.27 t.m

2 Analisis Stabilitas

2.1 Overturning/guling
e<=(BT/3) e= -0.145 m BT/3 is larger than e? OK
BT/3= 1.733 m

2.2 Sliding
Koefisien Gesekan =Tan f b = 0.8
Shearing registance force at base
Hu=V . Tan f b 287.57 tf
Safety Rate anaginst sliding
Fs=Hu/H 1.700 Fs is larger than 1.25 ? OK

2.3 Settlement
Allowale bearing capacity Qa 31.25 tf/m2
Reaction from the Foundation e > BT/6 ?

in case e<BT/6 in case e>BT/6


V 6M
Q max(min) = ± X=3(BT/2-e) = 8.236 m
BL × BT BL × BT 2
Reaksi pondasi maksimum Q max Foundation Reaction Qe
Q max = 9.588 tf/m2 Q=2V/(BL.X)= 14.548 tf/m2

Reaksi pondasi minimum Q max


Q min = 13.454 tf/m2

Qmax is smaller than Qa? OK Qe is smaller than Qa? OK


Qmax = 9.59 tf/m2
Qmin = 13.45 tf/m2
X= 5.20 m
DAYA DUKUNG TANAH
(1) Design Data
2 3
fB = 30.00 o cB = 0.00 t/m gs' = 1.00 t/m (=gsat -gw)
B = 5.20 m z = 1.50 m L = 6.00 m
(2) Daya Dukung Tanah Ultimate, (qu)

Perhitungan dari Daya Dukung Tanah Ultimate dapat dijabarkan sebagai berikut,
Terzaghi's formula :

qu = a c Nc + gs' z Nq + b gs' B Ng

Shape factor/faktor bentuk (Table 2.5 of KP-06)

a = 1.27 b = 0.40

Shape of footing : rectangular, B x L

Shape of footing a b
1 strip 1.00 0.50
2 square 1.30 0.40
3 rectangular, B x L 1.27 0.40
(B < L) (= 1.09 + 0.21 B/L)
(B > L) (= 1.09 + 0.21 L/B)
4 circular, diameter = B 1.30 0.30

Faktor Kapasitas Daya Dukung (Figure 2.3 of KP-06, by Capper)

Nc = 36.0 Nq = 23.0 Ng = 20.0

f Nc Nq Ng
0 5.7 0.0 0.0
5 7.0 1.4 0.0
10 9.0 2.7 0.2
15 12.0 4.5 2.3
20 17.0 7.5 4.7
25 24.0 13.0 9.5
30 36.0 23.0 20.0
35 57.0 44.0 41.0
37 70.0 50.0 55.0
39 > 82.0 50.0 73.0

a c Nc = 0.000
gs' z Nq = 34.500
b gs' B Ng = 41.600

qu = 76.10 t/m2

(3) Daya Dukung Tanah Ijin, (qa)

qa = qu / 3 = 25.37 t/m2 (faktor keamanan = 3 , kondisi normal)


qae = qu / 2 = 38.05 t/m2 (faktor keamanan = 2 , kondisi seismik)

CEK ANALISIS STABILITAS BERDASAR INPUT DATA

Kondisi Normal Kondisi Seismik


Overturning (guling) e= 0.01 m e= -0.15 m
BT / 6 = 0.87 m BT / 3 = 1.73 m
(e < BT/6) OK (e < BT/3) OK
Sliding Fs =Hu / H= 3.47 Fs =Hu / H= 1.70
Fs > 2.00 OK Fs > 1.25 OK
Settlement Qmax = 12.45 t/m2 Qmax = 9.59 t/m2
(penurunan tanah) Qmax < Qa OK Qmax < Qa OK
Qa = 20.8 t/m2 Qae= 31.3 t/m2
PERHITUNGAN STRUKTURAL
A. BADAN ABUTMENT
1. Pembebanan dan Bending Moment/Momen Lentur Dari Badan Abutment

Dimensi unit:m
B1 B2 B3 B5 H1 H2 H5 H6 ho
1.50 0.40 0.40 1.50 1.20 4.50 1.00 0.40 3.10
Hw1 Hw2
0.80 3.23
Lebar Abutment
Bw= 6.00 m Plat Form of Impact Plate (Lp) = 0.30 m
Koefisien Seismik kh= 0.18
Support from Parapet hs= 0.75 m
Bagian A-A
Normal Seismik
Beban Jarak Momen Beban Jarak Momen Mi=
No. Vertikal X Mx Horizontal Y My Mx+My
t/m m tf.m/m t/m m tf.m/m tf.m/m
1 1.152 0.950 1.094 0.207 5.100 1.058 2.152
2 5.040 0.000 0.000 0.907 3.800 3.447 3.447
3 0.960 0.950 0.912 0.173 4.000 0.691 1.603
4 0.192 0.883 0.170 0.035 3.367 0.116 0.286
5 11.160 0.000 0.000 2.009 1.550 3.114 3.114
5' 0.000 -0.750 0.000 0.000 1.033 0.000 0.000
10 0.216 -1.300 -0.281 0.039 4.950 0.192 -0.088
11 0.108 -1.250 -0.135 0.019 4.700 0.091 -0.044
S 18.828 1.760 3.389 8.710 10.470
Total 112.968 10.561 20.334 52.259 62.821
Bagian B-B
Dimana Hw1' dipertimbangkan, bagian ini sama dengan permukaan air tanah.
Dimana Hw1' tidak dipertimbangkan, bagian ini hanya setengah dari (H1 + H2).
Jarak AB: 2.32 m

Normal Seismik
Beban Jarak Momen Beban Jarak Momen Mi=
No. Vertikal X Mx Horizontal Y My Mx+My
t/m m tf.m/m t/m m tf.m/m tf.m/m
1 1.152 -0.950 -1.094 0.207 2.780 0.576 -0.518
2 5.040 0.000 0.000 0.907 1.480 1.343 1.343
3 0.960 -0.950 -0.912 0.173 1.680 0.290 -0.622
4 0.192 -0.883 -0.170 0.035 1.047 0.036 -0.133
5 2.808 0.000 0.000 0.505 0.390 0.197 0.197
5' 0.000 -0.750 0.000 0.000 0.260 0.000 0.000
10 0.216 -1.300 -0.281 0.039 2.630 0.102 -0.179
11 0.108 -1.250 -0.135 0.019 2.380 0.046 -0.089
S 10.476 -2.592 1.886 2.591 -0.001
Total 62.856 -15.551 11.314 15.547 -0.003
2. Pembebanan dan Bending Moment/Momen Lentur Terhadap Super Structure

Normal Seismik
Beban Jarak Momen Beban Jarak Momen Mi=
No. Vertikal X Mx Horizontal Y My Mx+My
t/m m tf.m/m t/m m tf.m/m tf.m/m
Bagian A-A
Normal Rd + Rl 137.962 0.00 0.000 0.00 0.00 0.00 0.000
Seismik Rd 71.272 0.00 0.000 12.83 5.30 67.99 67.993
Bagian B-B
Normal Rd + Rl 137.962 0.00 0.000 0.00 0.00 0.00 0.000
Seismik Rd 71.272 0.00 0.000 12.83 2.98 38.23 38.230
3. Pembebanan dan Bending Moment/momen lentur terhadap tanah and tekanan
air

1) Bagian B-B

a) Kondisi Normal
q1= qs*Ka q1= 0.208 tf/m
q2= (qs+g*H)*Ka q2= 2.017 tf/m
EaH= (q1+q2)*(1/2)*H*cosd Eah= 3.534 tf/m
y= [H*(2q1+q2)]/[3*(q1+q2)] y= 1.232 m
S= EaH*Bw S= 21.202 tf
My= EaH*Bw*y My= 26.122 tf.m

where, qs Beban Merata 0.70 tf/m2


Ka2 koefisien tekanan tanah aktif 0.297
g Berat satuan tanah 1.8 tf/m3
Berat satuan tanah jenuh 2.0 tf/m3
d Sudut gesekan antara tanah dengan dinding 0.3491 radian
H kedalaman 3.38 m
y Acting Point (m)
S Shearing Force/Gaya Geser (tf)
Bw Lebar Abutment 6.00 m
b) Kondisi Seismik
qe1= q'*Kea qe1= 0.000 tf/m
qe2= (q'+g*H)*Kea qe2= 2.667 tf/m
EeH= (qe1+qe2)*(1/2)*H*cosd EaH= 4.354 tf/m
y= [H*(2qe1+qe2)]/[3*(qe1+qe2)] y= 1.127 m
S= EeH*Bw S= 26.124 tf
My= EeH*Bw*y My= 29.433 tf.m/m
where, q' Kondisi Seismik (seismik) 0 tf/m2
Kea koefisien tekanan tanah aktif 0.438
g Berat satuan tanah 1.8 tf/m3
d Sudut gesekan antara tanah dan dinding 0.2618 radian
H 3.38 m
y Acting Point (m)
S Shearing Force/Gaya Geser (tf)
Bw Lebar Abutment 6.00 m

2) Bagian A-A
a) Kondisi Normal
Deskripsi
EaH : Tekanan Tanah Aktif (t/m2/m) = Pa . cos d 9.435
Ka2 : koefisien tekanan tanah aktif 0.297
y: Vertical acting point y= 1.994
S=EaH*Bw S= 56.607
My=S*y My= 112.892

qa1 = 0.297 x 0.70 = 0.208


qa2 = 0.297 x 3.38 x 1.80 = 1.809
qa3 = 0.297 x 2.32 x 2.00 = 1.380
qw2 = -0.967 x 1.00 = -0.967

No. Deskripsi H Y HY
Pa1 = 0.208 x 5.700 = 1.186 2.850 3.381
Pa2 = 1.809 x 3.380 x 0.500 = 3.057 3.447 10.536
Pa2' = 1.809 x 2.320 = 4.197 1.160 4.868
Pa3 = 1.380 x 2.320 x 0.500 = 1.600 0.773 1.238
Total (Pa),per m 10.040 1.994 20.023
Pw2 = -0.967 x 0.967 x 0.500 = -0.468 0.322 -0.151
Total, per m -0.468 -0.151
Total (per width) width = 6.00 m -2.805 0.322 -0.904
b) Kondisi Seismik
Deskripsi
Pea : Tekanan Tanah Aktif (t/m2/m) = Pa . cos d 12.610
Kea : koefisien tekanan tanah aktif 0.438
y: Vertical acting point y= 1.880
S=EaH*Bw S= 75.661
My=S*y My= 142.215

qa1 = 0.438 x 0.00 = 0.000


qa2 = 0.438 x 3.38 x 1.80 = 2.667
qa3 = 0.438 x 2.32 x 2.00 = 2.034
qw2 = -0.967 x 1.00 = -0.967

No. Deskripsi H Y HY
Pa1= 0.000 x 5.700 = 0.000 2.850 0.000
Pa2 = 2.667 x 3.380 x 0.500 = 4.508 3.447 15.536
Pa2' = 2.667 x 2.320 = 6.188 1.160 7.178
Pa3 = 2.034 x 2.320 x 0.500 = 2.360 0.773 1.825
Total (per m) 13.055 1.880 24.539
Pw2 = -0.967 x 0.967 x 0.500 = -0.468 0.322 -0.151
Total (per m) -0.468 -0.151
Total (per width) width= 6.00 m -2.805 0.322 -0.904

4 Summary of Intersectional Force


Kondisi Normal Kondisi Seismik
Description Momen Beban Geser Momen Beban Geser
M (tfm) N (tf) S (tf) M (tfm) N (tf) S (tf)
Bagian A-A
Badan Abutment 10.56 112.97 0.00 52.26 112.97 20.33
Reaksi pada Abutment 0.00 137.96 0.00 67.99 71.27 12.83
Tekanan hidrostatik -0.90 0.00 -2.81 -0.90 0.00 -2.81
Tekanan Tanah 112.89 0.00 56.61 142.22 0.00 75.66
Total 122.55 250.93 53.80 262 184.24 106.02
Bagian B-B
Badan Abutment 0.00 62.86 0.00 15.55 62.86 11.31
Reaksi pada Abutment 0.00 137.96 0.00 38.23 71.27 12.83
Tekanan hidrostatik 0.00 0.00 0.00 0.00 0.00 0.00
Tekanan Tanah 26.12 0.00 21.20 29.43 0.00 26.12
Total 26 200.82 21.20 83 134.13 50.27

5 Calculation of Required Reinforcement Bar as Rectangular Beam, Kondisi Normal

1) Cracking Moment/momen retak Bagian A-A Bagian B-B

Mc= Zc*(s'ck + N/Ac) Mc= 72836952 kgf.cm/m 62833452 kgf.cm/m


= 728 tf.m/m 628 tf.m/m
where, Mc Cracking Moment kgf.cm kgf.cm
Zc Section Modulus
Zc=1/6*b*h1 2 b=100 cm 2,250,000 cm3 2,250,000 cm3
s'ck Kekuatan tarik Beton (lentur)
s'ck = 0.5*sck2/3 15.6 kgf/cm2 15.6 kgf/cm2
s ck= 175 kgf/cm2
N Gaya aksial 250,930 kg 184,240 kg
Ac Luas Beton = b*h1 15000 cm2 15000 cm2
h1 thickness/ketebalan of section, B5 150 cm 150 cm
b 600 cm 600 cm

Bagian A-A Bagian B-B

1) Design Bending Moment Mf= 123 tf.m/m 26 tf.m/m

2) Required Bar Area As_req= Mf / (s sa*j*d)


As_req= 54 cm2 12 cm2
s sa= Tegangan Ijin R-bar 1850 kgf/cm2 1850 kgf/cm2
j= 1 - k/3 0.854 0.854
k= n / (n + ssa / sca) 0.438 0.438
n= Rasio modulus Young 24 24
sca= Tegangan ijin beton 60 kgf/cm2 60 kgf/cm2
d= Tinggi efektif = h1-d1 143 cm 143 cm
d1= 7.5 cm
h1= 150 cm
3) Ultimate Bending Moment Mu= As*ssy { d - 0.5*[As*ssy]/[0.85*sck*b]}
Mu= 231 tf.m 50 tf.m
Mu= Momen Lentur Ultimate
As= Luas Batang Tarik
ssy= Yielding point of Tensile Bar (Spec >295 N/mm2) 3000 kgf/cm2 3000 kgf/cm2
s'ck= Desain Kekuatan Tekan Beton 175 kgf/cm2 175 kgf/cm2
b= Lebar Efektif 600 cm 600 cm

4) Checking : Single or Double Bar Arrangement M1= (d/Cs)2*ssa*b


M1= 1,366 tf.m 1,366 tf.m
M1= Resistance moment/momen perlawanan
Cs= { 2n / ( k*j ) }1/2 12.844 12.844
j= 1 - k/3 0.854 0.854
k= n / (n + ssa / sca) 0.438 0.438
n= ssa/sca 31 31
ssa= 1850 kgf/cm2 1850 kgf/cm2
sca= 60 kgf/cm2 60 kgf/cm2

Check : M1 > Mf ? M1= 1,366 tf.m 1,366 tf.m


Mf= 123 tf.m 26 tf.m
Mf < Ml : Tensile Bar Only Mf < Ml : Tensile Bar Only

(a) Batang Tarik/tulangan tarik


Luasan tulangan max : 2%*b*d As max = 1,710 cm2 1,710 cm2
Luasan tulangan min : 4.5%*b As min = 27 cm2 27 cm2
Estimasi luasan tulangan yang diperlukan : As_req= 54 cm2 12 cm2
Apply f : 30 @ 125 30 @ 250
Required Bar Nos : b/pitch= 48 nos 24 nos
Luasan Tulangan : As= 339 cm2 170 cm2
ok ok

Resistance Moment dari batang tarik As2 As1= Mf / {ssa*j*d}


As1= 54 cm2 12 cm2
As2= 285 cm2 158 cm2
ssa= 1850 kgf/cm2 1850 kgf/cm2
d= 142.5 cm 142.5 cm
d2= 7.5 cm 7.5 cm
d
h Mrs= ssa*As2*(d-d2)
d1 Mrs= 711 tf.m 395 tf.m
As=As1+As2

(b) batang tekan/tulangan tekan ( in case Mf > Ml ) M' = Mf - M1


M'= 0 tf.m 0 tf.m
As'_req= M' / [ssa*(d - d2)]
As'_req= 0 cm2 0 cm2
As' M1= 1,366 tf.m 1,366 tf.m
Mf= 123 tf.m 26 tf.m
h d d2
d= 142.5 cm 142.5 cm
d1
d2= 0 cm 0 cm
As ssa= 1850 kgf/cm2 1850 kgf/cm2
Luasan tulangan yang diperlukan : As'_req= 0 cm2 0 cm2
Apply f =
Luasan Tulangan : As' = 0 cm2 ok 0 cm2 ok

5) Cek Tegangan Ijin

(a) Hanya Batang Tarik


Mf= 123 tf.m 26 tf.m
S= 54 tf 106 tf
ss = Mf/(As*j*d)= 287 kgf/cm2 ok 119 kgf/cm2 ok
sc = 2*Mf/(k*j*b*d2 )= 6 kgf/cm2 ok 2 kgf/cm2 ok
tm = S/(b*j*d)= 1 kgf/cm2 ok 1 kgf/cm2 ok
p= As/(b*d)= 0.004 0.002
k= {(n*p)2+2*n*p}1/2 - n*p= 0.351 0.265
j= 1-k/3= 0.883 0.912
b= 600 cm 600 cm
b d= 142.5 cm 142.5 cm
n= 24 24

x=kd
h d

As
d1
(b) Batang Tarik dan Batang Tekan
Mf= 0 tf.m 0 tf.m
S= 0 tf 0 tf
sc = Mf/(b*d2*Lc)= 0 kgf/cm2 ok 0 kgf/cm2 ok
ss = n*sc*(1-k)/k= 0 kgf/cm2 ok 0 kgf/cm2 ok
ss' = n*sc*(k-d2/d)/k= 0 kgf/cm2 ok 0 kgf/cm2 ok
tm = S/(b*j*d)= 0 kgf/cm2 ok 0 kgf/cm2 ok
p= As/(b*d)= 0.004 0.002
p'= p'=As'/(b*d)= 0.000 0.000
k= {n2(p+p')2+2n(p+p'*d2/d)}1/2-n(p+p')= 0.351 0.265
Lc= 0.5 k (1-k/3)+(np'/k) (k-d2/d)(1-d2/d)= 0.155 0.121
j= (1-d2/d)+k2/{2*n*p*(1-k)}*(d2/d-k/3)= 0.883 0.912
b= 600 cm 600 cm
b d2= 0 cm 0 cm
d2 d= 142.5 cm 142.5 cm
n= 24 24
As' x=kd
h d

As
d1

6 Calculation of Required Reinforcement Bar as Column, Kondisi Seismik

1) Luasan minimum sebagai kolom Bagian A-A Bagian B-B

Acmin = N / (0.008*ssa+sca) 1,642 cm2 1,195 cm2


ssa= Allowable stress of Reinforcement bar 2775 kgf/m2 2775 kgf/m2
sca= Allowable stress of Concrete 90 kgf/m2 90 kgf/m2
N= Axial force 184 tf 134 tf
Acdes= b*h 90,000 > Acmin ok 90,000 > Acmin ok

Minimum Reinforcement Bar


(a) Sebagai balok 4.5% * b As min= 27 cm2 27 cm2
(b) Sebagai kolom 0.8% * Acmin As min= 13 cm2 10 cm2

Maximum Reinforcement Bar


(a) As a beam 2%*b*d As max = 1,710 cm2 1,710 cm2
(b) As a column 6% * Ac As max = 5,400 cm2 5,400 cm2

2) Required Reinforcement Bar

Design Bending Moment Mf= 262 tf.m 83 tf.m


As_req= {[sc*(s/2)-N/(b*d)]/ssa}*b*d
As_req= 260 cm2 125 cm2

sc= Tegangan Beton sc= 72.09 kg.cm2 50.15 kg.cm2


Eq1= sc3 + [3*ssa/(2*n)-3*Ms/(b*d2)]*sc2 - 6*Ms/(n*b*d2)*ssa*sc - 3*Ms/(n2*b*d2)*ssa2 = 0
ssa= Tegangan ijin untuk penguat tulangan/reinforcement bar 2775 kg.cm2 2775 kg.cm2
Ms= Momen Eksentrik, Ms=N(e+c) 38592573 kgf.cm 17374670 kgf.cm
e= Jarak Essentrik e=M/N 141.97 cm 62.04 cm
M= Desain Momen Lentur 262 tf.m 83 tf.m
N= Gaya aksial 184 tf 134 tf
n= Rasio Modulus Young 16 16
c= c=h/2 - d1 67.5 cm 67.5 cm
h= Tinggi dari tiap bagian 150 cm 150 cm
b= Lebar dari tiap bagian 600 cm 600 cm
d1= Concrete Cover/selimut beton 8 cm 8 cm
d= Lebar Efektif bagian d=h-d1 143 cm 143 cm
s= n*sc/(n*sc+ssa) 0.294 0.224
[3*ssa/(2*n)-3*Ms/(b*d2)]= 251 256
6*Ms/(n*b*d2)*ssa= 3,296 1,484
3*Ms/(n2*b*d^2)*ssa2= 285,845 128,689
sc (trial)= 72 sc (trial)= 50
Eq1 (trial)= 1153973 re-check Eq1 (trial)= 566508 re-check
cross check 1153973 ok cross check 566508 ok
3) Ultimate Bending Moment
Mu= c*(h/2-0.4X)+Ts'(h/2-d2)+Ts(h/2-d1)
Mu= Momen Lentur Abutment (tf.m) Mu= 1,259 tf.m 649 tf.m
Mu= Min (Mu1,Mu2) Misal X>0 Misal X<0 Misal X>0 Misal X<0
Mu1= 1.26E+08 1.65E+08 64943845 91432074

c= 0.68*sck*b*X 719395 -1184.10 521387.9 -786.00


sck= Desain Kekuatan Beton 175 kg/cm2 175 kg/cm2
b= Width of section 600 cm 600 cm
X= solve the equation Eq2 below 10.076 -9.950 7.302 -6.605
Ts'= As'*Es*ecu*(X-d2)/X 243978 1673833 -12428 980557
As'= Batang Tekan, As'=0.5 As 130 62
As= Required Reinforcement Bar (Tensile/tarik) 260 125
Es= modulus young (reinforcement bar) 2,100,000 2,100,000
ecu= Koefisien regangan creep (beton) 0 0
h= Height of Section 150 cm 150 cm
d1= Concrete Cover/selimut beton (tensile side/sisi tarik) 7.5 cm 7.5 cm
d2= Concrete Cover (compressive side/sisi tekan) 7.5 cm 7.5 cm

Eq2 = a*X2 + (b-Ts-N)*X-b*d2 = 0


a= 0.68*sck*b 50 71400 71400
b= As'*Es*ecu 954438 459169
Ts= As*ssy 779133 374832
ssy= Yielding point of Tensile Bar (Spec >295 N/mm2) 3000 kgf/cm2 3000 kgf/cm2
N= Gaya Aksial 184240 kgf 134128 kgf
Masukkan a,b,c sebagai berikut : a= a = 71400 71400
b= b-Ts-N = -8935 -49791
c= - b*d2 = -7158283 -3443767

maka, X= (-b + (b2 -4ac)0.2 ) / (2*a)= 10.076 7.302


X= (-b - (b2 -4ac)0.2 ) / (2*a)= -9.950 -6.605

4) Bar Arrangement

d d2
d1

Luasan Tulangan Max : As max = 1,710 cm2 1,710 cm2


Luasan Tulangan Min : As min = 27 cm2 27 cm2

(a) Tensile Bar (Tarik)


Required Bar Area/yang dibutuhkan As req= 260 cm2 125 cm2
Apply f = 30 @ 125 30 @ 250
Column width/lebar kolom b= 600 cm2 600 cm2
Bar Area/Luasan Tulangan As = 339 cm2 ok 170 cm2 ok
(b) Compressive Bar (Tekan)
Required Bar Area/yang dibutuhkan As' req= 130 cm2 62 cm2
Apply f = 30 @ 250 30 @ 250
Column width/lebar kolom b= 600 cm2 600 cm2
Bar Area/Luasan Tulangan As' = 170 cm2 ok 170 cm2 ok
(c ) Hoop Bar
Minimum Diameter f' min = 12 mm 12 mm
Apply f' = 16 mm 16 mm
Interval Tulangan harus memenuhi ketentuan berikut:
d = 1425 mm 1425 mm
t < 12*f = 360 mm 360 mm
t < 48*f '= 768 mm 768 mm
Maka t= 200 mm ok 200 mm ok

5) Cek Tegangan Ijin, Kondisi Seismik

(a) Tensile Bar Only (Hanya Tarik)


Mf= 262 tf.m 83 tf.m
S= 106 tf 50 tf
ss = Mf/(As*j*d)= 601 kgf/cm2 ok 372 kgf/cm2 ok
sc = 2*Mf/(k*j*b*d2 )= 16 kgf/cm2 ok 7 kgf/cm2 ok
tm = S/(b*j*d)= 1 kgf/cm2 ok 1 kgf/cm2 ok
p= As/(b*d)= 0.00397 0.00198
k= {(n*p)^2+2*n*p}^0.5 - n*p= 0.29847 0.22222
j= 1-k/3= 0.90051 0.92593
b b= 600 cm 600 cm
d= 142.5 cm 142.5 cm
n= 16 16
x=kd
h d

As
d1
(b) Tensile Bar & Compressive Bar (Tarik dan Tekan)
Mf= 262 tf.m 83 tf.m
S= 106 tf 50 tf
sc = Mf/(b*d2*Lc)= 14 kgf/cm2 ok 6 kgf/cm2 ok
ss = n*sc*(1-k)/k= 592 kgf/cm2 ok 368 kgf/cm2 ok
ss' = n*sc*(k-d2/d)/k= 185 kgf/cm2 ok 69 kgf/cm2 ok
tm = S/(b*j*d)= 1 kgf/cm2 ok 1 kgf/cm2 ok
p= As/(b*d)= 0.004 0.002
p'= p'=As'/(b*d)= 0.002 0.002
k= {n2(p+p')2+2n(p+p'*d2/d)}1/2 -n(p+p')= 0.278 0.203
Lc= 0.5 k (1-k/3)+(np'/k) (k-d2/d)(1-d2/d)= 0.151 0.117
j= (1-d2/d)+k2/{2*n*p*(1-k)}*(d2/d-k/3)= 0.914 0.935
b b= 600 cm 600 cm
d2 d2= 7.5 cm 7.5 cm
d= 142.5 cm 142.5 cm
x=kd n= 16 16
As'
h d

As
d1

7 Cek Tegangan Pada Beton dan Tulangan Sebagai Kolom


Bagian A-A Bagian B-B
Normal Seismik Normal Seismik
Height of section/Tinggi Bagian h cm 150 150 150 150
Lebar efektif b cm 600 600 600 600
Concrete cover/Selimut Beton d1 cm 7.5 7.5 7.5 7.5
d2 cm 7.5 7.5 7.5 7.5
Reinforcement bar As cm2 339 339 170 170
As' cm2 0 170 0 170
Momen Mf kgf/cm 1.23.E+07 2.62.E+07 2.61.E+06 8.32.E+06
Gaya aksial N kgf 250,930 184,240 200,818 134,128
Gaya geser S kgf 53,802 106,019 21,202 50,267
Rasio modulus Young n 24 16 24 16
c 68 68 68 68
e 49 142 13 62
a1 -78 201 -186 -39
b1 9473 13393 3278 3368
c1 -1349952 -1635573 -467108 -499944
Neutral line/Garis netral x 72 50 56 33
-707080 -319596 -690243 -396679
Check Check Check Check
a2 21477 15139 16767 9791
b2 51 58 56 64
b3 7678 7261 4918 5614
b4 64 43 48 25
b5 7678 7261 4918 5614
b6 71 92 87 110
Stressing/Tegangan sc 5.74 ok 14.05 ok 1.62 ok 6.00 ok
ss 136.46 ok 410.13 ok 60.38 ok 323.42 ok
ss' 123.34 ok 191.45 ok 33.73 ok 74.00 ok
tc 0.69 ok 1.36 ok 0.27 ok 0.64 ok

SUMMARY OF DESIGN CALCULATION (HASIL)


Bagian A-A Bagian B-B
Deskripsi Variabel Satuan Kondisi Normal Kondisi Seismik Kondisi Normal Kondisi Seismik
Calculation Condition Rectangular Beam Column Rectangular Beam Column

Principle Dimensions
Desain Kekuatan Beton sc kgf/m2 175 175 175 175
Lebar Efektif Bagian/section b cm 600 600 600 600
Tinggi Bagian h cm 150 150 150 150
Concrete Cover (tensile/tarik) d1 cm 7.5 7.5 7.5 7.5
Concrete Cover (compressive/tekan) d2 cm 7.5 7.5 7.5 7.5
Tinggi efektif Bagian/section d cm 142.5 142.5 142.5 142.5
Tegangan Ijin Concrete sca kgf/m2 60 90 60 90
Re-Bar ssa kgf/m2 1850 2775 1850 2775
Shearing ta kgf/m2 5.5 8.25 5.5 8.25
Yielding Point of Reinforcement Bar ssy kgf/cm2 3000 3000 3000 3000
Reinforcement Bar
Tensile Bar/Tarik Required As_req. cm2 54 260 12 125
Designed As cm2 339 339 170 170
D30@125 D30@125 D30@250 D30@250
Compressive Bar/Tekan Required As'_req. cm2 0 130 0 62
Designed As' cm2 0 170 0 170
D30@250 D30@250
Hoop Bar Designed Aso D16@200 D16@200
Design Load/Desain Pembebanan
Design Bending Moment/momen lentur Mf tf.m 123 262 26 83
Design Axis Force/gaya aksial Nd tf 251 184 201 134
Shearing Force/gaya geser S tf 54 106 21 50
Checking of Minimum Re-Bar
Ultimate Bending Moment Mu tf.m 231 1,259 50 649
Max Re-bar As max cm2 1,710 1,710 1,710 1,710
Min Re-bar As min cm2 27 27 27 27
Required Bar As req. cm2 54 390 12 187
Area of Re-bar for Design As_tot=As+As' cm2 339 509 170 339
Checking of Allowable Stress/cek tegangan ijin
Rectangular Beam
Rasio Modulus Young n 24 16 24 16
Tinggi efektif d cm 142.5 142.5 142.5 142.5
Compressive Stress/tekan sc kgf/cm2 6 ok 2 ok
Bending Tensile Stress/lentur tarik ss kgf/cm2 287 ok 119 ok
ss' kgf/cm2 - -
Mean Shearing Stress/geser tm kgf/cm2 1 ok 1 ok
Column
Compressive Stress/tekan sc kgf/cm2 6 ok 14 ok 2 ok 6 ok
Bending Stress/lentur ss kgf/cm2 136 ok 410 ok 60 ok 323 ok
ss' kgf/cm2 123 ok 191 ok 34 ok 74 ok
Shearing Stress/geser tm kgf/cm2 1 ok 1 ok 0 ok 1 ok

CEK ANALISIS STRUKTUR (BODY) BERDASAR INPUT DATA


Bagian A-A Bagian B-B
Normal Seismic Normal Seismic
Bar arrangement
Back face (batang tarik) f (mm) 30 30 30 30
(vertikal) spacing (mm) 125 125 250 250
As (cm2) 339 339 170 170
Front face (batang tekan) f (mm) 30 30 30 30
(vertikal) spacing (mm) 250 ok 250 ok 250 ok 250 ok
( As' > 0.5 As, cm2 ) 170 >=169.6 170 >=169.6 170 >=84.8 170 >=84.8
Hoop bar (horizontal) f (mm) 16 16
interval (mm) 200 200
Max interval (mm) 360 360
Desain Dimensi
Lebar efektif (lebar keseluruhan) (cm) 600 600 600 600
Selimut beton : d1(cm) 7.5 7.5 7.5 7.5
d2(cm) 7.5 7.5 7.5 7.5
Tinggi efektif (cm) : d-d1(cm) 142.5 142.5 142.5 142.5
Desain Beban Mf (t m) 122.55 261.56 26.12 83.21
Nd (t) 250.93 184.24 200.82 134.13
S (t) 53.80 106.02 21.20 50.27
Cek tulangan minimum
Required bar/Tulangan yang dibutuhkan (cm2) 54 390 12 187
Cek Tegangan Ijin as rectangular beam as column as rectangular beam as column
Tegangan Normal/Kompresi sc kgf/cm2 6 ok 14 ok 2 ok 6 ok
Tegangan Lendut ss kgf/cm2 287 ok 410 ok 119 ok 323 ok
ss' kgf/cm2 - 191 ok - 74 ok
Tegangan Geser tm kgf/cm2 0.71 ok 1.36 ok 1.36 ok 0.64 ok
B. FOOTING
1. Pembebanan and Bending Moment/Momen Lentur Pada Footing
1) Kondisi
l1
Kondisi Normal Toe Side

M
(0,0)

Ra=Qmax Ra'

Q max Q min
B4

BT
Heel Side
l2

Kondisi Seismik M
(0,0)

Q Ra' Ra=Qmin

X
B6
BT

2) Footing
Dimensi unit:m
B4 B5 B6 BT H3 H4 HT
B4 B5 B6 1.85 1.50 1.85 5.20 0.50 1.00 7.20
Lebar Abutment HT-H3-H4
Bw= 6.00 m 5.70
H3 6 7 8
Berat Satuan Bahan
F1 F2 F3
H4 Tanah 1800 kgf/m3 1.80 tf/m3
9
Beton 2400 kgf/m3 2.40 tf/m3
BT Beban Merata q 700 kgf/m3 0.70 tf/m3
q'= q seismik 0 kgf/m3 0 tf/m3

Toe Side kondisi normal Kondisi seismik


Luasan Berat Beban Jarak Momen Beban Jarak Momen Koefisien Seismik
No. Satuan Vertikal X Mx Horizontal Y My Kh= 0.18
m2 tf/m3 tf/m m tf.m/m tf/m m tf.m/m
6 0.463 2.4 1.110 0.617 0.685 0.200 1.167 0.233
F1 1.850 2.4 4.440 0.925 4.107 0.799 0.500 0.400
sub-total 5.550 4.792 0.999 0.633
Jarak l1 l1 (X) 0.863 m l1 (Y) 0.633 m

Heel Side kondisi normal Kondisi seismik


Luasan Berat Beban Jarak Momen Beban Jarak Momen
No. Satuan Vertikal N X Mx Horizontal Y My
m2 tf/m3 tf/m m tf.m/m tf/m m tf.m/m
8 0.463 2.400 1.110 0.617 0.685 0.200 1.250 0.250
F3 1.850 2.400 4.440 0.925 4.107 0.799 0.500 0.400
sub-total 5.550 4.792 0.999 0.649
Jarak l2 l2 (X) 0.863 m l2 (Y) 0.650 m

3) Earth Pressure, Heel Side Only


Kondisi Normal Kondisi Seismik
Beban Mati (Tanah) W1= 19.477 tf/m We1= 19.477 tf/m
Jarak l3 =Xo-(B4+B5) l3 = 0.964 m l3 = 0.964 m
Bending Moment/momen lentur Md Md= 18.773 tf.m/m Mde= 18.773 tf.m/m

Beban Merata W2=q*B6 W2= 1.295 tf/m We2= 0.000 tf/m


Jarak l4 =B6/2 l4 = 0.925 m l4 = 0.925 m
Bending Moment/momen lentur Ms Ms= 1.198 tf.m/m Mse= 0.000 tf.m/m

Tekanan Vertikal Tanah Pv= Pv= 3.379 tf/m Pve= 3.280 tf/m
Pv=sin d*{ (1/2)*Ka*g*HT^2 + q*Ka*HT}
Koefisien tekanan tanah aktif Ka= 0.297 Kea= 0.433
Sudut antara tanah dan dinding d= 0.3491 radian d e= 0.2618 radian
Jarak l5 =B6*(2/3) l5 = 1.233 l5 = 1.233 m
Bending Moment/momen lentur Me Me= 4.168 tf.m/m Mee= 4.046 tf.m/m
4) Reaction from Foundation (pondasi)

Reaction from the Foundation


Normal Q max 12.447 tf/m2
Qmin 12.043 tf/m2
Seismik Qmax 9.588 tf/m2
Qmin 13.454
X 5.200 m

Reaction from Foundation, Toe Side


Kondisi Normal
Rat= Q max Rat= 12.447 tf/m2 Panjang kantilever =B4= 1.850 m
Ra't= Q max-(B4/BT)*(Q max - Qmin) Ra't= 12.303 tf/m2
Kondisi Seismik
Reat= Q Reat= 9.588 tf/m2 Panjang kantilever =B4= 1.850 m
Rea't= Q*(X-B4)/X Reat'= 6.177 tf/m2

Reaction from Foundation, Heel Side


Kondisi Normal
Rah= Q min Rah= 12.043 tf/m2 Panjang kantilever =B6= 1.850 m
Ra'h= Q max-[(B4+B5)/BT]*(Q max - Qmin) Ra'h= 12.187 tf/m2
Kondisi Seismik
Reah'= Q*(X-B4-B5)/X Rea'h= 12.079 tf/m2 Panjang kantilever =X-B4-B5= 1.850 m
Reah= Qmin Reah= 13.454 tf/m2
Reah'= Q*(X-B4-B5)/X Rea'h= 3.411 tf/m2 Panjang kantilever =X-B4-B5= 4.886 m
Reah= 0 Reah= 0.000 tf/m2
Reah'= Q*(X-B4-B5)/X Rea'h= 12.079 tf/m2 Panjang kantilever =X-B4-B5= 1.850 m
Reah= Qmin Reah= 13.454 tf/m2

5) Intersectional Force due Reaction


Gaya Aksial = 0 tf/m per m
Toe Section Heel Section
Kondisi Normal Kondisi Seismik Kondisi Normal Kondisi Seismik
Deskripsi Moment Shearing Moment Shearing Moment Shearing Moment Shearing
M S Me Se M S Me Se
(tf.m/m) (tf/m) (tf.m/m) (tf/m) (tf.m/m) (tf/m) (tf.m/m) (tf/m)
Footing -4.792 -5.550 -4.792 -5.550 4.792 5.550 4.792 5.550
Beban Mati (Tanah) 18.773 19.477 18.773 19.477
Beban Merata 1.198 1.295 0.000 0.000
Tekanan Tanah 4.168 3.379 4.046 3.280
Reaction form Foundation (Pondasi) 21.218 22.894 14.462 14.582 -20.690 -22.412 -22.239 -23.618
Total - per m 16.426 17.344 9.670 9.032 8.240 7.289 5.372 4.690
Total -6 m 98.556 104.061 58.021 54.195 49.441 43.737 32.231 28.138

2 Calculation of Required Reinforcement Bar : Toe Section

1) Design Bending Moment (Lentur) ( Mf )

Kondisi Normal M= 16.426 tf.m/m


Kondisi Seismik Me= 9.670 tf.m/m
Max. Design Bending Moment Mf= 16.43 tf.m/m

2) Required Bar Area (Luasan Tulangan)


As= Mf / (s sa*j*d) 7.30 cm2
s sa= Tegangan Ijin R-bar 1850 kgf/cm2
j= 1 - k/3 0.854
k= n / (n + ssa / sca) 0.438
n= Rasio modulus Young 24
sca= Tegangan Ijin Beton 60 kgf/cm2

3) Ultimate Bending Moment (Lentur)

Mu=As*s sy{d-(1/2)*[As*s sy]/[0.85*s ck*b]} Mu= 3.10E+06 kgf.cm


31.03 tf.m
where, Mu Ultimate Bending Moment
As Area of Tensile Bar (Tarik)
s sy Yielding point of Tensile Bar 3000 kgf/cm2 (Spec >295 N/mm2)
d Tinggi Efektif = h1-cover 142.5 cm
cover d1= 7.5 cm
h1= 150 cm
s'ck Desain Kekuatan Tekan Beton 175 kgf/cm2
b Lebar Efektif 100 cm
4) Checking of Single or Double bar arrangement
M1= (d/Cs)2*ssa*b
M1= 2.28E+07 kgf.cm/m
= 227.73 tf.m/m
M1= Resistance moment
Cs= { 2n / ( k*j ) }1/2 12.844
k= n / (n + ssa / sca) 0.438
n= Rasio modulus Young 30.833
Compressive
ssa= 1850 kgf/cm2
sca= 60 kgf/cm2
Tensile
n= 24
Check M1 > Mf? M1= 227.734 tf.m
Mf= 16.426 tf.m M1 > Mf : Design Tensile Bar Only

(a) Tensile Bar (Tarik)

Max Bar Area : 2%*b*d = 285.00 cm2


Min Bar Area : 4.5%*b = 4.50 cm2 h d
Required Bar Area As req= 7.30 cm2 d1
Apply f = 25 @ 150
Required Bar Nos Nos=b/pitch = 6.6666667 nos
Bar Area As = 32.72 cm2 ok

(b) Compressive Bar (Tekan), misal M1<Mf


M' = Mf - M1
M'= 0.00 tf.m
As' = M' / [ssa*(d - d2)]
h d d2
Required Bar Area As'= 0.00 cm2
d= 142.5 cm d1
d2= 0.00 cm
ssa= 1850 kgf/cm2
Apply f = 0
Bar Area As' = 0.00 cm2 ok
5) Cek Tegangan Ijin

(a) Tensile Bar Only (Tarik)


Mf= 16.43 tf.m/m b
S= 17.34 tf/m
ss = Mf/(As*j*d)= 388.71 kgf/cm2 ok
sc = 2*Mf/(k*j*b*d2)= 6.34 kgf/cm2 ok x=kd
tm = S/(b*j*d)= 1.34 kgf/cm2 ok h d
p= As/(b*d)= 0.00 b= 100 cm
k= {(n*p)2+2*n*p}1/2 - n*p= 0.28 d= 142.5 cm As
j= 1-k/3= 0.91 n= 24 d1

(b) Tensile Bar & Compressive Bar (Tarik dan Tekan)


Mf= 16.43 tf.m
S= 17.34 tf
b
sc = 2
Mf/(b*d *Lc)= 6.34 kgf/cm2 ok
d2
ss = n*sc*(1-k)/k= 388.71 kgf/cm2 ok
ss' = n*sc*(k-d2/d)/k= 152.24 kgf/cm2 ok
As' x=kd
tm = S/(b*j*d)= 1.34 kgf/cm2 ok
h d
p= As/(b*d)= 0.00
p'= p'=As'/(b*d)= 0.00 b= 100 cm
As
k= {n2(p+p')2+2n(p+p'*d2/d)}1/2-n(p+p')= 0.28 d= 142.5 cm
Lc= 0.5 k (1-k/3)+(np'/k) (k-d2/d)(1-d2/d)= 0.13 d2= 0.00 cm d1
j= (1-d2/d)+k2/{2*n*p*(1-k)}*(d2/d-k/3)= 0.91 n= 24

3 Calculation of Required Reinforcement Bar : Heel Section ( Normal Condition )

1) Design Bending Moment Me>0 Me<0

Kondisi Normal M= 8.240 tf.m/m


Kondisi Seismik Me= 5.372 tf.m/m
Mf= 8.24 tf.m/m Tensile Compressive

Compressivee Tensile

2) Required Bar Area

As= Mf / (s sa*j*d) 3.66 cm2


s sa= Tegangan Ijin R-bar 1850 kgf/cm2
j= 1 - k/3 0.854
k= n / (n + ssa / sca) 0.438
n= Rasio modulus Young 24
sca= Tegangan Ijin Beton 60 kgf/cm2
3) Ultimate Bending Moment

Mu=As*s sy{d-(1/2)*[As*s sy]/[0.85*s ck*b]} Mu= 1560461 kgf.cm


= 15.60 tf.m
where, Mu Ultimate Bending Moment
As Area of Tensile Bar
s sy Yielding point of Tensile Bar 3000 kgf/cm2 (Spec >295 N/mm2)
d Effective height = h1-cover 142.5 cm
cover d1= 7.5 cm
h1= 150 cm
s'ck Design Compressive Strength of Concrete 175 kgf/cm2
b Effective Width 100 cm

4) Checking of Single or Double bar arrangement

M1= (d/Cs)2 *ssa*b M1= 29257501.5 kgf.cm/m


= 292.58 tf.m/m
M1= Resistance moment Mf= 8.240 tf.m M1>Mf : Design Tensile Bar Only
Cs= { 2n / ( k*j ) }1/2 11.33
k= n / (n + ssa / sca) 0.438
n= Young's modulus ratio 24

(a) Tensile Bar

Max Bar Area : 2%*b*d = 300.00 cm2 d


Min Bar Area : 4.5%*b = 4.50 cm2 h
d1
Required Bar Area As req= 3.66 cm2
Apply f = 25 @ 150
Required Bar Nos Nos=b/pitch = 6.6666667 nos Pitch shall be same as that of toe
Bar Area As = 32.72 cm2 ok

(b) Compressive Bar, in case M1<Mf


M' = Mf - M1 M'= 0.00 tf.m
As' = M'/[ssa*(d - d2)] As'= 0.00 cm2
d= 142.5 cm h d d2
d2= 0.00 cm d1
Required Bar Area As' req= 0.00 cm2
Apply f = 0
Bar Area As' = 0.00 cm2 ok

5) Checking of Allowable Stress


(a) Tensile Bar Only
Mf= 8.24 tf.m/m b
S= 7.29 tf/m
ss = Mf/(As*j*d)= 195.00 kgf/cm2 ok ok
x=kd
sc = 2*Mf/(k*j*b*d2)= 3.18 kgf/cm2 ok ok
h d
tm = S/(b*j*d)= 0.56 kgf/cm2 ok ok
p= As/(b*d)= 0.00 b= 100 cm As
k= {(n*p)2+2*n*p}1/2 - n*p= 0.28 d= 142.5 cm d1
j= 1-k/3= 0.91 n= 24

(b) Tensile Bar & Compressive Bar


Mf= 8.24 tf.m
S= 7.29 tf
sc = Mf/(b*d2*Lc)= 3.18 kgf/cm2 ok b
ss = n*sc*(1-k)/k= 195.00 kgf/cm2 ok d2
ss' = n*sc*(k-d2/d)/k= 76.37 kgf/cm2 ok
tm = S/(b*j*d)= 0.56 kgf/cm2 ok x=kd
As'
p= As/(b*d)= 0.00 h d
p'= p'=As'/(b*d)= 0.00
k= {n2(p+p')2+2n(p+p'*d2/d)}1/2-n(p+p')= 0.28 b= 100 cm As
Lc= 0.5 k (1-k/3)+(np'/k) (k-d2/d)(1-d2/d)= 0.13 d= 142.5 cm d1
j= (1-d2/d)+k2/{2*n*p*(1-k)}*(d2/d-k/3)= 0.91 d2= 0.00 cm
n= 24
4 Calculation of Required Reinforcement Bar : Heel Section ( Seismic Condition )

1) Design Bending Moment Me>0 Me<0

Kondisi Normal M= 8.240 tf.m/m


Kondisi Seismik Me= 5.372 tf.m/m
Tensile Compressive
Mf= 5.37 tf.m/m
Compressivee Tensile

2) Required Bar Area

As= Mf / (s sa*j*d) 1.53 cm2


s sa= Allowable Stress R-bar 2775 kgf/cm2
j= 1 - k/3 0.886
k= n / (n + ssa / sca) 0.438
n= Young's modulus ratio 16
sca= Allowable Stress Concrete 90 kgf/cm2

2) Required Bar Area

As= Mf / (s sa*j*d) 1.53 cm2


s sa= Allowable Stress R-bar 2775 kgf/cm2
j= 1 - k/3 0.886
k= n / (n + ssa / sca) 0.438
n= Young's modulus ratio 16
sca= Allowable Stress Concrete 90 kgf/cm2

3) Ultimate Bending Moment Mu= 6.55E+05 kgf.cm


= 6.55 tf.m
where, Mu Ultimate Bending Moment
As Area of Tensile Bar
s sy Yielding point of Tensile Bar 3000 kgf/cm2 (Spec >295 N/mm2)
d Effective height = h1-cover 142.5 cm
cover d1= 7.5 cm
h1= 150 cm
s'ck Design Compressive Strength of Concrete 175 kgf/cm2
b Effective Width 100 cm

4) Checking of Single or Double bar arrangement

M1= (d/Cs)2*ssa*b M1= 5.33E+07 kgf.cm/m


= 533.09 tf.m/m
M1= Resistance moment Mf= 5.372 tf.m M1>Mf : Design Tensile Bar Only
Cs= { 2n / ( k*j ) }1/2 10.281
k= n / (n + ssa / sca) 0.342
n= Young's modulus ratio 16

(a) Tensile Bar


Max Bar Area : 2%*b*d = 0.00 cm2
h d
Min Bar Area : 4.5%*b = 0.29 cm2
Required Bar Area As req= 1.53 cm2 d1
Apply f = 25 @ 150
Required Bar Nos Nos=b/pitch = 6.6666667 nos
Bar Area As = 32.72 cm2 check or arrange compressive bar

(b) Compressive Bar, in case M1<Mf


M' = Mf - M1 M'= 0.00 tf.m
As' = M'/[ssa*(d - d2)] As'= 0.00 cm2
d= 142.5 cm h d d2
d2= 0.00 cm d1
Required Bar Area As' req= 0.00 cm2
Apply f =
Bar Area As' = 0.00 cm2 ok
5) Checking of Allowable Stress

(a) Tensile Bar Only


Mf= 5.37 tf.m/m b
S= 4.69 tf/m
ss = Mf/(As*j*d)= 125.07 kgf/cm2 ok
sc = 2*Mf/(k*j*b*d2)= 2.43 kgf/cm2 ok x=kd
tm = S/(b*j*d)= 0.36 kgf/cm2 ok h d
p= As/(b*d)= 0.00 b= 100 cm
As
k= {(n*p)2+2*n*p}1/2 - n*p= 0.24 d= 142.5 cm
d1
j= 1-k/3= 0.92 n= 16

(b) Tensile Bar & Compressive Bar


Mf= 5.37 tf.m
S= 4.69 tf
sc = Mf/(b*d2*Lc)= 2.43 kgf/cm2 ok b
ss = n*sc*(1-k)/k= 125.07 kgf/cm2 ok d2
ss' = n*sc*(k-d2/d)/k= 38.81 kgf/cm2 ok
tm = S/(b*j*d)= 0.36 kgf/cm2 ok x=kd
As'
p= As/(b*d)= 0.00 h d
p'= p'=As'/(b*d)= 0.00
k= {n2(p+p')2+2n(p+p'*d2/d)}1/2-n(p+p')= 0.24 b= 100 cm As
Lc= 0.5 k (1-k/3)+(np'/k) (k-d2/d)(1-d2/d)= 0.11 d= 142.5 cm d1
2
j= (1-d2/d)+k /{2*n*p*(1-k)}*(d2/d-k/3)= 0.92 d2= 0.00 cm
n= 16

SUMMARY OF DESIGN CALCULATION, FOOTING (HASIL)

Deskripsi Variabel Satuan Toe Side Heel Side


Hasil Perhitungan Normal Normal Seismik
Principle Dimensions
Desain Kekuatan Beton sc kgf/m2 175 175 175
Lebar Efektif Bagian b cm 100 100 100
Tinggi Bagian, H4 h cm 100 100 100
Concrete Cover/selimut beton (tensile/tarik) d1 cm 7.5 7.5 7.5
Concrete Cover (compressive/tekan) d2 cm 0 0 0
Tinggi efektif Bagian/section d cm 92.5 92.5 92.5
Tegangan ijin Concrete sca kgf/m2 60 60 90
Re-Bar ssa kgf/m2 1850 1850 2775
Shearing ta kgf/m2 5.5 5.5 8.25
tma kgf/m2 14 14 21
Yielding Point of Reinforcement Bar ssy kgf/cm2 3000 3000 3000
Reinforcement Bar
Tensile Bar Required As req. cm2 7.30 3.66 1.53
Designed As cm2 32.72 32.72 32.72
D25@150 D25@150 25 @ 150
Compressive Bar Required As' req. cm2 0.00 0.00 0.00
Designed As' cm2 0.00 0.00 0.00
Desain Pembebanan
Design Bending Moment (Lentur) Mf tf.m/m 16.43 8.24 6.55
Design Axis Force (Gaya Aksial) Nd tf/m 0.00 0.00 0.00
Shearing Force (Gaya Geser) S tf/m 17.34 7.29 4.69
Ultimate Bending Moment Mu tf.m 31.03 15.60 6.55
Resistance moment (single bar) Ml tf.m 227.73 292.58 533.09
Max Re-bar As max cm2 285.00 300.00 0.36
Min Re-bar As min cm2 4.50 4.50 4.50
Required Bar As req. cm2 7.30 3.66 1.53
Area of Re-bar for Design As cm2 32.72 32.72 32.72
Checking of Allowable Stress (Cek Tegangan Ijin)
Rasio Modulus Young n 24 24 16
Tinggi Efektif d-d1 cm 92.5 92.5 92.5
Compressive Stress (Tekan) sc kgf/cm2 6.34 ok 3.18 ok 2.43 ok
Bending Tensile Stress (Lentur) ss kgf/cm2 388.71 ok 195.00 ok 125.07 ok
ss' kgf/cm2
Mean Shearing Stress (Geser) tm kgf/cm2 1.34 ok 0.56 ok 0.36 ok
CEK ANALISIS STRUKTUR (FOOTING) BERDASAR INPUT DATA
Toe side Heel side
(Normal / Seismic) Normal Seismic
Bar arrangement
Upper (sisi atas) (batang tarik) f (mm) 25 25
(sumbu jembatan) spacing (mm) 150 150
As1 (cm2) 32.72
(batang tekan) f (mm) 25
(sumbu jembatan) spacing (mm) 300 ok
As2' (cm2, >0.5 As2) 16.36 >=16.36
(batang distribusi) f (mm) 16 16 16
spacing (mm) 300 ok 150 ok 150 ok
Aso (cm2, > As /3) 6.70 >=5.45 13.40 >=4.50 13.40 >=10.91
Lower (bawah) (batang tarik) f (mm) 25
(sumbu jembatan) spacing (mm) 150
As2 (cm2) 32.72
(batang tekan) f (mm) 25 25
(sumbu jembatan) spacing (mm) 300 ok 300 ok
As1' (cm2, >0.5 As1) 16.36 >=4.50 16.36 >=16.36
(batang distribusi) f (mm) 16 16 16
spacing (mm) 150 ok 300 ok 300 ok
Aso (cm2, >As /3) 13.40 >=10.91 6.70 >=5.45 6.70 >=5.45
Desain dimensi
Lebar efektif (lebar satuan) (cm) 100 100 100
selimut beton : d1(cm) 7.5 7.5 7.5
d2(cm) 7.5 7.5 7.5
Tinggi efektif (cm) : d-d1(cm) 92.5 92.5 92.5
Desain Pembebanan Mf 16.43 8.24 5.37
Nd 0.00 0.00 0.00
S 17.34 7.29 4.69
Cek Tulangan Minimum
Required bar/Tulangan yang dibutuhkan (cm2) 7.30 3.66 1.53
Cek Tegangan Ijin
Tegangan Normal/Kompresi 6.34 ok 3.18 ok 2.43 ok
Tegangan Lendut 388.71 ok 195.00 ok 125.07 ok
Tegangan Geser 1.34 ok 0.56 ok 0.36 ok

C. PARAPET
1. Sectional Force without Impact Plate
(1) Rear Face Reinforcement Bar Mo= Mp + Me
So= Sp + Ph
T-Load Earth Pressure
b
where,
a Mo Bending Moment/lentur at Parapet (tfm/m)
So Shearing Force/gaya geser pada Platform (tf/m)
Mp Momen Lentur berdasar Beban-T (tfm/m)
Me Momen Lentur berdasar tekanan tanah (tfm/m)
Sp Shearing Force/gaya geser berdasar beban-T (tf/m)
Ph Tekanan Tanah/Earth Pressure (tf/m)
H1

gKaH1
1) Sectional Force/gaya penampang karena Beban-T
Mp= Ka T/1.375*{-H1+(H1+a)*ln[(a+H1)/a] 3.296 tfm
Sp= Ka T/1.375*ln[(a+H1)/a] 4.208 tf

where, Ka Koefisien Tekanan Tanah Aktif 0.297


T Wheel load of T-Load 10.000 tf
a contact width of T-load 0.200 m
H1 Tinggi dari Parapet 1.200 m

2) Gaya Penampang karena Tekanan Tanah


Ph= 0.5 g *Kah*H1^2 Ph= 0.379 tf
Me= (1/3)*Ph*H1 Me= 0.152 tfm

where, Kah Ka*cos d 0.293


d sudut gesekan antara dinding parapet dan tanah = (1/3)f 0.175 (radian)
g satuan berat tanah 1.800 tf/m3
H1 Tinggi Parapet 1.200 m

3) Summary of Sectional Force


Mo= Mp + Me 3.448 tfm
So= Sp + Ph 4.587 tf

2. Gaya Penampang dengan Pelat Benturan/Plat Impact

(1) Front Face Reinforcement Bar (Perhitungan dalam Kondisi Normal)

Lo
R
Lo-Bu
Lx w1

Ds w2

Ft

B1 B2 Bu L=0.7 Lo

Rf= (1/2)*Wd*Lo Rf= 2.835 tf/m


Rp= T/1.375 Rp= 7.273 tf/m
R= Rf + Rp R= 10.108 tf/m B2= 0.40 m
Lx= (1/2)*B2+Bu Lx= 0.500 m Bu= 0.30 m (=Lp)
Mf= R*Lx Mf= 5.054 tfm/m
where, Rf Reaksi Akibat Beban Sendiri Wd tf
Wd w1 + w2 1.89 tf/m2
w1 Berat tanah pada pelat benturan 1.17 tf/m2
w2 Berat sendiri pelat benturan 0.72 tf/m2
Lo Panjang Pelat Benturan 3.00 m Ketebalan pelat benturan Ft= 0.30 m
Rp Reaksi akibat T-Load tf Kedalaman Tanah Diatas Pelat Ds= 0.60 m
R Reaksi Total tf Ketebalan perkerasan Dp= 0.05 m
Lx Jarak dari pusat parapet ke titik reaksi m Lebar jalan efektif B= 3.00 m
Bu lebar korbel 0.30 m
Mf Bending Moment/momen lentur pada Parapet tfm/m
(2) Rear Face Reinforcement Bar (Perhitungan Dalam Kondisi Seismik)

Lo

Ds
Ft
H1 RH H1
Yr he

B1 B2 Bu g Kah he

1) Sectional Force/Gaya Penampang karena Pelat Tumbukan

Rh= 2*Rf*Kh 1.021 tf/m Lp= 0.300 m (= Bu)


Mr = Rh*Yr 0.919 tfm/m

Dimana, Kh Koefisien seismik 0.18


Yr = H1-Lp = 0.900 m

2) Sectional Force/Gaya Penampang karena Tekanan Tanah

H1 > Ds ? H1= 1.200 m


H1-Ds= 0.600 m

Peh 1= (1/2)*g*Kah*Lp^2 0.024 tf/m


Me 1= Peh*[(Lp)*(1/3)+(H1-Lp)] 0.024 tfm/m
Peh 2= (1/2)*g*Kah*he^2 0.095 tf/m
Me 2= (1/3)*Peh*he 0.019 tfm/m

maka Peh =Peh 1+ Peh2 0.119 tf/m


Me =Me 1+Me2 0.043 tfm/m

3) Intersectional Force/Gaya Persimpangan Parapet karena Tekanan Tanah

B1 B2

Lp Section Luasan Berat Beban Kh Beban Jarak Momen


(bagian) (m2) Satuan (tf) Seismik
Gh (tf) y(m) Mg (tfm)
H1 1 10 Lp 1 0.480 2.4 1.152 0.18 0.207 0.600 0.124
Lp 10 0.090 2.4 0.216 0.18 0.039 0.450 0.017
11
11 0.045 2.4 0.108 0.18 0.019 0.500 0.010
S 0.266 0.152
B5 catatan: jika H1 < Dc, luas 10 & 11 akan dihitung sebagai "0"

4) Summary of Intersectional Force (Hasil)

Mo= Mr+Me+Mg 1.113 tfm/m


So= Rh+Reh+Gh 1.405 tf/m
3. Calculation of Required Reinforcement Bar/Perhitungan Kebutuhan Tulangan
1) Cracking Moment/Momen Retak

Mc= Zc*(s'ck + N/Ac) Mc= 417155 kgf.cm = 4.172 tf.m


where, Mc Cracking Moment kgf.cm
Zc Sectional Coefficient/Koefisien Penampang
Zc=b*B2^2/6 b=100 cm 26667 cm3
s'ck Kekuatan tarik Beton (lentur)
s'ck = 0.5*sck^(2/3) 15.64 kgf/cm2
s ck= 175 kgf/cm2
N Axis force (=0) 0
Ac Luas Beton = b*B2 4000 cm2
b Lebar Efektif 100 cm
B2 Ketebalan parapet 40 cm

2) Checking of Cracking Moment and Design Bending Moment


Design Bending Moment/momen lentur Mf 5.054 tf.m

Check Mf & Mc 1.7*Mf>Mc?, Jika ya cek momen lentur ultimate


1.7*Mf = 8.592 tf.m
Mc= 4.172 tf.m 1.7*Mf>Mc? Ya, cek momen lentur ultimate

3) Ultimate Bending Moment

Mu=As*s sy{d-(1/2)*[As*s sy]/[0.85*s ck*b]} Mu= 931120 kgf.cm = 9.311 tf.m


where, Mu Ultimate Bending Moment/momen lentur tf.m
As Luas Batang Tarik cm2
s sy Yielding point of Tensile Bar 3000 kgf/cm2 (Spec >295 N/mm2)
d Tinggi Efektif = B2-cover 33 cm
cover d1= 7 cm
B2 = 40 cm
s'ck Desain Kekuatan Tekan Beton 175 kgf/cm2
b Lebar Efektif 100 cm
As=Mf/(s sa*j*d) 9.692 cm2
s sa= Tegangan Ijin R-bar 1850 kgf/cm2
j= 1 -k/3 (=8/9 ) 0.854
or k = n/{n+s sa/s ca)
n= Rasio modulus Young 24
s ca Tegangan Ijin Beton 60 kgf/cm2
Cek Mu & Mc Mu = 9.311 tf.m
Mc = 4.172 tf.m Mu>Mc? ok

4) Bar Arrangement/Penentuan Tulangan

(a) Front Face, with Impact Plate


Max Bar Area As max = 0.02*b*d = 66.0 cm2 Concrete Cover d1= 7 cm
Min Bar Area As min = b*4.5%= 4.5 cm2 Maka d= 33 cm
Required Bar Area As req= 10.500 cm2
Apply f = 16 @ 125 mm
Bar Area As = 16.085 cm2 ok

(b) Rear Face, without Impact Plate


Max Bar Area As max = 0.02*b*d = 60.0 cm2 Concrete Cover d1= 10 cm
Min Bar Area As min = b*4.5%= 4.5 cm2 Maka d= 30 cm
Required Bar Area As req= cm2
Apply f = 13 @ 250 mm spacing of body, tensile f 30 @ 250
Bar Area As = cm2

(c) Rear Face, with Impact Plate


Max Bar Area As max = 0.02*b*d = 60.0 cm2 Concrete Cover d1= 10 cm
Min Bar Area As min = b*4.5%= 4.5 cm2 Maka d= 30 cm
Required Bar Area As req= 2.228 cm2
Apply f = 16 @ 250 mm Jarak, tensile f 30 @ 250
Bar Area As = 8.042 cm2 ok
5) Checking of Allowable Stress/Cek Tegangan Ijin

(a) Front Face, with Impact Plate


Mf (front) 5.054 tf.m Concrete Cover d1= 7 cm
S 0.000 tf Maka d= 33 cm
ss = Mf/(As*j*d) 1207.62 kgf/cm2 check ss < ssa ? ok
sc = 2*Mf/(k*j*b*d^2) 18.55 kgf/cm2 check sc < sca ? ok
p=As/(b*d) 0.0230
k={(n*p)^2+2*n*p}^0.5 - n*p 0.6347
j= 1-k/3 0.7884

(b) Rear Face, without Impact Plate


Mf (rear) 3.448 tf.m Concrete Cover d1= 10 cm
So 4.587 tf Maka d= 30 cm
ss = Mf/(As*j*d) kgf/cm2 check ss < ssa ?
sc = 2*Mf/(k*j*b*d^2) kgf/cm2 check sc < sca ?
tm = S/(b*j*d) kgf/cm2 check tm < ta ?
p=As/(b*d)
k={(n*p)^2+2*n*p}^0.5 - n*p
j= 1-k/3

(c) Rear Face, with Impact Plate


Mf (rear) 1.113 tf.m Concrete Cover d1= 10 cm
So 1.405 tf Maka d= 30 cm
ss = Mf/(As*j*d) 512.51 kgf/cm2 check ss < ssa ? ok
sc = 2*Mf/(k*j*b*d^2) 9.16 kgf/cm2 check sc < sca ? ok
tm = S/(b*j*d) 0.52 kgf/cm2 check tm < ta ? ok
p=As/(b*d) 0.0027
k={(n*p)^2+2*n*p}^0.5 - n*p 0.3001
j= 1-k/3 0.9000

4. Summary of Design Calculation (Hasil)


Deskripsi Variabel Satuan Sisi Depan Sisi Belakang
Provision on Impact Plate Ya Tidak Ya Remarks
Calculation Condition Normal Normal Seismik

Principle Dimensions
Desain Kekuatan Beton sc kgf/m2 175 175 175
Lebar Efektif Bagian b cm 100 100 100
Tinggi Parapet B2 cm 40 40 40
concrete cover/selimut beton (tensile/tarik) d1 cm 7 10 10
concrete cover (compressive/tekan) d2 cm 0 0 0
Lebar efektif Parapet d cm 33 30 30
Tegangan Ijin Concrete sca kgf/m2 60 60 90 (K175)
Re-Bar ssa kgf/m2 1850 1850 2775
Shearing ta kgf/m2 5.5 5.5 8.25
Yielding Point of Reinforcement Bar ssy kgf/cm2 3000 3000 3000 (Spec >295 N/mm2)

Reinforcement Bar
Tensile Bar (Tarik) Required (butuh) As req. cm2 10.50 2.23
Tensile Bar (Tarik) Designed (dipakai) As cm2 16.08 8.04
D16@125 D16@250
Design Load/Desain Pembebanan
Design Bending Moment (Lentur) Mf tf.m 5.054 3.448 1.113
Design Axis Force (Gaya Sumbu) Nd tf 0.000 0.000 0.000
Shearing Force (Geser) S tf 0.000 4.587 1.405

Checking of Minimum Re-Bar


Cracking Moment/momen retak Mc tf.m 4.172 4.172 4.172
1.7*Mf 8.592 5.861 1.892
1.7*Mf < Mc ? If no, check Mu check Mu ok
Ultimate Bending Moment Mu tf.m 9.311
Mu > Mc ? ok
Max Re-bar As max cm2 66.0 60.0 60.0
Min Re-bar As min cm2 4.5 4.5 4.5
Required Bar As req. cm2 10.500 2.228
Area of Re-bar for Design As cm2 16.085 8.042

Checking of Allowable Stress/tegangan ijin


Rasio Modulus Young n 24 24 16
Tinggi efektif d cm 33 30 30
Compressive Stress (Tekan) sc kgf/cm2 18.55 9.16
Bending Tensile Stress (Lentur Tarik) ss kgf/cm2 1207.62 512.51
Mean Shearing Stress (Geser) tm kgf/cm2 0 0.52
CEK ANALISIS STRUKTUR (PARAPET) BERDASAR INPUT DATA
Parapet (back wall) With Impact Plate Without Impact Plate With Impact Plate
Normal Normal Seismic
Bar arrangement
Back face (batang tarik) f (mm) 13 16
(vertikal) spacing (mm) 250 250
As1 (cm2) 8.04
(batang tekan) f (mm) 16
(vertikal) spacing (mm) 250 ok
As1 (cm2, >As3/2) 8.04 >=8.04
(batang distribusi) f (mm) 13 13 13
(horizontal) spacing (mm) 250 250 ok 250 ok
As2 (cm2, >As1/3) 5.31 >=4.50 5.31 >=4.50
Front face (batang tarik) f (mm) 16
(vertikal) spacing (mm) 125
As3 (cm2, >As1/2) 16.08
(batang tekan) f (mm) 13 16
(vertikal) spacing (mm) 125 ok
As3 (cm2, >As1/2) 16.08 >=4.50
(batang distribusi) f (mm) 13 16 16
(horizontal) spacing (mm) 250 ok 250 ok
As6 (cm2, >As3/3) 8.04 >=5.36 8.04 >=5.36
Desain dimensi
Lebar efektif (lebar satuan) (cm) 100 100
Selimut Beton Sisi Depan (cm) 7
Selimut Beton Sisi Belakang (cm) 10 10
Tinggi efektif (cm) 33 30
Desain Pembebanan Mf (t m) 5.054 1.113
Nd (t) 0.000 0.000
S (t) 0.000 1.405
Cek Tulangan Minimum
Required bar/Tulangan yang dibutuhkan (cm2) 10.50 2.23
Cek Tegangan Ijin
Tegangan Normal/Kompresi 18.55 ok 9.16 ok
Tegangan Lendut 1207.62 ok 512.51 ok
Tegangan Geser 0 ok 0.52 ok

D. IMPACT PLATE AND CORBEL


1. Parameter Desain
Active load T-Load
Impact plate/pelat benturan Length L= 3.00 m Span length Ls = 0.7*L= 2.10 m
Thickness h1= 0.30 m Lebar korbel Lp= 0.30 m
Lebar jalan yang efektif B= 3.00 m Tinggi korbel h2= 0.30 m
Berat satuan pelat gc = 2.40 tf/m3
Berat satuan tanah gs = 1.80 tf/m3 Cover of R-bar
Kedalaman tanah di atas pelat Ds= 0.05 m Pelat tumbuk d1= 5 cm
Ketebalan perkerasan Dp= 0.05 m Corbel d3= 7 cm
2 Computation of Intersectional Force, Corbel

1) Dead Load/beban mati

Impact plate 0.72 tf/m2


Soil above plate 0.09 tf/m2
Total dead load Wd= 0.81 tf/m2

2) Intersectional Force karena Dead Load/beban mati

Md= (1/8)*Wd*Ls^2 0.446513 tf.m

3) Intersectional Force karena Live Load/beban hidup

wL=2*T*(1+ i)/{2.75*(a+2*d)} wL = 33.39051 tf/m2


ML={(1/4)*wL*Ls*(a+2*d)-(1/8)*wL*(a+2*d)^2}*a ML= 5.371698 tf.m

where, ML bending moment due live load


T: wheel load of T-load 10.00 tf
a contact width of T-load 0.20 m
i: impact coefficient
i=20/(50+L)= 0.377
Dp: ketebalan perkerasan 0.05 m
a: Koefisien 1.10

4) Total Intersectional Force

M=Md+ML 5.818211 tf.m

3 Corbel
1) Intersectional Force due Impact Plate

M1=R*bu M1= 3.032 tf.m

where, R reaksi total dari korbel 10.108 tf.m/m


bu lebar korbel =Lp 0.300 m

2) Intersectional Force karena Corbel


M2=(1/6)*(2w1+w2)*gc*bu^2 M2= 0.032 tf.m

where, w1 0.15 m
w2 0.60 m
gc = 2.40 tf/m3
bu 0.30 m

3) Total Intersectional Force


M=M1+M2 3.065 tf.m
3 Calculation of Required Reinforcement Bar for Impact Plate
1) Cracking Moment

Mc= Zc*(s'ck + N/Ac) Mc= 234650 kgf.cm = 2.346 tf.m

where, Mc cracking moment/momen keretakan kgf.cm


Zc section modulus
Zc=b*h1^2/6 15000 cm3
b= 100 cm
s'ck Kekuatan tarik beton (lentur)
s'ck = 0.5*sck^(2/3) 15.643 kgf/cm2
s ck= 175 kgf/cm2
N gaya aksial 0.000 tf
Ac Luasan Beton = b*h1 3000 cm2
h1 thickness of section, impact plate 30 cm

2) Checking of Cracking Moment and Design Bending Moment

Design bending moment Mf 5.818 tf.m

Check Mf & Mc 1.7*Mf>Mc?, if yes check ultimate bending moment


1.7*Mf = 9.891 tf.m
Mc= 2.346 tf.m 1.7*Mf>Mc? Yes, check ultimate bending moment
3) Ultimate Bending Moment

Mu=As*s sy{d-(1/2)*[As*s sy]/[0.85*s ck*b]} Mu= 1039032 kgf.cm = 10.390 tf.m

where, Mu ultimate bending moment tf.m


As Luas Tulangan Tarik cm2
s sy yielding point of tensile bar 3000 kgf/cm2 (Spec >295 N/mm2)
d Tinggi Efektif = h1-cover 25 cm
cover d1= 5 cm
h1= 30 cm
s'ck desain kekuatan tekan beton 175 kgf/cm2
b lebar efektif 100 cm

As=Mf/(s sa*j*d) 14.729 cm2


s sa= Tegangan ijin pada tulangan 1850 kgf/cm2
j= 1 -k/3 (=8/9 ) 0.854
or k = n/{n+s sa/s ca)
n= Rasio modulus Young 24
s ca Tegangan ijin pada beton 60 kgf/cm2

Check Mu & Mc Mu = 10.390 tf.m


Mc = 2.346 tf.m Mu>Mc? ok

4) Bar Arrangement,penentuan tulangan

Checking of single or double bar arrangement

M1= (d/Cs)^2*ssa*b >Mf? M1= 700936 kgf.cm = 7.009 tf.m

where, M1 resistance moment/momen perlawanan


Cs ={2m/[s*(1-s/3)]}^(1/2) 12.844
s (n*sca)/(n*sca+ssa) 0.438
m ssa/sca 30.833
ssa 1850 kgf/cm2
sca 60 kgf/cm2
n 24

Check M1 > Mf? M1= 7.009 tf.m M1>Mf: Design Tensile Bar Only
Mf= 5.818 tf.m
(a) Tensile Bar (Tarik

Max bar area As max = 0.02*b*d = 50.0 cm2


Min bar area As min = b*4.5%= 4.5 cm2 h d
Required bar area As req= 14.729 cm2 d1
Apply f = 16 @ 125 mm
Bar area As = 16.085 cm2 ok

(b) Compressive Bar (Tekan), misal M1<Mf

M' = Mf - M1=ssa*As'*(d - d2)


As' = M'/[ssa*(d - d2)] As'= 0.000 cm2 h
d d2
d= 25 cm M1= 7.009 tf.m
d1
d2= 0 cm Mf= 5.818211 tf.m
ssa= 1850 kgf/cm2

Required bar area As' req= 0.000 cm2


Apply f = 16 @ 250 mm
Bar area As' = 8.042 cm2 ok

5) Cek Tegangan Ijin

(a) Tensile Bar Only (Hanya Tarik)

Mf 5.818211 tf.m
S 0 tf
ss = Mf/(As*j*d) 1683.95 kgf/cm2 check ss < ssa ? ok
sc = 2*Mf/(k*j*b*d^2) 51.3 kgf/cm2 check sc < sca ? ok b

p=As/(b*d) 0.0064 b= 100 cm


k={(n*p)^2+2*n*p}^0.5 - n*p 0.4224 d= 25 cm x=kd
j= 1-k/3 0.8592 n= 24 h d

(b) Tensile Bar & Compressive Bar (Tarik dan Tekan) As


d1
Mf 5.818211 tf.m
S 0.000 tf
sc = Mf/(b*d^2*Lc) 38.86 kgf/cm2 check sc < sca ? ok
ss = n*sc*(1-k)/k 1585.01 kgf/cm2 check ss < ssa ? ok
ss' = n*sc*(k-d2/d)/k 932.64 kgf/cm2 check ss' < ssa ? ok
b
p=As/(bd) 0.0064 d2
p'=As'/(bd) 0.0032
k={n^2(p+p')^2+2n(p+p'*d2/d)}^05-n(p+p') 0.3704 As' x=kd
Lc=(1/2)k(1-k/3)+(np'/k)(k-d2/d)(1-d2/d) 0.2396 h d
b= 100 cm
d= 25 cm As
d2= 0 cm d1
n= 24

4 Perhitungan Kebutuhan Tulangan Untuk Korbel


1) Cracking Moment

Mc= Zc*(s'ck + N/Ac) Mc= 234650 kgf.cm = 2.346 tf.m

where, Mc cracking moment kgf.cm


Zc section modulus
Zc=b*h2^2/6 15000 cm3
b= 100 cm
s'ck Kekuatan tarik beton (lentur)
s'ck = 0.5*sck^(2/3) 15.643 kgf/cm2
s ck= 175 kgf/cm2
N gaya aksial 0 tf
Ac Luasan Beton = b*h1 3000 cm2
h2 thickness of section, impact plate 30 cm

2) Checking of Cracking Moment and Design Bending Moment

Design bending moment Mf 3.065 tf.m

Check Mf & Mc 1.7*Mf>Mc?, Jika ya cek Momen Lentur Ultimate


1.7*Mf = 5.211 tf.m
Mc= 2.346 tf.m 1.7*Mf>Mc? Ya, Cek Momen Lentur Ultimate
3) Ultimate Bending Moment

Mu=As*s sy{d-(1/2)*[As*s sy]/[0.85*s ck*b]} Mu= 560411 kgf.cm = 5.604 tf.m

where, Mu ultimate bending moment tf.m


As area of tensile bar cm2
s sy yielding point of tensile bar 3000 kgf/cm2 (Spec >295 N/mm2)
d tinggi efektif = h1-cover 23 cm
cover d1= 7 cm
h2= 30 cm
s'ck desain kekuatan tekan beton 175 kgf/cm2
b lebar efektif 100 cm

As=Mf/(s sa*j*d) 8.434 cm2


s sa= allowable stress of reinforcement bar 1850 kgf/cm2
j= 1 -k/3 (=8/9 ) 0.854
or k = n/{n+s sa/s ca)
n= Rasio Modulus Young = 12 24
s ca Tegangan Ijin Beton 60 kgf/cm2

Check Mu & Mc Mu = 5.604 tf.m


Mc = 2.346 tf.m Mu>Mc? ok

4) Bar Arrangement/Penentuan Tulangan

Checking of single or double bar arrangement

M1= (d/Cs)^2*ssa*b >Mf? M1= 593272 kgf.cm = 5.933 tf.m

where, M1 resistance moment


Cs ={2m/[s*(1-s/3)]}^(1/2) 12.844
s (n*sca)/(n*sca+ssa) 0.438
m ssa/sca 30.833
ssa 1850 kgf/cm2
sca 60 kgf/cm2
n 24

Check M1 > Mf? M1= 5.933 tf.m M1>Mf: Design Tensile Bar Only
Mf= 3.065 tf.m

(a) Tensile Bar (Tarik)

Max bar area As max = 0.02*b*d = 46.0 cm2


Min bar area As min = b*4.5%= 4.5 cm2
Required bar area As req= 8.434 cm2 h d
Apply f = 16 @ 150 mm d1
Bar area As = 13.404 cm2 ok

5) Checking of Allowable Stress


Mf 3.065 tf.m
So 0.000 tf
ss = Mf/(As*j*d) 1150.32 kgf/cm2 check ss < ssa ? ok
sc = 2*Mf/(k*j*b*d^2) 32.93 kgf/cm2 check sc < sca ? ok

p=As/(b*d) 0.0058
k={(n*p)^2+2*n*p}^0.5 - n*p 0.4072
j= 1-k/3 0.8643

SUMMARY OF DESIGN CALCULATION (HASIL)


Deskripsi Variabel Satuan Impact Plate Corbel Remarks

Principle Dimensions
Desain Kekuatan Beton sc kgf/m2 175 175
Lebar Efektif Bagian/section b cm 100 100
Tinggi Bagian/section h cm 30 30
concrete cover/selimut beton (tensile/tarik) d1 cm 5 7
concrete cover (compressive/tekan) d2 cm - -
Tinggi Efektif Bagian/section d cm 25 23
Tegangan Ijin Concrete sca kgf/m2 60 60 (K175)
Re-Bar ssa kgf/m2 1850 1850
Shearing ta kgf/m2 5.5 5.5
Yielding Point of Reinforcement Bar ssy kgf/cm2 3000 3000 (Spec >295 N/mm2)
Reinforcement Bar
Tensile Bar Required As req. cm2 14.73 8.43
Designed As cm2 16.08 D16@125 13.40 D16@150

Compressive Bar Required As' req. cm2 0.00


Designed As' cm2 8.04 D16@250
Desain Pembebanan
Design Bending Moment (Lentur) Mf tf.m 5.818 3.065
Design Axis Force (Gaya Sumbu) Nd tf - -
Shearing Force (Geser) S tf - -
Checking of Minimum Re-Bar
Cracking Moment Mc tf.m 2.346 5.604
1.7*Mf 9.891 5.211
1.7*Mf<Mc? If "no" check Mu check Mu ok
Ultimate Bending Moment Mu tf.m 10.390
Mu>1.7*Mf? ok
Max Re-bar As max cm2 50.00 46.00
Min Re-bar As min cm2 4.50 4.50
Required Bar As req. cm2 14.73 8.43
Area of Re-bar for Design As cm2 16.08 13.40
Checking of Allowable Stress/Cek Tegangan Ijin
Rasio Modulus Young n 24 24
Tinggi efektif d cm 25 23
Compressive Stress (Tekan) sc kgf/cm2 51.30 ok 32.93 ok
Bending Tensile Stress (Lentur Tarik) ss kgf/cm2 1,683.95 ok 1,150.32 ok
ss' kgf/cm2 - -
Mean Shearing Stress (Geser) tm kgf/cm2 - -

CEK ANALISIS STRUKTUR (IMPACT PLATE AND CORBEL/KONSOL PENDEK)


BERDASAR INPUT DATA
Impact Plate Corbel
Upper Lower Upper Lower
Bar arrangement
(main bar) f (mm) 16 16 16 16
spacing (mm) 250 ok 125 150 300 ok
As1 (cm2) 8.04 >=4.50 16.08 13.40 6.70 >=4.50
(distribution bar) f (mm) 13 13 13 13
spacing (mm) 250 ok 250 ok 250 ok 250 ok
As2 (cm2, >As1/6) 5.31 >=4.50 5.31 >=4.50 5.31 >=4.50 5.31 >=4.50
Desain Dimensi
Lebar efektif (lebar satuan) (cm) 100 100 100 100
Selimut beton (cm) 5 5 7 7
Tinggi efektif (cm) 25 25 23 23
Desain pembebanan Mf (t m) 5.818 3.065
Nd (t) - -
S (t) - -
Cek Tulangan Minimum
Required bar/Tulangan yang dibutuhkan (cm2) 14.73 8.43
Cek Tegangan Ijin
Tegangan Normal/Kompresi 51.30 ok 32.93 ok
Tegangan Lendut 1683.95 ok 1150.32 ok
Tegangan Geser - -
SKEMA

1.50 0.40

D16@200 D30@250
+ 66.50
D16@200
D16@200
1.20
+ 65.70
1.50
D16@200
0.50
D16@200 0.80
D16@200

4.50 D30@250
5.70 D30@250
7.20

D16@200 D16@200
2.50
2.25
D30@250
D30@125

D25@150
D16@150 D16@150 D25@150
+ 60.77
0.50
2.40
1.00
+ 57.70

D25@150 D16@150 D25@150

5.20

1.85 1.50 1.85