Ekonomi Blasting 2018
Ekonomi Blasting 2018
ADVANTAGES :
DISADVANTAGES :
Permit
Environmental
In Certain Condition may produce Boulders,
Damage of Vessel of Dump Truck
BLASTING
Cost Comparison :
BLASTING >< RIPPING ()
But
BLASTING RIPPING
LOADING >< LOADING ()
HAULING HAULING
A. Drilling Cost
Drilling Cost Parameter
Drill Area Preparation Cost
Labour & Pattern Layout Cost
Drill Equipment & Maintenance Cost
Drill Consumable Cost
Grouting Cost
Drilling Cost per meter / hole
Drilling Cost per BCM / tonne
Drilling Cost per hour
B. Explosives Cost
Main Explosives (ANFO & Bulk Explosives)
Surface Initiation
Trunk Line Delay
Detonating Cord
MS. Connector
Down the hole
Primer Cost (Booster & Powergel)
In hole delay
Explosives Cost per BCM / tonne
Explosives Cost per hole
EKONOMI PELEDAKAN (Cost Analysis & Productivity)
C. Charging Cost
Labour Cost per tonne of explosives
Labour Cost per BCM / tonne
Labour Cost per hole
D. Dewatering Cost
Pump Equipment & maintenance cost
Liner cost
Labour cost
Dewatering cost per BCM / tonne
Dewatering cost per hole
E. Miscellaneous Cost
Explosives Magazine
Bulk Explosives Bin
MMU Cost
OSP Cost
Miscellaneous Equipment
EKONOMIPELEDAKAN
EKONOMI PELEDAKAN(Analisa
(AnalisaProductivity)
Productivity)
A. SASARAN OPERATIONAL
Aman
Overall Cost paling murah
Analisa Drilling & Blasting Cost sebagai bagian dari overall
cost yang tidak terpisahkan.
Sempurnakan Blast Design berdasarkan overall
productivity & cost effectiveness.
Drilling Machine Efficiency
B. BLASTING PERFORMANCE
Design peledakan harus didasarkan pada overall
productivity (PF & Cost).
Cost Record (Drilling, Charging, Blasting) harus
diperhatikan pada setiap peledakan.
Dibuat Graph Historical Cost.
EKONOMIPELEDAKAN
EKONOMI PELEDAKAN(Analisa
(AnalisaProductivity)
Productivity)
E. LAIN-LAIN
Toe & Back Break
Hitung BCM Digable
Memodifikasi Design Peledakan
Evaluasi Implikasi Overall Cost terhadap Modifikasi
Design.
EKONOMIPELEDAKAN
EKONOMI PELEDAKAN
PERMINTAAN PASAR
Kebutuhan
primer (bahan
bakar/energi)
dan konsumtif
(perhiasan,
Tingkat kendaraan, dll)
pengetahuan Situasi politik
masyarakat dan
terhadap pertahanan
pemanfaatan nasional
bahan galian
Permintaan Pasar
terhadap Bahan
Galian
Laju
peningkatan Cadangan
jumlah devisa
penduduk
Tingkat
pembangunan
sarana dan
prasarana fisik
PERTIMBANGAN EVALUASI EKONOMI PELEDAKAN
ANTARA LAIN:
Permintaan pasar/konsumen akan
Biaya perawatan
Dapat mengakibatkan
terhadap komponen
in-alignment pemboran
pemboran tinggi pada
pada daerah kontak
batuan yang sangat
perlapisan batuan.
keras dan abrasif. Mineral-mineral berat,
Mempengaruhi
bertekstur halus, BJ
distribusi fragmentasi
dan kuat tekan tinggi
Pemborosan handak hasil peledakan
Biaya peledakan besar memboroskan bit.
mungkin terjadi,
pada batuan yang
karena pengisian celah
keras karena perlu
retakan, rekahan atau
handak dengan
rongga di dalam
strength tinggi.
batuan.
EVALUASI EKONOMI PELEDAKAN – BIAYA PEMBORAN
Adalah kapasitas per daur (cycle) Adalah kapasitas per shift pemboran
pemboran biasanya dinyatakan dalam biasanya dinyatakan dalam:
meter/jam Drillmeter/shift drm/ shift
M3/ shift atau ton/shift
EVALUASI EKONOMI PELEDAKAN – KAPASITAS PEMBORAN JANGKA PENDEK
• Bergerak ke
0’30” • Membor
0’35” • Membor
0’35”
lubang • Mengatur batang bor 1 • Menambah batang bor 2 • Menambah
berikutnya boom dan (5,6 m) batang bor 2 (5,6 m) batang bor 3
feed
1’00” 0’30” 0’30”
1 3 5
7 9 11
•Membor
0’35” •Membor
0’35” •Membor
3’00” •Memasang
batang bor 3 •Menambah batang bor 4 •Menambah batang bor 5 •Melepas penutup
(5,6 m) batang bor 4 (5,6 m) batang bor 5 (5,6 m) batang bor 2 (dummy plug)
6 8 10
Total Daur Total Kedalaman Kapasitas Waktu Waktu
Pemboran Lubang Tembak Pemboran Pemboran Non Pemboran
22’30” 30 m 80 m/jam 15’20” = 68% 7’10” = 32%
EVALUASI EKONOMI PELEDAKAN – KAPASITAS PEMBORAN JANGKA PANJANG
TERJADWAL (SCHEDULED) : S
TERSEDIA (AVAILABLE) : A PERAWATAN (MAINTENANCE) : M
JALAN (OPERATION) : O
PERBAIKAN TAK PERAWATAN
KERJA TERHENTI (IDLE) : I
TERTUNDA (DELAYED) : D TERJADWAL : UM TERJADWAL : SM
(WORKING) : W
Kerja (lancar) Mengisi BBM Diminta standby Waktu perbaikan waktu perbaikan
Ganti bit Tidak ada operator Tunggu suku cadang Tunggu suku cadang
Bersihkan bit tersumbat tanah Makan & istirahat Lain-lain Lain-lain
peledakan Rapat
Mengatur alat berat Hujan berkabut
Tunggu alat muat Lain-lain
Tunggu truck
Pengawasan Rutin
Semprot lub. Bor
Pelumasan
Persiapan posisi alat muat
Pengecdekan awal sbl. Jalan
Lain-lain
07.00
07.30
08.00
08.30
=________________________= =________________________=
JADWAL KERJA
Jumlah batuan
yang dibongkar
Jumlah periode
Susunan shift
Jadwal kerja
INVESTASI
Meliputi :
PEMBELIAN ALAT BOR
PERIODE DEPRESIASI
BUNGA DARI MODAL
BIDANG USAHA
KEBIJAKAN
STRATEGI BISNIS
ALTERNATIF
- AKIBAT-AKIBAT JIKA INVESTASI LAIN PASAR - POTENSI
TIDAK DILAKSANAKAN. - KONSINYUITAS
- SEWA, ATAU PERBAIKAN YANG - TREND PENJUALAN
LAMA. - PESAING
INVESTASI - HARGA
CONTOH MENGHITUNG
BIAYA INVESTASI
BIAYA INVESTASI
BIAYA PERAWATAN
Meliputi :
SUKU CADANG
MATERIAL UNTUK SERVIS (LAYANAN)
UPAH MEKANIK
Tergantung pada :
JENIS BATUAN
PRODUKSI LUBANG PER TAHUN
PROSEDUR SERVIS (premise on worksite)
KETERAMPILAN MEKANIK
UPAH MEKANIK
PERAWATAN ALAT BOR
MISAL :
Gaji total team mekanik = US$ 11,500/tahun
Produksi lubang tembak = 31,300 drm/tahun
Jadi upah mekanik = US$ 0.37/drm
Jumlah batuan
yang dibongkar
Sifat abrasi batuan
Rock drillability
Sirkulasi dari
komponen bor
Specific drilling
Keperluan kopling : Nc = M
(Ac x )
Keterangan :
M = Jumlah batuan yang dibongkar,
= hasil batuan per meter pemboran, / drm
= umur layanan bit, drm
= umur layanan batang bor, drm
= umur layanan kopling, drm
= umur layanan shank adaptor, drm
KONSUMSI KOMPONEN BOR – CONTOH KEPERLUAN KOMPONEN BOR
CONTOH :
Produksi batugamping = 1.000.000 ton/tahun
Produksi lubang tembak = 31.300 drm/tahun
A. DRILLING PATTERN
- Hole Diameter mm 89.0
- Burden Meter 3.7
- Spacing Meter 4.4
- Bench Height Meter 5
- Hole Depth Meter 6
- Angle Degree 0
- Sub Drilling Meter 1
WORKING CONDITION
- Working Schedule HR/Shift 10
Shift/Day 2
Days/Month 25
Month/Year 12
- Non operative time HR/Shift 1
- Long term utilization % 80
- Drill rig availability % 90
CALCULATION RESULT
- Net drill rig out put Drill meter/HR 45
- Shift Capacity Drill meter/Shift 405
- Normal Productivity Drill meter/Month 14,500
A. OPERATION
- Depreciation USD/HR 2.7
- Interest, Tax, Insurance USD/HR 1.51
SUB TOTAL OWNERSHIP COST USD/HR 4.2
B. OPERATION
- Duel Consumption Liter/HR 30
- Fuel Price USD/Liter 0.08
- Fuel Cost USD/HR 2.4
E. SPARE PARTS
- Spare Parts Factor % 40
- Parts Cost USD/HR 1.08
G. LABOUR
- Operator USD/HR 0.92
- Helper USD/HR 0.46
SUB TOTAL LABOUR COST USD/HR 1.38
BIAYA PELEDAKAN
BAHAN PELEDAK
SISTEM PENEMBAKAN
ALAT PENGISIAN (kalau diperlukan)
TENAGA KERJA
BIAYA PELEDAKAN – GEOMETRI PELEDAKAN
ROW 2
ROW 1
h
B L
B = burden
S = spacing
D = diameter lubang bor
h = bench high
Volume / hole = B x S x L
L = depth hole
BIAYA PELEDAKAN – SUMMARY OF OPTIMUM BLAST DESIGN
GEOMETRY :
Burden Stiffness Ratio > 3.5 (Excellent)
Relative Confinement > 1.4 (Confine)
Vertical Energy Distribution > 80% (Even Energy)
Angle Drilling (10o)
S = 1.15 x B
Stemming = 20 – 30 x Ø
Sub Drilling = 8 - 12 x Ø
DELAY CONFIGURATION :
Delay Between Holes in a Row min 3-6 ms per meter Spacing
Delay Between Rows min 12-18 ms per meter Burden
Delay Between Rows min 2-3 x Delay Between Holes in a Row.
Longer Delay (> 100 ms) to maximize Displacement
Longer Delay in Back Row to minimize Back Break
ENVIRONMENTAL :
Use Nonel to minimize Air Blast & Ground Vibration
BIAYA PELEDAKAN
EXPLOSIVES COST
Surface Delay
In Hole Delay
Dewatering Cost
Transpor Cost / Permit Explosives
BIAYA PELEDAKAN – BIAYA BAHAN PELEDAK
TOTAL COST Rp
UNIT COST
BASED ON CRUSHER PRODUCT Rp/LCM
SUMMARY
EXPLOSIVE, MAGNUM & OTHERS Rp
BLASTING ACCESSORIES Rp
PARTS/MAINTENANCE Rp
FUEL, OIL & GREASE Rp
ADMINISTRATION Rp
LABOUR Rp
DEPRECIATION Rp
TRANSPORTATION Rp
CONSULTING & HIRE Rp
TOTAL COST Rp