Air 28
Air 28
10 T u k a n g b e s i Hr 125,000 135,000
11 K e p . t k . b e s i Hr 140,000 150,000
12 T u k a n g c a t Hr 135,000 145,000
13 K e p . t k . c a t Hr 140,000 150,000
14 T u k a n g p l i t u r Hr 135,000 145,000
15 T u k a n g j a l a n Hr 105,000 115,000
16 T u k a n g g a l i Hr 105,000 115,000
18 T k . l e i d e n g Hr 135,000 145,000
20 P e m b . M a s i n i s Hr 150,000 175,000
21 P e n j a g a a p i Hr 105,000 115,000
22 P e n j a g a m a l a m Hr 105,000 115,000
10 X 20 cm m2 50,000 72,000
15 X 15 cm m2 55,000 73,000
20 X 20 cm m2 55,000 74,000
20 X 25 cm m2 56,000 74,000
V.BAHAN CETAK
1 BUIS BETON Ø 10 cm - 100 cm bh 39,000 40,000
Ø 20 cm - 100 cm bh 45,000 50,000
Ø 30 cm - 100 cm bh 64,500 80,000
Ø 50 cm - 100 cm bh 135,000 160,000
Ø 60 cm - 100 cm bh 185,000 215,000
Ø 70 cm - 100 cm bh 250,000 265,000
U 10 cm - 100 cm bh 30,000 32,500
U 15 cm - 100 cm bh 35,000 40,000
U 20 cm - 100 cm bh 39,000 45,000
U 30 cm - 100 cm bh 40,000 55,000
U 50 cm - 100 cm bh 65,000 65,000
VI . B A H A N B E S I
1 BESI BETON besi beton polos kg 10,200 12,150
besi beton prestress kg 14,000 14,600
besi beton ulir kg 13,200 13,500
VII . B A H A N P I P A
1 Pipa PVC SII SCJ , S - 12,5 (10 bar)
Teak wood
IX . B A H A N F I N I S H I N G
1 KAYU
2 TEMBOK
3 BESI
XIII. L A I N - L A I N
1 KREI 25 MM m2 45,000 50,000
2 Sliding Pintu J4 bh 180,000 235,000
3 Naco per Daun bh 12,000 12,500
4 Rolling door Besi m2 300,000 325,000
Rolling door Almunium m2 230,000 275,000
5 Awning Almunium m2 210,000 225,000
6 Kusen Almunium 4" Putih m' 80,000 85,000
7 WIDE FLANGE BEAM
8 ASPAL.
12 LAIN-LAIN
JUMLAH
No. SNI VOL SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM
Rp Rp
A.1 PEKERJAAN TANAH
29 T.08.b.4 1 m3 KEDALAMAN YANG > 3 m untuk setiap penambahan kedalaman 1 m 48,675.00 53,418.75
34 T.09.a.1 1 m3 GALIAN TANAH CADAS ATAU TANAH KERAS BATU Sedalam ≤ 1 m 162,250.00 178,062.50
35 T.09.a.2 1 m3 GALIAN TANAH CADAS ATAU TANAH KERAS Sedalam > 1 m sd 2 m 180,681.60 198,290.40
GALIAN TANAH CADAS ATAU TANAH KERAS BATU Sedalam > 2 m sd 3
36 T.09.a.3 1 m3 194,700.00 213,675.00
m
GALIAN TANAH CADAS ATAU TANAH KERAS > 3 m untuk setiap
37 T.09.b.4 1 m3 12,980.00 14,245.00
penambahan kedalaman 1 m
T.09.b CARA SEMI MEKANIS
38 T.09.b.1 1 m3 GALIAN TANAH CADAS ATAU TANAH KERAS BATU Sedalam ≤ 1 m 174,625.00 193,153.13
39 T.09.b.2 1 m3 GALIAN TANAH CADAS ATAU TANAH KERAS Sedalam > 1 m sd 2 m 66,891.00 74,919.63
45 T.10.a.4 1 m3 GALIAN LUMPUR > 3 m untuk setiap penambahan kedalaman 1 m 19,470.00 21,367.50
49 T.10.b.4 1 m3 GALIAN LUMPUR > 3 m untuk setiap penambahan kedalaman 1 m 5,860.80 6,439.40
53 T.11.a.4 1 m3 GALIAN PASIR > 3 m untuk setiap penambahan kedalaman 1 m 12,980.00 14,245.00
57 T.11.b.4 1 m3 GALIAN PASIR > 3 m untuk setiap penambahan kedalaman 1 m 5,211.80 5,727.15
T.12.a PASANGAN 2 LAPIS SESEG BAMBU, JAT (JARAK ANTAR TIANG) ≤ 1,0
58 (K.3)
1 m2
m'
39,770.50 43,931.25
T.12.b
59 (K.3)
1 m2 PASANGAN PAPAN 3/20, JAT ≤ 1,50 m' 69,204.30 76,860.85
T.12.c
60 (K.3)
1 m2 PASANGAN BALOK KAYU 8/12 , JAT 4 m' 198,848.10 215,202.90
T.12.d
61 1 m2 PASANGAN BALOK KAYU 8/12 , JAT ≤ 6 m' 210,354.10 227,621.90
(K.3)
T.14 TIMBUNAN DAN PEMADATAN
Koefisien pada AHSP T.15.a adalah kondisi normal, untuk hal khusus seperti
angkutan melalui sungai dengan kedalaman s/d 0,5 m dikalikan 1,2; sedang
untuk kedalaman sungai 1 m dikalikan 1,5
AHSP T.15.a ini berlaku pada angkutan material untuk jarak harizontal
(datar) dan termasuk juga medan dengan pelandaian menurun 1V:5H
sampai dengan pelandaian 1V:10H yang dihitung sebagai panjang
lintasannya.
T.15.d Konversi berat material tanah biasa (lepas) kepada jenis material lain
99 T.15.d.1.a 1 m3 ANGKUT MATERIAL DENGAN JARAK ANGKUT 100 M' HORIZONTAL 66,900.00 73,350.00
Contoh perhitungan konversi jenis material dan jarak angkut naik atau turun
113 P.01.e.1 1 m3 BONGKAR PASANGAN BATU & PEMBERSIHAN BATU (MANUAL) 164,406.00 180,125.00
115 P.01.e.3 1 m3 BONGKAR PASANGAN BATU DENGAN JACK HAMMER 99,880.00 110,220.00
128 P.02.f.2 1 m3 BONGKAR PASANGAN BATA MERAH dengan JACK HAMMER 34,760.00 38,390.00
176 P.12.b.1.a 1 m2 Pembabadan Rumput secara umum dan manual 1,622.50 1,780.63
P.12.b.1.b Daerah datar sampai pelandaian naik dengan kemiringan 1V : 1H s/d 2,5V :
180 1 m2 3,245.00 3,561.25
.4 1H
P.12.b.1.b Daerah datar sampai pelandaian naik dengan kemiringan 2,5V : 1H Sampai
181 1 m2 6,490.00 7,122.50
.5 Tegak
182 P.12.b.2.a 1 m2 Perhitungan Secara Umum (Jika medan tidak diketahui secara detail) 519.75 578.49
P.12.b.2.b Perhitungan secara detail (jika diketahui kondisi medan secara detail)
P.12.b.2.b
183 1 m2 Daerah datar sampai pelandaian naik dengan kemiringan 1V : 10H 495.55 550.66
.1
P.12.b.2.b Perhitungan secara detail (jika diketahui kondisi medan secara detail)
P.12.b.2.b Daerah datar sampai pelandaian naik dengan kemiringan 1V : 10H s/d 1V :
184 1 m2 534.52 595.05
.2 2,5H
P.12.b.2.b Daerah datar sampai pelandaian naik dengan kemiringan 1V : 2,5H s/d 1V :
185 1 m2 1,629.87 1,933.58
.3 1H
P.12.b.2.b Daerah datar sampai pelandaian naik dengan kemiringan 1V : 1H s/d 2,5V :
186 1 m2 1,157.31 1,288.27
.4 1H
193 P.14.d 1 bh Pembuatan Blok Beton Berat 0,5 Ton Quatripod, Tetrapod, Dolos Tribar 757,110.11 855,437.35
194 P.14.e 1 bh Pembuatan Blok Beton Berat 0,75 Ton Quatripod, Tetrapod, Dolos Tribar 1,133,074.86 1,280,269.33
195 P.14.f 1 bh Pembuatan Blok Beton Berat 1,00 Ton Quatripod, Tetrapod, Dolos Tribar 1,517,057.68 1,713,986.06
196 P.14.g 1 bh Pembuatan Blok Beton Berat 1,50 Ton Quatripod, Tetrapod, Dolos Tribar 2,229,993.66 2,521,673.75
197 P.14.h 1 bh Pembuatan Blok Beton Berat 2,00 Ton Quatripod, Tetrapod, Dolos Tribar 2,229,993.66 2,521,673.75
200 P.14.k 1 m3 Pemasangan Batu 1 kg - 3 kg, void maks 15% 514,409.50 588,808.00
201 P.14.l 1 m3 Pemasangan Batu 3 kg - 5 kg, void maks 15% 526,350.00 604,450.00
202 P.14.m 1 m3 Pemasangan Batu 5 kg - 10 kg, void maks 20% 590,920.00 674,465.00
203 P.14.n 1 m3 Pemasangan Batu 10 kg - 30 kg, void maks 20% 606,870.00 693,165.00
204 P.14.o 1 m3 Pemasangan Batu 30 kg - 50 kg, void maks 25% 619,410.00 707,465.00
205 P.14.p 1 m3 Pemasangan Batu 50 kg - 100 kg, void maks 25% 635,360.00 724,900.00
206 P.14.q 1 m3 Pemasangan Batu 100 kg - 200 kg, void maks 30% 648,120.00 739,860.00
208 P.14.s 1 m3 Pemasangan Batu 300 kg - 400 kg, void maks 30% 686,180.00 782,815.00
209 P.14.t 1 m3 Pemasangan Batu 400 kg - 500 kg, void maks 35% 686,180.00 782,815.00
210 P.14.u 1 m3 Pemasangan Batu 200 kg - 500 kg, void maks 32% 681,395.00 777,584.50
211 P.14.v 1 m3 Pemasangan Batu 500 kg - 650 kg, void maks 35% 706,915.00 806,492.50
212 P.14.w 1 m3 Pemasangan Batu 650 kg - 800 kg, void maks 35% 716,485.00 817,712.50
B.03 BETON MUTU , fc' = 9,8 Mpa (K.125), SLUMP (12± 2) w/c = 0,78
B.04 BETON MUTU , fc' = 12,2 Mpa (K.150), SLUMP (12± 2) w/c = 0,72
B.05 BETON MUTU , fc' = 14,5 Mpa (K.175), SLUMP (12± 2) w/c = 0,66
B.06 BETON MUTU , fc' = 16,9 Mpa (K.200), SLUMP (12± 2) w/c = 0,61
B.08 BETON MUTU , fc' = 21,7 Mpa (K.250), SLUMP (12± 2) w/c = 0,56
B.09 BETON MUTU , fc' = 16,9 Mpa (K.200), SLUMP (12± 2) w/c = 0,61
BETON MUTU , fc' = 26,4 Mpa (K.300), SLUMP (12± 2) w/c = 0,52 (KEDAP
B.10
AIR)
BETON MUTU , fc' = 31,2 Mpa (K.350), SLUMP (12± 2) w/c = 0,48 (KEDAP
B.12
AIR)
dg Ketinggian/kedalaman < 1m
Manual
241 B.17.b 100 kg Untuk Pembesian Kolom, Balok, Ring Balk dan Sloof 1,696,090.00 1,966,470.00
242 B.18 100 kg Pembesian dengan Jaring Kawat (wire mesh) Untuk Pelat atau Dinding 1,708,025.00 1,737,202.50
10 s/d
245 B.20.b m' Mekanis (penambahan jarak horizontal) 83,022.50 86,680.00
25
247 B.20.c 4 m' Mekanis (penambahan tiap 4 m' jarak vertikal) 107,690.00 115,335.00
249 B.21.b 1 m2 Bekisting Lantai Beton Biasa dengan multipleks 12 mm atau 18 mm (TP) 65,582.00 72,138.00
250 B.21.c 1 m2 Bekisting Lantai Beton Biasa menggunakan papan kayu 3/20 cm (TP) 142,065.00 156,915.00
Perancah Beksiting Lantai menggunakan kaso 5/7 tinggi 4m', JAT (Jarak
251 B.21.d 1 m2 166,375.00 174,735.00
Antar Tiang) ≤ 60 cm
252 B.21.e 1 m2 Perancah Beksiting kayu dolken Ø 8 - 10 cm tinggi 4m', JAT ≤ 80 cm 107,191.70 116,623.65
B.22 FLOORDECK
254 B.22.a 1 m2 Bekisting Lantai Floordeck tipe Pelat (JAP ≤ 0,60 m) 69,685.00 72,633.00
255 B.22.b 1 m2 Bekisting Lantai Floordeck tipe Pelat (JAP ≤ 0,80 m) 67,925.00 70,554.00
256 B.22.c 1 m2 Bekisting Lantai Floordeck tipe Pelat (JAP ≤ 1,20 m) 56,974.50 58,996.30
257 B.22.d 1 m2 Bekisting Lantai Floordeck tipe Pelat (JAP ≤ 2.00 m) 52,453.50 54,206.90
260 B.23.c 1 m2 Bekisting balok beton biasa menggunakan kayu papan 3/20 cm (TP) 200,970.00 218,702.00
Perancah Beksiting balok menggunakan Kaso 5/7 tinggi 4m' dan JAT (Jarak
261 B.23.d 1 m2 134,376.00 142,846.00
Antar Tiang) ≤ 1,00 m
266 B.24.c 1 m2 Bekisting Kolom beton biasa menggunakan kayu papan 3/20 cm, (TP) 186,835.00 203,973.00
Perancah Bekisting Kolom beton menggunakan kayu uk.5/7 cm, tinggi 4m'
267 B.24.d 1 m2 130,141.00 39,100.00
JAT ≤ 1,00 M
Perancah Bekisting Kolom beton dengan bambu Ø 8 -10 cm, tinggi 4m' JAT
269 B.24.f 1 m2 93,032.50 106,557.00
≤ 1,00 M
271 B.25.b 1 m2 Bekisting Dinding beton biasa dengan multipleks 12 mm atau 18 mm (TP) 104,478.00 113,080.00
272 B.25.c 1 m2 Bekisting Dinding beton biasa menggunakan Kayu Papan 3/20 cm 186,120.00 203,522.00
276 B.26.b 1 m2 Bekisting Pondasi dan sloof beton biasa menggunakan papan 3/20 cm 193,215.00 209,935.00
281 B.28.b 100 m2 Menyirami air permukaan beton menggunakan media terpal selama 4 hari 216,040.00 254,210.00
282 B.28.c 100 m2 Menyirami permukaan beton menggunakan media karung goni selama 4 hari 575,300.00 642,950.00
286 B.30.b 1 m' Pasangan Water stop PVC lebar 200 mm 61,231.50 68,326.50
287 B.30.c 1 m' Pasangan Water stop PVC lebar 230 mm - 320 mm 109,549.00 122,606.00
288 B.30.d 1 m' Pasangan Water stop Ruber lebar 150 mm - 200 mm 153,840.50 166,721.50
290 F.02 1 m' Penetrasi Tiang Pancang Kayu atau Dolken Ø 8 - 10 cm 17,506.50 19,563.50
291 F.03 1 m' Penetrasi Tiang Pancang Baja Pipa Ø 30 cm atau Kotak 30 x 30 cm 64,465.50 70,103.00
293 F.04.b 1 m' Penetrasi Tiang Pancang Beton Kotak 25 x 25 cm 100,584.00 110,176.00
294 F.04.c 1 m' Penetrasi Tiang Pancang Beton Kotak 30 x 30 cm 179,982.00 195,723.00
295 F.04.d 1 m' Penetrasi Tiang Pancang Beton Kotak 40 x 40 cm 219,978.00 239,217.00
296 F.04.e 1 m' Penetrasi Tiang Pancang (Hollow) Beton Ø 40 cm 125,730.00 137,720.00
298 F.05.b 1 m' Penetrasi untuk 1 m' lebar turap (10 buah) Papan (2-3) x 10 cm 183,205.00 202,620.00
299 F.05.c 1 m' Penetrasi untuk 1 m' lebar turap (5 buah) Papan (2-3) x 20 cm 166,908.50 183,469.00
300 F.05.d 1 m' Penetrasi untuk 1 m' lebar turap (4 buah) Papan (2-3) x 25 cm 170,104.00 186,681.00
301 F.05.e 1 m' Penetrasi untuk 1 m' lebar turap (3,33 buah) Papan (2-3) x 30 cm 138,297.50 152,427.00
302 F.05.f 1 m' Penetrasi untuk 1 m' lebar turap (4 buah) Kayu Kaso 5/7 tebal 5 cm 147,295.50 163,443.50
303 F.05.g 1 m' Penetrasi untuk 1 m' lebar turap (20 buah) Kayu Kaso 5/7 tebal 7 cm 130,999.00 144,292.50
304 F.05.h 1 m' Penetrasi untuk 1 m' lebar turap (8 buah) Kayu Balok 8/12 tebal 8 cm 183,205.00 202,620.00
305 F.05.i 1 m' Penetrasi untuk 1 m' lebar turap (12,5 buah) Kayu Balok 8/12 tebal 12 cm 166,908.50 183,469.00
307 F.06.b 1 m' Penetrasi untuk 1 m' lebar Turap (7 buah) Baja Profil INP-8 + UNP-8 113,410.00 122,980.00
308 F.06.c 1 m' Penetrasi untuk 1 m' lebar Turap (5,56 buah) Baja Profil INP- 10 + UNP- 10 127,479.00 137,890.50
310 F.07.b 1 m' Penetrasi 1 buah Turap Beton Precast 15 x 40 cm 98,384.00 110,176.00
311 F.07.c 1 m' Penetrasi 1 buah Turap Beton Precast 22 x 50 cm 122,980.00 137,720.00
B BAHAN - -
C PERALATAN
D Jumlah A + B + C 7,080.00 7,770.00
E OVERHEAD & PROFIT (CONTOH) 10% 708.00 777.00
F Harga Satuan Pekerjaan (D+E) 7,788.00 8,547.00
B BAHAN - -
- -
C PERALATAN 3,000 3,500
0.100 hari Chainswaw 30,000 35,000 3,000 3,500
D Jumlah A + B + C 26,600.00 29,400.00
E OVERHEAD & PROFIT (CONTOH) 10% 2,660.00 2,940.00
F Harga Satuan Pekerjaan (D+E) 29,260.00 32,340.00
103,784.72 117,210.38
179,362.15 201,600.39
[Path]
B BAHAN - -
C PERALATAN - -
D Jumlah A + B + C 66,434.00 72,908.50
E OVERHEAD & PROFIT (CONTOH) 10% 6,643.40 7,290.85
F Harga Satuan Pekerjaan (D+E) 73,077.40 80,199.35
B BAHAN - -
C PERALATAN - -
D Jumlah A + B + C 79,650.00 87,412.50
E OVERHEAD & PROFIT (CONTOH) 10% 7,965.00 8,741.25
F Harga Satuan Pekerjaan (D+E) 87,615.00 96,153.75
B BAHAN - -
C PERALATAN - -
D Jumlah A + B + C 89,680.00 98,420.00
E OVERHEAD & PROFIT (CONTOH) 10% 8,968.00 9,842.00
F Harga Satuan Pekerjaan (D+E) 98,648.00 108,262.00
B BAHAN - -
C PERALATAN - -
D Jumlah A + B + C 8,850.00 9,712.50
E OVERHEAD & PROFIT (CONTOH) 10% 885.00 971.25
F Harga Satuan Pekerjaan (D+E) 9,735.00 10,683.75
B BAHAN - -
- - -
C PERALATAN - -
- -
B BAHAN - -
- - -
C PERALATAN - -
- - -
B BAHAN - -
- -
C PERALATAN - -
- -
[Path]
B BAHAN - -
- - -
C PERALATAN - -
- -
B BAHAN - -
- - -
C PERALATAN - -
- - -
B BAHAN - -
- -
C PERALATAN - -
- -
B BAHAN - -
- -
C PERALATAN - -
- -
B BAHAN - -
- - -
C PERALATAN - -
- -
B BAHAN - -
- - -
C PERALATAN - -
- - -
B BAHAN - -
- -
C PERALATAN - -
- -
B BAHAN - -
- -
C PERALATAN - -
- -
B BAHAN - -
- -
C PERALATAN - -
- -
B BAHAN - -
- - -
C PERALATAN - -
- - -
B BAHAN - -
- -
C PERALATAN - -
- -
B BAHAN - -
- -
C PERALATAN - -
- -
B BAHAN - -
- -
C PERALATAN - -
- -
B BAHAN - -
- - -
C PERALATAN - -
- - -
B BAHAN - -
- -
C PERALATAN - -
- -
B BAHAN - -
- -
C PERALATAN - -
- -
catatan :
** coret yang tidak perlu sesuai rencana pelaksanaan di lapangan
* bahan yang digunakan berulang kali
ke - 1 ; koefisien seseg bambu 2,200
ke - 2 ; koefisien seseg bambu 1,485
ke - 3 ; koefisien seseg bambu 1,127
59 T.12.b (K.3) 1 m2 PASANGAN PAPAN 3/20, JAT ≤ 1,50 m' 69,204.30 76,860.85
catatan :
** coret yang tidak perlu sesuai rencana pelaksanaan di lapangan 43a
* bahan yang digunakan berulang kali
ke - 1 ; koefisien menjadi kayu papan 0,0321
ke - 2 ; koefisien menjadi kayu papan 0,01926
ke - 3 ; koefisien menjadi kayu papan 0,01284
ke - 4 ; koefisien menjadi kayu papan 0,00963
60 T.12.c (K.3) 1 m2 PASANGAN BALOK KAYU 8/12 , JAT 4 m' 198,848.10 215,202.90
catatan :
** coret yang tidak perlu sesuai rencana pelaksanaan di lapangan
* bahan yang digunakan berulang kali
ke - 1 ; koefisien menjadi kayu balok 0,126
ke - 2 ; koefisien menjadi kayu balok 0,0681
ke - 3 ; koefisien menjadi kayu balok 0,0391
ke - 4 ; koefisien menjadi kayu balok 0,0246
ke - 5 ; koefisien menjadi kayu balok 0,0174
T.12 PERKUATAN DINDING GALIAN
Penggunaan perkuatan dinding galian dilakukan dalam rangka sistem manajemen keselamatan dan kesehatan kerja (SMK3). Sesuai dengan Peraturan Menteri PU
No.5/PRT/M/2014 tentang SMK3.Keperluan Konstruksi perkuatan dinding disesuaikan dengan ketentuan pada spesifikasi teknis, jika tidak ditentukan perlu mempertimbangkan
hal-hal sebagai berikut :
a). perkuatan diding galian sangat tergantung pada potensi kelongsoran dinding galian tanahnya, untuk tanah cadas/keras apabila batu pada umumnya tidak diperlukan
perkuatan, Hal ini sering dilakukan pada tanah biasa, tanah berbatu atau pada galian yang mempunyai potensi longsor terutama jika kedalaman galiannya lebih dari 2 m.
Namun prakteknya galian saluran ataupun pemasangan pipa, gorong-gorong ataui box culvert untuk kedalaman galian > 1 m' saja biasa dilakukan perkuatan dinding galian.
b). Pelaksanaan perkuatan dinding galian, umumnya hanya bersifat sementara saja sehingga konstruksi perkuatan dinding galian ini setelah selesai terus dilakukan pencabutan
dan pemindahan ke ruas pekerjaan yang lainnya. Sehubungan dengan hal tersebut, beberapa jenis material sering terjadi kerusakan sehingga diperlukan penambahan
material disesuaikan dengan potensi kerusakannya.
Dengan asumsi pemakian bahan / material secara berulang, penggunaan material dihitung berdasarkan Tabel II.A.1 berikut ini :
Tabel II.A.1 Koefisien Penggunaan Berulang Bahan/Material
NO. BAHAN 1 m' PALING BAWAH SETIAP PENAMBAHAN TINGGI 1 m' JARAK
a) b) c) d) e) f) g) h) i) j) TIANG
BAHAN PEKERJA TUKANG MANDOR PERALATAN BAHAN PEKERJA TUKANG MANDOR PERALATAN (m)
- DIPAKAI KE 2 0.02840 m3 0.860 0.430 0.086 0.0101 m3 0.800 0.300 0.080 0.120
4.080 kg 1.000 OH 0.500 OH 0.100 OH 0.120 2.720 kg 0.72 OH 0.38 OH 0.072 OH 0.110 0.8
2.970 kg 1.980 kg
7.200 kg 1.200 OH 0.600 OH 0.120 OH 0.100 2.720 kg 0.86 OH 0.43 OH 0.086 OH 0.090 1
5.240 kg 1.980 kg
b) DINDING PERKUATAN
a) b) c) d) e) f) g) h) i) j)
BAHAN PEKERJA TUKANG MANDOR PERALATAN BAHAN PEKERJA TUKANG MANDOR PERALATAN
KE-2 1.80 m2 0.400 0.200 0.040 1.50 m2 0.300 0.150 0.030 0.050
KE-2 0.034 m3 0.500 OH 0.250 OH 0.050 OH 0.06 0.028 m3 0.376 OH 0.188 OH 0.0375 OH 0.070
KE-2 0.130 m3 0.480 OH 0.230 OH 0.045 OH 0.09 0.108 m3 0.338 OH 0.169 OH 0.0338 OH 0.080
TABEL KOEFISIEN PEKERJAAN & BAHAN PERKUATAN DINDING GALIAN DENGAN TURAP
A.3
NO. BAHAN 1 m' PALING BAWAH SETIAP PENAMBAHAN TINGGI 1 m' JARAK
a) b) c) d) e) f) g) h) i) j) TIANG
BAHAN PEKERJA TUKANG MANDOR PERALATAN BAHAN PEKERJA TUKANG MANDOR PERALATAN (m)
KE-2 0.033488 m3 0.840 0.280 0.084 0.022326 m3 0.570 0.190 0.057 0.070
KE-2 0.061236 m3 1.280 OH 0.420 OH 0.126 OH 0.12 0.040824 m3 0.84 OH 0.28 OH 0.064 OH 0.06 5
20.62 kg 1.500 oh 0.500 OH 0.150 OH 0.15 13.75 kg 1.2 OH 0.4 OH 0.12 OH 0.11 5
15.00 kg 10.00 kg
28.860 kg 2.100 OH 0.700 OH 0.210 OH 0.160 19.220 kg 1.5 OH 0.5 OH 0.15 OH 0.120 5
21.000 kg 14.000 kg
39.520 kg 3.000 OH 1.000 OH 0.300 OH 0.240 26.350 kg 2.1 OH 0.7 OH 0.21 OH 0.180 5
28.750 kg 19.160 kg
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
1 2 3 4 5 6 7 8 9=4X7 10 = 4 X 8
C PERALATAN - -
Koefisien pada AHSP T.15.a adalah kondisi normal, untuk hal khusus seperti angkutan melalui sungai dengan kedalaman s/d 0,5 m dikalikan 1,2; sedang untuk kedalaman
sungai 1 m dikalikan 1,5
T.15.a. ANGKUTAN MATERIAL DAN ATAU HASIL GALIAN UNTUK JARAK HARIZONTAL (DATAR)
AHSP T.15.a ini berlaku pada angkutan material untuk jarak harizontal (datar) dan termasuk juga medan dengan pelandaian menurun 1V:5H sampai dengan pelandaian
1V:10H yang dihitung sebagai panjang lintasannya.
MENGANGKUT MATERIAL ATAU DAN HASIL GALIAN DG
66 T.15.a.1 1 m3 30,417.20 33,349.80
JARAK ANGKUT 5 m
A TENAGA 27,652.00 30,318.00
L.01 0.2480 OH Pekerja 105,000 115,000 26,040.00 28,520.00
L.04 0.0124 OH Mandor 130,000 145,000 1,612.00 1,798.00
B BAHAN - -
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
1 2 3 4 5 6 7 8 9=4X7 10 = 4 X 8
C PERALATAN - -
C PERALATAN - -
D Jumlah A + B + C 47,053.00 51,589.50
E OVERHEAD & PROFIT (CONTOH) 10% 4,705.30 5,158.95
F Harga Satuan Pekerjaan (D+E) 51,758.30 56,748.45
C PERALATAN - -
10 Pipa Beton (tidak bertulang) Fc’ = 12,5 Mpa 2,25 - 2,50 2.40 0.9
11 Pipa Beton (bertulang 155 kg besi / m3) 2,35 - 2,55 2.50 0.9
Keterangan :
* Berat isi lepas ** Hasil pemecah batu mulai dari 1,20 ton/m3
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
1 2 3 4 5 6 7 8 9=4X7 10 = 4 X 8
JIKA BIAYA ANGKUTAN DIMASUKKAN DALAM HSD - BAHAN
T.15.d.1
(DIHITUNG TANPA OVERHEAD + KEUNTUNGAN)
Contoh perhitungan konversi jenis material dan jarak angkut naik atau turun
ANGKUT MATERIAL DENGAN JARAK ANGKUT 100 M'
99 T.15.d.1.a 1 m3 66,900.00 73,350.00
HORIZONTAL
A TENAGA 66,900.00 73,350.00
L.01 0.6000 OH Pekerja 105,000 115,000 63,000.00 69,000.00
L.04 0.0300 OH Mandor 130,000 145,000 3,900.00 4,350.00
B BAHAN - -
- -
C PERALATAN - -
- -
D Jumlah A + B + C 66,900.00 73,350.00
HSP angkut 1m3 agregat kasar atau koral = 1,00 x 1,26/1,10 x HSP angkut 1 m3 tanah lepas
HSP angkut 50 kg angkut jarak horizontal = 1,00 x 0,05/1,10 X hps angkut 1 m3 tanah lepas
HSP angkut 100 kg besi beton = 0,70 x 0,1/1,10 X hps angkut 1 m3 tanah lepas
HSP angkut 100 kg GIP = 0,80 x 0,1/1,10 X hps angkut 1 m3 tanah lepas
HSP angkut 100 kg PIPA PVC = 0,90 x 0,1/1,10 X hps angkut 1 m3 tanah lepas
HSP angkut 1m3 agregat kasar atau koral = 1,00 x 1,26/1,10 x HSP angkut 1 m3 tanah lepas
HSP angkut 100 kg besi beton = 0,70 x 0,1/1,10 X hps angkut 1 m3 tanah lepas
HSP angkut 100 kg GIP = 0,80 x 0,1/1,10 X hps angkut 1 m3 tanah lepas
HSP angkut 100 kg PIPA PVC = 0,90 x 0,1/1,10 X hps angkut 1 m3 tanah lepas
HSP angkut 1m3 agregat kasar atau koral = 1,00 x 1,26/1,10 x HSP angkut 1 m3 tanah lepas
HSP angkut 100 kg besi beton = 0,70 x 0,1/1,10 X hps angkut 1 m3 tanah lepas
HSP angkut 100 kg GIP = 0,80 x 0,1/1,10 X hps angkut 1 m3 tanah lepas
HSP angkut 100 kg PIPA PVC = 0,90 x 0,1/1,10 X hps angkut 1 m3 tanah lepas
Contoh perhitungan konversi jenis material dan jarak angkut naik atau turun
102 T.15.d.2.a 1 m3 JARAK ANGKUT HORIZONTAL 100 M 73,590.00 80,685.00
JARAK ANGKUT MATERIAL DENGAN JARAK ANGKUT
T.15.d.6
100 M'
A TENAGA 66,900.00 73,350.00
L.01 0.6000 OH Pekerja 105,000 115,000 63,000.00 69,000.00
L.04 0.0300 OH Mandor 130,000 145,000 3,900.00 4,350.00
B BAHAN - -
- -
C PERALATAN - -
- -
D Jumlah A + B + C 66,900.00 73,350.00
E OVERHEAD & PROFIT (CONTOH) 10% 6,690.00 7,335.00
F Harga Satuan Pekerjaan (D+E) 73,590.00 80,685.00
HSP angkut 1m3 agregat kasar atau koral = 1,00 x 1,26/1,10 x HSP angkut 1 m3 tanah lepas
HSP angkut 50 kg angkut jarak horizontal = 1,00 x 0,05/1,10 X hps angkut 1 m3 tanah lepas
HSP angkut 100 kg besi beton = 0,70 x 0,1/1,10 X hps angkut 1 m3 tanah lepas
HSP angkut 100 kg GIP = 0,80 x 0,1/1,10 X hps angkut 1 m3 tanah lepas
HSP angkut 100 kg PIPA PVC = 0,90 x 0,1/1,10 X hps angkut 1 m3 tanah lepas
HSP angkut 1m3 agregat kasar atau koral = 1,00 x 1,26/1,10 x HSP angkut 1 m3 tanah lepas
HSP angkut 100 kg besi beton = 0,70 x 0,1/1,10 X hps angkut 1 m3 tanah lepas
HSP angkut 100 kg GIP = 0,80 x 0,1/1,10 X hps angkut 1 m3 tanah lepas
HSP angkut 100 kg PIPA PVC = 0,90 x 0,1/1,10 X hps angkut 1 m3 tanah lepas
HSP angkut 1m3 agregat kasar atau koral = 1,00 x 1,26/1,10 x HSP angkut 1 m3 tanah lepas
HSP angkut 100 kg besi beton = 0,70 x 0,1/1,10 X hps angkut 1 m3 tanah lepas
HSP angkut 100 kg GIP = 0,80 x 0,1/1,10 X hps angkut 1 m3 tanah lepas
HSP angkut 100 kg PIPA PVC = 0,90 x 0,1/1,10 X hps angkut 1 m3 tanah lepas
115 P.01.e.3 1 m3 BONGKAR PASANGAN BATU DENGAN JACK HAMMER 99,880.00 110,220.00
A TENAGA 70,800.00 77,700.00
L.01 0.60 OH Pekerja 105,000 115,000 63,000.00 69,000.00
L.04 0.06 OH Mandor 130,000 145,000 7,800.00 8,700.00
B BAHAN - -
C PERALATAN 20,000.00 22,500.00
0.050 hr Jack Hammer 400,000 450,000 20,000.00 22,500.00
D Jumlah A + B + C 90,800.00 100,200.00
E OVERHEAD & PROFIT (CONTOH) 10% 9,080.00 10,020.00
F Harga Satuan Pekerjaan (D+E) 99,880.00 110,220.00
140 P.06.a.1.b 2 m3 Kawat Bronjong galvanis dg kawat anyaman tiga 1,584,286.00 1,787,511.00
lilitan Uk.3,0 mm, kwat sisi 4,0 mm dan kawat
pengikat 2,0mm, ukuran lobang heksagonal 100 x 120 mm
A TENAGA 373,290.00 405,685.00
L.01 1.680 OH Pekerja 105,000 115,000 176,400.00 193,200.00
L.02 0.560 OH Tukang Batu 135,000 145,000 75,600.00 81,200.00
L.03 0.650 OH Kepala Tukang 140,000 150,000 91,000.00 97,500.00
L.04 0.233 OH Mandor 130,000 145,000 30,290.00 33,785.00
B BAHAN 1,066,970.00 1,219,325.00
2.60 m3 Batu 290,000 340,000 754,000.00 884,000.00
22.355 kg Kawat Bronjong Ø 3 mm 14,000 15,000 312,970.00 335,325.00
C PERALATAN - -
- -
D Jumlah A + B + C 1,440,260.00 1,625,010.00
E OVERHEAD & PROFIT (CONTOH) 10% 144,026.00 162,501.00
F Harga Satuan Pekerjaan (D+E) 1,584,286.00 1,787,511.00
141 P.06.a.1.c 2 m3 Kawat Bronjong wire mesh 5 mm ulir dan kawat 2,091,265.00 2,337,115.00
pengikat 2,0mm, ukuran lobang heksagonal 100 x 100 mm
A TENAGA 613,050.00 668,400.00
L.01 2.865 OH Pekerja 105,000 115,000 300,825.00 329,475.00
L.02 0.955 OH Tukang Batu 135,000 145,000 128,925.00 138,475.00
L.03 0.650 OH Kepala Tukang 140,000 150,000 91,000.00 97,500.00
L.04 0.710 OH Mandor 130,000 145,000 92,300.00 102,950.00
B BAHAN 1,288,100.00 1,456,250.00
2.60 m3 Batu 290,000 340,000 754,000.00 884,000.00
38.15 kg Kawat Bronjong Ø 2,7 mm 14,000 15,000 534,100.00 572,250.00
C PERALATAN - -
- -
D Jumlah A + B + C 1,901,150.00 2,124,650.00
E OVERHEAD & PROFIT (CONTOH) 10% 190,115.00 212,465.00
F Harga Satuan Pekerjaan (D+E) 2,091,265.00 2,337,115.00
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
1 2 3 4 5 6 7 8 9=4X7 10 = 4 X 8
P.06.a.2 Bentuk I, tipe B Bronjong kawat
Uk.L=3.0m x B=1.0m x T=1.0m berisi Batu (buat sendiri)
142 P.06.a.2.a 3 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 3,026,025.20 3,395,425.00
Uk.2,70 mm, kwat sisi 3,40 mm dan kawat pengikat
2,0mm, ukuran lobang heksagonal 80 x 100 mm
A TENAGA 1,093,920.00 1,188,380.00
L.01 4.740 OH Pekerja 105,000 115,000 497,700.00 545,100.00
L.02 1.580 OH Tukang Batu 135,000 145,000 213,300.00 229,100.00
L.03 2.100 OH Kepala Tukang 140,000 150,000 294,000.00 315,000.00
L.04 0.684 OH Mandor 130,000 145,000 88,920.00 99,180.00
B BAHAN 1,657,012.00 1,898,370.00
4.20 m3 Batu 290,000 340,000 1,218,000.00 1,428,000.00
31.358 kg Kawat Bronjong Ø 2,7 mm 14,000 15,000 439,012.00 470,370.00
C PERALATAN - -
- -
D Jumlah A + B + C 2,750,932.00 3,086,750.00
E OVERHEAD & PROFIT (CONTOH) 10% 275,093.20 308,675.00
F Harga Satuan Pekerjaan (D+E) 3,026,025.20 3,395,425.00
143 P.06.a.2.b 3 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 2,341,321.40 2,643,338.50
Uk.3,0 mm, kwat sisi 4,0 mm dan kawat pengikat
2,0mm, ukuran lobang heksagonal 100 x 120 mm
A TENAGA 545,330.00 592,595.00
L.01 2.430 OH Pekerja 105,000 115,000 255,150.00 279,450.00
L.02 0.810 OH Tukang Batu 135,000 145,000 109,350.00 117,450.00
L.03 0.975 OH Kepala Tukang 140,000 150,000 136,500.00 146,250.00
L.04 0.341 OH Mandor 130,000 145,000 44,330.00 49,445.00
B BAHAN 1,583,144.00 1,810,440.00
3.90 m3 Batu 290,000 340,000 1,131,000.00 1,326,000.00
32.296 kg Kawat Bronjong Ø 3 mm 14,000 15,000 452,144.00 484,440.00
C PERALATAN - -
- -
D Jumlah A + B + C 2,128,474.00 2,403,035.00
E OVERHEAD & PROFIT (CONTOH) 10% 212,847.40 240,303.50
F Harga Satuan Pekerjaan (D+E) 2,341,321.40 2,643,338.50
144 P.06.a.2.c 3 m3 Kawat Bronjong wire mesh 5 mm ulir & kawat pengikat 2,996,345.00 3,351,095.00
2,0mm, ukuran lobang heksagonal 100 x 100 mm
A TENAGA 821,550.00 893,950.00
L.01 4.125 OH Pekerja 105,000 115,000 433,125.00 474,375.00
L.02 1.375 OH Tukang Batu 135,000 145,000 185,625.00 199,375.00
L.03 0.975 OH Kepala Tukang 140,000 150,000 136,500.00 146,250.00
L.04 0.510 OH Mandor 130,000 145,000 66,300.00 73,950.00
B BAHAN 1,902,400.00 2,152,500.00
3.90 m3 Batu 290,000 340,000 1,131,000.00 1,326,000.00
55.10 kg Kawat Bronjong Ø 2,7 mm 14,000 15,000 771,400.00 826,500.00
C PERALATAN - -
D Jumlah A + B + C 2,723,950.00 3,046,450.00
E OVERHEAD & PROFIT (CONTOH) 10% 272,395.00 304,645.00
F Harga Satuan Pekerjaan (D+E) 2,996,345.00 3,351,095.00
146 P.06.a.3.b 4 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 3,081,383.80 3,480,911.50
Uk.3,0 mm, kwat sisi 4,0 mm dan kawat pengikat
2,0mm, ukuran lobang heksagonal 100 x 120 mm
A TENAGA 701,940.00 762,910.00
L.01 3.180 OH Pekerja 105,000 115,000 333,900.00 365,700.00
L.02 1.060 OH Tukang Batu 135,000 145,000 143,100.00 153,700.00
L.03 1.200 OH Kepala Tukang 140,000 150,000 168,000.00 180,000.00
L.04 0.438 OH Mandor 130,000 145,000 56,940.00 63,510.00
B BAHAN 2,099,318.00 2,401,555.00
5.20 m3 Batu 290,000 340,000 1,508,000.00 1,768,000.00
42.237 kg Kawat Bronjong Ø 3 mm 14,000 15,000 591,318.00 633,555.00
C PERALATAN - -
D Jumlah A + B + C 2,801,258.00 3,164,465.00
E OVERHEAD & PROFIT (CONTOH) 10% 280,125.80 316,446.50
F Harga Satuan Pekerjaan (D+E) 3,081,383.80 3,480,911.50
147 P.06.a.3.c 4 m3 Kawat Bronjong wire mesh 5 mm ulir & kawat 3,956,150.00 4,426,015.00
pengikat 2,0mm uk. lobang heksagonal 100x100 mm
A TENAGA 1,079,100.00 1,174,150.00
L.01 5.400 OH Pekerja 105,000 115,000 567,000.00 621,000.00
L.02 1.800 OH Tukang Batu 135,000 145,000 243,000.00 261,000.00
L.03 1.300 OH Kepala Tukang 140,000 150,000 182,000.00 195,000.00
L.04 0.670 OH Mandor 130,000 145,000 87,100.00 97,150.00
B BAHAN 2,517,400.00 2,849,500.00
5.20 m3 Batu 290,000 340,000 1,508,000.00 1,768,000.00
72.10 kg Kawat Bronjong Ø 2,7 mm 14,000 15,000 1,009,400.00 1,081,500.00
C PERALATAN - -
- -
D Jumlah A + B + C 3,596,500.00 4,023,650.00
E OVERHEAD & PROFIT (CONTOH) 10% 359,650.00 402,365.00
F Harga Satuan Pekerjaan (D+E) 3,956,150.00 4,426,015.00
150 P.06.a.4.c 1 m3 Kawat Bronjong wire mesh 5 mm ulir & kawat pengikat 1,233,045.00 1,370,154.50
2,0mm, ukuran lobang heksagonal 100 x 100 mm
A TENAGA 372,530.00 405,645.00
L.01 1.980 OH Pekerja 105,000 115,000 207,900.00 227,700.00
L.02 0.660 OH Tukang Batu 135,000 145,000 89,100.00 95,700.00
L.03 0.325 OH Kepala Tukang 140,000 150,000 45,500.00 48,750.00
L.04 0.231 OH Mandor 130,000 145,000 30,030.00 33,495.00
B BAHAN 748,420.00 839,950.00
1.30 m3 Batu 290,000 340,000 377,000.00 442,000.00
26.53 kg Kawat Bronjong Ø 2,7 mm 14,000 15,000 371,420.00 397,950.00
C PERALATAN - -
D Jumlah A + B + C 1,120,950.00 1,245,595.00
E OVERHEAD & PROFIT (CONTOH) 10% 112,095.00 124,559.50
F Harga Satuan Pekerjaan (D+E) 1,233,045.00 1,370,154.50
152 P.06.a.5.b 1.5 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 1,754,737.60 1,955,426.00
Uk.3,0 mm, kwat sisi 4,0 mm dan kawat pengikat
2,0mm, ukuran lobang heksagonal 100 x 120 mm
A TENAGA 712,700.00 775,000.00
L.01 3.390 OH Pekerja 105,000 115,000 355,950.00 389,850.00
L.02 1.130 OH Tukang Batu 135,000 145,000 152,550.00 163,850.00
L.03 1.050 OH Kepala Tukang 140,000 150,000 147,000.00 157,500.00
L.04 0.440 OH Mandor 130,000 145,000 57,200.00 63,800.00
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
1 2 3 4 5 6 7 8 9=4X7 10 = 4 X 8
B BAHAN 882,516.00 1,002,660.00
1.95 m3 Batu 290,000 340,000 565,500.00 663,000.00
22.644 kg Kawat Bronjong Ø 3 mm 14,000 15,000 317,016.00 339,660.00
C PERALATAN - -
- -
D Jumlah A + B + C 1,595,216.00 1,777,660.00
E OVERHEAD & PROFIT (CONTOH) 10% 159,521.60 177,766.00
F Harga Satuan Pekerjaan (D+E) 1,754,737.60 1,955,426.00
153 P.06.a.5.c 1.5 m3 Kawat Bronjong wire mesh 5 mm ulir & kawat pengikat 2,334,838.00 2,583,515.00
2,0mm, ukuran lobang heksagonal 100 x 100 mm
A TENAGA 1,016,400.00 1,106,350.00
L.01 5.250 OH Pekerja 105,000 115,000 551,250.00 603,750.00
L.02 1.750 OH Tukang Batu 135,000 145,000 236,250.00 253,750.00
L.03 1.050 OH Kepala Tukang 140,000 150,000 147,000.00 157,500.00
L.04 0.630 OH Mandor 130,000 145,000 81,900.00 91,350.00
B BAHAN 1,106,180.00 1,242,300.00
1.95 m3 Batu 290,000 340,000 565,500.00 663,000.00
38.620 kg Kawat Bronjong Ø 2,7 mm 14,000 15,000 540,680.00 579,300.00
C PERALATAN - -
D Jumlah A + B + C 2,122,580.00 2,348,650.00
E OVERHEAD & PROFIT (CONTOH) 10% 212,258.00 234,865.00
F Harga Satuan Pekerjaan (D+E) 2,334,838.00 2,583,515.00
155 P.06.a.6.b 2 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 1,797,305.40 2,017,697.00
Uk.3,0 mm, kwat sisi 4,0 mm & kawat pengikat
2,0mm, ukuran lobang heksagonal 100 x 120 mm
A TENAGA 463,820.00 504,455.00
L.01 2.235 OH Pekerja 105,000 115,000 234,675.00 257,025.00
L.02 0.745 OH Tukang Batu 135,000 145,000 100,575.00 108,025.00
L.03 0.650 OH Kepala Tukang 140,000 150,000 91,000.00 97,500.00
L.04 0.289 OH Mandor 130,000 145,000 37,570.00 41,905.00
B BAHAN 1,170,094.00 1,329,815.00
2.60 m3 Batu 290,000 340,000 754,000.00 884,000.00
29.721 kg Kawat Bronjong Ø 3 mm 14,000 15,000 416,094.00 445,815.00
C PERALATAN - -
D Jumlah A + B + C 1,633,914.00 1,834,270.00
E OVERHEAD & PROFIT (CONTOH) 10% 163,391.40 183,427.00
F Harga Satuan Pekerjaan (D+E) 1,797,305.40 2,017,697.00
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
1 2 3 4 5 6 7 8 9=4X7 10 = 4 X 8
156 P.06.a.6.c 2 m3 Kawat Bronjong wire mesh 5 mm ulir&kawat pengikat 2,331,043.00 2,593,690.00
2,0mm, ukuran lobang heksagonal 100 x 100 mm
A TENAGA 655,050.00 713,100.00
L.01 3.405 OH Pekerja 105,000 115,000 357,525.00 391,575.00
L.02 1.135 OH Tukang Batu 135,000 145,000 153,225.00 164,575.00
L.03 0.650 OH Kepala Tukang 140,000 150,000 91,000.00 97,500.00
L.04 0.410 OH Mandor 130,000 145,000 53,300.00 59,450.00
B BAHAN 1,464,080.00 1,644,800.00
2.60 m3 Batu 290,000 340,000 754,000.00 884,000.00
50.72 kg Kawat Bronjong Ø 2,7 mm 14,000 15,000 710,080.00 760,800.00
C PERALATAN - -
- -
D Jumlah A + B + C 2,119,130.00 2,357,900.00
E OVERHEAD & PROFIT (CONTOH) 10% 211,913.00 235,790.00
F Harga Satuan Pekerjaan (D+E) 2,331,043.00 2,593,690.00
159 P.06.b.1.b 2.04 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 2,302,887.40 2,564,281.50
Uk.2,7 mm, kwat sisi 4,0 mm & kawat pengikat
2,0mm, ukuran lobang heksagonal 80 x 100 mm
A TENAGA 614,850.00 669,195.00
L.01 3.150 OH Pekerja 105,000 115,000 330,750.00 362,250.00
L.02 1.050 OH Tukang Batu 135,000 145,000 141,750.00 152,250.00
L.03 0.663 OH Kepala Tukang 140,000 150,000 92,820.00 99,450.00
L.04 0.381 OH Mandor 130,000 145,000 49,530.00 55,245.00
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
1 2 3 4 5 6 7 8 9=4X7 10 = 4 X 8
B BAHAN 1,478,684.00 1,661,970.00
2.652 m3 Batu 290,000 340,000 769,080.00 901,680.00
50.686 kg Kawat Bronjong Ø 2,7 mm 14,000 15,000 709,604.00 760,290.00
C PERALATAN - -
- -
D Jumlah A + B + C 2,093,534.00 2,331,165.00
E OVERHEAD & PROFIT (CONTOH) 10% 209,353.40 233,116.50
F Harga Satuan Pekerjaan (D+E) 2,302,887.40 2,564,281.50
161 P.06.b.2.b 2.76 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 2,762,326.60 3,088,420.50
Uk.2,7 mm, kwat sisi 4,0 mm & kawat pengikat
2,0mm, ukuran lobang heksagonal 80 x 100 mm
A TENAGA 724,080.00 787,800.00
L.01 3.600 OH Pekerja 105,000 115,000 378,000.00 414,000.00
L.02 1.200 OH Tukang Batu 135,000 145,000 162,000.00 174,000.00
L.03 0.897 OH Kepala Tukang 140,000 150,000 125,580.00 134,550.00
L.04 0.450 OH Mandor 130,000 145,000 58,500.00 65,250.00
B BAHAN 1,787,126.00 2,019,855.00
3.588 m3 Batu 290,000 340,000 1,040,520.00 1,219,920.00
53.329 kg Kawat Bronjong Ø 2,7 mm 14,000 15,000 746,606.00 799,935.00
C PERALATAN - -
D Jumlah A + B + C 2,511,206.00 2,807,655.00
E OVERHEAD & PROFIT (CONTOH) 10% 251,120.60 280,765.50
F Harga Satuan Pekerjaan (D+E) 2,762,326.60 3,088,420.50
163 P.06.b.3.b 3.6 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 3,687,857.80 4,124,884.50
Uk.2,7 mm, kwat sisi 4,0 mm & kawat pengikat
2,0mm, ukuran lobang heksagonal 80 x 100 mm
A TENAGA 1,205,910.00 1,312,815.00
L.01 6.300 OH Pekerja 105,000 115,000 661,500.00 724,500.00
L.02 2.100 OH Tukang Batu 135,000 145,000 283,500.00 304,500.00
L.03 1.170 OH Kepala Tukang 140,000 150,000 163,800.00 175,500.00
L.04 0.747 OH Mandor 130,000 145,000 97,110.00 108,315.00
B BAHAN 2,146,688.00 2,437,080.00
4.68 m3 Batu 290,000 340,000 1,357,200.00 1,591,200.00
56.392 kg Kawat Bronjong Ø 2,7 mm 14,000 15,000 789,488.00 845,880.00
C PERALATAN - -
D Jumlah A + B + C 3,352,598.00 3,749,895.00
E OVERHEAD & PROFIT (CONTOH) 10% 335,259.80 374,989.50
F Harga Satuan Pekerjaan (D+E) 3,687,857.80 4,124,884.50
Untuk pemancangan kayu atau dolken Ø 8 - 10 cm menggunakan AHSP F.02 per-m' penetrasi tiang pancang kayu dolken Ø 8 - 10 cm, Terkait
dengan asesoris sepatu adan atau sambungan kayu atau dolken Ø 8 - 10 cm harus disesuaikan, misalnya menggunakan sepatu atau tidak dan
berapa jumlah sambungan yang digunakan?, Berapa panjang kayu atau dolken yang digunakan dapat pula berbeda dengan panjang penetrasi
yang dipancangnya. Sebaiknya dibuat masing-masing secara terpisah yaitu :
a. Panjang kayu atau dolken yang digunakan sesuai dengan harga materialnya;
b. jika menggunakan sepatu pancang sesuai harga materialnya; dan
c. biaya per-m' pemancangan sesuai dengan harga penjualannya pada AHSP F.02 per - m' penetrasi tiang pancang kayu dolken Ø 8 - 10 cm
Saringan kasar terbuat dari besi beton sesuai kebutuhan, misal menggunakan besi beton Ø 12 mm berjarak as satu sama lain 3,5
cm dihitung untuk 1 m2 saringan kasar AHSPnya sebagai berikut :
176 P.12.b.1.a 1 m2 Pembabadan Rumput secara umum dan manual 1,622.50 1,780.63
A TENAGA 1,475.00 1,618.75
L.01 0.01250 OH Pekerja 105,000 115,000 1,312.50 1,437.50
L.04 0.00125 OH Mandor 130,000 145,000 162.50 181.25
B BAHAN - -
- - -
C PERALATAN - -
- hr Alat Potong Rumput 7,500 8,000 - -
D Jumlah A + B + C 1,475.00 1,618.75
E OVERHEAD & PROFIT (CONTOH) 10% 147.50 161.88
F Harga Satuan Pekerjaan (D+E) 1,622.50 1,780.63
Berbagai jenis armor yang terbuat dari beton diantaranya : berbentuk kubus, 3B, Quadripod, tetrapod, dolos dan
lain-lain. Untuk pembuatan dan pemasangan berbagai jenis armor sebagai berikut :
201 P.14.l 1 m3 Pemasangan Batu 3 kg - 5 kg, void maks 15% 526,350.00 604,450.00
A TENAGA 132,000.00 144,000.00
L.01 1.000 OH Pekerja 105,000 115,000 105,000.00 115,000.00
L.02 0.200 OH Tukang Batu 135,000 145,000 27,000.00 29,000.00
L.04 0.100 OH Mandor 130,000 145,000 13,000.00 14,500.00
B BAHAN 333,500.00 391,000.00
1.150 m3 Batu 290,000 340,000 333,500.00 391,000.00
C PERALATAN 505,500.00 577,500.00
0.1000 jam Whell Loader / Excavator 270,000 280,000 27,000.00 28,000.00
D Jumlah A + B + C 478,500.00 549,500.00
E OVERHEAD & PROFIT (CONTOH) 10% 47,850.00 54,950.00
F Harga Satuan Pekerjaan (D+E) 526,350.00 604,450.00
202 P.14.m 1 m3 Pemasangan Batu 5 kg - 10 kg, void maks 20% 590,920.00 674,465.00
A TENAGA 159,500.00 174,350.00
L.01 1.100 OH Pekerja 105,000 115,000 115,500.00 126,500.00
L.02 0.220 OH Tukang Batu 135,000 145,000 29,700.00 31,900.00
L.04 0.110 OH Mandor 130,000 145,000 14,300.00 15,950.00
B BAHAN 348,000.00 408,000.00
1.200 m3 Batu 290,000 340,000 348,000.00 408,000.00
C PERALATAN 29,700.00 30,800.00
0.110 jam Whell Loader / Excavator 270,000 280,000 29,700.00 30,800.00
D Jumlah A + B + C 537,200.00 613,150.00
E OVERHEAD & PROFIT (CONTOH) 10% 53,720.00 61,315.00
F Harga Satuan Pekerjaan (D+E) 590,920.00 674,465.00
203 P.14.n 1 m3 Pemasangan Batu 10 kg - 30 kg, void maks 20% 606,870.00 693,165.00
A TENAGA 159,500.00 174,350.00
L.01 1.100 OH Pekerja 105,000 115,000 115,500.00 126,500.00
L.02 0.220 OH Tukang Batu 135,000 145,000 29,700.00 31,900.00
L.04 0.110 OH Mandor 130,000 145,000 14,300.00 15,950.00
B BAHAN 362,500.00 425,000.00
1.250 m3 Batu 290,000 340,000 362,500.00 425,000.00
C PERALATAN 29,700.00 30,800.00
0.110 jam Whell Loader / Excavator 270,000 280,000 29,700.00 30,800.00
D Jumlah A + B + C 551,700.00 630,150.00
E OVERHEAD & PROFIT (CONTOH) 10% 55,170.00 63,015.00
F Harga Satuan Pekerjaan (D+E) 606,870.00 693,165.00
204 P.14.o 1 m3 Pemasangan Batu 30 kg - 50 kg, void maks 25% 619,410.00 707,465.00
A TENAGA 159,500.00 174,350.00
L.01 1.100 OH Pekerja 105,000 115,000 115,500.00 126,500.00
L.02 0.220 OH Tukang Batu 135,000 145,000 29,700.00 31,900.00
L.04 0.110 OH Mandor 130,000 145,000 14,300.00 15,950.00
B BAHAN 371,200.00 435,200.00
1.280 m3 Batu 290,000 340,000 371,200.00 435,200.00
C PERALATAN 32,400.00 33,600.00
0.120 jam Whell Loader / Excavator 270,000 280,000 32,400.00 33,600.00
D Jumlah A + B + C 563,100.00 643,150.00
E OVERHEAD & PROFIT (CONTOH) 10% 56,310.00 64,315.00
F Harga Satuan Pekerjaan (D+E) 619,410.00 707,465.00
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
1 2 3 4 5 6 7 8 9=4X7 10 = 4 X 8
205 P.14.p 1 m3 Pemasangan Batu 50 kg - 100 kg, void maks 25% 635,360.00 724,900.00
A TENAGA 174,000.00 190,200.00
L.01 1.200 OH Pekerja 105,000 115,000 126,000.00 138,000.00
L.02 0.240 OH Tukang Batu 135,000 145,000 32,400.00 34,800.00
L.04 0.120 OH Mandor 130,000 145,000 15,600.00 17,400.00
B BAHAN 371,200.00 435,200.00
1.280 m3 Batu 290,000 340,000 371,200.00 435,200.00
C PERALATAN 32,400.00 33,600.00
0.120 jam Whell Loader / Excavator 270,000 280,000 32,400.00 33,600.00
D Jumlah A + B + C 577,600.00 659,000.00
E OVERHEAD & PROFIT (CONTOH) 10% 57,760.00 65,900.00
F Harga Satuan Pekerjaan (D+E) 635,360.00 724,900.00
206 P.14.q 1 m3 Pemasangan Batu 100 kg - 200 kg, void maks 30% 648,120.00 739,860.00
A TENAGA 174,000.00 190,200.00
L.01 1.200 OH Pekerja 105,000 115,000 126,000.00 138,000.00
L.02 0.240 OH Tukang Batu 135,000 145,000 32,400.00 34,800.00
L.04 0.120 OH Mandor 130,000 145,000 15,600.00 17,400.00
B BAHAN 382,800.00 448,800.00
1.320 m3 Batu 290,000 340,000 382,800.00 448,800.00
C PERALATAN 32,400.00 33,600.00
0.120 jam Whell Loader / Excavator 270,000 280,000 32,400.00 33,600.00
D Jumlah A + B + C 589,200.00 672,600.00
E OVERHEAD & PROFIT (CONTOH) 10% 58,920.00 67,260.00
F Harga Satuan Pekerjaan (D+E) 648,120.00 739,860.00
207 P.14.r 1 m3 Pemasangan Batu 200 kg - 300 kg, void maks 30% 648,120.00 739,860.00
A TENAGA 174,000.00 190,200.00
L.01 1.200 OH Pekerja 105,000 115,000 126,000.00 138,000.00
L.02 0.240 OH Tukang Batu 135,000 145,000 32,400.00 34,800.00
L.04 0.120 OH Mandor 130,000 145,000 15,600.00 17,400.00
B BAHAN 382,800.00 448,800.00
1.320 m3 Batu 290,000 340,000 382,800.00 448,800.00
C PERALATAN 32,400.00 33,600.00
0.120 jam Whell Loader / Excavator 270,000 280,000 32,400.00 33,600.00
D Jumlah A + B + C 589,200.00 672,600.00
E OVERHEAD & PROFIT (CONTOH) 10% 58,920.00 67,260.00
F Harga Satuan Pekerjaan (D+E) 648,120.00 739,860.00
208 P.14.s 1 m3 Pemasangan Batu 300 kg - 400 kg, void maks 30% 686,180.00 782,815.00
A TENAGA 188,500.00 206,050.00
L.01 1.300 OH Pekerja 105,000 115,000 136,500.00 149,500.00
L.02 0.260 OH Tukang Batu 135,000 145,000 35,100.00 37,700.00
L.04 0.130 OH Mandor 130,000 145,000 16,900.00 18,850.00
B BAHAN 400,200.00 469,200.00
1.380 m3 Batu 290,000 340,000 400,200.00 469,200.00
C PERALATAN 35,100.00 36,400.00
0.130 jam Whell Loader / Excavator 270,000 280,000 35,100.00 36,400.00
D Jumlah A + B + C 623,800.00 711,650.00
E OVERHEAD & PROFIT (CONTOH) 10% 62,380.00 71,165.00
F Harga Satuan Pekerjaan (D+E) 686,180.00 782,815.00
209 P.14.t 1 m3 Pemasangan Batu 400 kg - 500 kg, void maks 35% 686,180.00 782,815.00
A TENAGA 188,500.00 206,050.00
L.01 1.300 OH Pekerja 105,000 115,000 136,500.00 149,500.00
L.02 0.260 OH Tukang Batu 135,000 145,000 35,100.00 37,700.00
L.04 0.130 OH Mandor 130,000 145,000 16,900.00 18,850.00
B BAHAN 400,200.00 469,200.00
1.380 m3 Batu 290,000 340,000 400,200.00 469,200.00
C PERALATAN 35,100.00 36,400.00
0.130 jam Whell Loader / Excavator 270,000 280,000 35,100.00 36,400.00
D Jumlah A + B + C 623,800.00 711,650.00
E OVERHEAD & PROFIT (CONTOH) 10% 62,380.00 71,165.00
F Harga Satuan Pekerjaan (D+E) 686,180.00 782,815.00
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
1 2 3 4 5 6 7 8 9=4X7 10 = 4 X 8
210 P.14.u 1 m3 Pemasangan Batu 200 kg - 500 kg, void maks 32% 681,395.00 777,584.50
A TENAGA 184,150.00 201,295.00
L.01 1.270 OH Pekerja 105,000 115,000 133,350.00 146,050.00
L.02 0.254 OH Tukang Batu 135,000 145,000 34,290.00 36,830.00
L.04 0.127 OH Mandor 130,000 145,000 16,510.00 18,415.00
B BAHAN 400,200.00 469,200.00
1.380 m3 Batu 290,000 340,000 400,200.00 469,200.00
C PERALATAN 35,100.00 36,400.00
0.130 jam Whell Loader / Excavator 270,000 280,000 35,100.00 36,400.00
D Jumlah A + B + C 619,450.00 706,895.00
E OVERHEAD & PROFIT (CONTOH) 10% 61,945.00 70,689.50
F Harga Satuan Pekerjaan (D+E) 681,395.00 777,584.50
211 P.14.v 1 m3 Pemasangan Batu 500 kg - 650 kg, void maks 35% 706,915.00 806,492.50
A TENAGA 195,750.00 213,975.00
L.01 1.350 OH Pekerja 105,000 115,000 141,750.00 155,250.00
L.02 0.270 OH Tukang Batu 135,000 145,000 36,450.00 39,150.00
L.04 0.135 OH Mandor 130,000 145,000 17,550.00 19,575.00
B BAHAN 411,800.00 482,800.00
1.420 m3 Batu 290,000 340,000 411,800.00 482,800.00
C PERALATAN 35,100.00 36,400.00
0.130 jam Whell Loader / Excavator 270,000 280,000 35,100.00 36,400.00
D Jumlah A + B + C 642,650.00 733,175.00
E OVERHEAD & PROFIT (CONTOH) 10% 64,265.00 73,317.50
F Harga Satuan Pekerjaan (D+E) 706,915.00 806,492.50
212 P.14.w 1 m3 Pemasangan Batu 650 kg - 800 kg, void maks 35% 716,485.00 817,712.50
A TENAGA 195,750.00 213,975.00
L.01 1.350 OH Pekerja 105,000 115,000 141,750.00 155,250.00
L.02 0.270 OH Tukang Batu 135,000 145,000 36,450.00 39,150.00
L.04 0.135 OH Mandor 130,000 145,000 17,550.00 19,575.00
B BAHAN 420,500.00 493,000.00
1.450 m3 Batu 290,000 340,000 420,500.00 493,000.00
C PERALATAN 35,100.00 36,400.00
0.130 jam Whell Loader / Excavator 270,000 280,000 35,100.00 36,400.00
D Jumlah A + B + C 651,350.00 743,375.00
E OVERHEAD & PROFIT (CONTOH) 10% 65,135.00 74,337.50
F Harga Satuan Pekerjaan (D+E) 716,485.00 817,712.50
C PERALATAN - -
- -
D Jumlah A + B + C 897,040.00 967,060.00
E OVERHEAD & PROFIT (CONTOH) 10% 89,704.00 96,706.00
F Harga Satuan Pekerjaan (D+E) 986,744.00 1,063,766.00
C PERALATAN - -
hr Molen 0,35 m3 250,000 275,000 - -
D Jumlah A + B + C 922,192.50 990,425.00
E OVERHEAD & PROFIT (CONTOH) 10% 92,219.25 99,042.50
F Harga Satuan Pekerjaan (D+E) 1,014,411.75 1,089,467.50
C PERALATAN - -
- -
D Jumlah A + B + C 1,021,783.36 1,097,027.12
E OVERHEAD & PROFIT (CONTOH) 10% 102,178.34 109,702.71
F Harga Satuan Pekerjaan (D+E) 1,123,961.70 1,206,729.83
232 B.13.b
A TENAGA - -
L.01 - OH Pekerja 105,000 115,000 - -
L.02 - OH Tukang Batu 135,000 145,000 - -
L.03 - OH Kepala Tukang 140,000 150,000 - -
L.04 - OH Mandor 130,000 145,000 - -
B BAHAN 150,000.00 162,000.00
1.20 Ltr Bahan Aditif**) 125,000 135,000 150,000.00 162,000.00
C PERALATAN - -
- -
D Jumlah A + B + C 150,000.00 162,000.00
E OVERHEAD & PROFIT (CONTOH) 10% 15,000.00 16,200.00
F Harga Satuan Pekerjaan (D+E) 165,000.00 178,200.00
**) dosis atau jumlah bahan aditif yang ditambahkan agar disesuaikan dengan petunjuk penggunannya
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
1 2 3 4 5 6 7 8 9=4X7 10 = 4 X 8
235 1 m3 Beton Dicorkan pada tapak berjarak setiap tambahan 25 m 85,360.00 94,490.00
238 B.16 1 m3 Beton Dicorkan pada tapak Tiap Kenaikan 4 m (vertikal) 32,450.00 35,612.50
241 B.17.b 100 kg Untuk Pembesian Kolom, Balok, Ring Balk dan Sloof 1,696,090.00 1,966,470.00
A TENAGA 442,400.00 481,950.00
L.01 2.100 OH Pekerja 105,000 115,000 220,500.00 241,500.00
L.02 1.400 OH Tukang Besi 125,000 135,000 175,000.00 189,000.00
L.03 0.140 OH Kepala Tukang 140,000 150,000 19,600.00 21,000.00
L.04 0.210 OH Mandor 130,000 145,000 27,300.00 30,450.00
B BAHAN 1,099,500.00 1,305,750.00
105.0 kg Besi Beton (polos/ulir) 10,200 12,150 1,071,000.00 1,275,750.00
1.5 kg Kawat Ikat 19,000 20,000 28,500.00 30,000.00
C PERALATAN - -
- -
D Jumlah A + B + C 1,541,900.00 1,787,700.00
E OVERHEAD & PROFIT (CONTOH) 10% 154,190.00 178,770.00
F Harga Satuan Pekerjaan (D+E) 1,696,090.00 1,966,470.00
244 B.20
MENGANGKUT / MENAIKKAN TULANGAN SETIAP
KENAIKAN VERTIKAL 4 M' ATAU JARAK HORIZONTAL 25
M KE TAPAK PEMASANGAN
C PERALATAN - -
245 B.20.b 10 s/d 25 m' Mekanis (penambahan jarak horizontal) 83,022.50 86,680.00
A TENAGA 28,600.00 31,300.00
L.01 0.200 OH Pekerja 105,000 115,000 21,000.00 23,000.00
L.02 0.040 OH Tukang Besi 125,000 135,000 5,000.00 5,400.00
L.04 0.020 OH Mandor 130,000 145,000 2,600.00 2,900.00
B BAHAN
247 B.20.c 4 m' Mekanis (penambahan tiap 4 m' jarak vertikal) 107,690.00 115,335.00
A TENAGA 47,900.00 52,350.00
L.01 0.300 OH Pekerja 105,000 115,000 31,500.00 34,500.00
L.02 0.100 OH Tukang Besi 125,000 135,000 12,500.00 13,500.00
L.04 0.030 OH Mandor 130,000 145,000 3,900.00 4,350.00
B BAHAN
249 B.21.b 1 m2 Bekisting Lantai Beton Biasa dengan multipleks 12 mm 65,582.00 72,138.00
atau 18 mm (TP)
250 B.21.c 1 m2 Bekisting Lantai Beton Biasa menggunakan papan kayu 142,065.00 156,915.00
3/20 cm (TP)
C PERALATAN - -
- -
D Jumlah A + B + C 129,150.00 142,650.00
E OVERHEAD & PROFIT (CONTOH) 10% 12,915.00 14,265.00
F Harga Satuan Pekerjaan (D+E) 142,065.00 156,915.00
koef. Multipleks koef.kaso
B.22 FLOORDECK
254 B.22.a 1 m2 Bekisting Lantai Floordeck tipe Pelat (JAP ≤ 0,60 m) 69,685.00 72,633.00
A TENAGA 19,250.00 20,950.00
L.01 0.100 OH Pekerja 105,000 115,000 10,500.00 11,500.00
L.02 0.050 OH Tukang kayu 135,000 145,000 6,750.00 7,250.00
L.03 0.005 OH Kepala Tukang 140,000 150,000 700.00 750.00
L.04 0.010 OH Mandor 130,000 145,000 1,300.00 1,450.00
B BAHAN 44,100.00 45,080.00
0.0030 m3 Kaso 5/7 cm x 4.00 4,500,000 4,600,000 13,500.00 13,800.00
0.0068 m3 Balok 8/12 cm x 4.00 4,500,000 4,600,000 30,600.00 31,280.00
0.270 kg Paku 14,000 16,000 3,780.00 4,320.00
1.080 m2 Floordeck 80,000 90,000 86,400.00 97,200.00
C PERALATAN - -
- -
D Jumlah A + B + C 63,350.00 66,030.00
E OVERHEAD & PROFIT (CONTOH) 10% 6,335.00 6,603.00
F Harga Satuan Pekerjaan (D+E) 69,685.00 72,633.00
kaso balok
255 B.22.b 1 m2 Bekisting Lantai Floordeck tipe Pelat (JAP ≤ 0,80 m) 67,925.00 70,554.00
A TENAGA 15,400.00 16,760.00
L.01 0.080 OH Pekerja 105,000 115,000 8,400.00 9,200.00
L.02 0.040 OH Tukang kayu 135,000 145,000 5,400.00 5,800.00
L.03 0.004 OH Kepala Tukang 140,000 150,000 560.00 600.00
L.04 0.008 OH Mandor 130,000 145,000 1,040.00 1,160.00
B BAHAN 46,350.00 47,380.00
0.0014 m3 Kaso 5/7 cm x 4.00 4,500,000 4,600,000 6,300.00 6,440.00
0.0089 m3 Balok 8/12 cm x 4.00 4,500,000 4,600,000 40,050.00 40,940.00
0.230 kg Paku 14,000 16,000 3,220.00 3,680.00
1.080 m2 Floordeck 80,000 90,000 86,400.00 97,200.00
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
1 2 3 4 5 6 7 8 9=4X7 10 = 4 X 8
C PERALATAN - -
- -
D Jumlah A + B + C 61,750.00 64,140.00
E OVERHEAD & PROFIT (CONTOH) 10% 6,175.00 6,414.00
F Harga Satuan Pekerjaan (D+E) 67,925.00 70,554.00
kaso balok
256 B.22.c 1 m2 Bekisting Lantai Floordeck tipe Pelat (JAP ≤ 1,20 m) 56,974.50 58,996.30
A TENAGA 10,395.00 11,313.00
L.01 0.0540 OH Pekerja 105,000 115,000 5,670.00 6,210.00
L.02 0.0270 OH Tukang kayu 135,000 145,000 3,645.00 3,915.00
L.03 0.0027 OH Kepala Tukang 140,000 150,000 378.00 405.00
L.04 0.0054 OH Mandor 130,000 145,000 702.00 783.00
B BAHAN 41,400.00 42,320.00
0.0014 m3 Kaso 5/7 cm x 4.00 4,500,000 4,600,000 6,300.00 6,440.00
0.0078 m3 Balok 8/12 cm x 4.00 4,500,000 4,600,000 35,100.00 35,880.00
0.210 kg Paku 14,000 16,000 2,940.00 3,360.00
1.080 m2 Floordeck 80,000 90,000 86,400.00 97,200.00
C PERALATAN - -
- -
D Jumlah A + B + C 51,795.00 53,633.00
E OVERHEAD & PROFIT (CONTOH) 10% 5,179.50 5,363.30
F Harga Satuan Pekerjaan (D+E) 56,974.50 58,996.30
kaso balok
257 B.22.d 1 m2 Bekisting Lantai Floordeck tipe Pelat (JAP ≤ 2.00 m) 52,453.50 54,206.90
A TENAGA 8,085.00 8,799.00
L.01 0.0420 OH Pekerja 105,000 115,000 4,410.00 4,830.00
L.02 0.0210 OH Tukang kayu 135,000 145,000 2,835.00 3,045.00
L.03 0.0021 OH Kepala Tukang 140,000 150,000 294.00 315.00
L.04 0.0042 OH Mandor 130,000 145,000 546.00 609.00
B BAHAN 39,600.00 40,480.00
0.0010 m3 Kaso 5/7 cm x 4.00 4,500,000 4,600,000 4,500.00 4,600.00
0.0078 m3 Balok 8/12 cm x 4.00 4,500,000 4,600,000 35,100.00 35,880.00
0.200 kg Paku 14,000 16,000 2,800.00 3,200.00
1.080 m2 Floordeck 80,000 90,000 86,400.00 97,200.00
C PERALATAN - -
- -
D Jumlah A + B + C 47,685.00 49,279.00
E OVERHEAD & PROFIT (CONTOH) 10% 4,768.50 4,927.90
F Harga Satuan Pekerjaan (D+E) 52,453.50 54,206.90
kaso balok
259 B.23.b 1 m2 Bekisting balok beton biasa menggunakan multipleks 12 134,332.00 143,616.00
mm JAT (Jarak Antar Tiang) ≤ 1,00 m
260 B.23.c 1 m2 Bekisting balok beton biasa menggunakan kayu papan 200,970.00 218,702.00
3/20 cm (TP)
C PERALATAN - -
- -
D Jumlah A + B + C 95,770.00 103,370.00
E OVERHEAD & PROFIT (CONTOH) 10% 9,577.00 10,337.00
F Harga Satuan Pekerjaan (D+E) 105,347.00 113,707.00
koef multipleks koef.kaso
270 B.25.a 1 m2 Bekisting Dinding beton expose dengan multipleks 18 mm 176,550.00 188,518.00
C PERALATAN - -
- -
D Jumlah A + B + C 160,500.00 171,380.00
E OVERHEAD & PROFIT (CONTOH) 10% 16,050.00 17,138.00
F Harga Satuan Pekerjaan (D+E) 176,550.00 188,518.00
multipleks koef.kaso
271 B.25.b 1 m2 Bekisting Dinding beton biasa dengan multipleks 12 mm 104,478.00 113,080.00
atau 18 mm (TP)
272 B.25.c 1 m2 Bekisting Dinding beton biasa menggunakan Kayu Papan 186,120.00 203,522.00
3/20 cm
C PERALATAN - -
- -
D Jumlah A + B + C 117,660.00 125,260.00
E OVERHEAD & PROFIT (CONTOH) 10% 11,766.00 12,526.00
F Harga Satuan Pekerjaan (D+E) 129,426.00 137,786.00
koef.kaso
C PERALATAN - -
- -
D Jumlah A + B + C 170,360.00 179,640.00
E OVERHEAD & PROFIT (CONTOH) 10% 17,036.00 17,964.00
F Harga Satuan Pekerjaan (D+E) 187,396.00 197,604.00
koef.balok
C PERALATAN - -
- -
D Jumlah A + B + C 111,180.00 117,460.00
E OVERHEAD & PROFIT (CONTOH) 10% 11,118.00 11,746.00
F Harga Satuan Pekerjaan (D+E) 122,298.00 129,206.00
multipleks koef.kaso
276 B.26.b 1 m2 Bekisting Pondasi dan sloof beton biasa menggunakan 193,215.00 209,935.00
papan 3/20 cm
277 B.26.c 1 m2 Perancah/penyokong Bekisting Pondasi dan sloof beton 115,500.00 121,330.00
biasa menggunakan kaso 5/7, tinggi maksimum 2,00 m
C PERALATAN - -
- -
D Jumlah A + B + C 105,000.00 110,300.00
E OVERHEAD & PROFIT (CONTOH) 10% 10,500.00 11,030.00
F Harga Satuan Pekerjaan (D+E) 115,500.00 121,330.00
koef.kaso
279 B.27.b 1 m2 Bongkar Bekisting secara Biasa secara hati-ahti (dan 7,788.00 8,547.00
membereskan puing-puing)
281 B.28.b 100 m2 Menyirami air permukaan beton menggunakan media 216,040.00 254,210.00
terpal selama 4 hari
282 B.28.c 100 m2 Menyirami permukaan beton menggunakan media karung 575,300.00 642,950.00
goni selama 4 hari
Perhitungan praktis pembongkaran beton dan atau bertulang ditentukan oleh tingkat mutu beton
dan kemudahan pembongkarannya. Pada kondisi normal sering dihitung pembongkaran sekitar
2,5 kali upah pembuatan beton. Jika dibutuhkan analisa yang rinci pembongkaran beton
bertulang sebagai berikut :
287 B.30.c 1 m' Pasangan Water stop PVC lebar 230 mm - 320 mm 109,549.00 122,606.00
A TENAGA 15,400.00 16,760.00
L.01 0.080 OH Pekerja 105,000 115,000 8,400.00 9,200.00
L.02 0.040 OH Tukang Batu 135,000 145,000 5,400.00 5,800.00
L.03 0.0040 OH Kepala Tukang 140,000 150,000 560.00 600.00
L.04 0.008 OH Mandor 130,000 145,000 1,040.00 1,160.00
B BAHAN 84,190.00 94,700.00
1.050 m' Water stop PVC lebar 230 mm- 320 mm 80,000 90,000 84,000.00 94,500.00
0.010 kg Kawat Beton / Bindrad 19,000 20,000 190.00 200.00
C PERALATAN - -
288 B.30.d 1 m' Pasangan Water stop Ruber lebar 150 mm - 200 mm 153,840.50 166,721.50
A TENAGA 13,475.00 14,665.00
L.01 0.070 OH Pekerja 105,000 115,000 7,350.00 8,050.00
L.02 0.035 OH Tukang Batu 135,000 145,000 4,725.00 5,075.00
L.03 0.0035 OH Kepala Tukang 140,000 150,000 490.00 525.00
L.04 0.007 OH Mandor 130,000 145,000 910.00 1,015.00
B BAHAN 126,380.00 136,900.00
1.050 m' Water stop Ruber lebar 150 mm- 200 mm 120,000 130,000 126,000.00 136,500.00
0.020 kg Kawat Beton / Bindrad 19,000 20,000 380.00 400.00
C PERALATAN - -
289 F.01 1 m' Penetrasi Tiang Pancang Kayu Gelondongan Ø 15 - 20 cm 82,335.00 91,740.00
290 F.02 1 m' Penetrasi Tiang Pancang Kayu atau Dolken Ø 8 - 10 cm 17,506.50 19,563.50
A TENAGA 12,290.00 13,410.00
L.01 0.075 OH Pekerja 105,000 115,000 7,875.00 8,625.00
L.02 0.025 OH Tukang batu 135,000 145,000 3,375.00 3,625.00
L.04 0.008 OH Mandor 130,000 145,000 1,040.00 1,160.00
B BAHAN - -
- -
- -
C PERALATAN 3,625.00 4,375.00
0.025 hr Tripod tinggi 5 m' 125,000 150,000 3,125.00 3,750.00
0.025 hr Hammer 0,5 ton (manual) 20,000 25,000 500.00 625.00
- -
D Jumlah A + B + C 15,915.00 17,785.00
E OVERHEAD & PROFIT (CONTOH) 10% 1,591.50 1,778.50
F Harga Satuan Pekerjaan (D+E) 17,506.50 19,563.50
293 F.04.b 1 m' Penetrasi Tiang Pancang Beton Kotak 25 x 25 cm 100,584.00 110,176.00
A TENAGA 67,440.00 73,760.00
L.01 0.4800 OH Pekerja 105,000 115,000 50,400.00 55,200.00
L.02 0.0800 OH Tukang batu 135,000 145,000 10,800.00 11,600.00
L.04 0.0480 OH Mandor 130,000 145,000 6,240.00 6,960.00
B BAHAN - -
- m' Tiang pancang beton bertulang 40 x 40 cm - - - -
- -
C PERALATAN 24,000.00 26,400.00
0.0800 hr Tripod tinggi 7 m' 150,000 170,000 12,000.00 13,600.00
0.0800 hr Alat Pancang dan Hammer 2 ton 150,000 160,000 12,000.00 12,800.00
100,000 110,000 - -
D Jumlah A + B + C 91,440.00 100,160.00
E OVERHEAD & PROFIT (CONTOH) 10% 9,144.00 10,016.00
F Harga Satuan Pekerjaan (D+E) 100,584.00 110,176.00
294 F.04.c 1 m' Penetrasi Tiang Pancang Beton Kotak 30 x 30 cm 179,982.00 195,723.00
A TENAGA 136,620.00 148,230.00
L.01 0.5400 OH Pekerja 105,000 115,000 56,700.00 62,100.00
L.02 0.5400 OH Tukang batu 135,000 145,000 72,900.00 78,300.00
L.04 0.0540 OH Mandor 130,000 145,000 7,020.00 7,830.00
B BAHAN - -
- m' Tiang pancang beton bertulang 40 x 40 cm - - - -
- -
C PERALATAN 27,000.00 29,700.00
0.0900 hr Tripod tinggi 7 m' 150,000 170,000 13,500.00 15,300.00
0.0900 hr Alat Pancang dan Hammer 2 ton 150,000 160,000 13,500.00 14,400.00
100,000 110,000 - -
D Jumlah A + B + C 163,620.00 177,930.00
E OVERHEAD & PROFIT (CONTOH) 10% 16,362.00 17,793.00
F Harga Satuan Pekerjaan (D+E) 179,982.00 195,723.00
295 F.04.d 1 m' Penetrasi Tiang Pancang Beton Kotak 40 x 40 cm 219,978.00 239,217.00
A TENAGA 166,980.00 181,170.00
L.01 0.6600 OH Pekerja 105,000 115,000 69,300.00 75,900.00
L.02 0.6600 OH Tukang batu 135,000 145,000 89,100.00 95,700.00
L.04 0.0660 OH Mandor 130,000 145,000 8,580.00 9,570.00
B BAHAN - -
- m' Tiang pancang beton bertulang 40 x 40 cm - - - -
- -
C PERALATAN 33,000.00 36,300.00
0.1100 hr Tripod tinggi 7 m' 150,000 170,000 16,500.00 18,700.00
0.1100 hr Alat Pancang dan Hammer 2 ton 150,000 160,000 16,500.00 17,600.00
100,000 110,000 - -
D Jumlah A + B + C 199,980.00 217,470.00
E OVERHEAD & PROFIT (CONTOH) 10% 19,998.00 21,747.00
F Harga Satuan Pekerjaan (D+E) 219,978.00 239,217.00
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
1 2 3 4 5 6 7 8 9=4X7 10 = 4 X 8
296 F.04.e 1 m' Penetrasi Tiang Pancang (Hollow) Beton Ø 40 cm 125,730.00 137,720.00
A TENAGA 84,300.00 92,200.00
L.01 0.6000 OH Pekerja 105,000 115,000 63,000.00 69,000.00
L.02 0.1000 OH Tukang batu 135,000 145,000 13,500.00 14,500.00
L.04 0.0600 OH Mandor 130,000 145,000 7,800.00 8,700.00
B BAHAN - -
- m' Tiang pancang beton bertulang 40 x 40 cm - - - -
- -
C PERALATAN 30,000.00 33,000.00
0.1000 hr Tripod tinggi 7 m' 150,000 170,000 15,000.00 17,000.00
0.1000 hr Alat Pancang dan Hammer 2 ton 150,000 160,000 15,000.00 16,000.00
100,000 110,000 - -
D Jumlah A + B + C 114,300.00 125,200.00
E OVERHEAD & PROFIT (CONTOH) 10% 11,430.00 12,520.00
F Harga Satuan Pekerjaan (D+E) 125,730.00 137,720.00
Penetrasi untuk 1 m' lebar turap (20 buah) Kayu Kaso 5/7
303 F.05.g 1 m' 130,999.00 144,292.50
tebal 7 cm
306 F.06.a 1 m' Penetrasi (1 buah) Turap Baja Profil Larsen lebar 350 mm 92,070.00 99,907.50
310 F.07.b 1 m' Penetrasi 1 buah Turap Beton Precast 15 x 40 cm 98,384.00 110,176.00
A TENAGA 67,440.00 73,760.00
L.01 0.4800 OH Pekerja 105,000 115,000 50,400.00 55,200.00
L.02 0.0800 OH Tukang batu 135,000 145,000 10,800.00 11,600.00
L.04 0.0480 OH Mandor 130,000 145,000 6,240.00 6,960.00
B BAHAN - -
m' Beton bertulang precast 135,000 145,000 - -
C PERALATAN 22,000.00 26,400.00
0.08 hr Tripod tinggi 5 m' 125,000 170,000 10,000.00 13,600.00
0.08 hr Alat Pancang & Hammer 2 ton 150,000 160,000 12,000.00 12,800.00
bh Alat Penyambung Tiang Pancang - - - -
D Jumlah A + B + C 89,440.00 100,160.00
E OVERHEAD & PROFIT (CONTOH) 10% 8,944.00 10,016.00
F Harga Satuan Pekerjaan (D+E) 98,384.00 110,176.00
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
1 2 3 4 5 6 7 8 9=4X7 10 = 4 X 8
311 F.07.c 1 m' Penetrasi 1 buah Turap Beton Precast 22 x 50 cm 122,980.00 137,720.00
A TENAGA 84,300.00 92,200.00
L.01 0.6000 OH Pekerja 105,000 115,000 63,000.00 69,000.00
L.02 0.1000 OH Tukang batu 135,000 145,000 13,500.00 14,500.00
L.04 0.0600 OH Mandor 130,000 145,000 7,800.00 8,700.00
B BAHAN - -
m' Beton bertulang precast 250,000 270,000 - -
C PERALATAN 27,500.00 33,000.00
0.1 hr Tripod tinggi 5 m' 125,000 170,000 12,500.00 17,000.00
0.1 hr Alat Pancang & Hammer 2 ton 150,000 160,000 15,000.00 16,000.00
- - - -
D Jumlah A + B + C 111,800.00 125,200.00
E OVERHEAD & PROFIT (CONTOH) 10% 11,180.00 12,520.00
F Harga Satuan Pekerjaan (D+E) 122,980.00 137,720.00
T.12 PERKUAT DINDING GALIAN SANGAT TERGANTUNG PADA POTENSI GALIAN TANAHNYA,
- UNT TANAH BIASA & TANAH BERBATU SERING DIPERLUKAN JIKA KEDALAMAN GALIAN LEBIH DARI 2 m
- UNT TANAH CADAS / KERAS APALAGI BATU PADA UMUMNYA TIDAK DIPERLUKAN PERKUATAN
HAL INI SERING DILAKUKAN PADA GALIAN TANAH DENGAN KEDALAMAN > 1 m DALAM RANGKA PEMASANGAN
TABEL KOEFISIEN PEKERJAAN & BAHAN PERKUATAN DINDING GALIAN DENGAN RANGKA & DINDING
BAHAN PEKERJA TUKANG MANDOR PERALATAN BAHAN PEKERJA TUKANG MANDOR PERALATAN (m)
- DIPAKAI KE 2 0.02840 m3 0.860 OH 0.430 OH 0.086 OH 0.125 0.0101 m3 0.800 OH 0.300 OH 0.080 OH 0.120 0.5
4.080 kg 1.000 OH 0.500 OH 0.100 OH 0.120 2.720 kg 0.72 OH 0.38 OH 0.072 OH 0.110 0.8
2.970 kg 1.980 kg
7.200 kg 1.200 OH 0.600 OH 0.120 OH 0.100 2.720 kg 0.86 OH 0.43 OH 0.086 OH 0.090 1
5.240 kg 1.980 kg
b) DINDING PERKUATAN
NO. BAHAN a) b) c) d) e) f) g) h) i) j)
BAHAN PEKERJA TUKANG MANDOR PERALATAN BAHAN PEKERJA TUKANG MANDOR PERALATAN
KE-2 1.80 m2 0.400 OH 0.200 OH 0.040 OH 0.06 1.50 m2 0.300 OH 0.150 OH 0.030 OH 0.050
KE-2 0.034 m3 0.500 OH 0.250 OH 0.050 OH 0.06 0.028 m3 0.376 OH 0.188 OH 0.0375 OH 0.070
KE-2 0.130 m3 0.480 OH 0.230 OH 0.045 OH 0.09 0.108 m3 0.338 OH 0.169 OH 0.0338 OH 0.080
TABEL KOEFISIEN PEKERJAAN & BAHAN PERKUATAN DINDING GALIAN DENGAN TURAP
A.3
BAHAN PEKERJA TUKANG MANDOR PERALATAN BAHAN PEKERJA TUKANG MANDOR PERALATAN (m)
KE-2 0.033488 m3 0.840 OH 0.280 OH 0.084 OH 0.10 0.022326 m3 0.570 OH 0.190 OH 0.057 OH 0.070 5
KE-2 0.061236 m3 1.280 OH 0.420 OH 0.126 OH 0.12 0.040824 m3 0.84 OH 0.28 OH 0.064 OH 0.06 5
20.62 kg 1.500 oh 0.500 OH 0.150 OH 0.15 13.75 kg 1.2 OH 0.4 OH 0.12 OH 0.11 5
15.00 kg 10.00 kg
28.860 kg 2.100 OH 0.700 OH 0.210 OH 0.160 19.220 kg 1.5 OH 0.5 OH 0.15 OH 0.120 5
21.000 kg 14.000 kg
39.520 kg 3.000 OH 1.000 OH 0.300 OH 0.240 26.350 kg 2.1 OH 0.7 OH 0.21 OH 0.180 5
28.750 kg 19.160 kg
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
1 2 3 4 5 6 7 8 9=4X7 10 = 4 X 8
56 T.12.a 1 m' PERKUATAN DINDING GALIAN UNT 1 m' PALING BAWAH 1,433,421.00 1,489,961.00
contoh MENGGUNAKAN BAJA INP-10 & BALOK KAYU 8/12
A TENAGA 294,430.00 320,820.00
L.01 1.660 OH Pekerja 105,000 115,000 174,300.00 190,900.00
L.02 0.730 OH Tukang 135,000 145,000 98,550.00 105,850.00
L.04 0.166 OH Mandor 130,000 145,000 21,580.00 24,070.00
B BAHAN 991,580.00 1,014,690.00
5.240 kg Tiang perkuatan dengan INP -10 14,500 14,750 75,980.00 77,290.00
0.109 m3 Dinding perkuatan kayu 8/12 8,400,000 8,600,000 915,600.00 937,400.00
C PERALATAN 17,100.00 19,000.00
0.190 hr Crane 2 ton 90,000 100,000 17,100.00 19,000.00
D Jumlah A + B + C 1,303,110.00 1,354,510.00
E OVERHEAD & PROFIT (CONTOH) 10% 130,311.00 135,451.00
F Harga Satuan Pekerjaan (D+E) 1,433,421.00 1,489,961.00
C PERALATAN - -
e) hr Tripod/Tackle Handle/Crane 2 ton
D Jumlah A + B + C - -
E OVERHEAD & PROFIT (CONTOH) 10% - -
F Harga Satuan Pekerjaan (D+E) - -
44 T.12.c 1 m' PERKUATAN DINDING GALIAN DG TURAP PALING BAWAH 523,050.00 553,300.00
contoh MENGGUNAKAN TURAP BAJA INP-8
A TENAGA 244,500.00 266,750.00
L.01 1.500 OH Pekerja 105,000 115,000 157,500.00 172,500.00
L.02 0.500 OH Tukang 135,000 145,000 67,500.00 72,500.00
L.04 0.150 OH Mandor 130,000 145,000 19,500.00 21,750.00
B BAHAN 217,500.00 221,250.00
15.000 kg Perkuatan Dinding galian dg Turap (Tabel A.3) 14,500 14,750 217,500.00 221,250.00
- -
C PERALATAN 13,500.00 15,000.00
0.150 hr Crane 2 ton 90,000 100,000 13,500.00 15,000.00
D Jumlah A + B + C 475,500.00 503,000.00
E OVERHEAD & PROFIT (CONTOH) 10% 47,550.00 50,300.00
F Harga Satuan Pekerjaan (D+E) 523,050.00 553,300.00
45a T.12.d 1 m' PERKUATAN DINDING GALIAN DG TURAP UNTUK PENAMBAHAN TINGGI
A TENAGA
L.01 g) OH Pekerja (Tabel A.3)
L.02 h) OH Tukang
L.04 i) OH Mandor
B BAHAN - -
f) m3/kg Perkuatan Dinding galian dg Turap (Tabel A.3)
C PERALATAN - -
j) hr Tripod/Tackle Handle/Crane 2 ton
D Jumlah A + B + C - -
E OVERHEAD & PROFIT (CONTOH) 10% - -
F Harga Satuan Pekerjaan (D+E) - -
45 T.12.d 1 m' PERKUATAN DINDING GALIAN DG TURAP UNTUK PENAMBAHAN TINGGI 385,550.00 409,090.00
contoh MENGGUNAKAN TURAP BAJA INP-8
A TENAGA 195,600.00 213,400.00
L.01 1.200 OH Pekerja 105,000 115,000 126,000.00 138,000.00
L.02 0.400 OH Tukang 135,000 145,000 54,000.00 58,000.00
L.04 0.120 OH Mandor 130,000 145,000 15,600.00 17,400.00
B BAHAN 145,000.00 147,500.00
10.00 kg Perkuatan Dinding galian dg Turap (Tabel A.3) 14,500 14,750 145,000.00 147,500.00
- -
C PERALATAN 9,900.00 11,000.00
0.110 hr Crane 2 ton 90,000 100,000 9,900.00 11,000.00
D Jumlah A + B + C 350,500.00 371,900.00
E OVERHEAD & PROFIT (CONTOH) 10% 35,050.00 37,190.00
F Harga Satuan Pekerjaan (D+E) 385,550.00 409,090.00
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
1 2 3 4 5 6 7 8 9=4X7 10 = 4 X 8
C PERALATAN - -
Koefisien pada AHSP T.15.a adalah kondisi normal, untuk hal khusus seperti angkutan melalui sungai dengan kedalaman s/d 0,5 m dikalikan 1,2; sedang untuk kedalaman
sungai 1 m dikalikan 1,5
T.15.a. ANGKUTAN MATERIAL DAN ATAU HASIL GALIAN UNTUK JARAK HARIZONTAL (DATAR)
AHSP T.15.a ini berlaku pada angkutan material untuk jarak harizontal (datar) dan termasuk juga medan dengan pelandaian menurun 1V:5H sampai dengan pelandaian
1V:10H yang dihitung sebagai panjang lintasannya.
MENGANGKUT MATERIAL ATAU DAN HASIL GALIAN DG
63 T.15.a.1 1 m3 30,417.20 33,349.80
JARAK ANGKUT 5 m
A TENAGA 27,652.00 30,318.00
L.01 0.2480 OH Pekerja 105,000 115,000 26,040.00 28,520.00
L.04 0.0124 OH Mandor 130,000 145,000 1,612.00 1,798.00
B BAHAN - -
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
1 2 3 4 5 6 7 8 9=4X7 10 = 4 X 8
C PERALATAN - -
C PERALATAN - -
C PERALATAN - -