ABSTRACT
New and renewable energy (EBT) is a government policy to save on the use
of fuel oil (BBM) or fossil fuels. In order to support the achievement of the New
RenewableEnergy (EBT) mix target and support the Government's policy on the
use of solar power, PLN Indonesia Power Bali PGU is now installing floating solar
power plants (PLTS) above the surface of the Muara Nusa Dua reservoir . The 100
kWp Muara Nusa floating PLTS is a showcase at the G20 activities held in Bali. A
feasibility analysis of the 100 kWp Floating PLTS in the Muara Nusa Dua reservoir
was carried out by PLN Indonesia Power Bali PGU both technically and
economically. The data collection method in this study is to take real time data
from the production produced by the floating PLTS starting in October 2022 and
the costs incurred each month for PLTS investment. The simulations results of this
study indicate that PLTS can generates a power of 145.930,08 kWh and
economically can generate a profit of Rp. 236.406,730.00 in a year. Based on these
results, the 100 kWp Muara Nusa Dua Floating PLTS PLN Indonesia Power Bali
PGU is feasible to operate based on technical and economic analysis.
viii
DAFTAR ISI
x
DAFTAR GAMBAR
xi
DAFTAR TABEL
xii
BAB I
PENDAHULUAN
3
1.3 Tujuan Penelitian
Dengan segala keterbatasan hak akses dan waktu pengumpulan data maka
penulis melakukan pembatasan pembahasan yaitu:
1. Analisis efektifitas pemasangan PLTS Waduk Muara Nusa Dua PLN
Indonesia Power dari segi teknis.
2. Analisis efektifitas pemasangan PLTS Waduk Muara Nusa Dua PLN
Indonesia Power dari segi ekonomis dengan perhitungan.
BAB I. PENDAHULUAN
Pada bab ini dijelaskan tentang isi dari materi yang menyangkut dari
latar belakang, rumusan masalah, batasan masalah serta maksud dan tujuan
penelitian.
4
BAB III. METODOLOGI PENELITIAN
Bab ini dijelaskan mengenai lokasi penelitian, metode metode yang
digunakan untuk penelitian, dan alur penelitiannya.
BAB V. PENUTUP
Bab ini berisikan kesimpulan diperoleh dari hasil analisa serta saran-saran
untuk pengembangan selanjutnya
5