Cleaning fin radiator (buka gurading) > kondisi air bersih

General engine check :

1. Check / adjust valve lash

2. Cek Wiring Loom / wiring engine


(wiring selenoid cut off, wiring battery)
Check temp in out by thermo gun
Kuras Fuel tank
Instalasi Racor 500 FG (B2B)
. Elektrik system

Pengecekan line dan fungsi MCCB, voltmeter, ampermeter, menu deepsea

Pembersihan Geno dan re-insulating varnish

Penggantian bearing Geno

. Proker Canopy, Mast, Attach

Pengecekan fungsi telecsopic mast (LS4-2000)Pengecekan fungsi LS4-2000:


- telecsopic mast, tilt, swing mast
- retorque + locktite bolt L 10 pcs

PengecekaTes uji fungsi telescopic (LS4-6000)


(fungsi spring, wirerope, greasing)
Drain secondary contaiment (LS4-2000)

Replacement bottom baring mast (AM-LTH-6000KS-L480)


Minor repair skidding, canopy

Penambahan jalaur hose untuk breather agar tidak banjir pada area engine (LS4-
2000)

Painting canopy, mast, attch

Pembuatan Adjusteble mounting bracket lamp (LS4-2000)

Fire prevention pengadaan apar (fire prevention)


Pemasangan APAR Sumanto (B2B)
. Proker Convert
Penggantian mast hyd (LS4-6000 => Cartenz)

vidance "YA" = membutuhkan upload foto pada saat eksekusi proker berlangsung
Interval
Pengecheckan Interval Cleaning Interval Penggantian

@ 250 jam (saat service)

Tiap semester / 2000


jam

@ 250 jam

@ 500 jam
General Repair
Instalasi

@ 250 jam

@5000 jam / 1 tahun


sekali / General Repair

@5000 jam / 1 tahun sekali /


General Repair

@ 250 jam

@ 250 jam

@ 250 jam
@5000 jam / 1 tahun sekali /
General Repair
@5000 jam / 1 tahun sekali /
General Repair

Instalasi

@5000 jam / 1 tahun sekali /


General Repair
@5000 jam / 1 tahun sekali /
General Repair

Instalasi

By request
APL/Part need Leadtime Activity (menit)
(pn/SC)
Pengecheckan

60

15

15

30

15

15

5
Leadtime Activity (menit)
Man Power

Cleaning Penggantian

15 2

30 2

120 jam 2

120 jam 2

48 jam 3
120 jam 2

30 2

120 jam 2

120 jam 2

60 2
No Mandatory Detail Activity Interval Interval Interval APL/Part need
Pengecheckan Cleaning Penggantian (pn/SC)

A.Proker Attachment Tower & Skiding Mega Tower


A.1 Pengecekan bolt mounting skiding Daily check & PS
A.2 Visual check welding structure pada skiding megatower PS 250
A.3 Pengecekan pull point pada skiding megatower PS 250
A.4 Re painting box panel Boc / 6 bulan
A.5 Maintenance box panel assy (cleaning & check door seal ) PS 250

Boc / General
A.6 Standarisasi guarding jalur kabel arus AC di tower nya Repair

Boc / General
A.7 Reinforce di 4 sisi bagian sudut skiding sisi luar Repair
A.8 Pengecekan bolt mounting tower 1 tahun BOC
A.9 Pengecekan bolt mounting lampu 1 Tahun BOC
A.10 Visual check korosif & crack skiding dan tower 1 Tahun BOC
A.11 Pengecekan tangga 1 Tahun BOC
A.12 Convert Bracket Mega tower dari 4 sisi ke segi 8 (B2B KPCS)
Leadtime
Activity Man Power
(menit) Cleaning

5 2
3 7 2
3 7 2
45 15 2
15 15 2

720 2

720 2
30 2
30 2
90 30 2