McPherson G (1981): An Introduction to
Electrical Machines and Transformers, John
Wiley & Sons
Kuznetsov, M: Fundamental of Electrical
Engineering, Peace Publisher, Moscow
Abdul Kadir (1982):Energi, UI Press,
Jakarta
Abdul Kadir (1984):Pengantar Teknik
Tenaga Listrik, LP3ES,Jakarta
Zuhal (1993):Dasar Teknik Tenaga Listrik
dan Elektronika Daya, PT Gramedia Pustaka
Umum, Jakarta
Bonggas L. Tobing
I.1. JENIS-JENIS ENERGI
ENERGI PRIMER: ENERGI SEKUNDER:
1. Tenaga Air 1. Energi mekanis
2. Tenaga Angin 2. Energi Thermal
3. Energi Nuklir 3. Energi Listrik
4. Energi Fuel 4. Energi Kimia
5. Energi Surya
6. Energi Laut
7. Enegi Panas Bumi
8. Energi Biomassa
Bonggas L. Tobing
I.2. KONVERSI DAN TRANSFORMASI
ENERGI

Energi Energi
Alat Konversi
A B
(Konvertor)

Bonggas L. Tobing
CONTOH KONVERSI ENERGI

Energi Primer
E
(Mis. Matahari) N
E
Energi Primer Strika R
(Mis. Fuel)
Arang G
I
Energi Sekunder Strika (Mis.
(Mis. Energi Listrik)
Listrik Panas)

Bonggas L. Tobing
Transformasi

Energi Alat Energi


A Transformasi A

Contoh:
1.Transformator (Trafo) Listrik
2. Charger HP
Bonggas L. Tobing
1.3. ENERGI LISTRIK

1. Mudah dikonversi ke bentuk energi lain

Bonggas L. Tobing
Bonggas L. Tobing
2. Mudah dibangkitkan dari bentuk energi lain

Bonggas L. Tobing
Bonggas L. Tobing
3. Mudah dipusatkan dan didistribusikan

Bonggas L. Tobing
Bandingkan dengan pendistribusian gas

Bonggas L. Tobing
4. Mudah diukur, mudah dioperasikan,
mudah dikendalikan

Bonggas L. Tobing
Bonggas L. Tobing
5. Tidak menimbulkan polusi

Bonggas L. Tobing
6. Dapat disimpan dan dapat diambil
kembali

Bonggas L. Tobing
7. Pengusahaannya lebih ekonomis

Bonggas L. Tobing
1.4. Konsep Pembangkitan
Energi Listrik

Penggerak mula
(Prime Mover)

Contoh: AIR TURBIN GENERATOR

Bonggas L. Tobing
Bonggas L. Tobing
1.5. SISTIM TENAGA LISTRIK

1. STL Sederhana

Bonggas L. Tobing
2. STL Menengah

Bonggas L. Tobing
3. STL Besar

Bonggas L. Tobing
RUMAH
TANGGA (R)

INDUSTRI
(I)

BISNIS
(B)

PUBLIK
(P)

GI SUTT 150 GI JAR.DIST.20 TRAFO JTR


TRANSMISI KV DISTRIBUSI KV DIST. 220/380 V

SOSIAL (S)
PELANGGAN PELANGGAN
TEGANGAN TEGANGAN
PUSAT LISTRIK TINGGI MENENGAH
INDUSTRI IDUSTRI & BISNIS

- PLTA
- PLTM MULTIGUNA (M)
- PLTD
- PLTU
- PLTG
-
PLTGU
- PLTP
Bonggas L. Tobing
4. STL Interkoneksi

Bonggas L. Tobing
1.6. PLN REGIONAL SUMATERA UTARA

PLN PUSAT

PLN PIKITRING PLN KITLUR PLN WILAYAH PLN UDIKLAT


SUMUT-ACEH SUMBAGUT SUMUT TUNTUNGAN

Menyelenggarakan Menyelenggarakan Menyelenggarakan Menyelenggarakan


pembangunan operasi pemasaran dan Jasa Pendidikan
pembangkitan dan pembangkitan dan pendistribusian untuk meningkatkan
penyaluran di penyaluran di tenaga listrik di pengetahun baik
wilayah kerja Sumut wilayah kerja wilayah kerja yang sifatnya internal
& NAD Sumut,NAD dan Riau Sumatera Utara PLN maupun
eksternal
PLTG BANDA ACEH = 50 MW
PLTA PEUSANGAN = 86 MW
~

PLTU SUMUT = 400 MW


PLTD LUENG BATA
~
PLTU BELAWAN
PLTGU BELAWAN

PLTU MEULABOH = 200 MW ~


~

~ PLTA ASAHAN III = 154 MW


PLTG P.PASIR
PLTG GLUGUR
PLTD T. KUNING
~

~
PLTA RENUN

PLTG TELUK LEMBU


PLTD GUNUNG SITOLI ~ PLTD TELUK DALAM
PLTD TELUK DALAM

PLTA SIPAN SIHAPORAS


PLTMH TERSEBAR
PLTA KOTO PANJANG

PLTU LABUHAN ANGIN = 230 MW


PT PLN (Pesero)
Pembangkitan Sumbagut
PT PLN (PERSERO)
SEKTOR PEMBANGKITAN BELAWAN
OVERVIEW SISTEM TENAGA LISTRIK SUMUT-NAD Rencana Beban Puncak
TW I Tertinggi : 1.156 MW
23 JULI 2007 TW II Tertinggi : 1.190 MW
TW III Tertinggi : 1.179 MW *
TW IV Tertinggi : 1.181 MW
PLTD L. Bata
30 MW PLTGU Belawan 104 MW
443 MW PLTD/G T.Lembu
PLTU Belawan PLTG 32 MW
P.Pasir/Glugur PLTA K. Panjang
155 MW
45 MW
Sub Sistem NAD Sub Sistem RIAU
15 MW Daya Mampu 136 MW
150 MW
PLTD Sewa
P.Pasir
Beban Puncak
210 MW

Sistem SUMUT ACEH 70 MW Riau Power 17 MW


PLTD tersebar Daya Mampu 890 MW
7 MW
45 MW Sistem P. NIAS

B.Puncak Tertinggi
1.179 MW Bbn Puncak
PT Inalum PLTMH + PLTA Sipan PLTD T. Kuning
8,5 MW
56 MW PLTA Renun
12 MW
82 MW PLTD
Brown Out : 70 MW
10 MW
Pemadaman TT : 70 MW
Daya Mampu : 890 MW Pemadaman TM : 20 MW
TW III Bbn Puncak Tertinggi : 1.179 MW *
Pemadaman : 129 MW
Defisit : 289 MW
Feeder Umum
SINGLE LINE DIAGRAM SISTEM SUMUT-ACEH
1 2
1
KIM
PLTGU T. MORAWA INALUM

BELAWAN MABAR

DENAI

PLTU 1 2
PAYA PASIR
1 2 1 2 1 2 TEBING TINGGI KUALA TANJUNG
2
Sicanang Indah SEI ROTAN
PLTG
1 2
PERBAUNGAN 1
LABUHAN GUNUNG 1 2
PARA
L KISARAN
LAMHOTMA M P.SIANTAR
1
TITI KUNING

PAYA GELI
BINJAI AEK KANOPAN
2 PLTD R.PRAPAT
2 I NAMURAMBE
PORSEA

1 BERASTAGI
LANGSA PLTA
P. BRANDAN GLUGUR K. PINANG
SIPANSIHAPORAS

RENUN
PLTG
GUNUNG
TUA
SIDIKALANG TELE TARUTUNG SIBOLGA
TUALANG CUT
IDIE
RIAU

LHOKSEUMAWE P.SIDEMPUAN
PT PLN (PERSERO)
PEMBANGKITAN SUMBAGUT
PT PLN (Pesero)
Pembangkitan Sumbagut BEBERAPA HAL PENYEBAB KRISIS
KELISTRIKAN DI SUMATERA UTARA
1. Tidak ada tambahan pembangkit baru yang signifikan sejak 1995 s.d.
2006, sedangkan pertumbuhan beban rata-rata sekitar 8% pertahun.
2. Proyek pembangkitan sebesar 555 MW yang telah dikontrakkan,
ditunda pelaksanaannya sesuai Keppres No.39 Tahun 1997 yaitu :
- PLTU SIBOLGA = 200 MW
- PLTP SARULLA = 165 MW
- PLTA ASAHAN = 180 MW
- PLTP SIBAYAK = 10 MW
3. Usia Pembangkit : 31 - 40 THN;
26 - 30 THN; 1 - 5 THN;
3% 10%
8%
6 - 10 THN;
21 - 25 THN; 8%
10%

16 - 20 THN; 11 - 15 THN;
> 20 THN : 21 %
19% 42%
16 - 20 THN : 19 %
11 - 15 THN : 42 %
1 - 10 THN : 18 %

4. Substitusi pasokan bahan bakar HSD akibat menurunnya pasokan Gas.


PT PLN (Pesero)
Pembangkitan Sumbagut

KONDISI PENYEBAB KRISIS KELISTRIKAN DI SUMATERA UTARA

TAHUN 1995 - 2007


PT PLN (Pesero)
Pembangkitan Sumbagut

PROGRAM MENGATASI KRISIS LISTRIK (JANGKA PENDEK)


PT PLN (Persero) PEMBANGKITAN SUMBAGUT
PT PLN (Pesero)
Pembangkitan Sumbagut

PROGRAM MENGATASI KRISIS LISTRIK (JANGKA PANJANG)


PT PLN (Persero) PEMBANGKITAN SUMBAGUT