Bonggas L. Tobing
DAFTAR PUSTAKA
Bonggas L. Tobing
McPherson G (1981): An Introduction to
Electrical Machines and Transformers, John
Wiley & Sons
Kuznetsov, M: Fundamental of Electrical
Engineering, Peace Publisher, Moscow
Abdul Kadir (1982):Energi, UI Press,
Jakarta
Abdul Kadir (1984):Pengantar Teknik
Tenaga Listrik, LP3ES,Jakarta
Zuhal (1993):Dasar Teknik Tenaga Listrik
dan Elektronika Daya, PT Gramedia Pustaka
Umum, Jakarta
Bonggas L. Tobing
I.1. JENIS-JENIS ENERGI
ENERGI PRIMER: ENERGI SEKUNDER:
1. Tenaga Air 1. Energi mekanis
2. Tenaga Angin 2. Energi Thermal
3. Energi Nuklir 3. Energi Listrik
4. Energi Fuel 4. Energi Kimia
5. Energi Surya
6. Energi Laut
7. Enegi Panas Bumi
8. Energi Biomassa
Bonggas L. Tobing
I.2. KONVERSI DAN TRANSFORMASI
ENERGI
Energi Energi
Alat Konversi
A B
(Konvertor)
Bonggas L. Tobing
CONTOH KONVERSI ENERGI
Energi Primer
E
(Mis. Matahari) N
E
Energi Primer Strika R
(Mis. Fuel)
Arang G
I
Energi Sekunder Strika (Mis.
(Mis. Energi Listrik)
Listrik Panas)
Bonggas L. Tobing
Transformasi
Contoh:
1.Transformator (Trafo) Listrik
2. Charger HP
Bonggas L. Tobing
1.3. ENERGI LISTRIK
Bonggas L. Tobing
Bonggas L. Tobing
2. Mudah dibangkitkan dari bentuk energi lain
Bonggas L. Tobing
Bonggas L. Tobing
3. Mudah dipusatkan dan didistribusikan
Bonggas L. Tobing
Bandingkan dengan pendistribusian gas
Bonggas L. Tobing
4. Mudah diukur, mudah dioperasikan,
mudah dikendalikan
Bonggas L. Tobing
Bonggas L. Tobing
5. Tidak menimbulkan polusi
Bonggas L. Tobing
6. Dapat disimpan dan dapat diambil
kembali
Bonggas L. Tobing
7. Pengusahaannya lebih ekonomis
Bonggas L. Tobing
1.4. Konsep Pembangkitan
Energi Listrik
Penggerak mula
(Prime Mover)
Bonggas L. Tobing
Bonggas L. Tobing
1.5. SISTIM TENAGA LISTRIK
1. STL Sederhana
Bonggas L. Tobing
2. STL Menengah
Bonggas L. Tobing
3. STL Besar
Bonggas L. Tobing
RUMAH
TANGGA (R)
INDUSTRI
(I)
BISNIS
(B)
PUBLIK
(P)
SOSIAL (S)
PELANGGAN PELANGGAN
TEGANGAN TEGANGAN
PUSAT LISTRIK TINGGI MENENGAH
INDUSTRI IDUSTRI & BISNIS
- PLTA
- PLTM MULTIGUNA (M)
- PLTD
- PLTU
- PLTG
-
PLTGU
- PLTP
Bonggas L. Tobing
4. STL Interkoneksi
Bonggas L. Tobing
1.6. PLN REGIONAL SUMATERA UTARA
PLN PUSAT
~
PLTA RENUN
B.Puncak Tertinggi
1.179 MW Bbn Puncak
PT Inalum PLTMH + PLTA Sipan PLTD T. Kuning
8,5 MW
56 MW PLTA Renun
12 MW
82 MW PLTD
Brown Out : 70 MW
10 MW
Pemadaman TT : 70 MW
Daya Mampu : 890 MW Pemadaman TM : 20 MW
TW III Bbn Puncak Tertinggi : 1.179 MW *
Pemadaman : 129 MW
Defisit : 289 MW
Feeder Umum
SINGLE LINE DIAGRAM SISTEM SUMUT-ACEH
1 2
1
KIM
PLTGU T. MORAWA INALUM
BELAWAN MABAR
DENAI
PLTU 1 2
PAYA PASIR
1 2 1 2 1 2 TEBING TINGGI KUALA TANJUNG
2
Sicanang Indah SEI ROTAN
PLTG
1 2
PERBAUNGAN 1
LABUHAN GUNUNG 1 2
PARA
L KISARAN
LAMHOTMA M P.SIANTAR
1
TITI KUNING
PAYA GELI
BINJAI AEK KANOPAN
2 PLTD R.PRAPAT
2 I NAMURAMBE
PORSEA
1 BERASTAGI
LANGSA PLTA
P. BRANDAN GLUGUR K. PINANG
SIPANSIHAPORAS
RENUN
PLTG
GUNUNG
TUA
SIDIKALANG TELE TARUTUNG SIBOLGA
TUALANG CUT
IDIE
RIAU
LHOKSEUMAWE P.SIDEMPUAN
PT PLN (PERSERO)
PEMBANGKITAN SUMBAGUT
PT PLN (Pesero)
Pembangkitan Sumbagut BEBERAPA HAL PENYEBAB KRISIS
KELISTRIKAN DI SUMATERA UTARA
1. Tidak ada tambahan pembangkit baru yang signifikan sejak 1995 s.d.
2006, sedangkan pertumbuhan beban rata-rata sekitar 8% pertahun.
2. Proyek pembangkitan sebesar 555 MW yang telah dikontrakkan,
ditunda pelaksanaannya sesuai Keppres No.39 Tahun 1997 yaitu :
- PLTU SIBOLGA = 200 MW
- PLTP SARULLA = 165 MW
- PLTA ASAHAN = 180 MW
- PLTP SIBAYAK = 10 MW
3. Usia Pembangkit : 31 - 40 THN;
26 - 30 THN; 1 - 5 THN;
3% 10%
8%
6 - 10 THN;
21 - 25 THN; 8%
10%
16 - 20 THN; 11 - 15 THN;
> 20 THN : 21 %
19% 42%
16 - 20 THN : 19 %
11 - 15 THN : 42 %
1 - 10 THN : 18 %