PT INFTAMA YAKTI

MULTI GUNA REKAYASA & TRIPLE-C



FINAL REPORT i
DAFTAR ISI


Daftar Isi ............................................................................................i
Daftar Tabel ............................................................................................iv
Daftar Gambar ............................................................................................vi

I. Pendahuluan
1.1. Latar Belakang.................................................................................I-1
1.2. Maksud dan Tujuan.........................................................................I-2
1.3. Lingkup Pekerjaan...........................................................................I-3
1.3.1. Komponen Air Minum ........................................................I-3
1.3.2. Komponen Air Limbah .......................................................I-4
1.3.3. Drainase ............................................................................I-6
1.3.4. Persampahan ....................................................................I-7
1.3.5. Pengumpulan Data, Peta dan Pengukuran .......................I-7
1.4. Sistematika Pelaporan .................................................................I-9

II. Gambaran Umum Wilayah Studi
2.1 Geografi ....................................................................................II-1
2.2 Topografi ....................................................................................II-1
2.3 Penduduk ....................................................................................II-1

III. Skenario Pengembangan Kota
3.1. Kebijaksanaan Pembangunan.........................................................III-1
3.2. Pembagian Wilayah.........................................................................III-1
3.3. Rencana Umum Tata Ruang ..........................................................III-2
3.3.1. Rencana Pemanfaatan Ruang ............................................III-2
3.3.2. Rencana Penataan Kawasan Permukiman ........................III-4
3.3.3. Rencana Penyebaran dan Kepadatan Penduduk ...............III-5
3.4. Rencana Sarana Kota .....................................................................III-6
3.4.1. Perumahan .........................................................................III-6
3.4.2. Perdagangan dan J asa .......................................................III-8
3.4.3. Industri ................................................................................III-8
3.4.4. Pendidikan ..........................................................................III-8
3.4.5. Rencana Pengembangan Pariwisata Kabupaten
Aceh J aya............................................................................III-9

IV. Sistem Penyediaan Air Minum
4.1. Kondisi Eksisting ..............................................................................IV-1
4.1.1. Kecamatan J aya/IKK Lamno ...............................................IV-1
4.1.2. Kecamatan Sampoinet ........................................................IV-7
4.1.3. Kecamatan Krueng Sabee...................................................IV-11
4.1.4. Kecamatan Teunom ............................................................IV-16
4.2. Kebutuhan Air Minum ....................................................................IV-21
4.2.1. Kecamatan J aya ................................................................IV-25
4.2.2. Kecamatan Sampoinet.........................................................IV-30
4.2.3. Kecamatan Krueng Sabee ..................................................IV-35
PENYUSUNAN OUTLINE PLAN &DED KAB. ACEH JAYA

PT INFTAMA YAKTI
MULTI GUNA REKAYASA & TRIPLE-C

FINAL REPORT ii
4.2.4. Kecamatan Teunom.............................................................IV-39
4.3. Rancangan Sistem Penyediaan Air Minum.......................................IV-43
4.3.1. Sistem Penyediaan Air Minum..............................................IV-46
4.3.2. Rancangan Sistem Air Minum Kecamatan J aya...................IV-48
4.3.3. Kecamatan Sampoinet..........................................................IV-56
4.3.4. Kecamatan Krueng Sabee....................................................IV-62
4.3.5. Kecamatan Teunom..............................................................IV-70


V. Persampahan
5.1. Kondisi eksisting ..............................................................................V-1
5.1.1. Sebelum Bencana ................................................................V-1
5.1.2. Setelah Bencana....................................................................V-11
5.2. Kriteria Perencanaan ......................................................................V-12
5.2.1. Aspek Organisasi dan Manajemen........................................V-12
5.2.2. Teknis Operasional ................................................................V-13
5.3. Rencana Pengembangan Pengolahan Persampahan .....................V-21
6.1. Proyek Timbulan Sampah......................................................V-21
6.2. Kebutuhan Peralatan.............................................................V-22
6.3. Tempat Pembuangan Akhir (TPA) .........................................V-29


VI. Sistem Pengolahan Air Limbah
6.1. Umum ............................................................................................VI-1
6.1.1. Kecamatan J aya .................................................................VI-2
6.1.2. Kecamatan Krueng Sabee ...................................................VI-3
6.1.3. Kecamatan Eksisting ..........................................................VI-4
6.1.4. Kecamatan Teunom..............................................................VI-5
6.2. Kriteria Perencanaan........................................................................VI-6
6.2.1. Perhitungan Rancangan Rinci Bak Anaerob.........................VI-6
6.2.2. Perhitungan Sistem...............................................................VI-7
6.2.3. Perhitungan Rancangan Rinci Bak Fakultatif........................VI-7
6.2.4. Perhitungan Sistem...............................................................VI-8
6.2.5. Perhitungan Rancangan Rinci Bak Maturasi.........................VI-9
6.2.6. Perhitungan Sistem...............................................................VI-10
6.3. Rencana Pengembangan Sistem Pengolahan Air Limbah ..............VI-12
6.3.1. Kecamatan J aya ..................................................................VI-13
6.3.2. Kecamatan Krueng Sabe......................................................VI-16
6.3.3. Kecamatan Sampinet............................................................VI-18
6.3.4. Kecamatan Teunom..............................................................VI-20


VII. Drainase
7.1. Daerah Perencanaan .......................................................................VII-1
7.2. Gambaran Umum dan Kondisi yang ada..........................................VII-1
7.2.1. Pelayanan Sistem Prasarana yang ada..............................VII-1
7.2.2. Sungai VII-2
7.2.3. Drainase Primer / Utama.....................................................VII-3
7.2.4. Drainase Sekunder / Lokal ..................................................VII-4
PENYUSUNAN OUTLINE PLAN &DED KAB. ACEH JAYA

PT INFTAMA YAKTI
MULTI GUNA REKAYASA & TRIPLE-C

FINAL REPORT iii
7.2.5. Drainase Genangan............................................................VII-5
7.3. Perhitungan Hidrologi dan Simulasi Curah Hujan.............................VII-6
7.3.1. Umum VII-6
7.3.2. Periode Ulang Curah Hujan Maksimum..............................VII-6
7.3.3. Kurva Intensitas Durasi .......................................................VII-8
7.3.4. Perhitungan Debit Rencana ................................................VII-8
7.4. Daerah Aliran Saluran.......................................................................VII-9
7.4.1. Simulasi Drainase................................................................VII-9
7.5. Rencana Pengembangan Sistem Drainase......................................VII-9
7.5.1. Kriteria Perencanaan...........................................................VII-9
7.5.2. Rencana Sistem Drainase...................................................VII-9
7.5.3. J adual dan Prioritas Penanganan .......................................VII-10


VIII. Rencana Anggaran Biaya
8.1. Sistem Penyediaan Air Minum..........................................................VIII-1
8.1.1. Harga Satuan........................................................................VIII-1
8.1.2. Biaya Perangkat Lunak.........................................................VIII-1
8.1.3. Sumber Dana........................................................................VIII-1
8.1.4. Kontingensi ...........................................................................VIII-1
8.2. Prakiraan Biaya Investasi Sistem Penyediaan Air Minum................VIII-2
8.3. Prakiraan Biaya Investasi Persampahan.........................................VIII-10
8.4. Prakiraan Biaya Investasi Sistem Air Limbah...................................VIII-12
8.5. Prakiraan Biaya Investasi Sistem Drainase.....................................VIII-14


IX. Institusi / Kelembagaan
9.1. Air Bersih ....................................................................................IX-1
9.1.1 Kondisi Eksisting Kelembagaan dan Analisa Permasalahan
Pengolahan Air Minum Kabupeten Aceh J aya .....................IX-1
9.2. Air Limbah ....................................................................................IX-3
9.2.1 Kelembagaan Air Limbah Kabupaten Aceh J aya ...................IX-3
9.3. Persampahan ...................................................................................IX-6
9.3.1. Kelembagaan Persampahan Kabupaten Aceh J aya..............IX-6
9.4. Usulan Kegiatan ..............................................................................IX-9

X. IAnalisa Finansial/Keuangan
10.1. Air Bersih .................................................................................... X-1
10.2. Pengelolaan Air Minum.................................................................... X-4
10.3. Permasalahan.................................................................................. X-6
10.3.1. Aspek Teknik........................................................................ X-6
10.3.2. Aspek Non Teknik................................................................ X-6
10.4. Rencana Investasi ........................................................................... X-6
10.5. Proyek Pendapatan dan Biaya......................................................... X-14
10.6. Pengelolaan Kebersihan Kota.......................................................... X-17




PENYUSUNAN OUTLINE PLAN &DED KAB. ACEH JAYA

PT INFTAMA YAKTI
MULTI GUNA REKAYASA & TRIPLE-C

FINAL REPORT iv

DAFTAR TABEL



Tabel 2.1. J umlah dan Kepadatan Penduduk Kabupaten Aceh J aya
sebelum dan sesudah bencana ....................................................II-2
Tabel 2.2. Banyaknya Rumah Tangga, Penduduk Th. 2002..........................II-2
Tabel 3.1. Rencana Kebutuhan dan Penambahan Perumahan di
Kabupaten Aceh J aya ...................................................................III-7
Tabel 3.2. Rencana Pelayanan Air Minum Perpipaan Dan Non Perpipaan
Kecamatan J aya ..........................................................................III-9
Tabel 3.3. Proyeksi Kebutuhan Air Kec. J aya Sesuai Tingkat Dan J enis
Pelayanan ....................................................................................III-10
Tabel 3.4. Karakteristik Sumber Mata Air Yang Ada ......................................III-13
Tabel 3.5. Kondisi Mata Air Kecamatan Lhok Kruet .......................................III-19
Tabel 3.6. Proyeksi Penduduk Kecamatan Sampoinet ..................................III-21
Tabel 3.7. Rencana Pelayanan Air Minum Perpipaan dan Non Perpipaan
Kecamatan Sampoinet Tahun 2011 dan 2026...............................III-23
Tabel 3.8. Proyeksi Kebutuhan Air Kec. J aya Sesuai Tingkat Dan J enis
Pelayanan ....................................................................................III-24
Tabel 3.9. Kondisi Mata Air Di Kecamatan Krueng Sabee .............................III-32
Tabel 3.10. Proyeksi Penduduk Kecamatan Krueng Sabee ............................III-34
Tabel 3.11. Rencana Pelayanan Air Minum Perpipaan Dan Non Perpipaan
Di Kecamatan Krueng Sabee Tahun 2011 dan 2026 ...................III-38
Tabel 3.12. Rencana Pelayanan Air Minum Perpipaan Dan Non Perpipaan
Di Kecamatan Krueng Sabee Tahun 2011 dan 2026 ...................III-38
Tabel 3.13. Proyeksi Kebutuhan Air di Kecamatan Krueng Sabee...................III-37
Tabel 3.14. Kondisi Sumber Air di Kecamatan Teunom ..................................III-46
Tabel 3.15. Proyeksi Penduduk Kecamatan Teunom ......................................III-48
Tabel 3.16. Rencana Pelayanan Air Minum Perpipaan dan Non Perpipaan
Kecamatan Teumon Tahun 2011 dan Tahun 2026........................III-49
Tabel 3.17. Proyeksi Kebutuhan Air Di Kecamatan Teunom Sesuai Proyeksi
Tingkat dan J enis Pelayanan .........................................................III-50
Tabel 4.1. Kondisi Mata Air di Kecamatan Lohk Kruet ...................................IV-8
Tabel 4.2. Kondisi Mata Air Di Kecamatan Krueng Sabee .............................IV-12
Tabel 4.3. Kondisi Sumber Air di Kecamatan Teunom ..................................IV-17
Tabel 4.4. Proyeksi Penduduk Kecamatan J aya ............................................IV-25
Tabel 4.5. Rencana Pelayanan Air Minum Perpipiaan dan Non Perpipaan
Di Kecamatan J aya. Tahun 2011 dan 2026...................................IV-26
Tabel 4.6. Proyeksi Kebutuhan Air di Kecamatan J aya..................................IV-29
Tabel 4.7. Proyeksi Penduduk Kecamatan Sampoinet...................................IV-30
Tabel 4.8. Rencana Pelayanan Air Minum Perpipaan dan Non
Perpipaan di Kecamatan Sampinet tahun 2011 & 2026................IV-31
Tabel 4.9. Proyeksi Kebutuhan Air di Kecamatan Sampoinet.........................IV-34
Tabel 4.10 Proyeksi Penduduk Kecamatan Krueng Sabee ...........................IV-35
Tabel 4.11 Rencana Pelayanan Air Minum Perpipaan dan Non
Perpipaan di Kecamatan Krueng Sabee tahun 2011 dan 2026.....IV-36
Tabel 4.12 Proyoeksi Kebutuhan Air di Kecamatan Krueng Sabee.................IV-38
PENYUSUNAN OUTLINE PLAN &DED KAB. ACEH JAYA

PT INFTAMA YAKTI
MULTI GUNA REKAYASA & TRIPLE-C

FINAL REPORT v
Tabel 4.13 Proyeksi Penduduk Kecamatan Teunom.......................................IV-39

Tabel 4.14 Rencana Pelayanan Air Minum Perpipaan dan Non
Perpipaan di Kecamatan Teunom tahun 2011 & 2026..................IV-40
Tabel 4.15 Proyoeksi Kebutuhan Air di Kecamatan Teunom...........................IV-42
Tabel 4.16 Karakteristik Sumber Mata Air yang Ada .......................................IV-49
Tabe 4.17 Komponen Sistem Penyediaan Air Minum Kec. J aya
(2006-2026) ...................................................................................IV-52
Tabel 4.18 Komponen Sistem Pelayanan Air Minum Kecamatan
Sampoinet Kabupaten Aceh J aya..................................................IV-59
Tabel 4.19 Komponen Sistem Pelayanan Air Minum Kecamatan
Krueng Sabee Kabupaten Aceh J aya............................................IV-67
Tabel 5.1 Proyeksi Timbulan Sampah dan Kebutuhan Peralatan
Kecamatan J aya.............................................................................V-25
Tabel 5.2 Proyeksi Timbulan Sampah dan Kebutuhan Peralatan
Kecamatan Sampionet....................................................................V-26
Tabel 5.3 Proyeksi Timbulan Sampah dan Kebutuhan Peralatan
Kecamatan Teunom........................................................................V-27
Tabel 5.4 Proyeksi Timbulan Sampah dan Kebutuhan Peralatan
Kecamatan Krueng Sabe................................................................V-28
Tabel 6.1 Asumsi Parameter pada bak Anaerob.............................................VI-6
Tabel 6.2 Asumsi Parameter pada bak Fakultatif ............................................VI-8
Tabel 6.3 Asumsi parameter air limbah pada bak maturasi.............................VI-9
Tabel 6.4 Proyeksi Timbulan Tinja dan Kebutuhan IPLT Kec. J aya................VI-15
Tabel 6.5 Proyeksi Timbulan Tinja dan Kebutuhan IPLT Kec. Krueng Sabe...VI-17
Tabel 6.6 Proyeksi Timbulan Tinja dan Kebutuhan IPLT Kec. Sampionet.......VI-19
Tabel 6.7 Proyeksi Timbulan Tinja dan Kebutuhan IPLT Kec. Teunom...........VI-21
Tabel 7.1 Daerang Genangan..........................................................................VII-6
Tabel 8.1 Rekap Rencana Anggaran Biaya Sistem Air Minum Kabupaten
Aceh J aya ....................................................................................VIII-3
Tabel 8.2 Prakiraan Biaya Sistem Kecamatan J aya (Kota Lamno),
Kabupaten Aceh J aya .....................................................................VIII-4
Tabel 8.3 Prakiraan Biaya Sistem Kecamatan Sampoinet (Kota Lhok Kruet),
Kabupaten Aceh J aya.....................................................................VIII-6
Tabel 8.4 Prakiraan Biaya Sistem Kecamatan Krueng Sabee
(Kota Krueng Sabee), Kabupaten Aceh J aya.................................VIII-7
Tabel 8.5 Prakiraan Biaya Sistem Kecamatan Teunom
(Kota Teunom), Kabupaten Aceh J aya...........................................VIII-9
Tabel 8.6 Rekapitulasi Rencana Anggaran Biaya Persampahan
Kabupaten Aceh J aya...................................................................VIII-12
Tabel 8.7 Rekapitulasi Rencana Anggaran Biaya Air Limbah
Kabupaten Aceh J aya...................................................................VIII-13
Tabel 8.8 Rekapitulasi Rencana Anggaran Biaya Drainase Kabupaten
Aceh J aya ..................................................................................VIII-15
Tabel 10.1 Realisasi APBD Kabupaten Aceh J aya pada Tahun 2006 ............. X -3
Tabel 10.2 Kondisi Pengelolaan Air Minum Sebelum Tsunami
(24 Desember 2004)....................................................................... X - 4
Tabel 10.6 Proyeksi Timbunan Sampah (m3)................................................... X -18

PENYUSUNAN OUTLINE PLAN &DED KAB. ACEH JAYA

PT INFTAMA YAKTI
MULTI GUNA REKAYASA & TRIPLE-C

FINAL REPORT vi


DAFTAR GAMBAR


Gambar 2.1. Peta Administratif Kabupaten Aceh J aya .................................II-3
Gambar 3.1. Lokasi Kecamatan di Kabupaten Aceh J aya ............................III-2
Gambar 3.2. Zonasi Pemanfaatan Ruang .....................................................III-4
Gambar 3.3. Skematik Pendekatan Pengembangan Kota.............................III-5
Gambar 4.1. Presentase Pelayanan Air Minum di Kabupaten
Aceh J aya .................................................................................IV-1
Gambar 4.2. Persentase Pelayanan Air Minum di Kecamatan J aya 4-2
Gambar 4.3. Skematik Sistem Penyediaan Air Minum Kec. J aya
(IKK Lamno) ............................................................................IV-5
Gambar 4.4. Peta Pelayanan Air Munum Kecamatan J aya
(IKK Lamno) ............................................................................IV-6
Gambar 4.5. Persentase Pelayanan Air Minum di Kecamatan
Sampoinet ................................................................................IV-7
Gambar 4.6. Skematik Sistem Penyediaan Air Minum Kecamatan
Sampoinet (IKK Lohk Kruet) ...................................................IV-10
Gambar 4.7. Persentase Pelayanan Air Minum di Kecamatan
Sampoinet ..............................................................................IV-11
Gambar 4.8. Skematik Sistem Penyediaan Air Minum Kecamatan
Krueng Sabee ..........................................................................IV-14
Gambar 4.9. Peta Pelayanan Air Minum Kota Calang ..................................IV-15
Gambar 4.10. Persentase Pelayanan Air Minum di Kecamatan Teunom ......IV-16
Gambar 4.11. Skematik Sistem Penyediaan Air Minum Kec.Teunom ............IV-19
Gambar 4.12. Peta Pelayanan Air Minum Kecamatan Teunom .....................IV-20
Gambar 4.13. Proyeksi Pelayanan Air Minum, J umlah SR, HU
Pertahun sampai Tahun 2026 .................................................IV-27
Gambar 4.14. Proyeksi Pelanggan Air Minum Kecamatan J aya
sampai Tahun 2026...................................................................IV-27
Gambar 4.15. Proyeksi Kebutuhan Air Minum, J umlah SR, HU
Pertahun sampai Tahun 2026 ..................................................IV-32
Gambar 4.16. Proyeksi Pelanggan Air Minum Kecamatan Sampoinet
Sampai Tahun 2026..................................................................IV-32
Gambar 4.17. Proyeksi Pelanggan Air dan Rencana Kapasitas IPA,
Kecamatan Sampoinet sampai Tahun 2026.............................IV-33
Gambar 4.18. Proyoeksi Pelayanan Air Minum, J umlah SR, HU
Pertahun Sampai Tahun 2026 .................................................IV-35
Gambar 4.19 Proyeksi Pelayanan Air Minum Kecamatan Krueng
Sabee Sampai Tahun 2026 .....................................................IV-36
Gambar 4.20 Proyeksi Kebutuhan Air dan Rencana Kapasitas IPA,
Kecamatan Krueng Sabee Sampai Tahun 2026.......................IV-37
Gambar 4.21 Proyeksi Pelayanan Air Minum, J umlah SR, HU Pertahun
sampai Tahun 2026...................................................................IV-40
Gambar 4.22 Proyeksi Pelayanan Air Minum Kecamatan Teunom
Sampai Tahun 2026..................................................................IV-41

PENYUSUNAN OUTLINE PLAN &DED KAB. ACEH JAYA

PT INFTAMA YAKTI
MULTI GUNA REKAYASA & TRIPLE-C

FINAL REPORT vii
Gambar 4.23 Proyeksi Kebutuhan Air dan Rencana Kapasitas IPA,
Kecamatan Teunom sampai Tahun 2026..................................IV-41
Gambar 4.24 Sumur Dangkal ..........................................................................IV-48
Gambar 4.25 Rancangan Sistem Air Minum IKK J aya ....................................IV-54
Gambar 4.26 Skematik Rancangan Sistem Air Minum Sistem IKK .................IV-55
Gambar 4.27 Sistem Instalasi Pengolahan Air.................................................IV-57
Gambar 4.28 Rancangan Sistem Pelayanan Air Minum Sistem IKK
Lhok Kruet Kecamatan Sampoinet, Kabupaten Aceh J aya........IV-60
Gambar 4.29 Rancangan Sistem Pelayanan Air Minum Sistem IKK
Lhok Kruet Kecamatan Sampoinet, Kabupaten Aceh J aya .......IV-61
Gambar 4.30 Diagram Pelayanan di Krueng Sabee dan Calang.....................IV-63
Gambar 4.31 Intake Sumuran..........................................................................IV-64
Gambar 4.32 Instalasi Pengolahan Air ............................................................IV-65
Gambar 4.33 Wilayah Pelayanan Air Minum Sistem IKK Krueng Sabe dan
Calang, Kabupaten Aceh J aya...................................................IV-66
Gambar 4.34 Rancangan Sistem Pelayanan Air Minum Kecamatan
Krueng Sabe Kabupaten Aceh J aya..........................................IV-68
Gambar 4.35 Skematik Rancangan Sistem Pelayanan Air Kecamatan
Krueng Sabe Kabupaten Aceh J aya..........................................IV-69
Gambar 4.36 Sistem Pengolahan Air Minum Sistem IKK Teunom..................IV-71
Gambar 4.37 Rancangan Sistem Pelalyanan Air Minum Sistem IKK
Teunom, Kabupaten Aceh J aya.................................................IV-74
Gambar 5.1. Hubungan Kerja Instalasi Pengolahan Persampahan...............V-2
Gambar 5.2. Daerah Pelayanan Sistem Pengolahan Persampahan
Kota Calang Sebelum Bencana ................................................V-8
Gambar 5.3. Daerah Pelayanan Sistem Pengolahan Persampahan
Kota Teunom Sebelum Bencana ...............................................V-9
Gambar 5.4. Daerah Pelayanan Sistem Pengolahan Persampahan
Kota Lamno Sebelum Bencana .................................................V-10
Gambar 5.5. Proyeksi Timbulan Sampah Kecamatan J aya............................V-21
Gambar 5.6. Proyeksi Timbulan Sampah Kecamatan Teunom......................V-21
Gambar 5.7. Proyeksi Timbulan Sampah Kec. Sampoinet.............................V-22
Gambar 5.8. Proyeksi Timbulan Sampah Kec. Krueng Sabee.......................V-22
Gambar 5.9. Proyeksi Kebutuhan Peralatan Kec. J aya..................................V-23
Gambar 5.10. Proyeksi Kebutuhan Peralatan Kec. Sampionet ........................V-23
Gambar 5.11. Proyeksi Kebutuhan Peralatan Kec. Krueng Sabee...................V-24
Gambar 5.12. Lokasi TPA Kecamatan J aya.....................................................V-29
Gambar 5.13. Lokasi TPA Kecamatan Sampionet............................................V-30
Gambar 5.14. Lokasi TPA Kecamatan Teunom................................................V-31
Gambar 5.15. Lokasi TPA Kecamatan Krueng Sabe........................................V-32
Gambar 6.1. Daerah Padat dan Komersial ....................................................VI-12
Gambar 6.2. Septik Tank Komunal ...............................................................VI-13
Gambar 6.3. Grafik Proyeksi Limbah Kec. J aya dan Rencana
Penganananya .........................................................................VI-14
Gambar 6.4. Proyeksi Limbah dan Rencana Penanganannya.......................VI-16
Gambar 6.5. Proyeksi Limbah dan Rencana Penanganannya.......................VI-18
Gambar 6.6. Proyeksi Limbah dan Rencana Penanganannya.......................VI-18
Gambar 7.1. Peta Administrasi Kota Calang ..................................................VII-2
Gambar 7.2. Peta Saluran Drainase Primer Kota Calang...............................VII-4
PENYUSUNAN OUTLINE PLAN &DED KAB. ACEH JAYA

PT INFTAMA YAKTI
MULTI GUNA REKAYASA & TRIPLE-C

FINAL REPORT viii
Gambar 7.3. Belum Ada Saluran Drainase.....................................................VII-4
Gambar 7.4. Daerah Genangan di Kota Calang.............................................VII-5
Gambar 9.1a. Struktur Organisasi Kimpraswil Kab. Aceh J aya ....................... IX-1
Gambar 9.1b. Struktur Organisasi Kantor Pengelola Air Minum
(KPAM) Kab. Aceh J aya ........................................................... IX-2
Gambar 9.2. Usulan Struktur Organisasi Kebersihan dan Air Limbah/
Tinja, Kantor Kebersihan dan Pertamanan Kabupaten Aceh
J aya ....................................................................................IX-4
Gambar 9.3. Struktur Organisasi Pengelola Kebersihan Kabupaten
Aceh J aya.................................................................................. IX-6
Gambar 10.1. Grafik PDRB di Kabupaten Aceh J aya....................................... X-2
PENYUSUNAN OUTLINE PLAN &DED KAB. ACEH JAYA

PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
BAB I
PENDAHULUAN


1.1. Latar Bel akang
Agar dapat memenuhi kebutuhan riil masyarakat, untuk masing-masing
Kota/Kabupeten perlu dilakukan terlebih dahulu Outline Plan pembangunan
sarana dan prasarana perkotaan. Penyusunan Outline Plan dan DED ini
sifatnya sangat mendesak, sehingga proses penyusunannya diharapkan
lebih pendek dari penyusunan studi serupa pada kondisi-kondisi normal.
Outline Plan akan menggambarkan bahwa perlu sekali adanya proyek
pengembangan sistem sarana dan prasarana perkotaan di Kabupaten Aceh
J aya yang dikaitkan dengan kebutuhan masa mendatang. Rencana yang
sifatnya strategis ini akan mempelajari, menganalisa dan membandingkan
beberapa pilihan sistem yang dapat dilaksanakan. Pilihan sistem akan
didasarkan kepada berbagai pertimbangan teknis, sosial dan ekonomis
serta aspek lingkungan, yang nantinya akan dilaksanakan oleh PDAM dan
Dinas Prasarana Wilayah, Dinas Pekerjaan Umum atau Dinas Kebersihan
terkait dengan pekerjaan air minum, air limbah, drainase dan persampahan di
wilayah Kabupaten Aceh J aya.

Outline Plan ini akan didasarkan kepada tata guna lahan yang ada serta
rencana tata ruang wilayah yang tersedia. Ketersediaan prasarana air
minum, air limbah, drainase dan persampahan untuk Kabupaten Aceh J aya
diproyeksikan mampu memenuhi kebutuhan baik untuk keperluan domestik
dan non-domestik untuk jangka waktu 20 tahun mendatang. Outline Plan
akan menyajikan kondisi sistem yang ada dan kebutuhan mendatang yang
meliputi komponen air minum, air limbah, drainase dan persampahan.

Tahapan selanjutnya dari Outline Plan ini adalah dengan melakukan
perencanaan teknis (DED) dari berbagai program terpilih Outline Plan untuk
pemenuhan kebutuhan sampai dengan tahun 2011. Penyusunan DED ini
FINAL REPORT I-1
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
diharapkan dapat menjadi pemicu bagi implementasi keseluruhan program
sistem air minum, air limbah, drainase dan persampahan di Kabupaten Aceh
J aya.


1.2. Maksud Dan Tujuan
Penyusunan Outline Plan & DED ini dimaksudkan untuk menyusun program-
program penanganan permasalahan komponen air minum, air limbah,
drainase dan persampahan pasca gempa bumi dan tsunami di NAD.
Program penanganan 4 komponen tersebut akan meliputi pemenuhan
kebutuhan penduduk hingga tahun 2026. Untuk itu beberapa tujuan
penyusunan studi Outline Plan & DED yang perlu dicapai adalah sebagai
berikut :
Mengevaluasi kinerja eksisting sistem penyediaan air minum,
air limbah, drainase dan persampahan.
Mengidentifikasi berbagai permasalahan dan kendala untuk ke
4 komponen tersebut.
Melakukan evaluasi dan analisa tata guna lahan dan rencana
pembangunan perkotaan yang ada dalam RTRW Kabupaten Aceh
J aya
Menganalisa kebutuhan air minum untuk kegiatan domestik dan
non domestik sampai tahun 2026 berdasarkan antisipasi
pertumbuhan dan trend saat ini serta pola konsumsi air minum.
Menganalisa volume air limbah dan perhitungan saluran air limbah
paling tidak untuk 20 tahun mendatang.
Mengidentifikasi dan mengevaluasi ketersediaan sumber-
sumber air baku dengan memperhatikan prinsip-prinsip efisiensi
dan konservasi eksploitasi.
Mengidentifikasi sistem pengolahan air limbah yang paling tepat
dengan jenis buangan air limbah yang ada.
Mengevaluasi kinerja eksisting sistem Drainase, dan sistem
pengelolaan persampahan yang ada saat ini.
Mengidentifikasi berbagai permasalahan dan kendala pengelolaan
persampahan dan Drainase.
FINAL REPORT I-2
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
Menganalisa curah hujan dan perhitungan dimensi saluran
drainase untuk periode ulang 20 tahun.
Menyusun program rehabilitasi dan rekonstruksi sistem air minum,
air limbah, drainase dan sistem pengelolaan persampahan pasca
gempa bumi dan tsunami jangka pendek dan jangka panjang.
Penyusunan DED untuk komponen air minum, air limbah,
drainase dan pengelolaan persampahan berdasarkan kepada hasil
analisa Outline Plan yang ada dan penetapannya berdasarkan hasil
evaluasi dengan BRR dan instansi terkait lainnya yang
berhubungan dengan kegiatan tersebut diatas.


1.3. Li ngkup Pekerj aan
1.3.1. Komponen Air Minum
A. Outline Plan s/d 2026 :
1. Mengevaluasi kinerja ekisting sistem baik unit produksi,
jaringan perpipaan, transimsi dan distribusi serta sambungan rumah
yang dikelola oleh PDAM.
2. Melakukan review berbagai literatur dan studi terkait yang mempelajari
perhitungan kebutuhan air minum serta teknik pendekatannya.
3. Mengevaluasi kebutuhan air minum 2026 berdasarkan penyebaran
populasi dan kegiatan perkotaan.
4. Memperkiraan jumlah populasi penduduk hingga tahun 2026 untuk
menghitung kebutuhan air domestik dan non-domestik
5. Mencari potensi sumber air baku untuk pasokan penyediaan air minum di
Kabupaten Aceh J aya serta mencari kemungkinan pengembangan
sumber air baku tersebut secara regional
6. Mengevaluasi kebutuhan SDM, baik ratio personil, kualifikasi, serta
program pelatihan dan training.
7. Estimasi kebutuhan anggaran untuk investasi, serta operasi dan
pemeliharaan.
8. Membuat rencana investasi yang didasarkan atas prioritas pekerjaan
dan sumber dana investasi.
FINAL REPORT I-3
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
9. Mengembangkan sistim kemitraan dengan masyarakat dimulai
dari perencanaan sesuai dengan tahap operasional.
10. Penetapan sumber air baku
11. Penetapan J enis pengolahan air yang diperlukan
12. Penetapan jalur pipa transmisi
13. Penetapan jaringan distribusi
14. Penetapan lokasi dan dimensi Reservoir.

B. Detail Engineering Design atau Perencanaan Rinci s/d 2011:
1. DED untuk unit sistem air minum terpilih bisa berupa Intake,
IPA, Transmisi, Distribusi, Reservoir, standard sambungan baru dan
thrust blok dll yang diperlukan.
2. Design Notes untuk sistem terpilih
3. Pengukuran topografi, sondir dan lainnya untuk seluruh komponen
4. Penyusun gambar perancang untuk seluruh unit sistem air minum
5. Rencana anggaran biaya
6. Penyusun Dokumen Tender

Ada 14 (empat belas) tahap lingkup pekerjaan outline plan air minum yang akan
dilakukan sesuai KAK agar tercapai penyusunan outline plan yang dapat
dilaksanakan sesuai kebutuhan di lokasi proyek air minum. Kegiatan 1 dan 2
untuk mengidentifikasi kondisi eksisting, kegiatan 3 s/d 14 untuk mengidentifikasi
secara tepat kebutuhan untuk komponen air minum melalui perhitungan, analisa
dan pengamatan lapangan baik berupa data-data primer baik data teknik,
keuangan dan SDM untuk menghasil perencanaan SPAM yang baik.

Dari program outline plan ini, maka dilakukan perencanaan rinci untuk sampai
tahun 2011 sehingga siap diimplementasikan / di tenderkan.

1.3.2. Komponen Air Limbah
A. Outline Plan s/d 2026 :
1. Menganalisa sistem penanganan air limbah eksisting baik sistem on site
maupun off site, dan menetapkan sistem yang rusak dan tidak berfungsi.

FINAL REPORT I-4
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
2. Analisa terhadap volume air limbah dari masing-masing rumah tangga
dan menetapkan besarnya volume air limbah untuk perhitungan
perencanaan saluran air limbah.
3. Membuat alternatif penanganan air limbah berupa tahapan pelaksanaan
pembangunan saluran baik untuk off site maupun on site dengan
mempertimbangkan suistanalbility operasional jangka panjang.
4. Penetapan jalur saluran air limbah dan jenis / lokasi pengolahan air
limbah.

B. Detail Engineering Design atau Perencanaan Rinci s/d 2011 :
1. Perhitungan dimensi saluran air limbah dan penetapan bentuk saluran.
2. Perhitungan jenis dan dimensi pengolahan air limbah .
3. Penyusunan gambar perencanaan saluran air limbah, instalasi
pengolahan air limbah, sambungan rumah, bak control dan interkoneksi
dengan saluran drainase untuk penggelontoran air limbah, baik untuk
bangunan / saluran yang bersifat rehabilitasi maupun
pembangunan saluran / istalasi baru.
4. Penyusunan Rencana Anggaran Biaya pembangunan untuk seluruh unit
penanganan air limbah.
5. Penyusunan dokumen lelang untuk seluruh pekerjaan komponen
penanganan air limbah.

Pada tahap awal konsultan melakukan kegiatan pendataan dan permasalahan
serta menganalisa informasi tentang sistem penanganan air limbah eksisting baik
sistem on site maupun off site, sehingga dapat disusun daftar dan rekomendasi
Prasarana dan Sarana Air Limbah sistem Perkotaan atau Perdesaan di lokasi
yang harus diperbaiki atau dibangun.

Selanjutnya, dilakukan penyusunan Detail Engineering Design sebagai Dokumen
Tender Pembangunan / Perbaikan Prasarana dan Sarana Air Limbah Perkotaan
dan Perdesaan.




FINAL REPORT I-5
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
1.3.3. Drainase
A. Outline Plan s/d 2026 :
1. Menganalisa sistem Drainase eksisting berupa dimensi saluran
drainase, tingkat kerusakan dan saluran drainase yang tersumbat.
2. Analisa curah hujan
3. Menetapkan besarnya daerah tangkapan air hujan, run off area dan
4. Menetapkan dimensi saluran drainase untuk perioda ulang 10 tahun.
5. Penetapan alternatif saluran primer dan sekunder dengan
mempertimbangkan integrasi dengan perencanaan saluran air limbah.
Saluran drainase primer dan sekunder terpilih mempertimbangkan
kedalaman saluran induk penerima limpasan air hujan.

B. Detail Engineering Design atau Perencanaan Rinci s/d 2011 :
1. Perhitungan dirnensi saluran baik primer maupun sekunder
2. Penetapan bentuk saluran primer dan sekunder
3. Penyusunan gambar perencanaan ( gambar tender ) saluran drainase
berupa saluran primer, sekunder, street inlet, gorong -gorong dan
lainnya sesuai kebutuhan .
4. Penyusunan Rencana Anggaran Biaya untuk rehabilitasi dan
pembangunan saluran drainase.
5. Penyiapan dokumen tender untuk pekerjaan rehabilitasi dan
perencanaan saluran drainase.

Pada tahap penyusunan outline plan, secara umum permasalahan pasca bencana
adalah bertambahnya luasan wilayah kota yang masih tergenang air khususnya di
dataran rendah, saluran-saluran drainase kota hampir seluruhnya tidak berfungsi
akibat tertutup pasir, lumpur, dan puing-puing bangunan. Selain itu, ada
kemungkinan struktur jaringan drainase kota tidak dapat difungsikan kembali.
Langkah yang akan dilakukan adalah sebagaimana tertera dalam item 1 s/d 5
pada KAK tersebut diatas, dengan mengutamakan keterpaduan pembangunan
sarana drainase kota dengan prasarana pengendali banjir lainnya. Selanjutnya
dilakukan langkah 1 s/d 5 sebagaimana tersebut dalam sub penyusunan DED
drainase di atas.

FINAL REPORT I-6
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
1.3.4. Persampahan
1. Review kondisi eksisting sistem persampahan di masing-masing wilayah
proyek sebelum dan sesudah bencana Tsunami. Identifikasi
permasalahan dan kebutuhan di subsektor persampahan Menyiapkan
alternatif penyelesaian permasalahan persampahan. Koordinasi dengan
berbagai instansi terkait.
2. Evaluasi terhadap TPA eksisting dan atau melakukan pemilihan lokasi
TPA baru, dan kemungkinan pemanfaatan TPA regional.
3. Menyusun UKL dan UPL TPA eksisting dan atau lokasi TPA baru.
4. Menyusun rencana strategis penanganan sampah yang
dituangkan dalam Outline Plan untuk 15 tahun kedepan.
5. Melakukan perencanaan teknis tahap-1 (mendesak) untuk
sistem pengumpulan, pengangkutan, pemindahan, dan Tempat
Pembuangan Akhir (Tempat Pengolahan Sampah Terpadu termasuk
penanganan 3R dan pembuatan kompos, serta menyusun standar
prosedur operasinya (SOP).
6. Menyusun Rencana Anggaran Biaya dan Dokumen Tender.
7. Menyusun Rencana Kegiatan dan Rencana Tindak (Action Plan)
program pengembangan pengelolaan persampahan jangka pendek,
jangka menengah dan jangka panjang.

Tersusunnya outline plan program pengelolaan sampah untuk jangka pendek /
mendesak dan jangka menengah sesuai kemampuan teknis dan ekonomi dari
pengelolaan dan masyarakat penghasil sampah. Langkah-langkah pembuatan
outline plan dalam KAK sudah jelas dan tersistematis.

1.3.5. Pengumpulan Data, Peta dan Pengukuran
A. Pengumpulan Data dan Peta
1. Data kependudukan, sosial dan ekonomi terutama di daerah studi
dan sekitarnya yang berpengaruh terhadap dampak pada keempat
komponen.
2. Data dan Peta Tata Ruang Kota dan Tata Guna Lahan.
3. Inventory data-data perencanaan terdahulu yaitu jaringan pipa air
minum dan air limbah kota pada daerah studi dan termasuk daerah
FINAL REPORT I-7
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
pelayanan, sistem saluran drainase yang ada serta sistem
pengelolaan persampahan.

B. Metode Pengukuran
1. Secara garis besar, pengukuran dan pemetaan situasi meliputi
pemasangan patok beton BM & CP, kontrol horizontal dan vertikal,
pengukuran situasi detail dan pengukuran/pengamatan pasang surut.
2. Semua data penting yang digunakan untuk menentukan koordinat
Bench Mark diperoleh dengan cara pengukuran langsung di lapangan.
3. Semua alat ukur (Theodolit, Waterpass) yang digunakan dalam
keadaan baik dan memenuhi syarat ketelitian yang diminta
(dikalibrasi).
4. Sebelum pekerjaan dimulai, konsultan menyerahkan program kerja
yang berisi jadwal waktu pelaksanaan pekerjaan, daftar personil,
daftar peralatan dan rencana keberangkatan untuk dibahas bersama
dengan Direksi.
5. Pelaksanaan pekerjaan disesuaikan dengan program kerja
dan waktu pelaksanaan sesuai dengan jangka waktu yang telah
direncanakan.

C. Pengukuran Si t uasi
1. Situasi diukur berdasarkan jaringan kerangka horizontal dan
vertikal yang telah dipasang dengan melakukan pengukuran keliling
serta pengukuran didalam daerah survey. Bila perlu jalur poligon
dapat ditarik lagi dari kerangka utama dan cabang untuk mengisi
detail planimetris. Karena pekerjaan ini lebih dominan berada dalam
wilayah perkotaan dan pemukiman penduduk, pengambilan titik - titik
situasi (spot height) juga perlu disesuaikan dengan kondisi
lapangan dan kebutuhan untuk kelengkapan data perencanaan.
2. Semua legenda lapangan ditampilkan, terutama :
3. Seluruh jalur jaringan pipa distribusi, saluran drainase.
4. Seluruh jalan yang melingkupi areal studi.
5. Batas kampung, rumah - rumah, jembatan,tower telepon, tower
listrik.
FINAL REPORT I-8
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
6. Batas tata guna lahan (misalnya pemukiman penduduk, areal
perkantoran, pusat kota, daerah resapan, belukar berupa
rerumputan dan alang-alang, sawah, rawa, ladang, kampung, kebun,
dan Iain-Iain).
7. Tiap detail topografi setempat (seperti misalnya tanggul curam,
bukit kecil dan Iain-Iain).
8. Batas pemerintahan ( Kabupaten/Kota, Kecamatan, Desa dan Iain-
lain). Nama kampung, kecamatan, nama jalan dan lain-lain yang
dianggap diperlukan.
9. Untuk pengumpulan data dan peta, perlu ditambahkan lagi dengan data
kualitatif tentang kondisi air tanah baik dari survei lapangan maupun data
geologi. Data lainnya yang disebutkan dalan KAK sudah standar untuk
pembuatan outline plan dan DED.
10. Di dalam metode pengukuran disebutkan bahwa sebelum pekerjaan
dimulai, konsultan menyerahkan program kerja yang berisi jadwal
waktu pelaksanaan pekerjaan, daftar personil, daftar peralatan
dan rencana keberangkatan untuk dibahas bersama dengan Direksi.
Mengingat waktu pelaksanaan relatif singkat, maka perlu ditetapkan
bahwa yang dimaksud direksi dalam hal ini adalah wakil pemberi
tugas yang berada di Kabupaten Aceh J aya. Dalam penulisan tata
guna lahan, mengingat studi ini bukan studi tata ruang maka kami usulkan
agar pembuatan peta tidak terfokus pada tata guna lahan, daerah
resapan, belukar berupa rerumputan dan alang-alang, sawah, rawa,
ladang, kampung, kebun, dan lain-Iain.


1.4. Sistematika Pelaporan
Laporan Draft Final ini disusun untuk memenuhi salah satu kewajiban
Konsultan dalam melaksanakan pekerjaan tersebut di atas.

Secara garis besarnya FINAL REPORT ini disusun sebagai berikut:



FINAL REPORT I-9
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
Bab I : Pendahuluan
Uraian pada Bab ini mencakup latar belakang, maksud tujuan, sasaran,
lingkup kegiatan dan sistematika usulan penulisan laporan.

Bab II : Skenario Pembangunan Kota
Bab ini menguraikan mengenai skenario pembangunan di Kabupaten Aceh
J aya.

Bab III : Sistem Penyediaan Air Minum
Pada bab ini akan dideskripsikan kondisi eksisting, kriteria dan rekomendasi
perencanaan, rancangan teknik maupun institusi, rencana anggaran biaya dan
jadual pelaksanaan pekerjaan sektor air minum.

Bab IV : Sanitasi dan Limbah
Uraian bab ini akan berisikan kondisi eksisting, kriteria dan rekomendasi
perencanaan, rancangan teknik maupun institusi, rencana anggaran biaya dan
jadual pelaksanaan pekerjaan sektor sanitasi dan limbah.

Bab V : Persampahan
Pada bab ini akan dideskripsikan kondisi eksisting, kriteria dan rekomendasi
perencanaan, rancangan teknik maupun institusi, rencana anggaran biaya dan
jadual pelaksanaan pekerjaan sektor persampahan.

Bab VI : Drainase
Uraian bab ini akan mendeskripsikan kondisi eksisting, kriteria dan
rekomendasi perencanaan, rancangan teknik maupun institusi, rencana
anggaran biaya dan jadual pelaksanaan pekerjaan sektor drainase.

Bab VII : Rencana Anggaran Biaya
Uraian bab ini akan diuraiakan biaya investasi dari masing-masing sektor yaitu
air minum, air limbah, persapahan dan drainase.

Bab VIII : Analisa Keuangan
Uraian bab ini akan diuraiakan analisa keuangan dari biaya investasi dari
masing-maisng sektor.
FINAL REPORT I-10
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
Bab IX : Institusi/Kelembagaan
Uraian bab ini akan diuraiakan reomendasi kelembagaan dari masing-masing
sektor.


FINAL REPORT I-11
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
BAB II
GAMBARAN UMUM WILAYAH STUDI



2.1. Geografi
Letak geografis Kabupaten Aceh Barat terletak di antara 44
0
22- 05
0
16LU dan di
antara 95
0
02- 63
0
03LS dengan luas wilayah 23.727,00 Km
2
. Wilayah administratif
Kabupaten Aceh J aya terbagi menjadi 6 Kecamatan dengan 21 Desa dan 0
Kelurahan. Secara administratif Kabupaten Aceh J aya memiliki batas-batas
sebagai berikut :
Sebelah Utara : Kab. Aceh Besar dan Kab. Pidie
Sebelah Selatan : Samudra Indonesia dan Kab. Aceh Barat
Sebelah Timur : Kab. Pidie dan Kab. Aceh Barat
Sebelah Barat : Samodra Indonesia


2.2. Topografi
Sebagian besar wilayah Kabupaten Aceh J aya topografinya adalah sebagai
berikut:
Dataran dengan ketinggian 0 5 m mencakup : 87 desa
Dataran dengan ketinggian 5 50 m : 154 desa
Berbukit-bukit mencakup : 21 desa

Kota-kota dan Desa sebagian besar berada di dataran yang terdapat di pesisir
pantai Samudra Indonesia.

2.3. Penduduk
J umlah dan kepadatan penduduk di Kabupaten Aceh J aya menurut Kecamatan
dipaparkan pada Tabel 2.1.



DRAFT FINAL REPORT II-1
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
Tabel 2.1. J umlah dan Kepadatan Penduduk Kabupaten Aceh J aya sebelum dan
sesudah bencana

Sebelum Bencana Sesudah Bencana

NO



KECAMATAN


Luas
Wilayah
(Ha)

J umlah
Penduduk
(jiwa)
Kepadatan
Penduduk
(jiwa/Ha)
J umlah
Penduduk
(jiwa)
Kepadatan
Penduduk
(jiwa/Ha)
1 Teunom 56.800 19.350 0.34 16.473 0.29
2 Panga 30.700 6.673 0.22 5.336 0.17
3 Krueng Sabe 58.800 14.864 0.25 9.897 0.17
4 Setia Bakti 62.900 6.760 0.11 5.391 0.09
5 Sampoi Niet 101.100 18.348 0.18 16.339 0.16
6 J aya 62.400 23.481 0.38 19.981 0.32
TOTAL 372.700 89.476 0.24 73.417 0.20


Tabel 2.2. Banyaknya Rumah Tangga, Penduduk Th. 2002
NO KECAMATAN
J umlah Rumah
Tangga
(KK)
J umlah
Penduduk
(J iwa)
1 Teunom 3.356 21.553
2 Panga 1.293 7.514
3 Krueng Sabe 2.494 14.106
4 Setia Bakti 1.457 8.059
5 Sampoi Niet 2.363 13.532
6 J aya 4.452 23.472
TOTAL 15.415 88.236

DRAFT FINAL REPORT II-2
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
Gambar 2.1. Peta Administratif Kabupaten Aceh J aya
































DRAFT FINAL REPORT II-3
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

BAB III
SKENARIO PENGEMBANGAN KOTA


3.1. Kebijaksanaan Pembangunan
Kebijaksanaan pembangunan terkait erat dengan rancangan infrastruktur
yang pada dasarnya merupakan suatu rencana yang dibuat secara
berkesinambungan dimana satu rancangan merupakan suatu dasar untuk
rancangan yang lain sehingga :
Ada suatu evaluasi dan perbaikan terhadap rancangan yang sudah
ada.
Rancangan tidak tumpang tindih atau mengalami duplikasi.
Arah pengembangan konsisten dengan hal hal yang sudah ada.

Dengan diberlakukannya Undang-Undang no. 22 tentang Pemerintahan Daerah
dan Undang-undang no 25. tahun 1999 tentang Perimbangan Keuangan Antara
Pemerintahan Daerah dan Pusat yang kesemuanya merupakan pelaksanaan dari
Otonomi Daerah, maka basis kebijakan pembangunan terletak pada daerah
otonomi. Beberapa urusan yang semula ditangani oleh pemerintah pusat, dengan
diberlakukannya Undang-undang ini harus diserahkan kepada daerah. Khusus
untuk bidang air minum, kebijaksanaannya penting untuk dikaitkan dengan PP 16
tahun 2005 tentang Pengembangan Air Minum di Indonesia yang direncanakan
akan diberlakukan sejak 1 J anuari 2008.


3.2. Pembagian Wilayah
Kabupaten Aceh J aya, terdiri dari 6 Kecamatan, yaitu :
a. Teunom
b. Panga
c. Krueng Sabee
d. Setia Bakti
e. Sampoinet
f. J aya
FINAL REPORT III-1
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

Untuk lebih jelasnya lokasi kecamatan di Kabupaten Aceh J aya tersebut dapat
dilihat pada gambar 3.1.

Gambar 3.1. Lokasi Kecamatan di Kabupaten Aceh J aya

EDI T : nomer pada gambar di edi t
sesuai l apor an














Pada saat sebelum tsunami, Kota Calang sebagai Ibukota Kabupaten Aceh J aya
merupakan daerah urban dengan ciri perkotaan yang non agraris. Sedangkan
kecamatan kecamatan lain merupakan daerah perdesaan dengan ciri-ciri
daerah pertanian dan nelayan. Namun setelah tsunami, kondisi kota dan
infrastrukturnya hampir 80% rusak.


3.3. Rencana Umum Tata Ruang
3.3.1. Rencana Pemanfaatan Ruang
Rencana pola pemanfaatan ruang Kabupaten Aceh J aya meliputi rencana pola
pemanfaatan kawasan lindung dan rencana pola pemanfaatan kawasan budidaya
sebagai berikut :
1. Kawasan lindung, meliputi:
a. Hutan bakau dan sempadan sungai
FINAL REPORT III-2
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

b. Hutan lindung.
2. Kawasan budidaya, meliputi:
a. Perikanan /tambak.
b. Hutan produksi
c. Kawasan produksi, terdiri atas:
- Kawasan pertanian lahan basah.
- Kawasan pertanian lahan kering.
- Kawasan pertanian tanaman tahunan
- Kawasan perkebunan besar.
- Kawasan perkebunan rakyat/tanaman rakyat.
d. Kawasan permukiman dan pusat kota, terdiri atas:
- Kawasan permukiman perkotaan.
- Kawasan permukiman terbatas.
- Zona CBD dan sub pusat wilayah kota.
e. Kawasan pelabuhan

Peruntukan zona pemanfaatan ruang Kabupaten Aceh J aya, yang terdiri dari
kawasan perkotaan dan perdesaan disesuaikan dengan karakteristik wilayah yang
rawan bencana, meliputi :
1. Zona Pantai/Hutan Bakau (Z-1-1).
2. Zona Perikanan/Tambak dan Permukiman Desa Terbatas (Z-1-2).
3. Zona Hutan (Hutan Produksi)/Ruang Terbuka Hijau (Z-1-3).
4. Zona Hutan Lindung (Z-1-4).
5. Zona Rawa (Z-1-5).
6. Zona Pertanian Lahan Basah dan Permukiman Desa Terbatas (Z-2-1)
7. Zona Pertanian Lahan Kering dan Permukiman Desa Terbatas (Z-2-2)
8. Zona Pertanian Tanaman Tahunan dan Permukiman Terbatas (Z-2-3)
9. Zona Perkebunan Besar dan Permukiman Terbatas (Z-2-4).
10. Zona Perkebunan Rakyat/Tanaman Rakyat dan Permukiman Desa
a. Terbatas (Z-2-5).
11. Zona Pusat Kota/CBD dan Sub-Pusat Kota (Z-3-1).
12. Zona Pusat Permukiman Baru (Z-3-2).
13. Zona Permukiman Terbatas (Z-3-3).
FINAL REPORT III-3
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

Untuk lebih jelasnya, zonasi tersebut dapat dilihat pada gambar berikut ini.

Gambar 3.2. : Zonasi Pemanfaatan Ruang















Sumber : Buku Rinci Rehabilitasi dan Rekonstruksi NAD-Nias,
Bappenas 2004


3.3.2. Rencana Penataan Kawasan Permukiman
Salah satu yang menjadi acuan di dalam skenario pengembangan kota dalam
rangka Rehabilitasi / Rekonstruksi kawasan permukiman adalah perencanaan
partisipatif yang dimulai dari penataan skala lingkungan (area based) yang
mengacu kepada rencana tata ruang sebelum bencana, rencana rekonstruksi
struktur kota, dan upaya-upaya peningkatan kualitas lingkungan perumahan dan
permukiman melalui penataan kembali (revitalisasi). Secara skematik pendekatan
tersebut digambarkan seperti dibawah ini :

FINAL REPORT III-4
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

Gambar 3.3 : Skematik Pendekatan Pengembangan Kota
Sumber : Buku Rencana Rinci Infrastruktur Rehabilitasi dan Rekonstruksi
GRAND SKENARIO
Konsep Struktur (Conceptual Structure)
Rekonstruksi Kota
Rekonstruksi Rencana
UmumTata Ruang Kota
Semua Tingkatan
Tingkat Kota
Skala Kota
Skala Kawasan


3.3.3 Rencana Penyebaran dan Kepadatan Penduduk
Berdasarkan hasil analisis yang dilakukan berkaitan dengan rencana proyeksi
perkembangan penduduk Kabupaten Aceh J aya tahun 2010, maka dengan
menggunakan analisa regresi untuk perhitungan proyeksi dan penyebaran
penduduk diperkirakan masih memiliki kecenderungan yang sama dengan kondisi
penyebaran sebelum bencana tsunami. Arah penyebaran penduduk yang terjadi
saat ini cenderung ke arah jalur utama yang menghubungkan Kota Calang dengan
Tapaktuan Medan.

Berdasarkan hasil analisis yang telah dilakukan tersebut, maka perkiraan
penyebaran penduduk tersebut sampai tahun 2026 adalah sebagai berikut :
FINAL REPORT III-5
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

1. Kecamatan dengan Tingkat Kepadatan relatif tinggi (>500 jiwa/km),
adalah Kecamatan J aya, Krueng Sabee, Teunom
2. Kecamatan dengan Tingkat Kepadatan relatif sedang (> 101 500
jiwa/km), meliputi Kecamatan Setia Bakti, Sampoinet
3. Kecamatan dengan Tingkat Kepadatan relatif rendah (<100 jiwa/km),
adalah Kecamatan Panga.


3.4. Rencana Sarana Kota
Seluruh aktivitas kota termasuk sarananya diusahakan berlokasi dikawasan
budidaya. Semua peruntukan merupakan konsekuensi logis dari kebutuhan ruang
sampai dengan tahun 2026 dan merupakan perwujudan dari kecenderungan
perkembangan kota dengan tetap berdasar pada kepentingan dan pemberdayaan
masyarakat.

Konsep peruntukan lahan yang diterapkan adalah flexible zoning, artinya dalam
bentuk ruang (spatial). Peruntukan yang dimaksud tidak bermaksud mutlak, dalam
kondisi tertentu, pemasukan aktifitas lain terhadap kawasan yang telah ditetapkan
masih diperbolehkan, terutama demi mencapai perwujudan penggunaan lahan
yang intensif dan tingkat efisiensi yang tinggi dari berbagai aktivitas yang saling
berkaitan.

Peruntukan lahan kota direncanakan sedemikian rupa dalam suatu kesatuan
sistem yang saling terkait, tapi dinamis untuk dikembangkan lebih lanjut atau
diintegrasikan dengan lingkungan sekitarnya. Khusus untuk perumahan ditetapkan
sedemikian rupa agar dapat mengakomodasikan pertumbuhan yang melompat-
lompat (discontinue). Artinya akomodatif terhadap tahapan pelaksanaan dan perlu
dicadangkan jauh melebihi rencana yang dibutuhkan.

3.4.1. Perumahan
Pembangunan lingkungan perumahan baru terutama diarahkan di Ibukota
Kabupaten dan kecamatan atau desa di jalur utama jalan Calang Banda Aceh,
Calang Tapaktuan Medan. Permukiman baru diarahkan pengembangannya
pada Kecamatan Krueng Sabee, Teunom, J aya. Namun demikian secara khusus
perumahan pada bagian wilayah kota (Calang dan Keude Krueng Sabee) perlu di
FINAL REPORT III-6
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

prioritaskan penataan pengembangannya, mengingat BWK tersebut saat ini
memiliki kecenderungan perkembangan permukiman yang paling tinggi.
Rencana kawasan perumahan ditetapkan untuk dapat menampung sekitar 30.000
an jiwa penduduk saat ini sampai dengan tahun 2026/2027, dengan ketetapan
(rata-rata) 1 unit rumah untuk 4 - 6 anggota keluarga.

Apabila digunakan standar 1 unit rumah membutuhkan kavling besar dengan
ukuran 270 m, kavling sedang dengan ukuran 150 m, dan kavling kecil dengan
ukuran 90 m maka kebutuhan ruang untuk kawasan perumahan masing-masing
untuk lima tahun pertama (tahun 2011) dan tahun 2026 dapat dilihat pada tabel
3.1.
Tabel 3.1. Rencana Kebutuhan dan Penambahan Perumahan di
Kabupaten Aceh J aya
Sumber : Podes 2005 dan analisa konsultan
Tahun
Rencana
Jumlah
Penduduk
(Jiwa)
Kebutuhan
Sarana
Perumahan
(Unit)
Depresiasi
(%)
Penyusutan
Perumahan
Ketersediaan
(Unit)
Kebutuhan
Penambaha
n (Unit)
2006 64.041 10.674 0 0 10.674 10.674
2011 74.241 4.175 5,5 4.404 8.579 8.579
2026 95.194 14.864 12 16.648 31.512 31.512

Usulan Kebijakan Pembangunan Perumahan
1. Sarana Unit Lingkungan Perumahan
Sarana unit lingkungan perumahanakan berada di setiap pusat lingkungan
perumahan sesuai dengan hirarkinya. J enis sarana yang terdapat pada
setiap pusat lingkungan perumahan tersebut yakni perdagangan,
perkantoran/jasa bangunan umum, pendidikan kesehatan, peribadatan dan
ruang terbuka hijau.
2. Distribusi Kepadatan Penduduk di Kawasan Perumahan
Penyebaran kepadatan penduduk untuk seluruh wilayah Kabupaten Aceh
J aya sampai tahun 2011 ditetapkan berdasarkan kepadatan penduduk
bersih dan kepadatan penduduk kotor.


FINAL REPORT III-7
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

3. Pola Pembangunan Lingkungan perumahan
Pola pembangunan kawasan perumahan di Kabupaten Aceh J aya
diarahkan berpedoman pada perumahan yang ada dengan meningkatkan
kualitas lingkungan perumahan tersebut. Prioritas penataan kawasan
perumahan di Kabupaten Aceh J aya pada daerah perumahan di Pusat
Kota Calang. Pengembangan kawasan perumahan baru diarahkan ke arah
jalur transportasi utama Calang Banda Aceh dan ke arah Tapaktuan
Medan.
4. Tipe-tipe Perumahan
Tipe perumahan yang dimungkinkan meliputi :
a. Perumahan tipe besar dengan luas parsil minimal 300 - 600 m
b. Perumahan tipe sedang dengan luas parsil minimal 120 - 300 m
c. Perumahan tipe kecil dengan luas persil minimal 70- 120 m

3.4.2. Perdagangan dan Jasa
Kegiatan perdagangan ditempatkan pada sub-sub pusat kota, pusat-pusat
lingkungan perumahan dan pada koridar jalan arteri. Barang-barang yang dijual
disini adalah konsumsi harian penduduk dan berbentuk barang eceran.
Seluruh kecamatan perlu dilengkapi dengan sebuah pasar eceran (retail) yang
sekaligus representatif.

3.4.3. Industri
Kegiatan industri dalam bentuk skala yang kecil atau industri rumah tangga yang
bersifat tidak polutif dibolehkan berlokasi secara acak di dalam kota. Produk
kegiatan industri yang dimaksud diantaranya berupa barang-barang elektronik,
pakaian/ konveksi, meubeler, mainan anak-anak dan lain-lain.

3.4.4 Pendidikan
Untuk jangka panjang, perguruaan tinggi yang mungkin berkembang secara pesat
diarahkan untuk mengembangkan kegiatan mereka nantinya di koridor jalan arteri,
dan pusat perkantoran dan pendidikan.



FINAL REPORT III-8
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

3.4.5. Rencana Pengembangan Pariwisata Kabupaten Aceh Jaya
Rencana pengembangan pariwisata yang hendak diusulkan pada laporan ini
bertujuan untuk meningkatkan kontribusi sektor ini di dalam pengembangan
perekonomian, terutama dalam peningkatan Pendapatan Asli Daerah (PAD) dan
yang lebih utama adalah untuk mengembangkan segala potensi obyek dan daya
tarik wisata yang dimiliki agar dapat memberikan hasil yang lebih optimal. Untuk
tujuan itu dilakukan beberapa pendekatan antara lain :
1. Rencana pengembangan pariwisata ini dibuat atas dasar berbagai kondisi
obyektif yang ditemui pada setiap lokasi obyek wisata yang ada serta
kecenderungan arah dan orientasi pengembangan yang terjadi sehingga
apa yang hendak diusulkan dalam rencana pengembangan pariwisata ini
benar-benar relevan, logis dan realistis, serta mudah dioperasikan didalam
program pembangunan kepariwisataan.
2. Pengembangan pariwisata yang hendak dilakukan tetap memperhatikan
berbagai faktor yang sangat prinsipil yaitu nilai keagamaan, kebudayaan,
adat istiadat yang telah begitu menyatu dalam kehidupan masyarakat
Kabupaten Aceh J aya.
3. Demikian pula di dalam aktivitas pembangunan fisik guna penyediaan
sarana, prasarana, dan sarana penunjang harus tetap dapat dilakukan
dengan pola pembangunan yang berwawasan lingkungan sehingga potensi
dan kualitas lingkungan yang ada tetap dapat dipelihara dan dikembangkan
secara arif dan bijaksana. Menyadari kemampuan dan keterbatasan yang
dimiliki Pemerintah Kabupaten Aceh J aya, maka pengembangan pariwisata
akan dilakukan dengan suatu strategi pengembangan yang dibuat khusus
sesuai dengan urutan skala prioritas pengembangan melalui evaluasi dan
inventarisasi potensi obyek wisata dan daya tarik wisata yang dimiliki.
Pengembangan perbaikan dan peningkatan prasarana pendukung seperti
jalan, drainase, air bersih, listrik dan jaringan telekomunikasi serta sarana
dan sarana penunjang lainnya. Menciptakan iklim usaha dan investasi yang
lebih kondusif para pengusaha dan investor yang berminat membangun
dan mengembangkan obyek wisata yang ada. Melakukan kegiatan
publikasi dan promosi dan pemasaran secara lebih intensif melalui
berbagai pihak yang berkaitan dengan pengembangan kegiatan pariwisata.
FINAL REPORT III-9
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C


BAB IV
SISTEM PENYEDIAAN AIR MINUM


4.1. KONDISI EKSISTING

Sistem penyediaan air minum di Kabupaten Aceh J aya melalui dua sistem yaitu
sistem non perpipaan baik berupa sumur dangkal, sumur pompa tangan, bak
penampung air hujan dan bangunan perlindungan mata air. Dan sistem perpipaan
yang terdapat di Kota Calang, IKK Teunom dan IKK Lamno.

Gambar 4.1. Persentase Pelayanan Air Minum di Kabupaten Aceh J aya


Lai-lain, 13%
Sungai, 4%
Perpipaan, 4%
Mata air, 7%
Sumur, 73%











4.1.1. Kecamatan Jaya/IKK Lamno
A. Umum
Sumber air untuk penduduk di kecamatan J aya dibedakan untuk
pemenuhan kebutuhan bagi air minum dan kebutuhan MCK ( mandi, cuci
dan kakus ). Kondisi eksisting sumber air untuk memenuhi kebutuhan
tersebut diperoleh dari beberapa cara umumnya dilakukan sebagai berikut :
Untuk air minum : umumnya penduduk mempunyai sumur dan sebagian
kecil melalui PDAM / perpipaan, serta sebagian kecil lagi mendapatkan
air langsung dari sungai.
FINAL REPORT IV-1
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C


Untuk MCK sebagian besar penduduk mendapatkan sumber air dari :
sumur, sungai atau menampung air hujan.




Lai-lain, 48%
Sungai, 4%
Perpipaan, 2%
Mata air, 2%
Sumur, 44%
















Gambar 4.2. Persentase Pelayanan Air Minum di Kecamatan J aya

Dari hasil penelitian lapangan didapatkan data sumber air sebagai berikut :
Mata air
Tidak didapatkan mata air yang layak untuk dikembangkan sebagai
sumber air minum perpipaan. Sebagian penduduk di desa Gle Putoh
mendapatkan air dari air gunung yang jernih (dari hulu sungai Krueng
Lambeso).

Air tanah dangkal
Dari pengamatan beberapa sumur penduduk, maka air sumur cukup
baik kualitasnya, pH berkisar antara 7,0 8,1, air nya jernih dan tidak
terintrusi air laut. Kedalaman sumur antara : 6 sampai 18 meter, dan
menurut keterangan beberapa pemilik sumur tidak terdapat fluktuasi
yang nyata (sampai kering) pada saat musim kemarau.

Air tanah dalam
FINAL REPORT IV-2
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C


Selain sumber air tanah dangkal juga terdapat air tanah dalam dengan
dari sumur bor yang dibuat oleh OXFAM di Lamno bagian selatan
terdapat air yang layak dikonsumsi pada kedalaman sekitar 70 m. Dan
dari hasil penelitian geolistrik oleh OXFAM dapat dilihat bahwa sumber
air berada antara 10-70 dengan debit kecil sampai sedang yaitu 1-3
l/dtk perlubang.
B. Sistem Perpipaan
Kabupaten Aceh J aya merupakan salah satu wilayah dengan jumlah
korban relatif tinggi, sehingga pada sub bab ini dalam membahas sistem air
minum perpipaan dilakukan pembagian kondisi sebelum bencana dan
kondisi setelah bencana
1). Sebelum Bencana Tsunami
a). Sumber air baku dan sistem produksi
Air baku bagi sistem penyediaan air minum Kecamatan J aya dari
mata air Gle Melha dengan kapasitas 5 - 10 l/det berlokasi diperbukitan
pada ketinggian +90 meter diatas permukaan laut dengan jarak 1,2 km
dari Kota Lamno. Bangunan penangkap air dibangun pada jaman
pendudukan Belanda. Karena bentuknya yang terbuka, kualitas airnya
dipengaruhi oleh aliran permukaan air hujan.

b.) Pengolahan
Tidak ada sistem pengolahan

c). Sistem transmisi
Sistem transmisi dilakukan secara gravitasi dengan pipa berdiameter
150 mm.

d). Reservoir distribusi
Tidak terdapat reservoir pada sistem IKK Lamno

e). Sistem distribusi
Pendistribusian air kepada masyarakat pelanggan dilakukan dengan
memanfaatkan perbedaan tinggi antara instalasi pengolahan air
dengan daerah pelayanan (sistem gravitasi) dan disalurkan melalui
FINAL REPORT IV-3
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C


FINAL REPORT IV-4
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
pipa distribusi primer dan sekunder dengan diameter 150 mm, 100
mm dan 75 mm.

f). Sambungan dan pelanggan
J umlah penduduk yang terlayani diperkirakan sebanyak 500 jiwa dan
sampai dengan terjadinya bencana, air yang digunakan oleh penduduk
tidak dipungut bayaran karena belum ada meter air. Dengan jumlah
penduduk 23.481 jiwa, maka cakupan pelayanan adalah sebesar 2%.

2). Setelah Bencana
Hampir 70% wilayah kecamatan J aya terkena bencana tsunami atau 31
dari 48 desa terkena tsunami. Sistem perpipaan air minum yang
sebagian besar terletak di desa Pasar Lamno termasuk desa yang luput
dari tsunami. Maka hanya sebagian kondisi jaringan pipa air minum
yang rusak, sedangkan sebagian lagi masih dapat digunakan.

C. Rehabilitasi/Rekonstruksi

Beberapa NGO yang ditemui merencanakan untuk memperbaiki sistem
adalah : Oxfam , membangun sarana penyediaan air secara dararut
dan permanen berlokasi di desa :
- Mon J aneng : sistem air bersih sudah beroperasi mengambil air dari
mata air Mon J aneng yang di pompa masuk kedalam bak
pengolahan, kemudian disalurkan ke 10 unit kran umum yang ini
melayani 597 jiwa di tiga desa.
- Mukhan : sistem air bersih dengan sumber dari sumur bor dan
dipompa untuk melayani 7 kran umum atau 257 jiwa.
- Membersihkan dan memperbaiki sumur penduduk sebanyak 367
unit.






PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C


Gambar 4.3. Skematik Sistem Penyediaan Air Minum Kec. J aya (IKK Lamno)




















GIP 150 mm
Broncaptering
Mata air Gle Melha
5-10 L/dt
1.200 m
GIP 75 mm
GIP 100 mm
GIP 150 mm
Kota Lamno
500 jiwa (2%)
FINAL REPORT IV-5
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C


FINAL REPORT IV-6
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA

Gambar 4.4. Peta Pelayanan Air Minum Kec. J aya (IKK Lamno)
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C


4.1.2. Kecamatan Sampoinet
A. Umum
Sumber air untuk penduduk di kecamatan Sampoinet dibedakan untuk
pemenuhan kebutuhan bagi air minum dan kebutuhan MCK (mandi, cuci
dan kakus). Kondisi eksisting sumber air untuk memenuhi kebutuhan
tersebut diperoleh dari beberapa cara umumnya dilakukan sebagai berikut :
Untuk air minum : umumnya penduduk mempunyai sumur dan sebagian
kecil melalui PDAM / perpipaan, serta sebagian kecil lagi mendapatkan
air langsung dari sungai.
Untuk MCK sebagian besar penduduk mendapatkan sumber air dari :
sumur, sungai atau menampung air hujan.



Lai-lain, 1%
Sungai, 13%
Perpipaan, 0%
Mata air, 25%
Sumur, 62%













Gambar 4.5. Persentase Pelayanan Air Minum di Kecamatan Sampoinet

Dari hasil penelitian lapangan, didapatkan data sumber air sebagai
berikut :
Terdapat 2 ( dua ) mata air yang layak untuk dikembangkan sebagai
sumber air minum perpipaan, yaitu mata air Kumala dan sumber air Tee
Bee.

Beberapa penduduk desa yang mendapatkan air dari mata air adalah :
a. Desa Mata Ie
b. Desa Patek
FINAL REPORT IV-7
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C


c. Desa Kuala Bakong
d. Desa Cot Langsat
e. Desa Babah Nipah
f. Desa Kuala ligan dan
g. Desa Teupin Nasar.

Penduduk di desa-desa yang mempunyai mata air dengan debit sesaat
berkisar antara 5 L/dt tersebut, memperoleh air dengan cara mengambil
langsung dari mata air. Sistem perpipaan di Lhok Kruet merupakan satu-
satunya sistem perpipaan di Kecamatan Sampoinet.

Dari hasil penelitian lapangan, maka untuk sumber air : mata air Kumala
dan mata air Tee Bee dilaporkan sebagai berikut :

Tabel 4.1. Kondisi Mata Air di Kecamatan Lhok Kruet
1 Kecamatan Lhok Kruet Bpk. Yakyah
- Mata Air Kumala 5.9 - 0.01 008 0.00 J ernih, Tidak Bau
- Mata Air Teebe 7.0 -

0.02 015 0.00 J ernih, Tidak Bau
No
Penunjuk Lokasi
Sumber
Lokasi Survey
Fe mg/L Warna
Hasil Tes Air
PH DHL/S Cl ppm

B. Sistem Perpipaan
1). Sebelum Bencana
a). Sumber air baku dan sistem produksi
Air baku bagi sistem penyediaan air minum Kecamatan Sampoinet
dari mata air Lhok Kruet dengan kapasitas 2,5 l/det berlokasi
dipegunungan. Bangunan penangkap air bentuknya yang terbuka, kualitas
airnya dipengaruhi oleh aliran permukaan air hujan.

b.) Pengolahan
Tidak ada sistem pengolahan

c). Sistem transmisi
Sistem transmisi dilakukan secara gravitasi dengan pipa berdiameter
100 mm.
FINAL REPORT IV-8
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C


FINAL REPORT IV-9
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
d). Reservoir distribusi
Tidak terdapat reservoir pada sistem IKK Lhok Kruet

e). Sistem distribusi
Pendistribusian air kepada masyarakat pelanggan dilakukan dengan
memanfaatkan perbedaan tinggi antara instalasi pengolahan air
dengan daerah pelayanan (sistem gravitasi) dan disalurkan melalui
pipa distribusi primer dan sekunder dengan diameter 100 mm, 75
mm dan 50 mm.

2). Setelah Bencana
Sekitar 30 % dari wilayah kecamatan Sampoinet terkena tsunami
dengan tingkat kerusakan sebagian hingga total. Desa Lhok Kruet
merupakan salah satu desa di Kecamatan Sampoinet yang sebagian
terkena bencana tsunami . Kondisi perpipaan banyak yang putus
dan perlu diganti dengan jaringan baru.

C. Rehabilitasi/Rekonstruksi
OXFAM membangun sumur bor dan menyediakan truck tangki dan bak
penampungan air. NGO yang lain membantu memperbaiki mata air dan
sistem pengaliran untuk Lhok Kruet dan bebarapa desa di Setia Bakti.













Mata air Lhok Kruet
2,5 L/dt
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C


FINAL REPORT IV-10
100 mm
50 mm
75 mm
100 mm
Gambar 4.6. Skematik Sistem Penyediaan Air Minum Kec. Sampionet (IKK Lhok Kruet)
Broncaptering
Desa Lhok KRUET
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA




















PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



4.1.3. Kecamatan Krueng Sabee
A. Umum
Sumber air untuk penduduk di kecamatan Krueng Sabee dibedakan untuk
pemenuhan kebutuhan bagi air minum dan kebutuhan MCK ( mandi, cuci
dan kakus ). Kondisi eksisting sumber air untuk memenuhi kebutuhan
tersebut diperoleh dari beberapa cara umumnya dilakukan sebagai berikut :
Untuk air minum : umumnya penduduk mempunyai sumur dan sebagian
kecil melalui PDAM / perpipaan, serta sebagian kecil mendapatkan air
langsung dari sungai.
Untuk MCK sebagian besar penduduk mendapatkan sumber air dari :
sumur, sungai atau menampung air hujan.


Lai-lain, 1%
Sungai, 0%
Perpipaan, 5%
Mata air, 0%
Sumur, 94%














Gambar 4.7. Persentase Pelayanan Air Minum di Kecamatan Sampoinet

Dari hasil penelitian lapangan, didapatkan data sumber air sebagai berikut :
Terdapat 3 (tiga) mata air yang layak untuk dikembangkan sebagai sumber
air minum perpipaan, yaitu mata air Ie Merah, Krueng Sabee 1 dan sumber
air Krueng Sabee 2.

Dari hasil penelitian lapangan untuk sumber air mata air Ie Merah dan
mata air Kruerng Sabee 1 dan 2 terdapat pada table 4.2.

FINAL REPORT IV-11
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



Tabel 4.2. Kondisi Mata Air di Kecamatan Krueng Sabee

3.4.2.
1 Kecamatan Krueng Sabe Bpk. Yusuf Cs Lokasi Sumber MA Ie MerahElevasi +62.6meter
- MataAir Ie MerahDesaIe Merah 6.8- 0.16 093 0.03 Lokasi PelayananElevasi Muka Tanah+5.2Meter
J arak Mata Air Ke Pelayanan5000m
2 - Sungai KruengSabe 1 7.5-


0.08 047 0.31 Lokasi Rencana Intake Sungai Krueng1Sabe Elevasi +4.6meter
Lokasi PelayananElevasi Muka Tanah+5.2Meter
J arak Mata Air Ke Pelayanan2000m
3 - Sungai KruengSabe 2 7.1-


0.09 056 0.03 Lokasi Rencana Intake Sungai Krueng2Sabe Elevasi 3.2meter
Lokasi PelayananElevasi Muka Tanah+5.2Meter
J arak Mata Air Ke Pelayanan1000m
J ernih, Tidak
Bau
Sedikit
Keruh,tidak bau
Sedikit
Keruh,tidak bau
No
Penunjuk
Lokasi
Sumber
Lokasi Survey
Fe mg/L Warna
Keterangan
Hasil Tes Air
PH DHL/S Cl ppm

B. Sistem Perpipaan
1). Sebelum Bencana
a). Sumber air baku dan sistem produksi
Air baku bagi sistem penyediaan air minum Kecamatan Krueng
Sabee dari krueng Sabee dengan kapasitas 40 l/det berlokasi di Desa
Bahagia di sebelah selatan Kota Calang.

b.) Pengolahan
Sistem Pengolahan lengkap (koagulasi, flokulasi, sedimentasi, filtrasi
dan desinfeksi) yang ada saat ini terdapat di Krueng Sabee
kapasitas produksi 40 l/det.

c). Sistem transmisi
Sistem transmisi dilakukan secara gravitasi dengan pipa berdiameter
300 mm dengan jenis pipa GIP dan PVC.

d). Reservoir distribusi
Tidak terdapat data reservoir pada sistem Krueng Sabe

e). Sistem distribusi
Pendistribusian air kepada masyarakat pelanggan dilakukan dengan
sistem perpompaan dan disalurkan melalui pipa distribusi primer dan
sekunder dengan diameter 300 mm sepanjang 4.000 meter ke arah
Kota Calang, pipa PVC 150 mm sepanjang 2.500 meter kearah
Teunom.

FINAL REPORT IV-12
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



FINAL REPORT IV-13
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
2). Setelah Bencana
Hampir 80% desa di kecamatan Krueng Sabee terkena bencana
tsunami termasuk sistem air minum yang ada di desa Bahagia ini.
Instalasi dan jaringan pipa mengalami rusak berat dan sebagian
tidak dapat digunakan lagi.

C. Rehabilitasi/Rekonstruksi
Thames J aya membangun saranan air bersih secara darurat dan
dioperasikan oleh IRC-Cardi namun sistem ini dipindahkan ketempat lain
karena OXFAM dan IRC mulai membangun sistem perpipaan dari sumber
mata air ACf telah mengangkut air dengan truck tangki sekitar 20 m
3
per
hari. IRC-Cardi membangun sumur bor lengkap dengan pompa, genset
untuk melayani tenda pengungsi di desa Kuta Tuha. Samaritan purse telah
membersihkan banyak sumur di panga.

IRC-Cardi memperbaiki mata air. OXFAM memasang pipa dan saringan air
dari air terjun, mengalih sumur bor membersihkan dari lebih 100 unit sumur
dan menyediakan truck tangki dan bak penambungan air. Sekitar 4000-
6000 jiwa terlayani dengan air bersih. Di barak Keutapang, IRC
membangun penangkap air kemudian disimpan di bak penampungan
(kapasitas 45000 Liter)













PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C


Gambar 4.8. Skematik Sistem Penyediaan Air Minum Kec. Krueng Sabee

Sungai
GIP 300 mm
IPA 40 L/dt
PVC 300 mm
4.000 meter
Kec. Krueng Sabee
2.500 meter
PVC 150 mm














Kota Calang



Teunom


FINAL REPORT IV-14
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



FINAL REPORT IV-15
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA

Gambar 4.9. Peta Pelayanan Air Minum Kota Calang
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



4.1.4. Kecamatan Teunom
A. Umum
Sumber air untuk penduduk di kecamatan Teunom dibedakan untuk
pemenuhan kebutuhan bagi air minum dan kebutuhan MCK ( mandi, cuci
dan kakus ). Kondisi eksisting sumber air untuk memenuhi kebutuhan
tersebut diperoleh dari beberapa cara umumnya dilakukan sebagai berikut :
Untuk air minum : umumnya penduduk mempunyai sumur dan sebagian
kecil melalui PDAM / perpipaan, serta sebagian kecil mendapatkan air
langsung dari sungai.
Untuk MCK sebagian besar penduduk mendapatkan sumber air dari :
sumur.

Lai-lain, 0%
Sungai, 0%
Perpipaan, 8%
Mata air, 0%
Sumur, 92%















Gambar 4.10. Persentase Pelayanan Air Minum di Kecamatan Teunom


Dari hasil penelitian lapangan, didapatkan data sumber air sebagai berikut :
Terdapat 1 (satu) mata air yang layak untuk dikembangkan sebagai sumber
air minum perpipaan dan Sungai Teunom. Dari hasil penelitian lapangan,
maka untuk sumber air terdapat pada table 4.3.



FINAL REPORT IV-16
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



Tabel 4.3. Kondisi Sumber Air di Kecamatan Teunom
Kecamatan Teunom Bpk. Din Laot
1 - Mata Air Teungoh Desa Bintan 7.3 - 0.03 23 0.12 Lokasi Sumber MA Teungoh Elevasi +35.4 meter
Lokasi Pelayanan Elevasi Muka Tanah 3.7 Meter
J arak Mata Air Ke Pelayanan 25 Km
Harus ada Pengadaan J embatan Gantung Bentang 200 m
2 - Sungai Teunom 6.8 -

0.11 64 0.12
Lokasi Dekat J embatan J alan Propinsi
J ernih, Tidak
Bau
J ernih, Tidak
Bau
No
Penunjuk
Lokasi
Sumber
Lokasi Survey
Fe mg/L Warna
Keterangan
Hasil Tes Air
PH DHL/S Cl ppm

B. Sistem Perpipaan
1). Sebelum Bencana
a). Sumber air baku dan sistem produksi
Air baku bagi sistem penyediaan air minum Kecamatan Teunom dari
Krueng Teunom dengan kapasitas 5 m
3
/det .

b.) Pengolahan
Sistem Pengolahan lengkap (koagulasi, flokulasi, sedimentasi, filtrasi
dan desinfeksi) yang ada saat ini terdapat di Krueng Teunom
kapasitas produksi 5 l/det.

c). Sistem transmisi
Sistem transmisi dilakukan secara pompanisasi dengan pipa
berdiameter 100 mm.
Pompa intake type submersible pump sebanyak 2 unit dengan kapasitas
masing-masing 5 l/det.

d). Reservoir distribusi
Reservoir kapasitas 102 m
3

e). Sistem distribusi
Pipa distribusi yang terpasang adalah jenis PVC dengan diameter 100 mm
sepanjang 4.700 meter, diameter 75 mm sepanjang 1.200 meter dan
diameter 50 mm sepanjang 1.600 meter.





FINAL REPORT IV-17
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



FINAL REPORT IV-18
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
f). Sambungan dan pelanggan
J umlah penduduk yang dilayani adalah sebanyak +1.600 jiwa melalui 325
unit sambungan rumah. Dengan jumlah penduduk sebanyak 19.350 jiwa,
maka cakupan pelayanan adalah sebesar 8 %.

2). Setelah Bencana
Bencana tsunami membuat seluruh pusat kota kecamatan Keude
Teunom hancur dan tidak berfungsi termasuk sistem air minum
perpipaan (IPA dan seluruh jaringan perpipaan ) tersapu tsunami.

C. Rehabilitasi/Rekonstruksi
Di kecamatan Teunom, GRC membangun IPA mini yang menghasilkan
air 40m
3
per hari dengan 8 jam kerja. Setengah dari jumlah air itu dikirim
ke Teunom dengan menggunakan truck tangki milik GRC, sedangkan
setengahnya lagi dikirim ke Panga dengan menggunakan truck tangki
milik ACF.


























PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C


Gambar 4.11. Skematik Sistem Penyediaan Air Minum Kec. Teunom



Krueng Teunom
1.200 meter
PVC 75 mm
PVC 50 mm
1.600 meter
4.700 meter
PVC 100 mm
GIP 100 mm
Pompa
Submersible 2 unit
kap 5 L/dt
5 m
3
/dtk



IPA 5 L/dt

Reservoir 102 m
3













Kota Teunom
325 SR (1.600 jiwa)
8%








FINAL REPORT IV-19
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



FINAL REPORT IV-20
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA

Gambar 4.12. Peta Pelayanan Air Minum Kec. Teunom

PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



4.2 . KEBUTUHAN AIR MINUM
Kebutuhan air bersih suatu wilayah berinteraksi dengan kegiatan wilayah tersebut,
lazimnya semakin tinggi tingkat kegiatan semakin besar kebutuhan akan air.
Variabel yang menentukan besaran kebutuhan akan air antara lain adalah sebagai
berikut:

a. J umlah penduduk
b. J enis kegiatan
c. Standar konsumsi air untuk individu dan kegiatan.
d. J umlah sambungan

Kebutuhan akan meningkatnya air minum sejalan dengan meningkatnya jumlah
penduduk atau kegiatannya, untuk mengantisipasi kebutuhan ini dilakukan
perencanaan dengan melakukan prediksi laju pertambahan penduduk dan sarana-
saran pendukung kehidupannya. Perencanaan dapat dilakukan untuk jangka
panjang ,menengah dan jangka pendek. Dalam melakukan pembuatan studi
kelayakan selayaknya dilakukan berdasarkan akurasi yang diperlukan.

J umlah penduduk masa datang diramalkan dengan proyeksi, kemudian ditentukan
kebutuhan perkapitanya. Kedua faktor ini merupakan parameter penentu
kebutuhan air untuk rumah tangga (domestik), selain kebutuhan air untuk non
rumah tangga (non domestik). Proyeksi kebutuhan air total kota, merupakan
penjumlahan dari kebutuhan air rumah tangga, non rumah tangga, ditambah
sejumlah air untuk kehilangan air yang tidak dapat ditanggulangi baik secara
teknis maupun ekonomis.

Kebutuhan air disini diproyeksikan dalam kondisi sedang yaitu :
Pertumbuhan kawasan perumahan dan pemukiman pada masa yang
akan datang pada masing-masing kabupaten dianggap mengalami
pertumbuhan yang sedang.
Pengembangan pergudangan/industri diasumsikan akan berkembang
sedang pada masing-masing kabupaten.
Pengembangan pariwisata diasumsikan berkembang tidak banyak hal ini
tidak banyak memicu kegiatan perdagangan dan komersial lainnya.
FINAL REPORT IV-21
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



Pertumbuhan penduduk dianggap sedang akibat dari asumsi
perkembangan di atas.

A. Proyeksi Penduduk
Dari data statistik penduduk (BPS) yang diperoleh dapat diketahui jumlah
pertumbuhan penduduk wilayah perencanaan yang di gunakan sebagai dasar
perhitungan proyeksi pertambahan penduduk sampai 20 tahun kedepan, sehingga
dapat diproyeksikan perkembangan kebutuhan air minum di wilayah perencanaan.

Pertambahan penduduk dimasa yang akan datang (proyeksi) pada dasarnya
sudah dilakukan dalam perencanaan Induk kota atau RUTRK, RBWK dan rencana
induk jangka panjang lainnya pada skala kota.

Selanjutnya untuk melacak perkembangan penduduk dimasa yang akan datang,
dengan kemungkinan-kemungkinan yang mendekati kenyataan adalah sebagai
berikut:
Pertumbuhan penduduk terjadi yang mendekati rata-rata berkisar 2-5%
pertahun selama minimal 5 tahun terakhir.

B. Proyeksi Tingkat Pelayanan Air Minum
Daerah pelayanan yang akan dijangkau oleh sistim penyediaan air minum
dirancang dan disesuaikan berdasarkan :
a. Urgensi kebutuhan air
b. Kepadatan hunian
c. Kemudahan atas penjangkauan sistim daerah pelayanan
d. Efisiensi

Yang dimaksud dengan tingkat pelayanan air minum adalah pelayanan melalui
perpipaan dan non perpipaan. Mengingat bahwa sebagian besar dari pelayanan
air minum perpipaan belum ada pengelolanya, maka tinjauan khusus terhadap
pembentukan unit pengelola ini sangat diperlukan. Sedangkan untuk non
perpipaan, dicirikan sebagai sistem perdesaan karena umumnya tidak
memerlukan input teknologi tinggi, sebagai contoh:
sumur gali
FINAL REPORT IV-22
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



sumur pompa tangan
perlindungan mata air
penampungan air hujan

Air minum perdesaan ada juga yang memakai perpipaan, dengan sistem yang
sederhana, antara lain sumur bor dan mata air gravitasi. Sistem penyediaan air
minum perdesaan pada umumnya dikelola secara swadaya oleh masyarakat atau
individual. Layanan tingkat pelayanan dengan sistem non perpipaan/individu, di
perkotaan dan perdesaan diasumsikan cenderung menurun sampai tahun 2015
dan penurunannya di dasarkan pada selisih tingkat pelayanan total dengan tingkat
pelayanan dengan sistem perpipaan

C. Jenis Pelayanan
J enis pelayanan sambungan pelanggan air bersih didaerah pelayanan meliputi:
a. Domestik
Sambungan Rumah
Hidran Umum
b. Non Domestik Kecil
c. Non Domestik Khusus

D. Proyeksi Jumlah Sambungan
Berdasarkan proyeksi penduduk dan cakupan pelayanan sistim penyediaan air
minum di perkotaan maka potensi pasar sambungan perpipan akan meningkat
dimasa yang akan datang. Tingkat pelayanan sambungan di suatu wilayah
tergantung dari Sambungan Domestik :
Kebutuhan air untuk keperluan sehari hari seperti mandi,cuci, masak dan
minum.
Ketersediaan sumber air alternatif seperti sumur dangkal,
Kemampuan membeli air.

Berdasarkan tingkat pelayanan yang ada sekarang dan faktor-faktor tersebut di
atas maka dapat diperkirakan proyeksi prosentase pelayanan sampai 20 tahun
kedepan. Berdasarkan proyeksi penduduk dan prosentase pelayanan tersebut
dapat dihitung proyeksi jumlah sambungan sesuai dengan klasifikasi pelanggan
yang ada, hal ini dituangkan dalam tabel perhitungan kebutuhan air.
FINAL REPORT IV-23
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



E. Satuan Kebutuhan Air
1). Satuan Kebutuhan Air Domestik
Perkiraan satuan kebutuhan air untuk keperluan domestik didapat
berdasarkan hasil survey penelitian pemakaian air rumah tangga yang
diambil secara random disuatu daerah pelayanan. Angka ini kemudian
dapat dijadikan patokan satuan kebutuhan air domestik. Tingkat pemakian
air sambungan rumah (SR) : 100 Lt/Org/Hari dan tingkat pemakaian air
hidran umum (HU) : 40 Lt/Org/Hari.

2). Satuan Kebutuhan Air Bersih Non Domestik
Kebutuhan air non domestik adalah kebutuhan air untuk mememnuhi
sarana-sarana kota, seperti sarana sosial, industri dan niaga. Perkiraan
satuan kebutuhan air tersebut tergantung dari jenis kegiatan non domestik
tersebut. Hal ini dapat dilihat dari rekening pembayaran PDAM untuk non
domestik. Tingkat pemakian air non domestik kecil : 1 m
3
/Hari dan tingkat
pemakaian air non domestik besar : 3 m
3
/Hari.

F. Kehilangan Air
Dalam suatu sistim penyediaan air minum, biasanya tidak seluruhnya air yang
diproduksi instalasi sampai kepada konsumen. Terdapat kebocoran disana sini
yang disebut kehilangan air. Kebocoran/kehilangan air berasal dari instalasi itu
sendiri, pada pipa distribusi dan sekunder, pada alat meter air kesalahan
administrasi dan juga untuk pemadam kebakaran/penyiraman tanah. Kehilangan
air pada sistim ini diusahakan sekecil mungkin, di antaranya dilakukan dengan
mengoperasikan instalasi yang benar, pemasangan sambungan pipa transmisi
dan distribusi dengan baik, penggunaan peralatan meter air yang baik dan
ketelitian dalam laporan administrasi. Untuk perencanaan ini kehilangan air
dibatasi sebesar lebih kurang 20% dari kebutuhan air.

G. Kebutuhan Hari Maksimum
Yaitu dalam periode satu minggu, bulan atau tahun terdapat hari-hari tertentu
dimana pemakaian airnya maksimum. Keadaan ini dicapai karena adanya
pengaruh musim. Pada saat pemakaian demikian disebut pemakaian hari
FINAL REPORT IV-24
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



maksimum. Besarnya faktor hari maksimum adalah berdasarkan pengamatan
karakteristik daerah tersebut adalah sekitar 110 %. Kebutuhan air produksi
direncanakan sama dengan kebutuhan maksimum.

4.2.1. Kecamatan Jaya
A. Proyeksi Penduduk
Berdasarkan beberapa justifikasi di atas, maka proyeksi penduduk
Kecamaan J aya pada tahun 2011 sebanyak 19.329 jiwa (5.518 KK) dan
pada tahun 2026 sebanyak 55.867 jiwa (13. 967 KK), data lengkap dapat
dilihat pada tabel 4.4.
Tabel 4.4. Proyeksi Penduduk Kecamatan J aya
2011 2016 2021 2026
3,0% 2,5% 2,0% 2,0%
22.579 (5.906) 16.673 4.760 19.329 21.869 24.145 26.658
1 KK= 4 5.518 6.243 6.893 7.611
001 CEUNAMP RONG 682 -297 385 135 446 505 558 616
002 KEUDE UNGA 500 -215 285 97 330 374 413 456
003 KARENG ATEUH 950 -402 548 102 635 719 794 876
004 MEUDANG GHON 434 -258 176 42 204 231 255 281
005 UJ ONG MULOH 851 -339 512 227 594 672 741 819
006 KUALA 1108 -708 400 165 464 525 579 640
007 TEUMAREUM 874 -280 594 135 689 779 860 950
008 J ANGEUT 817 -562 255 91 296 334 369 408
009 ALUE MIE 603 -334 269 85 312 353 390 430
010 BABAH DUA 438 102 540 104 626 708 782 863
011 MEUTARA 384 40 424 106 492 556 614 678
012 MEUNASAH TUTONG 219 26 245 71 284 321 355 392
013 MEUNASAH TEUNGOH 155 -27 128 40 148 168 185 205
014 MEUNASAH RAYEUK 419 -133 286 91 332 375 414 457
015 LHUET 727 -229 498 143 577 653 721 796
016 LAMME 494 -42 452 110 524 593 655 723
017 SEUREUBA 306 -7 299 70 347 392 433 478
018 LEUP E 366 -46 320 91 371 420 463 512
019 MUKHAN 420 -191 229 93 265 300 332 366
020 NUSA 554 -324 230 102 267 302 333 368
021 RUMP ET 381 -211 170 58 197 223 246 272
022 DARAT 412 -306 106 55 123 139 154 169
023 GLE J ONG 505 -398 107 63 124 140 155 171
024 GAMP ONG BARO 626 -462 164 79 190 215 237 262
025 MEUNASAH WEH 486 389 875 220 1.014 1.148 1.267 1.399
026 COT DULANG 366 41 407 106 472 534 589 651
027 P UTUE 252 -45 207 58 240 272 300 331
028 LAM DURIAN 493 -32 461 120 534 605 668 737
029 BABAH KRUENG 436 -86 350 105 406 459 507 560
030 BAK P AOH 715 -35 680 123 788 892 985 1.087
031 P ASAR LAMNO 257 -43 214 50 248 281 310 342
032 P ANTE KEUTAP ANG 625 -72 553 135 641 725 801 884
033 P ANTON MAKMUR 160 -29 131 36 152 172 190 209
034 KRUENG TUNONG 634 -209 425 180 493 557 615 680
035 LAMTUI 292 8 300 84 348 393 434 480
036 J AMBO MASI 205 93 298 76 345 391 432 476
037 LAMBAROH 338 44 382 107 443 501 553 611
038 GLE P UTOH 344 -31 313 75 363 411 453 500
039 ALUE RAYEUK 181 6 187 78 217 245 271 299
040 MAREU 198 -91 107 17 124 140 155 171
041 SABET 509 -40 469 130 544 615 679 750
042 P ANTE CERMIN 330 269 599 155 694 786 867 958
043 SANGO 449 5 454 116 526 595 657 726
044 LAMASAN 398 -5 393 86 456 515 569 628
045 UJ ONG SUDEUN 263 -158 105 45 122 138 152 168
046 BABAH IE 312 -106 206 72 239 270 298 329
047 MEUDHEUN 625 -165 460 110 533 603 666 735
048 SAP EK 486 -11 475 121 551 623 688 759
Pr o yek s i Pend u d u k
081
2003 +/- 2006 KK
KEC J AYA, KAB ACEH J AYA
FINAL REPORT IV-25
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



Sumber : Podes 2005, Kunjungan / data Kecamatan Jaya Analisa Konsultan 2006


B. Proyeksi Tingkat Pelayanan Air Minum
Target tingkat pelayanan air minum baik perpipaan maupun non perpipaan
dapat dilihat pada tabel 4.5. dan gambar 4.13.
Tabel 4.5. Rencana Pelayanan Air Minum Perpipaan dan Non Perpipaan di
Kecamatan J aya, tahun 2011 dan 2026
Sumur HU+MCK SR Sumur HU+MCK SR Sumur HU+MCK SR Sumur HU+MCK SR
67% 10% 23% 2.581 19 897 55% 22% 24% 3.348 66 1.447
001 CEUNAMPRONG 100% 0% 0% 89 - - 100% 0% 0% 123 - -
002 KEUDE UNGA 100% 0% 0% 66 - - 100% 0% 0% 91 - -
003 KARENG ATEUH 100% 0% 0% 127 - - 100% 0% 0% 175 - -
004 MEUDANG GHON 100% 0% 0% 41 - - 100% 0% 0% 56 - -
005 UJ ONG MULOH 100% 0% 0% 119 - - 100% 0% 0% 164 - -
006 KUALA 40% 20% 40% 37 1 37 20% 20% 60% 26 3 77
007 TEUMAREUM 40% 20% 40% 55 1 55 20% 20% 60% 38 5 114
008 J ANGEUT 40% 20% 40% 24 1 24 20% 20% 60% 16 2 49
009 ALUE MIE 40% 20% 40% 25 1 25 20% 20% 60% 17 2 52
010 BABAH DUA 100% 0% 0% 125 - - 100% 0% 0% 173 - -
011 MEUTARA 20% 20% 60% 20 1 59 20% 20% 60% 27 3 81
012 MEUNASAH TUTONG 20% 0% 80% 11 - 45 20% 0% 80% 16 - 63
013 MEUNASAH TEUNGOH 20% 0% 80% 6 - 24 20% 0% 80% 8 - 33
014 MEUNASAH RAYEUK 100% 0% 0% 66 - - 100% 0% 0% 91 - -
015 LHUET 20% 20% 60% 23 1 69 20% 20% 60% 32 4 96
016 LAMME 20% 20% 60% 21 1 63 20% 20% 60% 29 4 87
017 SEUREUBA 20% 20% 60% 14 1 42 20% 20% 60% 19 2 57
018 LEUPE 20% 20% 60% 15 1 45 20% 20% 60% 20 3 61
019 MUKHAN 100% 0% 0% 53 - - 100% 0% 0% 73 - -
020 NUSA 40% 20% 40% 21 1 21 20% 20% 60% 15 2 44
021 RUMPET 40% 20% 40% 16 - 16 20% 20% 60% 11 1 33
022 DARAT 40% 20% 40% 10 - 10 20% 20% 60% 7 1 20
023 GLE J ONG 40% 20% 40% 10 - 10 20% 20% 60% 7 1 21
024 GAMPONG BARO 40% 20% 40% 15 - 15 20% 20% 60% 10 1 31
025 MEUNASAH WEH 20% 40% 40% 41 4 81 20% 40% 40% 56 14 112
026 COT DULANG 100% 0% 0% 94 - - 100% 0% 0% 130 - -
027 PUTUE 100% 0% 0% 48 - - 100% 0% 0% 66 - -
028 LAM DURIAN 100% 0% 0% 107 - - 100% 0% 0% 147 - -
029 BABAH KRUENG 100% 0% 0% 81 - - 100% 0% 0% 112 - -
030 BAK PAOH 100% 0% 0% 158 - - 100% 0% 0% 217 - -
031 PASAR LAMNO 20% 20% 60% 10 - 30 20% 20% 60% 14 2 41
032 PANTE KEUTAPANG 20% 20% 60% 26 1 77 20% 20% 60% 35 4 106
033 PANTON MAKMUR 20% 20% 60% 6 - 18 20% 20% 60% 8 1 25
034 KRUENG TUNONG 40% 20% 40% 39 1 39 40% 20% 40% 54 3 54
035 LAMTUI 100% 0% 0% 70 - - 100% 0% 0% 96 - -
036 J AMBO MASI 40% 20% 40% 28 1 28 20% 20% 60% 19 2 57
037 LAMBAROH 40% 20% 40% 35 1 35 20% 20% 60% 24 3 73
038 GLE PUTOH 40% 20% 40% 29 1 29 20% 20% 60% 20 3 60
039 ALUE RAYEUK 100% 0% 0% 43 - - 100% 0% 0% 60 - -
040 MAREU 100% 0% 0% 25 - - 100% 0% 0% 34 - -
041 SABET 100% 0% 0% 109 - - 100% 0% 0% 150 - -
042 PANTE CERMIN 100% 0% 0% 139 - - 100% 0% 0% 192 - -
043 SANGO 100% 0% 0% 105 - - 100% 0% 0% 145 - -
044 LAMASAN 100% 0% 0% 91 - - 100% 0% 0% 126 - -
045 UJ ONG SUDEUN 100% 0% 0% 24 - - 100% 0% 0% 34 - -
046 BABAH IE 100% 0% 0% 48 - - 100% 0% 0% 66 - -
047 MEUDHEUN 100% 0% 0% 107 - - 100% 0% 0% 147 - -
048 SAPEK 100% 0% 0% 110 - - 100% 0% 0% 152 - -
Pelayanan Air Minum
081 KEC JAYA,KABACEHJAYA
2011
pelayanan % pelayanan unit
2026
pelayanan % pelayanan unit







FINAL REPORT IV-26
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C




Gambar 4.13. Proyeksi Pelayanan Air Minum , J umlah SR , HU Pertahun
Sampai Tahun 2026
PELAYANANAIR MINUMKEC JAYA, KAB ACEHJAYA
-
10.000
20.000
30.000
Tahun
J
u
m
l
a
h

P
e
n
d
u
d
u
k
proyeksi pend 16.673 19.329 21.869 24.145 26.658
Dilayani SR 1.347 4.493 5.114 5.680 6.308
Dilayani HU 800 1900 3000 4300 5800
2006 2011 2016 2021 2026


C. Proyeksi Jumlah Sambungan
Prosentase sambungan rumah yang melayani rumah tangga adalah yang
dilayani pada awal perencanaan sampai akhir rencana mengikuti tabel
komposisi sambungan seperti dapat dilihat pada Gambar 4.14.

Gambar 4.14. Proyeksi Pelanggan Air Minum Kecamatan J aya
Sampai Tahun 2026
PROYEKSI PELANGGANKEC JAYA, KABACEHJAYA
0
1000
2000
U
n
i
t
SR 383 897 1.080 1.264 1447
HU 11 19 30 43 66
NonDomestik Kecil 77 179 216 253 289
NonDomestik Khusus 2 4 6 9 13
2006 2011 2016 2021 2026


D. Proyeksi Kebutuhan Air
Proyeksi kebutuhan air di Kecamatan J aya dalam studi ini dibagi
berdasarkan kebutuhan di wilayah perkotaan dan perdesaan. Proyeksi
Kebutuhan Air di Kecamatan J aya sesuai proyeksi tingkat dan jenis
Pelayanan ditunjukkan pada gambar 5.3. dan tabel 5.3. berikut ini.
FINAL REPORT IV-27
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



FINAL REPORT IV-28
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PROYEKSI KEBUTUHAN AIR DAN RENCANA KAPASITAS IP


Gambar 4.15. Proyeksi Kebutuhan Air dan Rencana Kapasitas IPA ,
Kecamatan J aya Sampai Tahun 2026






A
KEC JAYA, KAB ACEH JAYA
0
10
20
30
Q

l
p
d
KapsitasIPA(lpd) 5 20 20 20 25
Qr (lpd) 3,47 10,26 12,73 15,33 18,31
2006 2011 2016 2021 2026
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



FINAL REPORT IV-29
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
Tabel 4.6. Proyeksi Kebutuhan Air di Kecamatan J aya

Volume Harga Total
Satuan existing 2007 2008 2009 2010 2011
l Data Umum
1.1 Jumlah Penduduk
Administrasi Orang 16,673 17,173 17,688 18,219 18,766 19,329 28,400 39,832 55,867
% Penduduk di Area Pelayanan % 50 52 54 56 58 60 70 80
DalamArea Pelayanan Orang 8,337 8,712 9,104 9,513 9,941 10,389 20,896 33,653 54,198
% Penduduk Terlayanani % 30 35 40 45 50 55 65 75
Penduduk Terlayani orang 2,501 3,049 3,641 4,281 4,971 5,714 13,582 25,239 46
1.2 Konsumsi air minum
K. Domestik :
Sambungan Rumah liter / orang / hari 100 100 100 100 100 100 110 120
HU / Kran Umum liter / orang / hari 60 60 60 60 60 60 70 80
K.Non Domestik / Komersial ( % dari Domestik ) % 20 20 20 20 20 20 20 20
1.3 Sambungan pelanggan unit 0 494 590 694 805 926 2,200 4,089 7
K. Domestik :
Sambungan Rumah unit 0 488 583 685 795 914 2,173 4,038 7
HU / Kran Umum unit 0 6 7 9 10 11 27 50
1.4 Pemakaian air minum m3 / hari 0 337 402 473 549 631 1,662 3,392 6
K. Domestik : 0 281 335 394 457 526 1,385 2,827 5
Sambungan Rumah m3 / hari 0 244 291 342 398 457 1,195 2,423 4
HU / Kran Umum m3 / hari 0 37 44 51 60 69 190 404
K.Non Domestik / Komersial ( % dari Domestik ) m3 / hari 0 56 67 79 91 105 277 565 1
1.5 Jumlah penduduk yang dilayani orang 0 3,293 3,933 4,623 5,368 6,171 14,669 27,259 49
K. Domestik : orang 0 2,744 3,277 3,853 4,474 5,142 12,224 22,715 41
Sambungan Rumah orang 0 2,439 2,913 3,425 3,977 4,571 10,866 20,192 36
HU / Kran Umum orang 0 305 364 428 497 571 1,358 2,524 4
K.Non Domestik / Komersial ( % dari Domestik ) orang 0 549 655 771 895 1,028 2,445 4,543 8
1.6 Tingkat pelayanan
Terhadap wilayah pelayanan
- Domestik SR/KU/HU % 0% 80% 80% 80% 80% 80% 80% 80%
- Non Domestik (% dari Domestik) % 0% 20% 20% 20% 20% 20% 20% 20%
1.7 Kebutuhan air minum liter / detik 0 4 5 5 6 7 19 39
1.8 Kehilangan ai
90
85
,068
130
90
20
,463
,371
92
,744
,620
,791
829
,124
,754
,461
,854
,607
,292
80%
20%
78
r % 0 30 30 30 30 30 30 30
1.9 Total kebutuhan air minum
Kebutuhan air rata - rata liter / detik 0 5 6 7 8 9 25 51
Kebutuhan air hari max ( 1.2 hari rata rata ) liter / detik 0 6 7 9 10 11 30 61
Kebutuhan air jampuncak ( 1.7 hari max ) liter / detik 0 10 12 15 17 19 51 104
Kebutuhan IP
30
101
122
207
A liter / detik 0 10 10 10 10 15 30 60
Penambahan IP
120
A 10 5 15 30
2016 2021 2026 NO Uraian Satuan
Program Jangka Menengah
60



PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



4.2.2. Kecamatan Sampoinet
A. Proyeksi Penduduk
Berdasarkan beberapa justifikasi di atas, maka proyeksi penduduk
Kecamaan Sampoinet pada tahun 2011 sebanyak 12.626 jiwa dan pada
tahun 2026 sebanyak 17. 413 jiwa, data lengkap dapat dilihat pada tabel
5.4.
Tabel 4.7. Proyeksi Penduduk Kecamatan Sampoinet
2011 2016 2021 2026
3,0% 2,5% 2,0% 2,0%
13.019 (2.128) 10.891 3.189 12.626 14.285 15.772 17.413
1 KK= 3 3.697 4.183 4.618 5.099
001 PATEK 896 -391 505 101 585 662 731 807
002 BLANG DALAM 316 -80 236 107 274 310 342 377
003 GAMPONG BARO P 262 -21 241 93 279 316 349 385
004 KUALA BAKONG 614 -187 427 136 495 560 618 683
005 PAJ AR 184 96 280 68 325 367 405 448
006 REUNTANG 377 43 420 103 487 551 608 672
007 COT PANGE 299 -43 256 64 297 336 371 409
008 ARONGAN 234 72 306 95 355 401 443 489
009 COT LANGSAT 165 -67 98 34 114 129 142 157
010 MATAIE 87 56 143 103 166 188 207 229
011 J EUMPHEUK 577 -136 441 143 511 578 639 705
012 BABAH NIPAH 352 -230 122 65 141 160 177 195
013 KUALA LIGAN 652 -400 252 134 292 331 365 403
014 SEUMANTOK 748 -305 443 157 514 581 642 708
015 KRUENG THO 414 -91 323 91 374 424 468 516
016 PANTON KRUENG 125 -22 103 20 119 135 149 165
017 PAYA SANTEUT 212 22 234 51 271 307 339 374
018 LAM TEUNGOH 320 82 402 128 466 527 582 643
019 UJ ONG RIMBA 502 83 585 133 678 767 847 935
020 GUNUNG CUT 342 -2 340 94 394 446 492 544
021 SAYEUNG 159 -47 112 24 130 147 162 179
022 BABAH DUA 490 -22 468 120 543 614 678 748
023 GAMPONG BARO L 333 52 385 104 446 505 558 616
024 ALUE GAJ AH 103 106 209 51 242 274 303 334
025 MASEN 388 -147 241 72 279 316 349 385
026 TEUPIN ASAN 241 -176 65 61 75 85 94 104
027 BLANG LUAH 228 228 54 264 299 330 365
028 COT PUNTI (EX UPT V PA 236 -57 179 45 208 235 259 286
029 LIGAN 845 51 896 156 1.039 1.175 1.298 1.433
030 LHOK KRUET 645 -133 512 157 594 672 741 819
031 PULO RAYA 307 -40 267 77 310 350 387 427
032 KRUENG NO 282 1 283 77 328 371 410 452
033 CRAK MONG 327 -154 173 45 201 227 251 277
034 MEUNASAH KULAM 154 -50 104 50 121 136 151 166
035 BLANG MONLUNG 257 -166 91 39 105 119 132 145
036 ALUE GRO 175 -91 84 25 97 110 122 134
037 IE J EUREUNGEH 248 -28 220 56 255 289 319 352
038 RANTO SABON 151 66 217 56 252 285 314 347
2003 +/- 2006 KK
081 KEC SAMPOINET, KABACEHJAYA


FINAL REPORT IV-30
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



B. Proyeksi Tingkat Pelayanan Air Minum
Target tingkat pelayanan air minum baik perpipaan maupun non perpipaan
dapat dilihat pada tabel 4.8. dan gambar 4.15.

Tabel 4.8. Rencana Pelayanan Air Minum Perpipaan dan Non Perpipaan di
Kecamatan Sampoinet tahun 2011 dan 2026
Sumur HU+MCK SR Sumur HU+MCK SR Sumur HU+MCK SR Sumur HU+MCK SR
76% 9% 15% 1.926 11 382 67% 18% 14% 2.630 36 555
001 PATEK 100% 0% 0% 117 - - 100% 0% 0% 161 - -
002 BLANGDALAM 100% 0% 0% 55 - - 100% 0% 0% 75 - -
003 GAMPONGBAROP 100% 0% 0% 56 - - 100% 0% 0% 77 - -
004 KUALABAKONG 100% 0% 0% 99 - - 100% 0% 0% 137 - -
005 PAJAR 100% 0% 0% 65 - - 100% 0% 0% 90 - -
006 REUNTANG 100% 0% 0% 97 - - 100% 0% 0% 134 - -
007 COT PANGE 100% 0% 0% 59 - - 100% 0% 0% 82 - -
008 ARONGAN 100% 0% 0% 71 - - 100% 0% 0% 98 - -
009 COT LANGSAT 100% 0% 0% 23 - - 100% 0% 0% 31 - -
010 MATAIE 0% 30% 70% - - 23 0% 30% 70% - 2 32
011 JEUMPHEUK 0% 30% 70% - 2 72 0% 30% 70% - 5 99
012 BABAHNIPAH 0% 30% 70% - - 20 0% 30% 70% - 1 27
013 KUALALIGAN 100% 0% 0% 58 - - 100% 0% 0% 81 - -
014 SEUMANTOK 100% 0% 0% 103 - - 100% 0% 0% 142 - -
015 KRUENGTHO 100% 0% 0% 75 - - 100% 0% 0% 103 - -
016 PANTONKRUENG 100% 0% 0% 24 - - 100% 0% 0% 33 - -
017 PAYASANTEUT 100% 0% 0% 54 - - 100% 0% 0% 75 - -
018 LAMTEUNGOH 100% 0% 0% 93 - - 100% 0% 0% 129 - -
019 UJONGRIMBA 100% 0% 0% 136 - - 100% 0% 0% 187 - -
020 GUNUNGCUT 100% 0% 0% 79 - - 100% 0% 0% 109 - -
021 SAYEUNG 100% 0% 0% 26 - - 100% 0% 0% 36 - -
022 BABAHDUA 100% 0% 0% 109 - - 100% 0% 0% 150 - -
023 GAMPONGBAROL 100% 0% 0% 89 - - 100% 0% 0% 123 - -
024 ALUE GAJAH 100% 0% 0% 48 - - 100% 0% 0% 67 - -
025 MASEN 100% 0% 0% 56 - - 100% 0% 0% 77 - -
026 TEUPINASAN 100% 0% 0% 15 - - 100% 0% 0% 21 - -
027 BLANGLUAH 100% 0% 0% 53 - - 100% 0% 0% 73 - -
028 COT PUNTI (EXUPT VPA 50% 30% 20% 21 1 8 50% 30% 20% 29 2 11
029 LIGAN 50% 30% 20% 104 3 42 40% 30% 30% 115 11 86
030 LHOK KRUET 0% 30% 70% - 2 83 0% 30% 70% - 6 115
031 PULORAYA 0% 30% 70% - 1 43 0% 30% 70% - 3 60
032 KRUENGNO 0% 30% 70% - 1 46 0% 30% 70% - 3 63
033 CRAK MONG 0% 30% 70% - 1 28 0% 30% 70% - 2 39
034 MEUNASAHKULAM 0% 30% 70% - - 17 0% 30% 70% - 1 23
035 BLANGMONLUNG 100% 0% 0% 21 - - 100% 0% 0% 29 - -
036 ALUE GRO 100% 0% 0% 19 - - 100% 0% 0% 27 - -
037 IE JEUREUNGEH 100% 0% 0% 51 - - 100% 0% 0% 70 - -
038 RANTOSABON 100% 0% 0% 50 - - 100% 0% 0% 69 - -
2026
pelayanan% pelayananunit
2011
081 KECSAMPOINET,KABACEHJAYA
pelayanan% pelayananunit
Pelayanan Air Minum






FINAL REPORT IV-31
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C




Gambar 4.15. Proyeksi Pelayanan Air Minum , J umlah SR , HU Pertahun
Sampai Tahun 2026
PELAYANAN AIR MINUMKEC SAMPOINET, KAB ACEH JAYA
-
5,000
10,000
15,000
20,000
Tahun
J
u
m
l
a
h

P
e
n
d
u
d
u
k
proyeksi pend 10,891 12,626 14,285 15,772 17,413
Dilayani SR 626 1,906 2,115 2,288 2,475
Dilayani HU 1900 1100 1700 2400 3200
2006 2011 2016 2021 2026


C. Proyeksi Jumlah Sambungan
Prosentase sambungan rumah yang melayani rumah tangga adalah yang
dilayani pada awal perencanaan sampai akhir rencana mengikuti tabel
komposisi sambungan seperti dapat dilihat pada Gambar 4.16.

Gambar 4.16. Proyeksi Pelanggan Air Minum Kecamatan Sampoinet
Sampai Tahun 2026
PROYEKSI PELANGGANKEC SAMPOINET, KAB ACEH JAYA
0
500
1000
U
n
i
t
SR 185 382 439 497 555
HU 28 11 17 24 36
Non Domestik Kecil 37 76 88 99 111
Non Domestik Khusus 6 2 3 5 7
2006 2011 2016 2021 2026



FINAL REPORT IV-32
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



FINAL REPORT IV-33
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA


D. Proyeksi Kebutuhan Air
Proyeksi kebutuhan air di Kecamatan Sampoinet dalam studi ini dibagi
berdasarkan kebutuhan di wilayah perkotaan dan perdesaan. Proyeksi
Kebutuhan Air di Kecamatan Sampoinet sesuai proyeksi tingkat dan jenis
Pelayanan ditunjukkan pada gambar 4.17. dan tabel 4.9. berikut ini.

Gambar 4.17. Proyeksi Kebutuhan Air dan Rencana Kapasitas IPA ,
Kecamatan Sampoinet Sampai Tahun 2026




































PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



FINAL REPORT IV-34
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
Tabel 4.9. Proyeksi Kebutuhan Air di Kecamatan Sampoinet

Volume Harga Total
Satuan existing 2007 2008 2009 2010 2011
l Data Umum
1.1 Jumlah Penduduk
Administrasi Orang 10,891 11,238 11,585 11,932 12,279 12,626 14,285 15,772 17,413
% Penduduk di Area Pelayanan % 50 52 54 56 58 60 70 80 90
Dalam Area Pelayanan Orang 5,446 5,691 5,947 6,214 6,494 6,786 13,649 21,982 35,403
% Penduduk Terlayanani % 30 35 40 45 50 55 65 75 85
Penduduk Terlayani orang 1,634 1,992 2,379 2,796 3,247 3,732 8,872 16,487 30,092
1.2 Konsumsi air minum
K. Domestik :
Sambungan Rumah liter / orang / hari 100 100 100 100 100 100 110 120 130
HU / Kran Umum liter / orang / hari 60 60 60 60 60 60 70 80 90
K.Non Domestik / Komersial ( % dari Domestik ) % 20 20 20 20 20 20 20 20 20
1.3 Sambungan pelanggan unit 0 323 385 453 526 605 1,437 2,671 4,875
K. Domestik :
Sambungan Rumah unit 0 319 381 447 520 597 1,420 2,638 4,815
HU / Kran Umum unit 0 4 5 6 6 7 18 33 60
1.4 Pemakaian air minum m3 / hari 0 220 263 309 358 412 1,086 2,216 4,406
K. Domestik : 0 183 219 257 299 343 905 1,847 3,671
Sambungan Rumah m3 / hari 0 159 190 224 260 299 781 1,583 3,130
HU / Kran Umum m3 / hari 0 24 29 34 39 45 124 264 542
K.Non Domestik / Komersial ( % dari Domestik ) m3 / hari 0 37 44 51 60 69 181 369 734
1.5 Jumlah penduduk yang dilayani orang 0 2,151 2,569 3,020 3,507 4,031 9,582 17,806 32,500
K. Domestik : orang 0 1,793 2,141 2,517 2,922 3,359 7,985 14,838 27,083
Sambungan Rumah orang 0 1,593 1,903 2,237 2,598 2,986 7,098 13,189 24,074
HU / Kran Umum orang 0 199 238 280 325 373 887 1,649 3,009
K.Non Domestik / Komersial ( % dari Domestik ) orang 0 359 428 503 584 672 1,597 2,968 5,417
1.6 Tingkat pelayanan
Terhadap wilayah pelayanan
- Domestik SR/KU/HU % 0% 80% 80% 80% 80% 80% 80% 80% 80%
- Non Domestik (% dari Domestik) % 0% 20% 20% 20% 20% 20% 20% 20% 20%
1.7 Kebutuhan air minum liter / detik 0 3 3 4 4 5 13 26 51
1.8 Kehilangan air % 0 30 30 30 30 30 30 30 30
1.9 Total kebutuhan air minum
Kebutuhan air rata - rata liter / detik 0 3 4 5 5 6 16 33 66
Kebutuhan air hari max ( 1.2 hari rata rata ) liter / detik 0 4 5 6 6 7 20 40 80
Kebutuhan air jam puncak ( 1.7 hari max ) liter / detik 0 7 8 9 11 13 33 68 135
Kebutuhan IPA liter / detik 0 5 5 5 5 10 20 40 80
Penambahan IPA liter / detik 5 5 10 20 40
2016 2021 2026 NO Uraian Satuan
Program Jangka Menengah

PT. I NFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV. TRI PLE- C



FINAL REPORT IV-35
4.2.3. Kecamatan Krueng Sabee
A. Proyeksi Penduduk
Berdasarkan beberapa justifikasi di atas, maka proyeksi penduduk
Kecamaan Krueng Sabee pada tahun 2011 sebanyak 14.754 jiwa dan pada
tahun 2026 sebanyak 20.349 jiwa, data lengkap dapat dilihat pada tabel
4.10.
Tabel 4.10. Proyeksi Penduduk Kecamatan Krueng Sabee
2011 2016 2021 2026
3,0% 2,5% 2,0% 2,0%
12.727 12.727 2.834 14.754 16.693 18.430 20.349
1 KK= 4 3.285 3.717 4.104 4.531
001 BAHAGIA 638 638 123 740 837 924 1.020
002 SENTOSA 558 558 163 647 732 808 892
003 DAYAH BARO 1093 1093 263 1.267 1.434 1.583 1.748
004 KAMPUNG BLANG 471 471 153 546 618 682 753
005 PANTON MAKMUR 445 445 154 516 584 644 711
006 KEUTAPANG 1258 1258 130 1.458 1.650 1.822 2.011
007 PADANG DATAR 547 547 250 634 717 792 875
008 MON MATA 771 771 220 894 1.011 1.117 1.233
009 KEUDE KRUENG SABEE 810 810 193 939 1.062 1.173 1.295
010 KABONG 700 700 167 811 918 1.014 1.119
011 DATAR LUAS 1041 1041 296 1.207 1.365 1.507 1.664
012 PAYA SEUMANTOK 1105 1105 228 1.281 1.449 1.600 1.767
013 RANTO PANYANG 299 299 64 347 392 433 478
014 CUREK 401 401 133 465 526 581 641
015 ALUE THO 288 288 78 334 378 417 460
016 BUNTHA 634 634 111 735 832 918 1.014
017 PANGGONG 1668 1668 108 1.934 2.188 2.415 2.667
2003 2006 KK
Proyeksi Penduduk
081 KEC KR SABE, KAB ACEHJAYA


B. Proyeksi Tingkat Pelayanan Air Minum
Target tingkat pelayanan air minum baik perpipaan maupun non perpipaan
dapat dilihat pada tabel 4.11. dan gambar 4.18.

Gambar 4.18. Proyeksi Pelayanan Air Minum , J umlah SR , HU Pertahun
Sampai Tahun 2026










PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA


-
10.000
20.000
30.000
ah u n
J
u
m
l
a
h

P
e
n
d
u
d
u
k
proyeksi pend 12.727 14.754 16.693 18.430 20.349
Dilayani SR 1.874 4.554 5.192 5.776 6.425
Dilayani HU 3100 3400 4200 5100 6100
2006 2011 2016 2021 2026
T
PT. I NFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV. TRI PLE- C



Tabel 4.11. Rencana Pelayanan Air Minum Perpipaan dan Non Perpipaan di
Kecamatan Krueng Sabee tahun 2011 dan 2026





















Sumur HU+MCK SR Sumur HU+MCK SR Sumur HU+MCK SR Sumur HU+MCK SR
46% 23% 31% 1.376 34 918 38% 30% 32% 1.898 75 1.568
001 BAHAGIA 0% 30% 70% - 2 104 0% 20% 80% - 5 163
002 SENTOSA 0% 30% 70% - 2 91 0% 20% 80% - 4 143
003 DAYAHBARO 0% 30% 70% - 4 177 0% 20% 80% - 9 280
004 KAMPUNGBLANG 0% 30% 70% - 2 76 0% 20% 80% - 4 120
005 PANTONMAKMUR 0% 30% 70% - 2 72 0% 20% 80% - 4 114
006 KEUTAPANG 50% 30% 20% 146 4 58 50% 20% 30% 201 10 121
007 PADANGDATAR 50% 30% 20% 63 2 25 50% 20% 30% 87 4 52
008 MONMATA 50% 30% 20% 89 3 36 50% 20% 30% 123 6 74
009 KEUDE KRUENGSABEE 40% 30% 30% 75 3 56 40% 20% 40% 104 6 104
010 KABONG 40% 30% 30% 65 2 49 40% 20% 40% 90 6 90
011 DATARLUAS 30% 30% 40% 72 4 97 30% 20% 50% 100 8 166
012 PAYASEUMANTOK 40% 30% 30% 102 4 77 40% 20% 40% 141 9 141
013 RANTOPANYANG 100% 0% 0% 69 - - 100% 0% 0% 96 - -
014 CUREK 100% 0% 0% 93 - - 100% 0% 0% 128 - -
015 ALUE THO 100% 0% 0% 67 - - 100% 0% 0% 92 - -
016 BUNTHA 100% 0% 0% 147 - - 100% 0% 0% 203 - -
017 PANGGONG 100% 0% 0% 387 - - 100% 0% 0% 533 - -
2026
pelayanan% pelayananunit
2011
081 KECKRSABE,KABACEHJAYA
pelayanan% pelayananunit
Pelayanan Air Minum


C. Proyeksi Jumlah Sambungan
Prosentase sambungan rumah yang melayani rumah tangga adalah yang
dilayani pada awal perencanaan sampai akhir rencana mengikuti tabel
komposisi sambungan seperti dapat dilihat pada Gambar 4.19.

Gambar 4.19. Proyeksi Pelanggan Air Minum Kecamatan Krueng Sabee
Sampai Tahun 2026













0
1000
2000
Unit
SR
414 918 1.135 1.351 1568
HU
34 34 42 51 75
Non Domestik Kecil
83 184 227 270 314
Non Domestik Khusus
7 7 8 10 15
2006 2011 2016 2021 2026


FINAL REPORT IV-36
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. I NFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV. TRI PLE- C



FINAL REPORT IV-37
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
D. Proyeksi Kebutuhan Air
Proyeksi kebutuhan air di Kecamatan Krueng Sabee dalam studi ini dibagi
berdasarkan kebutuhan di wilayah perkotaan dan perdesaan. Proyeksi
Kebutuhan Air di Kecamatan Krueng Sabee sesuai proyeksi tingkat dan
jenis Pelayanan ditunjukkan pada gambar 4.20. dan tabel 4.12. berikut ini.

Gambar 4.20. Proyeksi Kebutuhan Air dan Rencana Kapasitas IPA ,
Kecamatan Krueng Sabee Sampai Tahun 2026

0
20
40
Q

l
p
d

























Kapsitas IPA (lpd) 10 30 30 20 20
Qr (lpd)
5,76 24 19,08
2006 2021 2026
11,36 13,77 16,
2011 2016
PT. I NFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV. TRI PLE- C



FINAL REPORT IV-38
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
Tabel 4.12. Proyeksi Kebutuhan Air di Kecamatan Krueng Sabee

Volume Harga Total
Satuan existing 2007 2008 2009 2010 2011
l Data Umum
1.1 Jumlah Penduduk
Administrasi Orang 12,727 13,132 13,538 13,943 14,349 14,754 17,104 19,828 22,9
% Penduduk di Area Pelayanan % 50 52 54 56 58 60 70 80
Dalam Area Pelayanan Orang 6,364 6,650 6,949 7,262 7,589 7,930 15,950 25,688 41,3
% Penduduk Terlayanani % 30 35 40 45 50 55 65 75
Penduduk Terlayani orang 1,909 2,327 2,780 3,268 3,794 4,362 10,368 19,266 35,1
1.2 Konsumsi air minum
K. Domestik :
Sambungan Rumah liter / orang / hari 100 100 100 100 100 100 110 120
HU / Kran Umum liter / orang / hari 60 60 60 60 60 60 70 80
K.Non Domestik / Komersial ( % dari Domestik ) % 20 20 20 20 20 20 20 20
1.3 Sambungan pelanggan uni
86
90
71
85
65
130
90
20
t 0 377 450 529 615 707 1,680 3,121 5,
K. Domestik :
Sambungan Rumah unit 0 372 445 523 607 698 1,659 3,083 5,
HU / Kran Umum unit 0 5 6 7 8 9 21 39
1.4 Pemakaian air minum m3 / hari 0 214 307 361 419 482 1,269 2,589 5,
K. Domestik : 0 256 301 349 401 1,057 2,158 4,2
Sambungan Rumah m3 / hari 0 186 222 261 304 349 912 1,850 3,
HU / Kran Umum m3 / hari 0 28 33 39 46 52 145 308
K.Non Domestik / Komersial ( % dari Domestik ) m3 / hari 0 0 51 60 70 80 211 432
1.5 Jumlah penduduk yang dilayani orang 0 2,514 3,002 3,529 4,098 4,710 11,197 20,807 37,9
K. Domestik : orang 0 2,095 2,502 2,941 3,415 3,925 9,331 17,339 31,
Sambungan Rumah orang 0 1,862 2,224 2,614 3,035 3,489 8,294 15,413 28,
HU / Kran Umum orang 0 233 278 327 379 436 1,037 1,927 3,
K.Non Domestik / Komersial ( % dari Domestik ) orang 0 419 500 588 683 785 1,866 3,468 6,
1.6 Tingkat pelayanan
Terhadap wilayah pelayanan
- Domestik SR/KU/HU % 0% 80% 80% 80% 80% 80% 80% 80% 8
- Non Domestik (% dari Domestik) % 0% 20% 20% 20% 20% 20% 20% 20% 2
1.7 Kebutuhan air minum liter / detik 0 2 4 4 5 6 15 30
1.8 Kehilangan ai
697
626
70
148
90
657
633
858
78
649
132
517
330
0%
0%
60
r % 0 30 30 30 30 30 30 30 3
1.9 Total kebutuhan air minum
Kebutuhan air rata - rata liter / detik 0 3 5 5 6 7 19 39
Kebutuhan air hari max ( 1.2 hari rata rata ) liter / detik 0 4 6 7 8 9 23 47
Kebutuhan air jam puncak ( 1.7 hari max ) liter / detik 0 7 9 11 13 15 39 79
Kebutuhan IP
0
77
93
158
A liter / detik 0 10 10 10 10 10 25 50
Penambahan IP
100
A 10 15 25
2016 2021 2026 NO Uraian Satuan
Program Jangka Menengah
50



PT. I NFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV. TRI PLE- C



4.2.4. Kecamatan Teunom
A. Proyeksi Penduduk
Berdasarkan beberapa justifikasi di atas, maka proyeksi penduduk
Kecamaan Teunom pada tahun 2011 sebanyak 18.879 jiwa dan pada
tahun 2026 sebanyak 26.37 jiwa, data lengkap dapat dilihat pada tabel
4.13.
Tabel 4.13. Proyeksi Penduduk Kecamatan Teunom
2011 2016 2021 2026
3,0% 2,5% 2,0% 2,0%
30.015 (13.730) 16.285 4.492 18.879 21.360 23.583 26.037
1 KK= 4 5.207 5.892 6.505 7.182
001 LUENG GAYO 440 -175 265 111 307 348 384 424
002 COT TRAP 557 -3 554 124 642 727 802 886
003 PASI GEULIMA 410 0 410 104 475 538 594 656
004 TEUPIN ARA 546 -106 440 124 510 577 637 703
005 PAYA BARO 983 -657 326 172 378 428 472 521
006 PASI TULAK BALA 304 -249 55 35 64 72 80 88
007 PANTON 791 0 791 199 917 1.037 1.145 1.265
008 GAMPONG BARO 476 -346 130 50 151 171 188 208
009 PASI PAWANG 377 -226 151 56 175 198 219 241
010 RAMBONG PAYONG 396 0 396 86 459 519 573 633
011 PADANG KLENG 1572 -360 1212 348 1.405 1.590 1.755 1.938
012 KEUDE TEUNOM 799 3 802 205 930 1.052 1.161 1.282
013 ALUE AMBANG 1552 -493 1059 336 1.228 1.389 1.534 1.693
014 BATEE-ROO 304 -186 118 44 137 155 171 189
015 TANOH MANYANG 675 -161 514 149 596 674 744 822
016 TANOH ANOU 4267 -3424 843 216 977 1.106 1.221 1.348
017 BLANG BARO 1042 -597 445 129 516 584 644 711
018 PULO TINGGI 357 -97 260 80 301 341 377 416
019 PASI TIMON 634 -1 633 135 734 830 917 1.012
020 ALUE KRUENG 264 264 73 306 346 382 422
021 PASI TEUBEE 492 508 1000 250 1.159 1.312 1.448 1.599
022 TIM PLEUNG 389 -83 306 96 355 401 443 489
023 KRUENG BEUKAH 332 -47 285 81 330 374 413 456
024 TUWI KAREUNG I 4027 -3595 432 188 501 567 626 691
025 SEUMIRA 986 -784 202 34 234 265 293 323
026 SEUNEUBOK PADANG 620 -360 260 108 301 341 377 416
046 KUBU 168 -39 129 41 150 169 187 206
048 LHOK GUCI 442 0 442 90 512 580 640 707
049 BINTAH 389 211 600 100 696 787 869 959
051 ALUE MEURAKSA 403 0 403 86 467 529 584 644
052 TUWI PERYA 935 -302 633 151 734 830 917 1.012
053 ALUE PUNTI 204 4 208 51 241 273 301 333
054 CEURACEU 309 0 309 83 358 405 447 494
055 ALUE J ANG 3309 -2649 660 175 765 866 956 1.055
056 SARAH RAYA 528 22 550 140 638 721 796 879
057 BUKET KEMUNENG 198 198 42 230 260 287 317
Proyeksi Penduduk
081 KEC TEUNOM, KAB ACEHJAYA
2003 +/- 2006 KK



B. Proyeksi Tingkat Pelayanan Air Minum
Target tingkat pelayanan air minum baik perpipaan maupun non perpipaan
dapat dilihat pada tabel 4.14. dan gambar 4.21.
FINAL REPORT IV-39
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. I NFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV. TRI PLE- C



Tabel 4.14. Rencana Pelayanan Air Minum Perpipaan dan Non Perpipaan di
Kecamatan Teunom tahun 2011 dan 2026
Sumur HU+MCK SR Sumur HU+MCK SR Sumur HU+MCK SR Sumur HU+MCK SR
50% 25% 25% 1.900 48 938 41% 33% 27% 2.621 106 1.724
001 LUENG GAYO 40% 30% 30% 25 1 18 40% 20% 40% 34 2 34
002 COT TRAP 40% 30% 30% 51 2 39 40% 20% 40% 71 4 71
003 PASI GEULIMA 40% 30% 30% 38 1 29 40% 20% 40% 52 3 52
004 TEUPIN ARA 40% 30% 30% 41 2 31 40% 20% 40% 56 4 56
005 PAYA BARO 40% 30% 30% 30 1 23 40% 20% 40% 42 3 42
006 PASI TULAK BALA 40% 30% 30% 5 - 4 40% 20% 40% 7 - 7
007 PANTON 40% 30% 30% 73 3 55 40% 20% 40% 101 6 101
008 GAMPONG BARO 40% 30% 30% 12 - 9 40% 20% 40% 17 1 17
009 PASI PAWANG 40% 30% 30% 14 1 11 40% 20% 40% 19 1 19
010 RAMBONG PAYONG 40% 30% 30% 37 1 28 40% 20% 40% 51 3 51
011 PADANG KLENG 40% 30% 30% 112 4 84 40% 20% 40% 155 10 155
012 KEUDE TEUNOM 40% 30% 30% 74 3 56 40% 20% 40% 103 6 103
013 ALUE AMBANG 40% 30% 30% 98 4 74 40% 20% 40% 135 8 135
014 BATEE-ROO 40% 30% 30% 11 - 8 40% 20% 40% 15 1 15
015 TANOH MANYANG 40% 30% 30% 48 2 36 40% 20% 40% 66 4 66
016 TANOH ANOU 40% 30% 30% 78 3 59 40% 20% 40% 108 7 108
017 BLANG BARO 40% 30% 30% 41 2 31 40% 20% 40% 57 4 57
018 PULO TINGGI 40% 30% 30% 24 1 18 40% 20% 40% 33 2 33
019 PASI TIMON 40% 30% 30% 59 2 44 40% 20% 40% 81 5 81
020 ALUE KRUENG 40% 30% 30% 24 1 18 40% 20% 40% 34 2 34
021 PASI TEUBEE 40% 30% 30% 93 3 70 40% 20% 40% 128 8 128
022 TIM PLEUNG 40% 30% 30% 28 1 21 40% 20% 40% 39 2 39
023 KRUENG BEUKAH 40% 30% 30% 26 1 20 40% 20% 40% 36 2 36
024 TUWI KAREUNG I 40% 30% 30% 40 2 30 40% 20% 40% 55 3 55
025 SEUMIRA 100% 0% 0% 47 - - 100% 0% 0% 65 - -
026 SEUNEUBOK PADANG 100% 0% 0% 60 - - 100% 0% 0% 83 - -
046 KUBU 100% 0% 0% 30 - - 100% 0% 0% 41 - -
048 LHOK GUCI 40% 30% 30% 41 2 31 40% 20% 40% 57 4 57
049 BINTAH 40% 30% 30% 56 2 42 40% 20% 40% 77 5 77
051 ALUE MEURAKSA 100% 0% 0% 93 - - 100% 0% 0% 129 - -
052 TUWI PERYA 100% 0% 0% 147 - - 100% 0% 0% 202 - -
053 ALUE PUNTI 100% 0% 0% 48 - - 100% 0% 0% 67 - -
054 CEURACEU 100% 0% 0% 72 - - 100% 0% 0% 99 - -
055 ALUE J ANG 100% 0% 0% 153 - - 100% 0% 0% 211 - -
056 SARAH RAYA 40% 30% 30% 51 2 38 40% 20% 40% 70 4 70
057 BUKET KEMUNENG 40% 30% 30% 18 1 14 40% 20% 40% 25 2 25
Pelayanan Air Minum
pelayanan % pelayanan unit
2011
081 KECTEUNOM,KABACEHJAYA
2026
pelayanan % pelayanan unit

Gambar 4.21. Proyeksi Pelayanan Air Minum , J umlah SR , HU Pertahun
Sampai Tahun 2026
PELAYANANAIR MINUMKEC TEUNOM, KAB ACEHJAYA
-
10.000
20.000
30.000
Tahun
J
u
m
l
a
h

P
e
n
d
u
d
u
k
proyeksi pend
16.285 18.879 21.360 23.583 26.037
Dilayani SR
2.708 4.661 5.414 6.133 6.943
Dilayani HU
4200 4800 5900 7100 8500
2006 2011 2016 2021 2026
FINAL REPORT IV-40
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. I NFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV. TRI PLE- C



FINAL REPORT IV-41
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PROYEKSI PELANGGANKEC TEUNOM, KAB ACEH JAYA
C. Proyeksi Jumlah Sambungan
Prosentase sambungan rumah yang melayani rumah tangga adalah yang
dilayani pada awal perencanaan sampai akhir rencana mengikuti tabel
komposisi sambungan seperti dapat dilihat pada Gambar 4.22.

Gambar 4.22. Proyeksi Pelanggan Air Minum Kecamatan Teunom
Sampai Tahun 2026

D. Proyeksi Kebutuhan Air
Proyeksi kebutuhan air di Kecamatan Teunom dalam studi ini dibagi
berdasarkan kebutuhan di wilayah perkotaan dan perdesaan. Proyeksi
Kebutuhan Air di Kecamatan Teunom sesuai proyeksi tingkat dan jenis
Pelayanan ditunjukkan pada gambar 4.23. dan tabel 4.15. berikut ini.

Gambar 4.23. Proyeksi Kebutuhan Air dan Rencana Kapasitas IPA ,
Kecamatan Teunom Sampai Tahun 2026

0
1000
2000
U
n
i
t
SR 1724 753 938 1.200 1.462
HU 106 58 48 59 71
Non Domest 345 ik Kecil 151 188 240 292
Non Domes 21
2026
tik Khusus 12 10 12 14
2006 2011 2016 2021
Q

l
p
d
0
20
40
Kapsitas IPA(lpd)
30 10 20 20 30
Qr (lpd)
21,97
2026
8,67 12,47 15,37 18,39
2006 2011 2016 2021




FINAL REPORT IV-42
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
Tabel 4.15. Proyeksi Kebutuhan Air di Kecamatan Teunom


Volume Harga Total
Satuan existing 2007 2008 2009 2010 2011
l Data Umum
1.1 Jumlah Penduduk
Administrasi Orang 16,285 16,804 17,323 17,841 18,360 18,879 21,360 23,583 26,037
% Penduduk di Area Pelayanan % 50 52 54 56 58 60 70 80 90
Dalam Area Pelayanan Orang 8,143 8,509 8,892 9,292 9,710 10,147 20,409 32,869 52,937
% Penduduk Terlayanani % 30 35 40 45 50 55 65 75 85
Penduduk Terlayani orang 2,443 2,978 3,557 4,181 4,855 5,581 13,266 24,652 44,996
1.2 Konsumsi air minum
K. Domestik :
Sambungan Rumah liter / orang / hari 100 100 100 100 100 100 110 120 130
HU / Kran Umum liter / orang / hari 60 60 60 60 60 60 70 80 90
K.Non Domestik / Komersial ( % dari Domestik ) % 20 20 20 20 20 20 20 20 20
1.3 Sambungan pelanggan unit 0 482 576 677 787 904 2,149 3,994 7,289
K. Domestik :
Sambungan Rumah unit 0 476 569 669 777 893 2,123 3,944 7,199
HU / Kran Umum unit 0 6 7 8 10 11 27 49 90
1.4 Pemakaian air minum m3 / hari 0 329 393 462 536 616 1,624 3,313 6,587
K. Domestik : 0 274 327 385 447 513 1,353 2,761 5,490
Sambungan Rumah m3 / hari 0 238 285 335 388 446 1,167 2,367 4,680
HU / Kran Umum m3 / hari 0 36 43 50 58 67 186 394 810
K.Non Domestik / Komersial ( % dari Domestik ) m3 / hari 0 55 65 77 89 103 271 552 1,098
1.5 Jumlah penduduk yang dilayani orang 0 3,216 3,841 4,516 5,243 6,027 14,327 26,624 48,596
K. Domestik : orang 0 2,680 3,201 3,763 4,370 5,023 11,939 22,187 40,496
Sambungan Rumah orang 0 2,382 2,845 3,345 3,884 4,465 10,613 19,722 35,997
HU / Kran Umum orang 0 298 356 418 486 558 1,327 2,465 4,500
K.Non Domestik / Komersial ( % dari Domestik ) orang 0 536 640 753 874 1,005 2,388 4,437 8,099
1.6 Tingkat pelayanan
Terhadap wilayah pelayanan
- Domestik SR/KU/HU % 0% 80% 80% 80% 80% 80% 80% 80% 80%
- Non Domestik (% dari Domestik) % 0% 20% 20% 20% 20% 20% 20% 20% 20%
1.7 Kebutuhan air minum liter / detik 0 4 5 5 6 7 19 38 76
1.8 Kehilangan air % 0 30 30 30 30 30 30 30 30
1.9 Total kebutuhan air minum
Kebutuhan air rata - rata liter / detik 0 5 6 7 8 9 24 50 99
Kebutuhan air hari max ( 1.2 hari rata rata ) liter / detik 0 6 7 8 10 11 29 60 119
Kebutuhan air jam puncak ( 1.7 hari max ) liter / detik 0 10 12 14 16 19 50 102 202
Kebutuhan IPA liter / detik 0 10 10 10 10 15 30 60 120
Penambahan IPA liter / detik 10 5 15 30 60
2016 2021 2026 NO Uraian Satuan
Program Jangka Menengah




PT. I NFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV. TRI PLE- C
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C




4.3 RANCANGAN SISTEM PENYEDIAAN AIR MINUM

Rencana sistem air minum wilayah studi dirancang untuk memenuhi kebutuhan air
sampai 20 tahun ke depan. Pengembangan sistem ini direncanakan dalam 2
tahap yaitu
Tahap I yaitu tahun 2006 - 2011
Tahap II yaitu tahun 2012 - 2026

Setiap tahap dalam pelaksanaan meliputi :
Pengembangan sistem produksi
Pengembangan sistem distribusi
Pengembangan sambungan ke konsumen

Rancangan sistem air minum ini akan disesuaikan dengan proyeksi kebutuhan air
sesuai dengan masing-masing jenis pelayanan dan disesuaikan dengan
rancangan pengembangan masing-masing kabupaten pada jangka panjang.


Untuk mendapatkan perancancangan yang layak dari segi teknis maka rancangan
perlu mengikuti kriteria teknis perencanaan. Dalam penyusunan kriteria teknis
perencanaan, tetap berpedoman pada kriteria perencanaan dari petunjuk teknis
bidang air minum, Direktorat J enderal Cipta Karya, hanya dalam penerapan
parameter-parameter tersebut disesuaikan dengan kondisi daerah perencanaan.


A. Kriteria Kuantitas Sumber
Secara umum kebutuhan air dalam perencanaan sistem pengaliran air minum
dipengaruhi oleh keadaan daerah perencanaan, yaitu :
- Iklim
- Standar Kehidupan
- J enis Aktivitas (Perdagangan Komersial dan Industri)
- Ketersediaan Sistem Penyediaan Air Minum per orangan
- Harga Air

FINAL REPORT IV-43
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



Agar pelayanan air minum memenuhi syarat tahapan pelayanan yang
direncanakan, maka dibutuhkan sumber air dimana dari segi kualitas maupun
kuantitasnya memenuhi syarat.

B. Kapasitas Sistem
Dihitung berdasarkan kebutuhan rumah tangga, non domestik dan kebocoran air
kebutuhan ini dilihat berdasarkan hasil perhitungan proyeksi penduduk,
prosentase penduduk yang dilayani dan besarnya pemakaian air.

C. Kebocoran/Kehilangan Air
Kehilangan air, yang disebabkan baik oleh teknis maupun non teknis, dihitung
dengan perkiraan 20 % dari kebutuhan air rata-rata.

D. Kriteria Kualitas Air Minum
Semua sistem yang dihasilkan harus dapat memproduksi air minum yang
memenuhi standar air minum yang ditetapkan oleh Departeman Kesehatan
Republik Indonesia.

E. Kriteria Kebutuhan Dasar
a. Jenis Pelayanan
Usaha pelayanan air minum pada umumnya melalui 2 (dua) macam cara
yaitu sambungan langsung dan hidran umum.
Hidran umum melayani daerah pedesaan untuk pelanggan Sosial.
Sambungan langsung melayani perumahan dan perkantoran
dikelompokan untuk pelanggan non niaga. pertokoan, perdagangan
industri dan pelabuhan dikelompokan untuk pelanggan niaga.
b. Kebutuhan Untuk Kebakaran
Pada dasarnya keperluan air untuk kebakaran dicadangkan 10 % dari
kebutuhan air perhari dan dicadangkan di reservoir.

F. Beberapa Pokok Kriteria Teknis
a. Pokok Perencanaan
Bagian-bagian pokok perencanaan adalah :
Sistem produksi meliputi :
FINAL REPORT IV-44
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



Sistem Pengambilan Air Baku
Bangunan Pengolahan
Pipa Transmisi.

Sistem distribusi meliputi :
Reservoir
Pipa induk.
Pipa Sekunder
Pipa Tersier/Pipa Service

Sistem Sambungan meliputi :
Sambungan Rumah/Sambungan Langsung
Kran Umum/Hidran Umum
b. Sistem Distribusi
Beberapa faktor yang mempengaruhi sistem distribusi adalah :
- Pola tata guna tanah
- Kepadatan penduduk
- Kondisi topografi
- Rencana induk kota

c. Fluktuasi Penggunaan Air Bersih
Fluktuasi penggunaan air berdasarkan pada :
- Hari Maksimum (Q max) = 1,1 x kebutuhan air rata-rata
- J am Puncak (Q peak) = 1,5 x kebutuhan air rata-rata.

d. Pipa Transmisi
Direncanakan dengan berpatokan pada saat debit maksimum (Q max).

e. Pipa Distribusi
Direncanakan dengan berpatokan pada saat debit puncak (Q peak).

f. Kapasitas Reservoar
Kapasitas reservoar pada umumnya berkisar antara (15 - 30) % dari
jumlah produksi hari maksimum.
FINAL REPORT IV-45
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C




g. Tekanan Air Dalam Pipa
- Tekanan maksimum direncanakan 60 m kolom air.
- Tekanan minimum direncanakan 10 m kolom air.
h. Kecepatan Pengaliran Pipa
Kecepatan pengaliran air dalam pipa :
- Transmisi : 0,5 - 3,0 m/det
- Distribusi : 0,3 - 2,5 m/det

i. Koefisien Kekasaran Pipa
Untuk perhitungan hidrolis baik untuk pipa transmisi maupun distribusi,
koefisien kekasaran pipa (koefisien Hazen Wiliam) digunakan nilai
sebagai berikut :

- Pipa PVC : 120 - 140
- Pipa Steel baru : 120
- Pipa Steel lama : 90 100

j. Pembagian Daerah Pelayanan
Untuk meratakan aliran ke konsumen, maka daerah pelayanan di bagi
dalam beberapa zone dan sub zone, sehingga mempermudah
menghitung besarnya pembebanan kebutuhan air minum (debit taping).
Pembagian tersebut disesuaikan dengan jumlah penduduk tiap blok.
Luas blok ditentukan atas dasar jumlah kebutuhan air dan kepadatan
penduduk, sedangkan kebutuhan air ini disesuaikan dengan rencana
tahapan penyediaan air minum. Rancangan pembagian daerah
pelayanan air minum pada masing-masing kabupaten sampai tahun
2026 dapat dilihat pada sub bab berikut.

4.3.1. SISTEM PENYEDIAAN AIR MINUM
Sistem Penyediaan air minum yang akan di rancangan oleh konsultan
adalah system perpipaan dan system non perpipaan.
Untuk Sistem perpipaan rancangannya terdiri dari :
Sumber air baku,
FINAL REPORT IV-46
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



Sistem transmisi,
Pengolahan dan
Sistem distribusi

Sedangkan untuk system non perpipaan yang akan dikembangkan adalah
sumur dangkal.
Secara umum sumber air yang dipakai penduduk adalah sumur dangkal,
untuk dapat memanfaatkan air sumur tersebut dengan aman keriteria
sebagai berikut harus di ikuti :
Sumur harus dalam kondisi :
o Air jerih <1 NTU
o Tidak berwarna
o Tidak Berbau
J arak sumur dari septic tank atau cubluk harus minimal 12 m
Untuk sumur dengan Fe yang tinggi/kuning harus di olah dengan
menggunakan saringan pasir 2 tahap.
Sedangkan untuk sumur dengan kekeruhan yang tinggi harus dilakukan
perbaikan dasar sumur/dilapisi pasir sampai 0,5 m sehingga
menghasilkan air yang relatif jernih. Lihat Gambar 4.24.

Gambar 4.24. Sumur Dangkal
FINAL REPORT IV-47
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C




Pemanfaatan pengambilan air dapat dilakukan dengan menggunakan :
Ember dan Timba
Pompa tangan
Atau dengan pompa listrik 100-125 W

Sumur gali ini harus dilakukan insperksi secara berkala oleh instansi yang
berwenang dengan memberi sertifikasi untuk sumur yang layak pakai
sebagai sumber air minum.


4.3.2. Rancangan Sistem Air Minum Kecamatan Jaya
A. Rancangan Sumber Air Baku
Sebagai sumber air minum lokasi ini secara garis besar adalah :
Air tanah
Air tanah dangkal dikelola secara individu (sistem non perpipaan).

Mata air
FINAL REPORT IV-48
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



Mata air dikelola secara kolektif (sistem perpipaan).
Sebagaimana telah disebutkan pada bab 5, maka tambahan kebutuhan air
untuk 20 tahun kedepan untuk Kecamatan J aya adalah 25 L/dt . Sampai
dengan tahun 2011 diperlukan debit 20 L/dt .

Secara umum lokasi pelayanan air minum dibagi 3 zone dimana masing
masing zone dilayani oleh sebuah sumber air yang berupa mata air.
Pembagian zone tersebut adalah sebagai berikut :
Zone Utara : dengan sumber air di MA Medhen
Zone Tengah : dengan sumber air di MA Melha
Zone Selatan : dengan sumber air di MA Teumarem

Adapun karakteristik sumber mata air terdapat pada tabel 4.16.

Tabel 4.16. Karakteristik Sumber Mata Air yang Ada
Uraian Satuan
Zone
Utara
Zone
Tengah
Zone
Selatan
Luas DAS Km
2
4.3 4.2 10.3
Sumber Mata Air Q (l/dt) 3-10 3-5 3-10
Kandungan Fe
Mn
Cl <400 <400

Sumber air mempunyai DAS yang terbatas yaitu antara 4-10 Km
2
dengan
demikian sumber air ini sangat dipengaruhi oleh musim. Pada Musim hujan
debit air dapat mencapai 50 l/dt sedangkan pada kondisi tidak hujan 1 minggu
dapat turun sampai 5-10 l/dt.
B. Rancangan Sistem Penyediaan Air Minum
1). Rancangan Sistem Penyediaan Air Minum Non Perpipaan
J umlah sumur yang ada dilokasi perencanaan diperkirakan 2000 unit pada
tahun 2011 dan akan berkembang menjadi 3000 Pada tahun 2026.

2). Rancangan Sistem Penyediaan Air Minum Perpipaan
a). Umum
FINAL REPORT IV-49
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



Rancangan Alternatif ini menggunakan sumber mata air dengan
sistem distribusi melayani daerah pelayanan di Kecamatan J aya.
Tahapan pelaksanaan sampai 20 tahun ke depan adalah sebagai
berikut :
b).Sub Sistem Produksi
Kapasitas produksi dirancang untuk memenuhi debit rata rata
masksimum harian. Eksploitasi sumber air dilakukan oleh sub sistem
produksi yang teknologinya bervariasi sesuai dengan jenis sumber air
dan kualitas sumber air. Adapun jenis teknologi eksploitasi terdiri dari :
Sistem Intake
Sehubungan dengan adanya penambahan kapasitas sampai
dengan tahun 2026 untuk :
zona utara sebesar 10 l/dt,
zona tengah sebesar 10 L/dt dan
zona selatan sebesar 30 L/dt.

Sistem Instalasi Pengolahan Air
Pengolahan air yang ada terletak di Medhen.
IPA yang ada akan di rancang adalah :
zona utara sebesar 10 l/dt,
zona tengah sebesar 10 L/dt dan
zona selatan sebesar 10 L/dt.

c). Intake Air Permukaan
Sumber air permukaan dibangun di Medhen dengan kapasitas intake
10 L/dt, Melha dengan kapasitas intake 10 L/dt dan Teumaren dengan
kapasitas intake 10 L/dt, untuk sampai tahun 2026. Pengambilan air
baku dilakukan dengan cara gravitasi

Eksploitasi air pemukaan menggunakan sistem intake yang
rancanganya mempertimbangkan Kondisi mata air meliputi sedimen
transport, banjir maksimum dan permukaan air minum

FINAL REPORT IV-50
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



Instalasi Pengolahan Air yang diperlukan untuk mengolah mata air
adalah :
Prased
SPC
SPL
Lokasi pengolahan terletak di Medhen, Melha dan Teumaren.

d). Transmisi
Pipa transmisi untuk zona utara, zona tengah dan zona selatan adalah
pipa HDPE dengan diameter 150 dan panjang pipa ini adalah sekitar
0,12 m.
e). Sistem Distribusi
Sistem distribusi untuk alternatif ini dilakukan dengan sistem gravitasi
mulai dari reservoir distribusi ke daerah pelayanan di masing-masing
zona. Dengan pipa induk distribusi dirancang untuk memenuhi
kebutuhan sampai tahun 2026 yaitu mulai dengan diameter 40-
150mm.
f). Reservoir Distribusi
Reservoir diperlukan untuk menampung kelebihan air pada pemakaian
minimum dan membantu supply air pada pemakaian maksimum.
Volume reservoir untuk masing-masing zona adalah 100 m3.
g). Komponen Sistem
Komponen dari sistem yang dirancang meliputi komponen:
A. Bahan baku yaitu meliputi:
Pipa
Perlengkapan pipa
B. Komponen Pekerjaan Konstruksi meliputi :
Konstruksi Intake
Instalasi Pengolahan Air
Ground reservoir
Bangunan Penunjang
Komponen Sambungan pelanggan
Adapun rincian dari komponen ini dapat dilihat pada Tabel 4.17.
FINAL REPORT IV-51
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



Tabel 4.17. Komponen Sistem Penyediaan Air Minum Kec. J aya (2006-2026)



Zone Utara
IV




























RENCANA PENGEMBANGAN
Produksi
Intake Medhen 10 lpd unit 1
IPA Prased+SPC+SPL 10lpd unit 1
Pembebasan Tanah m2 5,000
4 Pipa transmisi HDPE 150 mm m 1,000
Accessories Ls
istribusi
1 Reservoir 100 m3 Gravitasi unit 1
Pipa PVC 150 mm s/d pasar Lamno m 7,500
Pipa PVC 100 mm m
Pipa PVC 75 mm s/d masing pemukiman m 3,500
Pipa PVC 50 mm
6 Pipa PVC 40 mm dalam pemukiman m 1,965
Sambungan Rumah unit 131
HU unit 4
MCK unit 4
10 J embatan Pipa 30 m unit 1
11 Accessories
Zone Tengah
Sumber Air MA Melha 20 lpd
Produksi
Intake Melha 5 lpd unit 1
PA Prased+SPC+SPL 10lpd unit 1
Pembebasan Tanah m2 5,000
Pipa transmisi HDPE 150 mm unit 400
Accessories Ls 1
istribusi
Reservoir 100 m3 Gravitasi unit 1
2 Pipa PVC 150 mm s/d pasar Lamno m 7,500
Pipa PVC 100 mm
Pipa PVC 75 mm s/d masing pemukiman m 3,500
Pipa PVC 50 mm
Pipa PVC 40 mm dalam pemukiman m 4,410
7 Sambungan Rumah unit 294
HU unit 9
MCK unit 9
10 J embatan Pipa 70 m unit 1
11 Accessories
No Uraian Keterangan satuan Volume
a
1
2
3
5
b D
2
3
4
5
7
8
9
a
1
2 I
3
4
5
b D
1
3
4
5
6
8
9

FINAL REPORT IV-52
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



FINAL REPORT IV-53
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA













Zone Selatan
Sumber Air Melha 30 lpd
a Produksi
1 Intake Teumarem 30 lpd unit 1
2 IPA Prased+SPC+SPL 10lpd unit 1
3 Pembebasan Tanah m2 5,000
4 Pipa transmisi HDPE 150 mm unit 400
5 Accessories Ls 1
b Distribusi
1 Reservoir 100 m3 Gravitasi unit 1
2 Pipa PVC 150 mm s/d pasar Lamno m 4,800
3 Pipa PVC 100 mm
4 Pipa PVC 75 mm s/d masing pemukiman m 3,500
5 Pipa PVC 50 mm
6 Pipa PVC 40 mm dalam pemukiman m 7,991
7 Sambungan Rumah unit 533
8 HU unit 6
9 MCK unit 6
10 J embatan Pipa 70 m unit 1
11 Accessories
Volume No Uraian Keterangan satuan
Lanjutan Tabel 4.17. Komponen Sistem Penyediaan Air Minum Kec. J aya
(2006-2026)
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



FINAL REPORT IV-54
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
Gambar 4.25. Rancangan Sistem Air Minum Sistem IKK J aya





PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



Gambar 4.26. Skematik Rancangan Sistem Air Minum Sistem IKK J aya



















FINAL REPORT IV-55
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



4.3.3. K
A. Rancangan Sumber Air Baku
Sebagai sumber air minum lokasi ini secara garis besar adalah :
Air Tanah
Mata Air

Air tanah dangkal dikelola secara individu sedangkan air tanah dalam dikelola
secara kolektif. tambahan kebutuhan air untuk 20 tahun kedepan untuk
LhokKruet adalah 10 L/dt . Sampai dengan tahun 2011 diperlukan debit 5 L/dt .
Secara umum lokasi pelayanan air minum dibagi 2 tahap dimana masing
masing tahap dilayani oleh sebuah sumber air yang berupa mata air.
Pembagian tahap tersebut adalah sebagai berikut :
Tahap 1 : dengan sumber air di Keumala
Tahap 2 : dengan sumber air di Tee Bee

Sumber air mempunyai DAS yang terbatas yaitu antara 2-4 Km2 dengan
demikian sumber air ini sangat dipengaruhi oleh musim. Pada Musim hujan
debit air dapat mencapai 10 lpd sedangkan pada kondisi tidak hujan 1 minggu
dapat turun sampai 3-5 lpd.
B. Rancangan Sistem Penyediaan Air Minum
1). Rancangan Sistem Penyediaan Air Minum Non Perpipaan
J umlah sumur yang ada dilokasi perencanaan diperkirakan 2000 unit pada
tahun 2011 dan akan berkembang menjadi 3000 Pada tahun 2026.

2). Rancangan Sistem Penyediaan Air Minum Perpipaan
Rancangan sistem penyediaan air minum pada dasarnya terdiri dari
komponen :
Sub Sistem Produksi (Instalasi Pengolahan Air)
Sub Sistem Transmisi
Sub Sistem Distribusi
Sub Sistem Wilayah pelayanan / retikulasi


ecamatan Sampoinet

FINAL REPORT IV-56
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C




Rancangan sistem untuk Kecamatan Sampoinet adalah memenuhi debit
suai dengan
ber air baku yang terpilih dengan mempertimbangkan biaya
investasi dan biaya OM. Lebih terinci lagi alternatif sistem yang di
rencanakan adalah sebagai berikut :
i terdiri dari :
Gambar 4.27. Sistem Instalasi Pengolahan Air
kebutuhan maksimum harian sampai 20 tahun ke depan se
alternative sum

a). Sub Sistem Produksi
Kapasitas produksi dirancang untuk memenuhi debit rata rata
masksimum harian. Eksploitasi sumber air dilakukan oleh sub sistem
produksi yang teknologinya bervariasi sesuai dengan jenis sumber air dan
kualitas sumber air. Adapun jenis teknologi eksploitas
Sistem Intake Sumber Air
Merupakan intake terbuka dengan system penyaringan kasar di ujung
pipa.
Sistem Instalasi Pengolahan Air
Sistem Pengolahan Air yang direkomendasikan adalah saringan pasir
cepat kasar dengan loading rate 6 m/jam.




FINAL REPORT IV-57
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



b). Sub Sistem Transmisi
Sistem distribusi terdiri dari Reservoir dan jaringan perpipaan. Sistem
uaikan dengan lokasi IPA, elevasi dan sistem
d). Su
Sistem IKK Lhok Kruet ini diharapkan dapat melayani 6 desa-desa
e). Komponen
Kom komponen:
A. Bahan baku yaitu meliputi:
Pipa
Perlengkapan pipa
B. Komponen Pekerjaan Konstruksi meliputi :
Konstruksi Intake
Instalasi Pengolahan Air
Ground reservoir
Bangunan Penunjang
Komponen Sambungan pelanggan
Adapun rincian dari komponen ini dapat dilihat pada Tabel 4.18.






Pipa transmisi adalah pipa yang menghantarkan air baku dari intake ke
IPA. Pipa transmisi ini dirancang untuk memenuhi kapasitas debit
maksimum harian.

c). Sistem Distribusi
distribusi adalah dises
pengaliran. Reservoir diperlukan untuk menampung kelebihan air pada
pemakaian minimum dan membantu supply air pada pemakaian
maksimum dengan volume reservoir dirancang sebesar 17,5% - 20 %Q
maksimum per hari.

b Sistem Pelayanan

Sistem
ponen dari sistem yang dirancang meliputi
FINAL REPORT IV-58
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



FINAL REPORT IV-59
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA

Tabel 4












































.18. Komponen Sistem Pelayanan Air Minum Kec. Sampoinet Kabupaten
Aceh J aya


Lhok Kruet
IV Rencana Pengembangan
5,000
pick up unit 1
Ls 1
1
00 mm S/d Lhok Kruet 1,500
s/d masing pemukiman m 3,500
P 0
dalam pemukiman 4,392
unit 439.2
unit 9
8 unit 9
1
10 Accessories
satuan Volume No Keterangan
a Produksi
1 Intake MA Keumala 5 lpd unit 1
2 IPA Prased+SPC+SPL 5lpd unit 2
3 Rumah J aga 30 m2 unit 1
4 Kantor 45 m2 unit 1
5 Pembebasan Tanah
6 Kendaraan Operasional
7 Pipa transmisi HDPE 100 mm m 300
8 Accessories
b Distribusi
1 Reservoir 100 m3 Lokasi MA unit
2 Pipa PVC 1
3 Pipa PVC 75 mm
4 ipa PVC 50 mm
5 Pipa PVC 40 mm
6 Sambungan Rumah
7 HU
MCK
9 J embatan Pipa 80 M unit
Uraian
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



FINAL REPO

RT IV-60
Gambar 4.28. Rancangan Sistem Pelayanan Air Minum Sistem IKK Lhok Kruet Kecamatan Sampoinet, Kabupaten Aceh J aya





AN OUTLINE PLAN & DED, KAB. ACEH JAYA PENYUSUN
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



Gambar 4.29. Rancangan Sistem Pelayanan Air Minum Sistem IKK Lhok Kruet
Kecamatan Sampoinet Kabupaten Aceh J aya ,
FINAL REPORT IV-61
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



4.3


.4. Kecamatan Krueng Sabee
A. Rancangan Sumber Air Baku
Sebagai sumber air minum lokasi ini secara garis besar adalah :
Air Tanah
Mata Air
Air Permukaan

Air tanah dangkal dikelola secara individu sedangkan Mata Air dan air
permukaan dikelola secara kolektif/PDAM. Sebagaimana telah disebutkan
maka tambahan kebutuhan air untuk 20 tahun kedepan untuk Krueng Sabe -
Calang adalah 20 L/dt . Sampai dengan tahun 2011 diperlukan debit 10 L/dt .
Secara umum lokasi pelayanan air minum dibagi 2 Zone dimana masing
masing tahap dilayani oleh sebuah sumber air Suungai Krueng Sabe Di Desa
Paya Seumantok. Pembagian tahap tersebut adalah sebagai berikut :
Zone 1 : Wilayah Keude Krueng Sabe dan Sekitarnya
Zone 2 : Wilayah Calang dan Sekitarnya
Sumber air mempunyai DAS yang cukup besar sehingga menghasilkan debit
kurang lebih 3.2 s/d 40 m3/dt sumber air ini dipengaruhi oleh musim. Pada
Musim hujan debit air dapat mencapai 80 m3/dt sedangkan pada kondisi tidak
hujan 3 minggu dapat turun sampai 3. m3/dt.

B. Rancangan Sistem Pelayanan Air Minum
1). Rancangan Sistem Penyediaan Air Minum Non Perpipaan
Sumur gali ini harus dilakukan insperksi secara berkala oleh instansi yang
berwenang dengan memberi sertifikasi untuk sumur yang layak pakai
sebagai sumber air minum. J umlah sumur yang ada dilokasi perencanaan
diperkirakan 2000 unit pada tahun 2011 dan akan berkembang menjadi
3000 Pada tahun 2026.
2). Rancangan Sistem Penyediaan Air Minum Perpipaan
Rancangan sistem penyediaan air minum pada dasarnya terdiri dari
Sub Sistem Produksi (Instalasi Pengolahan Air)
komponen :
FINAL REPORT IV-62
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



Sub Sistem Transmisi
Distribusi Sub Sistem
Sub Sistem Wilayah pelayanan / retikulasi

Rancangan sistem untuk Kecamatan Krueng Sabe adalah memenuhi debit
kebutuhan maksimum harian sampai 20 tahun ke depan sesuai dengan
alternative sumber air baku yang terpilih dengan mempertimbangkan biaya
investasi dan biaya OM.

Secara garis besar daerah pelayanan mencakup :
Krueng Sabe
Calang

J arak dari kedua zone pelayanan tersebut terpaut 10 km, untuk itu harus
disediakan pipa transmisi air bersih yang menghubungkan Calang dan
Krueng Sabe.
Air Baku dari Sungai Krueng Sabe di olah dengan IPA kemudian
didistribusikan di zone pelayanan Krueng Sabe.
Air untuk Calang dipompa keatas sebuah reservoir di bukit dekat Calang
dengan ketinggian 40 m dpl. Dari sini air kemuadian dialirkan secara
gravitasi kedaerah pelayanan di kota Calang.Lihat gambar 4.30.

Gambar 4.30. Diagram Pelayanan di Krueng Sabe dan Calang
PsKruengSabel
DaerahPelayanan
Calang
DaerahPelayanan
DaerahPelayanan
CalangBaru
Kobung



FINAL REPORT IV-63
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



a). Sub Sistem Produksi
Kapasitas produksi dirancang untuk memenuhi debit rata rata
h sub sistem
yang teknologinya bervariasi sesuai dengan jenis sumber air
litas sumber air. Adapun jenis teknologi eksploitasi terdiri dari :
Sistem Intake Sumber Air
masksimum harian. Eksploitasi sumber air dilakukan ole
produksi
dan kua

Gambar 4.31. Intake Sumuran

Sistem Instalasi Pengolahan Air
Sistem Pengolahan Air yang direkomendasikan adalah pengolahan



lengkap dengan proses koagulasi, flokulasi, sedimentasi filtrasi dan
reservoir. Lihat Gambar 4.32.





FINAL REPORT IV-64
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



FINAL REPORT IV-65
Gambar 4.32. Instalasi Pengolahan Air


b). Sub Sistem Transmisi
Pipa transmisi adalah pipa yang menghantarkan air baku dari intake ke
IPA. Pipa transmisi ini dirancang untuk memenuhi kapasitas
maksimum harian diameter pipa yang diperlukan adala
debit
h 150 mm untuk
c).
Sistem distribusi terdiri dari Reservoir dan jaringan perpipaan. Sistem
sistem
pengaliran. Reservoir diperlukan untuk menampung kelebihan air pada
pemakaian minimum dan membantu supply air pada pemakaian
maksimum dengan volume reservoir dirancang sebesar 17,5% - 20 %Q
maksimum per hari.

d). Sub Sistem Pelayanan
Sistem IKK Krueng Sabe ini diharapkan dapat melayani 21 desa-desa
sebagaimana gambar 4.33.

keperluan sampai dengan th 2026.

Sistem Distribusi
distribusi adalah disesuaikan dengan lokasi IPA, elevasi dan

PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



Gamb an Air Minum Sistem IKK Krueng Sabe dan ar 4.33. Wilayah Pelayan
Calang, Kabupaten Aceh J aya
Calang
CalangBaru

e). Komponen Sistem
Komponen dari sistem yang dirancang meliputi komponen:
A. Bahan baku yaitu meliputi:
Pipa
Perlengkapan pipa
B. Komponen Pekerjaan Konstruksi meliputi :
Konstruksi Intake
Instalasi Pengolahan Air
Adap pat dilihat pada Tabel 4.19.

Ground reservoir
Bangunan Penunjang
Komponen Sambungan pelanggan
un rincian dari komponen ini da









FINAL REPORT IV-66
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



FINAL REPORT IV-67
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
Tabel 4.19. omponen Sistem Pelayanan Air Minum Kec. Krueng Sabee
Kabupaten Aceh J aya



















K
Zone Kr Sabe
IV RENCANA PENGEMBANGAN
a Produksi
1 Intake Paya Semantok unit 1
2 Pompa Intake 10 lpd Paya Semantok unit 1
3 Pompa Intake 20 lpd Paya Semantok unit 1
4 IPA Peng lengkap 10 lpd unit 2
5 Pompa Distribusi 10 lpd Paya Semantok unit 1
6 Pompa Distribusi 10 lpd Paya Semantok unit 1
7 Genset unit 1
8 Rumah Genset unit 1
9 Kantor+Gudang unit 1
m2 5,000
11
12
13
14 m
15 ccessories Ls 1
10 Pembebasan Tanah
Rumah Pompa unit 1
Kendaraan Operasional Pickup unit 1
Pagar +land clearing unit
Pipa transmisi HDPE 150 mm
A
V Distribusi
1
2
3
4
5
6 dalam pemukiman m 4,500
7 ambungan Rumah unit 300
unit 4
9
10 unit 1
11 J embatan Pipa 60 m unit 1
12 Accessories
No Uraian satuan Volume Keterangan
Reservoir 500 m3 Gravitasi unit 1
Pipa PVC 150 mm s/d J embatan Kr Sabe m 4,000
Pipa PVC 100 mm m 3,000
Pipa PVC 75 mm s/d masing pemukiman m 4,000
Pipa PVC 50 mm m 6,000
Pipa PVC 40 mm
S
8 HU
MCK unit 4
J embatan Pipa 120 m
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



FINAL REPORT IV-68
TA 2006 ABT
TA 2006
TA 2007
TA 2007-2011


Gambar 4.34. Rancangan Sistem Pelayanan Air Minum Kec. Krueng Sabe Kabupaten Aceh J aya


















PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
MA YAKTI
LTI GUNA REKAYASA & CV.TRIPLE-C



FINAL REPO IV-69 RT
eh J aya
PENYUSUN
Gambar 4.35. Skematik


Rancangan Sistem Pelayanan Air Minum Kec. Krueng Sabe Kabupaten Ac
AN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATA
PT. MU
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



4.3.5. Kecamatan Teunom
A. Rancangan Sumber Air Baku
Sebagai sumber air minum lokasi ini secara garis besar adalah :
Air Tanah
Mata Air

Air tanah dangkal dikelola secara individu sedangkan air tanah dalam dikelola
secara kolektif. tambahan kebutuhan air untuk 20 tahun kedepan untuk
Teunom adalah 30 L/dt . Sampai dengan tahun 2011 diperlukan debit 10 L/dt .
Secara umum lokasi pelayanan air minum dibagi 2 Zone dimana masing
masing tahap dilayani oleh sebuah sumber air Sungai Tengoh di Di Desa
Bintan. Pembagian tahap tersebut adalah sebagai berikut :
Zone 1 : Wilayah Keude Teunom dan Sekitarnya
Zone 2 : Wilayah Tepinara

Sumber air mempunyai DAS yang cukup sedang sehingga menghasilkan debit
kurang lebih 100 s/d 300 m3/dt . Akibat hutan di hulu masih baik maka sumber
air ini sedikit dipengaruhi oleh musim.

B. Rancangan Sistem Penyediaan Air Minum
1). Rancangan Sistem Penyediaan Air Min
J umlah sumur yang ada dilokasi perencanaan diperkirakan 2000 unit pada
tahun 2011 dan akan berkembang menjadi 3000 Pada tahun 2026.
2). Rancangan Sistem Penyediaan Air Minum Perpipaan
Rancangan sistem penyediaan air minum pada dasarnya terdiri dari
komponen :
Sub Sistem Produksi (Instalasi Pengolahan Air)
Sub Sistem Transmisi
Sub Sistem Distribusi
Sub Sistem Wilayah pelayanan / retikulasi

Rancangan sistem untuk Kecamatan J aya adalah memenuhi debit
kebutuhan maksimum harian sampai 20 tahun ke depan sesuai dengan
um Non Perpipaan

FINAL REPORT IV-70
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



alternative sumber air baku yang terpilih dengan mempertimbangkan biaya
investasi dan biaya OM.
Lebih terinci lagi alternatif sistem yang di rencanakan adalah sebagai
berikut :
a). Sub Sistem Produksi
Kapasitas produksi dirancang untuk memenuhi debit rata rata
masksimum harian. Eksploitasi sumber air dilakukan oleh sub sistem
produksi yang teknologinya bervariasi sesuai dengan jenis sumber air
dan kualitas sumber air. Adapun jenis teknologi eksploitasi terdiri dari :
Sistem Intake Sumber Air
Merupakan intake terbuka dengan system penyaringan kasar di
ujung pipa.

Sistem Instalasi Pengolahan Air
Sistem Pengolahan Air yang direkomendasikan adalah pengolahan
lengkap dengan proses filtrasi dengan saringan pasir cepat dan
saringan pasir lambat dan reservoir.

Gambar 4.36. Sistem Pengolahan Air Minum Sistem IKK Teunom





FINAL REPORT IV-71
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



b). Sub Sistem Transmisi
ang menghantarkan air baku dari intake ke
pasitas debit
m harian diameter pipa yang diperlukan adalah 150 mm untuk
an sampai dengan th 2026.


sar 17,5% - 20 %Q
anan
e). Komponen Sistem
iputi komponen:
B. Komponen Pekerjaan Konstruksi meliputi :
ound reservoir
bungan pelanggan
ponen ini dapat dilihat pada Tabel 4.20.



Pipa transmisi adalah pipa y
IPA. Pipa transmisi ini dirancang untuk memenuhi ka
maksimu
keperlu
c). Sistem Distribusi
Sistem distribusi terdiri dari Reservoir dan jaringan perpipaan. Sistem
distribusi adalah disesuaikan dengan lokasi IPA, elevasi dan sistem
pengaliran. Reservoir diperlukan untuk menampung kelebihan air pada
pemakaian minimum dan membantu supply air pada pemakaian
maksimum dengan volume reservoir dirancang sebe
maksimum per hari.

d). Sub Sistem Pelay
Sistem IKK Krueng Sabe ini diharapkan dapat melayani 21 desa-desa
sebagaimana gambar berikut ini.

Komponen dari sistem yang dirancang mel
A. Bahan baku yaitu meliputi:
Pipa
Perlengkapan pipa
Konstruksi Intake
Instalasi Pengolahan Air
Gr
Bangunan Penunjang
Komponen Sam
Adapun rincian dari kom
FINAL REPORT IV-72
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



FINAL REPORT IV-73
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
Tabel 4.20.
Aceh J aya































Komponen Sistem Pelayanan Air Minum KecTeunom Kabupaten















Z
a P
1 In
2 IP
3 K
4 R a unit 1
5 Pemb
6 Kend l Pickup unit 1
7 Pipa nsmisi HDPE 150 mm m 26,000
8 A Ls 1
b Distribusi
1 Reserv
2 Pipa m 2,500
4 Pipa PVC 75 mm s/d masing pemukiman m 3,500
5 Pipa PVC 50 mm m 4,000
6 Pipa PVC 40 mm dalam pemukiman m 10,553
7 Sambungan Rumah unit 704
8 HU unit 16
9 MCK unit 16
10 J embatan Pipa 60 m unit 1
11 J embatan Pipa 70 m unit 1
12 Accessories
13 Accessories
c Lain-Lain
Training
Penyuluhan Calon Pelanggan
DED
Supervisi
No
one Teunom
IV Rencana Pengembangan
roduksi
take Bintang 10 lpd unit 1
A Prased+SPC+SPL 10lpd unit 1
antor+Gudang 60 m2 unit 1
um h J aga 30 m2
ebasan Tanah m2 5,000
araan Operasiona
tra
ccessories
oir 100 m3 Gravitasi unit 1
PVC 150 mm s/d pasar Teunom
3 Pipa PVC 100 mm m 8,000
Uraian Keterangan satuan Volume
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



FINAL REPORT IV-74
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
Gambar 4.37. Rancangan Sistem Pelayanan Air Minum Sistem IKK Teunom, Kabupaten Aceh J aya



Gambar 6.15. Skematik Rancangan Sistem Pelayanan Air Minum Sistem IKK Teunom aten Aceh , Kabup J aya
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



FINAL REPORT IV-75
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA



























PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
BAB V
PERSAMPAHAN


5.1. KONDISI EKSISTING
5.1.1. Sebelum Bencana
A. Organisasi
1. Instansi Pengelola
Pengelolaan persampahan di Kabupaten Aceh J aya ditangani oleh
Dinas Pendapatan Daerah Kabupaten Aceh J aya dibantu oleh Kantor
Kecamatan diwilayah pelayanan.
Pengelolaan sampah hanya di 3 dari 6 Ibukota Kecamatan yang ada
di Kabupaten Aceh J aya, yaitu :
- Kota Calang sebagai Ibukota Kabupaten Aceh J aya
- Kota Teunom sebagai Ibukota Kecamatan Keude Teunom
- Kota Lamno sebagai Ibukota Kecamatan J aya

2. Struktur Organisasi
Mengingat bahwa instansi pengelola yang secara khusus menangani
pengelolaan persampahan di Kabupaten Aceh J aya belum ada,
sedangkan instansi tersebut diatas hanya bersifat sementara, maka
struktur organisasi instansi pengelola sampah juga belum ada.
Namum demikian hubungan kerja antar instansi yang terkait dapat
digambarkan sebagai berikut :








FINAL REPORT V-1
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

Gambar 5.1. Hubungan kerja Instansi Pengelola Persampahan











3. Personalia
J umlah personil yang khusus menangani pengelolaan persampahan
adalah sebanyak 13 orang yang terdiri dari :
Sekretaris Daerah
Dinas
Pendapatan
Kantor
Kecamatan
Petugas
Lapangan
Dinas
Lainnya
Bupati Kepala
Daerah
- Pegawai Negeri Sipil =6 orang
- Pegawai honorer Harian =7 orang

4. Tata Laksana Kerja
Pembagian kerja antara instansi tersebut diatas dalam pengelolaan
persampahan adalah sebagai berikut :
- Dinas Pendapatan akan menyediakan peralatan, menyediakan
anggaran biaya pengelolaan persampahan serta melakukan
penarikan retribusi sampah.
- Kantor Kecamatan akan mengawasi pelaksanaan operasi
pengumpulan sampah di wilayah masing-masing.

B. Teknis Operasional
1. Timbulan Sampah
FINAL REPORT V-2
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
J umlah Timbulan Sampah pada 3 Ibukota Kecamatan di Kabupaten
Aceh J aya tersebut adalah sebanyak 74.2 m
3
/hari dengan perincian
sebagai berikut :
- Kota Calang = 24.5 m
3
/hari
- Kota Teunom = 36.4 m
3
/hari
- Kota Lamno = 13.3 m
3
/hari

2. Daerah Pelayanan dan Prioritas Pelayanan
Daerah yang sudah mendapat pelayanan pengelolaan persampahan
adalah sebgai berikut :
- Kota Calang : Pasar, Daerah Komersil, Perkantoran dan
Permukiman Padat
- Kota Teunom : Pasar, Daerah Komersil, Perkantoran dan
Permukiman Padat
- Kota Lamno : Pasar
Peta daerah pelayanan pengelolaan persampahan pada 3 IKK
tersebut diatas sebelum terjadinya bencana dapat dilihat dalam
gambar 3.2, gambar 3.3. dan gambar 3.4.

3. Tingkat Pelayanan
Dilihat dari jumlah sampah yang sudah dilayani yaitu sebesar 35.5
m
3
/hari, maka tingkat pelayanan pengelolaan persampahan sebelum
bencana adalah 48 % dari sampah kota dengan perincian sebagai
berikut :
- Kota Calang : 71%
- Kota Teunom : 48%
- Kota Lamno : 5%

4. Pola pengelolaan sampah.
Secara umum, pola pengelolaan sampah yang dilakukan sebelum
bencana adalah sebagai berikut :
FINAL REPORT V-3
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
Pola 1 : Sampah dari sumbernya dikumpulkan oleh petugas ke
dalam TPS dan diangkut ke tempat pembuangan akhir
dengan menggunakan dump truck.
Pola ini digunakan untuk melayani daerah pasar di Kota
Calang dan Kota Teunom.
J umlah sampah yang diangkut dengan pola ini adalah 3
m
3
/hari di Kota Calang dan 4 m
3
/hari di Kota Teunom.
Pola 2 : Sampah dari sumbernya dikumpulkan door to door
dengan menggunakan dump truck untuk diangkut ke
tempat pembuangan akhir
Pola ini digunakan untuk melayani daerah komersil dan
permukiman di Kota Calang dan Kota Teunom.
J umlah sampah yang diangkut dengan pola ini adalah
14.2 m
3
/hari di Kota Calang dan 13.6 m
3
/hari di Kota
Teunom.
Pola 3 : Sampah dari sumbernya dikumpulkan oleh petugas dan
diangkut ke pembuangan akhir dengan menggunakan
gerobak sampah.
Pola ini digunakan untuk melayani daerah pasar di Kota
Lamno, dengan jumlah sampah yang diangkut adalah
0.7 m
3
/hari.
Pola penanganan sampah untuk daerah-daerah yang belum
mendapat pelayanan adalah sebagai berikut :
- Dibakar dihalaman rumah
- Ditimbun dalam lubang.
- Dibuang ke sungai
- Dibuang ke saluran drainase.
- Dibuang ke tanah kosong.

5. Pewadahan
J enis pewadahan yang umumnya digunakan oleh masyarakat adalah
sebagai berikut :
FINAL REPORT V-4
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
- Drum (merupakan potongan drum bekas dengan kapasitas 80 liter
tanpa menggunakan tutup.
- Bin Container (merupakan bin plastik / ember bekas dengan
kapasitas 20 liter tanpa menggunakan tutup)
- TPS dari pasangan batu bata dengan volume yang bervariasi
6. Pengumpulan
Pengumpulan sampah yang dilakukan di Kabupaten Aceh J aya dapat
dibedakan atas 4 macam cara, yaitu :
- Disapu dan dikumpulkan oleh petugas kebersihan pasar
- Dikumpulkan oleh masyarakat ke dalam bak sampah komunal.
- Dikumpulkan dengan menggunakan gerobak
- Dikumpulkan dengan menggunakan dump truk.

7. Pemindahan
Pemindahan sampah dari alat pengumpul ke alat pengangkut tidak
dilakukan karena alat pengumpul yang ada juga sekaligus berfungsi
sebagai alat pengangkut.

8. Pengangkutan
Peralatan yang digunakan untuk pengangkutan sampah ke tempat
pembuangan akhir adalah berupa gerobak sampah dan dump truck.

9. Pembuangan Akhir
Tempat pembuangan akhir sampah yang digunakan untuk kota
Calang adalah sebagai berikut :
- Nama Lokasi : Lho Buya
- Luas : 2,0 Ha
- J arak dari permukiman terdekat : 400 meter
- J arak dari Pusat Kota Calang : 6.0 km ke arah Banda
Aceh

Kondisi geologi permukaan tanah di lokasi TPA terdiri dari lapisan
alluvial berpasir yang sangat mudah meresapkan air ke dalam tanah
FINAL REPORT V-5
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
dan karena lokasinya berada di dataran tepi pantai, elevasi muka air
tanah di TPA tersebut relatif tinggi (<2 meter)
Fasilitas yang ada di TPA dan sistem pengoperasian yang dilakukan
sebelum terjadinya bencana adalah sebagai berikut :
- J alan masuk ke TPA
- Dasar TPA tidak dilapisi dengan lapisan kedap air sehingga air
lindi yang berasal dari sampah meresap ke dalam tanah.
- Pengoperasian dilakukan secara open dumping

Tempat pembuangan akhir sampah yang digunakan untuk kota
Teunom adalah sebagai berikut :
- Nama Lokasi : Bate Ro
- Luas : 2.5 Ha
- J arak dari permukiman terdekat : 300 meter
- J arak dari Pusat Kota Teunom : 1.5 km ke arah Banda
Aceh

Kondisi geologi permukaan tanah di lokasi TPA terdiri dari lapisan
alluvial berpasir yang sangat mudah meresapkan air ke dalam tanah
dan karena lokasinya berada di dataran tepi pantai, elevasi muka air
tanah di TPA tersebut relatif tinggi (<2 meter)
Fasilitas yang ada di TPA dan sistem pengoperasian yang dilakukan
sebelum terjadinya bencana adalah sebagai berikut :
- J alan masuk ke TPA
- Dasar TPA tidak dilapisi dengan lapisan kedap air sehingga air
lindi yang berasal dari sampah meresap ke dalam tanah.
- Pengoperasian dilakukan secara open dumping

Sedangkan untuk Kota Lamno belum ada tempat pembuangan akhir
permanen. Sampah yang sudah dikumpulkan dibuang ke tanah
kosong yang masih banyak terdapat di Kota Lamno.



FINAL REPORT V-6
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
FINAL REPORT V-7
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
Sarana pengelolaan persampahan yang ada sebelum terjadinya
bencana adalah 1 unit dump truck yang digunakan untuk melayani
kota Calang dan 1 unit dump truck yang digunakan untuk Kota
Teunom serta 1 unit gerobak sampah yang digunakan untuk kota
Lamno.
10. Sarana Pengelolaan Sampah.

PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
Gambar 5.2. Daerah Pelayanan Sistem Pengelolaan Persampahan Kota Calang Sebelum Bencana
300
100
HUNTARA
2
5
0
200
100
7
5
0
2
5
0
HUNTARA
300
250
HUNTARA
450
K
E

B
A
N
D
A

A
C
E
H
SAMUDERA INDONESIA
6
0
0
K
E
M
E
U
L
A
B
O
H
TELKOM
D
P
R
0
.0
0
SAMUDERA INDONESIA
P
U
K
O
M
P
L
E
K
S
D
, S
M
P
,
S
M
A
600
1
0
0
7
0
0
420
K
O
M
P
L
E
K
T
N
I
1
8
2
5
K
O
M
P
L
E
K

R
E
L
A
W
A
N

N
O
R
W
E
G
IA
1
3
2
5
K
O
M
P
LE
K
T
E
N
T
A
R
A
1
0
0
0
1
0
2
5
700
8
0
0
SAMUDERA INDONESIA
250
FINAL REPORT V-8
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
Gambar 5.3. Daerah Pelayanan Sistem Pengelolaan Persampahan Kota Teunom Sebelum Bencana
Ds Gampong
Danau Padang
Keling
KE BANDA ACEH
PDAM
Ds Padang Keling
RAWA-RAWA
Ds Alue Ambang
RAWA-RAWA
TPA
0427'LU
RAWA-RAWA
RAWA-RAWA
RAWA-RAWA
R
A
W
A
- R
A
W
A
Ds Pasi Tolak
Bala Ds Panton
9
5
4
9
'B
T
TUGU TEUNOM
RAWA-RAWA
KE TIMPLEUNG
Ds Rombang
Payung
HUNTARA
KE MEULABOH
FINAL REPORT V-9
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
FINAL REPORT V-10
Ds. J ANGUT
(PESANTREN BUD)
DS. BABAH DUA
Kr. LAMBASO
P
E
N
Y
E
B
R
A
N
G
A
N
TANAH
Ds. LHEUET
2.40
K
r
.

B
A
B
A
H

D
U
A
TSUNAMI
2.50
BARAK
6.50
Ds. MEUNASAH TENGAH
Ds. ALUEMIE
TSUNAMI
5.70
ASPAL LAPEN
S
M
U
-1
J
A
L
A
N
B
A
R
U
J l. N
. T
U
M
A
R
0.00
K
T
R
. P
O
L
IS
I
L
A
M
N
O
KTR. CAMAT
BANK
ASPAL LAPEN
1.20
2.00
Ds.
MEUTARA
1.800
3.10
ASPAL LAPEN
2.00
1.00
Ds. LAMNE
250 M
0.750
ASPAL LAPEN
1.400
J ALAN BARU
J EMBATAN BARU
2.050
D
s. K
U
A
LA
5.50
5.00
Ds. LAMBESO
K
E
M
E
U
L
A
B
O
H
5.70
S
LT
P
A
N
D
A
A
C
E
H 1.0
D
s. M
E
L
H
A
U
B
S
T
Gambar 5.4. Daerah Pelayanan Sistem Pengelolaan Persampahan Kota Lamno Sebelum Bencana
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA








PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
C. Peran Serta Masyarakat
Secara umum perhatian masyarakat Kabupaten Aceh J aya dalam
mensukseskan program pemeliharaan kebersihan kota masih kurang
memuaskan. Hal ini dapat dilihat dalam beberapa hal, antara lain :
o Masih banyak penduduk yang bermukim disepanjang sungai/saluran
drainase membuang sampahnya kedalam sungai/saluran sehingga
sungai/saluran tersebut tersumbat dan aliran air menjadi terhambat.
o Disepanjang jalan di kota-kota Kecamatan di Kabupaten Aceh J aya
masih terlihat adanya sampah yang bertebaran.

5.1.2. Setelah Bencana
A. Organisasi
Setelah terjadinya bencana, pengelolaan sampah hanya di 1 dari 6 Ibukota
Kecamatan yang ada di Kabupaten Aceh J aya, yaitu di Kota Lamno Ibukota
Kecamatan J aya, sedangkan di Kota Calang sebagai Ibukota Kabupaten
Aceh J aya dan Kota Teunom sebagai Ibukota Kecamatan Keude Teunom
tidak ada lagi pelayanan karena kedua Kota tersebut telah hancur total.

B. Teknis Operasional
1. Timbulan Sampah
J umlah Timbulan Sampah di Kota Lamno adalah sebanyak 13,3 m
3
/hari
ditambah dengan sampah Huntara sebanyak 10 m
3
/hari yang tersebar
di 3 Kecamatan.

2. Daerah Pelayanan
Daerah pelayanan pengelolaan persampahan setelah terjadinya
bencana adalah Pasar Kota Lamno ditambah dengan sampah Huntara
sebanyak 10 m
3
/hari yang tersebar di 3 Kecamatan.

3. Sarana Pengelolaan Sampah.
Sarana pengelolaan persampahan yang ada sebelum terjadinya
bencana adalah 2 buah dump truck untuk melayani kota Calang dan
Kota Teunom serta 1 unit gerobak sampah untuk kota Lamno. Kedua
FINAL REPORT V-11
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
dump truck tersebut diatas telah hancur akibat bencana yang terjadi.
Dengan demikian yang tersisa hanya 1 buah gerobak di kota Lamno.

5.2. KRITERIA PERENCANAAN
5.2.1 Aspek Organisasi Dan Manajemen
Menurut UU No.5 Tahun 1974 bentuk institusi pengolahan persampahan dapat
berbentuk DINAS atau PERUSAHAAN DAERAH.
Sesuai dengan NUDS (National Urban Development Strategy):
- Kota Metropolitan dan kota besar bentuk pengelolanya
PERUSAHAAN DAERAH
- Kota sedang 1 (penduduk 250.000 500.000 jiwa) dan ibukota
propinsi sebaiknya Dinas Tersendiri
- Kota sedang 2 (penduduk 100.000 250.000 jiwa) dan atau
kotamadya/kotib suatu Dinas Tersendiri
- Kota Kecil dapat merupakan suatu Dinas tersendiri atau unit di
bawah Dinas Pekerjaan Umum.

Adalah struktur yang bagian-bagiannya harus menggambarkan aktivitas utama
dalam sistem pengelolaan persampahan yang dikehendaki serta mencerminkan
pola kerja yang jelas dan mempunyai fungsi perencanaan, pelaksanaan, dan
pengendalian.

Personel tingkat pimpinan harus memiliki kemampuan manajemen dan teknik.
Perbandingan jumlah personil unit pengelolaan persampahan untuk pengumpulan
minimal 1 orang/1.000 penduduk yang dilayani; sedangkan untuk angkutan,
pembuangan akhir dan staf minimal 1 orang/1.000 penduduk yang dilayani.

Adalah bagian yang mendifinisikan lingkup tugas, wewenang, tanggung jawab
serta bentuk antar unit/komponen organisasi.





FINAL REPORT V-12
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
5.2.2. Teknis Operasional
A. Tingkat Pelayanan
Tingkat pelayanan terbagi dalam 2 penggolongan, yaitu : Kualitas dan Kuantitas.
Sasaran MDG (Millenium Development Goal) untuk tahun 2015 adalah
penambahan pelayanan untuk setengah dari penduduk yang belum mendapat
pelayanan saat ini.

Sasaran untuk tahan mendesak :
- 100% daerah komersial dan Pasar
- 50% daerah pemukiman (100% untuk daerah dengan kapasitas > 150
orang/ha)

Sasaran untuk 5 tahun berikutnya adalah :
- 100% untuk daerah komersial dan pasar
- 100% untuk daerah dengan kepadatan >100 orang/ha

Sasaran 5 tahun berikutnya adalah :
- 100% untuk daerah komersial dan pasar
- 100% untuk daerah dengan kepadatan >50 orang/ha

Tingkat pelayanan ditingkatkan secara bertahap, sehingga memerlukan sasaran
antara.

B. Daerah Pelayanan
Penentuan prioritas daerah pelayanan berdasarkan kriteria daerah yang saat ini
telah berkembang menjadi daerah pemukiman, pasar/daerah komersial, daerah
industri dan daerah urban yang mempunyai kepadatan >50 orang.

Daerah pelayanan terdiri dari :
a. Daerah pemukiman
- Belum teratur (penghasilan rendah)
- Teratur (penghasilan menengah/tinggi)

b. Daerah Komersial
FINAL REPORT V-13
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
adalah daerah perniagaan seperti pertokoan, pasar, gedung bioskop,
dan lain-lain.

c. Fasilitas umum
Terdiri dari gelanggang olah raga, hotel, pendidikan dan taman.

d. J alan dan taman
Sampah yang berasal dari penyapuan jalan dan taman dilayani 100%

C. Penampungan(Pewadahan)
Merupakan awal dari sistem pengelolaan persampahan, yang dapat dilakukan
dengan beberapa pola, yaitu :
- Disediakan oleh masyarakat dengan model bebas
- Disediakan oleh masyarakat dengan model ditentukan oleh pemerintah
- Disediakan oleh pemerintah daerah
- Disediakan oleh organisasi swadaya masyarakat

Berdasarkan mekanisme penggunaannya dapat diklasifikasikan sebagai berikut :
- Tetap (misal bak sampah dari pasangan bata)
Model ini tidak disarankan untuk dipergunakan lagi karena menghambat
kecepatan operasi, sulit dikontrol tingkat kebersihannya dan estetika kurang
baik.
- Semi tetap(tong sampah yang menggunakan tiang penyangga)
Digunakan untuk menghindari binatang, bentuknya masih dianggap lebih
baik dari bentuk tetap. Tetapi mempunyai kesulitan perawatannya,
mencegah dari kecurian(tutup, maupun keseluruhannya).
- Non tetap, dianjurkan karena sangat fleksibel, tetapi dalam penerapannya
harus memperhatikan kondisi sosial budaya.
Contoh : kantong plastik, bin, keranjang, dan lain-lain

D. Pengumpulan
Sistem pengumpulan dapat dilaksanakan dengan cara sebagai berikut :
1. Pola individual (door to door)
Pengumpulan sampah dari rumah ke rumah dengan alat angkut jarak
pendek (mis : gerobak) untuk diangkut ke stasiun transfer terdekat
FINAL REPORT V-14
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
Pengumpulan sampah dari rumah ke rumah dengan truk untuk dibawa
ketempat pembuangan akhir (TPA).
2. Pola komunal
Pengumpulan samapah beberapa rumah dilakukan pada satu titik
pengumpulan
Pengunpulan sampah untuk beberapa lokasi pada satu titik
pengumpulan

Pola komunal ini sangat tepat untuk daerah pemukiman yang
berpenghasilan rendah.

Peralatan yang digunakan :
Bin/tong sampah : 40/60 liter
Bin/tong sampah : 120 liter
Kantong plastik : 30/50 liter
Gerobak sampah : 0,5 m3/1,0 m3

Perencanaan Operasional :
Ritasi antara 3 4 kali/rit per hari
Periodisasi 1 hari, 2 hari atau maximal 3 hari sekali, tergantung dari
komposisi sampah(semakin besar prosentase organiknya semakin
kecil periodisasi pelayanan), kapasitas kerja, desain peralatannyadan
kualitas yang ingin diberikan.
Mempunyai daerah pelayanan tertentu dan tetap
Mempunyai petugas pelaksanaan yang tetap dan dipindahkan secara
periodik Pembebanan pekerjaan diusahakan merata dengan kriteria :
jumlah sampah terangkut, jarak tempuh dan kondisi daerahnya.




E. Pemindahan
Adalah fase antara yang dapat melepas ketergantungan antara fase pengumpulan
Station transfer I :
FINAL REPORT V-15
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
Tempat pertemuan peralatan pengumpul (gerobak) dengan peralatan
pengangkutan dan dapat merupakan tempat penyimpanan alat
kebersihan, bengkel sederhana dan kantor/pengendali
Luas : 200m
2
Station Transfer II :
Tempat pertemuan peralatan pengumpul gerobak dan alat peralatan
pengangkutan. Karena sulit didapatnya lahan untuk station transfer
type I, maka hanya merupakan tempat parkir gerobak-gerobak saja.
Luas : 50 m
2
Station Transfer III :
Tempat pertemuan gerobak dengan container besar (6 10 m
2
) atau
lokasi penempatan container komunal (1 10 m
2
)
Luas : 2 10 m
2

F. Pengangkutan
Dari station transfer, sampah diangkut ke tempat pembuangan akhir (TPA).
Peralatan :
- Truk terbuka bisa - 6 m
3
, 8 m
3
, 10 m
3

- Dump truk - 6 m
3
, 8 m
3
, 10 m
3

- Arm roll truk dengan container - 6 m
3
, 8 m
3
, 10 m
3

- Compactor truk - 6 m
3
, 8 m
3
, 10 m
3


a. Umur teknis peralatan 5 7 tahun
b. Pemilihan jenis truk ditentukan oleh : kondisi jalan daerah operasi, jarak
tempuh, karakteristik sampah, tingkat persyaratan sanitasi yang
dibutuhkan, daya dukung pemeliharaan.
c. Daerah pelayanan tetap dan dapat dilayani oleh peralatan angkut yang
tetap.

Perencanaan operasional :
- Ada 2 pendekatan, yaitu :
* Perencanaan rute
* Perencanaan Blok operasi
- Ritasi antara 3 4 kali rit per hari
FINAL REPORT V-16
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
- Mempunyai daerah pelayanan tertentu dan tetap
- Mempunyai petugas pelaksana yang tetap dan dapat dipindahkan secara
periodik

Untuk lokasi pembuangan akhir yang jauhnya >25 km dari kota perlu
dipertimbangkan adanya proses pemadatan.

G. Pengolahan
J enis-jenis pengolahan sampah :
- Incinerator : alat yang digunakan untuk meminimalkan sampah
dengan cara membakar .
Dibagi 2 sistem :
Sistem dengan pembakaran berkesinambungan untuk kapasitas >100
ton per hari
Sistem pembakaran terputus untuk kapasitas <100 ton per hari

- Daur Ulang : proses pengolahan sampah yang menghasilkan
produk baru
- Komposting : proses pengolahan sampah organik dengan batuan
mikroorganisme sehingga terbentuk kompos
- Balling : dipertimbangkan apabila jarak station transfer
dengan TPA >25 km

H. Pembuangan Akhir
Pembuangan di darat :
- Open dumping : tidak dianjurkan
- Controlled landfill : minimal untuk dilaksanakan
- Sanitary landfill : untuk kota Besar/Metropolitan
- Improved Sanitary landfill : untuk kota Metropolitan

Pembuangan di laut :
- Di sekitar
- Di tengah laut

FINAL REPORT V-17
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
Pemenuhan kriteria teknik Controlled Landfill sebagai berikut :
- J auh dari pemukiman
- Terletak di luar rencana perluasan kota (10 km)
- Muka air tanah cukup dalam, jenis tanah kedap air
- Daerah yang tidak produktif untuk pertanian dan sebagainya
- Dapat dipakai minimal untuk 5 10 tahun
- Bekas lokasi Landfill dapat digunakan untuk taman atau lapangan olah raga
tetapi bukan pemukiman

Analisa dampak lingkungan dilakukan untuk sejauh mana dampak lokasi
pembuangan akhir yang direncanakan terhadap lingkungan fisik, biologi, serta
sosial budaya daerah sekitarnya.

Pemilihan lokasi TPA sampah secara umum harus memenuhi ketentuan sebagai
berikut :
TPA sampah tidak boleh berlokasi di danau, sungai dan laut
Disusun berdasarkan 3 tahapan, yaitu :
- Tahap regional yang merupaka tahapan untuk menghasilkan peta yang
berisi daerah atau tempat dalam wilayah tersebut yang terbagi menjadi
beberapa zona kelayakan.
- Tahap penyisih merupakan tahapan untuk menghasilkan satu atau dua
lokasi terbaik diantara beberapa lokasi yang dipilih dari zona-zona
kelayakan pada tahap regional.
- Tahap penetapan yang merupakan tahap penetuan lokasi terpilih oleh
Instansi yang berwenang

Kriteria pemilihan lokasi TPA sampah dibagi 2 bagian :
1. Kriteria Regional, yaitu kriteria yang digunakan untuk menentukan zona
layak atau tidak layak sebagi berikut :
- Kondisi geologi : tidak berlokasi di zona holocone fault dan tidak boleh
zona bahaya geologi
- Kondisi hidrogeologi :
o Tidak boleh mempunyai muka air tanah kurang dari 3 meter
o Tidak boleh kehalusan tanah lebih dari 10
-6
cm/det
FINAL REPORT V-18
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
o J arak terhadap sumber air minum harus lebih besar dari 100
meter di hilir aliran
o Dalam hal tidak ada zona yang memenuhi kriteria-kriteria
tersebut di atas, maka harus diadakan masukan teknologi.
- Kemiringan zona kurang dari 20%
- J arak dari lapangan terbang harus lebih besar dari 3.000 meter untuk
penerbangan turbo jet dan harus lebih besar dari 1.500 meter untuk
jenis lain.

2. Kriteria penyisih yaitu kriteria yang digunakan untuk memilih lokasi terbaik
diantaranya yaitu :
- Iklim :
Hujan, intensitas hujan makin kecil dinilai makin baik
Angin, arah angin dominan tidak menuju kepemukiman dinilai
makin baik

- Utilitas : tersedia lebih lengkap dinilai lebih baik
- Lingkungan biologis :
Habitat : kurang bervariasi, dinilai makin baik
Daya dukung : kurang menunjang kehidupan flora
dan fauna dinilai makin baik.

- Kondisi tanah :
Produktifitas tanah : tidak produktif dinilai tidak baik
Kapasitas dan umur : dapat menampung lahan lebih banyak
dan lebih lama finilai lebih baik
Status tanah penutup : mempunyai tanah penutup yang
cukup, dinilai lebih baik
Status tanah : makin bervariasi dinilai tidak baik

- Demografi : kepadatan penduduk lebih rendah dinilai
makin baik
- Batas administrasi : dalam batas administrasi dinilai makin baik
- Kebisingan : semakin banyak zona penyangga dinilai
FINAL REPORT V-19
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
semakin baik
- Bau : semakin banyak
- Estetika : semakin tidak terlihat dari luar semakin
baik
- Ekonomi : semakin rendah biaya satuan pengelolaan
sampah (per m3/ton) dinilai semakin baik



























FINAL REPORT V-20
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
5.3. RENCANA PENGEMBANGAN PENGELOLAAN PERSAMPAHAN

5.3.1. Proyeksi Timbulan Sampah
Timbulan sampah diproyeksikan hingga tahun 2011 dan 2026. Diasumsikan,
berdasarkan skala kepadatan penduduk berciri rural, maka timbulan sampah
adalah sebesar 2,5 L/org/hari. Untuk memudahkan, maka volume timbulan
sampah dan proyeksinya hingga tahun 2011 dan 2026 dapat dilihat pada tabel
berikut ini. Terdapat pada gambar 5.5. 5.8.

Gambar 5.5. Proyeksi Timbulan Sampah Kec. J aya

KEC JAYA, KAB ACEH JAYA PROYEKSI VOL SAMPAH
-
10
20
30
40
50
60
M
3
/
H
A
R
I
Proyeksi Timbulan Sampah m3/hr 33 39 44 48 53
Sampah yang dilayani terpusat
m3/hari
5.8 6.7 7.6 8.4 9.2
2006 2011 2016 2021 2026









Gambar 5.6. Proyeksi Timbulan Sampah Kec. Teunom
KEC TEUNOM, KAB ACEH JAYA PROYEKSI VOL SAMPAH
-
10
20
30
40
50
60
2006 2011 2016 2021 2026
M
3
/
H
A
R
I
Proyeksi TimbulanSampahm3/hr 33 38 43 47 52
Sampahyangdilayani terpusat m3/hari 7.5 8.7 9.8 10.9 12.0
2006 2011 2016 2021 2026


FINAL REPORT V-21
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
Gambar 5.7. Proyeksi Timbulan Sampah Kec. Sampionet


ambar 5.8. Proyeksi Timbulan Sampah Kec. Krueng Sabee











.3.2. Kebutuhan Peralatan
bupaten Aceh J aya dapat dilihat pada
ambar 5.9.- 5.11 .
KEC SAMPOINET, KAB ACEH JAY

PROYEKSI VOL SAMPAH A








-
10
20
30
40
2006 2011 2016 2021 2026
M
3
/
H
A
R
I
Proyeksi Timbulan Sampah m3/hr 22 25 29 32 35
Sampah yang dilayani terpusat m3/hari 2.7 3.2 3.6 3.9 4.4
2006 2011 2016 2021 2026

G

PROYEKSI VOL SAMPAH KEC KR SABE, KAB ACEH JAYA
-
10
20
30
40
50
60
2006 2011 2016 2021 2026
M
3
/
H
A
R
I
Proyeksi Timbulan Sampah m3/hr 25 37 42 46 51
Sampah yang dilayani terpusat m3/hari 5.5 8.0 9.1 10.0 11.0
2006 2011 2016 2021 2026
5
Kebutuhan peralatan sampah untuk Ka
G






FINAL REPORT V-22
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

Gambar 5.9. Proyeksi Kebutuhan Peralatan Kec. J aya


















KEC JAYA, KAB ACEH JAY PROYEKSI PENANGANAN SAMPAH A



-
10
5
u
n
i
t
Kebutuhan Truk 1 1 1 1 1
Arm Rol Truk 1 1 1 1 1
Container 2 3 3 3 3
Gerobak Sampah 8 8 8 8 8
TPA untuk 5 tn (Ha) 0.4 0.4 0.5 0.5 0.6
2006 2011 2016 2021 2026

Gambar 5.10. Proyeksi Kebutuhan Peralatan Kec. Sampionet
PROYEKSI PENANGANAN SAMPAH KEC SAMPOINET, KAB ACEH JAYA

-
2.0
4.0
6.0
8.0
u
n
i
t
Kebutuhan Truk - - - - -
Arm Rol Truk - - - - -
Container - - - - -
Gerobak Sampah 6 6 6 6 6
TPA untuk 5 tn (Ha) 0.2 0.2 0.2 0.2 0.3
2006 2011 2016 2021 2026

FINAL REPORT V-23
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
FINAL REPORT V-24
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA

Gambar 5.11. Proyeksi Kebutuhan Peralatan Kec. Krueng Sabe

























-
2
4
6
8
u
n
i
t







Gerobak Sampah 4 4 4 4 4
Container 2 4 5 6 6
Arm Rol Truk 1 2 2 2 2
Kebutuhan Truk 1 1 1 1 1
TPA untuk 5 tn (Ha) 2 3 3 3 4
2006 2011 2016 2021 2026

PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
Tabel 5.1. Proyeksi Timbulan Sampah dan Kebutuhan Peralatan Kec J aya
No Uraian Satuan exsisting
2006 2007 2008 2009 2010 2011 2016 2021 2026
1.1 Penduduk :
J umlah Penduduk J iwa 16,673 17,340 18,034 18,755 19,505 20,285 23,516 26,606 29,376
J umlah penduduk terlayani J iwa 0 1,734 2,705 3,751 4,876 6,086 9,406 13,303 17,625
1.2 Timbulan Sampah :
Rumah Tangga (RT) l/org/hari 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50
Daerah Komersial / Niaga % dari RT 15 15 15 15 15 15 15 15 15
1.3 Produksi sampah :
Rumah Tangga m/hari 41.68 43.35 45.08 46.89 48.76 50.71 58.79 66.52 73.44
Daerah Komersial/niaga m/hari 6.25 6.50 6.76 7.03 7.31 7.61 8.82 9.98 11.02
Total m/hari 48 50 52 54 56 58 68 76 84
1.4 Cakupan / Tingkat Pelayanan :
Rumah Tangga % 0 10 15 20 25 30 40 50 60
m3/hari 0 4.33 6.76 9.38 12.19 15.21 23.52 33.26 44.06
Daerah Komersial/niaga % 0 100 100 100 100 100 100 100 100
m3/hari 0 6.50 6.76 7.03 7.31 7.61 8.82 9.98 11.02
Total Pelayanan % 0 22 26 30 35 39 48 57 65
m3/hari 0 10.84 13.53 16.41 19.51 22.82 32.33 43.24 55.08
Pelayanan D.Truck % 100 100 80 70 60 50 40 30 30
m3/hari 0 10.8 10.8 11.5 11.7 11.4 12.9 13.0 16.5
Pelayanan A.Roll Truck % 0 - 20 30 40 50 60 70 70
m3/hari 0 - 2.7 4.9 7.8 11.4 19.4 30.3 38.6
1.5 Sarana Pengumpulan & Pengangkutan
1.5.1Kebutuhan D.Truck(.6m3/2rit/hr) unit 1 1 1 1 1 1 2 2
- Penambahan D.Truck unit 0 - - - - - 1 - -
1.5.2Kebutuhan A.roll truck (6m3/3rit/hri) unit 0 1 1 1 2 2 2 3 4
- Penambahan A.Roll truck (5 thn sekali) unit 0 1 0 0 1 0 0 1 1
1.5.

2
3Kebutuhan Kontainer 6 M3 unit 0 0 1 1 2 2 4 6 7
Penambahan container unit 0 0 1 0 1 0 2 2 1
1.5.4Kebutuhan Gerobak (1m3,1rit/hari) 30% RT unit 0 2 3 3 4 5 8 10 14
1.6 Alat Berat di TPA
1.6.1Kebutuhan Buldozer unit 0 0 0 0 0 0 0 0 0
Penambahan Buldozer unit 0 0 0 0 0 0 0 0 0
1.6.2Kebutuhan D.Truck Pengangkut tanah unit 0 0 0 0 0 0 0 0 0
Penambahan D.Truck Pengangkut tanah unit 0 0 0 0 0 0 0 0 0
1.6.3Kebutuhan Excapator unit 0 0 0 0 0 0 0 0 0
Penambahan Excapator unit 0 0 0 0 0 0 0 0 0
1.7 TPA
Lahan TPA Ha 0 0.20 0.24 0.30 0.35 0.41 0.58 0.78 0.99
bengkel,pos jaga & pencucian m2 0 0 0 0 0 0 0 0 0
Bangunan bengkel,pos jaga & Pencucian m2 0 0 0 0 0 0 0 0 0
Program Jangka Menengah Program Jangka Panjang
FINAL REPORT V-25
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
FINAL REPORT V-26
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
Tabel 5.2. Proyeksi Timbulan Sampah dan Kebutuhan Peralatan Kec Sampionet
No Uraian Satuan exsisting
2006 2007 2008 2009 2010 2011 2016 2021 2026
1.1 Penduduk :
J umlah Penduduk J iwa 10,891 11,327 11,780 12,251 12,741 13,251 15,361 17,380 19,188
J umlah penduduk terlayani J iwa 0 1,133 1,767 2,450 3,185 3,975 6,144 8,690 11,513
1.2 Timbulan Sampah :
Rumah Tangga (RT) l/org/hari 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50
Daerah Komersial / Niaga % dari RT 5 5 5 5 5 5 10 10 10
1.3 Produksi sampah :
Rumah Tangga m/hari 27.23 28.32 29.45 30.63 31.85 33.13 38.40 43.45 47.97
Daerah Komersial/niaga m/hari 1.36 1.42 1.47 1.53 1.59 1.66 3.84 4.34 4.80
Total m/hari 29 30 31 32 33 35 42 48 53
1.4 Cakupan / Tingkat Pelayanan :
Rumah Tangga % 0 10 15 20 25 30 40 50 60
m3/hari 0 2.83 4.42 6.13 7.96 9.94 15.36 21.72 28.78
Daerah Komersial/niaga % 0 100 100 100 100 100 100 100 100
m3/hari 0 1.42 1.47 1.53 1.59 1.66 3.84 4.34 4.80
Total Pelayanan % 0 14 19 24 29 33 45 55 64
m3/hari 0 4.25 5.89 7.66 9.56 11.59 19.20 26.07 33.58
Pelayanan D.Truck % 0 0 0 20 20 20 20 20 20
m3/hari 0 - - 1.5 1.9 2.3 3.8 5.2 6.7
Pelayanan A.Roll Truck % 0 100 100 80 80 80 80 80 80
m3/hari 0 4.2 5.9 6.1 7.6 9.3 15.4 20.9 26.9
1.5 Pengumpulan & Pengangkutan
1.5.1 Kebutuhan D.Truck(.6m3/2rit/hr) unit 0 - - 1 1 1 1 1 1
- Penambahan D.Truck unit 0 - - 1 - - - - -
1.5.2 Kebutuhan A.roll truck unit 0 1 1 1 1 1 1 2 2
- Penambahan A.Roll truck (baru) unit 0 1 0 0 0 0 0 1 0
1.5.3 Kebutuhan Kontainer 6 M3 unit 0 1 1 2 2 2 3 4 5
Penambahan container unit 0 1 0 1 0 0 1 1 2
1.5.4 Kebutuhan Gerobak (1m3,1rit/hari) 30% RT unit 0 1 2 2 3 3 5 7 9
1.6 Alat Berat di TPA
1.6.1 Kebutuhan Buldozer unit 0 0 0 0 0 0 0 0 0
Penambahan Buldozer unit 0 0 0 0 0 0 0 0 0
1.6.2 Kebutuhan D.Truck Pengangkut tanah unit 0 0 0 0 0 0 0 0 0
Penambahan D.Truck Pengangkut tanah unit 0 0 0 0 0 0 0 0 0
1.6.3 Kebutuhan Excapator unit 0 0 0 0 0 0 0 0 0
Penambahan Excapator unit 0 0 0 0 0 0 0 0 0
1.7 TPA
Controll Land fill/thn Ha 0 0.08 0.11 0.14 0.17 0.21 0.35 0.47 0.60
Lahan bengkel,pos jaga & pencucian m2 0 0 0 0 0 0 0 0 0
Bangunan bengkel,pos jaga & Pencucian m2 0 0 0 0 0 0 0 0 0
Program Jangka Menengah Program Jangka Panjang
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
FINAL REPORT V-27
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
Tabel 5.3. Proyeksi Timbulan Sampah dan Kebutuhan Peralatan Kec Teunom
No Uraian Satuan exsisting
2006 2007 2008 2009 2010 2011 2016 2021 2026
1.1 Penduduk :
J umlah Penduduk J iwa 16,285 16,936 17,614 18,318 19,051 19,813 22,969 25,987 28,692
J umlah penduduk terlayani J iwa 0 1,694 2,642 3,664 4,763 5,944 9,188 12,994 17,215
1.2 Timbulan Sampah :
Rumah Tangga (RT) l/org/hari 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50
Daerah Komersial / Niaga % dari RT 5 5 5 5 5 5 10 10 10
1.3 Produksi sampah :
Rumah Tangga m/hari 40.71 42.34 44.03 45.80 47.63 49.53 57.42 64.97 71.73
Daerah Komersial/niaga m/hari 2.04 2.12 2.20 2.29 2.38 2.48 5.74 6.50 7.17
Total m/hari 43 44 46 48 50 52 63 71 79
1.4 Cakupan / Tingkat Pelayanan :
Rumah Tangga % 0 10 15 20 25 30 40 50 60
m3/hari 0 4.23 6.61 9.16 11.91 14.86 22.97 32.48 43.04
Daerah Komersial/niaga % 0 100 100 100 100 100 100 100 100
m3/hari 0 2.12 2.20 2.29 2.38 2.48 5.74 6.50 7.17
Total Pelayanan % 0 14 19 24 29 33 45 55 64
m3/hari 0 6.35 8.81 11.45 14.29 17.34 28.71 38.98 50.21
Pelayanan D.Truck % 0 0 0 0 0 0 10 10 10
m3/hari 0 - - - - - 2.9 3.9 5.0
Pelayanan A.Roll Truck % 0 100 100 100 100 100 90 90 90
m3/hari 0 6.4 8.8 11.4 14.3 17.3 25.8 35.1 45.2
1.5 Jumlah Sarana
1.5.1 Kebutuhan D.Truck(.6m3/2rit/hr) unit 0 - - - - - 1.0 1.0 1.0
- Penambahan D.Truck unit 0 0 0 0 0 0 1 0 0
1.5.2 Kebutuhan A.roll truck (6m3/3rit/hri) unit 0 1 1 1 1 1 2 2 3
- Penambahan A.Roll truck (5 thn sekali) unit 0 1 0 0 0 0 1 0 1
1.5.3 Kebutuhan Kontainer 6 M3 unit 0 2 2 2 3 3 5 6 8
Penambahan container unit 0 2 0 0 1 0 2 1 2
1.5.4 Kebutuhan Gerobak (1m3,1rit/hari) 30% RT unit 0 2 2 3 4 5 7 10 13
1.6 Alat Berat di TPA
1.6.1 Kebutuhan Buldozer unit 0 0 0 0 0 0 0 0 0
Penambahan Buldozer unit 0 0 0 0 0 0 0 0 0
1.6.2 Kebutuhan D.Truck Pengangkut tanah unit 0 0 0 0 0 0 0 0 0
Penambahan D.Truck Pengangkut tanah unit 0 0 0 0 0 0 0 0 0
1.6.3 Kebutuhan Excapator unit 0 0 0 0 0 0 0 0 0
Penambahan Excapator unit 0 0 0 0 0 0 0 0 0
1.7 TPA
Controll Land fill/thn Ha 0 0.11 0.16 0.21 0.26 0.31 0.52 0.70 0.90
Lahan bengkel,pos jaga & pencucian m2 0 0 0 0 0 0 0 0 0
Bangunan bengkel,pos jaga & Pencucian m2 0 0 0 0 0 0 0 0 0
Program Jangka Menengah Program Jangka Panjang
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
FINAL REPORT V-28
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
Tabel 5.4. Proyeksi Timbulan Sampah dan Kebutuhan Peralatan Kec Krueng Sabe
No Uraian Satuan exsisting
2006 2007 2008 2009 2010 2011 2016 2021 2026
1.1 Penduduk :
J umlah Penduduk J iwa 12,727 13,236 13,766 14,316 14,889 15,484 17,951 20,309 22,4
J umlah penduduk terlayani J iwa 0 1,324 2,065 2,863 3,722 4,645 7,180 10,155 13,4
1.2 Timbulan Sampah :
Rumah Tangga (RT) l/org/hari 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2
Daerah Komersial / Niaga % dari RT 5 5 5 5 5 5 10 10
1.3 Produksi sampah :
Rumah Tangga m/hari 31.82 33.09 34.41 35.79 37.22 38.71 44.88 50.77 56.
Daerah Komersial/niaga m/hari 1.59 1.65 1.72 1.79 1.86 1.94 4.49 5.08 5.
Total m/hari 33 35 36 38 39 41 49 56
1.4 Cakupan / Tingkat Pelayanan :
Rumah Tangga % 0 10 15 20 25 30 40 50
m3/hari 0 3.31 5.16 7.16 9.31 11.61 17.95 25.39 33
Daerah Komersial/niaga % 0 100 100 100 100 100 100 100
m3/hari 0 1.65 1.72 1.79 1.86 1.94 4.49 5.08 5
Total Pelayanan % 0 14 19 24 29 33 45 55
m3/hari 0 4.96 6.88 8.95 11.17 13.55 22.44 30.46 39.
Pelayanan D.Truck % 0 0 30 30 30 30 30 30
m3/hari 0 - 2.1 2.7 3.3 4.1 6.7 9.1 11
Pelayanan A.Roll Truck % 0 100 70 70 70 70 70 70
m3/hari 0 5.0 4.8 6.3 7.8 9.5 15.7 21.3 27
1.5 Sarana Pengumpulan & Pengangkutan
1.5.1 Kebutuhan D.Truck(.6m3/2rit/hr) unit 0 - 1 1 1 1 1 1
- Penambahan D.Truck unit 0 - 1 - - - - -
1.5.2 Kebutuhan A.roll truck (6m3/3rit/hri) unit 0 1 1 1 1 1 2 2
- Penambahan A.Roll truck (5 thn sekali) unit 0 1 0 0 0 0 1 0
1.5.3 Kebutuhan Kontainer 6 M3 unit 0 1 1 2 2 2 3 4
Penambahan container unit 0 1 0 1 0 0 1 1
1.5.4 Kebutuhan Gerobak (1m3,1rit/hari) 30% RT unit 0 1 2 3 3 4 6 8
1.6
23
54
.50
10
06
61
62
60
.63
100
.61
64
24
30
.8
70
.5
1
-
3
1
5
1
11
Alat Berat di TPA
1.6.1 Kebutuhan Buldozer unit 0 1 1 1 1 1 1 1
Penambahan Buldozer unit 0 1 0 0 0 0 1 1
1.6.2 Kebutuhan D.Truck Pengangkut tanah unit 0 1 1 1 1 1 1 1
Penambahan D.Truck Pengangkut tanah unit 0 1 0 0 0 0 1 1
1.6.3 Kebutuhan Excapator unit 0 1 1 1 1 1 1 1
Penambahan Excapator unit 0 1 0 0 0 0 1 1
1.7 TP
1
1
1
1
1
1
A
Lahan TPA Ha 0 0.48 0.63 0.80 0.98 1.18 1.85 2.50 3.
bengkel,pos jaga & pencucian m2 0 150 0 0 0 0 0 0
Bangunan bengkel,pos jaga & Pencucian m2 0 100 0 0 0 0 0 0
Program Jangka Menengah Program Jangka Panjang
21
0
0
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
FINAL REPORT V-29
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
5.3.3. Tempat Pembuangan Akhir (TPA)







Luas lahan yang dibutuhkan diperhitungkan untuk 5 tahun kedepan Lokasi TPA
dapat dilihat pada Gambar 5.12, - 5.15.
Gambar 5.12. Lokasi TPA Kec. J aya






















Ujung Muloh
GE. JANGUE
Jang Uet
GE. TROH
GE. BATA
Meunasah Rajeuk
Blang Mangi
Kampung Baru
Gle Jong
Lam Kuta
Kuala
Bahagia
GE. KAPAI
Rampak
GE. BAYU
Teumerem
Meunasah
GE. BITAY
Teumaleuk
Alumie
Meunasah Tulang
Babah Dua
Meutara
Nusa
GE. MUKHAN
GE. BALE
Meunasah Weh
Meunasah
Meunasah
Cat Dulang
GE. MEULAIRI
Lhut
GE. KATO
Meulinteung
Lam Me
Bak Paoh
Lam Derian
Ule Umang
Lho Bate
Melha
GE. MELHA
Gle Putoh
GE. PUTOH
Lam Baroh
GE. SANGO
Sango
GE. RAMBONG SAMLAKOI
Panton Makmur
GE. CEURE
GE. GROTEE
Babahleu
Meudhen
GE. TEUMIGA
Krueng Tunong
Lam Tui
GE. NILAM
Jambo Masi
GE. BATEIPUTEH
GE. BEUTONG
Lam Asan
4.0 KM
LAMNO
Mukhan
Bore Hole
Sapek
Keutapang
Serba
Leupe
Babah Krueng
Teungah
5 l/s
Darat
TPA
Luas 0,99 Ha
Timbulan Sampah
84 m
3
/hari
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
Gambar 5.13. Lokasi TPA Kec. Sampionet





Luas 0,6 Ha

Timbulan Sampah
53 m
3
/hari


























FINAL REPORT V-30
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYA

SA & CV.TRIPLE-C
FINAL REPORT V-31
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA

TPA
Luas 0.9 Ha
Timbulan sampah 79
m
3
/hari
Gambar 5.14. Lokasi TPA Kec. Teunom

PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
FINAL REPORT V-32
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
Gambar 5.15. Lokasi TPA Kec. Krueng Sabe



















TPA
Luas 3,21 Ha
Timbulan Sampah
62 m
3
/hari
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
FINAL REPORT V-33
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA











PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
BAB VI
SISTEM PENGELOLAAN AIR LIMBAH



6.1. UMUM

Secara umum kondisi pengelolaan air limbah adalah sebagai berikut :

1. Pengelolaan Air Limbah Individual
Limbah yang dihasilkan pada umumnya berasal dari WC dan dari mandi
dan cuci. Air mandi dan cuci masuk kedalam saluran air hujan dan dari WC
masuk kedalam tangki septic yang tergabung dengan bidang resapan.
Lumpurnya setelah tangki septic penuh diambil oleh truk tinja. Pengelolaan
secara individu atau on site sanitation dilakukan oleh masing masing rumah
tangga.

2. Pengelolaan Air limbah Dengan Fasilitas Bersama
Prinsipnya sama dengan fasilitas individu. Yang mebedakannya adalah
volume . Pengelolaan dilakukan secara individu atau on site sanitation
dilakukan oleh satu atau lebih rumah secara bersama.

3. Pengelolaan Air Limbah Komunal
Limbah yang dihasilkan pada umumnya berasal dari WC dan dari mandi
dan cuci. Air mandi dan cuci masuk kedalam saluran air hujan dan dari WC
masuk kedalam tangki septic yang tergabung dengan bidang resapan.
Lumpurnya setelah tangki septic penuh diambil oleh truk tinja. Satu unit
MCK bisa terdiri dari 4 5 WC dengan satu septik tank. Pengelolaan
dilakukan secara individu atau on site sanitation dilakukan oleh satu atau
lebih rumah secara bersama.
Penyebaran lokasi fasilitas dengan angka tersebut di atas relatif menyebar .



FINAL REPORT VI-1
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
6.1.1. Kecamatan Jaya
A. Kondisi Eksisting
Berdasarkan analisa data lapangan, maka diperoleh angka penanganan
limbah domestik sebagai berikut :
1. Fasilitas Individu = 4 %
2. Fasilitas Bersama = 10 %
3. Sistem Komunal = 62 % dan
4. Tidak ada fasilitas = 24 %

B. Sarana dan Prasarana Yang Ada
1. Sarana dan Prasarana Penduduk
Fasilitas jamban yang umum dimiliki penduduk adalah :
- Bangunan atas, berupa kloset dengan leher angsa. Kloset umumnya
berupa kloset duduk dan jongkok yang terbuat dari keramik atau
batu bata dilapis portland cement.
- Bangunan Bawah, berupa cubluk tunggal dengan konstruksi buis
beton dan cubluk komunal dengan konstruksi papan atau buis beton
yang berfungsi untuk menerima buangan dari kakus (tinja+black
water) .

2. Sarana dan Prasarana Pengelola
- belum tersedia

C. Permasalahan
Pada pengelolaan air limbah individual di Kecamatan Jaya, khususnya di
Kota Kedai Blang Pidie masalahnya adalah kondisi tangki septik yang tidak
kedap air. Pada kondisi tertentu, dimana penduduk akan semakin
meningkat maka kondisi ini diantisipasi untuk ditangani yaitu sesuai
proyeksi produksi dan penangan air limbah, mulai 2007 mulai
diperkenalkan septik tank kedap air yang jumlahnya meningkat bertahap
hingga akhir tahun perencamaan ( 2026 ).



FINAL REPORT VI-2
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
6.1.2. Kecamatan Krueng Sabee
A. Kondisi Eksisting
Berdasarkan analisa data lapangan, maka diperoleh angka penanganan
limbah domestik sebagai berikut :
1. Fasilitas Individu = 10 %
2. Fasilitas Bersama = 9 %
3. Sistem Komunal = 6 % dan
4. Tidak ada fasilitas = 75 %

B. Sarana dan Prasarana Yang Ada
1. Sarana dan Prasarana Penduduk
Fasilitas jamban yang umum dimiliki penduduk adalah :
- Bangunan Atas, berupa kloset dengan leher angsa. Kloset umumnya
berupa kloset duduk dan jongkok yang terbuat dari keramik atau
batu bata dilapis portland cement.
- Bangunan Bawah, berupa cubluk tunggal dengan konstruksi buis
beton dan cubluk komunal dengan konstruksi papan atau buis beton
yang berfungsi untuk menerima buangan dari kakus (tinja+black
water).

2. Sarana dan Prasarana Pengelola
Belum ada sarana

C. Permasalahan
Pada pengelolaan air limbah individual di Kecamatan Krueng Sabee,
khususnya di Calang masalahnya adalah kondisi tangki septik yang tidak
kedap air. Pada kondisi tertentu, dimana penduduk akan semakin
meningkat maka kondisi ini diantisipasi untuk ditangani yaitu sesuai
proyeksi produksi dan penangan air limbah, mulai 2007 mulai
diperkenalkan septik tank kedap air yang jumlahnya meningkat bertahap
hingga akhir tahun perencamaan ( 2026 ).




FINAL REPORT VI-3
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
6.1.3. Kecamatan Sampoinet
A. Kondisi Eksisting
Berdasarkan analisa data lapangan, maka diperoleh angka penanganan
limbah domestik sebagai berikut :
1. Fasilitas Individu = 0 %
2. Fasilitas Bersama = 0 %
3. Sistem Komunal = 28 % dan
4. Tidak ada fasilitas = 72 %

B. Sarana dan Prasarana Yang Ada
1. Sarana dan Prasarana Penduduk
Fasilitas jamban yang umum dimiliki penduduk adalah :
Bangunan Atas, berupa kloset dengan leher angsa. Kloset umumnya
berupa kloset duduk dan jongkok yang terbuat dari keramik atau batu
bata dilapis portland cement.
Bangunan Bawah, berupa cubluk tunggal dengan konstruksi buis beton
dan cubluk komunal dengan konstruksi papan atau buis beton yang
berfungsi untuk menerima buangan dari kakus (tinja+black water) .

2. Sarana dan Prasarana Pengelola
Belum ada pengelolaan, mengingat 72% belum memiliki jamban.

C. Permasalahan
Pada pengelolaan air limbah individual di Kecamatan Sampoinet,
khususnya di Kota Sampoinet masalahnya adalah baru 28% penduduk
yang menggunakan jamban komunal dan 72% lainnya belum ada sarana.
Pada kondisi tertentu, dimana penduduk akan semakin meningkat maka
kondisi ini diantisipasi untuk ditangani yaitu sesuai proyeksi produksi dan
penangan air limbah, mulai 2007 mulai diperkenalkan septik tank kedap air
yang jumlahnya 28 unit, meningkat bertahap hingga akhir tahun
perencamaan ( 2026 ) mencapai sekitar 97 unit.




FINAL REPORT VI-4
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
6.1.4. Kecamatan Teunom
A. Kondisi Eksisting
Berdasarkan analisa data lapangan, maka diperoleh angka penanganan
limbah domestik sebagai berikut :
1. Fasilitas Individu = 59 %
2. Fasilitas Bersama = 15 %
3. Sistem Komunal = 3 % dan
4. Tidak ada fasilitas = 22 %

B. Sarana dan Prasarana Yang Ada
1. Sarana dan Prasarana Penduduk
Fasilitas jamban yang umum dimiliki penduduk adalah :
a. Bangunan Atas, berupa kloset dengan leher angsa. Kloset umumnya
berupa kloset duduk dan jongkok yang terbuat dari keramik atau
batu bata dilapis portland cement.
b. Bangunan Bawah, berupa cubluk tunggal dengan konstruksi buis
beton dan cubluk komunal dengan konstruksi papan atau buis beton
yang berfungsi untuk menerima buangan dari kakus (tinja+black
water) .

2. Sarana dan Prasarana Pengelola
Belum Ada, sosialisasi sanitasi cenderung diarahkan ke Dinas Sosial
dan Dinas Kesehatan

C. Permasalahan
Pada pengelolaan air limbah individual di Kecamatan Teunom, khususnya
di Kota Kedai Teunom masalahnya adalah kondisi tangki septik yang tidak
kedap air. Pada kondisi tertentu, dimana penduduk akan semakin
meningkat maka kondisi ini diantisipasi untuk ditangani yaitu sesuai
proyeksi produksi dan penangan air limbah, mulai 2007 mulai
diperkenalkan septik tank kedap air yang jumlahnya meningkat bertahap
hingga akhir tahun perencamaan ( 2026 )


FINAL REPORT VI-5
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C


6.2. KRITERIA PERENCANAAN
Dalam merancang sistem IPLT ini tentunya harus mengacu pada kriteria dan
karakteristik Lumpur tinja yang akan diolah, termasuk asumsi timbulan Lumpur
tinja dimaksud. Sebagai acuan kami menggunakan aturan, petunjuk maupun
pedoman yang selama ini diacu di lingkungan Dep. PU.

Kriteria ini, meliputi antara lain sebagai berikut:
(1) Laju/ kapasitas Lumpur tinja (cairan dan endapan) = 0.5 l/org.hari,
(2) KOB = 5.000 mg/l,
(3) TS = 40.000 mg/l,
(4) TVS = 25.000 mg/l,
(5) TSS = 15.000 mg/l.

Namun demikian, perhitungan rancangan proses dibuat berdasarkan perhitungan
berbasis pada kandungan organik yang dinyatakan dalam angka Kebutuhan
Oksigen Bio-kimia (KOB/ BOD).
Beberapa kriteria lain, mengenai angka yang menyangkut kinetika, diasumsi
sesuai dengan proses pengolahan dan kaidah yang lazim digunakan dalam
proses anaerob, fakultatif maupun maturasi.

6.2.1. Perhitungan Rancangan Rinci Bak Anaerob
Untuk perhitungan ini ada beberapa parameter yang harus ditentukan/
diasumsi, yaitu sebagai berikut :
Tabel 6.1 Asumsi parameter pada bak anaerob
NO PARAMETER SIMBOL SATUAN NILAI KETERANGAN
1 Debit Pengolahan Q m
3
/hari 8.00 Data, Perhitungan
2 BOD
5
Influen BOD
5
In mg/l 3500.00 Kriteria/ Asumsi
3 BOD
5
Efluen Se mg/l 500 Target rancangan
4 Suhu T
o
C 35 Angka Rata-rata
5 Konstanta laju reaksi K Hari -1 0.03 Asumsi/ Literatur
6 Konstanta laju kematian Kd Hari -1 0.015 Asumsi/ Literatur
7 BOD
5
Ultimate (perhitungan) So mg/l 5,147 Angka Perhitungan
8 Koefisien Pertumbuhan Yt - 0.1 dari Literatur
9 MLVSS (dalam tangki Anaerob) X mg/l 1,000 Asumsi/ Literatur
10 Bilogical Solid Retention Time (BSRT) Hari 30.98 Perhitungan


FINAL REPORT VI-6
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
6.2.2. Perhitungan Sistem

1 Efisiensi Penyisihan BOD
(So - Se)

= ------------------------------ x 100
%
= 90.29 %
So

2 Volume Reaktor :
Yt . Q ( So - Se )
V = ------------------------------ = 247.84 m
3
X . Kd
V 247.84 m
3
3
Waktu tinggal hidrolis (HRT) =
BSRT

V
= --------- = 30.98 hari
Q
= 743.53 jam

4 Produksi Lumpur
X x V 1000 x 247,84
= ----------- = ----------------------- = 8,000,000 mg/hari
HRT 30,98
= 8.00 kg/hari

5 Volume buangan lumpur
Prod. Lumpur
Qw = ------------------------- = 0.258 kg/hari
c


6.2.3. Perhitungan Rancangan Rinci Bak Fakultatif
Untuk perhitungan ini ada beberapa parameter yang harus ditentukan/diasumsi
selain parameter yang telah diperiksa di laboratorium seperti pada tabel 6.2 :






FINAL REPORT VI-7
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
Tabel 6.2 Asumsi parameter air limbah pada bak fakultatif
NO PARAMETER SIMBOL SATUAN NILAI KETERANGAN
1 Debit Pengolahan Q m
3
/hari 8 Data, Perhitungan
2 BOD
5
Influen BOD
5
In mg/l 500.00 Data Laboratorium
3 BOD
5
Efluen Se mg/l 200 Angka Perencanaan
4 Suhu T
o
C 30 Angka Rata-rata
5 Konstanta laju reaksi K Hari -1 0.1 dari literatur
6 Konstanta laju kematian Kd Hari -1 0.055 dari literature
7 BOD
5
Ultimate (perhitungan) SO mg/l 735 Angka Perhitungan
8 Biological Solid Retention Time qc Hari 10 Rencana Desain
9 Koefisien Pertumbuhan Yt - 0.5 dari Literatur
10 MLVSS (dalam bak aerasi) X mg/l 500 Rencana
12 Kadar O
2
di udara - % 23.20
13 Efisiensi Transfer O
2
- % 2.0
14 Berat Jenis Oksigen - kg/m
3
1.20 pada t = 30
o
C


6.2.4. Perhitungan Sistem

1 Efisiensi Penyisihan BOD
(So - Se)

= ------------------------------ x 100
%
= 72.80 %
So

2 Volume Reaktor :
Yt . Q ( So - Se )
V = ------------------------------ = 77.86
X . Kd
V 77.86 m
3

3 Produksi Lumpur
X x V 3600 . 60
= ----------- = ----------------------- = 3,893,048.13 mg/hari
c 10
= 3.89 kg/hari

4 Volume buangan lumpur
V
Qw = --------------- = 8 m
3
/hari
c
= 0.39 kg/hari

5 Waktu tinggal hidrolis
V
= --------- = 9.73 hari
c
= 233.58 jam
FINAL REPORT VI-8
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
6 Kebutuhan O
2



(BOD in - BOD out) x Q - 1,42
(Qw)
= 54,792,752.94 mg/hari

= 54.79 kg/hari
Diketahui :
BD O
2
: 1.20 kg/m
3
= 0.07 lb/cuft
Kandungan O
2
di udara : 23.20 %
Efisiensi Transfer O
2
: 2.00 %

7 Kebutuhan Udara Teoritis
O
2

= ----------------------------- = 196.32 m
3
/hari
BD O
2
x Kadar O
2


8 Volume Udara
Keb. Udara Teoritis
= ------------------------------ = 9,816.11 m
3
/hari
Eff Transfer O
2

= 0.00 cfm
= 0.00 lb/sec

6.2.5. Perhitungan Rancangan Rinci Bak Maturasi
Untuk perhitungan ini ada beberapa parameter yang harus ditentukan/diasumsi
selain parameter yang telah diperiksa di laboratorium sebagai berikut :
Tabel 6.3 Asumsi parameter air limbah pada bak maturasi
NO PARAMETER SIMBOL SATUAN NILAI KETERANGAN
1 Debit Pengolahan Q m
3
/hari 8 Data, Perhitungan
2 BOD
5
Influen BOD
5
In mg/l 200.00 Data Laboratorium
3 BOD
5
Efluen Se mg/l 40 Angka Perencanaan
4 Suhu T
o
C 30 Angka Rata-rata
5 Konstanta laju reaksi K Hari -1 0.1 dari literatur
6 Konstanta laju kematian Kd Hari -1 0.055 dari literature
7 BOD
5
Ultimate (perhitungan) SO mg/l 294 Angka Perhitungan
8 Biological Solid Retention Time qc Hari 10 Rencana Desain
9 Koefisien Pertumbuhan Yt - 0.5 dari Literatur
10 MLVSS (dalam bak aerasi) X mg/l 300 Rencana
11 Kadar O
2
di udara - % 23.20
12 Efisiensi Transfer O
2
- % 2.0
13 Berat Jenis Oksigen - kg/m
3
1.20 pada t = 30
o
C


FINAL REPORT VI-9
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
6.2.6. Perhitungan Sistem

1 Efisiensi Penyisihan BOD
(So - Se)

= ------------------------------ x 100
%
= 86.40 %
So

2 Volume Reaktor :
Yt . Q ( So - Se )
V = ------------------------------ = 61.60
X . Kd
V 60.00 m
3

3 Produksi Lumpur
X x V 3600 . 60
= ----------- = ----------------------- = 1,800,000.00 mg/hari
c 10
= 1.80 kg/hari

4 Volume buangan lumpur
V
Qw = --------------- = 6 m
3
/hari
c
= 0.18 kg/hari

5 Waktu tinggal hidrolis
V
= --------- = 7.50 hari
c
= 180.00 jam
6 Kebutuhan O
2



(BOD in - BOD out) x Q - 1,42
(Qw)
= 23,863,341.18 mg/hari

= 23.86 kg/hari
Diketahui :
BD O
2
: 1.20 kg/m
3
= 0.07 lb/cuft
Kandungan O
2
di udara : 23.20 %
Efisiensi Transfer O
2
: 2.00 %

7 Kebutuhan Udara Teoritis
O
2

= ----------------------------- = 85.50 m
3
/hari
BD O
2
x Kadar O
2


8 Volume Udara
FINAL REPORT VI-10
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
Keb. Udara Teoritis
= ------------------------------ = 4,275.11 m
3
/hari
Eff Transfer O
2
































FINAL REPORT VI-11
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
6.3. RENCANA PENGEMBANGAN SISTEM PENGELOLAAN AIR LIMBAH

Penanganan masalah bisa difokuskan pada sosialisasi pengelolaan individual
karena hal ini sejalan dengan meningkatnya jumlah penduduk serta antisipasi
peningkatan ekonomi. Secara bertahap dilakukan sosialisasi yang bertujuan
untuk:
- Mengurangi jumlah penduduk yang membuang limbah domestik tanpa
dikelola atau pembuatan tangki septik yang kedap air,
- Melakukan pengelolaan limbah domestik terpusat untuk skala perkotaan.

Secara umum penanganan dilakukan sebagai berikut :
A. Untuk daerah padat dan komersial
Pada tahap awal belum diperlukan IPLT mengingat penanganan sanitasi
dilakukan secara bertahap. Pada tahap awal dilakukan peningkatan dari
yang tanpa fasilitas ke MCK komunal. Konsep penanganan terpusat
diprediksi tahun 2007/2008. yaitu dengan cara : air limbah ditampung
dalam septic tank yang kedap air kemudian secara berkala diambil dengan
mobil tinja. Jumlah air yang ditampung dalam septic tank adalah sekitar
200-500 L/hari tergantung pemakaian air dan volume efektif septic tank
adalah 2-5 m
3
. Selanjutnya setelah terakumulasi 2 3 hari dialirkan melalui
bidang resapan. Alternatif lain adalah disedot dengan mobil tinja. ( Gambar
6.1 ).

Daerah Padat dan Komersil


B. Untuk daerah Padat Non Komersil

Penanganan peningkatan tangki septik menjadi kedap air dengan tipikal
penambahan /pembuatan tangki septik dan bidang resapan. Untuk jamban
yang membuang limbah ke drainase, ditingkatkan dengan membuat tangki /
bak penampung dan bidang resapan. Bentuk sistem komunalnya
sebagaimana gambar berikut ini :
FINAL REPORT VI-12
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
Gambar 6.2. Septik Tank Komunal





C. ntuk Daerah Kepadatan Rendah
Lokasi masih cukup luas dan tidak memberatkan penduduk untuk membuat
sarana sanitasi di halamannya.

D. Penyuluhan
Lokasi Penyuluhan disarankan di instansi dan sekolah dengan bantuan
biaya pembangun jamban higienis ( bangunan atas leher angsa, bidang
resapan dan tangki septik ). Hal dimungkinkan mengingat : bidang ini
merupakan bagian dari budaya, sehingga meningkatan sanitasi merupakan
Untuk itu perlu dilakukan penyuluhan
an adalah :
Masyarakat diberi penyuluhan untuk meningkatkan partisipasi
idang dan sanitasi.

6.3.1.
Jika k
Pembangunan dan Pengelolaan Bidang KE-PLP-AN Perkotaan dan Perdesaan,
Dept.
diproyeksikan hingga tahun 2011 dan 2026. Volume limbah meningkat dari 1.456

U
upaya peningkatan budaya bersih.
dengan memperhatikan budaya lokal. Sehingga seperti halnya dengan
kebersihan tahapan yang dilakuk
-
masyarakat dib
- Diadakan dana bergulir untuk pembuatan kamar mandi dan jamban
yang bersih dan hygienis.
- Masyarakat diberi pengetahuan untuk mengembangkan sendiri alat alat
kebersihan dan sanitasi, closet duduk, bak mandi dan cubluk yang baik.

Kecamatan Jaya
ita kaitkan dengan kriteria (Menurut Petunjuk Teknis Perencanaan,
PU 1999 laju timbulan lumpur sebesar 0,5 /orang/hari, Timbulan limbah
FINAL REPORT VI-13
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
FINAL REPORT VI-14
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
m
3
menjadi 3.097 m unal 11 unit sampai tahun 2006
untuk menambah 10 % tingkat pelayanan per
Volume tim
dapat dilihat pada tabel berikut ini,

Sesuai dengan proyeksi kebutuhan MCK dan volume limbah yang terkonsentrasi
di daerah padat maka diperlukan IPLT pada tahun 2008 / 2009.

PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
PT. INFRATAMA YAKTI
3
, Diperlukan septik tank kom
tahun sampai 66 unit di tahun 2026.
bulan limbah domestik dan proyeksinya hingga tahun 2011 dan 2026

Gambar 6.3 Grafik Proyeksi Limbah Kec. Jaya dan Rencana Penanganannya
500
1.000
m
1.500
2.000
2.500
3
/
h
a
r
i
-
Volu 1.050 1.278 1.524 1.769 2.0 me Air Limbah (m3/hr)
Ditangani Secara terpusat (m3/hari) - - 73 85 9
Setic Tank Komunal (unit) 11 19 19 19 66
6
2006 2011 2016 2021 202

PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
FINAL REPORT VI-15
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
Tabel 6.4. Proyeksi Timbulan Tinja dan Kebutuhan IPLT Kec. Jaya



EKSISTING PROYEKSI
2006 2007 2008 2009 2010 2011 2016 2021 2026
1 Jumlah Penduduk:
Jumlah Penduduk jiwa 16,673 17,340 18,034 18,755 19,505 20,285 23,516 26,606 29,376
Jumlah Penduduk Terlayani jiwa 667 867 1,082 1,313 1,560 1,826 3,292 5,055 7,050
Cakupan Pelayanan % 4% 5% 6% 7% 8% 9% 14% 19% 24%
2 Fasilitas Sanitasi:
MCK (@10 KK/MCK) unit - 3 4 5 6 7 13 20 28
jiwa - 173 216 263 312 365 658 1,011 1,410
% - 20% 20% 20% 20% 20% 20% 20% 20%
3 Truk Tinja:
Volume Lumpur Tinja m/hr - 0.03 0.04 0.05 0.06 0.07 0.12 0.18 0.25
Truk Tinja @ 3 m, 2 rit/hr unit - 1 1 1 1 1 1 1 1
4 Kapasitas IPLT m/hr - 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
No URAIAN SATUAN















FINAL REPORT VI-16
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
Sumber : Analisa Konsultan

Jika kita kaitkan dengan kriteria (Menurut Petunjuk Teknis Perencanaan,
Pembangunan dan Pengelolaan Bidang KE-PLP-AN Perkotaan dan Perdesaan,
Dept. PU 1999 laju timbulan lumpur sebesar 0,5 (/orang.har)i, Timbulan limbah
diproyeksikan hingga tahun 2011 dan 2026. Volume limbah meningkat dari 1050
m3 menjadi 2015 m3, Diperlukan septik tank komunal 19 unit sampai tahun 2011
untuk menambah 10 % tingkat pelayanan per tahun. Volume timbulan limbah
domestik dan proyeksinya hingga tahun 2011 dan 2026 dapat dilihat pada tabel
berikut ini.
6.3.2. Kecamatan Krueng Sabe
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
PT. INFRATAMA YAKTI

Gambar 6.4. Proyeksi Limbah dan Rencana Penanganannya







-
200
400
600
800
1.000
1.200
1.400
1.600
m
3
/
h
a
r
i
Volume Air Limbah (m3/hr) 693 843 1.047 1.252 1.456
Ditangani Secara terpusat (m3/hari) 59 137 173 209 246
Setic Tank Komunal (unit) 34 34
2006 2011
34 34 75
2016 2021 2026

PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
FINAL REPORT VI-17
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
Tabel 6.5. Proyeksi Timbulan Tinja dan Kebutuhan IPLT Kec. Krueng Sabe










EKSISTING PROYEKSI
2006 2007 2008 2009 2010 2011 2016 2021
1 Jumlah Penduduk:
Jumlah Penduduk jiwa 12,727 13,236 13,766 14,316 14,889 15,484 17,951 20,309
Jumlah Penduduk Terlayani jiwa 509 662 826 1,002 1,191 1,394 2,513 3,859
Cakupan Pelayanan % 4% 5% 6% 7% 8% 9% 14% 19%
2 Fasilitas Sanitasi:
MCK (@10 KK/MCK) unit - 3 3 4 5 6 10 15
jiwa - 132 165 200 238 279 503 772
% - 20% 20% 20% 20% 20% 20% 20%
3 Truk Tinja:
Volume Lumpur Tinja m/hr - 0.02 0.03 0.04 0.04 0.05 0.09 0.14
Truk Tinja @ 3 m, 2 rit/hr unit - 1 1 1 1 1 1 1
4 Kapasitas IPLT m/hr - 1.00 1.00 1.00 1.00 1.00 1.00 1.00
No URAIAN SATUAN
2026
22,423
5,382
24%
22
1,076
20%
0.19
1
1.00










FINAL REPORT VI-18
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA


Jika kita kaitkan dengan kriteria (Menurut Petunjuk Teknis Perencanaan,
Pembangunan dan Pengelolaan Bidang KE-PLP-AN Perkotaan dan Perdesaan,
Dept. PU 1999laju timbulan lumpur sebesar 0,5 (/orang.har)i, Timbulan limbah
diproyeksikan hingga tahun 2011 dan 2026. Volume limbah meningkat dari 1.097
m3 menjadi 2.318 m
3
, Diperlukan septik tank komunal 39 unit sampai tahun 2011
untuk menambah 10 % tingkat pelayanan per tahun. Volume timbulan limbah
domestik dan proyeksinya hingga tahun 2011 dan 2026 dapat dilihat pada tabel
berikut ini.
6.3.3. Kecamatan Sampionet
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
PT. INFRATAMA YAKTI
Sumber : Analisa Konsultan
Gambar 6.5. Grafik Proyeksi Limbah dan Rencana Penanganannya
-
200
400
600
800
1,000
1,200
1,400
m
3
/
h
a
r
i
Volume Air Limbah (m3/hr) 666 811 967 1,123 1,278
Ditangani Secara terpusat
(m3/hari)
- - - - -
Setic Tank Komunal (unit) 28
2006
11 11 11 36
2011 2016 2021 2026


PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
FINAL REPORT VI-19
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
Tabel 6.6. Proyeksi Timbulan Tinja dan Kebutuhan IPLT Kec. Sampionet

EKSISTING PROYEKSI
2006 2007 2008 2009 2010 2011 2016 2021 2026
1 Jumlah Penduduk:
Jumlah Penduduk jiwa 10,891 11,327 11,780 12,251 12,741 13,251 15,361 17,380 19,188
Jumlah Penduduk Terlayani jiwa 436 566 707 858 1,019 1,193 2,151 3,302 4,605
Cakupan Pelayanan % 4% 5% 6% 7% 8% 9% 14% 19% 24%
2 Fasilitas Sanitasi:
MCK (@10 KK/MCK) unit - 2 3 3 4 5 9 13 18
jiwa - 113 141 172 204 239 430 660 921
% - 20% 20% 20% 20% 20% 20% 20% 20%
3 Truk Tinja:
Volume Lumpur Tinja m/hr - 0.02 0.03 0.03 0.04 0.04 0.08 0.12 0.16
Truk Tinja @ 3 m, 2 rit/hr unit - 1 1 1 1 1 1 1 1
4 Kapasitas IPLT m/hr - 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
No URAIAN SATUAN










FINAL REPORT VI-20
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA

Jika kita kaitkan dengan kriteria (Menurut Petunjuk Teknis Perencanaan,
Pembangunan dan Pengelolaan Bidang KE-PLP-AN Perkotaan dan Perdesaan,
Dept. PU 1999laju timbulan lumpur sebesar 0,5 (/orang.har)i, Timbulan limbah
diproyeksikan hingga tahun 2011 dan 2026. Volume limbah meningkat dari 857
m3 menjadi 1829 m3, Diperlukan septik tank komunal 5 8unit sampai tahun 2011
untuk menambah 10 % tingkat pelayanan per tahun. Volume timbulan limbah
domestik dan proyeksinya hingga tahun 2011 dan 2026 dapat dilihat pada tabel
berikut ini,
6.3.4. Kecamatan Teunom
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
PT. INFRATAMA YAKTI


Sumber : Analisa Konsultan

Gambar 6.6. Grafik Proyeksi Limbah dan Rencana Penanganannya

PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
Tabel 6.7. Proyeksi Timbulan Tinja dan Kebutuhan IPLT Kec. Teunom

EKSISTING PROYEKSI
2006 2007 2008 2009 2010 2011 2016 2021 2026
1 Jumlah Penduduk:
Jumlah Penduduk jiwa 16,285 16,804 17,323 17,841 18,360 18,879 21,360 23,583 26,037
Jumlah Penduduk Terlayani jiwa 651 840 1,039 1,249 1,469 1,699 2,990 4,481 6,249
Cakupan Pelayanan % 4% 5% 6% 7% 8% 9% 14% 19% 24%
2 Fasilitas Sanitasi:
MCK (@10 KK/MCK) unit - 3 4 5 6 7 12 18 25
jiwa - 168 208 250 294 340 598 896 1,250
% - 20% 20% 20% 20% 20% 20% 20% 20%
3 Truk Tinja:
Volume Lumpur Tinja m/hr - 0.03 0.04 0.04 0.05 0.06 0.11 0.16 0.22
Truk Tinja @ 3 m, 2 rit/hr unit - 1 1 1 1 1 1 1 1
4 Kapasitas IPLT m/hr - 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
No URAIAN SATUAN








FINAL REPORT VI-21
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

BAB VII
DRAINASE


7.1. DAERAH PERENCANAAN
Wilayah Kabupaten Aceh jaya berbatasan sisi utara dengan Kabupaten Aceh
Besar dan Kab. Pidie disebelah selatan dengan Samudra Indonesia, disebelah
timur dengan Kabupaten Pidie dan Kabupaten Aceh Barat, disebelah barat
dengan Samudra Indonesia.

Kabupaten Aceh Jaya terdiri dari 6 (Kecamatan), dengan Ibukota Kabupaten
adalah Calang terletak di Kecamatan Krueng Sabe.
Daerah perencanaan di Kabupaten Aceh Jaya meliputi :
- Kota Calang


7.2. Gambaran Umum dan Kondisi yang ada
7.2.1 Pelayanan Sistem Prasarana yang ada
Wilayah Calang dilalui oleh 2(dua) saluran Induk yang membagi kota menjadi 3
(tiga) bagian, dimana setiap bagian terdiri dari beberapa blok sedangkan setiap
blok dibatasi oleh jalan dan drainase. Saluran Induk pertama mengalir dari arah
Timur menuju Barat memotong jalan Negara (arah ke utara/Banda Aceh)
kemudian berbelok kearah selatan sebelum kantor bupati menuju langsung ke
laut.

Saluran induk kedua berada disisi timur komplek TNI. Mengalir kedua arah yaitu
arah selatan dan utara dimana pembuangan akhir kedua-duanya langsung
menuju ke laut.

Dari hasil inventarisasi diperoleh data-data saluran sebagai berikut:
Panjang saluran drainase dalam kota = 10275 m
Panjang saluran drainase induk konstruksi beton = 550 m
Panjang saluran drainase induk konstruksi tanah = 2000 m
FINAL REPORT VII-1
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

7.2.2 Sungai
Pada saat ini, jaringan drainase yang ada terbentuk dengan memanfaatkan pola
jaringan jalan, saluran alam dan anak sungai serta pembuangan irigasi. Sungai
yang dapat dimanfaatkan untuk jaringan utama drainase kota sebagai tempat
pembuangan akhir yaitu saluran alam.

Saluran alam yang terdapat di Kabupaten Aceh Jaya antara lain :
- Krueng Lambaso, mengalir di Kecamatan Jaya melalui Kota Lamno.
- Krueng Legan, mengalir dibagian Timur Lhok Kruet Kec. Sampoie Met.
- Krueng Masem, mengalir dibagian Timur Lhok Kruet Kec. Sampoie Met
- Krueng Sabe , mengalir dibagian Timur Calang Kec.Krueng Sabe
- Krueng On, mengalir di bagian Barat Keude Tenom Kec.Tenom.

Gambar 7.1. Peta Administrasi Kota Calang




















FINAL REPORT VII-2
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

7.2.3 Drainase Primer / Utama
Sistem saluran drainase yang tersedia masih menggabungkan air limbah dengan
air hujan .Sistem kerja aliran saluran drainase di kota Calang adalah sebagai
berikut:
Air limbah maupun air hujan dari pemukiman (saluran pemukiman) ditampung
oleh saluran kota dan dialirkan ke saluran utama, selanjutnya saluran utama
mengalirkan ke pembuangan akhir (laut).
Saluran induk terdiri dari :
1). Saluran Induk Timur - Barat - Selatan Mempunyai cathment area 16 Ha
2). Saluran Induk Utara - Selatan mempunyai cathment area 11 Ha

Wilayah Calang dilalui oleh 2(dua) saluran Induk yang membagi kota menjadi 3
(tiga) bagian, dimana setiap bagian terdiri dari beberapa blok sedangkan setiap
blok dibatasi oleh jalan dan drainase. Saluran Induk pertama mengalir dari arah
Timur menuju Barat memotong jalan Negara (arah ke Utara/Banda Aceh)
kemudian berbelok kearah selatan sebelum kantor Bupati menuju langsung ke
laut.

Saluran induk kedua berada disisi timur komplek TNI. Mengalir kedua arah yaitu
arah Selatan dan Utara dimana pembuangan akhir kedua-duanya langsung
menuju ke laut.
Dari hasil inventarisasi diperoleh data-data saluran sebagai berikut:
Panjang saluran drainase dalam kota = 10275 m
Panjang saluran drainase induk konstruksi beton = 550 m
Panjang saluran drainassse induk konstruksi tanah = 2000 m









FINAL REPORT VII-3
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

Gambar 7.2. Peta saluran drainase primer Kota Calang















SAMUDERA INDONESIA
GORONG - GORONG
GORONG - GORONG
K
E

B
A
N
D
A

A
C
E
H
BARAK
D
P
R
SAMUDERA INDONESIA
P
U
SAMUDERA INDONESIA
438' LU
2+050
K
E
M
E
U
L
A
B
O
H
BARAK
BARAK
TELKOM

Gambar 7.3. Belum Ada Saluran Drainase










7.2.4 Drainase Sekunder / Lokal
Drainase lokal umumnya merupakan drainase jalan yang melayani ruas-ruas jalan
kota dan ada beberapa saluran yang merupakan saluran pengumpul/saluran
sekunder melayani beberapa saluran jalan. Konstruksi saluran umumnya
permanen terdiri dari pasangan beton atau batu kali ataupun ada yang belum ada
FINAL REPORT VII-4
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

perkerasan, tetapi ada beberapa ruas jalan yang belum ada saluran sehingga air
mengalir diatas jalan/dipinggir jalan sewaktu hujan.
Umumnya untuk daerah pada saluran ini merupakan saluran tertutup dengan
penutup beton dan atau kayu.

7.2.5 Daerah Genangan
Genangan akibat air hujan umumnya disebabkan karena tidak tertampungnya air
hujan di saluran. Umumnya terjadi akibat meluapnya saluran utama di jalan Durian
dan meluapnya saluran lokal di sekitar Pasar Pagi dan terminal. Sebab utama
meluapnya adalah :
1. Tidak terpeliharannya saluran sehingga saluran tersumbat sampah
2. Tidak terpeliharanya saluran sehingga saluran tersumbat endapan tanah
3. Arah aliran yang kurang baik
4. Terlalu kecilnya atau masalah pendimensian saluran dan gorong gorong
5. Akibat perkembangan pemukiman yang tidak teratur sehingga air hujan tidak
tertampung
6. Rusaknya saluran sehingga air hujan tak tertampung
7. Rusaknya jalan sehingga air tergenang di jalan.

Gambar 7.4. Daerah Genangan di Kota Calang

SAMUDERA INDONESIA
GORONG - GORONG
GORONG - GORONG
K
E
B
A
N
D
A
BARAK
D
P
R
SAMUDERA INDONESIA
PU
SAMUDERA INDONESIA
2+050
K
E
M
E
U
L
A
B
O
H
BARAK
BARAK
TELKOM





3

1

2


FINAL REPORT VII-5
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

Luas daerah genangan adalah 0,12 Ha meliputi daerah daerah seperti terlihat
pada Tabel 7.1.
Tabel 7.1. Daerah Genangan
No Daerah Genangan Luas Genangan Keterangan
1 Genangan 1 2250 m
2
Saluran perlu
pengembangan
2 Genangan 2 400 m
2
Saluran perlu
rekonstruksi
3 Genangan 3 600 m
2
Saluran perlu
rekonstruksi


7.3. Perhitungan Hidrologi dan Simulasi Curah Hujan
7.3.1 Umum
Perhitungan hidrologi bertujuan untuk menghitung probabilitas dan Intensitas
Hujan Maksimum yang mungkin terjadi hingga didapat besarnya debit rencana
yang akan dipakai sebagai dasar perhitungan dimensi saluran ataupun dimensi
bangunan pelengkap.
Sebagai data dasar perhitungan hidrologi ini adalah data curah hujan yang dicatat
pada beberapa stasiun pencatat hujan disekitar lokasi studi. Sedangkan metoda
perhitungan ditetapkan dengan melihat kondisi perencanaan yang ada.

7.3.2 Periode Ulang Curah Hujan Maksimum
Data curah hujan yang dipakai disini adalah data curah hujan maksimum dari
stsiun terdekat di daerah studi yang diperoleh dari Biro Meteorologi dan Geofisika.
Kdang kala data yang ada adakalanya kosong. Untuk itu perlu ada perkiraan
untuk melengkapi data tersebut.
Data yang diperoleh tersebut masih ada yang kosong sehingga perlu dilengkapi.
Karena perbedaan antara curah hujan tahunan normal yang hilang (S/Rx100%)
lebih besar dari 10% maka metode yang digunakan untuk melengkapi data yang
kosong adalah metoda perbandingan yaitu :


FINAL REPORT VII-6
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C


Rx=1/(n-1). Ri/Ni

Dimana: Rx = harga tinggi hujan yang dicari
Ri = data tinggi hujan pada stasiun disekitar
.n = banyaknya stasiun tinggi curah hujan untuk perhitungan
Ni = rata rata curah hujan tahunan pada stasiun sekitar
Nx = rata rata curah hujan pada stasiun yang kehilangan

Setelah data curah hujan yang kita perlukan lengkap, maka langkah selanjutnya
adalah uji homogenitas array data tersebut. Untuk keperluan ini maka perlu
dilakukan penarikan regresi terlebih dahulu, dalam hal ini dengan metoda Gumbel
yaitu :
RTr = R + k.Sx
Dimana :
RTr = besarnya untuk untuk periode tahun berulang Tr tahun (mm)
R = besarnya curah hujan maksimum rata rata selama tahun pengamatan
(mm).
.k = faktor frekuensi
Sx = Standard deviasi

Besarnya faktor frekuensi k, dalam metode ini adalah :

.k = (Ytr Yn)/Sn

Dimana : Sn dan Yn = fungsi dari banyaknya data
Ytr = reduce variate

Dari perhitungan dapat di peroleh :
- Curah hujan maksimum rata rata R
- Standard deviasi, Sx
- Untuk n=10 maka :

Sn =
Yn =
FINAL REPORT VII-7
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

Dengan demikian persamaan regresinya menjadi :
RTr = R + (Ytr Yn)/Sn .Sx

7.3.3 Kurva Intensitas Durasi
Untuk mendapatkan perhitungan intesitas curah hujan rencana dapat dilakukan
dengan menggunakan Metode Mononobe dengan pertimbangan bahwa metode
ini praktis dan cukup mudah digunakan.
Rumus empiris Intesitas Durasi Curah Hujan dari Mononobe ini adalah sebagai
berikut :
I = R
24
/24.(24/tc)
2/3

Dimana : I = intensitas durasi
R24 = Curah hujan maksimum yang terjadi selama 24 jam
tc = Waktu konsentrasi
Waktu konsentrasi untuk DAS diatas 200 Ha digunakan metoda Kirpich yaitu

Tc = 0,0195 L
0,77
S
-0,385
Dimana:
Tc = waktu konsentrasi (menit)
L = panjang sungai/saluran (m)
S = kemiringan saluran

Sedangkan untuk daerah aliran yang lebih kecil dari 200 Ha digunakan metoda
tc = to+td
dimana :
to = adalah waktu pengaliran awal diambil minimal 5 menit
td = waktu pengaliran dimana vd=L/v dimana L adalah panjang saluran
dan v adalah kecepatan air disaluran.

7.3.4 Perhitungan Debit Rencana
Perhitungan debit rencana disni digunakan rasional methode dengan rumus
empiris sebagai berikut ;

Q = 0,002785.C.I.A

FINAL REPORT VII-8
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C


Dimana :
Q = Debit rencana (m3/dt)
C = Koefisien pengaliran
I = Intensitas Hujan (mm/jam)
A = Luas Daerah pengaliran (Ha)


7.4. Daerah Aliran Saluran
Daerah aliran saluran dibagi menurut kondisi topografi, batas jalan dan arah air di
saluran. Pembagian daerah aliran untuk masing masing saluran primer,peta
daerah aliran dapat dilihat pada Gambar 6.2.


7.4.1 Simulasi Drainase
Untuk dapat mengevaluasi hidrolis dan dimensi pada saluran yang ada sekaran
disini dilakukan simulasi aliran air hujan pada periode ulang 2 , 5 ,10 dan 25 tahun
didaerah perencanaan.


7.5. Rencana Pengembangan Sistem Drainase
7.5.1 Kriteria Perencanaan
Kriteria perencanaan berdasarkan kondisi genangan dan tidak adanya saluran
drainase yang berfungsi akibat terputusnya saluran, hilangnya saluran-saluran
drainase akibat timbunan tanah dan timbunan sampah.


7.5.2 Rencana Sistem Drainase
Berdasarkan kondisi eksisiting saluran, simulasi saluran drainase di masing-
masing daerah perencanaan dan kriteria penrencanaan yang perlu diterapkan
maka dapat disimpulkan saluran mana saja yang perlu dibangun baru maupun di
perbaiki dimensi maupun lining saluran.


FINAL REPORT VII-9
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

7.5.3 Jadual dan Prioritas Penanganan
Drainase Kota Calang tidak mengalami kerusakan akibat bencana alam. Di
wilayah perkotaan dan perdesaan di Kabupaten Aceh Jaya tidak mengalami
kerusakan akibat bencana gempa bumi dan tsunami, sehingga tidak diperlukan
penanganan untuk rehabilitasi sarana dan prasarana drainase, sedangkan pada
tahap rekonstruksi diperlukan Studi Kelayakan dan Perencanaan (DED) untuk
penataan saluran drainase di Kota Calang (Ibukota Kabupaten Aceh Jaya).
Pembangunan sistem drainase direncanakan sampai tahun 2011 dan diharapkan
sampai pada masa itu kota sudah tidak ada genangan tahunan sampai pada
periode ulang 10 tahunan pada daerah tertentu.

FINAL REPORT VII-10
PENYUSUNAN OUTLINE PLAN & DED, KAB. ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

BAB VIII
RENCANA ANGGARAN BIAYA



8.1. SISTEM PENYEDIAAN AIR MINUM
Perkiraan biaya pada outline plan jaringan ini merupakan perkiraan biaya terinci
sementara. Mengingat pembangunan akan mencakup 20 tahun ke depan dengan
mengalami perubahan harga akibat inflasi dan perbedaan kurs.

8.1.1. Harga Satuan
Harga satuan digunakan berasal dari harga yang ditetapkan tahun dengan
perkalian terhadap faktor untuk pengamanan kenaikan pada saat pelaksanaan.
Sumber harga satuan antara lain:
Daftar harga satuan dari distributor material.
Pedoman harga yang disertakan oleh Departemen Pekerjaan Umum .
Daftar harga satuan dan upah seluruh Indonesia.
Harga tanah sesuai informasi Pemda setempat.
Kontingensi 10 %

8.1.2. Biaya Perangkat Lunak
Biaya perangkat lunak merupakan layanan konsultan. Layanan konsultan dihitung
berdasarkan biaya konstruksi sebesar 4 %.

8.1.3. Sumber Dana
Sumber dana yang diperoleh PDAM dapat berasal dari :
APBN, APBD tk I, APBD tk II
Penyertaan Modal lain lain
Pinjaman dari lembaga keuangan

8.1.4. Kontigensi
Pada saat pembangunan biaya yang terealisasi umumnya berbeda dari yang telah
dianggarkan. Hal ini disebabkan adanya volume dan harga satuan pekerjaan yang
FINAL REPORT VIII-1
PENYUSUNAN OUTLINE PLAN & DED, KAB ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

FINAL REPORT VIII-2
PENYUSUNAN OUTLINE PLAN & DED, KAB ACEH JAYA
diluar perkiraan sebelumnya, seperti kurangnya panjang pipa atau harga satuan
pompa yang salah. Untuk mengantisipasi hal ini Harga pelaksanaan yang ada
perlu dikoreksi dengan faktor kontingensi sebanyak sekitar 10 % dari nilai
perhitungan investasi.


8.2. PRAKIRAAN BIAYA INVESTASI SISTEM PENYEDIAAN AIR MINUM
Biaya investasi pada dasarnya mengikuti rancangan sistem yang akan dibangun
selama 20 tahun ke depan dengan tahapan seperti yang tertulis pada BAB IV.

Perkiraan biaya investasi yang ada harus dilihat dari besarnya rencana anggaran
biaya yang meliputi anggran biaya pembangunan tahun 2006-2011 dan
2012-2026 termasuk di dalamnya biaya kontingensi fisik dan engineering service.
Komponen untuk biaya investasi meliputi :
Biaya Pengadaan Barang meliputi :
Pengadaan peralatan Mekanikal Elektrikal
Pengadaan Pipa dan perlengkapan/accessries
Pengadaan Pompa dan perlengkapan pompa seperti alat
ukur/meter air
Biaya Konstruksi meliputi:
Pembebasan tanah
Konstruksi Intake
Konstruksi IPA
Konstruksi Reservoir
Konstruksi Bangunan
Pemasangan Pipa
J embatan Pipa
Pemasangan Sambungan Baru

Perhitungan prakiraan biaya sistem sampai dengan tahun 2026 dengan
harga sekarang ditunjukkan pada tabel 8.1


SA & CV.TRIPLE-C

FINAL REPORT VIII-3
PENYUSUNAN OUTLINE PLAN & DED, KAB ACEH JAYA

Tabel 8.1. Rekap Rencana Anggaran Biaya Sistem Air Minum Kabupaten Aceh J aya


2006 2006 ABT 2007 2008 2009 2010 2011 2016 2021 2026
1 Keb Aceh Jaya
J aya Lamno 16,673 19,329 20 6,191.4 - 5,402.4 197.3 197.3 197.3 197.3 2,660.3 2,660.3 2,530
Sampoinet lhok kruet 10,891 12,626 5 6,796.5 5,765.1 257.9 257.9 257.9 257.9 1,167.6 1,167.6 1,167
Kr Sabe Kr Sabe 12,727 14,754 20 15,989.1 6,136.7 8,414.3 359.5 359.5 359.5 359.5 2,970.2 2,970.2 2,831
Calang
Teunom Teunom 16,285 18,879 20 17,938.3 - 9,658.4 7,082.0 399.3 399.3 399.3 1,426.8 1,334.4 1,333
46,915.3 6,136.7 - 29,240.2 7,896.7 1,213.9 1,213.9 1,213.9 8,224.8 8,132.4 7,863
1.1 .5
1.2 .6
1.3 .5
1.4 .6
.2
No
Q

l
p
d
Pend
2011
Pend
2006
Kota
Total Investasi
2006 - 2011 2016-2026 Kabupaten/Keca
matan
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYA






PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

FINAL REPORT VIII-4
Tabel 8.2. Prakiraan Biaya Sistem Kecamatan J aya (Kota Lamno), Kabupaten
Aceh J aya


RENCANA ANGGARAN BIAYA
PROPINSI : NANGGROE ACEH DARUSSALAM
KABUPATEN : ACEH JAYA
KECAMATAN : KEC JAYA, KOTA LAMNO
PEKERJAAN : SEKTOR AIR MINUM
Zone Utara
IV RENCANA PENGEMBANGAN
a Produksi
1 Intake Medhen 10 lpd 61.48 unit 1 61.5
2 IPA Prased+SPC+SPL 10lpd 1,421.04 unit 1 1,421.0
3 Pembebasan Tanah 0.10 m2 5,000 500.0
4 Pipa transmisi HDPE 150 mm 0.12 m 1,000 123.7
5 Accessories Ls 210.62
b Distribusi
1 Reservoir 100 m3 Gravitasi 265.00 unit 1 265.0
2 Pipa PVC 150 mm s/d pasar Lamno 0.22 m 7,500 1,672.0
3 Pipa PVC 100 mm 0.11 m -
4 Pipa PVC 75 mm s/d masing pemukiman 0.08 m 3,500 264.7
5 Pipa PVC 50 mm 0.04 -
6 Pipa PVC 40 mm dalam pemukiman 0.02 m 1,965 47.1
7 Sambungan Rumah 1.00 unit 131 131.4
8 HU 8.58 unit 4 34.3
9 MCK 122.26 unit 4 489.0
10 J embatan Pipa 30 m 49.99 unit 1 50.0
11 Accessories 295.35
SubTotal 5,565.7
Zone Tengah
Sumber Air MA Melha 20 lpd
a Produksi
1 Intake Melha 5 lpd 61.48 unit 1 61.5
2 IPA Prased+SPC+SPL 10lpd 1,421.04 unit 1 1,421.0
3 Pembebasan Tanah 0.10 m2 5,000 500.0
4 Pipa transmisi HDPE 150 mm 0.12 unit 400 49.5
5 Accessories 1.00 Ls 1 203.2
b Distribusi
1 Reservoir 100 m3 Gravitasi unit 1 -
2 Pipa PVC 150 mm s/d pasar Lamno 0.22 m 7,500 1,672.0
3 Pipa PVC 100 mm 0.11 -
4 Pipa PVC 75 mm s/d masing pemukiman 0.08 m 3,500 264.7
5 Pipa PVC 50 mm 0.04 -
6 Pipa PVC 40 mm dalam pemukiman 0.02 m 4,410 105.6
7 Sambungan Rumah 1.00 unit 294 294.9
8 HU 8.58 unit 9 77.2
9 MCK 122.26 unit 9 1,100.3
10 J embatan Pipa 70 m 81.85 unit 1 81.8
11 Accessories 359.66
SubTotal 6,191.4
No Uraian Keterangan
Harga
Satuan
(juta)
satuan Volume Total













































PENYUSUNAN OUTLINE PLAN & DED, KAB ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

FINAL REPORT VIII-5
Lanjutan Tabel 8.2. Prakiraan Biaya Sistem Kecamatan J aya (Kota Lamno),
Kabupaten Aceh J aya

Zone Selatan
Sumber Air Melha 30 lpd
a Produksi
1 Intake Teumarem 30 lpd 61.48 unit 1 61.5
2 IPA Prased+SPC+SPL 10lpd 1,421.04 unit 1 1,421.0
3 Pembebasan Tanah 0.10 m2 5,000 500.0
4 Pipa transmisi HDPE 150 mm 0.12 unit 400 49.5
5 Accessories 1.00 Ls 1 203.20
b Distribusi
1 Reservoir 100 m3 Gravitasi 265.00 unit 1 265.0
2 Pipa PVC 150 mm s/d pasar Lamno 0.22 m 4,800 1,070.1
3 Pipa PVC 100 mm 0.11 -
4 Pipa PVC 75 mm s/d masing pemukiman 0.08 m 3,500 264.7
5 Pipa PVC 50 mm 0.04 -
6 Pipa PVC 40 mm dalam pemukiman 0.02 m 7,991 191.4
7 Sambungan Rumah 1.00 unit 533 534.4
8 HU 8.58 unit 6 51.5
9 MCK 122.26 unit 6 733.5
10 J embatan Pipa 70 m 81.85 unit 1 81.8
11 Accessories 319.24
c Lain-Lain
Training 500.0
Penyuluhan Calon Pelanggan 500.0
DED 358.1
Supervisi 358.1
SubTotal 7,463.2
Total 19,220.2
Volume Total No Uraian Keterangan
Harga
Satuan
(juta)
satuan











PENYUSUNAN OUTLINE PLAN & DED, KAB ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

FINAL REPORT VIII-6
Tabel 8.3. Prakiraan Biaya Sistem Kecamatan Sampoinet (Kota Lhok Kruet),
Kabupaten Aceh J aya





RENCANA ANGGARAN BIAYA
PROPINSI : NANGGROE ACEH DARUSSALAM
KABUPATEN : ACEH JAYA
KECAMATAN : KEC SAMPOINET, KOTA LHOK KRUET
PEKERJAAN : SEKTOR AIR MINUM
IV Rencana Pengembangan
a Produksi
1 Intake MA Keumala 5 lpd 61.48 unit 1 61.5
2 IPA Prased+SPC+SPL 5lpd 950.00 unit 2 1,900.0
3 Rumah J aga 30 m2 60.00 unit 1 60.0
4 Kantor 45 m2 90.00 unit 1 90.0
5 Pembebasan Tanah 0.10 5,000 500.0
6 Kendaraan Operasional pick up 120.00 unit 1 120.0
7 Pipa transmisi HDPE 100 mm 0.07 m 300 19.9
8 Accessories 1.00 Ls 1 275.1
SubTotal 3,026.6
b Distribusi
1 Reservoir 100 m3 Lokasi MA 260.00 unit 1 260.0
2 Pipa PVC 100 mm S/d Lhok Kruet 0.11 1,500 166.1
3 Pipa PVC 75 mm s/d masing pemukiman 0.08 m 3,500 264.7
4 Pipa PVC 50 mm 0.04 0 -
5 Pipa PVC 40 mm dalam pemukiman 0.02 4,392 105.2
6 Sambungan Rumah 1.0032 unit 439.2 440.7
7 HU 8.58 unit 9 77.2
8 MCK 122.26 unit 9 1,100.3
9 J embatan Pipa 80 M 89.07 unit 1 89.1
10 Accessories 250.3
c Lain-Lain
Training 600.0
Penyuluhan Calon Pelanggan 600.0
DED 173.4
Supervisi 173.4
SubTotal 4,300.4
Total 7,327.0
satuan Volume Total No Uraian Keterangan
Harga
Satuan
(Juta)
PENYUSUNAN OUTLINE PLAN & DED, KAB ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

FINAL REPORT VIII-7
Tabel 8.4. Prakiraan Biaya Sistem Kecamatan Krueng Sabee
(Kota Krueng Sabee), Kabupaten Aceh J aya














































RENCANA ANGGARAN BIAYA
PROPINSI : NANGGROE ACEH DARUSSALAM
KABUPATEN : ACEH JAYA
KECAMATAN : KEC KEUENG SABE, KOTA KRUENG SABE-CALANG
PEKERJAAN : SEKTOR AIR MINUM
IV RENCANA PENGEMBANGAN
a Produksi
1 Intake Paya Semantok 61.48 unit 1 61.5
2 Pompa Intake 10 lpd Paya Semantok 120.00 unit 1 120.0
3 Pompa Intake 20 lpd Paya Semantok 140.00 unit 1 140.0
4 IPA Peng lengkap 10 lpd 1,300.00 unit 2 2,600.0
5 Pompa Distribusi 10 lpd Paya Semantok 120.00 unit 1 120.0
6 Pompa Distribusi 10 lpd Paya Semantok 140.00 unit 1 140.0
7 Genset 250.00 unit 1 250.0
8 Rumah Genset 104.06 unit 1 104.1
9 Kantor+Gudang 120.60 unit 1 120.6
10 Pembebasan Tanah 0.10 m2 5,000 500.0
11 Rumah Pompa 210.61 unit 1 210.6
12 Kendaraan Operasional Pickup 120.00 unit 1 120.0
13 Pagar +land clearing 0.36 unit -
14 Pipa transmisi HDPE 150 mm 0.12 m -
15 Accessories Ls 1 448.7
V Distribusi
1 Reservoir 500 m3 Gravitasi 723.10 unit 1 723.1
2 Pipa PVC 150 mm s/d J embatan Kr Sabe 0.22 m 4,000 891.7
3 Pipa PVC 100 mm 0.11 m 3,000 332.3
4 Pipa PVC 75 mm s/d masing pemukiman 0.08 m 4,000 302.5
5 Pipa PVC 50 mm 0.04 m 6,000 254.1
6 Pipa PVC 40 mm dalam pemukiman 0.02 m 4,500 107.8
7 Sambungan Rumah 1.00 unit 300 301.0
8 HU 8.58 unit 4 34.3
9 MCK 122.26 unit 4 489.0
10 J embatan Pipa 120 m 122.93 unit 1 122.9
11 J embatan Pipa 60 m 74.63 unit 1 74.6
12 Accessories 363.3
Sub Total 8,932.1
No Uraian
Harga
Satuan (Juta)
satuan Volume Keterangan Total
PENYUSUNAN OUTLINE PLAN & DED, KAB ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

FINAL REPORT VIII-8
Lanjutan Tabel 8.4. Prakiraan Biaya Sistem Kecamatan Krueng Sabee
(Kota Krueng Sabee), Kabupaten Aceh J aya










a Produksi
1 Kantor+Gudang 45 m2 90.00 unit 1 90.0
2 Pembebasan Tanah 0.10 m2 5,000 500.0
3 Accessories Ls 1 9.0
b Distribusi
1 Reservoir 200 m3 Gravitasi 433.33 unit 1 433.3
2 Pipa PVC 150 mm s/d Res Calang 0.22 m 6,100 1,359.9
3 Pipa PVC 100 mm s/d Pemukiman Calang 0.11 m 6,400 708.8
4 Pipa PVC 100 mm s/d Pemukiman Calang Baru 0.11 m 3,400 376.6
5 Pipa PVC 75 mm s/d masing pemukiman 0.08 m 3,500 264.7
6 Pipa PVC 50 mm 0.04
7 Pipa PVC 40 mm dalam pemukiman 0.02 m 9,271 222.0
8 Sambungan Rumah 1.00 unit 618 620.0
9 HU 8.58 unit 3 24.0
10 MCK 122.26 unit 3 342.3
11 J embatan Pipa 70 m 81.85 unit 1 81.8
12 Accessories 443.4
c Lain-Lain
Training 800.0
Penyuluhan Calon Pelanggan 800.0
DED 600.3
Supervisi 600.3
Sub Total 8,276.4
Total 17,208.5
satuan Volume Total No Uraian Keterangan
Harga
Satuan (Juta)
PENYUSUNAN OUTLINE PLAN & DED, KAB ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

Tabel 8.5. Prakiraan Biaya Sistem Kecamatan Teunom
(Kota Teunom), Kabupaten Aceh J aya

RENCA
PROPI SI : NANGGROE ACEH DARUSSALAM
KABUP TEN : ACEH JAY
NA ANGGARAN BIAYA
N
A A
KECAM TAN : KEC TEUNOM, KOTA TEUNOM
PEKER AN : SEKTOR AIR MINUM
IV Rencana Pengembangan
a P uksi
1 In e Bintang 10 lpd 61.48 unit 1 61.5
2 IP Prased+SPC+SPL 10lpd 1,530.35 unit 1 1,530.4
3 K r+Gudang 60 m2 120.00 unit 1 120.0
4 R ah J aga 30 m2 60.00 unit 1 60.0
5 P ebasan Tanah 0.10 m2 5,000 500.0
6 K raan Operasional Pickup 120.00 unit 1 120.0
7 P ansmisi HDPE 150 mm 0.22 m 26,000 5,720.0
8 A ssories Ls 1 811.2
Sub Total 1 8,923.0
b D ibusi
1 R voir 100 m3 Gravitasi 260.00 unit 1 260.0
2 P 150 mm s/d pasar Teunom 0.22 m 2,500 557.3
3 P PVC 100 mm 0.11 m 8,000 886.0
4 P 75 mm s/d masing pemukiman 0.08 m 3,500 264.7
5 P 50 mm 0.04 m 4,000 169.4
6 P 40 mm dalam pemukiman 0.02 m 10,553 252.8
7 S bungan Rumah 1.00 unit 704 705.8
8 H 8.58 unit 16 137.2
9 M 122.26 unit 16 1,956.1
10 J e atan Pipa 60 m 74.63 unit 1 74.6
11 J e atan Pipa 70 m 81.85 unit 1 81.8
12 A ries 1,069.2
13 A ssories 641.5
c La -Lain
T ning 500.0
Penyuluhan Calon Pelanggan 500.0
DED 477.1
Supervisi 477.1
Sub Total 2 9,010.8
Total 17,933.8
No Uraian Keterangan
Harga
Satuan
(Juta)
satuan Volume Total
A
JA
rod
tak
A
anto
um
emb
enda
ipa tr
cce
istr
eser
ipa PVC
ipa
ipa PVC
ipa PVC
ipa PVC
am
U
CK
mb
mb
ccesso
cce
in
rai
FINAL REPORT VIII-9
PENYUSUNAN OUTLINE PLAN & DED, KAB ACEH JAYA
FINAL REPORT VIII-10
PENYUSUNAN OUTLINE PLAN & DED KAB ACEH JAYA
8.3. PRAKIRAAN BIAYA INVESTASI PERSAMPAHAN
Biaya investasi pada dasarnya mengikuti rancangan sistem yang akan dibangun
selama 20 tahun ke depan dengan tahapan seperti yang tertulis pada BAB V.

Perkiraan biaya investasi yang ada harus dilihat dari besarnya rencana anggaran
biaya yang meliputi anggran biaya pembangunan tahun 2006-2011 dan
2012-2026 termasuk di dalamnya biaya kontingensi fisik dan engineering service.
Komponen untuk biaya investasi meliputi :
Biaya Pengadaan Barang meliputi :
Gerobak sampah
Damp truk
Arm Truck
Container 6 m3 da landasan
Bolduzer
Damp truk di TPA
Excapator
Biaya Konstruksi meliputi:
Pembebasan tanah
Konstruksi TPA
Konstruksi Bangunan Bengkel
Konstruksi Posjaga
Konstruksi Pencucian

Perhitungan prakiraan biaya sistem sampai dengan tahun 2026 dengan
harga sekarang ditunjukkan pada tabel 8.6.




PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
PT. INFRATAMA YAKTI
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
FINAL REPORT VIII-11
PENYUSUNAN OUTLINE PLAN & DED KAB ACEH JAYA
Tabel 8.6. Rekapitulasi Rencana Anggaran Biaya Persampahan Kabupaten Aceh J aya
No Kota Satuan Harga Crash Prog
2006 Th.2006 2007 2008 2009 2010 2011 2016 2021 2026
1 Kruengsabe
- Gerobak s (1 m3) Rp.J uta/unit 3.00 3.00 6.00 9.00 9.00 12.00 18.00 24.00 33.00
- Dump tr ) Rp.J uta/unit 220.00 440.00 - 220.00 - - - - - -
- Arm roll T m3) Rp.J uta/unit 230.00 460.00 230.00 - - - - 230.00 - 230.00
- Containe & landasan Rp.J uta/unit 24.00 192.00 24.00 - 24.00 - - 24.00 24.00 24.00
- Buldozer Rp.J uta/unit 890.00 890.00 - - - - 890.00 890.00 890.00
- Dump tr A Rp.J uta/unit 220.00 220.00 - - - - 220.00 220.00 220.00
Excapato Rp.J uta/unit 890.00 890.00 - - - - 890.00 890.00 890.00
- Lah
ampah
uck (6 m3
ruck (6
r (6 m3)
uck di TP
r
an TPA Rp.J uta/ha 100.00 406.41 - - - - 755.18 - -
- Kont ontroll landfill) Rp.J uta/ha 704.74 2,864.13 - - - - 5,322.04 - -
- Lah TPA Rp.J uta/m2 0.01 1.50 - - - - - - -
- Ban el,posjaga & pencucian Rp.J uta/m2 2.00 200.00 - - - - - - -
Sub Rp.J uta - 1,092.00 5,729.04 226.00 33.00 9.00 12.00 8,349.22 2,048.00 2,287.00
2 Jay
- Ger (1 m3) Rp.J uta/unit 3.00 460.00 690.00 690.00 920.00 1,150.00 1,840.00 2,300.00 3,220.00
- Du ) Rp.J uta/unit 220.00 - - - - - 24.00 - -
- Arm m3) Rp.J uta/unit 230.00 890.00 - - 890.00 - - 890.00 890.00
- Con & landasan Rp.J uta/unit 24.00 - 220.00 - 220.00 - 440.00 440.00 220.00
- Bul Rp.J uta/unit 890.00 - - - - - - - -
- Du A Rp.J uta/unit 220.00 - - - - - - - -
Exc Rp.J uta/unit 890.00 - - - - - - - -
- Lah Rp.J uta/ha 100.00 - - - - - - - -
- Kont ontroll landfill) Rp.J uta/ha 704.74 - - - - - - - -
- Lah R m - - - - - - - -
- Ban el,posjaga & pencucian Rp.J uta/m2 2.00 - - - - - - - -
Sub Rp.J uta 1,350.00 910.00 690.00 2,030.00 1,150.00 2,304.00 3,630.00 4,330.00
3 Teu
- Ger (1 m3) Rp.J uta/unit 3.00 6.00 6.00 9.00 12.00 15.00 21.00 30.00 39.00
- Du ) Rp.J uta/unit 220.00 - - - - - 220.00 - -
- Arm m3) Rp.J uta/unit 230.00 230.00 - - - - 230.00 - 230.00
- Con & landasan Rp.J uta/unit 24.00 48.00 - - 24.00 - 48.00 24.00 48.00
- Bul Rp.J uta/unit 890.00 - - - - - - - -
- Du A Rp.J uta/unit 220.00 - - - - - - - -
Exc Rp.J uta/unit 890.00 - - - - - - - -
- Lah Rp.J uta/ha 100.00 - - - - - - - -
- Kont ontroll landfill) Rp.J uta/ha 704.74 - - - - - - - -
- Lah TPA Rp.J uta/m2 0.01 - - - - - - - -
- Ban kel,posjaga & pencucian Rp.J uta/m2 2.00 - - - - - - - -
Su Rp.J uta 284.00 6.00 9.00 36.00 15.00 519.00 54.00 317.00
4 Sampoin
- Gerobak (1 m3) Rp.J uta/unit 3.00 3.00 6.00 6.00 9.00 9.00 15.00 21.00 27.00
- Dump tr ) Rp.J uta/unit 220.00 - - 220.00 - - - - -
- Arm roll T m3) Rp.J uta/unit 230.00 230.00 - - - - - 230.00 -
- Container & landasan Rp.J uta/unit 24.00 24.00 - 24.00 - - 24.00 24.00 48.00
- Buldoz Rp.J uta/unit 890.00 - - - - - - - -
- Dump tr A Rp.J uta/unit 220.00 - - - - - - - -
Excapator Rp.J uta/unit 890.00 - - - - - - - -
- Lahan TPA Rp.J uta/ha 100.00 - - - - - - - -
- Kontruksi TPA (controll landfill) Rp.J uta/ha 704.74 - - - - - - - -
- Lahan Bengkel di TPA Rp.J uta/m2 0.01 - - - - - - - -
- Bangunan bengkel,posjaga & pencucian Rp.J uta/m2 2.00 - - - - - - - -
Sub Total Rp.J uta 257.00 6.00 250.00 9.00 9.00 39.00 275.00 75.00
Total Rp.J uta 1,092.00 7,620.04 1,148.00 982.00 2,084.00 1,186.00 11,211.22 6,007.00 7,009.00
Program Jangka Menengah Program Jangka Panjang
0.01 2 p.J uta/
ruksi T
an Beng
gunan b
Total
a
obak sa
mp truck
roll Tru
tainer (
dozer
mp truck
apator
an TPA
ruksi T
an Beng
gunan b
Total
non
obak sa
mp truck
roll Tru
tainer (
dozer
mp truck
apator
an TPA
ruksi T
an Beng
gunan
b Total
PA (c
kel di
engk
mpah
(6 m3
ck (6
6 m3)
di TP
PA (c
kel di
engk
mpah
(6 m3
ck (6
6 m3)
di TP
PA (c
kel di
beng
et
sampah
uck (6 m3
ruck (6
(6 m3)
er
uck di TP
TPA
FINAL REPORT VIII-12
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
8.4. PRAKIRAAN BIAYA INVESTASI SISTEM AIR LIMBAH
Biaya investasi pada dasarnya mengikuti rancangan sistem yang akan dibangun
selama 20 tahun ke depan dengan tahapan seperti yang tertulis pada BAB V.

Perkiraan biaya investasi yang ada harus dilihat dari besarnya rencana anggaran
biaya yang meliputi anggran biaya pembangunan tahun 2006-2011 dan
2012-2026 termasuk di dalamnya biaya kontingensi fisik dan engineering service.
Komponen untuk biaya investasi meliputi :
Biaya Pengadaan Barang meliputi :
Truk Tinja
Biaya Konstruksi meliputi:
MCK
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
PT. INFRATAMA YAKTI
Konstruksi IPLT

Perhitungan prakiraan biaya sistem sampai dengan tahun 2026 dengan
harga sekarang ditunjukkan pada tabel 8.7





PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
DRAFT FINAL REPORT VIII-13
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
Rekapitulasi Rencana Anggaran Biaya Air Limbah Kabupaten Ace a

h J ya



Tabel 8.7.
DRAFT FINAL REPORT VIII-14
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
8.5. PRAKIRAAN BIAYA INVESTASI SISTEM DRAINASE


dan
a biaya kontingensi fisik dan engineering service.
Biaya Konstruksi meliputi:
Konstruksi Saluran
Konstruksi Box Culvert/Gorong-gorong

Perhitungan prakiraan biaya sistem sampai dengan tahun 2026 dengan
harga sekarang ditunjukkan pada tabel 8.8
2012-2026 termasuk di dalamny
Komponen untuk biaya investasi meliputi :




PT. MULTI GUNA REKAYASA & CV.TRIPLE-C
PT. INFRATAMA YAKTI
Biaya investasi pada dasarnya mengikuti rancangan sistem yang akan dibangun
selama 20 tahun ke depan dengan tahapan seperti yang tertulis pada BAB VII.
Perkiraan biaya investasi yang ada harus dilihat dari besarnya rencana anggaran
biaya yang meliputi anggran biaya pembangunan tahun 2006-2011

PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

FINAL REPORT VIII-15
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
Tabel 8.8. Rekapitulasi Rencana Anggaran Biaya Drainase Kabupaten Aceh y




















J a a
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

















FINAL REPORT VIII-16
PENYUSUNAN OUTLINE PLAN & DED KAB. ACEH JAYA
PT. INFRATAMA YAKTI FINAL REPORT ACEH JAYA
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

BAB IX
INSTITUSI / KELEMBAGAAN


9.1 Air Bersih
9.1.1 Kondisi eksisting Kelembagaan dan Analisa Permasalahan Pengelola
Air Minum Kabupaten Aceh Jaya
a. Organisasi Pengelola dan SDM
Secara Kelembagaan Pengelolaan air minum di Kabuapten Aceh J aya
dilaksanakan oleh Bidang Permukiman dan Perkotaan Dinas Permukiman dan
Prasarana Wilayah (KIMPRASWIL) Kabupaten Aceh J aya, yang
pembentukankannya berdasarkan Peraturan Daerah (Perda) Kabupaten Aceh
J aya.
Saat ini pengelola air minum hanya memiliki 1 orang staf. Struktur Organisasi
Kimpraswil dapat dilihat pada gambar 9.1a.
Gambar 9.1a. Struktur Organisasi Kimpraswil Kab. Aceh Jaya

Kabag Tata
Usaha
Urusan
Umum
Urusan
Kepegawaian
Kabid Jalan dan
Jembatan
Kabid Perkotaan
& Permukiman
Urusan
Keuangan
Kabid Sumber
Daya Air
Ka.Dinas







- Staf air minum
- Staf Drainase
- Staf Perkotaan & Permikiman

FINAL REPORT IX-1
PENYUSUNAN OUTLINE PLAN & DED, KAB ACEH JAYA

PT. INFRATAMA YAKTI FINAL REPORT ACEH JAYA
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

Untuk mempercepat pemulihan serta meningkat pelayanan air minum di
kabupaten aceh J aya, organisasi yang ada saat ini perlu ditingkatkan statusnya
menjadi Kantor Pengelola Air Minum (KPAM) Kab.Aceh J aya yang sepenuhnya di
biayai oleh Pemda, dan selanjutnya statusnya dapat ditingkatkan menjadi
Perusahaan Daerah (PDAM). Usulan Struktur Organisasi KPAM dapat dilihat pada
gambar 9.1b.
Gambar 9.1b
Usulan Struktur Organisasi Kantor Pengelola Air Minum (KPAM) Kab.Aceh
Jaya

b. Peralatan Kantor dan alat Mobilitas kerja
Peralatan kantor dan alat mobilitas kerja merupakan fasilitas yang sangat
dibutuhkan untuk meningkatkan kinerja organisasi pengelolaan. Kantor Kimpraswil
merupakan kantor sementara / darurat demikian pula halnya dengan fasilitas kerja
yang ada masih sangat minim.

c. Operasi dan Pemeliharaan
Gempa yang disertai tsunami mengakibatkan semua fasilitas produksi, IPA,
jaringan transmisi & distribusi, kantor beserta fasilitasnya mengalami kerusakan
berat sehingga pelayanan air bersih tidak dapat dilakukan. pelayanan air bersih
masih menggunakan sumur bor dan truck tangki . Dalam merahabilitasi kerusakan
ditemukan indikasi lambannya penanganan akibat kemampuan pengelola yang
sangat terbatas baik dari segi sumber daya manusia maupun keuangannya
FINAL REPORT IX-2
PENYUSUNAN OUTLINE PLAN & DED, KAB ACEH JAYA

PT. INFRATAMA YAKTI FINAL REPORT ACEH JAYA
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

FINAL REPORT IX-3
PENYUSUNAN OUTLINE PLAN & DED, KAB ACEH JAYA

sehingga peran yang besar diharapkan bersal dari Pemda, Pemerintah Pusat
(BRR, Dep.PU serta Instansi terkait lainnya) dan LSM, maupun lembaga donor .
d. Pengembangan dan Pemasaran
Target yang igin dicapai oleh pengelola saat ini adalah rehabilitasi dan pemulihan
kembali pelayanan yang ada sebelum terjadi gempa dan tsunami sehingga belum
ada rencana pemasaran dan pengembangan daerah pelayanan. Permintaan
sambungan baru dan rencana pengembangan belum bisa dilakukan mengingat
kondisi keuangan Pemda.
e. Partisipasi Swasta dan Masyarakat Umum
Partisipasi masyarakat sebenarnya masaih cukup tinggi, namun keterbatasan dan
keseriusan menjawab dan menyelesaikan masalah yang menyangkut pelayanan
konsumen belum maksimal, sehingga respon masyarakat terhadap pengelola
menjadi semakin berkurang.
f. Program dan Kebijakan yang diterapkan
Program dan kebijakan yang dilakukan adalah melakukan pendekatan dan usulan
program kepada Pemerintah Pusat melalui dana APBN untuk memulihkan
pelayanan ke kondisi semula sebelum terjadinya tsunami dan kedepan
meningkatan kapasitas pelayanan.

9.2 Air Limbah
9.2.1 Kelembagaan Air Limbah Kabupaten Aceh Jaya
a. Organisasi Pengelola
Kabupaten Aceh J aya belum memiliki Institusi pengelola air limbah. Air limbah
yang berasal dari kegiatan mandi, cuci, kakus (MCK) dibuang ke seftic tank,
cubluk, saluran drainase dll. Sekitar 22,2 dari penduduk Kabupaten menggunakan
sarana MCK pribadi, 32,1 menggunakan MCK bersama, sedangkan 45,7 tidak
memiliki sarana MCK. Dari jumlah seftic tank, cubluk dan cemplung yang ada
belum diketahui berapa banyak jumlahnya.
Institusi yang sangat berperan dalam pengawasan pembangunan seftic tank
adalah institusi yang mengeluarkan Izin Mendirikan Bangunan (IMB), dimana
PT. INFRATAMA YAKTI FINAL REPORT ACEH JAYA
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

dalam persaratan IMB pemohon harus menyertakan gambar disign seftic tank.
Selain itu institusi Satpol PP atau Ketertiban Umum juga sangat berperan dalam
melaksanakan penegakan hukum terhadap pencemaran lingkungan, terutama
pencemaran terhadap sumber daya air.
b. Usulan Organisasi Pengelola
Untuk mengantisipasi perkembangan penduduk dan menjaga pencemaran
lingkungan maka sudah selayaknya pemerintah daerah menyiapkan institusi yang
bertanggungjawab terhadap pengelolaan air limbah khususnya air limbah yang
berasal dari kakus/seftic tank. Sebaiknya organisasi pengelola menyatu dengan
pengelola Kebersihan yang diusulkan (Kantor Kebersihan & Pertamanan). Selain
itu perlu dipersiapakan perangkat lainnya seperti Instalasi Pengolah Lumpur Tinja
(IPLT), dan mobil tangki tinja. Usulan Struktur Organisasi dapat dilihat pada
gambar 9.2.
J umlah personil yang dibutuhkan pada tahap awal sebanyak 3 orang terdiri dari 1
orang petugas IPLT, 1 orang supir dan 1 orang knek truk tinja. Kualifikasi
pendidikan yang dibutuhkan SMU.
Gambar 9.2
Usulan Struktur Organisasi Kebersihan dan Air Limbah / Tinja
Kantor Kebersihan dan Pertamanan Kab. Aceh Jaya

Kasubbag
Tata Usaha
Kasie.
Kebersihan
Kasie
Pertamanan dan
Lampu Jaan
Kasie Pemadam
Kebakaran
Petugas
Lap.Peng Tinja
Petugas
Lap.Peng.Sampah
KA. KANTOR











FINAL REPORT IX-4
PENYUSUNAN OUTLINE PLAN & DED, KAB ACEH JAYA

PT. INFRATAMA YAKTI FINAL REPORT ACEH JAYA
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

FINAL REPORT IX-5
PENYUSUNAN OUTLINE PLAN & DED, KAB ACEH JAYA

c. Aspek Hukum
Beberapa perangkat hukum/Perda harus dipersiapkan untuk mendukung
beroperasinya pengelolaan air limbah antara lain :
Membuat Perda tentang Organisasi pengelola Persampahan yang
tugasnya juga mengelola air limbah ;
Membuat Perda yang berisi tentang larangan dan sangsi bagi masyarakat
yang membuang air limbahnya yang dapat mengganggu sumberdaya air
(disungai, saluran drainase, pantai dll)
Membuat/menerbitkan Perda tentang Retribusi Penyedotan Kakus.
d. Aspek Pembiayaan
Tahap awal pembanguanan IPLT diharapkan dana dari APBN sedangkan biaya
operasi dan pemeliharaan menggunakan dana dari APBD. Pada tahun-tahun
berikutnya biaya operasi dan pemeliharaan diperoleh dari hasil pendapatan
retribusi.
e. Aspek Peran Serta Masyarakat
Secara keseluruhan tingkat kesadaran penduduk Kabupaten Aceh J aya dalam hal
penanganan air limbah masih rendah hal ini dapat dilihat dari masyarakat yang
memiliki sarana MCK baru mencapai 54,3 %. Untuk meningkatkan peran serta
masyarakat ini perlu :
mengefektifkan pelaksanaan pengawasan
melakukan penyuluhan dan sosialisi secara terprogram untuk
menggugah masyarakat berperan aktip dalam menjaga lingkungan
mempersiapkan tenaga penyuluh
membuat panduan untuk program penyuluhan
mulai melakukan pelatihan bidang air limbah kepada tenaga formal
(yang ada di Pemerintahan) dan Pimpinan informal masyarakat (tokoh
masyarakat) yang akan digunakan sebagai ujung tombak pelaksanaan
penyuluhan kepada masyarakat pada tahap selanjutnya.



PT. INFRATAMA YAKTI FINAL REPORT ACEH JAYA
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

9.3 Persampahan
9.3.1 Kelembagaan Persampahan Kabupaten Aceh Jaya
a. Organisasi
Sebelum terjadi gempa dan gelombang tsunami pengelolaan sampah/kebersihan
menjadi tanggung jawab Dinas Pendapatan (Dispenda) dibantu dengan Kantor
Kecamatan didaerah pelayanan yang meliputi Kota Calang Kecamatan Ibu Kota
Aceh J aya, Kota Lamno Kecamatan J aya dan Kota Kecamatan Keude Teunon.
Pengelolaan sampah/kebersihan oleh Dispenda ini sifatnya sementara karena
institusi yang khusus menangani ini belum ada.
Pembagian kerja antara instansi tersebut diatas dalam pengelolaan persampahan
adalah sebagai berikut :
- Dinas Pendapatan menyediakan peralatan, menyediakan anggaran biaya
pengelolaan persampahan serta melakukan penarikan retribusi sampah.
- Kantor Kecamatan akan mengawasi pelaksanaan operasi pengumpulan
sampah di wilayah masing-masing.

Gambar 9.3
Struktur Organisasi Pengelola Kebersihan Kab. Aceh Jaya

Sekretaris
Daerah
Dinas
Pendapatan
Kecamatan
Dinas Lainnya
Petugas
Lapangan
Bupati











FINAL REPORT IX-6
PENYUSUNAN OUTLINE PLAN & DED, KAB ACEH JAYA

PT. INFRATAMA YAKTI FINAL REPORT ACEH JAYA
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

FINAL REPORT IX-7
PENYUSUNAN OUTLINE PLAN & DED, KAB ACEH JAYA


Setelah bencana pelayanan persampahan hanya ada di pasar kota Lamno
sampah yang terangkut sebanyak 13,3 m3/hari, dan di lokasi hunian sementara
(Huntara) yang tersebar di 3 kota Kecamatan (Lamno, Calang dan Teunon)
sebanyak 10 m3/hari. Sedangkan pelayanan persampahan di kedua kota
Kecamatan lainnya yakni Calang dan Teunon tidak dilakukan karena kedua
kecamatan ini hancur total.
Institusi pengelola yang ada sebaiknya setingkat Kantor Kebersihan dan
Pertamanan yang didalam operasionalnya dilengkapi dengan staf fungsional yang
bertanggungjawab di bidang perencanaan, pelaksanaan, pengawasan dan
penyuluhan disertai dengan penyusunan uraian tugas dan tata laksana kerja (lihat
gambar 9.2) . Agar keberadaan Kantor Kebersihan dan Pertamanan mempunyai
dasar hukum yang kuat maka sebaiknya pembentukannya dengan Perda.
b. Personil
Personil kebersihan terdiri dari staf administrasi/kantor, supir, knek, penyapu jalan
dan petugas TPA dengan kulaipikasi pendidikan dari SMP sampai dengan S1.
Untuk mengoptimalkan personil yang ada diperlukan peningkatan kualitas staf di
bidang perencanaan dan jumlah petugas lapangan dengan melakukan

pelatihan manajemen untuk tingkat pimpinan (Penanggungjawab
kebersihan.) ;
pelatihan manajemen persampahan untuk pelaksana menengah
(penanggung jawab perencanaan, pelaksanaan, pengawasan,
penyuluhan) ;
Pelatihan khusus untuk tingkat pelaksanaan operasional lapangan
(operator truk, dll).
c. Aspek Pembiayaan
Biaya operasional persampahan/kebersihan di Kabupaten Aceh J aya yang
meliputi pengadaan dan perawatan sarana dan prasarana serta gaji pegawai
operasional bersumber dari APBD dan retribusi.
PT. INFRATAMA YAKTI FINAL REPORT ACEH JAYA
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

FINAL REPORT IX-8
PENYUSUNAN OUTLINE PLAN & DED, KAB ACEH JAYA

Pola penarikan retribusi dilakukan secara langsung oleh petugas kebersihan
selanjutnya disetorkan ke Kas Daerah (Dispenda). Berdasarkan SK Bupati tentang
struktur dan tarip retribusi.
Melihat besarnya subsidi dan kemampuan keuangan pemerintah daerah untuk
membiayai pengelolaan persampahan maka sudah sewajarnya beban ini secara
bertahap dikurangi. Untuk mengurangi beban biaya operasional ini diperlukan
rencana tindakan :
mengkaji ulang SK Bupati tentang retibusi pelayanan persampahan;
meningkatkan peranserta masyarakat dalam menjaga kebersihan
lingkungan, terutama untuk pengumpulan sampah dari rumah ke TPS.
d. Aspek Hukum
Dasar hukum atau Perda tentang penanggungjawab pengelola kebersihan belum
ada, demikian pula halnya tentang Perda tentang kebersihan. Untuk itu
dibutuhkan segera membuat Perda tersebut. Selain itu Perda tentang retribusi
persampahan perlu di tinjau kembali terutama menyangkut kriteria wajib retribusi,
struktur tarif disesuaikan besarnya biaya pengelolaan sehingga diharapkan dapat
mengurangi subsidi Pemda.
e. Aspek Peranserta Masyarakat
Tingkat kesadaran penduduk dalam menjaga kebersihan di Kabupaten Aceh J aya
perlu ditingkatkan terutama penduduk yang bermukim dibantaran sungai, tepi
pantai dan beberapa pemukiman yang padat, terminal dan pasar.
Untuk meningkatkan peran serta masyarakat ini pengelola kebersihan perlu :
mengefektifkan pelaksanaan pengawasan ;
melakukan penyuluhan dan sosialisi secara terprogram untuk
menggugah masyarakat berperan aktip dalam menjaga kebersihan ;
mempersiapkan tenaga penyuluh ;
membuat panduan untuk program penyuluhan ;
mulai melakukan pelatihan bidang kebersihan kepada tenaga formal
(yang ada di Pemerintahan) dan Pimpinan informal masyarakat (tokoh
masyarakat) yang akan menjadi ujung tombak pelaksanaan
penyuluhan kepada masyarakat pada tahap selanjutnya.
PT. INFRATAMA YAKTI FINAL REPORT ACEH JAYA
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

FINAL REPORT IX-9
PENYUSUNAN OUTLINE PLAN & DED, KAB ACEH JAYA


9.4 Usulan Kegiatan
Usulan rencana kegiatan yang diajukan untuk pemecahan permasalahan meliputi
organisasi, personnel, tata laksana kerja, serta peralatan kantor & alat mobilitas
kerja. Pelaksanaan usulan rencana kegiatan dirinci dalam program jangka pendek
(tahun 2007), jangka menengah tahun 2008 s/d tahun 2011 dan program jangka
panjang 2012 s/d 2026 yang dirinci setiap tahunnya disertai dengan biaya yang
dibutuhkan.Usulan Kegiatan Kelembagaan dapat dilihat pada Lampiran.
PT. INFRATAMA YAKTI FINAL REPORT ACEH JAYA
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



FINAL REPORT IX-10
PENYUSUNAN OUTLINE PLAN & DED, KAB ACEH JAYA

PT. INFRATAMA YAKTI FINAL REPORT ACEH JAYA
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C


FINAL REPORT IX-11
PENYUSUNAN OUTLINE PLAN & DED, KAB ACEH JAYA

PT. INFRATAMA YAKTI FINAL REPORT ACEH JAYA
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C



FINAL REPORT IX-12
PENYUSUNAN OUTLINE PLAN & DED, KAB ACEH JAYA

PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

BAB X
ANALISA FINANSIAL/KEUANGAN


10.1 GAMBARAN UMUM
A. Luas wilayah dan jumlah penduduk Kabupaten Aceh J aya sebagai
berikut:

No Kecamatan Ibu Kota Luas (Km2) Jumlah KK Penduduk
1. Teunom Teunom 567,61 2342 14,051
2. Panga Panga 307,34 889 4,888
3. Krueng Sabee Calang 588 2769 10,244
4. Setia bakti Lageun 629 1177 5,767
5. Sampoiniet Lhokkruet 1011 2985 10,685
6. J aya lamno 624 3892 17,904
Jumlah (2005) 3727 14054 63,539


B. Perekonomian
PDRB Kabupaten Aceh J aya pada tahun 2003 tercatat Rp. 334.828 juta
dalam harga berlaku atau Rp. 115.046 juta dalam harga konstan. Tiga pilar
utama perekonomian didukung oleh sektor pertanian sebesar Rp. 234.387
juta atau 70 %, sector pengangkutan sebesar Rp. 33.920 juta atau 10 % dan
sector perdagangan sebesar Rp. 18,200 juta atau 5.4 %. Rata-rata
pertumbuhan perekonomian dari tahun 1998 sampai dengan tahun 2003
tercatat sekitar 1.2 %.








FINAL REPORT X-1
PENYUSUNAN OUTLINE PLAN & DED, KAB ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

Gambar 10.1 Grafik PDRB di Kabupaten Aceh Jaya

















PDRB per kapita pada tahun 2004 tercatat Rp. 3.761.613 dalam harga
berlaku atau Rp. 1.292.464 juta dalam harga konstan. Pertumbuhan PDRB
per kapita selama periode tersebuit tercatat sekitar -1.6 %.

Grafik PDRB Kab. Aceh Jaya
Transport 10%
Perdagangan 5%
lain-lain
(15 sektor) 15%
Pertanian 70%
C. Keuangan Daerah
Realisasi APBD Kabupaten Aceh J aya pada tahun 2005 disajikan secara
ringkas sebagai berikut :













FINAL REPORT X-2
PENYUSUNAN OUTLINE PLAN & DED, KAB ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

Tabel 10.1 Realisasi APBD Kabupaten Aceh Jaya pada tahun 2005
NO URAIAN JUMLAH TOTAL
1 Pendapatan
- PAD Rp. 1,431 juta
- Perimbangan Keuangan Rp. 133,638 juta
- lain-lain Rp. 1,505 juta
Rp. 136,573 juta

2 Belanja
1. Belanja Aparat Daerah
- Administrasi Umum Rp. 41,663 juta
- Operasi & Pemeliharaan Rp. 4,306 juta
- Penambahan Barang Modal Rp. 13,275 juta
Rp. 59,244 juta

2. Belanja Pelayanan Umum
- Administrasi Umum Rp. 8,724 juta
- Operasi & Pemeliharaan Rp. 10,062 juta
- Penambahan Barang Modal Rp. 25,593 juta
- Bagi Hasil Rp. 22,372 juta
- Belanja tak terduga Rp. 11,178 juta
Rp. 77,929 juta Rp. 137,174 juta

3 Defisit akhir tahun (Rp. 601 juta)


Pada tahun 2004, PAD per kapita pada tahun yang sama adalah jumlah PAD
dibagi dengan jumlah penduduk =Rp. 22,521 juta dan merupakan 0,6%
dari jumlah income per kapita ( dengan harga berlaku ).
Lebih lanjut, Realisasi Belanja Pelayanan Publik pada tahun yang sama
tercatat Rp. 77,929 juta, diantaranya dikelola oleh :
-- Dinas Pekerjaan Umum : Rp. 16,069 juta
-- Dinas Kebersihan : Tidak ada data




FINAL REPORT X-3
PENYUSUNAN OUTLINE PLAN & DED, KAB ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

10.2 Pengelolaan Air Minum
Tabel 10.2 Kondisi Pengelolaan Minum Sebelum Tsunami (24 Desember 2004)
No Kecamatan Desa Sumber Air
1 J aya
- Lamno
- J anget
- Mata Air 5 L/dt, gravitasi
- Sumur Dalam, 1 L/dt
2 Sampoinet
- Lhok Kruet
- Blang dalam
- Mata Air 2,5 L/dt, gravitasi
- Sumur Dalam 1 L/dt
3 Setia Bakti - -
4 Krueng Sabee
- Calang

- Paya seumanto
- Air permukaan 20 L/dt,
IPA belum beoperasi
- Sumur Dalam 1 L/dt
5
Panga - Terdapat banyak sumur pribadi
6
Teunom Teunom Air Permukaan 5 L/dt. IPA sudah rusak

Pada saat ini terdapat 37 NGO, 10 badan PBB 5 dan donatur internasional
membantu pembangunan Aceh J aya, namun baru 24 NGO yang sudah
melakukan komitmen, dibidang perumahan air bersih dan sanitasi, dengan
penjelasan sebagai berikut:

1. Kecamatan J aya.
Di Lamno, OXFAM membangun sarana penyediaan air secara dararut
dan akan membangun sistem yang permanen meliputi,
- Mon J aneng : sistem air bersih sudah beroperasi mengambil air
dari mata air Mon J aneng yang di pompa masuk kedalam bak
pengolahan, kemudian disalurkan ke 10 unit kran umum. J aringan
ini melayani 597 jiwa di tiga desa
- Desa Mukhan, 257 jiwa dilayani dengan air, yang dipompa dari
sumur bor yang dialirkan ke 7 unit kran umum.
- Membersihkan dan memperbaiki sumur 367 unit
2. Kecamatan Sampoiniet dan Kecamatan Setia bakti
FINAL REPORT X-4
PENYUSUNAN OUTLINE PLAN & DED, KAB ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

OXFAM membangun sumur bor dan menyediakan truck tangki dan bak
penampungan air. NGO yang lain membantu memperbaiki mata air
dan sistem pengaliran untuk Lhok Kruet dan bebarapa desa di Setia
Bakti.
MERLIN membentuk panitia air desa pedesaan di Setia Bakti dan
mengadakan penyuluhan tentang kesehatan.
3. Kecamatan Calang
IRC-Cardi memperbaiki mata air. OXFAM memasang pipa dan
saringan air dari air terjun, menggali sumur bor, membersihkan dari
lebih 100 unit sumur dan menyediakan truck tangki dan bak
penampungan air. Sekitar 4000-6000 jiwa terlayani dengan air bersih.
Di barak Keutapang, IRC membangun penangkap air kemudian
disimpan di bak penampungan (kapasitas 45000 Liter)
4. Kecamatan Krueng Sabee
Thames J aya membangun saranan air bersih secara darurat dan
dioperasikan oleh IRC-Cardi namun sistem ini dipindahkan ketempat
lain karena OXFAM dan IRC mulai membangun sistem perpipaan dari
sumber mata air. ACF telah mengangkut air dengan truck tangki
sekitar 20 m3 per hari. IRC-Cardi membangun sumur bor lengkap
dengan pompa, genset untuk melayani tenda pengungsi di desa Kuta
Tuha. Samaritan Purse telah membersihkan banyak sumur di Panga.
5. Kecamatan Teunom
Di kecamatan Teunom, GRC membangun IPA mini yang menghasilkan
air 40m3 per hari dengan 8 jam kerja. Setengah dari jumlah air itu
dikirim ke Teunom dengan menggunakan truck tangki milik GRC,
sedangkan setengahnya lagi dikirim ke Panga dengan menggunakan
truck tangki milik ACF.
Kabupaten Aceh J aya mempunyai banyak sungai, mata air, dan air tanah
yang dapat dipakai sebagai sumber air, antara lain Krueng Lambeso
(Kecamatan J aya), Krueng Sabee (Kec.Krueng Sabee), Krueng Panga (Kec.
FINAL REPORT X-5
PENYUSUNAN OUTLINE PLAN & DED, KAB ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

Panga), krueng Teunom (Kec. Teunom), dimana airnya tidak stabil sepanjang
tahun. dekat dengan laut airnya tercemar dengan air laut

10.3. PERMASALAHAN
10.3.1. Aspek Tehnik
- Kabupaten Aceh J aya belum memiliki tata ruang yang definitip,
sehingga menimbulkan keragu-raguan dalam membangun
prasarana air bersih.
- Intake lama ( 40 liter/detik ) tidak lagi bekerja optimal.
- Sebagian besar pipa distribusi sudah tua dan kropos, sehingga
aliran air tidak lancar.
- Water meter pelanggan tidak dipakai lagi, karena airnya tidak stabil
- Air pasang diperkirakan cukup mempengaruhi kwalitas air bersih

10.3.2. Aspek Non Tehnik
Tarif air dinilai sangat rendah, sehingga pendapatan penjualan air tidak cukup
untuk melakukan perbaikan dan pemeliharaan, apalagi biaya listrik dan
harga accessories mengalami kenaikna sekitar 300 % .

10.4. RENCANA INVESTASI

Gambaran Umum rencana investasi

Rencana pembangunan dan pengembangan prasarana air bersih di Kab
Aceh J aya .
dititikberatkan untuk empat kecamatan, yaitu :
Kec. Teunom
Kec. Krueng Sabee
Kec.Sampoinet
Kec. J aya

FINAL REPORT X-6
PENYUSUNAN OUTLINE PLAN & DED, KAB ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

Secara keseluruhan, rencana pembangunan tersebut akan dijadwalkan dari
tahun 2006 s/d tahun 2026 yang akan membutuhkan dana sekitar Rp. 76,57
milliard, dengan rincian sebagai berikut :




Untuk memperoleh analisa keuangan terhadap pembangunan prasarana air
bersih tsb. secara obyektip, telah disusun beberapa asumsi yang berlaku
untuk semua kecamatan
Analisa keuangan
1 Periode studi ditetapkan selama 20 tahun, dari tahun 2006 -2026
2 Pertumbuhan jumlah penduduk diasumsikan
2006 - 2011 : 3.0%/tahun
2012 - 2016 : 2.5%/tahun
2017 - 2021 : 2.0%/tahun
2022 - 2026 : 2.0%/tahun
3 Rata-rata jumlah anggauta keluarga dalam satu keluarga diperkirakan
4 - 5 orang
4 J am operasi 24 jam/hari
5 J umlah kehilangan air dalam produksi dan distribusi diperkirakan
20%/tahun
6 Rata-rata pemakaian air per orang adalah 100 liter/hari dan akan
meningkat
7 Rata-rata pemakaian air pelanggan Non Domestik adalah 1 m3/hari
8 Rata-rata pemakaian air pelanggan HU adalah 40 liter/hari
9 Rata-rata pemakai HU adalah 75 orang/hari
10 Biaya Intake diasumsikan Rp.12/m3

FINAL REPORT X-7
PENYUSUNAN OUTLINE PLAN & DED, KAB ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

11 Biaya Produksi air diasumsikan Rp.18/m3 dan Rp.9/m3 untuk sistim
gravitasi
12 Biaya Distribusi air diasumsikan Rp.12/m3
13 Biaya Administrasi dan Hubungan Langganan diasumsikan Rp.79/m3
14 Biaya Penyusutan mengukuti Peraturan Dept. Keuangan
15 Harga jual air Domestik diasumsikan Rp. 1000/m3
16 Harga jual air Non Domestik diasumsikan Rp. 1500/m3
17 Harga jual air HU diasumsikan Rp. 400/m3
18 Tarip sambungan baru diasumsikan Rp.500.000/SR
19 Setiap tahun semua biaya mengalami kenaikan 10%
20 Harga jual air mengalami kenaikan 50% setiap 5 tahun

Analisa Ekonomi
1 Setiap rumah yang berlangganan PLN, dikenakan tagihan listrik
sebesar
Rp.100.000/bulan, dimana Rp.10.000 untuk menggerakkan pompa air
2 Menimba air dari sumur diperlukan waktu 2 x 15 menit/hari
3 Mengambil air dari sungai, rawa, mata ir diperlukan 2 x 20 menit/hari

4 Nilai tenaga kerja adalah Rp.20.000/hari

Kecamatan Aceh J aya

Kecamatan Aceh J aya terdiri dari 48 desa, yang merupakan daerah
pedesaan, dimana 31 desa diantaranya mengalami rusak parah pada saat
bencana tsunami, sedangkan sisanya 17 desa tidak terkena musibah sama
sekali.
J umlah penduduk pada tahun 2006 diperkirakan 16.673 jiwa yang terhimpun
didalam 4760 keluarga/rumah tangga. Kebutuhan air untuk keluarga dipenuhi
dengan mengambil air dari sumur sendiri ( 42 % ), mengambil air dari rawa (
49 % ), sisanya mengambil air dari sungai atau mata ir ( 9 % ). Pada saat ini
hanya sekitar 7% dari jumlah rumah tangga tersebut yang sudah menikmati
listrik PLN

FINAL REPORT X-8
PENYUSUNAN OUTLINE PLAN & DED, KAB ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

Untuk mengatasi masalah air bersih tersebut, Kec. Aceh J aya akan dibagi
menjadi 3 zone :
Zone Utara : mata air Medhen, gravitasi, dengan kapasitas 10 liter/detik

Zone Tengah : mata air Melha, gravitasi, dengan kapasitas 10 liter/detik

Zone Utara : mata air Teumarem, gravitasi, dengan kapasitas 10 liter/detik


Rencana biaya pembangunan prasarana air bersih Kec. Aceh J aya ( 3 zone )
adalah sbb. :





Kecamatan TEUNOM

KecamatanTeunom terdiri dari 36 desa, yang merupakan daerah pedesaan,
dimana 15 desa diantaranya mengalami rusak parah pada saat bencana
tsunami, sedangkan sisanya 21 desa tidak terkena musibah sama sekali.

FINAL REPORT X-9
PENYUSUNAN OUTLINE PLAN & DED, KAB ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

J umlah penduduk pada tahun 2006 diperkirakan 16.285 jiwa yang terhimpun
didalam 2834 keluarga/rumah tangga. Kebutuhan air untuk keluarga dipenuhi
dengan mengambil air dari sumur sendiri dan sumur kolektip.
Pada saat ini belum ada aliran listrik PLN yang masuk kedesa tersebut,
sehingga warga terpaksa menimba air sumur dengan ember

Untuk mengatasi masalah air bersih tersebut, diupayakan membangun sistim
air perpipaan diwilayah tersebut

Rencana biaya pembangunan prasarana air bersih Kec. Teunom adalah sbb.
:






Kecamatan SAMPOINET ( LHOK KRUET )


Kecamatan Sampoinet terdiri dari 38 desa, yang merupakan daerah
pedesaan, dimana 13 desa diantaranya mengalami rusak parah pada saat
FINAL REPORT X-10
PENYUSUNAN OUTLINE PLAN & DED, KAB ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

bencana tsunami, sedangkan sisanya 25 desa tidak terkena musibah sama
sekali.
J umlah penduduk pada tahun 2006 diperkirakan 10.891 jiwa yang terhimpun
didalam 3189 keluarga/rumah tangga. Kebutuhan air untuk keluarga dipenuhi
dengan mengambil air dari sumur sendiri dan sumur kolektip ( 62 % ), mata
air ( 24 % ) dan sungai ( 14 % )

Pada saat ini belum ada aliran listrik PLN yang masuk kedesa tersebut,
sehingga warga terpaksa menimba air sumur dengan ember
Untuk mengatasi masalah air bersih tersebut, diupayakan membangun sistim
air perpipaan diwilayah tersebut









FINAL REPORT X-11
PENYUSUNAN OUTLINE PLAN & DED, KAB ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

Kecamatan KRUENG SABEE

Kecamatan Krueng Sabee terdiri dari 17 desa, yang merupakan daerah
pedesaan ( 15 desa), dan daerah perkotaan ( 2 desa ). 13 desa diantaranya
mengalami rusak parah pada saat bencana tsunami, sedangkan sisanya 4
desa tidak terkena musibah sama sekali.

J umlah penduduk pada tahun 2006 diperkirakan 12.727 jiwa yang terhimpun
didalam 2834 keluarga/rumah tangga. Kebutuhan air untuk keluarga dipenuhi
dengan mengambil air dari sumur sendiri dan sumur kolektip ( 94 % ), lain-lain
( 6 % )
Pada saat ini 7 % baru dari jumlah KK yang menikmati aliran listrik PLN , dan
dapat memaksa pompa air, sisanya terpaksa menimba air sumur dengan
ember. Untuk mengatasi masalah air bersih tersebut, diupayakan
membangun sistim air perpipaan diwilayah tersebut yang juga akan
menjangkau kota Calang

Rencana biaya pembangunan prasarana air bersih Kec. Krueng Sabee
adalah sbb. :



FINAL REPORT X-12
PENYUSUNAN OUTLINE PLAN & DED, KAB ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C




Kecamatan SAMPOINET ( LHOK KRUET)

Kecamatan Sampoinet terdiri dari 38 desa, yang merupakan daerah
pedesaan, dimana 13 desa diantaranya mengalami rusak parah pada saat
bencana tsunami, sedangkan sisanya 25 desa tidak terkena musibah sama
sekali.
J umlah penduduk pada tahun 2006 diperkirakan 10.891 jiwa yang terhimpun
didalam 3189 keluarga / rumah tangga. Kebutuhan air untuk keluarga
dipenuhi dengan mengambil air dari sumur sendiri dan sumur kolektip (62
%), mata air ( 24 % ) dan sungai ( 14 % )
Pada saat ini belum ada aliran listrik PLN yang masuk kedesa tersebut,
sehingga warga
terpaksa menimba air sumur dengan ember
Untuk mengatasi masalah air bersih tersebut, diupayakan membangun sistim
air perpipaan diwilayah tersebut

Rencana biaya pembangunan prasarana air bersih Kec. Sampoinet adalah
sbb. :

FINAL REPORT X-13
PENYUSUNAN OUTLINE PLAN & DED, KAB ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C





Kecamatan KRUENG SABEE

Kecamatan Krueng Sabee terdiri dari 17 desa, yang merupakan daerah
pedesaan ( 15 desa),
dan daerah perkotaan ( 2 desa ). 13 desa diantaranya mengalami rusak
parah pada saat bencana tsunami, sedangkan sisanya 4 desa tidak terkena
musibah sama sekali.

J umlah penduduk pada tahun 2006 diperkirakan 12.727 jiwa yang terhimpun
didalam 2834 keluarga/rumah tangga. Kebutuhan air untuk keluarga dipenuhi
dengan mengambil air dari sumur sendiri dan sumur kolektip ( 94 % ), lain-lain
( 6 % )

FINAL REPORT X-14
PENYUSUNAN OUTLINE PLAN & DED, KAB ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

Pada saat ini 7 % baru dari jumlah KK yang menikmati aliran listrik PLN , dan
dapat memaksa pompa air, sisanya terpaksa menimba air sumur dengan
ember untuk mengatasi masalah air bersih tersebut, diupayakan membangun
sistim air perpipaan diwilayah tersebut yang juga akan menjangkau kota
Calang.

Rencana biaya pembangunan prasarana air bersih Kec. Krueng Sabee
adalah sbb. :



10.5. PROYEKSI PENDAPATAN DAN BIAYA.

Proyeksi pendapatan dan biaya pelayanan air bersih di Kab Aceh J aya
disusun untuk 4 empat kecamatan, yaitu :
- Kec. Teunom
- Kec. Krueng Sabee
FINAL REPORT X-15
PENYUSUNAN OUTLINE PLAN & DED, KAB ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

- Kec. Sampoinet
- Kec. J aya
Penyusunan proyeksi tsb. dimaksudkan untuk mengetahui potensi
pendapatan PDAM dari tagihan air serta untuk mengalokasikan biaya O & M
secara lebih terarah.
Potensi pendapatan dari pelanggan domestik dapat diperkirakan dari
pertumbuhan jumlah penduduk, namun pertumbuhan jumlah pelanggan non
domestik perlu diadakan penelitian.
lebih lanjut. Dilain fihak, besarnya biaya tergantung kepada kapasitas IPA,
sistim pengolahan dan sistim distribusi air.

PDAM KEC. TEUNOM.
( Kap. 10 lt/dt, prasedimentasi, gravitasi )





FINAL REPORT X-16
PENYUSUNAN OUTLINE PLAN & DED, KAB ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

PDAM KEC. KRUENG SABEE.
( Kap. 10 lt/dt, pengolahan lengkap, gravitasi )

FINAL REPORT X-17
PENYUSUNAN OUTLINE PLAN & DED, KAB ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C




10.6 PENGELOLAAN KEBERSIHAN KOTA
Di Kabupaten Aceh J aya, masyarakat mengelola sendiri sampah rumah
tangganya, masing-masing mengumpulkan dan membuang ke tanah kosong.
Pada saat ini Dinas Pendapatan Daerah Kabupaten Aceh J aya di beri
tanggung jawab untuk mengelola sampah kota.
UNDP Tsunami Recovery Waste Management Program (TRWMP)
menyediakan dana dan bantuan teknis mencakup
Rehabilitasi TPA dan alat-alat.
Daur ulang sampah dan penggunaan sampah-sampah/puing-puing
bekas Tsunami.
Membongkar bangunan yang rusak.
Salah satu strategi UNDP adalah menyediakan TPA sementara sambil
menunggu pembangunan TPA yang permanen. Kelak TPA sementara akan
dibersihkan dan di rehabilitasi

Proyeksi timbunan sampah di estimasikan sebagi berikut:
FINAL REPORT X-18
PENYUSUNAN OUTLINE PLAN & DED, KAB ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

J umlah penduduk di proyeksikan seseuai tingkat pertumbuhan
penduduk
Sampah terdiri dari 65% sampah organik dan 35% non organik,
puing-puing bangunan tidak di proyeksikan
Sampah 1m3 =200-300 kg
Sampah rumah tangga =2,5 L /orang/hari
Sampah pasar =0,2 L / m2
Sampah daerah perdagangan 2,5 L /orang/hari
Sampah sekolah=0,1 L /pelajar/hari
Sampah jalan =0,1 L/ meter lari /hari

Tabel 10.6 Proyeksi Timbunan Sampah (m
3
)
Kecamatan 2006 2010 Area (ha)
J aya 17,207 18,262 3,1
Sampoiniet 10,269 10,899 1,9
Setia Bakti 5,542 5,882 1,0
Krueng Sabee 9,845 10,449 1,8
Panga 4,698 4,986 0,8
Teunom 13,504 14,332 2,4
Jumlah 61065 64810 11


10.7 Peran Serta Pihak Swasta
Seperti halnya sektor air bersih dan sanitasi, banyak peluang bagi pihak
swasta untuk pengelolaan sampah, karena tidak diperlukan peralatan khusus
atau keterampilan teknik yang tinggi. Pengumpulan dan pengangkutan
sampah memerlukan truk sampah (ketika mengangkut harus ditutup agar
sampah tidak berhamburan), dan tempat pembuangan akhir. Kegiatan ini
dapat mendorong perekonomian daerah tanpa membebani Pemerintah.



FINAL REPORT X-19
PENYUSUNAN OUTLINE PLAN & DED, KAB ACEH JAYA
PT. INFRATAMA YAKTI
PT. MULTI GUNA REKAYASA & CV.TRIPLE-C

Strategi Penyediaan Prasarana Persampahan
1. Dengan bantuan UNDP dan NGO membangun tempat pembuangan
untuk menampung runtuhan gedung akibat gempa dan tsunami
(kayu,bata, logam, besi,seng), sehingga kontaminasi terhadap air tanah
dapat dihindari. Logam dapat didaur ulang, kayu dapat dipakai untuk
bahan bakar dapur.
2. Membangun tempat sampah disetiap kecamatan untuk menampung
sampah domestik. Dimulai dengan menggali lubang dan menutup pada
tempat yang sesuai.
3. Membangun TPS disetiap kecamatan sebaiknya dekat pasar atau
kawasan perdagangan.
4. Sampah dari Rumah Sakit, Pukesmas, Apotek agar dibakar sediri
dengan membangun incinerator
5. Setiap kecamatan setidak-tidaknya memiliki satu truck untuk mengangkut
sampah.
6. Menyediakan gerobak sampah dan tong sampah sesuai dengan
kebutuhan.
7. Membentuk partisipasi masyarakat dan mensosialisasikan kesadaran
masyarakat tentang pengolahan sampah (memisahkan sampah,daur
ulang sampah dan membuat kompos).


FINAL REPORT X-20
PENYUSUNAN OUTLINE PLAN & DED, KAB ACEH JAYA