Satuan
[1]
[2]
[3]
Zona I
[4]
Harga Satuan
Kota/ Kabupaten
Zona II
Zona III
[5]
[6]
Keterangan
Zona IV
[7]
[8]
M'
221,243.30
256,642.23
287,616.29
M'
549,138.30
637,000.43
713,879.79
316,377.92
785,267.77
M'
786,110.30
911,887.95
1,021,943.39
1,124,137.73
M'
43,576.50
50,548.74
56,649.45
62,314.40
M2
1,317,331.00
1,528,103.96
1,712,530.30
1,883,783.33
M2
605,907.00
702,852.12
787,679.10
866,447.01
M2
816,578.00
947,230.48
1,061,551.40
1,167,706.54
M2
11,190.00
12,980.40
14,547.00
16,001.70
M2
816,543.00
947,189.88
1,061,505.90
1,167,656.49
M2
78,887.60
91,509.62
102,553.88
112,809.27
M3
23,852.10
27,668.44
31,007.73
34,108.50
M3
151,327.00
175,539.32
196,725.10
216,397.61
M3
433,985.30
503,422.95
564,180.89
620,598.98
M3
433,985.30
503,422.95
564,180.89
620,598.98
2. Pekerjaan Tanah
1
M3
47,525.00
55,129.00
61,782.50
67,960.75
M3
100,710.00
116,823.60
130,923.00
144,015.30
M3
69,863.00
81,041.08
90,821.90
99,904.09
M3
63,228.00
73,344.48
82,196.40
90,416.04
M3
96,090.00
111,464.40
124,917.00
137,408.70
M3
76,560.00
88,809.60
99,528.00
109,480.80
M3
3,515.00
4,077.40
4,569.50
5,026.45
M3
20,807.00
24,136.12
27,049.10
29,754.01
Urugan Kembali
22,653.58
M3
15,841.67
18,376.33
20,594.17
10 Pemadatan Tanah
M3
35,150.00
40,774.00
45,695.00
50,264.50
11 Urugan Pasir
M3
140,930.00
163,478.80
183,209.00
201,529.90
M3
183,855.50
213,272.38
239,012.15
262,913.37
M3
165,031.20
191,436.19
214,540.56
235,994.62
M3
155,145.00
179,968.20
201,688.50
221,857.35
15 Urugan Sirtu
M3
318,775.00
369,779.00
414,407.50
455,848.25
M3
182,846.00
212,101.36
237,699.80
261,469.78
3. Pekerjaan Pondasi
1
M3
1,142,245.00
1,325,004.20
1,484,918.50
1,633,410.35
M3
977,854.50
1,134,311.22
1,271,210.85
1,398,331.94
M3
1,142,245.00
1,325,004.20
1,484,918.50
1,633,410.35
M3
927,651.50
1,076,075.74
1,205,946.95
1,326,541.65
M3
876,328.00
1,016,540.48
1,139,226.40
1,253,149.04
M3
840,766.00
975,288.56
1,092,995.80
1,202,295.38
M3
815,755.50
946,276.38
1,060,482.15
1,166,530.37
M3
781,496.00
906,535.36
1,015,944.80
1,117,539.28
M3
584,476.20
677,992.39
759,819.06
835,800.97
M3
3,927,837.80
4,556,291.85
5,106,189.14
5,616,808.05
M3
820,486.80
951,764.69
1,066,632.84
1,173,296.12
M2
368,964.52
427,998.84
479,653.88
527,619.26
M2
339,291.00
393,577.56
441,078.30
485,186.13
M2
325,608.80
377,706.21
423,291.44
465,620.58
M2
316,694.20
367,365.27
411,702.46
452,872.71
M2
311,639.80
361,502.17
405,131.74
445,644.91
M2
308,964.00
358,398.24
401,653.20
441,818.52
M2
177,283.70
205,649.09
230,468.81
253,515.69
M2
326,452.00
378,684.32
424,387.60
466,826.36
M2
320,792.58
372,119.39
417,030.35
458,733.39
M2
317,071.50
367,802.94
132,414.36
145,655.80
M2
24,172.00
28,039.52
31,423.60
34,565.96
M2
39,855.50
46,232.38
51,812.15
56,993.37
M2
18,690.60
21,681.10
24,297.78
26,727.56
M2
405,703.88
470,616.50
527,415.04
580,156.55
M2
178,249.00
206,768.84
231,723.70
254,896.07
M2
155,995.44
180,954.71
202,794.07
223,073.48
M2
219,460.54
254,574.23
285,298.70
313,828.57
M2
137,935.16
160,004.79
179,315.71
197,247.28
M2
747,778.40
867,422.94
972,111.92
1,069,323.11
M2
129,271.00
149,954.36
168,052.30
184,857.53
M2
949,480.00
1,101,396.80
1,234,324.00
1,357,756.40
Halaman 1
Satuan
[1]
[2]
[3]
Zona I
[4]
Harga Satuan
Kota/ Kabupaten
Zona II
Zona III
[5]
[6]
Keterangan
Zona IV
[7]
[8]
5. Pekerjaan Plesteran
1
M2
50,355.74
58,412.65
65,462.46
72,008.70
M2
43,310.22
50,239.85
56,303.28
61,933.61
M2
40,194.28
46,625.37
52,252.57
57,477.83
M2
38,123.16
44,222.87
49,560.11
54,516.12
M2
36,871.86
42,771.35
47,933.41
52,726.75
M2
35,902.04
41,646.37
46,672.66
51,339.92
M2
35,345.22
41,000.46
45,948.79
50,543.67
M2
57,304.79
66,473.55
74,496.22
81,945.85
M2
53,150.21
61,654.25
69,095.28
76,004.80
M2
50,344.88
58,400.06
65,448.34
71,993.18
M2
48,720.31
56,515.56
63,336.40
69,670.04
M2
47,383.39
54,964.73
61,598.41
67,758.25
M2
60,590.50
70,284.98
78,767.65
86,644.42
M2
58,106.00
67,402.96
75,537.80
83,091.58
M2
55,245.32
64,084.57
71,818.92
79,000.81
M2
53,168.46
61,675.41
69,119.00
76,030.90
M2
73,739.60
85,537.94
95,861.48
105,447.63
M2
67,812.60
78,662.62
88,156.38
96,972.02
M2
64,234.92
74,512.51
83,505.40
91,855.94
M2
28,783.08
33,388.37
37,418.00
41,159.80
M2
26,736.06
31,013.82
34,756.87
38,232.56
M2
49,961.20
57,954.99
64,949.56
71,444.52
M2
47,157.88
54,703.14
61,305.24
67,435.77
M2
12,510.20
14,511.83
16,263.26
17,889.59
25 Plesteran Skoning 1 Pc : 2 Ps
M2
2,033,727.00
2,359,123.32
2,643,845.10
2,908,229.61
M2
2,033,727.00
2,359,123.32
2,643,845.10
2,908,229.61
M2
31,976.88
37,093.18
41,569.94
45,726.94
28 Plesteran Ciprat, 1 Pc : 2 Ps
M2
24,182.08
28,051.21
31,436.70
34,580.37
M2
3,878,695.00
4,499,286.20
5,042,303.50
5,546,533.85
6. Pekerjaan Kayu
1
M3
3,878,665.00
4,499,251.40
5,042,264.50
5,546,490.95
M3
3,376,825.00
3,917,117.00
4,389,872.50
4,828,859.75
M3
2,014,225.00
2,336,501.00
2,618,492.50
2,880,341.75
M3
181,443.00
210,473.88
235,875.90
259,463.49
M3
169,495.00
196,614.20
220,343.50
242,377.85
M2
363,028.00
421,112.48
471,936.40
519,130.04
M2
351,080.00
407,252.80
456,404.00
502,044.40
M2
348,684.00
404,473.44
453,289.20
498,618.12
M2
283,962.00
329,395.92
369,150.60
406,065.66
M2
283,962.00
329,395.92
369,150.60
406,065.66
M2
273,507.50
317,268.70
355,559.75
391,115.73
M2
458,164.80
531,471.17
595,614.24
655,175.66
M2
478,964.80
555,599.17
622,654.24
684,919.66
M2
345,338.00
400,592.08
448,939.40
493,833.34
M2
336,302.72
390,111.16
437,193.54
480,912.89
M2
306,352.00
355,368.32
398,257.60
438,083.36
M2
306,352.00
355,368.32
398,257.60
438,083.36
M2
330,448.20
383,319.91
429,582.66
472,540.93
M2
341,402.72
396,027.16
443,823.54
488,205.89
M2
341,402.72
396,027.16
443,823.54
488,205.89
M2
450,464.72
522,539.08
585,604.14
644,164.55
M2
427,914.72
496,381.08
556,289.14
611,918.05
M2
450,464.72
522,539.08
585,604.14
644,164.55
M2
526,930.72
611,239.64
685,009.94
753,510.93
M2
526,930.72
611,239.64
685,009.94
753,510.93
M2
526,930.72
611,239.64
685,009.94
753,510.93
M3
3,480,610.00
4,037,507.60
4,524,793.00
4,977,272.30
M3
1,771,540.00
2,054,986.40
2,303,002.00
2,533,302.20
M3
3,020,590.00
3,503,884.40
3,926,767.00
4,319,443.70
M3
1,771,540.00
2,054,986.40
2,303,002.00
2,533,302.20
M2
30,857.00
35,794.12
40,114.10
44,125.51
M2
46,669.40
54,136.50
60,670.22
66,737.24
M2
38,982.80
45,220.05
50,677.64
55,745.40
M2
44,706.00
51,858.96
58,117.80
63,929.58
M2
38,982.80
45,220.05
50,677.64
55,745.40
M2
277,311.70
321,681.57
360,505.21
396,555.73
M2
208,308.70
241,638.09
270,801.31
297,881.44
M2
58,464.40
67,818.70
76,003.72
83,604.09
M2
39,820.00
46,191.20
51,766.00
56,942.60
M2
53,446.00
61,997.36
69,479.80
76,427.78
Halaman 2
Satuan
[1]
[2]
[3]
Zona I
[4]
Harga Satuan
Kota/ Kabupaten
Zona II
Zona III
[5]
[6]
Keterangan
Zona IV
[7]
[8]
M2
76,808.10
89,097.40
99,850.53
109,835.58
M2
86,210.50
100,004.18
112,073.65
123,281.02
M2
67,189.50
77,939.82
87,346.35
96,080.99
M2
91,295.90
105,903.24
118,684.67
130,553.14
M2
102,333.50
118,706.86
133,033.55
146,336.91
M2
80,004.50
92,805.22
104,005.85
114,406.44
M2
36,161.64
41,947.50
47,010.13
51,711.15
M'
40,390.20
46,852.63
52,507.26
57,757.99
M'
43,949.90
50,981.88
57,134.87
62,848.36
M'
48,446.70
56,198.17
62,980.71
69,278.78
M'
39,272.00
45,555.52
51,053.60
56,158.96
M'
37,555.50
43,564.38
48,822.15
53,704.37
M'
32,773.60
38,017.38
42,605.68
46,866.25
M2
88,915.75
103,142.27
115,590.48
127,149.52
M2
124,070.00
143,921.20
161,291.00
177,420.10
M2
202,833.55
235,286.92
263,683.62
290,051.98
M2
220,039.15
255,245.41
286,050.90
314,655.98
M2
207,368.90
240,547.92
269,579.57
296,537.53
M2
41,162.20
3,680.45
4,124.64
4,537.10
M'
36,247.80
42,047.45
47,122.14
51,834.35
7. Pekerjaan Beton
1
M3
811,128.00
940,908.48
1,054,466.40
1,159,913.04
M3
789,903.00
916,287.48
1,026,873.90
1,129,561.29
M3
757,953.00
879,225.48
985,338.90
1,083,872.79
M3
104,211.60
120,885.46
135,475.08
149,022.59
M3
805,176.00
934,004.16
1,046,728.80
1,151,401.68
M3
892,815.00
1,035,665.40
1,160,659.50
1,276,725.45
M3
963,204.00
1,117,316.64
1,252,165.20
1,377,381.72
M3
892,308.00
1,035,077.28
1,160,000.40
1,276,000.44
M3
1,014,657.00
1,177,002.12
1,319,054.10
1,450,959.51
M3
1,113,741.00
1,291,939.56
1,447,863.30
1,592,649.63
M3
1,104,690.00
1,281,440.40
1,436,097.00
1,579,706.70
M3
1,121,530.00
1,300,974.80
1,457,989.00
1,603,787.90
M3
1,092,841.00
1,267,695.56
1,420,693.30
1,562,762.63
M3
1,047,118.00
1,214,656.88
1,361,253.40
1,497,378.74
M3
1,134,829.00
1,214,656.88
1,361,253.40
1,497,378.74
M3
1,404,517.00
1,629,239.72
1,825,872.10
2,008,459.31
M3
1,404,517.00
1,629,239.72
1,825,872.10
2,008,459.31
M3
1,081,009.00
1,253,970.44
1,405,311.70
1,545,842.87
M'
6,505.80
7,546.73
8,457.54
9,303.29
M'
7,954.10
9,226.76
10,340.33
11,374.36
M'
331,342.50
384,357.30
430,745.25
473,819.78
M'
359,064.50
416,514.82
466,783.85
513,462.24
M'
331,446.50
384,477.94
430,880.45
473,968.50
M'
359,376.50
416,876.74
467,189.45
513,908.40
Kg
415,131.50
481,552.54
539,670.95
593,638.05
Kg
443,689.40
514,679.70
576,796.22
634,475.84
Kg
271,489.20
314,927.47
352,935.96
388,229.56
M2
268,662.00
311,647.92
349,260.60
384,186.66
M2
364,164.00
422,430.24
473,413.20
520,754.52
M2
63,983.60
74,220.98
83,178.68
91,496.55
M2
64,358.60
74,655.98
83,666.18
92,032.80
M2
64,358.60
74,655.98
83,666.18
92,032.80
M2
400,734.80
464,852.37
520,955.24
573,050.76
M2
408,094.40
473,389.50
530,522.72
583,574.99
M3
615,934.80
714,484.37
800,715.24
880,786.76
M3
684,336.80
793,830.69
889,637.84
978,601.62
M3
375,957.80
436,111.05
488,745.14
537,619.65
M3
4,349,665.50
5,045,611.98
5,654,565.15
6,220,021.67
M3
4,390,602.90
5,093,099.36
5,707,783.77
6,278,562.15
M3
51,250.00
59,450.00
66,625.00
73,287.50
M3
5,389,387.70
6,251,689.73
7,006,204.01
7,706,824.41
M3
6,808,017.30
7,897,300.07
8,850,422.49
9,735,464.74
M3
11,463,257.50
13,297,378.70
14,902,234.75
16,392,458.23
M3
8,801,735.50
10,210,013.18
11,442,256.15
12,586,481.77
M'
8,801,735.50
10,210,013.18
11,442,256.15
12,586,481.77
M'
9,384,678.50
10,886,227.06
12,200,082.05
13,420,090.26
Halaman 3
No.
Satuan
[1]
[2]
[3]
M2
9,384,678.50
10,886,227.06
12,200,082.05
13,420,090.26
M2
9,460,109.30
10,973,726.79
12,298,142.09
13,527,956.30
M2
118,482.40
137,439.58
154,027.12
169,429.83
M2
140,501.10
162,981.28
182,651.43
200,916.57
M2
91,361.30
105,979.11
118,769.69
130,646.66
M2
171,361.30
198,779.11
222,769.69
245,046.66
M2
57,180.00
66,328.80
74,334.00
81,767.40
M2
78,380.00
90,920.80
101,894.00
112,083.40
Zona I
[4]
Keterangan
Zona IV
[7]
[8]
M2
52,597.10
61,012.64
68,376.23
75,213.85
M2
35,512.30
41,194.27
46,165.99
50,782.59
M2
38,280.20
44,405.03
49,764.26
54,740.69
M2
43,305.20
50,234.03
56,296.76
61,926.44
M2
43,305.20
50,234.03
56,296.76
61,926.44
M2
43,305.20
50,234.03
56,296.76
61,926.44
M2
32,250.20
37,410.23
41,925.26
46,117.79
M2
32,250.20
37,410.23
41,925.26
46,117.79
M2
35,265.20
40,907.63
45,844.76
50,429.24
M2
35,265.20
40,907.63
45,844.76
50,429.24
M2
77,195.20
89,546.43
100,353.76
110,389.14
M'
77,530.20
89,935.03
100,789.26
110,868.19
M'
80,210.20
93,043.83
104,273.26
114,700.59
M'
80,210.20
93,043.83
104,273.26
114,700.59
M'
83,895.20
97,318.43
109,063.76
119,970.14
M'
103,324.90
119,856.88
134,322.37
147,754.61
M'
92,824.90
107,676.88
120,672.37
132,739.61
M'
91,074.90
105,646.88
118,397.37
130,237.11
M'
91,074.90
105,646.88
118,397.37
130,237.11
M2
61,324.90
71,136.88
79,722.37
87,694.61
M2
61,324.90
71,136.88
79,722.37
87,694.61
M2
61,324.90
71,136.88
79,722.37
87,694.61
M'
60,725.80
70,441.93
78,943.54
86,837.89
M'
57,824.90
67,076.88
75,172.37
82,689.61
M'
405,997.00
470,956.52
527,796.10
580,575.71
M2
131,628.00
152,688.48
171,116.40
188,228.04
M2
2,186,560.40
2,536,410.06
2,842,528.52
3,126,781.37
M2
149,784.20
173,749.67
194,719.46
214,191.41
M2
88,206.00
102,318.96
114,667.80
126,134.58
M2
73,005.90
84,686.84
94,907.67
104,398.44
M2
57,656.20
66,881.19
74,953.06
82,448.37
M2
57,656.20
66,881.19
74,953.06
82,448.37
M2
57,656.20
66,881.19
74,953.06
82,448.37
M2
57,656.20
66,881.19
74,953.06
82,448.37
M2
674,990.20
782,988.63
877,487.26
965,235.99
M2
333,990.20
387,428.63
434,187.26
477,605.99
M2
333,990.20
387,428.63
434,187.26
477,605.99
M2
95,757.00
111,078.12
124,484.10
136,932.51
M2
43,334.00
50,267.44
56,334.20
61,967.62
M2
44,571.50
51,702.94
57,942.95
63,737.25
M2
44,571.50
51,702.94
57,942.95
63,737.25
M2
43,334.00
50,267.44
56,334.20
61,967.62
M2
44,571.50
51,702.94
57,942.95
63,737.25
M2
106,809.80
123,899.37
138,852.74
152,738.01
M2
114,209.00
132,482.44
148,471.70
163,318.87
M2
359,095.00
416,550.20
466,823.50
513,505.85
M2
49,147.00
57,010.52
63,891.10
70,280.21
M2
61,602.00
71,458.32
80,082.60
88,090.86
M2
130,375.50
151,235.58
169,488.15
186,436.97
M2
532,549.50
617,757.42
692,314.35
761,545.79
M2
977,220.70
1,133,576.01
1,270,386.91
1,397,425.60
M2
105,074.20
121,886.07
136,596.46
150,256.11
BH
565,800.00
582,774.00
639,354.00
735,540.00
BH
560,700.00
577,521.00
633,591.00
728,910.00
BH
451,000.00
464,530.00
509,630.00
586,300.00
Memasang Urinoir
BH
1,911,700.00
1,969,051.00
2,160,221.00
2,485,210.00
Memasang wastafel
BH
1,760,700.00
1,813,521.00
1,989,591.00
2,288,910.00
BH
664,600.00
684,538.00
750,998.00
863,980.00
BH
885,100.00
911,653.00
1,000,163.00
1,150,630.00
Halaman 4
Satuan
[1]
[2]
[3]
BH
Zona I
[4]
2,666,300.00
Harga Satuan
Kota/ Kabupaten
Zona II
Zona III
[5]
[6]
2,746,289.00
3,012,919.00
Keterangan
Zona IV
[7]
[8]
3,466,190.00
BH
1,005,200.00
1,035,356.00
1,135,876.00
1,306,760.00
BH
91,230,500.00
93,967,415.00
103,090,465.00
118,599,650.00
BH
1,145,000.00
1,179,350.00
1,293,850.00
1,488,500.00
M'
658,800.00
678,564.00
744,444.00
856,440.00
M'
662,300.00
682,169.00
748,399.00
860,990.00
M'
166,400.00
171,392.00
188,032.00
216,320.00
M'
209,800.00
216,094.00
237,074.00
272,740.00
16 Memasang Bak Kontrol Pasangan Batu Bata Ukuran (30 x 30) cm Tinggi 35 c
BH
1,167,000.00
1,202,010.00
1,318,710.00
1,517,100.00
17 Memasang Bak Kontrol Pasangan Batu Bata Ukuran (45 x 45) cm Tinggi 50 c
BH
1,572,100.00
1,619,263.00
1,776,473.00
2,043,730.00
18 Memasang Bak Kontrol Pasangan Batu Bata Ukuran (60 x 60) cm Tinggi 60 c
BH
3,160,300.00
3,255,109.00
3,571,139.00
4,108,390.00
M'
1,210,500.00
1,246,815.00
1,367,865.00
1,573,650.00
M'
1,210,500.00
1,246,815.00
1,367,865.00
1,573,650.00
M'
1,210,500.00
1,246,815.00
1,367,865.00
1,573,650.00
M'
1,218,800.00
1,255,364.00
1,377,244.00
1,584,440.00
M'
1,218,800.00
1,255,364.00
1,377,244.00
1,584,440.00
M'
1,224,000.00
1,260,720.00
1,383,120.00
1,591,200.00
M'
18,900.00
19,467.00
21,357.00
24,570.00
M'
21,100.00
21,733.00
23,843.00
27,430.00
M'
27,900.00
28,737.00
31,527.00
36,270.00
M'
43,100.00
44,393.00
48,703.00
56,030.00
M'
61,300.00
63,139.00
69,269.00
79,690.00
M'
73,100.00
75,293.00
82,603.00
95,030.00
M'
116,700.00
120,201.00
131,871.00
151,710.00
M'
641,400.00
660,642.00
724,782.00
833,820.00
BH
734,300.00
756,329.00
829,759.00
954,590.00
BH
328,100.00
337,943.00
370,753.00
426,530.00
BH
49,600.00
51,088.00
56,048.00
64,480.00
BH
45,400.00
46,762.00
-
51,302.00
-
59,020.00
-
Kg
25,600.00
26,368.00
28,928.00
33,280.00
M2
144,400.00
148,732.00
163,172.00
187,720.00
M2
435,800.00
448,874.00
492,454.00
566,540.00
M2
445,400.00
458,762.00
503,302.00
579,020.00
M2
1,335,500.00
1,375,565.00
1,509,115.00
1,736,150.00
M2
1,818,600.00
1,873,158.00
2,055,018.00
2,364,180.00
M2
760,300.00
783,109.00
859,139.00
988,390.00
M2
1,311,800.00
1,351,154.00
1,482,334.00
1,705,340.00
M2
720,400.00
742,012.00
814,052.00
936,520.00
M2
1,220,400.00
1,257,012.00
1,379,052.00
1,586,520.00
M2
437,700.00
450,831.00
494,601.00
569,010.00
M2
47,400.00
48,822.00
53,562.00
61,620.00
M2
51,000.00
52,530.00
57,630.00
66,300.00
M2
49,800.00
51,294.00
56,274.00
64,740.00
M2
44,300.00
45,629.00
50,059.00
57,590.00
M2
219,600.00
226,188.00
248,148.00
285,480.00
M2
150,600.00
155,118.00
170,178.00
195,780.00
M2
140,700.00
144,921.00
158,991.00
182,910.00
M2
2,920,400.00
3,008,012.00
3,300,052.00
3,796,520.00
M2
2,916,200.00
3,003,686.00
-
3,295,306.00
-
3,791,060.00
-
BH
134,400.00
138,432.00
151,872.00
174,720.00
BH
179,600.00
184,988.00
202,948.00
233,480.00
BH
263,400.00
271,302.00
297,642.00
342,420.00
BH
212,200.00
218,566.00
239,786.00
275,860.00
BH
46,900.00
48,307.00
52,997.00
60,970.00
BH
36,800.00
37,904.00
41,584.00
47,840.00
BH
51,700.00
53,251.00
58,421.00
67,210.00
BH
100,000.00
103,000.00
113,000.00
130,000.00
BH
25,400.00
26,162.00
28,702.00
33,020.00
BH
197,100.00
203,013.00
222,723.00
256,230.00
BH
82,600.00
85,078.00
93,338.00
107,380.00
BH
131,100.00
135,033.00
148,143.00
170,430.00
BH
31,900.00
32,857.00
36,047.00
41,470.00
BH
1,219,800.00
1,256,394.00
1,378,374.00
1,585,740.00
BH
86,700.00
89,301.00
97,971.00
112,710.00
M2
139,400.00
143,582.00
157,522.00
181,220.00
Halaman 5
Satuan
[1]
[2]
[3]
Zona I
[4]
Harga Satuan
Kota/ Kabupaten
Zona II
Zona III
[5]
[6]
Keterangan
Zona IV
[7]
[8]
M2
158,400.00
163,152.00
178,992.00
205,920.00
M2
165,400.00
170,362.00
186,902.00
215,020.00
M2
753,200.00
775,796.00
851,116.00
979,160.00
M2
307,700.00
316,931.00
347,701.00
400,010.00
M2
381,600.00
393,048.00
431,208.00
496,080.00
M2
512,100.00
527,463.00
578,673.00
665,730.00
M2
257,400.00
265,122.00
290,862.00
334,620.00
M2
1,240,200.00
1,277,406.00
-
1,401,426.00
-
1,612,260.00
-
M2
89,000.00
91,670.00
100,570.00
115,700.00
M2
89,300.00
91,979.00
100,909.00
116,090.00
M2
88,700.00
91,361.00
100,231.00
115,310.00
M2
121,200.00
124,836.00
136,956.00
157,560.00
M2
57,100.00
58,813.00
64,523.00
74,230.00
M2
114,900.00
118,347.00
129,837.00
149,370.00
M2
51,500.00
53,045.00
58,195.00
66,950.00
M2
118,200.00
121,746.00
133,566.00
153,660.00
M2
87,900.00
90,537.00
99,327.00
114,270.00
M2
117,500.00
121,025.00
132,775.00
152,750.00
M2
86,100.00
88,683.00
97,293.00
111,930.00
M2
120,000.00
123,600.00
135,600.00
156,000.00
M2
44,900.00
46,247.00
50,737.00
58,370.00
M2
34,400.00
35,432.00
38,872.00
44,720.00
M2
18,300.00
18,849.00
20,679.00
23,790.00
M2
54,100.00
55,723.00
61,133.00
70,330.00
M2
15,100.00
15,553.00
17,063.00
19,630.00
M2
45,300.00
46,659.00
51,189.00
58,890.00
M2
55,400.00
57,062.00
62,602.00
72,020.00
M2
45,300.00
46,659.00
51,189.00
58,890.00
M2
15,000.00
15,450.00
16,950.00
19,500.00
M2
105,600.00
108,768.00
119,328.00
137,280.00
M2
37,200.00
38,316.00
42,036.00
48,360.00
M2
62,800.00
64,684.00
70,964.00
81,640.00
M2
39,400.00
40,582.00
44,522.00
51,220.00
M2
92,300.00
95,069.00
104,299.00
119,990.00
M2
92,300.00
95,069.00
104,299.00
119,990.00
M2
37,900.00
39,037.00
42,827.00
49,270.00
M2
13,700.00
14,111.00
15,481.00
17,810.00
M2
84,200.00
86,726.00
95,146.00
109,460.00
M2
1,718,100.00
1,769,643.00
1,941,453.00
2,233,530.00
M2
92,300.00
95,069.00
104,299.00
119,990.00
M2
94,500.00
97,335.00
106,785.00
122,850.00
M2
94,200.00
97,026.00
106,446.00
122,460.00
M2
94,500.00
97,335.00
106,785.00
122,850.00
M2
92,300.00
95,069.00
104,299.00
119,990.00
M2
91,400.00
94,142.00
103,282.00
118,820.00
M2
91,400.00
94,142.00
103,282.00
118,820.00
M2
97,500.00
100,425.00
110,175.00
126,750.00
M2
154,300.00
158,929.00
174,359.00
200,590.00
M2
701,800.00
722,854.00
793,034.00
912,340.00
M2
34,800.00
35,844.00
39,324.00
45,240.00
M2
34,800.00
35,844.00
39,324.00
45,240.00
M2
27,700.00
28,531.00
31,301.00
36,010.00
M2
27,700.00
28,531.00
31,301.00
36,010.00
M2
87,700.00
90,331.00
99,101.00
114,010.00
47 Pasang gymfloor
M2
87,700.00
90,331.00
99,101.00
114,010.00
Halaman 6
Satuan
[1]
[2]
[3]
Zona I
[4]
Harga Satuan
Kota/ Kabupaten
Zona II
Zona III
[5]
[6]
Keterangan
Zona IV
[7]
[8]
M2
96,800.00
99,704.00
109,384.00
125,840.00
M2
96,800.00
99,704.00
109,384.00
125,840.00
M2
91,900.00
94,657.00
103,847.00
119,470.00
M2
91,900.00
94,657.00
103,847.00
119,470.00
M2
93,700.00
96,511.00
105,881.00
121,810.00
M2
92,500.00
95,275.00
104,525.00
120,250.00
M2
93,700.00
96,511.00
105,881.00
121,810.00
M2
91,900.00
94,657.00
103,847.00
119,470.00
M2
93,700.00
96,511.00
105,881.00
121,810.00
M2
91,900.00
94,657.00
103,847.00
119,470.00
M2
92,500.00
95,275.00
104,525.00
120,250.00
M2
93,700.00
96,511.00
105,881.00
121,810.00
M2
707,900.00
729,137.00
799,927.00
920,270.00
M2
811,100.00
835,433.00
916,543.00
1,054,430.00
M2
337,900.00
348,037.00
381,827.00
439,270.00
M2
297,400.00
306,322.00
336,062.00
386,620.00
M2
32,000.00
32,960.00
36,160.00
41,600.00
M2
32,000.00
32,960.00
36,160.00
41,600.00
M2
32,000.00
32,960.00
36,160.00
41,600.00
M2
32,000.00
32,960.00
36,160.00
41,600.00
M2
67,300.00
69,319.00
76,049.00
87,490.00
M2
201,800.00
207,854.00
228,034.00
262,340.00
M2
16,800.00
17,304.00
18,984.00
21,840.00
71 Plint kayu 2 x 10 cm
M2
26,300.00
27,089.00
-
29,719.00
-
34,190.00
-
M2
9,900.00
10,197.00
11,187.00
12,870.00
M2
10,300.00
10,609.00
11,639.00
13,390.00
M2
10,300.00
10,609.00
11,639.00
13,390.00
M2
30,000.00
30,900.00
33,900.00
39,000.00
M2
41,300.00
42,539.00
46,669.00
53,690.00
M2
21,700.00
22,351.00
24,521.00
-
28,210.00
-
M2
14,700.00
15,141.00
16,611.00
19,110.00
M2
62,300.00
64,169.00
70,399.00
80,990.00
M2
31,900.00
32,857.00
36,047.00
41,470.00
M2
24,300.00
25,029.00
27,459.00
31,590.00
11 Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penu
M2
5,000.00
5,150.00
5,650.00
6,500.00
M2
10,000.00
10,300.00
11,300.00
13,000.00
M2
5,000.00
5,150.00
5,650.00
6,500.00
M2
10,000.00
10,300.00
11,300.00
13,000.00
M2
3,000.00
3,090.00
3,390.00
3,900.00
16 Pemasangan wallpaper
M2
14,900.00
15,347.00
16,837.00
19,370.00
M2
21,000.00
21,630.00
23,730.00
27,300.00
M2
36,900.00
38,007.00
41,697.00
47,970.00
M2
24,500.00
25,235.00
27,685.00
31,850.00
M2
144,900.00
149,247.00
M2
112,200.00
115,566.00
M2
112,200.00
115,566.00
163,737.00
126,786.00
126,786.00
188,370.00
145,860.00
145,860.00
Halaman 7
1.3
1.3
PEKERJAAN PERSIAPAN
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
II. BAHAN
Dolken Kayu Dia. 8 - 400 cm
Semen portland
Pasir Beton
Koral Beton
Kayu 5/7,meranti
Paku Biasa 2" - 5"
Residu
Harga
Satuan
Org
Org
Org
Org
0.400
0.200
0.020
0.020
59,900.00
77,700.00
89,600.00
104,000.00
Btg
Kg
1.250
2.500
0.005
53,800.00
1,434.00
227,100.00
M3
M3
M3
Kg
Ltr
Zona II
Jumlah
Harga
23,960.00
15,540.00
1,792.00
2,080.00
67,250.00
3,585.00
1,135.50
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
62,408.00
1,663.44
263,436.00
335,472.00
3,019.25
375,960.00
3,383.64
413,556.00
3,722.00
1,317,180.00
15,892.00
60,088.00
94,836.96
953.52
24,035.20
1,476,150.00
17,810.00
67,340.00
106,282.80
1,068.60
26,936.00
1,623,765.00
19,591.00
74,074.00
116,911.08
1,175.46
29,629.60
221,243.30
Jumlah
Satuan Indeks
Zona I
Harga
Satuan
0.400
0.200
0.020
0.020
59,900.00
77,700.00
89,600.00
104,000.00
Btg
Kg
1.250
2.500
0.005
0.009
1.200
0.072
0.060
0.450
M
Kg
Kg
Harga
Satuan
Jumlah
Harga
53,800.00
1,434.00
227,100.00
289,200.00
274,200.00
1,135,500.00
13,700.00
43,500.00
2,602.80
329,040.00
81,756.00
822.00
19,575.00
335,472.00
318,072.00
1,317,180.00
15,892.00
50,460.00
3,019.25
381,686.40
94,836.96
953.52
22,707.00
375,960.00
356,460.00
1,476,150.00
17,810.00
56,550.00
3,383.64
427,752.00
106,282.80
1,068.60
25,447.50
413,556.00
392,106.00
1,623,765.00
19,591.00
62,205.00
3,722.00
470,527.20
116,911.08
1,175.46
27,992.25
Harga
Satuan
549,138.30
Jumlah
0.300
0.200
0.020
0.020
59,900.00
77,700.00
89,600.00
104,000.00
Btg
Kg
Kg
1.000
2.000
25.000
0.005
0.009
0.060
53,800.00
1,434.00
27,500.00
227,100.00
289,200.00
13,700.00
Jumlah
17,970.00
15,540.00
1,792.00
2,080.00
53,800.00
2,868.00
687,500.00
1,135.50
2,602.80
822.00
786,110.30
No
Satuan Indeks
Harga
Satuan
Org
Org
Org
Org
0.100
0.100
0.010
0.005
59,900.00
77,700.00
89,600.00
104,000.00
M3
Kg
0.012
0.020
0.007
1,135,500.00
13,700.00
2,071,500.00
Jumlah
Jumlah
Jumlah
20,845.20
18,026.40
2,078.72
2,412.80
62,408.00
3,326.88
797,500.00
1,317.18
3,019.25
953.52
911,887.95
Harga
Satuan
5,990.00
7,770.00
896.00
520.00
13,626.00
274.00
14,500.50
43,576.50
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
1,317,180.00
15,892.00
2,402,940.00
Jumlah
Jumlah
Jumlah
23,361.00
20,202.00
2,329.60
2,704.00
69,940.00
3,728.40
893,750.00
1,476.15
3,383.64
1,068.60
1,021,943.39
Harga
Satuan
6,948.40
9,013.20
1,039.36
603.20
15,806.16
317.84
16,820.58
50,548.74
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
1,476,150.00
17,810.00
2,692,950.00
Jumlah
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
76,934.00
2,050.62
39,325.00
324,753.00
413,556.00
19,591.00
Jumlah
Zona III
Jumlah
Harga
785,267.77
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
69,940.00
1,864.20
35,750.00
295,230.00
375,960.00
17,810.00
Zona II
Jumlah
Harga
713,879.79
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
62,408.00
1,663.44
31,900.00
263,436.00
335,472.00
15,892.00
Zona I
Harga
Satuan
637,000.43
Zona II
Jumlah
Harga
Org
Org
Org
Org
M3
Harga
Satuan
34,262.80
22,222.20
2,562.56
2,974.40
96,167.50
5,126.55
1,623.77
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
II. BAHAN
Kayu 5/7,meranti
Paku Biasa 2" - 5"
Kayu papan 3/20
Zona IV
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
76,934.00
2,050.62
324,753.00
Zona I
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Harga
Satuan
31,148.00
20,202.00
2,329.60
2,704.00
87,425.00
4,660.50
1,476.15
Satuan Indeks
Uraian
Zona III
Jumlah
Harga
316,377.92
77,870.00
101,010.00
116,480.00
135,200.00
69,940.00
1,864.20
295,230.00
No
M3
M3
Kg
Jumlah
27,793.60
18,026.40
2,078.72
2,412.80
78,010.00
4,158.60
1,317.18
Jumlah
II. BAHAN
Dolken Kayu Dia. 8 - 400 cm
Semen portland
Kawat duri
Pasir Beton
Koral Beton
Paku Biasa 2" - 5"
287,616.29
69,484.00
90,132.00
103,936.00
120,640.00
62,408.00
1,663.44
263,436.00
: Pagar Sementara Dari Kawat Duri Tinggi 1,8 Meter (SNI Edisi Rev.2002)
: M1
: Harian
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
23,960.00
15,540.00
1,792.00
2,080.00
67,250.00
3,585.00
1,135.50
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
256,642.23
Zona II
Jumlah
Harga
Org
Org
Org
Org
34,262.80
22,222.20
2,562.56
2,974.40
96,167.50
5,126.55
1,623.77
2,602.80
No
M
M3
Lbr
85,657.00
111,111.00
128,128.00
148,720.00
76,934.00
2,050.62
324,753.00
81,756.00
822.00
20,720.00
: M1
: Harian
Koral Beton
Seng Gelombang 3" - 5"
Kayu 5/7,meranti
Paku Biasa 2" - 5"
Meni Besi
31,148.00
20,202.00
2,329.60
2,704.00
87,425.00
4,660.50
1,476.15
Jumlah
Harga
289,200.00
Kuantitas Pekerjaan
Produksi Harian / Jam
77,870.00
101,010.00
116,480.00
135,200.00
69,940.00
1,864.20
295,230.00
Harga
Satuan
1,135,500.00
13,700.00
51,800.00
Jumlah
II. BAHAN
Dolken Kayu Dia. 8 - 400 cm
Semen portland
Pasir Beton
Zona IV
Jumlah
Harga
0.072
0.060
0.400
: Pagar Sementara Dari Seng Gelombang Tinggi 2 Meter (SNI Edisi Rev.2002)
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
27,793.60
18,026.40
2,078.72
2,412.80
78,010.00
4,158.60
1,317.18
Harga
Satuan
0.009
Jenis Pekerjaan
Uraian
Zona III
Jumlah
Harga
25,697.10
22,222.20
2,562.56
2,974.40
76,934.00
4,101.24
983,125.00
1,623.77
3,722.00
1,175.46
1,124,137.73
Zona IV
Jumlah
Harga
7,787.00
10,101.00
1,164.80
676.00
17,713.80
356.20
18,850.65
56,649.45
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
1,623,765.00
19,591.00
2,962,245.00
Jumlah
Jumlah
Harga
8,565.70
11,111.10
1,281.28
743.60
19,485.18
391.82
20,735.72
62,314.40
Halaman 8
Kuantitas Pekerjaan
Produksi Harian / Jam
: M2
: Harian
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Kayu
Tukang Batu
Kepala Tukang
Mandor
Org
Org
Org
Org
Org
2.000
2.000
1.000
0.300
0.050
II. BAHAN
Dolken Kayu Dia. 8 - 400 cm
Harga
Satuan
Zona II
Jumlah
Harga
59,900.00
77,700.00
77,700.00
89,600.00
104,000.00
Harga
Satuan
Zona III
Jumlah
Harga
Harga
Satuan
Zona IV
Jumlah
Harga
Harga
Satuan
Jumlah
Harga
Btg
1.250
53,800.00
119,800.00
155,400.00
77,700.00
26,880.00
5,200.00
67,250.00
69,484.00
90,132.00
90,132.00
103,936.00
120,640.00
62,408.00
138,968.00
180,264.00
90,132.00
31,180.80
6,032.00
78,010.00
77,870.00
101,010.00
101,010.00
116,480.00
135,200.00
69,940.00
155,740.00
202,020.00
101,010.00
34,944.00
6,760.00
87,425.00
85,657.00
111,111.00
111,111.00
128,128.00
148,720.00
76,934.00
171,314.00
222,222.00
111,111.00
38,438.40
7,436.00
96,167.50
Kayu meranti
Paku Biasa
Besi Strip
Semen portland
M3
Kg
Kg
Kg
0.180
0.850
1.100
35.000
1,135,500.00
13,700.00
26,300.00
1,434.00
204,390.00
11,645.00
28,930.00
50,190.00
1,317,180.00
15,892.00
30,508.00
1,663.44
237,092.40
13,508.20
33,558.80
58,220.40
1,476,150.00
17,810.00
34,190.00
1,864.20
265,707.00
15,138.50
37,609.00
65,247.00
1,623,765.00
19,591.00
37,609.00
2,050.62
292,277.70
16,652.35
41,369.90
71,771.70
Pasir Pasang
M3
M3
0.150
131,500.00
19,725.00
152,540.00
22,881.00
170,950.00
25,642.50
188,045.00
28,206.75
Pasir Beton
Koral Beton
Bata merah
M
Bh
0.100
0.150
30.000
227,100.00
289,200.00
1,500.00
22,710.00
43,380.00
45,000.00
263,436.00
335,472.00
1,740.00
26,343.60
50,320.80
52,200.00
295,230.00
375,960.00
1,950.00
29,523.00
56,394.00
58,500.00
324,753.00
413,556.00
2,145.00
32,475.30
62,033.40
64,350.00
M3
Bh
0.250
2.000
48,300.00
179,400.00
12,075.00
358,800.00
56,028.00
208,104.00
14,007.00
416,208.00
62,790.00
233,220.00
15,697.50
466,440.00
69,069.00
256,542.00
17,267.25
513,084.00
Kaca Polos
Kunci Tanam
Plywood 4 mm
M2
Bh
Lbr
0.080
0.150
0.060
107,700.00
364,600.00
82,500.00
8,616.00
54,690.00
4,950.00
124,932.00
422,936.00
95,700.00
9,994.56
63,440.40
5,742.00
140,010.00
473,980.00
107,250.00
11,200.80
71,097.00
6,435.00
154,011.00
521,378.00
117,975.00
12,320.88
78,206.70
7,078.50
Jumlah
1,317,331.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Jumlah
Zona I
Uraian
Harga
Satuan
Org
Org
Org
Org
1.000
2.000
0.200
0.050
II. BAHAN
Dolken Kayu Dia. 8 - 400 cm
Btg
1.700
53,800.00
M3
Kg
Kg
0.210
0.300
10.500
0.030
0.050
1.500
1,135,500.00
13,700.00
1,434.00
131,500.00
289,200.00
Kayu meranti
Paku Biasa
Semen portland
Pasir Pasang
Koral Beton
Seng Gelombang BJLS 32
M3
M3
Lbr
59,900.00
77,700.00
89,600.00
104,000.00
Jumlah
Harga
Satuan
II. BAHAN
Dolken Kayu Dia. 8 - 400 cm
Kayu meranti
Paku Biasa
Seng Gelombang BJLS 30
Btg
3.000
0.276
0.700
1.500
53,800.00
1,135,500.00
13,700.00
91,400.00
M3
Kg
Lbr
Jumlah
238,455.00
4,110.00
15,057.00
3,945.00
14,460.00
-
1,317,180.00
15,892.00
1,663.44
152,540.00
335,472.00
-
276,607.80
4,767.60
17,466.12
4,576.20
16,773.60
-
1,476,150.00
17,810.00
1,864.20
170,950.00
375,960.00
-
309,991.50
5,343.00
19,574.10
5,128.50
18,798.00
-
1,623,765.00
19,591.00
2,050.62
188,045.00
413,556.00
-
340,990.65
5,877.30
21,531.51
5,641.35
20,677.80
-
605,907.00
Jumlah
59,900.00
116,550.00
13,440.00
5,200.00
161,400.00
313,398.00
9,590.00
137,100.00
816,578.00
No
Satuan Indeks
Harga
Satuan
Org
Org
0.100
0.050
59,900.00
104,000.00
Jumlah
Jumlah
69,484.00
135,198.00
15,590.40
6,032.00
187,224.00
363,541.68
11,124.40
159,036.00
947,230.48
Harga
Satuan
5,990.00
5,200.00
Harga
Satuan
69,484.00
120,640.00
Jumlah
Jumlah
77,870.00
151,515.00
17,472.00
6,760.00
209,820.00
407,417.40
12,467.00
178,230.00
1,061,551.40
Harga
Satuan
6,948.40
6,032.00
Harga
Satuan
77,870.00
135,200.00
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
76,934.00
1,623,765.00
19,591.00
130,702.00
Jumlah
Zona III
Jumlah
Harga
866,447.01
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
69,940.00
1,476,150.00
17,810.00
118,820.00
Zona II
Jumlah
Harga
787,679.10
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
62,408.00
1,317,180.00
15,892.00
106,024.00
Zona I
I. UPAH
Pekerja
Mandor
702,852.12
Zona II
Harga
Satuan
Jumlah
Harga
85,657.00
222,222.00
25,625.60
7,436.00
130,787.80
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
76,934.00
Jumlah
Harga
59,900.00
77,700.00
89,600.00
104,000.00
Zona IV
Jumlah
Harga
77,870.00
202,020.00
23,296.00
6,760.00
118,898.00
Zona I
1.000
1.500
0.150
0.050
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
69,940.00
Satuan Indeks
Org
Org
Org
Org
Zona III
Jumlah
Harga
1,883,783.33
69,484.00
180,264.00
20,787.20
6,032.00
106,093.60
No
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
69,484.00
90,132.00
103,936.00
120,640.00
62,408.00
Harga
Satuan
1,712,530.30
59,900.00
155,400.00
17,920.00
5,200.00
91,460.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Jumlah
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
1,528,103.96
85,657.00
166,666.50
19,219.20
7,436.00
230,802.00
448,159.14
13,713.70
196,053.00
1,167,706.54
Zona IV
Jumlah
Harga
7,787.00
6,760.00
Harga
Satuan
85,657.00
148,720.00
Jumlah
Harga
8,565.70
7,436.00
II. BAHAN
Jumlah
11,190.00
Jumlah
12,980.40
Jumlah
14,547.00
Jumlah
16,001.70
Halaman 9
Kuantitas Pekerjaan
Produksi Harian / Jam
: M2
: Harian
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Harga
Satuan
Zona II
Jumlah
Harga
Org
Org
Org
Org
1.000
2.000
0.200
0.050
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Dolken Kayu Dia. 8 - 400 cm
Kayu meranti
Paku Biasa
Semen portland
Pasir Beton
Btg
M3
Kg
Kg
M3
1.250
0.186
0.300
18.000
0.030
Koral Beton
Seng Gelombang BJLS 32
Plywood 4 mm
M3
Lbr
Lbr
0.050
1.500
1.350
Harga
Satuan
53,800.00
1,135,500.00
13,700.00
1,434.00
227,100.00
77,870.00
202,020.00
23,296.00
6,760.00
87,425.00
274,563.90
5,343.00
33,555.60
8,856.90
85,657.00
111,111.00
128,128.00
148,720.00
76,934.00
1,623,765.00
19,591.00
2,050.62
324,753.00
85,657.00
222,222.00
25,625.60
7,436.00
96,167.50
302,020.29
5,877.30
36,911.16
9,742.59
289,200.00
91,400.00
82,500.00
14,460.00
137,100.00
111,375.00
335,472.00
106,024.00
95,700.00
16,773.60
159,036.00
129,195.00
375,960.00
118,820.00
107,250.00
18,798.00
178,230.00
144,787.50
413,556.00
130,702.00
117,975.00
20,677.80
196,053.00
159,266.25
816,543.00
Jumlah
Satuan Indeks
Zona I
Harga
Satuan
Org
Org
0.300
0.002
77,700.00
104,000.00
II. BAHAN
Kayu terentang/meranti
Paku biasa
Kaso 5/7,meranti
M3
Kg
Btg
0.036
0.080
1.000
1,314,600.00
13,700.00
7,000.00
Jumlah
23,310.00
156.00
47,325.60
1,096.00
7,000.00
78,887.60
Harga
Satuan
90,132.00
120,640.00
1,524,936.00
15,892.00
8,120.00
Jumlah
: Pembuatan Stegger dari Bambu, Ukuran (40 x 50 x 20) cm (SNI Edisi Rev.2002)
Kuantitas Pekerjaan
Produksi Harian / Jam
: M2
: Harian
No
Satuan Indeks
Zona I
Org
Org
Org
Org
0.250
0.017
0.002
0.013
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Bambu dia. 6 - 8/600 cm
Tali ijuk
Btg
Kg
1.000
0.250
24,100.00
Jumlah
14,975.00
1,320.90
179.20
1,352.00
6,025.00
23,852.10
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Jumlah
1.000
0.050
59,900.00
104,000.00
M3
M3
M3
0.150
0.090
0.010
353,800.00
353,800.00
131,500.00
Jumlah
59,900.00
5,200.00
53,070.00
31,842.00
1,315.00
151,327.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Jumlah
I. UPAH
Pekerja
Mandor
Jumlah
17,371.00
1,532.24
207.87
1,568.32
6,989.00
27,668.44
Harga
Satuan
Zona IV
30,303.00
202.80
61,523.28
1,424.80
9,100.00
102,553.88
Harga
Satuan
Jumlah
111,111.00
148,720.00
1,879,878.00
19,591.00
10,010.00
69,484.00
6,032.00
61,561.20
36,936.72
1,525.40
19,467.50
1,717.17
232.96
1,757.60
7,832.50
31,007.73
175,539.32
Jumlah
112,809.27
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
34,463.00
21,414.25
1,888.89
256.26
1,933.36
8,615.75
Jumlah
34,108.50
Zona IV
Jumlah
Harga
77,870.00
135,200.00
459,940.00
459,940.00
170,950.00
33,333.30
223.08
67,675.61
1,567.28
10,010.00
Jumlah
Zona III
Harga
Satuan
Jumlah
Harga
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
31,330.00
1,167,656.49
77,870.00
6,760.00
68,991.00
41,394.60
1,709.50
196,725.10
Harga
Satuan
Jumlah
Harga
85,657.00
148,720.00
505,934.00
505,934.00
188,045.00
85,657.00
7,436.00
75,890.10
45,534.06
1,880.45
Jumlah
216,397.61
: M2
: Harian
Zona I
Uraian
Jumlah
Zona III
Jumlah
Harga
69,484.00
120,640.00
410,408.00
410,408.00
152,540.00
1,061,505.90
Jumlah
Harga
101,010.00
135,200.00
1,708,980.00
17,810.00
9,100.00
Zona II
Jumlah
Harga
Org
Org
91,509.62
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
27,956.00
Zona I
Harga
Satuan
27,039.60
180.96
54,897.70
1,271.36
8,120.00
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
Zona III
Jumlah
Harga
Jenis Pekerjaan
Harga
Satuan
947,189.88
Zona II
Jumlah
Harga
I. UPAH
Tukang Kayu
Mandor
II. BAHAN
Batu Belah 15/20
Batu Pecah 5/7
Pasir Pasang
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
69,940.00
1,476,150.00
17,810.00
1,864.20
295,230.00
No
I. UPAH
Pekerja
Mandor
Harga
Satuan
69,484.00
180,264.00
20,787.20
6,032.00
78,010.00
244,995.48
4,767.60
29,941.92
7,903.08
Jumlah
Uraian
Zona IV
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
62,408.00
1,317,180.00
15,892.00
1,663.44
263,436.00
Uraian
Harga
Satuan
59,900.00
155,400.00
17,920.00
5,200.00
67,250.00
211,203.00
4,110.00
25,812.00
6,813.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Zona III
Jumlah
Harga
Org
Org
6.667
0.333
Harga
Satuan
59,900.00
104,000.00
Zona II
Jumlah
Harga
399,353.30
34,632.00
Harga
Satuan
69,484.00
120,640.00
Zona III
Jumlah
Harga
463,249.83
40,173.12
Harga
Satuan
77,870.00
135,200.00
Zona IV
Jumlah
Harga
519,159.29
45,021.60
Harga
Satuan
85,657.00
148,720.00
Jumlah
Harga
571,075.22
49,523.76
II. BAHAN
Jumlah
433,985.30
Jumlah
503,422.95
Jumlah
564,180.89
Jumlah
620,598.98
Halaman 10
Kuantitas Pekerjaan
Produksi Harian / Jam
: M2
: Harian
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Mandor
Org
Org
6.667
0.333
Harga
Satuan
Zona II
Jumlah
Harga
59,900.00
104,000.00
399,353.30
34,632.00
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
120,640.00
463,249.83
40,173.12
Harga
Satuan
Zona IV
Jumlah
Harga
77,870.00
135,200.00
519,159.29
45,021.60
Harga
Satuan
Jumlah
Harga
85,657.00
148,720.00
571,075.22
49,523.76
II. BAHAN
Jumlah
2.
433,985.30
Jumlah
503,422.95
Jumlah
564,180.89
Jumlah
620,598.98
PEKERJAAN TANAH
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Mandor
Org
Org
0.750
0.025
Harga
Satuan
Zona II
Jumlah
Harga
59,900.00
104,000.00
44,925.00
2,600.00
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
120,640.00
52,113.00
3,016.00
Harga
Satuan
Zona IV
Jumlah
Harga
77,870.00
135,200.00
58,402.50
3,380.00
Harga
Satuan
Jumlah
Harga
85,657.00
148,720.00
64,242.75
3,718.00
II. BAHAN
Jumlah
47,525.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Jumlah
Zona I
Uraian
I. UPAH
Pekerja
Mandor
Org
Org
0.900
0.450
Harga
Satuan
Jumlah
Zona II
Jumlah
Harga
59,900.00
104,000.00
55,129.00
53,910.00
46,800.00
Harga
Satuan
Jumlah
Zona III
Jumlah
Harga
69,484.00
120,640.00
61,782.50
62,535.60
54,288.00
Harga
Satuan
Zona IV
Jumlah
Harga
77,870.00
135,200.00
67,960.75
70,083.00
60,840.00
Harga
Satuan
Jumlah
Harga
85,657.00
148,720.00
77,091.30
66,924.00
II. BAHAN
Jumlah
100,710.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Jumlah
Zona I
Uraian
I. UPAH
Pekerja
Mandor
Org
Org
1.050
0.067
Harga
Satuan
Jumlah
Zona II
Jumlah
Harga
59,900.00
104,000.00
116,823.60
62,895.00
6,968.00
Harga
Satuan
Jumlah
Zona III
Jumlah
Harga
69,484.00
120,640.00
130,923.00
72,958.20
8,082.88
Harga
Satuan
Zona IV
Jumlah
Harga
77,870.00
135,200.00
144,015.30
81,763.50
9,058.40
Harga
Satuan
Jumlah
Harga
85,657.00
148,720.00
89,939.85
9,964.24
II. BAHAN
Jumlah
69,863.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Jumlah
Zona I
Uraian
I. UPAH
Pekerja
Mandor
Org
Org
1.000
0.032
Harga
Satuan
Jumlah
Zona II
Jumlah
Harga
59,900.00
104,000.00
81,041.08
59,900.00
3,328.00
Harga
Satuan
Jumlah
Zona III
Jumlah
Harga
69,484.00
120,640.00
90,821.90
69,484.00
3,860.48
Harga
Satuan
Zona IV
Jumlah
Harga
77,870.00
135,200.00
99,904.09
77,870.00
4,326.40
Harga
Satuan
Jumlah
Harga
85,657.00
148,720.00
85,657.00
4,759.04
II. BAHAN
Jumlah
63,228.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Jumlah
Zona I
Uraian
I. UPAH
Pekerja
Mandor
Org
Org
1.500
0.060
Harga
Satuan
Jumlah
Zona II
Jumlah
Harga
59,900.00
104,000.00
73,344.48
89,850.00
6,240.00
Harga
Satuan
Jumlah
Zona III
Jumlah
Harga
69,484.00
120,640.00
82,196.40
104,226.00
7,238.40
Harga
Satuan
Zona IV
Jumlah
Harga
77,870.00
135,200.00
90,416.04
116,805.00
8,112.00
Harga
Satuan
Jumlah
Harga
85,657.00
148,720.00
128,485.50
8,923.20
II. BAHAN
Jumlah
96,090.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Jumlah
Zona I
I. UPAH
Pekerja
Mandor
Uraian
Org
Org
1.200
0.045
Harga
Satuan
59,900.00
104,000.00
111,464.40
Jumlah
Zona II
Jumlah
Harga
71,880.00
4,680.00
Harga
Satuan
69,484.00
120,640.00
124,917.00
Jumlah
Zona III
Jumlah
Harga
83,380.80
5,428.80
Harga
Satuan
77,870.00
135,200.00
137,408.70
Zona IV
Jumlah
Harga
93,444.00
6,084.00
Harga
Satuan
85,657.00
148,720.00
Jumlah
Harga
102,788.40
6,692.40
II. BAHAN
Jumlah
76,560.00
Jumlah
88,809.60
Jumlah
99,528.00
Jumlah
109,480.80
Halaman 11
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Mandor
Org
Org
0.050
0.005
Harga
Satuan
Zona II
Jumlah
Harga
59,900.00
104,000.00
2,995.00
520.00
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
120,640.00
3,474.20
603.20
Harga
Satuan
Zona IV
Jumlah
Harga
77,870.00
135,200.00
3,893.50
676.00
Harga
Satuan
Jumlah
Harga
85,657.00
148,720.00
4,282.85
743.60
II. BAHAN
Jumlah
3,515.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Jumlah
Zona I
Uraian
I. UPAH
Pekerja
Mandor
Org
Org
0.330
0.010
Harga
Satuan
Jumlah
Zona II
Jumlah
Harga
59,900.00
104,000.00
4,077.40
19,767.00
1,040.00
Harga
Satuan
Jumlah
Zona III
Jumlah
Harga
69,484.00
120,640.00
4,569.50
22,929.72
1,206.40
Harga
Satuan
Zona IV
Jumlah
Harga
77,870.00
135,200.00
5,026.45
25,697.10
1,352.00
Harga
Satuan
Jumlah
Harga
85,657.00
148,720.00
28,266.81
1,487.20
II. BAHAN
Jumlah
20,807.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Jumlah
Zona I
Uraian
I. UPAH
Pekerja
Mandor
Org
Org
0.250
0.008
Harga
Satuan
Jumlah
Zona II
Jumlah
Harga
59,900.00
104,000.00
24,136.12
14,975.00
866.67
Harga
Satuan
Jumlah
Zona III
Jumlah
Harga
69,484.00
120,640.00
27,049.10
17,371.00
1,005.33
Harga
Satuan
Zona IV
Jumlah
Harga
77,870.00
135,200.00
29,754.01
19,467.50
1,126.67
Harga
Satuan
Jumlah
Harga
85,657.00
148,720.00
21,414.25
1,239.33
II. BAHAN
Jumlah
15,841.67
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Jumlah
Zona I
Uraian
I. UPAH
Pekerja
Mandor
Org
Org
0.300
0.150
Harga
Satuan
Jumlah
Zona II
Jumlah
Harga
59,900.00
104,000.00
18,376.33
17,970.00
15,600.00
Harga
Satuan
Jumlah
Zona III
Jumlah
Harga
69,484.00
120,640.00
20,594.17
20,845.20
18,096.00
Harga
Satuan
Zona IV
Jumlah
Harga
77,870.00
135,200.00
22,653.58
23,361.00
20,280.00
Harga
Satuan
Jumlah
Harga
85,657.00
148,720.00
25,697.10
22,308.00
II. BAHAN
Jumlah
33,570.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Jumlah
Zona I
Uraian
I. UPAH
Pekerja
Mandor
Org
Org
0.350
0.020
Harga
Satuan
Jumlah
Zona II
Jumlah
Harga
59,900.00
104,000.00
38,941.20
20,965.00
2,080.00
Harga
Satuan
Jumlah
Zona III
Jumlah
Harga
69,484.00
120,640.00
43,641.00
24,319.40
2,412.80
Harga
Satuan
Zona IV
Jumlah
Harga
77,870.00
135,200.00
48,005.10
27,254.50
2,704.00
Harga
Satuan
Jumlah
Harga
85,657.00
148,720.00
29,979.95
2,974.40
II. BAHAN
Jumlah
23,045.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Jumlah
Zona I
Uraian
I. UPAH
Pekerja
Mandor
Org
Org
0.333
0.011
Harga
Satuan
Jumlah
Zona II
Jumlah
Harga
59,900.00
104,000.00
26,732.20
19,946.70
1,144.00
Harga
Satuan
Jumlah
Zona III
Jumlah
Harga
69,484.00
120,640.00
29,958.50
23,138.17
1,327.04
Harga
Satuan
Zona IV
Jumlah
Harga
77,870.00
135,200.00
32,954.35
25,930.71
1,487.20
Harga
Satuan
Jumlah
Harga
85,657.00
148,720.00
28,523.78
1,635.92
II. BAHAN
Jumlah
21,090.70
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Jumlah
Zona I
I. UPAH
Pekerja
Mandor
Uraian
Org
Org
0.500
0.020
Harga
Satuan
59,900.00
104,000.00
24,465.21
Jumlah
Zona II
Jumlah
Harga
29,950.00
2,080.00
Harga
Satuan
69,484.00
120,640.00
27,417.91
Jumlah
Zona III
Jumlah
Harga
34,742.00
2,412.80
Harga
Satuan
77,870.00
135,200.00
30,159.70
Zona IV
Jumlah
Harga
38,935.00
2,704.00
Harga
Satuan
85,657.00
148,720.00
Jumlah
Harga
42,828.50
2,974.40
II. BAHAN
Jumlah
32,030.00
Jumlah
37,154.80
Jumlah
41,639.00
Jumlah
45,802.90
Halaman 12
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Mandor
Org
Org
0.400
0.015
Harga
Satuan
Zona II
Jumlah
Harga
59,900.00
104,000.00
23,960.00
1,560.00
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
120,640.00
27,793.60
1,809.60
Harga
Satuan
Zona IV
Jumlah
Harga
77,870.00
135,200.00
31,148.00
2,028.00
Harga
Satuan
Jumlah
Harga
85,657.00
148,720.00
34,262.80
2,230.80
II. BAHAN
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
25,520.00
Jumlah
Zona I
Uraian
I. UPAH
Pekerja
Mandor
Org
Org
0.500
0.050
Harga
Satuan
Jumlah
Zona II
Jumlah
Harga
59,900.00
104,000.00
29,603.20
29,950.00
5,200.00
Harga
Satuan
Jumlah
Zona III
Jumlah
Harga
69,484.00
120,640.00
33,176.00
34,742.00
6,032.00
Harga
Satuan
Zona IV
Jumlah
Harga
77,870.00
135,200.00
36,493.60
38,935.00
6,760.00
Harga
Satuan
Jumlah
Harga
85,657.00
148,720.00
42,828.50
7,436.00
II. BAHAN
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
35,150.00
Jumlah
Zona I
Uraian
I. UPAH
Pekerja
Mandor
Harga
Satuan
0.300
0.010
59,900.00
104,000.00
M3
1.200
101,600.00
II. BAHAN
Pasir Urug
Jumlah
Harga
Satuan
69,484.00
120,640.00
-
121,920.00
117,856.00
140,930.00
No
Satuan Indeks
Jumlah
Zona I
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Harga
Satuan
Harga
Satuan
Harga
Satuan
Jumlah
77,870.00
135,200.00
-
141,427.20
132,080.00
163,478.80
Jumlah
Harga
Satuan
Harga
Satuan
Jumlah
Harga
23,361.00
1,352.00
-
85,657.00
148,720.00
-
158,496.00
145,288.00
183,209.00
25,697.10
1,487.20
174,345.60
Jumlah
Zona III
Jumlah
Harga
50,264.50
Zona IV
Jumlah
Harga
20,845.20
1,206.40
-
Zona II
Jumlah
Harga
45,695.00
Zona III
Jumlah
Harga
17,970.00
1,040.00
-
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Jumlah
Zona II
Jumlah
Harga
Org
Org
40,774.00
201,529.90
Zona IV
Jumlah
Harga
Harga
Satuan
Jumlah
Harga
Org
Org
Org
Org
0.800
0.400
0.040
0.080
59,900.00
77,700.00
89,600.00
104,000.00
47,920.00
31,080.00
3,584.00
8,320.00
-
69,484.00
90,132.00
103,936.00
120,640.00
-
55,587.20
36,052.80
4,157.44
9,651.20
-
77,870.00
101,010.00
116,480.00
135,200.00
-
62,296.00
40,404.00
4,659.20
10,816.00
-
85,657.00
111,111.00
128,128.00
148,720.00
-
68,525.60
44,444.40
5,125.12
11,897.60
-
0.400
0.135
0.948
131,500.00
298,900.00
52,600.00
40,351.50
-
152,540.00
346,724.00
-
61,016.00
46,807.74
-
170,950.00
388,570.00
-
68,380.00
52,456.95
-
188,045.00
427,427.00
-
75,218.00
57,702.65
-
II. BAHAN
Jumlah
183,855.50
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Jumlah
Zona I
Uraian
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
II. BAHAN
Kapur padam
Tanah liat
Harga
Satuan
0.800
0.400
0.040
0.080
59,900.00
77,700.00
89,600.00
104,000.00
M3
M3
0.248
1.240
298,900.00
Jumlah
47,920.00
31,080.00
3,584.00
8,320.00
74,127.20
165,031.20
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Jumlah
Harga
Satuan
I. UPAH
Pekerja
Mandor
Org
Org
0.150
0.015
59,900.00
104,000.00
II. BAHAN
Ijuk
Kg
6.000
24,100.00
Jumlah
55,587.20
36,052.80
4,157.44
9,651.20
85,987.55
191,436.19
Harga
Satuan
8,985.00
1,560.00
144,600.00
155,145.00
Harga
Satuan
69,484.00
120,640.00
27,956.00
Jumlah
Jumlah
Jumlah
62,296.00
40,404.00
4,659.20
10,816.00
96,365.36
214,540.56
Harga
Satuan
10,422.60
1,809.60
167,736.00
179,968.20
Harga
Satuan
77,870.00
135,200.00
31,330.00
Jumlah
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
427,427.00
-
68,525.60
44,444.40
5,125.12
11,897.60
106,001.90
-
Jumlah
Zona III
Jumlah
Harga
262,913.37
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
388,570.00
-
Zona II
Jumlah
Harga
239,012.15
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
346,724.00
-
Zona I
Uraian
Jumlah
Zona II
Jumlah
Harga
Org
Org
Org
Org
213,272.38
235,994.62
Zona IV
Jumlah
Harga
11,680.50
2,028.00
187,980.00
201,688.50
Harga
Satuan
85,657.00
148,720.00
34,463.00
Jumlah
Jumlah
Harga
12,848.55
2,230.80
206,778.00
221,857.35
Halaman 13
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Mandor
Harga
Satuan
Org
Org
0.250
0.025
59,900.00
104,000.00
M3
1.200
251,000.00
II. BAHAN
Sirtu
Zona II
Jumlah
Harga
Jumlah
Harga
Satuan
14,975.00
2,600.00
-
69,484.00
120,640.00
-
301,200.00
291,160.00
318,775.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Jumlah
Zona I
Uraian
I. UPAH
Pekerja
Mandor
II. BAHAN
Batu Belah
Kerikil
Pasir Pasang
Harga
Satuan
1.000
0.100
59,900.00
104,000.00
M3
0.275
M3
M3
0.030
0.050
Harga
Satuan
77,870.00
135,200.00
-
349,392.00
326,300.00
369,779.00
Harga
Satuan
Zona IV
Jumlah
Harga
17,371.00
3,016.00
-
Jumlah
Zona II
Jumlah
Harga
Org
Org
Zona III
Jumlah
Harga
Harga
Satuan
19,467.50
3,380.00
-
85,657.00
148,720.00
-
21,414.25
3,718.00
-
391,560.00
358,930.00
430,716.00
455,848.25
414,407.50
Jumlah
Zona III
Jumlah
Harga
Harga
Satuan
Jumlah
Harga
Zona IV
Jumlah
Harga
Harga
Satuan
Jumlah
Harga
353,800.00
59,900.00
10,400.00
97,295.00
69,484.00
120,640.00
410,408.00
69,484.00
12,064.00
112,862.20
77,870.00
135,200.00
459,940.00
77,870.00
13,520.00
126,483.50
85,657.00
148,720.00
505,934.00
85,657.00
14,872.00
139,131.85
289,200.00
131,500.00
8,676.00
6,575.00
335,472.00
152,540.00
10,064.16
7,627.00
375,960.00
170,950.00
11,278.80
8,547.50
413,556.00
188,045.00
12,406.68
9,402.25
Jumlah
182,846.00
Jumlah
212,101.36
Jumlah
237,699.80
Jumlah
261,469.78
PEKERJAAN PONDASI
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang batu
Kepala tukang
Mandor
II. BAHAN
Batu belah 15/20 cm
Semen portland
Pasir pasang
Harga
Satuan
Zona II
Jumlah
Harga
Harga
Satuan
Zona IV
Jumlah
Harga
1.500
0.600
0.060
0.075
59,900.00
77,700.00
89,600.00
104,000.00
89,850.00
46,620.00
5,376.00
7,800.00
69,484.00
90,132.00
103,936.00
120,640.00
104,226.00
54,079.20
6,236.16
9,048.00
77,870.00
101,010.00
116,480.00
135,200.00
116,805.00
60,606.00
6,988.80
10,140.00
M3
Kg
1.100
392.000
353,800.00
1,434.00
131,500.00
389,180.00
562,128.00
41,291.00
410,408.00
1,663.44
152,540.00
451,448.80
652,068.48
47,897.56
459,940.00
1,864.20
170,950.00
505,934.00
730,766.40
53,678.30
0.314
Jumlah
1,142,245.00
No
Satuan Indeks
Jumlah
Zona I
Harga
Satuan
Org
Org
Org
Org
1.500
0.600
0.060
0.075
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Batu belah 15/20 cm
Semen portland
Pasir pasang
M3
Kg
M3
1.100
267.000
0.427
353,800.00
1,434.00
131,500.00
Jumlah
89,850.00
46,620.00
5,376.00
7,800.00
389,180.00
382,878.00
56,150.50
977,854.50
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Jumlah
Jumlah
104,226.00
54,079.20
6,236.16
9,048.00
451,448.80
444,138.48
65,134.58
1,134,311.22
Harga
Satuan
Jumlah
Harga
Satuan
116,805.00
60,606.00
6,988.80
10,140.00
505,934.00
497,741.40
72,995.65
1,271,210.85
Harga
Satuan
Oh
Oh
Oh
Oh
1.500
0.600
0.060
0.075
59,900.00
77,700.00
89,600.00
104,000.00
89,850.00
46,620.00
5,376.00
7,800.00
69,484.00
90,132.00
103,936.00
120,640.00
104,226.00
54,079.20
6,236.16
9,048.00
77,870.00
101,010.00
116,480.00
135,200.00
116,805.00
60,606.00
6,988.80
10,140.00
II. BAHAN
Batu belah 15/20 cm
Semen portland
Pasir pasang
M3
Kg
M3
1.100
392.000
0.314
353,800.00
1,434.00
131,500.00
389,180.00
562,128.00
41,291.00
410,408.00
1,663.44
152,540.00
451,448.80
652,068.48
47,897.56
459,940.00
1,864.20
170,950.00
505,934.00
730,766.40
53,678.30
1,142,245.00
Jumlah
1,325,004.20
Jumlah
128,485.50
66,666.60
7,687.68
11,154.00
556,527.40
803,843.04
59,046.13
Jumlah
1,633,410.35
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
505,934.00
2,050.62
188,045.00
128,485.50
66,666.60
7,687.68
11,154.00
556,527.40
547,515.54
80,295.22
Jumlah
1,398,331.94
Zona IV
Jumlah
Harga
I. UPAH
Pekerja
Tukang batu
Kepala tukang
Mandor
Jumlah
85,657.00
111,111.00
128,128.00
148,720.00
505,934.00
2,050.62
188,045.00
Zona III
Jumlah
Harga
Jumlah
Harga
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
459,940.00
1,864.20
170,950.00
Zona II
Jumlah
Harga
1,484,918.50
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
410,408.00
1,663.44
152,540.00
Zona I
Harga
Satuan
1,325,004.20
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang batu
Kepala tukang
Mandor
Uraian
Harga
Satuan
Oh
Oh
Oh
Oh
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Zona III
Jumlah
Harga
1,484,918.50
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
505,934.00
2,050.62
188,045.00
Jumlah
Jumlah
Harga
128,485.50
66,666.60
7,687.68
11,154.00
556,527.40
803,843.04
59,046.13
1,633,410.35
Halaman 14
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang batu
Kepala tukang
Mandor
Harga
Satuan
Zona II
Jumlah
Harga
Harga
Satuan
Zona III
Jumlah
Harga
Harga
Satuan
Zona IV
Jumlah
Harga
Harga
Satuan
Jumlah
Harga
Oh
Oh
Oh
Oh
1.500
0.600
0.060
0.075
59,900.00
77,700.00
89,600.00
104,000.00
89,850.00
46,620.00
5,376.00
7,800.00
69,484.00
90,132.00
103,936.00
120,640.00
104,226.00
54,079.20
6,236.16
9,048.00
77,870.00
101,010.00
116,480.00
135,200.00
116,805.00
60,606.00
6,988.80
10,140.00
85,657.00
111,111.00
128,128.00
148,720.00
-
128,485.50
66,666.60
7,687.68
11,154.00
-
M3
Kg
1.200
202.000
353,800.00
1,434.00
424,560.00
289,668.00
410,408.00
1,663.44
492,489.60
336,014.88
459,940.00
1,864.20
551,928.00
376,568.40
505,934.00
2,050.62
607,120.80
414,225.24
Pasir pasang
0.485
131,500.00
63,777.50
152,540.00
73,981.90
170,950.00
82,910.75
188,045.00
II. BAHAN
Jumlah
927,651.50
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Jumlah
Zona I
Uraian
I. UPAH
Pekerja
Tukang batu
Kepala tukang
Mandor
Harga
Satuan
1,076,075.74
Jumlah
Zona II
Jumlah
Harga
Harga
Satuan
1,205,946.95
Zona III
Jumlah
Harga
Harga
Satuan
91,201.83
Jumlah
1,326,541.65
Zona IV
Jumlah
Harga
Harga
Satuan
Jumlah
Harga
Oh
Oh
Oh
Oh
1.500
0.600
0.060
0.075
59,900.00
77,700.00
89,600.00
104,000.00
89,850.00
46,620.00
5,376.00
7,800.00
-
69,484.00
90,132.00
103,936.00
120,640.00
-
104,226.00
54,079.20
6,236.16
9,048.00
-
77,870.00
101,010.00
116,480.00
135,200.00
-
116,805.00
60,606.00
6,988.80
10,140.00
-
85,657.00
111,111.00
128,128.00
148,720.00
-
128,485.50
66,666.60
7,687.68
11,154.00
-
M3
Kg
1.200
163.000
353,800.00
1,434.00
424,560.00
233,742.00
410,408.00
1,663.44
492,489.60
271,140.72
459,940.00
1,864.20
551,928.00
303,864.60
505,934.00
2,050.62
607,120.80
334,251.06
Pasir pasang
M3
0.520
131,500.00
68,380.00
152,540.00
79,320.80
170,950.00
88,894.00
188,045.00
II. BAHAN
Jumlah
876,328.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Jumlah
Zona I
Uraian
I. UPAH
Pekerja
Tukang batu
Kepala tukang
Mandor
Harga
Satuan
Harga
Satuan
Zona IV
Jumlah
Harga
Harga
Satuan
Jumlah
Harga
89,850.00
46,620.00
5,376.00
7,800.00
-
69,484.00
90,132.00
103,936.00
120,640.00
-
104,226.00
54,079.20
6,236.16
9,048.00
-
77,870.00
101,010.00
116,480.00
135,200.00
-
116,805.00
60,606.00
6,988.80
10,140.00
-
85,657.00
111,111.00
128,128.00
148,720.00
-
128,485.50
66,666.60
7,687.68
11,154.00
-
M3
Kg
1.200
136.000
0.544
353,800.00
1,434.00
131,500.00
424,560.00
195,024.00
71,536.00
410,408.00
1,663.44
152,540.00
492,489.60
226,227.84
82,981.76
459,940.00
1,864.20
170,950.00
551,928.00
253,531.20
92,996.80
505,934.00
2,050.62
188,045.00
607,120.80
278,884.32
102,296.48
840,766.00
No
Satuan Indeks
Jumlah
Zona I
Harga
Satuan
Oh
Oh
Oh
Oh
1.500
0.600
0.060
0.075
59,900.00
77,700.00
89,600.00
104,000.00
M3
Kg
1.200
117.000
0.561
353,800.00
1,434.00
131,500.00
M3
Jumlah
89,850.00
46,620.00
5,376.00
7,800.00
424,560.00
167,778.00
73,771.50
815,755.50
No
Satuan Indeks
Harga
Satuan
I. UPAH
Pekerja
Tukang batu
Kepala tukang
Mandor
Oh
Oh
Oh
Oh
1.500
0.600
0.060
0.075
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Batu belah 15/20 cm
Semen portland
Pasir pasang
M3
Kg
M3
1.200
91.000
0.584
353,800.00
1,434.00
131,500.00
Jumlah
Jumlah
Jumlah
104,226.00
54,079.20
6,236.16
9,048.00
492,489.60
194,622.48
85,574.94
946,276.38
Harga
Satuan
89,850.00
46,620.00
5,376.00
7,800.00
424,560.00
130,494.00
76,796.00
781,496.00
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
410,408.00
1,663.44
152,540.00
Jumlah
Jumlah
Jumlah
116,805.00
60,606.00
6,988.80
10,140.00
551,928.00
218,111.40
95,902.95
1,060,482.15
Harga
Satuan
104,226.00
54,079.20
6,236.16
9,048.00
492,489.60
151,373.04
89,083.36
906,535.36
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
459,940.00
1,864.20
170,950.00
Jumlah
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
505,934.00
2,050.62
188,045.00
128,485.50
66,666.60
7,687.68
11,154.00
607,120.80
239,922.54
105,493.25
Jumlah
Zona III
Jumlah
Harga
1,202,295.38
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
459,940.00
1,864.20
170,950.00
Zona II
Jumlah
Harga
1,092,995.80
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
410,408.00
1,663.44
152,540.00
Zona I
Harga
Satuan
975,288.56
Zona II
Jumlah
Harga
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Harga
Satuan
1,253,149.04
59,900.00
77,700.00
89,600.00
104,000.00
Jumlah
II. BAHAN
Batu belah 15/20 cm
Semen portland
Pasir pasang
Zona III
Jumlah
Harga
97,783.40
Jumlah
1.500
0.600
0.060
0.075
I. UPAH
Pekerja
Tukang batu
Kepala tukang
Mandor
1,139,226.40
Oh
Oh
Oh
Oh
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Jumlah
Zona II
Jumlah
Harga
II. BAHAN
Batu belah 15/20 cm
Semen portland
Pasir pasang
1,016,540.48
1,166,530.37
Zona IV
Jumlah
Harga
116,805.00
60,606.00
6,988.80
10,140.00
551,928.00
169,642.20
99,834.80
1,015,944.80
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
505,934.00
2,050.62
188,045.00
Jumlah
Jumlah
Harga
128,485.50
66,666.60
7,687.68
11,154.00
607,120.80
186,606.42
109,818.28
1,117,539.28
Halaman 15
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Harga
Satuan
Oh
Oh
Oh
Oh
0.780
0.390
0.390
0.039
59,900.00
77,700.00
89,600.00
104,000.00
46,722.00
30,303.00
34,944.00
4,056.00
-
M3
M3
1.200
0.432
353,800.00
101,600.00
424,560.00
43,891.20
584,476.20
II. BAHAN
Batu belah 15/20 cm
Pasir Urug
Zona II
Jumlah
Harga
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
410,408.00
117,856.00
Jumlah
Zona I
Uraian
Harga
Satuan
Oh
Oh
Oh
Oh
3.000
0.850
0.085
0.150
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Besi beton
Semen portland
Pasir beton
Kg
Kg
M3
126.000
194.000
0.312
Koral beton
Kawat beton
M3
Kg
0.468
1.800
Harga
Satuan
551,928.00
57,058.56
759,819.06
85,657.00
111,111.00
128,128.00
148,720.00
505,934.00
145,288.00
Jumlah
Zona III
Jumlah
Harga
Harga
Satuan
66,812.46
43,333.29
49,969.92
5,800.08
607,120.80
62,764.42
835,800.97
Zona IV
Jumlah
Harga
Harga
Satuan
Jumlah
Harga
24,800.00
1,434.00
227,100.00
77,870.00
101,010.00
116,480.00
135,200.00
32,240.00
1,864.20
295,230.00
233,610.00
85,858.50
9,900.80
20,280.00
4,062,240.00
361,654.80
92,111.76
85,657.00
111,111.00
128,128.00
148,720.00
35,464.00
2,050.62
324,753.00
256,971.00
94,444.35
10,890.88
22,308.00
4,468,464.00
397,820.28
101,322.94
289,200.00
27,600.00
135,345.60
49,680.00
335,472.00
32,016.00
157,000.90
57,628.80
375,960.00
35,880.00
175,949.28
64,584.00
413,556.00
39,468.00
193,544.21
71,042.40
3,927,837.80
No
Satuan Indeks
Jumlah
Zona I
Harga
Satuan
2.380
0.300
0.030
0.080
59,900.00
77,700.00
89,600.00
104,000.00
M3
Kg
0.450
194.000
0.312
0.468
353,800.00
1,434.00
227,100.00
289,200.00
Jumlah
4,556,291.85
Jumlah
Zona II
Jumlah
Harga
Oh
Oh
Oh
Oh
M3
M3
459,940.00
132,080.00
Jumlah
60,738.60
39,393.90
45,427.20
5,272.80
-
Jumlah
Harga
208,452.00
76,612.20
8,834.56
18,096.00
3,624,768.00
322,707.36
82,192.03
Jumlah
II. BAHAN
Batu belah 15/20 cm
Semen portland
Pasir beton
Koral beton
77,870.00
101,010.00
116,480.00
135,200.00
-
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
28,768.00
1,663.44
263,436.00
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
492,489.60
50,913.79
677,992.39
Zona IV
Jumlah
Harga
179,700.00
66,045.00
7,616.00
15,600.00
3,124,800.00
278,196.00
70,855.20
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
54,197.52
35,151.48
40,535.04
4,704.96
-
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Zona III
Jumlah
Harga
142,562.00
23,310.00
2,688.00
8,320.00
159,210.00
278,196.00
70,855.20
135,345.60
820,486.80
Harga
Satuan
Jumlah
Jumlah
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
410,408.00
1,663.44
263,436.00
335,472.00
5,106,189.14
165,371.92
27,039.60
3,118.08
9,651.20
184,683.60
322,707.36
82,192.03
157,000.90
951,764.69
Harga
Satuan
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
459,940.00
1,864.20
295,230.00
375,960.00
Jumlah
5,616,808.05
185,330.60
30,303.00
3,494.40
10,816.00
206,973.00
361,654.80
92,111.76
175,949.28
1,066,632.84
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
505,934.00
2,050.62
324,753.00
413,556.00
203,863.66
33,333.30
3,843.84
11,897.60
227,670.30
397,820.28
101,322.94
193,544.21
Jumlah
1,173,296.12
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
II. BAHAN
Bata Merah 5 x 11 x 22 cm
Semen Portland
Pasir Pasang
Harga
Satuan
Oh
Oh
Oh
Oh
0.650
0.200
0.020
0.030
59,900.00
77,700.00
89,600.00
104,000.00
Bh
Kg
140.000
64.030
0.059
1,500.00
1,434.00
131,500.00
M3
Zona II
Jumlah
Harga
Jumlah
38,935.00
15,540.00
1,792.00
3,120.00
210,000.00
91,819.02
7,758.50
368,964.52
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
1,740.00
1,663.44
152,540.00
Jumlah
Zona I
Uraian
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
II. BAHAN
Bata Merah 5 x 11 x 22 cm
Semen Portland
Pasir Pasang
Harga
Satuan
Oh
Oh
Oh
Oh
0.600
0.200
0.020
0.030
59,900.00
77,700.00
89,600.00
104,000.00
Bh
Kg
140.000
43.500
0.080
1,500.00
1,434.00
131,500.00
Jumlah
Zona III
Jumlah
Harga
45,164.60
18,026.40
2,078.72
3,619.20
243,600.00
106,510.06
8,999.86
427,998.84
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
1,950.00
1,864.20
170,950.00
Jumlah
Zona II
Jumlah
Harga
35,940.00
15,540.00
1,792.00
3,120.00
210,000.00
62,379.00
10,520.00
339,291.00
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
1,740.00
1,663.44
152,540.00
Jumlah
Zona IV
Jumlah
Harga
50,615.50
20,202.00
2,329.60
4,056.00
273,000.00
119,364.73
10,086.05
479,653.88
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
2,145.00
2,050.62
188,045.00
41,690.40
18,026.40
2,078.72
3,619.20
243,600.00
72,359.64
12,203.20
393,577.56
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
1,950.00
1,864.20
170,950.00
Jumlah
55,677.05
22,222.20
2,562.56
4,461.60
300,300.00
131,301.20
11,094.66
Jumlah
Zona III
Jumlah
Harga
Jumlah
Harga
527,619.26
Zona IV
Jumlah
Harga
46,722.00
20,202.00
2,329.60
4,056.00
273,000.00
81,092.70
13,676.00
441,078.30
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
2,145.00
2,050.62
188,045.00
Jumlah
Jumlah
Harga
51,394.20
22,222.20
2,562.56
4,461.60
300,300.00
89,201.97
15,043.60
485,186.13
Halaman 16
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.600
0.200
0.020
0.030
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Bata Merah 5 x 11 x 22 cm
Semen portland
Bh
Kg
140.000
32.950
1,500.00
1,434.00
0.091
131,500.00
Pasir Pasang
Zona II
Jumlah
Harga
Jumlah
Harga
Satuan
35,940.00
15,540.00
1,792.00
3,120.00
210,000.00
47,250.30
69,484.00
90,132.00
103,936.00
120,640.00
1,740.00
1,663.44
11,966.50
152,540.00
325,608.80
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Jumlah
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
II. BAHAN
Bata Merah 5 x 11 x 22 cm
Semen portland
Pasir Pasang
Harga
Satuan
0.600
0.200
0.020
0.030
59,900.00
77,700.00
89,600.00
104,000.00
Bh
Kg
140.000
26.550
0.093
1,500.00
1,434.00
131,500.00
M3
Jumlah
Harga
Satuan
II. BAHAN
Bata Merah 5 x 11 x 22 cm
Semen portland
Pasir Pasang
Bh
Kg
M3
140.000
22.200
0.102
1,500.00
1,434.00
131,500.00
Jumlah
0.600
0.200
0.020
0.030
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Bata Merah 5 x 11 x 22 cm
Semen portland
Pasir Pasang
Bh
Kg
M3
140.000
18.500
0.122
1,500.00
1,434.00
131,500.00
Jumlah
Zona II
Harga
Satuan
35,940.00
15,540.00
1,792.00
3,120.00
210,000.00
31,834.80
13,413.00
311,639.80
35,940.00
15,540.00
1,792.00
3,120.00
210,000.00
26,529.00
16,043.00
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Bata Merah 5 x 11 x 22 cm
Semen portland
Pasir Pasang
Bh
Kg
M3
70.000
27.800
0.023
1,500.00
1,434.00
131,500.00
Jumlah
41,690.40
18,026.40
2,078.72
3,619.20
243,600.00
30,773.64
18,609.88
Jumlah
405,131.74
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
2,145.00
2,050.62
188,045.00
51,394.20
22,222.20
2,562.56
4,461.60
300,300.00
45,523.76
19,180.59
Jumlah
445,644.91
358,398.24
Harga
Satuan
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
1,950.00
1,864.20
170,950.00
Jumlah
46,722.00
20,202.00
2,329.60
4,056.00
273,000.00
34,487.70
20,855.90
401,653.20
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
2,145.00
2,050.62
188,045.00
51,394.20
22,222.20
2,562.56
4,461.60
300,300.00
37,936.47
22,941.49
Jumlah
441,818.52
Zona I
0.320
0.100
0.010
0.015
Jumlah
46,722.00
20,202.00
2,329.60
4,056.00
273,000.00
41,385.24
17,436.90
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
1,740.00
1,663.44
152,540.00
308,964.00
Zona II
Jumlah
Harga
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
1,950.00
1,864.20
170,950.00
Zona II
Harga
Satuan
Satuan Indeks
Oh
Oh
Oh
Oh
361,502.17
Harga
Satuan
51,394.20
22,222.20
2,562.56
4,461.60
300,300.00
54,443.96
17,488.19
452,872.71
No
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
41,690.40
18,026.40
2,078.72
3,619.20
243,600.00
36,928.37
15,559.08
Jumlah
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
1,740.00
1,663.44
152,540.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Jumlah
Harga
Jumlah
Zona I
Oh
Oh
Oh
Oh
Harga
Satuan
411,702.46
Jumlah
Harga
17,112.10
465,620.58
Zona IV
Jumlah
Harga
Jumlah
Satuan Indeks
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Harga
Satuan
367,365.27
No
Harga
Satuan
Zona III
Jumlah
Harga
Jumlah
51,394.20
22,222.20
2,562.56
4,461.60
300,300.00
67,567.93
Jumlah
316,694.20
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
188,045.00
1.02
85,657.00
111,111.00
128,128.00
148,720.00
2,145.00
2,050.62
188,045.00
Jumlah
Harga
59,900.00
77,700.00
89,600.00
104,000.00
15,556.45
423,291.44
46,722.00
20,202.00
2,329.60
4,056.00
273,000.00
49,494.51
15,898.35
Zona I
0.600
0.200
0.020
0.030
85,657.00
111,111.00
128,128.00
148,720.00
2,145.00
2,050.62
1.02
77,870.00
101,010.00
116,480.00
135,200.00
1,950.00
1,864.20
170,950.00
Satuan Indeks
Oh
Oh
Oh
Oh
Jumlah
46,722.00
20,202.00
2,329.60
4,056.00
273,000.00
61,425.39
41,690.40
18,026.40
2,078.72
3,619.20
243,600.00
44,164.33
14,186.22
No
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
170,950.00
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
1,740.00
1,663.44
152,540.00
Harga
Satuan
13,881.14
Harga
Satuan
35,940.00
15,540.00
1,792.00
3,120.00
210,000.00
38,072.70
12,229.50
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
77,870.00
101,010.00
116,480.00
135,200.00
1,950.00
1,864.20
377,706.21
Zona IV
Jumlah
Harga
41,690.40
18,026.40
2,078.72
3,619.20
243,600.00
54,810.35
Zona II
Jumlah
Harga
Oh
Oh
Oh
Oh
Harga
Satuan
Zona I
Uraian
Zona III
Jumlah
Harga
Harga
Satuan
Zona III
Jumlah
Harga
Harga
Satuan
Zona IV
Jumlah
Harga
Harga
Satuan
Jumlah
Harga
19,168.00
7,770.00
896.00
1,560.00
105,000.00
39,865.20
3,024.50
1.01
69,484.00
90,132.00
103,936.00
120,640.00
1,740.00
1,663.44
152,540.00
22,234.88
9,013.20
1,039.36
1,809.60
121,800.00
46,243.63
3,508.42
1.02
77,870.00
101,010.00
116,480.00
135,200.00
1,950.00
1,864.20
170,950.00
24,918.40
10,101.00
1,164.80
2,028.00
136,500.00
51,824.76
3,931.85
1.02
85,657.00
111,111.00
128,128.00
148,720.00
2,145.00
2,050.62
188,045.00
27,410.24
11,111.10
1,281.28
2,230.80
150,150.00
57,007.24
4,325.04
177,283.70
Jumlah
205,649.09
Jumlah
230,468.81
Jumlah
253,515.69
Halaman 17
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
II. BAHAN
Bata Merah 5 x 11 x 22 cm
Semen portland
Pasir Pasang
Harga
Satuan
Oh
Oh
Oh
Oh
3.000
0.100
0.010
0.015
59,900.00
77,700.00
89,600.00
104,000.00
Bh
Kg
70.000
18.500
0.038
1,500.00
1,434.00
131,500.00
M3
Zona II
Jumlah
Harga
Jumlah
Harga
Satuan
179,700.00
7,770.00
896.00
1,560.00
105,000.00
26,529.00
4,997.00
69,484.00
90,132.00
103,936.00
120,640.00
1,740.00
1,663.44
152,540.00
326,452.00
No
Satuan Indeks
Harga
Satuan
Oh
Oh
Oh
Oh
3.000
0.100
0.010
0.015
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Bata Merah 5 x 11 x 22 cm
Semen portland
Pasir Pasang
Bh
Kg
M3
70.000
14.370
0.040
1,500.00
1,434.00
131,500.00
Jumlah
Harga
Satuan
179,700.00
7,770.00
896.00
1,560.00
105,000.00
20,606.58
5,260.00
No
Satuan Indeks
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
3.000
0.100
0.010
0.015
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Bata Merah 5 x 11 x 22 cm
Semen portland
Pasir Pasang
Bh
Kg
M3
70.000
11.500
0.043
1,500.00
1,434.00
131,500.00
Jumlah
Harga
Satuan
179,700.00
7,770.00
896.00
1,560.00
105,000.00
16,491.00
5,654.50
317,071.50
No
Satuan Indeks
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
3.000
0.100
0.010
0.015
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Bata Merah 5 x 11 x 22 cm
Semen portland
Pasir Pasang
Bh
Kg
M3
70.000
9.680
0.043
1,500.00
1,434.00
131,500.00
Jumlah
314,461.62
No
Satuan Indeks
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
II. BAHAN
Bata Merah 5 x 11 x 22 cm
Semen portland
Pasir Pasang
Oh
Oh
Oh
Oh
3.000
0.100
0.010
0.015
59,900.00
77,700.00
89,600.00
104,000.00
Bh
Kg
70.000
8.320
0.490
1,500.00
1,434.00
131,500.00
M3
Jumlah
Jumlah
Harga
Satuan
179,700.00
7,770.00
896.00
1,560.00
105,000.00
11,930.88
64,435.00
371,291.88
417,030.35
85,657.00
111,111.00
128,128.00
148,720.00
2,145.00
2,050.62
188,045.00
256,971.00
11,111.10
1,281.28
2,230.80
150,150.00
29,467.41
7,521.80
Jumlah
458,733.39
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
1,950.00
1,864.20
170,950.00
Jumlah
364,775.48
Harga
Satuan
233,610.00
10,101.00
1,164.80
2,028.00
136,500.00
21,438.30
7,350.85
412,192.95
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
2,145.00
2,050.62
188,045.00
256,971.00
11,111.10
1,281.28
2,230.80
150,150.00
23,582.13
8,085.94
Jumlah
453,412.25
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
1,950.00
1,864.20
170,950.00
Jumlah
Zona II
Jumlah
Harga
233,610.00
10,101.00
1,164.80
2,028.00
136,500.00
26,788.55
6,838.00
Jumlah
Harga
233,610.00
10,101.00
1,164.80
2,028.00
136,500.00
18,045.46
7,350.85
408,800.11
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
2,145.00
2,050.62
188,045.00
256,971.00
11,111.10
1,281.28
2,230.80
150,150.00
19,850.00
8,085.94
Jumlah
449,680.12
Zona I
Harga
Satuan
208,452.00
9,013.20
1,039.36
1,809.60
121,800.00
16,102.10
6,559.22
Jumlah
466,826.36
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
1,740.00
1,663.44
152,540.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
367,802.94
Harga
Satuan
179,700.00
7,770.00
896.00
1,560.00
105,000.00
13,881.12
5,654.50
Jumlah
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
1,950.00
1,864.20
170,950.00
Zona II
Jumlah
Harga
256,971.00
11,111.10
1,281.28
2,230.80
150,150.00
37,936.47
7,145.71
Zona I
Harga
Satuan
208,452.00
9,013.20
1,039.36
1,809.60
121,800.00
19,129.56
6,559.22
Jumlah
85,657.00
111,111.00
128,128.00
148,720.00
2,145.00
2,050.62
188,045.00
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
1,740.00
1,663.44
152,540.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
372,119.39
Harga
Satuan
Zona II
Jumlah
Harga
424,387.60
Jumlah
Harga
Zona I
Harga
Satuan
208,452.00
9,013.20
1,039.36
1,809.60
121,800.00
23,903.63
6,101.60
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Jumlah
233,610.00
10,101.00
1,164.80
2,028.00
136,500.00
34,487.70
6,496.10
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
1,740.00
1,663.44
152,540.00
320,792.58
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
1,950.00
1,864.20
170,950.00
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
378,684.32
Harga
Satuan
Zona I
Uraian
208,452.00
9,013.20
1,039.36
1,809.60
121,800.00
30,773.64
5,796.52
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Zona III
Jumlah
Harga
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
1,740.00
1,663.44
152,540.00
Jumlah
Zona III
Jumlah
Harga
208,452.00
9,013.20
1,039.36
1,809.60
121,800.00
13,839.82
74,744.60
430,698.58
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
1,950.00
1,864.20
170,950.00
Jumlah
Zona IV
Jumlah
Harga
233,610.00
10,101.00
1,164.80
2,028.00
136,500.00
15,510.14
83,765.50
482,679.44
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
2,145.00
2,050.62
188,045.00
Jumlah
Jumlah
Harga
256,971.00
11,111.10
1,281.28
2,230.80
150,150.00
17,061.16
92,142.05
530,947.39
Halaman 18
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
II. BAHAN
Bata Merah 5 x 11 x 22 cm
Semen portland
Pasir Pasang
Harga
Satuan
Oh
Oh
Oh
Oh
3.000
0.100
0.010
0.015
59,900.00
77,700.00
89,600.00
104,000.00
Bh
Kg
70.000
6.500
0.050
1,500.00
1,434.00
131,500.00
M3
Zona II
Jumlah
Harga
Jumlah
179,700.00
7,770.00
896.00
1,560.00
105,000.00
9,321.00
6,575.00
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
1,740.00
1,663.44
152,540.00
310,822.00
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
II. BAHAN
Hollow Block (HB.20)
Semen portland
Pasir Pasang
Besi Beton Polos
Harga
Satuan
3.000
0.150
0.015
0.150
59,900.00
77,700.00
89,600.00
104,000.00
Bh
Kg
12.500
30.320
0.728
0.280
4,100.00
1,434.00
131,500.00
24,800.00
M3
Kg
Jumlah
179,700.00
11,655.00
1,344.00
15,600.00
51,250.00
43,478.88
95,732.00
6,944.00
Harga
Satuan
405,703.88
No
Satuan Indeks
Oh
Oh
Oh
Oh
0.360
0.120
0.012
0.180
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Hollow Block (HB.15)
Semen portland
Pasir Pasang
Besi beton polos
Bh
Kg
M3
Kg
12.500
22.700
0.280
0.280
4,100.00
1,434.00
131,500.00
24,800.00
Jumlah
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Hollow Block (HB.15)
Semen portland
Pasir Pasang
Besi beton polos
Bh
Kg
M3
Kg
12.500
15.160
0.364
0.280
4,100.00
1,434.00
131,500.00
24,800.00
Jumlah
Jumlah
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
5,330.00
1,864.20
170,950.00
32,240.00
Jumlah
444,475.46
233,610.00
15,151.50
1,747.20
20,280.00
66,625.00
56,522.54
124,451.60
9,027.20
527,415.04
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
5,863.00
2,050.62
188,045.00
35,464.00
256,971.00
16,666.65
1,921.92
22,308.00
73,287.50
62,174.80
136,896.76
9,929.92
Jumlah
580,156.55
Zona III
Jumlah
Harga
Harga
Satuan
Zona IV
Jumlah
Harga
Harga
Satuan
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
5,330.00
1,864.20
170,950.00
32,240.00
28,033.20
12,121.20
1,397.76
24,336.00
66,625.00
42,317.34
47,866.00
9,027.20
1.02
85,657.00
111,111.00
128,128.00
148,720.00
5,863.00
2,050.62
188,045.00
35,464.00
30,836.52
13,333.32
1,537.54
26,769.60
73,287.50
46,549.07
52,652.60
9,929.92
178,249.00
Jumlah
206,768.84
Jumlah
231,723.70
Jumlah
254,896.07
Zona I
0.300
0.100
0.010
0.015
Harga
Satuan
256,971.00
11,111.10
1,281.28
2,230.80
150,150.00
13,329.03
9,402.25
25,014.24
10,815.84
1,247.23
21,715.20
59,450.00
37,760.09
42,711.20
8,055.04
Satuan Indeks
Oh
Oh
Oh
Oh
404,068.60
85,657.00
111,111.00
128,128.00
148,720.00
2,145.00
2,050.62
188,045.00
1.01
69,484.00
90,132.00
103,936.00
120,640.00
4,756.00
1,663.44
152,540.00
28,768.00
No
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
233,610.00
10,101.00
1,164.80
2,028.00
136,500.00
12,117.30
8,547.50
Jumlah
Harga
21,564.00
9,324.00
1,075.20
18,720.00
51,250.00
32,551.80
36,820.00
6,944.00
Harga
Satuan
470,616.50
Harga
Satuan
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Jumlah
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
77,870.00
101,010.00
116,480.00
135,200.00
1,950.00
1,864.20
170,950.00
Harga
Satuan
Zona I
Harga
Satuan
208,452.00
13,519.80
1,559.04
18,096.00
59,450.00
50,435.50
111,049.12
8,055.04
Jumlah
Zona IV
Jumlah
Harga
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
4,756.00
1,663.44
152,540.00
28,768.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
360,553.52
Harga
Satuan
Zona II
Jumlah
Harga
Oh
Oh
Oh
Oh
208,452.00
9,013.20
1,039.36
1,809.60
121,800.00
10,812.36
7,627.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Zona III
Jumlah
Harga
Zona II
Jumlah
Harga
17,970.00
7,770.00
896.00
1,560.00
51,250.00
21,739.44
47,866.00
6,944.00
155,995.44
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
4,756.00
1,663.44
152,540.00
28,768.00
Jumlah
Zona III
Jumlah
Harga
20,845.20
9,013.20
1,039.36
1,809.60
59,450.00
25,217.75
55,524.56
8,055.04
180,954.71
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
5,330.00
1,864.20
170,950.00
32,240.00
Jumlah
Zona IV
Jumlah
Harga
23,361.00
10,101.00
1,164.80
2,028.00
66,625.00
28,261.27
62,225.80
9,027.20
202,794.07
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
5,863.00
2,050.62
188,045.00
35,464.00
Jumlah
Jumlah
Harga
25,697.10
11,111.10
1,281.28
2,230.80
73,287.50
31,087.40
68,448.38
9,929.92
223,073.48
Halaman 19
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Batu
Tukang besi
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
Oh
0.370
0.157
0.007
0.016
0.019
II. BAHAN
Concrete block (CB. 20)
Semen portland
Harga
Satuan
Zona II
Jumlah
Harga
Zona III
Jumlah
Harga
Harga
Satuan
Zona IV
Jumlah
Harga
Harga
Satuan
Jumlah
Harga
Bh
Kg
12.500
14.050
4,500.00
1,434.00
22,163.00
12,198.90
543.90
1,469.44
1,924.00
56,250.00
20,147.70
Pasir Pasang
Besi beton polos
Pasir Beton
Paku biasa 2" - 5"
M3
Kg
M
Kg
0.042
3.870
0.004
0.006
131,500.00
24,800.00
227,100.00
13,700.00
5,523.00
95,976.00
908.40
82.20
Kayu terentang,meranti
Kawat beton
M3
Kg
0.001
0.030
27,600.00
828.00
32,016.00
960.48
35,880.00
1,076.40
39,468.00
1,184.04
Koral beton
M3
0.005
289,200.00
1,446.00
335,472.00
1,677.36
375,960.00
1,879.80
413,556.00
2,067.78
313,828.57
59,900.00
77,700.00
77,700.00
89,600.00
104,000.00
Harga
Satuan
Jumlah
219,460.54
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
69,484.00
90,132.00
90,132.00
103,936.00
120,640.00
5,220.00
1,663.44
25,709.08
14,150.72
630.92
1,704.55
2,231.84
65,250.00
23,371.33
77,870.00
101,010.00
101,010.00
116,480.00
135,200.00
5,850.00
1,864.20
28,811.90
15,858.57
707.07
1,910.27
2,501.20
73,125.00
26,192.01
85,657.00
111,111.00
111,111.00
128,128.00
148,720.00
6,435.00
2,050.62
31,693.09
17,444.43
777.78
2,101.30
2,751.32
80,437.50
28,811.21
152,540.00
28,768.00
263,436.00
15,892.00
6,406.68
111,332.16
1,053.74
95.35
170,950.00
32,240.00
295,230.00
17,810.00
7,179.90
124,768.80
1,180.92
106.86
188,045.00
35,464.00
324,753.00
19,591.00
7,897.89
137,245.68
1,299.01
117.55
Jumlah
I. UPAH
Pekerja
Tukang Batu
Tukang besi
Kepala Tukang
Mandor
II. BAHAN
Concrete block (CB. 15)
Semen portland
Pasir Pasang
Besi beton polos
Pasir Beton
Paku biasa 2" - 5"
Kayu terentang,meranti
Kawat beton
Koral beton
Harga
Satuan
0.340
0.130
0.007
0.014
0.017
59,900.00
77,700.00
77,700.00
89,600.00
104,000.00
Bh
Kg
12.500
14.460
0.003
0.870
0.003
0.004
0.001
0.030
0.005
4,500.00
1,434.00
131,500.00
24,800.00
227,100.00
13,700.00
1,962,500.00
27,600.00
289,200.00
M3
Kg
M3
Kg
M3
Kg
M3
Zona II
Jumlah
Harga
Oh
Oh
Oh
Oh
Jumlah
20,366.00
10,101.00
543.90
1,227.52
1,768.00
56,250.00
20,735.64
394.50
21,576.00
681.30
54.80
1,962.50
828.00
1,446.00
137,935.16
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
I. UPAH
Pekerja
Tukang Batu
Tukang besi
Kepala Tukang
Mandor
II. BAHAN
Concrete block (CB. 15)
Semen portland
Pasir Pasang
Besi beton polos
Pasir Beton
Paku biasa 2" - 5"
Kayu terentang,meranti
Kawat beton
Koral beton
Harga
Satuan
Oh
Oh
Oh
Oh
0.340
0.107
0.007
0.114
0.017
59,900.00
77,700.00
77,700.00
89,600.00
104,000.00
Bh
Kg
M3
Kg
M3
Kg
M3
Kg
M3
12.500
7.200
0.003
0.870
0.002
0.003
0.001
0.015
0.003
53,800.00
1,434.00
131,500.00
24,800.00
227,100.00
13,700.00
27,600.00
289,200.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Jumlah
20,366.00
8,313.90
543.90
10,214.40
1,768.00
672,500.00
10,324.80
394.50
21,576.00
454.20
41.10
414.00
867.60
747,778.40
I. UPAH
Pekerja
Tukang Batu
Tukang besi
Kepala Tukang
Mandor
II. BAHAN
Bondbeam 40 x 20 x 20 cm
Semen portland
Pasir beton
Besi beton polos
Koral beton
Harga
Satuan
Oh
Oh
Oh
Oh
0.100
0.030
0.030
0.006
0.005
59,900.00
77,700.00
77,700.00
89,600.00
104,000.00
Bh
Kg
M3
Kg
M3
2.500
5.100
0.080
1.500
0.150
4,600.00
1,434.00
227,100.00
24,800.00
289,200.00
Jumlah
Jumlah
160,004.79
Zona IV
Jumlah
Harga
77,870.00
101,010.00
101,010.00
116,480.00
135,200.00
5,850.00
1,864.20
170,950.00
32,240.00
295,230.00
17,810.00
2,551,250.00
35,880.00
375,960.00
Jumlah
26,475.80
13,131.30
707.07
1,595.78
2,298.40
73,125.00
26,956.33
512.85
28,048.80
885.69
71.24
2,551.25
1,076.40
1,879.80
179,315.71
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
111,111.00
128,128.00
148,720.00
6,435.00
2,050.62
188,045.00
35,464.00
324,753.00
19,591.00
2,806,375.00
39,468.00
413,556.00
29,123.38
14,444.43
777.78
1,755.35
2,528.24
80,437.50
29,651.97
564.14
30,853.68
974.26
78.36
2,806.38
1,184.04
2,067.78
Jumlah
197,247.28
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
90,132.00
103,936.00
120,640.00
62,408.00
1,663.44
152,540.00
28,768.00
263,436.00
15,892.00
32,016.00
335,472.00
23,624.56
9,644.12
630.92
11,848.70
2,050.88
780,100.00
11,976.77
457.62
25,028.16
526.87
47.68
480.24
1,006.42
Jumlah
867,422.94
Harga
Satuan
Zona IV
Jumlah
Harga
77,870.00
101,010.00
101,010.00
116,480.00
135,200.00
69,940.00
1,864.20
170,950.00
32,240.00
295,230.00
17,810.00
35,880.00
375,960.00
Jumlah
26,475.80
10,808.07
707.07
13,278.72
2,298.40
874,250.00
13,422.24
512.85
28,048.80
590.46
53.43
538.20
1,127.88
972,111.92
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
111,111.00
128,128.00
148,720.00
76,934.00
2,050.62
188,045.00
35,464.00
324,753.00
19,591.00
39,468.00
413,556.00
29,123.38
11,888.88
777.78
14,606.59
2,528.24
961,675.00
14,764.46
564.14
30,853.68
649.51
58.77
592.02
1,240.67
Jumlah
1,069,323.11
Zona I
Uraian
23,624.56
11,717.16
630.92
1,423.92
2,050.88
65,250.00
24,053.34
457.62
25,028.16
790.31
63.57
2,276.50
960.48
1,677.36
Harga
Satuan
Zona II
Jumlah
Harga
285,298.70
Zona III
Jumlah
Harga
69,484.00
90,132.00
90,132.00
103,936.00
120,640.00
5,220.00
1,663.44
152,540.00
28,768.00
263,436.00
15,892.00
2,276,500.00
32,016.00
335,472.00
Zona I
Uraian
Jumlah
Zona I
Uraian
254,574.23
Zona II
Jumlah
Harga
5,990.00
2,331.00
2,331.00
537.60
520.00
11,500.00
7,313.40
18,168.00
37,200.00
43,380.00
129,271.00
Harga
Satuan
69,484.00
90,132.00
90,132.00
103,936.00
120,640.00
5,336.00
1,663.44
263,436.00
28,768.00
335,472.00
Jumlah
Zona III
Jumlah
Harga
6,948.40
2,703.96
2,703.96
623.62
603.20
13,340.00
8,483.54
21,074.88
43,152.00
50,320.80
149,954.36
Harga
Satuan
77,870.00
101,010.00
101,010.00
116,480.00
135,200.00
5,980.00
1,864.20
295,230.00
32,240.00
375,960.00
Jumlah
Zona IV
Jumlah
Harga
7,787.00
3,030.30
3,030.30
698.88
676.00
14,950.00
9,507.42
23,618.40
48,360.00
56,394.00
168,052.30
Harga
Satuan
85,657.00
111,111.00
111,111.00
128,128.00
148,720.00
6,578.00
2,050.62
324,753.00
35,464.00
413,556.00
Jumlah
Jumlah
Harga
8,565.70
3,333.33
3,333.33
768.77
743.60
16,445.00
10,458.16
25,980.24
53,196.00
62,033.40
184,857.53
Halaman 20
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.300
0.100
0.010
0.015
II. BAHAN
Roster/terawang
Semen portland
Bh
Kg
30.000
14.000
29,900.00
1,434.00
Pasir Pasang
M3
0.032
131,500.00
59,900.00
77,700.00
89,600.00
104,000.00
Jumlah
Harga
Satuan
17,970.00
7,770.00
896.00
1,560.00
897,000.00
20,076.00
69,484.00
90,132.00
103,936.00
120,640.00
34,684.00
1,663.44
4,208.00
152,540.00
949,480.00
Zona III
Jumlah
Harga
Jumlah
Harga
Satuan
20,845.20
9,013.20
1,039.36
1,809.60
1,040,520.00
23,288.16
77,870.00
101,010.00
116,480.00
135,200.00
38,870.00
1,864.20
4,881.28
170,950.00
1,101,396.80
Zona IV
Jumlah
Harga
Jumlah
Harga
Satuan
Jumlah
Harga
23,361.00
10,101.00
1,164.80
2,028.00
1,166,100.00
26,098.80
85,657.00
111,111.00
128,128.00
148,720.00
42,757.00
2,050.62
5,470.40
188,045.00
1,234,324.00
25,697.10
11,111.10
1,281.28
2,230.80
1,282,710.00
28,708.68
6,017.44
Jumlah
1,357,756.40
V. PEKERJAAN PLESTERAN
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.200
0.150
0.015
0.010
II. BAHAN
Semen portland
Kg
15.504
1,434.00
Pasir Pasang
M3
0.016
131,500.00
59,900.00
77,700.00
89,600.00
104,000.00
Jumlah
Harga
Satuan
11,980.00
11,655.00
1,344.00
1,040.00
22,232.74
69,484.00
90,132.00
103,936.00
120,640.00
1,663.44
2,104.00
152,540.00
50,355.74
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Jumlah
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
II. BAHAN
Semen portland
Pasir Pasang
Harga
Satuan
0.200
0.150
0.015
0.010
59,900.00
77,700.00
89,600.00
104,000.00
Kg
10.224
0.020
1,434.00
131,500.00
M3
Jumlah
11,980.00
11,655.00
1,344.00
1,040.00
14,661.22
2,630.00
43,310.22
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Harga
Satuan
Oh
Oh
Oh
Oh
0.200
0.150
0.015
0.010
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Semen portland
Pasir Pasang
Kg
M3
7.776
0.023
1,434.00
131,500.00
Jumlah
11,980.00
11,655.00
1,344.00
1,040.00
11,150.78
3,024.50
40,194.28
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.200
0.150
0.015
0.010
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Semen portland
Pasir Pasang
Kg
M3
6.240
0.024
1,434.00
131,500.00
Jumlah
Jumlah
50,239.85
Harga
Satuan
11,980.00
11,655.00
1,344.00
1,040.00
8,948.16
3,156.00
38,123.16
Jumlah
Harga
15,574.00
15,151.50
1,747.20
1,352.00
28,902.56
85,657.00
111,111.00
128,128.00
148,720.00
2,050.62
2,735.20
188,045.00
65,462.46
17,131.40
16,666.65
1,921.92
1,487.20
31,792.81
3,008.72
Jumlah
72,008.70
Harga
Satuan
Jumlah
13,896.80
13,519.80
1,559.04
1,206.40
12,934.91
3,508.42
Jumlah
15,574.00
15,151.50
1,747.20
1,352.00
19,059.58
3,419.00
56,303.28
Harga
Satuan
46,625.37
Harga
Satuan
Jumlah
17,131.40
16,666.65
1,921.92
1,487.20
20,965.54
3,760.90
Jumlah
61,933.61
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
1,864.20
170,950.00
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
2,050.62
188,045.00
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
1,663.44
152,540.00
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
1,864.20
170,950.00
15,574.00
15,151.50
1,747.20
1,352.00
14,496.02
3,931.85
52,252.57
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
2,050.62
188,045.00
17,131.40
16,666.65
1,921.92
1,487.20
15,945.62
4,325.04
Jumlah
57,477.83
Zona II
Jumlah
Harga
Harga
Satuan
Zona III
13,896.80
13,519.80
1,559.04
1,206.40
17,007.01
3,050.80
Jumlah
Zona I
Uraian
170,950.00
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
2,440.64
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
1,663.44
152,540.00
Zona I
Uraian
77,870.00
101,010.00
116,480.00
135,200.00
1,864.20
58,412.65
Zona IV
Jumlah
Harga
13,896.80
13,519.80
1,559.04
1,206.40
25,789.97
Zona II
Jumlah
Harga
Oh
Oh
Oh
Oh
Harga
Satuan
Zona I
Uraian
Zona III
Jumlah
Harga
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
1,663.44
152,540.00
Jumlah
Zona III
Jumlah
Harga
13,896.80
13,519.80
1,559.04
1,206.40
10,379.87
3,660.96
44,222.87
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
1,864.20
170,950.00
Jumlah
Zona IV
Jumlah
Harga
15,574.00
15,151.50
1,747.20
1,352.00
11,632.61
4,102.80
49,560.11
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
2,050.62
188,045.00
Jumlah
Jumlah
Harga
17,131.40
16,666.65
1,921.92
1,487.20
12,795.87
4,513.08
54,516.12
Halaman 21
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
II. BAHAN
Semen portland
Pasir Pasang
Harga
Satuan
Oh
Oh
Oh
Oh
0.200
0.150
0.015
0.010
59,900.00
77,700.00
89,600.00
104,000.00
Kg
5.184
0.026
1,434.00
131,500.00
M3
Zona II
Jumlah
Harga
Jumlah
11,980.00
11,655.00
1,344.00
1,040.00
7,433.86
3,419.00
36,871.86
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
1,663.44
152,540.00
Harga
Satuan
Oh
Oh
Oh
Oh
0.200
0.150
0.015
0.010
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Semen portland
Pasir Pasang
Kg
M3
4.416
0.027
1,434.00
131,500.00
Jumlah
11,980.00
11,655.00
1,344.00
1,040.00
6,332.54
3,550.50
35,902.04
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.200
0.150
0.015
0.010
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Semen portland
Pasir Pasang
Kg
M3
3.936
0.028
1,434.00
131,500.00
Jumlah
11,980.00
11,655.00
1,344.00
1,040.00
5,644.22
3,682.00
35,345.22
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Harga
Satuan
Oh
Oh
Oh
Oh
0.260
0.200
0.020
0.013
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Semen portland
Pasir Pasang
Kg
M3
13.632
0.027
1,434.00
131,500.00
Jumlah
15,574.00
15,540.00
1,792.00
1,300.00
19,548.29
3,550.50
57,304.79
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Jumlah
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
II. BAHAN
Semen portland
Pasir Pasang
Harga
Satuan
Oh
Oh
Oh
Oh
0.260
0.200
0.020
0.013
59,900.00
77,700.00
89,600.00
104,000.00
Kg
10.368
0.031
1,434.00
131,500.00
M3
Jumlah
15,574.00
15,540.00
1,792.00
1,300.00
14,867.71
4,076.50
53,150.21
85,657.00
111,111.00
128,128.00
148,720.00
2,050.62
188,045.00
17,131.40
16,666.65
1,921.92
1,487.20
10,630.41
4,889.17
Jumlah
52,726.75
41,646.37
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
1,864.20
170,950.00
Jumlah
Harga
Satuan
15,574.00
15,151.50
1,747.20
1,352.00
8,232.31
4,615.65
46,672.66
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
2,050.62
188,045.00
17,131.40
16,666.65
1,921.92
1,487.20
9,055.54
5,077.22
Jumlah
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
1,663.44
152,540.00
13,896.80
13,519.80
1,559.04
1,206.40
6,547.30
4,271.12
Jumlah
41,000.46
Harga
Satuan
51,339.92
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
1,864.20
170,950.00
Jumlah
15,574.00
15,151.50
1,747.20
1,352.00
7,337.49
4,786.60
45,948.79
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
2,050.62
188,045.00
17,131.40
16,666.65
1,921.92
1,487.20
8,071.24
5,265.26
Jumlah
50,543.67
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
1,663.44
152,540.00
18,065.84
18,026.40
2,078.72
1,508.00
22,676.01
4,118.58
Jumlah
66,473.55
Harga
Satuan
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
1,864.20
170,950.00
Jumlah
20,246.20
20,202.00
2,329.60
1,690.00
25,412.77
4,615.65
74,496.22
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
2,050.62
188,045.00
22,270.82
22,222.20
2,562.56
1,859.00
27,954.05
5,077.22
Jumlah
81,945.85
Zona II
Jumlah
Harga
47,933.41
Jumlah
Harga
Zona I
Uraian
13,896.80
13,519.80
1,559.04
1,206.40
7,345.75
4,118.58
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah
15,574.00
15,151.50
1,747.20
1,352.00
9,664.01
4,444.70
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
1,663.44
152,540.00
Zona I
Uraian
77,870.00
101,010.00
116,480.00
135,200.00
1,864.20
170,950.00
Zona II
Jumlah
Harga
Zona IV
Jumlah
Harga
Zona I
Uraian
42,771.35
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
13,896.80
13,519.80
1,559.04
1,206.40
8,623.27
3,966.04
Jumlah
Zona I
Uraian
Zona III
Jumlah
Harga
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
1,663.44
152,540.00
Jumlah
Zona III
Jumlah
Harga
18,065.84
18,026.40
2,078.72
1,508.00
17,246.55
4,728.74
61,654.25
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
1,864.20
170,950.00
Jumlah
Zona IV
Jumlah
Harga
20,246.20
20,202.00
2,329.60
1,690.00
19,328.03
5,299.45
69,095.28
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
2,050.62
188,045.00
Jumlah
Jumlah
Harga
22,270.82
22,222.20
2,562.56
1,859.00
21,260.83
5,829.40
76,004.80
Halaman 22
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
II. BAHAN
Semen portland
Pasir Pasang
Harga
Satuan
Oh
Oh
Oh
Oh
0.260
0.200
0.020
0.013
59,900.00
77,700.00
89,600.00
104,000.00
Kg
8.320
0.032
1,434.00
131,500.00
M3
Zona II
Jumlah
Harga
Jumlah
15,574.00
15,540.00
1,792.00
1,300.00
11,930.88
4,208.00
50,344.88
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
1,663.44
152,540.00
Harga
Satuan
Oh
Oh
Oh
Oh
0.260
0.200
0.020
0.013
II. BAHAN
Semen portland
Kg
6.912
1,434.00
Pasir Pasang
M3
0.035
131,500.00
59,900.00
77,700.00
89,600.00
104,000.00
Jumlah
Harga
Satuan
4,602.50
152,540.00
No
Satuan Indeks
Jumlah
Zona I
Harga
Satuan
Oh
Oh
Oh
Oh
0.260
0.200
0.020
0.013
II. BAHAN
Semen portland
Kg
5.888
1,434.00
Pasir Pasang
M3
0.036
131,500.00
59,900.00
77,700.00
89,600.00
104,000.00
Jumlah
4,734.00
152,540.00
47,383.39
No
Satuan Indeks
Jumlah
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
II. BAHAN
Semen portland
Pasir Pasang
Oh
Oh
Oh
Oh
0.300
0.200
0.020
0.013
59,900.00
77,700.00
89,600.00
104,000.00
Kg
15.500
0.013
1,434.00
131,500.00
M3
Jumlah
60,590.50
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
II. BAHAN
Semen portland
Pasir Pasang
Harga
Satuan
Oh
Oh
Oh
Oh
0.300
0.200
0.020
0.013
59,900.00
77,700.00
89,600.00
104,000.00
Kg
11.750
0.035
1,434.00
131,500.00
M3
Jumlah
170,950.00
Jumlah
Harga
Satuan
17,970.00
15,540.00
1,792.00
1,352.00
16,849.50
4,602.50
58,106.00
22,270.82
22,222.20
2,562.56
1,859.00
17,061.16
6,017.44
Jumlah
71,993.18
Zona IV
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
1,864.20
5,491.44
170,950.00
Jumlah
Jumlah
Harga
20,246.20
20,202.00
2,329.60
1,690.00
12,885.35
85,657.00
111,111.00
128,128.00
148,720.00
2,050.62
5,983.25
188,045.00
63,336.40
22,270.82
22,222.20
2,562.56
1,859.00
14,173.89
6,581.58
Jumlah
69,670.04
Zona IV
Jumlah
Harga
18,065.84
18,026.40
2,078.72
1,508.00
9,794.33
Harga
Satuan
Jumlah
Harga
20,246.20
20,202.00
2,329.60
1,690.00
10,976.41
85,657.00
111,111.00
128,128.00
148,720.00
2,050.62
6,154.20
188,045.00
61,598.41
22,270.82
22,222.20
2,562.56
1,859.00
12,074.05
6,769.62
Jumlah
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
1,663.44
152,540.00
20,845.20
18,026.40
2,078.72
1,568.32
25,783.32
1,983.02
Jumlah
70,284.98
Harga
Satuan
67,758.25
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
1,864.20
170,950.00
Jumlah
23,361.00
20,202.00
2,329.60
1,757.60
28,895.10
2,222.35
78,767.65
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
2,050.62
188,045.00
25,697.10
22,222.20
2,562.56
1,933.36
31,784.61
2,444.59
Jumlah
86,644.42
Zona II
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
2,050.62
188,045.00
Zona III
54,964.73
Harga
Satuan
Zona I
Uraian
5,338.90
Zona II
17,970.00
15,540.00
1,792.00
1,352.00
22,227.00
1,709.50
65,448.34
Jumlah
Harga
Zona I
Jumlah
Harga
20,246.20
20,202.00
2,329.60
1,690.00
15,510.14
5,470.40
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
1,864.20
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
1,663.44
Harga
Satuan
Harga
Satuan
18,065.84
18,026.40
2,078.72
1,508.00
11,497.70
56,515.56
Harga
Satuan
15,574.00
15,540.00
1,792.00
1,300.00
8,443.39
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Jumlah
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
77,870.00
101,010.00
116,480.00
135,200.00
1,864.20
170,950.00
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
1,663.44
48,720.31
Zona IV
Jumlah
Harga
15,574.00
15,540.00
1,792.00
1,300.00
9,911.81
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
58,400.06
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
18,065.84
18,026.40
2,078.72
1,508.00
13,839.82
4,881.28
Jumlah
Zona I
Uraian
Zona III
Jumlah
Harga
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
1,663.44
152,540.00
Jumlah
Zona III
Jumlah
Harga
20,845.20
18,026.40
2,078.72
1,568.32
19,545.42
5,338.90
67,402.96
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
1,864.20
170,950.00
Jumlah
Zona IV
Jumlah
Harga
23,361.00
20,202.00
2,329.60
1,757.60
21,904.35
5,983.25
75,537.80
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
2,050.62
188,045.00
Jumlah
Jumlah
Harga
25,697.10
22,222.20
2,562.56
1,933.36
24,094.79
6,581.58
83,091.58
Halaman 23
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
II. BAHAN
Semen portland
Pasir Pasang
Harga
Satuan
Oh
Oh
Oh
Oh
0.300
0.200
0.020
0.013
59,900.00
77,700.00
89,600.00
104,000.00
Kg
9.480
0.038
1,434.00
131,500.00
M3
Zona II
Jumlah
Harga
Jumlah
17,970.00
15,540.00
1,792.00
1,352.00
13,594.32
4,997.00
55,245.32
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
1,663.44
152,540.00
Harga
Satuan
Oh
Oh
Oh
Oh
0.300
0.200
0.020
0.013
II. BAHAN
Semen portland
Kg
7.940
1,434.00
Pasir Pasang
M3
0.039
131,500.00
59,900.00
77,700.00
89,600.00
104,000.00
Jumlah
Harga
Satuan
5,128.50
152,540.00
No
Satuan Indeks
Jumlah
Zona I
Harga
Satuan
Oh
Oh
Oh
Oh
0.320
0.250
0.025
0.015
II. BAHAN
Semen portland
Kg
18.650
1,434.00
Pasir Pasang
M3
0.035
131,500.00
59,900.00
77,700.00
89,600.00
104,000.00
Jumlah
4,602.50
152,540.00
73,739.60
No
Satuan Indeks
Jumlah
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
II. BAHAN
Semen portland
Pasir Pasang
Oh
Oh
Oh
Oh
0.320
0.250
0.025
0.015
59,900.00
77,700.00
89,600.00
104,000.00
Kg
14.150
0.039
1,434.00
131,500.00
M3
Jumlah
67,812.60
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
II. BAHAN
Semen portland
Pasir Pasang
Harga
Satuan
Oh
Oh
Oh
Oh
0.320
0.250
0.025
0.015
59,900.00
77,700.00
89,600.00
104,000.00
Kg
11.380
0.042
1,434.00
131,500.00
M3
Jumlah
170,950.00
Jumlah
Harga
Satuan
19,168.00
19,425.00
2,240.00
1,560.00
16,318.92
5,523.00
64,234.92
25,697.10
22,222.20
2,562.56
1,933.36
19,439.88
7,145.71
Jumlah
79,000.81
Zona IV
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
1,864.20
5,338.90
170,950.00
Jumlah
Jumlah
Harga
23,361.00
20,202.00
2,329.60
1,757.60
14,801.75
85,657.00
111,111.00
128,128.00
148,720.00
2,050.62
6,667.05
188,045.00
69,119.00
25,697.10
22,222.20
2,562.56
1,933.36
16,281.92
7,333.76
Jumlah
76,030.90
Zona IV
Jumlah
Harga
22,234.88
22,533.00
2,598.40
1,809.60
31,023.16
Harga
Satuan
Jumlah
Harga
24,918.40
25,252.50
2,912.00
2,028.00
34,767.33
85,657.00
111,111.00
128,128.00
148,720.00
2,050.62
5,983.25
188,045.00
95,861.48
27,410.24
27,777.75
3,203.20
2,230.80
38,244.06
6,581.58
Jumlah
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
1,663.44
152,540.00
22,234.88
22,533.00
2,598.40
1,809.60
23,537.68
5,949.06
Jumlah
78,662.62
Harga
Satuan
105,447.63
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
1,864.20
170,950.00
Jumlah
24,918.40
25,252.50
2,912.00
2,028.00
26,378.43
6,667.05
88,156.38
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
2,050.62
188,045.00
27,410.24
27,777.75
3,203.20
2,230.80
29,016.27
7,333.76
Jumlah
96,972.02
Zona II
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
2,050.62
188,045.00
Zona III
85,537.94
Harga
Satuan
Zona I
Uraian
5,949.06
Zona II
19,168.00
19,425.00
2,240.00
1,560.00
20,291.10
5,128.50
71,818.92
Jumlah
Harga
Zona I
Jumlah
Harga
23,361.00
20,202.00
2,329.60
1,757.60
17,672.62
6,496.10
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
1,864.20
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
1,663.44
Harga
Satuan
Harga
Satuan
20,845.20
18,026.40
2,078.72
1,568.32
13,207.71
61,675.41
Harga
Satuan
19,168.00
19,425.00
2,240.00
1,560.00
26,744.10
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Jumlah
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
77,870.00
101,010.00
116,480.00
135,200.00
1,864.20
170,950.00
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
1,663.44
53,168.46
Zona IV
Jumlah
Harga
17,970.00
15,540.00
1,792.00
1,352.00
11,385.96
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
64,084.57
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
20,845.20
18,026.40
2,078.72
1,568.32
15,769.41
5,796.52
Jumlah
Zona I
Uraian
Zona III
Jumlah
Harga
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
1,663.44
152,540.00
Jumlah
Zona III
Jumlah
Harga
22,234.88
22,533.00
2,598.40
1,809.60
18,929.95
6,406.68
74,512.51
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
1,864.20
170,950.00
Jumlah
Zona IV
Jumlah
Harga
24,918.40
25,252.50
2,912.00
2,028.00
21,214.60
7,179.90
83,505.40
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
2,050.62
188,045.00
Jumlah
Jumlah
Harga
27,410.24
27,777.75
3,203.20
2,230.80
23,336.06
7,897.89
91,855.94
Halaman 24
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
II. BAHAN
Semen portland
Pasir Pasang
Harga
Satuan
Oh
Oh
Oh
Oh
0.320
0.250
0.025
0.015
59,900.00
77,700.00
89,600.00
104,000.00
Kg
11.380
0.042
1,434.00
131,500.00
M3
Zona II
Jumlah
Harga
Jumlah
19,168.00
19,425.00
2,240.00
1,560.00
16,318.92
5,523.00
64,234.92
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
1,663.44
152,540.00
Harga
Satuan
Oh
Oh
Oh
Oh
0.150
0.070
0.007
0.008
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Semen portland
Pasir Pasang
Kg
M3
7.070
0.021
1,434.00
131,500.00
Jumlah
8,985.00
5,439.00
627.20
832.00
10,138.38
2,761.50
28,783.08
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.150
0.070
0.007
0.008
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Semen portland
Pasir Pasang
Kg
M3
5.184
0.026
1,434.00
131,500.00
Jumlah
Harga
Satuan
II. BAHAN
Semen portland
Pasir Pasang
Kg
M3
9.300
0.018
1,434.00
131,500.00
Jumlah
Jumlah
II. BAHAN
Semen portland
Pasir Pasang
59,900.00
77,700.00
89,600.00
104,000.00
Kg
7.070
0.021
1,434.00
131,500.00
M3
Jumlah
37,418.00
85,657.00
111,111.00
128,128.00
148,720.00
2,050.62
188,045.00
12,848.55
7,777.77
896.90
1,189.76
14,497.88
3,948.95
Jumlah
41,159.80
Harga
Satuan
Zona III
Jumlah
Harga
Harga
Satuan
Zona IV
Jumlah
Harga
Harga
Satuan
Jumlah
Harga
31,013.82
Jumlah
34,756.87
Jumlah
38,232.56
Zona II
15,574.00
15,540.00
1,792.00
1,352.00
13,336.20
2,367.00
49,961.20
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
1,663.44
152,540.00
18,065.84
18,026.40
2,078.72
1,568.32
15,469.99
2,745.72
Jumlah
57,954.99
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
1,864.20
170,950.00
Jumlah
Zona II
Jumlah
Harga
15,574.00
15,540.00
1,792.00
1,352.00
10,138.38
2,761.50
47,157.88
Zona IV
Jumlah
Harga
20,246.20
20,202.00
2,329.60
1,757.60
17,337.06
3,077.10
64,949.56
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
2,050.62
188,045.00
22,270.82
22,222.20
2,562.56
1,933.36
19,070.77
3,384.81
Jumlah
71,444.52
Zona I
0.260
0.200
0.020
0.013
Jumlah
11,680.50
7,070.70
815.36
1,081.60
13,179.89
3,589.95
Jumlah
Harga
Jumlah
Satuan Indeks
Oh
Oh
Oh
Oh
77,870.00
101,010.00
116,480.00
135,200.00
1,864.20
170,950.00
Harga
Satuan
26,736.06
No
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
33,388.37
Zona IV
Jumlah
Harga
12,848.55
7,777.77
896.90
1,189.76
10,630.41
4,889.17
Harga
Satuan
10,422.60
6,309.24
727.55
965.12
11,760.52
3,203.34
Harga
Satuan
1.02
85,657.00
111,111.00
128,128.00
148,720.00
2,050.62
188,045.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
91,855.94
11,680.50
7,070.70
815.36
1,081.60
9,664.01
4,444.70
Jumlah
Harga
59,900.00
77,700.00
89,600.00
104,000.00
Jumlah
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
1,663.44
152,540.00
Zona I
0.260
0.200
0.020
0.013
27,410.24
27,777.75
3,203.20
2,230.80
23,336.06
7,897.89
1.02
77,870.00
101,010.00
116,480.00
135,200.00
1,864.20
170,950.00
Satuan Indeks
Oh
Oh
Oh
Oh
85,657.00
111,111.00
128,128.00
148,720.00
2,050.62
188,045.00
10,422.60
6,309.24
727.55
965.12
8,623.27
3,966.04
No
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
83,505.40
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
1,663.44
152,540.00
Harga
Satuan
Jumlah
24,918.40
25,252.50
2,912.00
2,028.00
21,214.60
7,179.90
Harga
Satuan
8,985.00
5,439.00
627.20
832.00
7,433.86
3,419.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
77,870.00
101,010.00
116,480.00
135,200.00
1,864.20
170,950.00
Zona II
Jumlah
Harga
Zona IV
Jumlah
Harga
Zona I
Uraian
74,512.51
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
22,234.88
22,533.00
2,598.40
1,809.60
18,929.95
6,406.68
Jumlah
Zona I
Uraian
Zona III
Jumlah
Harga
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
1,663.44
152,540.00
Jumlah
Zona III
Jumlah
Harga
18,065.84
18,026.40
2,078.72
1,568.32
11,760.52
3,203.34
54,703.14
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
1,864.20
170,950.00
Jumlah
Zona IV
Jumlah
Harga
20,246.20
20,202.00
2,329.60
1,757.60
13,179.89
3,589.95
61,305.24
Harga
Satuan
1.02
85,657.00
111,111.00
128,128.00
148,720.00
2,050.62
188,045.00
Jumlah
Jumlah
Harga
22,270.82
22,222.20
2,562.56
1,933.36
14,497.88
3,948.95
67,435.77
Halaman 25
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
II. BAHAN
Semen portland
Pasir Pasang
Harga
Satuan
Oh
Oh
Oh
Oh
0.057
0.038
0.038
0.003
59,900.00
77,700.00
89,600.00
104,000.00
Kg
0.500
0.013
1,434.00
131,500.00
M3
Zona II
Jumlah
Harga
3,414.30
2,952.60
3,404.80
312.00
717.00
1,709.50
12,510.20
Jumlah
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
1,663.44
152,540.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
Oh
Oh
Oh
Oh
0.450
0.200
0.020
0.025
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Semen portland
Pasir Pasang
Kg
M3
10.000
15.000
1,434.00
131,500.00
Jumlah
26,955.00
15,540.00
1,792.00
2,600.00
14,340.00
1,972,500.00
No
Satuan Indeks
Zona I
Oh
Oh
Oh
Oh
0.450
0.200
0.020
0.025
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Semen portland
Pasir Pasang
Kg
M3
10.000
15.000
1,434.00
131,500.00
Jumlah
26,955.00
15,540.00
1,792.00
2,600.00
14,340.00
1,972,500.00
2,033,727.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Harga
Satuan
Oh
Oh
Oh
Oh
0.250
0.100
0.010
0.013
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Semen portland
Pasir Pasang
Kg
M3
4.320
0.006
1,434.00
131,500.00
Jumlah
14,975.00
7,770.00
896.00
1,352.00
6,194.88
789.00
31,976.88
No
Satuan Indeks
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
II. BAHAN
Semen portland
Pasir Pasang
Oh
Oh
Oh
Oh
0.150
0.070
0.007
0.008
59,900.00
77,700.00
89,600.00
104,000.00
Kg
4.320
0.016
1,434.00
131,500.00
M3
Jumlah
31,267.80
18,026.40
2,078.72
3,016.00
16,634.40
2,288,100.00
Jumlah
2,359,123.32
Harga
Satuan
4,882.45
4,222.22
4,868.86
446.16
1,025.31
2,444.59
17,889.59
Jumlah
35,041.50
20,202.00
2,329.60
3,380.00
18,642.00
2,564,250.00
2,643,845.10
Harga
Satuan
Harga
Satuan
Jumlah
38,545.65
22,222.20
2,562.56
3,718.00
20,506.20
2,820,675.00
Jumlah
2,908,229.61
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
1,864.20
170,950.00
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
2,050.62
188,045.00
35,041.50
20,202.00
2,329.60
3,380.00
18,642.00
2,564,250.00
2,643,845.10
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
2,050.62
188,045.00
38,545.65
22,222.20
2,562.56
3,718.00
20,506.20
2,820,675.00
Jumlah
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
1,663.44
152,540.00
17,371.00
9,013.20
1,039.36
1,568.32
7,186.06
915.24
Jumlah
2,908,229.61
37,093.18
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
1,864.20
170,950.00
Jumlah
Zona II
Jumlah
Harga
8,985.00
5,439.00
627.20
832.00
6,194.88
2,104.00
24,182.08
Zona IV
Jumlah
Harga
19,467.50
10,101.00
1,164.80
1,757.60
8,053.34
1,025.70
41,569.94
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
2,050.62
188,045.00
21,414.25
11,111.10
1,281.28
1,933.36
8,858.68
1,128.27
Jumlah
45,726.94
Zona I
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
2,050.62
188,045.00
Jumlah
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
1,864.20
170,950.00
Zona II
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Jumlah
Harga
Jumlah
Harga
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
4,438.59
3,838.38
4,426.24
405.60
932.10
2,222.35
16,263.26
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
1,663.44
152,540.00
Zona I
Uraian
2,359,123.32
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
31,267.80
18,026.40
2,078.72
3,016.00
16,634.40
2,288,100.00
Jumlah
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
1,864.20
170,950.00
Jumlah
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
1,663.44
152,540.00
2,033,727.00
Zona IV
Jumlah
Harga
Harga
Satuan
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
3,960.59
3,425.02
3,949.57
361.92
831.72
1,983.02
14,511.83
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Zona III
Jumlah
Harga
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
1,663.44
152,540.00
Jumlah
Zona III
Jumlah
Harga
10,422.60
6,309.24
727.55
965.12
7,186.06
2,440.64
28,051.21
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
1,864.20
170,950.00
Jumlah
Zona IV
Jumlah
Harga
11,680.50
7,070.70
815.36
1,081.60
8,053.34
2,735.20
31,436.70
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
2,050.62
188,045.00
Jumlah
Jumlah
Harga
12,848.55
7,777.77
896.90
1,189.76
8,858.68
3,008.72
34,580.37
Halaman 26
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
6.000
20.000
2.000
0.300
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kayu bangkirai, balok
Paku 10 cm
Lem Kayu
M3
Kg
Kg
1.100
1.250
1.000
1,553,700.00
13,700.00
28,700.00
Jumlah
359,400.00
1,554,000.00
179,200.00
31,200.00
1,709,070.00
17,125.00
28,700.00
3,878,695.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
1,802,292.00
15,892.00
33,292.00
Jumlah
Harga
Satuan
Oh
Oh
Oh
Oh
6.000
18.000
2.000
0.300
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Paku 10 cm
Lem Kayu
Kayu bangkirai, balok
Kg
Kg
M3
1.250
1.000
1.200
13,700.00
28,700.00
1,553,700.00
Jumlah
359,400.00
1,398,600.00
179,200.00
31,200.00
17,125.00
28,700.00
1,864,440.00
3,878,665.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
II. BAHAN
Paku 10 cm
Lem Kayu
Kayu Meranti, balok
Harga
Satuan
Oh
Oh
Oh
Oh
6.000
18.000
2.000
0.300
59,900.00
77,700.00
89,600.00
104,000.00
Kg
Kg
1.250
1.000
1.200
13,700.00
28,700.00
1,135,500.00
M3
Jumlah
359,400.00
1,398,600.00
179,200.00
31,200.00
17,125.00
28,700.00
1,362,600.00
3,376,825.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
6.000
18.000
2.000
0.300
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Paku 10 cm
Lem Kayu
Kayu Damar Laut, balok
Kg
Kg
M3
1.250
1.000
1.200
13,700.00
28,700.00
Jumlah
359,400.00
1,398,600.00
179,200.00
31,200.00
17,125.00
28,700.00
2,014,225.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Harga
Satuan
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.350
1.050
0.105
0.018
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kayu bangkirai, papan
Paku Biasa 2" - 5"
M3
Kg
0.040
0.050
1,673,200.00
13,700.00
Jumlah
416,904.00
1,622,376.00
207,872.00
36,192.00
19,865.00
33,292.00
1,580,616.00
3,917,117.00
Harga
Satuan
20,965.00
81,585.00
9,408.00
1,872.00
66,928.00
685.00
181,443.00
467,220.00
1,818,180.00
232,960.00
40,560.00
22,262.50
37,310.00
2,423,772.00
5,042,264.50
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
19,591.00
41,041.00
2,221,791.00
Jumlah
513,942.00
1,999,998.00
256,256.00
44,616.00
24,488.75
41,041.00
2,666,149.20
5,546,490.95
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
17,810.00
37,310.00
1,476,150.00
Jumlah
467,220.00
1,818,180.00
232,960.00
40,560.00
22,262.50
37,310.00
1,771,380.00
4,389,872.50
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
19,591.00
41,041.00
1,623,765.00
Jumlah
513,942.00
1,999,998.00
256,256.00
44,616.00
24,488.75
41,041.00
1,948,518.00
4,828,859.75
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
15,892.00
33,292.00
Jumlah
416,904.00
1,622,376.00
207,872.00
36,192.00
19,865.00
33,292.00
2,336,501.00
Harga
Satuan
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
17,810.00
37,310.00
Jumlah
467,220.00
1,818,180.00
232,960.00
40,560.00
22,262.50
37,310.00
2,618,492.50
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
19,591.00
41,041.00
Jumlah
513,942.00
1,999,998.00
256,256.00
44,616.00
24,488.75
41,041.00
2,880,341.75
Zona II
Jumlah
Harga
513,942.00
2,222,220.00
256,256.00
44,616.00
2,443,970.10
24,488.75
41,041.00
5,546,533.85
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
15,892.00
33,292.00
1,317,180.00
Jumlah
Zona I
Uraian
85,657.00
111,111.00
128,128.00
148,720.00
2,221,791.00
19,591.00
41,041.00
Jumlah
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
17,810.00
37,310.00
2,019,810.00
Jumlah
Zona II
Jumlah
Harga
Jumlah
Harga
Zona I
Uraian
416,904.00
1,622,376.00
207,872.00
36,192.00
19,865.00
33,292.00
2,162,750.40
4,499,251.40
Harga
Satuan
Zona II
Jumlah
Harga
467,220.00
2,020,200.00
232,960.00
40,560.00
2,221,791.00
22,262.50
37,310.00
5,042,303.50
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
15,892.00
33,292.00
1,802,292.00
Jumlah
Zona I
Uraian
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
2,019,810.00
17,810.00
37,310.00
Jumlah
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
416,904.00
1,802,640.00
207,872.00
36,192.00
1,982,521.20
19,865.00
33,292.00
4,499,286.20
Harga
Satuan
Zona I
Uraian
Zona III
Jumlah
Harga
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
1,940,912.00
15,892.00
Jumlah
Zona III
Jumlah
Harga
24,319.40
94,638.60
10,913.28
2,171.52
77,636.48
794.60
210,473.88
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
2,175,160.00
17,810.00
Jumlah
Zona IV
Jumlah
Harga
27,254.50
106,060.50
12,230.40
2,433.60
87,006.40
890.50
235,875.90
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
2,392,676.00
19,591.00
Jumlah
29,979.95
116,666.55
13,453.44
2,676.96
95,707.04
979.55
259,463.49
Halaman 27
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Harga
Satuan
Harga
Satuan
24,319.40
94,638.60
10,913.28
2,171.52
-
1.02
77,870.00
101,010.00
116,480.00
135,200.00
-
27,254.50
106,060.50
12,230.40
2,433.60
-
1.02
85,657.00
111,111.00
128,128.00
148,720.00
-
29,979.95
116,666.55
13,453.44
2,676.96
-
M3
Kg
0.040
0.050
1,374,500.00
13,700.00
54,980.00
685.00
169,495.00
1,594,420.00
15,892.00
Jumlah
63,776.80
794.60
196,614.20
1,786,850.00
17,810.00
Jumlah
71,474.00
890.50
220,343.50
1,965,535.00
19,591.00
Jumlah
78,621.40
979.55
242,377.85
Satuan Indeks
Zona I
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
1.000
2.500
0.250
0.050
II. BAHAN
Lem Kayu
Kg
0.500
28,700.00
M3
0.040
1,673,200.00
59,900.00
77,700.00
89,600.00
104,000.00
Jumlah
Harga
Satuan
1.02
85,657.00
111,111.00
128,128.00
148,720.00
41,041.00
85,657.00
277,777.50
32,032.00
7,436.00
20,520.50
66,928.00
363,028.00
1,940,912.00
Jumlah
77,636.48
421,112.48
2,175,160.00
Jumlah
87,006.40
471,936.40
2,392,676.00
Jumlah
95,707.04
519,130.04
Zona II
Jumlah
Harga
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Lem Kayu
Kayu Meranti , papan
Kg
M3
0.500
0.040
28,700.00
1,374,500.00
Jumlah
59,900.00
194,250.00
22,400.00
5,200.00
14,350.00
54,980.00
351,080.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
II. BAHAN
Lem Kayu
Kayu Kapur, papan
1.000
2.500
0.250
0.050
59,900.00
77,700.00
89,600.00
104,000.00
Kg
0.500
0.040
28,700.00
1,314,600.00
M3
Jumlah
59,900.00
194,250.00
22,400.00
5,200.00
14,350.00
52,584.00
348,684.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.800
2.000
0.200
0.040
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kayu bangkirai, papan
M3
0.035
1,673,200.00
Jumlah
1.02
77,870.00
101,010.00
116,480.00
135,200.00
37,310.00
1,786,850.00
Jumlah
Harga
Satuan
47,920.00
155,400.00
17,920.00
4,160.00
58,562.00
283,962.00
77,870.00
252,525.00
29,120.00
6,760.00
18,655.00
71,474.00
456,404.00
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
41,041.00
1,965,535.00
Jumlah
85,657.00
277,777.50
32,032.00
7,436.00
20,520.50
78,621.40
502,044.40
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
33,292.00
1,524,936.00
Jumlah
69,484.00
225,330.00
25,984.00
6,032.00
16,646.00
60,997.44
404,473.44
Harga
Satuan
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
37,310.00
1,708,980.00
Jumlah
77,870.00
252,525.00
29,120.00
6,760.00
18,655.00
68,359.20
453,289.20
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
41,041.00
1,879,878.00
Jumlah
85,657.00
277,777.50
32,032.00
7,436.00
20,520.50
75,195.12
498,618.12
Zona II
Jumlah
Harga
Zona IV
Jumlah
Harga
Zona I
Uraian
69,484.00
225,330.00
25,984.00
6,032.00
16,646.00
63,776.80
407,252.80
Harga
Satuan
Zona II
Jumlah
Harga
Oh
Oh
Oh
Oh
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
33,292.00
1,594,420.00
Jumlah
Zona I
Harga
Satuan
Jumlah
Harga
77,870.00
252,525.00
29,120.00
6,760.00
18,655.00
Zona I
1.000
2.500
0.250
0.050
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
37,310.00
Satuan Indeks
Oh
Oh
Oh
Oh
Zona IV
Jumlah
Harga
69,484.00
225,330.00
25,984.00
6,032.00
16,646.00
No
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
33,292.00
Harga
Satuan
Zona III
Jumlah
Harga
59,900.00
194,250.00
22,400.00
5,200.00
14,350.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
-
No
Uraian
Harga
Satuan
20,965.00
81,585.00
9,408.00
1,872.00
-
Uraian
Zona IV
Jumlah
Harga
59,900.00
77,700.00
89,600.00
104,000.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Harga
Satuan
0.350
1.050
0.105
0.018
Jumlah
Uraian
Zona III
Jumlah
Harga
Oh
Oh
Oh
Oh
II. BAHAN
Kayu Meranti, papan
Paku Biasa 2" - 5"
Zona II
Jumlah
Harga
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
1,940,912.00
Jumlah
Zona III
Jumlah
Harga
55,587.20
180,264.00
20,787.20
4,825.60
67,931.92
329,395.92
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
2,175,160.00
Jumlah
Zona IV
Jumlah
Harga
62,296.00
202,020.00
23,296.00
5,408.00
76,130.60
369,150.60
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
2,392,676.00
Jumlah
68,525.60
222,222.00
25,625.60
5,948.80
83,743.66
406,065.66
Halaman 28
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Harga
Satuan
Harga
Satuan
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
-
55,587.20
180,264.00
20,787.20
4,825.60
-
1.02
77,870.00
101,010.00
116,480.00
135,200.00
-
62,296.00
202,020.00
23,296.00
5,408.00
-
1.02
85,657.00
111,111.00
128,128.00
148,720.00
-
68,525.60
222,222.00
25,625.60
5,948.80
-
M3
0.035
1,673,200.00
58,562.00
283,962.00
1,940,912.00
Jumlah
67,931.92
329,395.92
2,175,160.00
Jumlah
76,130.60
369,150.60
2,392,676.00
Jumlah
83,743.66
406,065.66
No
Satuan Indeks
Zona I
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.800
2.000
0.200
0.040
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kayu Meranti , papan
M3
0.035
1,374,500.00
Jumlah
47,920.00
155,400.00
17,920.00
4,160.00
48,107.50
273,507.50
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Harga
Satuan
Oh
Oh
Oh
Oh
1.000
3.000
0.300
0.300
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kayu bangkirai, papan
M3
0.064
1,673,200.00
Jumlah
59,900.00
233,100.00
26,880.00
31,200.00
107,084.80
458,164.80
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
1.000
3.000
0.300
0.500
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kayu Kamper, papan
M3
0.064
1,673,200.00
Jumlah
Harga
Satuan
59,900.00
233,100.00
26,880.00
52,000.00
107,084.80
478,964.80
Zona I
0.600
2.000
0.200
0.030
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kayu bangkirai, papan
Paku Biasa 1/2" - 1"
Lem kayu
Plywood 4' x 3' x 4 mm
M3
Kg
Kg
Lbr
0.025
0.030
0.300
1.000
1,673,200.00
600.00
28,700.00
82,500.00
Jumlah
Harga
Satuan
68,525.60
222,222.00
25,625.60
5,948.80
68,793.73
391,115.73
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
2,175,160.00
Jumlah
69,484.00
270,396.00
31,180.80
60,320.00
124,218.37
555,599.17
Harga
Satuan
77,870.00
303,030.00
34,944.00
40,560.00
139,210.24
595,614.24
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
2,392,676.00
Jumlah
85,657.00
333,333.00
38,438.40
44,616.00
153,131.26
655,175.66
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
2,175,160.00
Jumlah
77,870.00
303,030.00
34,944.00
67,600.00
139,210.24
622,654.24
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
2,392,676.00
Jumlah
85,657.00
333,333.00
38,438.40
74,360.00
153,131.26
684,919.66
Zona II
35,940.00
155,400.00
17,920.00
3,120.00
41,830.00
18.00
8,610.00
82,500.00
345,338.00
1.02
85,657.00
111,111.00
128,128.00
148,720.00
1,965,535.00
Jumlah
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
1,940,912.00
Jumlah
Satuan Indeks
Oh
Oh
Oh
Oh
69,484.00
270,396.00
31,180.80
36,192.00
124,218.37
531,471.17
Harga
Satuan
No
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
Harga
Jumlah
Harga
62,296.00
202,020.00
23,296.00
5,408.00
62,539.75
355,559.75
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
1,940,912.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
1,786,850.00
Jumlah
Zona II
Jumlah
Harga
Zona IV
Jumlah
Harga
Zona I
Harga
Satuan
55,587.20
180,264.00
20,787.20
4,825.60
55,804.70
317,268.70
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
1,594,420.00
Jumlah
Zona I
Uraian
Harga
Satuan
47,920.00
155,400.00
17,920.00
4,160.00
-
Uraian
Zona IV
Jumlah
Harga
59,900.00
77,700.00
89,600.00
104,000.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Harga
Satuan
0.800
2.000
0.200
0.040
Jumlah
Uraian
Zona III
Jumlah
Harga
Oh
Oh
Oh
Oh
II. BAHAN
Kayu Kamper, papan
Zona II
Jumlah
Harga
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
1,940,912.00
696.00
33,292.00
95,700.00
Jumlah
Zona III
Jumlah
Harga
41,690.40
180,264.00
20,787.20
3,619.20
48,522.80
20.88
9,987.60
95,700.00
400,592.08
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
2,175,160.00
780.00
37,310.00
107,250.00
Jumlah
Zona IV
Jumlah
Harga
46,722.00
202,020.00
23,296.00
4,056.00
54,379.00
23.40
11,193.00
107,250.00
448,939.40
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
2,392,676.00
858.00
41,041.00
117,975.00
Jumlah
51,394.20
222,222.00
25,625.60
4,461.60
59,816.90
25.74
12,312.30
117,975.00
493,833.34
Halaman 29
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Harga
Satuan
Zona II
Jumlah
Harga
Harga
Satuan
41,690.40
180,264.00
20,787.20
3,619.20
-
1.02
77,870.00
101,010.00
116,480.00
135,200.00
-
46,722.00
202,020.00
23,296.00
4,056.00
-
1.02
85,657.00
111,111.00
128,128.00
148,720.00
-
51,394.20
222,222.00
25,625.60
4,461.60
-
M3
Kg
Lt
Lbr
0.020
0.030
0.300
1.000
1,673,200.00
600.00
28,700.00
82,500.00
32,794.72
18.00
8,610.00
82,500.00
336,302.72
1,940,912.00
696.00
33,292.00
95,700.00
Jumlah
38,041.88
20.88
9,987.60
95,700.00
390,111.16
2,175,160.00
780.00
37,310.00
107,250.00
Jumlah
42,633.14
23.40
11,193.00
107,250.00
437,193.54
2,392,676.00
858.00
41,041.00
117,975.00
Jumlah
46,896.45
25.74
12,312.30
117,975.00
480,912.89
Satuan Indeks
Zona I
Harga
Satuan
Zona II
Jumlah
Harga
Harga
Satuan
Harga
Satuan
Zona IV
Jumlah
Harga
Harga
Satuan
Jumlah
Harga
0.500
2.000
0.200
0.025
59,900.00
77,700.00
89,600.00
104,000.00
29,950.00
155,400.00
17,920.00
2,600.00
-
1.01
69,484.00
90,132.00
103,936.00
120,640.00
-
34,742.00
180,264.00
20,787.20
3,016.00
-
1.02
77,870.00
101,010.00
116,480.00
135,200.00
-
38,935.00
202,020.00
23,296.00
3,380.00
-
1.02
85,657.00
111,111.00
128,128.00
148,720.00
-
42,828.50
222,222.00
25,625.60
3,718.00
-
M3
Kg
0.060
0.150
1,673,200.00
600.00
100,392.00
90.00
306,352.00
1,940,912.00
696.00
Jumlah
116,454.72
104.40
355,368.32
2,175,160.00
780.00
Jumlah
130,509.60
117.00
398,257.60
2,392,676.00
858.00
Jumlah
143,560.56
128.70
438,083.36
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.500
2.000
0.200
0.025
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kayu Kamper, papan
Paku Biasa 1/2" - 1"
M3
Kg
0.060
0.150
1,673,200.00
600.00
Jumlah
29,950.00
155,400.00
17,920.00
2,600.00
100,392.00
90.00
306,352.00
Harga
Satuan
No
Satuan Indeks
Zona I
Harga
Satuan
Oh
Oh
Oh
Oh
0.600
2.000
0.200
0.030
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kayu Meranti, papan
Paku Biasa 1/2" - 1"
Lem kayu
Plywood 4' x 3' x 4 mm
M3
Kg
Lt
Lbr
0.020
0.030
0.300
1.000
1,374,500.00
600.00
28,700.00
82,500.00
Jumlah
35,940.00
155,400.00
17,920.00
3,120.00
26,940.20
18.00
8,610.00
82,500.00
330,448.20
No
Satuan Indeks
Zona I
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.600
2.000
0.200
0.030
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kayu bangkirai, papan
Paku Biasa 1/2" - 1"
Lem kayu
Teakwood 4' x 8' x 4 mm
M3
Kg
Lt
Lbr
0.020
0.030
0.300
1.000
1,673,200.00
600.00
28,700.00
87,600.00
Jumlah
1.02
77,870.00
101,010.00
116,480.00
135,200.00
2,175,160.00
780.00
Jumlah
41,690.40
180,264.00
20,787.20
3,619.20
31,250.63
20.88
9,987.60
95,700.00
383,319.91
Harga
Satuan
35,940.00
155,400.00
17,920.00
3,120.00
32,794.72
18.00
8,610.00
87,600.00
341,402.72
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
2,392,676.00
858.00
Jumlah
42,828.50
222,222.00
25,625.60
3,718.00
143,560.56
128.70
438,083.36
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
1,786,850.00
780.00
37,310.00
107,250.00
Jumlah
46,722.00
202,020.00
23,296.00
4,056.00
35,022.26
23.40
11,193.00
107,250.00
429,582.66
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
1,965,535.00
858.00
41,041.00
117,975.00
Jumlah
51,394.20
222,222.00
25,625.60
4,461.60
38,524.49
25.74
12,312.30
117,975.00
472,540.93
Zona II
Jumlah
Harga
38,935.00
202,020.00
23,296.00
3,380.00
130,509.60
117.00
398,257.60
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
1,594,420.00
696.00
33,292.00
95,700.00
Jumlah
Zona IV
Jumlah
Harga
Harga
Satuan
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Harga
Satuan
34,742.00
180,264.00
20,787.20
3,016.00
116,454.72
104.40
355,368.32
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
1,940,912.00
696.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Zona III
Jumlah
Harga
Oh
Oh
Oh
Oh
II. BAHAN
Uraian
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
-
No
Uraian
Harga
Satuan
35,940.00
155,400.00
17,920.00
3,120.00
-
Zona IV
Jumlah
Harga
59,900.00
77,700.00
89,600.00
104,000.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Harga
Satuan
0.600
2.000
0.200
0.030
Jumlah
Uraian
Zona III
Jumlah
Harga
Oh
Oh
Oh
Oh
II. BAHAN
Kayu Kamper , papan
Paku Biasa 1/2" - 1"
Lem kayu
Plywood 4' x 3' x 4 mm
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
1,940,912.00
696.00
33,292.00
101,616.00
Jumlah
Zona III
Jumlah
Harga
41,690.40
180,264.00
20,787.20
3,619.20
38,041.88
20.88
9,987.60
101,616.00
396,027.16
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
2,175,160.00
780.00
37,310.00
113,880.00
Jumlah
Zona IV
Jumlah
Harga
46,722.00
202,020.00
23,296.00
4,056.00
42,633.14
23.40
11,193.00
113,880.00
443,823.54
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
2,392,676.00
858.00
41,041.00
125,268.00
Jumlah
51,394.20
222,222.00
25,625.60
4,461.60
46,896.45
25.74
12,312.30
125,268.00
488,205.89
Halaman 30
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Harga
Satuan
0.600
2.000
0.200
0.030
59,900.00
77,700.00
89,600.00
104,000.00
M3
Kg
Lt
Lbr
0.020
0.030
0.300
1.000
1,673,200.00
600.00
28,700.00
87,600.00
II. BAHAN
`
Zona II
Jumlah
Harga
Oh
Oh
Oh
Oh
Jumlah
35,940.00
155,400.00
17,920.00
3,120.00
32,794.72
18.00
8,610.00
87,600.00
341,402.72
Harga
Satuan
No
Satuan Indeks
Zona I
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Harga
Satuan
0.800
2.500
0.250
0.040
59,900.00
77,700.00
89,600.00
104,000.00
M3
Kg
Lt
Lbr
Lbr
0.020
0.300
0.800
1.000
0.500
1,673,200.00
600.00
28,700.00
82,500.00
86,600.00
II. BAHAN
Kayu bangkirai, papan
Paku Biasa 1/2" - 1"
Lem kayu
Plywood 4' x 8' x 4 mm
Formika
Jumlah
38,041.88
20.88
9,987.60
101,616.00
396,027.16
47,920.00
194,250.00
22,400.00
4,160.00
32,794.72
180.00
22,960.00
82,500.00
43,300.00
450,464.72
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
-
55,587.20
225,330.00
25,984.00
4,825.60
-
1,940,912.00
696.00
33,292.00
95,700.00
100,456.00
Jumlah
38,041.88
208.80
26,633.60
95,700.00
50,228.00
522,539.08
No
Satuan Indeks
Zona I
Oh
Oh
Oh
Oh
0.800
2.500
0.250
0.040
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kayu kamper, papan
Paku Biasa 1/2" - 1"
Lem kayu
Teakwood 4' x 8' x 4 mm
Vernis
Formika 4' x 8'
M3
Kg
Lt
Lbr
Lt
Lbr
0.020
0.300
0.800
0.500
0.500
0.500
1,673,200.00
600.00
28,700.00
87,600.00
32,300.00
86,600.00
Jumlah
47,920.00
194,250.00
22,400.00
4,160.00
32,794.72
180.00
22,960.00
43,800.00
16,150.00
43,300.00
427,914.72
Harga
Satuan
No
Satuan Indeks
Zona I
Harga
Satuan
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.800
2.500
0.250
0.040
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kayu kamper, papan
Paku Biasa 1/2" - 1"
Lem kayu
Plywood 4' x 8' x 4 mm
Formika 4' x 3'
M3
Kg
Lt
Lbr
Lbr
0.020
0.300
0.800
1.000
0.500
1,673,200.00
600.00
28,700.00
82,500.00
86,600.00
Jumlah
Harga
Satuan
47,920.00
194,250.00
22,400.00
4,160.00
32,794.72
180.00
22,960.00
82,500.00
43,300.00
450,464.72
42,633.14
23.40
11,193.00
113,880.00
443,823.54
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
-
51,394.20
222,222.00
25,625.60
4,461.60
-
2,392,676.00
858.00
41,041.00
125,268.00
Jumlah
46,896.45
25.74
12,312.30
125,268.00
488,205.89
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
2,175,160.00
780.00
37,310.00
107,250.00
112,580.00
Jumlah
55,587.20
225,330.00
25,984.00
4,825.60
38,041.88
208.80
26,633.60
50,808.00
18,734.00
50,228.00
496,381.08
Harga
Satuan
62,296.00
252,525.00
29,120.00
5,408.00
42,633.14
234.00
29,848.00
107,250.00
56,290.00
585,604.14
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
-
68,525.60
277,777.50
32,032.00
5,948.80
-
2,392,676.00
858.00
41,041.00
117,975.00
123,838.00
Jumlah
46,896.45
257.40
32,832.80
117,975.00
61,919.00
644,164.55
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
2,175,160.00
780.00
37,310.00
113,880.00
41,990.00
112,580.00
Jumlah
62,296.00
252,525.00
29,120.00
5,408.00
42,633.14
234.00
29,848.00
56,940.00
20,995.00
56,290.00
556,289.14
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
2,392,676.00
858.00
41,041.00
125,268.00
46,189.00
123,838.00
Jumlah
68,525.60
277,777.50
32,032.00
5,948.80
46,896.45
257.40
32,832.80
62,634.00
23,094.50
61,919.00
611,918.05
Zona II
Jumlah
Harga
46,722.00
202,020.00
23,296.00
4,056.00
-
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
1,940,912.00
696.00
33,292.00
101,616.00
37,468.00
100,456.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
2,175,160.00
780.00
37,310.00
113,880.00
Jumlah
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
77,870.00
101,010.00
116,480.00
135,200.00
-
Harga
Satuan
Zona III
Jumlah
Harga
: Pasang pintu plywood & formika, rangka kayu Kamper (dipernis) (SNI.Rev.2007)
: M2
:
: Harian
Harga
Satuan
Zona IV
Jumlah
Harga
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
Oh
Oh
Oh
Oh
41,690.40
180,264.00
20,787.20
3,619.20
-
1,940,912.00
696.00
33,292.00
101,616.00
Jumlah
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
-
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
1,940,912.00
696.00
33,292.00
95,700.00
100,456.00
Jumlah
Zona III
Jumlah
Harga
55,587.20
225,330.00
25,984.00
4,825.60
38,041.88
208.80
26,633.60
95,700.00
50,228.00
522,539.08
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
2,175,160.00
780.00
37,310.00
107,250.00
112,580.00
Jumlah
Zona IV
Jumlah
Harga
62,296.00
252,525.00
29,120.00
5,408.00
42,633.14
234.00
29,848.00
107,250.00
56,290.00
585,604.14
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
2,392,676.00
858.00
41,041.00
117,975.00
123,838.00
Jumlah
68,525.60
277,777.50
32,032.00
5,948.80
46,896.45
257.40
32,832.80
117,975.00
61,919.00
644,164.55
Halaman 31
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Harga
Satuan
1.000
2.600
0.260
0.050
59,900.00
77,700.00
89,600.00
104,000.00
M3
Kg
Lt
Lbr
Lbr
0.020
0.300
1.200
1.000
1.000
1,673,200.00
600.00
28,700.00
82,500.00
86,600.00
II. BAHAN
Kayu Kamper, papan
Paku Biasa 1/2" - 1"
Lem kayu
Plywood 4' x 8' x 4 mm
Formika 4' x 3'
Zona II
Jumlah
Harga
Oh
Oh
Oh
Oh
Jumlah
59,900.00
202,020.00
23,296.00
5,200.00
32,794.72
180.00
34,440.00
82,500.00
86,600.00
526,930.72
Harga
Satuan
No
Satuan Indeks
Zona I
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Harga
Satuan
1.000
2.600
0.260
0.050
59,900.00
77,700.00
89,600.00
104,000.00
M3
Kg
Lt
Lbr
Lbr
0.020
0.300
1.200
1.000
1.000
1,673,200.00
600.00
28,700.00
82,500.00
86,600.00
II. BAHAN
Kayu Kamper, papan
Paku Biasa 1/2" - 1"
Lem kayu
Plywood 4' x 8' x 4 mm
Formika 4' x 3'
Jumlah
59,900.00
202,020.00
23,296.00
5,200.00
32,794.72
180.00
34,440.00
82,500.00
86,600.00
526,930.72
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
4.000
12.000
1.200
0.200
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kayu bangkirai,balok
Besi strip
Paku Biasa 2" - 5"
M3
Kg
Kg
1.100
15.000
5.600
1,553,700.00
26,300.00
13,700.00
Jumlah
239,600.00
932,400.00
107,520.00
20,800.00
1,709,070.00
394,500.00
76,720.00
3,480,610.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
4.000
12.000
1.200
0.200
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kayu kamper,balok
Besi strip
Paku Biasa 2" - 5"
M3
Kg
Kg
1.100
15.000
5.600
26,300.00
13,700.00
Jumlah
2,175,160.00
780.00
37,310.00
107,250.00
112,580.00
Jumlah
69,484.00
234,343.20
27,023.36
6,032.00
-
1,940,912.00
696.00
33,292.00
95,700.00
100,456.00
Jumlah
38,041.88
208.80
39,950.40
95,700.00
100,456.00
611,239.64
Harga
Satuan
239,600.00
932,400.00
107,520.00
20,800.00
394,500.00
76,720.00
1,771,540.00
42,633.14
234.00
44,772.00
107,250.00
112,580.00
685,009.94
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
-
85,657.00
288,888.60
33,313.28
7,436.00
-
2,392,676.00
858.00
41,041.00
117,975.00
123,838.00
Jumlah
46,896.45
257.40
49,249.20
117,975.00
123,838.00
753,510.93
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
2,175,160.00
780.00
37,310.00
107,250.00
112,580.00
Jumlah
77,870.00
262,626.00
30,284.80
6,760.00
42,633.14
234.00
44,772.00
107,250.00
112,580.00
685,009.94
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
-
85,657.00
288,888.60
33,313.28
7,436.00
-
2,392,676.00
858.00
41,041.00
117,975.00
123,838.00
Jumlah
46,896.45
257.40
49,249.20
117,975.00
123,838.00
753,510.93
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
1,802,292.00
30,508.00
15,892.00
Jumlah
277,936.00
1,081,584.00
124,723.20
24,128.00
1,982,521.20
457,620.00
88,995.20
4,037,507.60
Harga
Satuan
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
2,019,810.00
34,190.00
17,810.00
Jumlah
311,480.00
1,212,120.00
139,776.00
27,040.00
2,221,791.00
512,850.00
99,736.00
4,524,793.00
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
2,221,791.00
37,609.00
19,591.00
Jumlah
342,628.00
1,333,332.00
153,753.60
29,744.00
2,443,970.10
564,135.00
109,709.60
4,977,272.30
Zona II
Jumlah
Harga
77,870.00
262,626.00
30,284.80
6,760.00
-
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
-
Zona I
Uraian
77,870.00
101,010.00
116,480.00
135,200.00
-
Zona II
Jumlah
Harga
Zona IV
Jumlah
Harga
Harga
Satuan
Zona I
Uraian
38,041.88
208.80
39,950.40
95,700.00
100,456.00
611,239.64
Harga
Satuan
Zona II
Jumlah
Harga
Oh
Oh
Oh
Oh
69,484.00
234,343.20
27,023.36
6,032.00
-
1,940,912.00
696.00
33,292.00
95,700.00
100,456.00
Jumlah
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
-
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
30,508.00
15,892.00
Jumlah
Zona III
Jumlah
Harga
277,936.00
1,081,584.00
124,723.20
24,128.00
457,620.00
88,995.20
2,054,986.40
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
34,190.00
17,810.00
Jumlah
Zona IV
Jumlah
Harga
311,480.00
1,212,120.00
139,776.00
27,040.00
512,850.00
99,736.00
2,303,002.00
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
37,609.00
19,591.00
Jumlah
Jumlah
Harga
342,628.00
1,333,332.00
153,753.60
29,744.00
564,135.00
109,709.60
2,533,302.20
Halaman 32
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Harga
Satuan
Oh
Oh
Oh
Oh
4.000
12.000
1.200
0.200
59,900.00
77,700.00
89,600.00
104,000.00
M3
Kg
Kg
1.100
15.000
5.600
1,135,500.00
26,300.00
13,700.00
II. BAHAN
Kayu Meranti,balok
Besi strip
Paku Biasa 2" - 5"
Zona II
Jumlah
Harga
Jumlah
Harga
Satuan
239,600.00
932,400.00
107,520.00
20,800.00
1,249,050.00
394,500.00
76,720.00
3,020,590.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
69,484.00
90,132.00
103,936.00
120,640.00
-
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Harga
Satuan
4.000
12.000
1.200
0.200
59,900.00
77,700.00
89,600.00
104,000.00
M3
Kg
Kg
1.100
15.000
5.600
26,300.00
13,700.00
II. BAHAN
Kayu Ktuing,balok
Besi strip
Paku Biasa 2" - 5"
Jumlah
Harga
Satuan
239,600.00
932,400.00
107,520.00
20,800.00
394,500.00
76,720.00
1,771,540.00
Satuan Indeks
Zona I
0.100
0.100
0.010
0.005
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kayu meranti,balok
Paku Biasa 2" - 5"
Genteng tanah
M3
Kg
Bh
0.012
0.150
26.000
1,135,500.00
13,700.00
Jumlah
5,990.00
7,770.00
896.00
520.00
13,626.00
2,055.00
30,857.00
No
Satuan Indeks
Zona I
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.100
0.100
0.010
0.005
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kayu borneo,balok
Paku Biasa 2" - 5"
M3
Kg
0.012
0.150
2,453,200.00
13,700.00
Jumlah
5,990.00
7,770.00
896.00
520.00
29,438.40
2,055.00
46,669.40
No
Satuan Indeks
Zona I
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.100
0.100
0.010
0.005
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kayu Bingkaray,balok
Paku Biasa 2" - 5"
M3
Kg
0.014
0.150
1,553,700.00
13,700.00
Jumlah
6,948.40
9,013.20
1,039.36
603.20
15,806.16
2,383.80
35,794.12
5,990.00
7,770.00
896.00
520.00
21,751.80
2,055.00
38,982.80
1,623,765.00
37,609.00
19,591.00
Jumlah
1,786,141.50
564,135.00
109,709.60
4,319,443.70
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
34,190.00
17,810.00
Jumlah
Harga
Satuan
311,480.00
1,212,120.00
139,776.00
27,040.00
512,850.00
99,736.00
2,303,002.00
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
-
342,628.00
1,333,332.00
153,753.60
29,744.00
-
37,609.00
19,591.00
Jumlah
564,135.00
109,709.60
2,533,302.20
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
1,476,150.00
17,810.00
Jumlah
7,787.00
10,101.00
1,164.80
676.00
17,713.80
2,671.50
40,114.10
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
1,623,765.00
19,591.00
Jumlah
Zona III
Jumlah
Harga
6,948.40
9,013.20
1,039.36
603.20
34,148.54
2,383.80
54,136.50
Harga
Satuan
8,565.70
11,111.10
1,281.28
743.60
19,485.18
2,938.65
44,125.51
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
3,189,160.00
17,810.00
Jumlah
7,787.00
10,101.00
1,164.80
676.00
38,269.92
2,671.50
60,670.22
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
3,508,076.00
19,591.00
Jumlah
8,565.70
11,111.10
1,281.28
743.60
42,096.91
2,938.65
66,737.24
Zona II
Jumlah
Harga
342,628.00
1,333,332.00
153,753.60
29,744.00
-
1.01
69,484.00
90,132.00
103,936.00
120,640.00
2,845,712.00
15,892.00
Jumlah
Harga
Satuan
1,623,765.00
512,850.00
99,736.00
3,926,767.00
85,657.00
111,111.00
128,128.00
148,720.00
-
Zona III
Jumlah
Harga
Harga
Satuan
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
311,480.00
1,212,120.00
139,776.00
27,040.00
-
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
1,317,180.00
15,892.00
Jumlah
Harga
Satuan
457,620.00
88,995.20
2,054,986.40
Harga
Satuan
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
1,476,150.00
34,190.00
17,810.00
Jumlah
Zona II
Jumlah
Harga
Oh
Oh
Oh
Oh
277,936.00
1,081,584.00
124,723.20
24,128.00
-
30,508.00
15,892.00
Jumlah
No
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
77,870.00
101,010.00
116,480.00
135,200.00
-
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
-
Harga
Satuan
Zona IV
Jumlah
Harga
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
1,448,898.00
457,620.00
88,995.20
3,503,884.40
Harga
Satuan
Zona II
Jumlah
Harga
Oh
Oh
Oh
Oh
277,936.00
1,081,584.00
124,723.20
24,128.00
-
1,317,180.00
30,508.00
15,892.00
Jumlah
Zona I
Uraian
Zona III
Jumlah
Harga
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
1,802,292.00
15,892.00
Jumlah
Zona III
Jumlah
Harga
6,948.40
9,013.20
1,039.36
603.20
25,232.09
2,383.80
45,220.05
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
2,019,810.00
17,810.00
Jumlah
Zona IV
Jumlah
Harga
7,787.00
10,101.00
1,164.80
676.00
28,277.34
2,671.50
50,677.64
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
2,221,791.00
19,591.00
Jumlah
Jumlah
Harga
8,565.70
11,111.10
1,281.28
743.60
31,105.07
2,938.65
55,745.40
Halaman 33
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Harga
Satuan
0.100
0.100
0.010
0.005
59,900.00
77,700.00
89,600.00
104,000.00
M3
Kg
0.014
0.150
1,962,500.00
13,700.00
II. BAHAN
Kayu Kamper,balok
Paku Biasa 2" - 5"
Zona II
Jumlah
Harga
Oh
Oh
Oh
Oh
Jumlah
5,990.00
7,770.00
896.00
520.00
27,475.00
2,055.00
44,706.00
Harga
Satuan
No
Satuan Indeks
Zona I
Harga
Satuan
Oh
Oh
Oh
Oh
0.100
0.100
0.010
0.005
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kayu bangkirai,balok
Paku Biasa 2" - 5"
M3
Kg
0.014
0.150
1,553,700.00
13,700.00
Jumlah
5,990.00
7,770.00
896.00
520.00
21,751.80
2,055.00
38,982.80
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.120
0.120
0.012
0.006
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kayu bangkirai,balok
Paku Biasa 2" - 5"
M3
Kg
0.165
0.200
1,553,700.00
13,700.00
Jumlah
7,188.00
9,324.00
1,075.20
624.00
256,360.50
2,740.00
277,311.70
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Oh
Oh
Oh
Oh
0.120
0.120
0.012
0.006
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kayu Meranti,balok
Paku Biasa 2" - 5"
M3
Kg
0.165
0.200
1,135,500.00
13,700.00
Jumlah
7,188.00
9,324.00
1,075.20
624.00
187,357.50
2,740.00
208,308.70
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
1,802,292.00
15,892.00
Jumlah
0.150
0.250
0.025
0.075
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kayu bangkirai,balok
Paku Biasa 2" - 5"
M3
Kg
0.012
0.100
1,553,700.00
13,700.00
Jumlah
39,289.25
2,938.65
63,929.58
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
2,019,810.00
17,810.00
Jumlah
Harga
Satuan
7,787.00
10,101.00
1,164.80
676.00
28,277.34
2,671.50
50,677.64
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
2,221,791.00
19,591.00
Jumlah
8,565.70
11,111.10
1,281.28
743.60
31,105.07
2,938.65
55,745.40
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
2,019,810.00
17,810.00
Jumlah
8,338.08
10,815.84
1,247.23
723.84
217,334.70
3,178.40
241,638.09
Harga
Satuan
9,344.40
12,121.20
1,397.76
811.20
333,268.65
3,562.00
360,505.21
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
2,221,791.00
19,591.00
Jumlah
10,278.84
13,333.32
1,537.54
892.32
366,595.52
3,918.20
396,555.73
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
1,802,292.00
15,892.00
Jumlah
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
1,476,150.00
17,810.00
Jumlah
9,344.40
12,121.20
1,397.76
811.20
243,564.75
3,562.00
270,801.31
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
1,623,765.00
19,591.00
Jumlah
10,278.84
13,333.32
1,537.54
892.32
267,921.23
3,918.20
297,881.44
Zona II
8,985.00
19,425.00
2,240.00
7,800.00
18,644.40
1,370.00
58,464.40
2,806,375.00
19,591.00
Jumlah
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
1,317,180.00
15,892.00
Jumlah
Zona I
Oh
Oh
Oh
Oh
8,338.08
10,815.84
1,247.23
723.84
297,378.18
3,178.40
321,681.57
Harga
Satuan
Satuan Indeks
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
8,565.70
11,111.10
1,281.28
743.60
-
No
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
-
Zona III
Jumlah
Harga
Harga
Satuan
35,717.50
2,671.50
58,117.80
Jumlah
Harga
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
6,948.40
9,013.20
1,039.36
603.20
25,232.09
2,383.80
45,220.05
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
2,551,250.00
17,810.00
Jumlah
7,787.00
10,101.00
1,164.80
676.00
-
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
1,802,292.00
15,892.00
Jumlah
Zona I
Uraian
77,870.00
101,010.00
116,480.00
135,200.00
-
Zona II
Jumlah
Harga
Zona IV
Jumlah
Harga
Harga
Satuan
Zona I
Uraian
31,871.00
2,383.80
51,858.96
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
6,948.40
9,013.20
1,039.36
603.20
-
2,276,500.00
15,892.00
Jumlah
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
-
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Zona III
Jumlah
Harga
10,422.60
22,533.00
2,598.40
9,048.00
21,627.50
1,589.20
67,818.70
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
2,019,810.00
17,810.00
Jumlah
Zona IV
Jumlah
Harga
11,680.50
25,252.50
2,912.00
10,140.00
24,237.72
1,781.00
76,003.72
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
2,221,791.00
19,591.00
Jumlah
Jumlah
Harga
12,848.55
27,777.75
3,203.20
11,154.00
26,661.49
1,959.10
83,604.09
Halaman 34
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Harga
Satuan
0.150
0.250
0.025
0.075
59,900.00
77,700.00
89,600.00
104,000.00
M3
Kg
0.012
0.100
13,700.00
II. BAHAN
Kayu Kamper,balok
Paku Biasa 2" - 5"
Zona II
Jumlah
Harga
Oh
Oh
Oh
Oh
Jumlah
8,985.00
19,425.00
2,240.00
7,800.00
1,370.00
39,820.00
Harga
Satuan
No
Satuan Indeks
Zona I
Harga
Satuan
Oh
Oh
Oh
Oh
0.150
0.250
0.025
0.075
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kayu Meranti,balok
Paku Biasa 2" - 5"
M3
Kg
0.012
0.100
1,135,500.00
13,700.00
Jumlah
8,985.00
19,425.00
2,240.00
7,800.00
13,626.00
1,370.00
53,446.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.200
0.300
0.030
0.010
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kayu Bingkaray,balok
Paku Biasa 2" - 5"
M3
Kg
0.023
0.150
1,553,700.00
13,700.00
Jumlah
11,980.00
23,310.00
2,688.00
1,040.00
35,735.10
2,055.00
76,808.10
Zona I
Oh
Oh
Oh
Oh
0.200
0.300
0.030
0.010
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kayu Kamper,balok
Paku Biasa 2" - 5"
M3
Kg
0.023
0.150
1,962,500.00
13,700.00
Jumlah
No
Satuan Indeks
Zona I
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.200
0.300
0.030
0.010
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kayu Meranti,balok
Paku Biasa 2" - 5"
M3
Kg
0.023
0.150
1,135,500.00
13,700.00
Jumlah
11,980.00
23,310.00
2,688.00
1,040.00
26,116.50
2,055.00
67,189.50
19,591.00
Jumlah
1,959.10
56,942.60
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
1,476,150.00
17,810.00
Jumlah
Harga
Satuan
11,680.50
25,252.50
2,912.00
10,140.00
17,713.80
1,781.00
69,479.80
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
1,623,765.00
19,591.00
Jumlah
12,848.55
27,777.75
3,203.20
11,154.00
19,485.18
1,959.10
76,427.78
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
2,019,810.00
17,810.00
Jumlah
15,574.00
30,303.00
3,494.40
1,352.00
46,455.63
2,671.50
99,850.53
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
2,221,791.00
19,591.00
Jumlah
17,131.40
33,333.30
3,843.84
1,487.20
51,101.19
2,938.65
109,835.58
Zona III
Jumlah
Harga
13,896.80
27,039.60
3,118.08
1,206.40
52,359.50
2,383.80
100,004.18
Harga
Satuan
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
2,551,250.00
17,810.00
Jumlah
15,574.00
30,303.00
3,494.40
1,352.00
58,678.75
2,671.50
112,073.65
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
2,806,375.00
19,591.00
Jumlah
17,131.40
33,333.30
3,843.84
1,487.20
64,546.63
2,938.65
123,281.02
Zona II
Jumlah
Harga
12,848.55
27,777.75
3,203.20
11,154.00
-
69,484.00
90,132.00
103,936.00
120,640.00
2,276,500.00
15,892.00
Jumlah
Harga
Satuan
13,896.80
27,039.60
3,118.08
1,206.40
41,452.72
2,383.80
89,097.40
Harga
Satuan
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Harga
Satuan
Zona II
11,980.00
23,310.00
2,688.00
1,040.00
45,137.50
2,055.00
86,210.50
85,657.00
111,111.00
128,128.00
148,720.00
-
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
1,802,292.00
15,892.00
Jumlah
Satuan Indeks
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
10,422.60
22,533.00
2,598.40
9,048.00
15,806.16
1,589.20
61,997.36
Harga
Satuan
No
Jumlah
Harga
1,781.00
51,766.00
Jumlah
Harga
Harga
Satuan
17,810.00
Jumlah
11,680.50
25,252.50
2,912.00
10,140.00
-
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
1,317,180.00
15,892.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
77,870.00
101,010.00
116,480.00
135,200.00
-
Zona II
Jumlah
Harga
Zona IV
Jumlah
Harga
Harga
Satuan
Zona I
Uraian
1,589.20
46,191.20
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
10,422.60
22,533.00
2,598.40
9,048.00
-
15,892.00
Jumlah
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
-
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
1,317,180.00
15,892.00
Jumlah
Zona III
Jumlah
Harga
13,896.80
27,039.60
3,118.08
1,206.40
30,295.14
2,383.80
77,939.82
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
1,476,150.00
17,810.00
Jumlah
Zona IV
Jumlah
Harga
15,574.00
30,303.00
3,494.40
1,352.00
33,951.45
2,671.50
87,346.35
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
1,623,765.00
19,591.00
Jumlah
Jumlah
Harga
17,131.40
33,333.30
3,843.84
1,487.20
37,346.60
2,938.65
96,080.99
Halaman 35
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Harga
Satuan
0.250
0.350
0.035
0.013
59,900.00
77,700.00
89,600.00
104,000.00
M3
Kg
0.027
0.200
1,553,700.00
13,700.00
II. BAHAN
Kayu Bingkarai,balok
Paku Biasa 2" - 5"
Zona II
Jumlah
Harga
Oh
Oh
Oh
Oh
Jumlah
14,975.00
27,195.00
3,136.00
1,300.00
41,949.90
2,740.00
91,295.90
Harga
Satuan
No
Satuan Indeks
Zona I
Harga
Satuan
Oh
Oh
Oh
Oh
0.250
0.350
0.035
0.013
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kayu Kamper,balok
Paku Biasa 2" - 5"
M3
Kg
0.027
0.200
1,962,500.00
13,700.00
Jumlah
14,975.00
27,195.00
3,136.00
1,300.00
52,987.50
2,740.00
102,333.50
No
Satuan Indeks
Zona I
Harga
Satuan
Oh
Oh
Oh
Oh
0.250
0.350
0.035
0.013
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kayu Meranti,balok
Paku Biasa 2" - 5"
M3
Kg
0.027
0.200
1,135,500.00
13,700.00
Jumlah
14,975.00
27,195.00
3,136.00
1,300.00
30,658.50
2,740.00
80,004.50
Satuan Indeks
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.100
0.200
0.025
0.005
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kayu Bingkarai,balok
Paku Biasa 2" - 5"
M3
Kg
0.007
0.050
1,553,700.00
13,700.00
Jumlah
36,161.64
Satuan Indeks
Zona I
Oh
Oh
Oh
Oh
0.100
0.220
0.022
0.005
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kayu Kamper,balok
Paku Biasa 2" - 5"
M3
Kg
0.007
0.050
1,962,500.00
13,700.00
Jumlah
5,990.00
17,094.00
1,971.20
520.00
14,130.00
685.00
40,390.20
59,988.36
3,918.20
130,553.14
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
2,551,250.00
17,810.00
Jumlah
Harga
Satuan
19,467.50
35,353.50
4,076.80
1,690.00
68,883.75
3,562.00
133,033.55
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
2,806,375.00
19,591.00
Jumlah
21,414.25
38,888.85
4,484.48
1,859.00
75,772.13
3,918.20
146,336.91
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
1,476,150.00
17,810.00
Jumlah
6,948.40
18,026.40
2,598.40
603.20
12,976.50
794.60
41,947.50
Harga
Satuan
19,467.50
35,353.50
4,076.80
1,690.00
39,856.05
3,562.00
104,005.85
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
1,623,765.00
19,591.00
Jumlah
21,414.25
38,888.85
4,484.48
1,859.00
43,841.66
3,918.20
114,406.44
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
2,019,810.00
17,810.00
Jumlah
7,787.00
20,202.00
2,912.00
676.00
14,542.63
890.50
47,010.13
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
2,221,791.00
19,591.00
Jumlah
8,565.70
22,222.20
3,203.20
743.60
15,996.90
979.55
51,711.15
Zona II
Jumlah
Harga
2,221,791.00
19,591.00
Jumlah
Zona III
Jumlah
Harga
Jumlah
No
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
92,805.22
69,484.00
90,132.00
103,936.00
120,640.00
1,802,292.00
15,892.00
Harga
Satuan
17,371.00
31,546.20
3,637.76
1,508.00
35,563.86
3,178.40
-
Harga
Satuan
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Harga
Satuan
Zona II
5,990.00
15,540.00
2,240.00
520.00
11,186.64
685.00
21,414.25
38,888.85
4,484.48
1,859.00
-
Zona I
Jumlah
Harga
54,534.87
3,562.00
118,684.67
85,657.00
111,111.00
128,128.00
148,720.00
-
Zona III
Jumlah
Harga
Jumlah
No
19,467.50
35,353.50
4,076.80
1,690.00
-
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
1,317,180.00
15,892.00
-
Harga
Satuan
17,371.00
31,546.20
3,637.76
1,508.00
61,465.50
3,178.40
118,706.86
Harga
Satuan
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
2,019,810.00
17,810.00
Jumlah
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
77,870.00
101,010.00
116,480.00
135,200.00
-
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
2,276,500.00
15,892.00
Jumlah
Zona IV
Jumlah
Harga
Harga
Satuan
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
48,661.88
3,178.40
105,903.24
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
17,371.00
31,546.20
3,637.76
1,508.00
-
1,802,292.00
15,892.00
Jumlah
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
-
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
2,276,500.00
15,892.00
Jumlah
Zona III
Jumlah
Harga
6,948.40
19,829.04
2,286.59
603.20
16,390.80
794.60
46,852.63
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
2,551,250.00
17,810.00
Jumlah
Zona IV
Jumlah
Harga
7,787.00
22,222.20
2,562.56
676.00
18,369.00
890.50
52,507.26
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
2,806,375.00
19,591.00
Jumlah
Jumlah
Harga
8,565.70
24,444.42
2,818.82
743.60
20,205.90
979.55
57,757.99
Halaman 36
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Harga
Satuan
0.110
0.220
0.022
0.005
59,900.00
77,700.00
89,600.00
104,000.00
M3
Kg
0.011
0.050
1,553,700.00
13,700.00
II. BAHAN
Kayu Bingkaray,balok
Paku Biasa 2" - 5"
Zona II
Jumlah
Harga
Oh
Oh
Oh
Oh
Jumlah
6,589.00
17,094.00
1,971.20
520.00
17,090.70
685.00
43,949.90
Harga
Satuan
No
Satuan Indeks
Zona I
Harga
Satuan
Oh
Oh
Oh
Oh
0.110
0.220
0.022
0.005
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kayu Kamper,balok
Paku Biasa 2" - 5"
M3
Kg
0.011
0.050
1,962,500.00
13,700.00
Jumlah
6,589.00
17,094.00
1,971.20
520.00
21,587.50
685.00
48,446.70
No
Satuan Indeks
Zona I
Harga
Satuan
Oh
Oh
Oh
Oh
0.150
0.250
0.025
0.075
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kayu Kamper,balok
Paku Biasa 2" - 5"
M3
Kg
0.015
0.060
13,700.00
Jumlah
8,985.00
19,425.00
2,240.00
7,800.00
822.00
39,272.00
No
Satuan Indeks
Zona I
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.100
0.100
0.010
0.050
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kayu Kamper,balok
Paku Biasa 2" - 5"
M3
Kg
0.009
0.060
1,962,500.00
13,700.00
Jumlah
5,990.00
7,770.00
896.00
5,200.00
16,877.50
822.00
37,555.50
No
Satuan Indeks
Zona I
Harga
Satuan
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.100
0.100
0.010
0.050
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kayu meranti,papan
Paku Biasa 2" - 5"
M3
Kg
0.009
0.060
1,374,500.00
13,700.00
Jumlah
10,422.60
22,533.00
2,598.40
9,048.00
953.52
45,555.52
5,990.00
7,770.00
896.00
5,200.00
12,095.60
822.00
32,773.60
2,221,791.00
19,591.00
Jumlah
24,439.70
979.55
62,848.36
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
2,551,250.00
17,810.00
Jumlah
Harga
Satuan
8,565.70
22,222.20
2,562.56
676.00
28,063.75
890.50
62,980.71
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
2,806,375.00
19,591.00
Jumlah
9,422.27
24,444.42
2,818.82
743.60
30,870.13
979.55
69,278.78
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
17,810.00
Jumlah
11,680.50
25,252.50
2,912.00
10,140.00
1,068.60
51,053.60
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
19,591.00
Jumlah
Zona III
Jumlah
Harga
6,948.40
9,013.20
1,039.36
6,032.00
19,577.90
953.52
43,564.38
Harga
Satuan
12,848.55
27,777.75
3,203.20
11,154.00
1,175.46
56,158.96
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
2,551,250.00
17,810.00
Jumlah
7,787.00
10,101.00
1,164.80
6,760.00
21,940.75
1,068.60
48,822.15
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
2,806,375.00
19,591.00
8,565.70
11,111.10
1,281.28
7,436.00
24,134.83
1,175.46
53,704.37
Jumlah
Zona II
Jumlah
Harga
9,422.27
24,444.42
2,818.82
743.60
-
1.01
69,484.00
90,132.00
103,936.00
120,640.00
2,276,500.00
15,892.00
Jumlah
22,217.91
890.50
57,134.87
85,657.00
111,111.00
128,128.00
148,720.00
-
Zona III
Jumlah
Harga
Harga
Satuan
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
8,565.70
22,222.20
2,562.56
676.00
-
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
15,892.00
Jumlah
Harga
Satuan
7,643.24
19,829.04
2,286.59
603.20
25,041.50
794.60
56,198.17
Harga
Satuan
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
2,019,810.00
17,810.00
Jumlah
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
77,870.00
101,010.00
116,480.00
135,200.00
-
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
2,276,500.00
15,892.00
Jumlah
Zona IV
Jumlah
Harga
Harga
Satuan
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
19,825.21
794.60
50,981.88
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
7,643.24
19,829.04
2,286.59
603.20
-
1,802,292.00
15,892.00
Jumlah
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
-
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
1,594,420.00
15,892.00
Jumlah
Zona III
Jumlah
Harga
6,948.40
9,013.20
1,039.36
6,032.00
14,030.90
953.52
38,017.38
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
1,786,850.00
17,810.00
Jumlah
Zona IV
Jumlah
Harga
7,787.00
10,101.00
1,164.80
6,760.00
15,724.28
1,068.60
42,605.68
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
1,965,535.00
19,591.00
Jumlah
Jumlah
Harga
8,565.70
11,111.10
1,281.28
7,436.00
17,296.71
1,175.46
46,866.25
Halaman 37
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Harga
Satuan
Oh
Oh
Oh
Oh
0.150
0.450
0.045
0.075
59,900.00
77,700.00
89,600.00
104,000.00
M3
M3
Kg
0.020
0.007
0.100
1,135,500.00
1,374,500.00
13,700.00
II. BAHAN
Kayu meranti,balok
Kayu meranti,papan
Paku Biasa 2" - 5"
Zona II
Jumlah
Harga
Jumlah
8,985.00
34,965.00
4,032.00
7,800.00
22,142.25
9,621.50
1,370.00
88,915.75
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
-
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Harga
Satuan
0.150
0.450
0.045
0.075
59,900.00
77,700.00
89,600.00
104,000.00
M3
M3
Kg
0.020
0.007
0.100
2,453,200.00
2,725,800.00
13,700.00
II. BAHAN
Kayu Borneo,balok
Kayu Borneo,papan
Paku Biasa 2" - 5"
Jumlah
25,685.01
11,160.94
1,589.20
103,142.27
8,985.00
34,965.00
4,032.00
7,800.00
47,837.40
19,080.60
1,370.00
124,070.00
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
2,845,712.00
3,161,928.00
15,892.00
Jumlah
No
Satuan Indeks
Zona I
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
11,680.50
45,454.50
5,241.60
10,140.00
28,784.93
12,507.95
1,781.00
115,590.48
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
-
12,848.55
49,999.95
5,765.76
11,154.00
-
1,623,765.00
1,965,535.00
19,591.00
Jumlah
31,663.42
13,758.75
1,959.10
127,149.52
10,422.60
40,559.40
4,677.12
9,048.00
55,491.38
22,133.50
1,589.20
143,921.20
Harga
Satuan
Harga
Satuan
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
3,189,160.00
3,543,540.00
17,810.00
Jumlah
11,680.50
45,454.50
5,241.60
10,140.00
62,188.62
24,804.78
1,781.00
161,291.00
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
-
Harga
Satuan
12,848.55
49,999.95
5,765.76
11,154.00
-
3,508,076.00
3,897,894.00
19,591.00
Jumlah
Zona III
Jumlah
Harga
Jumlah
Harga
68,407.48
27,285.26
1,959.10
177,420.10
Zona IV
Jumlah
Harga
Harga
Satuan
Jumlah
Harga
Oh
Oh
Oh
Oh
0.150
0.450
0.045
0.075
59,900.00
77,700.00
89,600.00
104,000.00
8,985.00
34,965.00
4,032.00
7,800.00
-
1.01
69,484.00
90,132.00
103,936.00
120,640.00
-
10,422.60
40,559.40
4,677.12
9,048.00
-
1.02
77,870.00
101,010.00
116,480.00
135,200.00
-
11,680.50
45,454.50
5,241.60
10,140.00
-
1.02
85,657.00
111,111.00
128,128.00
148,720.00
-
12,848.55
49,999.95
5,765.76
11,154.00
-
M3
M3
Kg
Lt
Lbr
0.020
0.007
0.100
0.560
1.000
1,553,700.00
1,673,200.00
13,700.00
28,700.00
87,600.00
30,297.15
11,712.40
1,370.00
16,072.00
87,600.00
202,833.55
1,802,292.00
1,940,912.00
15,892.00
33,292.00
101,616.00
Jumlah
35,144.69
13,586.38
1,589.20
18,643.52
101,616.00
235,286.92
2,019,810.00
2,175,160.00
17,810.00
37,310.00
113,880.00
Jumlah
39,386.30
15,226.12
1,781.00
20,893.60
113,880.00
263,683.62
2,221,791.00
2,392,676.00
19,591.00
41,041.00
125,268.00
Jumlah
43,324.92
16,748.73
1,959.10
22,982.96
125,268.00
290,051.98
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
1,476,150.00
1,786,850.00
17,810.00
Jumlah
Zona II
Jumlah
Harga
II. BAHAN
Kayu bangkirai,balok
Kayu bangkirai,papan
Paku Biasa 2" - 5"
Lem kayu
Teakwood 4' x 8' x 4 mm
77,870.00
101,010.00
116,480.00
135,200.00
-
Harga
Satuan
Zona III
Jumlah
Harga
Harga
Satuan
Zona IV
Jumlah
Harga
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
Oh
Oh
Oh
Oh
10,422.60
40,559.40
4,677.12
9,048.00
-
1,317,180.00
1,594,420.00
15,892.00
Jumlah
Zona I
Uraian
Zona III
Jumlah
Harga
Harga
Satuan
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.200
0.600
0.060
0.010
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kayu Kamper,balok
Kayu Kamper,papan
Paku Biasa 2" - 5"
Lem kayu
Teakwood 4' x 8' x 4 mm
M3
M3
Kg
Lt
Lbr
0.020
0.007
0.100
0.560
1.000
1,962,500.00
1,673,200.00
13,700.00
28,700.00
87,600.00
Jumlah
Zona II
Jumlah
Harga
11,980.00
46,620.00
5,376.00
1,040.00
38,268.75
11,712.40
1,370.00
16,072.00
87,600.00
220,039.15
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
2,276,500.00
1,940,912.00
15,892.00
33,292.00
101,616.00
Jumlah
Zona III
Jumlah
Harga
13,896.80
54,079.20
6,236.16
1,206.40
44,391.75
13,586.38
1,589.20
18,643.52
101,616.00
255,245.41
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
2,551,250.00
2,175,160.00
17,810.00
37,310.00
113,880.00
Jumlah
Zona IV
Jumlah
Harga
15,574.00
60,606.00
6,988.80
1,352.00
49,749.38
15,226.12
1,781.00
20,893.60
113,880.00
286,050.90
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
2,806,375.00
2,392,676.00
19,591.00
41,041.00
125,268.00
Jumlah
17,131.40
66,666.60
7,687.68
1,487.20
54,724.31
16,748.73
1,959.10
22,982.96
125,268.00
314,655.98
Halaman 38
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Harga
Satuan
Oh
Oh
Oh
Oh
0.600
1.800
0.180
0.030
59,900.00
77,700.00
89,600.00
104,000.00
M3
Kg
Bh
0.007
0.100
0.150
1,553,700.00
13,700.00
500.00
II. BAHAN
Kayu bangkirai,balok
Paku Biasa 2" - 5"
Paku skrup 3,5"
Zona II
Jumlah
Harga
Jumlah
35,940.00
139,860.00
16,128.00
3,120.00
10,875.90
1,370.00
75.00
207,368.90
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
-
Harga
Satuan
Oh
Oh
Oh
Oh
0.025
0.075
0.008
0.001
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Plywood 4' x 8' x 4 mm
Paku Biasa 1/2" - 1"
Lbr
Kg
0.400
0.050
82,500.00
600.00
Jumlah
1,497.50
5,827.50
672.00
135.20
33,000.00
30.00
41,162.20
Harga
Satuan
No
Satuan Indeks
Zona I
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.021
0.021
0.002
0.001
II. BAHAN
Kayu Profil bangkirai uk. 4 cm
M'
1.050
Jumlah
1,257.90
1,631.70
179.20
104.00
3,172.80
No
Satuan Indeks
Zona I
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.021
0.021
0.002
0.001
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kayu Profil bangkirai uk. 4 cm
M'
1.050
31,500.00
Jumlah
Harga
Satuan
1,257.90
1,631.70
179.20
104.00
33,075.00
36,247.80
14,138.67
1,781.00
97.50
269,579.57
85,657.00
111,111.00
128,128.00
148,720.00
-
51,394.20
199,999.80
23,063.04
4,461.60
-
2,221,791.00
19,591.00
715.00
Jumlah
15,552.54
1,959.10
107.25
296,537.53
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
107,250.00
780.00
Jumlah
1,946.75
7,575.75
873.60
175.76
42,900.00
39.00
53,510.86
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
117,975.00
858.00
Jumlah
Zona III
Jumlah
Harga
1,459.16
1,892.77
207.87
120.64
3,680.45
Harga
Satuan
2,141.43
8,333.33
960.96
193.34
47,190.00
42.90
58,861.95
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
Jumlah
1,635.27
2,121.21
232.96
135.20
4,124.64
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
Jumlah
1,798.80
2,333.33
256.26
148.72
4,537.10
Zona II
Jumlah
Harga
46,722.00
181,818.00
20,966.40
4,056.00
-
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
Jumlah
Harga
Satuan
1,737.10
6,759.90
779.52
156.83
38,280.00
34.80
47,748.15
Harga
Satuan
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
2,019,810.00
17,810.00
650.00
Jumlah
Zona II
Jumlah
Harga
59,900.00
77,700.00
89,600.00
104,000.00
77,870.00
101,010.00
116,480.00
135,200.00
-
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
95,700.00
696.00
Jumlah
Harga
Satuan
Zona IV
Jumlah
Harga
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
12,616.04
1,589.20
87.00
240,547.92
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
41,690.40
162,237.60
18,708.48
3,619.20
-
1,802,292.00
15,892.00
580.00
Jumlah
Zona I
Uraian
Zona III
Jumlah
Harga
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
36,540.00
Jumlah
1,459.16
1,892.77
207.87
120.64
38,367.00
42,047.45
Harga
Satuan
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
40,950.00
Jumlah
1,635.27
2,121.21
232.96
135.20
42,997.50
47,122.14
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
45,045.00
Jumlah
1,798.80
2,333.33
256.26
148.72
47,297.25
51,834.35
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
1.650
0.250
0.025
0.080
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Pasir Beton
Koral Beton
Semen portland
M3
M3
Kg
0.520
0.870
218.000
227,100.00
289,200.00
1,434.00
Jumlah
Zona II
Jumlah
Harga
98,835.00
19,425.00
2,240.00
8,320.00
118,092.00
251,604.00
312,612.00
811,128.00
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
263,436.00
335,472.00
1,663.44
Jumlah
Zona III
Jumlah
Harga
114,648.60
22,533.00
2,598.40
9,651.20
136,986.72
291,860.64
362,629.92
940,908.48
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
295,230.00
375,960.00
1,864.20
Jumlah
Zona IV
Jumlah
Harga
128,485.50
25,252.50
2,912.00
10,816.00
153,519.60
327,085.20
406,395.60
1,054,466.40
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
324,753.00
413,556.00
2,050.62
Jumlah
Jumlah
Harga
141,334.05
27,777.75
3,203.20
11,897.60
168,871.56
359,793.72
447,035.16
1,159,913.04
Halaman 39
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Harga
Satuan
Harga
Satuan
114,648.60
22,533.00
2,598.40
9,651.20
-
1.02
77,870.00
101,010.00
116,480.00
135,200.00
-
128,485.50
25,252.50
2,912.00
10,816.00
-
1.02
85,657.00
111,111.00
128,128.00
148,720.00
-
141,334.05
27,777.75
3,203.20
11,897.60
-
M3
M3
Kg
0.470
0.940
197.000
227,100.00
289,200.00
1,434.00
106,737.00
271,848.00
282,498.00
789,903.00
263,436.00
335,472.00
1,663.44
Jumlah
123,814.92
315,343.68
327,697.68
916,287.48
295,230.00
375,960.00
1,864.20
Jumlah
138,758.10
353,402.40
367,247.40
1,026,873.90
324,753.00
413,556.00
2,050.62
Jumlah
152,633.91
388,742.64
403,972.14
1,129,561.29
Satuan Indeks
Zona I
Harga
Satuan
Zona II
Jumlah
Harga
Oh
Oh
Oh
Oh
1.650
0.250
0.025
0.080
59,900.00
77,700.00
89,600.00
104,000.00
M3
M3
Kg
0.570
0.870
173.000
227,100.00
289,200.00
1,434.00
II. BAHAN
Jumlah
98,835.00
19,425.00
2,240.00
8,320.00
129,447.00
251,604.00
248,082.00
757,953.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Harga
Satuan
Harga
Satuan
Jumlah
Harga
114,648.60
22,533.00
2,598.40
9,651.20
-
77,870.00
101,010.00
116,480.00
135,200.00
-
128,485.50
25,252.50
2,912.00
10,816.00
-
85,657.00
111,111.00
128,128.00
148,720.00
-
263,436.00
335,472.00
1,663.44
Jumlah
150,158.52
291,860.64
287,775.12
879,225.48
295,230.00
375,960.00
1,864.20
Jumlah
168,281.10
327,085.20
322,506.60
985,338.90
324,753.00
413,556.00
2,050.62
Jumlah
141,334.05
27,777.75
3,203.20
11,897.60
185,109.21
359,793.72
354,757.26
1,083,872.79
Harga
Satuan
Zona III
Jumlah
Harga
Harga
Satuan
Zona IV
Jumlah
Harga
Harga
Satuan
Jumlah
Harga
1.150
0.020
0.002
0.006
59,900.00
77,700.00
89,600.00
104,000.00
68,885.00
1,554.00
179.20
624.00
-
1.01
69,484.00
90,132.00
103,936.00
120,640.00
-
79,906.60
1,802.64
207.87
723.84
-
1.02
77,870.00
101,010.00
116,480.00
135,200.00
-
89,550.50
2,020.20
232.96
811.20
-
1.02
85,657.00
111,111.00
128,128.00
148,720.00
-
98,505.55
2,222.22
256.26
892.32
-
M3
M3
Kg
0.026
0.044
10.000
227,100.00
289,200.00
1,434.00
5,904.60
12,724.80
14,340.00
104,211.60
263,436.00
335,472.00
1,663.44
Jumlah
6,849.34
14,760.77
16,634.40
120,885.46
295,230.00
375,960.00
1,864.20
Jumlah
7,675.98
16,542.24
18,642.00
135,475.08
324,753.00
413,556.00
2,050.62
Jumlah
8,443.58
18,196.46
20,506.20
149,022.59
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
1.650
0.250
0.025
0.080
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Pasir Beton
Koral Beton
Semen portland
M3
M3
Kg
0.520
0.780
232.000
227,100.00
289,200.00
1,434.00
Jumlah
98,835.00
19,425.00
2,240.00
8,320.00
118,092.00
225,576.00
332,688.00
805,176.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Harga
Satuan
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
1.650
0.250
0.025
0.080
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Pasir Beton
Koral Beton
Semen portland
M3
M3
Kg
0.450
0.900
280.000
227,100.00
289,200.00
1,434.00
Jumlah
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
263,436.00
335,472.00
1,663.44
Jumlah
114,648.60
22,533.00
2,598.40
9,651.20
136,986.72
261,668.16
385,918.08
934,004.16
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
295,230.00
375,960.00
1,864.20
Jumlah
Zona II
Jumlah
Harga
98,835.00
19,425.00
2,240.00
8,320.00
102,195.00
260,280.00
401,520.00
892,815.00
Zona IV
Jumlah
Harga
128,485.50
25,252.50
2,912.00
10,816.00
153,519.60
293,248.80
432,494.40
1,046,728.80
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
324,753.00
413,556.00
2,050.62
Jumlah
141,334.05
27,777.75
3,203.20
11,897.60
168,871.56
322,573.68
475,743.84
1,151,401.68
Zona I
Uraian
Zona IV
Jumlah
Harga
Oh
Oh
Oh
Oh
Jumlah
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
II. BAHAN
Pasir Beton
Koral Beton
Semen portland
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
-
Zona I
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
-
No
Uraian
Harga
Satuan
98,835.00
19,425.00
2,240.00
8,320.00
-
Pasir Beton
Koral Beton
Semen portland
Zona IV
Jumlah
Harga
59,900.00
77,700.00
89,600.00
104,000.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Harga
Satuan
1.650
0.250
0.025
0.080
Jumlah
Uraian
Zona III
Jumlah
Harga
Oh
Oh
Oh
Oh
II. BAHAN
Pasir Beton
Koral Beton
Semen portland
Zona II
Jumlah
Harga
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
263,436.00
335,472.00
1,663.44
Jumlah
Zona III
Jumlah
Harga
114,648.60
22,533.00
2,598.40
9,651.20
118,546.20
301,924.80
465,763.20
1,035,665.40
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
295,230.00
375,960.00
1,864.20
Jumlah
Zona IV
Jumlah
Harga
128,485.50
25,252.50
2,912.00
10,816.00
132,853.50
338,364.00
521,976.00
1,160,659.50
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
324,753.00
413,556.00
2,050.62
Jumlah
Jumlah
Harga
141,334.05
27,777.75
3,203.20
11,897.60
146,138.85
372,200.40
574,173.60
1,276,725.45
Halaman 40
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Harga
Satuan
Oh
Oh
Oh
Oh
1.650
0.250
0.025
0.080
59,900.00
77,700.00
89,600.00
104,000.00
M3
M3
Kg
0.560
0.700
352.000
227,100.00
289,200.00
1,434.00
II. BAHAN
Pasir Beton
Koral Beton
Semen portland
Zona II
Jumlah
Harga
Jumlah
98,835.00
19,425.00
2,240.00
8,320.00
127,176.00
202,440.00
504,768.00
963,204.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
-
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Harga
Satuan
1.650
0.250
0.025
0.080
59,900.00
77,700.00
89,600.00
104,000.00
M3
M3
Kg
0.420
0.540
357.000
227,100.00
289,200.00
1,434.00
II. BAHAN
Pasir Beton
Koral Beton
Semen portland
Jumlah
98,835.00
19,425.00
2,240.00
8,320.00
95,382.00
156,168.00
511,938.00
892,308.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
-
141,334.05
27,777.75
3,203.20
11,897.60
-
324,753.00
413,556.00
2,050.62
Jumlah
181,861.68
289,489.20
721,818.24
1,377,381.72
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
-
114,648.60
22,533.00
2,598.40
9,651.20
-
263,436.00
335,472.00
1,663.44
Jumlah
110,643.12
181,154.88
593,848.08
1,035,077.28
Harga
Satuan
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
295,230.00
375,960.00
1,864.20
Jumlah
128,485.50
25,252.50
2,912.00
10,816.00
123,996.60
203,018.40
665,519.40
1,160,000.40
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
-
141,334.05
27,777.75
3,203.20
11,897.60
-
324,753.00
413,556.00
2,050.62
Jumlah
136,396.26
223,320.24
732,071.34
1,276,000.44
Harga
Satuan
Zona III
Jumlah
Harga
Harga
Satuan
Zona IV
Jumlah
Harga
Harga
Satuan
Jumlah
Harga
59,900.00
77,700.00
89,600.00
104,000.00
98,835.00
19,425.00
2,240.00
8,320.00
-
1.01
69,484.00
90,132.00
103,936.00
120,640.00
-
114,648.60
22,533.00
2,598.40
9,651.20
-
1.02
77,870.00
101,010.00
116,480.00
135,200.00
-
128,485.50
25,252.50
2,912.00
10,816.00
-
1.02
85,657.00
111,111.00
128,128.00
148,720.00
-
141,334.05
27,777.75
3,203.20
11,897.60
-
M3
M3
Kg
0.470
0.780
386.000
227,100.00
289,200.00
1,434.00
106,737.00
225,576.00
553,524.00
1,014,657.00
263,436.00
335,472.00
1,663.44
Jumlah
123,814.92
261,668.16
642,087.84
1,177,002.12
295,230.00
375,960.00
1,864.20
Jumlah
138,758.10
293,248.80
719,581.20
1,319,054.10
324,753.00
413,556.00
2,050.62
Jumlah
152,633.91
322,573.68
791,539.32
1,450,959.51
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
1.650
0.250
0.025
0.080
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Pasir Beton
Koral Beton
Semen portland
M3
M3
Kg
0.370
0.740
479.000
227,100.00
289,200.00
1,434.00
Jumlah
98,835.00
19,425.00
2,240.00
8,320.00
84,027.00
214,008.00
686,886.00
1,113,741.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Harga
Satuan
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
1.650
0.250
0.025
0.080
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Pasir Beton
Koral Beton
Semen portland
Rapidrant
M3
M3
Kg
Gln
0.500
0.800
440.000
2.460
227,100.00
289,200.00
1,434.00
Jumlah
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
263,436.00
335,472.00
1,663.44
Jumlah
114,648.60
22,533.00
2,598.40
9,651.20
97,471.32
248,249.28
796,787.76
1,291,939.56
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
295,230.00
375,960.00
1,864.20
Jumlah
Zona II
Jumlah
Harga
98,835.00
19,425.00
2,240.00
8,320.00
113,550.00
231,360.00
630,960.00
1,104,690.00
Zona IV
Jumlah
Harga
128,485.50
25,252.50
2,912.00
10,816.00
109,235.10
278,210.40
892,951.80
1,447,863.30
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
324,753.00
413,556.00
2,050.62
Jumlah
141,334.05
27,777.75
3,203.20
11,897.60
120,158.61
306,031.44
982,246.98
1,592,649.63
Zona I
Uraian
165,328.80
263,172.00
656,198.40
1,252,165.20
Jumlah
Harga
1.650
0.250
0.025
0.080
Jumlah
Uraian
295,230.00
375,960.00
1,864.20
Jumlah
128,485.50
25,252.50
2,912.00
10,816.00
-
Harga
Satuan
Oh
Oh
Oh
Oh
II. BAHAN
Pasir Beton
Koral Beton
Semen portland
77,870.00
101,010.00
116,480.00
135,200.00
-
Zona II
Jumlah
Harga
Zona IV
Jumlah
Harga
Zona I
Uraian
147,524.16
234,830.40
585,530.88
1,117,316.64
Harga
Satuan
Zona II
Jumlah
Harga
Oh
Oh
Oh
Oh
114,648.60
22,533.00
2,598.40
9,651.20
-
263,436.00
335,472.00
1,663.44
Jumlah
Zona I
Uraian
Zona III
Jumlah
Harga
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
263,436.00
335,472.00
1,663.44
Jumlah
Zona III
Jumlah
Harga
114,648.60
22,533.00
2,598.40
9,651.20
131,718.00
268,377.60
731,913.60
1,281,440.40
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
295,230.00
375,960.00
1,864.20
Jumlah
Zona IV
Jumlah
Harga
128,485.50
25,252.50
2,912.00
10,816.00
147,615.00
300,768.00
820,248.00
1,436,097.00
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
324,753.00
413,556.00
2,050.62
Jumlah
Jumlah
Harga
141,334.05
27,777.75
3,203.20
11,897.60
162,376.50
330,844.80
902,272.80
1,579,706.70
Halaman 41
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Harga
Satuan
Oh
Oh
Oh
Oh
1.650
0.250
0.025
0.080
59,900.00
77,700.00
89,600.00
104,000.00
M3
M3
Kg
Ltr
0.540
0.810
336.000
1.000
227,100.00
289,200.00
1,434.00
154,000.00
II. BAHAN
Pasir Beton
Koral Beton
Semen portland
Puzzdith - 100 XR
Zona II
Jumlah
Harga
Jumlah
Harga
Satuan
98,835.00
19,425.00
2,240.00
8,320.00
-
69,484.00
90,132.00
103,936.00
120,640.00
-
122,634.00
234,252.00
481,824.00
154,000.00
1,121,530.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Harga
Satuan
295,230.00
375,960.00
1,864.20
200,200.00
Jumlah
128,485.50
25,252.50
2,912.00
10,816.00
159,424.20
304,527.60
626,371.20
200,200.00
1,457,989.00
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
-
141,334.05
27,777.75
3,203.20
11,897.60
-
324,753.00
413,556.00
2,050.62
220,220.00
Jumlah
175,366.62
334,980.36
689,008.32
220,220.00
1,603,787.90
Harga
Satuan
Zona III
Jumlah
Harga
Harga
Satuan
Zona IV
Jumlah
Harga
Harga
Satuan
Jumlah
Harga
59,900.00
77,700.00
89,600.00
104,000.00
119,800.00
27,195.00
3,136.00
104,000.00
-
1.01
69,484.00
90,132.00
103,936.00
120,640.00
-
138,968.00
31,546.20
3,637.76
120,640.00
-
1.02
77,870.00
101,010.00
116,480.00
135,200.00
-
155,740.00
35,353.50
4,076.80
135,200.00
-
1.02
85,657.00
111,111.00
128,128.00
148,720.00
-
171,314.00
38,888.85
4,484.48
148,720.00
-
M3
0.540
0.810
336.000
227,100.00
289,200.00
1,434.00
122,634.00
234,252.00
481,824.00
1,092,841.00
263,436.00
335,472.00
1,663.44
Jumlah
142,255.44
271,732.32
558,915.84
1,267,695.56
295,230.00
375,960.00
1,864.20
Jumlah
159,424.20
304,527.60
626,371.20
1,420,693.30
324,753.00
413,556.00
2,050.62
Jumlah
175,366.62
334,980.36
689,008.32
1,562,762.63
M3
Kg
No
Satuan Indeks
Zona I
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
2.000
0.350
0.035
1.000
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Pasir Beton
Koral Beton
Semen portland
M3
M3
Kg
0.470
0.930
291.000
227,100.00
289,200.00
1,434.00
Jumlah
Harga
Satuan
119,800.00
27,195.00
3,136.00
104,000.00
106,737.00
268,956.00
417,294.00
-
No
Satuan Indeks
Oh
Oh
Oh
Oh
2.000
0.350
0.035
1.000
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Pasir Beton
Koral Beton
Semen portland
M3
M3
Kg
0.440
0.880
367.000
227,100.00
289,200.00
1,434.00
Jumlah
Harga
Satuan
119,800.00
27,195.00
3,136.00
104,000.00
99,924.00
254,496.00
526,278.00
1,134,829.00
No
Satuan Indeks
Oh
Oh
Oh
Oh
2.000
0.350
0.035
1.000
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Pasir Beton
Koral Beton
Semen portland
M3
M3
Kg
0.520
0.520
615.000
227,100.00
289,200.00
1,434.00
Jumlah
Jumlah
138,968.00
31,546.20
3,637.76
120,640.00
115,911.84
295,215.36
610,482.48
1,316,401.64
Harga
Satuan
1,361,253.40
85,657.00
111,111.00
128,128.00
148,720.00
324,753.00
413,556.00
2,050.62
-
171,314.00
38,888.85
4,484.48
148,720.00
152,633.91
384,607.08
596,730.42
-
Jumlah
1,497,378.74
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
295,230.00
375,960.00
1,864.20
Jumlah
Zona II
119,800.00
27,195.00
3,136.00
104,000.00
118,092.00
150,384.00
881,910.00
1,404,517.00
155,740.00
35,353.50
4,076.80
135,200.00
138,758.10
349,642.80
542,482.20
-
Jumlah
Harga
155,740.00
35,353.50
4,076.80
135,200.00
129,901.20
330,844.80
684,161.40
1,475,277.70
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
324,753.00
413,556.00
2,050.62
Jumlah
171,314.00
38,888.85
4,484.48
148,720.00
142,891.32
363,929.28
752,577.54
1,622,805.47
Zona I
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
77,870.00
101,010.00
116,480.00
135,200.00
295,230.00
375,960.00
1,864.20
-
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
263,436.00
335,472.00
1,663.44
Jumlah
Jumlah
Harga
Zona IV
Jumlah
Harga
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Harga
Satuan
1,214,656.88
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
138,968.00
31,546.20
3,637.76
120,640.00
123,814.92
311,988.96
484,061.04
-
Jumlah
Zona I
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
263,436.00
335,472.00
1,663.44
-
1,047,118.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
77,870.00
101,010.00
116,480.00
135,200.00
-
Harga
Satuan
2.000
0.350
0.035
1.000
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Zona IV
Jumlah
Harga
Oh
Oh
Oh
Oh
Jumlah
Uraian
142,255.44
271,732.32
558,915.84
178,640.00
1,300,974.80
Harga
Satuan
Zona II
Jumlah
Harga
II. BAHAN
Pasir Beton
Koral Beton
Semen portland
114,648.60
22,533.00
2,598.40
9,651.20
-
263,436.00
335,472.00
1,663.44
178,640.00
Jumlah
Zona I
Uraian
Zona III
Jumlah
Harga
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
263,436.00
335,472.00
1,663.44
Jumlah
Zona III
Jumlah
Harga
138,968.00
31,546.20
3,637.76
120,640.00
136,986.72
174,445.44
1,023,015.60
1,629,239.72
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
295,230.00
375,960.00
1,864.20
Jumlah
Zona IV
Jumlah
Harga
155,740.00
35,353.50
4,076.80
135,200.00
153,519.60
195,499.20
1,146,483.00
1,825,872.10
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
324,753.00
413,556.00
2,050.62
Jumlah
Jumlah
Harga
171,314.00
38,888.85
4,484.48
148,720.00
168,871.56
215,049.12
1,261,131.30
2,008,459.31
Halaman 42
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Harga
Satuan
Harga
Satuan
138,968.00
31,546.20
3,637.76
120,640.00
-
1.02
77,870.00
101,010.00
116,480.00
135,200.00
-
155,740.00
35,353.50
4,076.80
135,200.00
-
1.02
85,657.00
111,111.00
128,128.00
148,720.00
-
171,314.00
38,888.85
4,484.48
148,720.00
-
M3
M3
Kg
0.520
0.520
615.000
227,100.00
289,200.00
1,434.00
118,092.00
150,384.00
881,910.00
1,404,517.00
263,436.00
335,472.00
1,663.44
Jumlah
136,986.72
174,445.44
1,023,015.60
1,629,239.72
295,230.00
375,960.00
1,864.20
Jumlah
153,519.60
195,499.20
1,146,483.00
1,825,872.10
324,753.00
413,556.00
2,050.62
Jumlah
168,871.56
215,049.12
1,261,131.30
2,008,459.31
Satuan Indeks
Zona I
Harga
Satuan
Zona II
Jumlah
Harga
Oh
Oh
Oh
Oh
2.100
0.350
0.035
0.105
59,900.00
77,700.00
89,600.00
104,000.00
M3
M3
Kg
0.480
0.800
400.000
1.200
227,100.00
289,200.00
1,434.00
II. BAHAN
Jumlah
125,790.00
27,195.00
3,136.00
10,920.00
109,008.00
231,360.00
573,600.00
1,081,009.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.060
0.030
0.003
0.003
II. BAHAN
Waterstop lebar 150 mm
M3
1.050
Harga
Satuan
Jumlah
3,594.00
2,331.00
268.80
312.00
6,505.80
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
263,436.00
335,472.00
1,663.44
Jumlah
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.070
0.035
0.004
0.007
II. BAHAN
Waterstop lebar 200 mm
M3
1.050
Jumlah
4,193.00
2,719.50
313.60
728.00
7,954.10
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Harga
Satuan
I. UPAH
Pekerja
Tukang Batu
Mandor
Oh
Oh
Oh
0.550
0.035
0.002
59,900.00
77,700.00
104,000.00
II. BAHAN
Waterstop lebar 230 mm
M3
1.050
281,400.00
Jumlah
295,230.00
375,960.00
1,864.20
Jumlah
4,169.04
2,703.96
311.81
361.92
7,546.73
Harga
Satuan
32,945.00
2,719.50
208.00
295,470.00
331,342.50
141,710.40
300,768.00
745,680.00
1,405,311.70
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
-
179,879.70
38,888.85
4,484.48
15,615.60
-
324,753.00
413,556.00
2,050.62
Jumlah
155,881.44
330,844.80
820,248.00
1,545,842.87
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
Jumlah
4,672.20
3,030.30
349.44
405.60
8,457.54
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
Jumlah
5,139.42
3,333.33
384.38
446.16
9,303.29
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
Jumlah
4,863.88
3,154.62
363.78
844.48
9,226.76
Harga
Satuan
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
Jumlah
5,450.90
3,535.35
407.68
946.40
10,340.33
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
Jumlah
5,995.99
3,888.89
448.45
1,041.04
11,374.36
Zona II
Jumlah
Harga
163,527.00
35,353.50
4,076.80
14,196.00
-
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
Jumlah
Zona I
Uraian
77,870.00
101,010.00
116,480.00
135,200.00
-
Zona II
Jumlah
Harga
59,900.00
77,700.00
89,600.00
104,000.00
126,449.28
268,377.60
665,376.00
1,253,970.44
Zona IV
Jumlah
Harga
Zona I
Harga
Satuan
145,916.40
31,546.20
3,637.76
12,667.20
-
Harga
Satuan
Zona II
Jumlah
Harga
59,900.00
77,700.00
89,600.00
104,000.00
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
-
Zona I
Uraian
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
-
No
Uraian
Harga
Satuan
119,800.00
27,195.00
3,136.00
104,000.00
-
Pasir Beton
Koral Beton 2/3
Semen portland
Storox - 100
Zona IV
Jumlah
Harga
59,900.00
77,700.00
89,600.00
104,000.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Harga
Satuan
2.000
0.350
0.035
1.000
Jumlah
Uraian
Zona III
Jumlah
Harga
Oh
Oh
Oh
Oh
II. BAHAN
Pasir Beton
Koral Beton
Semen portland
Zona II
Jumlah
Harga
Harga
Satuan
69,484.00
90,132.00
120,640.00
326,424.00
Jumlah
Zona III
Jumlah
Harga
38,216.20
3,154.62
241.28
342,745.20
384,357.30
Harga
Satuan
77,870.00
101,010.00
135,200.00
365,820.00
Jumlah
Zona IV
Jumlah
Harga
42,828.50
3,535.35
270.40
384,111.00
430,745.25
Harga
Satuan
85,657.00
111,111.00
148,720.00
402,402.00
Jumlah
Jumlah
Harga
47,111.35
3,888.89
297.44
422,522.10
473,819.78
Halaman 43
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Batu
Mandor
Harga
Satuan
Oh
Oh
Oh
0.550
0.035
0.000
0.003
59,900.00
77,700.00
104,000.00
M3
1.050
308,000.00
II. BAHAN
Waterstop lebar 250 mm
Zona II
Jumlah
Harga
Jumlah
32,945.00
2,719.50
323,400.00
359,064.50
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
69,484.00
90,132.00
120,640.00
-
I. UPAH
Pekerja
Tukang Batu
Mandor
Harga
Satuan
0.550
0.035
0.003
59,900.00
77,700.00
104,000.00
M3
1.050
281,400.00
II. BAHAN
Waterstop lebar 230 mm
Jumlah
32,945.00
2,719.50
312.00
295,470.00
331,446.50
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
I. UPAH
Pekerja
Tukang Batu
Mandor
Harga
Satuan
Oh
Oh
Oh
0.550
0.035
0.003
59,900.00
77,700.00
104,000.00
M3
1.050
308,000.00
II. BAHAN
Waterstop lebar 250 mm
Jumlah
32,945.00
2,719.50
312.00
323,400.00
359,376.50
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Harga
Satuan
Oh
Oh
Oh
0.550
0.035
0.003
59,900.00
77,700.00
104,000.00
II. BAHAN
Waterstop lebar 300 mm
M3
1.050
361,100.00
Jumlah
32,945.00
2,719.50
312.00
379,155.00
415,131.50
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
326,424.00
Jumlah
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
II. BAHAN
Waterstop lebar 320 mm
Harga
Satuan
Oh
Oh
Oh
0.080
0.040
0.004
0.004
59,900.00
77,700.00
89,600.00
104,000.00
M3
1.050
414,300.00
Jumlah
4,792.00
3,108.00
358.40
416.00
435,015.00
443,689.40
85,657.00
111,111.00
148,720.00
-
47,111.35
3,888.89
-
440,440.00
Jumlah
462,462.00
513,462.24
342,745.20
384,477.94
Zona IV
Jumlah
Harga
77,870.00
101,010.00
135,200.00
365,820.00
Jumlah
Harga
Satuan
42,828.50
3,535.35
405.60
384,111.00
430,880.45
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
148,720.00
-
47,111.35
3,888.89
446.16
-
402,402.00
Jumlah
Zona III
Jumlah
Harga
69,484.00
90,132.00
120,640.00
-
38,216.20
3,154.62
361.92
-
357,280.00
Jumlah
375,144.00
416,876.74
Harga
Satuan
422,522.10
473,968.50
Zona IV
Jumlah
Harga
77,870.00
101,010.00
135,200.00
400,400.00
Jumlah
42,828.50
3,535.35
405.60
420,420.00
467,189.45
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
148,720.00
-
47,111.35
3,888.89
446.16
-
440,440.00
Jumlah
462,462.00
513,908.40
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
120,640.00
418,876.00
Jumlah
38,216.20
3,154.62
361.92
439,819.80
481,552.54
Harga
Satuan
Zona IV
Jumlah
Harga
77,870.00
101,010.00
135,200.00
469,430.00
Jumlah
42,828.50
3,535.35
405.60
492,901.50
539,670.95
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
148,720.00
516,373.00
Jumlah
47,111.35
3,888.89
446.16
542,191.65
593,638.05
Zona II
Jumlah
Harga
420,420.00
466,783.85
Jumlah
Harga
Zona I
Uraian
38,216.20
3,154.62
361.92
-
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Batu
Mandor
400,400.00
Jumlah
42,828.50
3,535.35
-
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
120,640.00
-
Zona I
Uraian
77,870.00
101,010.00
135,200.00
-
Zona II
Jumlah
Harga
Zona IV
Jumlah
Harga
Zona I
Uraian
375,144.00
416,514.82
Harga
Satuan
Zona II
Jumlah
Harga
Oh
Oh
Oh
38,216.20
3,154.62
-
357,280.00
Jumlah
Zona I
Uraian
Zona III
Jumlah
Harga
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
480,588.00
Jumlah
Zona III
Jumlah
Harga
5,558.72
3,605.28
415.74
482.56
504,617.40
514,679.70
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
538,590.00
Jumlah
Zona IV
Jumlah
Harga
6,229.60
4,040.40
465.92
540.80
565,519.50
576,796.22
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
592,449.00
Jumlah
Jumlah
Harga
6,852.56
4,444.44
512.51
594.88
622,071.45
634,475.84
Halaman 44
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
II. BAHAN
Besi beton (polos/ulir)
Kawat beton
Harga
Satuan
Zona II
Jumlah
Harga
Oh
Oh
Oh
0.070
0.070
0.007
0.004
59,900.00
77,700.00
89,600.00
104,000.00
Kg
Kg
10.500
0.015
24,800.00
27,600.00
Jumlah
4,193.00
5,439.00
627.20
416.00
260,400.00
414.00
271,489.20
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
28,768.00
32,016.00
Jumlah
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
II. BAHAN
Besi beton (polos/ulir)
Kawat beton
Harga
Satuan
0.050
0.050
0.005
0.005
59,900.00
77,700.00
89,600.00
104,000.00
Kg
Kg
10.500
0.015
24,800.00
27,600.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
2,995.00
3,885.00
448.00
520.00
260,400.00
414.00
268,662.00
Harga
Satuan
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
II. BAHAN
Besi jaring kawat baja
Kawat beton
Harga
Satuan
Oh
Oh
Oh
0.025
0.025
0.025
0.001
59,900.00
77,700.00
89,600.00
104,000.00
Kg
Kg
10.200
0.050
35,000.00
27,600.00
1,497.50
1,942.50
2,240.00
104.00
357,000.00
1,380.00
364,164.00
No
Satuan Indeks
Harga
Satuan
Harga
Satuan
Oh
Oh
Oh
0.026
0.520
0.260
0.026
0.026
59,900.00
77,700.00
89,600.00
104,000.00
Kg
Kg
Ltr
0.040
0.300
0.100
75,000.00
13,700.00
4,900.00
31,148.00
20,202.00
2,329.60
2,704.00
3,000.00
4,110.00
490.00
63,983.60
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
II. BAHAN
Kayu terentang
Paku Biasa 2" - 5"
Minyak Bekisting
3,893.50
5,050.50
582.40
676.00
338,520.00
538.20
349,260.60
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
35,464.00
39,468.00
Jumlah
4,282.85
5,555.55
640.64
743.60
372,372.00
592.02
384,186.66
Harga
Satuan
Oh
Oh
Oh
0.026
0.520
0.260
0.026
0.026
59,900.00
77,700.00
89,600.00
104,000.00
Kg
Kg
Ltr
0.045
0.300
0.100
75,000.00
13,700.00
4,900.00
Jumlah
1,737.10
2,253.30
2,598.40
120.64
414,120.00
1,600.80
422,430.24
Harga
Satuan
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
45,500.00
35,880.00
Jumlah
1,946.75
2,525.25
2,912.00
135.20
464,100.00
1,794.00
473,413.20
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
50,050.00
39,468.00
Jumlah
2,141.43
2,777.78
3,203.20
148.72
510,510.00
1,973.40
520,754.52
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
87,000.00
15,892.00
5,684.00
Jumlah
36,131.68
23,434.32
2,702.34
3,136.64
3,480.00
4,767.60
568.40
74,220.98
Harga
Satuan
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
97,500.00
17,810.00
6,370.00
Jumlah
40,492.40
26,262.60
3,028.48
3,515.20
3,900.00
5,343.00
637.00
83,178.68
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
107,250.00
19,591.00
7,007.00
Jumlah
44,541.64
28,888.86
3,331.33
3,866.72
4,290.00
5,877.30
700.70
91,496.55
Zona I
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
5,995.99
7,777.77
896.90
594.88
372,372.00
592.02
388,229.56
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
32,240.00
35,880.00
Jumlah
Zona II
Jumlah
Harga
Jumlah
Uraian
1.02
85,657.00
111,111.00
128,128.00
148,720.00
35,464.00
39,468.00
Jumlah
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
40,600.00
32,016.00
Jumlah
Zona I
II. BAHAN
Kayu terentang
Paku Biasa 2" - 5"
Minyak Bekisting
3,474.20
4,506.60
519.68
603.20
302,064.00
480.24
311,647.92
Harga
Satuan
Zona II
Jumlah
Harga
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
Harga
Jumlah
Uraian
5,450.90
7,070.70
815.36
540.80
338,520.00
538.20
352,935.96
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
28,768.00
32,016.00
Jumlah
Zona I
Uraian
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
32,240.00
35,880.00
Jumlah
Zona II
Jumlah
Harga
Oh
Oh
Oh
4,863.88
6,309.24
727.55
482.56
302,064.00
480.24
314,927.47
Harga
Satuan
Zona I
Uraian
Zona III
Jumlah
Harga
Zona II
Jumlah
Harga
31,148.00
20,202.00
2,329.60
2,704.00
3,375.00
4,110.00
490.00
64,358.60
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
87,000.00
15,892.00
5,684.00
Jumlah
Zona III
Jumlah
Harga
36,131.68
23,434.32
2,702.34
3,136.64
3,915.00
4,767.60
568.40
74,655.98
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
97,500.00
17,810.00
6,370.00
Jumlah
Zona IV
Jumlah
Harga
40,492.40
26,262.60
3,028.48
3,515.20
4,387.50
5,343.00
637.00
83,666.18
Harga
Satuan
1.02
85,657.00
111,111.00
128,128.00
148,720.00
107,250.00
19,591.00
7,007.00
Jumlah
Jumlah
Harga
44,541.64
28,888.86
3,331.33
3,866.72
4,826.25
5,877.30
700.70
92,032.80
Halaman 45
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
II. BAHAN
Kayu terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Harga
Satuan
Zona II
Jumlah
Harga
Oh
Oh
Oh
0.026
0.520
0.260
0.026
0.026
59,900.00
77,700.00
89,600.00
104,000.00
Kg
Kg
Ltr
0.045
0.300
0.100
75,000.00
13,700.00
4,900.00
31,148.00
20,202.00
2,329.60
2,704.00
3,375.00
4,110.00
490.00
64,358.60
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
87,000.00
15,892.00
5,684.00
Jumlah
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
II. BAHAN
Kayu terentang
Paku Biasa 2" - 5"
Plywood Tebal 9 mm
Dolken Kayu Galam Dia. 8 - 4
Minyak Bekisting
Balok kayu borneo
Harga
Satuan
0.660
0.330
0.033
0.033
59,900.00
77,700.00
89,600.00
104,000.00
M3
Kg
Lbr
Btg
Ltr
0.040
0.400
0.350
2.000
0.200
2,453,200.00
13,700.00
229,100.00
53,800.00
4,900.00
M3
0.015
2,453,200.00
Jumlah
Harga
Satuan
II. BAHAN
Kayu terentang
Paku Biasa 2" - 5"
Plywood Tebal 9 mm
Dolken Kayu Galam Dia. 8 - 4
Minyak Bekisting
Balok kayu borneo
M3
Kg
Lbr
Btg
Ltr
0.040
0.400
0.350
2.000
0.200
0.018
2,453,200.00
13,700.00
229,100.00
53,800.00
4,900.00
2,453,200.00
M3
Jumlah
42,685.68
464,852.37
3,189,160.00
Jumlah
47,837.40
520,955.24
3,508,076.00
Jumlah
52,621.14
573,050.76
Zona II
39,534.00
25,641.00
2,956.80
3,432.00
98,128.00
5,480.00
80,185.00
107,600.00
980.00
44,157.60
408,094.40
Satuan Indeks
Harga
Satuan
II. BAHAN
Kayu terentang
Paku Biasa 2" - 5"
Plywood Tebal 9 mm
Dolken Kayu Galam Dia. 8 - 4
Minyak Bekisting
Balok kayu borneo
0.660
0.330
0.033
0.033
59,900.00
77,700.00
89,600.00
104,000.00
M3
Kg
Lbr
Btg
Ltr
0.040
0.400
0.350
6.000
0.200
0.015
2,453,200.00
13,700.00
229,100.00
53,800.00
4,900.00
2,453,200.00
M3
Jumlah
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
2,845,712.00
15,892.00
265,756.00
62,408.00
5,684.00
2,845,712.00
Jumlah
45,859.44
29,743.56
3,429.89
3,981.12
113,828.48
6,356.80
93,014.60
124,816.00
1,136.80
51,222.82
473,389.50
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
3,189,160.00
17,810.00
297,830.00
69,940.00
6,370.00
3,189,160.00
Jumlah
Zona II
Jumlah
Harga
39,534.00
25,641.00
2,956.80
3,432.00
98,128.00
5,480.00
80,185.00
322,800.00
980.00
36,798.00
615,934.80
Zona IV
Jumlah
Harga
51,394.20
33,333.30
3,843.84
4,461.60
127,566.40
7,124.00
104,240.50
139,880.00
1,274.00
57,404.88
530,522.72
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
3,508,076.00
19,591.00
327,613.00
76,934.00
7,007.00
3,508,076.00
Jumlah
56,533.62
36,666.63
4,228.22
4,907.76
140,323.04
7,836.40
114,664.55
153,868.00
1,401.40
63,145.37
583,574.99
Zona I
Oh
Oh
Oh
0.026
Jumlah
Harga
2,845,712.00
Jumlah
No
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Harga
Satuan
36,798.00
400,734.80
Harga
Satuan
Zona IV
Jumlah
Harga
56,533.62
36,666.63
4,228.22
4,907.76
140,323.04
7,836.40
114,664.55
153,868.00
1,401.40
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
3,508,076.00
19,591.00
327,613.00
76,934.00
7,007.00
Jumlah
Harga
59,900.00
77,700.00
89,600.00
104,000.00
Zona III
Jumlah
Harga
51,394.20
33,333.30
3,843.84
4,461.60
127,566.40
7,124.00
104,240.50
139,880.00
1,274.00
Zona I
0.660
0.330
0.033
0.033
44,541.64
28,888.86
3,331.33
3,866.72
4,826.25
5,877.30
700.70
92,032.80
77,870.00
101,010.00
116,480.00
135,200.00
3,189,160.00
17,810.00
297,830.00
69,940.00
6,370.00
Satuan Indeks
Oh
Oh
Oh
0.026
1.02
85,657.00
111,111.00
128,128.00
148,720.00
107,250.00
19,591.00
7,007.00
Jumlah
45,859.44
29,743.56
3,429.89
3,981.12
113,828.48
6,356.80
93,014.60
124,816.00
1,136.80
No
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
2,845,712.00
15,892.00
265,756.00
62,408.00
5,684.00
Harga
Satuan
40,492.40
26,262.60
3,028.48
3,515.20
4,387.50
5,343.00
637.00
83,666.18
Harga
Satuan
39,534.00
25,641.00
2,956.80
3,432.00
98,128.00
5,480.00
80,185.00
107,600.00
980.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
97,500.00
17,810.00
6,370.00
Jumlah
Zona II
Jumlah
Harga
Oh
Oh
Oh
0.026
36,131.68
23,434.32
2,702.34
3,136.64
3,915.00
4,767.60
568.40
74,655.98
Harga
Satuan
Zona I
Uraian
Zona III
Jumlah
Harga
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
2,845,712.00
15,892.00
265,756.00
62,408.00
5,684.00
2,845,712.00
Jumlah
Zona III
Jumlah
Harga
45,859.44
29,743.56
3,429.89
3,981.12
113,828.48
6,356.80
93,014.60
374,448.00
1,136.80
42,685.68
714,484.37
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
3,189,160.00
17,810.00
297,830.00
69,940.00
6,370.00
3,189,160.00
Jumlah
Zona IV
Jumlah
Harga
51,394.20
33,333.30
3,843.84
4,461.60
127,566.40
7,124.00
104,240.50
419,640.00
1,274.00
47,837.40
800,715.24
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
3,508,076.00
19,591.00
327,613.00
76,934.00
7,007.00
3,508,076.00
Jumlah
56,533.62
36,666.63
4,228.22
4,907.76
140,323.04
7,836.40
114,664.55
461,604.00
1,401.40
52,621.14
880,786.76
Halaman 46
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Harga
Satuan
Oh
Oh
Oh
0.026
0.660
0.330
0.033
0.033
59,900.00
77,700.00
89,600.00
104,000.00
M3
Kg
Lbr
Btg
Ltr
Bh
0.040
0.400
0.350
6.000
0.200
4.000
2,453,200.00
13,700.00
229,100.00
53,800.00
4,900.00
26,300.00
II. BAHAN
Kayu terentang
Paku Biasa 2" - 5"
Plywood Tebal 9 mm
Dolken Kayu Galam Dia. 8 - 4
Minyak Bekisting
Formtie/penjaga jarak bekistin
Zona II
Jumlah
Harga
Jumlah
Harga
Satuan
51,394.20
33,333.30
3,843.84
4,461.60
-
85,657.00
111,111.00
128,128.00
148,720.00
-
56,533.62
36,666.63
4,228.22
4,907.76
-
98,128.00
5,480.00
80,185.00
322,800.00
980.00
105,200.00
2,845,712.00
15,892.00
265,756.00
62,408.00
5,684.00
30,508.00
113,828.48
6,356.80
93,014.60
374,448.00
1,136.80
122,032.00
3,189,160.00
17,810.00
297,830.00
69,940.00
6,370.00
34,190.00
127,566.40
7,124.00
104,240.50
419,640.00
1,274.00
136,760.00
3,508,076.00
19,591.00
327,613.00
76,934.00
7,007.00
37,609.00
140,323.04
7,836.40
114,664.55
461,604.00
1,401.40
150,436.00
684,336.80
Jumlah
II. BAHAN
Kayu terentang
Paku Biasa 2" - 5"
Plywood Tebal 9 mm
Dolken Kayu Galam Dia. 8 - 4
Minyak Bekisting
Balok kayu borneo
M3
Kg
Lbr
Btg
Ltr
Bh
0.030
0.400
0.350
2.000
0.150
0.015
2,453,200.00
13,700.00
229,100.00
53,800.00
4,900.00
2,453,200.00
Jumlah
39,534.00
25,641.00
2,956.80
3,432.00
73,596.00
5,480.00
80,185.00
107,600.00
735.00
36,798.00
375,957.80
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Harga
Satuan
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
1.650
0.275
0.028
0.083
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Pasir Beton
Koral Beton
Semen portland
Air
Kg
Kg
Kg
Ltr
698.000
1047.000
371.000
215.000
227.10
289.20
1,434.00
15,000.00
Jumlah
98,835.00
21,367.50
2,508.80
8,632.00
158,515.80
302,792.40
532,014.00
3,225,000.00
4,349,665.50
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
0.026
II. BAHAN
Pasir Beton
Koral Beton
Semen portland
Air
Kg
Kg
Kg
Ltr
Harga
Satuan
1.650
0.275
0.028
0.083
59,900.00
77,700.00
89,600.00
104,000.00
684.000
1026.000
406.000
215.000
227.10
289.20
1,434.00
15,000.00
Jumlah
978,601.62
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
3,189,160.00
17,810.00
297,830.00
69,940.00
6,370.00
3,189,160.00
Jumlah
Harga
Satuan
51,394.20
33,333.30
3,843.84
4,461.60
95,674.80
7,124.00
104,240.50
139,880.00
955.50
47,837.40
488,745.14
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
3,508,076.00
19,591.00
327,613.00
76,934.00
7,007.00
3,508,076.00
Jumlah
56,533.62
36,666.63
4,228.22
4,907.76
105,242.28
7,836.40
114,664.55
153,868.00
1,051.05
52,621.14
537,619.65
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
263.44
335.47
1,663.44
17,400.00
114,648.60
24,786.30
2,910.21
10,013.12
183,878.33
351,239.18
617,136.24
3,741,000.00
Jumlah
5,045,611.98
Harga
Satuan
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
295.23
375.96
1,864.20
19,500.00
Jumlah
128,485.50
27,777.75
3,261.44
11,221.60
206,070.54
393,630.12
691,618.20
4,192,500.00
5,654,565.15
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
324.75
413.56
2,050.62
21,450.00
141,334.05
30,555.53
3,587.58
12,343.76
226,677.59
432,993.13
760,780.02
4,611,750.00
Jumlah
6,220,021.67
Zona II
Jumlah
Harga
Jumlah
Zona I
Uraian
45,859.44
29,743.56
3,429.89
3,981.12
85,371.36
6,356.80
93,014.60
124,816.00
852.60
42,685.68
436,111.05
Harga
Satuan
Zona II
Jumlah
Harga
889,637.84
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
2,845,712.00
15,892.00
265,756.00
62,408.00
5,684.00
2,845,712.00
Jumlah
Zona I
Uraian
Jumlah
Zona II
Jumlah
Harga
59,900.00
77,700.00
89,600.00
104,000.00
793,830.69
Zona I
0.660
0.330
0.033
0.033
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
-
Satuan Indeks
Oh
Oh
Oh
0.026
Harga
Satuan
45,859.44
29,743.56
3,429.89
3,981.12
-
No
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Zona IV
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
-
Harga
Satuan
Harga
Satuan
39,534.00
25,641.00
2,956.80
3,432.00
-
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Zona III
Jumlah
Harga
Harga
Satuan
Zona III
Jumlah
Harga
Harga
Satuan
Zona IV
Jumlah
Harga
Harga
Satuan
Jumlah
Harga
98,835.00
21,367.50
2,508.80
8,632.00
155,336.40
296,719.20
582,204.00
3,225,000.00
-
1.01
69,484.00
90,132.00
103,936.00
120,640.00
263.44
335.47
1,663.44
17,400.00
-
114,648.60
24,786.30
2,910.21
10,013.12
180,190.22
344,194.27
675,356.64
3,741,000.00
-
1.02
77,870.00
101,010.00
116,480.00
135,200.00
295.23
375.96
1,864.20
19,500.00
-
128,485.50
27,777.75
3,261.44
11,221.60
201,937.32
385,734.96
756,865.20
4,192,500.00
-
1.02
85,657.00
111,111.00
128,128.00
148,720.00
324.75
413.56
2,050.62
21,450.00
-
141,334.05
30,555.53
3,587.58
12,343.76
222,131.05
424,308.46
832,551.72
4,611,750.00
-
4,390,602.90
Jumlah
5,093,099.36
Jumlah
5,707,783.77
Jumlah
6,278,562.15
Halaman 47
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
II. BAHAN
Kayu terentang
Paku Biasa 2" - 5"
Dolken Kayu Galam Dia. 8 - 4
Harga
Satuan
Zona II
Jumlah
Harga
Oh
Oh
Oh
0.026
0.150
0.050
0.005
0.008
59,900.00
77,700.00
89,600.00
104,000.00
Kg
Kg
Btg
0.026
0.600
0.500
75,000.00
13,700.00
53,800.00
Jumlah
Harga
Satuan
11,680.50
5,050.50
582.40
1,081.60
2,574.00
10,686.00
34,970.00
-
1.02
85,657.00
111,111.00
128,128.00
148,720.00
107,250.00
19,591.00
76,934.00
-
12,848.55
5,555.55
640.64
1,189.76
2,831.40
11,754.60
38,467.00
-
51,250.00
Jumlah
59,450.00
Jumlah
66,625.00
Jumlah
73,287.50
Zona I
II. BAHAN
Kayu terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi beton polos
Kawat beton
Pasir Beton
Koral Beton
Semen portland
59,900.00
77,700.00
77,700.00
77,700.00
89,600.00
104,000.00
M3
Kg
Ltr
Kg
Kg
0.200
1.500
0.400
157.000
2.250
0.540
13,700.00
4,900.00
24,800.00
27,600.00
227,100.00
0.810
336.000
289,200.00
1,434.00
M3
M3
Kg
317,470.00
21,367.50
101,010.00
81,585.00
23,475.20
27,560.00
20,550.00
1,960.00
3,893,600.00
62,100.00
122,634.00
234,252.00
481,824.00
-
Jumlah
5,389,387.70
Harga
Satuan
Satuan Indeks
Zona I
I. UPAH
Pekerja
Tukang Batu
Tukang kayu
Tukang besi
Kepala Tukang
Mandor
II. BAHAN
Kayu terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi beton polos
Kawat beton
Pasir Beton
Koral Beton
Semen portland
5.650
0.275
1.560
1.400
0.323
0.283
59,900.00
77,700.00
77,700.00
77,700.00
89,600.00
104,000.00
M3
Kg
Ltr
Kg
Kg
0.270
2.000
0.600
210.000
3.000
0.540
0.810
336.000
13,700.00
4,900.00
24,800.00
27,600.00
227,100.00
289,200.00
1,434.00
M3
M3
Kg
Jumlah
II. BAHAN
Kayu terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi beton polos
Kawat beton
Pasir Beton
Koral Beton
Semen portland
Kayu borneo balok
Plywood Tebal 9 mm
Dolken Kayu Galam Dia. 8 - 4
M3
Kg
Ltr
Kg
Kg
0.400
4.000
2.000
315.000
4.500
0.540
0.710
336.000
0.150
3.500
20.000
M3
M3
Kg
M3
Lbr
Btg
59,900.00
77,700.00
77,700.00
77,700.00
89,600.00
104,000.00
13,700.00
4,900.00
24,800.00
27,600.00
227,100.00
289,200.00
1,434.00
229,100.00
53,800.00
Jumlah
304,527.60
626,371.20
-
Jumlah
7,006,204.01
453,982.10
30,555.53
144,444.30
116,666.55
33,569.54
39,410.80
29,386.50
2,802.80
5,567,848.00
88,803.00
175,366.62
413,556.00
2,050.62
-
334,980.36
689,008.32
-
Jumlah
7,706,824.41
Zona III
Jumlah
Harga
Harga
Satuan
Zona IV
Jumlah
Harga
Harga
Satuan
Jumlah
Harga
1.02
77,870.00
101,010.00
101,010.00
101,010.00
116,480.00
135,200.00
17,810.00
6,370.00
32,240.00
35,880.00
295,230.00
375,960.00
1,864.20
439,965.50
27,777.75
157,575.60
141,414.00
37,623.04
38,261.60
35,620.00
3,822.00
6,770,400.00
107,640.00
159,424.20
304,527.60
626,371.20
1.02
85,657.00
111,111.00
111,111.00
111,111.00
128,128.00
148,720.00
19,591.00
7,007.00
35,464.00
39,468.00
324,753.00
413,556.00
2,050.62
483,962.05
30,555.53
173,333.16
155,555.40
41,385.34
42,087.76
39,182.00
4,204.20
7,447,440.00
118,404.00
175,366.62
334,980.36
689,008.32
6,808,017.30
Jumlah
7,897,300.07
Jumlah
8,850,422.49
Jumlah
9,735,464.74
Zona I
7.050
0.275
1.650
2.100
0.403
0.035
375,960.00
1,864.20
-
1.02
85,657.00
111,111.00
111,111.00
111,111.00
128,128.00
148,720.00
19,591.00
7,007.00
35,464.00
39,468.00
324,753.00
392,584.60
24,786.30
140,605.92
126,184.80
33,571.33
34,141.12
31,784.00
3,410.40
6,041,280.00
96,048.00
142,255.44
271,732.32
558,915.84
Satuan Indeks
Oh
Oh
Oh
Oh
Oh
Oh
412,711.00
27,777.75
131,313.00
106,060.50
30,517.76
35,828.00
26,715.00
2,548.00
5,061,680.00
80,730.00
159,424.20
Jumlah
Harga
1.01
69,484.00
90,132.00
90,132.00
90,132.00
103,936.00
120,640.00
15,892.00
5,684.00
28,768.00
32,016.00
263,436.00
335,472.00
1,663.44
No
I. UPAH
Pekerja
Tukang Batu
Tukang kayu
Tukang besi
Kepala Tukang
Mandor
1.02
77,870.00
101,010.00
101,010.00
101,010.00
116,480.00
135,200.00
17,810.00
6,370.00
32,240.00
35,880.00
295,230.00
Harga
Satuan
338,435.00
21,367.50
121,212.00
108,780.00
28,940.80
29,432.00
27,400.00
2,940.00
5,208,000.00
82,800.00
122,634.00
234,252.00
481,824.00
Harga
Satuan
Zona IV
Jumlah
Harga
Harga
Satuan
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
6,251,689.73
Harga
Satuan
Zona II
Jumlah
Harga
Oh
Oh
Oh
Oh
Oh
Oh
271,732.32
558,915.84
-
Jumlah
No
Harga
Satuan
368,265.20
24,786.30
117,171.60
94,638.60
27,231.23
31,969.60
23,838.00
2,273.60
4,516,576.00
72,036.00
142,255.44
335,472.00
1,663.44
-
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
90,132.00
90,132.00
103,936.00
120,640.00
15,892.00
5,684.00
28,768.00
32,016.00
263,436.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Zona II
Jumlah
Harga
5.300
0.275
1.300
1.050
0.262
0.265
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
97,500.00
17,810.00
69,940.00
-
Satuan Indeks
Oh
Oh
Oh
Oh
Oh
Oh
Harga
Satuan
10,422.60
4,506.60
519.68
965.12
2,296.80
9,535.20
31,204.00
-
No
I. UPAH
Pekerja
Tukang Batu
Tukang kayu
Tukang besi
Kepala Tukang
Mandor
Zona IV
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
87,000.00
15,892.00
62,408.00
-
Harga
Satuan
Harga
Satuan
8,985.00
3,885.00
448.00
832.00
1,980.00
8,220.00
26,900.00
-
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Zona III
Jumlah
Harga
Zona II
Jumlah
Harga
422,295.00
21,367.50
128,205.00
163,170.00
36,108.80
3,671.20
54,800.00
9,800.00
7,812,000.00
124,200.00
122,634.00
205,332.00
481,824.00
801,850.00
1,076,000.00
11,463,257.50
Harga
Satuan
1.01
69,484.00
90,132.00
90,132.00
90,132.00
103,936.00
120,640.00
15,892.00
5,684.00
28,768.00
32,016.00
263,436.00
335,472.00
1,663.44
265,756.00
62,408.00
Jumlah
Zona III
Jumlah
Harga
489,862.20
24,786.30
148,717.80
189,277.20
41,886.21
4,258.59
63,568.00
11,368.00
9,061,920.00
144,072.00
142,255.44
238,185.12
558,915.84
930,146.00
1,248,160.00
13,297,378.70
Harga
Satuan
1.02
77,870.00
101,010.00
101,010.00
101,010.00
116,480.00
135,200.00
17,810.00
6,370.00
32,240.00
35,880.00
295,230.00
375,960.00
1,864.20
297,830.00
69,940.00
Jumlah
Zona IV
Jumlah
Harga
548,983.50
27,777.75
166,666.50
212,121.00
46,941.44
4,772.56
71,240.00
12,740.00
10,155,600.00
161,460.00
159,424.20
266,931.60
626,371.20
1,042,405.00
1,398,800.00
14,902,234.75
Harga
Satuan
1.02
85,657.00
111,111.00
111,111.00
111,111.00
128,128.00
148,720.00
19,591.00
7,007.00
35,464.00
39,468.00
324,753.00
413,556.00
2,050.62
327,613.00
76,934.00
Jumlah
Jumlah
Harga
603,881.85
30,555.53
183,333.15
233,333.10
51,635.58
5,249.82
78,364.00
14,014.00
11,171,160.00
177,606.00
175,366.62
293,624.76
689,008.32
1,146,645.50
1,538,680.00
16,392,458.23
Halaman 48
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
Harga
Satuan
Zona III
Jumlah
Harga
Zona IV
Jumlah
Harga
Jumlah
Harga
Oh
Oh
Oh
Oh
Oh
Oh
7.050
0.275
1.650
2.100
0.403
0.035
59,900.00
77,700.00
77,700.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kayu terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi beton polos
Kawat beton
M3
Kg
Ltr
Kg
Kg
0.320
3.200
1.600
210.000
3.000
13,700.00
4,900.00
24,800.00
27,600.00
422,295.00
21,367.50
128,205.00
163,170.00
36,108.80
3,671.20
43,840.00
7,840.00
5,208,000.00
82,800.00
M3
M3
Kg
0.540
227,100.00
122,634.00
263,436.00
142,255.44
295,230.00
159,424.20
324,753.00
175,366.62
Koral Beton
Semen portland
0.810
336.000
289,200.00
1,434.00
234,252.00
481,824.00
335,472.00
1,663.44
271,732.32
558,915.84
375,960.00
1,864.20
304,527.60
626,371.20
413,556.00
2,050.62
334,980.36
689,008.32
M3
Lbr
Btg
0.140
2.800
16.000
2,453,200.00
229,100.00
53,800.00
343,448.00
641,480.00
860,800.00
8,801,735.50
Jumlah
2,845,712.00
265,756.00
62,408.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Batu
Tukang kayu
Tukang besi
Kepala Tukang
Mandor
Harga
Satuan
3,189,160.00
297,830.00
69,940.00
Jumlah
548,983.50
27,777.75
166,666.50
212,121.00
46,941.44
4,772.56
56,992.00
10,192.00
6,770,400.00
107,640.00
446,482.40
833,924.00
1,119,040.00
11,442,256.15
1.02
85,657.00
111,111.00
111,111.00
111,111.00
128,128.00
148,720.00
19,591.00
7,007.00
35,464.00
39,468.00
3,508,076.00
327,613.00
76,934.00
Jumlah
603,881.85
30,555.53
183,333.15
233,333.10
51,635.58
5,249.82
62,691.20
11,211.20
7,447,440.00
118,404.00
491,130.64
917,316.40
1,230,944.00
12,586,481.77
Harga
Satuan
Zona III
Jumlah
Harga
Harga
Satuan
Zona IV
Jumlah
Harga
Harga
Satuan
Jumlah
Harga
Oh
Oh
Oh
Oh
Oh
Oh
5.300
0.275
1.300
1.050
0.265
0.265
59,900.00
77,700.00
77,700.00
77,700.00
89,600.00
104,000.00
317,470.00
21,367.50
101,010.00
81,585.00
23,744.00
27,560.00
-
1.01
69,484.00
90,132.00
90,132.00
90,132.00
103,936.00
120,640.00
-
368,265.20
24,786.30
117,171.60
94,638.60
27,543.04
31,969.60
-
1.02
77,870.00
101,010.00
101,010.00
101,010.00
116,480.00
135,200.00
-
412,711.00
27,777.75
131,313.00
106,060.50
30,867.20
35,828.00
-
1.02
85,657.00
111,111.00
111,111.00
111,111.00
128,128.00
148,720.00
-
453,982.10
30,555.53
144,444.30
116,666.55
33,953.92
39,410.80
-
M3
Kg
Ltr
Kg
Kg
0.320
3.200
1.600
210.000
3.000
0.540
0.810
336.000
0.140
2.800
16.000
2,453,200.00
13,700.00
4,900.00
24,800.00
27,600.00
227,100.00
289,200.00
1,434.00
2,453,200.00
229,100.00
53,800.00
785,024.00
43,840.00
7,840.00
5,208,000.00
82,800.00
122,634.00
234,252.00
481,824.00
343,448.00
641,480.00
860,800.00
9,384,678.50
2,845,712.00
15,892.00
5,684.00
28,768.00
32,016.00
263,436.00
335,472.00
1,663.44
2,845,712.00
265,756.00
62,408.00
Jumlah
910,627.84
50,854.40
9,094.40
6,041,280.00
96,048.00
142,255.44
271,732.32
558,915.84
398,399.68
744,116.80
998,528.00
10,886,227.06
3,189,160.00
17,810.00
6,370.00
32,240.00
35,880.00
295,230.00
375,960.00
1,864.20
3,189,160.00
297,830.00
69,940.00
Jumlah
1,020,531.20
56,992.00
10,192.00
6,770,400.00
107,640.00
159,424.20
304,527.60
626,371.20
446,482.40
833,924.00
1,119,040.00
12,200,082.05
3,508,076.00
19,591.00
7,007.00
35,464.00
39,468.00
324,753.00
413,556.00
2,050.62
3,508,076.00
327,613.00
76,934.00
Jumlah
1,122,584.32
62,691.20
11,211.20
7,447,440.00
118,404.00
175,366.62
334,980.36
689,008.32
491,130.64
917,316.40
1,230,944.00
13,420,090.26
M3
M3
Kg
M3
Lbr
Btg
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
398,399.68
744,116.80
998,528.00
10,210,013.18
Zona II
Jumlah
Harga
II. BAHAN
Kayu terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi beton polos
Kawat beton
Pasir Beton
Koral Beton
Semen portland
Kayu borneo balok
Plywood Tebal 9 mm
Dolken Kayu Galam Dia. 8 - 4
489,862.20
24,786.30
148,717.80
189,277.20
41,886.21
4,258.59
50,854.40
9,094.40
6,041,280.00
96,048.00
1.02
77,870.00
101,010.00
101,010.00
101,010.00
116,480.00
135,200.00
17,810.00
6,370.00
32,240.00
35,880.00
Harga
Satuan
I. UPAH
Pekerja
Tukang Batu
Tukang kayu
Tukang besi
Kepala Tukang
Mandor
Pasir Beton
1.01
69,484.00
90,132.00
90,132.00
90,132.00
103,936.00
120,640.00
15,892.00
5,684.00
28,768.00
32,016.00
Harga
Satuan
Harga
Satuan
I. UPAH
Pekerja
Tukang Batu
Tukang kayu
Tukang besi
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
Oh
Oh
5.300
0.275
1.300
1.050
0.265
0.265
59,900.00
77,700.00
77,700.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kayu terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi beton polos
Kawat beton
Pasir Beton
Koral Beton
Semen portland
Kayu borneo balok
Plywood Tebal 9 mm
Dolken Kayu Galam Dia. 8 - 4
M3
Kg
Ltr
Kg
Kg
M3
M3
Kg
M3
Lbr
Btg
0.320
3.200
1.600
210.000
3.000
0.540
0.810
336.000
0.140
2.800
16.000
2,453,200.00
13,700.00
4,900.00
24,800.00
27,600.00
227,100.00
289,200.00
1,434.00
2,453,200.00
229,100.00
53,800.00
Jumlah
Zona II
Jumlah
Harga
317,470.00
21,367.50
101,010.00
81,585.00
23,744.00
27,560.00
785,024.00
43,840.00
7,840.00
5,208,000.00
82,800.00
122,634.00
234,252.00
481,824.00
343,448.00
641,480.00
860,800.00
9,384,678.50
Harga
Satuan
1.01
69,484.00
90,132.00
90,132.00
90,132.00
103,936.00
120,640.00
2,845,712.00
15,892.00
5,684.00
28,768.00
32,016.00
263,436.00
335,472.00
1,663.44
2,845,712.00
265,756.00
62,408.00
Jumlah
Zona III
Jumlah
Harga
368,265.20
24,786.30
117,171.60
94,638.60
27,543.04
31,969.60
910,627.84
50,854.40
9,094.40
6,041,280.00
96,048.00
142,255.44
271,732.32
558,915.84
398,399.68
744,116.80
998,528.00
10,886,227.06
Harga
Satuan
1.02
77,870.00
101,010.00
101,010.00
101,010.00
116,480.00
135,200.00
3,189,160.00
17,810.00
6,370.00
32,240.00
35,880.00
295,230.00
375,960.00
1,864.20
3,189,160.00
297,830.00
69,940.00
Jumlah
Zona IV
Jumlah
Harga
412,711.00
27,777.75
131,313.00
106,060.50
30,867.20
35,828.00
1,020,531.20
56,992.00
10,192.00
6,770,400.00
107,640.00
159,424.20
304,527.60
626,371.20
446,482.40
833,924.00
1,119,040.00
12,200,082.05
Harga
Satuan
1.02
85,657.00
111,111.00
111,111.00
111,111.00
128,128.00
148,720.00
3,508,076.00
19,591.00
7,007.00
35,464.00
39,468.00
324,753.00
413,556.00
2,050.62
3,508,076.00
327,613.00
76,934.00
Jumlah
Jumlah
Harga
453,982.10
30,555.53
144,444.30
116,666.55
33,953.92
39,410.80
1,122,584.32
62,691.20
11,211.20
7,447,440.00
118,404.00
175,366.62
334,980.36
689,008.32
491,130.64
917,316.40
1,230,944.00
13,420,090.26
Halaman 49
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
Zona II
Zona III
Zona IV
Jumlah
Harga
Harga
Satuan
Jumlah
Harga
Harga
Satuan
Jumlah
Harga
Harga
Satuan
Jumlah
Harga
1.01
69,484.00
90,132.00
90,132.00
90,132.00
103,936.00
120,640.00
2,845,712.00
15,892.00
5,684.00
28,768.00
32,016.00
392,584.60
24,786.30
140,605.92
126,184.80
33,571.33
34,141.12
910,627.84
50,854.40
9,094.40
6,041,280.00
96,048.00
1.02
77,870.00
101,010.00
101,010.00
101,010.00
116,480.00
135,200.00
3,189,160.00
17,810.00
6,370.00
32,240.00
35,880.00
439,965.50
27,777.75
157,575.60
141,414.00
37,623.04
38,261.60
1,020,531.20
56,992.00
10,192.00
6,770,400.00
107,640.00
1.02
85,657.00
111,111.00
111,111.00
111,111.00
128,128.00
148,720.00
3,508,076.00
19,591.00
7,007.00
35,464.00
39,468.00
483,962.05
30,555.53
173,333.16
155,555.40
41,385.34
42,087.76
1,122,584.32
62,691.20
11,211.20
7,447,440.00
118,404.00
I. UPAH
Pekerja
Tukang Batu
Tukang kayu
Tukang besi
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
Oh
Oh
5.650
0.275
1.560
1.400
0.323
0.283
59,900.00
77,700.00
77,700.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kayu terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi beton polos
Kawat beton
M3
Kg
Ltr
Kg
Kg
0.320
3.200
1.600
210.000
3.000
2,453,200.00
13,700.00
4,900.00
24,800.00
27,600.00
338,435.00
21,367.50
121,212.00
108,780.00
28,940.80
29,432.00
785,024.00
43,840.00
7,840.00
5,208,000.00
82,800.00
M3
M3
Kg
0.540
227,100.00
122,634.00
263,436.00
142,255.44
295,230.00
159,424.20
324,753.00
175,366.62
Koral Beton
Semen portland
0.810
336.000
289,200.00
1,434.00
234,252.00
481,824.00
335,472.00
1,663.44
271,732.32
558,915.84
375,960.00
1,864.20
304,527.60
626,371.20
413,556.00
2,050.62
334,980.36
689,008.32
M3
Lbr
Btg
0.140
2.800
16.000
2,453,200.00
229,100.00
53,800.00
343,448.00
641,480.00
860,800.00
9,460,109.30
Pasir Beton
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
2,845,712.00
265,756.00
62,408.00
Jumlah
I. UPAH
Pekerja
Tukang Batu
Tukang kayu
Tukang besi
Kepala Tukang
Mandor
Harga
Satuan
Zona II
Jumlah
Harga
Harga
Satuan
Zona III
Jumlah
Harga
Harga
Satuan
Zona IV
Jumlah
Harga
Harga
Satuan
Jumlah
Harga
10,782.00
1,554.00
1,554.00
1,554.00
537.60
936.00
-
1.01
69,484.00
90,132.00
90,132.00
90,132.00
103,936.00
120,640.00
-
12,507.12
1,802.64
1,802.64
1,802.64
623.62
1,085.76
-
1.02
77,870.00
101,010.00
101,010.00
101,010.00
116,480.00
135,200.00
-
14,016.60
2,020.20
2,020.20
2,020.20
698.88
1,216.80
-
1.02
85,657.00
111,111.00
111,111.00
111,111.00
128,128.00
148,720.00
-
15,418.26
2,222.22
2,222.22
2,222.22
768.77
1,338.48
-
M3
Kg
Kg
Kg
Kg
0.002
0.010
3.000
0.450
4.000
0.006
0.009
2,453,200.00
13,700.00
24,800.00
27,600.00
1,434.00
227,100.00
289,200.00
4,906.40
137.00
74,400.00
12,420.00
5,736.00
1,362.60
2,602.80
118,482.40
2,845,712.00
15,892.00
28,768.00
32,016.00
1,663.44
263,436.00
335,472.00
Jumlah
5,691.42
158.92
86,304.00
14,407.20
6,653.76
1,580.62
3,019.25
137,439.58
3,189,160.00
17,810.00
32,240.00
35,880.00
1,864.20
295,230.00
375,960.00
Jumlah
6,378.32
178.10
96,720.00
16,146.00
7,456.80
1,771.38
3,383.64
154,027.12
3,508,076.00
19,591.00
35,464.00
39,468.00
2,050.62
324,753.00
413,556.00
Jumlah
7,016.15
195.91
106,392.00
17,760.60
8,202.48
1,948.52
3,722.00
169,429.83
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
II. BAHAN
Kayu terentang
Paku Biasa 2" - 5"
Besi Beton Polos
Kawat Beton
Semen portland
Pasir Beton
Koral Beton
491,130.64
917,316.40
1,230,944.00
13,527,956.30
59,900.00
77,700.00
77,700.00
77,700.00
89,600.00
104,000.00
M3
M3
I. UPAH
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
3,508,076.00
327,613.00
76,934.00
Jumlah
0.180
0.020
0.020
0.020
0.006
0.009
Jumlah
Uraian
446,482.40
833,924.00
1,119,040.00
12,298,142.09
Oh
Oh
Oh
Oh
Oh
Oh
II. BAHAN
Kayu terentang
Paku Biasa 2" - 5"
Besi Beton Polos
Kawat Beton
Semen portland
Pasir Beton
Koral Beton
3,189,160.00
297,830.00
69,940.00
Jumlah
Zona I
Uraian
398,399.68
744,116.80
998,528.00
10,973,726.79
Harga
Satuan
0.297
0.033
0.033
0.033
0.010
0.015
59,900.00
77,700.00
77,700.00
77,700.00
89,600.00
104,000.00
M3
Kg
Kg
Kg
Kg
0.003
0.020
3.600
0.050
5.500
0.009
0.015
2,453,200.00
13,700.00
24,800.00
27,600.00
1,434.00
227,100.00
289,200.00
M3
M3
Zona II
Jumlah
Harga
Oh
Oh
Oh
Oh
Oh
Oh
Jumlah
17,790.30
2,564.10
2,564.10
2,564.10
896.00
1,560.00
7,359.60
274.00
89,280.00
1,380.00
7,887.00
2,043.90
4,338.00
140,501.10
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
90,132.00
90,132.00
103,936.00
120,640.00
2,845,712.00
15,892.00
28,768.00
32,016.00
1,663.44
263,436.00
335,472.00
Jumlah
20,636.75
2,974.36
2,974.36
2,974.36
1,039.36
1,809.60
8,537.14
317.84
103,564.80
1,600.80
9,148.92
2,370.92
5,032.08
162,981.28
Harga
Satuan
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
101,010.00
101,010.00
116,480.00
135,200.00
3,189,160.00
17,810.00
32,240.00
35,880.00
1,864.20
295,230.00
375,960.00
Jumlah
23,127.39
3,333.33
3,333.33
3,333.33
1,164.80
2,028.00
9,567.48
356.20
116,064.00
1,794.00
10,253.10
2,657.07
5,639.40
182,651.43
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
111,111.00
111,111.00
128,128.00
148,720.00
3,508,076.00
19,591.00
35,464.00
39,468.00
2,050.62
324,753.00
413,556.00
Jumlah
25,440.13
3,666.66
3,666.66
3,666.66
1,281.28
2,230.80
10,524.23
391.82
127,670.40
1,973.40
11,278.41
2,922.78
6,203.34
200,916.57
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.150
0.075
0.008
0.008
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Genteng palentong
Bh
25.000
3,000.00
Jumlah
Zona II
Jumlah
Harga
8,985.00
5,827.50
716.80
832.00
75,000.00
91,361.30
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
3,480.00
Jumlah
Zona III
Jumlah
Harga
10,422.60
6,759.90
831.49
965.12
87,000.00
105,979.11
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
3,900.00
Jumlah
Zona IV
Jumlah
Harga
11,680.50
7,575.75
931.84
1,081.60
97,500.00
118,769.69
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
4,290.00
Jumlah
Jumlah
Harga
12,848.55
8,333.33
1,025.02
1,189.76
107,250.00
130,646.66
Halaman 50
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.150
0.075
0.008
0.008
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Genteng kodok
Bh
25.000
6,200.00
Jumlah
8,985.00
5,827.50
716.80
832.00
155,000.00
171,361.30
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
7,192.00
Jumlah
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
II. BAHAN
Genteng bubung kodok
Semen portland
Pasir pasang
Harga
Satuan
0.400
0.200
0.020
0.002
59,900.00
77,700.00
89,600.00
104,000.00
Bh
Kg
5.000
8.000
0.032
1,434.00
131,500.00
Jumlah
23,960.00
15,540.00
1,792.00
208.00
11,472.00
4,208.00
57,180.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
II. BAHAN
Genteng bubung palentong
Semen portland
Pasir pasang
Harga
Satuan
Oh
Oh
Oh
Oh
0.400
0.200
0.020
0.002
59,900.00
77,700.00
89,600.00
104,000.00
Bh
Kg
4.000
8.000
0.032
5,300.00
1,434.00
131,500.00
M3
Jumlah
23,960.00
15,540.00
1,792.00
208.00
21,200.00
11,472.00
4,208.00
78,380.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.140
0.067
0.007
0.007
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Roof light fibreglass
Paku biasa 1/2" - 1"
Lbr
Kg
0.600
0.050
62,700.00
600.00
Jumlah
8,386.00
5,205.90
627.20
728.00
37,620.00
30.00
52,597.10
Harga
Satuan
Zona I
Oh
Oh
Oh
Oh
0.140
0.075
0.008
0.008
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Asbes Gelombang
Paku Pancing 60 x 230
Lbr
Kg
0.500
0.120
33,500.00
25,000.00
Jumlah
Harga
Satuan
34,262.80
22,222.20
2,562.56
297.44
16,404.96
6,017.44
81,767.40
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
6,890.00
1,864.20
170,950.00
Jumlah
9,727.76
6,038.84
727.55
844.48
43,639.20
34.80
61,012.64
Harga
Satuan
31,148.00
20,202.00
2,329.60
270.40
27,560.00
14,913.60
5,470.40
101,894.00
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
7,579.00
2,050.62
188,045.00
Jumlah
34,262.80
22,222.20
2,562.56
297.44
30,316.00
16,404.96
6,017.44
112,083.40
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
81,510.00
780.00
Jumlah
10,901.80
6,767.67
815.36
946.40
48,906.00
39.00
68,376.23
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
89,661.00
858.00
Jumlah
11,991.98
7,444.44
896.90
1,041.04
53,796.60
42.90
75,213.85
Zona II
8,386.00
5,827.50
716.80
832.00
16,750.00
3,000.00
35,512.30
85,657.00
111,111.00
128,128.00
148,720.00
2,050.62
188,045.00
Jumlah
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
72,732.00
696.00
Jumlah
Satuan Indeks
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
27,793.60
18,026.40
2,078.72
241.28
24,592.00
13,307.52
4,881.28
90,920.80
Harga
Satuan
No
Jumlah
Harga
31,148.00
20,202.00
2,329.60
270.40
14,913.60
5,470.40
74,334.00
Jumlah
Harga
Harga
Satuan
12,848.55
8,333.33
1,025.02
1,189.76
221,650.00
245,046.66
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
6,148.00
1,663.44
152,540.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
85,657.00
111,111.00
128,128.00
148,720.00
8,866.00
Jumlah
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
1,864.20
170,950.00
Jumlah
Zona II
Jumlah
Harga
Jumlah
Harga
Zona I
Uraian
27,793.60
18,026.40
2,078.72
241.28
13,307.52
4,881.28
66,328.80
Harga
Satuan
Zona II
Jumlah
Harga
11,680.50
7,575.75
931.84
1,081.60
201,500.00
222,769.69
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
1,663.44
152,540.00
Jumlah
Zona I
Uraian
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
8,060.00
Jumlah
Zona II
Jumlah
Harga
Oh
Oh
Oh
Oh
10,422.60
6,759.90
831.49
965.12
179,800.00
198,779.11
Harga
Satuan
Zona I
Uraian
Zona III
Jumlah
Harga
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
38,860.00
29,000.00
Jumlah
Zona III
Jumlah
Harga
9,727.76
6,759.90
831.49
965.12
19,430.00
3,480.00
41,194.27
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
43,550.00
32,500.00
Jumlah
Zona IV
Jumlah
Harga
10,901.80
7,575.75
931.84
1,081.60
21,775.00
3,900.00
46,165.99
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
47,905.00
35,750.00
Jumlah
Jumlah
Harga
11,991.98
8,333.33
1,025.02
1,189.76
23,952.50
4,290.00
50,782.59
Halaman 51
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.140
0.070
0.007
0.007
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Asbes Gelombang
Paku Pancing 60 x 230
Lbr
Kg
0.600
0.120
33,500.00
25,000.00
Jumlah
8,386.00
5,439.00
627.20
728.00
20,100.00
3,000.00
38,280.20
Harga
Satuan
No
Satuan Indeks
Zona I
Harga
Satuan
Oh
Oh
Oh
Oh
0.140
0.070
0.007
0.007
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Asbes Gelombang
Paku Pancing 60 x 230
Lbr
Kg
0.750
0.120
33,500.00
25,000.00
Jumlah
8,386.00
5,439.00
627.20
728.00
25,125.00
3,000.00
43,305.20
No
Satuan Indeks
Zona I
Harga
Satuan
Oh
Oh
Oh
Oh
0.140
0.070
0.007
0.007
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Asbes Gelombang
Paku Pancing 60 x 230
Lbr
Kg
0.750
0.120
33,500.00
25,000.00
Jumlah
8,386.00
5,439.00
627.20
728.00
25,125.00
3,000.00
43,305.20
No
Satuan Indeks
Zona I
Harga
Satuan
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.140
0.070
0.007
0.007
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Asbes Gelombang
Paku Pancing 60 x 230
Lbr
Kg
0.750
0.120
33,500.00
25,000.00
Jumlah
8,386.00
5,439.00
627.20
728.00
25,125.00
3,000.00
43,305.20
No
Satuan Indeks
Zona I
Harga
Satuan
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.140
0.070
0.007
0.007
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Asbes Gelombang
Paku Pancing 60 x 230
Lbr
Kg
0.420
0.120
33,500.00
25,000.00
Jumlah
Harga
Satuan
8,386.00
5,439.00
627.20
728.00
14,070.00
3,000.00
32,250.20
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
47,905.00
35,750.00
Jumlah
11,991.98
7,777.77
896.90
1,041.04
35,928.75
4,290.00
61,926.44
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
43,550.00
32,500.00
Jumlah
10,901.80
7,070.70
815.36
946.40
32,662.50
3,900.00
56,296.76
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
47,905.00
35,750.00
Jumlah
Zona III
Jumlah
Harga
9,727.76
6,309.24
727.55
844.48
29,145.00
3,480.00
50,234.03
Harga
Satuan
11,991.98
7,777.77
896.90
1,041.04
35,928.75
4,290.00
61,926.44
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
43,550.00
32,500.00
Jumlah
10,901.80
7,070.70
815.36
946.40
32,662.50
3,900.00
56,296.76
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
47,905.00
35,750.00
Jumlah
11,991.98
7,777.77
896.90
1,041.04
35,928.75
4,290.00
61,926.44
Zona II
Jumlah
Harga
10,901.80
7,070.70
815.36
946.40
32,662.50
3,900.00
56,296.76
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
38,860.00
29,000.00
Jumlah
Uraian
9,727.76
6,309.24
727.55
844.48
29,145.00
3,480.00
50,234.03
Harga
Satuan
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
11,991.98
7,777.77
896.90
1,041.04
28,743.00
4,290.00
54,740.69
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
43,550.00
32,500.00
Jumlah
Zona II
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
47,905.00
35,750.00
Jumlah
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
38,860.00
29,000.00
Jumlah
10,901.80
7,070.70
815.36
946.40
26,130.00
3,900.00
49,764.26
Jumlah
Harga
Harga
Satuan
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
9,727.76
6,309.24
727.55
844.48
29,145.00
3,480.00
50,234.03
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
77,870.00
101,010.00
116,480.00
135,200.00
43,550.00
32,500.00
Jumlah
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
38,860.00
29,000.00
Jumlah
Zona IV
Jumlah
Harga
Harga
Satuan
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
9,727.76
6,309.24
727.55
844.48
23,316.00
3,480.00
44,405.03
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
38,860.00
29,000.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
38,860.00
29,000.00
Jumlah
Zona III
Jumlah
Harga
9,727.76
6,309.24
727.55
844.48
16,321.20
3,480.00
37,410.23
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
43,550.00
32,500.00
Jumlah
Zona IV
Jumlah
Harga
10,901.80
7,070.70
815.36
946.40
18,291.00
3,900.00
41,925.26
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
47,905.00
35,750.00
Jumlah
Jumlah
Harga
11,991.98
7,777.77
896.90
1,041.04
20,120.10
4,290.00
46,117.79
Halaman 52
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.140
0.070
0.007
0.007
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Asbes Gelombang
Paku Pancing
Lbr
Kg
0.420
0.120
33,500.00
25,000.00
Jumlah
8,386.00
5,439.00
627.20
728.00
14,070.00
3,000.00
32,250.20
Harga
Satuan
No
Satuan Indeks
Zona I
Harga
Satuan
Oh
Oh
Oh
Oh
0.140
0.070
0.007
0.007
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Asbes Gelombang
Paku Pancing
Lbr
Kg
0.510
0.120
33,500.00
25,000.00
Jumlah
8,386.00
5,439.00
627.20
728.00
17,085.00
3,000.00
35,265.20
No
Satuan Indeks
Zona I
Harga
Satuan
Oh
Oh
Oh
Oh
0.140
0.070
0.007
0.007
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Asbes Gelombang
Paku Pancing
Lbr
Kg
0.510
0.120
33,500.00
25,000.00
Jumlah
8,386.00
5,439.00
627.20
728.00
17,085.00
3,000.00
35,265.20
No
Satuan Indeks
Zona I
Harga
Satuan
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.140
0.670
0.007
0.007
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Asbes Gelombang
Paku Pancing
Lbr
Kg
0.370
0.120
33,500.00
25,000.00
Jumlah
8,386.00
52,059.00
627.20
728.00
12,395.00
3,000.00
77,195.20
No
Satuan Indeks
Zona I
Harga
Satuan
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.140
0.670
0.007
0.007
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Asbes Gelombang
Paku Pancing
Lbr
Kg
0.380
0.120
33,500.00
25,000.00
Jumlah
Harga
Satuan
8,386.00
52,059.00
627.20
728.00
12,730.00
3,000.00
77,530.20
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
47,905.00
35,750.00
Jumlah
11,991.98
7,777.77
896.90
1,041.04
24,431.55
4,290.00
50,429.24
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
43,550.00
32,500.00
Jumlah
10,901.80
7,070.70
815.36
946.40
22,210.50
3,900.00
45,844.76
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
47,905.00
35,750.00
Jumlah
Zona III
Jumlah
Harga
9,727.76
60,388.44
727.55
844.48
14,378.20
3,480.00
89,546.43
Harga
Satuan
11,991.98
7,777.77
896.90
1,041.04
24,431.55
4,290.00
50,429.24
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
43,550.00
32,500.00
Jumlah
10,901.80
67,676.70
815.36
946.40
16,113.50
3,900.00
100,353.76
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
47,905.00
35,750.00
Jumlah
11,991.98
74,444.37
896.90
1,041.04
17,724.85
4,290.00
110,389.14
Zona II
Jumlah
Harga
10,901.80
7,070.70
815.36
946.40
22,210.50
3,900.00
45,844.76
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
38,860.00
29,000.00
Jumlah
Uraian
9,727.76
6,309.24
727.55
844.48
19,818.60
3,480.00
40,907.63
Harga
Satuan
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
11,991.98
7,777.77
896.90
1,041.04
20,120.10
4,290.00
46,117.79
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
43,550.00
32,500.00
Jumlah
Zona II
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
47,905.00
35,750.00
Jumlah
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
38,860.00
29,000.00
Jumlah
10,901.80
7,070.70
815.36
946.40
18,291.00
3,900.00
41,925.26
Jumlah
Harga
Harga
Satuan
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
9,727.76
6,309.24
727.55
844.48
19,818.60
3,480.00
40,907.63
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
77,870.00
101,010.00
116,480.00
135,200.00
43,550.00
32,500.00
Jumlah
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
38,860.00
29,000.00
Jumlah
Zona IV
Jumlah
Harga
Harga
Satuan
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
9,727.76
6,309.24
727.55
844.48
16,321.20
3,480.00
37,410.23
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
38,860.00
29,000.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
38,860.00
29,000.00
Jumlah
Zona III
Jumlah
Harga
9,727.76
60,388.44
727.55
844.48
14,766.80
3,480.00
89,935.03
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
43,550.00
32,500.00
Jumlah
Zona IV
Jumlah
Harga
10,901.80
67,676.70
815.36
946.40
16,549.00
3,900.00
100,789.26
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
47,905.00
35,750.00
Jumlah
Jumlah
Harga
11,991.98
74,444.37
896.90
1,041.04
18,203.90
4,290.00
110,868.19
Halaman 53
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.140
0.670
0.007
0.007
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Asbes Gelombang
Paku Pancing
Lbr
Kg
0.460
0.120
33,500.00
25,000.00
Jumlah
8,386.00
52,059.00
627.20
728.00
15,410.00
3,000.00
80,210.20
Harga
Satuan
No
Satuan Indeks
Zona I
Harga
Satuan
Oh
Oh
Oh
Oh
0.140
0.670
0.007
0.007
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Asbes Gelombang
Paku Pancing
Lbr
Kg
0.460
0.120
33,500.00
25,000.00
Jumlah
8,386.00
52,059.00
627.20
728.00
15,410.00
3,000.00
80,210.20
No
Satuan Indeks
Zona I
Harga
Satuan
Oh
Oh
Oh
Oh
0.140
0.670
0.007
0.007
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Asbes Gelombang
Paku Pancing
Lbr
Kg
0.570
0.120
33,500.00
25,000.00
Jumlah
8,386.00
52,059.00
627.20
728.00
19,095.00
3,000.00
83,895.20
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.084
0.125
0.013
0.004
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Bubung stel Gelombang
Paku sekrup 3,5"
Lbr
Bh
2.400
6.000
35,000.00
500.00
Jumlah
5,031.60
9,712.50
1,164.80
416.00
84,000.00
3,000.00
103,324.90
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.084
0.125
0.013
0.004
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Nok stel Gelombang
Paku sekrup 3,5"
Lbr
Bh
2.100
6.000
35,000.00
500.00
Jumlah
9,727.76
60,388.44
727.55
844.48
22,150.20
3,480.00
97,318.43
Harga
Satuan
5,031.60
9,712.50
1,164.80
416.00
73,500.00
3,000.00
92,824.90
10,901.80
67,676.70
815.36
946.40
20,033.00
3,900.00
104,273.26
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
47,905.00
35,750.00
Jumlah
11,991.98
74,444.37
896.90
1,041.04
22,036.30
4,290.00
114,700.59
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
43,550.00
32,500.00
Jumlah
10,901.80
67,676.70
815.36
946.40
24,823.50
3,900.00
109,063.76
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
47,905.00
35,750.00
Jumlah
11,991.98
74,444.37
896.90
1,041.04
27,305.85
4,290.00
119,970.14
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
40,600.00
580.00
Jumlah
5,836.66
11,266.50
1,351.17
482.56
97,440.00
3,480.00
119,856.88
Harga
Satuan
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
45,500.00
650.00
Jumlah
6,541.08
12,626.25
1,514.24
540.80
109,200.00
3,900.00
134,322.37
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
50,050.00
715.00
Jumlah
7,195.19
13,888.88
1,665.66
594.88
120,120.00
4,290.00
147,754.61
Zona II
Jumlah
Harga
11,991.98
74,444.37
896.90
1,041.04
22,036.30
4,290.00
114,700.59
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
38,860.00
29,000.00
Jumlah
Zona I
Uraian
85,657.00
111,111.00
128,128.00
148,720.00
47,905.00
35,750.00
Jumlah
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
43,550.00
32,500.00
Jumlah
Zona II
Jumlah
Harga
10,901.80
67,676.70
815.36
946.40
20,033.00
3,900.00
104,273.26
Jumlah
Harga
Harga
Satuan
Zona I
Uraian
9,727.76
60,388.44
727.55
844.48
17,875.60
3,480.00
93,043.83
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
77,870.00
101,010.00
116,480.00
135,200.00
43,550.00
32,500.00
Jumlah
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
38,860.00
29,000.00
Jumlah
Zona IV
Jumlah
Harga
Harga
Satuan
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
9,727.76
60,388.44
727.55
844.48
17,875.60
3,480.00
93,043.83
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
38,860.00
29,000.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
40,600.00
580.00
Jumlah
Zona III
Jumlah
Harga
5,836.66
11,266.50
1,351.17
482.56
85,260.00
3,480.00
107,676.88
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
45,500.00
650.00
Jumlah
Zona IV
Jumlah
Harga
6,541.08
12,626.25
1,514.24
540.80
95,550.00
3,900.00
120,672.37
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
50,050.00
715.00
Jumlah
Jumlah
Harga
7,195.19
13,888.88
1,665.66
594.88
105,105.00
4,290.00
132,739.61
Halaman 54
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.084
0.125
0.013
0.004
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Nok stel Gelombang
Paku sekrup 3,5"
Lbr
Bh
2.050
6.000
35,000.00
500.00
Jumlah
5,031.60
9,712.50
1,164.80
416.00
71,750.00
3,000.00
91,074.90
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
40,600.00
580.00
Jumlah
Harga
Satuan
Oh
Oh
Oh
Oh
0.084
0.125
0.013
0.004
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Bubung stel Gelombang
Paku sekrup 3,5"
Lbr
Bh
2.050
6.000
35,000.00
500.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
5,031.60
9,712.50
1,164.80
416.00
71,750.00
3,000.00
91,074.90
Harga
Satuan
Harga
Satuan
Oh
Oh
Oh
Oh
0.084
0.125
0.013
0.004
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Nok paten
Paku sekrup 3,5"
Lbr
Bh
1.200
6.000
35,000.00
500.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Oh
Oh
Oh
Oh
0.084
0.125
0.013
0.004
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Nok paten
Paku sekrup 3,5"
Lbr
Bh
1.200
6.000
35,000.00
500.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
5,031.60
9,712.50
1,164.80
416.00
42,000.00
3,000.00
61,324.90
Harga
Satuan
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.084
0.125
0.013
0.004
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Nok paten
Paku sekrup 3,5"
Lbr
Bh
1.200
6.000
35,000.00
500.00
Jumlah
85,657.00
111,111.00
128,128.00
148,720.00
50,050.00
715.00
Jumlah
7,195.19
13,888.88
1,665.66
594.88
102,602.50
4,290.00
130,237.11
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
45,500.00
650.00
Jumlah
6,541.08
12,626.25
1,514.24
540.80
93,275.00
3,900.00
118,397.37
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
50,050.00
715.00
Jumlah
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
40,600.00
580.00
Jumlah
7,195.19
13,888.88
1,665.66
594.88
102,602.50
4,290.00
130,237.11
5,836.66
11,266.50
1,351.17
482.56
48,720.00
3,480.00
71,136.88
Harga
Satuan
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
45,500.00
650.00
Jumlah
6,541.08
12,626.25
1,514.24
540.80
54,600.00
3,900.00
79,722.37
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
50,050.00
715.00
Jumlah
7,195.19
13,888.88
1,665.66
594.88
60,060.00
4,290.00
87,694.61
Zona II
5,031.60
9,712.50
1,164.80
416.00
42,000.00
3,000.00
61,324.90
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
40,600.00
580.00
Jumlah
5,836.66
11,266.50
1,351.17
482.56
48,720.00
3,480.00
71,136.88
Harga
Satuan
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
45,500.00
650.00
Jumlah
6,541.08
12,626.25
1,514.24
540.80
54,600.00
3,900.00
79,722.37
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
50,050.00
715.00
Jumlah
7,195.19
13,888.88
1,665.66
594.88
60,060.00
4,290.00
87,694.61
Zona I
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
5,836.66
11,266.50
1,351.17
482.56
83,230.00
3,480.00
105,646.88
Harga
Satuan
Zona I
Uraian
Jumlah
Harga
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
6,541.08
12,626.25
1,514.24
540.80
93,275.00
3,900.00
118,397.37
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
40,600.00
580.00
Jumlah
Zona I
Uraian
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
45,500.00
650.00
Jumlah
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
5,836.66
11,266.50
1,351.17
482.56
83,230.00
3,480.00
105,646.88
Harga
Satuan
Zona I
Uraian
Zona III
Jumlah
Harga
Zona II
Jumlah
Harga
5,031.60
9,712.50
1,164.80
416.00
42,000.00
3,000.00
61,324.90
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
40,600.00
580.00
Jumlah
Zona III
Jumlah
Harga
5,836.66
11,266.50
1,351.17
482.56
48,720.00
3,480.00
71,136.88
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
45,500.00
650.00
Jumlah
Zona IV
Jumlah
Harga
6,541.08
12,626.25
1,514.24
540.80
54,600.00
3,900.00
79,722.37
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
50,050.00
715.00
Jumlah
Jumlah
Harga
7,195.19
13,888.88
1,665.66
594.88
60,060.00
4,290.00
87,694.61
Halaman 55
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
Zona II
Harga
Satuan
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.100
0.150
0.013
0.004
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Nok stel rata
Paku sekrup 3,5"
Lbr
Bh
1.100
6.000
35,000.00
500.00
5,990.00
11,655.00
1,164.80
416.00
38,500.00
3,000.00
60,725.80
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
40,600.00
580.00
Jumlah
Jumlah
Harga
Oh
Oh
Oh
Oh
0.084
0.125
0.013
0.004
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Nok stel rata
Paku sekrup 3,5"
Lbr
Bh
1.100
6.000
35,000.00
500.00
5,031.60
9,712.50
1,164.80
416.00
38,500.00
3,000.00
57,824.90
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.200
0.100
0.010
0.010
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Genteng Beton
Paku Biasa 2" - 5"
Lbr
Bh
11.000
0.030
34,900.00
13,700.00
11,980.00
7,770.00
896.00
1,040.00
383,900.00
411.00
405,997.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Oh
Oh
Oh
Oh
0.200
0.100
0.010
0.010
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Genteng Metal
Paku Biasa 2" - 5"
Lbr
Bh
1.020
0.200
105,100.00
13,700.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Harga
Satuan
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.166
0.250
0.025
0.008
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Sirap
Paku biasa 1/2" - 1"
Lbr
Bh
60.000
0.200
35,900.00
600.00
Jumlah
8,565.70
16,666.65
1,665.66
594.88
55,055.00
4,290.00
86,837.89
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
45,500.00
650.00
Jumlah
6,541.08
12,626.25
1,514.24
540.80
50,050.00
3,900.00
75,172.37
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
50,050.00
715.00
Jumlah
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
40,484.00
15,892.00
Jumlah
13,896.80
9,013.20
1,039.36
1,206.40
445,324.00
476.76
470,956.52
Harga
Satuan
7,195.19
13,888.88
1,665.66
594.88
55,055.00
4,290.00
82,689.61
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
45,370.00
17,810.00
Jumlah
Zona II
11,980.00
7,770.00
896.00
1,040.00
107,202.00
2,740.00
131,628.00
Harga
Satuan
15,574.00
10,101.00
1,164.80
1,352.00
499,070.00
534.30
527,796.10
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
49,907.00
19,591.00
Jumlah
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
121,916.00
15,892.00
Jumlah
17,131.40
11,111.10
1,281.28
1,487.20
548,977.00
587.73
580,575.71
13,896.80
9,013.20
1,039.36
1,206.40
124,354.32
3,178.40
152,688.48
Harga
Satuan
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
136,630.00
17,810.00
Jumlah
15,574.00
10,101.00
1,164.80
1,352.00
139,362.60
3,562.00
171,116.40
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
150,293.00
19,591.00
Jumlah
17,131.40
11,111.10
1,281.28
1,487.20
153,298.86
3,918.20
188,228.04
Zona I
Uraian
85,657.00
111,111.00
128,128.00
148,720.00
50,050.00
715.00
Jumlah
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
Harga
Zona I
Uraian
5,836.66
11,266.50
1,351.17
482.56
44,660.00
3,480.00
67,076.88
Harga
Satuan
Zona II
Harga
Satuan
7,787.00
15,151.50
1,514.24
540.80
50,050.00
3,900.00
78,943.54
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
40,600.00
580.00
Jumlah
Zona I
Uraian
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
45,500.00
650.00
Jumlah
Zona II
Harga
Satuan
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
6,948.40
13,519.80
1,351.17
482.56
44,660.00
3,480.00
70,441.93
Harga
Satuan
Zona I
Uraian
Zona III
Jumlah
Harga
Zona II
Jumlah
Harga
9,943.40
19,425.00
2,240.00
832.00
2,154,000.00
120.00
2,186,560.40
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
41,644.00
696.00
Jumlah
Zona III
Jumlah
Harga
11,534.34
22,533.00
2,598.40
965.12
2,498,640.00
139.20
2,536,410.06
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
46,670.00
780.00
Jumlah
Zona IV
Jumlah
Harga
12,926.42
25,252.50
2,912.00
1,081.60
2,800,200.00
156.00
2,842,528.52
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
51,337.00
858.00
Jumlah
Jumlah
Harga
14,219.06
27,777.75
3,203.20
1,189.76
3,080,220.00
171.60
3,126,781.37
Halaman 56
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.400
0.200
0.020
0.020
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Nok Genteng Beton
Paku Biasa 2" - 5"
Semen abu-abu
Bh
Kg
Kg
3.500
0.050
10.800
24,000.00
13,700.00
1,434.00
M3
Kg
0.032
1.000
131,500.00
2,032.00
Pasir Pasang
Semen Warna
Zona II
Jumlah
Harga
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
23,960.00
15,540.00
1,792.00
2,080.00
84,000.00
685.00
15,487.20
4,208.00
2,032.00
149,784.20
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
27,840.00
15,892.00
1,663.44
Harga
Satuan
Oh
Oh
Oh
Oh
0.250
0.150
0.015
0.013
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Nok Genteng Metal
Paku biasa 1/2" - 1"
Bh
Kg
1.100
0.050
53,500.00
600.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Harga
Satuan
14,975.00
11,655.00
1,344.00
1,352.00
58,850.00
30.00
88,206.00
Jumlah
Harga
31,148.00
20,202.00
2,329.60
2,704.00
109,200.00
890.50
20,133.36
85,657.00
111,111.00
128,128.00
148,720.00
34,320.00
19,591.00
2,050.62
34,262.80
22,222.20
2,562.56
2,974.40
120,120.00
979.55
22,146.70
170,950.00
2,641.60
Jumlah
5,470.40
2,641.60
194,719.46
188,045.00
2,905.76
Jumlah
6,017.44
2,905.76
214,191.41
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
62,060.00
696.00
Jumlah
17,371.00
13,519.80
1,559.04
1,568.32
68,266.00
34.80
102,318.96
Harga
Satuan
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
69,550.00
780.00
Jumlah
Zona II
Jumlah
Harga
0.125
0.250
0.025
0.006
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Seng Plat 3" x 6" BJLS 28
Lbr
Paku biasa 1/2" - 1"
Kg
Paku Biasa 2" - 5"
Kg
Kayu borneo, papan tebal 3 cm M3
0.400
0.060
0.050
0.004
86,100.00
600.00
13,700.00
2,017,100.00
Jumlah
7,487.50
19,425.00
2,240.00
624.00
34,440.00
36.00
685.00
8,068.40
73,005.90
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
19,467.50
15,151.50
1,747.20
1,757.60
76,505.00
39.00
114,667.80
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
76,505.00
858.00
Jumlah
Harga
Satuan
Oh
Oh
Oh
Oh
0.120
0.060
0.006
0.006
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Seng Plat 3" x 6" BJLS 28
Paku biasa 1/2" - 1"
Lbr
Kg
0.700
0.020
86,100.00
600.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
21,414.25
16,666.65
1,921.92
1,933.36
84,155.50
42.90
126,134.58
7,188.00
4,662.00
537.60
624.00
60,270.00
12.00
73,293.60
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.150
0.070
0.008
0.006
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Seng Plat 3" x 6" BJLS 28
Paku biasa 1/2" - 1"
Lbr
Kg
0.300
0.040
86,100.00
600.00
Jumlah
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
111,930.00
780.00
17,810.00
2,622,230.00
Jumlah
9,733.75
25,252.50
2,912.00
811.20
44,772.00
46.80
890.50
10,488.92
94,907.67
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
123,123.00
858.00
19,591.00
2,884,453.00
Jumlah
10,707.13
27,777.75
3,203.20
892.32
49,249.20
51.48
979.55
11,537.81
104,398.44
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
99,876.00
696.00
Jumlah
8,338.08
5,407.92
623.62
723.84
69,913.20
13.92
85,020.58
Harga
Satuan
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
111,930.00
780.00
Jumlah
9,344.40
6,060.60
698.88
811.20
78,351.00
15.60
95,281.68
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
123,123.00
858.00
Jumlah
10,278.84
6,666.66
768.77
892.32
86,186.10
17.16
104,809.85
Zona I
Harga
Satuan
8,685.50
22,533.00
2,598.40
723.84
39,950.40
41.76
794.60
9,359.34
84,686.84
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
99,876.00
696.00
15,892.00
2,339,836.00
Jumlah
Zona I
Uraian
Harga
Satuan
Oh
Oh
Oh
Oh
Uraian
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
31,200.00
17,810.00
1,864.20
Zona II
Harga
Satuan
Zona I
Uraian
4,881.28
2,357.12
173,749.67
Harga
Satuan
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
27,793.60
18,026.40
2,078.72
2,412.80
97,440.00
794.60
17,965.15
152,540.00
2,357.12
Jumlah
Zona I
Uraian
Zona III
Jumlah
Harga
Zona II
Jumlah
Harga
8,985.00
5,439.00
716.80
624.00
25,830.00
24.00
41,618.80
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
99,876.00
696.00
Jumlah
Zona III
Jumlah
Harga
10,422.60
6,309.24
831.49
723.84
29,962.80
27.84
48,277.81
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
111,930.00
780.00
Jumlah
Zona IV
Jumlah
Harga
11,680.50
7,070.70
931.84
811.20
33,579.00
31.20
54,104.44
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
123,123.00
858.00
Jumlah
Jumlah
Harga
12,848.55
7,777.77
1,025.02
892.32
36,936.90
34.32
59,514.88
Halaman 57
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Harga
Satuan
Zona II
Jumlah
Harga
Oh
Oh
Oh
Oh
0.150
0.750
0.008
0.006
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Atap alluminium gelombang teb Lbr
Paku hak panjang 15 cm
Kg
1.050
0.020
342,000.00
35,000.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
8,985.00
58,275.00
716.80
624.00
359,100.00
700.00
428,400.80
69,484.00
90,132.00
103,936.00
120,640.00
396,720.00
40,600.00
Jumlah
Harga
Satuan
Oh
Oh
Oh
Oh
0.100
1.000
0.010
0.010
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Nok standar 40 cm, swg 22
Paku hak panjang 15 cm
Lbr
Kg
1.200
0.040
35,400.00
35,000.00
Jumlah
Harga
Satuan
5,990.00
77,700.00
896.00
1,040.00
42,480.00
1,400.00
-
No
Satuan Indeks
Oh
Oh
Oh
Oh
0.150
0.050
0.005
0.008
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Sisalation/Aluminium foil
Lbr
1.050
916,300.00
Jumlah
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
489,060.00
50,050.00
Jumlah
12,848.55
83,333.25
1,025.02
892.32
513,513.00
1,001.00
612,613.14
150,226.96
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
46,020.00
45,500.00
Jumlah
Zona II
8,985.00
3,885.00
448.00
832.00
962,115.00
976,265.00
Zona IV
Jumlah
Harga
7,787.00
101,010.00
1,164.80
1,352.00
55,224.00
1,820.00
168,357.80
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
50,622.00
50,050.00
-
8,565.70
111,111.00
1,281.28
1,487.20
60,746.40
2,002.00
-
Jumlah
185,193.58
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
6,948.40
90,132.00
1,039.36
1,206.40
49,276.80
1,624.00
-
Jumlah
Zona I
Harga
Satuan
11,680.50
75,757.50
931.84
811.20
466,830.00
910.00
556,921.04
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
41,064.00
40,600.00
-
129,506.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
444,600.00
45,500.00
Jumlah
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
10,422.60
67,599.00
831.49
723.84
416,556.00
812.00
496,944.93
Harga
Satuan
Zona I
Uraian
Zona III
Jumlah
Harga
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
1,062,908.00
Jumlah
10,422.60
4,506.60
519.68
965.12
1,116,053.40
1,132,467.40
Harga
Satuan
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
1,191,190.00
Jumlah
11,680.50
5,050.50
582.40
1,081.60
1,250,749.50
1,269,144.50
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
1,310,309.00
Jumlah
12,848.55
5,555.55
640.64
1,189.76
1,375,824.45
1,396,058.95
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.030
0.070
0.007
0.002
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Pelat asbes tebal 6 mm
Paku
Lbr
Kg
1.100
0.010
45,000.00
13,700.00
Jumlah
1,797.00
5,439.00
627.20
156.00
49,500.00
137.00
57,656.20
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
52,200.00
15,892.00
Jumlah
Harga
Satuan
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.030
0.070
0.007
0.002
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Pelat asbes tebal 5 mm
Paku
Lbr
Kg
1.100
0.010
45,000.00
13,700.00
Jumlah
2,084.52
6,309.24
727.55
180.96
57,420.00
158.92
66,881.19
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
58,500.00
17,810.00
Jumlah
Zona II
Jumlah
Harga
1,797.00
5,439.00
627.20
156.00
49,500.00
137.00
57,656.20
Zona IV
Jumlah
Harga
2,336.10
7,070.70
815.36
202.80
64,350.00
178.10
74,953.06
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
64,350.00
19,591.00
Jumlah
2,569.71
7,777.77
896.90
223.08
70,785.00
195.91
82,448.37
Zona I
Uraian
Zona III
Jumlah
Harga
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
52,200.00
15,892.00
Jumlah
Zona III
Jumlah
Harga
2,084.52
6,309.24
727.55
180.96
57,420.00
158.92
66,881.19
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
58,500.00
17,810.00
Jumlah
Zona IV
Jumlah
Harga
2,336.10
7,070.70
815.36
202.80
64,350.00
178.10
74,953.06
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
64,350.00
19,591.00
Jumlah
Jumlah
Harga
2,569.71
7,777.77
896.90
223.08
70,785.00
195.91
82,448.37
Halaman 58
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.030
0.070
0.007
0.002
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Pelat asbes tebal 4 mm
Paku
Lbr
Kg
1.100
0.010
45,000.00
13,700.00
Jumlah
1,797.00
5,439.00
627.20
156.00
49,500.00
137.00
57,656.20
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
52,200.00
15,892.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
Oh
Oh
Oh
Oh
0.030
0.070
0.007
0.002
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Pelat asbes tebal 3.5 mm
Paku
Lbr
Kg
1.100
0.010
45,000.00
13,700.00
Jumlah
1,797.00
5,439.00
627.20
156.00
49,500.00
137.00
57,656.20
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.060
0.120
0.012
0.003
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Akustik ukuran 30 x 30 cm
Paku
Lbr
Kg
12.000
0.050
55,000.00
13,700.00
Jumlah
3,594.00
9,324.00
1,075.20
312.00
660,000.00
685.00
674,990.20
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.060
0.120
0.012
0.003
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Akustik ukuran 30 x 60 cm
Paku
Lbr
Kg
5.800
0.050
55,000.00
13,700.00
Jumlah
3,594.00
9,324.00
1,075.20
312.00
319,000.00
685.00
333,990.20
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.060
0.100
0.010
0.003
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Akustik arm strongukuran 60 x
Paku
Lbr
Kg
1.500
0.050
55,000.00
13,700.00
Jumlah
3,594.00
7,770.00
896.00
312.00
82,500.00
685.00
95,757.00
85,657.00
111,111.00
128,128.00
148,720.00
64,350.00
19,591.00
Jumlah
2,569.71
7,777.77
896.90
223.08
70,785.00
195.91
82,448.37
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
58,500.00
17,810.00
Jumlah
Harga
Satuan
2,336.10
7,070.70
815.36
202.80
64,350.00
178.10
74,953.06
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
64,350.00
19,591.00
Jumlah
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
63,800.00
15,892.00
Jumlah
4,169.04
10,815.84
1,247.23
361.92
765,600.00
794.60
782,988.63
Harga
Satuan
2,569.71
7,777.77
896.90
223.08
70,785.00
195.91
82,448.37
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
71,500.00
17,810.00
Jumlah
4,672.20
12,121.20
1,397.76
405.60
858,000.00
890.50
877,487.26
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
78,650.00
19,591.00
Jumlah
5,139.42
13,333.32
1,537.54
446.16
943,800.00
979.55
965,235.99
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
63,800.00
15,892.00
Jumlah
4,169.04
10,815.84
1,247.23
361.92
370,040.00
794.60
387,428.63
Harga
Satuan
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
71,500.00
17,810.00
Jumlah
4,672.20
12,121.20
1,397.76
405.60
414,700.00
890.50
434,187.26
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
78,650.00
19,591.00
Jumlah
5,139.42
13,333.32
1,537.54
446.16
456,170.00
979.55
477,605.99
Zona II
Jumlah
Harga
Jumlah
Harga
Zona I
Uraian
2,084.52
6,309.24
727.55
180.96
57,420.00
158.92
66,881.19
Harga
Satuan
Zona II
Jumlah
Harga
2,336.10
7,070.70
815.36
202.80
64,350.00
178.10
74,953.06
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
52,200.00
15,892.00
Jumlah
Zona I
Uraian
77,870.00
101,010.00
116,480.00
135,200.00
58,500.00
17,810.00
Jumlah
Zona II
Jumlah
Harga
Zona IV
Jumlah
Harga
Harga
Satuan
Zona I
Uraian
2,084.52
6,309.24
727.55
180.96
57,420.00
158.92
66,881.19
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Zona III
Jumlah
Harga
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
63,800.00
15,892.00
Jumlah
Zona III
Jumlah
Harga
4,169.04
9,013.20
1,039.36
361.92
95,700.00
794.60
111,078.12
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
71,500.00
17,810.00
Jumlah
Zona IV
Jumlah
Harga
4,672.20
10,101.00
1,164.80
405.60
107,250.00
890.50
124,484.10
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
78,650.00
19,591.00
Jumlah
Jumlah
Harga
5,139.42
11,111.10
1,281.28
446.16
117,975.00
979.55
136,932.51
Halaman 59
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.070
0.100
0.010
0.004
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Plywood 4' x 8' x 4 mm
Paku
Lbr
Kg
0.360
0.030
82,500.00
13,700.00
Jumlah
Harga
Satuan
4,193.00
7,770.00
896.00
364.00
29,700.00
411.00
43,334.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
69,484.00
90,132.00
103,936.00
120,640.00
95,700.00
15,892.00
Jumlah
Harga
Satuan
Oh
Oh
Oh
Oh
0.070
0.100
0.010
0.004
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Plywood 4' x 8' x 4 mm
Paku
Lbr
Kg
0.360
0.030
82,500.00
13,700.00
Jumlah
Harga
Satuan
4,193.00
7,770.00
896.00
364.00
29,700.00
411.00
43,334.00
No
Satuan Indeks
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.070
0.100
0.010
0.004
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Plywood 4' x 8' x 4 mm
Paku
Lbr
Kg
0.375
0.030
82,500.00
13,700.00
Jumlah
Harga
Satuan
4,193.00
7,770.00
896.00
364.00
30,937.50
411.00
44,571.50
No
Satuan Indeks
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.070
0.100
0.010
0.004
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Plywood 4' x 8' x 4 mm
Paku
Lbr
Kg
0.375
0.030
82,500.00
13,700.00
Jumlah
No
Satuan Indeks
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.070
0.100
0.010
0.004
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Plywood 4' x 8' x 4 mm
Paku
Lbr
Kg
0.360
0.030
82,500.00
13,700.00
Jumlah
Harga
Satuan
4,193.00
7,770.00
896.00
364.00
29,700.00
411.00
43,334.00
85,657.00
111,111.00
128,128.00
148,720.00
117,975.00
19,591.00
Jumlah
5,995.99
11,111.10
1,281.28
520.52
42,471.00
587.73
61,967.62
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
107,250.00
17,810.00
Jumlah
4,863.88
9,013.20
1,039.36
422.24
35,887.50
476.76
51,702.94
Harga
Satuan
5,450.90
10,101.00
1,164.80
473.20
40,218.75
534.30
57,942.95
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
117,975.00
19,591.00
Jumlah
5,995.99
11,111.10
1,281.28
520.52
44,240.63
587.73
63,737.25
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
107,250.00
17,810.00
Jumlah
Zona II
Jumlah
Harga
Jumlah
Harga
5,450.90
10,101.00
1,164.80
473.20
40,218.75
534.30
57,942.95
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
117,975.00
19,591.00
Jumlah
5,995.99
11,111.10
1,281.28
520.52
44,240.63
587.73
63,737.25
Zona I
Harga
Satuan
5,450.90
10,101.00
1,164.80
473.20
38,610.00
534.30
56,334.20
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
95,700.00
15,892.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
4,863.88
9,013.20
1,039.36
422.24
35,887.50
476.76
51,702.94
Harga
Satuan
4,193.00
7,770.00
896.00
364.00
30,937.50
411.00
44,571.50
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
107,250.00
17,810.00
Jumlah
Zona II
Jumlah
Harga
5,995.99
11,111.10
1,281.28
520.52
42,471.00
587.73
61,967.62
Zona I
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
117,975.00
19,591.00
Jumlah
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
95,700.00
15,892.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
4,863.88
9,013.20
1,039.36
422.24
34,452.00
476.76
50,267.44
Harga
Satuan
Zona II
Jumlah
Harga
Jumlah
Harga
Zona I
Harga
Satuan
5,450.90
10,101.00
1,164.80
473.20
38,610.00
534.30
56,334.20
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
95,700.00
15,892.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
107,250.00
17,810.00
Jumlah
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
4,863.88
9,013.20
1,039.36
422.24
34,452.00
476.76
50,267.44
Harga
Satuan
Zona I
Uraian
Zona III
Jumlah
Harga
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
95,700.00
15,892.00
Jumlah
Zona III
Jumlah
Harga
4,863.88
9,013.20
1,039.36
422.24
34,452.00
476.76
50,267.44
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
107,250.00
17,810.00
Jumlah
Zona IV
Jumlah
Harga
5,450.90
10,101.00
1,164.80
473.20
38,610.00
534.30
56,334.20
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
117,975.00
19,591.00
Jumlah
Jumlah
Harga
5,995.99
11,111.10
1,281.28
520.52
42,471.00
587.73
61,967.62
Halaman 60
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.070
0.100
0.010
0.004
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Plywood 4' x 8' x 4 mm
Paku
Lbr
Kg
0.375
0.030
82,500.00
13,700.00
4,193.00
7,770.00
896.00
364.00
30,937.50
411.00
44,571.50
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Harga
Satuan
Oh
Oh
Oh
Oh
0.200
0.600
0.060
0.010
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kayu kamper, papan
Paku
Paku sekrup
M3
Kg
Kg
0.024
0.010
0.050
1,673,200.00
13,700.00
30,000.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
11,980.00
46,620.00
5,376.00
1,040.00
40,156.80
137.00
1,500.00
106,809.80
Oh
Oh
Oh
Oh
0.600
0.100
0.010
0.003
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Soft board 4' x 8' x 4 mm
Paku Biasa
Lbr
Kg
0.350
0.030
196,800.00
13,700.00
Jumlah
69,484.00
90,132.00
103,936.00
120,640.00
1,940,912.00
15,892.00
34,800.00
Jumlah
13,896.80
54,079.20
6,236.16
1,206.40
46,581.89
158.92
1,740.00
123,899.37
35,940.00
7,770.00
896.00
312.00
68,880.00
411.00
114,209.00
69,484.00
90,132.00
103,936.00
120,640.00
228,288.00
15,892.00
Jumlah
41,690.40
9,013.20
1,039.36
361.92
79,900.80
476.76
132,482.44
Satuan Indeks
Zona I
0.150
0.500
0.050
0.008
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Akustik arm strong 60 x 120 c
Profil Aluminium "T"
Ramset/Dyna Bolt
Kawat Seng Polos
Lbr
M'
Bh
Kg
1.500
3.600
1.050
0.150
75,000.00
45,000.00
25,000.00
35,000.00
Jumlah
8,985.00
38,850.00
4,480.00
780.00
112,500.00
162,000.00
26,250.00
5,250.00
359,095.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Harga
Satuan
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.050
0.050
0.005
0.003
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
List Kayu Profil
Paku
Lbr
Kg
1.050
0.010
39,400.00
13,700.00
Jumlah
15,574.00
60,606.00
6,988.80
1,352.00
52,203.84
178.10
1,950.00
138,852.74
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
2,392,676.00
19,591.00
42,900.00
Jumlah
17,131.40
66,666.60
7,687.68
1,487.20
57,424.22
195.91
2,145.00
152,738.01
Harga
Satuan
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
255,840.00
17,810.00
Jumlah
46,722.00
10,101.00
1,164.80
405.60
89,544.00
534.30
148,471.70
Harga
Satuan
10,422.60
45,066.00
5,196.80
904.80
130,500.00
187,920.00
30,450.00
6,090.00
416,550.20
Harga
Satuan
51,394.20
11,111.10
1,281.28
446.16
98,498.40
587.73
163,318.87
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
97,500.00
58,500.00
32,500.00
45,500.00
Jumlah
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
281,424.00
19,591.00
Jumlah
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
87,000.00
52,200.00
29,000.00
40,600.00
Jumlah
11,680.50
50,505.00
5,824.00
1,014.00
146,250.00
210,600.00
34,125.00
6,825.00
466,823.50
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
107,250.00
64,350.00
35,750.00
50,050.00
Jumlah
12,848.55
55,555.50
6,406.40
1,115.40
160,875.00
231,660.00
37,537.50
7,507.50
513,505.85
Zona I
Uraian
77,870.00
101,010.00
116,480.00
135,200.00
2,175,160.00
17,810.00
39,000.00
Jumlah
Zona II
Jumlah
Harga
Oh
Oh
Oh
Oh
5,995.99
11,111.10
1,281.28
520.52
44,240.63
587.73
63,737.25
Zona IV
Jumlah
Harga
Zona III
Jumlah
Harga
No
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Harga
Satuan
Zona II
Harga
Satuan
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
117,975.00
19,591.00
Jumlah
Zona III
Jumlah
Harga
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
5,450.90
10,101.00
1,164.80
473.20
40,218.75
534.30
57,942.95
Harga
Satuan
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
107,250.00
17,810.00
Jumlah
Zona II
Harga
Satuan
Zona I
Uraian
4,863.88
9,013.20
1,039.36
422.24
35,887.50
476.76
51,702.94
Harga
Satuan
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
95,700.00
15,892.00
Jumlah
Zona I
Uraian
Zona II
Jumlah
Harga
2,995.00
3,885.00
448.00
312.00
41,370.00
137.00
49,147.00
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
45,704.00
15,892.00
Jumlah
Zona III
Jumlah
Harga
3,474.20
4,506.60
519.68
361.92
47,989.20
158.92
57,010.52
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
51,220.00
17,810.00
Jumlah
Zona IV
Jumlah
Harga
3,893.50
5,050.50
582.40
405.60
53,781.00
178.10
63,891.10
Harga
Satuan
1.02
85,657.00
111,111.00
128,128.00
148,720.00
56,342.00
19,591.00
Jumlah
Jumlah
Harga
4,282.85
5,555.55
640.64
446.16
59,159.10
195.91
70,280.21
Halaman 61
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
: Langit-langit asbes (1,00 x 1,00) m, tebal 3,2 mm, rangka borneo (SNI.Rev.2002)
: M3
:
: Harian
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Harga
Satuan
Harga
Satuan
3,474.20
4,506.60
519.68
361.92
-
1.02
77,870.00
101,010.00
116,480.00
135,200.00
-
3,893.50
5,050.50
582.40
405.60
-
1.02
85,657.00
111,111.00
128,128.00
148,720.00
-
4,282.85
5,555.55
640.64
446.16
-
M3
Kg
Lbr
0.012
0.060
1.100
1,962,500.00
13,700.00
26,900.00
23,550.00
822.00
29,590.00
61,602.00
2,276,500.00
15,892.00
31,204.00
Jumlah
27,318.00
953.52
34,324.40
71,458.32
2,551,250.00
17,810.00
34,970.00
Jumlah
30,615.00
1,068.60
38,467.00
80,082.60
2,806,375.00
19,591.00
38,467.00
Jumlah
33,676.50
1,175.46
42,313.70
88,090.86
Satuan Indeks
Zona I
Harga
Satuan
Oh
Oh
Oh
Oh
0.270
0.400
0.040
0.014
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Plywood 4' x 8' x 4 mm
Paku Biasa 2" - 5"
Lbr
Kg
0.390
0.060
82,500.00
13,700.00
0.023
1,962,500.00
Jumlah
Harga
Satuan
1.02
85,657.00
111,111.00
128,128.00
148,720.00
117,975.00
19,591.00
23,127.39
44,444.40
5,125.12
2,007.72
46,010.25
1,175.46
45,137.50
130,375.50
2,276,500.00
Jumlah
52,359.50
151,235.58
2,551,250.00
Jumlah
58,678.75
169,488.15
2,806,375.00
Jumlah
64,546.63
186,436.97
Lbr
Kg
5.800
0.060
75,000.00
13,700.00
0.023
1,962,500.00
Jumlah
Harga
Satuan
1.02
85,657.00
111,111.00
128,128.00
148,720.00
107,250.00
19,591.00
22,270.82
44,444.40
5,125.12
1,933.36
622,050.00
1,175.46
45,137.50
532,549.50
2,276,500.00
Jumlah
52,359.50
617,757.42
2,551,250.00
Jumlah
58,678.75
692,314.35
2,806,375.00
Jumlah
64,546.63
761,545.79
Lbr
Kg
M3
11.500
0.060
0.027
75,000.00
13,700.00
1,962,500.00
Jumlah
18,569.00
36,519.00
4,211.20
1,612.00
862,500.00
822.00
52,987.50
977,220.70
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Harga
Satuan
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.100
0.050
0.005
0.005
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Gypsum board (1200 x 2400 x
Paku sekrup
Lbr
Kg
0.364
0.110
248,300.00
35,000.00
Jumlah
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
87,000.00
15,892.00
2,276,500.00
Jumlah
21,540.04
42,362.04
4,884.99
1,869.92
1,000,500.00
953.52
61,465.50
1,133,576.01
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
97,500.00
17,810.00
2,551,250.00
Jumlah
Zona II
Jumlah
Harga
5,990.00
3,885.00
448.00
520.00
90,381.20
3,850.00
105,074.20
Zona IV
Jumlah
Harga
24,139.70
47,474.70
5,474.56
2,095.60
1,121,250.00
1,068.60
68,883.75
1,270,386.91
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
107,250.00
19,591.00
2,806,375.00
Jumlah
26,553.67
52,222.17
6,022.02
2,305.16
1,233,375.00
1,175.46
75,772.13
1,397,425.60
Zona I
Uraian
Zona II
Jumlah
Harga
II. BAHAN
Akustik 30 x 30 cm
Paku
Kayu borneo, balok
Jumlah
Harga
20,246.20
40,404.00
4,659.20
1,757.60
565,500.00
1,068.60
Zona I
59,900.00
77,700.00
89,600.00
104,000.00
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
97,500.00
17,810.00
Satuan Indeks
0.310
0.470
0.047
0.016
Zona IV
Jumlah
Harga
18,065.84
36,052.80
4,157.44
1,568.32
504,600.00
953.52
No
Oh
Oh
Oh
Oh
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
87,000.00
15,892.00
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Zona III
Jumlah
Harga
15,574.00
31,080.00
3,584.00
1,352.00
435,000.00
822.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Harga
Satuan
Zona II
Jumlah
Harga
II. BAHAN
Akustik 30 x 60 cm
Paku
Jumlah
Harga
21,024.90
40,404.00
4,659.20
1,825.20
41,827.50
1,068.60
Zona I
59,900.00
77,700.00
89,600.00
104,000.00
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
107,250.00
17,810.00
Satuan Indeks
0.260
0.400
0.040
0.013
Zona IV
Jumlah
Harga
18,760.68
36,052.80
4,157.44
1,628.64
37,323.00
953.52
No
Oh
Oh
Oh
Oh
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
95,700.00
15,892.00
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Zona III
Jumlah
Harga
16,173.00
31,080.00
3,584.00
1,404.00
32,175.00
822.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Uraian
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
-
No
Kayu borneo
Harga
Satuan
2,995.00
3,885.00
448.00
312.00
-
Uraian
Zona IV
Jumlah
Harga
59,900.00
77,700.00
89,600.00
104,000.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Kayu borneo
Harga
Satuan
0.050
0.050
0.005
0.003
Jumlah
Uraian
Zona III
Jumlah
Harga
Oh
Oh
Oh
Oh
II. BAHAN
Kayu borneo, balok
Paku biasa
Asbes 1,00 x 1,00 m
Zona II
Jumlah
Harga
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
288,028.00
40,600.00
Jumlah
Zona III
Jumlah
Harga
6,948.40
4,506.60
519.68
603.20
104,842.19
4,466.00
121,886.07
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
322,790.00
45,500.00
Jumlah
Zona IV
Jumlah
Harga
7,787.00
5,050.50
582.40
676.00
117,495.56
5,005.00
136,596.46
Harga
Satuan
1.02
85,657.00
111,111.00
128,128.00
148,720.00
355,069.00
50,050.00
Jumlah
Jumlah
Harga
8,565.70
5,555.55
640.64
743.60
129,245.12
5,505.50
150,256.11
Halaman 62
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Mandor
Tukang Batu
Kepala Tukang
Oh
Oh
Oh
Oh
3.300
0.160
1.100
0.001
59,900.00
104,000.00
77,700.00
89,600.00
II. BAHAN
Kloset duduk/monoblok setara
Perlengkapan (6% Harga Klose
Bh
Ls
1.000
1.000
1,972,100.00
118,326.00
Jumlah
197,670.00
16,640.00
85,470.00
89.60
1,972,100.00
118,326.00
2,390,295.60
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
1.01
69,484.00
120,640.00
90,132.00
103,936.00
2,287,636.00
137,258.16
Jumlah
Harga
Satuan
Oh
Oh
Oh
Oh
1.000
0.160
1.500
1.500
59,900.00
104,000.00
77,700.00
89,600.00
II. BAHAN
Kloset Jongkok porselen
Semen portland
Bh
Kg
1.000
6.000
298,900.00
1,434.00
0.010
131,500.00
Pasir Pasang
Jumlah
Harga
Satuan
II. BAHAN
Kloset Jongkok teraso
Bata merah 5 x 11 x 22 cm
Semen portland
Bh
Bh
Kg
1.000
7.000
6.000
298,900.00
1,500.00
1,434.00
M3
0.010
131,500.00
Pasir Pasang
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Oh
Oh
Oh
Oh
1.000
0.100
1.000
0.100
59,900.00
104,000.00
77,700.00
89,600.00
II. BAHAN
Urinoir
Semen portland
Pasir Pasang
Perlengkapan (30% Harga Urino
Bh
Kg
M3
Ls
1.000
6.000
0.010
1.000
1,613,500.00
1,434.00
131,500.00
484,050.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
I. UPAH
Pekerja
Mandor
Tukang Batu
Kepala Tukang
Oh
Oh
Oh
Oh
1.200
0.100
1.450
0.150
59,900.00
104,000.00
77,700.00
89,600.00
II. BAHAN
Wastafel
Semen abu-abu
Pasir Pasang
Perlengkapan (12% Harga klos
Bh
Kg
M3
Ls
1.000
6.000
0.010
1.000
1,673,200.00
1,434.00
131,500.00
200,784.00
Jumlah
Jumlah
Harga
152,540.00
Jumlah
1,525.40
738,118.44
170,950.00
Jumlah
1,709.50
827,201.70
188,045.00
Jumlah
1,880.45
909,921.87
Zona II
Harga
Satuan
Zona III
Jumlah
Harga
Harga
Satuan
Zona IV
Jumlah
Harga
Harga
Satuan
Jumlah
Harga
59,900.00
11,440.00
116,550.00
26,880.00
298,900.00
10,500.00
8,604.00
1.01
69,484.00
120,640.00
90,132.00
103,936.00
346,724.00
1,740.00
1,663.44
69,484.00
13,270.40
135,198.00
31,180.80
346,724.00
12,180.00
9,980.64
1.02
77,870.00
135,200.00
101,010.00
116,480.00
388,570.00
1,950.00
1,864.20
77,870.00
14,872.00
151,515.00
34,944.00
388,570.00
13,650.00
11,185.20
1.02
85,657.00
148,720.00
111,111.00
128,128.00
427,427.00
2,145.00
2,050.62
85,657.00
16,359.20
166,666.50
38,438.40
427,427.00
15,015.00
12,303.72
1,315.00
534,089.00
152,540.00
Jumlah
1,525.40
619,543.24
170,950.00
Jumlah
1,709.50
694,315.70
188,045.00
Jumlah
1,880.45
763,747.27
Zona II
59,900.00
10,400.00
77,700.00
8,960.00
1,613,500.00
8,604.00
1,315.00
484,050.00
2,264,429.00
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
120,640.00
90,132.00
103,936.00
1,871,660.00
1,663.44
152,540.00
561,498.00
Jumlah
69,484.00
12,064.00
90,132.00
10,393.60
1,871,660.00
9,980.64
1,525.40
561,498.00
2,626,737.64
Harga
Satuan
Zona IV
Jumlah
Harga
1.02
77,870.00
135,200.00
101,010.00
116,480.00
2,097,550.00
1,864.20
170,950.00
629,265.00
Jumlah
77,870.00
13,520.00
101,010.00
11,648.00
2,097,550.00
11,185.20
1,709.50
629,265.00
2,943,757.70
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
148,720.00
111,111.00
128,128.00
2,307,305.00
2,050.62
188,045.00
692,191.50
Jumlah
85,657.00
14,872.00
111,111.00
12,812.80
2,307,305.00
12,303.72
1,880.45
692,191.50
3,238,133.47
Zona I
Uraian
Harga
Satuan
1,315.00
636,309.00
Jumlah
Harga
I. UPAH
Pekerja
Mandor
Tukang Batu
Kepala Tukang
Zona IV
Jumlah
Harga
85,657.00
23,795.20
166,666.50
192,192.00
427,427.00
12,303.72
Zona I
Uraian
Harga
Satuan
1.02
85,657.00
148,720.00
111,111.00
128,128.00
427,427.00
2,050.62
Jumlah
Harga
59,900.00
104,000.00
77,700.00
89,600.00
Zona III
Jumlah
Harga
77,870.00
21,632.00
151,515.00
174,720.00
388,570.00
11,185.20
Zona I
1.000
0.110
1.500
0.300
282,668.10
23,795.20
122,222.10
128.13
2,820,103.00
169,206.18
3,418,122.71
1.02
77,870.00
135,200.00
101,010.00
116,480.00
388,570.00
1,864.20
Satuan Indeks
Oh
Oh
Oh
Oh
1.02
85,657.00
148,720.00
111,111.00
128,128.00
2,820,103.00
169,206.18
Jumlah
69,484.00
19,302.40
135,198.00
155,904.00
346,724.00
9,980.64
No
I. UPAH
Pekerja
Mandor
Tukang Batu
Kepala Tukang
Jumlah
Harga
1.01
69,484.00
120,640.00
90,132.00
103,936.00
346,724.00
1,663.44
Harga
Satuan
256,971.00
21,632.00
111,111.00
116.48
2,563,730.00
153,823.80
3,107,384.28
Harga
Satuan
59,900.00
16,640.00
116,550.00
134,400.00
298,900.00
8,604.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Zona IV
Jumlah
Harga
1.02
77,870.00
135,200.00
101,010.00
116,480.00
2,563,730.00
153,823.80
Jumlah
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Mandor
Tukang Batu
Kepala Tukang
229,297.20
19,302.40
99,145.20
103.94
2,287,636.00
137,258.16
2,772,742.90
Harga
Satuan
Zona I
Uraian
Zona III
Jumlah
Harga
Zona II
Jumlah
Harga
71,880.00
10,400.00
112,665.00
13,440.00
1,673,200.00
8,604.00
1,315.00
200,784.00
2,092,288.00
Harga
Satuan
1.01
69,484.00
120,640.00
90,132.00
103,936.00
1,940,912.00
1,663.44
152,540.00
232,909.44
Jumlah
Zona III
Jumlah
Harga
83,380.80
12,064.00
130,691.40
15,590.40
1,940,912.00
9,980.64
1,525.40
232,909.44
2,427,054.08
Harga
Satuan
1.02
77,870.00
135,200.00
101,010.00
116,480.00
2,175,160.00
1,864.20
170,950.00
261,019.20
Jumlah
Zona IV
Jumlah
Harga
93,444.00
13,520.00
146,464.50
17,472.00
2,175,160.00
11,185.20
1,709.50
261,019.20
2,719,974.40
Harga
Satuan
1.02
85,657.00
148,720.00
111,111.00
128,128.00
2,392,676.00
2,050.62
188,045.00
287,121.12
Jumlah
Jumlah
Harga
102,788.40
14,872.00
161,110.95
19,219.20
2,392,676.00
12,303.72
1,880.45
287,121.12
2,991,971.84
Halaman 63
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Mandor
Tukang Batu
Kepala Tukang
Oh
Oh
Oh
Oh
2.100
0.110
0.750
0.070
59,900.00
104,000.00
77,700.00
89,600.00
II. BAHAN
Bak Teraso
Semen portland
Pasir Pasang
Bh
Kg
M3
1.000
6.000
0.010
286,900.00
1,434.00
131,500.00
Jumlah
Harga
Satuan
1.01
69,484.00
120,640.00
90,132.00
103,936.00
332,804.00
1,663.44
152,540.00
Jumlah
125,790.00
11,440.00
58,275.00
6,272.00
286,900.00
8,604.00
1,315.00
498,596.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
I. UPAH
Pekerja
Mandor
Tukang Batu
Kepala Tukang
Harga
Satuan
1.800
0.110
2.700
0.540
59,900.00
104,000.00
77,700.00
89,600.00
II. BAHAN
Bak fibreglass
Bh
Perlengkapan (18% Harga bak) Ls
1.000
1.000
621,500.00
111,870.00
Jumlah
Harga
Satuan
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
I. UPAH
Pekerja
Mandor
Tukang Batu
Kepala Tukang
II. BAHAN
Batu Bata
Semen portland
Pasir Pasang
Porselen (11 x 11) cm
Semen Nat
Harga
Satuan
Oh
Oh
Oh
Oh
6.000
0.300
3.000
0.300
59,900.00
104,000.00
77,700.00
89,600.00
M3
Kg
0.400
120.000
0.300
360.000
6.000
1,500.00
1,434.00
131,500.00
M3
Bh
Kg
2,032.00
Jumlah
359,400.00
31,200.00
233,100.00
26,880.00
600.00
172,080.00
39,450.00
12,192.00
874,902.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
I. UPAH
Mandor
Tukang Batu
Kepala Tukang
Harga
Satuan
Oh
Oh
Oh
0.250
0.075
0.750
104,000.00
77,700.00
89,600.00
II. BAHAN
Badkip
Bh
Perlengkapan (20% harga badk Ls
1.000
1.000
890,400.00
178,080.00
Jumlah
26,000.00
5,827.50
67,200.00
890,400.00
178,080.00
1,167,507.50
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
I. UPAH
Pekerja
Tukang batu
Kepala tukang
Mandor
II. BAHAN
Beton 1 : 1 : 2
Besi beton
Kayu cetakan
Ubin porselen
Perlengkapan (10% harga total
Harga
Satuan
Oh
Oh
Oh
Oh
3.500
4.500
0.900
0.900
59,900.00
77,700.00
89,600.00
104,000.00
M3
Kg
0.900
180.000
8.000
5.000
1.000
1,250,000.00
24,800.00
350,000.00
102,100.00
172,690.00
M3
M3
Ls
Jumlah
416,904.00
36,192.00
270,396.00
31,180.80
696.00
199,612.80
45,762.00
14,142.72
1,014,886.32
Harga
Satuan
209,650.00
349,650.00
80,640.00
93,600.00
1,125,000.00
4,464,000.00
2,800,000.00
510,500.00
172,690.00
9,805,730.00
Jumlah
Harga
1.02
85,657.00
148,720.00
111,111.00
128,128.00
888,745.00
159,974.10
Jumlah
154,182.60
16,359.20
299,999.70
69,189.12
888,745.00
159,974.10
1,588,449.72
Zona IV
Jumlah
Harga
1.02
77,870.00
135,200.00
101,010.00
116,480.00
1,950.00
1,864.20
170,950.00
2,641.60
Jumlah
Harga
Satuan
467,220.00
40,560.00
303,030.00
34,944.00
780.00
223,704.00
51,285.00
15,849.60
1,137,372.60
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
148,720.00
111,111.00
128,128.00
2,145.00
2,050.62
188,045.00
2,905.76
Jumlah
Zona III
Jumlah
Harga
1.01
120,640.00
90,132.00
103,936.00
1,032,864.00
206,572.80
Jumlah
30,160.00
6,759.90
77,952.00
1,032,864.00
206,572.80
1,354,308.70
Harga
Satuan
513,942.00
44,616.00
333,333.00
38,438.40
858.00
246,074.40
56,413.50
17,434.56
1,251,109.86
Zona IV
Jumlah
Harga
1.02
135,200.00
101,010.00
116,480.00
1,157,520.00
231,504.00
Jumlah
33,800.00
7,575.75
87,360.00
1,157,520.00
231,504.00
1,517,759.75
Harga
Satuan
Jumlah
Harga
1.02
148,720.00
111,111.00
128,128.00
1,273,272.00
254,654.40
Jumlah
37,180.00
8,333.33
96,096.00
1,273,272.00
254,654.40
1,669,535.73
Zona II
Jumlah
Harga
140,166.00
14,872.00
272,727.00
62,899.20
807,950.00
145,431.00
1,444,045.20
Harga
Satuan
Zona I
Uraian
179,879.70
16,359.20
83,333.25
8,968.96
410,267.00
12,303.72
1,880.45
712,992.28
Zona IV
Jumlah
Harga
1.02
77,870.00
135,200.00
101,010.00
116,480.00
807,950.00
145,431.00
Jumlah
Zona II
Jumlah
Harga
1.02
85,657.00
148,720.00
111,111.00
128,128.00
410,267.00
2,050.62
188,045.00
Jumlah
Zona III
Jumlah
Harga
1.01
69,484.00
120,640.00
90,132.00
103,936.00
1,740.00
1,663.44
152,540.00
2,357.12
Jumlah
Zona I
Uraian
125,071.20
13,270.40
243,356.40
56,125.44
720,940.00
129,769.20
1,288,532.64
Harga
Satuan
Zona II
Jumlah
Harga
Jumlah
Harga
Zona I
Uraian
163,527.00
14,872.00
75,757.50
8,153.60
372,970.00
11,185.20
1,709.50
648,174.80
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
120,640.00
90,132.00
103,936.00
720,940.00
129,769.20
Jumlah
107,820.00
11,440.00
209,790.00
48,384.00
621,500.00
111,870.00
1,110,804.00
Zona IV
Jumlah
Harga
1.02
77,870.00
135,200.00
101,010.00
116,480.00
372,970.00
1,864.20
170,950.00
Jumlah
Zona II
Jumlah
Harga
Oh
Oh
Oh
Oh
145,916.40
13,270.40
67,599.00
7,275.52
332,804.00
9,980.64
1,525.40
578,371.36
Harga
Satuan
Zona I
Uraian
Zona III
Jumlah
Harga
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
1,450,000.00
28,768.00
406,000.00
118,436.00
200,320.40
Jumlah
Zona III
Jumlah
Harga
243,194.00
405,594.00
93,542.40
108,576.00
1,305,000.00
5,178,240.00
3,248,000.00
592,180.00
200,320.40
11,374,646.80
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
1,625,000.00
32,240.00
455,000.00
132,730.00
224,497.00
Jumlah
Zona IV
Jumlah
Harga
272,545.00
454,545.00
104,832.00
121,680.00
1,462,500.00
5,803,200.00
3,640,000.00
663,650.00
224,497.00
12,747,449.00
Harga
Satuan
1.02
85,657.00
111,111.00
128,128.00
148,720.00
1,787,500.00
35,464.00
500,500.00
146,003.00
246,946.70
Jumlah
Jumlah
Harga
299,799.50
499,999.50
115,315.20
133,848.00
1,608,750.00
6,383,520.00
4,004,000.00
730,015.00
246,946.70
14,022,193.90
Halaman 64
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang batu
Kepala tukang
Mandor
Harga
Satuan
Zona II
Jumlah
Harga
Oh
Oh
Oh
Oh
3.000
4.500
0.900
0.900
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Bak fibreglass
Bh
Perlengkapan (12% Harga bak) Ls
1.000
1.000
621,500.00
74,580.00
Jumlah
179,700.00
349,650.00
80,640.00
93,600.00
621,500.00
74,580.00
1,399,670.00
Zona III
Harga
Satuan
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
720,940.00
86,512.80
Jumlah
208,452.00
405,594.00
93,542.40
108,576.00
720,940.00
86,512.80
1,623,617.20
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
Oh
Oh
Oh
Oh
0.060
0.030
0.003
0.003
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Pipa tanah
Semen portland
Bh
Kg
1.600
0.680
250,000.00
1,434.00
3,594.00
2,331.00
268.80
260.00
400,000.00
975.12
M3
M3
0.013
131,500.00
1,709.50
0.011
101,600.00
1,117.60
410,256.02
Pasir urug
Jumlah
Harga
Satuan
4,169.04
2,703.96
311.81
301.60
464,000.00
1,131.14
152,540.00
1,983.02
117,856.00
Jumlah
1,296.42
475,896.98
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
I. UPAH
Pekerja
Tukang batu
Kepala tukang
Mandor
Oh
Oh
Oh
Oh
0.080
0.040
0.004
0.007
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Pipa tanah
Semen portland
Bh
Kg
1.600
0.870
250,000.00
1,434.00
Pasir pasang
Pasir urug
M
M3
0.014
0.014
131,500.00
101,600.00
Jumlah
Harga
Satuan
II. BAHAN
Pipa beton
Batu bata
Semen portland
Pasir pasang
Pasir urug
Bh
Bh
Kg
M3
M3
1.100
0.027
3.920
0.056
0.024
350,000.00
1,500.00
1,434.00
131,500.00
101,600.00
Jumlah
II. BAHAN
Pipa beton
Batu bata
Semen portland
Pasir pasang
Pasir urug
59,900.00
77,700.00
89,600.00
104,000.00
Bh
1.100
0.550
10.300
0.061
0.069
350,000.00
1,500.00
1,434.00
131,500.00
101,600.00
M3
Kg
M3
M3
Jumlah
Jumlah
Harga
170,950.00
132,080.00
Jumlah
2,393.30
1,849.12
537,546.59
188,045.00
145,288.00
Jumlah
2,632.63
2,034.03
591,301.25
Zona II
8,386.00
5,439.00
627.20
728.00
385,000.00
40.50
5,621.28
7,364.00
2,438.40
415,644.38
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
406,000.00
1,740.00
1,663.44
152,540.00
117,856.00
Jumlah
9,727.76
6,309.24
727.55
844.48
446,600.00
46.98
6,520.68
8,542.24
2,828.54
482,147.48
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
455,000.00
1,950.00
1,864.20
170,950.00
132,080.00
Jumlah
Zona II
Jumlah
Harga
22,762.00
14,763.00
1,702.40
1,976.00
385,000.00
825.00
14,770.20
8,021.50
7,010.40
456,830.50
Zona IV
Jumlah
Harga
10,901.80
7,070.70
815.36
946.40
500,500.00
52.65
7,307.66
9,573.20
3,169.92
540,337.69
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
500,500.00
2,145.00
2,050.62
188,045.00
145,288.00
Jumlah
11,991.98
7,777.77
896.90
1,041.04
550,550.00
57.92
8,038.43
10,530.52
3,486.91
594,371.46
Zona I
0.380
0.190
0.019
0.019
Harga
Satuan
2,135.56
1,649.98
479,656.96
Satuan Indeks
Oh
Oh
Oh
Oh
Zona IV
Jumlah
Harga
152,540.00
117,856.00
Jumlah
No
I. UPAH
Pekerja
Tukang batu
Kepala tukang
Mandor
1,598.17
586,666.11
1,841.00
1,422.40
413,497.38
Harga
Satuan
Harga
Satuan
2,444.59
145,288.00
Jumlah
6,852.56
4,444.44
512.51
1,041.04
572,000.00
1,784.04
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
188,045.00
Zona III
Jumlah
Harga
5,139.42
3,333.33
384.38
371.80
572,000.00
1,394.42
1.02
85,657.00
111,111.00
128,128.00
148,720.00
357,500.00
2,050.62
Jumlah
Harga
59,900.00
77,700.00
89,600.00
104,000.00
1,452.88
533,332.83
1.02
85,657.00
111,111.00
128,128.00
148,720.00
357,500.00
2,050.62
6,229.60
4,040.40
465.92
946.40
520,000.00
1,621.85
Zona I
0.140
0.070
0.007
0.007
2,222.35
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
325,000.00
1,864.20
Satuan Indeks
Oh
Oh
Oh
Oh
132,080.00
Jumlah
4,672.20
3,030.30
349.44
338.00
520,000.00
1,267.66
Harga
Satuan
5,558.72
3,605.28
415.74
844.48
464,000.00
1,447.19
No
I. UPAH
Pekerja
Tukang batu
Kepala tukang
Mandor
170,950.00
256,971.00
499,999.50
115,315.20
133,848.00
888,745.00
106,649.40
2,001,528.10
1.01
69,484.00
90,132.00
103,936.00
120,640.00
290,000.00
1,663.44
Harga
Satuan
1.02
85,657.00
111,111.00
128,128.00
148,720.00
888,745.00
106,649.40
Jumlah
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
325,000.00
1,864.20
Jumlah
Harga
4,792.00
3,108.00
358.40
728.00
400,000.00
1,247.58
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
233,610.00
454,545.00
104,832.00
121,680.00
807,950.00
96,954.00
1,819,571.00
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
290,000.00
1,663.44
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
807,950.00
96,954.00
Jumlah
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang batu
Kepala tukang
Mandor
Pasir pasang
Harga
Satuan
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
406,000.00
1,740.00
1,663.44
152,540.00
117,856.00
Jumlah
Zona III
Jumlah
Harga
26,403.92
17,125.08
1,974.78
2,292.16
446,600.00
957.00
17,133.43
9,304.94
8,132.06
529,923.38
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
455,000.00
1,950.00
1,864.20
170,950.00
132,080.00
Jumlah
Zona IV
Jumlah
Harga
29,590.60
19,191.90
2,213.12
2,568.80
500,500.00
1,072.50
19,201.26
10,427.95
9,113.52
593,879.65
Harga
Satuan
1.02
85,657.00
111,111.00
128,128.00
148,720.00
500,500.00
2,145.00
2,050.62
188,045.00
145,288.00
Jumlah
Jumlah
Harga
32,549.66
21,111.09
2,434.43
2,825.68
550,550.00
1,179.75
21,121.39
11,470.75
10,024.87
653,267.62
Halaman 65
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
:Memasang Bak Kontrol Pasangan Batu Bata Ukuran (30 x 30) cm Tinggi 35 cm (SNI.Rev.2002)
: M3
:
: Harian
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang batu
Kepala tukang
Mandor
Oh
Oh
Oh
Oh
3.200
0.016
1.015
0.002
Batu Bata
Semen portland
M3
Kg
Pasir Pasang
M3
Batu Kerikil
Besi Beton
Pasir Beton
Harga
Satuan
Zona II
Jumlah
Harga
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
-
1,500.00
1,434.00
217.50
63,096.00
1,740.00
1,663.44
252.30
73,191.36
1,950.00
1,864.20
282.75
82,024.80
2,145.00
2,050.62
311.03
90,227.28
131,500.00
9,205.00
152,540.00
10,677.80
170,950.00
11,966.50
188,045.00
13,163.15
M3
Kg
0.070
1.600
289,200.00
24,800.00
20,244.00
39,680.00
335,472.00
28,768.00
23,483.04
46,028.80
375,960.00
32,240.00
26,317.20
51,584.00
413,556.00
35,464.00
28,948.92
56,742.40
M3
0.060
227,100.00
13,626.00
430,091.70
15,806.16
498,906.37
:Memasang Bak Kontrol Pasangan Batu Bata Ukuran (30 x 30) cm Tinggi 35 cm (SNI.Rev.2002)
: M3
:
: Harian
No
Satuan Indeks
Zona I
II. BAHAN
Batu Bata
Semen portland
Pasir Pasang
Batu Kerikil
Besi Beton
Pasir Beton
Harga
Satuan
3.200
0.016
1.015
0.002
59,900.00
104,000.00
77,700.00
89,600.00
Bh
Kg
0.145
44.000
0.070
1,500.00
1,434.00
131,500.00
0.070
1.600
0.060
289,200.00
24,800.00
227,100.00
M3
M3
Jumlah
Harga
Satuan
II. BAHAN
Batu Bata
Semen portland
Pasir Pasang
Batu Kerikil
Besi Beton
Pasir Beton
0.250
77.000
0.130
0.020
2.600
0.090
1,500.00
1,434.00
131,500.00
289,200.00
24,800.00
227,100.00
M3
M3
Kg
M3
Jumlah
274,102.40
2,379.52
112,777.67
192.19
311.03
90,227.28
13,163.15
20,244.00
39,680.00
13,626.00
418,412.40
335,472.00
28,768.00
263,436.00
Jumlah
23,483.04
46,028.80
15,806.16
485,358.38
375,960.00
32,240.00
295,230.00
Jumlah
26,317.20
51,584.00
17,713.80
543,936.12
413,556.00
35,464.00
324,753.00
Jumlah
28,948.92
56,742.40
19,485.18
598,329.73
Zona II
85,058.00
7,384.00
36,752.10
4,211.20
375.00
110,418.00
17,095.00
5,784.00
64,480.00
20,439.00
351,996.30
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
120,640.00
90,132.00
103,936.00
1,740.00
1,663.44
152,540.00
335,472.00
28,768.00
263,436.00
Jumlah
98,667.28
8,565.44
42,632.44
4,884.99
435.00
128,084.88
19,830.20
6,709.44
74,796.80
23,709.24
408,315.71
:Memasang Bak Kontrol Pasangan Batu Bata Ukuran (60 x 60) cm Tinggi 60 cm (SNI.Rev.2002)
: M3
:
: Harian
No
Satuan Indeks
Zona I
Harga
Satuan
I. UPAH
Pekerja
Mandor
Tukang Batu
Tukang Gali
Kepala Tukang
Oh
Oh
Oh
Oh
Oh
2.160
0.108
0.720
0.100
0.072
59,900.00
104,000.00
77,700.00
77,700.00
89,600.00
II. BAHAN
Batu Bata
Semen portland
Pasir Pasang
Pasir Beton
Batu koral
Besi beton
Bh
Kg
M3
M3
M3
Kg
0.371
114.000
0.184
0.120
0.033
4.850
1,500.00
1,434.00
131,500.00
289,200.00
24,800.00
227,100.00
Jumlah
Jumlah
Harga
1.02
85,657.00
148,720.00
111,111.00
128,128.00
2,145.00
2,050.62
188,045.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Harga
Satuan
249,184.00
2,163.20
102,525.15
174.72
282.75
82,024.80
11,966.50
Jumlah
Harga
Bh
Kg
Zona IV
Jumlah
Harga
1.02
77,870.00
135,200.00
101,010.00
116,480.00
1,950.00
1,864.20
170,950.00
Zona I
59,900.00
104,000.00
77,700.00
89,600.00
19,485.18
615,031.13
222,348.80
1,930.24
91,483.98
155.90
252.30
73,191.36
10,677.80
Satuan Indeks
1.420
0.071
0.473
0.047
324,753.00
Jumlah
1.01
69,484.00
120,640.00
90,132.00
103,936.00
1,740.00
1,663.44
152,540.00
No
Oh
Oh
Oh
Oh
Harga
Satuan
274,102.40
1,777.78
130,049.92
223.08
-
191,680.00
1,664.00
78,865.50
134.40
217.50
63,096.00
9,205.00
:Memasang Bak Kontrol Pasangan Batu Bata Ukuran (45 x 45) cm Tinggi 50 cm (SNI.Rev.2002)
: M3
:
: Harian
I. UPAH
Pekerja
Mandor
Tukang Batu
Kepala Tukang
17,713.80
559,119.21
Zona III
Jumlah
Harga
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Harga
Satuan
295,230.00
Jumlah
Zona II
Jumlah
Harga
Oh
Oh
Oh
Oh
M3
Kg
Uraian
1.02
85,657.00
111,111.00
128,128.00
148,720.00
-
0.070
263,436.00
Jumlah
249,184.00
1,616.16
118,227.20
202.80
-
Jumlah
Harga
0.145
44.000
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
I. UPAH
Pekerja
Mandor
Tukang Batu
Kepala Tukang
1.02
77,870.00
101,010.00
116,480.00
135,200.00
-
Harga
Satuan
191,680.00
1,243.20
90,944.00
156.00
-
Jumlah
Uraian
Zona IV
Jumlah
Harga
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
222,348.80
1,442.11
105,495.04
180.96
-
Harga
Satuan
Harga
Satuan
1.02
77,870.00
135,200.00
101,010.00
116,480.00
1,950.00
1,864.20
170,950.00
375,960.00
32,240.00
295,230.00
Jumlah
Zona II
Jumlah
Harga
129,384.00
11,232.00
55,944.00
7,770.00
6,451.20
556.50
163,476.00
24,196.00
34,704.00
818.40
1,101,435.00
1,535,967.10
Harga
Satuan
1.01
69,484.00
120,640.00
90,132.00
90,132.00
103,936.00
1,740.00
1,663.44
152,540.00
335,472.00
28,768.00
263,436.00
Jumlah
Zona IV
Jumlah
Harga
110,575.40
9,599.20
47,777.73
5,474.56
487.50
143,543.40
22,223.50
7,519.20
83,824.00
26,570.70
457,595.19
Harga
Satuan
1.02
85,657.00
148,720.00
111,111.00
128,128.00
2,145.00
2,050.62
188,045.00
413,556.00
35,464.00
324,753.00
Jumlah
Zona III
Jumlah
Harga
150,085.44
13,029.12
64,895.04
9,013.20
7,483.39
645.54
189,632.16
28,067.36
40,256.64
949.34
1,277,664.60
1,781,721.84
Harga
Satuan
1.02
77,870.00
135,200.00
101,010.00
101,010.00
116,480.00
1,950.00
1,864.20
170,950.00
375,960.00
32,240.00
295,230.00
Jumlah
Jumlah
Harga
121,632.94
10,559.12
52,555.50
6,022.02
536.25
157,897.74
24,445.85
8,271.12
92,206.40
29,227.77
503,354.71
Zona IV
Jumlah
Harga
168,199.20
14,601.60
72,727.20
10,101.00
8,386.56
723.45
212,518.80
31,454.80
45,115.20
1,063.92
1,431,865.50
1,996,757.23
Harga
Satuan
1.02
85,657.00
148,720.00
111,111.00
111,111.00
128,128.00
2,145.00
2,050.62
188,045.00
413,556.00
35,464.00
324,753.00
Jumlah
Jumlah
Harga
185,019.12
16,061.76
79,999.92
11,111.10
9,225.22
795.80
233,770.68
34,600.28
49,626.72
1,170.31
1,575,052.05
2,196,432.95
Halaman 66
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Harga
Satuan
Harga
Satuan
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
-
3,752.14
8,111.88
935.42
3,257.28
-
1.02
77,870.00
101,010.00
116,480.00
135,200.00
-
4,204.98
9,090.90
1,048.32
3,650.40
-
1.02
85,657.00
111,111.00
128,128.00
148,720.00
-
4,625.48
9,999.99
1,153.15
4,015.44
-
M1
Ls
1.200
1.000
1,034,400.00
362,040.00
1,241,280.00
362,040.00
1,617,162.00
1,199,904.00
419,966.40
Jumlah
1,439,884.80
419,966.40
1,875,907.92
1,344,720.00
470,652.00
Jumlah
1,613,664.00
470,652.00
2,102,310.60
1,479,192.00
517,717.20
Jumlah
1,775,030.40
517,717.20
2,312,541.66
No
Satuan Indeks
Zona I
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.054
0.090
0.009
0.027
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Pipa Galvanis
Perlengkapan (35% Harga Pipa
M1
Ls
1.200
1.000
1,034,400.00
362,040.00
Jumlah
3,234.60
6,993.00
806.40
2,808.00
1,241,280.00
362,040.00
1,617,162.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Harga
Satuan
Oh
Oh
Oh
Oh
0.054
0.090
0.009
0.027
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Pipa Galvanis
Perlengkapan (35% Harga Pipa
M1
Ls
1.200
1.000
1,034,400.00
362,040.00
Jumlah
3,234.60
6,993.00
806.40
2,808.00
1,241,280.00
362,040.00
1,617,162.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.108
0.180
0.018
0.005
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Pipa Galvanis
Perlengkapan (35% Harga Pipa
M1
Ls
1.200
1.000
1,034,400.00
362,040.00
Jumlah
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
1,199,904.00
419,966.40
Jumlah
II. BAHAN
Pipa Galvanis
Perlengkapan (35% Harga Pipa
M1
Ls
1.200
1.000
1,034,400.00
362,040.00
Jumlah
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
1,344,720.00
470,652.00
Jumlah
4,204.98
9,090.90
1,048.32
3,650.40
1,613,664.00
470,652.00
2,102,310.60
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
1,479,192.00
517,717.20
Jumlah
Zona III
Jumlah
Harga
Harga
Satuan
6,469.20
13,986.00
1,612.80
561.60
1,241,280.00
362,040.00
-
1.01
69,484.00
90,132.00
103,936.00
120,640.00
1,199,904.00
419,966.40
-
7,504.27
16,223.76
1,870.85
651.46
1,439,884.80
419,966.40
-
1.02
77,870.00
101,010.00
116,480.00
135,200.00
1,344,720.00
470,652.00
-
8,409.96
18,181.80
2,096.64
730.08
1,613,664.00
470,652.00
-
1.02
85,657.00
111,111.00
128,128.00
148,720.00
1,479,192.00
517,717.20
-
1,625,949.60
Jumlah
1,886,101.54
Jumlah
2,113,734.48
Jumlah
Jumlah
Harga
9,250.96
19,999.98
2,306.30
803.09
1,775,030.40
517,717.20
2,325,107.93
Zona II
6,469.20
13,986.00
1,612.80
561.60
1,241,280.00
362,040.00
1,625,949.60
4,625.48
9,999.99
1,153.15
4,015.44
1,775,030.40
517,717.20
2,312,541.66
Zona IV
Harga
Satuan
Jumlah
Harga
4,625.48
9,999.99
1,153.15
4,015.44
1,775,030.40
517,717.20
2,312,541.66
Zona I
59,900.00
77,700.00
89,600.00
104,000.00
3,752.14
8,111.88
935.42
3,257.28
1,439,884.80
419,966.40
1,875,907.92
Harga
Satuan
Jumlah
Harga
Satuan Indeks
0.108
0.180
0.018
0.005
1.02
85,657.00
111,111.00
128,128.00
148,720.00
1,479,192.00
517,717.20
Jumlah
Zona III
Jumlah
Harga
Zona II
No
Oh
Oh
Oh
Oh
4,204.98
9,090.90
1,048.32
3,650.40
1,613,664.00
470,652.00
2,102,310.60
Jumlah
Harga
Harga
Satuan
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
1.02
77,870.00
101,010.00
116,480.00
135,200.00
1,344,720.00
470,652.00
Jumlah
Harga
Satuan
Jumlah
Harga
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Harga
Satuan
Zona IV
Jumlah
Harga
Zona I
Harga
Satuan
3,752.14
8,111.88
935.42
3,257.28
1,439,884.80
419,966.40
1,875,907.92
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
1,199,904.00
419,966.40
Jumlah
Zona I
Uraian
Harga
Satuan
3,234.60
6,993.00
806.40
2,808.00
-
Uraian
Zona IV
Jumlah
Harga
59,900.00
77,700.00
89,600.00
104,000.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Harga
Satuan
0.054
0.090
0.009
0.027
Jumlah
Uraian
Zona III
Jumlah
Harga
Oh
Oh
Oh
Oh
II. BAHAN
Pipa Galvanis
Perlengkapan (35% Harga Pipa
Zona II
Jumlah
Harga
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
1,199,904.00
419,966.40
Jumlah
Zona III
Jumlah
Harga
7,504.27
16,223.76
1,870.85
651.46
1,439,884.80
419,966.40
1,886,101.54
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
1,344,720.00
470,652.00
Jumlah
Zona IV
Jumlah
Harga
8,409.96
18,181.80
2,096.64
730.08
1,613,664.00
470,652.00
2,113,734.48
Harga
Satuan
1.02
85,657.00
111,111.00
128,128.00
148,720.00
1,479,192.00
517,717.20
Jumlah
Jumlah
Harga
9,250.96
19,999.98
2,306.30
803.09
1,775,030.40
517,717.20
2,325,107.93
Halaman 67
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Harga
Satuan
Harga
Satuan
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
-
9,380.34
20,279.70
2,338.56
820.35
-
1.02
77,870.00
101,010.00
116,480.00
135,200.00
-
10,512.45
22,727.25
2,620.80
919.36
-
1.02
85,657.00
111,111.00
128,128.00
148,720.00
-
11,563.70
24,999.98
2,882.88
1,011.30
-
M1
Ls
1.200
1.000
1,034,400.00
362,040.00
1,241,280.00
362,040.00
1,631,612.20
1,199,904.00
419,966.40
Jumlah
1,439,884.80
419,966.40
1,892,670.15
1,344,720.00
470,652.00
Jumlah
1,613,664.00
470,652.00
2,121,095.86
1,479,192.00
517,717.20
Jumlah
1,775,030.40
517,717.20
2,333,205.45
No
Satuan Indeks
Zona I
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.036
0.060
0.006
0.002
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Pipa PVC
Perlengkapan (35% Harga Pipa
M'
Ls
1.200
1.000
1,034,400.00
362,040.00
Jumlah
2,156.40
4,662.00
537.60
187.20
1,241,280.00
362,040.00
1,610,863.20
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Harga
Satuan
Oh
Oh
Oh
Oh
0.036
0.060
0.006
0.002
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Pipa PVC
Perlengkapan (35% Harga Pipa
M'
Ls
1.200
1.000
250,000.00
87,500.00
Jumlah
2,156.40
4,662.00
537.60
187.20
300,000.00
87,500.00
395,043.20
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.036
0.060
0.006
0.002
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Pipa PVC
Perlengkapan (35% Harga Pipa
M'
Ls
1.200
1.000
300,000.00
105,000.00
Jumlah
2,156.40
4,662.00
537.60
187.20
360,000.00
105,000.00
472,543.20
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.036
0.060
0.006
0.002
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Pipa PVC
Perlengkapan (35% Harga Pipa
M'
Ls
1.200
1.000
350,000.00
122,500.00
Jumlah
2,501.42
5,407.92
623.62
217.15
348,000.00
101,500.00
458,250.11
Harga
Satuan
2,156.40
4,662.00
537.60
187.20
420,000.00
122,500.00
550,043.20
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
1,479,192.00
517,717.20
Jumlah
3,083.65
6,666.66
768.77
267.70
1,775,030.40
517,717.20
2,303,534.38
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
325,000.00
113,750.00
Jumlah
2,803.32
6,060.60
698.88
243.36
390,000.00
113,750.00
513,556.16
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
357,500.00
125,125.00
Jumlah
3,083.65
6,666.66
768.77
267.70
429,000.00
125,125.00
564,911.78
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
348,000.00
121,800.00
Jumlah
2,501.42
5,407.92
623.62
217.15
417,600.00
121,800.00
548,150.11
Harga
Satuan
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
390,000.00
136,500.00
Jumlah
2,803.32
6,060.60
698.88
243.36
468,000.00
136,500.00
614,306.16
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
429,000.00
150,150.00
Jumlah
3,083.65
6,666.66
768.77
267.70
514,800.00
150,150.00
675,736.78
Zona II
Jumlah
Harga
2,803.32
6,060.60
698.88
243.36
1,613,664.00
470,652.00
2,094,122.16
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
290,000.00
101,500.00
Jumlah
Zona I
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
1,344,720.00
470,652.00
Jumlah
Zona II
Jumlah
Harga
Zona IV
Jumlah
Harga
Zona I
Harga
Satuan
2,501.42
5,407.92
623.62
217.15
1,439,884.80
419,966.40
1,868,601.31
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
1,199,904.00
419,966.40
Jumlah
Zona I
Uraian
Harga
Satuan
8,086.50
17,482.50
2,016.00
707.20
-
Uraian
Zona IV
Jumlah
Harga
59,900.00
77,700.00
89,600.00
104,000.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Harga
Satuan
0.135
0.225
0.023
0.007
Jumlah
Uraian
Zona III
Jumlah
Harga
Oh
Oh
Oh
Oh
II. BAHAN
Pipa Galvanis
Perlengkapan (35% Harga Pipa
Zona II
Jumlah
Harga
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
406,000.00
142,100.00
Jumlah
Zona III
Jumlah
Harga
2,501.42
5,407.92
623.62
217.15
487,200.00
142,100.00
638,050.11
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
455,000.00
159,250.00
Jumlah
Zona IV
Jumlah
Harga
2,803.32
6,060.60
698.88
243.36
546,000.00
159,250.00
715,056.16
Harga
Satuan
1.02
85,657.00
111,111.00
128,128.00
148,720.00
500,500.00
175,175.00
Jumlah
Jumlah
Harga
3,083.65
6,666.66
768.77
267.70
600,600.00
175,175.00
786,561.78
Halaman 68
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.036
0.060
0.006
0.002
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Pipa PVC
Perlengkapan (35% Harga Pipa
M'
Ls
1.200
1.000
350,000.00
122,500.00
Jumlah
2,156.40
4,662.00
537.60
187.20
420,000.00
122,500.00
550,043.20
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
406,000.00
142,100.00
Jumlah
Harga
Satuan
Oh
Oh
Oh
Oh
0.054
0.090
0.009
0.003
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Pipa PVC
Perlengkapan (35% Harga Pipa
M'
Ls
1.200
1.000
350,000.00
122,500.00
Jumlah
3,234.60
6,993.00
806.40
280.80
420,000.00
122,500.00
553,814.80
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Harga
Satuan
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.036
0.060
0.006
0.002
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Pipa PVC
Perlengkapan (35% Harga Pipa
M'
Ls
1.200
1.000
350,000.00
122,500.00
Jumlah
2,156.40
4,662.00
537.60
187.20
420,000.00
122,500.00
550,043.20
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.081
0.135
0.014
0.004
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Pipa PVC
Perlengkapan (35% Harga Pipa
M'
Ls
1.200
1.000
350,000.00
122,500.00
Jumlah
4,851.90
10,489.50
1,209.60
426.40
420,000.00
122,500.00
559,477.40
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Harga
Satuan
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.081
0.135
0.014
0.004
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Pipa PVC
Perlengkapan (35% Harga Pipa
M'
Ls
1.200
1.000
350,000.00
122,500.00
Jumlah
2,501.42
5,407.92
623.62
217.15
487,200.00
142,100.00
638,050.11
Harga
Satuan
4,851.90
10,489.50
1,209.60
426.40
420,000.00
122,500.00
559,477.40
4,204.98
9,090.90
1,048.32
365.04
546,000.00
159,250.00
719,959.24
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
500,500.00
175,175.00
Jumlah
4,625.48
9,999.99
1,153.15
401.54
600,600.00
175,175.00
791,955.16
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
455,000.00
159,250.00
Jumlah
2,803.32
6,060.60
698.88
243.36
546,000.00
159,250.00
715,056.16
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
500,500.00
175,175.00
Jumlah
3,083.65
6,666.66
768.77
267.70
600,600.00
175,175.00
786,561.78
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
406,000.00
142,100.00
Jumlah
5,628.20
12,167.82
1,403.14
494.62
487,200.00
142,100.00
648,993.78
Harga
Satuan
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
455,000.00
159,250.00
Jumlah
6,307.47
13,636.35
1,572.48
554.32
546,000.00
159,250.00
727,320.62
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
500,500.00
175,175.00
Jumlah
6,938.22
14,999.99
1,729.73
609.75
600,600.00
175,175.00
800,052.68
Zona II
Jumlah
Harga
3,083.65
6,666.66
768.77
267.70
600,600.00
175,175.00
786,561.78
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
406,000.00
142,100.00
Jumlah
Zona I
Uraian
1.02
85,657.00
111,111.00
128,128.00
148,720.00
500,500.00
175,175.00
Jumlah
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
455,000.00
159,250.00
Jumlah
Zona II
Jumlah
Harga
Jumlah
Harga
Zona I
Uraian
3,752.14
8,111.88
935.42
325.73
487,200.00
142,100.00
642,425.17
Harga
Satuan
Zona II
Jumlah
Harga
2,803.32
6,060.60
698.88
243.36
546,000.00
159,250.00
715,056.16
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
406,000.00
142,100.00
Jumlah
Zona I
Uraian
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
455,000.00
159,250.00
Jumlah
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
2,501.42
5,407.92
623.62
217.15
487,200.00
142,100.00
638,050.11
Harga
Satuan
Zona I
Uraian
Zona III
Jumlah
Harga
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
406,000.00
142,100.00
Jumlah
Zona III
Jumlah
Harga
5,628.20
12,167.82
1,403.14
494.62
487,200.00
142,100.00
648,993.78
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
455,000.00
159,250.00
Jumlah
Zona IV
Jumlah
Harga
6,307.47
13,636.35
1,572.48
554.32
546,000.00
159,250.00
727,320.62
Harga
Satuan
1.02
85,657.00
111,111.00
128,128.00
148,720.00
500,500.00
175,175.00
Jumlah
Jumlah
Harga
6,938.22
14,999.99
1,729.73
609.75
600,600.00
175,175.00
800,052.68
Halaman 69
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.030
0.300
0.030
0.002
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Bak Cuci Stainless Steel
Water Drain + Assesories
Bh
Set
1.000
1.000
729,100.00
250,000.00
Jumlah
1,797.00
23,310.00
2,688.00
156.00
729,100.00
250,000.00
1,007,051.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
845,756.00
290,000.00
Jumlah
Harga
Satuan
Oh
Oh
Oh
Oh
0.030
0.300
0.030
0.002
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Bak Cuci teraso
Water Drain + Assesories
Semen portland
Bh
Set
Kg
1.000
1.000
20.000
286,900.00
250,000.00
1,434.00
M3
0.050
131,500.00
Pasir
Jumlah
Harga
Satuan
II. BAHAN
Kran
Seal Tape
Bh
Bh
1.000
0.025
53,800.00
8,900.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Oh
Oh
Oh
Oh
0.010
0.100
0.010
0.005
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Floor Drain
Bh
1.000
35,000.00
Jumlah
Harga
Satuan
Jumlah
Harga
6,575.00
600,106.00
152,540.00
Jumlah
7,627.00
696,122.96
170,950.00
Jumlah
8,547.50
780,137.80
188,045.00
Jumlah
9,402.25
858,151.58
Zona II
Harga
Satuan
Zona III
Jumlah
Harga
Harga
Satuan
Zona IV
Jumlah
Harga
599.00
7,770.00
896.00
520.00
53,800.00
222.50
1.01
69,484.00
90,132.00
103,936.00
120,640.00
62,408.00
10,324.00
694.84
9,013.20
1,039.36
603.20
62,408.00
258.10
1.02
77,870.00
101,010.00
116,480.00
135,200.00
69,940.00
11,570.00
778.70
10,101.00
1,164.80
676.00
69,940.00
289.25
63,807.50
Jumlah
74,016.70
Jumlah
82,949.75
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
76,934.00
12,727.00
Jumlah
856.57
11,111.10
1,281.28
743.60
76,934.00
318.18
91,244.73
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Zona IV
Jumlah
Harga
2,569.71
33,333.30
3,843.84
223.08
410,267.00
357,500.00
41,012.40
Zona I
Uraian
Harga
Satuan
1.02
85,657.00
111,111.00
128,128.00
148,720.00
410,267.00
357,500.00
2,050.62
Jumlah
Harga
59,900.00
77,700.00
89,600.00
104,000.00
Zona III
Jumlah
Harga
2,336.10
30,303.00
3,494.40
202.80
372,970.00
325,000.00
37,284.00
Zona I
0.010
0.100
0.010
0.005
2,569.71
33,333.30
3,843.84
223.08
1,042,613.00
357,500.00
1,440,082.93
1.02
77,870.00
101,010.00
116,480.00
135,200.00
372,970.00
325,000.00
1,864.20
Satuan Indeks
Oh
Oh
Oh
Oh
1.02
85,657.00
111,111.00
128,128.00
148,720.00
1,042,613.00
357,500.00
Jumlah
2,084.52
27,039.60
3,118.08
180.96
332,804.00
290,000.00
33,268.80
No
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
332,804.00
290,000.00
1,663.44
Harga
Satuan
2,336.10
30,303.00
3,494.40
202.80
947,830.00
325,000.00
1,309,166.30
Harga
Satuan
1,797.00
23,310.00
2,688.00
156.00
286,900.00
250,000.00
28,680.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
947,830.00
325,000.00
Jumlah
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Batu
Kepala Tukang
Mandor
2,084.52
27,039.60
3,118.08
180.96
845,756.00
290,000.00
1,168,179.16
Harga
Satuan
Zona I
Uraian
Zona III
Jumlah
Harga
599.00
7,770.00
896.00
520.00
35,000.00
44,785.00
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
40,600.00
Jumlah
694.84
9,013.20
1,039.36
603.20
40,600.00
51,950.60
Harga
Satuan
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
45,500.00
Jumlah
778.70
10,101.00
1,164.80
676.00
45,500.00
58,220.50
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
50,050.00
Jumlah
856.57
11,111.10
1,281.28
743.60
50,050.00
64,042.55
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
I. UPAH
Tukang Besi
Pekerja
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.006
0.060
0.006
0.000
77,700.00
59,900.00
89,600.00
104,000.00
II. BAHAN
Baja Profil WF
Meni Besi
Kg
Kg
1.100
0.080
26,300.00
43,500.00
Jumlah
Zona II
Jumlah
Harga
466.20
3,594.00
537.60
31.20
28,930.00
3,480.00
37,039.00
Harga
Satuan
1.01
90,132.00
69,484.00
103,936.00
120,640.00
30,508.00
50,460.00
Jumlah
Zona III
Jumlah
Harga
540.79
4,169.04
623.62
36.19
33,558.80
4,036.80
42,965.24
Harga
Satuan
1.02
101,010.00
77,870.00
116,480.00
135,200.00
34,190.00
56,550.00
Jumlah
Zona IV
Jumlah
Harga
606.06
4,672.20
698.88
40.56
37,609.00
4,524.00
48,150.70
Harga
Satuan
1.02
111,111.00
85,657.00
128,128.00
148,720.00
37,609.00
62,205.00
Jumlah
Jumlah
Harga
666.67
5,139.42
768.77
44.62
41,369.90
4,976.40
52,965.77
Halaman 70
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Tukang besi konstruksi
Pekerja
Kepala tukang
Mandor
Oh
Oh
Oh
Oh
0.650
0.650
0.065
0.032
77,700.00
59,900.00
89,600.00
104,000.00
II. BAHAN
Pintu besi baja
Kg
1.000
26,000.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
50,505.00
38,935.00
5,824.00
3,328.00
26,000.00
124,592.00
Harga
Satuan
1.01
90,132.00
69,484.00
103,936.00
120,640.00
30,160.00
Jumlah
Harga
Satuan
Oh
Oh
Oh
Oh
1.050
1.050
0.105
0.005
77,700.00
59,900.00
89,600.00
104,000.00
II. BAHAN
Jendela besi
Kg
1.000
26,000.00
Jumlah
81,585.00
62,895.00
9,408.00
546.00
26,000.00
180,434.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Harga
Satuan
Oh
Oh
Oh
Oh
1.200
1.022
0.120
0.006
77,700.00
59,900.00
89,600.00
104,000.00
II. BAHAN
Jendela besi tahan api
Kg
1.000
26,000.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Oh
Oh
Oh
Oh
1.200
1.200
0.120
0.006
77,700.00
59,900.00
89,600.00
104,000.00
II. BAHAN
Pintu gulung besi
Kg
1.000
26,000.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
93,240.00
61,217.80
10,752.00
624.00
26,000.00
191,833.80
72,222.15
55,677.05
8,328.32
4,759.04
37,180.00
178,166.56
Zona IV
Jumlah
Harga
1.02
101,010.00
77,870.00
116,480.00
135,200.00
33,800.00
Jumlah
106,060.50
81,763.50
12,230.40
709.80
33,800.00
234,564.20
Harga
Satuan
Jumlah
Harga
1.02
111,111.00
85,657.00
128,128.00
148,720.00
37,180.00
Jumlah
116,666.55
89,939.85
13,453.44
780.78
37,180.00
258,020.62
108,158.40
71,012.65
12,472.32
723.84
30,160.00
222,527.21
Harga
Satuan
Zona IV
Jumlah
Harga
1.02
101,010.00
77,870.00
116,480.00
135,200.00
33,800.00
Jumlah
121,212.00
79,583.14
13,977.60
811.20
33,800.00
249,383.94
Harga
Satuan
Jumlah
Harga
1.02
111,111.00
85,657.00
128,128.00
148,720.00
37,180.00
Jumlah
133,333.20
87,541.45
15,375.36
892.32
37,180.00
274,322.33
Zona II
93,240.00
71,880.00
10,752.00
624.00
26,000.00
202,496.00
Harga
Satuan
Zona III
Jumlah
Harga
1.01
90,132.00
69,484.00
103,936.00
120,640.00
30,160.00
Jumlah
108,158.40
83,380.80
12,472.32
723.84
30,160.00
234,895.36
Harga
Satuan
Zona IV
Jumlah
Harga
1.02
101,010.00
77,870.00
116,480.00
135,200.00
33,800.00
Jumlah
121,212.00
93,444.00
13,977.60
811.20
33,800.00
263,244.80
Harga
Satuan
Jumlah
Harga
1.02
111,111.00
85,657.00
128,128.00
148,720.00
37,180.00
Jumlah
133,333.20
102,788.40
15,375.36
892.32
37,180.00
289,569.28
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Tukang besi konstruksi
Pekerja
Kepala tukang
Mandor
Oh
Oh
Oh
Oh
0.440
0.440
0.044
0.022
77,700.00
59,900.00
89,600.00
104,000.00
II. BAHAN
Pintu lipat
Kg
1.000
26,000.00
Jumlah
34,188.00
26,356.00
3,942.40
2,288.00
26,000.00
92,774.40
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Harga
Satuan
I. UPAH
Tukang besi konstruksi
Pekerja
Kepala tukang
Mandor
Oh
Oh
Oh
Oh
0.800
0.080
0.080
0.004
77,700.00
59,900.00
89,600.00
104,000.00
II. BAHAN
Sunscreen alluminium
Kg
1.000
26,000.00
Jumlah
Zona III
Jumlah
Harga
1.01
90,132.00
69,484.00
103,936.00
120,640.00
30,160.00
Jumlah
39,658.08
30,572.96
4,573.18
2,654.08
30,160.00
107,618.30
Harga
Satuan
1.02
101,010.00
77,870.00
116,480.00
135,200.00
33,800.00
Jumlah
Zona II
Jumlah
Harga
62,160.00
4,792.00
7,168.00
416.00
26,000.00
100,536.00
Zona IV
Jumlah
Harga
44,444.40
34,262.80
5,125.12
2,974.40
33,800.00
120,606.72
Harga
Satuan
Jumlah
Harga
1.02
111,111.00
85,657.00
128,128.00
148,720.00
37,180.00
Jumlah
48,888.84
37,689.08
5,637.63
3,271.84
37,180.00
132,667.39
Zona I
Uraian
1.02
111,111.00
85,657.00
128,128.00
148,720.00
37,180.00
Jumlah
Zona III
Jumlah
Harga
1.01
90,132.00
69,484.00
103,936.00
120,640.00
30,160.00
Jumlah
Zona I
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Tukang besi konstruksi
Pekerja
Kepala tukang
Mandor
94,638.60
72,958.20
10,913.28
633.36
30,160.00
209,303.44
Harga
Satuan
Zona I
Uraian
Jumlah
Harga
Jumlah
Harga
I. UPAH
Tukang besi konstruksi
Pekerja
Kepala tukang
Mandor
65,656.50
50,615.50
7,571.20
4,326.40
33,800.00
161,969.60
Harga
Satuan
Zona III
Jumlah
Harga
1.01
90,132.00
69,484.00
103,936.00
120,640.00
30,160.00
Jumlah
Zona I
Uraian
Zona IV
Jumlah
Harga
1.02
101,010.00
77,870.00
116,480.00
135,200.00
33,800.00
Jumlah
Zona II
Jumlah
Harga
I. UPAH
Tukang besi konstruksi
Pekerja
Kepala tukang
Mandor
58,585.80
45,164.60
6,755.84
3,860.48
30,160.00
144,526.72
Harga
Satuan
Zona I
Uraian
Zona III
Jumlah
Harga
Harga
Satuan
1.01
90,132.00
69,484.00
103,936.00
120,640.00
30,160.00
Jumlah
Zona III
Jumlah
Harga
72,105.60
5,558.72
8,314.88
482.56
30,160.00
116,621.76
Harga
Satuan
1.02
101,010.00
77,870.00
116,480.00
135,200.00
33,800.00
Jumlah
Zona IV
Jumlah
Harga
80,808.00
6,229.60
9,318.40
540.80
33,800.00
130,696.80
Harga
Satuan
1.02
111,111.00
85,657.00
128,128.00
148,720.00
37,180.00
Jumlah
Jumlah
Harga
88,888.80
6,852.56
10,250.24
594.88
37,180.00
143,766.48
Halaman 71
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Tukang besi konstruksi
Pekerja
Kepala tukang
Mandor
Harga
Satuan
Harga
Satuan
90,132.00
69,484.00
10,393.60
6,032.00
-
1.02
101,010.00
77,870.00
116,480.00
135,200.00
-
101,010.00
77,870.00
11,648.00
6,760.00
-
1.02
111,111.00
85,657.00
128,128.00
148,720.00
-
111,111.00
85,657.00
12,812.80
7,436.00
-
M2
1.000
350,000.00
350,000.00
501,760.00
406,000.00
Jumlah
406,000.00
582,041.60
455,000.00
Jumlah
455,000.00
652,288.00
500,500.00
Jumlah
500,500.00
717,516.80
Satuan Indeks
Zona I
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Tukang besi konstruksi
Pekerja
Kepala tukang
Mandor
Oh
Oh
Oh
Oh
0.430
0.430
0.004
0.002
77,700.00
59,900.00
89,600.00
104,000.00
II. BAHAN
Pintu alluminium
M2
1.000
350,000.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
33,411.00
25,757.00
385.28
208.00
350,000.00
409,761.28
Harga
Satuan
Harga
Satuan
Oh
Oh
Oh
Oh
0.350
0.350
0.035
0.018
77,700.00
59,900.00
89,600.00
104,000.00
II. BAHAN
Roll door
M2
1.000
350,000.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
27,195.00
20,965.00
3,136.00
1,872.00
350,000.00
403,168.00
1.670
1.670
0.167
0.830
77,700.00
59,900.00
89,600.00
104,000.00
II. BAHAN
Besi strip 2 x 3
Kg
1.000
26,300.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
1.01
90,132.00
69,484.00
103,936.00
120,640.00
406,000.00
Jumlah
31,546.20
24,319.40
3,637.76
2,171.52
406,000.00
467,674.88
129,759.00
100,033.00
14,963.20
86,320.00
26,300.00
357,375.20
Harga
Satuan
Harga
Satuan
47,777.73
36,832.51
550.95
297.44
500,500.00
585,958.63
Zona IV
Jumlah
Harga
1.02
101,010.00
77,870.00
116,480.00
135,200.00
455,000.00
Jumlah
35,353.50
27,254.50
4,076.80
2,433.60
455,000.00
524,118.40
Harga
Satuan
Jumlah
Harga
1.02
111,111.00
85,657.00
128,128.00
148,720.00
500,500.00
Jumlah
Harga
Satuan
38,888.85
29,979.95
4,484.48
2,676.96
500,500.00
576,530.24
0.100
0.100
0.010
0.001
59,900.00
77,700.00
89,600.00
104,000.00
M2
Kg
1.100
0.020
0.002
40,800.00
600.00
1,374,500.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
I. UPAH
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.100
0.100
0.010
0.005
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kawat Nyamuk
Pengelasan
Baja Strip (0.2 x 2 ) cm
M2
cm
kg
1.100
11.110
1.716
36,700.00
25,000.00
25,000.00
Zona IV
Jumlah
Harga
1.02
101,010.00
77,870.00
116,480.00
135,200.00
34,190.00
Jumlah
Zona II
5,990.00
7,770.00
896.00
52.00
44,880.00
12.00
2,474.10
62,074.10
Harga
Satuan
168,686.70
130,042.90
19,452.16
112,216.00
34,190.00
464,587.76
Harga
Satuan
Jumlah
Harga
1.02
111,111.00
85,657.00
128,128.00
148,720.00
37,609.00
Jumlah
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
47,328.00
696.00
1,594,420.00
Jumlah
185,555.37
143,047.19
21,397.38
123,437.60
37,609.00
511,046.54
6,948.40
9,013.20
1,039.36
60.32
52,060.80
13.92
2,869.96
72,005.96
Harga
Satuan
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
53,040.00
780.00
1,786,850.00
Jumlah
7,787.00
10,101.00
1,164.80
67.60
58,344.00
15.60
3,216.33
80,696.33
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
58,344.00
858.00
1,965,535.00
Jumlah
8,565.70
11,111.10
1,281.28
74.36
64,178.40
17.16
3,537.96
88,765.96
Zona I
Harga
Satuan
150,520.44
116,038.28
17,357.31
100,131.20
30,508.00
414,555.23
Harga
Satuan
Jumlah
Harga
Oh
Oh
Oh
Oh
Zona III
Jumlah
Harga
1.01
90,132.00
69,484.00
103,936.00
120,640.00
30,508.00
Jumlah
Zona I
Uraian
Jumlah
Harga
1.02
111,111.00
85,657.00
128,128.00
148,720.00
500,500.00
Jumlah
Zona III
Jumlah
Harga
Zona II
Jumlah
Harga
Oh
Oh
Oh
Oh
43,434.30
33,484.10
500.86
270.40
455,000.00
532,689.66
Harga
Satuan
I. UPAH
Tukang las
Pekerja
Kepala tukang
Mandor
Zona IV
Jumlah
Harga
1.02
101,010.00
77,870.00
116,480.00
135,200.00
455,000.00
Jumlah
Zona II
Harga
Satuan
Zona I
II. BAHAN
Kawat Harmonika
Paku biasa 1/2 " - 1"
Kayu meranti,papan
38,756.76
29,878.12
446.92
241.28
406,000.00
475,323.08
Harga
Satuan
Jumlah
Harga
I. UPAH
Tukang kayu
Pekerja
Kepala tukang
Mandor
Zona III
Jumlah
Harga
1.01
90,132.00
69,484.00
103,936.00
120,640.00
406,000.00
Jumlah
Zona I
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
Harga
1.01
90,132.00
69,484.00
103,936.00
120,640.00
-
No
Uraian
Harga
Satuan
77,700.00
59,900.00
8,960.00
5,200.00
-
Uraian
Zona IV
Jumlah
Harga
77,700.00
59,900.00
89,600.00
104,000.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Harga
Satuan
1.000
1.000
0.100
0.050
Jumlah
Uraian
Zona III
Jumlah
Harga
Oh
Oh
Oh
Oh
II. BAHAN
Roll door
Zona II
Jumlah
Harga
Zona II
Jumlah
Harga
5,990.00
7,770.00
896.00
520.00
40,370.00
277,750.00
42,900.00
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
42,572.00
29,000.00
29,000.00
Zona III
Jumlah
Harga
6,948.40
9,013.20
1,039.36
603.20
46,829.20
322,190.00
49,764.00
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
47,710.00
32,500.00
32,500.00
Zona IV
Jumlah
Harga
7,787.00
10,101.00
1,164.80
676.00
52,481.00
361,075.00
55,770.00
Harga
Satuan
1.02
85,657.00
111,111.00
128,128.00
148,720.00
52,481.00
35,750.00
35,750.00
Jumlah
Harga
8,565.70
11,111.10
1,281.28
743.60
57,729.10
397,182.50
61,347.00
Halaman 72
376,196.00
Jumlah
436,387.36
Jumlah
489,054.80
Jumlah
537,960.28
Halaman 73
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.100
0.100
0.010
0.001
Kawat Kassa
Paku biasa 1/2 " - 1"
M2
Kg
Kayu meranti,papan
M3
Harga
Satuan
Zona II
Jumlah
Harga
59,900.00
77,700.00
89,600.00
104,000.00
5,990.00
7,770.00
896.00
52.00
-
1.100
0.020
39,400.00
600.00
43,340.00
12.00
0.002
1,374,500.00
2,474.10
60,534.10
II. BAHAN
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
-
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Harga
Satuan
45,704.00
696.00
Harga
Satuan
3,537.96
86,563.76
Zona III
Jumlah
Harga
Harga
Satuan
Zona IV
Jumlah
Harga
Harga
Satuan
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
-
7,787.00
10,101.00
1,164.80
67.60
-
1.02
85,657.00
111,111.00
128,128.00
148,720.00
-
8,565.70
11,111.10
1,281.28
74.36
-
M2
Kg
1.100
0.020
0.002
39,400.00
600.00
1,374,500.00
43,340.00
12.00
2,474.10
60,534.10
45,704.00
696.00
1,594,420.00
Jumlah
50,274.40
13.92
2,869.96
70,219.56
51,220.00
780.00
1,786,850.00
Jumlah
56,342.00
15.60
3,216.33
78,694.33
56,342.00
858.00
1,965,535.00
Jumlah
61,976.20
17.16
3,537.96
86,563.76
M3
Oh
Oh
Oh
Oh
Jendela nako
M2
Paku biasa 1/2 " - 1" atau skru Buah
Besi strip
Kg
Harga
Satuan
Zona II
Jumlah
Harga
Harga
Satuan
Zona IV
Jumlah
Harga
Harga
Satuan
Jumlah
Harga
11,980.00
15,540.00
1,792.00
104.00
-
1.01
69,484.00
90,132.00
103,936.00
120,640.00
-
13,896.80
18,026.40
2,078.72
120.64
-
1.02
77,870.00
101,010.00
116,480.00
135,200.00
-
15,574.00
20,202.00
2,329.60
135.20
-
1.02
85,657.00
111,111.00
128,128.00
148,720.00
-
17,131.40
22,222.20
2,562.56
148.72
-
1.100
10.000
7.000
350,000.00
600.00
26,300.00
385,000.00
6,000.00
184,100.00
604,516.00
406,000.00
696.00
30,508.00
Jumlah
446,600.00
6,960.00
213,556.00
701,238.56
455,000.00
780.00
34,190.00
Jumlah
500,500.00
7,800.00
239,330.00
785,870.80
500,500.00
858.00
37,609.00
Jumlah
550,550.00
8,580.00
263,263.00
864,457.88
No
Satuan Indeks
Zona I
Harga
Satuan
Zona II
Jumlah
Harga
Oh
Oh
Oh
Oh
0.200
0.400
0.025
0.010
59,900.00
77,700.00
89,600.00
104,000.00
Lbr
Kg
1.050
0.015
0.019
86,100.00
600.00
1,374,500.00
Jumlah
11,980.00
31,080.00
2,240.00
1,040.00
90,405.00
9.00
26,115.50
162,869.50
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Harga
Satuan
Oh
Oh
Oh
Oh
0.040
0.400
0.025
0.010
59,900.00
77,700.00
89,600.00
104,000.00
Lbr
Kg
1.050
0.015
0.019
86,100.00
600.00
1,374,500.00
Jumlah
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
99,876.00
696.00
1,594,420.00
Jumlah
13,896.80
36,052.80
2,598.40
1,206.40
104,869.80
10.44
30,293.98
188,928.62
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
111,930.00
780.00
1,786,850.00
Jumlah
Zona II
Jumlah
Harga
2,396.00
31,080.00
2,240.00
1,040.00
90,405.00
9.00
26,115.50
153,285.50
Zona IV
Jumlah
Harga
15,574.00
40,404.00
2,912.00
1,352.00
117,526.50
11.70
33,950.15
211,730.35
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
123,123.00
858.00
1,965,535.00
Jumlah
17,131.40
44,444.40
3,203.20
1,487.20
129,279.15
12.87
37,345.17
232,903.39
Zona I
M3
Harga
Satuan
59,900.00
77,700.00
89,600.00
104,000.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
M3
Zona III
Jumlah
Harga
0.200
0.200
0.020
0.001
Jumlah
II. BAHAN
Seng plat 3 x 6 bjls 28
Paku biasa 1/2" - 1"
Kayu meranti,papan
61,976.20
17.16
6,948.40
9,013.20
1,039.36
60.32
-
II. BAHAN
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
56,342.00
858.00
1,965,535.00
Jumlah
1.01
69,484.00
90,132.00
103,936.00
120,640.00
-
Zona I
Uraian
3,216.33
78,694.33
8,565.70
11,111.10
1,281.28
74.36
-
5,990.00
7,770.00
896.00
52.00
-
Satuan Indeks
II. BAHAN
Seng plat 3 x 6 bjls 28
Paku biasa 1/2" - 1"
Kayu meranti,papan
56,342.00
15.60
1.02
85,657.00
111,111.00
128,128.00
148,720.00
-
59,900.00
77,700.00
89,600.00
104,000.00
No
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
51,220.00
780.00
1,786,850.00
Jumlah
Jumlah
Harga
0.100
0.100
0.010
0.001
Uraian
7,787.00
10,101.00
1,164.80
67.60
-
Harga
Satuan
Oh
Oh
Oh
Oh
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
2,869.96
70,219.56
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
-
Zona II
Jumlah
Harga
Jumlah
Uraian
50,274.40
13.92
Harga
Satuan
II. BAHAN
Kawat burung
Paku biasa 1/2 " - 1"
Kayu meranti,papan
6,948.40
9,013.20
1,039.36
60.32
-
1,594,420.00
Jumlah
Zona I
Uraian
Zona III
Jumlah
Harga
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
99,876.00
696.00
1,594,420.00
Jumlah
Zona III
Jumlah
Harga
2,779.36
36,052.80
2,598.40
1,206.40
104,869.80
10.44
30,293.98
177,811.18
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
111,930.00
780.00
1,786,850.00
Jumlah
Zona IV
Jumlah
Harga
3,114.80
40,404.00
2,912.00
1,352.00
117,526.50
11.70
33,950.15
199,271.15
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
123,123.00
858.00
1,965,535.00
Jumlah
3,426.28
44,444.40
3,203.20
1,487.20
129,279.15
12.87
37,345.17
219,198.27
Halaman 74
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.150
0.300
0.030
0.007
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Seng plat 3 x 6 bjls 28
Paku biasa 1/2" - 1"
Seng Plat
Besi strip
Lbr
Kg
M3
Kg
0.300
0.010
1.050
0.500
86,100.00
600.00
75,000.00
26,300.00
Jumlah
8,985.00
23,310.00
2,688.00
728.00
25,830.00
6.00
78,750.00
13,150.00
153,447.00
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
99,876.00
696.00
87,000.00
30,508.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Oh
Oh
Oh
Oh
0.150
0.250
0.025
0.001
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Seng plat 3 x 6 bjls 24
Paku biasa 1/2" - 1"
Lbr
Kg
0.300
0.010
86,100.00
600.00
M
Kg
1.050
0.500
75,000.00
26,300.00
Seng Plat
Besi strip
Jumlah
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
111,930.00
780.00
97,500.00
34,190.00
Jumlah
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
10,422.60
27,039.60
3,118.08
844.48
29,962.80
6.96
91,350.00
15,254.00
177,998.52
Harga
Satuan
11,680.50
30,303.00
3,494.40
946.40
33,579.00
7.80
102,375.00
17,095.00
199,481.10
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
123,123.00
858.00
107,250.00
37,609.00
Jumlah
12,848.55
33,333.30
3,843.84
1,041.04
36,936.90
8.58
112,612.50
18,804.50
219,429.21
Zona I
Uraian
Zona III
Jumlah
Harga
Harga
Satuan
Zona III
Jumlah
Harga
Harga
Satuan
Zona IV
Jumlah
Harga
Harga
Satuan
Jumlah
Harga
8,985.00
19,425.00
2,240.00
130.00
25,830.00
6.00
1.01
69,484.00
90,132.00
103,936.00
120,640.00
99,876.00
696.00
10,422.60
22,533.00
2,598.40
150.80
29,962.80
6.96
1.02
77,870.00
101,010.00
116,480.00
135,200.00
111,930.00
780.00
11,680.50
25,252.50
2,912.00
169.00
33,579.00
7.80
1.02
85,657.00
111,111.00
128,128.00
148,720.00
123,123.00
858.00
12,848.55
27,777.75
3,203.20
185.90
36,936.90
8.58
78,750.00
13,150.00
148,516.00
87,000.00
30,508.00
Jumlah
91,350.00
15,254.00
172,278.56
97,500.00
34,190.00
Jumlah
102,375.00
17,095.00
193,070.80
107,250.00
37,609.00
Jumlah
112,612.50
18,804.50
212,377.88
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.060
0.600
0.060
0.003
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kunci tanam antik
Bh
1.000
273,100.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
3,594.00
46,620.00
5,376.00
312.00
273,100.00
329,002.00
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
316,796.00
Jumlah
Harga
Satuan
Oh
Oh
Oh
Oh
0.010
0.500
0.010
0.005
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kunci tanam biasa
Bh
1.000
110,400.00
Jumlah
599.00
38,850.00
896.00
520.00
110,400.00
151,265.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Harga
Satuan
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.005
0.500
0.005
0.003
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kunci tanam kamar mandi
Bh
1.000
364,600.00
Jumlah
4,672.20
60,606.00
6,988.80
405.60
355,030.00
427,702.60
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
390,533.00
Jumlah
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
128,064.00
Jumlah
5,139.42
66,666.60
7,687.68
446.16
390,533.00
470,472.86
694.84
45,066.00
1,039.36
603.20
128,064.00
175,467.40
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
143,520.00
Jumlah
Zona II
Jumlah
Harga
299.50
38,850.00
448.00
260.00
364,600.00
404,457.50
Zona IV
Jumlah
Harga
778.70
50,505.00
1,164.80
676.00
143,520.00
196,644.50
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
157,872.00
Jumlah
856.57
55,555.50
1,281.28
743.60
157,872.00
216,308.95
Zona I
Uraian
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
355,030.00
Jumlah
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
4,169.04
54,079.20
6,236.16
361.92
316,796.00
381,642.32
Harga
Satuan
Zona I
Uraian
Zona III
Jumlah
Harga
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
422,936.00
Jumlah
Zona III
Jumlah
Harga
347.42
45,066.00
519.68
301.60
422,936.00
469,170.70
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
473,980.00
Jumlah
Zona IV
Jumlah
Harga
389.35
50,505.00
582.40
338.00
473,980.00
525,794.75
Harga
Satuan
1.02
85,657.00
111,111.00
128,128.00
148,720.00
521,378.00
Jumlah
Jumlah
Harga
428.29
55,555.50
640.64
371.80
521,378.00
578,374.23
Halaman 75
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.005
0.500
0.005
0.000
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kunci silinder
Bh
1.000
149,400.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
299.50
38,850.00
448.00
26.00
149,400.00
189,023.50
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
173,304.00
Jumlah
Harga
Satuan
Oh
Oh
Oh
Oh
0.015
0.150
0.015
0.001
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Engsel Pintu
Bh
1.000
18,100.00
Jumlah
898.50
11,655.00
1,344.00
78.00
18,100.00
32,075.50
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Harga
Satuan
Oh
Oh
Oh
Oh
0.010
0.100
0.010
0.001
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Engsel Jendela
Bh
1.000
13,500.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
599.00
7,770.00
896.00
52.00
13,500.00
22,817.00
Oh
Oh
Oh
Oh
0.020
0.200
0.020
0.010
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Engsel angin
Bh
1.000
85,000.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
23,530.00
Jumlah
1,168.05
15,151.50
1,747.20
101.40
23,530.00
41,698.15
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
25,883.00
Jumlah
1,284.86
16,666.65
1,921.92
111.54
25,883.00
45,867.97
694.84
9,013.20
1,039.36
60.32
15,660.00
26,467.72
Harga
Satuan
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
17,550.00
Jumlah
778.70
10,101.00
1,164.80
67.60
17,550.00
29,662.10
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
19,305.00
Jumlah
856.57
11,111.10
1,281.28
74.36
19,305.00
32,628.31
Zona II
1,198.00
15,540.00
1,792.00
1,040.00
85,000.00
104,570.00
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
98,600.00
Jumlah
1,389.68
18,026.40
2,078.72
1,206.40
98,600.00
121,301.20
Harga
Satuan
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
110,500.00
Jumlah
1,557.40
20,202.00
2,329.60
1,352.00
110,500.00
135,941.00
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
121,550.00
Jumlah
1,713.14
22,222.20
2,562.56
1,487.20
121,550.00
149,535.10
Harga
Satuan
Oh
Oh
Oh
Oh
0.015
0.150
0.015
0.001
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Spring knip
Bh
1.000
98,500.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
898.50
11,655.00
1,344.00
78.00
98,500.00
112,475.50
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
114,260.00
Jumlah
1,042.26
13,519.80
1,559.04
90.48
114,260.00
130,471.58
Harga
Satuan
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
128,050.00
Jumlah
1,168.05
15,151.50
1,747.20
101.40
128,050.00
146,218.15
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
140,855.00
Jumlah
1,284.86
16,666.65
1,921.92
111.54
140,855.00
160,839.97
Zona I
Uraian
428.29
55,555.50
640.64
37.18
213,642.00
270,303.61
Zona IV
Jumlah
Harga
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
15,660.00
Jumlah
Zona I
Uraian
1.02
85,657.00
111,111.00
128,128.00
148,720.00
213,642.00
Jumlah
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
Harga
Zona I
Uraian
1,042.26
13,519.80
1,559.04
90.48
20,996.00
37,207.58
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
389.35
50,505.00
582.40
33.80
194,220.00
245,730.55
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
20,996.00
Jumlah
Zona I
Uraian
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
194,220.00
Jumlah
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
347.42
45,066.00
519.68
30.16
173,304.00
219,267.26
Harga
Satuan
Zona I
Uraian
Zona III
Jumlah
Harga
Harga
Satuan
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.015
0.150
0.015
0.001
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kait angin
Bh
1.000
14,900.00
Jumlah
Zona II
Jumlah
Harga
898.50
11,655.00
1,344.00
78.00
14,900.00
28,875.50
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
17,284.00
Jumlah
Zona III
Jumlah
Harga
1,042.26
13,519.80
1,559.04
90.48
17,284.00
33,495.58
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
19,370.00
Jumlah
Zona IV
Jumlah
Harga
1,168.05
15,151.50
1,747.20
101.40
19,370.00
37,538.15
Harga
Satuan
1.02
85,657.00
111,111.00
128,128.00
148,720.00
21,307.00
Jumlah
Jumlah
Harga
1,284.86
16,666.65
1,921.92
111.54
21,307.00
41,291.97
Halaman 76
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.050
0.500
0.050
0.003
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Door closer
Bh
1.000
124,800.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
2,995.00
38,850.00
4,480.00
260.00
124,800.00
171,385.00
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
144,768.00
Jumlah
Harga
Satuan
Oh
Oh
Oh
Oh
0.020
0.200
0.020
0.001
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kunci selot
Bh
1.000
72,900.00
Jumlah
1,198.00
15,540.00
1,792.00
104.00
72,900.00
91,534.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Harga
Satuan
Oh
Oh
Oh
Oh
0.050
0.500
0.050
0.003
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Door holder
Bh
1.000
77,700.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
2,995.00
38,850.00
4,480.00
260.00
77,700.00
124,285.00
4,282.85
55,555.50
6,406.40
371.80
178,464.00
245,080.55
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
94,770.00
Jumlah
Harga
Satuan
1,557.40
20,202.00
2,329.60
135.20
94,770.00
118,994.20
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
104,247.00
Jumlah
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
90,132.00
Jumlah
3,474.20
45,066.00
5,196.80
301.60
90,132.00
144,170.60
Harga
Satuan
1,713.14
22,222.20
2,562.56
148.72
104,247.00
130,893.62
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
101,010.00
Jumlah
Zona II
Jumlah
Harga
Oh
Oh
Oh
Oh
0.010
0.100
0.010
0.001
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Door stop
Bh
1.000
350,000.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
599.00
7,770.00
896.00
52.00
350,000.00
359,317.00
Harga
Satuan
3,893.50
50,505.00
5,824.00
338.00
101,010.00
161,570.50
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
111,111.00
Jumlah
Harga
Satuan
4,282.85
55,555.50
6,406.40
371.80
111,111.00
177,727.55
Oh
Oh
Oh
Oh
0.060
0.600
0.060
0.003
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Rel pintu dorong
1.000
1,374,500.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.025
0.250
0.025
0.001
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kunci lemari
Bh
1.000
227,500.00
Jumlah
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
455,000.00
Jumlah
Zona II
3,594.00
46,620.00
5,376.00
312.00
1,374,500.00
1,430,402.00
Harga
Satuan
778.70
10,101.00
1,164.80
67.60
455,000.00
467,112.10
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
500,500.00
Jumlah
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
1,594,420.00
Jumlah
856.57
11,111.10
1,281.28
74.36
500,500.00
513,823.31
4,169.04
54,079.20
6,236.16
361.92
1,594,420.00
1,659,266.32
Harga
Satuan
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
1,786,850.00
Jumlah
4,672.20
60,606.00
6,988.80
405.60
1,786,850.00
1,859,522.60
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
1,965,535.00
Jumlah
5,139.42
66,666.60
7,687.68
446.16
1,965,535.00
2,045,474.86
Zona I
Harga
Satuan
694.84
9,013.20
1,039.36
60.32
406,000.00
416,807.72
Harga
Satuan
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
406,000.00
Jumlah
Zona I
Uraian
1.02
85,657.00
111,111.00
128,128.00
148,720.00
178,464.00
Jumlah
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Uraian
Jumlah
Harga
Zona I
Uraian
1,389.68
18,026.40
2,078.72
120.64
84,564.00
106,179.44
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
3,893.50
50,505.00
5,824.00
338.00
162,240.00
222,800.50
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
84,564.00
Jumlah
Zona I
Uraian
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
162,240.00
Jumlah
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
3,474.20
45,066.00
5,196.80
301.60
144,768.00
198,806.60
Harga
Satuan
Zona I
Uraian
Zona III
Jumlah
Harga
Zona II
Jumlah
Harga
1,497.50
19,425.00
2,240.00
130.00
227,500.00
250,792.50
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
263,900.00
Jumlah
Zona III
Jumlah
Harga
1,737.10
22,533.00
2,598.40
150.80
263,900.00
290,919.30
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
295,750.00
Jumlah
Zona IV
Jumlah
Harga
1,946.75
25,252.50
2,912.00
169.00
295,750.00
326,030.25
Harga
Satuan
1.02
85,657.00
111,111.00
128,128.00
148,720.00
325,325.00
Jumlah
Jumlah
Harga
2,141.43
27,777.75
3,203.20
185.90
325,325.00
358,633.28
Halaman 77
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Harga
Satuan
Oh
Oh
Oh
Oh
0.015
0.150
0.015
0.001
59,900.00
77,700.00
89,600.00
104,000.00
M2
1.100
228,000.00
II. BAHAN
Kaca
Zona II
Jumlah
Harga
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
898.50
11,655.00
1,344.00
78.00
250,800.00
264,775.50
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
-
Harga
Satuan
Oh
Oh
Oh
Oh
0.015
0.150
0.015
0.001
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kaca
M2
1.100
228,000.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
898.50
11,655.00
1,344.00
78.00
250,800.00
264,775.50
Oh
Oh
Oh
Oh
0.017
0.165
0.017
0.001
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kaca
M2
1.100
228,000.00
Jumlah
988.35
12,820.50
1,478.40
83.20
250,800.00
266,170.45
No
Satuan Indeks
69,484.00
90,132.00
103,936.00
120,640.00
264,480.00
Jumlah
Oh
Oh
Oh
Oh
0.025
0.250
0.025
0.001
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kaca buram
Sealent
M2
Kg
1.100
0.050
721,600.00
22,900.00
Jumlah
1,497.50
19,425.00
2,240.00
130.00
793,760.00
1,145.00
818,197.50
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Oh
Oh
Oh
Oh
0.015
0.150
0.015
0.001
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kaca cermin
M2
1.100
231,200.00
Jumlah
898.50
11,655.00
1,344.00
78.00
254,320.00
268,295.50
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.015
0.150
0.015
0.001
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kaca cermin
M2
1.100
231,200.00
Jumlah
1,168.05
15,151.50
1,747.20
101.40
326,040.00
344,208.15
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
326,040.00
Jumlah
1,284.86
16,666.65
1,921.92
111.54
358,644.00
378,628.97
1,146.49
14,871.78
1,714.94
96.51
290,928.00
308,757.72
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
296,400.00
Jumlah
Harga
Satuan
898.50
11,655.00
1,344.00
78.00
254,320.00
268,295.50
1,284.86
16,666.65
1,921.92
108.16
326,040.00
346,021.59
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
326,040.00
Jumlah
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
837,056.00
26,564.00
Jumlah
1,737.10
22,533.00
2,598.40
150.80
920,761.60
1,328.20
949,109.10
Harga
Satuan
1,413.34
18,333.32
2,114.11
118.98
358,644.00
380,623.74
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
938,080.00
29,770.00
Jumlah
1,946.75
25,252.50
2,912.00
169.00
1,031,888.00
1,488.50
1,063,656.75
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
1,031,888.00
32,747.00
Jumlah
2,141.43
27,777.75
3,203.20
185.90
1,135,076.80
1,637.35
1,170,022.43
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
268,192.00
Jumlah
1,042.26
13,519.80
1,559.04
90.48
295,011.20
311,222.78
Harga
Satuan
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
300,560.00
Jumlah
1,168.05
15,151.50
1,747.20
101.40
330,616.00
348,784.15
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
330,616.00
Jumlah
1,284.86
16,666.65
1,921.92
111.54
363,677.60
383,662.57
Zona II
Jumlah
Harga
Zona IV
Jumlah
Harga
Zona I
Uraian
358,644.00
378,628.97
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
296,400.00
Jumlah
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
1,284.86
16,666.65
1,921.92
111.54
-
326,040.00
Jumlah
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
264,480.00
Jumlah
Zona I
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
1,042.26
13,519.80
1,559.04
90.48
290,928.00
307,139.58
Harga
Satuan
Zona I
Harga
Satuan
326,040.00
344,208.15
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
-
Zona III
Jumlah
Harga
Zona II
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
296,400.00
Jumlah
1,168.05
15,151.50
1,747.20
101.40
-
Harga
Satuan
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
-
Zona II
Harga
Satuan
Zona I
Uraian
290,928.00
307,139.58
Harga
Satuan
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
1,042.26
13,519.80
1,559.04
90.48
-
264,480.00
Jumlah
Zona I
Uraian
Zona III
Jumlah
Harga
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
268,192.00
Jumlah
Zona III
Jumlah
Harga
1,042.26
13,519.80
1,559.04
90.48
295,011.20
311,222.78
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
300,560.00
Jumlah
Zona IV
Jumlah
Harga
1,168.05
15,151.50
1,747.20
101.40
330,616.00
348,784.15
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
330,616.00
Jumlah
Jumlah
Harga
1,284.86
16,666.65
1,921.92
111.54
363,677.60
383,662.57
Halaman 78
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Harga
Satuan
Oh
Oh
Oh
Oh
0.017
0.165
0.017
0.001
59,900.00
77,700.00
89,600.00
104,000.00
M2
1.100
231,200.00
II. BAHAN
Kaca cermin
Zona II
Jumlah
Harga
Jumlah
988.35
12,820.50
1,478.40
83.20
254,320.00
269,690.45
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
-
Harga
Satuan
Oh
Oh
Oh
Oh
0.015
0.150
0.015
0.001
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kaca wireglass
M2
1.100
750,000.00
Jumlah
898.50
11,655.00
1,344.00
78.00
825,000.00
838,975.50
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.015
0.150
0.015
0.001
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kaca patri
M2
1.100
894,600.00
Jumlah
77,870.00
101,010.00
116,480.00
135,200.00
300,560.00
Jumlah
Harga
Satuan
898.50
11,655.00
1,344.00
78.00
984,060.00
998,035.50
1,284.86
16,666.65
1,921.92
108.16
330,616.00
350,597.59
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
-
1,413.34
18,333.32
2,114.11
118.98
-
330,616.00
Jumlah
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
870,000.00
Jumlah
1,042.26
13,519.80
1,559.04
90.48
957,000.00
973,211.58
Harga
Satuan
363,677.60
385,657.34
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
975,000.00
Jumlah
1,168.05
15,151.50
1,747.20
101.40
1,072,500.00
1,090,668.15
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
1,072,500.00
Jumlah
1,284.86
16,666.65
1,921.92
111.54
1,179,750.00
1,199,734.97
Zona II
Jumlah
Harga
Zona IV
Jumlah
Harga
Zona I
Uraian
295,011.20
312,840.92
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
1,146.49
14,871.78
1,714.94
96.51
-
268,192.00
Jumlah
Zona I
Uraian
Zona III
Jumlah
Harga
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
1,037,736.00
Jumlah
1,042.26
13,519.80
1,559.04
90.48
1,141,509.60
1,157,721.18
Harga
Satuan
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
1,162,980.00
Jumlah
1,168.05
15,151.50
1,747.20
101.40
1,279,278.00
1,297,446.15
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
1,279,278.00
Jumlah
1,284.86
16,666.65
1,921.92
111.54
1,407,205.80
1,427,190.77
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
II. BAHAN
Ubin abu-abu 40 x 40 cm
Semen portland
Pasir pasang
Harga
Satuan
0.250
0.120
0.012
0.013
59,900.00
77,700.00
89,600.00
104,000.00
Bh
Kg
6.630
9.800
0.045
75,000.00
1,434.00
131,500.00
M3
Zona II
Jumlah
Harga
Oh
Oh
Oh
Oh
Jumlah
14,975.00
9,324.00
1,075.20
1,300.00
497,250.00
14,053.20
5,917.50
543,894.90
Harga
Satuan
No
Satuan Indeks
Zona I
Harga
Satuan
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.260
0.125
0.013
0.013
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Ubin abu-abu 30 x 30 cm
Semen portland
Pasir pasang
Bh
Kg
M3
11.870
10.000
0.045
75,000.00
1,434.00
131,500.00
Jumlah
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
87,000.00
1,663.44
152,540.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
17,371.00
10,815.84
1,247.23
1,508.00
576,810.00
16,301.71
6,864.30
630,918.08
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
97,500.00
1,864.20
170,950.00
Jumlah
15,574.00
9,712.50
1,120.00
1,352.00
890,250.00
14,340.00
5,917.50
938,266.00
19,467.50
12,121.20
1,397.76
1,690.00
646,425.00
18,269.16
7,692.75
707,063.37
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
107,250.00
2,050.62
188,045.00
Jumlah
21,414.25
13,333.32
1,537.54
1,859.00
711,067.50
20,096.08
8,462.03
777,769.71
Zona II
Jumlah
Harga
Zona IV
Jumlah
Harga
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
87,000.00
1,663.44
152,540.00
Jumlah
Zona III
Jumlah
Harga
18,065.84
11,266.50
1,299.20
1,568.32
1,032,690.00
16,634.40
6,864.30
1,088,388.56
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
97,500.00
1,864.20
170,950.00
Jumlah
Zona IV
Jumlah
Harga
20,246.20
12,626.25
1,456.00
1,757.60
1,157,325.00
18,642.00
7,692.75
1,219,745.80
Harga
Satuan
1.02
85,657.00
111,111.00
128,128.00
148,720.00
107,250.00
2,050.62
188,045.00
Jumlah
Jumlah
Harga
22,270.82
13,888.88
1,601.60
1,933.36
1,273,057.50
20,506.20
8,462.03
1,341,720.38
Halaman 79
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.270
0.130
0.013
0.014
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Ubin abu-abu 20 x 20 cm
Semen portland
Pasir pasang
Bh
Kg
M3
26.500
10.400
0.045
65,000.00
1,434.00
131,500.00
Jumlah
16,173.00
10,101.00
1,164.80
1,404.00
1,722,500.00
14,913.60
5,917.50
1,772,173.90
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Harga
Satuan
Oh
Oh
Oh
Oh
0.250
0.120
0.012
0.013
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Ubin warna 40 x 40 cm
Semen portland
Bh
Kg
6.630
9.800
M
Kg
0.045
1.300
Pasir pasang
Semen warna
Harga
Satuan
Harga
Satuan
Jumlah
Harga
85,000.00
1,434.00
131,500.00
2,032.00
Jumlah
5,917.50
2,641.60
612,836.50
152,540.00
2,357.12
Jumlah
6,864.30
3,064.26
710,890.34
170,950.00
2,641.60
Jumlah
7,692.75
3,434.08
796,687.45
188,045.00
2,905.76
Jumlah
8,462.03
3,777.49
876,356.20
Harga
Satuan
Zona II
Jumlah
Harga
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Ubin warna 40 x 40 cm
Semen portland
Bh
Kg
6.630
9.800
85,000.00
1,434.00
M
Kg
0.045
1.300
131,500.00
2,032.00
Jumlah
Harga
Satuan
1.02
85,657.00
111,111.00
128,128.00
148,720.00
121,550.00
2,050.62
21,414.25
13,333.32
1,537.54
1,859.00
805,876.50
20,096.08
5,917.50
2,641.60
612,836.50
152,540.00
2,357.12
Jumlah
6,864.30
3,064.26
710,890.34
170,950.00
2,641.60
Jumlah
7,692.75
3,434.08
796,687.45
188,045.00
2,905.76
Jumlah
8,462.03
3,777.49
876,356.20
Zona II
Jumlah
Harga
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Ubin warna 20 x 20 cm
Semen portland
Pasir pasang
Semen warna
Bh
Kg
M3
Kg
26.500
10.400
0.045
1.620
65,000.00
1,434.00
131,500.00
2,032.00
Jumlah
16,173.00
10,101.00
1,164.80
1,404.00
1,722,500.00
14,913.60
5,917.50
3,291.84
1,775,465.74
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Oh
Oh
Oh
Oh
0.250
0.120
0.012
0.013
59,900.00
77,700.00
89,600.00
104,000.00
Bh
Kg
6.630
9.800
0.045
1.300
85,000.00
1,434.00
131,500.00
2,032.00
Jumlah
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
75,400.00
1,663.44
152,540.00
2,357.12
Jumlah
18,760.68
11,717.16
1,351.17
1,628.64
1,998,100.00
17,299.78
6,864.30
3,818.53
2,059,540.26
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
84,500.00
1,864.20
170,950.00
2,641.60
Jumlah
Zona II
Jumlah
Harga
14,975.00
9,324.00
1,075.20
1,300.00
563,550.00
14,053.20
5,917.50
2,641.60
612,836.50
Zona IV
Jumlah
Harga
21,024.90
13,131.30
1,514.24
1,825.20
2,239,250.00
19,387.68
7,692.75
4,279.39
2,308,105.46
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
92,950.00
2,050.62
188,045.00
2,905.76
Jumlah
23,127.39
14,444.43
1,665.66
2,007.72
2,463,175.00
21,326.45
8,462.03
4,707.33
2,538,916.01
Zona I
Harga
Satuan
Jumlah
Harga
19,467.50
12,121.20
1,397.76
1,690.00
732,615.00
18,269.16
Zona I
0.270
0.130
0.013
0.014
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
110,500.00
1,864.20
Satuan Indeks
Oh
Oh
Oh
Oh
Zona IV
Jumlah
Harga
17,371.00
10,815.84
1,247.23
1,508.00
653,718.00
16,301.71
No
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
98,600.00
1,663.44
Harga
Satuan
Zona III
Jumlah
Harga
14,975.00
9,324.00
1,075.20
1,300.00
563,550.00
14,053.20
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
M
Kg
Zona IV
Jumlah
Harga
21,414.25
13,333.32
1,537.54
1,859.00
805,876.50
20,096.08
0.250
0.120
0.012
0.013
Harga
Satuan
1.02
85,657.00
111,111.00
128,128.00
148,720.00
121,550.00
2,050.62
Oh
Oh
Oh
Oh
II. BAHAN
Ubin teraso 40 x 40 cm
Semen portland
Pasir pasang
Semen warna
Zona III
Jumlah
Harga
19,467.50
12,121.20
1,397.76
1,690.00
732,615.00
18,269.16
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
23,127.39
14,444.43
1,665.66
2,007.72
2,463,175.00
21,326.45
8,462.03
2,534,208.68
Zona I
Uraian
1.02
85,657.00
111,111.00
128,128.00
148,720.00
92,950.00
2,050.62
188,045.00
Jumlah
1.02
77,870.00
101,010.00
116,480.00
135,200.00
110,500.00
1,864.20
Satuan Indeks
Uraian
21,024.90
13,131.30
1,514.24
1,825.20
2,239,250.00
19,387.68
7,692.75
2,303,826.07
Jumlah
Harga
17,371.00
10,815.84
1,247.23
1,508.00
653,718.00
16,301.71
No
Pasir pasang
Semen warna
1.02
77,870.00
101,010.00
116,480.00
135,200.00
84,500.00
1,864.20
170,950.00
Jumlah
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
98,600.00
1,663.44
Zona IV
Jumlah
Harga
14,975.00
9,324.00
1,075.20
1,300.00
563,550.00
14,053.20
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
18,760.68
11,717.16
1,351.17
1,628.64
1,998,100.00
17,299.78
6,864.30
2,055,721.72
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
75,400.00
1,663.44
152,540.00
Jumlah
Zona I
Uraian
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
98,600.00
1,663.44
152,540.00
2,357.12
Jumlah
Zona III
Jumlah
Harga
17,371.00
10,815.84
1,247.23
1,508.00
653,718.00
16,301.71
6,864.30
3,064.26
710,890.34
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
110,500.00
1,864.20
170,950.00
2,641.60
Jumlah
Zona IV
Jumlah
Harga
19,467.50
12,121.20
1,397.76
1,690.00
732,615.00
18,269.16
7,692.75
3,434.08
796,687.45
Harga
Satuan
1.02
85,657.00
111,111.00
128,128.00
148,720.00
121,550.00
2,050.62
188,045.00
2,905.76
Jumlah
Jumlah
Harga
21,414.25
13,333.32
1,537.54
1,859.00
805,876.50
20,096.08
8,462.03
3,777.49
876,356.20
Halaman 80
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.260
0.125
0.013
0.013
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Ubin teraso 40 x 40 cm
Semen portland
Pasir pasang
Semen warna
Bh
Kg
M3
Kg
11.875
10.000
0.045
1.500
85,000.00
1,434.00
131,500.00
2,032.00
Jumlah
15,574.00
9,712.50
1,120.00
1,352.00
1,009,375.00
14,340.00
5,917.50
3,048.00
1,060,439.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
98,600.00
1,663.44
152,540.00
2,357.12
Jumlah
Harga
Satuan
Oh
Oh
Oh
Oh
0.250
0.120
0.012
0.013
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Ubin granito 40 x 40 cm
Semen portland
Pasir pasang
Semen warna
Bh
Kg
M3
Kg
6.630
9.800
0.045
1.300
125,000.00
1,434.00
131,500.00
2,032.00
Jumlah
14,975.00
9,324.00
1,075.20
1,300.00
828,750.00
14,053.20
5,917.50
2,641.60
878,036.50
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
II. BAHAN
Ubin granito 30 x 30 cm
Semen portland
Pasir pasang
Semen warna
Harga
Satuan
Oh
Oh
Oh
Oh
0.250
0.125
0.013
0.013
59,900.00
77,700.00
89,600.00
104,000.00
Bh
Kg
11.870
10.000
0.045
1.500
125,000.00
1,434.00
131,500.00
2,032.00
M3
Kg
Jumlah
14,975.00
9,712.50
1,120.00
1,352.00
1,483,750.00
14,340.00
5,917.50
3,048.00
1,534,215.00
Harga
Satuan
No
Satuan Indeks
Zona I
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.250
0.120
0.013
0.013
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Ubin teralux marmer 40 x 40
Semen portland
Pasir pasang
Semen warna
Bh
Kg
M3
Kg
6.630
9.800
0.045
0.013
150,000.00
1,434.00
131,500.00
2,032.00
Jumlah
14,975.00
9,324.00
1,164.80
1,352.00
994,500.00
14,053.20
5,917.50
26.42
1,041,312.92
No
Satuan Indeks
Zona I
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.260
0.125
0.013
0.035
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Ubin teralux marmer 30 x 30
Semen portland
Pasir pasang
Semen warna
Bh
Kg
M3
Kg
11.870
10.000
0.045
1.500
150,000.00
1,434.00
131,500.00
2,032.00
Jumlah
Harga
Satuan
15,574.00
9,712.50
1,164.80
3,640.00
1,780,500.00
14,340.00
5,917.50
3,048.00
1,833,896.80
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
178,750.00
2,050.62
188,045.00
2,905.76
Jumlah
21,414.25
13,333.32
1,537.54
1,859.00
1,185,112.50
20,096.08
8,462.03
3,777.49
1,255,592.20
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
162,500.00
1,864.20
170,950.00
2,641.60
Jumlah
19,467.50
12,626.25
1,456.00
1,757.60
1,928,875.00
18,642.00
7,692.75
3,962.40
1,994,479.50
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
178,750.00
2,050.62
188,045.00
2,905.76
Jumlah
Zona III
Jumlah
Harga
17,371.00
10,815.84
1,351.17
1,568.32
1,153,620.00
16,301.71
6,864.30
30.64
1,207,922.98
Harga
Satuan
21,414.25
13,888.88
1,601.60
1,933.36
2,121,762.50
20,506.20
8,462.03
4,358.64
2,193,927.45
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
195,000.00
1,864.20
170,950.00
2,641.60
Jumlah
19,467.50
12,121.20
1,514.24
1,757.60
1,292,850.00
18,269.16
7,692.75
34.34
1,353,706.79
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
214,500.00
2,050.62
188,045.00
2,905.76
Jumlah
21,414.25
13,333.32
1,665.66
1,933.36
1,422,135.00
20,096.08
8,462.03
37.77
1,489,077.47
Zona II
Jumlah
Harga
19,467.50
12,121.20
1,397.76
1,690.00
1,077,375.00
18,269.16
7,692.75
3,434.08
1,141,447.45
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
174,000.00
1,663.44
152,540.00
2,357.12
Jumlah
Harga
Satuan
17,371.00
11,266.50
1,299.20
1,568.32
1,721,150.00
16,634.40
6,864.30
3,535.68
1,779,689.40
Harga
Satuan
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
22,270.82
13,888.88
1,601.60
1,933.36
1,443,406.25
20,506.20
8,462.03
4,358.64
1,516,427.77
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
162,500.00
1,864.20
170,950.00
2,641.60
Jumlah
Zona II
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
121,550.00
2,050.62
188,045.00
2,905.76
Jumlah
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
145,000.00
1,663.44
152,540.00
2,357.12
Jumlah
Harga
Satuan
Jumlah
Harga
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
17,371.00
10,815.84
1,247.23
1,508.00
961,350.00
16,301.71
6,864.30
3,064.26
1,018,522.34
Harga
Satuan
Zona II
Jumlah
Harga
20,246.20
12,626.25
1,456.00
1,757.60
1,312,187.50
18,642.00
7,692.75
3,962.40
1,378,570.70
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
145,000.00
1,663.44
152,540.00
2,357.12
Jumlah
Zona I
Uraian
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
110,500.00
1,864.20
170,950.00
2,641.60
Jumlah
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
18,065.84
11,266.50
1,299.20
1,568.32
1,170,875.00
16,634.40
6,864.30
3,535.68
1,230,109.24
Harga
Satuan
Zona I
Uraian
Zona III
Jumlah
Harga
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
174,000.00
1,663.44
152,540.00
2,357.12
Jumlah
Zona III
Jumlah
Harga
18,065.84
11,266.50
1,351.17
4,222.40
2,065,380.00
16,634.40
6,864.30
3,535.68
2,127,320.29
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
195,000.00
1,864.20
170,950.00
2,641.60
Jumlah
Zona IV
Jumlah
Harga
20,246.20
12,626.25
1,514.24
4,732.00
2,314,650.00
18,642.00
7,692.75
3,962.40
2,384,065.84
Harga
Satuan
1.02
85,657.00
111,111.00
128,128.00
148,720.00
214,500.00
2,050.62
188,045.00
2,905.76
Jumlah
Jumlah
Harga
22,270.82
13,888.88
1,665.66
5,205.20
2,546,115.00
20,506.20
8,462.03
4,358.64
2,622,472.42
Halaman 81
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.090
0.090
0.009
0.005
Plint ubin 15 x 20 cm
Semen portland
M3
Kg
Pasir pasang
M3
Harga
Satuan
Zona II
Jumlah
Harga
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
-
48,300.00
1,434.00
255,990.00
2,366.10
56,028.00
1,663.44
296,948.40
2,744.68
62,790.00
1,864.20
332,787.00
3,075.93
69,069.00
2,050.62
366,065.70
3,383.52
526.00
272,592.50
152,540.00
Jumlah
610.16
316,207.30
170,950.00
Jumlah
683.80
354,370.25
188,045.00
Jumlah
752.18
389,807.28
Satuan Indeks
Harga
Satuan
Zona II
Jumlah
Harga
Oh
Oh
Oh
Oh
0.090
0.090
0.009
0.005
59,900.00
77,700.00
89,600.00
104,000.00
Bh
Kg
3.530
1.240
0.003
48,300.00
1,434.00
131,500.00
Jumlah
Harga
Satuan
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Oh
Oh
Oh
Oh
0.090
0.090
0.030
0.005
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Plint ubin 10 x 40 cm
Semen portland
Pasir pasang
Bh
Kg
M3
2.650
2.562
0.003
65,000.00
1,434.00
131,500.00
Jumlah
5,391.00
6,993.00
2,688.00
520.00
172,250.00
3,673.91
394.50
191,910.41
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Harga
Satuan
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.090
0.090
0.009
0.005
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Plint ubin pc warna 10 x 20 cm
Semen portland
Pasir pasang
Semen warna
Bh
Kg
M3
Kg
5.300
1.140
0.003
0.100
65,000.00
1,434.00
131,500.00
2,032.00
Jumlah
5,391.00
6,993.00
806.40
520.00
344,500.00
1,634.76
394.50
203.20
360,442.86
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
II. BAHAN
Plint ubin pc warna 10 x 30 cm
Semen portland
Pasir pasang
Semen warna
Harga
Satuan
Oh
Oh
Oh
Oh
0.090
0.090
0.009
0.005
59,900.00
77,700.00
89,600.00
104,000.00
Bh
Kg
3.530
1.140
0.003
0.100
65,000.00
1,434.00
131,500.00
2,032.00
M
Kg
3
Jumlah
5,391.00
6,993.00
806.40
520.00
229,450.00
1,634.76
420.80
203.20
245,419.16
1.02
85,657.00
111,111.00
128,128.00
148,720.00
69,069.00
2,050.62
188,045.00
Jumlah
7,709.13
9,999.99
1,153.15
743.60
243,813.57
2,542.77
564.14
266,526.35
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
84,500.00
1,864.20
170,950.00
Jumlah
Harga
Satuan
7,008.30
9,090.90
3,494.40
676.00
223,925.00
4,776.08
512.85
249,483.53
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
92,950.00
2,050.62
188,045.00
Jumlah
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
75,400.00
1,663.44
152,540.00
2,357.12
Jumlah
6,253.56
8,111.88
935.42
603.20
399,620.00
1,896.32
457.62
235.71
418,113.72
Harga
Satuan
7,709.13
9,999.99
3,843.84
743.60
246,317.50
5,253.69
564.14
274,431.88
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
84,500.00
1,864.20
170,950.00
2,641.60
Jumlah
7,008.30
9,090.90
1,048.32
676.00
447,850.00
2,125.19
512.85
264.16
468,575.72
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
92,950.00
2,050.62
188,045.00
2,905.76
Jumlah
7,709.13
9,999.99
1,153.15
743.60
492,635.00
2,337.71
564.14
290.58
515,433.29
Zona II
Jumlah
Harga
Jumlah
Harga
Zona I
Uraian
6,253.56
8,111.88
3,118.08
603.20
199,810.00
4,261.73
457.62
222,616.07
Harga
Satuan
Zona II
Jumlah
Harga
7,008.30
9,090.90
1,048.32
676.00
221,648.70
2,311.61
512.85
242,296.68
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
75,400.00
1,663.44
152,540.00
Jumlah
Zona I
Uraian
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
62,790.00
1,864.20
170,950.00
Jumlah
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
6,253.56
8,111.88
935.42
603.20
197,778.84
2,062.67
457.62
216,203.19
Harga
Satuan
Zona I
Uraian
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
56,028.00
1,663.44
152,540.00
Jumlah
5,391.00
6,993.00
806.40
520.00
170,499.00
1,778.16
394.50
186,382.06
7,709.13
9,999.99
1,153.15
743.60
-
Zona I
M3
1.02
85,657.00
111,111.00
128,128.00
148,720.00
-
131,500.00
No
7,008.30
9,090.90
1,048.32
676.00
-
Jumlah
Harga
0.004
II. BAHAN
Plint ubin 10 x 30 cm
Semen portland
Pasir pasang
1.02
77,870.00
101,010.00
116,480.00
135,200.00
-
Harga
Satuan
5.300
1.650
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Zona IV
Jumlah
Harga
5,391.00
6,993.00
806.40
520.00
-
Jumlah
6,253.56
8,111.88
935.42
603.20
-
Harga
Satuan
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Uraian
Zona III
Jumlah
Harga
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
75,400.00
1,663.44
152,540.00
2,357.12
Jumlah
Zona III
Jumlah
Harga
6,253.56
8,111.88
935.42
603.20
266,162.00
1,896.32
488.13
235.71
284,686.23
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
84,500.00
1,864.20
170,950.00
2,641.60
Jumlah
Zona IV
Jumlah
Harga
7,008.30
9,090.90
1,048.32
676.00
298,285.00
2,125.19
547.04
264.16
319,044.91
Harga
Satuan
1.02
85,657.00
111,111.00
128,128.00
148,720.00
92,950.00
2,050.62
188,045.00
2,905.76
Jumlah
Jumlah
Harga
7,709.13
9,999.99
1,153.15
743.60
328,113.50
2,337.71
601.74
290.58
350,949.40
Halaman 82
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.090
0.090
0.009
0.005
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Plint ubin pc warna 10 x 40 cm
Semen portland
Pasir pasang
Semen warna
Bh
Kg
M3
Kg
2.650
1.140
0.003
0.100
65,000.00
1,434.00
131,500.00
2,032.00
Jumlah
5,391.00
6,993.00
806.40
520.00
172,250.00
1,634.76
394.50
203.20
188,192.86
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
75,400.00
1,663.44
152,540.00
2,357.12
Jumlah
Harga
Satuan
Oh
Oh
Oh
Oh
0.090
0.090
0.009
0.005
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Plint ubin teraso 10 x 30 cm
Semen portland
Pasir pasang
Semen warna
Bh
Kg
M3
Kg
3.530
1.140
0.003
0.100
65,000.00
1,434.00
131,500.00
2,032.00
Jumlah
5,391.00
6,993.00
806.40
520.00
229,450.00
1,634.76
394.50
203.20
245,392.86
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
II. BAHAN
Plint ubin teraso 10 x 40 cm
Semen portland
Pasir pasang
Semen warna
Harga
Satuan
Oh
Oh
Oh
Oh
0.090
0.090
0.009
0.005
59,900.00
77,700.00
89,600.00
104,000.00
Bh
Kg
2.650
1.140
0.003
0.100
65,000.00
1,434.00
131,500.00
2,032.00
M3
Kg
Jumlah
5,391.00
6,993.00
806.40
520.00
172,250.00
1,634.76
394.50
203.20
188,192.86
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.090
0.090
0.009
0.005
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Plint ubin teraso 10 x 40 cm
Semen portland
Pasir pasang
Semen warna
Bh
Kg
M3
Kg
2.650
1.140
0.003
0.100
65,000.00
1,434.00
131,500.00
2,032.00
Jumlah
5,391.00
6,993.00
806.40
520.00
172,250.00
1,634.76
394.50
203.20
188,192.86
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Harga
Satuan
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.900
0.090
0.009
0.005
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Plint ubin granito 10 x 30 cm
Semen portland
Pasir pasang
Semen warna
Bh
Kg
M3
Kg
3.530
1.140
0.003
0.100
65,000.00
1,434.00
131,500.00
2,032.00
Jumlah
6,253.56
8,111.88
935.42
603.20
199,810.00
1,896.32
457.62
235.71
218,303.72
Harga
Satuan
53,910.00
6,993.00
806.40
468.00
229,450.00
1,634.76
420.80
203.20
293,886.16
7,008.30
9,090.90
1,048.32
676.00
298,285.00
2,125.19
512.85
264.16
319,010.72
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
92,950.00
2,050.62
188,045.00
2,905.76
Jumlah
7,709.13
9,999.99
1,153.15
743.60
328,113.50
2,337.71
564.14
290.58
350,911.79
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
84,500.00
1,864.20
170,950.00
2,641.60
Jumlah
7,008.30
9,090.90
1,048.32
676.00
223,925.00
2,125.19
512.85
264.16
244,650.72
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
92,950.00
2,050.62
188,045.00
2,905.76
Jumlah
7,709.13
9,999.99
1,153.15
743.60
246,317.50
2,337.71
564.14
290.58
269,115.79
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
75,400.00
1,663.44
152,540.00
2,357.12
Jumlah
6,253.56
8,111.88
935.42
603.20
199,810.00
1,896.32
457.62
235.71
218,303.72
Harga
Satuan
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
84,500.00
1,864.20
170,950.00
2,641.60
Jumlah
7,008.30
9,090.90
1,048.32
676.00
223,925.00
2,125.19
512.85
264.16
244,650.72
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
92,950.00
2,050.62
188,045.00
2,905.76
Jumlah
7,709.13
9,999.99
1,153.15
743.60
246,317.50
2,337.71
564.14
290.58
269,115.79
Zona II
Jumlah
Harga
7,709.13
9,999.99
1,153.15
743.60
246,317.50
2,337.71
564.14
290.58
269,115.79
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
75,400.00
1,663.44
152,540.00
2,357.12
Jumlah
Zona I
Uraian
1.02
85,657.00
111,111.00
128,128.00
148,720.00
92,950.00
2,050.62
188,045.00
2,905.76
Jumlah
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
84,500.00
1,864.20
170,950.00
2,641.60
Jumlah
Zona II
Jumlah
Harga
Jumlah
Harga
Zona I
Uraian
6,253.56
8,111.88
935.42
603.20
266,162.00
1,896.32
457.62
235.71
284,655.72
Harga
Satuan
Zona II
Jumlah
Harga
7,008.30
9,090.90
1,048.32
676.00
223,925.00
2,125.19
512.85
264.16
244,650.72
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
75,400.00
1,663.44
152,540.00
2,357.12
Jumlah
Zona I
Uraian
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
84,500.00
1,864.20
170,950.00
2,641.60
Jumlah
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
6,253.56
8,111.88
935.42
603.20
199,810.00
1,896.32
457.62
235.71
218,303.72
Harga
Satuan
Zona I
Uraian
Zona III
Jumlah
Harga
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
75,400.00
1,663.44
152,540.00
2,357.12
Jumlah
Zona III
Jumlah
Harga
62,535.60
8,111.88
935.42
542.88
266,162.00
1,896.32
488.13
235.71
340,907.95
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
84,500.00
1,864.20
170,950.00
2,641.60
Jumlah
Zona IV
Jumlah
Harga
70,083.00
9,090.90
1,048.32
608.40
298,285.00
2,125.19
547.04
264.16
382,052.01
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
92,950.00
2,050.62
188,045.00
2,905.76
Jumlah
Jumlah
Harga
77,091.30
9,999.99
1,153.15
669.24
328,113.50
2,337.71
601.74
290.58
420,257.21
Halaman 83
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Harga
Satuan
Oh
Oh
Oh
Oh
0.360
0.180
0.018
0.018
59,900.00
77,700.00
89,600.00
104,000.00
M3
0.003
85,000.00
II. BAHAN
Bahan teraso cor
Zona II
Jumlah
Harga
Jumlah
21,564.00
13,986.00
1,612.80
1,872.00
272.00
39,306.80
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
98,600.00
Jumlah
Harga
Satuan
Oh
Oh
Oh
Oh
0.900
0.090
0.009
0.005
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Bahan teralux cor
M3
0.004
85,000.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
53,910.00
6,993.00
806.40
468.00
306.00
62,483.40
Harga
Satuan
Harga
Satuan
Oh
Oh
Oh
Oh
0.270
0.150
0.015
0.014
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Ubin tahan asam
Semen tahan asam
Pasir pasang
M2
Kg
M3
1.050
14.140
0.040
85,000.00
1,434.00
131,500.00
Jumlah
16,173.00
11,655.00
1,344.00
1,404.00
89,250.00
20,276.76
5,260.00
145,362.76
No
Satuan Indeks
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
II. BAHAN
Ubin keramik artistik 10 x 20
Semen portland
Pasir pasang
Semen warna
Oh
Oh
Oh
Oh
0.620
0.350
0.035
0.030
Bh
Kg
53.000
8.190
0.042
2.750
M3
Kg
85,000.00
1,434.00
131,500.00
2,032.00
Jumlah
37,138.00
27,195.00
3,136.00
3,120.00
4,505,000.00
11,744.46
5,523.00
5,588.00
4,598,444.46
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.090
0.090
0.009
0.005
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Plint keramik artistik 10 x 10
Semen portland
Pasir pasang
Semen warna
Bh
Kg
M3
Kg
53.000
8.190
0.042
2.750
85,000.00
1,434.00
131,500.00
2,032.00
Jumlah
315.52
45,595.89
110,500.00
Jumlah
353.60
51,098.84
121,550.00
Jumlah
388.96
56,208.72
Zona III
Harga
Satuan
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
110,500.00
Jumlah
70,083.00
9,090.90
1,048.32
608.40
397.80
81,228.42
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
121,550.00
Jumlah
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
98,600.00
1,663.44
152,540.00
Jumlah
77,091.30
9,999.99
1,153.15
669.24
437.58
89,351.26
18,760.68
13,519.80
1,559.04
1,628.64
103,530.00
23,521.04
6,101.60
168,620.80
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
110,500.00
1,864.20
170,950.00
Jumlah
Harga
Satuan
5,391.00
6,993.00
806.40
468.00
4,505,000.00
11,744.46
5,523.00
5,588.00
4,541,513.86
21,024.90
15,151.50
1,747.20
1,825.20
116,025.00
26,359.79
6,838.00
188,971.59
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
121,550.00
2,050.62
188,045.00
Jumlah
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
98,600.00
1,663.44
152,540.00
2,357.12
Jumlah
43,080.08
31,546.20
3,637.76
3,619.20
5,225,800.00
13,623.57
6,406.68
6,482.08
5,334,195.57
Harga
Satuan
23,127.39
16,666.65
1,921.92
2,007.72
127,627.50
28,995.77
7,521.80
207,868.75
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
110,500.00
1,864.20
170,950.00
2,641.60
Jumlah
48,279.40
35,353.50
4,076.80
4,056.00
5,856,500.00
15,267.80
7,179.90
7,264.40
5,977,977.80
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
121,550.00
2,050.62
188,045.00
2,905.76
Jumlah
53,107.34
38,888.85
4,484.48
4,461.60
6,442,150.00
16,794.58
7,897.89
7,990.84
6,575,775.58
Zona II
Jumlah
Harga
Zona IV
Jumlah
Harga
Zona I
Uraian
30,836.52
19,999.98
2,306.30
2,676.96
-
Zona II
Jumlah
Harga
59,900.00
77,700.00
89,600.00
104,000.00
85,657.00
111,111.00
128,128.00
148,720.00
-
62,535.60
8,111.88
935.42
542.88
354.96
72,480.74
Harga
Satuan
Zona I
Harga
Satuan
28,033.20
18,181.80
2,096.64
2,433.60
-
Zona II
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Jumlah
Harga
Jumlah
Harga
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
-
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
98,600.00
Jumlah
Zona I
Uraian
Zona IV
Jumlah
Harga
25,014.24
16,223.76
1,870.85
2,171.52
-
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Harga
Satuan
Zona I
Uraian
Zona III
Jumlah
Harga
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
98,600.00
1,663.44
152,540.00
2,357.12
Jumlah
Zona III
Jumlah
Harga
6,253.56
8,111.88
935.42
542.88
5,225,800.00
13,623.57
6,406.68
6,482.08
5,268,156.08
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
110,500.00
1,864.20
170,950.00
2,641.60
Jumlah
Zona IV
Jumlah
Harga
7,008.30
9,090.90
1,048.32
608.40
5,856,500.00
15,267.80
7,179.90
7,264.40
5,903,968.02
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
121,550.00
2,050.62
188,045.00
2,905.76
Jumlah
Jumlah
Harga
7,709.13
9,999.99
1,153.15
669.24
6,442,150.00
16,794.58
7,897.89
7,990.84
6,494,364.82
Halaman 84
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.090
0.090
0.009
0.005
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Plint keramik artistik 5 x 20 cm
Semen portland
Pasir pasang
Semen warna
Bh
Kg
M3
Kg
5.300
0.570
0.002
0.013
85,000.00
1,434.00
131,500.00
2,032.00
Jumlah
5,391.00
6,993.00
806.40
468.00
450,500.00
817.38
197.25
26.42
465,199.45
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
98,600.00
1,663.44
152,540.00
2,357.12
Jumlah
Harga
Satuan
Oh
Oh
Oh
Oh
0.750
0.450
0.045
0.038
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Internal cove artistik 5 x 5 x 2
Semen portland
Pasir pasang
Semen warna
Bh
Kg
M3
Kg
5.300
0.570
0.002
0.013
85,000.00
1,434.00
131,500.00
2,032.00
Jumlah
44,925.00
34,965.00
4,032.00
3,900.00
450,500.00
817.38
197.25
26.42
539,363.05
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Harga
Satuan
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.080
0.080
0.008
0.004
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Lt. vinyil karet 30 x 30 kwl l
Lem vinyil
Bh
Kg
5.300
0.570
55,000.00
36,400.00
Jumlah
4,792.00
6,216.00
716.80
416.00
291,500.00
20,748.00
324,388.80
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.620
0.350
0.035
0.030
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Ubin keramik artistik 10 x 20
Semen portland
Pasir pasang
Semen Warna
Bh
Kg
M3
Kg
53.000
8.190
0.042
2.750
55,000.00
1,434.00
131,500.00
2,032.00
Jumlah
37,138.00
27,195.00
3,136.00
3,120.00
2,915,000.00
11,744.46
5,523.00
5,588.00
3,008,444.46
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Harga
Satuan
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.620
0.350
0.035
0.030
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Ubin keramik 15 x 15 cm
Semen portland
Pasir pasang
Semen Warna
Bh
Kg
M3
Kg
44.000
11.380
0.042
1.500
55,000.00
1,434.00
131,500.00
2,032.00
Jumlah
5,558.72
7,210.56
831.49
482.56
338,140.00
24,067.68
376,291.01
Harga
Satuan
37,138.00
27,195.00
3,136.00
3,120.00
2,420,000.00
16,318.92
5,523.00
3,048.00
2,515,478.92
58,402.50
45,454.50
5,241.60
5,070.00
585,650.00
1,062.59
256.43
34.34
701,171.96
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
121,550.00
2,050.62
188,045.00
2,905.76
Jumlah
64,242.75
49,999.95
5,765.76
5,577.00
644,215.00
1,168.85
282.07
37.77
771,289.16
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
71,500.00
47,320.00
Jumlah
6,229.60
8,080.80
931.84
540.80
378,950.00
26,972.40
421,705.44
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
78,650.00
52,052.00
Jumlah
6,852.56
8,888.88
1,025.02
594.88
416,845.00
29,669.64
463,875.98
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
63,800.00
1,663.44
152,540.00
2,357.12
Jumlah
43,080.08
31,546.20
3,637.76
3,619.20
3,381,400.00
13,623.57
6,406.68
6,482.08
3,489,795.57
Harga
Satuan
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
71,500.00
1,864.20
170,950.00
2,641.60
Jumlah
48,279.40
35,353.50
4,076.80
4,056.00
3,789,500.00
15,267.80
7,179.90
7,264.40
3,910,977.80
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
78,650.00
2,050.62
188,045.00
2,905.76
Jumlah
53,107.34
38,888.85
4,484.48
4,461.60
4,168,450.00
16,794.58
7,897.89
7,990.84
4,302,075.58
Zona II
Jumlah
Harga
7,709.13
9,999.99
1,153.15
669.24
644,215.00
1,168.85
282.07
37.77
665,235.21
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
63,800.00
42,224.00
Jumlah
Zona I
Uraian
85,657.00
111,111.00
128,128.00
148,720.00
121,550.00
2,050.62
188,045.00
2,905.76
Jumlah
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
110,500.00
1,864.20
170,950.00
2,641.60
Jumlah
Zona II
Jumlah
Harga
Jumlah
Harga
Zona I
Uraian
52,113.00
40,559.40
4,677.12
4,524.00
522,580.00
948.16
228.81
30.64
625,661.13
Harga
Satuan
Zona II
Jumlah
Harga
7,008.30
9,090.90
1,048.32
608.40
585,650.00
1,062.59
256.43
34.34
604,759.28
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
98,600.00
1,663.44
152,540.00
2,357.12
Jumlah
Zona I
Uraian
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
110,500.00
1,864.20
170,950.00
2,641.60
Jumlah
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
6,253.56
8,111.88
935.42
542.88
522,580.00
948.16
228.81
30.64
539,631.36
Harga
Satuan
Zona I
Uraian
Zona III
Jumlah
Harga
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
63,800.00
1,663.44
152,540.00
2,357.12
Jumlah
Zona III
Jumlah
Harga
43,080.08
31,546.20
3,637.76
3,619.20
2,807,200.00
18,929.95
6,406.68
3,535.68
2,917,955.55
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
71,500.00
1,864.20
170,950.00
2,641.60
Jumlah
Zona IV
Jumlah
Harga
48,279.40
35,353.50
4,076.80
4,056.00
3,146,000.00
21,214.60
7,179.90
3,962.40
3,270,122.60
Harga
Satuan
1.02
85,657.00
111,111.00
128,128.00
148,720.00
78,650.00
2,050.62
188,045.00
2,905.76
Jumlah
Jumlah
Harga
53,107.34
38,888.85
4,484.48
4,461.60
3,460,600.00
23,336.06
7,897.89
4,358.64
3,597,134.86
Halaman 85
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.620
0.350
0.035
0.030
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Ubin keramik 20 x 20 cm
Semen portland
Pasir pasang
Semen Warna
Bh
Kg
M3
Kg
26.500
10.400
0.045
1.620
55,000.00
1,434.00
131,500.00
2,032.00
Jumlah
37,138.00
27,195.00
3,136.00
3,120.00
1,457,500.00
14,913.60
5,917.50
3,291.84
1,552,211.94
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
63,800.00
1,663.44
152,540.00
2,357.12
Jumlah
Harga
Satuan
Oh
Oh
Oh
Oh
0.620
0.350
0.035
0.030
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Ubin keramik 25 x 25 cm
Semen portland
Pasir pasang
Semen Warna
Bh
Kg
M3
Kg
16.000
11.380
0.042
1.500
65,000.00
1,434.00
131,500.00
2,032.00
Jumlah
37,138.00
27,195.00
3,136.00
3,120.00
1,040,000.00
16,318.92
5,523.00
3,048.00
1,135,478.92
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
II. BAHAN
Ubin keramik 15 x 20 cm
Semen portland
Pasir pasang
Semen Warna
Harga
Satuan
Oh
Oh
Oh
Oh
0.620
0.350
0.035
0.030
59,900.00
77,700.00
89,600.00
104,000.00
Bh
Kg
35.000
11.380
0.042
1.500
65,000.00
1,434.00
131,500.00
2,032.00
M3
Kg
Jumlah
37,138.00
27,195.00
3,136.00
3,120.00
2,275,000.00
16,318.92
5,523.00
3,048.00
2,370,478.92
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.620
0.350
0.035
0.030
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Ubin keramik 33 x 33 cm
Semen portland
Pasir pasang
Semen Warna
Bh
Kg
M3
Kg
10.000
8.190
0.045
1.620
85,000.00
1,434.00
131,500.00
2,032.00
Jumlah
37,138.00
27,195.00
3,136.00
3,120.00
850,000.00
11,744.46
5,917.50
3,291.84
941,542.80
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Harga
Satuan
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.620
0.350
0.035
0.030
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Ubin keramik 33 x 33 cm
Semen portland
Pasir pasang
Semen Warna
Bh
Kg
M3
Kg
10.000
8.190
0.045
1.620
85,000.00
1,434.00
131,500.00
2,032.00
Jumlah
43,080.08
31,546.20
3,637.76
3,619.20
2,639,000.00
18,929.95
6,406.68
3,535.68
2,749,755.55
Harga
Satuan
37,138.00
27,195.00
3,136.00
3,120.00
850,000.00
11,744.46
5,917.50
3,291.84
941,542.80
48,279.40
35,353.50
4,076.80
4,056.00
1,352,000.00
21,214.60
7,179.90
3,962.40
1,476,122.60
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
92,950.00
2,050.62
188,045.00
2,905.76
Jumlah
53,107.34
38,888.85
4,484.48
4,461.60
1,487,200.00
23,336.06
7,897.89
4,358.64
1,623,734.86
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
84,500.00
1,864.20
170,950.00
2,641.60
Jumlah
48,279.40
35,353.50
4,076.80
4,056.00
2,957,500.00
21,214.60
7,179.90
3,962.40
3,081,622.60
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
92,950.00
2,050.62
188,045.00
2,905.76
Jumlah
53,107.34
38,888.85
4,484.48
4,461.60
3,253,250.00
23,336.06
7,897.89
4,358.64
3,389,784.86
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
98,600.00
1,663.44
152,540.00
2,357.12
Jumlah
43,080.08
31,546.20
3,637.76
3,619.20
986,000.00
13,623.57
6,864.30
3,818.53
1,092,189.65
Harga
Satuan
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
110,500.00
1,864.20
170,950.00
2,641.60
Jumlah
48,279.40
35,353.50
4,076.80
4,056.00
1,105,000.00
15,267.80
7,692.75
4,279.39
1,224,005.64
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
121,550.00
2,050.62
188,045.00
2,905.76
Jumlah
53,107.34
38,888.85
4,484.48
4,461.60
1,215,500.00
16,794.58
8,462.03
4,707.33
1,346,406.20
Zona II
Jumlah
Harga
53,107.34
38,888.85
4,484.48
4,461.60
2,084,225.00
21,326.45
8,462.03
4,707.33
2,219,663.07
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
75,400.00
1,663.44
152,540.00
2,357.12
Jumlah
Zona I
Uraian
1.02
85,657.00
111,111.00
128,128.00
148,720.00
78,650.00
2,050.62
188,045.00
2,905.76
Jumlah
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
84,500.00
1,864.20
170,950.00
2,641.60
Jumlah
Zona II
Jumlah
Harga
Jumlah
Harga
Zona I
Uraian
43,080.08
31,546.20
3,637.76
3,619.20
1,206,400.00
18,929.95
6,406.68
3,535.68
1,317,155.55
Harga
Satuan
Zona II
Jumlah
Harga
48,279.40
35,353.50
4,076.80
4,056.00
1,894,750.00
19,387.68
7,692.75
4,279.39
2,017,875.52
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
75,400.00
1,663.44
152,540.00
2,357.12
Jumlah
Zona I
Uraian
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
71,500.00
1,864.20
170,950.00
2,641.60
Jumlah
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
43,080.08
31,546.20
3,637.76
3,619.20
1,690,700.00
17,299.78
6,864.30
3,818.53
1,800,565.85
Harga
Satuan
Zona I
Uraian
Zona III
Jumlah
Harga
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
98,600.00
1,663.44
152,540.00
2,357.12
Jumlah
Zona III
Jumlah
Harga
43,080.08
31,546.20
3,637.76
3,619.20
986,000.00
13,623.57
6,864.30
3,818.53
1,092,189.65
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
110,500.00
1,864.20
170,950.00
2,641.60
Jumlah
Zona IV
Jumlah
Harga
48,279.40
35,353.50
4,076.80
4,056.00
1,105,000.00
15,267.80
7,692.75
4,279.39
1,224,005.64
Harga
Satuan
1.02
85,657.00
111,111.00
128,128.00
148,720.00
121,550.00
2,050.62
188,045.00
2,905.76
Jumlah
Jumlah
Harga
53,107.34
38,888.85
4,484.48
4,461.60
1,215,500.00
16,794.58
8,462.03
4,707.33
1,346,406.20
Halaman 86
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.620
0.350
0.035
0.030
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Ubin keramik 10 x 33 cm
Semen portland
Pasir pasang
Semen Warna
Bh
Kg
M3
Kg
33.000
9.800
0.045
4.370
85,000.00
1,434.00
131,500.00
2,032.00
Jumlah
Harga
Satuan
43,080.08
31,546.20
3,637.76
3,619.20
3,253,800.00
16,301.71
6,864.30
10,300.61
1.02
77,870.00
101,010.00
116,480.00
135,200.00
110,500.00
1,864.20
170,950.00
2,641.60
48,279.40
35,353.50
4,076.80
4,056.00
3,646,500.00
18,269.16
7,692.75
11,543.79
2,904,439.54
Jumlah
3,369,149.87
Jumlah
3,775,771.40
No
Satuan Indeks
Zona II
Jumlah
Harga
Oh
Oh
Oh
Oh
0.620
0.350
0.035
0.030
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Ubin keramik 30 x 30 cm
Semen portland
Pasir pasang
Semen Warna
Bh
Kg
M3
Kg
11.870
14.150
0.039
2.000
85,000.00
1,434.00
131,500.00
2,032.00
Jumlah
37,138.00
27,195.00
3,136.00
3,120.00
1,008,950.00
20,291.10
5,128.50
4,064.00
1,109,022.60
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
II. BAHAN
Marmer
Semen portland
Pasir pasang
Semen Warna
Harga
Satuan
Oh
Oh
Oh
Oh
0.620
0.350
0.035
0.030
59,900.00
77,700.00
89,600.00
104,000.00
Bh
Kg
1.060
8.190
0.045
0.650
85,000.00
1,434.00
131,500.00
2,032.00
M3
Kg
Jumlah
37,138.00
27,195.00
3,136.00
3,120.00
90,100.00
11,744.46
5,917.50
1,320.80
179,671.76
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.170
0.170
0.017
0.009
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Feltex carpet 100% wool-T-21
Lem vinyil
M2
Kg
1.050
0.350
85,000.00
36,400.00
Jumlah
10,183.00
13,209.00
1,523.20
884.00
89,250.00
12,740.00
127,789.20
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Harga
Satuan
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.170
0.170
0.017
0.009
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Carpet 80% wool, 20% nylon
Lem vinyil
M2
Kg
1.050
0.350
150,000.00
36,400.00
Jumlah
43,080.08
31,546.20
3,637.76
3,619.20
104,516.00
13,623.57
6,864.30
1,532.13
208,419.24
Harga
Satuan
10,183.00
13,209.00
1,523.20
884.00
157,500.00
12,740.00
196,039.20
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
121,550.00
2,050.62
188,045.00
2,905.76
Jumlah
53,107.34
38,888.85
4,484.48
4,461.60
1,442,798.50
29,016.27
7,333.76
5,811.52
1,585,902.32
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
110,500.00
1,864.20
170,950.00
2,641.60
Jumlah
48,279.40
35,353.50
4,076.80
4,056.00
117,130.00
15,267.80
7,692.75
1,717.04
233,573.29
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
121,550.00
2,050.62
188,045.00
2,905.76
Jumlah
53,107.34
38,888.85
4,484.48
4,461.60
128,843.00
16,794.58
8,462.03
1,888.74
256,930.62
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
98,600.00
42,224.00
Jumlah
11,812.28
15,322.44
1,766.91
1,025.44
103,530.00
14,778.40
148,235.47
Harga
Satuan
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
110,500.00
47,320.00
Jumlah
13,237.90
17,171.70
1,980.16
1,149.20
116,025.00
16,562.00
166,125.96
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
121,550.00
52,052.00
Jumlah
14,561.69
18,888.87
2,178.18
1,264.12
127,627.50
18,218.20
182,738.56
Zona II
Jumlah
Harga
48,279.40
35,353.50
4,076.80
4,056.00
1,311,635.00
26,378.43
6,667.05
5,283.20
1,441,729.38
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
98,600.00
1,663.44
152,540.00
2,357.12
Jumlah
Zona I
Uraian
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
110,500.00
1,864.20
170,950.00
2,641.60
Jumlah
Zona II
Jumlah
Harga
53,107.34
38,888.85
4,484.48
4,461.60
4,011,150.00
20,096.08
8,462.03
12,698.17
4,153,348.54
Zona I
Uraian
43,080.08
31,546.20
3,637.76
3,619.20
1,170,382.00
23,537.68
5,949.06
4,714.24
1,286,466.22
Harga
Satuan
Zona II
Jumlah
Harga
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
121,550.00
2,050.62
188,045.00
2,905.76
Jumlah
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
98,600.00
1,663.44
152,540.00
2,357.12
Jumlah
Zona I
Uraian
Harga
Satuan
Zona I
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Zona IV
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
98,600.00
1,663.44
152,540.00
2,357.12
Harga
Satuan
Harga
Satuan
37,138.00
27,195.00
3,136.00
3,120.00
2,805,000.00
14,053.20
5,917.50
8,879.84
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Zona III
Jumlah
Harga
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
174,000.00
42,224.00
Jumlah
Zona III
Jumlah
Harga
11,812.28
15,322.44
1,766.91
1,025.44
182,700.00
14,778.40
227,405.47
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
195,000.00
47,320.00
Jumlah
Zona IV
Jumlah
Harga
13,237.90
17,171.70
1,980.16
1,149.20
204,750.00
16,562.00
254,850.96
Harga
Satuan
1.02
85,657.00
111,111.00
128,128.00
148,720.00
214,500.00
52,052.00
Jumlah
Jumlah
Harga
14,561.69
18,888.87
2,178.18
1,264.12
225,225.00
18,218.20
280,336.06
Halaman 87
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Zona II
Harga
Satuan
Jumlah
Harga
Oh
Oh
Oh
Oh
0.120
0.120
0.012
0.006
59,900.00
77,700.00
89,600.00
104,000.00
7,188.00
9,324.00
1,075.20
624.00
-
M2
Kg
1.050
0.350
150,000.00
36,400.00
157,500.00
12,740.00
II. BAHAN
Underlyer tebal 6 mm/rubber c
Lem
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
188,451.20
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
-
Jumlah
0.120
0.120
0.012
0.006
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Carpet
Lem vinyil
M2
Kg
1.050
0.350
150,000.00
36,400.00
7,188.00
9,324.00
1,075.20
624.00
157,500.00
12,740.00
188,451.20
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Harga
Satuan
Oh
Oh
Oh
Oh
0.650
0.350
0.035
0.033
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Parquet jati
Lem vinyil
M2
Kg
1.050
0.600
150,000.00
36,400.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
244,986.56
1.02
85,657.00
111,111.00
128,128.00
148,720.00
-
10,278.84
13,333.32
1,537.54
892.32
-
214,500.00
52,052.00
Jumlah
225,225.00
18,218.20
269,485.22
Harga
Satuan
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
195,000.00
47,320.00
Jumlah
9,344.40
12,121.20
1,397.76
811.20
204,750.00
16,562.00
244,986.56
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
214,500.00
52,052.00
Jumlah
10,278.84
13,333.32
1,537.54
892.32
225,225.00
18,218.20
269,485.22
Zona II
38,935.00
27,195.00
3,136.00
3,380.00
157,500.00
21,840.00
251,986.00
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
174,000.00
42,224.00
Jumlah
45,164.60
31,546.20
3,637.76
3,920.80
182,700.00
25,334.40
292,303.76
Harga
Satuan
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
195,000.00
47,320.00
Jumlah
50,615.50
35,353.50
4,076.80
4,394.00
204,750.00
28,392.00
327,581.80
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
214,500.00
52,052.00
Jumlah
55,677.05
38,888.85
4,484.48
4,833.40
225,225.00
31,231.20
360,339.98
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.650
0.350
0.035
0.033
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Gymfloor
Lem vinyil
M2
Kg
1.050
0.600
150,000.00
36,400.00
Jumlah
38,935.00
27,195.00
3,136.00
3,380.00
157,500.00
21,840.00
251,986.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Harga
Satuan
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.620
0.500
0.050
0.030
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Porselin 11 x 11 cm
Semen abu-abu
Pasir pasang
Semen Warna
Bh
Kg
M3
Kg
86.000
9.300
0.018
1.500
75,000.00
1,434.00
131,500.00
2,032.00
Jumlah
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
174,000.00
42,224.00
Jumlah
45,164.60
31,546.20
3,637.76
3,920.80
182,700.00
25,334.40
292,303.76
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
195,000.00
47,320.00
Jumlah
Zona II
Jumlah
Harga
37,138.00
38,850.00
4,480.00
3,120.00
6,450,000.00
13,336.20
2,367.00
3,048.00
6,552,339.20
Zona IV
Jumlah
Harga
50,615.50
35,353.50
4,076.80
4,394.00
204,750.00
28,392.00
327,581.80
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
214,500.00
52,052.00
Jumlah
55,677.05
38,888.85
4,484.48
4,833.40
225,225.00
31,231.20
360,339.98
Zona I
Uraian
8,338.08
10,815.84
1,247.23
723.84
182,700.00
14,778.40
218,603.39
Harga
Satuan
Zona I
Uraian
Jumlah
204,750.00
16,562.00
Jumlah
Harga
Jumlah
Harga
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
195,000.00
47,320.00
9,344.40
12,121.20
1,397.76
811.20
-
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
174,000.00
42,224.00
Jumlah
Zona I
Uraian
218,603.39
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
-
Zona II
Jumlah
Harga
Oh
Oh
Oh
Oh
182,700.00
14,778.40
Harga
Satuan
Harga
Satuan
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
8,338.08
10,815.84
1,247.23
723.84
-
174,000.00
42,224.00
Zona I
Uraian
Zona III
Jumlah
Harga
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
87,000.00
1,663.44
152,540.00
2,357.12
Jumlah
Zona III
Jumlah
Harga
43,080.08
45,066.00
5,196.80
3,619.20
7,482,000.00
15,469.99
2,745.72
3,535.68
7,600,713.47
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
97,500.00
1,864.20
170,950.00
2,641.60
Jumlah
Zona IV
Jumlah
Harga
48,279.40
50,505.00
5,824.00
4,056.00
8,385,000.00
17,337.06
3,077.10
3,962.40
8,518,040.96
Harga
Satuan
1.02
85,657.00
111,111.00
128,128.00
148,720.00
107,250.00
2,050.62
188,045.00
2,905.76
Jumlah
Jumlah
Harga
53,107.34
55,555.50
6,406.40
4,461.60
9,223,500.00
19,070.77
3,384.81
4,358.64
9,369,845.06
Halaman 88
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.620
0.500
0.050
0.030
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Porselin 11 x 11 cm
Semen abu-abu
Pasir pasang
Semen Warna
Bh
Kg
M3
Kg
86.000
9.300
0.018
1.500
75,000.00
1,434.00
131,500.00
2,032.00
Jumlah
37,138.00
38,850.00
4,480.00
3,120.00
6,450,000.00
13,336.20
2,367.00
3,048.00
6,552,339.20
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
87,000.00
1,663.44
152,540.00
2,357.12
Jumlah
Harga
Satuan
Oh
Oh
Oh
Oh
0.600
0.450
0.045
0.030
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Porselin 15 x 15 cm, putih
Semen abu-abu
Pasir pasang
Semen Warna
Bh
Kg
M3
Kg
45.000
9.300
0.018
1.500
75,000.00
1,434.00
131,500.00
2,032.00
Jumlah
35,940.00
34,965.00
4,032.00
3,120.00
3,375,000.00
13,336.20
2,367.00
3,048.00
3,471,808.20
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
II. BAHAN
Porselin 10 x 20 cm, warna
Semen abu-abu
Pasir pasang
Semen Warna
Harga
Satuan
Oh
Oh
Oh
Oh
0.600
0.450
0.045
0.030
59,900.00
77,700.00
89,600.00
104,000.00
Bh
Kg
53.000
9.300
0.018
2.750
75,000.00
1,434.00
131,500.00
2,032.00
M3
Kg
Jumlah
35,940.00
34,965.00
4,032.00
3,120.00
3,975,000.00
13,336.20
2,367.00
5,588.00
4,074,348.20
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.600
0.450
0.045
0.030
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Porselin 20 x 20 cm, warna
Semen abu-abu
Pasir pasang
Semen Warna
Bh
Kg
M3
Kg
26.500
9.300
0.018
1.940
75,000.00
1,434.00
131,500.00
2,032.00
Jumlah
35,940.00
34,965.00
4,032.00
3,120.00
1,987,500.00
13,336.20
2,367.00
3,942.08
2,085,202.28
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Harga
Satuan
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.600
0.450
0.045
0.030
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Keramik artistik 10 x 20 cm
Semen abu-abu
Pasir Pasang
Semen warna
Bh
Kg
M3
Kg
53.000
9.300
0.018
2.750
75,000.00
1,434.00
131,500.00
2,032.00
Jumlah
41,690.40
40,559.40
4,677.12
3,619.20
4,611,000.00
15,469.99
2,745.72
6,482.08
4,726,243.91
Harga
Satuan
35,940.00
34,965.00
4,032.00
3,120.00
3,975,000.00
13,336.20
2,367.00
5,588.00
4,074,348.20
46,722.00
45,454.50
5,241.60
4,056.00
4,387,500.00
17,337.06
3,077.10
3,962.40
4,513,350.66
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
107,250.00
2,050.62
188,045.00
2,905.76
Jumlah
51,394.20
49,999.95
5,765.76
4,461.60
4,826,250.00
19,070.77
3,384.81
4,358.64
4,964,685.73
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
97,500.00
1,864.20
170,950.00
2,641.60
Jumlah
46,722.00
45,454.50
5,241.60
4,056.00
5,167,500.00
17,337.06
3,077.10
7,264.40
5,296,652.66
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
107,250.00
2,050.62
188,045.00
2,905.76
Jumlah
51,394.20
49,999.95
5,765.76
4,461.60
5,684,250.00
19,070.77
3,384.81
7,990.84
5,826,317.93
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
87,000.00
1,663.44
152,540.00
2,357.12
Jumlah
41,690.40
40,559.40
4,677.12
3,619.20
2,305,500.00
15,469.99
2,745.72
4,572.81
2,418,834.64
Harga
Satuan
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
97,500.00
1,864.20
170,950.00
2,641.60
Jumlah
46,722.00
45,454.50
5,241.60
4,056.00
2,583,750.00
17,337.06
3,077.10
5,124.70
2,710,762.96
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
107,250.00
2,050.62
188,045.00
2,905.76
Jumlah
51,394.20
49,999.95
5,765.76
4,461.60
2,842,125.00
19,070.77
3,384.81
5,637.17
2,981,839.26
Zona II
Jumlah
Harga
53,107.34
55,555.50
6,406.40
4,461.60
9,223,500.00
19,070.77
3,384.81
4,358.64
9,369,845.06
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
87,000.00
1,663.44
152,540.00
2,357.12
Jumlah
Zona I
Uraian
1.02
85,657.00
111,111.00
128,128.00
148,720.00
107,250.00
2,050.62
188,045.00
2,905.76
Jumlah
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
97,500.00
1,864.20
170,950.00
2,641.60
Jumlah
Zona II
Jumlah
Harga
Jumlah
Harga
Zona I
Uraian
41,690.40
40,559.40
4,677.12
3,619.20
3,915,000.00
15,469.99
2,745.72
3,535.68
4,027,297.51
Harga
Satuan
Zona II
Jumlah
Harga
48,279.40
50,505.00
5,824.00
4,056.00
8,385,000.00
17,337.06
3,077.10
3,962.40
8,518,040.96
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
87,000.00
1,663.44
152,540.00
2,357.12
Jumlah
Zona I
Uraian
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
97,500.00
1,864.20
170,950.00
2,641.60
Jumlah
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
43,080.08
45,066.00
5,196.80
3,619.20
7,482,000.00
15,469.99
2,745.72
3,535.68
7,600,713.47
Harga
Satuan
Zona I
Uraian
Zona III
Jumlah
Harga
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
87,000.00
1,663.44
152,540.00
2,357.12
Jumlah
Zona III
Jumlah
Harga
41,690.40
40,559.40
4,677.12
3,619.20
4,611,000.00
15,469.99
2,745.72
6,482.08
4,726,243.91
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
97,500.00
1,864.20
170,950.00
2,641.60
Jumlah
Zona IV
Jumlah
Harga
46,722.00
45,454.50
5,241.60
4,056.00
5,167,500.00
17,337.06
3,077.10
7,264.40
5,296,652.66
Harga
Satuan
1.02
85,657.00
111,111.00
128,128.00
148,720.00
107,250.00
2,050.62
188,045.00
2,905.76
Jumlah
Jumlah
Harga
51,394.20
49,999.95
5,765.76
4,461.60
5,684,250.00
19,070.77
3,384.81
7,990.84
5,826,317.93
Halaman 89
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.600
0.450
0.045
0.030
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Keramik artistik 5 x 20 cm
Semen abu-abu
Pasir Pasang
Semen warna
Bh
Kg
M3
Kg
100.000
9.300
0.018
1.500
75,000.00
1,434.00
131,500.00
2,032.00
Jumlah
35,940.00
34,965.00
4,032.00
3,120.00
7,500,000.00
13,336.20
2,367.00
3,048.00
7,596,808.20
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
87,000.00
1,663.44
152,540.00
2,357.12
Jumlah
Harga
Satuan
Oh
Oh
Oh
Oh
0.600
0.450
0.045
0.030
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Keramik artistik 5 x 20 cm
Semen abu-abu
Pasir Pasang
Semen warna
Bh
Kg
M3
Kg
53.000
9.300
0.018
2.750
75,000.00
1,434.00
131,500.00
2,032.00
Jumlah
35,940.00
34,965.00
4,032.00
3,120.00
3,975,000.00
13,336.20
2,367.00
5,588.00
4,074,348.20
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
II. BAHAN
Keramik 15 x 15 cm
Semen abu-abu
Pasir Pasang
Semen warna
Harga
Satuan
Oh
Oh
Oh
Oh
0.600
0.450
0.045
0.030
59,900.00
77,700.00
89,600.00
104,000.00
Bh
Kg
45.000
9.300
0.018
1.500
75,000.00
1,434.00
131,500.00
2,032.00
M3
Kg
Jumlah
Harga
Satuan
0.600
0.450
0.045
0.030
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Keramik 20 x 20 cm
Semen abu-abu
Pasir Pasang
Semen warna
Bh
Kg
M3
Kg
56.500
9.300
0.018
1.940
75,000.00
1,434.00
131,500.00
2,032.00
Jumlah
4,027,297.51
Jumlah
4,513,350.66
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
97,500.00
1,864.20
170,950.00
2,641.60
46,722.00
45,454.50
5,241.60
4,056.00
5,508,750.00
17,337.06
3,077.10
5,124.70
4,335,202.28
Jumlah
5,028,834.64
Jumlah
5,635,762.96
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.600
0.450
0.045
0.030
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Keramik 10 x 20 cm
Semen abu-abu
Pasir Pasang
Semen warna
Bh
Kg
M3
Kg
53.000
9.300
0.018
2.750
75,000.00
1,434.00
131,500.00
2,032.00
Jumlah
35,940.00
34,965.00
4,032.00
3,120.00
3,975,000.00
13,336.20
2,367.00
5,588.00
4,074,348.20
1.02
85,657.00
111,111.00
128,128.00
148,720.00
107,250.00
2,050.62
188,045.00
2,905.76
Jumlah
51,394.20
49,999.95
5,765.76
4,461.60
4,826,250.00
19,070.77
3,384.81
4,358.64
4,964,685.73
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
107,250.00
2,050.62
188,045.00
2,905.76
Jumlah
51,394.20
49,999.95
5,765.76
4,461.60
6,059,625.00
19,070.77
3,384.81
5,637.17
6,199,339.26
Zona II
Jumlah
Harga
Jumlah
Harga
Zona IV
Jumlah
Harga
41,690.40
40,559.40
4,677.12
3,619.20
4,915,500.00
15,469.99
2,745.72
4,572.81
Zona I
Harga
Satuan
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
87,000.00
1,663.44
152,540.00
2,357.12
Satuan Indeks
51,394.20
49,999.95
5,765.76
4,461.60
5,684,250.00
19,070.77
3,384.81
7,990.84
5,826,317.93
Harga
Satuan
Zona III
Jumlah
Harga
35,940.00
34,965.00
4,032.00
3,120.00
4,237,500.00
13,336.20
2,367.00
3,942.08
No
1.02
85,657.00
111,111.00
128,128.00
148,720.00
107,250.00
2,050.62
188,045.00
2,905.76
Jumlah
Zona II
Jumlah
Harga
Zona IV
Jumlah
Harga
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Harga
Satuan
3,471,808.20
Zona I
Oh
Oh
Oh
Oh
51,394.20
49,999.95
5,765.76
4,461.60
10,725,000.00
19,070.77
3,384.81
4,358.64
10,863,435.73
Harga
Satuan
Zona III
Jumlah
Harga
46,722.00
45,454.50
5,241.60
4,056.00
4,387,500.00
17,337.06
3,077.10
3,962.40
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
107,250.00
2,050.62
188,045.00
2,905.76
Jumlah
1.02
77,870.00
101,010.00
116,480.00
135,200.00
97,500.00
1,864.20
170,950.00
2,641.60
Satuan Indeks
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
46,722.00
45,454.50
5,241.60
4,056.00
5,167,500.00
17,337.06
3,077.10
7,264.40
5,296,652.66
41,690.40
40,559.40
4,677.12
3,619.20
3,915,000.00
15,469.99
2,745.72
3,535.68
No
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
97,500.00
1,864.20
170,950.00
2,641.60
Jumlah
1.01
69,484.00
90,132.00
103,936.00
120,640.00
87,000.00
1,663.44
152,540.00
2,357.12
Jumlah
Harga
Zona IV
Jumlah
Harga
35,940.00
34,965.00
4,032.00
3,120.00
3,375,000.00
13,336.20
2,367.00
3,048.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
41,690.40
40,559.40
4,677.12
3,619.20
4,611,000.00
15,469.99
2,745.72
6,482.08
4,726,243.91
Harga
Satuan
Zona II
Jumlah
Harga
46,722.00
45,454.50
5,241.60
4,056.00
9,750,000.00
17,337.06
3,077.10
3,962.40
9,875,850.66
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
87,000.00
1,663.44
152,540.00
2,357.12
Jumlah
Zona I
Uraian
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
97,500.00
1,864.20
170,950.00
2,641.60
Jumlah
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
41,690.40
40,559.40
4,677.12
3,619.20
8,700,000.00
15,469.99
2,745.72
3,535.68
8,812,297.51
Harga
Satuan
Zona I
Uraian
Zona III
Jumlah
Harga
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
87,000.00
1,663.44
152,540.00
2,357.12
Jumlah
Zona III
Jumlah
Harga
41,690.40
40,559.40
4,677.12
3,619.20
4,611,000.00
15,469.99
2,745.72
6,482.08
4,726,243.91
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
97,500.00
1,864.20
170,950.00
2,641.60
Jumlah
Zona IV
Jumlah
Harga
46,722.00
45,454.50
5,241.60
4,056.00
5,167,500.00
17,337.06
3,077.10
7,264.40
5,296,652.66
Harga
Satuan
1.02
85,657.00
111,111.00
128,128.00
148,720.00
107,250.00
2,050.62
188,045.00
2,905.76
Jumlah
Jumlah
Harga
51,394.20
49,999.95
5,765.76
4,461.60
5,684,250.00
19,070.77
3,384.81
7,990.84
5,826,317.93
Halaman 90
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
II. BAHAN
Marmer
Pacu pancing 60 x 230
Semen abu-abu
Pasir Pasang
Semen warna
Harga
Satuan
Zona II
Jumlah
Harga
Oh
Oh
Oh
Oh
0.720
0.650
0.065
0.035
59,900.00
77,700.00
89,600.00
104,000.00
Bh
Kg
M3
Kg
1.020
2.000
12.440
0.025
0.650
125,000.00
75,000.00
1,434.00
131,500.00
2,032.00
Jumlah
Harga
Satuan
56,066.40
65,656.50
7,571.20
4,732.00
165,750.00
195,000.00
23,190.65
4,273.75
1,717.04
1.02
85,657.00
111,111.00
128,128.00
148,720.00
178,750.00
107,250.00
2,050.62
188,045.00
2,905.76
61,673.04
72,222.15
8,328.32
5,205.20
182,325.00
214,500.00
25,509.71
4,701.13
1,888.74
403,044.26
Jumlah
467,531.34
Jumlah
523,957.54
Jumlah
576,353.29
Zona I
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Bata pelapis dinding
Semen abu-abu
Semen Warna
Bh
Kg
Kg
63.000
12.440
2.750
1,500.00
1,434.00
2,032.00
M3
0.025
131,500.00
Pasir Pasang
Zona II
Jumlah
Harga
0.650
0.500
0.050
0.030
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
II. BAHAN
Batu paras
Semen abu-abu
Pasir Pasang
Harga
Satuan
0.620
0.350
0.035
0.030
59,900.00
77,700.00
89,600.00
104,000.00
M2
Kg
1.100
11.750
0.035
1,434.00
131,500.00
Jumlah
1.02
85,657.00
111,111.00
128,128.00
148,720.00
2,145.00
2,050.62
2,905.76
55,677.05
55,555.50
6,406.40
4,461.60
135,135.00
25,509.71
7,990.84
3,287.50
206,599.46
152,540.00
Jumlah
3,813.50
239,655.37
170,950.00
Jumlah
4,273.75
268,579.30
188,045.00
Jumlah
4,701.13
295,437.23
Zona II
37,138.00
27,195.00
3,136.00
3,120.00
16,849.50
4,602.50
92,041.00
Satuan Indeks
Harga
Satuan
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Batu tempel hitam
Semen abu-abu
Pasir Pasang
M2
Kg
M3
1.100
11.750
0.035
233,100.00
1,434.00
131,500.00
Jumlah
37,138.00
27,195.00
3,136.00
3,120.00
256,410.00
16,849.50
4,602.50
348,451.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.150
0.150
0.015
0.008
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Vinyl karet 30 x 30 cm KL I
Lem vinyil
Bh
Kg
11.870
0.350
85,000.00
36,400.00
Jumlah
1.02
77,870.00
101,010.00
116,480.00
135,200.00
1,864.20
170,950.00
Jumlah
Harga
Satuan
48,279.40
35,353.50
4,076.80
4,056.00
21,904.35
5,983.25
119,653.30
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
2,050.62
188,045.00
Jumlah
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
270,396.00
1,663.44
152,540.00
Jumlah
43,080.08
31,546.20
3,637.76
3,619.20
297,435.60
19,545.42
5,338.90
404,203.16
Harga
Satuan
53,107.34
38,888.85
4,484.48
4,461.60
24,094.79
6,581.58
131,618.63
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
303,030.00
1,864.20
170,950.00
Jumlah
48,279.40
35,353.50
4,076.80
4,056.00
333,333.00
21,904.35
5,983.25
452,986.30
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
333,333.00
2,050.62
188,045.00
Jumlah
53,107.34
38,888.85
4,484.48
4,461.60
366,666.30
24,094.79
6,581.58
498,284.93
Zona II
Jumlah
Harga
Zona IV
Jumlah
Harga
Zona I
Uraian
43,080.08
31,546.20
3,637.76
3,619.20
19,545.42
5,338.90
106,767.56
Harga
Satuan
Zona II
Jumlah
Harga
0.620
0.350
0.035
0.030
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
1,663.44
152,540.00
Jumlah
Zona I
Oh
Oh
Oh
Oh
Jumlah
Harga
50,615.50
50,505.00
5,824.00
4,056.00
122,850.00
23,190.65
7,264.40
No
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
1,950.00
1,864.20
2,641.60
Harga
Satuan
Zona IV
Jumlah
Harga
45,164.60
45,066.00
5,196.80
3,619.20
109,620.00
20,693.19
6,482.08
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
1,740.00
1,663.44
2,357.12
Jumlah
Harga
Oh
Oh
Oh
Oh
Zona III
Jumlah
Harga
38,935.00
38,850.00
4,480.00
3,120.00
94,500.00
17,838.96
5,588.00
Zona I
Uraian
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
162,500.00
97,500.00
1,864.20
170,950.00
2,641.60
Satuan Indeks
Oh
Oh
Oh
Oh
Harga
Satuan
50,028.48
58,585.80
6,755.84
4,222.40
147,900.00
174,000.00
20,693.19
3,813.50
1,532.13
No
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Zona IV
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
145,000.00
87,000.00
1,663.44
152,540.00
2,357.12
Harga
Satuan
Harga
Satuan
43,128.00
50,505.00
5,824.00
3,640.00
127,500.00
150,000.00
17,838.96
3,287.50
1,320.80
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Zona III
Jumlah
Harga
Harga
Satuan
Zona III
Jumlah
Harga
Harga
Satuan
Zona IV
Jumlah
Harga
8,985.00
11,655.00
1,344.00
780.00
1,008,950.00
12,740.00
1.01
69,484.00
90,132.00
103,936.00
120,640.00
98,600.00
42,224.00
10,422.60
13,519.80
1,559.04
904.80
1,170,382.00
14,778.40
1.02
77,870.00
101,010.00
116,480.00
135,200.00
110,500.00
47,320.00
11,680.50
15,151.50
1,747.20
1,014.00
1,311,635.00
16,562.00
1,044,454.00
Jumlah
1,211,566.64
Jumlah
1,357,790.20
Harga
Satuan
1.02
85,657.00
111,111.00
128,128.00
148,720.00
121,550.00
52,052.00
Jumlah
Jumlah
Harga
12,848.55
16,666.65
1,921.92
1,115.40
1,442,798.50
18,218.20
1,493,569.22
Halaman 91
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.150
0.150
0.015
0.008
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Vinyl karet 30 x 30 cm KL II
Lem vinyil
Bh
Kg
11.870
0.350
85,000.00
85,000.00
Jumlah
8,985.00
11,655.00
1,344.00
780.00
1,008,950.00
29,750.00
1,061,464.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
98,600.00
98,600.00
Jumlah
Harga
Satuan
Oh
Oh
Oh
Oh
0.150
0.150
0.015
0.008
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Vinyl asbes 30 x 30 cm
Lem vinyil
Bh
Kg
11.870
0.350
85,000.00
36,400.00
Jumlah
Harga
Satuan
11,680.50
15,151.50
1,747.20
1,014.00
1,311,635.00
16,562.00
1,044,454.00
Jumlah
1,211,566.64
Jumlah
1,357,790.20
Oh
Oh
Oh
Oh
0.150
0.150
0.015
0.008
59,900.00
77,700.00
89,600.00
104,000.00
Zona II
II. BAHAN
Vinyl motif kembang ex DN
Lem vinyil
Bh
Kg
11.870
0.350
85,000.00
36,400.00
Jumlah
8,985.00
11,655.00
1,344.00
780.00
1,008,950.00
12,740.00
1,044,454.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Harga
Satuan
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.750
0.170
0.017
0.004
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Vinyl wall covering, lebar 50 c
Lem vinyil
M2
Kg
2.200
0.250
85,000.00
36,400.00
Jumlah
44,925.00
13,209.00
1,523.20
416.00
187,000.00
9,100.00
256,173.20
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.120
0.120
0.012
0.006
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Floor Hardener ferrovax
Kg
5.000
85,000.00
Jumlah
7,188.00
9,324.00
1,075.20
624.00
425,000.00
443,211.20
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Harga
Satuan
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.120
0.120
0.012
0.006
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Mastercron "S"
Kg
5.000
75,000.00
52,113.00
15,322.44
1,766.91
482.56
216,920.00
10,556.00
297,160.91
Harga
Satuan
7,188.00
9,324.00
1,075.20
624.00
375,000.00
-
11,680.50
15,151.50
1,747.20
1,014.00
1,311,635.00
16,562.00
1,357,790.20
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
121,550.00
52,052.00
Jumlah
12,848.55
16,666.65
1,921.92
1,115.40
1,442,798.50
18,218.20
1,493,569.22
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
110,500.00
47,320.00
Jumlah
58,402.50
17,171.70
1,980.16
540.80
243,100.00
11,830.00
333,025.16
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
121,550.00
52,052.00
Jumlah
64,242.75
18,888.87
2,178.18
594.88
267,410.00
13,013.00
366,327.68
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
98,600.00
Jumlah
8,338.08
10,815.84
1,247.23
723.84
493,000.00
514,124.99
Harga
Satuan
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
110,500.00
Jumlah
9,344.40
12,121.20
1,397.76
811.20
552,500.00
576,174.56
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
121,550.00
Jumlah
10,278.84
13,333.32
1,537.54
892.32
607,750.00
633,792.02
Zona II
Jumlah
Harga
12,848.55
16,666.65
1,921.92
1,115.40
1,442,798.50
18,218.20
1,493,569.22
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
98,600.00
42,224.00
Jumlah
Zona I
Uraian
1.02
85,657.00
111,111.00
128,128.00
148,720.00
121,550.00
52,052.00
Jumlah
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
110,500.00
47,320.00
Jumlah
Zona II
Jumlah
Harga
Jumlah
Harga
Zona I
Uraian
10,422.60
13,519.80
1,559.04
904.80
1,170,382.00
14,778.40
1,211,566.64
Harga
Satuan
Zona II
Jumlah
Harga
12,848.55
16,666.65
1,921.92
1,115.40
1,442,798.50
42,542.50
1,517,893.52
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
98,600.00
42,224.00
Jumlah
Zona I
Uraian
1.02
85,657.00
111,111.00
128,128.00
148,720.00
121,550.00
121,550.00
Jumlah
Zona I
Jumlah
Harga
Jumlah
Harga
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
110,500.00
47,320.00
Satuan Indeks
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Harga
Satuan
10,422.60
13,519.80
1,559.04
904.80
1,170,382.00
14,778.40
No
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
98,600.00
42,224.00
Harga
Satuan
11,680.50
15,151.50
1,747.20
1,014.00
1,311,635.00
38,675.00
1,379,903.20
8,985.00
11,655.00
1,344.00
780.00
1,008,950.00
12,740.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
110,500.00
110,500.00
Jumlah
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
10,422.60
13,519.80
1,559.04
904.80
1,170,382.00
34,510.00
1,231,298.24
Harga
Satuan
Zona I
Uraian
Zona III
Jumlah
Harga
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
87,000.00
-
Zona III
Jumlah
Harga
8,338.08
10,815.84
1,247.23
723.84
435,000.00
-
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
97,500.00
-
Zona IV
Jumlah
Harga
9,344.40
12,121.20
1,397.76
811.20
487,500.00
-
Harga
Satuan
1.02
85,657.00
111,111.00
128,128.00
148,720.00
107,250.00
-
Jumlah
Harga
10,278.84
13,333.32
1,537.54
892.32
536,250.00
-
Halaman 92
393,211.20
Jumlah
456,124.99
Jumlah
511,174.56
Jumlah
562,292.02
Halaman 93
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang batu
Kepala Tukang
Mandor
Harga
Satuan
Zona II
Jumlah
Harga
Zona III
Jumlah
Harga
Harga
Satuan
Zona IV
Jumlah
Harga
Harga
Satuan
Jumlah
Harga
Oh
Oh
Oh
Oh
0.120
0.120
0.012
0.006
59,900.00
77,700.00
89,600.00
104,000.00
7,188.00
9,324.00
1,075.20
624.00
-
1.01
69,484.00
90,132.00
103,936.00
120,640.00
-
8,338.08
10,815.84
1,247.23
723.84
-
1.02
77,870.00
101,010.00
116,480.00
135,200.00
-
9,344.40
12,121.20
1,397.76
811.20
-
1.02
85,657.00
111,111.00
128,128.00
148,720.00
-
10,278.84
13,333.32
1,537.54
892.32
-
M3
Bh
0.003
0.050
2,509,900.00
500.00
7,529.70
25.00
25,765.90
2,911,484.00
580.00
Jumlah
8,734.45
29.00
29,888.44
3,262,870.00
650.00
Jumlah
9,788.61
32.50
33,495.67
3,589,157.00
715.00
Jumlah
10,767.47
35.75
36,845.24
II. BAHAN
Kayu jati papan
Paku skrup 3,5"
Harga
Satuan
Jumlah
XIV. PEKERJAAN PENGECATAN
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Mandor
Oh
Oh
0.150
0.003
59,900.00
104,000.00
II. BAHAN
Soda api
Kg
0.050
10,400.00
Jumlah
8,985.00
260.00
520.00
9,765.00
Harga
Satuan
1.01
69,484.00
120,640.00
12,064.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
Oh
Oh
0.150
0.003
59,900.00
104,000.00
II. BAHAN
Sabun
Kg
0.050
18,600.00
Jumlah
10,422.60
301.60
603.20
11,327.40
8,985.00
260.00
930.00
10,175.00
Harga
Satuan
1.01
69,484.00
120,640.00
21,576.00
Jumlah
10,422.60
301.60
1,078.80
11,803.00
No
Satuan Indeks
Zona I
Oh
Oh
0.150
0.003
59,900.00
104,000.00
II. BAHAN
Sabun
Kg
0.050
18,600.00
Jumlah
8,985.00
260.00
930.00
10,175.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Harga
Satuan
I. UPAH
Pekerja
Tukang Cat
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.070
0.075
0.008
0.003
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Plamir
Cat Dasar
Cat Penutup
Kg
Kg
Kg
0.150
0.170
0.170
40,600.00
39,900.00
35,000.00
Jumlah
4,193.00
5,827.50
672.00
260.00
6,090.00
6,783.00
5,950.00
29,775.50
10,422.60
301.60
1,078.80
11,803.00
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
47,096.00
46,284.00
40,600.00
Jumlah
4,863.88
6,759.90
779.52
301.60
7,064.40
7,868.28
6,902.00
34,539.58
No
Satuan Indeks
Zona I
I. UPAH
Pekerja
Tukang Cat
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.070
0.009
0.006
0.003
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Cat meni
Plamir
Cat Dasar
Cat Penutup 2 kali
Kg
Kg
Kg
Kg
0.200
0.150
0.170
0.260
29,900.00
40,600.00
39,900.00
35,000.00
Jumlah
Harga
Satuan
4,193.00
699.30
537.60
260.00
5,980.00
6,090.00
6,783.00
9,100.00
33,642.90
11,680.50
338.00
1,209.00
13,227.50
Jumlah
Harga
1.02
85,657.00
148,720.00
26,598.00
Jumlah
12,848.55
371.80
1,329.90
14,550.25
Zona IV
Jumlah
Harga
1.02
77,870.00
135,200.00
24,180.00
Jumlah
Harga
Satuan
11,680.50
338.00
1,209.00
13,227.50
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
148,720.00
26,598.00
Jumlah
12,848.55
371.80
1,329.90
14,550.25
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
34,684.00
47,096.00
46,284.00
40,600.00
Jumlah
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
52,780.00
51,870.00
45,500.00
Jumlah
Zona II
Jumlah
Harga
12,848.55
371.80
743.60
13,963.95
Harga
Satuan
Zona III
Jumlah
Harga
: Pengecatan Bidang Kayu Baru (1 Lapis Plamir), 1 Lapis Cat Dasar, 2 Lapis Cat Penutup (SNI.Rev.2002)
:
: M2
: Harian
Harga
Satuan
1.02
85,657.00
148,720.00
14,872.00
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Jumlah
Harga
Zona IV
Jumlah
Harga
1.02
77,870.00
135,200.00
24,180.00
Jumlah
Zona II
Jumlah
Harga
11,680.50
338.00
676.00
12,694.50
Zona III
Jumlah
Harga
1.01
69,484.00
120,640.00
21,576.00
Jumlah
Zona I
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Mandor
1.02
77,870.00
135,200.00
13,520.00
Jumlah
Harga
Satuan
Zona III
Jumlah
Harga
: Mengerok Karat Cat Lama Permukaan Baja Dengan Cara Manual (SNI.Rev.2002)
:
: M2
: Harian
Harga
Satuan
Zona IV
Jumlah
Harga
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Mandor
Zona III
Jumlah
Harga
5,450.90
7,575.75
873.60
338.00
7,917.00
8,817.90
7,735.00
38,708.15
Harga
Satuan
1.02
85,657.00
111,111.00
128,128.00
148,720.00
58,058.00
57,057.00
50,050.00
Jumlah
Zona III
Jumlah
Harga
4,863.88
811.19
623.62
301.60
6,936.80
7,064.40
7,868.28
10,556.00
39,025.76
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
38,870.00
52,780.00
51,870.00
45,500.00
Jumlah
Jumlah
Harga
5,995.99
8,333.33
960.96
371.80
8,708.70
9,699.69
8,508.50
42,578.97
Zona IV
Jumlah
Harga
5,450.90
909.09
698.88
338.00
7,774.00
7,917.00
8,817.90
11,830.00
43,735.77
Harga
Satuan
1.02
85,657.00
111,111.00
128,128.00
148,720.00
42,757.00
58,058.00
57,057.00
50,050.00
Jumlah
Jumlah
Harga
5,995.99
1,000.00
768.77
371.80
8,551.40
8,708.70
9,699.69
13,013.00
48,109.35
Halaman 94
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
: Pengecatan Bidang Kayu Baru (1 Lapis Plamir), 1 Lapis Cat Dasar, Lapis Cat Penutup (SNI.Rev.2002)
:
: M2
: Harian
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Cat
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.070
0.009
0.006
0.003
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Cat meni
Plamir
Cat Dasar
Cat Penutup 3 kali
Kg
Kg
Kg
Kg
0.200
0.150
0.170
0.350
29,900.00
40,600.00
39,900.00
35,000.00
Jumlah
4,193.00
699.30
537.60
260.00
5,980.00
6,090.00
6,783.00
12,250.00
36,792.90
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
34,684.00
47,096.00
46,284.00
40,600.00
Jumlah
4,863.88
811.19
623.62
301.60
6,936.80
7,064.40
7,868.28
14,210.00
42,679.76
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
: Pengecatan Bidang Kayu Baru (1 Lapis Plamir), 1 Lapis Cat Dasar, Lapis Cat Penutup (SNI.Rev.2002)
:
: M2
: Harian
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
Oh
Oh
Oh
Oh
0.070
0.009
0.006
0.003
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Cat meni
Plamir
Cat Dasar
Cat Penutup 3 kali
Kg
Kg
Kg
Kg
0.200
0.150
0.170
0.350
29,900.00
40,600.00
39,900.00
35,000.00
Jumlah
4,193.00
699.30
537.60
260.00
5,980.00
6,090.00
6,783.00
12,250.00
36,792.90
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Harga
Satuan
Oh
Oh
Oh
Oh
0.040
0.063
0.063
0.003
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Tear oil
Ltr
0.360
38,300.00
Jumlah
2,396.00
4,895.10
5,644.80
260.00
13,788.00
26,983.90
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Harga
Satuan
I. UPAH
Tukang Cat
Kepala Tukang
Mandor
Oh
Oh
Oh
0.060
0.016
0.003
77,700.00
89,600.00
104,000.00
II. BAHAN
Politur
Politur jadi
Ampelas
Ltr
Ltr
Lbr
0.150
0.372
2.000
48,600.00
50,000.00
8,900.00
Jumlah
4,662.00
1,433.60
260.00
7,290.00
18,600.00
17,800.00
50,045.60
Harga
Satuan
No
Satuan Indeks
Zona I
I. UPAH
Pekerja
Mandor
Oh
Oh
0.100
0.006
59,900.00
104,000.00
II. BAHAN
Residu Atau Ter
Ltr
0.350
51,800.00
Jumlah
5,990.00
624.00
18,130.00
24,744.00
5,995.99
1,000.00
768.77
371.80
8,551.40
8,708.70
9,699.69
17,517.50
52,613.85
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
49,790.00
Jumlah
5,407.92
1,662.98
301.60
8,456.40
21,576.00
20,648.00
58,052.90
Harga
Satuan
3,114.80
6,363.63
7,338.24
338.00
17,924.40
35,079.07
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
54,769.00
Jumlah
3,426.28
6,999.99
8,072.06
371.80
19,716.84
38,586.98
Zona IV
Jumlah
Harga
1.02
101,010.00
116,480.00
135,200.00
63,180.00
65,000.00
11,570.00
Jumlah
6,060.60
1,863.68
338.00
9,477.00
24,180.00
23,140.00
65,059.28
Harga
Satuan
Jumlah
Harga
1.02
111,111.00
128,128.00
148,720.00
69,498.00
71,500.00
12,727.00
Jumlah
6,666.66
2,050.05
371.80
10,424.70
26,598.00
25,454.00
71,565.21
Zona II
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
42,757.00
58,058.00
57,057.00
50,050.00
Jumlah
Zona III
Jumlah
Harga
1.01
90,132.00
103,936.00
120,640.00
56,376.00
58,000.00
10,324.00
Jumlah
Harga
Satuan
5,450.90
909.09
698.88
338.00
7,774.00
7,917.00
8,817.90
15,925.00
47,830.77
Jumlah
Harga
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
2,779.36
5,678.32
6,547.97
301.60
15,994.08
31,301.32
Harga
Satuan
Zona II
Jumlah
Harga
5,995.99
1,000.00
768.77
371.80
8,551.40
8,708.70
9,699.69
17,517.50
52,613.85
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
44,428.00
Jumlah
Zona I
Uraian
1.02
85,657.00
111,111.00
128,128.00
148,720.00
42,757.00
58,058.00
57,057.00
50,050.00
Jumlah
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
38,870.00
52,780.00
51,870.00
45,500.00
Jumlah
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Cat
Kepala Tukang
Mandor
4,863.88
811.19
623.62
301.60
6,936.80
7,064.40
7,868.28
14,210.00
42,679.76
Harga
Satuan
Jumlah
Harga
Zona I
Uraian
5,450.90
909.09
698.88
338.00
7,774.00
7,917.00
8,817.90
15,925.00
47,830.77
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
34,684.00
47,096.00
46,284.00
40,600.00
Jumlah
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
38,870.00
52,780.00
51,870.00
45,500.00
Jumlah
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Cat
Kepala Tukang
Mandor
Harga
Satuan
Harga
Satuan
1.01
69,484.00
120,640.00
60,088.00
Jumlah
Zona III
Jumlah
Harga
6,948.40
723.84
21,030.80
28,703.04
Harga
Satuan
1.02
77,870.00
135,200.00
67,340.00
Jumlah
Zona IV
Jumlah
Harga
7,787.00
811.20
23,569.00
32,167.20
Harga
Satuan
1.02
85,657.00
148,720.00
74,074.00
Jumlah
Jumlah
Harga
8,565.70
892.32
25,925.90
35,383.92
Halaman 95
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Cat
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.160
0.160
0.016
0.003
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Vernis
Dempul
Ampelas
Kuas
Ltr
Kg
Lbr
Bh
0.150
0.050
0.100
0.010
32,300.00
40,600.00
8,900.00
25,200.00
Jumlah
Harga
Satuan
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
37,468.00
47,096.00
10,324.00
29,232.00
11,117.44
14,421.12
1,662.98
301.60
5,620.20
2,354.80
1,032.40
292.32
1.02
77,870.00
101,010.00
116,480.00
135,200.00
41,990.00
52,780.00
11,570.00
32,760.00
12,459.20
16,161.60
1,863.68
338.00
6,298.50
2,639.00
1,157.00
327.60
31,726.60
Jumlah
36,802.86
Jumlah
41,244.58
: Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup) (SNI.Rev.2002)
:
: M2
: Harian
No
Satuan Indeks
Zona I
Harga
Satuan
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Cat
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.020
0.063
0.006
0.003
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Plamir
Cat Dasar
Cat Penutup 2 x
Kg
Kg
Kg
0.100
0.100
0.260
40,600.00
39,900.00
35,000.00
Jumlah
1,198.00
4,895.10
564.48
260.00
4,060.00
3,990.00
9,100.00
24,067.58
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
47,096.00
46,284.00
40,600.00
Jumlah
1,389.68
5,678.32
654.80
301.60
4,709.60
4,628.40
10,556.00
27,918.39
: Pengecatan Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Penutup (SNI.Rev.2002)
:
: M2
: Harian
No
Satuan Indeks
Zona I
Harga
Satuan
I. UPAH
Pekerja
Tukang Cat
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.028
0.042
0.004
0.003
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Cat Dasar
Cat Penutup 2 x
Kg
Kg
0.120
0.180
39,900.00
35,000.00
Jumlah
1,677.20
3,263.40
376.32
260.00
4,788.00
6,300.00
16,664.92
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Harga
Satuan
Harga
Satuan
Oh
Oh
Oh
Oh
0.028
0.042
0.004
0.003
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Kalkarium
Kg
0.100
55,000.00
Jumlah
1,677.20
3,263.40
376.32
260.00
5,500.00
11,076.92
Harga
Satuan
No
Satuan Indeks
Zona I
I. UPAH
Pekerja
Tukang Cat
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.150
0.001
0.000
0.003
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Ampelas
Alang-alang
Perancah kayu
Kapur sirih
Lbr
Ikat
M3
Kg
0.100
0.250
0.002
0.150
8,900.00
25,000.00
1,900,000.00
25,000.00
Jumlah
1,945.55
3,785.54
436.53
301.60
6,380.00
12,849.23
Harga
Satuan
8,985.00
77.70
8.96
260.00
890.00
6,250.00
3,800.00
3,750.00
24,021.66
1,713.14
6,999.99
807.21
371.80
5,805.80
5,705.70
13,013.00
34,416.64
Zona IV
2,180.36
4,242.42
489.22
338.00
6,224.40
8,190.00
21,664.40
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
57,057.00
50,050.00
Jumlah
2,398.40
4,666.66
538.14
371.80
6,846.84
9,009.00
23,830.84
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
71,500.00
Jumlah
2,180.36
4,242.42
489.22
338.00
7,150.00
14,400.00
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
78,650.00
Jumlah
2,398.40
4,666.66
538.14
371.80
7,865.00
15,840.00
Zona II
Jumlah
Harga
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
58,058.00
57,057.00
50,050.00
Jumlah
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
63,800.00
Jumlah
Harga
Satuan
Harga
Satuan
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
1,557.40
6,363.63
733.82
338.00
5,278.00
5,187.00
11,830.00
31,287.85
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
51,870.00
45,500.00
Jumlah
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Cat
Kepala Tukang
Mandor
1,945.55
3,785.54
436.53
301.60
5,554.08
7,308.00
19,331.31
Harga
Satuan
13,705.12
17,777.76
2,050.05
371.80
6,928.35
2,902.90
1,272.70
360.36
45,369.04
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
52,780.00
51,870.00
45,500.00
Jumlah
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
46,189.00
58,058.00
12,727.00
36,036.00
Jumlah
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
46,284.00
40,600.00
Jumlah
Zona I
Uraian
Harga
Satuan
Zona II
Jumlah
Harga
Harga
Satuan
Zona III
Jumlah
Harga
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Zona IV
Jumlah
Harga
9,584.00
12,432.00
1,433.60
260.00
4,845.00
2,030.00
890.00
252.00
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Harga
Satuan
Harga
Satuan
1.01
69,484.00
90,132.00
103,936.00
120,640.00
10,324.00
29,000.00
2,204,000.00
29,000.00
Jumlah
Zona III
Jumlah
Harga
10,422.60
90.13
10.39
301.60
1,032.40
7,250.00
4,408.00
4,350.00
27,865.13
Harga
Satuan
1.02
77,870.00
101,010.00
116,480.00
135,200.00
11,570.00
32,500.00
2,470,000.00
32,500.00
Jumlah
Zona IV
Jumlah
Harga
11,680.50
101.01
11.65
338.00
1,157.00
8,125.00
4,940.00
4,875.00
31,228.16
Harga
Satuan
1.02
85,657.00
111,111.00
128,128.00
148,720.00
12,727.00
35,750.00
2,717,000.00
35,750.00
Jumlah
Jumlah
Harga
12,848.55
111.11
12.81
371.80
1,272.70
8,937.50
5,434.00
5,362.50
34,350.97
Halaman 96
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
Zona I
Uraian
I. UPAH
Pekerja
Tukang Cat
Kepala Tukang
Mandor
Harga
Satuan
Perancah kayu
Kapur sirih
Zona II
Jumlah
Harga
Oh
Oh
Oh
Oh
0.040
0.005
0.001
0.003
59,900.00
77,700.00
89,600.00
104,000.00
2,396.00
388.50
44.80
260.00
-
M3
Kg
0.002
0.300
1,900,000.00
25,000.00
3,800.00
7,500.00
II. BAHAN
Jumlah
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
No
Satuan Indeks
14,389.30
Harga
Satuan
Harga
Satuan
Oh
Oh
Oh
Oh
0.020
0.200
0.002
0.003
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Wallpaper
Perekat
M3
Kg
1.200
0.200
64,500.00
36,400.00
Jumlah
2,204,000.00
29,000.00
1,198.00
15,540.00
179.20
260.00
77,400.00
7,280.00
101,857.20
No
Satuan Indeks
Jumlah
Oh
Oh
Oh
Oh
0.020
0.200
0.020
0.010
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Meni besi
Kuas
Kg
Bh
0.100
0.010
43,500.00
25,200.00
Jumlah
1.01
69,484.00
90,132.00
103,936.00
120,640.00
74,820.00
42,224.00
Jumlah
1,389.68
18,026.40
207.87
301.60
89,784.00
8,444.80
118,154.35
1,198.00
15,540.00
1,792.00
1,040.00
4,350.00
252.00
24,172.00
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
50,460.00
29,232.00
Jumlah
Satuan Indeks
Zona I
II. BAHAN
Meni besi
Kuas
Perancah kayu
0.250
0.225
0.023
0.008
59,900.00
77,700.00
89,600.00
104,000.00
Kg
Bh
0.100
0.010
0.002
43,500.00
25,200.00
M3
Jumlah
Harga
Satuan
14,975.00
17,482.50
2,016.00
780.00
4,350.00
252.00
39,855.50
1,557.40
20,202.00
232.96
338.00
100,620.00
9,464.00
132,414.36
1,389.68
18,026.40
2,078.72
1,206.40
5,046.00
292.32
28,039.52
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
56,550.00
32,760.00
Jumlah
Harga
Satuan
Jumlah
17,371.00
20,279.70
2,338.56
904.80
5,046.00
292.32
46,232.38
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
56,550.00
32,760.00
Jumlah
19,467.50
22,727.25
2,620.80
1,014.00
5,655.00
327.60
51,812.15
Satuan Indeks
Zona I
Oh
Oh
Oh
Oh
0.006
0.060
0.012
0.006
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Cat
Kg
0.300
39,900.00
Jumlah
Zona II
Jumlah
Harga
359.40
4,662.00
1,075.20
624.00
11,970.00
18,690.60
Harga
Satuan
Jumlah
Harga
1.02
85,657.00
111,111.00
128,128.00
148,720.00
92,235.00
52,052.00
Jumlah
1,713.14
22,222.20
256.26
371.80
110,682.00
10,410.40
145,655.80
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
46,284.00
Jumlah
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
62,205.00
36,036.00
Jumlah
416.90
5,407.92
1,247.23
723.84
13,885.20
21,681.10
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
51,870.00
Jumlah
1,713.14
22,222.20
2,562.56
1,487.20
6,220.50
360.36
34,565.96
Harga
Satuan
Jumlah
Harga
85,657.00
111,111.00
128,128.00
148,720.00
62,205.00
36,036.00
-
21,414.25
24,999.98
2,882.88
1,115.40
6,220.50
360.36
56,993.37
Jumlah
Zona III
Jumlah
Harga
Jumlah
Harga
Zona IV
Jumlah
Harga
No
I. UPAH
Pekerja
Tukang Cat
Kepala Tukang
Mandor
5,434.00
10,725.00
20,576.70
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
50,460.00
29,232.00
-
1,557.40
20,202.00
2,329.60
1,352.00
5,655.00
327.60
31,423.60
: Pengecatan Permukaan Baja Lapis Seng (Galbani) Secara Manual Sistem 1 Lapis Cat Mutakhir Dengan Tebal 200 um (SNI.Rev.2002)
:
: M2
: Harian
Harga
Satuan
2,717,000.00
35,750.00
Jumlah
Zona IV
Jumlah
Harga
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
3,426.28
555.56
64.06
371.80
-
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
83,850.00
47,320.00
Jumlah
Zona II
Jumlah
Harga
Oh
Oh
Oh
Oh
18,706.09
1.02
85,657.00
111,111.00
128,128.00
148,720.00
-
Zona III
Jumlah
Harga
No
I. UPAH
Pekerja
Tukang Cat
Kepala Tukang
Mandor
4,940.00
9,750.00
Jumlah
Harga
Harga
Satuan
Jumlah
3,114.80
505.05
58.24
338.00
-
Harga
Satuan
Zona III
Jumlah
Harga
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
2,470,000.00
32,500.00
Zona II
Jumlah
Harga
I. UPAH
Pekerja
Tukang Cat
Kepala Tukang
Mandor
16,691.59
Harga
Satuan
Zona I
Harga
Satuan
4,408.00
8,700.00
Zona IV
Jumlah
Harga
1.02
77,870.00
101,010.00
116,480.00
135,200.00
-
Zona II
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
2,779.36
450.66
51.97
301.60
-
Harga
Satuan
Jumlah
Harga
I. UPAH
Pekerja
Tukang Cat
Kepala Tukang
Mandor
Zona III
Jumlah
Harga
1.01
69,484.00
90,132.00
103,936.00
120,640.00
-
Zona I
Uraian
Zona IV
Jumlah
Harga
467.22
6,060.60
1,397.76
811.20
15,561.00
24,297.78
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
57,057.00
Jumlah
Jumlah
Harga
513.94
6,666.66
1,537.54
892.32
17,117.10
26,727.56
Halaman 97
Jenis Pekerjaan
Kuantitas Pekerjaan
Produksi Harian / Jam
: Pengecatan Permukaan Baja Lapis Seng (Galbani) Secara Manual 3 Lapis Cat Konvensional Dengan Tebal 200 um (SNI.Rev.2002)
:
: M2
: Harian
No
Satuan Indeks
Zona I
Uraian
Harga
Satuan
I. UPAH
Pekerja
Tukang Cat
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.500
0.800
0.300
0.200
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Cat Dasar
Cat Antara
Cat Penutup
Kg
Kg
Kg
0.110
0.170
0.080
39,900.00
35,000.00
35,000.00
Jumlah
Jenis Pekerjaan
Zona II
Jumlah
Harga
29,950.00
62,160.00
26,880.00
20,800.00
4,389.00
5,950.00
2,800.00
152,929.00
Harga
Satuan
Zona III
Jumlah
Harga
69,484.00
90,132.00
103,936.00
120,640.00
46,284.00
40,600.00
40,600.00
Jumlah
34,742.00
72,105.60
31,180.80
24,128.00
5,091.24
6,902.00
3,248.00
177,397.64
Harga
Satuan
Zona IV
Jumlah
Harga
77,870.00
101,010.00
116,480.00
135,200.00
51,870.00
45,500.00
45,500.00
Jumlah
38,935.00
80,808.00
34,944.00
27,040.00
5,705.70
7,735.00
3,640.00
198,807.70
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
57,057.00
50,050.00
50,050.00
: Pengecatan Permukaan Baja Lapis Seng (Galbani) Secara Semprot (Airless Spray) Dengan Sistem 1 Lapis Mutakhir Dengan Tebal 200 um (SNI.Rev.2002)
:
: M2
: Harian
No
Satuan Indeks
Zona I
Harga
Satuan
I. UPAH
Pekerja
Tukang Cat
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.400
0.700
0.200
0.200
59,900.00
77,700.00
89,600.00
104,000.00
II. BAHAN
Cat Dasar
Kg
0.300
39,900.00
Jumlah
Zona II
Jumlah
Harga
23,960.00
54,390.00
17,920.00
20,800.00
11,970.00
129,040.00
Harga
Satuan
69,484.00
90,132.00
103,936.00
120,640.00
46,284.00
Jumlah
Zona III
Jumlah
Harga
27,793.60
63,092.40
20,787.20
24,128.00
13,885.20
149,686.40
Harga
Satuan
77,870.00
101,010.00
116,480.00
135,200.00
51,870.00
Jumlah
42,828.50
88,888.80
38,438.40
29,744.00
6,276.27
8,508.50
4,004.00
Jumlah
Kuantitas Pekerjaan
Produksi Harian / Jam
Uraian
Jumlah
Harga
218,688.47
Zona IV
Jumlah
Harga
31,148.00
70,707.00
23,296.00
27,040.00
15,561.00
167,752.00
Harga
Satuan
85,657.00
111,111.00
128,128.00
148,720.00
57,057.00
Jumlah
Jumlah
Harga
34,262.80
77,777.70
25,625.60
29,744.00
17,117.10
184,527.20
Halaman 98
II. HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA
KABUPATEN KUTAI TIMUR PROPINSI KALIMANTAN TIMUR
TAHUN 2010
No.
Zona II
[5]
377,800.00
377,800.00
438,200.00
438,200.00
475,300.00
475,300.00
491,100.00
491,100.00
380,800.00
414,600.00
441,700.00
480,900.00
479,200.00
521,700.00
495,000.00
539,000.00
331,700.00
384,800.00
417,300.00
431,200.00
- Batu Abu
M
M
351,100.00
352,200.00
220,100.00
407,300.00
408,600.00
255,300.00
441,700.00
443,200.00
276,900.00
456,400.00
457,900.00
286,100.00
3
5
7
8
9
10
- Sirtu
Batu padas
M
M
196,600.00
238,500.00
228,100.00
276,700.00
247,400.00
300,000.00
255,600.00
310,100.00
Batu kali
377,800.00
438,200.00
475,300.00
491,100.00
- Beton
196,600.00
228,100.00
247,400.00
255,600.00
- Biasa
- Halus
M
M
M
174,100.00
253,000.00
202,000.00
253,000.00
219,100.00
253,000.00
226,300.00
253,000.00
220,000.00
220,000.00
220,000.00
220,000.00
260,100.00
521,100.00
202,700.00
301,700.00
604,500.00
235,100.00
327,200.00
655,600.00
255,100.00
338,100.00
677,400.00
263,500.00
M2
M2
63,500.00
600.00
222,600.00
222,600.00
185,800.00
73,700.00
700.00
258,200.00
258,200.00
215,500.00
79,800.00
800.00
280,200.00
280,200.00
233,700.00
82,600.00
800.00
289,400.00
289,400.00
241,500.00
Bh
4,400.00
5,100.00
5,600.00
5,700.00
Bh
Bh
Bh
4,500.00
4,500.00
4,500.00
5,200.00
5,200.00
5,200.00
5,700.00
5,700.00
5,700.00
5,900.00
5,900.00
5,900.00
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Zak
Kg
4,500.00
4,500.00
4,500.00
4,500.00
4,500.00
4,500.00
4,500.00
4,500.00
4,500.00
4,500.00
4,500.00
4,500.00
4,500.00
34,300.00
63,700.00
6,300.00
5,200.00
5,200.00
5,200.00
5,200.00
5,200.00
5,200.00
5,200.00
5,200.00
5,200.00
5,200.00
5,200.00
5,200.00
5,200.00
39,800.00
73,900.00
7,300.00
5,700.00
5,700.00
5,700.00
5,700.00
5,700.00
5,700.00
5,700.00
5,700.00
5,700.00
5,700.00
5,700.00
5,700.00
5,700.00
43,200.00
80,100.00
7,900.00
5,900.00
5,900.00
5,900.00
5,900.00
5,900.00
5,900.00
5,900.00
5,900.00
5,900.00
5,900.00
5,900.00
5,900.00
5,900.00
44,600.00
82,800.00
8,200.00
13
14
16
1,454,100.00
1,656,700.00
1,742,500.00
1,811,100.00
1,879,800.00
2,450,000.00
297,400.00
154,000.00
100,900.00
1,544,200.00
1,759,400.00
1,850,500.00
1,923,400.00
1,996,300.00
2,650,000.00
297,400.00
154,000.00
100,900.00
1,565,600.00
1,783,800.00
1,876,200.00
1,950,100.00
2,024,000.00
2,750,000.00
297,400.00
154,000.00
100,900.00
1,610,500.00
1,834,900.00
1,930,000.00
2,006,000.00
2,082,000.00
2,850,000.00
297,400.00
154,000.00
100,900.00
M
M
M
M
[8]
Kerikil / Koral
- Timbunan
Pasir
- Pasir pasangan
- Pasir beton/ cor
- Pasir urug
- Tanah urug / timbunan
Batu Bata
Batu Tempel Palimanan 15x30
Zona IV
[7]
Batu Gunung
- Batu Pasang (Bulat)
- Batu Pecah 14-15 cm
[3]
Zona III
[6]
Keterangan
Zona I
[4]
[1]
[2]
II.1 BAHAN - BAHAN BANGUNAN
1. Bahan Dinding Dan Pondasi
1
Satuan
- Beton K- 175
- Beton K- 225
- Beton K- 250
- Beton K- 275
- Beton K- 300
- Beton K- 500
17 Rapidrant
18 Puzzdith - 100 XR
19 Storox - 100
M
M
M
Bh
M
M
M3
M3
M3
M3
M3
Gln
Ltr
Kg
Halaman 99
II. HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA
KABUPATEN KUTAI TIMUR PROPINSI KALIMANTAN TIMUR
TAHUN 2010
No.
[1]
[2]
Satuan
[3]
Zona I
[4]
Zona II
[5]
Zona III
[6]
Keterangan
Zona IV
[7]
[8]
2. Bahan Atap
1
Sirap
Genteng
- Genteng flam
- Karpus genteng flam
- Genteng kodok
63,500.00
73,700.00
79,800.00
82,600.00
Bh
2,500.00
2,900.00
3,300.00
3,300.00
Bh
Bh
2,100.00
2,000.00
2,400.00
2,300.00
2,600.00
2,500.00
2,700.00
2,600.00
Bh
2,000.00
2,300.00
2,500.00
2,600.00
- Genteng beton
- Genteng kaca
Bh
Bh
3,500.00
3,700.00
4,100.00
4,300.00
4,400.00
4,700.00
4,600.00
4,800.00
- Genteng keramik
Bh
5,200.00
6,000.00
6,500.00
6,800.00
Bh
Bh
6,100.00
6,100.00
7,100.00
7,100.00
7,700.00
7,700.00
7,900.00
7,900.00
Bh
Bh
15,300.00
13,300.00
17,700.00
15,400.00
19,200.00
16,800.00
19,900.00
17,300.00
Bh
17,600.00
20,400.00
22,100.00
22,900.00
- Genteng palentong
- Genteng bubung palentong
Bh
Bh
17,600.00
4,300.00
20,400.00
5,000.00
22,100.00
5,500.00
22,900.00
5,600.00
- Atap Aluminium
- Roof Light Fiber Glass 180 x 90 m
Lbr
291,100.00
58,200.00
337,700.00
67,500.00
366,200.00
73,200.00
378,400.00
75,700.00
Glng
Glng
M2
Lbr
858,500.00
780,400.00
11,100.00
995,900.00
905,300.00
12,900.00
1,080,200.00
981,900.00
13,900.00
1,116,100.00
1,014,500.00
14,400.00
307,100.00
356,200.00
386,500.00
399,200.00
Lbr
Lbr
Lbr
30,100.00
34,300.00
30,100.00
34,900.00
39,800.00
34,900.00
38,000.00
43,200.00
38,000.00
39,100.00
44,600.00
39,100.00
Lbr
Lbr
Lbr
Lbr
Lbr
27,400.00
27,400.00
28,700.00
27,400.00
34,300.00
31,800.00
31,800.00
33,300.00
31,800.00
39,800.00
34,500.00
34,500.00
36,000.00
34,500.00
43,200.00
35,600.00
35,600.00
37,300.00
35,600.00
44,600.00
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
32,900.00
80,700.00
80,700.00
59,400.00
53,700.00
56,300.00
38,200.00
80,700.00
80,700.00
59,400.00
62,300.00
65,300.00
41,300.00
80,700.00
80,700.00
59,400.00
67,600.00
70,900.00
42,800.00
80,700.00
80,700.00
59,400.00
69,800.00
73,200.00
Lbr
Lbr
Lbr
Lbr
Lbr
112,600.00
93,300.00
65,600.00
47,100.00
34,300.00
130,600.00
108,200.00
76,100.00
54,600.00
39,800.00
141,700.00
117,400.00
82,600.00
59,300.00
43,200.00
146,400.00
121,300.00
85,300.00
61,200.00
44,600.00
Lbr
Lbr
Lbr
Lbr
Lbr
m'
m'
m'
m'
m'
m'
Lbr
kg
Lbr
105,700.00
88,000.00
65,800.00
49,400.00
34,300.00
12,300.00
17,500.00
19,500.00
25,600.00
30,700.00
46,100.00
50,800.00
22,800.00
2,500.00
122,600.00
102,100.00
76,300.00
57,300.00
39,800.00
14,300.00
20,300.00
22,600.00
29,700.00
35,600.00
53,500.00
58,900.00
26,400.00
2,900.00
133,000.00
110,800.00
82,800.00
62,100.00
43,200.00
15,500.00
22,000.00
24,400.00
32,200.00
38,600.00
58,000.00
63,800.00
28,700.00
3,300.00
137,400.00
114,400.00
85,500.00
64,200.00
44,600.00
16,000.00
22,800.00
25,400.00
33,300.00
39,900.00
59,900.00
66,000.00
29,600.00
3,300.00
Lbr
Lbr
Lbr
145,800.00
92,100.00
76,800.00
169,100.00
106,800.00
89,100.00
183,600.00
116,000.00
96,600.00
189,500.00
119,700.00
99,800.00
- Aluminium 0.55 mm
Asbes
- Gelombang uk. 2,5 x 92 cm
- Gelombang uk. 1,0 x 92 cm
- Rata uk. 2 x 1 meter
-
8
9
10
11
Ikat
Lbr
Halaman 100
II. HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA
KABUPATEN KUTAI TIMUR PROPINSI KALIMANTAN TIMUR
TAHUN 2010
No.
[1]
[2]
3. Bahan Kaca
1
Kaca Bening Tebal 3 mm
2
Kaca Bening Tebal 5 mm
3
Kaca Bening Tebal 8 mm
4
Kaca Buram Tebal 3 mm
5
6
8
9
Kaca Stopsol
Kaca Nako Antik
10
Kaca Cermin
11 Kaca Wireglass
12 Kaca Patri
Satuan
Zona II
[5]
M
M
115,700.00
134,200.00
145,600.00
150,400.00
133,000.00
154,300.00
167,400.00
172,900.00
138,200.00
138,200.00
160,300.00
160,300.00
173,900.00
173,900.00
179,700.00
179,700.00
665,400.00
174,100.00
771,900.00
202,000.00
837,200.00
219,100.00
865,000.00
226,300.00
144,400.00
167,500.00
181,600.00
187,700.00
Set
315,500.00
179,800.00
315,500.00
179,800.00
315,500.00
179,800.00
315,500.00
179,800.00
M2
268,700.00
311,700.00
338,100.00
349,300.00
M2
M2
223,000.00
1,116,400.00
223,000.00
1,295,000.00
223,000.00
1,404,700.00
223,000.00
1,451,300.00
[3]
M
M
Set
M
M
Zona III
[6]
Keterangan
Zona I
[4]
Zona IV
[7]
[8]
4. Bahan Listrik
1
Bh
87,300.00
101,300.00
109,700.00
113,500.00
2
3
Bh
Bh
87,300.00
30,200.00
101,300.00
35,000.00
109,700.00
38,100.00
113,500.00
39,300.00
4
5
Bh
Bh
39,800.00
52,000.00
46,200.00
60,300.00
50,100.00
65,500.00
51,700.00
67,600.00
6
7
8
Sakelar Engkel
Sakelar Double
Bh
Bh
Roll
22,500.00
36,800.00
282,100.00
26,100.00
42,700.00
327,200.00
28,300.00
46,300.00
354,900.00
29,300.00
47,800.00
366,700.00
Roll
Roll
Roll
Bh
Bh
443,200.00
700,200.00
937,400.00
126,000.00
187,300.00
514,100.00
812,200.00
1,087,400.00
146,200.00
217,300.00
557,700.00
881,000.00
1,179,400.00
158,500.00
235,700.00
576,200.00
910,300.00
1,218,600.00
163,800.00
243,500.00
9
10
11
12
13
14
15
16
17
18
Bh
Btg
Btg
Bh
Bh
237,400.00
24,700.00
16,200.00
15,100.00
3,700.00
275,400.00
28,700.00
18,800.00
17,500.00
4,300.00
298,700.00
31,200.00
20,400.00
19,000.00
4,700.00
308,600.00
32,100.00
21,100.00
19,600.00
4,800.00
19
20
21
22
23
24
25
26
27
Klemp
Zekering Box 3 Phase
Zekering Box 1 Phase
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
16,200.00
70,800.00
38,300.00
28,800.00
31,500.00
32,900.00
35,600.00
36,900.00
42,500.00
18,800.00
82,100.00
44,400.00
33,400.00
36,500.00
38,200.00
41,300.00
42,800.00
49,300.00
20,400.00
89,100.00
48,200.00
36,100.00
39,700.00
41,300.00
44,900.00
46,400.00
53,400.00
21,100.00
92,000.00
49,800.00
37,400.00
41,000.00
42,800.00
46,300.00
48,000.00
55,300.00
Psg
Psg
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
28,700.00
34,800.00
15,100.00
56,300.00
17,500.00
13,300.00
26,200.00
25,600.00
144,400.00
334,900.00
62,800.00
74,500.00
85,800.00
46,100.00
229,100.00
178,100.00
66,500.00
156,600.00
66,400.00
33,300.00
40,400.00
17,500.00
65,300.00
20,300.00
15,400.00
30,400.00
29,700.00
167,500.00
388,500.00
72,800.00
86,400.00
99,500.00
53,500.00
265,800.00
206,600.00
77,100.00
181,700.00
77,000.00
36,000.00
43,800.00
19,000.00
70,900.00
22,000.00
16,800.00
33,000.00
32,200.00
181,600.00
421,500.00
79,000.00
93,700.00
107,900.00
58,000.00
288,200.00
224,100.00
83,700.00
197,100.00
83,600.00
37,300.00
45,200.00
19,600.00
73,200.00
22,800.00
17,300.00
34,100.00
33,300.00
187,700.00
435,400.00
81,600.00
96,900.00
111,500.00
59,900.00
297,800.00
231,500.00
86,500.00
203,600.00
86,300.00
Bola
Bola
Bola
Bola
Bola
Bola
Lampu
Lampu
Lampu
Lampu
Lampu
Lampu
5 watt
8 watt
11 watt
14 watt
18 watt
23 watt
5. Bahan Penggantung
1
Engsel 3"
2
Engsel 4"
3
Engsel Plastik/Nylon
4
Engsel Pintu Kipas
5
Hak Angin
6
Kait Angin
7
Espagnolet Lengkap
8
Grendel Lokal
9
Kunci Tanam union 1 x Slash
10 Kunci Tanam union 2 x Slash
11 Kunci Tanam Yale 1 x Slash
12 Kunci Tanam Yale 2 x Slash
13 Kunci tanam pendek
14 Kunci tanam panjang
15 Kunci Tanam Kamar mandi
16 Kunci Silinder
17 Kunci lemari
18 Door Closer
19 Kunci Slot
Halaman 101
II. HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA
KABUPATEN KUTAI TIMUR PROPINSI KALIMANTAN TIMUR
TAHUN 2010
No.
[1]
[2]
20
21
Satuan
[3]
Keterangan
Zona I
[4]
90,600.00
23,800.00
Zona II
[5]
105,100.00
23,800.00
Zona III
[6]
114,000.00
23,800.00
Zona IV
[7]
117,800.00
23,800.00
Bh
22
Door stop
Rel pintu dorong
Bh
M2
1,171,200.00
1,358,600.00
1,473,600.00
1,522,600.00
23
24
Roling door
Pintu Aluminium
M2
M2
1,171,200.00
664,600.00
1,358,600.00
770,900.00
1,473,600.00
836,200.00
1,522,600.00
864,000.00
25
26
Bh
Bh
Bh
902,900.00
398,300.00
902,900.00
398,300.00
902,900.00
398,300.00
902,900.00
398,300.00
27
Vertikals blinds
Spring knip
87,900.00
102,000.00
110,600.00
114,300.00
28
Door holder
Bh
105,800.00
105,800.00
105,800.00
105,800.00
[8]
Teakwood
Lem Aibon
Lbr
Kg
59,000.00
40,500.00
68,400.00
47,000.00
74,200.00
51,000.00
76,700.00
52,700.00
3
4
Plywood 3 mm
Plywood 4 mm
Lbr
Lbr
52,100.00
63,700.00
60,400.00
73,900.00
65,700.00
80,100.00
67,700.00
82,800.00
Plywood 5 mm
Lbr
71,700.00
83,200.00
90,200.00
93,200.00
6
7
Plywood 6 mm
Plywood 9 mm
Lbr
Lbr
81,000.00
104,100.00
94,000.00
120,800.00
101,900.00
130,900.00
105,300.00
135,300.00
8
9
Plywood 12 mm
Jabarwood Bergaris
Lbr
Lbr
148,500.00
156,600.00
172,300.00
181,700.00
186,800.00
197,100.00
193,100.00
203,600.00
10
11
12
Jabarwood Polos
Acustik 30 x 60
Eternit ( Asbes )
Lbr
Lbr
Lbr
76,800.00
98,600.00
26,200.00
89,100.00
114,400.00
30,400.00
96,600.00
124,000.00
33,000.00
99,800.00
128,200.00
34,100.00
13
14
15
16
17
Multiplek 4 mm
Multiplek 6 mm
Multiplek 9 mm
Lbr
Lbr
Lbr
Lbr
Lbr
88,000.00
102,400.00
115,700.00
63,700.00
75,200.00
102,100.00
118,800.00
134,200.00
73,900.00
87,200.00
110,800.00
128,800.00
145,600.00
80,100.00
94,600.00
114,400.00
133,100.00
150,400.00
82,800.00
97,800.00
Lbr
Lbr
Lbr
Lbr
M'
239,000.00
321,400.00
57,900.00
63,700.00
68,700.00
277,200.00
372,800.00
67,200.00
73,900.00
79,700.00
300,700.00
404,400.00
72,800.00
80,100.00
86,500.00
310,700.00
417,800.00
75,300.00
82,800.00
89,300.00
Lbr
Lbr
Lbr
Lbr
M'
Bh
Kg
21,700.00
189,400.00
180,800.00
322,900.00
100,900.00
201,800.00
16,900.00
25,200.00
219,700.00
209,700.00
322,900.00
100,900.00
201,800.00
16,900.00
27,300.00
238,300.00
227,500.00
322,900.00
100,900.00
201,800.00
16,900.00
28,200.00
246,200.00
235,000.00
322,900.00
100,900.00
201,800.00
16,900.00
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
M'
M'
M'
M'
M'
M'
57,600.00
68,700.00
72,700.00
120,800.00
159,300.00
226,600.00
265,100.00
350,400.00
54,400.00
31,200.00
37,000.00
93,700.00
131,900.00
171,100.00
261,400.00
403,900.00
773,100.00
103,400.00
185,800.00
196,500.00
281,400.00
308,000.00
361,100.00
414,300.00
66,800.00
79,700.00
84,300.00
140,100.00
184,800.00
262,900.00
307,500.00
406,500.00
63,100.00
36,200.00
42,900.00
108,700.00
153,000.00
198,500.00
303,200.00
468,500.00
896,800.00
119,900.00
185,800.00
196,500.00
281,400.00
308,000.00
361,100.00
414,300.00
72,500.00
86,500.00
91,400.00
152,000.00
200,500.00
285,200.00
333,600.00
440,800.00
68,400.00
39,300.00
46,500.00
117,900.00
165,900.00
215,300.00
328,900.00
508,200.00
972,800.00
130,100.00
185,800.00
196,500.00
281,400.00
308,000.00
361,100.00
414,300.00
74,900.00
89,300.00
94,500.00
157,000.00
207,100.00
294,600.00
344,600.00
455,500.00
70,700.00
40,600.00
48,100.00
121,800.00
171,500.00
222,400.00
339,800.00
525,100.00
1,005,000.00
134,400.00
185,800.00
196,500.00
281,400.00
308,000.00
361,100.00
414,300.00
18
19
20
21
22
Gipsum 9 mm
Gipsum 12 mm
GRS 9 mm
GRS 12 mm
Kalsiboard 9 mm
Kalsiboard 12 mm
List Gipsun
23 List Eternit ( Asbes )
24 Formika 4' x 3'
25 Soft board 4' x 8' x 4 mm
26 Akustik arm strong 60 x 120 cm
27 Profil Aluminium "T"
28 Ramset/Dyna Bolt
29 Kawat Seng Polos
7. Bahan Pipa
1
Pipa Besi " - 4 m
2
Pipa Besi " - 6 m
3
Pipa Besi " - 4 m
4
Pipa Besi 1,5" - 4 m
5
Pipa Besi 2" - 4 m
6
Pipa Besi 2,5" - 4 m
7
Pipa Besi 3" - 4 m
8
Pipa Besi 4" - 4 m
8
Pipa Paralon 1" - 4 m
9
Pipa Paralon " - 4 m
10 Pipa Paralon 3/4" - 4 m
11 Pipa Paralon 1,5" - 4 m
12 Pipa Paralon 2" - 4 m
13 Pipa Paralon 2,5" - 4 m
14 Pipa Paralon 3" - 4 m
15 Pipa Paralon 4" - 4 m
16 Pipa Galvanis
17 Pipa beton
19 Waterstop lebar 150 mm
20 Waterstop lebar 200 mm
21 Waterstop lebar 230 mm
22 Waterstop lebar 250 mm
23 Waterstop lebar 300 mm
24 Waterstop lebar 320 mm
Halaman 102
II. HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA
KABUPATEN KUTAI TIMUR PROPINSI KALIMANTAN TIMUR
TAHUN 2010
No.
[1]
[2]
Satuan
[3]
Zona I
[4]
Zona II
[5]
Zona III
[6]
Keterangan
Zona IV
[7]
[8]
8. Bahan Besi
1
Besi Plaat 3 mm
Lbr
622,500.00
622,500.00
622,500.00
622,500.00
2
3
Besi Plaat 2 mm
Besi Plaat 1 mm
Lbr
Lbr
245,700.00
515,300.00
285,000.00
597,700.00
309,100.00
648,300.00
319,400.00
669,900.00
4
5
Kg
Kg
432,500.00
33,200.00
501,700.00
38,500.00
544,200.00
41,700.00
562,300.00
43,200.00
Btg
Btg
22,600.00
35,000.00
26,200.00
40,600.00
28,500.00
44,100.00
29,400.00
45,500.00
Btg
41,100.00
47,700.00
51,700.00
53,400.00
Btg
Btg
57,100.00
56,900.00
66,200.00
66,000.00
71,900.00
71,600.00
74,200.00
74,000.00
Btg
Btg
61,100.00
74,100.00
70,900.00
86,000.00
77,000.00
93,300.00
79,400.00
96,300.00
Btg
89,900.00
104,300.00
113,100.00
116,900.00
Btg
Btg
98,100.00
136,900.00
113,800.00
158,800.00
123,500.00
172,300.00
127,500.00
178,000.00
Btg
Btg
142,800.00
164,100.00
165,600.00
190,400.00
179,700.00
206,600.00
185,600.00
213,300.00
Btg
Btg
16,400.00
22,600.00
19,000.00
26,200.00
20,700.00
28,500.00
21,300.00
29,400.00
Btg
Btg
Btg
Btg
Btg
25,500.00
33,800.00
36,600.00
45,300.00
54,500.00
29,600.00
39,200.00
42,500.00
52,500.00
63,200.00
32,100.00
42,600.00
46,000.00
56,900.00
68,500.00
33,200.00
43,900.00
47,600.00
58,900.00
70,900.00
Btg
Btg
Btg
44,500.00
73,400.00
71,000.00
51,600.00
85,100.00
82,400.00
56,000.00
92,300.00
89,300.00
57,900.00
95,400.00
92,300.00
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
Besi
Besi
Besi
Besi
Besi
beton
beton
beton
beton
beton
( Banci )
8 ( 5,2 ) x 7,0 m
10 ( 6,4 ) x 7,0 m
10 ( 6,6 ) x 7,5 m
12 ( 8,0 ) x 7,0 m
12 ( 8,0 ) x 7,5 m
12 ( 8,7 ) x 8,0 m
12 ( 9,7 ) x 7,8 m
14 ( 10,0 ) x 6,0 m
14 ( 10,5 ) x 9,0 m
14 ( 11,0 ) x 8,0 m
10 x 12,0 m
13 x 12,0 m
16 x 12,0 m
19 x 12,0 m
Btg
82,400.00
95,600.00
103,600.00
107,100.00
Btg
Btg
Btg
Btg
Kg
M'
M'
M'
Roll
M'
M'
M'
M'
Roll
Roll
M'
138,800.00
208,000.00
292,000.00
391,000.00
16,000.00
14,400.00
15,300.00
18,700.00
107,000.00
32,500.00
31,500.00
29,100.00
24,100.00
3,787,900.00
4,591,500.00
24,100.00
884,000.00
673,200.00
16,300.00
15,300.00
18,700.00
12,300.00
16,300.00
53,100.00
292,100.00
292,100.00
1,171,200.00
1,756,800.00
695,400.00
161,000.00
241,300.00
338,700.00
453,600.00
18,600.00
16,700.00
17,700.00
21,700.00
124,100.00
32,500.00
36,500.00
33,800.00
28,000.00
4,394,000.00
5,326,100.00
28,000.00
1,025,400.00
780,900.00
18,900.00
15,300.00
21,700.00
14,300.00
18,900.00
61,600.00
292,100.00
292,100.00
1,358,600.00
2,037,900.00
806,700.00
174,600.00
261,700.00
367,400.00
491,900.00
20,200.00
18,100.00
19,200.00
23,500.00
134,700.00
32,500.00
39,700.00
36,500.00
30,300.00
4,765,900.00
5,777,100.00
30,300.00
1,112,300.00
847,000.00
20,500.00
15,300.00
23,500.00
15,500.00
20,500.00
66,800.00
292,100.00
292,100.00
1,473,600.00
2,210,400.00
874,900.00
180,400.00
270,400.00
379,600.00
508,300.00
20,800.00
18,700.00
19,900.00
24,300.00
139,100.00
32,500.00
41,000.00
37,800.00
31,300.00
4,924,300.00
5,969,000.00
31,300.00
1,149,200.00
875,200.00
21,200.00
15,300.00
24,300.00
16,000.00
21,200.00
69,000.00
292,100.00
292,100.00
1,522,600.00
2,283,800.00
904,000.00
M2
M'
Kg
Bh
Kg
Kg
M'
M'
M2
M2
M2
Bh
M2
Halaman 103
II. HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA
KABUPATEN KUTAI TIMUR PROPINSI KALIMANTAN TIMUR
TAHUN 2010
No.
[1]
[2]
Satuan
[3]
Zona I
[4]
Zona II
[5]
Zona III
[6]
Keterangan
Zona IV
[7]
[8]
9. Bahan Lantai
1
57,600.00
66,800.00
72,500.00
74,900.00
2
3
71,400.00
57,600.00
82,800.00
66,800.00
89,800.00
72,500.00
92,800.00
74,900.00
4
5
61,800.00
59,000.00
71,700.00
68,400.00
77,700.00
74,200.00
80,300.00
76,700.00
63,100.00
73,200.00
79,400.00
82,000.00
7
8
60,600.00
49,900.00
65,800.00
54,200.00
67,900.00
55,900.00
M
M
52,200.00
43,000.00
58,400.00
67,700.00
73,500.00
75,900.00
10
11
M
M
56,300.00
14,400.00
65,300.00
16,700.00
70,900.00
18,100.00
73,200.00
18,700.00
12
13
31,500.00
32,900.00
36,500.00
38,200.00
39,700.00
41,300.00
41,000.00
42,800.00
14
M
M
34,300.00
39,800.00
43,200.00
44,600.00
15
16
M
M
35,600.00
35,600.00
41,300.00
41,300.00
44,900.00
44,900.00
46,300.00
46,300.00
17
18
36,900.00
36,900.00
42,800.00
42,800.00
46,400.00
46,400.00
48,000.00
48,000.00
19
20
21
38,400.00
38,600.00
577,100.00
44,500.00
44,800.00
669,400.00
48,400.00
48,600.00
726,200.00
49,900.00
50,200.00
750,200.00
22
23
24
25
26
288,100.00
301,900.00
71,400.00
50,200.00
75,500.00
334,200.00
350,200.00
82,800.00
58,200.00
87,600.00
362,400.00
379,900.00
89,800.00
63,200.00
95,000.00
374,500.00
392,500.00
92,800.00
65,300.00
98,200.00
27
28
29
30
31
76,900.00
78,300.00
257,500.00
322,300.00
317,700.00
89,200.00
90,800.00
298,700.00
373,900.00
368,500.00
96,700.00
98,400.00
324,000.00
405,500.00
399,800.00
100,000.00
101,800.00
334,800.00
419,000.00
413,000.00
Bh
Bh
Bh
Bh
Bh
Bh
Bh
519,500.00
3,400.00
3,700.00
3,700.00
3,700.00
3,800.00
26,400.00
768,000.00
602,600.00
3,900.00
4,300.00
4,300.00
4,300.00
4,400.00
30,600.00
890,900.00
653,600.00
4,300.00
4,700.00
4,700.00
4,700.00
4,800.00
33,300.00
966,300.00
675,400.00
4,400.00
4,800.00
4,800.00
4,800.00
4,900.00
34,300.00
998,400.00
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
246,100.00
242,100.00
259,000.00
264,600.00
1,717,900.00
1,569,800.00
1,569,800.00
1,457,600.00
1,289,400.00
459,600.00
777,000.00
1,407,700.00
1,351,300.00
371,600.00
670,000.00
225,300.00
1,345,400.00
1,177,200.00
1,401,600.00
46,200.00
129,600.00
334,200.00
382,100.00
285,500.00
280,800.00
300,400.00
306,900.00
1,992,800.00
1,821,000.00
1,821,000.00
1,690,800.00
1,495,700.00
533,100.00
901,300.00
1,632,900.00
1,567,500.00
431,100.00
777,200.00
261,300.00
1,560,700.00
1,365,600.00
1,625,900.00
53,600.00
150,300.00
387,700.00
443,200.00
309,700.00
304,600.00
325,900.00
332,900.00
2,161,400.00
1,975,100.00
1,975,100.00
1,833,900.00
1,622,400.00
578,400.00
977,600.00
1,771,100.00
1,700,300.00
467,600.00
843,100.00
283,400.00
1,692,700.00
1,481,200.00
1,763,600.00
58,100.00
163,000.00
420,600.00
480,700.00
319,900.00
314,700.00
336,700.00
344,000.00
2,233,300.00
2,040,700.00
2,040,700.00
1,894,900.00
1,676,200.00
597,500.00
1,010,100.00
1,830,000.00
1,756,700.00
483,100.00
871,000.00
292,900.00
1,749,000.00
1,530,400.00
1,822,100.00
60,100.00
168,500.00
434,500.00
496,700.00
32
33
34
35
36
37
38
39
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
Halaman 104
II. HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA
KABUPATEN KUTAI TIMUR PROPINSI KALIMANTAN TIMUR
TAHUN 2010
No.
[1]
[2]
24
Kran air
Satuan
[3]
Bh
Zona II
[5]
47,600.00
Zona III
[6]
51,600.00
Keterangan
Zona IV
[7]
53,300.00
[8]
Halaman 105
II. HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA
KABUPATEN KUTAI TIMUR PROPINSI KALIMANTAN TIMUR
TAHUN 2010
No.
Satuan
Keterangan
25
26
Kran tembok
Wastafel lengkap
[3]
Bh
Bh
Zona I
[4]
47,300.00
1,391,400.00
27
Bh
1,098,000.00
1,273,700.00
1,381,500.00
1,427,400.00
28
29
Bh
Bh
1,407,700.00
1,604,700.00
1,632,900.00
1,861,500.00
1,771,100.00
2,019,000.00
1,830,000.00
2,086,100.00
30
31
Bh
Bh
355,800.00
7,900.00
355,800.00
9,200.00
355,800.00
10,000.00
355,800.00
10,300.00
Kg
21,500.00
24,900.00
27,000.00
28,000.00
Kg
17,500.00
20,300.00
22,000.00
22,800.00
[1]
[2]
Zona II
[5]
54,900.00
1,614,000.00
Zona III
[6]
59,500.00
1,750,600.00
Zona IV
[7]
61,500.00
1,808,800.00
3
4
Paku Beton
Paku Ulin 1"
Bh
Kg
800.00
15,000.00
900.00
17,400.00
1,000.00
18,900.00
1,000.00
19,500.00
5
6
Kg
Kg
21,900.00
17,500.00
25,400.00
20,300.00
27,600.00
22,000.00
28,500.00
22,800.00
Paku Plywood
Kg
17,500.00
20,300.00
22,000.00
22,800.00
8
9
Paku Sekrup
Paku Asbes
Bh
Kotak
300.00
1,000.00
300.00
1,200.00
400.00
1,200.00
400.00
1,300.00
10
11
Paku Sirap
Paku Gypsum
Kg
Kg
19,900.00
15,300.00
23,100.00
17,700.00
25,000.00
19,200.00
25,900.00
19,900.00
12
13
14
Paku
Paku
Paku
Paku
Bh
Bh
Kg
Kg
1,000.00
600.00
19,900.00
1,200.00
700.00
23,100.00
1,200.00
800.00
25,000.00
1,300.00
800.00
25,900.00
42,900.00
49,800.00
54,100.00
55,800.00
Bh
Bh
35,900.00
37,500.00
41,600.00
43,500.00
45,100.00
47,200.00
46,700.00
48,800.00
Bh
Bh
Bh
Bh
52,100.00
98,300.00
185,100.00
205,800.00
60,400.00
114,000.00
214,700.00
238,700.00
65,700.00
123,600.00
232,800.00
259,000.00
67,700.00
127,800.00
240,600.00
267,500.00
M
M
Kpj
2,453,200.00
2,725,800.00
104,100.00
2,845,700.00
3,161,900.00
120,800.00
3,086,600.00
3,429,500.00
130,900.00
3,189,200.00
3,543,500.00
135,300.00
M
M
1,962,500.00
2,017,100.00
2,276,500.00
2,339,800.00
2,469,200.00
2,537,900.00
2,551,300.00
2,622,200.00
M
M
1,962,500.00
2,071,500.00
2,276,500.00
2,402,900.00
2,469,200.00
2,606,400.00
2,551,300.00
2,693,000.00
M
M
M
M
M
M
M
M
M
M
M
M
1,853,400.00
1,962,500.00
2,815,300.00
2,590,100.00
3,153,100.00
2,815,300.00
767,800.00
1,069,800.00
1,407,700.00
1,036,000.00
1,238,800.00
1,238,800.00
870,200.00
2,815,300.00
2,815,300.00
1,036,000.00
36,600.00
31,500.00
31,500.00
47,300.00
10,000.00
2,149,900.00
2,276,500.00
3,265,700.00
3,004,500.00
3,657,600.00
3,265,700.00
890,600.00
1,241,000.00
1,632,900.00
1,201,800.00
1,437,000.00
1,437,000.00
1,009,400.00
3,265,700.00
3,265,700.00
1,201,800.00
42,500.00
36,500.00
36,500.00
54,900.00
10,000.00
2,332,100.00
2,469,200.00
3,542,200.00
3,258,800.00
3,967,300.00
3,542,200.00
966,000.00
1,346,000.00
1,771,100.00
1,303,500.00
1,558,600.00
1,558,600.00
1,094,900.00
3,542,200.00
3,542,200.00
1,303,500.00
46,000.00
39,700.00
39,700.00
59,500.00
10,000.00
2,409,400.00
2,551,300.00
3,659,900.00
3,367,100.00
4,099,000.00
3,659,900.00
998,100.00
1,390,700.00
1,830,000.00
1,346,800.00
1,610,400.00
1,610,400.00
1,131,300.00
3,659,900.00
3,659,900.00
1,346,800.00
47,600.00
41,000.00
41,000.00
61,500.00
10,000.00
15
Kait
Sumbat
Reng
Multi Roof
Buis
Buis
Buis
Buis
Beton
Beton
Beton
Beton
20 cm x 1 m
25 cm x 1 m
50 cm x 1 m
100 cm x 1 m
Btg
M
M
M
Btg
Btg
Btg
Btg
Btg
[8]
Halaman 106
II. HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA
KABUPATEN KUTAI TIMUR PROPINSI KALIMANTAN TIMUR
TAHUN 2010
No.
[1]
[2]
24 Kayu Bakar
Satuan
[3]
M3
Zona II
[5]
58,800.00
Zona III
[6]
63,700.00
Keterangan
Zona IV
[7]
65,900.00
[8]
Halaman 107
II. HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA
KABUPATEN KUTAI TIMUR PROPINSI KALIMANTAN TIMUR
TAHUN 2010
No.
[1]
[2]
Satuan
[3]
Zona I
[4]
Zona II
[5]
Zona III
[6]
Keterangan
Zona IV
[7]
[8]
Amplas Kayu/Besi
Lbr
4,400.00
5,100.00
5,600.00
5,700.00
2
3
Meni Kayu
Meni Besi
Kg
Kg
38,400.00
39,400.00
44,500.00
45,700.00
48,400.00
49,700.00
49,900.00
51,200.00
4
5
Dempul Kayu
Plamir Tembok
Kg
Kg
33,500.00
20,800.00
38,900.00
24,100.00
42,100.00
26,300.00
43,600.00
27,000.00
Minyak Cat
Ltr
20,800.00
24,100.00
26,300.00
27,000.00
7
8
Residu
Cat Tembok Paragon (5 kg)
Ltr
Klg
23,100.00
75,200.00
26,800.00
87,200.00
29,000.00
94,600.00
30,000.00
97,800.00
Aspal
Drum
30,700.00
35,600.00
38,600.00
39,900.00
10
11
Kapur Tembok
Special Plitur Pernis
Kaleng
Ltr
9,000.00
35,900.00
10,400.00
41,600.00
11,300.00
45,100.00
11,700.00
46,700.00
12 Tiner B Special
13 Tiner A Biasa
Kaleng
Ltr
19,900.00
17,500.00
23,100.00
20,300.00
25,000.00
22,000.00
25,900.00
22,800.00
14 Tiner A Special
Ltr
29,000.00
33,600.00
36,400.00
37,700.00
15
16
Kg
Ltr
9,200.00
22,200.00
10,700.00
22,200.00
11,600.00
22,200.00
12,000.00
22,200.00
Kg
Kg
33,800.00
29,000.00
33,800.00
33,600.00
33,800.00
36,400.00
33,800.00
37,700.00
35,900.00
46,100.00
27,600.00
41,600.00
53,500.00
32,000.00
45,100.00
58,000.00
34,700.00
46,700.00
59,900.00
35,900.00
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
62,400.00
88,000.00
79,200.00
105,900.00
38,100.00
72,400.00
102,100.00
91,900.00
122,800.00
38,100.00
78,500.00
110,800.00
99,700.00
133,300.00
38,100.00
81,100.00
114,400.00
103,000.00
137,700.00
38,100.00
Wood staind
Sanding
Clear doop
Water profing
Lem kayu
Ltr
Ltr
Ltr
Kg
Kg
42,300.00
55,700.00
38,300.00
57,100.00
37,700.00
42,300.00
55,700.00
44,400.00
57,100.00
43,700.00
42,300.00
55,700.00
48,200.00
57,100.00
47,300.00
42,300.00
55,700.00
49,800.00
57,100.00
49,000.00
Kg
Ltr
Ltr
Bh
Bh
Bh
Kg
M2
Ltr
57,300.00
44,000.00
25,500.00
31,200.00
218,500.00
20,700.00
318,700.00
318,700.00
318,700.00
37,000.00
58,700.00
2,300.00
57,300.00
44,000.00
29,600.00
31,200.00
218,500.00
20,700.00
318,700.00
318,700.00
318,700.00
37,000.00
68,100.00
2,700.00
57,300.00
44,000.00
32,100.00
31,200.00
218,500.00
20,700.00
318,700.00
318,700.00
318,700.00
37,000.00
73,800.00
3,000.00
57,300.00
44,000.00
33,200.00
31,200.00
218,500.00
20,700.00
318,700.00
318,700.00
318,700.00
37,000.00
76,300.00
3,000.00
15. Pondasi
1
Pancangan AP 20 X 20 (Segiempat)
2
Pancangan AP 25 X 25 (Segiempat)
3
Pancangan AP 30 X 30 (Segiempat)
4
Pancangan AP 28 X 28 (Segitiga)
5
Pancangan AP 32 X 32 (Segitiga)
6
Pancang Diameter 35 cm ( bulat )
7
Pancang Diameter 40 cm ( bulat )
8
Pancang Diameter 45 cm ( bulat )
9
Pancang Diameter 50 cm ( bulat )
10 Pancang Diameter 60 cm ( bulat )
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
343,500.00
458,000.00
601,100.00
321,000.00
343,500.00
302,100.00
405,400.00
610,100.00
716,600.00
809,800.00
398,500.00
531,300.00
697,300.00
372,400.00
398,500.00
350,400.00
470,300.00
707,700.00
831,300.00
939,400.00
432,300.00
576,300.00
756,300.00
403,900.00
432,300.00
380,000.00
510,000.00
767,700.00
901,700.00
1,018,900.00
446,600.00
595,400.00
781,400.00
417,300.00
446,600.00
392,700.00
527,000.00
793,100.00
931,600.00
1,052,700.00
M
M
M
M
M
281,200.00
281,200.00
299,200.00
299,200.00
299,200.00
326,200.00
326,200.00
347,100.00
347,100.00
347,100.00
353,900.00
353,900.00
376,500.00
376,500.00
376,500.00
365,600.00
365,600.00
389,000.00
389,000.00
389,000.00
Soda api
Pembersih lantai
17
18
Flincote
Cat dasar
19 Plitur/Oil
20 Vernis
21 Teak oil
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
Lem vinyl
Formika
Sealent
Lt. vinyil karet 30 x 30 kwl l
Vinyl motif kembang ex DN
Vinyl wall covering, lebar 50 cm
Floor Hardener ferrovax
Wallpaper
Minyak Bekisting
Untuk
Untuk
Untuk
Untuk
Untuk
ATB
Pondasi
ATB
Beton
Pondasi
Halaman 108
II. HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA
KABUPATEN KUTAI TIMUR PROPINSI KALIMANTAN TIMUR
TAHUN 2010
No.
[1]
II.2 UPAH KERJA
1
Pekerja Biasa
[2]
Satuan
[3]
Zona I
[4]
Zona II
[5]
Zona III
[6]
Keterangan
Zona IV
[7]
Hari
65,600.00
76,100.00
82,600.00
85,300.00
Mandor
Hari
87,000.00
100,900.00
109,500.00
113,100.00
3
4
Tukang Kayu
Kepala Tukang Kayu
Hari
Hari
70,600.00
81,900.00
81,900.00
95,000.00
88,900.00
103,000.00
91,800.00
106,500.00
5
6
Hari
Hari
54,300.00
70,600.00
63,000.00
81,900.00
68,300.00
88,900.00
70,600.00
91,800.00
Hari
81,900.00
95,000.00
103,000.00
106,500.00
8
9
Hari
Hari
54,300.00
70,600.00
63,000.00
81,900.00
68,300.00
88,900.00
70,600.00
91,800.00
10
Hari
81,900.00
95,000.00
103,000.00
106,500.00
11
12
Hari
Hari
54,300.00
70,600.00
63,000.00
81,900.00
68,300.00
88,900.00
70,600.00
91,800.00
13
14
Hari
Hari
81,900.00
54,300.00
95,000.00
63,000.00
103,000.00
68,300.00
106,500.00
70,600.00
15
Tukang Gali
Hari
70,600.00
81,900.00
88,900.00
91,800.00
16
17
Hari
Hari
81,900.00
45,100.00
95,000.00
52,300.00
103,000.00
56,700.00
106,500.00
58,600.00
18
19
Hari
Bln
68,700.00
1,373,800.00
79,700.00
1,593,600.00
86,500.00
1,728,600.00
89,300.00
1,785,900.00
[8]
Halaman 109
II. HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA
KABUPATEN KUTAI TIMUR PROPINSI KALIMANTAN TIMUR
TAHUN 2010
No.
[1]
[2]
Satuan
[3]
Zona I
[4]
Zona II
[5]
Zona III
[6]
Keterangan
Zona IV
[7]
[8]
Batu Asahan
Bh
8,700.00
10,100.00
10,900.00
11,300.00
2
3
Kuas 4"
Tang Pemotong Kawat
Bh
Bh
9,300.00
7,300.00
10,800.00
8,500.00
11,700.00
9,200.00
12,100.00
9,500.00
4
5
Keranjang
Bh
Bh
86,700.00
29,300.00
100,600.00
34,000.00
109,100.00
36,900.00
112,700.00
38,100.00
Gergaji
Gunting Pemotong
Bh
37,700.00
43,700.00
47,300.00
49,000.00
7
8
Palu
Kasut Kayu
Bh
Bh
29,800.00
337,800.00
34,600.00
391,800.00
37,600.00
425,000.00
38,700.00
439,100.00
Gerobak / Arco
Bh
25,900.00
30,000.00
32,600.00
33,700.00
10
11
Ember
Bodem
Bh
Bh
53,500.00
32,000.00
62,100.00
37,100.00
67,300.00
40,300.00
69,600.00
41,600.00
12
13
Kunci Pembengkok
Linggis
Bh
Bh
33,700.00
20,300.00
39,100.00
23,500.00
42,500.00
25,600.00
43,800.00
26,400.00
Jam
63,000.00
73,100.00
79,300.00
81,900.00
Jam
Kg
16,700.00
16,400.00
19,400.00
16,400.00
21,100.00
16,400.00
21,700.00
16,400.00
Jam
Jam
30,200.00
393,100.00
30,200.00
456,000.00
30,200.00
494,700.00
30,200.00
511,000.00
14
Chain Saw
15 Kotak Adukan
16 Sabun
17 Gunting Besi
18 Mesin Las
Halaman 110
II. HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA
KABUPATEN KUTAI TIMUR PROPINSI KALIMANTAN TIMUR
TAHUN 2010
No.
[1]
Satuan
Zona I
[4]
Zona II
[5]
Zona III
[6]
Keterangan
Zona IV
[7]
[2]
[3]
Jam
4,902,800.00
4,951,828.00
5,687,248.00
6,373,640.00
2
3
ASPHALT FINISHER
ASPHALT SPRAYER
Jam
Jam
391,300.00
416,100.00
395,213.00
420,261.00
453,908.00
482,676.00
508,690.00
540,930.00
4
5
BULLDOZER 100-150 HP
Jam
Jam
580,200.00
72,200.00
586,002.00
72,922.00
673,032.00
83,752.00
754,260.00
93,860.00
[8]
Jam
91,400.00
92,314.00
106,024.00
118,820.00
7
8
Jam
Jam
619,200.00
208,900.00
625,392.00
210,989.00
718,272.00
242,324.00
804,960.00
271,570.00
DUMP TRUCK
10 EXCAVATOR 80-140 HP
11 FLAT BED TRUCK 3-4 M3
12 GENERATOR SET
13 MOTOR GRADER >100 HP
Jam
524,800.00
530,048.00
608,768.00
682,240.00
Jam
Jam
683,100.00
304,500.00
689,931.00
307,545.00
792,396.00
353,220.00
888,030.00
395,850.00
Jam
Jam
603,100.00
631,900.00
609,131.00
638,219.00
699,596.00
733,004.00
784,030.00
821,470.00
Jam
460,100.00
464,701.00
533,716.00
598,130.00
Jam
Jam
479,200.00
436,000.00
483,992.00
440,360.00
555,872.00
505,760.00
622,960.00
566,800.00
Jam
Jam
358,700.00
290,200.00
362,287.00
293,102.00
416,092.00
336,632.00
466,310.00
377,260.00
Jam
Jam
Jam
241,200.00
46,300.00
573,100.00
243,612.00
46,763.00
578,831.00
279,792.00
53,708.00
664,796.00
313,560.00
60,190.00
745,030.00
Jam
Jam
Jam
31,800.00
371,000.00
142,900.00
32,118.00
374,710.00
144,329.00
36,888.00
430,360.00
165,764.00
41,340.00
482,300.00
185,770.00
Halaman 111
HARGA BAHAN
KABUPATE
No.
Satuan
ZONA 1 (1.00)
Triwulan 1
(0.44%)
I.
Batu Gunung
0.44%
355,600.00
355,600.00
358,500.00
390,300.00
312,200.00
330,500.00
331,500.00
- Batu Abu
207,200.00
Rekap Satuan Harga Barang dan Jasa Provinsi Kalimantan Timur Tahun 2009
112 Of 48