Introduction...........................................................................................................
Kata Pengantar
Indorama Vision and Values..................................................................................
Visi dan Nilai Indorama
What We Do..........................................................................................................
Apa yang Kami Lakukan
Our Business Philosophy........................................................................................
Filosofi Bisnis Kami
Indorama Policy Statement....................................................................................
Pernyataan Kebijakan Indorama
CSR Implementation................................................................................................
Implementasi CSR
CSR Committee Structure........................................................................................
Struktur Komite CSR
CSR Activities..........................................................................................................
Kegiatan CSR
CSR Activity Testimonials.........................................................................................
Testimoni Kegiatan CSR
Community Development.......................................................................................
Pengembangan Masyarakat
Education................................................................................................................
Pendidikan
Politeknik Enjinering Indorama................................................................................
16
Contact Details.............................................................................................
Detil Kontak
4
4
5
6
7
7
8
8
9
10
11
16
17
18
20
23
23
27
30
32
Page 2
Introduction
Kata Pengantar
Page 3
What We Do
Apa yang Kami Lakukan
Page 4
People First
Customer
Delight
Business
Leadership
Happy
Stakeholders
Page 5
1.
2.
3.
4.
5.
1.
2.
3.
4.
5.
Page 6
CSR Implementation
Implementasi CSR
A CSR Committee comprised of senior management
reports directly to the President Director and implements
the CSR programs that are identified at the start of each
year. The Site Head at Indorama Purwakarta, supported by
a dynamic team of Indonesian and expatriate managers,
implement these programs with passion and commitment.
Every attempt is made to involve a wider range of
employees and to effectively socialize the programs.
Outreach is made to stakeholders such as officials,
academic institutions, NGOs and other companies in our
vicinity.
Periodic reviews are undertaken of CSR activities especially
to understand impacts and identify areas of additional
support and improvement. We also encourage our
employees to provide ideas and suggestions related to CSR
and incorporate the best ones in our calendar.
Site Incharge
Ketua
Site Commitee
Advisor (Penasehat)
Secretary
Sekretaris
Members (5)
Anggota (5)
Page 7
CSR Activities
Kegiatan CSR
As a part of our business leadership vision, we also strive
to be a trusted and responsible member of the
communities in which we work and live. Our CSR activities
are aimed at achieving that goal with focus on 4 areas
Education, Health, Community Development and
Environment.
Page 8
"Dengan
terbatasnya
dana
dari
pemerintah untuk anggaran sekolah
kami, bantuan dari Indorama dirasa
sangat membantu kegiatan sekolah agar
anak-anak dapat mengikuti pelajaran
dengan perkembangan teknologi."
dr. H. Agung Darwis Suriaatmadja, M.Kes. - Direktur RSUD Bayu Asih Kabupaten Purwakarta
Help with renovation given to the hospital
was used to house underprivileged patients.
With this aid, our hospital can add capacity
for those underprivileged.
Community Development
Pengembangan Masyarakat
A core aspect of community support has been the creation
of approximately 6,500 jobs (including contract workers)
which is unique in an industry that has seen periodic plant
closures and downsizing due to textile sector related
issues. Indoramas business excellence focus and
achievements have enabled job stability for its employees
and an indirect benefit to the wider community since
majority of these employees and their families reside in
Purwakarta.
Page 9
Education
Pendidikan
PEI is a spacious well designed campus with comprehensive facilities for quality engineering education.
PEI adalah kampus luas yang dirancang dengan fasilitas yang menyeluruh untuk pendidikan teknik yang berkualitas
Page 10
Vision
Through its focus on education based CSR Indorama
creates reputable academic institutions and provides
needed support to deserving students.
Visi
Melalui fokus kepada pendidikan berbasis CSR Indorama
menciptakan institusi pendidikan terkemuka dan
menyediakan dukungan yang dibutuhkan siswa-siswa
berprestasi yang membutuhkan.
Objectives
1. Create values based educational institutions in
major countries where Indorama is based in a
phased manner.
2. Ensure long term sustainability of through
proper structuring, budgeting, operations and
oversight.
3. Establish linkages with reputable institutional
and academic partners to ensure standards of
excellence and continuous improvement.
4. Provide access to deserving and meritorious
students from disadvantaged sections of society
Tujuan
1. Menciptakan institusi pendidikan berbasis nilai di
negara-negara dimana Indorama berada dengan
bertahap
2. Memastikan keberlanjutan jangka panjang
melalui strukturisasi, anggaran, operasional dan
pengawasan yang baik.
3. Membangun hubungan dengan institusi
terkemuka dan rekanan akademik untuk
memastikan standar-standar keunggulan dan
peningkatan berkelanjutan.
4. Menyediakan akses untuk siswa-siswa layak dan
berjasa dari bagian masyarakat yang kurang
mampu
Values
1. Strong Character (Integrity, Leadership, Courage)
2. World Citizen (Knowledge, Excellence,
Innovation)
3. Team Player (Teamwork, Respect, Commitment)
Nilai-nilai
1. Karakter Kuat (Integritas, Kepemimpinan,
Keberanian)
2. Warga Dunia (Pengetahuan, Keunggulan,
Inovasi)
3. Pemain Tim (Kerjasama, Rasa Hormat,
Komitmen)
Page 11
Page 12
Page 13
Faculty housing
Perumahan untuk pengajar
Page 14
Mr. SP Lohia, Group Chairman of Indorama appreciates the support of Bp. Dedi Mulyadi, Bupati Purwakarta at the launch of PEI.
Bp. SP Lohia, Pimpinan Grup Indorama, menghargai dukungan Bp. Dedi Mulyadi, Bupati Purwakarta di peluncuran PEI.
Page 15
Employee Development
Pengembangan Karyawan
Employee training and development is a priority in
Indorama and the company has one of the most
comprehensive competencies based technical and
managerial skills development programs in industry.
Apart from in house trainers the company also partners
with external specialists to drive this initiative.
Page 16
Health
Kesehatan
Page 17
Page 18
CPP
Canteen major modification and renovation, improving quality and facility of CPP canteen.
Ubahan pada kantin dan renovasi, meningkatkan kualitas dan fasilitas kantin CPP.
Toilet modification and renovation to increase hygienic condition of CPP toilet at turbine hall area
Ubahan dan renovasi untuk toilet untuk meningkatkan kondisi kebersihan toilet CPP di area turbin
Medical Checkup for Operators Planning 50 person
Pemeriksaan kesehatan untuk operator direncanakan 50 orang.
Weaving
Medical checkup for 240 workers
Pemeriksaan kesehatan untuk 240 pekerja.
To organize blood donation in coordination with site
Menyelenggarakan donor darah bekerja sama dengan situs lain.
Aerobic training for workers in female mess
Latihan aerobik untuk pekerja wanita di asrama.
Page 19
Spinning
To conduct In house Health training/awareness program for general health guide lines. Total 700 employees from all the
departments to participate in this program
Melaksanakan pelatihan/program kesadaran kesehatan internal untuk pedoman dasar kesehatan. Total 700 pekerja dari semua
departmen turut serta program ini.
Medical checkup as per OHSAS 18001 : 2007 requirement for employees for 200 employees /annum
Pemeriksaan kesehatan sesuai persyaratan OHSAS 18001:2007 untuk 200 pekerja/tahun
Construction of new toilet (male & female) for Spg 5 employees (350 employees)
Pembangunan toilet baru (pria & wanita) untuk pekerja Spg 5 (350 pekerja)
Construction of new toilet (male & female) for Spg 1 employees (325 employees)
Pembangunan toilet baru (pria & wanita) untuk pekerja Spg 1 (325 pekerja)
To Install water purifier of higher capacity for Spg 5 employees to provide potable water.
Pemasangan penjernih air dengan kapasitas lebih besar untuk pekerja Spg 5
To Install water purifier of higher capacity for Spg 1 employees to provide potable water.
Pemasangan penjernih air dengan kapasitas lebih besar untuk pekerja Spg 5
Page 20
CPP
Additional lightening arrester
Arrester pencahayaan tambahan
Hydrant line retrofit at several point, change from underground to over ground for reliability improvement.
Retrofit barisan hidran di berbagai titik, perubahan dari bawah tanah ke atas tanah untuk peningkatan penggunaan.
Additional acid fume evacuation fan at DM plant metering room area.
Tambahan kipas untuk pembuangan uap asam di area ruang metering di pabrik DM
Chimney repainting as per standard law and regulation
Pengecatan ulang cerobong asap sesuai peraturan hukum yang berlaku
Daily/Weekly safety CDs shows for plant personnel
Pertunjukkan CD keselamatan untuk pegawai pabrik secara harian/mingguan
Safety railing installation for sediment tank and reused water regulating reservoir.
Rel keselamatan dipasang pada tanki sedimen dan penampungan air daur ulang.
Installation of water curtain at DM Plant chemical storage tank area.
Pemasangan tirai air pada wilayah tanki penyimpanan kimia pabrik DM
Installation of safety portal at boiler pulverize area.
Pemasangan portal keselamatan di wilayah boiler pulverize
Upgrading boiler pocking tools to improve man power safety during pocking jobs.
Meningkatkan alat pocking boiler untuk meningkatkan keselamatan tenaga kerja saat pekerjaan pocking
Cooling tower caging and wire mesh installation at cooling tower basin.
Kerangka untuk cooling tower dan pagar besi untuk basin cooling tower
Additional safety signboard (4 Nos)
Tambahan papan pengumuman safety (4 buah)
2 Nos safety slogan installation at plant entrance
Pemasangan slogan keselamatan di pintu masuk pabrik (2 buah)
Page 21
Weaving
annual Alarm system service maintenance
Pemeliharaan sistem alarm tahunan
Training for Enggineering to proteksion kecelakaan kerja from hazard m/c
Pelatihan untuk enjinering untuk perlindungan kecelakaan kerja
Fire Hydrant system service in WVG 2 Box & Pipe Cause of leak detection.
Perawatan sistem hidran api di WVG box dan deteksi penyebab kebocoran pipa
Modification ladder trap Utl wv1position abnormal
Modifikasi ladder trap utl wv1 posisi tidak normal
Additional/change sign board Emergency Exit with green coulor
Penambahan/penggantian papan pengumuman keluar darurat dengan warna hijau
Spinning
Safety Reward Scheme started in year 2012/2013.
Memulai skema hadiah keselamatan dimulai 2012/2013
Planned P3K Training Program by Outside Agency
Program pelatihan P3K terencana oleh badan eksternal
Additional safety poster/Boards for OSBL/ISBL to be provided
Tambahan poster/papan keselamatanuntuk OSBL/ISBL untuk disediakan
To implement new design of Safety JILBAB for employees
Perencanaan penerapan desain baru untuk Jilbab Keselamatan untuk karyawan
Safety gloves to be designed while using knife to prevent injuries
Sarung tangan keselamatan untuk dirancang saat menggunakan pisau untuk menghindari luka
Page 22
Safety sticker
Stiker keselamatan
Environment
Lingkungan
Indorama is committed to high standards of environmental
sustainability. These are at the core of our operational
excellence pillar. Our focus on this issue covers raw
materials, processes, management of emissions and
discharges, water treatment and recycling, energy
efficiency and assessment of external impacts.
Environment, Health and Safety (EHS) practices are
provided the highest priority and the company makes
every effort in minimizing industrial accidents.
Indorama
berkomitmen
terhadap
standar
tinggi
kesinambungan lingkungan hidup. Hal ini merupakan pilar
kesempuranaan operasi kami. Fokus kami pada hal ini
mencakup
pengelolaaan
bahan
mentah,
proses,
pengelolaan emisi, limbah buangan pengelolaan air dan
daur ulang, efisiensi energi dan penilaian dampak eksternal.
Praktek Lingkungan, Kesehatan, dan Keamanan atau yang
lebih dikenal dengan Environment, Health and Safety (EHS)
menjadi prioritas kami dan perusahaan semaksimal
mungkin berusaha meminimalisir kecelakaan yang dapat
terjadi
Page 23
Before
Sebelum
After
Sesudah
Page 24
Before
Sebelum
After
Sesudah
CPP
Plantation of additional (100 Nos) trees at CPP area
Penanaman 100 pohon di CPP
New coal yard drain pit installation to control coal spillage.
Pemasangan kolam kurasan batu bara untuk mengendalikan tumbahan batu bara
Improving operation SOP for bottom ash handling at CPP, confirm with local law regulation for hazardous waste handling system
Meningkatkan operasional SOP untuk penanganan bottom ash, konfirmasi dengan hukum lokal unuk sistem penanganan limbah
50 Nos Bio-pore planting to improves water catchment and soil re-cultivation
Penanaman 50 tanaman bio pore untuk meningkatkan penangkapan air dan rekultivasi tanah
Weaving
Planted 40 trees, (In December 2013)
Penanaman 40 pohon di Desember 2013
Training for Supervisor and above for socialising EMS
Pelatihan supervisor ke atas untuk sosialisasi EMS
Make two small garden at weaving
Membuat du ataman kecil di weaving
To make board for waste water flow process
Membuat papan proses arus air limbah
Page 25
Page 26
Eco-Friendly Products
Produk Ramah Lingkungan
Our textile products have been tested against harmful
substances by the International Association for Research
and Testing in Textile Ecology. They have been awarded
the prestigious Oeko-Tex Standard 100 for several
consecutive years.
th
Certified by Certified Control Union for the Global Recycle Standar dated November 20 2011, CU Number 803338.
Page 27
Page 28
norms.
ETP (Effluent Treatment Plant) has sludge belt
press and drier system to reduce the generated
sludge volume by almost 95%.
The machine cooled water is collected and recycled for
processing.
Page 29
Energy Conservation
Penghematan Energi
Energy saving is a crucial part of sustaining the
environment. We at Indorama make it one of our primary
objectives to continuously find methods to reduce our
energy consumption. Following is a table of energy
reduction conducted in the past year from all our divisions.
Saving Kwh /
Division Poly
Unit Electrical
Replacement TL conventional 40 watt to TL LED 17 watt area T/U sys 2/3
Replacement TL conventional 20 watt to TL LED 9 watt area PMC & CP2
Replacement High bay HPLN 125 watt to TL conventional 36 watt area UTL
Replacement HPIT 400 watt to LED floodlight 50 watt area DCB2
Replacement High bay HPLN 250 watt to LED floodlight 50 watt area DCB1
Replacement High bay HPLN to TL conventional 2x36 watt area AHU Pos 7.1/7.2/7.3
Replacement TL conventional 40 watt to TL LED 22 watt area Spinning Sys 1-10
Replacement street lighting 70 watt to Solar cell area common road
Replacement TL conventional 40 watt to TL LED 17 watt area DTY m/c 8/11/23
Replacement TL conventional 20 watt to TL LED 9 watt area PMC
Replacement Mercury 125 watt to LED floodlight 50 watt area PTA
Replacement TL conventional 40 watt to TL LED 17 watt area PSF
Replacement TL conventional 40 watt to TL LED 17 watt area Poly CP2
Replacement TL conventional 40 watt to TL LED 17 watt area DCS Poly CP2
Replacement TL conventional 40 watt to TL LED 17 watt area PSF
Replacement TL conventional 40 watt to TL LED 17 watt area Poly CP1 office
Replacement TL conventional 40 watt to TL LED 17 watt area Packing
Month
529.92
174.24
306
504
288
734.4
1296
1108.8
414
396
162
496.8
165.6
165.6
165.6
298.09
165.6
Saving Kwh /
Division Poly
Unit Ply
Steam consumption optimization against KPI In CP-2
Steam consumption optimization against KPI In CP-3
Installing Inverter in CP-2 HTM Dow Circulalation HTM Pump Heater 2 and Liq. Dow Pump, and
getting benefid for CP-2/3
Month
59978
30825
43795.04
Divison Poly
Unit UTL
Fuel Reduction via improved Maintenance procedures For DCB & SCB
New Haiduk compressor
VAC CP3 replacement with York Chiller
Saving Kwh /
Month
438342.15
37434.45
150257
Division SPG
Unit Eng
Installation freq. inv. on wdg AHU pump :
Installation of freq. inv & temp. controller on cooling tower no.4
Power saving in chiller by optimization of chilled water in Spg 6 and 7 preparatory area. From July
to Dec. 2013
Saving Kwh /
Month
5,760
4,830
254,019
Page 30
Division IRT
Unit Eng
Plant lighting 1*52 W Change With 1*22 W
After Replaced Autoconer 238 with X5,Stopped 45 kw Central Suction Fan.
Replaced existing CRT monitor of 110w with LCD 35 W
Plant lighting J 20 TLD 1*36 W Change With LED 1*22 W
Optimization of RCR Supply fan SF. 11 with reference to requirement. Power consumption without
freq. Inv. KW 12.5 Power consumption with freq int. at 40 HZ in KW 4.56
Saving Kwh /
Month
583
29,520
270
1,888
Division Weaving
Unit Eng
Modification switch tfo lighting from manual to automatic system
Modification switch tfo lighting from manual to automatic system
Saving Kwh /
Month
4,267
3,840
Divison CPP
Unit Operation
Modification of lighting at CWP house (CWP house, PLC cabinet and Dozing room)
Replacement of street lamps with Solar lights (7 Set).
Replacing with Con-Tempo 150W at Demin process area
New installation of Road light from Coal Storage Yard to Ash Dyke gate for IPCI road.
Saving Kwh /
Month
889
658
527
219
Division
Polyester
Spinning
Spinning IRT
Weaving
CPP
Total
5,717
Saving Kwh/Month
768002.38
264609.17
37977.64
8107
2292.88
1080989.07
Equivalent to GWH
Atau sama dengan GWH
1 GWH=3.6 TJ
Total Saving
Carbon emission factor for coal (CO2 emission factor) Ton/Tj
Carbon emission factor untuk batu bara (CO2 emission factor) Ton/TJ
Reduce of Greenhouse Effect Gas emission CO2 per month is (Ton CO2/mnth)
Penurunan gas rumah kaca berupa emisi CO2 per bulan adalah . ( Ton CO2/mth)
1.08098907
3.6
3.891560652
96.1
373.98
Page 31