Anda di halaman 1dari 4

ANALISA QUANTITY DAN BUDGET MATERIAL

FORM
PROYEK
PEKERJAAN

: ANALISA QUANTITY DAN BUDGET MATERIAL


: PEMBANGUNAN KOST HOTEL
: RENOVASI RUMAH - ALTERNATIFE 1

ITEM PEKERJAAN

NO.
A

B
B.i

PEKERJAAN PENDAHULUAN
Pembongkaran dinding
* Luas dinding untuk tiang, sloof dll
* Luas dinding lt. 2
* Qty

QUANTITY

l
l

= (0,6+0,6+0,6)*3,5+(7+7+7+4+4)*0,4
= (4+2)*3,5
=

=
=
=

17,900 M
21,000 M
38,900 M

Pembongkaran atap baja ringan


* Luas

= (4*4)+(1*1,5)

17,500 M

Pembongkaran plat meja dapur


* Luas

= 1*0,6

0,600 M

PEKERJAAN LANTAI 1
Konstruksi Beton Bertulang
Galian tanah pondasi & sloof
a. Pondasi tapak
* Volume
* Unit
* Qty
b. Sloof
* Luas
* Panjang
* Qty
Pasir urug
a. Pondasi tapak
* Volume
* Unit
* Qty
b. Sloof
* Luas
* Panjang
* Qty
Pondasi tapak
* Volume
* Unit
* Qty
Pembesian
* Panjang efektif
* Tulangan 13-150
* Kawat beton
* Rasio x 10% Overhead
Bekisting
* Luas
* Rasio
Sloof uk. 20x35
* Luas
* Panjang
* Qty
Pembesian
* Panjang efektif
* Panjang sengkang
* Tulangan 5D10
* Sengkang 6-150
* Kawat beton
* Rasio x 10% Overhead
Bekisting
* Luas
* Rasio
Kolom struktur uk. 15x40
* Luas
* Unit
* Qty
Pembesian
* Panjang efektif
* Panjang sengkang
* Tulangan 6D13
* Sengkang 6-150
* Kawat beton
* Rasio x 10% Overhead
Bekisting
* Luas
* Rasio
Balok struktur
a. B 15/40
* Luas
* Panjang
* Qty
Pembesian
* Panjang efektif
* Panjang sengkang
* Tulangan 6D13
* Sengkang 6-150
* Kawat beton
* Rasio x 20% Overhead
Bekisting
* Luas

38,90 M

17,50 M
0,60 M

1,70 M
v
n
v
v
p
v

x n

= 0,8*0,8*0,3
= 3,000
=

=
=
=

x p

= 0,2*0,35
= (7)+(1+4+4)
=

=
=
=

0,192 M
3,000 Unit
0,576 M
0,070 M
16,000 M
1,120 M
0,26 M

v
n
v
v
p
v
v
n
v

x n

= 0,8*0,8*0,05
= 3,000
=

=
=
=

x p

= 0,2*0,05
= link
=

=
=
=

x n

= 0,8*0,8*0,3
= 3,000
=

=
=
=

=
=
=
=

=
=
=
=

p
b
k
l
l
l
p
l

l
n
l

0,192 M
3,000 Unit
0,576 M
2,126
134,407
1,920
150,000

=
=

x p

= 0,2*0,35
= link
=

=
=
=

0,070 M
16,000 M
1,120 M

=
=
=
=
=
=

=
=
=
=
=
=

14,286
1,000
44,036
21,359
0,934
70,000

0,700 M
10,000 M/M

1/(0,2*0,35)
(0,15+0,3)*2+0,1
5*p*(0,006165*10^2)
ps*(p/0,15+1)*(0,006165*6^2)
b/70
(b+k)*1,1

/ p

= 0,35*2
=

=
=

x n

= 0,15*0,4*3,5
= 3,000
=

=
=
=

=
=
=
=
=
=

=
=
=
=
=
=

/ p

1/(0,2*0,4)
(0,15+0,35)*2+0,1
6*p*(0,006165*13^2)
ps*(p/0,15+1)*(0,006165*6^2)
b/70
(b+k)*1,1

= 0,4*2
=

=
=

0,58 M

M
Kg/M
Kg/M
Kg/M

= p*0,3
=

p
ps
b
b
k
l
l

0,010 M
16,000 M
0,160 M

/ v

p
ps
b
b
k
l
l

sqrt(1/0,3)+0,3
p*(p/0,15+1)*2*2*(0,006165*13^2)
b/70
(b+k)*1,1

0,032 M
3,000 Unit
0,096 M

0,548 M/M
0,548 M/M

M
M
Kg/M
Kg/M
Kg/M
Kg/M

0,210 M
3,000 Unit
0,630 M
12,500
1,000
78,141
18,717
1,384
110,000

1,12 M

0,63 M

M
M
Kg/M
Kg/M
Kg/M
Kg/M

0,800 M
10,000 M/M
1,48 M

l
p
l

= 0,15*0,4
= (7)+(4+4+4)
=

=
=
=

p
ps
b
b
k

=
=
=
=
=
=

=
=
=
=
=
=

= 0,15+0,4*2

x p

1/(0,15*0,4)
(0,1+0,35)*2+0,1
6*p*(0,006165*13^2)
ps*(p/0,15+1)*(0,006165*6^2)
b/70
(b+k)*1,2

0,060 M
19,000 M
1,140 M
16,667
1,000
104,189
24,882
1,844
157,097

M
M
Kg/M
Kg/M
Kg/M
Kg/M

0,950 M

QTY

ANALISA QUANTITY DAN BUDGET MATERIAL


FORM
PROYEK
PEKERJAAN

: ANALISA QUANTITY DAN BUDGET MATERIAL


: PEMBANGUNAN KOST HOTEL
: RENOVASI RUMAH - ALTERNATIFE 1

ITEM PEKERJAAN

NO.
* Rasio
b. B 15/30
* Luas
* Panjang
* Qty
Pembesian
* Panjang efektif
* Panjang sengkang
* Tulangan 4D13
* Sengkang 6-150
* Kawat beton
* Rasio x 20% Overhead
Bekisting
* Luas
* Rasio

B.ii
1

2
3
4
B.iii
1
2

Kolom & balok praktis


* Luas
* Panjang
* Qty
Pembesian
* Panjang efektif
* Panjang sengkang
* Tulangan 410
* Sengkang 6-150
* Kawat beton
* Rasio x 20% Overhead
Bekisting
* Luas
* Rasio
Plat lantai t. 12 cm
* Luas
* Tebal
* Qty
Pembesian
* Panjang efektif
* Tulangan 10-250
* Kawat beton
* Rasio x 10% Overhead
Pasangan Dinding & Pintu Jendela
Pasangan dinding bata : mix 1:4
a.
Dinding
* Panjang
* Tinggi
* Qty
b.
Void
Pintu lipat buka 4
Pintu standar uk. 80x210 cm : R. Pembantu
Jendela uk. 90x150 : R. Pembantu

Pasangan Plafond
Pasangan plafond : ex. Gypsum t. 9mm
* Luas

B.v
1

Finishing Pengecatan
Cat dinding interior
a.
Dinding
* Panjang
* Tinggi
* Qty
b.
Void

2
3
B.vi
1
2
3

/ p

l
p
l

x p

= 0,15*0,3
= (3+3)+(1,5)
=

=
=
=

=
=
=
=
=
=

=
=
=
=
=
=

22,222
0,900
92,612
29,792
1,749
148,983

M
M
Kg/M
Kg/M
Kg/M
Kg/M

=
=
Rasio pembesian rata-rata =
Rasio bekisting rata-rata =

0,750
16,667
160,000
20,000

M
M/M
Kg/M
M/M

p
ps
b
b
k
l
l

l
p
l

= 0,15+0,3*2
=

x p

= 0,15*0,15
= (2,5+2,5+2,5)
=

=
=
=

=
=
=
=
=
=

=
=
=
=
=
=

p
ps
b
b
k
l
l
l
t
l

1/(0,15*0,3)
(0,1+0,3)*2+0,1
4*p*(0,006165*13^2)
ps*(p/0,15+1)*(0,006165*6^2)
b/70
(b+k)*1,2

/ p

1/(0,15*0,15)
(0,1+0,1)*2+0,1
4*p*(0,006165*10^2)
ps*(p/0,2+1)*(0,006165*6^2)
b/70
(b+k)*1,2

15,833 M/M
0,045 M
7,500 M
0,338 M

0,023 M
7,500 M
0,169 M
44,444
0,500
109,600
24,771
1,920
160,000

= 0,15*2
=

=
=

0,300 M
13,333 M/M

x t

= (4*4)+(1*1,5)
= 0,120
=

=
=
=

17,500 M
0,120 M
2,100 M

=
=
=
=

=
=
=
=

p
b
k

sqrt(1/0,12)
p*(p/0,25+1)*2*2*(0,006165*10^2)
b/70
(b+k)*1,1

2,887
89,319
1,276
100,000

2,27 M

M
M
Kg/M
Kg/M
Kg/M
Kg/M

/ p

2,10 M

M
Kg/M
Kg/M
Kg/M
15,23 M

p
t

Pelapis Lantai & Dinding


Pasangan keramik lantai : Area Laundry
* Luas
l
Dinding meja dapur : cermin bevel uk. 30x30
* Luas
l

B.iv
1

QUANTITY

= (1)+(4)
= 3,500
=
= 2,1*1,8

=
=
=
=

5,000
3,500
19,005
-3,780

M
M
M
M

= (4*1)+(2*1,5)+(1*1,5)

8,500 M

= 3*0,6

1,800 M

= (3*4)+(1*4)+(1*1,5)

17,500 M

1,00 Unit
1,00 Unit
1,00 Unit
8,50 M
1,80 M

17,50 M

89,25 M
p
t
p

Cat plafond
Cat pintu lipat 4 daun

x t

= (7+4)+(4+4+4+4)
= 3,500
=
= 2,1*2,5

=
=
=
=

= link

Mekanikal & Elektrikal


Instalasi pipa air bersih dan air kotor : ex. Wavin
Instalasi elektikal titik lampu
Instalasi elektikal stop kontak

27,000
3,500
94,500
-5,250

M
M
M
M
17,50 M
1,00 Unit
1,00 ls
7,00 titik
4,00 titik

QTY

ANALISA QUANTITY DAN BUDGET MATERIAL


FORM
PROYEK
PEKERJAAN

: ANALISA QUANTITY DAN BUDGET MATERIAL


: PEMBANGUNAN KOST HOTEL
: RENOVASI RUMAH - ALTERNATIFE 1

ITEM PEKERJAAN

NO.
C
C.i
1

C.ii
1

C.iii
1
2
3
4

PEKERJAAN LANTAI 2
Konstruksi Beton Bertulang
Kolom struktur uk. 15x40
* Luas
* Unit
* Qty
Pembesian
* Panjang efektif
* Panjang sengkang
* Tulangan 6D14
* Sengkang 6-150
* Kawat beton
* Rasio x 10% Overhead
Bekisting
* Luas
* Rasio
Balok struktur uk. 15x30
* Luas
* Panjang
* Qty
Pembesian
* Panjang efektif
* Panjang sengkang
* Tulangan 6D13
* Sengkang 6-150
* Kawat beton
* Rasio x 20% Overhead
Bekisting
* Luas
* Rasio
Kolom & balok praktis
* Luas
* Panjang
* Qty
Pembesian
* Panjang efektif
* Panjang sengkang
* Tulangan 410
* Sengkang 6-150
* Kawat beton
* Rasio x 20% Overhead
Bekisting
* Luas
* Rasio
Plat dag
* Luas
* Tebal
* Qty
Pembesian
* Panjang efektif
* Tulangan 10-250
* Kawat beton
* Rasio x 10% Overhead
Pasangan Dinding & Partisi
Pasangan dinding bata
* Panjang
* Tinggi
* Qty

l
n
l

x n

p
ps
b
b
k
l
l
l
p
l

l
p
l

C.iv
1

Pasangan Plafond
Pasangan plafond : ex. Gypsum t. 9mm
* Luas

C.v
1

Finishing Pengecatan
Cat dinding interior
a.
Dinding
* Panjang
* Tinggi
* Qty
b.
Void

=
=
=
=
=
=

=
=
=
=
=
=

1/(0,2*0,4)
(0,15+0,35)*2+0,1
6*p*(0,006165*14^2)
ps*(p/0,15+1)*(0,006165*6^2)
b/70
(b+k)*1,1

0,210 M
3,000 Unit
0,630 M
12,500
1,000
90,626
18,717
1,562
120,000

0,800 M
10,000 M/M

x p

= 0,15*0,3
= (7+7)+(4+4+4)
=

=
=
=

0,045 M
26,000 m
1,170 M

=
=
=
=
=
=

=
=
=
=
=
=

1/(0,2*0,4)
(0,15+0,35)*2+0,1
6*p*(0,006165*13^2)
ps*(p/0,15+1)*(0,006165*6^2)
b/70
(b+k)*1,2

/ p

= 0,2+0,4*2
=

=
=

x p

= 0,15*0,15
= (2,5+2,5+2,5)
=

=
=
=

=
=
=
=
=
=

=
=
=
=
=
=

1/(0,15*0,15)
(0,1+0,1)*2+0,1
4*p*(0,006165*10^2)
ps*(p/0,2+1)*(0,006165*6^2)
b/70
(b+k)*1,2

12,500
1,100
78,141
20,589
1,410
120,000

1,000 M
12,500 M/M
0,023 M
7,500 M
0,169 M
44,444
0,500
109,600
24,771
1,920
160,000

=
=

0,300 M
13,333 M/M

x t

= (4*4)+(3*1,5)
= 0,120
=

=
=
=

20,500 M
0,120 M
2,460 M

p
b
k

=
=
=
=

=
=
=
=

p
t

= (7+2)+(4+1,5+4+4)
= 3,500
=

=
=
=

22,500 M
3,500 M
78,750 M

= (3+2+7+7)+(4+2,5+4)
= 0,300
=

=
=
=

29,500 M
0,300 M
8,850 M

= (4*4)

16,000 M

= (3*1,5)+(1*1,5)

6,000 M

l
l

= 2*1,5
= (2+1,5)*2*1,5-(0,7*1,5)

=
=

3,000 M
9,450 M

= 2*1,5

3,000 M

= (4*4)+(3*1,5)

20,500 M

p
t
p

= (7+7)+(4+4+4+4)
= 3,500
=
= 2,1*2,5

=
=
=
=

2,887
89,319
1,276
100,000

2,63 M

M
M
Kg/M
Kg/M
Kg/M
Kg/M

= 0,15*2
=

sqrt(1/0,12)
p*(p/0,25+1)*2*2*(0,006165*10^2)
b/70
(b+k)*1,1

1,17 M

M
M
Kg/M
Kg/M
Kg/M
Kg/M

/ p

l
t
l

0,63 M

M
M
Kg/M
Kg/M
Kg/M
Kg/M

=
=

Pasangan dinding bata parafet (railling ) area void & plat dag
* Panjang
p
* Tinggi
t
* Qty
Pelapis Lantai & Dinding
Pasangan keramik lantai : R. Keluarga
* Luas
Pasangan keramik lantai : Area Jemur
* Luas
Kamar Mandi Lt. 2
* Lantai
* Dinding
Waterproofing + screeding lantai
* Lantai

=
=
=

= 0,4*2
=

p
ps
b
b
k
l
l

= 0,15*0,4*3,5
= 3,000
=

/ p

p
ps
b
b
k
l
l

QUANTITY

2,46 M

m
Kg/M
Kg/M
Kg/M
78,75 M

8,85 M

16,00 M
6,00 M
1,00 unit
3,00 M

20,50 M

99,75 M

x t

30,000
3,500
105,000
-5,250

M
M
M
M

QTY

ANALISA QUANTITY DAN BUDGET MATERIAL


FORM
PROYEK
PEKERJAAN

: ANALISA QUANTITY DAN BUDGET MATERIAL


: PEMBANGUNAN KOST HOTEL
: RENOVASI RUMAH - ALTERNATIFE 1

ITEM PEKERJAAN

NO.
2

3
4

Cat dinding ekterior


a.
Dinding
* Panjang
* Tinggi
* Qty
Cat plafond
Cat pintu lipat 4 daun

52,50 M
p
t
p

B.vi
1
2
3
4

Mekanikal & Elektrikal


Instalasi pipa air bersih dan air kotor : ex. Wavin
Instalasi elektikal titik lampu.
Instalasi elektikal titik stop kontak.
Instalasi TV + power

D
D.i

PEKERJAAN LANTAI DAG BETON


Pelapis Lantai & Dinding
Pasangan keramik lantai : Dag beton
* Luas
Waterproofing + screeding lantai
* Lantai

1
2

QUANTITY

x t

= (7)+(4+4)
= 3,500
=
= link

=
=
=
=

15,000 M
3,500 M
52,500 M

20,50 M
1,00 Unit
1,00
10,00
6,00
1,00

= (4*4)+(3*1,5)

20,500 M

= Link

20,500 M

ls
titik
titik
titik

20,50 M
20,50 M

QTY

Anda mungkin juga menyukai