Langkah perhitungan :
3. Hitung
0,05 γsV2 〖 [d50/(g(γs/γ-1))] 〗 ^(1/2) x [ 〖 τ0/(γs-γ)d50] 〗 ^(3/2)
qs =
*τ0 = γ*D*S
*τ0 = 1000*0,839*0,00101
*τ0 = 0.00084739
maka,
qs =2 〖 [0,241/(9,81(0,6/1-1))] 〗 ^(1/2) x [ 〖 0,00085/(0,6-1)0,241] 〗 ^(3/2)
0,05 *0,6*0,847
qs = 0.00000440
4. Hitung
Gw = γ*W*D*V
Gw = 1*69,5*0,839*0,847
Gw = 49.40360255
dimana W = lebar saluran
5. Hitung
Qs = W*qs
Qs = 69,5*(4,398*10-6)
Qs = 0.000305691
Qs = Ct*Q
Qs = (6,187*10-6 )*(50)
Qs = 0.000309382 Ton/det
Qs = 0.309381702 kg/det
Qs = 1113.774129 kg/jam
Qs = 26730.5791 kg/hari
Maka banyaknya volume sedimen dalam satu hari dalam satuan meter kubik adalah
Vsedimen = Qs/γs
Vsedimen = 26730,5791/600
Vsedimen = 44.55097 m3