Anda di halaman 1dari 61

DAFTAR JUDUL

TUGAS AKHIR DAN


PROYEK AKHIR
2013 – 2017
2013
DOSEN
NO INVENTARIS NAMA MAHASISWA JUDUL TUGAS AKHIR/PROYEK AKHIR
PEMBIMBING
AGUS
KURNIAWAN, WARTUM PROPERTI BETON SEGAR DAN BETON KERAS UNTUK BETON
013/DTS/3/AK/001
ST., MT., ILMANNUDDIN SERAT KACA (FIBER GLASS)
PH.D.
AGUS METODE KOMBINASI BARCHART DAN S-CURVE PADA
KURNIAWAN, SCHEDULE PROYEK PEMBANGUNAN JARINGAN PIPA AIR
013/DTS/3/AK/002 RINI RATNAYANTI
ST., MT., LIMBAH APY MSMHP FASE III PT ADHI KARYA (PERSERO)
PH.D. TBK DIVISI IV KONSTRUKSI SEMARANG, JAWA TENGAH
AGUS
KURNIAWAN, RESTU EKO ANALISA PERBANDINGAN PEJAL DAN SPUN PILE "STUDI
013/DTS/3/AK/003
ST., MT., PRABOWO S KASUS DI PT SURYA MAX INDUSTRIES"
PH.D.
AGUS
ANALISA KEAMANAN SOLDIER PILE MENGGUNAKAN
KURNIAWAN,
013/DTS/3/AK/004 LYDIA AFIYATI METODE FEM STUDI KASUS KANTOR AMBARUKMO OFFICE
ST., MT.,
CENTER JL. SOLO
PH.D.
AGUS
APLIKASI PLAT LENGKUNG ATAP BETON MENGGUNAKAN
KURNIAWAN,
013/DTS/3/AK/005 TRIO WIJANARKO CAMPURAN SERAT SERABUT KELAPA (COCONUT FIBER)
ST., MT.,
DENGAN VARIASI RADIUS
PH.D.
AGUS
PERENCANAAN STRUKTUR GEDUNG HOTEL THE KIRANA
KURNIAWAN, ERIE BUDI
013/DTS/3/AK/006 DENGAN METODE SISTEM RANGKA PEMIKUL MOMENT
ST., MT., KURNIAWAN
KHUSUS (SRPMK)
PH.D.
AGUS
PRODUKTIVITAS PEKERJA PADA PEKERJAAN PASANGAN
NUGROHO, GHULAM AHMAD
013/DTS/3/AN/001 BATA MERAH DI PT. KARYA SEHATI UTAMA UTAMA PADA
ST., MT., ROBBANI
PROYEK PERUMAHAN THE JALIMBAR RESIDENCE
PH.D.
ANALISIS PENGARUH KUALITAS PROYEK PERUMAHAN DAN
AGUS
LAYANAN TERHADAP KEPUASAN KONSUMEN STUDI KASUS
NUGROHO,
013/DTS/3/AN/002 MUH ROFIK PROYEK PEMBANGUNAN PERUMAHAN GRAHA
ST., MT.,
PERMATAKOTA PT. VARINDO LOMBOK INTI MATARAM
PH.D.
LOMBOK BARAT NTB
AGUS
FAKTOR-FAKTOR PEMILIHAN EXCAVATOR PEKERJAAN
NUGROHO,
013/DTS/3/AN/003 SYARDIANTI PENINGKATAN JALAN INSPEKSI SELOKAN MATARAM -
ST., MT.,
YOGYAKARTA PT. ANEKA DHARMA PERSADA
PH.D.
AGUS ANALISIS FAKTOR - FAKTOR PENTING YANG
NUGROHO, BIEFFE ANNELIS MEMPENGARUHI KETERLAMBATAN PROYEK JALAN
013/DTS/3/AN/004
ST., MT., ASHITA DENGAN MENGGUNAKAN METODE ANALYTICAL
PH.D. HIERARCHY PROCESS
DEVI
GRACEA ELYDA PENGARUH PENAMBAHAN ABU VULKANIK DAN KAPUR
OKTAVIANA
013/DTS/3/DO/001 SAFARET BR PADA TANAH EKSPANSIF TERHADAP PERILAKU SEWWLING
LATIF, ST.,
SEMBIRING TANAH
M.ENG
DEVI
REHABILITAS DAN PEMELIHARAAN SALURAN SEKUNDER
OKTAVIANA
013/DTS/3/DO/002 KHRISTIN PUJIYANTI PANJATAN DAERAH IRIGASI SAPON KABUPATEN KULON
LATIF, ST.,
PROGO DAERAH ISTIMEWA YOGYAKARTA
M.ENG
DEVI
OKTAVIANA PENGARUH ABU VULKANIK SEBAGAI BAHAN STABILISASI
013/DTS/3/DO/003 IMAM PRABOWO
LATIF, ST., TANAH UNTUK LAPIS SUBGRADE
M.ENG
DIAN
ROY SEMPAKATA METODE PELAKSANAAN PONDASI BORED PILE
013/DTS/3/DS/001 SESTINING
PERANGIN-ANGIN APARTEMENT GRAND DHIKA CITY BEKASI SEKTOR 2A
AYU, ST., MT.
SCHEDULING TENAGA KERJA PEKERJAAN PIER R2 SAMPAI
DIAN
ABUTMENT A3 PROYEK FLY OVER (FO) JOMBOR PT. ADHI
013/DTS/3/DS/002 SESTINING HENIN AGUSTYA
KARYA (PERSERO) TBK. DIVISI KONSTRUKSI IV SLEMAN,
AYU, ST., MT.
DAERAH ISTIMEWA YOGYAKARTA
DIAN TINJAUAN JAM OPERASIONAL TOWER CRANE (STUDI
MEUTIA WIDYA
013/DTS/3/DS/003 SESTINING KASUS PADA PEKERJAAN STRUKTUR PROYEK MALL
HERNINGRUM
AYU, ST., MT. BINTARO XCHANGE)
DIAN
ATINA TUNGGA ANALISIS STRUKTUR PILAT R3 FLY OVER JOMBOR DI
013/DTS/3/DS/004 SESTINING
DEWI PROPINSI DIY
AYU, ST., MT.
ANALISIS VOLUME AKTUAL DAN HARGA SATUAN
DR. ENG.
PEKERJAAN STRUKTUR BETON BOILER FOUNDATION
IMAN
013/DTS/3/IH/001 HENDRO SISTEM KONTRAK UNIT PRICE STUDI KASUS PROYEK
HARYANTO
MULTIFIED BOULER PT. LONTAR PAPYRUS PULP AND
S.T., M.T.
PAPPER INDUSTRIES, TEBING TINGGI, JAMBI.
DR. ENG. PERANCANGAN TEBAL DAN ESTIMASI BIAYA PERKERASAN
IMAN KAKU (RIGID PAVEMENT) PADA PROYEK PEMELIHARAAN
013/DTS/3/IH/002 SIMPLISIUS AMBOT
HARYANTO JALAN KOLEKTOR DI JALAN MADUKARA KABUPATEN
S.T., M.T. CILACAP
DR. ENG.
IMAN AGUSTIEN DYAH METODE PERANCANGAN CAMPURAN BERASPAL PANAS
013/DTS/3/IH/003
HARYANTO TRISNAWATI DENGAN BAHAN TAMBAH RETONA
S.T., M.T.
DR. IR. SINDU
PELAKSANAAN PEMASANGAN BENTANG GIRDER DUPLIKASI
013/DTS/3/SN/001 NURANTO, DINI WIDIANI
JEMBATAN MUSI II PALEMBANG
MS.
DR. IR. SINDU PENGUKURAN BEDA TINGGI GROUNDSILL KRETEK DENGAN
RIZAL RASYID
013/DTS/3/SN/002 NURANTO, BENDUNG KARANG DINAS SUMBER DAYA AIR KABUPATEN
HALIM
MS. BANTUL
DR. IR. SINDU
ANDIKATAMA PROSEDUR PENYAJIAN DATA RADAR CUACA DAN DATA
013/DTS/3/SN/003 NURANTO,
ANGGARA PUTRA CURAH HUJAN
MS.
DR. IR.
PEMELIHARAAN RUTIN JALAN DALANGAN-JOMBOKAN
013/DTS/3/SA/001 SYAUKAT ALI, LIZA AMANATA
KABUPATEN KULONPROGO
M.SI
DR. IR. PEKERJAAN PEMELIHARAAN PERIODIK PADA JALAN TOL
013/DTS/3/SA/002 SYAUKAT ALI, RIZKHI RINAWAN PALIMANAN-KANCI TAHUN 2013 PT. JASA MARGA
M.SI (PERSERO) TBK CABANG PALIKANCI
DR. IR.
EFISIENSI PEKERJAAN BEKISTING KONVENSIONAL UNTUK
013/DTS/3/SA/003 SYAUKAT ALI, RAGIL ABHIKAMA
PEKERJAAN PLAT DAN BALOK
M.SI
DR. SC. ADHY
YOGI SATRIO PENYUSUNAN SISTEM INFORMASI SUMBER DAYA AIR
013/DTS/3/AY/001 KURNIAWAN,
PURNAMA MENGGUNAKAN ARCGIS VERSI 9.3 DI UPT PENGAMATAN
ST.
PENGAIRAN OPAK HILIR KABUPATEN BANTUL DAERAH
ISTIMEWA YOGYAKARTA
EDI
MUCHAMAD PELAKSANAAN PEKERJAAN PERKERASAN KAKU PADA RUAS
013/DTS/3/EK/001 KURNIADI,
TAUFIQQUROHMAN JALAN SEMARANG - BAWEN, JAWA TENGAH
ST., MT
EDI
DHANI ARIF ANALISIS KAPASITAS DAYA DUKUNG FONDASI BORED PILE
013/DTS/3/EK/002 KURNIADI,
KURNIAWAN PADA FLY OVER JOMBOR YOGYAKARTA
ST., MT
EDI ANALIIS KAPASITAS PRODUKSI ALAT BERAT DAN
SOBITA MARCHKY
013/DTS/3/EK/003 KURNIADI, PELAKSANAAN PEKERJAAN STRUKTUR PIER R2 PROYEK
PERMATASARI
ST., MT PEMBANGUNAN FLY OVER JOMBOR YOGYAKARTA
EDI MUHAMMAD METODE PELAKSANAAN DAN SPESIFIKASI BALOK
013/DTS/3/EK/004 KURNIADI, ROYYANA PRATEGANG (POST TENSION) PADA PROYEK BINTARO X-
ST., MT ANDRIYANTO CHANGE, BINTARO, JAKARTA SELATAN
IR. BAMBANG
PELAKSANAAN PEKERJAAN BAR BENDING SCHEDULE
013/DTS/3/BB/001 HERUMANTA, OKY INDAH SAFITRI
PROYEK BINTARO X-CHANGE, BINTARO, JAKARTA SELATAN
M.T
IR. BAMBANG PRODUKTIVITAS PEKERJA PADA PEKERJAAN PLESTERAN
DONI ADHI
013/DTS/3/BB/002 HERUMANTA, (STUDI KASUS PADA PROYEK PERUMAHAN THE JALIMBAR
SAPUTRA
M.T ERSIDENCE) SEWON BANTUL PT. KARYA SEHATI UTAMA
IR. BAMBANG
PERENCANAAN PERKERASAN KAKU JALAN PADANGAN -
013/DTS/3/BB/003 HERUMANTA, NIKO ZARDI YUDO
NGAWI
M.T
PENGUKUR SUHU BETON (THERMOCOUPLES) UNTUK
IR. FATHI
EMPU WIJOYO PENGECORAN MASS CONCRETE PROYEK SHERWOOD
013/DTS/3/FB/001 BASEWED ,
MULYO RESIDENCE APARTMENTS KELAPA GADING - JAKARTA
M.T
UTARA PT. WIJAYA KARYA BANGUNAN GEDUNG
PERCEPATAN PROYEK PEMBANGUNAN SYARIAH HOTEL
IR. FATHI
AZWAR HALIM DAN LOR IN TRIPLE MODERATE A - SOLO DENGAN SISTEM
013/DTS/3/FB/002 BASEWED ,
PRAYOGO AJI TRACKING SCHEDULE PT. ADHI KARYA (PERSERO) TBK. -
M.T
DIVISI KONSTRUKSI IV
IR. FATHI PEMBUATAN SCHEDULE PEKERJAAN BASEMENT 2 PROYEK
MUHAMMAD ROIS
013/DTS/3/FB/003 BASEWED , PEMBANGUNAN APARTEMEN GRAND DHIKA CITY PT. ADHI
MUSTAK FAOZI
M.T KAYA (PERSERO), TBK DIVISI KONSTRUKSI I
IR. FATHI
MEYTA SISTEM OPERASIONAL PRODUKSI BETON READYMIX DI PT.
013/DTS/3/FB/004 BASEWED ,
MAFILINDATI SCG READYMIX INDONESIA-SOLO PLANT
M.T
TINJAUAN PEKERJAAN TRIBUN DENGAN PRECAST PADA
IR. FATHI
GEDUNG SOFTBALL PROYEK SENTRA PEMBINAAN
013/DTS/3/FB/005 BASEWED , SINTIA RAHMI
OLAHRAGA TERPADU (SPORT) JAWA BARAT ARCAMANIK
M.T
BANDUNG
BEKISTING VERTIKAL SEMI SYSTEM PADA PROYEK
IR. FATHI
WAHYU ENDRA APARTEMEN DAN KOMPLEK PERTOKOAN PUNCAK BUKIT
013/DTS/3/FB/006 BASEWED ,
PRANATA GOLF PT. WIJAYA KARYA BANGUNAN GEDUNG SURABAYA,
M.T
JAWA TIMUR
IR. HERU
KIRINE VRITA PENGELOLAAN DAN PERAWATAN BANGUNAN GEDUNG
013/DTS/3/HB/001 BUDI
SANSIATRI DENGAN PRINSIP "ASSET MANAGEMENT"
UTOMO, M.T
IR. HERU KARAKTERISTIK MARSAHLL CAMPURAN ASPAL BETON
013/DTS/3/HB/002 BUDI SANDY PERDANA DENGAN MENGGUNAKAN SUBSTITUSI BIOASPAL SEBAGAI
UTOMO, M.T BAHAN IKAT UNTUK KATEGORI LALU LINTAS BERAT
IR. HERU
013/DTS/3/HB/003 BUDI FEBRY SUHARYADI ANALISIS KINERJA BUS TRANS JOGJA JALUR 3A DAN 3B
UTOMO, M.T
IR. HERU SIFAT-SIFAT TEKNIS CAMPURAN LAPIS ASPAL BETON
MOHAMMAD NUR
013/DTS/3/HB/004 BUDI (LASTON) DAN BIO ASPAL UNTUK KATEGORI LALULINTAS
FAUZY
UTOMO, M.T MENENGAH DENGAN PENGUJIAN MARSHALL IMMERSION`
IR. HERU PENGUKURAN KEPADATAN TANAH DAN KAAR AIR
SELVINA TRI
013/DTS/3/HB/005 BUDI MENGGUNAKAN ALAT SAND CONE DAN NUCLEAR
SAPTARI PUTRI
UTOMO, M.T DENSITOMETER TEST (TROXLER 3430)
IR. HERU PENGAWASAN PELAKSANAAN PROYEK REKONSTRUKSI
ADITIYA AMURWA
013/DTS/3/HB/006 BUDI JALAN ARTERI SELATAN YOGYAKARTA DENGAN METODE
TRAJA
UTOMO, M.T CTRB (CEMENT TREATED RECYCLING BASE)
IR. HOTMA
MANDALANTA PROYEK PEMBANGUNAN PERUMAHAN HYARTA RESIDENCE
013/DTS/3/HP/001 PRAWOTO S,
KAROSEKALI YOGYAKARTA
MT., IP-MD
IR. HOTMA
HERJUNA WIDHI PELAKSANAAN KONSTRUKSI BASEMENT PADA PROYEK
013/DTS/3/HP/002 PRAWOTO S,
ARYA DWIUTAMA GEDUNG KANTOR MANDIRI AREA SOLO PT ADHI KARYA
MT., IP-MD
IR. HOTMA
ANALISIS STRUKTUR PORTAL PEMBANGUNAN HOTEL NEO
013/DTS/3/HP/003 PRAWOTO S, LOVERY ARIFIANTO
MALIOBORO CITY
MT., IP-MD
METODELOGI PEMBANGUNAN ABUTMENT JEMBATAN
IR. SRI AHMAD FUAD
013/DTS/3/SR/001 PROYEK PEMBANGUNAN JEMBATAN DOUBLE TRACK
WINARNI HABIBI
KERETA CIREBON-KROYA
PERENCANAAN STRUKTUR ATAS SHOP OFFICE A
IR. SRI HERMAWAN
013/DTS/3/SR/002 MALIOBORO CITY "STUDY KASUS MAGANG DI PT. INTI
WINARNI PRASETYO
HOSMED"
ANALISIS PERBANDINGAN METODE PELAKSANAAN
PEMASANGAN PLAT LANTAI MENGGUNAKAN HALF SLAB
IR. SRI DWI CANDRA ADI (PRECAST) DAN BETON KONVENSIONAL STUDI KASUS
013/DTS/3/SR/003
WINARNI SATRIA PROYEK GEDUNG PENCAK SILAT SPORT JABAR ARCAMANIK
BANDUNG PT. PEMBANGUNAN PERUMAHAN BANDUNG,
JAWA BARAT
METODE PELAKSANAAN FONDASI TIANG PANCANG PADA
IR. SRI
013/DTS/3/SR/004 TENGKU ANNISA PROYEK PEMBANGUNAN GEDUNG PERPUSTAKAAN
WINARNI
KABUPATEN KULON PROGO YOGYAKARTA
IR.
ADULTVINE PRITA NILAI SWELLING PRESSURE TANAH LEMPUNG EKSPANSIF
013/DTS/3/SP/001 SUPRIYONO,
WIJAYANTI MENGGUNAKAN ALAT GEONOR SWELLING TEST
MT.
IR.
AGUS SALIM FONDASI TIANG PANCANG JEMBATAN BRAWIJAYA KOTA
013/DTS/3/SP/002 SUPRIYONO,
NASUTION KEDIRI - JAWA TIMUR
MT.
IR.
SEPTIANA PENENTUAN SWELLING PRESSURE TANAH LEMPUNG
013/DTS/3/SP/003 SUPRIYONO,
SETYORINI EKSPANSIF MENGGUNAKAN ALAT GEONOR
MT.
IR.
NILAI TAHANAN GESEK SATUAN PENGUJIAN GESER
013/DTS/3/SP/004 SUPRIYONO, UMI OKTAVIANI
LANGSUNG PADA TANAH EKSPANSIF
MT.
LAVA ANALISIS PERBEDAAN PERHITUNGAN RAB DWENGAN
DWI PUTRA
013/DTS/3/LH/001 HIMAWAN, ACUAN HARGA SNI DAN HARGA LUMPSUM RUMAH TYPE
PRASETYA
ST., MT 45, 50, 60
LAVA IDENTIFIKASI PENYEBAB KETERLAMBATAN PADA PROYEK
013/DTS/3/LH/002 HIMAWAN, WILY WICAKSONO PEMBANGUNAN PEMBANGKIT LISTRIK TENAGA UAP 2X3
ST., MT MW. KEPULAUAN TALAUD, SULAWESI UTARA
MUH.
SULAIMAN, PANDU BUDHI KARAKETRISTIK SUNGAI OPAK PASCA ERUPSI MERAPI 2010
013/DTS/3/MH/001
ST., MT., WIBOWO DARI HULU SAMPAI BENDUNG TAMANAN
D.ENG
MUH. ANALISIS PROSES PELAKSANAAN KONSTRUKSI STRUKTUR
SULAIMAN, PONDASI PADA PROYEK PEMBANGUNAN CRUDE PALM OIL
013/DTS/3/MH/002 SUPRIYANTO
ST., MT., (CPO) STORAGE TANK PT PP LONDON SUMATRA
D.ENG INDONESIA PALEMBANG, SUMATRA SELATAN
MUH.
SULAIMAN, PEMELIHARAAN BANGUNAN SABO DI SUNGAI-SUNGAI
013/DTS/3/MH/003 TITIS HARYANI
ST., MT., LAHAR MERAPI PASCA ERUPSI 2010
D.ENG
PEMELIHARAAN DAN INVENTARISASI BANGUNAN GEDUNG
NUNU LUTFI, INDAH DENGAN PRINSIP "ASSET MANAGEMENT" STUDI KASUS
013/DTS/3/NN/001
ST. SULISTYOWATI KEGIATAN MAGANG DI DIREKTORAT PENGELOLAAN DAN
PEMELIHARAAN ASET UNIVERSITAS GADJAH MADA
NURSYAMSU PENGARUH FASILITAS TROTOAR TERHADAP TINGKAT
RICO SATRIA
013/DTS/3/NH/001 HIDAYAT, ST., PELAYANAN PEJALAN KAKI DI KAWASAN TITIK NOL DEPAN
HUTAMA
MT., PH.D. BENTENG VREDEBURG
NURSYAMSU
ZULHAQSHAUM PERBAIKAN BENDUNG PENAPEN KECAMATAN KESUGIHAN
013/DTS/3/NH/002 HIDAYAT, ST.,
WINARSO KABUPATEN CILACAP
MT., PH.D.
NURSYAMSU
ERDIAN NUR ANALISIS ADMIXTURE SUPERPLASTISIZER 'CONPLAST DAN
013/DTS/3/NH/003 HIDAYAT, ST.,
RAHMAN STRUCTURO' PADA PERKERASAN JALAN BETON SEMEN
MT., PH.D.
ERECTION PRECAST BOX GIRDER MENGGUNAKAN ALAT
NURSYAMSU LAUNCHING GANTRY DENGAN SISTEM SPAN - BY - SPAN
013/DTS/3/NH/004 HIDAYAT, ST., RINALDI FAHREZA PEMBANGUNAN JALAN TOL BOGOR OUTER RING ROAD
MT., PH.D. SEKSI IIA RUAS KEDUNG HALANG - KEDUNG BADAK (STA
3+300 - 5+915) PT. WIJAYA KARYA (PERSERO) TBK.
MEKANISME PELELANGAN PT. ANGKASA PURAA I
NURSYAMSU
(PERSERO) STUDI KASUS PEKERJAAN KEBERSIHAN INDOOR
013/DTS/3/NH/005 HIDAYAT, ST., ERI RAHMAWATI
GEDUNG TERMINAL DAN OPERASIONAL DI BANDARA
MT., PH.D.
ADISUCIPTO YOGYAKARTA
SUWARDO,
ISWORO PENGUJIAN TAILING EX. PT. FREEPORT SEBAGAI
013/DTS/3/SW/001 ST., MT.,
DWIPAYANA PENGGANTI AGREGAT HALUS DALAM MORTAR BETON
PH.D.,
SUWARDO,
DINDA BRAMUDYA PENGENDALIAN MUTU PROYEK REKONSTRUKSI JALAN
013/DTS/3/SW/002 ST., MT.,
PRANANJAYA ARTERI RINGROAD SELATAN YOGYAKARTA
PH.D.,
WIRYANTA, EKA MARIS CAHYA METODE PELAKSANAAN PEKERJAAN RAMP FLY OVER
013/DTS/3/WY/001
ST., MT. PUTRA JOMBOR YOGYAKARTA
WIRYANTA, KARTIKA AMBASARI KONSTRUKSI PERKERASAN LANDAS PARKIR (APRON)
013/DTS/3/WY/002
ST., MT. PUDYASTUTI BANDARA INTERNASIONAL AHMAD YANI SEMARANG
EVALUASI RENCANA KERJA PT. ELJINDO KONSTRUKSI ABADI
WIRYANTA,
013/DTS/3/WY/003 ALHAM SURYAWAN DALAM MENGERJAKAN PROYEK MULTI FUEL BOILER 24
ST., MT.
PAKET ESP FOUNDATION DI PT. LPPI, TEBING TINGGI JAMBI
PENINGKATAN JALAN DARI KONSTRUKSI PERKERASAN
IR. HERU
LENTUR MENJADI PERKERASAN KAKU BERDASARKAN SEGI
013/DTS/3/HB/007 BUDI BUDI SUSILO
EKONOMIS PADA RUAS JALAN KREWENG - LEBENG,
UTOMO, M.T
CILACAP
EDI
CYNTHIA AMELIA QUALITY CONTROL READYMIX CONCRETE DI PT. SCG
013/DTS/3/EK/005 KURNIADI,
PRIMAPUTRI READYMIX INDONESIA - SOLO PLANT
ST., MT
AGUS
KURNIAWAN, PROPERTI PLAT DATAR DAN SILINDER BETON DENGAN
013/DTS/3/AK/007 EDIT SETIANTO
ST., MT., SERAT KELAPA (COCONUT FIBER)
PH.D.
PEMELIHARAAN FASILITAS AIR SIDE (RUNWAY, TAXIWAY
WIRYANTA,
013/DTS/3/WY/004 ADEK CHANDRA DAN APRON) BANDAR UDARA INTERNASIONAL
ST., MT.
MINANGKABAU
OPERASI DAN PEMELIHARAAN JARINGAN IRIGASI
IR. FATHI
KALIBAWANG SISTEM DI BIDANG PENGAIRAN DINAS
013/DTS/3/FB/007 BASEWED , BAGAS RAHMANTO
PEKERJAAN UMUM KABUPATEN KULON PROGO
M.T
YOGYAKARTA
ANALISA KAPASITAS DAYA DUKUNG FONDASI TIANG
DIAN
PANCANG UNTUK MESIN BOILER PEMBANGKIT LISTRIK
013/DTS/3/DS/005 SESTINING DELIMA
TENAGA UAP 2 X 3 MW KEPULAUAN TALAUD, SULAWESI
AYU, ST., MT.
UTARA
IR. HERU ANALISA PRODUKTIVITAS PEKERJAAN PADA PROYEK
013/DTS/3/HB/008 BUDI ABDUL MAJID PERUMAHAN GRAHA PERMATA KOTA SELAGALAS
UTOMO, M.T MATARAM NUSA TENGGARA BARAT
DEVI
PENGARUH ABU VULKANIK TERHADAP KUAT GESER DAN
OKTAVIANA DEDE MAHFUL
013/DTS/3/DO/004 PERMEABILITAS TANAH LEMPUNG YANG DISTABILISASI
LATIF, ST., AZIZAN
KAPUR
M.ENG
DEVI
OKTAVIANA PENGELOLAAN FASILITAS AIR SIDE BANDARA
013/DTS/3/DO/005 HENRI RIYANTI
LATIF, ST., INTERNASIONAL AHMAD YANI SEMARANG
M.ENG
2014
DOSEN NAMA
NO INVENTARIS JUDUL TUGAS AKHIR/PROYEK AKHIR
PEMBIMBING MAHASISWA
AGUS
RICHARD LOUIS
KURNIAWAN, ANALISIS INVESTASI PROYEK PEMBANGUNAN PERUMAHAN
014/DTS/3/AK/001 HERMAWAN
ST., MT., HYARTA RESIDENCE YOGYAKARTA
GINTING
PH.D.
AGUS
METODE ANALISIS PERBANDINGAN TULANGAN STEK DAN
KURNIAWAN,
014/DTS/3/AK/002 ARIEF WIRAGUNA TULANGAN MENERUS KOLOM PADA PROYEK PASAR LEGI
ST., MT.,
PARAKAN TEMANGGUNG PT. HUTAMA KARYA (PERSERO)
PH.D.
AGUS
APLIKASI PLAT LENGKUNG ATAP BETON MENGGUNAKAN
KURNIAWAN, GUNAWAN
014/DTS/3/AK/003 CAMPURAN SERATKAWAT BENDRAT (STEEL FIBER) DENGAN
ST., MT., WICAKSONO
VARIASI RADIUS
PH.D.
AGUS ANALISIS PERENCANAAN PONDASI SUMURAN JEMBATAN
KURNIAWAN, HOSEA KARANG KABUPATEN KULON PROGO DAN PROGRAM
014/DTS/3/AK/004
ST., MT., LUAHAMBOWO SPREADSHEET EXCEL PERENCANAAN PONDASI JEMBATAN
PH.D. KARANG KABUPATEN KULON PROGO
AGUS
KURNIAWAN, FATHUL MUNGIN ANALISA STABILITAS PERKUATAN LERENG TEBING SUNGAI
014/DTS/3/AK/005
ST., MT., GOTHA PRATOMO (REVETMENT) PADA HULU SUNGAI BENGAWAN SOLO
PH.D.
AGUS
KURNIAWAN,
014/DTS/3/AK/006 AGUNG TIRTA AJI EFEKTIVITAS KONFIGURASI ELEMEN STRUKTUR KUDA-KUDA
ST., MT.,
PH.D.
AGUS
KURNIAWAN, PENJADWALAN PEMBANGUNAN GEDUNG PARKIR RUMAH
014/DTS/3/AK/007 IRMALIA NURSITA
ST., MT., SAKIT TELOGOREJO, SEMARANG
PH.D.
AGUS
METODE PELAKSANAAN ERECTION BAJA MENGGUNAKAN
KURNIAWAN,
014/DTS/3/AK/008 ADI SUPRIANTO MOBILE CRANE PROYEK RENOVASI GERBANG DAN PLASA
ST., MT.,
TOL TEMBALANG - SEMARANG PT. JASA MARGA
PH.D.
AGUS
KOMPOSISI BAKTERI BACILLUS SUBTILIS DENGAN METODE
KURNIAWAN,
014/DTS/3/AK/009 MEILANI ADRIYATI ENKAPSULASI HIDROGEL UNTUK APLIKASI SELF HEALING
ST., MT.,
CONCRETE
PH.D.
AGUS TINJAUAN ERGONOMI TENAGA KERJA PEMASANGAN
NUGROHO, RICCO SURVIVAL DINDING BATA MENGGUNAKAN METODE RAPID ENTIRE
014/DTS/3/AN/001
ST., MT., YUBAIDI BODY ASSESSMENT (REBA) STUDI KASUS PROYEK
PH.D. CITRAGRAND MUTIARA YOGYAKARTA)
AGUS
NUGROHO, RIZKY FAUZI PEMBUATAN MAKET GEDUNG DIPLOMA TEKNIK SIPIL
014/DTS/3/AN/002
ST., MT., SATRIA PURNAMA SEKOLAH VOKASI UNIVERSITAS GADJAH MADA
PH.D.
AGUS
ABDUL HALIL PRODUKTIVITAS JAM KERJA EVEKTIF PEKERJA PASANGAN
NUGROHO,
014/DTS/3/AN/003 MUBARAQ BATA BERDASARKAN ELEVASI PEKERJAAN PADA PROYEK
ST., MT.,
MURSIDI PERUMAHAN GRAHA PERMATA KOTA
PH.D.
AGUS PRODUKTIVITAS JAM KERJA EFEKTIF PEKERJA PADA
NUGROHO, ANGGA DICKY PEKERJAAN PLESTERAN DAN ACIAN TERHADAP ELEVASI
014/DTS/3/AN/004
ST., MT., SUSANTO DINDING PADA PROYEK PERUMAHAN GRAHA PERMATA
PH.D. KOTA
AGUS
NUGROHO, AHSAN MUSTHAFA PERENCANAAN PERBAIKAN GEDUNG E PASAR
014/DTS/3/AN/005
ST., MT., SHIDIQ BERINGHARJO YOGYAKARTA
PH.D.
DEVI
OKTAVIANA PEMBANGUNAN JALAN PERDESAAN DENGAN LAPISAN
014/DTS/3/DO/001 IRWAN FARIT
LATIF, ST., PENETRASI MAKADAM
M.ENG
DEVI ANALISIS SETTLEMENT KONTRUKSI SARANG LABA-LABA
OKTAVIANA PROYEK PEMBANGUNAN GEDUNG BNI 46 JL. DR. CIPTO
014/DTS/3/DO/002 TITA MAYA BELLA
LATIF, ST., SEMARANG DENGAN PERKUATAN MINIPLE BETON
M.ENG MENGGUNAKAN SOFTWARE PLAXIS VERSI 8.2
DEVI
PENGARUH WAKTU PEMERAMAN TERHADAP SIFAT FISIS
OKTAVIANA MARBONO WIDYA
014/DTS/3/DO/003 DAN MEKANIS TANAH EKSPANSIF STABILISASI KAPUR
LATIF, ST., DIPUTRA
MODIFIKASI ABU VULKANIK KELUD
M.ENG
DEVI PELAKSANAAN PEMANCANGAN PONDASI TIANG PANCANG
OKTAVIANA METODE JACK-IN PILE PADA PERKUATAN FONDASI
014/DTS/3/DO/004 INTAN CESARIA
LATIF, ST., KONSTRUKSI SARANG LABA-LABA (KSLL) BANGUNAN BNI 46
M.ENG WILAYAH 05 SEMARANG
DEVI
METODE PELAKSANAAN PEKERJAAN COREWALL
OKTAVIANA
014/DTS/3/DO/005 DONY ASHARI PEMBANGUNAN PROYEK APARTEMEN SKYLAND CITY ROSE
LATIF, ST.,
IN SPRING JATINANGOR PT. PP (PERSERO) TBK. - CABANG IV
M.ENG
DEVI
PENGARUH WAKTU PEMERAMAN TERHADAP SIFAT FISIS
OKTAVIANA
014/DTS/3/DO/006 SITI NURLITA FITRI DAN MEKANIS TANAH EKSPANSIF STABILISASI KAPUR
LATIF, ST.,
MODIFIKASI ABU VULKANIK MERAPI
M.ENG
PENGGUNAAN CANGKANG KEONG MAS SEBAGAI BAHAN
DIAN
DENNY KUSUMA ALTERNATIF PAPAN PARTIKEL (STUDI KASUS DENGAN
014/DTS/3/DS/001 SESTINING
ARNANTO KOMBINASI PEMAKAIAN SERBUK KAYU GLUGU DAN KAYU
AYU, ST., MT.
SENGON)
DIAN METODE CLIMBING FORM DALAM PELAKSANAAN
FARANINDA
014/DTS/3/DS/002 SESTINING PEKERJAAN CORE WALL "STUDI KASUS PROYEK HOTEL
PRABANDINI
AYU, ST., MT. QUEST SOLO" PT ADHI KARYA
DIAN RYAN
METODE PAPAN CATUR PADA PEKERJAAN PELINDUNG
014/DTS/3/DS/003 SESTINING KAMESWARA
BANTARAN DI SUNGAI BENGAWAN SOLO
AYU, ST., MT. PUTRA
DIAN METODE PELAKSANAAN PEKERJAAN SHEAR WALL
014/DTS/3/DS/004 SESTINING HARDIYANTI PEMBANGUNAN RUSUNAWA WATES DI WATES KULON
AYU, ST., MT. PROGO DIY
PEMANFAATAN CANGKANG KEONG EMAS SEBAGAI BAHAN
DIAN
GILANG KUMORO ALTERNATIF PEMBUATAN PAPAN PARTIKEL (STUDI KASUS
014/DTS/3/DS/005 SESTINING
DEWOJATI DENGAN PENAMBAHAN SERBUK KAYU MAHONI DAN
AYU, ST., MT.
RANDU)
DIAN PENGARUH PENAMBAHAN SERAT KAWAT BENDRAT DAN
DICGO MARADEVA
014/DTS/3/DS/006 SESTINING TALI TAMBANG PLASTIK PADA PEMBUATAN BATA BETON
WINARTO
AYU, ST., MT. (PAVING BLOCK)
DIAN PELAKSANAAN STRUKTUR PADA PROYEK APARTEMEN
RODDI M.
014/DTS/3/DS/007 SESTINING SKYLAND CITY JATINANGOR DENGAN METODE
BARINGBING
AYU, ST., MT. KONVENSIONAL DI PT. PP (PERSERO) TBK.
PELAKSANAAN DANA ANALISIS PRODUKTIVITAS ALAT BERAT
DIAN DALAM PENGECORAN ELEMEN STRUKTUR (KOLOM, BALOK,
014/DTS/3/DS/008 SESTINING ANDHIKA WIGUNA DAN PLAT) PEMBANGUNAN GEDUNG RITA SUPER MALL
AYU, ST., MT. DAN SWISS-BELL HOTEL PURWOKERTO - JAWA TENGAH PT.
ADHI KARYA (PERSERO) TBK. - DIVISI KONSTRUKSI IV
DIAN
LUCKY PERBANDINGAN KUAT TEKAN DAN KUAT LENTUR PADA
014/DTS/3/DS/009 SESTINING
SATYANEGARA PAVING BLOCK NORMAL DAN PAVING BLOCK CAMPURAN
AYU, ST., MT.
DR. ENG.
IMAN ANGGA KUSUMAH PENGUJIAN MARSHALL CAMPURAN LATASTON YANG
014/DTS/3/IH/001
HARYANTO WARDANI MENGANDUNG BIO ASPAL UNTUK LALULINTAS SEDANG
S.T., M.T.
DR. ENG.
IMAN REAZ ADHI PENGUJIAN MARSHALL CAMPURAN LASTON YANG
014/DTS/3/IH/002
HARYANTO KUSUMA MENGANDUNG BIO ASPAL UNTUK LALU LINTAS SEDANG
S.T., M.T.
DR. ENG.
IMAN AULIA RAHMAN
014/DTS/3/IH/003 TINGKAT KEAMANAN BENDUNGAN MUKAKUNING BATAM
HARYANTO FAHMI
S.T., M.T.
DR. ENG.
PENELOLAAN WAKTU PADA PEKERJAAN STRUKTUR DALAM
IMAN MEGHAN
014/DTS/3/IH/004 PROYEK PEMBANGUNAN QUEST HOTEL SOLO DENGAN
HARYANTO OCTIANTY AAS
MENGGUNAKAN MICROSOFT PROJECT
S.T., M.T.
DR. ENG.
METODE PELAKSANAAN INTEGRAL BRIDGE PADA PROYEK
IMAN
014/DTS/3/IH/005 AZIZUR RAHMAN PEMBANGUNAN JALAN TOL SURABAYA - MOJOKERTO
HARYANTO
(SECTION P1-P25 PADA STA 11+190 - 11+440)
S.T., M.T.
DR. ENG.
IMAN AGUNG RAHMAN DEFORMATION STRENGTH CAMPURAN LATASTON YANG
014/DTS/3/IH/006
HARYANTO YASMIN MENGANDUNG BIOASPAL UNTUK LALU LINTAS BERAT
S.T., M.T.
DR. ENG.
PENGADAAN BARANG / JASA DAN PELAKSANAAN
IMAN
014/DTS/3/IH/007 SHOFA SYAHIDI KONSTRUKSI PENIGNKATAN KAPASITAS JALAN TOL
HARYANTO
PALIMANAN - KANCI
S.T., M.T.
DR. ENG. DESAIN ULANG TEBAL LAPIS PERKERASAN LENTUR RUAS
IMAN ISYANA YUVITA JALAN MAGELANG - YOGYAKARTA DENGAN
014/DTS/3/IH/008
HARYANTO PONCOWATI MENGGUNAKAN PEDOMAN PERENCANAAN PERKERASAN
S.T., M.T. TAHUN 2002
DR. ENG.
KARAKTERISTIK CAMPURAN LASTON YANG MENGANDUNG
IMAN JERMY IWADA
014/DTS/3/IH/009 MIKROENKAPSULASI DENGAN BAHAN PEREMAJA MINYAK
HARYANTO SAWATO GEA
TANAH
S.T., M.T.
STUDI KARAKTERISTIK TEKANAN WATER HAMMER DENGAN
DR. ING. IR.
IWAN JUGO MENGGUNAKAN CABANG "Y" DAN BEBAN TURBIN
014/DTS/3/AM/001 AGUS
PRANOTO CROSSFLOW (DIAMETER PIPA 4 WAKTU PENUTUPAN 1-10
MARYONO
DETIK)
DR. ING. IR. PENGERUKAN SUNGAI TUNTANG UNTUK MENINGKATKAN
PRATAMA TIRZA
014/DTS/3/AM/002 AGUS DEBIT GUNA OPTIMALISASI PEMBANGKIT LISTRIK TENAGA
SURYA SEMBADA
MARYONO AIR (PLTA) JELOK KAB. SEMARANG PROVINSI JAWA TENGAH
DR. IR. SINDU
ANALISA KEBUTUHAN DAN KETERSEDIAAN AIR IRIGASI PADA
014/DTS/3/SN/001 NURANTO, ARIF KRISTANTO
DAERAH IRIGASI KADIBESO KABUATEN BANTUL
MS.
DR. IR.
BAGUS TIRTA PENILAIAN PABRIK KAYU PT. SINAR PUSPITA ABADI DENGAN
014/DTS/3/SA/001 SYAUKAT ALI,
FANANY METODE JASA PENILAIAN PROPERTI
M.SI
PEKERJAAN PEMELIHARAAN PERIODIK PADA RUAS JALAN
DR. IR.
TOL PALIMANAN-KANCI DENGAN JAMINN PERFORMA ZERO
014/DTS/3/SA/002 SYAUKAT ALI, M. ZUHDI FADHLI
POTHOLE TAHUN 2014 PT. JASA MARGA (PERSERO) TBK.
M.SI
CABANG PALIKANCI
DR. IR.
PEMELIHARAAN PERKERASAN LENTUR RUAS JALAN NGAWI-
014/DTS/3/SA/003 SYAUKAT ALI, DEWI PUSPITASARI
MUNGGUR KABUPATEN GUNUNGKIDUL YOGYAKARTA
M.SI
DR. SC. ADHY
ANALISIS KEHILANGAN AIR DAN EFISIENSI PADA SALURAN
014/DTS/3/AY/001 KURNIAWAN, PUPUT CYPRIANI
IRIGASI D.I KLEGEN, KABUATEN BANTUL
ST.
DR. SC. ADHY PENGAMATAN LAPANGAN, INVENTARISASI DAN RENCANA
014/DTS/3/AY/002 KURNIAWAN, DIANTO ANGGARAN BIAYA PEMELIHARAAN DAERAH IRIGASI
ST. GROJOGAN DINAS SUMBER DAYA AIR KABUPATEN BANTUL
DR. SC. ADHY PERENCANAAN REVITALISASI SALURAN IRIGASI JALAN
014/DTS/3/AY/003 KURNIAWAN, FAHMI AFRIZAL RINJANI KELURAHAN SIDANEGARA KECAMATAN CILACAP
ST. TENGAH KABUPATEN CILACAP
DR. SC. ADHY
ANALISIS KETERSEDIAAN AIR DAN KEBUTUHAN AIR D.I
014/DTS/3/AY/004 KURNIAWAN, ARIZKI HIDAYAT
MERDIKO KABUPATEN BANTUL
ST.
EDI
PENGARUH PENAMBAHAN ABU AMPAS TEBU TERHADAP
014/DTS/3/EK/001 KURNIADI, TRI JOKO
KUAT TEKAN BETON DENGAN F.A.S 0,6
ST., MT
EDI
RIDAN ANALISIS BETON CETAK EKSPOSE UNTUK EFISIENSI
014/DTS/3/EK/002 KURNIADI,
BRAMANTYA PEKERJAAN FINISHING
ST., MT
EDI
ANALISIS WAKTU DAN BIAYA PEMASANGAN DAN
014/DTS/3/EK/003 KURNIADI, ARIF WIBOWO
PEMBONGKARAN TOWER CRANE
ST., MT
EDI EVALUASI BETON PASCA PENGECORAN PADA PROYEK
ANANDA APRILIA
014/DTS/3/EK/004 KURNIADI, PEMBANGUNAN QUEST HOTEL SOLO PT. ADHI KARYA
SUKRONI
ST., MT (PERSERO) TBK. - DIVISI KONSTRUKSI IV
EDI EVALUASI MUTU BETON PADA PROYEK PEMBANGUNAN
IRWAN
014/DTS/3/EK/005 KURNIADI, GEDUNG PARKIR RUMAH SAKIT TELOGOREJO SEMARANG DI
KURNIAWAN
ST., MT PT. ADHI KARYA (PERSERO) TBK - SEMARANG
EDI METODE PELAKSANAAN PONDASI TIANG PANCANG PADA
ANDREAS S.S
014/DTS/3/EK/006 KURNIADI, PROYEK APARTEMENT GRAND DHIKA CITY BEKASI SEKTOR
SIRAIT
ST., MT 2A
EDI
ULFA KHOIRUNITA PERHITUNGAN KAPASITAS DUKUNG AKSIAL FONDASI TIANG
014/DTS/3/EK/007 KURNIADI,
GUCCI APARTEMEN GRAND DHIKA CITY BEKASI
ST., MT
PELAKSANAAN REHABILITASI DAN PEMELIHARAAN RUAS
EDI
FRANSISCA YUNITA JALAN HARGOMULYO - TEGALREJO KABUPATEN
014/DTS/3/EK/008 KURNIADI,
NUGRAHENI GUNUNGKIDUL DENGAN PERKERASAN KAKU (RIGID
ST., MT
PAVEMENT)
EDI AROMAN
ANALISIS TEMBOK PENAHAN (REVETMENT) HULU
014/DTS/3/EK/009 KURNIADI, KARSENSYAH
BENGAWAN SOLO
ST., MT SONIEL ZAI
EDI
FAUHAN NOOR METODE PEKERJAAN BEKISTING PADA PROYEK PASAR LEGI
014/DTS/3/EK/010 KURNIADI,
KHOLIS PARAKAN
ST., MT
IR. BAMBANG TUDI PENGARUH PEMELIHARAAN DAN PERAWATAN
YOGA PRADANA
014/DTS/3/BB/001 HERUMANTA, TERHADAP KINERJA GEDUNG (STDUI KASUS GEDUNG PUSAT
MUHAJIRIN
M.T DIREKTORAT UNIVERSITAS GADJAH MADA)
IR. BAMBANG PENGARUH FAKTOR AIR SEMEN (FAS) DAN MIX DESIGN
014/DTS/3/BB/002 HERUMANTA, ARIF WAHYULIE PADA PEMBUATAN BATA BETON (PAVING BLOCK)
M.T TERHADAP KUAT TEKAN
IR. BAMBANG
MUHAMMAD RIZA STUDI PENERAPAN E-PROCUREMENT PADA PENGADAAN
014/DTS/3/BB/003 HERUMANTA,
RIYADI JASA KONSTRUKSI DI PEMERINTAHAN KABUPATEN SLEMAN
M.T
IR. BAMBANG STUDI PENGARUH PENERAPAN E-PROCUREMENT TERHADAP
014/DTS/3/BB/004 HERUMANTA, SEPTIAN APRELLY KINERJA DAN EFISIENSI PENGADAAN JASA KONSTRUKSI DI
M.T PEMERINTAH KOTA YOGYAKARTA
IR. BAMBANG
JULIA EVELLYN METODE PELAKSANAAN KUDA-KUDA BAJA GEDUNG
014/DTS/3/BB/005 HERUMANTA,
KUSUMANINGRUM BALLROOM PROYEK PUSDIKLAT PELINDO II CIAWI
M.T
IR. BAMBANG PERHITUNGAN TEBAL PERKERASAN DAN METODE
ERLITA VITANTI
014/DTS/3/BB/006 HERUMANTA, PELAKSANAAN PERKERASAN KAKU PADA PEMBANGUNAN
PUTRI
M.T JALAN TOL GEMPOL - PASURUAN
IR. BAMBANG KEGIATAN PEMELIHARAAN BANGUNAN GEDUNG DALAM
014/DTS/3/BB/007 HERUMANTA, ISWATI KONTEKS "ASET MANAGEMENT" STUDI KASUS: KANTOR ITC
M.T UNIVERSITAS AHMAD DAHLAN YOGYAKARTA
IR. FATHI METODE PELAKSANAAN PONDASI TIANG PANCANG PADA
BERNAD
014/DTS/3/FB/001 BASEWED , PROYEK PASAR LEGI PARAKAN TEMANGGUNG PT. HUTAMA
SIMANJUNTAK
M.T KARYA (PERSERO)
IR. FATHI
BETON DENGAN SUBSTITUSI FLY ASH UNTUK MENGGANTI
014/DTS/3/FB/002 BASEWED , RONI SUSANTO
SEMEN
M.T
IR. FATHI
YUDHA
014/DTS/3/FB/003 BASEWED , PELAKSANAAN JEMBATAN KAKI SERIBU JORR W2N JAKARTA
WIDYANTORO
M.T
IR. FATHI APLIKASI VALUE ENGINEERING TERHADAP STRUKTUR BALOK
014/DTS/3/FB/004 BASEWED , SHOFWAN LATHIF PADA PROYEK PEMBANGUNAN STADION GRESIK DAN
M.T SARANA PENUNJANG LAINNYA
IR. FATHI PERENCANAAN SALURAN AIR HUJAN DUSUN DUNGGUBAH I
014/DTS/3/FB/005 BASEWED , KIKY FITRIANASARI & II, DESA DUWET, KECAMATAN WONOSARI, KABUPATEN
M.T GUNUNGKIDUL
IR. HERU EVALUASI STRUKTUR JEMBATAN GANTUNG UNTUK
ALI WARDANA
014/DTS/3/HB/001 BUDI PEJALAN KAKI DI KECAMATAN SIMPANG GAMBIR KAB.
HASIBUAN
UTOMO, M.T MANDAILING NATAL
IR. HERU
AMRUDIN FUAD KOMPARASI ANALISTEGANGAN JEMBATAN BAJA DENGAN
014/DTS/3/HB/002 BUDI
RIDLO MODEL TIGA DIMENSI DAN DUA DIMENSI
UTOMO, M.T
IR. HERU
ANALISA OPERASIONAL JALAN PEMUDA TENGAH DEPAN
014/DTS/3/HB/003 BUDI SURYA SETYAWAN
TOKO LARIS DAN PLASA MATAHARI KLATEN
UTOMO, M.T
IR. HERU
WAHYU ADITYA KARAKTERISTIK ASPAL PERTAMINA DENGAN PENAMBAHAN
014/DTS/3/HB/004 BUDI
RUDI NUGROHO ASPAL HASIL DESTILASI TAR CANGKANG KELAPA SAWIT
UTOMO, M.T
IR. HERU PERBANDINGAN METODE KERJA ANTARA MESIN CONCRETE
MUSTOFA AGUNG
014/DTS/3/HB/005 BUDI PAVER DAN MESIN WACKER PADA MAINROAD LAJUR KIRI
SANTOSA
UTOMO, M.T PROYEK JALAN TOL SURABAYA - MOJOKERTO SEKSI 1A
IR. HERU
HARYO WAHYU EVALUASI FONDASI BORE PILE YANG TIDAK MEMENUHI
014/DTS/3/HB/006 BUDI
HAPSORO DAYA DUKUNG RENCANA PADA PROYEK GRAHA INDOLAND
UTOMO, M.T
IR. HERU SIFAT-SIFAT TEKNIS CAMPURAN LASTON YANG
HALIMATU
014/DTS/3/HB/007 BUDI MENGANDUNG BIOASPAL UNTUK KATEGORI LALU LINTAS
SA'IDAH
UTOMO, M.T BERAT DENGAN PENGUJIAN MARSHALL IMMERSION
IR. HERU PERENCANAAN DAN PELAKSANAAN TEBAL LAPIS
014/DTS/3/HB/008 BUDI WAHYU LESTARI PERKERASAN JALAN DI DESA SELADI KECAMATAN PONJONG
UTOMO, M.T KABUPATEN GUNUNG KIDUL
IR. HOTMA
MUHAMMAD IDENTIFIKASI KERUSAKAN DAN RENCANA PERBAIKAN PADA
014/DTS/3/HP/001 PRAWOTO S,
DIAN ADITYA GEDUNG D PASAR BRINGHARJO
MT., IP-MD
IR. HOTMA PERENCAAAN PERBAIKAN GEDUNG C DAN PERKUATAN
WAHYUDI ADI
014/DTS/3/HP/002 PRAWOTO S, STRUKTUR TANGGA METRO GEDUNG B PASAR
PRABOWO
MT., IP-MD BERINGHARJO YOGYAKARTA
IR. HOTMA
LUTFI AFIPAH
014/DTS/3/HP/003 PRAWOTO S, KAPASITAS LENTUR BALOK KOMPOSIT BETON-BAJA RINGAN
OKTORIN
MT., IP-MD
IR. KORELASI KADAR AIR METODE OVEN, SPRITUS DAN SPEEDY
014/DTS/3/SP/001 SUPRIYONO, RINA MAYASARI MOISTURE TESTER TANAH JENIS SAND, LOAMY SAND DAN
MT. SANDY LOAM
LAVA ANALISIS DAN PERENCANAAN KOLOM BETON BERTULANG
EVAN TRISON
014/DTS/3/LH/001 HIMAWAN, BERPENAMPANG 'L' STUDI KASUS PERUMAHAN GRAHA
HULU
ST., MT PERMATA KOTA SELAGALAS
LAVA
DIAN METODE PELAKSANAAN STRUKTUR ATAS JEMBATAN
014/DTS/3/LH/002 HIMAWAN,
PRASETIYOWATI BRANTAS
ST., MT
LAVA
OKVIAWARNI METODE PELAKSANAAN PEMBUATAN DAN PEMASANGAN
014/DTS/3/LH/003 HIMAWAN,
EKAPUTRI GIRDER PRATEGANG PADA JEMBATAN KAKI SERIBU
ST., MT
LAVA
FATI JUL LESTARI METODE PELAKSANAAN SISTEM PSA (PRACETAK SAMBUNG
014/DTS/3/LH/004 HIMAWAN,
ZALUKHU AKHIR) DI RUSUNAWA WATES
ST., MT
LAVA
ILYAS ZAINUL ANALISIS DAN PERENCANAAN TANGGA PROYEK SKYLAND
014/DTS/3/LH/005 HIMAWAN,
BAHAR CITY - JATINANGOR, SUMEDANG
ST., MT
PENGENDALIAN MUTU (QUALITY CONTROL) DAN ANALISIS
LAVA
WAHYU ANGGA PERBANDINGAN KUAT TEKAN BETON DENGAN VARIASI
014/DTS/3/LH/006 HIMAWAN,
PRATAMA KADAR FLY ASH DI PT. SCG READYMIX INDONESIA SOLO
ST., MT
PLANT
MUH.
SULAIMAN, TETHA HOSY REHABILITASI SALURAN SEKUNDER DAERAH IRIGASI TEGAL
014/DTS/3/MH/001
ST., MT., PRATAMA KIRI KABUPATEN BANTUL DAERAH ISTIMEWA OGYAKARTA
D.ENG
MUH.
SULAIMAN, AHMAD EKA RANCANGAN REHABILITASI SALURAN-SALURAN IRIGASI DI
014/DTS/3/MH/002
ST., MT., PURNAMA DAERAH IRIGASI DI DAERAH IRIGASI PRANTI
D.ENG
MUH.
MUHAMMAD REZA EVALUASI BANGUNAN SABO DI SUNGAI PUTIH DAN
SULAIMAN,
014/DTS/3/MH/003 OKTAFFANDI SUNGAIN PUTIH DAN SUNGAI GENDOL PASCA ERUPSI
ST., MT.,
SYAHPUTRA MERAPI 2010
D.ENG
MUH.
OPERASI PEMELIHARAAN JARINGAN IRIGASI D.I KLEGEN
SULAIMAN,
014/DTS/3/MH/004 ARIF AFRIYANTO UNIT PELAKSANA TEKNIS WINONGO DIANS SUMBER DAYA
ST., MT.,
AIR BANTUL YOGYAKRTA
D.ENG
MUH.
SULAIMAN, PELAKSANAAN MAGANG PEMBANGUNAN PROYEK GEDUNG
014/DTS/3/MH/005 M. YAFIE WIRDA
ST., MT., KANTOR PT. MITRAIS
D.ENG
ANALISA DEBIT DAN KEBUTUHAN AIR IRIGASI DAERAH
NURSYAMSU
MAULANA EKA IRIGASI PEKIK JAMAL DI BIDANG PENGAIRAAN DINAS
014/DTS/3/NH/001 HIDAYAT, ST.,
NUGRAHA PEKERJAAN UMUM KABUPATEN KULON PROGO
MT., PH.D.
YOGYAKARTA
NURSYAMSU
RANGGA PADMA ANALISIS FAKTOR PENYUSUTAN BANGUNAN TERHADAP
014/DTS/3/NH/002 HIDAYAT, ST.,
NUGRAHA NILAI PASAR PADA ASET GEDUNG MILIK PT.K33 DISTRIBUSI
MT., PH.D.
NURSYAMSU
MUHAMMAD PEMANFAATAN ASAP CAIR SEBAGAI STABILISASI TANAH
014/DTS/3/NH/003 HIDAYAT, ST.,
RAHMANI DENA DASAR LEMPUNG
MT., PH.D.
NURSYAMSU SISTEM PENGELOLAAN DAN PRODUKTIVITAS ALAT BERAT
AGUSTINA EKA
014/DTS/3/NH/004 HIDAYAT, ST., PROYEK PEMBANGUNAN RITA SUPERMALL DAN SWISS
PUTRI AULIA
MT., PH.D. BELHOTEL PURWOKERTO
NURSYAMSU
ANALISIS TINGKAT PELAYANAN PEJALAN KAKI PADA
014/DTS/3/NH/005 HIDAYAT, ST., AHMAD BASTOMI
TROTOAR BERDASARKAN PENGAMATAN VISUAL
MT., PH.D.
NURSYAMSU
NANDA TRIGANI TINGKAT PELAYANAN ANGKUTAN KERETA API PRAMBANAN
014/DTS/3/NH/006 HIDAYAT, ST.,
PRAJA EKSPRESS KUTOARO - YOGYAKARTA - SOLO
MT., PH.D.
NURSYAMSU
SISTEM PEMELIHARAAN RUNWAY BANDARA
014/DTS/3/NH/007 HIDAYAT, ST., DIAN FATMAWATI
INTERNASIONAL ADISUTJIPTO YOGYAKARTA
MT., PH.D.
NURSYAMSU ANALISIS TINGKAT PELAYANAN PEJALAN KAKI PADA
014/DTS/3/NH/008 HIDAYAT, ST., BOBBY RASYID TROTOAR DENGAN METODE LANDIS JALAN PANEMBAHAN
MT., PH.D. SENOPATI YOGYAKARTA
NURSYAMSU
MUHAMMAD ANALISIS TINGKAT PELAYANAN TROTOAR METODE
014/DTS/3/NH/009 HIDAYAT, ST.,
FATHAN FIRDAUS AUSTRALIA
MT., PH.D.
NURSYAMSU EVALUASI TINGKAT KERUSAKAN JALAN SEBAGAI DASAR
SALAKA BAYU
014/DTS/3/NH/010 HIDAYAT, ST., PENENTUAN PERBAIKAN JALAN MENGGUNAKAN METODE
PAMUNGKAS
MT., PH.D. BINA MARGA DAN PAVEMENT CONDITION INDEX (PSI)
NURSYAMSU QUALITY CONTROL DAN METODE KERJA INTEGRAL BRIDGE
ANDITHASARI
014/DTS/3/NH/011 HIDAYAT, ST., SECTION P53-P87 PROYEK PEMBANGUNAN JALAN TOL
PANCANINGRUM
MT., PH.D. SURABAYA - MOJOKERTO SEKSI IB
SUWARDO,
ANALISIS DEBIT BANJIR RENCANA DI SUNGAI PAPAH
014/DTS/3/SW/001 ST., MT., JENJANG SARITI
KABUPATEN KULON PROGO
PH.D.,
SUWARDO,
RICHIE PRAMUDYA METODE PELAKSANAAN KONSTRUKSI PIPA DISTRIBUSI GAS
014/DTS/3/SW/002 ST., MT.,
LAKSMANA PADA PROYEK PEMBANGKIT LISTRIK JAWA BALI DI GRESIK
PH.D.,
SUWARDO, ANALISA BIAYA SIKLUS HIDUP JEMBATAN GELAGAR BETON
GINA RIZKA
014/DTS/3/SW/003 ST., MT., BERTULANG KONVENSIONAL DAN JEMBATAN INTEGRAL
AMALIA
PH.D., PENUH BETON BERTULANG BENTANG 20 METER
SUWARDO, METODE PELAKSANAAN KONSTRUKSI PILE CAP PADA
ARUM
014/DTS/3/SW/004 ST., MT., PROYEK PEMBANGUNAN GEDUNG RITA SUPERMALL DAN
SEPTINAWATI
PH.D., SWISS BEL HOTEL DI PURWOKERTO
SUWARDO, EVALUASI OPERASIONAL SIMPANG BUNDARAN UGM
014/DTS/3/SW/005 ST., MT., DEVI EKA SAPUTRA YOGYAKARTA BERDASARKAN MANUAL KAPASITAS JALAN
PH.D., INDONESIA 1997
SUWARDO, REHABILITASI TERMINAL CILACAP PAKET PEKERJAAN
014/DTS/3/SW/006 ST., MT., IRWAN KUNANDAR PENINGKATAN JALAN DAN JEMBATAN KABUPATEN CILACAP
PH.D., TAHUN 2013
SUWARDO, PENGENDALIAN MUTU DENGAN METODE Q-PASS
IWAN SETYO
014/DTS/3/SW/007 ST., MT., PEMBANGUNAN JALAN TOL SURABAYA-MOJOKERTO (SEKSI
WIBISONO
PH.D., I-B)
TEGUH
YUSUF SETYA PERENCANAAN DAN EVALUASI CAMPURAN BETON KUAT
014/DTS/3/TS/001 SUDIBYO, ST.,
PRABOWO AWAL TINGGI PADA PT. ADHIMIX PRECAST INDONESIA
MT
TEGUH PABRIKASI BAJA RINGAN PADA PROYEK PERUM GRAHA
014/DTS/3/TS/002 SUDIBYO, ST., ADI PAMUNGKAS PERMATA KOTA, SELAGELAS PT. VARINDO LOMBOK INTI
MT LOMBOK, NUSA TENGGARA BARAT
TEGUH
AGUNG WAHYU ANALISIS STRUKTUR KUDA-KUDA BAJA RINGAN DI
014/DTS/3/TS/003 SUDIBYO, ST.,
UTOMO PERUMAHAN GRAHA PERMATA KOTA
MT
TEGUH MANAJEMEN OPERASIONAL, KONTROL KUALITAS PRODUK,
DYAH AYU
014/DTS/3/TS/004 SUDIBYO, ST., DAN JOB MIX DESIGN PRODUK PADA PT. SCG. READYMIX
SITARESMI
MT INDONESIA (JAYAMIX) - SOLO PLANT
PERUBAHAN METODE KERJA PADA PROYEK PEMBANGUNAN
TEGUH
EWITHA JALAN TOL LINGKAR LUAR JAKARTA ATAU JORR (JAKARTA
014/DTS/3/TS/005 SUDIBYO, ST.,
NURULHUDA OUTER RING ROAD) PAKET 4 TERHADAP EFISIENSI WAKTU
MT
DAN BIAYA
TEGUH METODE PELAKSANAAN OVERPASS SIDOWAYAH 1 DAN
014/DTS/3/TS/006 SUDIBYO, ST., NITA HERMAWATI REVIEW DESIGN PILAR JEMBATAN OVERPASS PADA
MT PEMBANGUNAN JALAN TOL GEMPOL-PASURUAN
WIRYANTA, DHANES AYU INVENTARISASI FASILITAS PARKIR DI KAMPUS UNIVERSITAS
014/DTS/3/WY/001
ST., MT. RINANTI GADJAH MADA
ANALISIS PERENCANAAN ANGKUTAN UMUM DARI KOTA
WIRYANTA, ARIFIN JAINAL
014/DTS/3/WY/002 YOGYAKARTA MENUJU BANDARA BARU KULON PROGO
ST., MT. SIBARANI
MENGGUNAKAN KERETA API
PRADITYA PENGUJIAN DEFORMATION STRENGTH CAMPURAN
WIRYANTA,
014/DTS/3/WY/003 WIRADIPATI NUR LATASTON YANG MENGANDUNG BIOASPAL UNTUK LALU
ST., MT.
FATAH LINTAS BERAT
ANALISIS PERENCANAAN ANGKUTAN UMUM DARI KOTA
WIRYANTA, AKHMAD
014/DTS/3/WY/004 YOGYAKARTA MENUJU BANDARA BARU KULON PROGO
ST., MT. NUGRAHA
MENGGUNAKAN SHUTTLE BUS
DR. ENG.
IMAN ZULFI NIHAYATUN PERHITUNGAN PRODUKTIVITAS DAN ESTIMASI WAKTU
014/DTS/3/IH/010
HARYANTO NAZMI PENGECORAN KOLOM MENGGUNAKAN TOWER CRANE
S.T., M.T.
IR. HERU
AJENG PUTRI PEMBUATAN MIKROENKAPSULASI DENGAN BAHAN
014/DTS/3/HB/009 BUDI
MAHARANI PEREMAJA MINYAK TANAH DAN SOLAR
UTOMO, M.T
METODE PENGECORAN BETON READY MIX PADA PROYEK
IR. FATHI PASAR LEGI PARAKAN TEMANGGUNG STUDI KASUS
HENI
014/DTS/3/FB/006 BASEWED , KEGIATAN MAGANG DI PT. HUTAMA KARYA (PERSERO)
WAHYUNINGTYAS
M.T PADA PROYEK PEMBANGUNAN PASAR LEGI PARAKAN
TEMANGGUNG
2015
DOSEN NAMA
NO INVENTARIS JUDUL TUGAS AKHIR/PROYEK AKHIR
PEMBIMBING MAHASISWA
AGUS
KURNIAWAN, IKRIMA IFFAH PENGARUH PENAMBAHAN SERAT IJUK DAN
015/DTS/3/AK/001
ST., MT., SOCHIFAH PENAMBAHAN SUPERPLASTICIZER PADA BETON
PH.D.
AGUS
KURNIAWAN, PANGGIH TRI KOMPOSISI BACILLUS CEREUS PADA APLIKASI SELF
015/DTS/3/AK/002
ST., MT., APRIYATI HEALING CONCRETE DENGAN MEDIA HIDROGEL
PH.D.
AGUS
PEMELIHARAAN PERKERASAN LENTUR RUAS JALAN
KURNIAWAN, ACHMAD SYAKAR
015/DTS/3/AK/003 BANDUNG - NGAWU KABUPATEN GUNUNG KIDUL
ST., MT., ABDULLAH
YOGYAKARTA
PH.D.
AGUS
PENGARUH PENAMBAHAN SERAT KACA, SERABUT
KURNIAWAN, MUHAMAD
015/DTS/3/AK/004 KELAPA, SERAT IJUK DAN SERAT TAMBANG
ST., MT., SIDIQ MUSTOPA
TERHADAP KUAT TEKAN DAN KUAT LENTUR BETON
PH.D.
AGUS
PEMANFAATAN BACILLUS CEREUS SEBAGAI
KURNIAWAN, WYDHA
015/DTS/3/AK/005 ALTERNATIF INOVASI PADA STRUKTUR BETON
ST., MT., MARCHELYNA
UNTUK PROSES SELF HEALING CONCRETE
PH.D.
AGUS
ANALISA KEKUATAN DINDING GESER (SHEARWALL)
KURNIAWAN,
015/DTS/3/AK/006 VARA YULIA ULFA PADA PROYEK GEDUNG UNIVERSITAS
ST., MT.,
PEMBANGUNAN JAYA
PH.D.
AGUS
ANALISIS PRODUKTIVITAS PEMASANGAN BEKISTING
KURNIAWAN, TRI WAHYUNI
015/DTS/3/AK/007 KOLOM SISTEM PERI DAN ESTIMASI WAKTU
ST., MT., NURSIYAMI
PELAKSANAANNYA
PH.D.
PERENCANAAN CAMPURAN BETON (JOBMIX
AGUS
DESIGN) DENGAN METODE DOE SERTA ANALISA
KURNIAWAN, FAJAR WAFA
015/DTS/3/AK/008 SETTING TIME MORTAR DAN KUAT TEKAN BETON
ST., MT., GIFARI
BERDASARKAN DOSIS ADMIXTURE TYPE D DAN
PH.D.
TYPE F
AGUS ANALISA PERHITUNGAN PENULANGAN DAN
DWINTO
KURNIAWAN, METODE PELAKSANAAN DINDING GESER PADA
015/DTS/3/AK/009 RACHMAT
ST., MT., GEDUNG ANNEX PROYEK NEW SKM PT GUDANG
SAPUTRO
PH.D. GARAM UNIT V KEDIRI
AGUS
PENGARUH VARIASI PERSENTASE
KURNIAWAN, FARID ADNAN
015/DTS/3/AK/010 SUPERPLASTICIZER PADA BETON SERAT IJUK MUTU
ST., MT., NAFIANTO
TINGGI
PH.D.
AGUS PERBANDINGAN ANALISA PERHITUNGAN
KURNIAWAN, PERENCANAAN DAN METODE PEKERJAA
015/DTS/3/AK/011 ESTU AMALIA
ST., MT., PEMELIHARAAN JALAN KABUPATEN DINAS
PH.D. PEKERJAAN UMUM KABUPATEN KULON PROGO
AGUS
METODE PELAKSANAAN PEMBUATAN DAN
KURNIAWAN, AFAN
015/DTS/3/AK/012 PEMASANGAN BEKISTING PADA PROYEK "MARQUIS
ST., MT., FATHURRAHMAN
DE LAFAYETTE-SEMARANG"
PH.D.
AGUS PENILAIAN ERGONOMI KERJA KONSTRUKSI
NUGROHO, TIA YUNI BERDASARKAN METODE RAPID UPPER LIMB
015/DTS/3/AN/001
ST., MT., PERMATASARI ASSESSMENT (RULA) (STUDI KASUS: PEKERJAAN
PH.D. PEMASANGAN KERAMIK)
AGUS PENILAIAN ERGONOMI KERJA KONSTRUKSI
NUGROHO, ADELINA CRISTA BERDASARKAN METODE RAPID ENTIRE BODY
015/DTS/3/AN/002
ST., MT., MERSHICA ASSESSMENT (REBA) (STUDI KASUS: PEKERJAAN
PH.D. PEMASANGAN KERAMIK)
AGUS
NUGROHO, WITRI IDENTIFIKASI POTENSI RESIKO KECEKLAKAAN PADA
015/DTS/3/AN/003
ST., MT., KUSWANTO PENGOPERASIAN TOWER CRANE
PH.D.
AGUS
NUGROHO, ANDRE IDENTIFIKASI KESALAHAN ERGONOMI DALAM
015/DTS/3/AN/004
ST., MT., NURCAHYO PEKERJAAN DINDING PASANGAN BATA
PH.D.
PENILAIAN ERGONOMI PEKERJA KONSTRUKSI PADA
AGUS
PEKERJAAN PENGECORAN PLAT LANTAI
NUGROHO, BERLIAN PUTRA
015/DTS/3/AN/005 MENGGUNAKAN METODE OVAKO WORKING
ST., MT., WICAKSANA
ANALYSIS SYSTEM (OWAS) PROYEK NEW BUILDING
PH.D.
SKM UNIT V PT. GUDANG GARAM TBK., KEDIRI
AGUS KAJIAN 7 (TUJUH) PRINSIP DAN 8 (DELAPAN) ETIKA
NOVI AYU
NUGROHO, PENGADAAN BARANG/JASA PADA LAYANAN
015/DTS/3/AN/006 MUSTIKA
ST., MT., PENGADAAN SISTEM ELEKTRONIK (LPSE)
NINGRUM
PH.D. KABUPATEN KULON PROGO
AGUS PENGARUH KESEHATAN PEKERJA KONSTRUKSI DAN
NUGROHO, BRILLY APRINT MANAJERIAL TERHADAP PRODUKTIVITAS PEKERJA
015/DTS/3/AN/007
ST., MT., GILANG PERKASA DENGAN METODE PRODUKTIVITY RATING (STUDI
PH.D. KASUS PEKERJA PEMBESIA TOWER IBIZA)
PENILAIAN ERGONOMI PEKERJA KONSTRUKSI PADA
AGUS
PEKERJAAN PENGECORAN MENGGUNAKAN
NUGROHO, CHARLES TRI
015/DTS/3/AN/008 METODE RAPID UPPER LMB ASSESSMENT (RULA)
ST., MT., ARDIANATA
(STUDI KASUS PROYEK PEMBANGUNAN PLTU
PH.D.
TALAUD 2X3 MW)
AGUS
ANALISIS PRODUKTIFITAS ALAT BERAT STUDI KASUS
NUGROHO,
015/DTS/3/AN/009 DWI SUJATMIKO PROYEK PEMBANGUNAN PLTU TALAUD 2 X 3 MW
ST., MT.,
SULAWESI UTARA
PH.D.
DIAN PENGARUH NILAI SLUMP TERHADAP KUAT TEKAN
AMELIA
015/DTS/3/DS/001 SESTINING BETON YANG MENGGUNAKAN BAHAN TAMBAH FLY
RAHMAWATI
AYU, ST., MT. ASH DI PT. SCG READYMIX INDONESIA SOLO PLANT
METODE PELAKSANAAN SERTA ANALISIS
DIAN
PERBANDINGAN RESPON STRUKTUR BASE
015/DTS/3/DS/002 SESTINING FAHMI AKBAR
ISOLATOR DAN TANPA BASE ISOLATOR PADA
AYU, ST., MT.
PROYEK PEMBANGUNAN UI TEACHING HOSPITAL
TINGKAT KUALITAS PAPAN PARTIKEL BERBAHAN
DIAN
AHMAD BUDI UTAMA CANGKANG KELAPA SAWIT DENGAN
015/DTS/3/DS/003 SESTINING
SANTOSO SUBSTITUSI SERBUK KAYU SENGON DAN KAYU
AYU, ST., MT.
GLUGU
METODE PELAKSANAAN DAN ANALISA ZONA
DIAN
DEDDY ANGKUR BALOK PRATEGANG PADA PROYEK
015/DTS/3/DS/004 SESTINING
HANDOKO PEMBANGUNAN RITA SUPERMALL & SWISS-
AYU, ST., MT.
BELHOTEL DI PURWOKERTO
ANALISA EFEKTIVITAS DAN PRODUKTIVITAS
DIAN
NILA ANANDA PEKERJA MENGGUNAKAN METODE WORK
015/DTS/3/DS/005 SESTINING
PUTRI RAGILIA SAMPLING PADA PEKERJAAN PEMBESIAN PLAT
AYU, ST., MT.
LANTAI
ANALISIS DAYA DUKUNG FONDASI TIANG TUNGGAL
DENGAN DATA STANDARD PENETRATION TEST
DIAN
HELENA SETYA (SPT) DAN PILE DRIVIGN ANALYZER (PDA) PADA
015/DTS/3/DS/006 SESTINING
PUTRI PROYEK PEMBANGUNAN JALAN LAYANG KHUSUS
AYU, ST., MT.
BUSWAY KAPTEN TENDEAN-BLOK M-CILEDUG
PAKET TRUNOJOYO
PERENCANAAN KEBUTUHAN AIR BERSIH DAN
DIAN
WAHYU MUFTHI KOTOR BERDASARKAN UNIT BEBAN ALAT
015/DTS/3/DS/007 SESTINING
WIJANARKO PLAMBING PROYEK PEMBANGUNAN RUMAH SAKIT
AYU, ST., MT.
PRATAMA YOGYAKARTA
DIAN LEMBAH CANGKANG KELAPA SAWIT SEBAGAI
DAPOT SORITUA
015/DTS/3/DS/008 SESTINING BAHAN PEMBUAT PAPAN PARTIKEL DENGAN
MANURUNG
AYU, ST., MT. SUBSTITUSI SERBUK KAYU RANDU DAN MAHONI
DR. ENG.
IMAN RITA PEMANFAATAN LIMBAH PLASTIK DAN BIOASPAL
015/DTS/3/IH/001
HARYANTO DHAMAYANTI UNTUK JALAN LINGKUNGAN
S.T., M.T.
DR. ENG. PENGARUH MATRIC SUCTION TERHADAP
IMAN PARAMETER GESER TANAH PADA TANAH LEMPUNG
015/DTS/3/IH/002 NAFIATUSSAIDAH
HARYANTO EKSPANSIF DUSUN KREBET KULON PROGO
S.T., M.T. YOGYAKART
DR. ENG.
PENGARUH MATRIC SUCTION TERHADAP
IMAN
015/DTS/3/IH/003 PUPUT RISTANTY PARAMETER GESER TANAH LEMPUNG
HARYANTO
TERSTABILISASI KAPUR DAN ABU VULKANIS KELUD
S.T., M.T.
PELAKSANAAN PERKUATAN PADA JEMBATAN
DR. ENG.
DENGAN METODE STEEL PLATE BONDING DAN
IMAN FARIDA NUR
015/DTS/3/IH/004 PENGUJIAN PEMBEBANAN PADA JEMBATAN TIPE
HARYANTO HANIFAH
SLAB ON PILE JALAN TOL RUAS CAWANG IR WIYOTO
S.T., M.T.
WIYONO
DR. ENG.
PERHITUNGAN KAPASITAS DAYA DUKUNG TIANG
IMAN
015/DTS/3/IH/005 YESI LISTYORINI BORE PILE PADA KONSTRUKSI MASS RAPID TRANSIT
HARYANTO
JAKARTA PAKET KONTRAK 101
S.T., M.T.
METODE PENGUJIAN DAN ANALISIS DAYA DUKUNG
DR. ENG. TAING PANCANG TUNGGAL MENGGUNAKAN CARA
IMAN EDWIN DWI PENGUJIAN BEBAN STATISTIK AKSIAL TEKAN
015/DTS/3/IH/006
HARYANTO CAHYA (LOADING TEST) PADA PEMBANGUNAN
S.T., M.T. APARTEMEN GRAND PAKUBUWONO JAKARTA
SELATAN
DR. ENG. APLIKASI VALUE ENGINEERING PADA PEKERJAAN
IMAN ARYANI TYAS RIGID PAVEMENT PADA PROYEK PENAMBAHAN
015/DTS/3/IH/007
HARYANTO NINGRUM DAN PENATAAN LAJUR GERBANG TOL DUKUH 2
S.T., M.T. JALAN TOL JAGOWARI
DR. ENG. METODE OPELAKSANAAN DAN ANALISIS
IMAN TESHAR PRODUKTIVITAS GANTRY LAUNCHER PADA
015/DTS/3/IH/008
HARYANTO OCKTARIO PEKERJAAN ERECTION GIRDER PROYEK ELYOVER
S.T., M.T. PALUR
DR. ENG. KONTROL KUALITAS AN PERMASALAHAN
IMAN MAHFUDZ AINUL PEKERJAAN BETON ASAL KONSTRUKSI APRON
015/DTS/3/IH/009
HARYANTO YAQIN BANDARA INTERNASIONAL AHMAD YANI
S.T., M.T. SEMARANG
DR. ENG.
PENGUKURAN DAN ANALISIS LENDUTAN BALIK
IMAN MOCHAMAD
015/DTS/3/IH/010 DENGAN ALAT BENKELMAN BEAM DI KULONPROGO
HARYANTO RIZAL AR
DAN GUNUNG KIDUL
S.T., M.T.
EFISIENSI DEN BIAYA EFEKTIVITAS WAKTU
DR. ENG. PEKERJAAN PENGGALIAN DAN PENGANGKUTAN
IMAN TANAH BERDASARKAN ANALISIS PRODUKTIVITAS
015/DTS/3/IH/011 ALPIN
HARYANTO DAN ESTIMASI BIAYA ALAT BERAT DIRENCANAKAN
S.T., M.T. ONTRAKTOR DAN DILAKSANAKANN DILAKSANAKAN
SUB KONTRAKTOR
DR. ING. IR. OPTIMALISASI BANGUNAN PENGAMBILAN UNTUK
PUTHUT WISNU
015/DTS/3/AM/001 AGUS PEMBANGKIT LISTRIK TENAGA AIR (PLTA) JELOK
SETYO UTOMO
MARYONO KAB. SEMARANG PROVINSI JAWA TENGAH
DR. IR. SINDU REHABILITASI DAN PEMELIHARAAN SALURAN
MOHAMAD
015/DTS/3/SN/001 NURANTO, SEKUNDER DAERAH IRIGASI KLEGEN KABUPATEN
POSYA PRATISTA
MS. BANTUL DAERAH ISTIMEWA YOGYAKARTA
METODE KONSTRUKSI DAN ERECTION CHIMNEY
DR. IR. SINDU
PADA INSTALASI BOILER AREA MAIN BUILDING
015/DTS/3/SN/002 NURANTO, YUDI PRASETYO
PROYEK PEMBANGUNAN PLTU 2X3 MW POWER
MS.
PLANT TALAUD - SULAWESI UTARA
PENGEMBANGAN POTENSI SUMBER DAYA AIR DI
DR. IR. SINDU SEKITAR MUARA SUNGAI OPAK DALAM
M. ALBRIAN
015/DTS/3/SN/003 NURANTO, MENDUKUNG PENYEDIAAN AIR BERSIH UNTUK
YUDITYA PUTRA
MS. OBJEK WISATA PARANGTRITIS DI DINAS SUMBER
DAYA AIR BANTUL YOGYAKARTA
ANALISIS DAYA DUKUNG KELOMPOK PONDASI
DR. IR. SINDU
YOGHI ANGGARA TIANG PANCANG PADA PEMBANGUNAN MENARA
015/DTS/3/SN/004 NURANTO,
PUTRA PERMAINAN JOGJA BAY ADVENTURE PIRATES
MS.
WATERPARK
DR. IR. ANALISIS PENYERAPAN KARBON DIOKSIDA (CO2)
MAWAR RANI
015/DTS/3/SA/001 SYAUKAT ALI, OLEH TUMBUHAN DI LINGKUNGAN TAMAN KANAK-
RIFZY
M.SI KANAK MASJID KAMPUS UGM
DR. IR. PENGARUH PENCAHAYAAN DAN PENGHAWAAN
ADEL IRENUS
015/DTS/3/SA/002 SYAUKAT ALI, TERHADAP PENGHEMATAN ENERGI PERUMAHAN
ZEGA
M.SI EKOLOGI
DR. IR. ANALISIS PERBANDINGAN RUANG TERBUKA HIJAU
GUNAWAN
015/DTS/3/SA/003 SYAUKAT ALI, TAMAN DI PERUMAHAN THE JALIMBAR RESIDENCE
WIDAGDO
M.SI DAN GRIYA PALEM HIJAU
DR. IR. AGUNG METODE PELAKSANAAN PENAMBAHAN BORED PILE
015/DTS/3/SA/004 SYAUKAT ALI, HERYANTO AS 7 (C-D) PADA PROYEK UTTARA THE ICON
M.SI WIBOWO APARTEMENT OF YOGYAKARTA
DR. IR. ANALISIS PERKUATAN LERENG DENGAN GEOFRAME
MAEDWI RIANA
015/DTS/3/SA/005 SYAUKAT ALI, PADA KLASTER ALPEN-KILIMANJARO VIMALA HILLS
MAHANI
M.SI VILLA AND RESORT CIAWI BOGOR
DR. IR. QUALITY CONTROL BETON STUDI KASUS: RITA
WISNU
015/DTS/3/SA/006 SYAUKAT ALI, SUPERMALL & SWISS-BELHOTEL PURWOKERTO PT.
RAMADHAN
M.SI ADHI KARYA (PERSERO) TBK.
DR. IR. METODE PELAKSANAAN SISTEM HALF SLAB
015/DTS/3/SA/007 SYAUKAT ALI, RODHI AN NAJMI PRECAST JETTY PLTU 2X3 MW TALAUD - SULAWESI
M.SI UTARA
DR. IR. DWI ASTUTI PENGARUH ZEBRA CROSS TERHADAP HUBUNGAN
015/DTS/3/SA/008 SYAUKAT ALI, YUSTIKA INTAN ANTARA ARUS, KECEPATAN DAN KERAPATAN LALU
M.SI PRATIWI LINTAS JALAN LAKSDA ADISUCIPTO KM 6,5
ANALISIS PERUMAHAN RAMAH LINGKUNGAN
DR. IR.
ARGITA JUNIA DITINJAU ARI ASPEK EMISI CO2 STUDI KASUS DI
015/DTS/3/SA/009 SYAUKAT ALI,
EKA PUTRI PERUMAHAN CITRA KEDATON 2 CONDONG CATUR
M.SI
D.I YOGYAKARTA
DR. IR. PENGGAMBARAN JARINGAN DAERAH IRIGASI BARU
ARIANSYAH
015/DTS/3/SA/010 SYAUKAT ALI, MATA AIR TUK PANCURAN MENGGUNAKAN
KHAMDANI
M.SI APLIKASI SOFTWARE ARCGIS 10.2
DR. SC. ADHY EFEKTIFITAS MUTU PEKERJAAN GALIAN TANAH
MIRA AYU
015/DTS/3/AY/001 KURNIAWAN, PADA REHABILITASI JARINGAN IRIGASI D.I.
AISYAH
ST. BLAWONG (DAK)
DR. SC. ADHY ANALISIS KEBUTUHAN AIR IRIGASI PADA DAERAH
OCTARIAN ADAM
015/DTS/3/AY/002 KURNIAWAN, IRIGASI MEJING UPT WINONGO DINAS SUMBER
PAMUNGKAS
ST. DAYA AIR KABUPATEN BANTUL
DR. SC. ADHY PERENCANAAN LAPIS TAMBAH (OVERPLAY)
PUTRI
015/DTS/3/AY/003 KURNIAWAN, PERKERASAN LENTUR PADA RUAS JALAN JENDERAL
RAHMAWANTI
ST. WIRATNO KABUPATEN CILACAP
DR. SC. ADHY
ANALISA PEKERJAAN PELAKSANAAN
015/DTS/3/AY/004 KURNIAWAN, BATUL WAFIYYA
REHABILITASI/PEMELIHARAAN JARINGAN IRIGASI
ST.
SEPANJANG 200 METER PAKET 1 ; DI. SIKLUWIH
KABUPATEN BANTUL TAHUN ANGGARAN 2015
ANALISIS PERBANDINGAN PERHITUNGAN RENCANA
DR. SC. ADHY ANGGARAN BIAYA KEGIATAN
WINNA ELVIA
015/DTS/3/AY/005 KURNIAWAN, PENINGKATAN/PEMELIHARAAN JARINGAN IRIGASI
JULINAWATI
ST. WILAYAH TIMUR PAKET 7 D.I TAPANGAN DAN D.I
KLEGEN TAHUN ANGGARAN 2015 KAB. BANTUL
PELAKSANAAN PERKERASAN KAKU (RIGID
DR. SC. ADHY
RIZKI NUR PAVEMENT) RUAS JALAN HARUM NAFSI - H.M.
015/DTS/3/AY/006 KURNIAWAN,
HIDAYAT RIFADIN (STA.0+000-STA.4+782)-(STA.0+000-
ST.
STA.7+300) KOTA SAMARINDA KALIMANTAN TIMUR
DR. SC. ADHY METODE PELAKSANAAN FONDASI RAKIT PADA
015/DTS/3/AY/007 KURNIAWAN, PRASTAMA NUR PROYEK PEMBANGUNAN RITA SUPERMALL &
ST. SWISS-BELHOTEL PURWOKERTO
DR. SC. ADHY METODE PERKUATAN LERENG MENGGUNAKAN
MUHAMMAD
015/DTS/3/AY/008 KURNIAWAN, GEOFRAME DAN GEOSINTETIK PADA PROYEK
RAHMAT TINJANI
ST. GREEN VALLEY GUNUNG GUNTUR BALIKPAPAN
EDI TINJAUAN KEKUATAN BALOK DAN KOLOM BETON
ARDIAN EKA
015/DTS/3/EK/001 KURNIADI, BERTULANG PADA PROYEK RITA SUPERMALL DAN
PRATAMA
ST., MT SWISS BELHOTEL PURWOKERTO
EDI TINJAUAN KEKUATAN DAN PELAKSANAAN CORBEL
REFA FAIRUZ
015/DTS/3/EK/002 KURNIADI, PADA PROYEK NEW SKM PT GUDANG GARAM UNIT
RAHMAN
ST., MT V KEDIRI
PENGENDALIAN MIX DESIGN BETON
EDI
MOCHAMAD MENGGUNAKAN VARIASI TIPE BAHAN TAMBAH
015/DTS/3/EK/003 KURNIADI,
IKHSAN ALWI CHEMICAL ADMIXTURE (PROYEK. PT ADHIMIX
ST., MT
LENTENG AGUNG PLANT)
EDI
NIKEN KRISTANTI APLIKASI METAL DECK UNTUK PELAT LANTAI PADA
015/DTS/3/EK/004 KURNIADI,
PRADASARI UNIVERSITAS PEMBANGUNAN JAYA
ST., MT
EDI PERENCANAAN PORTAL BANGUNAN GEDUNG
WAHID ANDANG
015/DTS/3/EK/005 KURNIADI, TEMPAT EVAKUASI SEMENTARA (TES) DI
SUPRAYOGI
ST., MT KABUPATEN PANGANDARAN
ANALISA STRUKTUR KOLOM AKIBAT PERUBAHAN
EDI
ANDI AGUNG ELEVASI LANTAI PADA LANTAI GROUND FLOOR
015/DTS/3/EK/006 KURNIADI,
KUSWANTORO TOWER BELIZE PROYEK APARTEMEN PLUIT SEA
ST., MT
VIEW
STUDI PENGARUH PEMELIHARAAN INFRASTRUKTUR
IR. BAMBANG
GEDUNG TERHADAP KINERJA GEDUNG (STUDI
015/DTS/3/BB/001 HERUMANTA, SISWANTO
KASUS DI GEDUNG FAKULTAS TEKNIK UNIVERSITAS
M.T
NEGERI YOGYAKARTA)
IR. BAMBANG PENGENDALIAN MUTU BETON PROYEK
CICI RAHMAWATI
015/DTS/3/BB/002 HERUMANTA, PEMBANGUNAN GEDUNG MASTER PLAN TAHAP II
SUKARDI
M.T RUMAH SAKIT TELOGOREJO SEMARANG
IR. BAMBANG
NOVI DWI "QUALITY CONTROL BETON STRUKTUR PADA
015/DTS/3/BB/003 HERUMANTA,
LESTARI PROYEK PEMBANGUNAN GEDUNG MIXED USE
M.T
SENTRALAND SEMARANG" DI PT. WIJAYA KARYA
BANGUNAN GEDUNGN - SEMARANG
ANALISIS BIAYA PEKERJAAN BEKISTING DENGAN
IR. BAMBANG
AYU RINA METODE BOW, SNI DAN LAPANGAN PADA PROYEK
015/DTS/3/BB/004 HERUMANTA,
MAHARANI CONSTRUCTION WORKS FOR UNIVERSITY HOSPITAL
M.T
DEPOK, JAWA BARAT
METODE PELAKSANAAN PILE CAP DAN TIE BEAM
IR. BAMBANG
RANGGA DWI SERTA ANALISA KEKUATAN TIE BEAM PADA PROYEK
015/DTS/3/BB/005 HERUMANTA,
HENDIKA PEMBANGUNAN RITA SUPERMALL DAN SWISS BEL-
M.T
HOTEL PURWOKERTO
METODE PELAKSANAAN, DURASI DAN
IR. BAMBANG PRODUKTIVITAS PENGEBORAN PEKERJAAN
ILMA
015/DTS/3/BB/006 HERUMANTA, PONDASI BORE PILE PADA PROYEK PEMBANGUNAN
FAHRUNNISA
M.T JALAN LAYANG KHUSUS BUSWAY KAPTEN
TENDEAN-BLOK M-CILEDUG PAKET TRUNOJOYO
METODE PELAKSANAAN PEMASANGAN AGUR
IR. BAMBANG
DADANG EKO TANAH DAN TES PEMBEBANAN (STRESSING) PADA
015/DTS/3/BB/007 HERUMANTA,
WIBOWO EKS AREA SUTT DAN JEMBATAN PENGGARON
M.T
JALAN TOL SEMARANG - SOLO
STUDI PENGARUH PEMELIHARAAN DAN
IR. BAMBANG
RESHA WISNU PERAWATAN TERHADAP KINERJA GEDUNG STUDI
015/DTS/3/BB/008 HERUMANTA,
WARDANA KASUS GEDUNG KOTAK TAMAN PINTAR
M.T
YOGYAKART
STUDI PENGARUH PEMELIHARAAN DAN
IR. BAMBANG MUHAMMAD
PERAWATAN INFRASTRUKTUR GEDUNG TERHADAP
015/DTS/3/BB/009 HERUMANTA, GINANJAR
KINERJA GEDUNG (STUDI KASUS GEDUNG JOGJA
M.T RISMANTANA
TRONIK MALL YOGYAKARTA)
PERENCANAAN GALIAN DAN TIMBUNAN TANAH
IR. FATHI
FAISAL ARIF PEMBANGUNAN JALAN TOL SEMARANG-SOLO
015/DTS/3/FB/001 BASEWED ,
WIBAWA PAKET 3.1 BAWEN-PULOSIRI (STA. 22+840-
M.T
STA.26+300)
IR. FATHI OPTIMALISASI WAKTU DAN BIAYA PEKERJAAN
DINIARSHINTA
015/DTS/3/FB/002 BASEWED , BEKISTING DENGAN SISTEM HOLLOW PADA PROYEK
AYU F
M.T PEMBANGUNAN MIXED USE SENTRALAND
ANALISIS PRODUKTIVITAS ALAT BERAT PADA
PEKERJAAN PENGECORAN BETON READY MIX
IR. FATHI ADITIA
(STUDI KASUS PROYEK PEMBANGUNAN GEDUNG
015/DTS/3/FB/003 BASEWED , MAULANA
MASTERPLAN TAHAP II PAKET PEKERJAAN
M.T AKHMAD
STRUKTUR DAN ARSITEKTUR RS TELOGOREJO
SEMARANG)
APLIKASI VALUE ENGINEERING TERHADAP
IR. FATHI
STRUKTUR PONDASI TIANG PILE PADA PROYEK
015/DTS/3/FB/004 BASEWED , FADIL UMRON
PEMBANGUNAN (PEMBANGUNAN HOTEL BEST
M.T
WESTERN ADISUCIPTO
IR. FATHI PERENCANAAN STRUKTUR BAGIAN ATAS GEDUNG
015/DTS/3/FB/005 BASEWED , AMRI HIDAYAT TEMPAT EVAKUASI SEMENTARA (TES) DI
M.T KABUPATEN PACITAN
IR. HERU MAHESA PERENCANAAN TEBAL PERKERASAN DAN
015/DTS/3/HB/001 BUDI ALFIDHIAWANTA PELAKSANAAN PELEBARAN JALAN BETON SEMEN
UTOMO, M.T PALEDANG PORTLAND PADA GERBANG TOL DUKUH 2B
IR. HERU PROYEK PEMBANGUNAN JALAN BARU PONCOSARI-
NOVITASARI NUR
015/DTS/3/HB/002 BUDI GRERES BANTUL "PENGAMATAN PELAKSANAAN
ARDIANTI
UTOMO, M.T PEKERJAAN JALAN BARU"
IR. HERU EVALUASI STRUKTUR PROTEKSI UNDERPINNING
LITWINA RATRI
015/DTS/3/HB/003 BUDI PADA PATUNG PEMUDA MEMBANGUN DI AREA
ROSARIA
UTOMO, M.T TRANSISI PROYEK MRT JAKARTA
EVALUASI PELAKSANAAN PEKERJAAN PERKERASAN
IR. HERU
KAKU (RIGID PAVEMENT) PADA PROYEK
015/DTS/3/HB/004 BUDI IMAM PRASETYO
PEMBANGUNAN JALAN TOL SURABAYA -
UTOMO, M.T
MOJOKERTO SEKSI IV
IR. HOTMA
VISKOSITAS CAMPURAN TANAHDAN SEMEN
015/DTS/3/HP/001 PRAWOTO S, ADE ARIANTI
BENTUK APLIKASI PASTA FRIKSI
MT., IP-MD
IR. HOTMA PENGARUH KADAR CAMPURAN SEMEN TERHADAP
VIOLA NUR
015/DTS/3/HP/002 PRAWOTO S, FAKTOR GESEK TIANG DENGAN PERKUATAN PASTA
RAKHMADIKA
MT., IP-MD FRIKSI
IR. HOTMA EVALUASI PENEMPATAN SAMBUNGAN PADA
YUPDI AKBAR AL-
015/DTS/3/HP/003 PRAWOTO S, KOLOM DAN PERENCANAAN SAMBUNGAN
RASYID
MT., IP-MD HUBUNGAN BALOK-KOLOM
BESAR GAYA GESEK SATUAN PADA TIANG DENGAN
IR. HOTMA
ALBERTUS SURYA CAMPURAN TANAH DAN SEMEN DENGAN
015/DTS/3/HP/004 PRAWOTO S,
KUSUMA VARIABEL DIAMETER FONDASI (SKALA
MT., IP-MD
LABORATORIUM)
IR. HOTMA PENGARUH PANJANG TIANG FONDASI TERHADAP
MUHAMMAD
015/DTS/3/HP/005 PRAWOTO S, TAHANAN GESEK SATUAN DENGAN CAMPURAN
KHAERUL HUDA
MT., IP-MD TANAH DAN SEMEN
IR. HOTMA ANALISIS KEKAKUAN DAN STABILITAS BEKISTING
015/DTS/3/HP/006 PRAWOTO S, NIDA ZAKKIYAH PADA PROYEK PEMBANGUNAN UI TEACHING
MT., IP-MD HOSPITAL
IR. HOTMA PERBANDINGAN RESPON STRUKTUR BANGUNAN
BETTY PRASETYA
015/DTS/3/HP/007 PRAWOTO S, GEDUNG 2 LANTAI DENGAN DINDING PENGISI DAN
NINGRUM
MT., IP-MD TANPA DINDING PENGISI AKIBAT BEBAN GEMPA
IR. HOTMA
LINA OCTAVIA PENGARUH PENAMBAHAN ABU BATU PADA
015/DTS/3/HP/008 PRAWOTO S,
SIDABALOK CAMPURAN BETON
MT., IP-MD
LAVA
REDESIGN BALOK INDUK GEDUNG NEW SKM UNIT-
015/DTS/3/LH/001 HIMAWAN, HASAN RAHARJO
V KEDIRI MENGGUNAKAN PROGRAM ETABS
ST., MT
PROPOSAL CAMPURAN OPTIMUM LFC
LAVA
(LIGHTWEIGHT FOAMED CONCRETE) DENGAN
015/DTS/3/LH/002 HIMAWAN, CANDRA WIJAYA
BAHAN TAMBAH SILICA FUME DAN FLY ASH
ST., MT
MENGGUNAKAN METODE TAGUCHI
PENGGUNAAN LOADER DAN SOFTWARE CPAC
LAVA VONSCA
SERTA WAKTU YANG DIBUTUHKAN PADA PRODUKSI
015/DTS/3/LH/003 HIMAWAN, NOVANDA
BETON DI PT. SCG READYMIX INDONESIA-SOLO
ST., MT RITAMA
PLANT
LAVA
ERLIN FIRNI ANALISIS KAPASITAS BATCHING PLANT TANAH
015/DTS/3/LH/004 HIMAWAN,
ARYANDARI ABANG PT. ADHIMIX PRECAST INDONESIA
ST., MT
LAVA PROPOSAL OPTIMAL PADA BETON RINGAN DEGAN
NUGROHO DWI
015/DTS/3/LH/005 HIMAWAN, BAHAN TAMBAHAN SILICA FUME, FLY ASH DAN
LAKSONO
ST., MT BUBUK KAPUR MENGGUNAKAN METODE TAGUCHI
LAVA OPTIMALISASI PEMBUATAN BETON RINGAN
FAJAR
015/DTS/3/LH/006 HIMAWAN, MENGGUNAKAN METODE TAGUCHI DENGAN
PURWANTO
ST., MT PENAMBAHAN SILICA FUME
LAVA PENGENDALIAN WAKTU DAN BIAYA PROYEK THE
015/DTS/3/LH/007 HIMAWAN, RULLY SASMINTA WUJIL UNGARAN SEMARANG DENGAN METODE
ST., MT EARNED VALUE
MUH.
SULAIMAN, BACHTIAR ARIF SISTEM DRAINASE RAMAH LINGKUNGAN (ECO-
015/DTS/3/MH/001
ST., MT., PAMBUDI DRAINASE) DENGAN CARA MEMANEN AIR HUJAN
D.ENG
MUH.
PENDATAANDAERAH IRIGASI BARU UNIT
SULAIMAN, RAGIL BAGUS
015/DTS/3/MH/002 PENGAMATAN TEKNIS OPAK HILIR KABUPATEN
ST., MT., EKSTRIYAN
BANTUL YOGYAKARTA
D.ENG
MUH. APLIKASI GEOFRAME UNTUK PERKUATAN LERENG
SULAIMAN, ARDYAN PADA PROYEK PEMBANGUNAN KLASTER
015/DTS/3/MH/003
ST., MT., BADRIZA ARGOPURO D VIMALA HILLS VILLA AND RESORT
D.ENG CIAWI BOGOR
MUH.
REHABILITASI SUNGAI BELIK SECARA EKOHIDRAULIK
SULAIMAN,
015/DTS/3/MH/004 HILDA MEYLIA KAWASAN PDAM TIRTAMARTA PEDUKUHAN
ST., MT.,
KARANGGAYAM
D.ENG
MUH.
EVALUASI DAN BENCANA REVITALISASI
SULAIMAN,
015/DTS/3/MH/005 ANA KAMALIYAH PENGELOLAAN PERSAMPAHAN KAMPUS
ST., MT.,
UNIVERSITAS GADJAH MADA
D.ENG
PEMETAAN JARINGAN IRIGASI DAERAH IRIGASI
MUH.
BARU BERBASIS SISTEM INFORMASI GEOGRAFIS
SULAIMAN, MUHAMMAD ALI
015/DTS/3/MH/006 (SIG) UPT BWK (BEDOG WINONGO KECIL) DINAS
ST., MT., SADIKIN
SUMBER DAYA AIR KABUPATEN BANTUL DAERAH
D.ENG
ISTIMEWA YOGYAKARTA
MUH.
SULAIMAN, PRA-DESAIN CONSTRUCTED WETLAND LIMBAH
015/DTS/3/MH/007 INDRI RIANTARI
ST., MT., SUNGAI BELIK DI KAWASAN UGM YOGYAKARTA
D.ENG
MUH.
PERENCANAAN LUAS AREA IRIGASI OPTIMAL PADA
SULAIMAN, PRASETYO
015/DTS/3/MH/008 BENDUNG GERAK SEMBAYAT (LOKASI STUDI DESA
ST., MT., UTOMO
SIDOMUKTI, GRESIK)
D.ENG
PENGARUH WAKTU PEMERAMAN TERHADAP KUAT
NURSYAMSU
TEKAN TANAH EKSPANSIF TERSTABILISASI KAPUR
015/DTS/3/NH/001 HIDAYAT, ST., SURYO NEGORO
DENGAN VARIASI PENAMBAHAN ABU VULKANIS
MT., PH.D.
MERAPI
PENGARUH WAKTU PEMERAMAN TERHADAP KUAT
NURSYAMSU
SANDRO FEBRI TEKAN TANAH EKSPANSIF TERSTABILISASI KAPUR
015/DTS/3/NH/002 HIDAYAT, ST.,
IWANSYAH DENGAN VARIASI PENAMBAHAN ABU VULKANIS
MT., PH.D.
KELUD
NURSYAMSU MIX DESIGN BETON UNTUK LAPIS PONDASI APRON
FERY TRI
015/DTS/3/NH/003 HIDAYAT, ST., PADA PERBAIKAN APRON BANDARA UDARA
HARYANTO
MT., PH.D. AHMAD YANI SEMARANG
NURSYAMSU KENYAMANAN PEJALAN KAKI DALAM
AGNES DIANA BR
015/DTS/3/NH/004 HIDAYAT, ST., MEMANFAATKAN TROTOAR JALAN AHMAD YANI
SEMBIRING
MT., PH.D. YOGYAKARTA
ANALISIS PERBANDINGAN PERBANDINGAN
PONDASI TIANG PANCANG (SPUN PILE) DAN
NURSYAMSU
FATMA PONDASI BORE PILE DENGAN MUTU SAMA DARI
015/DTS/3/NH/005 HIDAYAT, ST.,
WIDYASTUTI SEGI METODE KERJA, DURASI, DAN BIAYA PADA
MT., PH.D.
JEMBATAN SUMBER WARU PROYEK TOL
SURABAYA-MOJOKERTO SEKSI IV
APLIKASI METODE DUAL TUBE DUAL PHASES UNTUK
NURSYAMSU
PUTRI HAPSARI PERBAIKAN TANAH PADA PROYEK MRT JAKARTA CP
015/DTS/3/NH/006 HIDAYAT, ST.,
SURYA NINGTYAS 105 AREA PIPA AIR DI STASIUN BENDUNGAN HILIR
MT., PH.D.
JAKARTA
ANALISIS DAN EVALUASI DAYA DUKUNG PONDASI
NURSYAMSU
NOORSHIN TIANG BOR TUNGGAL PADA PROYEK
015/DTS/3/NH/007 HIDAYAT, ST.,
TRIWIDIYANTO PEMBANGUNAN APARTEMEN UTTARA THE ICON JL.
MT., PH.D.
KALIURANG KM 5,3 SLEMAN, YOGYAKART
NURSYAMSU REDESIGN BETON DENGAN MUTU K-300 UNTUK
015/DTS/3/NH/008 HIDAYAT, ST., YUS IMA NAZARA KETAHANAN RESISTANCE 3 JAM PADA PT. ADHIMIX
MT., PH.D. PRECAST INDONESIA
METODE PEKERJAAN PERKERASAN KAKU DENGAN
NURSYAMSU
DANIEL WIDI PAVER MACHINE SLIPFORM 500 PADA RAMP 106
015/DTS/3/NH/009 HIDAYAT, ST.,
PRAKOSA PROYEK JALAN TOL SURABAYA-MOJOKERTO SEKSI
MT., PH.D.
IA
METODE PELAKSANAAN JEMBATAN OVERPASS
NURSYAMSU
MONICA MAWAR PEDAGANGAN STA. 29+834,87 PADA
015/DTS/3/NH/010 HIDAYAT, ST.,
A. PEMBANGUNAN JALAN TOL SURABAYA-
MT., PH.D.
MOJOKERTO
ANALISIS PRODUKTIVITAS DAN BIAYA PADA
SUWARDO,
JAUZAN LUKY PEMANCANGAN TIANG PANCAG YANG
015/DTS/3/SW/001 ST., MT.,
WARDANA MENGGUNAKAN HYDRAULIC STATIC PILE DIVER
PH.D.,
DAN DROP HAMMER
SUWARDO, PEKERJAAN PEMELIHARAAN ERIODIK JALAN TOL
015/DTS/3/SW/002 ST., MT., GIRI GARJITO JAGOWARI MENGGUNAKAN CARA SCRAPPING,
PH.D., FILLING, DAN OVERPLAY (SFO)
SUWARDO, TINJAUAN METODE PELAKSANAAN DAN ANALISIS
RATNA FITRIA
015/DTS/3/SW/003 ST., MT., DIAPHRAGM WALL DI STASIUN BAWAH TANAH
TAMIMI
PH.D., DUKUH ATAS PADA PROYEK MRT JAKARTA
SUWARDO,
ANALISA KINERJA SIMPANG TAK BERSINYAL JL.
015/DTS/3/SW/004 ST., MT., GALIH NUGROHO
AGRO - JL. GAMBIR - JL. WIRATA YOGYAKARTA
PH.D.,
SUWARDO, ANALISIS PRODUKTIVITAS CUT OFF PONDASI TIANG
AMALIA RISKI
015/DTS/3/SW/005 ST., MT., BOR DAN TINJAUAN KARAKERISTIK TENAGA
YULIANTI
PH.D., KERJANYA
SUWARDO, PRODUKTIVITAS ALAT BERAT PADA PEKERJAAN
DARYANTI
015/DTS/3/SW/006 ST., MT., TIMBUNAN BORROW MATERIAL PADA PROYEK
ASMUNIK
PH.D., JALAN TOL SURABAYA - MOJOKERTO
SUWARDO, PERENCANAAN GEOMETRI DAN PERKERASAN
DODI TRI
015/DTS/3/SW/007 ST., MT., LANDAS HUBUNG (EXIT TAXIWAY) DI BANDAR
WIBOWO
PH.D., UDARA INTERNASIONALAHMAD YANI SEMARANG
METODE PELAKSANAAN FONDASI DAN
TEGUH
GILANG SRI PERHITUNGAN KAPASITAS DUKUNG TIANG PADA
015/DTS/3/TS/001 SUDIBYO, ST.,
ANDRIYATMOKO REDESAIN FONDASI TIANG STASIUN BLOK M
MT
PROYEK MRT JAKARTA
ANALISIS PRODUKTIVITAS DAN KEBUTUHAN
TEGUH BATCHING PLANT, WHEEL LOADER DAN TRUCK
IRFAN WAFI
015/DTS/3/TS/002 SUDIBYO, ST., MIXER BERDASARKAN PRODUKSI TAHUNAN PT.
RAHMAWAN
MT ADHIMIX PRECAST INDONESIA PLANT
PULOGADUNG
ANALISIS PENGARUH PENAMBAHAN JAM LEMBUR
TEGUH
KURNIADI TERHADAP WAKTU DAN BIAYA PROYEK
015/DTS/3/TS/003 SUDIBYO, ST.,
SAPUTRA BERDAARKAN KEPUTUSAN MENTERI TENAGA KERJA
MT
DAN TRANSMIGRASI
SUWARDO, RENCANA PENGEMBANGAN DAN PEMELIHARAAN
RULIAN PUTRA
015/DTS/3/SW/008 ST., MT., INFRASTRUKTUR KOLAM RETENSI DI KAWASAN
ERNANTO
PH.D., RUAG TERBUKA HIJAU UGM
AGUS
APLIKASI PLAT DATAR BETON MENGGUNAKAN
KURNIAWAN,
015/DTS/3/AK/013 ROBBY KEMIT SERAT POLYPROPYLENE TINJAUAN TERHADAP KUAT
ST., MT.,
LENTUR BETON
PH.D
TEGUH ABRAM METODE PELAKSANAAN BALOK PRESTRESS - POST
015/DTS/3/TS/004 SUDIBYO, ST., WICAKSANA TENSION PC 15B DI PROYEK RESINDA PARK MALL
MT PUTRA KARAWANG BARAT
SUWARDO,
SUSAN ARIADI ANALISIS KAPASITAS DAN KINERJA RUAS JALAN ASRI
015/DTS/3/SW/010 ST., MT.,
PUTRI KEMUNING - JALAN WIRATA SLEMAN
PH.D.,
PENENTUN PRIORITAS PENGELOLAAN KORIDOR
DR. ENG.
015/DTS/4/IH/001 BAYU SYAPUTRA JALAN RING ROAD YOGYAKARTA MENGGUNAKAN
IMAN
SISTEM INFORMASI GEOGRAFIS
HARYANTO
S.T., M.T.
SUWARDO, ANALISIS PENENTUAN PRIORITAS PEMELIHARAAN
PANDU BUDHI
015/DTS/4/SW/001 ST., MT., JALAN LINGKAR YOGYAKARTA MENGGUNAKAN
WIBOWO
PH.D., METODE ANALYTHYCAL HIERARCHY PROCESS (AHP)
PENILAIAN KONDISI JALAN DENGAN MENENTUKAN
IR. HERU
GIRI PRIORITAS PEMELIHARAAN DAN REVIEW DESAIN
015/DTS/4/HB/001 BUDI
OSCAMARIZKI PERKERASAN JALAN ARTERI UTARA BARAT
UTOMO, M.T
YOGYAKARTA
2016
DOSEN
NO INVENTARIS NAMA MAHASISWA JUDUL TUGAS AKHIR/PROYEK AKHIR
PEMBIMBING
AGUS PENGARUH PENAMBAHAN BAKTERI BACILLUS
DIANITA IKA
016/DTS/3/AK/001 KURNIAWAN, SUBTILLIS DENGAN METODE HIDROGEL
ROSHINTA DEWI
ST., MT., PH.D ENKAPSULASI DAALAM PROSES SELF HEALING
AGUS PENGARUH PENAMBAHAN SERAT AREN
ADITYA EKA
016/DTS/3/AK/002 KURNIAWAN, DENGAN ALKALI TREATMENT TERHADAP KUAT
YUDHANTO
ST., MT., PH.D LENTUR DAN DAKTILITAS BETON
PEMANFAATAN BACILLUS SUBTILIS SEBAGAI
AGUS
FATKUR RAHMAN ALTERNATIF INOVASI PADA STRUKTUR PLAT
016/DTS/3/AK/003 KURNIAWAN,
SETIADI BETONRIGID UNTUK PROSES SELF HEALING
ST., MT., PH.D
CONCRETE
AGUS APLIKASI PLAT LENGKING ATAP BETON
DIMAS ARYO
016/DTS/3/AK/004 KURNIAWAN, MENGGUNAKAN CAMPURAN SERAT TAMBANG
PRAKOSO
ST., MT., PH.D (POLYPROPYLENE) DENGAN VARIASI RADIUS
PEMANFAATAN BAKTERI BACILLUS SUBTILIS
AGUS
ROCHMAT DAN BACILLUS CEREUS UNTUK PROSES SELF
016/DTS/3/AK/005 KURNIAWAN,
WICAKSONO HEALING CONCRETE DENGAN METODE
ST., MT., PH.D
ENKAPSULASI HIDROGEL BAKTERI
AGUS PENGARUH PENAMBAHAN BAKTERI BACILLLUS
SATRIYO AGUS ADI
016/DTS/3/AK/007 KURNIAWAN, CEREUS DENGAN METODE MIKROENKAPSULASI
PRASTYO
ST., MT., PH.D DALAM PROSES SELH HEALING CONCRETE
AGUS ANALISIS PENGARUH PERAWAT BETON
FEBRI CLAUDIA
016/DTS/3/AK/008 KURNIAWAN, TERHADAP KUAT TEKAN BETON MUTU K400
NABASA SIAHAAN
ST., MT., PH.D FA20
METODE PELAKSANAAN DAN ANLISA STRUKTUR
AGUS
IMAM PEMBANGUNAN PILAR JEMBATAN NASIONAL
016/DTS/3/AK/009 KURNIAWAN,
ADHIRIYANTO KEBON ROMO STA 47 + 694 PADA PROYEK
ST., MT., PH.D
JALAN TOL SOLO-NGAWI SEKSI 1 B
ANALISIS PERENANAAN DAN BIAYA FONDASI
AGUS TELAPAK PADA INSTRUMENT AIR RECEIVER
016/DTS/3/AK/010 KURNIAWAN, AILIA OCTAVIANI PROYEK LAHENDONG UNIT 5 DAN 6
ST., MT., PH.D GEOTHERMAL POWER PLANT 2 X 20 MW DI
TOMPASO, SULAWESI UTARA
PERBANDINGAN PENGGUNAAN FLOOR STEEL
DECK DAN RC PRECAST PEKERJAAN PELAT
AGUS
GLADIA PRIMA LANTAI DITINJAU DARI METODE PELAKSANAAN,
016/DTS/3/AK/011 KURNIAWAN,
REGINA MARTA PRODUKTIVITAS PEKERJAAN, DAN BIAYA
ST., MT., PH.D
PEKERJAAN PADA PROYEK PEMBANGUNAN
JALAN TOL SURABAYA-MOJOKERTO SEKSI IB
ANALISIS PONDASI TIANG MENGGUNAKAN
AGUS
MUHAMMAD METODE PRE-BORING PADA PROYEK
016/DTS/3/AK/012 KURNIAWAN,
MAHFUD HANAFI PEMBANGUNAN LIGHT RAIL TRANSIT (LRT)
ST., MT., PH.D
JAKARTA
DR. ING. IR. APLIKASI METODE INJECTION GROUT DENGAN
016/DTS/3/AM/001 AGUS WIDI KURNIAWAN SIKAGROUT 215 (NEW) UNTUK PERBAIKAN
MARYONO BETON KEROPOS AREA KOLOM K5 DAN K6
DINDING GWT PADA PROYEK APARTEMEN "THE
ELEMENTS", KUNINGAN JAKARTA
DR. ING. IR. APLIKASI METODE GROUTING UNTUK
RANDIKA
016/DTS/3/AM/002 AGUS PERBAIKAN STRUKTUR BETON BERTULANG DI
ANJASMARA
MARYONO DERMAGA PT. PETROKIMIA GRESIK
QUALITY CONTROL PEKERJAAN TIMBUNAN
DR. ING. IR. TANAH BIASA DAN TIMBUNAN TANAH PILIHAN
AKBAR HERDA
016/DTS/3/AM/003 AGUS PADA PROYEK PEMBANGUNAN JARINGAN
PRATAMA
MARYONO JALAN LINTAS SELATAN LOT.1 TAMBAKMULYO-
WAWAR, KEBUMEN, JAWA TENGAH
METODE PELAKSANAAN PEMBUATAN PIERHEAD
DR. ING. IR.
CAST IN SAITU PADA PROYEK JALAN LAYANG
016/DTS/3/AM/004 AGUS ASEP NURALAM
KAPTEN TENDEAN - BLOK M CILEDUG PAKET
MARYONO
SESKOAL
STUDI POTENSI DAN PERENCANAAN
DR. ING. IR.
BANGUNAN SIPIL PEMBANGKIT LISTRIK TENAGA
016/DTS/3/AM/005 AGUS WAHYUDI
MIKROHIDRO PUCANG, KABUPATEN
MARYONO
BANJARNEGARA, JAWA TENGAH
QUALITY CONTROL PEKERJAAN TIMBUNAN
DR. ING. IR. TANAH BIASA DAN TIMBUNAN TANAH PILIHAN
AKBAR HERDA
016/DTS/3/AM/006 AGUS PADA PROYEK PEMBANGUNAN JARINGAN
PRATAMA
MARYONO JALAN LINTAS SELATAN LOT. 1 TAMBAKMULYO -
WAWAR, KEBUMEN, JAWA TENGAH
PERHITUNGAN PRODUKTIVITAS DAN
EFEKTIVITAS ALAT BERAT PADA PEKERJAAN
DR. ING. IR. GALIAN DAN TIMBUNAN PROYEK
016/DTS/3/AM/007 AGUS DINA LESTARI PEMBANGUNAN JALAN TOL SEMARANG-SOLO
MARYONO TAHAP II: BAWEN-SOLO SEKSI 3: BAWEN-
SALATIGA PAKET 3.3D: SIDOREJO-TENGARAN
(STA. 36+100-STA. 40+400)
DR. ING. IR.
HANNA PEMERIKSAAN DAN ANALISIS KUALITAS AIR
016/DTS/3/AM/008 AGUS
MARSHELLA HUJAN SEBAGAI SUMBER AIR MINUM
MARYONO
EVALUASI KAPASITAS DAYA DUKUNG
AGUS
KELOMPOK TIANG PANCANG PROYEK LIGHT
016/DTS/3/AN/001 NUGROHO, ST., WASIS ARI WISESA
RAIL TRANSIT (LRT) LINTAS LAYANAN CAWANG-
MT., PH.D
CIBUBUR
PERBANDINGAN ANALISIS PERHITUNGAN TEBAL
AGUS
MUHAMMAD PERKERASAN KAKU DENGAN METODE BINA
016/DTS/3/AN/002 NUGROHO, ST.,
RIF'AN MANNANI MARGA 2013 DAN METODE MODIFIED
MT., PH.D
FORMULA AASHTO 1993
PERBAIKAN KEBOCORAN RETAINING WALL DAN
AGUS
NURUL NURILLAHI LANTAI BASEMENT DENGAN METODE INJEKSI
016/DTS/3/AN/003 NUGROHO, ST.,
FAUZIAH (STUDI KASUS: PROYEK SATRIO TOWER JAKARTA
MT., PH.D
SELATAN)
EVALUASI PRODUKTIVITAS TENAGA KERJA PADA
AGUS PEMBANGUNAN PERUMAHAN MENGGUNAKAN
016/DTS/3/AN/004 NUGROHO, ST., AYU FATIMAH SARI METODE TIME AND MOTION STUDY (STUDI
MT., PH.D KASUS : PEKERJAAN PENGECORAN BETON
READYMIX)
PERBANDINGAN PRODUKTIVITAS ANTAR
AGUS KELOMPOK KERJA PADA PEKERJAAN SEMENTASI
DHESI PUTRI
016/DTS/3/AN/005 NUGROHO, ST., (STUDI KASUS: BENDUNGAN UTAMA PROYEK
MIRMALASARI
MT., PH.D PEMBANGUNAN BENDUNGAN GONDANG,
KARANGANYAR, JAWA TENGAH)
AGUS
TITO SATRIO METODE PERAWATAN DAN PERBAIKAN BETON
016/DTS/3/AN/006 NUGROHO, ST.,
WIBOWO PADA BANGUNAN WATER TREATMENT PLANT
MT., PH.D
AGUS ANALISIS STABILITAS SHEET PILE AKIBAT
WIDYANTO HADI
016/DTS/3/AN/007 NUGROHO, ST., PEKERJAAN FONDASI BORED PILE (STUDI KASUS:
PRASETYO
MT., PH.D TITIK FP 03 PROYEK MRTJ PAKET KONTRAK 102)
DR. SC. TECH
PELINDUNG TEBING KALI BELIK RAMAH
ADHY
016/DTS/3/AY/001 EMIL FAJR DHAKARI LINGKUNGAN DENGAN MENGGUNAKAN
KURNIAWAN,
METODE VEGETASI
S.T.
DR. SC. TECH METODE PELAKSANAAN FLEXIBLE PAVEMENT
ADHY AULIA FATMA PADA PELAPISAN DAN PELEBARAN JALAN RAYA
016/DTS/3/AY/002
KURNIAWAN, KARTIKA WAWAR-CONGOT LOT 3 KABUPATEN
S.T. PURWOREJO
DR. SC. TECH ANALISIS PELAKSANAAN SISTEM MANAJEMEN
ADHY AGUSTINA MUTU STRUKTUR ATAS (PEKERJAAN BALOK DAN
016/DTS/3/AY/003
KURNIAWAN, RACHMAWATI PELAT LANTAI) PADA PROYEK PEMBANGUNAN
S.T. GEDUG BNI 46 BSD - TANGERANG
DR. SC. TECH
ANALISIS PELAKSANAAN BALOK BETON
ADHY NADYA PUTRI
016/DTS/3/AY/004 PRATEGANG-1 PROYEK PEMBANGUNAN SOPO
KURNIAWAN, NURMANIA
DEL TOWER JAKARTA SELATAN
S.T.
DR. SC. TECH
PERBANDINGAN METODE PENENTUAN NILAI
ADHY HAFID IRFAN
016/DTS/3/AY/005 HUJAN RATA-RATA UNTUK PERHITUNGAN DEBIT
KURNIAWAN, FAHRU Z
BANJIR DI SUB DAS BELIK YOGYAKARTA
S.T.
DR. SC. TECH
BUNGA ARUMSARI
ADHY ANALISIS PEKERJAAN TANAH REHABILITASI
016/DTS/3/AY/006 MUTIARA
KURNIAWAN, SUNGAI IJO KABUPATEN BANYUMAS
WULANDARI
S.T.
PERBANDINGAN METODE PELAKSANAAN
DR. SC. TECH
PENGERJAAN KOLOM CARA KONVENSIONAL
ADHY JESSICA ELISABETH
016/DTS/3/AY/007 DAN CARA STANDING PADA PROYEK
KURNIAWAN, SITORUS
CONDOMINIUM THE ACCENT - TANGERANG
S.T.
SELATAN
DR. SC. TECH
ANALISIS DAYA DUKUNG TIANG METODE
ADHY NUR RAUDHATUL
016/DTS/3/AY/008 PELAKSANAAN FONDASI COOLER 09 M-126 PT.
KURNIAWAN, HIDAYAH
PETROKIMIA GRESIK
S.T.
METODE PELAKSANAAN DAN PRODUKTIVITAS
IR. BAMBANG
NURLIASARI ALAT BERAT PEKERJAAN EARTH MOVING PADA
016/DTS/3/BB/001 HERUMANTA,
DIRTIANANDA PROYEK PEMBANGUNAN BENDUNGAN LOGUNG
MT
KUDUS
PRODUKTIVITAS ERECTION WORK DENGAN
IR. BAMBANG METODE SPAN BY SPAN OLEH LAUNCHING
016/DTS/3/BB/002 HERUMANTA, TITIS PAWESTRI GANTRY PADA PEMASANGAN BOX GIRDER CP
MT 102 DI PROYEK KONSTRUKSI MRT (MASS RAPID
TRANSIT) JAKARTA
ANALISIS PERBANDINGAN PRODUKTIVITAS
IR. BAMBANG PEKERJA PASANGAN HEBEL BERDASAR ELEVASI
ENDAH DWI
016/DTS/3/BB/003 HERUMANTA, PEKERJAAN PADA PROYEK PEMBANGUNAN
HARYANTI
MT GEDUNG BNI 46 BUMI SERPONG DAMAI,
TANGERANG SELATAN, BANTEN
PERBANDINGAN ANALISA HARGA SATUAN
PEKERJAAN DINDING BATA MERAH DALAM
IR. BAMBANG
TEGUH ADI ESTIMASI BIAYA KONSTRUKSI ANTARA ANALISA
016/DTS/3/BB/004 HERUMANTA,
PRASETYO BOW, SNI, DAN PERHITUNGAN KONTRAKTOR
MT
(STUDI KASUS PADA PROYEK PEMBANGUNAN
LABORATORIUM KOMPUTER UAD III)
PERBAIKAN FONDASI TUBUH BENDUNGAN
IR. BAMBANG
ALVIAN YOGI DENGAN METODE GROUTING SEMEN PADA
016/DTS/3/BB/005 HERUMANTA,
MAHENDRA PEMBANGUNAN BENDUNGAN GONDANG
MT
KABUPATEN KARANGANYAR JAWA TENGAH
METODE "PAPAN CATUR" PADA PELAKSANAAN
IR. BAMBANG PEKERJAAN BANGUNAN HYDROLYSIS
ANDY MARISKA
016/DTS/3/BB/006 HERUMANTA, ACCIDIFICATION TANK UNIT PENGOLAHAN
AYU NINGRUM
MT LIMBAH EFFLUENT TREATMENT PLANT (ETP) PT
OKI PULP AND PAPER PALEMBANG
PENILAIAN ERGONOMI PEKERJA KONSTRUKSI
IR. BAMBANG
IVANA DVAN BERDASARKAN METODE RAPID ENTIRE BODY
016/DTS/3/BB/007 HERUMANTA,
OKTAVITALOKA ASSESSMENT (REBA) (STUDI KASUS: PEKERJAAN
MT
PEMASANGAN DINDING PENAHAN TANAH)
PERBANDINGAN ANALISIS HARGA SATUAN
PEKERJAAN DINDING BATA MERAH DALAM
IR. BAMBANG
ESTIMASI BIAYA KONSTRUKSI ANTARA METODE
016/DTS/3/BB/008 HERUMANTA, PANDU IRAWAN
BOWM SNI DAN KONTRAKTOR (STUDI KASUS
MT
PROYEK PEMBANGUNAN GEDUNG SWRO
PEKALONGAN)
TINJAUAN KAPASITAS PRODUKSI DAN ANALISA
DIAN
BIAYA UNTUK PENGGUNAAN BEKISTING SISTEM
016/DTS/3/DS/001 SESTINING IMAM MALIK
PERI PADA PROYEK PT. OKI PULP AND PAPER
AYU,ST.,MT.
MILLS PALEMBANG
METODE PELAKSANAAN MENARA INTAKE DAN
DIAN
ADNIN DEWI SETYA ANALISIS PERHITUNGAN MIX DESIGN MUTU
016/DTS/3/DS/002 SESTINING
ARDANI K225 PADA PEMBANGUNAN BENDUNGAN
AYU,ST.,MT.
LOGUNG KUDUS
ANALISIS EFISIENSI ANTARA PENGGUNAAN
DIAN FONDASI TELAPAK DAN BORED PILE PADA PIPE
MAYNANDA AGNIA
016/DTS/3/DS/003 SESTINING SUPPORT PROYEK LAHENDONG UNIT 5&6
DYNA REZSA
AYU,ST.,MT. GEOTHERMAL POWER PLANT TAMPOSO, KAB.
MINAHASA, SULAWESI UTARA
PERENCANAAN DAN PERHITUNGAN VOLUME
DIAN
AUDREY IKHSAN READYMIX DENGAN CARA WETMIX PADA MASS
016/DTS/3/DS/004 SESTINING
MEYLANA CONCRETE RAFT FOUNDATION PEMBANGUNAN
AYU,ST.,MT.
APARTEMEN ICON COMPLEX
METODE PELAKSANAAN FONDASI TIANG BOR
DIAN DAN ANALISIS KAPASITAS DUKUNG TIANG PADA
INDRA NUR
016/DTS/3/DS/005 SESTINING PROYEK PEMBANGUNAN JALAN TOL SOLO-
KUSUMA
AYU,ST.,MT. NGAWI-KERTOSONO RUAS SOLO-NGAWI PAKET
1B
STUDI PEMBUATAN BETON RINGAN NON - AAC
EDI KURNIADI, DERIZA DEBY (NON - AUTOCLAVED AERATED CONCRETE)
016/DTS/3/EK/001
ST., MT DWIANTO DENGAN BAHAN TAMBAH HIDROGEN
PEROKSIDA DAN MILL
PELAKSANAAN DAN PERBAIKAN PONDASI BORE
EDI KURNIADI, FAHMI PILE PADA UNDERPASS NASIONAL KLITIK
016/DTS/3/EK/002
ST., MT NURRAKHMAN PROYEK PEMBANGUNAN JALAN TOL RUAS
SOLO-NGAWI PAKET SN-02B
METODE PELAKSANAAN ERECTION PCI GIRDER
CHINTYA DAN ANALISIS PRODUKTIVITAS MENGGUNAKAN
EDI KURNIADI,
016/DTS/3/EK/003 PANGESTIKA ALAT GANTRY LAUNCHER PADA PROYEK
ST., MT
PERMADANI PEMBANGUNAN JALAN TOL SURABAYA-
MOJOKERTO SEKSI 1B
QUALITY CONTROL PEKERJAAN BETON PROYEK
MUHAMMAD
EDI KURNIADI, DIVERSION CHANNEL KALI PUTIH (ICB CIVIL
016/DTS/3/EK/004 WAKHID NUR
ST., MT WORK PACKAGE NO. 1: CONSTRUCTION OF
IKHSAN
DIVERSION CHANNEL IN PUTIH RIVER)
ANALISIS BATCHING PLANT DAN EVALUASI
EDI KURNIADI, MUTU BETON PADA PEKERJAAN MASS
016/DTS/3/EK/005 RIZKI WIDODO
ST., MT CONCRETE RAFT FOUNDATION LIPPO THAMRIN
OFFICE TOWER
ANALISIS PRODUKTIVITAS DAN BIAYA ALAT
EDI KURNIADI, BERAT PEKERJAAN PENGHAMPARAN HOTMIX
016/DTS/3/EK/006 RIMA MEGITA SARI
ST., MT PROYEK PEMBANGUNAN JALAN RUAS WAWAR -
CONGOT, KABUPATEN PURWOREJO
ADITYA LEWATA
IR. FATHI KARAKTERISTIK BETON SUBSTITUSI FLY ASH
016/DTS/3/FB/001 RADIZAT
BASEWED., MT DENGAN PENAMBAHAN SERAT YUTE
TANGGELA
IR. FATHI BIMO ADHI KARAKTERISTIK BETON SUBSTITUSI FLY ASH
016/DTS/3/FB/002
BASEWED., MT TAMORO DENGAN PENAMBAHAN SERAT RAMI
PERENCANAAN SCHEDULE PELAKSANAAN
IR. FATHI BUDIARTI NUR PROYEK JALAN MAWAR-CONGOT, PURWOREJO,
016/DTS/3/FB/003
BASEWED., MT KHASANAH JAWA TENGAH DENGAN MENGGUNAKAN
PRECEDENCE DIAGRAM METHOD
METODE PELAKSANAAN DAN ANLISA MUTU
IR. FATHI NICOLAS ANGGA
016/DTS/3/FB/004 DINDING PRACETAK (PRECAST WALL) PADA
BASEWED., MT DEWANTA
PROYEK CONDOMINIUM THE ACCENT BINTARO
METODE PEMBUATAN DAN PEMILIHAN CRANE
IR. FATHI WILLIBRORDUS DALAM PEKERJAAN STRUKTUR BAJA CONVEYOR
016/DTS/3/FB/005
BASEWED., MT A.S.P DI PROYEK PABRIK INDARUNG VI PT. SEMEN
PADANG
"QUALITY CONTROL" PENGARUH ABU TERBANG
IR. FATHI
016/DTS/3/FB/006 SELVIA NOVITASARI (FLY ASH) PADA PENERAPAN MUTU BETON K
BASEWED., MT
350
BETON DENGAN SUBSTITUSI FLY ASH DAN
IR. FATHI
016/DTS/3/FB/007 RUDY YULIANTO VARIASI BAHAN ADITIF DENGAN
BASEWED., MT
MENGGUNAKAN SEMEN MERK TIGA RODA
METODE PELAKSANAAN PEKERJAAN TIMBUNAN
IR. FATHI ABDULLAH FAJR BORROW MATERIAL PADA PROYEK
016/DTS/3/FB/008
BASEWED., MT TAHAJJUDDIN PEMBANGUNAN JALAN TOL SOLO-KERTOSONO,
RUAS SOLO-NGAWI, PAKET 1 B
ANALISIS KEKUATAN CLOSURE GATE SALURAN
IR. FATHI RIZKY KUSUMA
016/DTS/3/FB/009 PENGELAK PADA PEMBANGUNAN BENDUNGAN
BASEWED., MT SURYANINGRUM
LOGUNG KABUPATEN KUDUS, JAWA TENGAH
IR. HERU BUDI SEPTARIA PERMEABILITAS BETON ASPAL DENGAN MIKRO
016/DTS/3/HB/001
UTOMO, MT ANDRIYANI KAPSUL SOLAR
DEFORMATION STRENGTH BETON ASPAL YANG
IR. HERU BUDI
016/DTS/3/HB/002 WINI NOVITA MENGGUNKAN MIKROENKAPSULASI DENGAN
UTOMO, MT
BAHAN PEREMAJA SOLAR
PENGUJIAN TARIK TAK LANGSUNG LAPIS ASPAL
IR. HERU BUDI BETON (LASTON) YANG MENGGUNAKAN
016/DTS/3/HB/003 KHOIRUDIN AHKAM
UTOMO, MT MIKROENKAPSULASI SEBAGAI AGREGAT HALUS
DENGAN BAHAN PEREMAJA SOLAR
SISTEM MANAJEMEN WAKTU PADA PROYEK
IR. HERU BUDI
016/DTS/3/HB/004 YUSUF ALFIANI KONSTRUKSI GEDUNG BERTINGKAT MARIGOLD
UTOMO, MT
APARTEMENT AT NAVA PARK
PRODUKTIVITAS ALAT BERAT PADA PEKERJAAN
IR. HERU BUDI AGUNG GALIAN DAN PEMADATAN PADA PROYEK
016/DTS/3/HB/005
UTOMO, MT PRIHARTANTO REHABILITASI MINOR JALAN YOGYAKARTA-
PIYUNGAN
METODE PELAKSANAAN PEKERJAAN
IR. HERU BUDI SELLY WIDYA REKONSTRUKSI PERKERASAN GERBANG TOL
016/DTS/3/HB/006
UTOMO, MT PANGESTIKA KANCI DENGAN MENGGUNAKAN RIGID
PAVEMENT
PENGUJIAN POTENSI STRIPPING BETON ASPAL
IR. HERU BUDI ANGGI NUR
016/DTS/3/HB/007 DENGAN MENGGUNAKAN MIKROENKAPSUL
UTOMO, MT ARIESTA
BAHAN ISI SOLAR DAN FILLER KAPUR
PENGARUH MIKROENKAPSULASI ISI SOLAR DAN
IR. HERU BUDI DHIA RANIA
016/DTS/3/HB/008 FILLER SEMEN TERHADAP POTENSI STRIPPING
UTOMO, MT KHANSA
BETON ASPAL
PEKERJAAN ERECTION PIERHEAD PRECAST PADA
IR. HERU BUDI EKA SURYA PUTRA
016/DTS/3/HB/009 PROYEK TOL BEKASI-CAWANG-KAMPUNG
UTOMO, MT AGUS P
MELAYU
IR. HOTMA ANALISIS FONDASI TOWER CRANE PROYEK
016/DTS/3/HP/001 PRAWOTO S, SATRIA ISTANA WORLD CAPITAL TOWER JAKARTA SELATAN PT.
M.T., IP-MD NUSA KONSTRUKSI ENJINIRING
TINJAUAN GAYA GESEK (FS) KELOMPOK TIANG
IR. HOTMA
CITRA ANNISA PANCANG SKALA LABORATORIUM DENGAN
016/DTS/3/HP/002 PRAWOTO S,
SAVITRIE LUBANG BOR MENGGUNAKAN PASTA TANAH,
M.T., IP-MD
SEMEN, DAN EPOXY
IR. HOTMA QUALITY CONTROLBETON F'C 30 DAN F'C 40 PT.
KHAERUL HABIB
016/DTS/3/HP/003 PRAWOTO S, ADHIMIX PRECAST INDONESIA PLANT LENTENG
ALMAKI
M.T., IP-MD AGUNG
TINJAUAN NILAI GESEK SATUAN (FS) TIANG
IR. HOTMA
APRILIA DANA PANCANG TUNGGAL DENGAN PERKUATAN
016/DTS/3/HP/004 PRAWOTO S,
ELISKA PASTA TANAH, SEMEN, DAN EPOXY PADA
M.T., IP-MD
LUBANG BOR
UJI GAYA GESEK ARAH VERTIKAL KELOMPOK
IR. HOTMA TIANG DENGAN VARIABEL PANJANG TIANG
MUHAMMAD
016/DTS/3/HP/005 PRAWOTO S, (SKALA LABORATORIUM) MENGGUNAKAN
ROBERT SASONGKO
M.T., IP-MD PERKUATAN PASTA TANAH, SEMEN, AIR DAN
EPOXY
IR. HOTMA PENGARUH WAKTU PEMEAMAN PONDASI
APRILIA
016/DTS/3/HP/006 PRAWOTO S, TERHADAP FAKTOR GESEK TIANG DENGAN
YERISTRIANISARI
M.T., IP-MD PERKUATAN PASTA FRIKSI
IR. HOTMA ANALISIS PERBANDINGAN KADAR CAMPURAN
ABDUL HARIS
016/DTS/3/HP/007 PRAWOTO S, PASTA TANAH, SEMEN, DAN EPOXY DENGAN
MAULANA
M.T., IP-MD METODE TRIAL AND ERROR
IR. HOTMA PENGADAAN PEKERJAAN PEMELIHARAAN
KHUSNUL
016/DTS/3/HP/008 PRAWOTO S, PERIODIK PADA JALAN TOL. PALIMANAN KANCI
KHOTIMAH
M.T., IP-MD DENGAN E-PROCUREMENT SYSTEM
DR. ENG. IMAN PENGUJIAN POTENSI STRIPPING BETON ASPAL
ADI LAKSONO
016/DTS/3/IH/001 HARYANTO, DENGAN MENGGUNAKAN MIKROENKAPSULASI
PAMUNGKAS
ST., MT. BAHAN ISI MINYAK TAAH DAN FILLER KAPUR
DR. ENG. IMAN
BASKARA PRIYA PENGUJIAN POTENSI STRIPPING BETON ASPAL
016/DTS/3/IH/002 HARYANTO,
SULISTYA BERDASARKAN SNI 6753 : 2015
ST., MT.
DR. ENG. IMAN PERMEABILITAS BETON ASPAL YANG
016/DTS/3/IH/003 HARYANTO, ARI SUTRISNO MENGGUNAKAN MIKROKAPSUL BERISI MINYAK
ST., MT. TANAH
KUAT TARIK TAK LANGSUNG BETON ASPAL
DR. ENG. IMAN
YASINTA DWI SWAPULIH (SELF HEALING) YANG
016/DTS/3/IH/004 HARYANTO,
UNTARI MENGGUNAKAN MIKROKAPSUL BERISI MINYAK
ST., MT.
TANAH
PERBANDINGAN NILAI DAYA DUKUNG TIANG
PANCANG TUNGGAL DENGAN METODE
DR. ENG. IMAN
AKHMAD KHANIF STANDARD PENETRATION TEST DAN PILE
016/DTS/3/IH/005 HARYANTO,
BERLIANA DRIVING ANALYZER PADA PROYEK
ST., MT.
PEMBANGUNAN JALAN TOL BEKASI - CAWANG -
KAMPUNG MELAYU SEKSI I
PERBANDINGAN METODE PELAKSANAAN DAN
DR. ENG. IMAN
FADHLI ANGGARAN BIAYA PELAT LANTAI HALF SLAB
016/DTS/3/IH/006 HARYANTO,
SUKMAWINATA DAN KONVENSIONAL PADA PROYEK GRAND
ST., MT.
KAMALA LAGOON BEKASI
RE-DESIGN PERKERASAN KAKU (RIGID
DR. ENG. IMAN PAVEMENT) PADA PROYEK PRESERVASI
MUHAMMAD RIVA
016/DTS/3/IH/007 HARYANTO, REHABILITASI MINOR YOGYAKARTA-WONOSARI-
AULIA RAIS
ST., MT. DUWET MENGGUNAKAN MANUAL DESAIN
PERKERASAN JALAN NOMOR 02/M/BM/2013
DR. ENG. IMAN PENGARUH GEOTEKSTIL TERHADAP NILAI
LAVENIA LAILI DITA
016/DTS/3/IH/008 HARYANTO, CALIFORNIA BEARING RATIO (CBR) PADA TANAH
PRABAWATI
ST., MT. LEMPUNG EKSPANSIF
METODE KONSTRUKSI DAN BIAYA STRUKTUR
DR. ENG. IMAN
FAIZAL IMAN PONDASI RAFT DAN PONDASI PILE CAP PADA
016/DTS/3/IH/009 HARYANTO,
MAHARDHIKAMAS PROYEK PEMBANGUNAN PABRIK KERTAS OKI
ST., MT.
PULP AND PAPER PALEMBANG
PERBANDINGAN METODE PELAKSANAAN DAN
DR. ENG. IMAN
FADHLI ANGGARAN BIAYA PELAT LANTAI HALF SLAB
016/DTS/3/IH/010 HARYANTO,
SUKMAWINATA DAN KONVENSIONAL PADA PROYEK GRAND
ST., MT.
KAMALA LAGOON BEKASI
METODE PELAKSANAAN DAN ANALISIS
DR. ENG. IMAN
FATMAWATI DEWI KAPASITAS PIER COLUMN LP20 PROYEK MRT
016/DTS/3/IH/011 HARYANTO,
ANGGITA JAKARTA CP 102 JL. TB SIMATUPANG JAKARTA
ST., MT.
SELATAN
LAVA EVALUASI VARIABILITAS KUAT TEKAN BETON
ADITYA HENDY
016/DTS/3/LH/001 HIMAWAN., PADA PROYEK PP PRACETAK DENGAN METODE
KURNIAWAN
ST., MT STATISTIK
STUDI PEMBUATAN BETON RINGAN NON - AAC
LAVA
(NON - AUTOCLAVED AERATED CONCRETE)
016/DTS/3/LH/002 HIMAWAN., WILLY SUKMO AJI
DENGAN BAHAN TAMBAH HIDROGEN
ST., MT
PEROKSIDA, FLY ASH DAN MILL
LAVA EVALUASI PERENCANAAN QUARRY AREA
MUHAMMAD
016/DTS/3/LH/003 HIMAWAN., PEMBANGUNAN BENDUNGAN GONDANG
FATAH NUR HAKIM
ST., MT KABUPATEN KARANGANYAR
LAVA PROPORSI CAMPURAN OPTIMUM BETON
PUNGKY ADITYA
016/DTS/3/LH/004 HIMAWAN., RINGAN BERSERAT (LIGHT-WEIGHT FOAMED
RINDY SAPUTRA
ST., MT FIBERS CONCRETE) DENGAN BAHAN TAMBAH
POLYPROPYLENE FIBERS, MILL, DAN SILICA
FUME
PROPORSI OPTIMUM BETON RINGAN NON
LAVA
FARIDA NUR PASIR DENGAN PENAMBAHAN BUBUK KAPUR,
016/DTS/3/LH/005 HIMAWAN.,
ARIFAH SILICA FUME DAN FLY ASH MENGGUNAKAN
ST., MT
METODE TAGUCHI
PROPORSI CAMPURAN OPTIMUM LFFC
(LIGHTWEIGHT FIBERS FOAMED CONCRETE)
LAVA DENGAN PENAMBAHAN SILICA FUME, MILL,
YERA AFIF
016/DTS/3/LH/006 HIMAWAN., FIBERGLASS DAN SUPERPLASTICIZER
SIHANDOKO
ST., MT MENGGUNAKAN ORTHOGONAL ARRAY
TAGUCHI TERHADAP KUAT TEKAN, KUAT TARIK
BELAH, POROSITAS, BERAT JENIS.
LAVA
ISNA RIZKI TINJAUAN KINERJA SERAT POLYPROPYLENE DAN
016/DTS/3/LH/007 HIMAWAN.,
PRIMAYANTI FIBERGLASS PADA BETON RINGAN
ST., MT
LAVA KUAT LEKAT (BOND STRENGTH) BAJA
MUHAMMAD
016/DTS/3/LH/008 HIMAWAN., TULANGAN PADA LIGHTWEIGHT FIBERED
RIFAN VURQONI
ST., MT FOAMED CONCRETE (LFFC)
PERBANDINGAN WAKTU DAN BIAYA
LAVA PEMBUATAN DINDING DENGAN
NDARU
016/DTS/3/LH/009 HIMAWAN., MENGGUNAKAN PANEL PRECAST DAN HEBEL
SWANDANU
ST., MT PADA PROYEK APARTEMEN PLUIT SEA VIEW
JAKARTA UTARA
STUDI PEMBUATAN BETON RINGAN NON - AAC
LAVA
(NON - AUTOCLAVED AERATED CONCRETE)
016/DTS/3/LH/010 HIMAWAN., GANGSAR PERMADI
DENGAN BAHAN TAMBAH HIDROGEN
ST., MT
PEROKSIDA, MILL DAN FLY ASH 1:1
PENGOPTIMALAN CAMPURAN BETON RINGAN
LAVA
NOORLINGGAR DENGAN BAHAN TAMBAH SILICA FUME DAN
016/DTS/3/LH/011 HIMAWAN.,
S.D.K BUBUK BATU KAPUR MENGGUNAKAN METODE
ST., MT
TAGUCHI
LAVA PERENCANAAN ULANG FONDASI ABUTMENT
GALIH PUNJUNG
016/DTS/3/LH/012 HIMAWAN., JEMBATAN BENDO MENGGUNAKAN FONDASI
WASKITA
ST., MT SPUN PILE
ANALISIS DAYA DUKUNG FONDASI KELOMPOK
LAVA
TIANG PADA PEMBANGUNAN LIGHT RAIL
016/DTS/3/LH/013 HIMAWAN., FAJAR DWI RIYANI
TRANSIT (LRT) LINTAS LAYANAN CAWANG -
ST., MT
CIBUBUR
PELAKSANAAN PEKERJAAN COREWALL DENGAN
LAVA
METODE SATECO CLIMBING FORMWORK
016/DTS/3/LH/014 HIMAWAN., HENGGA LUKGITA
PROYEK PEMBANGUNAN GEDUNG BNI BSD
ST., MT
SERPONG PT. WIJAYA KARYA (PERSERO) TBK.
DESAIN CAMPURAN OPTIMUM BETON RINGAN
LAVA GRISELDA
(LIGHTWEIGHT FOAM CONCRETE) DENGAN
016/DTS/3/LH/015 HIMAWAN., JUNIANDA
BAHAN TAMBAHAN SILICA FUME DAN BUBUK
ST., MT VELANTIKA
KAPUR MENGGUNAKAN METODE TAGUCHI
MUHAMMAD
ANNISA NURUL EVALUASI SISTEM DRAINASE KAMPUS
016/DTS/3/MH/001 SULAIMAN,
MUKHSININ UNIVERSITAS GADJAH MADA YOGYAKARTA
S.T.,M.T.,D.ENG
KAJIAN SISTEM PENGOLAHAN AIR LIMBAH
MUHAMMAD MUHAMMAD
BERBASIS MASYARAKAT DI PADUKUHAN
016/DTS/3/MH/002 SULAIMAN, FARID
KARANGGAYAM, KELURAHAN CATURTUNGGAL,
S.T.,M.T.,D.ENG HIDAYATULLOH
KECAMATAN DEPOK, KABUPATEN SLEMAN, DIY
MUHAMMAD OPERASI TEKNIS DAN PEMELIHARAAN INSTALASI
AZWAR HALIM
016/DTS/3/MH/003 SULAIMAN, SISTEM PENYEDIAAN AIR MINUM (SPAM)
PRAYOGO
S.T.,M.T.,D.ENG KAMPUS UGM TAHAP I
MUHAMMAD ANALISIS DAYA DUKUNG PONDASI TIANG
MELINDA DWI
016/DTS/3/MH/004 SULAIMAN, PANCANG PADA PEMBANGUNAN GERBANG TOL
RAHMAWATI
S.T.,M.T.,D.ENG SALATIGA
SIMULASI KAPASITAS PENAMPANG SUNGAI DAN
MUHAMMAD
ARFIDA HESA PROFIL MUKA AIR BANJIR DENGAN PROGRAM
016/DTS/3/MH/005 SULAIMAN,
PENTA MEDIA HEC-RAS VERSI 4.1 (STDUI KASUS NORMALISASI
S.T.,M.T.,D.ENG
SUNGAI KECEPAK DI KABUPATEN BANYUMAS)
METODE PELAKSANAAN PEKERJAAN TIMBUNAN
MUHAMMAD
TANAH BADAN JALAN PADA PROYEK
016/DTS/3/MH/006 SULAIMAN, TITIN TRIMULYANI
PEMBANGUNAN JALAN TOL RUAS SOLO-NGAWI
S.T.,M.T.,D.ENG
STA 86+700 - 86+950
ANALISIS PERBANDINGAN PENGGUNAAN
NURSYAMSU
JUNI LUKMAN MUL BONDEK DENGAN BEKISTING KONVENSIONAL
016/DTS/3/NH/001 HIDAYAT, ST.,
HAKIM PADA PEKERJAAN PLATN LANTAI PROYEK PT.
MT, PH.D
OKI PULP AND PAPER MILLS
PERBANDINGAN PERKERASAN LENTUR PADA
NURSYAMSU
LOGAM SEHAT ERHABILITASI RUAS JALAN YOGYAKARTA -
016/DTS/3/NH/002 HIDAYAT, ST.,
UTAMA PIYUNGAN DENGAN METODE BINA MARGA
MT, PH.D
NOMOR 02/M/BM/2013 DAN AASHTO 1993
ANALISIS PERBANDINGAN PRODUKTIVITAS
NURSYAMSU PEKERJAAN PASANGAN BATA RINGAN (HEBEL)
016/DTS/3/NH/003 HIDAYAT, ST., YULIANTO BERDASARKAN PERBEDAAN WAKTU KERJA DAN
MT, PH.D ELEVASI PEKERJAAN PROYEK MARIGOLD AT
NAVAPARK
NURSYAMSU
NURUDIN JOKO PEMANFAATAN ASAP CAIR SEBAGAI STABILISASI
016/DTS/3/NH/004 HIDAYAT, ST.,
PAMINTO TANAH DASAR TANAH PASIR
MT, PH.D
NURSYAMSU ANALISIS KINERJA SIMPANG BUNDARAN
016/DTS/3/NH/005 HIDAYAT, ST., BAYU APRIANTO FAKULTAS FILSAFAT UNIVERSITAS GADJAH
MT, PH.D MADA
EFEKTIFITAS DAN PRODUKTIFITAS METODE
NURSYAMSU
PENGECORAN PADA PROYEK PEMBANGUNAN
016/DTS/3/NH/006 HIDAYAT, ST., ERNA ISMIYATI
JALAN TOL BEKASI - CAWANG - KAMPUNG
MT, PH.D
MELAYU
NURSYAMSU
IKHANANTO METODE PELAKSANAAN PENAMBAHAN LAPIS
016/DTS/3/NH/007 HIDAYAT, ST.,
MARTEDI OVERPLAY PADA PROYEK REHABILITASI MINOR
MT, PH.D
JALAN YOGYAKARTA - PIYUNGAN DENGAN
METODE BINA MARGA 2013
PERENCANAAN GALIAN DAN TIMBUNAN TANAH
NURSYAMSU
PANJI BUANA PEMBANGUNAN JALAN TOL SOLO - KERTOSONO
016/DTS/3/NH/008 HIDAYAT, ST.,
PRATAMA RUAS NGAWI - KERTOSONO PAKET 3 ZONE 2
MT, PH.D
(STA. 126+900 - STA. 132+100)
EFEKTIVITAS DAN EFISIENSI PEKERJAAN SHEAR
NURSYAMSU
HILDA PUSPITA AJI WALL DENGAN METODE CLIMBING FORMWORK
016/DTS/3/NH/009 HIDAYAT, ST.,
LESTARI PADA PROYEK CONDOMINIUM THE ACCENT -
MT, PH.D
BINTARO TANGERANG SELATAN
NURSYAMSU ANALISIS KERJA SIMPANG BUNDARAN RING
ANDY PRASETYO
016/DTS/3/NH/010 HIDAYAT, ST., ROAD UTARA JALAN MAGELANG BERDASARKAN
OKTAVIANSYAH
MT, PH.D MKJI 1997
METODE PELAKSANAAN ERECTION PCI GIRDER
DR. IR. DENGAN LAUNCHING GANTRY METHOD PADA
016/DTS/3/SA/001 SYAUKAT ALI, ARI PRASETYO SEGMEN PEB 202 - PEB 203 PROYEK JALAN TOL
M.SI. BEKASI - CAWANG - KAMPUNG MELAYU
(BECAKAYU)
ANALISIS PRODUKTIVITAS PEKERJAAN
DR. IR.
LUTFI ODIE PEMBESIAN PILECAP DAN PIER PADA
016/DTS/3/SA/002 SYAUKAT ALI,
PRATAMA PEMBANGUNAN PRASARANA KERETA API
M.SI.
RINGAN (LRT) JAKARTA
ANALISIS KERUSAKAN JALAN DENGAN METODE
DR. IR. PCI PADA JALAN YOGYAKARTA-WONOSARI KM.
016/DTS/3/SA/003 SYAUKAT ALI, INDRA PRADITYA 06+000-KM, 16+000 PADA PROYEK PRESERVASI
M.SI. REHABILITASI MINOR JALAN YOGYAKARTA-
WONOSARI-DUWET
DR. IR. ANALISIS SAFETY METHOD ERECTION SPAN BY
ANDREAS AGUNG
016/DTS/3/SA/004 SYAUKAT ALI, SPAN JALAN LAYANG NON TOL CILEDUG - BLOK
SETYA AJI
M.SI. M PAKET SESKOAL
DR. IR. TINJAUAN TINGKAT PELAYANAN RUAS JALAN
NUR HENDRA TOMI
016/DTS/3/SA/005 SYAUKAT ALI, KALIURANG KM 4,5 - 5,8 DENGAN METODE
GESTARI PUTRA
M.SI. MOVING CAR OBSERVER
DR. IR. ANALISIS KEBUTUHAN ELEKTRODA LAS PADA
016/DTS/3/SA/006 SYAUKAT ALI, GINA FAIRUZ FABRIKASI BAJA KANOPI PROYEK SATRIO TOWER
M.SI. JAKARTA SELATAN
ANALISIS DAYA DUKUNG PONDASI TIANG
PANCANG BANGUNAN OVERPASS WONOAYU 2
DR. IR.
PROYEK PEMBANGUNAN JALAN TOL SOLO-
016/DTS/3/SA/007 SYAUKAT ALI, HERLAN
NGAWI-KERTOSONO RUAS NGAWI-
M.SI.
KEERTOSONO PAKET 3 DENGAN METODE
KALENDERING
ANALISIS KEMAJUAN JADWAL PELAKSANAAN
DR. IR. SINDU
016/DTS/3/SN/001 DICKY APRIANTO DENGAN METODE PERT/CPM PADA PROYEK
NURANTO, MS.
HOTEL GRANDHIKA SEMARANG
METODE PELAKSANAAN PENGECORAN BETON
DENGAN MENGGUNAKAN CAMPURAN
CHEMICAL ADMIXTURE WATERPROOING
MUHAMMAD
DR. IR. SINDU INTEGRAL SIKA VISCOCRETE 3115N DAN
016/DTS/3/SN/002 RIFANDY
NURANTO, MS. ANALISIS PERBANDINGAN KUAT TEKAN BETON
FADHILLAH
INTEGRAL DENGAN BETON NORMAL FC' 30 MPA
PADA PROYEK CONCOMINIUM THE ACCENT,
BINTARO, TANGERANG SELATAN
ANALISIS PRODUKTIVITAS DAN BIAYA ALAT
BERAT PADA PEKERJAAN PEMBUATAN LAPIS
DR. IR. SINDU
016/DTS/3/SN/003 SUGI TRIYUWONO PONDASI ATAS JALAN DI PT JAYA KONTRUKSI
NURANTO, MS.
PADA PROYEK JALAN WAWAR-CONGOT,
PURWOREJO
PERENCANAAN OPTIMALISASI INSTALASI
DR. IR. SINDU PENGOLAHAN AIR LIMBAH RUMAH SAKIT GIGI
016/DTS/3/SN/004 DENIMA NIDIASA
NURANTO, MS. DAN MULUT (RSGM) PROF. SOEDOMO FKG
UGM
APLIKASI AUTOCAD CIVIL 3D DALAM
PERHITUNGAN VOLUME MATERIAL DAN
DR. IR. SINDU ARBI YUDA
016/DTS/3/SN/005 PERANCANGAN GEOMETRIK JALAN
NURANTO, MS. PAMUNGKAS
TAMBAKMULYO - WAWAR STA. 9+000 - 10+500
KABUPATEN KEBUMEN
PENERAPAN JOINT REINFORCED CONCRETE
DR. IR. SINDU MUHAMMAD RIVAI PAVEMENT (JRCP) UNTUK PERKERASAN KAKU
016/DTS/3/SN/006
NURANTO, MS. ZHEIN PADA PROYEK PEMBETONAN JALAN TRI
DHARMA (TAHAP II) PETROKIMIA GRESIK
EVALUASI KAPASITAS JALINAN TUNGGAL EMPAT
JANSWHESD
SUWARDO, ST., ZONA PADA AREA FASILITAS PUTAR BALIK (U-
016/DTS/3/SW/001 PARLINDUNGAN
MT., PH.D., TURN) DI KARANG NONGKO JALAN RINGROAD
NAINGGOLAN
UTARA YOGYAKARTA
REDESAIN ALINEMEN HORIZONTAL DAN
SUWARDO, ST., CAHYO
016/DTS/3/SW/002 ALINEMEN VERTIKAL PADA JALAN WONOSARI -
MT., PH.D., BAGASKORO
DUWET
TINJAUAN PERENCANAAN DAN PELAKSANAAN
SUWARDO, ST.,
016/DTS/3/SW/003 NUR RAHMAWATI DRAINASE PADA PROYEK JALAN WAWAR -
MT., PH.D.,
CONGOT KABUPATEN PURWOREJO
REDESAIN FOOTING PADA FONDASI PROYEK
SUWARDO, ST., RATNA NUR
016/DTS/3/SW/004 PEMBANGUNAN JALAN TOL BEKASI-CAWANG-
MT., PH.D., HASANAH
KAMPUNG MELAYU (BECAKAYU)
ANALISIS EARNED VALUE TERHADAP BIAYA DAN
SUWARDO, ST., NENI DEWI WAKTU PADA PROYEK KONSTRUKSI
016/DTS/3/SW/007
MT., PH.D., PRASETYANA PEMBANGUNAN PABRIK KERTAS PT. OKI PULP
AND PAPER MILLS
METODE PELAKSANAAN PEKERJAAN ABUTMENT
SUWARDO, ST., DWI FAJAR JEMBATAN PADA PROYEK PEMBANGUNAN
016/DTS/3/SW/008
MT., PH.D., PRIHANANTO JALAN TOL SOLO-NGAWI PT. WASKITA KARYA
(PERSERO) TBK.
PERBANDINGAN METODE PELAKSANAAN
SUWARDO, ST., ANTARA SCAFFOLDING DAN PERTH
016/DTS/3/SW/009 DEWI ASTUTI
MT., PH.D., CONSTRUCTION HIRE (PCH) PADA PROYEK
GRAND KAMALA LAGOON BEKASI
METODE DRAINASE VERTIKAL PRACETAK
SUWARDO, ST., EKO PANJI
016/DTS/3/SW/010 DALAM PROSES KONSOLIDASI TANAH PADA
MT., PH.D., PRASETYO
PROYEK PENGEMBANGAN UDARA AHMAD YANI
ANALISIS KAPASITAS DINDING PENAHAN TANAH
TEGUH CONTIGUOUS BORED PILE AKIBAT TANAH
SEPTO
016/DTS/3/TS/001 SUDIBYO, ST., DENGAN MENGGUNAKAN PROGRAM PLAXIS
DWIHANGGORO
MT. PADA PEMBANGUNAN PROYEK APARTEMEN
CIPUTRA INTERNATIONAL PHASE 1
TEGUH PEMBESARAN KOLOM DENGAN METODE
SARAH
016/DTS/3/TS/002 SUDIBYO, ST., GROUTING PADA PROYEK PEMBANGUNAN
MAR'ATUSHOLIHAH
MT. GEDUNG BNI BSD SERPONG
PERENCANAAN BANGUNAN GEDUNG
TEGUH
LIA GALIH PERKANTORAN 3 LANTAI BERDASARKAN SNI
016/DTS/3/TS/003 SUDIBYO, ST.,
PRASETYANTI 1729:2015 SPESIFIKASI UNTUK BANGUNAN
MT.
GEDUNG BAJA STRUKTURAL
METODE PELAKSANAAN DAN ANALISIS
TEGUH
KAPASITAS KOLOM PADA PROYEK LIGHT RAIL
016/DTS/3/TS/004 SUDIBYO, ST., FARAH ROYYANA
TRANSIT (LRT) LINTAS LAYANAN CAWANG -
MT.
CIBUBUR
STUDI PERENCANAAN JARINGAN IRIGASI
TEGUH
RIZKA ANGGITA GEMPOLAN PADA PEMBANGUNAN
016/DTS/3/TS/005 SUDIBYO, ST.,
BAHAR BENDUNGAN GONDANG KABUPATEN
MT.
KARANGANYAR
TEGUH ANALISIS PRODUKTIVITAS ALAT BERAT PADA
REZZA
016/DTS/3/TS/006 SUDIBYO, ST., PEKERJAAN GALIAN-TIMBUNAN PROYEK
DHIWASPODO
MT. PEMBANGUNAN JALAN TOL SEMARANG - SOLO
DESAIN STRUKTUR PONDASI TIANG BOR
TEGUH
JEMBATAN BENDO PROYEK PEMBANGUNAN
016/DTS/3/TS/007 SUDIBYO, ST., AZIM BI AL-KHOIR
JALAN TOL RUAS NGAWI-KERTOSONO PAKET 3
MT.
STA 118+700 SD 139+760 PT.ADHI KARYA, TBK
IDENTIFIKASI ROBOT PRIORITAS PEMELIHARAAN
AGUS
UNTUK BANGUNAN RUMAH SAKIT DENGAN
016/DTS/4/AN/001 NUGROHO, ST., YUDAN YUNARKO
METODE ANALYTICAL HIERARCHY PROCESS
MT., PH.D
(AHP)
2017
DOSEN
NO INVENTARIS NAMA MAHASISWA JUDUL TUGAS AKHIR/PROYEK AKHIR
PEMBIMBING
AGUS ANALISA INERJA BIAYA DAN WAKTU DENGAN
KURNIAWAN, FADILLAH ALI KONSEP EARNED VALUE MANAGEMENT PADA
017/DTS/3/AK/001
ST., MT., NUGROHO PROYEK PEMBANGUNAN APARTEMEN TAMAN
PH.D. MELATI SURABAYA
AGUS METODE PELAKSANAAN DAN ESTIMASI BIAYA
KURNIAWAN, PEKERJAAN STRUKTUR KOLOM PROYEK
017/DTS/3/AK/002 FAIZAL RINALDI
ST., MT., PEMBANGUNAN RUKO APARTEMEN ROYAL
PH.D. SENTUL PARK BOGOR
METODE PELAKSANAAN DAN WAKTU SIKLUS
AGUS
SISTEM SAMBUNGAN KOLOM-BALOK DENGAN
KURNIAWAN, BAYU PUTRO
017/DTS/3/AK/003 DISSIPATER STUDI KASUS : PROYEK
ST., MT., NUGROHO
PEMBANGUNAN GEDUNG PELAYANAN
PH.D.
KESEHATAN ST. CAROLUS BORROMEUS TAHAP II)
AGUS METODE PELAKSANAAN, ANALISIS STABILITAS
KURNIAWAN, DAN REMBESAN DINDING PADA BANGUNAN
017/DTS/3/AK/004 INDRI TRIAWATI
ST., MT., PELIMPAH DI PROYEK PEMBANGUNAN
PH.D. BENDUNGAN LOGUNG KUDUS
AGUS PENGARUH PENAMBAHAN SERAT IJUK AREN DAN
KURNIAWAN, SERAT IJUK AREN ALKALI TREATMENT TERHADAP
017/DTS/3/AK/005 AGUNG KUSMADI
ST., MT., PERUBAHAN KUAT TEKAN DAN KUAT TARIK
PH.D. BELAH SILINDER BETON
PERBANDINGAN BIAYA DAN PRODUKTIVITAS
AGUS WAKTU PEKERJAAN BEKISTING MENGGUNAKAN
KURNIAWAN, METODE KONVENSIONAL DAN METODE
017/DTS/3/AK/006 RIZKI WULANDARI
ST., MT., SETENGAH SISTEM PADA PROYEK
PH.D. PEMBANGUNAN KAMPUS IV UNIVERSITAS
AHMAD DAHLAN YOGYAKARTA
DR. SC. ADHY PERENCANAAN DAN PEALAKSANAAN PIPA
017/DTS/3/AK/007 KURNIAWAN, M.N. AL FAHMI DRAINASE BAWAH PERMUKAAN PADA RENOVASI
ST. LAPANGAN SEPAKBOLA A GELORA BUNG KARNO
ANALISIS PERBANDINGAN PRODUKTIVITAS
DR. ING. IR.
PEKERJAAN KEPALA KOLOM MENGGUNAKAN
017/DTS/3/AM/001 AGUS MINYATUL FALIHAH
BETON INSTAN MUTU K-700 DAN BETON READY
MARYONO
MIX MUTU K-700
DR. ING. IR. METODE PELAKSANAAN DAN ANALISIS
RAFIKA CAHYA
017/DTS/3/AM/002 AGUS PERHITUNGAN STABILITAS REVETMENT PROYEK
KARUNIAWATI
MARYONO DIVERSION CHANNEL KALI PUTIH
DR. ING. IR. METODE PELAKSANAAN, ANALISIS KEKUATAN
FARDATUL
017/DTS/3/AM/003 AGUS DAN RENCANA ANGGARAN BIAYA BEKISTING
HUSNIAH
MARYONO SEMI SISTEM STRUKTUR SUB DAM 1 WO-C2
DR. ING. IR. METODE PELAKSANAAN, QUALITY CONTROL, DAN
INDRI APRIYANI BR
017/DTS/3/AM/004 AGUS RENCANA ANGGARAN BIAYA DINDING PRACETAK
GINTING
MARYONO PADA PROYEK APARTEMEN PURI ORCHAD
DR. ING. IR. PEKERJAAN PERENCANAAN PELAKSANAAN DAN
RIFQI AMRILLAH
017/DTS/3/AM/005 AGUS EVALUASI INSTALASI PEMANEN AIR HUJAN DI
ABDI
MARYONO DAERAH ISTIMEWA YOGYAKARTA
AGUS ANALISIS PRODUKTIVITAS PRODUKSI BETON
NUGROHO, ERVAN MAULANA PADA PROYEK PEMBANGUNAN DIVERSION
017/DTS/3/AN/001
ST., MT., SETIABUDI CHANNEL ICB CIVIL WORKS PACKAGE NO. 1 DI
PH.D. KALI PUTIH, SEMEN, SUCEN, SALAM, MAGELANG
AGUS EVALUASI PENGGUNAAN HCS (HOLLO CORE SLAB)
NUGROHO, INTAN NINI SEBAGAI TEMPORARY STOCKYARD PADA PROYEK
017/DTS/3/AN/002
ST., MT., SETYAWATI PEMBANGUNAN GEDUNG PELAYANAN
PH.D. KESEHATAN ST. CAROLUS BORROMEUS
HUBUNGAN JUMLAH LINTASAN DAN KEPADATAN
AGUS
TANAH LAPANGAN (SAND CONE) PEKERJAAN
NUGROHO, ALFIN PRADANA
017/DTS/3/AN/003 TIMBUNAN TANAH INTI PADA PROYEK
ST., MT., KURNIAWAN
BENDUNGAN GONDANG KABUPATEN
PH.D.
KARANGANYAR - JAWA TENGAH
AGUS
PENERAPAN SISTEM MANAJEMEN MUTU PADA
NUGROHO, MAHARANI YULIA
017/DTS/3/AN/004 PROSES DESAIN DI PT. NS BUESCOPE LYSAGHT
ST., MT., ANGGRAENI
INDONESIA
PH.D.
AGUS
NUGROHO, ANALISIS BIAYA PEKERJAAN TANAH DENGAN
017/DTS/3/AN/005 KIKI OCTAVIA
ST., MT., MENGGUNAKAN ALAT BERAT
PH.D.
ANALISIS STABILITAS DAN PELAKSANAAN
DR. SC. ADHY CONSOLIDATION DAN PROYEK DIVERSION
017/DTS/3/AY/001 KURNIAWAN, PUJI RACHMAWATI CHANNEL KALI PUTIH KABUPATEN MAGELANG
ST. 9ICB CIVIL WORK PACKAGE NO.1: CONSTRUCTION
OF DIVERSION CHANNEL IN PUTIH RIVER)
METODE PELAKSANAAN PEMASANGAN
DR. SC. ADHY
GEOFORCE SEGMENTAL RETAINING WALL PADA
017/DTS/3/AY/002 KURNIAWAN, FAJAR WIDHIASTUTI
PROYEK FLY OVER DERMOLENG,
ST.
KETANGGUNGAN KABUPATEN BREBES
DR. SC. ADHY PELAKSANAAN PEMBANGUNAN LONG SOAK
017/DTS/3/AY/003 KURNIAWAN, TYAS HAYU PALUPI POND PADA APARTEMEN CIPUTRA
ST. INTERNATIONAL JAKARTA BARAT
PENGENDALIAN MUTU (QUALITY CONTROL)
DR. SC. ADHY
RAFIKA PEKERJAAN BETON PADA PRODUKSI HOLLOW
017/DTS/3/AY/004 KURNIAWAN,
MARHAENITA CORE SLAB DI PABRIK PRODUK BETON BOGOR, PT
ST.
WIJAYA KARYA BETON TBK
DR. SC. ADHY PENGENDALIAN MUTU (QUALITY CONTROL)
017/DTS/3/AY/005 KURNIAWAN, ALAM MAULANA PEKERJAAN BETON PADA PROYEK REHABILITASI
ST. DAN REKONTRUKSI SABO DAM KALI WORO
IR. BAMBANG ANALISIS STRUKTUR PADA PEMBANGUNAN
JOKI IWAN
017/DTS/3/BB/001 HERUMANTA, GEDUNG RUMAH SUSUN 5 LANTAI DI DESA
SAPUTRA MALAU
M.T TUKSONO KABUPATEN KULON PROGO
METODE PELAKSANAAN DAN ANALISA
IR. BAMBANG PRODUKTTIVITAS PEKERJAAN DINDING PARAPET
LEONARDUS KEVIN
017/DTS/3/BB/002 HERUMANTA, DENGAN METODE PRECAST DAN METODE
DEODATUS
M.T KONVENSIONAL PADA PROYEK PEMBANGUNAN
APARTEMEN U-RESIDENCE 3 TANGERANG
METODE PELAKSANAAN DAN PERHITUNGAN
IR. BAMBANG
ALDILLA PUTRI TEBAL PERKERASAN KAKU BERDASARKAN BINA
017/DTS/3/BB/003 HERUMANTA,
SUSILAWATI MARGA 203 PADA PROYEK PEMBANGUNAN
M.T
UNDERPASS MAMPANG - KUNINGAN
METODE PELAKSANAAN PEMBESIAN DAN
IR. BAMBANG
MUHAMMAD BEKISTING PADA SISTEM SAMBUNGAN
017/DTS/3/BB/004 HERUMANTA,
AZHAR BASIL STRUKTUR PRECAST STUDI KASUS PROYEK
M.T
PEAYANAN KESEHATAN CAROLUS BORROMEUS
STUDI PERANCANGAN SCAFFOLDING DI PROYEK
IR. BAMBANG
APARTEMEN RU IV CILACAP SEBAGAI PENGAMAN
017/DTS/3/BB/005 HERUMANTA, AJENG AYANG SHA
DAN AKSES KERJA SAMPING MENGGUNAKAN SAP
M.T
2000
IR. BAMBANG STUDI PENGARUH PEMELIHARAAN DAN
AGUS PUTRA
017/DTS/3/BB/006 HERUMANTA, PERAWATAN TERHADAP KINERJA GEDUNG
TRIYANTO
M.T (STUDI KASUS GEDUNG MALIOBORO MALL)
DIAN ANALISA PERHITUNGAN PEMASANGAN
ANDHI BAYU
017/DTS/3/DS/001 SESTINING DRAINASE VERTIKAL PRACETAK DAN PEKERJAAN
NUGROHO
AYU, ST., MT. INSTRUMENTASI GEOTEKNIK
ANALISIS BIAYA DAN PRODUKTIVITAS PEKERJAAN
DIAN
BEKISTING MULTIPLEKS DAN BEKISTING STEEL
017/DTS/3/DS/002 SESTINING FARIS ABDILLA
PLATE PADA DINDING SPILLWAY BENDUNGAN
AYU, ST., MT.
BENDO PONOROGO
ANALISIS KAPASISTAS DUKUNG FONDASI TIANG
DIAN BOR DAN EFISIENSI BIAYA JEMBATAN SUNGAI
017/DTS/3/DS/003 SESTINING ZAID AL JIHAN KEDUNGGALENG STA 28+201 PADA PROYEK
AYU, ST., MT. PEMBANGUNAN JALAN TOL PASURUAN -
PROBOLINGGO
ANALISIS KEKUATAN DAN METODE BEKISTING
DIAN
HARY INTAN PADA TOWER INTAKE BLOK 8 BENDUNGAN
017/DTS/3/DS/004 SESTINING
PITALOKA GONDANG KARANGANYAR PT. WASKITA KARYA
AYU, ST., MT.
(PERSERO) TBK.
ANALISIS TIME & MOTION STUDY (TMS) PROSES
DIAN
PRODUKSI TIANG PANCANG BULAT DI JALUR VIII
017/DTS/3/DS/005 SESTINING ARI AMJAD SETIADI
PABRIK PRODUK BETON (PBB) BOGOR PT WIJAYA
AYU, ST., MT.
KARYA BETON TBK.
EFEKTIVITAS SECANT PILE DENGAN SHEET PILE
DIAN
SEBAGAI DINDING PENAHAN TANAH
017/DTS/3/DS/006 SESTINING FRISCHA ANNISA
PEMBANGUNAN UNDERPASS MAMPANG
AYU, ST., MT.
KUNINGAN
DIAN METODE PELAKSANAAN DAN ANALISIS
ADHITYA IBNU
017/DTS/3/DS/007 SESTINING KEKUATAN PILE CAP PADA PROYEK MALL DAN
SYINA
AYU, ST., MT. APARTEMEN EASTERNGREEN LOT 1
DIAN PENGARUH PENAMBAHAN SERAT KAWAT
REZZA NURUL
017/DTS/3/DS/008 SESTINING BENDRAT TERHADAP KUAT TEKAN, KUAT TARIK
AKMAL
AYU, ST., MT. BELAH, DAN KUAT LENTUR BETON
EDI ANALISIS PERBANDINGAN PERENCANAAN FRAME
017/DTS/3/EK/001 KURNIADI, SHEFTY AYUSA BANGUNAN BAJA PRA-REKAYASA (MODEL
ST., MT DOUBLE-SPAN DAN MODEL CLEAR-SPAN)
EDI KUAT TEKAN DAN DAYA SERAP AIR MORTAR
017/DTS/3/EK/002 KURNIADI, ISHARYADI DENGAN MENGGUNAKAN PUMICE SEBAGAI
ST., MT SUBTITUSI AGREGAT PASIR
METODE PELAKSANAAN SERTA ANALISIS BIAYA
EDI
DESSY RAHMA DAN WAKTU PEMASANGAN DINDING BETON
017/DTS/3/EK/003 KURNIADI,
ANGGRAHINI PRACETAK PADA PROYEK PEMBANGUNAN
ST., MT
KAMPUS 4 UAD YOGYAKARTA
PELAKSANAAN QUALITY CONTROL BALOK U-
EDI
SANIA NUR WIDHIA SHELL DI PT. WIJAYA KARYA BETON PABRIK
017/DTS/3/EK/004 KURNIADI,
PUSPA PRODUK BETON BOGOR PROYEK RUMAH SAKIT
ST., MT
SAINT CAROLUS JAKARTA PUSAT
PENYAMBUNGAN TULANGAN BALOK TERHADAP
EDI
COREWALL DENGAN METODE COUPLER PADA
017/DTS/3/EK/005 KURNIADI, GIANI SAFITRI
PROYEK APARTEMEN U-RESIDENCE TOWER 3 -
ST., MT
TANGERANG
PENGARUH SUBSTITUSI AGREGAT HALUS
EDI
AFDAL SATRIO DENGAN MENGGUNAKAN PASIR BESI REJECT
017/DTS/3/EK/006 KURNIADI,
SANDIYANTO TERHADAP KUAT TEKAN, KUAT TARIK BELAH, DAN
ST., MT
DAYA SERAP
METODE PELAKSANAAN DAN PRODUKTIVITAS
EDI
PEKERJAAN BEKISTING TABLE FORM PLAT LANTAI
017/DTS/3/EK/007 KURNIADI, SUCI GIAN PRATIWI
PADA PROYEK APARTEMEN PURI ORCHARD
ST., MT
CENGKARENG, JAKARTA BARAT
IR. FATHI ANALISA METODE PELAKSANAAN DAN
017/DTS/3/FB/001 BASEWED , YUDI GUMILAR PRODUKTIVITAS PADA PEKERJAAN INSTALASI
M.T KOMPONEN BETON PRACETAK
IR. FATHI ANALISIS METODE PEMBAGIAN ZONA
JIHAN BILQIS CLARA
017/DTS/3/FB/002 BASEWED , PENGECORAN PADA STRATEGI PERCEPATAN
BELLA
M.T PROYEK APARTEMEN PERTAMINA RU IV CILACAP
METODE PELAKSANAAN DAN PRODUKTIVITAS
IR. FATHI
ERECTION GIRDER DENGAN CRAWLER CRANE
017/DTS/3/FB/003 BASEWED , TRI RAHMANTO
JEMBATAN SUKOWIDI ZONA 3 STA 104+550
M.T
JALAN TOL SOLO - KERTOSONO NKJI
IR. FATHI METODE PELAKSANAAN DAN QUALITY CONTROL
RIZAL ADDIN
017/DTS/3/FB/004 BASEWED , PADA PEKERJAAN SECANT PILE PADA PROYEK
UTAMA
M.T UNDERPASS MAMPANG - KUNINGAN
METODE PELAKSANAAN ERECTION GRIDER
IR. FATHI
TIAS PERMANA DENGAN LAUNCHING GANTRY PADA
017/DTS/3/FB/005 BASEWED ,
YUDAMI PEMASANGAN BOX GIRDER PROYEK MRT CP103
M.T
BLOK A JAKARTA
PEMBAGIAN ZONA DAN METODE PELAKSANAAN
IR. FATHI
DALAM PEKERJAAN STRUKTUR PONDASI TIANG
017/DTS/3/FB/006 BASEWED , HARIS SETIAWAN
PANCANG DI PROYEK PABRIK BARU PT. KIMIA
M.T
FARMA (PERSERO) TBK.
IR. HERU DEFORMATION STRENGTH BETON ASPAL
RIZALDI JUSMAN
017/DTS/3/HB/001 BUDI MENGGUNAKAN MIKROENKAPSUL DENGAN
NASUTION
UTOMO, M.T BAHAN CAMPURAN MINYAK TANAH
EFEKTIFITAS DAN PRODUKTIVITAS METODE
IR. HERU PELAKSANAAN PEKERJAAN TIMBUNAN TANAH
017/DTS/3/HB/002 BUDI AJIK PRASTIYO BORROW MATERIAL STA. 06+550 - 09+500
UTOMO, M.T PROYEK PEMBANGUNAN JALAN TOL PASURUAN -
PROBOLINGGO SEKSI 1
METODE PELAKSANAAN DAN ANALISIS DAYA
IR. HERU
DUKUNG FONDASI BORED PILE OVERPASS
017/DTS/3/HB/003 BUDI RIDWAN AJI PUTRA
MULUNG 1 STA 17 + 787 PROYEK JALAN TOL
UTOMO, M.T
SURABAYA MOJOKERTO SEKSI II & III
METODE PELAKSANAAN DAN ANALISIS DAYA
IR. HERU
AKHMAD FAJAR DUKUNG FONDASI TIANG BOR PADA PEKERJAAN
017/DTS/3/HB/004 BUDI
SETIAWAN UNDERPASS BOJONG STA 354 + 870 PROYEK
UTOMO, M.T
JALAN TOL PEMALANG - BATANG
METODE PELAKSANAAN DAN PRODUKTIVITAS
IR. HERU
PEKERJAAN INSTALASI HOLLOW CORE SLAB PADA
017/DTS/3/HB/005 BUDI M HARUN ALRASYID
PROYEK PEMBANGUNAN PELAYANAN
UTOMO, M.T
KESEHATAN ST CAROLUS BORROMEUS JAKARTA
METODE PELAKSANAAN DSAN ANALISIS
IR. HERU
STRUKTUR PILAR UNDER BRIDGE KALI MATI STA.
017/DTS/3/HB/006 BUDI TRI WASPODO
415 + 034 PROYEK PEMBANGUNAN JALAN TOL
UTOMO, M.T
BATANG - SEMARANG SEKSI III
PRODUKTIVITAS ALAT BERAT UNTUK PEKERJAAN
IR. HERU
RAFID YUDA TIMBUNAN TANAH PADA PROYEK
017/DTS/3/HB/007 BUDI
SETIAWAN PEMBANGUNAN JALAN TOL SOLO - KERTOSONO
UTOMO, M.T
PAKET 2A STA 56+050 - 79+000
IR. HERU ANALISIS SIMPANG JL. BASUKI RACHMAD - JL.
ADITIYA DWI
017/DTS/3/HB/008 BUDI VETERAN DAN JL PEMUDA - JL. RONGGOLAWE
PRADANA
UTOMO, M.T TUBAN
IR. HERU PENGUJIAN POTENSI STRIPPING BETON ASPAL
RIDO PRATAMA
017/DTS/3/HB/009 BUDI DENGAN MENGGUNAKAN MIKROENKAPSULASI
ARIZAL ANNAS
UTOMO, M.T BAHAN ISI MINYAK TANAH DAN FILLER SEMEN
IR. HERU TINJAUAN PENGGUNAAN MIKROKAPSUL SEBAGAI
017/DTS/3/HB/010 BUDI MUHAMMAD RISA BAGIAN AGREGAT HALUS DALAM CAMPURAN
UTOMO, M.T ASPAL BETON
METODE PELAKSANAAN DAN ANALISIS
IR. HOTMA KAPASISTAS DAYA DUKUNG PEKERJAAN FONDASI
PRAMITA GALUH
017/DTS/3/HP/001 PRAWOTO S, TIANG BOR (BORED) PILE PADA PROYEK
NUGRAHENI
MT., IP-MD PEMBGANUNAN LIGHT RAIL TRANSIT (lrt)
JAKARTA
IR. HOTMA PROSES PRODUKSI U-GIRDER PADA JALUR 2 DAN
CANDRIKA DYAS
017/DTS/3/HP/002 PRAWOTO S, JALUR 5 PABRIK PRODUK BETON BOGOR PT
ARVITA
MT., IP-MD WIJAYA KARYA BETON, TBK.
DR. ENG.
ANALISIS HIDROLOGI DAN HIDRAULIKA SUNGAI
IMAN ERIK HERMANIUS
017/DTS/3/IH/001 CISANGKUY UNTUK PENGENDALIAN BANJIR DI
HARYANTO PURBA
SUB UNIT PLTA LAMAJAN KABUPATEN BANDUNG
S.T., M.T.
DR. ENG. KONTROL MUTU DAN MONITORING BETON
IMAN UNTUK RIGID PAVEMENT PADA MAIN ROAD
017/DTS/3/IH/002 KARINA ANANDA
HARYANTO PROYEK JALAN TOL SURABAYA - MOJOKERTO
S.T., M.T. SEKSI IB
METODE PELAKSANAAN DAN ANALISIS
DR. ENG. PRODUKTIVITAS CRAWLER CRANE PADA
IMAN FAJAR NUR PEKERJAAN ERECTION GIRDER KONSTRUKSI
017/DTS/3/IH/003
HARYANTO WAHIDIN OVERPASS INTERCHANGE PROYEK
S.T., M.T. PEMBANGUNAN JALAN TOL SOLO - NGAWI PT.
WASKITA KARYA (PERSREO) TBK.
DR. ENG. PEKERJAAN TANAH PADA PROYEK
IMAN PEMBANGUNAN JALAN TOL BATANG -
017/DTS/3/IH/004 MUHAMMAD HARIS
HARYANTO SEMARANG SEKSI III (STA. 414 + 300 - STA. 425 +
S.T., M.T. 300
DR. ENG.
PELAKSANAAN STRUKTUR UNDERPASS PADA
IMAN
017/DTS/3/IH/005 WEGIG WIJAYANTA PROYEK PEMBANGUNAN JALAN TOL PEMALANG -
HARYANTO
BATANG PAKET 1, PEKALONGAN
S.T., M.T.
DR. ENG. PENGENDALIAN MUTU PELAKSANAAN
IMAN NINDYA PUTRI PERKERASAN KAKU PROYEK PEMBANGUNAN
017/DTS/3/IH/006
HARYANTO KUSUMA DEWI JALAN TOL SOLO - KERTOSONO PAKET SN 2A STA
S.T., M.T. 56+050 - 7+000
PERHITUNGAN VOLUME AKTUAL DAN VOLUME
DR. ENG.
MATERIAL TERBUANG (WASTE) PEKERJAAN
IMAN
017/DTS/3/IH/007 ZAINUL ARIFIN PERKERASAN KAKU PROYEK EMBANGUNAN
HARYANTO
JALAN TOL SURABAYA MOJOKERTO SEKSI II DAN
S.T., M.T.
III
DR. ENG.
PERBANDINGAN BERAT JENIS MAKSIMUM
IMAN IRMA ISTIANA
017/DTS/3/IH/008 TERHITUNG DAN TERUKUR PADA BETON ASPAL
HARYANTO HIDAYATI
YANG MENGANDUNG MIKROENKAPSULASI
S.T., M.T.
ANALISIS PROPERTI PENAMPANG EFEKTIF BAJA
LAVA
ALFIAN SONY RINGAN PROFIL LYSAGHT C PURLIN DAN LYSAGHT
017/DTS/3/LH/001 HIMAWAN,
KHOIRUL ZAMAN TOPSPAN PADA KOMPONEN TEKAN DAN
ST.,MT
KOMPONEN LENTUR
ANALISIS WAKTU BEKERJA EFEKTIF PEKERJA
LAVA
PEMASANGAN BATA RINGAN PADA PROYEK
017/DTS/3/LH/002 HIMAWAN, RAHMA FITRIYANA
PEMBANGUNAN APARTEMEN U - RESIDENCE 3 +
ST.,MT
TOWER 5 TANGERANG
LAVA EFEKTIVITAS PENGGUNAAN TOWER CRANE
017/DTS/3/LH/003 HIMAWAN, LAILY KURNIAWATI UNTUK TOWER-4 DAN TOWER-5 PROYEK
ST.,MT CIPUTRA INTERNATIONAL
EVALUASI PERENCANAAN KAPASITAS FRICTION
LAVA
DHINTA AYUNDYA TIE PADA GEOFORCESEGMENTAL RETAINING
017/DTS/3/LH/004 HIMAWAN,
NURJANNAH WALL (GSRW) PROYEK PEMBANGUNAN FLYOVER
ST.,MT
DERMOLENG KETANGGUNGAN BREBES
METODE PELAKSANAAN TIMBUNAN ZONA
LAVA
RANDOM COFFERDAM HULU PADA PROYEK
017/DTS/3/LH/005 HIMAWAN, RIZAL ANSARI ADY
PEMBANGUNAN BENDUNGAN GONDANG
ST.,MT
KABUPATEN KARANGANYAR JWA TENGAH
LAVA PRODUKTIVITAS DAN EFEKTIFITAS PEMBUATAN
MATIUS DWI
017/DTS/3/LH/006 HIMAWAN, HOLLOW CORE SLAB PADA JALUR VI PT WIJAYA
ANGGORO
ST.,MT KARYA BETON PABRIK PRODUK BETON BOGOR
LAVA
PENGARUH PENAMBAHAN SERAT TAMBANG
017/DTS/3/LH/007 HIMAWAN, FENDY SETYAWAN
PADA BETON RINGAN
ST.,MT
LAVA FINITE ELEMENT ANALYSIS PADA INTERLOCKING
MUHAMMAD
017/DTS/3/LH/008 HIMAWAN, BLOCK BETO MENGGUNAKAN APLIKASI ANSYS
RINGGA ANGGARA
ST.,MT 15.0
LAVA PERILAKU PANEL DINDING INTERLOCKING BLOCK
RAMDAN BIMO
017/DTS/3/LH/009 HIMAWAN, AKIBAT BEBAN MERATA MENGGUNAKAN
WICAKSONO
ST.,MT APLIKASI ANSYS 15
MUH. ANALISIS DEBIT BANJIR WADUK SAGULING
SULAIMAN, TERHADAP BAHAYA TERJADINYA OVERTOPPING
017/DTS/3/MH/001 DWI PRASETYAWAN
ST., MT., DI DAM SAGULING, KABUPATEN BANDUNG
D.ENG BARAT
MUH. METODE PELAKSANAAN PEKERJAAN GROUTING
SULAIMAN, ALMASTYAS DAN ANALISIS PERBAIKAN TANAH BERDASARKAN
017/DTS/3/MH/002
ST., MT., NADHILAH SARI PERMEABILITASNYA PADA PROYEK
D.ENG PEMBANGUNAN BENDUNGAN LOGUNG KUDUS
MUH. METODEPELAKSANAAN DAN ANALISIS KAPASITAS
SULAIMAN, RYAN GIHLANG DUKUNG FONDASI TIANG BOR DOUBLE BOX
017/DTS/3/MH/003
ST., MT., RAMADHAN UNDERPASS PADA PROYEK PEMBANGUNAN
D.ENG JALAN TOL PASURUAN - PROBOINGGO
MUH. EVALUASI KAPASITAS SISTEM SALURAN DRAINASE
SULAIMAN, INDRA PONCO KALI BELIK RUAS PDAM TIRTA MARTA
017/DTS/3/MH/004
ST., MT., KUSUMO KARANGGAYAM - KOLAM PERIKANAN
D.ENG UNIVERSITAS GADJAH MADA
MUH.
SOLUSI PERMASALAHAN BANJIR SUNGAI BELIK
SULAIMAN,
017/DTS/3/MH/005 SYAMSUL HADI (SEGMEN PDAM TIRTA MARTA KARANGGAYAM
ST., MT.,
JL. SAMIRONO) TAHUN 2017
D.ENG
MUH.
EVALUASI PERKUATAN TEBING KALI BELIK (RUAS
SULAIMAN, VERA CAROLINA
017/DTS/3/MH/006 KOST AZARIN SAMPAI DENGAN MASJID AL-
ST., MT., SIMBOLON
MUTAQIN)
D.ENG
ANALISA KONSOLIDASI TANAH AKBIAT
MUHAMMAD
PRAPEMBEBANAN YANG DIKOMBINASIKAN
SULAIMAN KHARISMA
017/DTS/3/MH/007 DENGAN PREFABRICATED VERTICAL DRAIN (PVD)
ST., MT., PRAYOGA
PADA AREA 1 PROYEK CITRALAND CITY
D.ENG.
MAKASSAR
ANALISISKEBUTUHAN DAN WASTE DALAM
NURSYAMSU PEKERJAAN PEMBESIAN MENGGUNAKAN
017/DTS/3/NH/001 HIDAYAT, ST., FARCHATUL KIFYATI SOFTWARE BARBEQUEPRO PADA PEKERJAAN
MT., PH.D. BOX TRAFFIC STA.421+803,2 PROYEK JALAN TOL
BATANG-SEMARANG SEKSI 3.
METODE PELAKSANAAN DAN PERBANDINGAN
VOLUME RENCANA DENGAN VOLUME REALISASI
NURSYAMSU
PEMBANGUNAN BOX JALAN (BOX PEDESTRIAN)
017/DTS/3/NH/002 HIDAYAT, ST., SIRAJUL UMAM
SEMBUNG JAMBU KABUPATEN PADA PROYEK
MT., PH.D.
PEMBANGUNAN JALAN TOL PEMALANG -
BATANG
NURSYAMSU MUHAMMAD METODE PELAKSANAAN DAN PRODUKTIVITAS
017/DTS/3/NH/003 HIDAYAT, ST., ADITYA ALAT BERAT PADA PEKERJAAN PENIMBUNAN
MT., PH.D. FIRMANSYAH BENDUNGAN LOGUNG KUDUS
NURSYAMSU PERENCANAAN DINDING PENAHAN TANAH PADA
MUHAMMAD
017/DTS/3/NH/004 HIDAYAT, ST., JALAN HANTAR MENUJU INTAKE DAM
NAUFAL AMRIZAL
MT., PH.D. SAGULUNG
NURSYAMSU
AZTANTO BUDI ANALISIS PARKIR DIPLOMA TEKNIK SIPIL SEKOLAH
017/DTS/3/NH/005 HIDAYAT, ST.,
SULISTYADI VOKASI UNIVERSITAS GADJAH MADA
MT., PH.D.
METODE PELAKSANAAN FONDASI TIANG BOR
NURSYAMSU DAN ANALISIS KAPASITAS TIANG BOR DAN
MEI DHEVI
017/DTS/3/NH/006 HIDAYAT, ST., ANALISIS KAPASITAS TIANG PADA PROYEK
PUSPITASARI
MT., PH.D. PEMBANGUNAN JALAN TOL SOLO KERTOSONO
PAKET 2 A STA 56+05079+000
METODE PELAKSANAAN JEMBATAN SEMENTARA
NURSYAMSU
LEBAK GEDONG PROYEK PEMBANGUNAN JALAN
017/DTS/3/NH/007 HIDAYAT, ST., BAYU AJI
TOL KAYU AGUNG -PALEMBANG - BETUNG
MT., PH.D.
(KAPAL BETUNG)
ANALISIS REMBESAN PADA TUBUH BENDUNG
DR. IR.
RIZKI AULIANI DENGAN METODE PENGUJIAN TEKANAN AIR
017/DTS/3/SA/001 SYAUKAT ALI,
FAUZIAH (WATER PRESSURE TEST) PEMBANGUNAN
M.SI
BENDUNGAN GONDANG, KARANGANYAR
DR. IR. METODE PELAKSANAAN DAN PRODUKTIVITAS
HADIQ
017/DTS/3/SA/002 SYAUKAT ALI, PEMASANGAN BALOK KANTILEVER BETON
MIFTAHUSSURUR
M.SI PRACETAK
METODE PELAKSANAAN EFISIENSI BIAYA DAN
DR. IR.
NUARITA DEWI WAKTU PEKERJAAN GALIAN BATU DENGAN
017/DTS/3/SA/003 SYAUKAT ALI,
RACHMAYANTI METODE PELEDAKAN (BLASTING) PADA PROYEK
M.SI
PEMBANGUNAN WADUK BENDO PONOROGO
PERENCANAAN PEKERJAAN GALIAN DAN
DR. IR.
MEIDA BANGUN TIMBUNAN BADAN JALAN PADA PROYEK
017/DTS/3/SA/004 SYAUKAT ALI,
BUDIYARTI PEMBANGUNAN JALAN TOL SOLO - KERTOSONO
M.SI
SN.2B ZONA 4
DR. IR. STUDI PENGELOLAAN LIMBAH RUMAH SAKIT
017/DTS/3/SA/005 SYAUKAT ALI, FARIZNA JULINDA ISLAM KLATEN DAN PROSPEK
M.SI PENGEMBANGANNYA DI KOTA KLATEN
PERBANDINGAN PRODUKTIVITAS ANTARA
DR. IR.
FRISTA ANDANG PLACING BOOM DAN TOWER CRANE PADA
017/DTS/3/SA/006 SYAUKAT ALI,
CHRISTIYA YAMA PEKERJAAN PENGECORAN PADA PROYEK MALL
M.SI
DAN APARTEMEN CHADSTONE, CIKARANG
ANALISIS BESARNYA PENCEMARAN UDARA
DR. IR.
ANJAR SETYO DENGAN PARAMETER GAS BUANG KENDARAAN
017/DTS/3/SA/007 SYAUKAT ALI,
NUGROHO BERMOTOR DI LINGKUNGAN SEKOLAH VOKASI
M.SI
UGM
DR. IR.
ANALISIS KUALITAS AIR SUMUR DI KELURAHAN
017/DTS/3/SA/008 SYAUKAT ALI, ZULFIKAR FAWZI
GEDONG KIWO YOGYAKARTA
M.SI
METODE PELAKSANAAN DAN HITUNGAN
DR. IR. SINDU EFEKTIVITAS PENULANGAN STRUKTUR
FARIS PRATAMA
017/DTS/3/SN/001 NURANTO, ABUTMENT JEMBATAN SUNGAI KLAMPOK STA
PUTRA
MS. 08+857 PADA PROYEK PEMBANGUNAN JALAN
TOL PASURUAN-PROBOLINGGO
METODE PELAKSANAAN DAN HITUNGAN
DR. IR. SINDU KAPASITAS DUKUNG FONDASI TIANG PANCANG
017/DTS/3/SN/002 NURANTO, M. JAZULI BANGUNAN JEMBATAN TERUSAN JAWA PROYEK
MS. PEMBANGUNAN JALAN TOL KAYU AGUNG-
PALEMBANG-BETUNG PAKET II SEKSI I
DR. IR. SINDU METODE PELAKSANAAN DAN PRODUKTIVITAS
017/DTS/3/SN/003 NURANTO, FAUZI AKBAR ALAT BERAT PEKERJAAN TANGGUL BRONJONG
MS. PROYEK WADUK BENDO KABUPATEN PONOROGO
SPESIFIKASI TANAH DAN METODE TRIAL
DR. IR. SINDU
BRILYAN ADAM EMBANKMENT PADA TIMBUNAN ZONA EMPAT
017/DTS/3/SN/004 NURANTO,
MIRANATA PROYEK PEMBANGUNAN BENDUNGAN LOGUNG
MS.
KUDUS KABUPATEN KUDUS JAWATENGAH
DR. IR. SINDU EVALUASI PRODUKTIFITAS TENAGA KERJA DAN
017/DTS/3/SN/005 NURANTO, ACEP SAIFULLOH WAKTU PELAKSANAAN PEKERJAAN REHABILITASI
MS. DAERAH IRIGASI SAPON, KULON PROGO
ANALISIS PERBANDINGAN VOLUME, MUTU,
SUWARDO,
BIAYA DAN WAKTU PELAKSANAAN PEKERJAAN
017/DTS/3/SW/001 ST., MT., DIAS SARI HIDAYAH
BETON UNTUK PERKERASAN KAKU PADA PROYEK
PHD.
JALAN TOL SOLO - NGAWI PAKET SN.2B
METODE PELAKSANAAN DAN PRODUKTIVITAS
SUWARDO,
KHAIRUNNISA SITI STRESSING GIRDER JEMBATAN SUKOWIDI
017/DTS/3/SW/002 ST., MT.,
MUBARRANI PROYEK JALAN TOL NGAWI KERTOSONO KAPET
PHD.
NKI
METODE PELAKSANAAN, PRODUKTIVITAS DAN
SUWARDO, MUHAMMAD
ANALISIS KAPASITAS FONDASI TIANG PANCANG
017/DTS/3/SW/003 ST., MT., KRISNA WIRA
UNTUK JEMBATAN PADA PEMBANGUNAN JALAN
PHD. DHIKA
TOL
PELAKSANAAN DAN PENGENDALIAN
SUWARDO,
PRODUKTIVITAS, MUTU, SERTA BIAYA PRODUKSI
017/DTS/3/SW/004 ST., MT., FIERLY AMALIA
BETON CORRUGATED CONCRETE SHEET PILES DI
PHD.
PT. WIJAYA KARYA BETON PABRIK BOGOR
SUWARDO,
MUHAMMAD DIAN PERANCANGAN BUNDARAN FAKULTAS
017/DTS/3/SW/005 ST., MT.,
FATKHURROCHMAN PETERNAKAN UNIVERSITAS GAJAH MADA
PHD.
METODE PELAKSANAAN, PRODUKTIVITAS DAN
SUWARDO, DURASI/WAKTU PEKERJAAN PERKERASAN KAKU
017/DTS/3/SW/006 ST., MT., WIJANG PERDANA MENGGUNAKAN MESIN PAVER G&Z S600 PADA
PHD. PROYEK PEMBANGUNAN JALAN TOL SOLO-
KERTOSONO
PENGARUH MUATAN SUMBU TERBERAT DAN
SUWARDO,
JUMLAH KENDARAAN TERHADAP KERUSAKAN
017/DTS/3/SW/007 ST., MT., FAHMI ILMIZAN
JALAN ASPAL KELAS III-B DI JALAN TEMPEL -
PHD.
PAKEM
ANALISIS KAPASISTAS KOLOM PADA PROYEK
TEGUH
INGGRIT PEMBANGUNAN KANTOR DINAS PEMADAM
017/DTS/3/TS/006 SUDIBYO, ST.,
WIDYAWATI KEBAKARAN DAN PENANGGULANGAN BENCANA
MT
DKI JAKARTA
TEGUH METODE EVALUASI PRESTRESS BOX GIRDER PADA
MUHAMMAD
017/DTS/3/TS/007 SUDIBYO, ST., PROYEK JL. KA MEDAN - ARASKAMBU -
IQBAL FADLI
MT KUALANAMU
TEGUH METODE KONSTRUKSI DAN BIAYA U-SHAPED
JESSICA ZAAL
017/DTS/3/TS/008 SUDIBYO, ST., GIRDER PADA JALUR LAYANG PROYEK LIGHT RAIL
HAQUE HARIYONO
MT TRANSIT (LRT) JABODETABEK
TEGUH METODE PELAKSANAAN, PRODUKTIVITAS SERTA
ELLYA DELLA ISLA
017/DTS/3/TS/009 SUDIBYO, ST., BIAYA PRODUKSI HOLLOW CORE SLAB MASSIVE
NESS
MT DI JALUR VI PT WIJAYA KARYA BETON BOGOR
PEMBESARAN KOLOM DENGAN METODE
TEGUH
JACKETING PADA PROYEK PEMBANGUNAN
017/DTS/3/TS/010 SUDIBYO, ST., ARULYTA YUNISAR
APARTEMEN U-RESIDENCE 3 + TOWER 5
MT
TANGERANG
TEGUH ANALISIS STRUKTUR PADA PEMBANGUNAN
FEBBRY SATRIA
017/DTS/3/TS/011 SUDIBYO, ST., GEDUNG RUMAH SUSUN 5 LANTAI DI DESA
YUDHA SANJAYA
MT TUKSONO KABUPATEN KULON PROGO
TEGUH DESAIN STRUKTUR PADA SISTEM PORTAL CLEAR
017/DTS/3/TS/012 SUDIBYO, ST., DEWI SPAN MENGGUNAKAN KONSEP PRE-ENGINEERED
MT BUILDING
AGUS ANALISIS TEGANGAN DAN KEHILANGAN GAYA
KURNIAWAN, PRATEGANG BALOK PASCA TARIK (STUDI KASUS
017/DTS/4/AK/001 DIEN AULIA KARIM
ST., MT., GEDUNG PELAYANAN KESEHATAN ST. CAROLUS
PH.D. BOROO MEUS)
AGUS PENGARUH SUHU TERHADAP PERKEMBANGAN
KURNIAWAN, BAKTERI BACILLUS CEREUS DAN BACILLUS
017/DTS/4/AK/002 ANA MARLINA
ST., MT., SUBTILIUS UNTUK OPTIMASI PEMELIHARAAN
PH.D. MANDIRI BETON RIGID PAVEMENT
PERBAIKAN JALAN PADA PERKERASAN KAKU
AGUS
(RIGID PAVEMENT) DENGAN MENGGUNAKAN
KURNIAWAN, WINNA ELVIA
017/DTS/4/AK/003 METODE ENKAPSULASI HIDROGEL BAKTERI
ST., MT., JULIANAWATI
BACILLUS SUBTILIS SEBAGAI PEMULIH
PH.D.
KEREKATAN PADA BETON
PERBAIKAN NON STRUKTURAL PERKERASAN
AGUS KAKU (RIGID PAVEMENT) DENGAN
KURNIAWAN, MENGGUNAKAN PERKEMBANGAN BAKTERI
017/DTS/4/AK/004 PUTRI RAHMASANTI
ST., MT., BACILLUS SUBTILIS DAN BAKTERI BACILLUS
PH.D. CEREUS SEBAGAI AGEN SELF HEALING CONCRETE
DENGAN VARIASI NILAI PH
AGUS
IDENTIFIKASI KETAHANAN STRUKTUR KAYU
KURNIAWAN,
017/DTS/4/AK/005 RODHI AN NAJMI PROYEK PEMUGARAN BANGUNAN CAGAR
ST., MT.,
BUDAYA MASJID BESAR PAKUALAMAN
PH.D.
DR. ING. IR. APLIKASI PERANCANGAN SISTEM PEMANEN AIR
PRATAMA TIRZA
017/DTS/4/AM/001 AGUS HUJAN DI KAWASAN INDUSTRI PT. TIRTA
SURYA SEMBADA
MARYONO INVESTAMA CIHERANG BOGOR JAWA BARAT
ANALISIS DAN PERENCANAAN PADA GEOMETRIK
DR. ING. IR.
RIFKI KHAIRUL DAN DRAINASE JALAN KAWASAN EKONOMI
017/DTS/4/AM/002 AGUS
ULFAH KHUSUS (KEK) MANDALIKA LOMBOK, RUAS N-E
MARYONO
DENGAN METODE BINA MARGA
IDENTIFIKASI RISIKO KECELAKAAN KERJA DENGAN
AGUS METODE HIRARC (HAZARD IDENTIFICATION, RISK
NUGROHO, TIA YUNI ASSESSMENT, AND RISK CONTROL) PADA PROYEK
017/DTS/4/AN/001
ST., MT., PERMATASARI PEMBANGUNAN PASCA SARJANA TAHIR
PH.D. FOUNDATION BUILDING FAKULTAS KEDOKTERAN
UGM
AGUS OPTIMASI DURASI DAN BIAYA PROYEK
NUGROHO, NIKEN KRISTANTI REHABILITASI MINOR JALAN PAA KONDISI MUTU
017/DTS/4/AN/002
ST., MT., PRADASARI SESUAI SPESIFIKASI TEKNIK DENGAN METODE
PH.D. CRASHING
AGUS IDENTIFIKASI KRITERIA PADA PEMILIHAN
NUGROHO, NOVI AYU MUSTIKA KONTRAKTOR UNTUK BANGUNAN CAGAR
017/DTS/4/AN/003
ST., MT., NINGRUM BUDAYA DENGAN MENGGUNAKAN METODE
PH.D. ANALYTICAL HIERARCHY PROCESS (AHP)
EVALUASI JADWAL KEGIATAN MENGGUNAKAN
AGUS METODE CRITICAL CHAIN PROJECT
NUGROHO, ADELINA CRISTA MANAGEMENT (CCPM) PADA PROYEK
017/DTS/4/AN/004
ST., MT., MERSHICA PEMELIHARAAN JALAN (STUDI KASUS:
PH.D. REHABILITASI MINOR JALAN WONOSARI - DUWET
TAHUN 2016)
AGUS
PRIORITAS PEMELIHARAAN JALAN
NUGROHO, PUTRI HAPSARI
017/DTS/4/AN/005 MENGGUNAKAN METODE ANALYTIC NETWORK
ST., MT., SURYA NNGTYAS
PROCESS (ANP)
PH.D.
AGUS IDENTIFIKASIDURASI PEKERJAAN AMANDEMEN
NUGROHO, KE-12 JALAN TOL SURABAYA-MOJOKERTO SEKSI
017/DTS/4/AN/006 RENO MARHAENI
ST., MT., III DENGAN MENGGUNAKAN METODE EARNED
PH.D. VALUE ANALYSIS
AGUS PENERAPAN LINE OF BALANCE (LOB) UNTUK
NUGROHO, AYU ARDILLA MENGHITUNG KEBUTUHAN TENAGA KERJA PADA
017/DTS/4/AN/007
ST., MT., ROMADHONI PEKERJAAN KONSTRUKSI (REHABILITASI
PH.D. MUSHOLA AL KAUTSAR KOTA YOGYAKARTA)
DR. SC. TECH PERENCANAAN DESAIN ALTERNATIF PADA
ADHY DEWI CAHYANING STRUKTUR PELAT BETON BERLUBANG (STUDI
017/DTS/4/AY/006
KURNIAWAN, TYAS KASUS PROYEK PEMBANGUNAN APARTEMEN
S.T. PODOMORO GOLF VIEW CIMANGGIS)
KAJIAN PENERAPAN SISTEM MANAJEMEN
IR. BAMBANG
KESELAMATAN DAN KESEHATAN KERJA (SMK3)
017/DTS/4/BB/001 HERUMANTA, ILHAM RESTU AJI
PADA PROYEK TOL LAMPUNG PT. WIKA KONTRAK
M.T
ANAK 2
QUALITY PRODUCT ASSESMENT PADA PEKERJAAN
IR. BAMBANG
ARDIYA FARDHAN STRUKTUR BETON DI PROYEK TOL LAMPUNG
017/DTS/4/BB/002 HERUMANTA,
PRAYOGA (TRANS SUMATRA) PAKET 4 METRO - TERBANGGI
M.T
BESAR PROYEK AKHIR
APLIKASI VALUE ENGINEERING TERHADAP PRE-
IR. BAMBANG
WILDAN MIRDANA CAST FAÇADE PADA PROYEK PEMBANGUNAN
017/DTS/4/BB/003 HERUMANTA,
ROZAQ RUSUN PODOMORO GOLF VIEW CIMANGGIS
M.T
JAWA BARAT
IR. BAMBANG STUDI PENGARUH PEMELIHARAAN DAN
RIZAL RASYID
017/DTS/4/BB/004 HERUMANTA, PERAWATAN GEDUNG TERHADAP KINERJA
HALIM
M.T GEDUNG HOTEL GRAND TJOKRO YOGYAKARTA
DESAIN ALTERNATIF PERBAIKAN KAPASITAS
DIAN
DHARMA YUDHA DUKUNG TIANG PANCANG PADA STRUKTUR
017/DTS/4/DS/001 SESTINING
KURNIAWAN FONDASI APARTEMEN PODOMORO GOLF VIEW
AYU,ST.,MT.
GEDUNG DAHOMA
EVALUASI KONDISI PERKERASAN JALAN JENDERAL
IR. HERU ACHMAD
GATOT SUBROTO KABUPATEN INDRAMAYU
017/DTS/4/HB/001 BUDI KURNIAWAN
SERTA ALTERNATIF PENANGANAN KONSTRUKSI
UTOMO, M.T FACHREZA
DAN ANGGARAN BIAYANYA
TEKNIK PEMILIHAN METODE PEMELIHARAAN
IR. HERU
NANDA TRIGANI (MAINTENANCE) JALAN TOL BENOA SEBAGAI
017/DTS/4/HB/002 BUDI
PRAJA AKSES MENUJU BANDARA INTERNASIONAL
UTOMO, M.T
NGURAH RAI - NUSA DUA
IR. HERU PENENTUAN NILAI PCN (PAVEMENT
017/DTS/4/HB/003 BUDI NIDA ZAKKIYAH CLASIFICATION NUMBER) LANDAS PACU PADA
UTOMO, M.T PENGEMBANGAN BANDAR UDARA KOROWAI
BATU PAPUA MENGGUNAKAN METODE ANALITIS
FAA
EVALUASI PERKERASAN JALAN DENGAN METODE
PAVEMENT CONDITION INDEX (PCI) DAN
IR. HERU
PEMILIHAN METODE PERBAIKAN JALAN ASPAL
017/DTS/4/HB/004 BUDI ANA KAMALIYAH
MENGGUNAKAN PENDEKATAN NILAI PCI DAN
UTOMO, M.T
BINA MARGA 2013 (STUDI KASUS: JALAN P16
DAN ROAD1E PT. KALTIM PRIMA COAL)
PENGENDALIAN MUTU DAN PERBAIKAN
IR. HERU
KERUSAKAN TAHAP KONSTRUKSI PEKERJAAN
017/DTS/4/HB/005 BUDI HANIK MARSINTA
PERKERASAN PROYEK JALAN TOL SOLO - NGAWI -
UTOMO, M.T
KERTOSONO PAKET 2 STA. 56+050-79+000
DR. ENG.
ANALISIS DAN PERBAIKAN RETAK TEPI (EDGE
IMAN
017/DTS/4/IH/001 MEILISA SETIAWATI CRACKING) LANDAS PACU BANDAR UDARA EL
HARYANTO
TARI - KUPANG
S.T., M.T.
DR. ENG. ANALISIS PERBANDINGAN PEMELIHARAAN JALAN
IMAN DRAJAT TOL SEMARANG MANYARAN BERDASARKAN
017/DTS/4/IH/002
HARYANTO DARYPRADIPTO STANDAR PELAYANAN MINIMAL DAN BINA
S.T., M.T. MARGA 2013
PERENCANAAN TEBAL LAPIS ULANG 9OVERLAY)
DR. ENG.
LANDAS PACU PADA PENGEMBANGAN BANDAR
IMAN GILANG SRI
017/DTS/4/IH/003 UDARA KOROWAL BATU PAPUA MENGGUNAKAN
HARYANTO ANDRIYATMOKO
METODE MANUAL FAA DAN FAARFIELD
S.T., M.T.
SOFTWARE
DR. ENG.
IMAN PENILAIAN DAN MITIGASI RISIKO KESELAMATAN
017/DTS/4/IH/004 SISWANTO
HARYANTO BANDAR UDARA AKIBAT RUNWAY EXCURSION
S.T., M.T.
DR. ENG. REHABILITASI KERUSAKAN JALAN AKIBAT
IMAN IRFAN WAFI MUATAN BERLEBIH BERDASARKAN METODE
017/DTS/4/IH/005
HARYANTO RAHMAWAN PAVEMENT CONDITION INDEX (PCI) DAN
S.T., M.T. METODE BINA MARGA 2013
PENILAIAN KONDISI PERKERASAN RUWAY
DR. ENG.
DENGAN METODE PAVEMENT CONDITION INDEX
IMAN DWINTO RACHMAT
017/DTS/4/IH/006 (PCI) DAN INTERNATIONAL ROUGHNESS INDEX
HARYANTO SAPUTRO
(IRI) DI BANDAR UDARA INTERNASIONAL ADI
S.T., M.T.
SOEMARMO SOLO
DR. ENG.
PENGEMBANGAN MODUL KEGIATAN INSPEKSI
IMAN NOVITASARI NUR
017/DTS/4/IH/007 PERKERASANN LANDAS PACU BANDAR UDARA
HARYANTO, ARDIANTI
ADISUTJIPTO YOGYAKARTA
ST., MT.
LAVA
EVALUASI DAN PERBAIKAN STRUKTUR GEDUNG L
017/DTS/4/LH/001 HIMAWAN, YUDI PRASETYO
SMP MUHAMMADIYAH 3 YOGYAKARTA
ST.,MT
ANALISIS KONDISI INFRASTRUKTUR JALAN TOL
NURSYAMSU PALIMANAN-KANCI CIREBON BERDASARKAN
MUHAMMAD
017/DTS/4/NH/001 HIDAYAT, ST., STANDAR PELAYANAN MINIMUM JALAN TOL
NASRUDDIN
MT, PH.D UNTUK MENENTUKAN PRIORITAS PERBAIKAN
DAN PEMELIHARAAN
PERBANDINGAN BIAYA PENGGUNAAN BEKISTING
DR. IR.
SISTEM PERI DAN BEKISTING KONVENSIONAL
017/DTS/4/SA/001 SYAUKAT ALI, DINI PERTIWI
PADA PEKERJAAN PIER COLUMN PROYEK
M.SI.
PEMBANGUNAN MRT CP 103 DI JAKARTA
PRODUKTIVITAS PEMANCANG SPUN PILE
DR. IR. DENGAN ALAT PANCANG TIPE DIESEL HAMMER
017/DTS/4/SA/002 SYAUKAT ALI, HARPAT MULYONO UNTUK PEKERJAAN ABUTMENT JEMBATAN PADA
M.SI. PROYEK JALAN TRANS SUMATERA PAKET 4
(METRO - TERBANGGI BESAR)
ANALISIS POTENSI GENANGAN AKIBAT BENCANA
DR. IR. SINDU TSUNAMI MENGGUNAKAN SOFTWARE COMCOT
AHMAD NUUR
017/DTS/4/SN/001 NURANTO, 1.6 PADA KAWASAN EKONOMI KHUSUS
ROMADHON
MS. MANDALIKA TAHAP 1, LOMBOK, NUSA
TENGGARA BARAT
PENENTUAN DAYA DUKUNG TIANG PANCANG
DR. IR. SINDU
AHMAD KHAERUN SECARA STATIS DAN DINAMIS (PENGUJIAN
017/DTS/4/SN/002 NURANTO,
SOLEH LAPANGAN) PADA PROYEK MASJID MANDALIKA
MS.
DI KUTE LOMBOK
DR. IR. SINDU QAREL
PENGELOLAAN LIMBAH BETON MENJADI AIR
017/DTS/4/SN/003 NURANTO, MUHAMMAD
BERSIH DI PT WIJAYA KARYA BETON PPB BOGOR
MS. HAWARI
DR. IR. SINDU TINJAUAN PEMELIHARAAN PIPA AIR MINUM
AHMAD FU`AD
017/DTS/4/SN/004 NURANTO, PDAM TIRTAMARTA YOGYAKARTA UNTUK
HABIBI
MS. MENEKAN TINGKAT KEBOCORAN AIR
SUWARDO, ANALISIS GEOTEKNIK DAN PEMILIHAN TIPE
017/DTS/4/SW/001 ST., MT., ANGGI PRADIKNA FONDASI BOX PORTAL IRIGASI MELINTANG PADA
PHD. RENCANA JALAN TOL LAMPUNG
ANALISIS KONDISI JALAN MAGELANG DAN JALAN
SUWARDO,
MOHAMAD POSYA LAKSDA ADISUCIPTO YOGYAKARTA
017/DTS/4/SW/002 ST., MT.,
PRATISTA BERDASARKAN PERSYARATAN TEKNIS STANDAR
PHD.
LAIK FUNGSI JALAN
SUWARDO,
MUH SIROJ EVALUASI KINERJA ANTRIAN DAN PENGELOLAAN
017/DTS/4/SW/003 ST., MT.,
ABDURROFI OPERASI GERBANG TOL KANCI
PHD.
SUWARDO, EVALUASI KEMAMPUAN STRUKTURAL RUNWAY
VIOLA NUR
017/DTS/4/SW/004 ST., MT., DAN DESAIN OVERPLAY BANDAR UDARA I GUSTI
RAKHMADIKA
PHD. NGURAH RAI DI BALI
SUWARDO, EVALUASI KONDISI JALAN TOL SEMARANG -
DARYANTI
017/DTS/4/SW/005 ST., MT., MANYARAN BERDASARKAN STANDAR
ASMUNIK
PHD. PELAYANAN MINIMAL
PENGARUH PENERAPAN SISTEM MANAJEMEN
SUWARDO, KESELAMATAN DAN KESEHATAN KERJA (SMK3)
RADITA LARASWARI
017/DTS/4/SW/006 ST., MT., TERHADAP PRODUKTIVITAS PEKERJA DI PROYEK
ADEPUTRI
PHD. KONSTRUKSI JALAN TOL SOLO - NGAWI -
KERTOSONO
TINJAUAN PENGELOLAAN DAN PEMELIHARAAN
SUWARDO,
LANDSCAPE RUANG TERBUKA HIJAU PADA JALAN
017/DTS/4/SW/007 ST., MT., PRASETYO UTOMO
ABU BAKAR ALI DAN JALAN MALIOBORO
PHD.
YOGYAKARTA
TEGUH ANALISA DAN REVIEW STRUKTUR GEDUNG
LUTFI AFIPAH
017/DTS/4/TS/001 SUDIBYO, ST., APARTEMEN SEJAHTERA MENGGUNAKAN SNI
OKTORIN
MT 1726:2012
APLIKASI LEAN CONSTRUCTION DALAM
TEGUH
DANDY IMAM PENGENDALIAN PROYEK PADA PEKERJAAN
017/DTS/4/TS/002 SUDIBYO, ST.,
FAUZI STRUKTUR BANGUNAN GEDUNG CORDIA PROYEK
MT
PODOMORO GOLF VIEW CIMANGGIS DEPOK

PERHATIKAN:
1. MAHASISWA DILARANG MENGEMBALIKAN TUGAS AKHIR/PROYEK AKHIR YANG TELAH
DIBACA KE RAK SENDIRI/MANDIRI. KEMBALIKAN DI MEJA.
2. MAHASISWA YANG INGIN MEMINJAM TUGAS AKHIR/PROYEK AKHIR MEMINTA SURAT
PENGANTAR DARI PETUGAS PERPUSTAKAAN UNTUK DIMINTAKAN TANDA TANGAN
DOSEN PEMBIMBING.

Anda mungkin juga menyukai