PEKERJAAN DESIGN AND BUILD GEDUNG VVIP, BASE OPS TNI DAN
PENGGANTIAN LINE MAINTENANCE AIRLINES
DIBANDAR UDARA INTERNASIONAL I GUSTI NGURAH RAI BALI
Terbilang :
Empat Puluh Sembilan Milyar Tujuh Ratus Enam Puluh Juta
Enam Ratus Empat Puluh Tujuh Ribu Dua Ratus Rupiah
LOKASI : PAKET 3
JUMLAH HARGA
NO URAIAN PEKERJAAN AKHIR
B.2 Lantai 2
1 - Sipil + Arsitek 5,997,641,662.47
2 - Mekanikal + Plumbing 552,498,121.34
3 - Elektrikal 249,498,725.51
4 - Elektronika 181,530,199.27
5 - Furniture 398,768,930.00
6 - Interior 1,999,025,113.40
G Taman Dalam
termasuk pekerjaan mekanikal dan elektrikal (penerangan pelataran)
1 - Landscape (Hard scape + Soft scape) 487,189,948.80
H Landscape Candi Bentar Landside, Tembok Penyengker dan Taman Sisi Luar
H.1. Candi Bentar dan Pagar Tembok Penyengker Style Bali
1 - Pagar Tembok Penyengker Style Bali 4,518,810,807.91
2 - Candi Bentar 1,051,688,320.15
J Pembersihan Lahan
1 - Pembersihan Lahan 50,000,000.00
B.2 Canopy
1 Sipil + Arsitek 492,302,955.42
G Taman Luar
Termasuk pekerjaan mekanikal dan elektrikal (penerangan pelataran)
1 Landscape (Hard scape + Soft Scape ) 515,165,921.20
H Pembersihan Lahan
1 Pembersihan Lahan 35,000,000.00
I Pekerjaan Lain-lain
1 Pekerjaan Jembatan 332,145,441.14
J Pekerjaan Mekanikal
1 Bangunan Base Ops
Pekerjaan pemasangan & instalasi 216,104,460.00
2 Bangunan Safe House
Pekerjaan pemasangan & instalasi 122,535,240.00
D Pembersihan Lahan
JUMLAH HARGA
NO URAIAN PEKERJAAN AKHIR
1 Pembersihan Lahan 15,000,000.00
G Pekerjaan Elektronik
1 Data dan Telpon 471,879,477.41
NO URAIAN PEKERJAAN UNIT VOLUME AKHIR HARGA SATUAN JUMLAH HARGA AKHIR
13 Kusen dan daun pintu swing sz. 800x2200 mm (KP7) unit 7.00 -
- Kusen finish politur unit 7.00 2,549,027.10 17,843,189.73
- Daun pintu finish politur unit 7.00 4,911,188.48 34,378,319.36
- Engsel Set 10.50 168,463.60 1,768,867.80
- Lockcase bh 7.00 244,220.00 1,709,540.00
- Cylinder bh 7.00 264,406.00 1,850,842.00
- Handle pintu Set 7.00 572,516.00 4,007,612.00
- Escutheon bh 14.00 91,846.00 1,285,844.00
Kusen dan daun pintu swing sz. 800x1100 mm (KPS) unit 2.00 -
14
- Kusen Aluminium 4" unit 2.00 625,607.68 1,251,215.36
- Daun pintu finish politur unit 2.00 808,456.00 1,616,912.00
- Engsel Set 2.00 136,316.00 272,632.00
- Cylinder bh 2.00 279,406.00 558,812.00
- Handle pintu Set 2.00 167,516.00 335,032.00
Kusen dan daun jendela kaca mati 4 lubang sz. 2100x1800 mm (KJ1) unit 5.00 -
15
- Kusen finish politur unit 5.00 5,735,310.98 28,676,554.92
- Pasang kaca t 8 mm m2 18.90 319,763.60 6,043,532.04
A.2 Pasang pintu pengganti di VVIP existing
1 Daun pintu double swing sz. 1766x2200 mm (P1) unit 1.00 -
- Daun pintu finish politur unit 1.00 3,569,333.24 3,569,333.24
- Engsel Set 3.00 168,463.60 505,390.80
NO URAIAN PEKERJAAN UNIT VOLUME AKHIR HARGA SATUAN JUMLAH HARGA AKHIR
14 - Pemasangan Outdoor AC cap 348.000 BTU/H, Daikin VRV RXQ 36 AMY14 unt 1.00 368,772,400.00 368,772,400.00
15 - Outdoor AC cap 54.600 BTU/H, Daikin VRV RXQ 36 AMY14 unit 77,934,000.00
16 Pemasangan AC split wall 1,5 PK unit 1.00 7,429,000.00 7,429,000.00
17 Pemasangan ducting AC m2 168.01 784,630.00 131,825,686.30
18 Pemasangan flexible ducting AC
- ø20 cm m' 39.75 428,730.00 17,042,017.50
19 Pemasangan Plenum AC Bahan BJLS bh 4.00 1,983,000.00 7,932,000.00
20 Pemasangan Grill AC
- Uk. 200 X 15 CM bh 1.00 1,956,200.00 1,956,200.00
- Uk. 160 X 15 CM bh 1.00 1,956,200.00 1,956,200.00
- Uk. 170 X 10 CM bh 1.00 1,546,200.00 1,546,200.00
- Uk. 160 X 10 CM bh 1.00 1,546,200.00 1,546,200.00
- Uk. 140 X 10 CM bh 4.00 1,546,200.00 6,184,800.00
- Uk. 120 X 10 CM bh 1.00 1,546,200.00 1,546,200.00
- Uk. 110 X 10 CM bh 4.00 1,546,200.00 6,184,800.00
- Uk. 80 X 10 CM bh 2.00 846,200.00 1,692,400.00
- Uk. 70 X 10 CM bh 1.00 846,200.00 846,200.00
- Uk. 60 X 10 CM bh 1.00 846,200.00 846,200.00
21 Penambahan Freon R-410a kg 28.25 400,000.00 11,299,600.00
22 Pembuatan pondasi AC unt 1.00 6,750,000.00 6,750,000.00
23 Partial test pekerjaan AC ls 1.00 30,000,000.00 30,000,000.00
IV PEKERJAAN PEMADAM KEBAKARAN
A LANTAI 1
Pekerjaan Pengadaan material dan pemasangan Instalasi :
1 - Pemasangan branch control valve bh 1.00 8,325,500.00 8,325,500.00
2 - Pemasangan pipa Black Steel Sch 40 ø4" m' 7.00 722,231.75 5,055,622.25
3 - Pemasangan pipa Black Steel Sch 40 ø2,5" m' 13.00 470,768.50 6,119,990.50
4 - Pemasangan pipa Black Steel Sch 40 ø2" m' 17.00 376,812.00 6,405,804.00
5 - Pemasangan pipa Black Steel Sch 40 ø1,5" m' 20.00 337,003.00 6,740,060.00
6 - Pemasangan pipa Black Steel Sch 40 ø1" m' 47.00 291,537.25 13,702,250.75
7 - Pemasangan pipa riser drain PVC AW ø2" m' 8.00 50,150.75 401,206.00
8 - Pemasangan head sprinkler ø1" tipe reccessed ceilling bh 17.00 181,680.00 3,088,560.00
9 - Pemasangan Apar (Fire Extinguisher) Multi Purpose Dry Chemical Powder kap 5 unit 3.00 9,504,680.00 28,514,040.00
10 - Pemasangan Apar (Fire Extinguisher) Carbon Dioxide kap 6,8 kg unit 1.00 12,309,680.00 12,309,680.00
3 Elektrikal 1,250,022,818.51
I PEKERJAAN PANEL TEGANGAN RENDAH :
Pekerjaan Pengadaan material dan pemasangan Instalasi : -
1 - SDP VVIP Unit 1.00 224,400,000.00 224,400,000.00
2 - PP - VVIP UTAMA LT.1 Unit 1.00 33,334,000.00 33,334,000.00
3 - PP - OUTDOOR AC VRV Unit 1.00 17,234,000.00 17,234,000.00
4 - Sekring box 12 group Unit 7,500,000.00
5 - UPS 20 KVA Unit 1.00 273,828,000.00 273,828,000.00
II PEKERJAAN KABEL FEEDER :
Pekerjaan Pengadaan material dan pemasangan Instalasi :
1 - Dari SS New ke SDP PP.VVIP kabel NYFGbY 4x120mm2 m' 155.00 1,334,506.00 206,848,430.00
2 - Dari SDP PP.VVIP ke PP - VVIP1 LT1 kabel NYY 4x10mm2 m' 9.00 124,513.00 1,120,617.00
3 - Dari SDP PP.VVIP ke PP - OUTDOOR AC VRV kabel NYFGbY 4x70mm2 m' 144.00 715,265.50 102,998,232.00
4 - Dari SDP PP.VVIP ke PP - UPS kabel NYY 4x25mm2 m' 7.00 295,949.50 2,071,646.50
5 - Dari PP - UPS ke PP - PP-VVIP1 Lt1 kabel NYY 4x25mm2 m' 7.00 295,949.50 2,071,646.50
6 - Kabel NYA 1x6mm2 m' 9.00 38,175.00 343,575.00
7 - Kabel NYA 1x16mm2 m' 14.00 61,385.00 859,390.00
8 - Kabel NYA 1x35mm2 m' 144.00 97,685.00 14,066,640.00
9 - Kabel NYA 1x70mm2 m' 155.00 165,335.00 25,626,925.00
10 - Galian tanah utk parit kabel m' 315.00 89,227.07 28,106,526.51
23 - Instalasi Hand dryer, NYM 3 x 2,5 mm2 in HIC 20 mm2 ttk 3.00 378,260.00 1,134,780.00
24 - Partial test pekerjaan listrik ls 1.00 15,000,000.00 15,000,000.00
Pengadaan Lampu Downlight DN 291B 1xDLED-4000 PSU WH + Emergency
25 - bh 1.00 1,983,750.00 1,983,750.00
battery
26 - Lampu RM TBS 318 ( 2 x TLD -36 HF M2 bh 17.00 1,171,950.00 19,923,150.00
27 - Lampu RM TBS 318 ( 2 x TLD -36 HF M2 + Emergency bh 4.00 2,436,950.00 9,747,800.00
28 - Lampu Kolom Spot BGO 310 6 x LED HP/WW 220-240V bh 22.00 1,873,750.00 41,222,500.00
29 - Lampu Strip Smart LED Flexible cover G4 + Dimer bh 38.00 1,178,550.00 44,784,900.00
IV PEKERJAAN GROUNDING
4 Elektronika 1,699,353,954.83
I PEKERJAAN INSTALASI DATA (INTERNET, ETHERNET, WIFI&IP CAMERA)
Pekerjaan Instalasi dan pemasangan :
1 - Pemasangan Data Rack Unit 2.00 15,998,500.00 31,997,000.00
2 - Pemasangan Manageble Switch Hub 24 Port Unit - 42,595,000.00 -
3 - Pemasangan UPS Back Up 2000 VA bh 1.00 7,655,000.00 7,655,000.00
4 - Pemasangan PoE Injector bh 1.00 5,921,200.00 5,921,200.00
5 - Penarikan kabel feeder FO SM 4 Core + HIC dr R. Tunggu Sopir m' 100.00 69,824.50 6,982,450.00
Switch Cisco WS-C2960-24T-S, 24Port GigE PoE 370WIP Base 4x1G SFP LAN
6 - Base, Include SmartNet SNTC8x5xNBD, Cisco Catalyst 3850-24 Port PoE IP unit 2.00 48,410,156.80 96,820,313.60
Base
7 - Cisco Catalayst 3850 4x1GE Network Modul bh 2.00 5,435,000.00 10,870,000.00
8 - 715W AC Confiq 1 Secondary Power Supply bh 1.00 19,312,400.00 19,312,400.00
9 - Catalyst Stack Power Cable 30CM bh 2.00 1,412,200.00 2,824,400.00
10 - 50CM Type Stacking Cable bh 2.00 1,412,200.00 2,824,400.00
11 - Cisco 1000Base-LX/LH SFP Transceiver, GLC-LH-SMD bh 2.00 14,366,000.00 28,732,000.00
A Lantai 1
Pekerjaan Instalasi dan pemasangan :
1 - Instalasi kabel Data UTP CAT 6A + HIC 20mm ttk 32.00 425,230.00 13,607,360.00
2 - Instalasi Kabel TV RG 6 + HIC 20 mm ttk 165,000.00
3 - Instalasi Kabel CCTV RG 6 + HIC 20 mm ttk 165,000.00
4 - Instalasi Kabel Power CCTV NYM 3 x 1.5 mm +HIC 20 mm ttk 325,000.00
5 - Pemasangan Fixed IP camera PoE unt 5.00 6,941,400.00 34,707,000.00
6 - Pengadaan Fixed Camera Unit 1,565,000.00
7 - Pemasangan Dome IP camera PoE unt 7.00 6,939,675.00 48,577,725.00
8 - Pengadaan Dome Camera unit 1,215,000.00
9 - Pemasangan outlet data tipe dinding bh 11.00 243,900.00 2,682,900.00
10 - Pemasangan Acces Point (WIFI) unt 3.00 11,466,565.00 34,399,695.00
11 - Pemasangan IP TV unt 2.00 5,656,495.00 11,312,990.00
12 - Pemasangan Outlet TV Unit 243,900.00
13 - Pemasangan IP Phone unt 2.00 261,502.00 523,004.00
14 - Pemasangan FIDS (Flight Information Disolay System) unt 2.00 25,006,530.00 50,013,060.00
15 - Pemasangan Master Clock unt 2.00 43,047,000.00 86,094,000.00
II PEKERJAAN INSTALASI TELEPON
Pekerjaan Instalasi dan pemasangan :
Penarikan kabel telepon Jelly Filled Armoured 2 Pairs x 0,6 mm2 + HIC dr R
1 - m' 527.73 54,522.50 28,773,010.23
Tunggu Sopir
V SISTEM BAS
a. Inteligent Station
- SCS Modbus type BCY44100M0060 unit 1.00 76,700,000.00 76,700,000.00
- Modbus Converter unit 1.00 18,200,000.00 18,200,000.00
- Hub Swith 8 port unit 1.00 1,950,000.00 1,950,000.00
b. DDC Controler -
- INFILEX GC Multi Purpose Controller Type WYS111W0000 unit 1.00 8,450,000.00 8,450,000.00
- DI - 8 Module RY500850000 unit 1.00 3,250,000.00 3,250,000.00
-DO - 8 Module RY5008D0000 unit 1.00 4,550,000.00 4,550,000.00
- Al - 4 Module Type RY5004*0000 Optional unit 1.00 6,500,000.00 6,500,000.00
- UT Module For Connection Of Neopanel Type RY5001U0000 unit 1.00 4,550,000.00 4,550,000.00
- Operator Panel for Inflex GC Type QY500W0000 unit 1.00 13,326,950.00 13,326,950.00
c. Material dan Jasa Porsi Local -
- Bos Panel DDC + Accessories unit 1.00 9,750,000.00 9,750,000.00
NO URAIAN PEKERJAAN UNIT VOLUME AKHIR HARGA SATUAN JUMLAH HARGA AKHIR
5 Furniture 179,608,700.00
A Lantai 1
1 Press Confrence
- Pekerjaan meja pimpinan unit 1.00 17,758,700.00 17,758,700.00
- Kursi pimpinan unit 3.00 7,500,000.00 22,500,000.00
- Kursi audience unit 20.00 1,800,000.00 36,000,000.00
2 Area Lobby
- Kursi reception unit 2.00 3,400,000.00 6,800,000.00
- Pot hias unit 2.00 2,500,000.00 5,000,000.00
- Meja pot unit 1.00 20,000,000.00 20,000,000.00
- Pot tanaman besar unit 1.00 6,000,000.00 6,000,000.00
3 Ruang Protokoler
- Kursi 2 seater (refinishing) unit 2.00 4,200,000.00 8,400,000.00
- Kursi 1 seater handle (refinishing) unit 4.00 2,100,000.00 8,400,000.00
- Meja segi empat 1 (refinishing) unit 1.00 1,500,000.00 1,500,000.00
- Side table (refinishing) unit 2.00 1,000,000.00 2,000,000.00
- Meja kecil unit 2.00 12,500,000.00 25,000,000.00
- Pot hias unit 2.00 2,500,000.00 5,000,000.00
4 Dapur
- Kompor+hood unit 1.00 11,750,000.00 11,750,000.00
- Kitchen zink bolsena unit 1.00 3,500,000.00 3,500,000.00
5 - Pekerjaan frame relief background counter kayu jati unit 1.00 45,000,000.00 45,000,000.00
6 - + rangka, pasang relief, & service finishing relief
7 - Pekerjaan frame pintu kayu jati ukir 'finishing politur m¹ 30.49 2,609,300.00 79,557,557.00
8 - Pekerjaan cover lift HPL + architrave ukir unit 1.00 35,000,000.00 35,000,000.00
9 - Pekerjaan meja counter multiplek + top marmer unit 1.00 46,273,920.00 46,273,920.00
10 - Lukisan tema pewayangan bh 3.00 8,000,000.00 24,000,000.00
11 - Papan signage bh 5.00 1,500,000.00 7,500,000.00
A.4 TOILET UMUM -
1 - Pekerjaan box wastafel unit 4.00 4,720,100.00 18,880,400.00
2 - Pekerjaan cermin wastafel unit 4.00 2,186,800.00 8,747,200.00
3 - Papan signage bh 6.00 1,500,000.00 9,000,000.00
A.5 KITCHEN -
1 - Pekerjaan kitchen set+dinding keramik unit 1.00 63,622,800.00 63,622,800.00
2 - Pekerjaan frame pintu kayu jati ukir 'finishing politur m¹ 5.35 2,609,300.00 13,959,755.00
3 - Papan signage bh 2.00 1,500,000.00 3,000,000.00
A.6 AREA SERVICE -
1 - Railling tangga kayu kamper + panel ukir finishing m¹ 9.26 3,100,020.00 28,706,185.20
2 - politur
3 - Papan signage bh 5.00 1,500,000.00 7,500,000.00
A.7 AREA DALAM LIFT/ELEVATOR
1 - Pekerjaan Interior unt 1.00 75,000,000.00 75,000,000.00
B.2 Lantai 2
1 Sipil + Arsitek 5,997,641,662.47
I Pekerjaan Struktur Beton
A Lantai 2
1 Pek. Beton Balok B1 200x400 mm, Pembesian T: 8D13 / ø10-95 : L:8D13 / ø10-150
- Bekisting M2 120.00 386,862.00 46,424,987.45
- Pembesian Kg 2,526.55 19,701.40 49,776,594.10
- Beton K - 250 M3 8.84 1,591,420.00 14,071,972.21
2 Pek. Beton Balok B1A 200x400 mm, Pembesian T:9D13 / ø10-95 : L:8D13 / ø10-125 -
- Bekisting M2 17.48 386,862.00 6,762,347.76
- Pembesian Kg 429.15 19,701.40 8,454,895.76
- Beton K - 250 M3 1.29 1,591,420.00 2,049,748.96
3 Pek. Beton Balok B2 200x300 mm, Pembesian 4D13 - ø8-100 -
- Bekisting M2 42.92 386,862.00 16,605,664.49
- Pembesian Kg 544.59 19,701.40 10,729,090.86
- Beton K - 250 M3 2.76 1,591,420.00 4,391,364.35
4 Pek. Beton Balok B3 200x350 mm, Pembesian 4D13 - ø8-125 -
- Bekisting M2 32.87 386,862.00 12,715,380.22
- Pembesian Kg 407.64 19,701.40 8,031,067.66
- Beton K - 250 M3 2.29 1,591,420.00 3,645,624.94
5 Pek. Beton Balok B4 150x200 mm, Pembesian 4D13 - ø8-100 -
- Bekisting M2 6.16 386,862.00 2,383,069.92
- Pembesian Kg 88.21 19,701.40 1,737,948.36
- Beton K - 250 M3 0.34 1,591,420.00 534,717.12
6 Pek. Beton balok separator sz 200x300 mm, Pembesian 4D13 - ø8-100 -
- Bekisting M2 13.92 386,862.00 5,385,119.04
- Pembesian Kg 140.29 19,701.40 2,763,885.76
- Beton K - 250 M3 1.04 1,591,420.00 1,661,442.48
7 Pek. Beton Plat Lantai t = 120 mm, Pembesian ø10-100 2 Layer -
- Bekisting M2 333.67 519,485.00 173,336,733.11
- Pembesian Kg 9,360.43 19,701.40 184,413,607.45
- Beton K - 250 M3 37.06 1,591,420.00 58,978,025.20
8 Pek. Beton Plat Atap t = 100 mm Pembesian M7-1 Layer -
- Bekisting M2 19.61 519,485.00 10,187,100.85
- Wiremesh M-7 M2 16.39 105,321.52 1,726,219.64
- Beton K - 250 M3 1.64 1,591,420.00 2,614,703.06
9 Pek. Beton Kolom K2 sz 300x300 mm, Pembesian 8D13 / ø8-100 -
- Bekisting M2 52.61 383,185.00 20,158,596.48
- Pembesian Kg 535.08 19,701.40 10,541,743.15
- Beton K - 250 M3 3.95 1,591,420.00 6,279,106.75
10 Pek. Beton Kolom K3 sz 300x300 mm, Pembesian 12D13 / ø8-100 -
- Bekisting M2 39.46 383,185.00 15,118,947.36
- Pembesian Kg 583.49 19,701.40 11,495,615.59
- Beton K - 250 M3 2.96 1,591,420.00 4,709,330.06
11 Pek. Beton Kolom K5 sz 200x400 mm, Pembesian 12D13 / ø8-150 -
- Bekisting M2 45.79 383,185.00 17,546,807.52
- Pembesian Kg 568.63 19,701.40 11,202,728.28
- Beton K - 250 M3 2.91 1,591,420.00 4,624,029.95
12 Pek. Beton Kolom K8 sz 200x300 mm, Pembesian 8D13 / ø8-100 -
- Bekisting M2 18.24 383,185.00 6,989,294.40
- Pembesian Kg 342.50 19,701.40 6,747,713.74
- Beton K - 250 M3 1.37 1,591,420.00 2,177,062.56
13 Pek. Beton Balok BR1 200x300 mm, Pembesian 4D13 - ø8-100 -
- Bekisting M2 48.00 386,862.00 18,569,376.00
- Pembesian Kg 481.36 19,701.40 9,483,464.80
- Beton K - 250 M3 3.60 1,591,420.00 5,729,112.00
B Plat atap Lift -
1 Pek. Beton Balok B1A 200x400 mm, Pembesian T:9D13 / ø10-95 : L:8D13 / ø10-125 -
NO URAIAN PEKERJAAN UNIT VOLUME AKHIR HARGA SATUAN JUMLAH HARGA AKHIR
Kusen dan daun pintu swing sz. 800x1100 mm (KPS) unit 1.00 -
7
- Kusen finish politur unit 1.00 625,607.68 625,607.68
- Daun pintu finish politur unit 1.00 808,456.00 808,456.00
- Engsel Set 1.00 136,316.00 136,316.00
- Cylinder bh 1.00 279,406.00 279,406.00
- Handle pintu Set 1.00 167,516.00 167,516.00
Kusen dan daun jendela kaca mati 4 lubang sz. 2100x1800 mm (KJ1) unit 1.00 -
9
- Kusen finish politur unit 1.00 5,735,310.98 5,735,310.98
- Pasang kaca t 8 mm m2 3.78 319,763.60 1,208,706.41
10 Kusen dan kaca anti peluru jendela sz. 2100x1800 mm (KJ4) unit 1.00 415,000,000.00 415,000,000.00
Kusen dan daun jendela kaca mati 2 lubang sz. 1500x1800 mm (KJ3) unit 2.00 -
- Kusen finish politur unit 2.00 3,970,599.91 7,941,199.82
- Pasang kaca t 8 mm m2 5.40 319,763.60 1,726,723.44
11 Kusen dan daun jendela kaca mati 2 lubang sz. 2100x1800 mm (KJ2) unit 1.00 -
- Kusen finish politur unit 1.00 4,852,955.45 4,852,955.45
- Pasang kaca t 8 mm m2 3.78 319,763.60 1,208,706.41
A.2 Pasang pintu pengganti di VVIP existing
1 Daun pintu double sliding sz. 1880x2180 mm (P16&P17) unit 1.00 -
- Daun pintu finish politur unit 1.00 3,765,200.08 3,765,200.08
- Rel sliding Set 1.00 2,127,264.00 2,127,264.00
- Lockcase bh 1.00 247,220.00 247,220.00
- Cylinder bh 1.00 179,406.00 179,406.00
- Handle pintu Set 2.00 831,516.00 1,663,032.00
- Escutheon bh 2.00 91,846.00 183,692.00
2 Daun pintu double swing sz. 1440x2100 mm (P7) unit 1.00 -
- Daun pintu finish politur unit 1.00 2,778,148.80 2,778,148.80
- Engsel Set 3.00 168,463.60 505,390.80
- Lockcase bh 1.00 247,220.00 247,220.00
- Cylinder bh 1.00 179,406.00 179,406.00
- Handle pintu Set 2.00 831,516.00 1,663,032.00
- Escutheon bh 2.00 91,846.00 183,692.00
- Flush bolt Set 1.00 325,220.00 325,220.00
- Door closer Set 2.00 788,276.00 1,576,552.00
3 Daun pintu swing sz. 950x2205 mm (P13) unit 1.00 -
- Daun pintu finish politur unit 1.00 1,924,446.83 1,924,446.83
- Engsel Set 1.50 168,463.60 252,695.40
- Lockcase bh 1.00 244,220.00 244,220.00
- Cylinder bh 1.00 179,406.00 179,406.00
- Handle pintu Set 1.00 572,516.00 572,516.00
- Escutheon bh 2.00 91,846.00 183,692.00
- Door closer Set 1.00 788,276.00 788,276.00
4 Daun pintu swing sz. 950x2205 mm (P14) unit 1.00 -
- Daun pintu finish politur unit 1.00 1,924,446.83 1,924,446.83
NO URAIAN PEKERJAAN UNIT VOLUME AKHIR HARGA SATUAN JUMLAH HARGA AKHIR
37 Pemasangan Grill AC -
38 - Uk. 200 X 15 CM bh 1.00 1,956,200.00 1,956,200.00
39 - Uk. 160 X 15 CM bh 1.00 1,956,200.00 1,956,200.00
40 - Uk. 170 X 10 CM bh 1.00 1,546,200.00 1,546,200.00
41 - Uk. 160 X 10 CM bh 1.00 1,546,200.00 1,546,200.00
42 - Uk. 140 X 10 CM bh 4.00 1,546,200.00 6,184,800.00
43 - Uk. 120 X 10 CM bh 1.00 1,546,200.00 1,546,200.00
44 - Uk. 110 X 10 CM bh 4.00 1,546,200.00 6,184,800.00
45 - Uk. 80 X 10 CM bh 2.00 846,200.00 1,692,400.00
46 - Uk. 70 X 10 CM bh 1.00 846,200.00 846,200.00
47 - Uk. 60 X 10 CM bh 1.00 846,200.00 846,200.00
48 - Penambahan Freon R-410a kg 25.05 400,000.00 10,020,400.00
49 - Partial test pekerjaan AC ls 1.00 30,000,000.00 30,000,000.00
IV PEKERJAAN PEMADAM KEBAKARAN -
A LANTAI 2 -
Pekerjaan Instalasi : -
1 - Pemasangan branch control valve Unit 1.00 8,325,500.00 8,325,500.00
2 - Pemasangan pipa Black Steel Sch 40 ø2,5" M 16.00 470,768.50 7,532,296.00
3 - Pemasangan pipa Black Steel Sch 40 ø2" M 21.00 376,812.00 7,913,052.00
4 - Pemasangan pipa Black Steel Sch 40 ø1,5" M 20.00 337,003.00 6,740,060.00
5 - Pemasangan pipa Black Steel Sch 40 ø1" M 32.00 291,537.25 9,329,192.00
6 - Pemasangan pipa riser drain PVC AW ø2" M 9.00 50,150.75 451,356.75
7 - Pemasangan head sprinkler ø1" tipe reccessed ceilling bh 9.00 181,680.00 1,635,120.00
8 - Pemasangan Apar (Fire Extinguisher) Multi Purpose Dry Chemical Powder kap 5 bh 2.00 9,504,680.00 19,009,360.00
9 - Partial test pekerjaan Fire Hydrant ls 1.00 20,000,000.00 20,000,000.00
3 Elektrikal 249,498,725.51
I PEKERJAAN PANEL TEGANGAN RENDAH :
Pekerjaan Pemasangan : -
1 - PP - VVIP UTAMA LT.2 Unit 1.00 22,409,000.00 22,409,000.00
2 - Sekring box 12 group Unit 7,500,000.00
3 - PP - LIFT Unit - 16,084,000.00 -
II PEKERJAAN KABEL FEEDER : -
Pekerjaan penarikan kabel feeder dari LVMDP ke : -
1 - Dari SDP PP.VVIP ke PP - VVIP1 LT2 kabel NYY 4x10mm2 m' 33.00 124,513.00 4,108,929.00
2 - Dari SDP PP.VVIP ke PP - LIFT kabel FRC 4x10mm2 m' 33.00 692,349.50 22,847,533.50
3 - Dari PP - UPS ke PP - PP-VVIP1 Lt2 kabel NYY 4x25mm2 m' 33.00 295,949.50 9,766,333.50
4 - Kabel NYA 1x6mm2 m' 66.00 38,175.00 2,519,550.00
5 - Kabel NYA 1x16mm2 m' 33.00 61,385.00 2,025,705.00
6 - Galian tanah utk parit kabel m' 66.00 89,227.07 5,888,986.51
4 Elektronika 181,530,199.27
I PEKERJAAN INSTALASI DATA (INTERNET, ETHERNET, WIFI&IP CAMERA)
A Lantai 2 -
Pekerjaan Instalasi dan pemasangan : -
1 - Instalasi kabel Data UTP CAT 6A + HIC 20mm ttk 11.00 425,230.00 4,677,530.00
2 - Instalasi Kabel TV RG 6 + HIC 20 mm ttk 165,000.00
3 - Pemasangan Dome IP camera PoE unt 6.00 6,939,675.00 41,638,050.00
4 - Pemasangan outlet data tipe dinding bh 7.00 243,900.00 1,707,300.00
5 - Pemasangan Acces Point (WIFI) unt 3.00 11,466,565.00 34,399,695.00
6 - Pemasangan IP TV unt 3.00 5,656,495.00 16,969,485.00
7 - Pemasangan Outlet TV unit 261,502.00
8 - Pemasangan IP Phone unt 1.00 261,502.00 261,502.00
9 - Pemasangan FIDS (Flight Information Disolay System) unt - 25,006,530.00 -
10 - Pemasangan Master Clock unt - 43,047,000.00 -
II PEKERJAAN INSTALASI TELEPON -
Pekerjaan Instalasi dan pemasangan : -
Penarikan kabel telepon Jelly Filled Armoured 2 Pairs x 0,6 mm2 + HIC dr R
1 - m' 633.27 54,522.50 34,527,612.27
Tunggu Sopir
2 - Instalasi kabel telepon UTP CAT 6A + HIC titik 5.00 425,230.00 2,126,150.00
3 - Instalasi Kabel Telpon ITC 2 x 2 x0.6 + HIC titik 225,000.00
4 - Pemasangan outlet telepon tipe dinding Lt. 2 bh 5.00 188,400.00 942,000.00
5 - Pemasangan pesawat telpon bh 5.00 525,000.00 2,625,000.00
III PEKERJAAN INSTALASI FIRE ALARM -
A Lantai 2 -
Pekerjaan Instalasi dan pemasangan : -
1 - Instalasi kabel NYA 2 x 1,5mm2 + HIC ttk 13.00 409,650.00 5,325,450.00
2 - Pemasangan Smoke detector bh 10.00 1,672,475.00 16,724,750.00
3 - Pemasangan Manual Push Button bh 1.00 1,329,475.00 1,329,475.00
4 - Pemasangan Alarm Bell bh 1.00 982,475.00 982,475.00
5 - Pemasangan Alarm Lamp bh 1.00 2,293,725.00 2,293,725.00
6 - Partial test pekerjaan elektronik ls 1.00 15,000,000.00 15,000,000.00
5 Furniture 398,768,930.00
A Lantai 2
Ruang Paspampres
1 - Kursi 2 seater (refinishing) unit 1.00 4,200,000.00 4,200,000.00
2 - Kursi 1 seater unhandle (refinishing B) unit 2.00 2,100,000.00 4,200,000.00
3 - Meja segi empat 1 (refinishing) unit 1.00 1,500,000.00 1,500,000.00
4 - Meja rias 1 (refinishing) unit 1.00 1,500,000.00 1,500,000.00
5 - Pot tanaman besar unit 1.00 6,000,000.00 6,000,000.00
6 - Meja kecil unit 2.00 12,500,000.00 25,000,000.00
7 - Pot hias unit 2.00 2,500,000.00 5,000,000.00
Ruang Santai
1 - Sofa 2 seater unit 3.00 8,000,000.00 24,000,000.00
2 - Coffee table (100 x 60 x 45 cm) unit 3.00 4,500,000.00 13,500,000.00
3 - Corner table (45 x 45 cm) unit 4.00 2,359,500.00 9,438,000.00
3 - Pot tanaman besar unit 2.00 6,000,000.00 12,000,000.00
4 - Pot hias unit 7.00 2,500,000.00 17,500,000.00
Area Selasar
1 - Sofa 3 seater unit 2.00 11,500,000.00 23,000,000.00
2 - Corner table (50 x 50 cm) unit 4.00 3,200,000.00 12,800,000.00
3 - Kursi 1 seat handle (refinishing B) unit 7.00 2,100,000.00 14,700,000.00
4 - Side table (refinishing) unit 2.00 1,000,000.00 2,000,000.00
5 - Pot hias unit 4.00 2,500,000.00 10,000,000.00
6 - Kursi reception unit 1.00 3,400,000.00 3,400,000.00
Ruang Tamu Presiden
1 - Kursi 3 seater (refinishing A) unit 1.00 6,588,000.00 6,588,000.00
2 - Kursi 1 seat handle (refinishing A) unit 4.00 2,196,000.00 8,784,000.00
3 - Meja bundar (refinishing) unit 1.00 2,500,000.00 2,500,000.00
4 - Corner table (50 x 50 cm) unit 2.00 2,359,500.00 4,719,000.00
Ruang Tidur Presiden
1 - Pekerjaan bed kayu jati finishing politur unit 1.00 21,000,000.00 21,000,000.00
2 - Matras bed ukuran 2000 x 2000 mm, bantal, bed seat set 1.00 78,802,800.00 78,802,800.00
3 - Meja rias (refinishing) unit 1.00 2,000,000.00 2,000,000.00
4 - Living set rotan sintetis set 3.00 6,806,250.00 20,418,750.00
5 - Pekerjaan meja nakas kayu solid finishing politur unit 2.00 3,675,600.00 7,351,200.00
6 - Pekerjaan stool kayu solid + bantalan (refinishing) unit 1.00 1,000,000.00 1,000,000.00
7 - Pekerjaan meja TV kayu solid finishing politur unit 1.00 5,031,180.00 5,031,180.00
8 - Pekerjaan cermin + frame kayu solid finishing politur unit 1.00 3,955,100.00 3,955,100.00
9 - Pekerjaan meja kerja kayu solid finishing politur unit 1.00 5,520,400.00 5,520,400.00
10 - Pekerjaan almari multiplek + HPL unit 1.00 37,077,000.00 37,077,000.00
11 - Pekerjaan box washtafel multiplek top granite unit 1.00 4,283,500.00 4,283,500.00
1,999,025,113.40
6 Pekerjaan Interior
A LANTAI 2
A.1 AREA SELASAR
1 - Pekerjaan railing kayu bengkirai motif pecira m¹ 45.20 4,466,000.00 201,863,200.00
2 - Pekerjaan lis plafon kayu bengkirai finishing politur m¹ 47.93 1,262,800.00 60,526,004.00
A.2 Cover ukiran atap expose -
1 - Pekerjaan lis bagian atas m¹ 28.00 1,632,400.00 45,707,200.00
2 - Pekerjaan ukiran pada atap expose (kayu jatii) m¹ 28.00 5,471,928.00 153,213,984.00
2 - Pekerjaan lis bagian bawah m¹ 28.00 2,858,856.00 80,047,968.00
3 - Cover Panel Listrik Multriplek Finishing HPL Unit 1.00 12,850,000.00 12,850,000.00
A.3 Atap expose -
NO URAIAN PEKERJAAN UNIT VOLUME AKHIR HARGA SATUAN JUMLAH HARGA AKHIR
finishing politur -
14 - Pekerjaan box gorden ukir kayu solid finishing politur unit 1.00 4,281,200.00 4,281,200.00
15 - Pekerjaan backdrop TV multiplek + kayu unit 1.00 36,128,400.00 36,128,400.00
solid finishing politur -
16 - Gorden jendela KJ4 (2.1 x 3.30) Type 1 unit 1.00 9,130,000.00 9,130,000.00
17 - Lampu nakas unit - 625,000.00 -
18 - Frame foto/lukisan kayu jati m² 3.64 1,667,820.00 6,070,864.80
19 - Lukisan tema pewayangan bh 1.00 3,500,000.00 3,500,000.00
20 - Papan signage bh 2.00 500,000.00 1,000,000.00
A.8 RUANG TAMU PRESIDEN -
1 - Lis plafond kayu jati finishing politur m¹ 19.10 1,575,420.00 30,090,522.00
2 - Pekerjaan lis drop celling kayu politur m¹ 13.00 1,025,640.00 13,333,320.00
3 - Pekerjaan plin lantai kayu jati finishing politur m¹ 16.00 540,540.00 8,648,640.00
4 - Pekerjaan wallpaper setara Belagio m² 44.00 323,400.00 14,229,600.00
5 - Lampu gantung chandlelier unit - 15,862,000.00 -
6 - Pekerjaan frame relief multiplek finishing politur unit 1.00 23,312,520.00 23,312,520.00
+ rangka, pasang relief, & service finishing relief -
7 - Pekerjaan frame pintu multiplek unit 1.00 21,436,800.00 21,436,800.00
finishing politur (310 x 250 cm) -
8 - Pekerjaan cover dinding multiplek finishing politur unit 2.00 6,375,600.00 12,751,200.00
(sebelah panel relief) -
9 - Frame foto/lukisan kayu jati m² 3.64 1,667,820.00 6,070,864.80
10 - Lukisan tema pewayangan bh 1.00 3,500,000.00 3,500,000.00
11 - Papan signage bh 1.00 500,000.00 500,000.00
NO URAIAN PEKERJAAN UNIT VOLUME AKHIR HARGA SATUAN JUMLAH HARGA AKHIR
3 Elektrikal 280,174,973.39
I PEKERJAAN PANEL TEGANGAN RENDAH :
Pekerjaan Pemasangan : -
1 - PP - VVIP 2 Unit 1.00 22,984,000.00 22,984,000.00
2 - Sekring box 12 group Unit 7,500,000.00
II PEKERJAAN KABEL FEEDER : -
Pekerjaan penarikan kabel feeder dari LVMDP ke : -
1 - Dari SDP PP.VVIP ke PP - VVIP 2 kabel NYFGbY 4x10mm2 + NYA 1x6mm2 m' 57.00 124,513.00 7,097,241.00
2 - Dari PP - UPS ke PP - PP-VVIP2 kabel NYY 4x25mm2 + NYA 1x16mm2 m' 57.00 295,949.50 16,869,121.50
3 - NYA 1x6mm2 m' 57.00 38,175.00 2,175,975.00
4 - NYA 1x16mm2 m' 57.00 61,385.00 3,498,945.00
5 - Galian tanah utk parit kabel m' 57.00 89,227.07 5,085,942.89
III PEKERJAAN INSTALASI PENERANGAN : -
Pemasangan dan instalasi penerangan, stop kontak dan lampu termasuk
1 - -
koneksi ke kabel instalasi, gantungan dan semua alat bantu yg diperlukan.
2 - Pemasangan Lampu Downlight LED E-27 15w-220V bh - 718,750.00 -
3 - Pemasangan Lampu Downlight LED E-27 15w-220V (Emergency) bh - 1,666,750.00 -
4 - Pemasangan Lampu TKO TL LED 2x36w-220V+NB ( Emergency) bh - 1,968,598.00 -
5 - Pemasangan Lampu T5 8w - 220V bh - 324,398.00 -
6 - Pemasangan Lampu Downlight LED E-27 10w-220V bh - 278,250.00 -
7 - Pemasangan Lampu Spot Tanam 10w-220V (power dgn timer di panel) bh - 214,310.00 -
8 - Pemasangan Lampu Spot Light LED 8w-220V bh - 1,287,550.00 -
9 - Pemasangan Lampu Gantung 50w-220V bh 1.00 10,299,050.00 10,299,050.00
10 - Pemasangan Lampu Exit bh 3.00 1,402,310.00 4,206,930.00
11 - Pemasangan Stop Kontak 10A-220V bh 12.00 70,450.00 845,400.00
12 - Pemasangan Stop Kontak Lantai 10A-220V bh 8.00 740,800.00 5,926,400.00
13 - Pemasangan Stop Kontak Shaver 10A-220V bh 2.00 737,550.00 1,475,100.00
14 - Pemasangan Stop Kontak AC 16A-220V bh - 100,700.00 -
15 - Pemasangan Exhaust Fan tipe ceiling 80CM/H Daya 11w-220V bh 4.00 1,312,750.00 5,251,000.00
16 - Pemasangan Hand Dryer bh 2.00 5,950,000.00 11,900,000.00
17 - Instalasi penerangan lampu, NYM 3 x 2,5 mm2 in HIC 20 mm2 ttk 61.00 323,510.00 19,734,110.00
18 - Instalasi stop kontak, NYM 3 x 2,5 mm2 in HIC 20 mm2 ttk 22.00 378,260.00 8,321,720.00
19 - Instalasi AC, NYM 3 x 2,5 mm2 in HIC 20 mm2 ttk 3.00 510,310.00 1,530,930.00
20 - Instalasi Exhaust Fan, NYM 3 x 2,5 mm2 in HIC 20 mm2 ttk 4.00 323,510.00 1,294,040.00
21 - Instalasi Hand dryer, NYM 3 x 2,5 mm2 in HIC 20 mm2 ttk 2.00 378,260.00 756,520.00
22 - Pengadaan Lampu Downlight DN 291B 1xDLED-4000 PSU WH bh 30.00 718,750.00 21,562,500.00
23 - Pengadaan Lampu Downlight DN 291B 1xDLED-4000 PSU WH + emergency Bat bh 1.00 1,983,750.00 1,983,750.00
24 - Lampu Kolom Spot BGO 310 6 x LED HP/WW 220-240V bh 23.00 1,873,750.00 43,096,250.00
25 - Lampu Strip Smart LED Flexible cover G4 + Dimer bh 52.00 1,178,550.00 61,284,600.00
26 Pemasangan Lampu Downlight Essential 15w-220V bh 178,000.00
IV PEKERJAAN GROUNDING : -
NO URAIAN PEKERJAAN UNIT VOLUME AKHIR HARGA SATUAN JUMLAH HARGA AKHIR
5 Furniture 113,776,000.00
1 - Pekerjaan meja counter multiplek + top granite unit 1.00 25,000,000.00 25,000,000.00
2 - Pekerjaan cofee table ukir unit 2.00 8,600,000.00 17,200,000.00
3 - Kursi tunggu (refinishing B) unit 5.00 1,650,000.00 8,250,000.00
4 - Sofa 1 seater ukir (refinishing B) unit 12.00 1,650,000.00 19,800,000.00
5 - Sofa 2 seater ukir (refinishing B) unit 2.00 3,300,000.00 6,600,000.00
6 - Sofa 3 seater ukir (refinishing A) unit 2.00 6,588,000.00 13,176,000.00
7 - Kursi 1 seater receptionis unit 1.00 1,750,000.00 1,750,000.00
8 - Meja rapat kayu jati ukir (refinishing) unit 8.00 2,000,000.00 16,000,000.00
9 - Pot tanaman besar unit 4.00 1,500,000.00 6,000,000.00
10 - Meja pot unit 4.00 12,500,000.00 50,000,000.00
11 - Pot hias unit 3.00 1,000,000.00 3,000,000.00
6 INTERIOR 758,418,134.40
I AREA LOBBY
1 Pekerjaan plin lantai kayu bengkirai finishing politur m¹ 25.80 620,000.00 15,996,000.00
2 Pekerjaan lis plafon kayu bengkirai finishing politur m¹ 34.35 1,262,800.00 43,377,180.00
3 Pekerjaan plafond lambersiring -
- Pekerjaan rangka plafond (usuk 4/6) m² 20.60 425,040.00 8,755,824.00
- Pekerjaan papan lambersiring m² 20.60 711,480.00 14,656,488.00
- Pekerjaan finishing politur lambersiring m² 20.60 246,400.00 5,075,840.00
4 Pekerjaan wallpaper setara Belagio m² 81.14 323,400.00 26,240,676.00
5 Lampu gantung chandlelier unit 1.00 35,000,000.00 35,000,000.00
6 Pekerjaan frame relief kayu jati + rangka, pasang relief unit 1.00 65,000,000.00 65,000,000.00
& service finishing relief -
7 Pekerjaan frame jendela kayu bengkirai kombinasi m¹ 15.60 2,500,000.00 39,000,000.00
multiplek finishing politur -
8 Pekerjaan box wastafel unit 2.00 4,720,100.00 9,440,200.00
9 Pekerjaan cermin wastafel unit 2.00 2,186,800.00 4,373,600.00
10 Gorden jendela J2 (1.2 x 2.57) Type 1 set 2.00 4,700,000.00 9,400,000.00
11 Papan signage bh 5.00 1,500,000.00 7,500,000.00
12 Cover Panel Listrik Multriplek Finish HPL Unit 2.00 17,650,000.00 35,300,000.00
II RUANG RAPAT A & B -
1 Pekerjaan plin lantai kayu bengkirai finishing politur m¹ 74.40 620,000.00 46,128,000.00
2 Pekerjaan lis plafon kayu bengkirai finishing politur m¹ 85.60 1,262,800.00 108,095,680.00
3 Pekerjaan wallpaper setara Belagio m² 129.76 323,400.00 41,964,384.00
4 Pekerjaan plafond lambersiring -
- Pekerjaan rangka plafond (usuk 4/6) m² 33.72 425,040.00 14,332,348.80
- Pekerjaan papan lambersiring m² 33.72 711,480.00 23,991,105.60
- Pekerjaan finishing politur lambersiring m² 33.72 246,400.00 8,308,608.00
5 Lampu gantung chandlelier unit 2.00 15,862,000.00 31,724,000.00
NO URAIAN PEKERJAAN UNIT VOLUME AKHIR HARGA SATUAN JUMLAH HARGA AKHIR
2 Kusen dan daun pintu swing+ventilasi sz. 800x2150 mm (P2) unit 2.00 -
- Kusen finish politur unit 2.00 2,500,007.35 5,000,014.70
- Daun pintu finish politur unit 2.00 4,799,570.56 9,599,141.12
- Engsel Set 3.00 168,463.60 505,390.80
- Lockcase bh 2.00 244,220.00 488,440.00
- Cylinder bh 2.00 264,406.00 528,812.00
- Handle pintu Set 2.00 572,516.00 1,145,032.00
- Escutheon bh 4.00 91,846.00 367,384.00
3 Kusen dan daun jendela kaca mati sz. 1800x1200 mm (J1) unit 2.00 -
- Kusen finish politur unit 2.00 2,941,185.12 5,882,370.24
- Pasang kaca t 8 mm m2 4.32 319,763.60 1,381,378.75
X Pekerjaan pengecatan dan polituran -
1 - Cat interior ICI M2 114.78 40,464.40 4,644,604.99
2 - Cat plafond ICI M2 53.10 40,464.40 2,148,659.64
3 - Cat list plafond ICI M1 32.46 40,464.40 1,313,474.42
4 - Polituran plafond lambresering (grantangan) M2 73.32 82,324.00 6,036,292.05
5 - Polituran plafond lambersering M2 0.90 82,324.00 74,091.60
6 - Polituran list kayu M1 26.80 41,162.00 1,103,141.60
7 - Polituran usuk kayu expose jarak 50 cm M1 146.65 41,162.00 6,036,292.05
8 - Polituran Listplank 25/150 mm M1 134.64 41,162.00 5,542,051.68
9 - Polituran List ring ukir 25/150 mm M1 47.20 41,162.00 1,942,846.40
10 - Polituran List Tatab 25/150 mm M1 94.40 41,162.00 3,885,692.80
11 - Polituran Papan tutup balok 20x200 mm M1 30.00 41,162.00 1,234,860.00
12 - Polituran List penutup ujung usuk 20/60 mm M1 102.64 41,162.00 4,224,867.68
XI Pekerjaan sanitair -
A Sanitary Ware & Fitting -
1 - Closet Duduk ex. TOTO Avante CW 823 NJ + TX 403 SECR unit 2.00 10,445,465.00 20,890,930.00
NO URAIAN PEKERJAAN UNIT VOLUME AKHIR HARGA SATUAN JUMLAH HARGA AKHIR
3 Elektrikal 174,202,280.80
I PEKERJAAN PANEL TEGANGAN RENDAH :
Pekerjaan Pemasangan : -
1 - - Sekring box 12 group Unit 7,500,000.00
2 - PP - R. RAPAT Unit 1.00 22,984,000.00 22,984,000.00
II PEKERJAAN KABEL FEEDER : -
Pekerjaan penarikan kabel feeder dari LVMDP ke : -
1 - Dari SDP PP.VVIP ke PP - R.RAPAT kabel NYFGbY 4x6mm2 m' 63.00 124,513.00 7,844,319.00
2 - Dari PP - UPS ke PP - PP-R.RAPAT kabel NYY 4x25mm2 m' 63.00 295,949.50 18,644,818.50
3 - NYA 1x6mm2 m' 63.00 38,175.00 2,405,025.00
4 - NYA 1x16mm2 m' 63.00 61,385.00 3,867,255.00
5 - Galian tanah utk parit kabel m' 63.00 89,227.07 5,621,305.30
III PEKERJAAN INSTALASI PENERANGAN : -
Pemasangan dan instalasi penerangan, stop kontak dan lampu termasuk
- -
koneksi ke kabel instalasi, gantungan dan semua alat bantu yg diperlukan.
1
2 - Pemasangan Lampu Downlight LED E-27 15w-220V bh - 718,750.00 -
3 - Pemasangan Lampu TKO TL LED 2x36w-220V+NB ( Emergency) bh - 1,968,598.00 -
4 - Pemasangan Lampu T5 8w - 220V bh - 324,398.00 -
5 - Pemasangan Lampu Downlight LED E-27 10w-220V bh - 278,250.00 -
6 - Pemasangan Lampu Spot Tanam 10w-220V (power dgn timer di panel) bh - 214,310.00 -
7 - Pemasangan Lampu Exit bh 1.00 1,402,310.00 1,402,310.00
8 - Pemasangan Stop Kontak 10A-220V bh 4.00 70,450.00 281,800.00
9 - Pemasangan Stop Kontak Lantai 10A-220V bh 3.00 740,800.00 2,222,400.00
10 - Pemasangan Stop Kontak Shaver 10A-220V bh 1.00 737,550.00 737,550.00
11 - Pemasangan Stop Kontak AC 16A-220V bh - 100,700.00 -
12 - Pemasangan Exhaust Fan tipe ceiling 80CM/H Daya 11w-220V bh 2.00 1,312,750.00 2,625,500.00
13 - Pemasangan Hand Dryer bh 2.00 5,950,000.00 11,900,000.00
14 - Instalasi penerangan lampu, NYM 3 x 2,5 mm2 in HIC 20 mm2 ttk 28.00 323,510.00 9,058,280.00
15 - Instalasi stop kontak, NYM 3 x 2,5 mm2 in HIC 20 mm2 ttk 8.00 378,260.00 3,026,080.00
16 - Instalasi stop kontak AC, NYM 3 x 2,5 mm2 in HIC 20 mm2 ttk - 510,310.00 -
17 - Instalasi Exhaust Fan, NYM 3 x 2,5 mm2 in HIC 20 mm2 ttk 2.00 323,510.00 647,020.00
18 - Instalasi Hand dryer, NYM 3 x 2,5 mm2 in HIC 20 mm2 ttk 2.00 378,260.00 756,520.00
19 - Pengadaan Lampu Downlight DN 291B 1xDLED-4000 PSU WH bh 16.00 718,750.00 11,500,000.00
20 - Pengadaan Lampu Downlight DN 291B 1xDLED-4000 PSU WH + Emergency bat bh 1.00 1,983,750.00 1,983,750.00
21 - Lampu Kolom Spot BGO 310 6 x LED HP/WW 220-240V bh 12.00 1,873,750.00 22,485,000.00
22 - Lampu Strip Smart LED Flexible cover G4 + Dimer bh 18.00 1,178,550.00 21,213,900.00
23 - Pemasangan Lampu Downlight Essential 15w-220V bh 178,000.00
IV PEKERJAAN GROUNDING : -
NO URAIAN PEKERJAAN UNIT VOLUME AKHIR HARGA SATUAN JUMLAH HARGA AKHIR
Penarikan kabel Fire Alarm 2 x STP AWG #18 + HIC + kabel FRC 2 x 2,5 mm2
- m' 68.00 153,254.00 10,421,272.00
+ HIC dr R. Tunggu Sopir
2
3 - Pengadaan kabel FRC 2 x 2,5 mm2 m' 68.00 70,626.50 4,802,602.00
4 - Instalasi kabel fire alarm NYA 2 x 1,5mm2 + HIC ttk 4.00 409,650.00 1,638,600.00
5 - Pemasangan Smoke detector bh 1.00 1,672,475.00 1,672,475.00
6 - Pemasangan Manual Push Button bh 1.00 1,329,475.00 1,329,475.00
7 - Pemasangan Alarm Bell bh 1.00 982,475.00 982,475.00
8 - Pemasangan Alarm Lamp bh 1.00 2,293,725.00 2,293,725.00
9 - Partial test pekerjaan elektronik ls 1.00 15,000,000.00 15,000,000.00
5 Furniture 63,890,920.00
1 - Sofa 1 seater ukir (refinishing B) unit 10.00 1,650,000.00 16,500,000.00
2 - Meja rapat kayu jati ukir unit 1.00 37,328,560.00 37,328,560.00
3 - Corner table unit 3.00 3,354,120.00 10,062,360.00
4 - Pot hias unit 3.00 1,000,000.00 3,000,000.00
6 INTERIOR 196,074,021.60
1 Pekerjaan plin lantai kayu bengkirai finishing politur m¹ 24.60 620,000.00 15,252,000.00
2 Pekerjaan lis plafon kayu bengkirai finishing politur m¹ 26.19 1,262,800.00 33,072,732.00
3 Pekerjaan wallpaper m² 85.50 323,400.00 27,650,700.00
4 Pekerjaan plafond lambersiring -
- Pekerjaan rangka plafond (usuk 4/6) m² 9.47 425,040.00 4,025,128.80
- Pekerjaan papan lambersiring m² 9.47 711,480.00 6,737,715.60
- Pekerjaan finishing politur lambersiring m² 9.47 246,400.00 2,333,408.00
5 Lampu gantung chandlelier unit 1.00 15,862,000.00 15,862,000.00
6 Pekerjaan frame jendela kayu bengkirai kombinasi m1 28.80 1,416,800.00 40,803,840.00
multiplek finishing politur (2 unit) -
7 Pekerjaan cover pintu ulap-ulap bagian dalam unit 1.00 14,876,400.00 14,876,400.00
multiplek finishing politur -
8 Pekerjaan box wastafel unit 2.00 4,720,100.00 9,440,200.00
9 Pekerjaan cermin wastafel unit 2.00 2,186,800.00 4,373,600.00
10 Gorden jendela J1 (1.8 x 2.57) Type 1 set 2.00 6,270,000.00 12,540,000.00
11 Frame foto/lukisan kayu jati m² 5.46 1,667,820.00 9,106,297.20
12 Lukisan tema pewayangan bh 1.00 3,500,000.00 3,500,000.00
13 Papan signage bh 4.00 500,000.00 2,000,000.00
3 Elektrikal 125,338,500.73
I PEKERJAAN PANEL TEGANGAN RENDAH :
Pekerjaan Pemasangan : -
1 - - Sekring box 12 group Unit 7,500,000.00
2 - PP - SECURITY CHECK Unit 1.00 18,010,250.00 18,010,250.00
II PEKERJAAN KABEL FEEDER : -
Pekerjaan penarikan kabel feeder dari LVMDP ke : -
1 - Dari SDP PP.VVIP ke PP - SECURITY CHECK kabel NYFGbY 4x10mm2 + NYA 1x m' 40.00 124,513.00 4,980,520.00
2 - Dari PP - UPS ke PP - PP-SECURITY CHECK kabel NYY 4x25mm2 + NYA 1x16mm m' 40.00 295,949.50 11,837,980.00
3 - NYA 1x6mm2 m' 40.00 38,175.00 1,527,000.00
4 - NYA 1x16mm2 m' 40.00 61,385.00 2,455,400.00
5 - Galian tanah utk parit kabel m' 40.00 89,227.07 3,569,082.73
III PEKERJAAN INSTALASI PENERANGAN : -
Pemasangan dan instalasi penerangan, stop kontak dan lampu termasuk
-
koneksi ke kabel instalasi, gantungan dan semua alat bantu yg diperlukan.
1 - Pemasangan Lampu Downlight LED E-27 15w-220V bh - 718,750.00 -
2 - Pemasangan Lampu TKO TL LED 2x36w-220V+NB ( Emergency) bh - 1,968,598.00 -
3 - Pemasangan Lampu T5 8w - 220V bh - 324,398.00 -
4 - Pemasangan Lampu Spot Tanam 10w-220V (power dgn timer di panel) bh - 214,310.00 -
5 - Pemasangan Stop Kontak 10A-220V bh 6.00 70,450.00 422,700.00
6 - Pemasangan Stop Kontak AC 16A-220V bh - 100,700.00 -
7 - Pemasangan Stop Kontak Lantai bh 2.00 740,800.00 1,481,600.00
8 - Instalasi penerangan lampu, NYM 3 x 2,5 mm2 in HIC 20 mm2 ttk 18.00 323,510.00 5,823,180.00
9 - Instalasi stop kontak, NYM 3 x 2,5 mm2 in HIC 20 mm2 ttk 8.00 378,260.00 3,026,080.00
10 - Instalasi AC, NYM 3 x 2,5 mm2 in HIC 20 mm2 ttk 1.00 510,310.00 510,310.00
11 - Pengadaan Lampu Downlight LED E-27 15w-220V bh 10.00 718,750.00 7,187,500.00
Pengadaan Lampu Downlight DN 291B 1xDLED-4000 PSU WH + Emergency
12 - bh 1.00 1,983,750.00 1,983,750.00
battery
13 - Lampu Kolom Spot BGO 310 6 x LED HP/WW 220-240V bh 6.00 1,873,750.00 11,242,500.00
14 - Lampu Strip Smart LED Flexible cover G4 + Dimer bh 24.00 1,178,550.00 28,285,200.00
15 - Pemasangan Lampu Downlight Essential 15w-220V bh 178,000.00
IV PEKERJAAN GROUNDING -
4 Elektronika 283,252,034.30
I PEKERJAAN INSTALASI DATA (INTERNET, ETHERNET, WIFI&IP CAMERA)
Pekerjaan Instalasi dan pemasangan : -
1 - Pemasangan Data Rack unt 1.00 15,998,500.00 15,998,500.00
2 - Pemasangan Manageble Switch Hub 16 Port unt 0.00 14,343,000.00 -
3 - Pemasangan UPS Back Up 1200 VA unt 1.00 6,905,000.00 6,905,000.00
4 - Penarikan kabel feeder FO SM 4 Core + HIC dr R Tunggu supir m' 69.00 69,824.50 4,817,890.50
5 - Instalasi kabel Data UTP CAT 6A + HIC 20mm ttk 8.00 425,230.00 3,401,840.00
6 - Pemasangan Fixed IP camera PoE unt 2.00 6,941,400.00 13,882,800.00
7 - Pemasangan Dome IP camera PoE unt 2.00 6,939,675.00 13,879,350.00
8 - Pemasangan outlet data tipe dinding bh 2.00 243,900.00 487,800.00
9 - Pemasangan Acces Point (WIFI) unt 1.00 11,466,565.00 11,466,565.00
10 - Pemasangan IP Phone unt 1.00 261,502.00 261,502.00
11 - Pemasangan Master Clock unt 0.00 43,047,000.00 -
NO URAIAN PEKERJAAN UNIT VOLUME AKHIR HARGA SATUAN JUMLAH HARGA AKHIR
Switch Cisco WS-C2960-24T-S, 24Port GigE PoE 370WIP Base 4x1G SFP LAN
12 - Base, Include SmartNet SNTC8x5xNBD, Cisco Catalyst 3850-24 Port PoE IP unit 1.00 48,410,156.80 48,410,156.80
Base
13 - Cisco Catalayst 3850 4x1GE Network Modul bh 1.00 5,435,000.00 5,435,000.00
14 - 715W AC Confiq 1 Secondary Power Supply bh 1.00 19,312,400.00 19,312,400.00
15 - Catalyst Stack Power Cable 30CM bh 1.00 1,412,200.00 1,412,200.00
16 - 50CM Type Stacking Cable bh 1.00 1,412,200.00 1,412,200.00
17 - Cisco 1000Base-LX/LH SFP Transceiver, GLC-LH-SMD bh 1.00 14,366,000.00 14,366,000.00
II PEKERJAAN INSTALASI TELEPON -
Pekerjaan Instalasi dan pemasangan : -
Penarikan kabel telepon Jelly Filled Armoured 2 Pairs x 0,6 mm2 + HIC dr R
1 - m' 150.00 54,522.50 8,178,375.00
Tunggu Sopir
2 - Instalasi kabel telepon UTP CAT 6A + HIC ttk 0.00 425,230.00 -
3 - Pemasangan outlet telepon tipe dinding bh 1.00 188,400.00 188,400.00
4 - Pemasangan pesawat telpon bh 1.00 525,000.00 525,000.00
III PEKERJAAN INSTALASI FIRE ALARM -
Pekerjaan Instalasi dan pemasangan : -
1 - Pemasangan Box Panel TB.FA #4 dgn Powder Coating IP.55 unt 1.00 5,464,450.00 5,464,450.00
2 - Pemasangan Annunciator unt 1.00 11,719,950.00 11,719,950.00
Penarikan kabel Fire Alarm 2 x STP AWG #18 + HIC + kabel FRC 2 x 2,5 mm2
3 - m' 70.00 82,627.50 5,783,925.00
+ HIC dr R. Tunggu Sopir
Penarikan kabel Annunciator 2 x kabel RS 485 + HIC + 2 x STP AWG #18 +
4 - m' 70.00 70,626.50 4,943,855.00
HIC dr R. Tunggu Sopir
5 - Instalasi kabel NYA 2 x 1,5mm2 + HIC ttk 5.00 409,650.00 2,048,250.00
6 - Pemasangan Smoke detector bh 2.00 1,672,475.00 3,344,950.00
7 - Pemasangan Manual Push Button bh 1.00 1,329,475.00 1,329,475.00
8 - Pemasangan Alarm Bell bh 1.00 982,475.00 982,475.00
9 - Pemasangan Alarm Lamp bh 1.00 2,293,725.00 2,293,725.00
10 - Partial test pekerjaan elektronik ls 1.00 15,000,000.00 15,000,000.00
5 Furniture
6 INTERIOR 323,159,555.00
1 - Pekerjaan plin lantai kayu bengkirai finishing politur m¹ 24.96 460,460.00 11,493,081.60
2 - Pekerjaan lis plafon kayu bengkirai finishing politur m¹ 34.06 1,262,800.00 43,010,968.00
3 - Pekerjaan lis drop ceilling kayu bengkirai profil m¹ 55.39 412,720.00 22,860,560.80
finishing politur (kecil) -
4 - Pekerjaan lis drop ceilling kayu bengkirai profil m¹ 54.99 833,140.00 45,814,368.60
finishing politur (besar) -
5 - Pekerjaan plafond panel ukiran kayu bengkirai unit 1.00 20,425,020.00 20,425,020.00
finishing politur (5850 x 520 mm) -
6 - Pekerjaan wallpaper setara Belagio m² 81.14 323,400.00 26,240,676.00
7 - Pekerjaan cover pintu ulap-ulap bagian dalam unit 1.00 14,876,400.00 14,876,400.00
multiplek finishing politur -
8 - Pekerjaan background & dudukan patung multiplek unit 2.00 7,392,000.00 14,784,000.00
kombinasi panel ukiran finishing politur -
9 - Pekerjaan frame jendela kayu bengkirai kombinasi m¹ 33.60 1,416,800.00 47,604,480.00
multiplek finishing politur -
10 - Gorden jendela J1 (1.8 x 2.57) Type 2 set 4.00 3,712,500.00 14,850,000.00
11 - Patung set 2.00 15,000,000.00 30,000,000.00
12 - Pot Hias set 4.00 1,550,000.00 6,200,000.00
13 - Frame foto/lukisan kayu jati Unit 4.00 2,500,000.00 10,000,000.00
14 - Lukisan tema pewayangan bh 1.00 3,500,000.00 3,500,000.00
15 - Papan signage bh 2.00 1,500,000.00 3,000,000.00
16 - Cover Panel Listrik Multriplek Finish HPL Unit 1.00 16,980,000.00 16,980,000.00
3 Elektrikal 313,978,758.30
BANGUNAN RUANG TUNGGU SUPIR
I PEKERJAAN PANEL TEGANGAN RENDAH :
Pekerjaan Pemasangan : -
1 - Sekring box 12 group Unit 7,500,000.00
2 - PP - R. TUNGGU SOPIR Unit 1.00 9,759,000.00 9,759,000.00
II PEKERJAAN KABEL FEEDER : -
Pekerjaan penarikan kabel feeder dari LVMDP ke : -
- Dari SDP PP.VVIP ke PP - R.TUNGGU SOPIR kabel NYFGbY 4x10mm2 + NYA m' 136.00 295,949.50 40,249,132.00
- NYA 1x6mm2 m' 136.00 38,175.00 5,191,800.00
- Galian tanah utk parit kabel m' 136.00 89,227.07 12,134,881.29
III PEKERJAAN INSTALASI PENERANGAN : -
4 Elektronika 463,221,597.30
BANGUNAN RUANG TUNGGU SUPIR
I PEKERJAAN INSTALASI DATA (INTERNET, ETHERNET, WIFI&IP CAMERA)
Pekerjaan Instalasi dan pemasangan : -
1 - Pengadaan Data Rack unt 2.00 15,998,500.00 31,997,000.00
2 - Pengadaan Manageble Switch Hub 48 Port unit 0.00 22,468,000.00 -
3 - Pemasangan UPS Back Up 2000 VA unt 1.00 7,655,000.00 7,655,000.00
4 - Pemasangan PC server + monitor LCD 24" + keyboard unt 1.00 11,756,425.00 11,756,425.00
5 - Pemasangan NVR netwok video recorder unt 1.00 23,130,500.00 23,130,500.00
6 - Penarikan kabel feeder FO SM 12 Core + HIC dr Utilitas Cargo Domestik m' 56.00 106,665.00 5,973,240.00
7 - Instalasi kabel Data UTP CAT 6A + HIC 20mm ttk 7.00 425,230.00 2,976,610.00
8 - Pemasangan Fixed IP camera PoE unt 3.00 6,941,400.00 20,824,200.00
9 - Pemasangan outlet data tipe dinding bh 2.00 188,400.00 376,800.00
10 - Pemasangan Acces Point (WIFI) unt 1.00 243,900.00 243,900.00
11 - Pemasangan Outlet IP TV unt 1.00 243,900.00 243,900.00
Switch Cisco WS-C2960X-24P-S, 24Port GigE PoE IP Base370 W 4x1G SFP
12 - LAN Base, Include SmartNet SNTC8x5xNBD, Cisco Catalyst 3850-24 Port PoE unt 1.00 48,410,156.80 48,410,156.80
IP Base
NO URAIAN PEKERJAAN UNIT VOLUME AKHIR HARGA SATUAN JUMLAH HARGA AKHIR
Switch Cisco WS-C3850-24T-S, 24Port GigE IP Base 4x1G SFP LAN Base,
13 - Include SmartNet SNTC8x5xNBD, Cisco Catalyst 3850-24 Port PoE IP Base unt 1.00 83,161,000.00 83,161,000.00
( Non PoE )
14 - Cisco Catalayst 3850 4x1GE Network Modul bh 1.00 5,435,000.00 5,435,000.00
15 - 715W AC Confiq 1 Secondary Power Supply bh 1.00 19,312,400.00 19,312,400.00
16 - Catalyst Stack Power Cable 30CM bh 1.00 1,412,200.00 1,412,200.00
17 - 50CM Type Stacking Cable bh 1.00 1,412,200.00 1,412,200.00
18 - Cisco 1000Base-LX/LH SFP Transceiver, GLC-LH-SMD bh 5.00 14,366,000.00 71,830,000.00
II PEKERJAAN INSTALASI TELEPON -
Pekerjaan Instalasi dan pemasangan : -
1 - Pemasangan Box Panel Telepon dgn Powder Coating IP.55, LSA 60 Pairs unt 1.00 1,083,100.00 1,083,100.00
Penarikan kabel telepon Jelly Filled Armoured 40 Pairs x 0,6 mm2 + HIC dr
2 - m' 57.00 165,721.50 9,446,125.50
Utilitas Cargo Domestik
3 - Instalasi kabel telepon ITC 2x0.6 mm + HIC ttk 1.00 411,480.00 411,480.00
4 - Pemasangan outlet telepon tipe dinding bh 1.00 188,400.00 188,400.00
5 - Pemasangan pesawat telpon Analog bh 1.00 525,000.00 525,000.00
III PEKERJAAN INSTALASI FIRE ALARM -
Pekerjaan Instalasi dan pemasangan : -
1 - Pemasangan Box Panel MDF dgn Powder Coating IP.55 100 Pairs unt 1.00 8,481,250.00 8,481,250.00
2 - Pemasangan Master Control Fire Alarm (MCFA) tipe full addresable 2 zone unt 1.00 51,729,950.00 51,729,950.00
3 - Grounding max 1 Ohm dg kabel BC 16 mm2 unt 1.00 3,730,750.00 3,730,750.00
4 - Partial test pekerjaan elektronik ls 1.00 15,000,000.00 15,000,000.00
BANGUNAN POS JAGA -
I PEKERJAAN INSTALASI TELEPON -
Pekerjaan Instalasi dan pemasangan : -
Penarikan kabel telepon Jelly Filled Armoured 2 Pairs x 0,6 mm2 + HIC dr R
1 - m' 276.00 54,522.50 15,048,210.00
Tunggu Sopir
2 - Pemasangan outlet telepon tipe dinding bh 2.00 188,400.00 376,800.00
3 - Pemasangan pesawat telpon bh 2.00 525,000.00 1,050,000.00
4 - Partial test pekerjaan elektronik ls 2.00 10,000,000.00 20,000,000.00
5 Furniture -
I BANGUNAN POS JAGA
1 - Sofa 3 seater unit - 7,500,000.00 -
2 - Meja unit - 5,000,000.00 -
6 INTERIOR 13,230,140.00
I BANGUNAN RUANG TUNGGU SUPIR
1 - Pekerjaan cermin wastafel unit 2.00 2,646,028.00 5,292,056.00
2 - Papan signage bh 3.00 2,646,028.00 7,938,084.00
IV PANGGUNG TERBUKA -
1 Pek. Panggung dan anak tangga M2 199.30 1,187,500.00 236,668,750.00
G Taman Dalam
* termasuk pekerjaan mekanikal dan elektrikal (penerangan pelataran)*
1 Landscape (Hard scape + Soft scape) 487,189,948.80
I PEKERJAAN HARD SCAPE
1 Pekerjaan pasangan Batu Andesit bakar ( Area Pedestrian ) m2 44,554,948.80
129.00 345,387.20
2 Pekerjaan Water flow taman dalam unit 1.00 10,725,000.00 10,725,000.00
II PEKERJAAN SOFT SCAPE -
A PENANAMAN POHON & PALEM -
1 - Kelapa Gading TK. 3.5 m phn 8.00 1,500,000.00 12,000,000.00
2 - Mahoni TK. 1.5 m phn 12.00 900,000.00 10,800,000.00
3 - Kamboja Bali TK. 3 m phn 12.00 2,340,000.00 28,080,000.00
4 - Sawo Kecik TK. 1,5 m phn 12.00 1,320,000.00 15,840,000.00
5 - Ketapang Kencana TK. 1,5 m phn 15.00 1,380,000.00 20,700,000.00
6 - Cempaka TK. 1,5 m phn 7.00 900,000.00 6,300,000.00
7 - Majegau TK. 1,5 m phn 10.00 1,320,000.00 13,200,000.00
8 - Palm merah TK. 1,5 m phn 10.00 1,110,000.00 11,100,000.00
9 - Matoa TK. 1,5 m phn 8.00 1,500,000.00 12,000,000.00
10 - Bambu Kuning TK. 2 m phn 60.00 420,000.00 25,200,000.00
B PENANAMAN SEMAK, GROUNDCOVER -
1 - Arachis pintoi (Kacang-kacangan) TK. 10cm plb 1,200.00 6,000.00 7,200,000.00
2 - Calathea lutea (Pisang Mangkok) TK.60cm plb 75.00 72,000.00 5,400,000.00
3 - Crinum asiaticum (Bakung Daun Lebar) TK.40cm plb 200.00 36,000.00 7,200,000.00
4 - Heliconia Psittacorum ( Pisang pisangan ) TK.50cm plb 200.00 30,000.00 6,000,000.00
5 - Hymenocallis littoralis (Spider Lily) TK.30cm plb 300.00 12,000.00 3,600,000.00
6 - Neomarica longifolia (Bunga Iris) TK.30cm plb 250.00 15,000.00 3,750,000.00
7 - Ophiopogon Jaburan (Jaburan) TK.30cm plb 250.00 12,000.00 3,000,000.00
8 - Syzygium oleana ( Pucuk merah ) TK. 100 cm plb 25.00 228,000.00 5,700,000.00
9 - Karimbosa TK. 30 cm plb 350.00 27,000.00 9,450,000.00
10 - Codiaeum variaegatum ( Puring ) TK. 25 cm plb 200.00 42,600.00 8,520,000.00
11 - Rumput Jepang Kerapatan 75 % m2 835.00 54,000.00 45,090,000.00
12 - Cuphea hyssopifolia (Taiwan Beauty ) TK 20 cm plb 800.00 15,000.00 12,000,000.00
13 - Karimbusa Mini TK 20 cm plb 250.00 30,000.00 7,500,000.00
14 - Colifa ( Brokoli ) TK 20 cm plb 150.00 33,000.00 4,950,000.00
15 - Pisang Bali Atau Pisang Belut Plb 75.00 96,000.00 7,200,000.00
16 - Kenanga TK 50cm Plb 20.00 150,000.00 3,000,000.00
17 - Pacing TK 40 cm Plb 300.00 30,000.00 9,000,000.00
18 - Sirih Belanda Pjg 20 cm Plb 200.00 46,200.00 9,240,000.00
19 - Analys Atau Bayam Merah Pjg 20 cm Plb 500.00 12,000.00 6,000,000.00
C PERAWATAN
1 Perawatan per bulan bln 12.00 7,500,000.00 90,000,000.00
- Pemangkasan
- Pemotongan
- Pemupukan
- Penyemprotan penanggulangan hama
- Tenaga kerja
D TANAH SUBUR & PUPUK
1 - Tanah subur truk 15.00 950,000.00 14,250,000.00
2 - Pupuk Organik zak 180.00 48,000.00 8,640,000.00
H Landscape Candi Bentar Landside, Tembok Penyengker dan Taman Sisi Luar
H.1. Candi Bentar dan Pagar Tembok Penyengker Style Bali
1 - Pagar Tembok Penyengker Style Bali M' 352.79 4,518,810,807.91
2 - Candi Bentar Unit 2.00 1,051,688,320.15
I Pekerjaan Pagar Stil Bali
A Pagar diatas tanah
1 Pasang bowplank m 223.59 69,361.00 15,508,634.07
2 Galian tanah m3 197.21 86,040.00 16,967,864.60
3 Urugan kembali dipadatkan m3 26.83 52,600.00 1,411,319.02
4 Pembuangan sisa tanah m3 170.38 30,300.00 5,162,449.34
5 Urugan pasir m3 7.83 273,720.00 2,142,065.66
6 Pas. Pondasi batu kali m3 190.05 922,260.00 175,279,248.15
7 Plesteran batu kali m2 100.80 63,165.92 6,367,124.74
8 Pek. Kolom praktis 200x200 mm -
- Pembesian kg 1,146.00 19,701.40 22,577,779.18
- Beton K250 m3 11.32 1,591,420.00 18,017,420.67
9 Pek. Kolom praktis 150x150 mm -
- Pembesian kg 1,540.35 19,701.40 30,347,046.76
- Beton K250 m3 9.84 1,591,420.00 15,659,095.37
10 Pek. Kolom praktis 150x200 mm -
- Pembesian kg 549.04 19,701.40 10,816,856.66
- Beton K250 m3 2.55 1,591,420.00 4,058,121.00
11 Pek. Sloof 150x200 mm -
- Pembesian kg 846.50 19,701.40 16,677,186.32
- Beton K250 m3 6.71 1,591,420.00 10,674,911.16
12 Pek. Ring balok 150x150 mm -
- Pembesian kg 787.56 19,701.40 15,516,104.01
- Beton K250 m3 5.03 1,591,420.00 8,006,183.37
13 Pek. Beton isian/pengresek m3 59.03 1,006,079.29 59,387,403.43
NO URAIAN PEKERJAAN UNIT VOLUME AKHIR HARGA SATUAN JUMLAH HARGA AKHIR
1 - Pekerjaan pasangan Batu Candi (area gelung kori ) Tebal 2.5 cm m2 68,431,845.35
239.66 285,537.20
2 - Pekerjaan pembuatan Kolam unit 1.00 52,000,000.00 52,000,000.00
3 - Pekerjaan pembuatan Air Mancur unit 1.00 19,500,000.00 19,500,000.00
4 - Pedestal Patung Tinggi 0,6 m unit 6.00 4,550,000.00 27,300,000.00
5 - Patung Style Bali Tinggi 1.7 m proporsional unit 6.00 22,750,000.00 136,500,000.00
II PEKERJAAN MEP
NO URAIAN PEKERJAAN UNIT VOLUME AKHIR HARGA SATUAN JUMLAH HARGA AKHIR
VI Pemasangan pagar BRC perimeter antara VVIP dengan Air Side (Explo C M 353,750,632.68
1 - Pasang bowplank M1 225.74 69,361.00 15,657,552.14
2 - Galian tanah M3 199.10 86,040.00 17,130,794.59
3 - Urugan kembali dipadatkan M3 27.09 52,600.00 1,424,870.88
4 - Pembuangan sisa tanah M3 172.01 30,300.00 5,212,020.56
5 - Urugan pasir M3 7.90 273,720.00 2,162,634.35
6 - Pas. Pondasi batu kali M3 191.88 922,260.00 176,962,326.54
7 - Pek. Plesteran muka pondasi M2 388.27 63,165.92 24,525,608.62
8 - Pas. Tiang pagar BRC T. 1.900 mm Bh 98.00 326,000.00 31,948,000.00
9 - Pas. Pagar BRC T. 1200 mm M1 225.74 348,750.00 78,726,825.00
VII Pekerjaan Pintu Gerbang masuk & keluar Unt 2.00 33,000,000.00 66,000,000.00
II Pekerjaan Pondasi -
1 Pek. Pondasi plat P1 sz 2000x2000x300mm, Pembesian B:D13-160 : T:ø10-160 -
- Lantai kerja T = 5 cm M3 6.05 1,006,079.29 6,086,779.68
- Bekisting M2 60.00 153,792.54 9,227,552.40
- Pembesian Kg 2,669.51 19,701.40 52,593,163.12
- Beton K-250 M3 30.00 1,395,820.00 41,874,600.00
2 Pek. Pondasi plat P2 sz 1000x1000x300mm, Pembesian B:D13-200 : T:ø10-200 -
- Lantai kerja T = 5 cm M3 - 1,006,079.29 -
- Bekisting M2 - 153,792.54 -
- Pembesian Kg - 19,701.40 -
- Beton K-250 M3 - 1,395,820.00 -
2 Pek. Pondasi plat P3 sz 1000x1000x300mm, Pembesian B:D13-200 : T:ø10-200 -
- Lantai kerja T = 5 cm M3 0.07 1,006,079.29 72,437.71
- Bekisting M2 1.20 153,792.54 184,551.05
- Pembesian Kg 27.09 19,701.40 533,734.57
- Beton K-250 M3 0.30 1,395,820.00 418,746.00
3 Pek. Kolom Pondasi K1 sz 450x450x2.800 mm, Pembesian 16D13 - ø8-150 -
- Bekisting M2 45.36 383,185.00 17,381,271.60
- Pembesian Kg 645.52 19,701.40 12,717,639.85
- Beton K-250 M3 5.10 1,395,820.00 7,122,869.46
Pek. Kolom Pondasi K2 sz 250x250x1.200 mm, Pembesian 6D13 - ø8-150 -
- Bekisting M2 - 383,185.00 -
- Pembesian Kg - 19,701.40 -
- Beton K-250 M3 - 1,395,820.00 -
4 Pek. Kolom Pondasi K3 sz 400x400x2.800 mm, Pembesian 14D13 - ø8-150 -
- Bekisting M2 71.68 383,185.00 27,466,700.80
- Pembesian Kg 1,003.83 19,701.40 19,776,769.68
- Beton K-250 M3 7.17 1,395,820.00 10,005,237.76
5 Pek. Kolom Pondasi K4 sz 200x300x2.300 mm, Pembesian 6D13 - ø8-150 -
- Bekisting M2 4.60 383,185.00 1,762,651.00
- Pembesian Kg 50.84 19,701.40 1,001,707.44
- Beton K-250 M3 0.28 1,395,820.00 385,246.32
6 Pondasi batu kali (Di atas perkerasan) -
- Pasangan Batu Kali M3 34.56 922,260.00 31,873,305.60
III Pekerjaan Struktur Beton -
A Lantai 1 -
1 Pek. Beton Sloof S1 + BK 200x400 mm, Pembesian 4D13 - ø8-150 -
- Bekisting M2 76.80 203,035.00 15,593,088.00
- Pembesian Kg 648.64 19,701.40 12,779,177.17
- Beton K - 250 M3 7.68 1,591,420.00 12,222,105.60
2 Pek. Beton Sloof S1 200x400 mm, Pembesian 4D13 - ø8-150 -
- Lantai kerja t = 5 cm M3 2.14 1,006,079.29 2,148,230.79
- Bekisting M2 113.88 203,035.00 23,121,625.80
- Pembesian Kg 961.24 19,701.40 18,937,815.11
- Beton K - 250 M3 11.39 1,591,420.00 18,123,090.96
3 Pek. Beton Sloof S2 200x300 mm, Pembesian 4D10 - ø8-100 -
- Lantai kerja t = 5 cm M3 1.04 1,006,079.29 1,041,292.06
- Bekisting M2 33.12 203,035.00 6,724,519.20
- Pembesian Kg 361.53 19,701.40 7,122,623.50
- Beton K - 250 M3 2.48 1,591,420.00 3,953,087.28
4 Plat Lantai t = 10 cm (wiremesh M-5 1 lapis) -
- Lantai kerja t = 5 cm M3 28.32 1,006,079.29 28,492,165.37
- Wiremesh M-5 M2 566.40 66,912.83 37,899,426.30
- Beton K - 250 M3 56.64 1,591,420.00 90,138,028.80
5 Pek. Beton dinding beda level dr. +6,60 ke +7,20 di G. Angkutan -
- Bekisting M2 15.60 422,190.00 6,586,164.00
- Pembesian Kg 95.54 19,701.40 1,882,248.11
- Beton K - 250 M3 0.78 1,591,420.00 1,241,307.60
6 Pek. Beton Kolom K1 sz 450x450 mm, Pembesian 16D13 - ø8-150 -
- Bekisting M2 71.28 383,185.00 27,313,426.80
- Pembesian Kg 834.97 19,701.40 16,450,052.35
- Beton K - 250 M3 8.02 1,591,420.00 12,761,596.98
Pek. Beton Kolom K2 sz 250x250 mm, Pembesian 6D13 - ø8-150 -
- Bekisting M2 - 383,185.00 -
- Pembesian Kg - 19,701.40 -
- Beton K - 250 M3 - 1,591,420.00 -
7 Pek. Beton Kolom K3 sz 400x400 mm, Pembesian 14D13 - ø8-150 -
- Bekisting M2 112.64 383,185.00 43,161,958.40
- Pembesian Kg 1,298.35 19,701.40 25,579,320.57
- Beton K - 250 M3 11.26 1,591,420.00 17,925,754.88
8 Pek. Beton Kolom K4 sz 200x300 mm, Pembesian 6D13 - ø8-150 -
- Bekisting M2 11.20 383,185.00 4,291,672.00
- Pembesian Kg 91.98 19,701.40 1,812,144.62
- Beton K - 250 M3 0.67 1,591,420.00 1,069,434.24
9 Balok Latei 100x150, Pembesian 4ø12 - ø8-200 -
- Bekisting M2 28.68 386,862.00 11,095,202.16
- Pembesian Kg 415.25 19,701.40 8,181,069.39
NO URAIAN PEKERJAAN UNIT VOLUME AKHIR HARGA SATUAN JUMLAH HARGA AKHIR
B Lantai 2 -
1 Pek. Beton Balok B1 250x500 mm, Pembesian T:9D13-ø10-100 ; L:6D13+2ø10-ø10-150 -
- Bekisting M2 120.00 386,862.00 46,423,440.00
- Pembesian Kg 1,417.52 19,701.40 27,927,078.09
- Beton K - 250 M3 12.00 1,591,420.00 19,097,040.00
2 Pek. Beton Balok B2 250x500 mm, Pembesian 8D13-ø10-100 -
- Bekisting M2 90.00 386,862.00 34,817,580.00
- Pembesian Kg 1,170.18 19,701.40 23,054,281.97
- Beton K - 250 M3 9.00 1,591,420.00 14,322,780.00
3 Pek. Beton Balok B3 250x500 mm, Pembesian T:9D13-ø10-100 ; L:6D13+2ø10-ø10-150 -
- Bekisting M2 75.00 386,862.00 29,014,650.00
- Pembesian Kg 981.02 19,701.40 19,327,383.89
- Beton K - 250 M3 7.50 1,591,420.00 11,935,650.00
4 Pek. Beton Balok B5 200x400 mm, Pembesian T:6D13-ø10-100 ; L:4D13+-ø10-100 -
- Bekisting M2 84.00 386,862.00 32,496,408.00
- Pembesian Kg 946.58 19,701.40 18,648,932.69
- Beton K - 250 M3 6.72 1,591,420.00 10,694,342.40
5 Pek. Beton Balok B6 200x300 mm, Pembesian T:5D13-ø8-100 ; L:4D13+-ø8-100 -
- Bekisting M2 17.52 386,862.00 6,777,822.24
- Pembesian Kg 170.57 19,701.40 3,360,460.90
- Beton K - 250 M3 1.31 1,591,420.00 2,091,125.88
Pek. Beton Balok B7 200x300 mm, Pembesian 4D13-ø8-100 -
- Bekisting M2 - 386,862.00 -
- Pembesian Kg - 19,701.40 -
- Beton K - 250 M3 - 1,591,420.00 -
6 Pek. Beton Plat Lantai t = 120 mm, Pembesian M8 2 Layer -
- Bekisting M2 514.13 519,485.00 267,080,225.63
- Wiremesh M-8 M2 1,028.25 136,303.04 140,153,601.46
- Beton K - 250 M3 61.70 1,591,420.00 98,182,656.90
7 Pek. Beton Plat Atap t = 100 mm Pembesian M6-2 Layer -
- Bekisting M2 26.40 519,485.00 13,714,404.00
- Wiremesh M-8 Kg 52.80 136,303.04 7,196,800.54
- Beton K - 250 M3 2.64 1,591,420.00 4,201,348.80
8 Pek. Beton Kolom K3 sz 300x300 mm, Pembesian 8D13-ø8-150 -
- Bekisting M2 112.64 383,185.00 43,161,958.40
- Pembesian Kg 1,289.63 19,701.40 25,407,492.84
- Beton K - 250 M3 11.26 1,591,420.00 17,925,754.88
9 Pek. Beton Balok Ring 250x400 mm, Pembesian T:6D13-ø8-150 ; L:5D13+-ø8-150 -
- Bekisting M2 100.80 386,862.00 38,995,689.60
- Pembesian Kg 824.15 19,701.40 16,236,999.44
- Beton K - 250 M3 9.60 1,591,420.00 15,277,632.00
10 Balok ring balk praktis 100x200, Pembesian 4ø12 - ø8-200 -
- Bekisting M2 61.16 386,862.00 23,660,479.92
- Pembesian Kg 694.39 19,701.40 13,680,372.40
- Beton K - 175 M3 3.06 1,206,681.43 3,690,031.81
11 Balok Latei 100x150, Pembesian 4ø12 - ø8-200 -
- Bekisting M2 24.81 386,862.00 9,598,046.22
- Pembesian Kg 359.32 19,701.40 7,079,114.93
- Beton K - 175 M3 1.24 1,206,681.43 1,496,888.31
12 Kolom praktis 100x130, Pembesian 4ø12 - ø8-200 -
- Bekisting M2 110.97 383,185.00 42,521,273.08
- Pembesian Kg 1,819.59 19,701.40 35,848,482.25
- Beton K -175 M3 5.55 1,206,681.43 6,695,151.24
IV Pekerjaan pasangan dan plesteran -
A Lantai 1 -
1 - Pasangan Bata Ringan M2 816.93 202,289.99 165,257,045.97
2 - Plesteran M2 1,445.43 80,198.70 115,921,430.50
3 - Plesteran Batu Kali M2 67.20 63,165.92 4,244,749.82
4 - Acian M2 1,300.18 38,350.00 49,861,818.63
5 - Pek. Meja dapur sz. 650x(3160+700) mm tebal 100 mm Unit 1.00 1,846,650.92 1,846,650.92
6 - Pek. Trap Tangga Pintu Masuk M3 7.83 922,260.00 7,222,494.74
B Lantai 2 -
1 - Pasangan Bata Ringan M2 875.29 202,289.99 177,062,669.64
2 - Plesteran M2 1,638.06 80,198.70 131,370,090.05
NO URAIAN PEKERJAAN UNIT VOLUME AKHIR HARGA SATUAN JUMLAH HARGA AKHIR
- Daun pintu frame aluminium + Sprendell uk. 700x2100 mm bh 12.00 1,993,458.77 23,921,505.22
- Engsel pintu set 12.00 168,463.60 2,021,563.20
- Kunci pintu & handle unit 12.00 745,672.00 8,948,064.00
5 Kusen dan daun pintu swing shaft PS1 sz.400x1300 mm unit 1.00 -
- Kusen aluminium 4" Powder coating m' 3.00 164,633.60 493,900.80
- Daun pintu frame aluminium + HPL uk. 300x1250 mm bh 1.00 283,613.53 283,613.53
- Engsel pintu set 1.00 168,463.60 168,463.60
- Kunci pintu & handle unit 1.00 745,672.00 745,672.00
6 Kusen dan daun jendela kaca J1 sz. 900x1500 mm unit 3.00 -
3 Elektrikal 963,883,619.88
I PEKERJAAN PANEL TEGANGAN RENDAH :
Pekerjaan Pengadaan dan pemasangan termasuk asesoris
Pekerjaan Pemasangan : -
1 - Sekring box 12 group Unit 7,500,000.00
2 - SDP - BOL Unit 1.00 32,830,875.00 32,830,875.00
3 - PP - BOL1 Unit 1.00 16,982,437.50 16,982,437.50
4 - PP - BOL2 Unit 1.00 16,982,437.50 16,982,437.50
5 - PP - OD Unit 1.00 15,925,875.00 15,925,875.00
II PEKERJAAN KABEL FEEDER : -
Pekerjaan pengadaan & penarikan kabel feede dari LVMDP ke : -
Pekerjaan Pemasangan : -
1 - Dari SS New ke SDP BOL kabel NYFGbY 4x120mm2 m' 360.00 1,334,506.00 480,422,160.00
2 - Dari SDP BOL ke PP - BOL1 kabel NYY 4x16mm2 m' 9.00 223,308.50 2,009,776.50
3 - Dari SDP BOL ke PP - BOL2 kabel NYY 4x16mm2 m' 24.00 223,308.50 5,359,404.00
4 - Dari SDP BOL ke PP - OD kabel NYFGbY 4x6mm2 m' 52.00 112,080.00 5,828,160.00
5 - NYA 1x6mm2 m' 52.00 38,175.00 1,985,100.00
6 - NYA 1x10mm2 m' 33.00 44,335.00 1,463,055.00
7 - NYA 1x70mm2 m' 360.00 165,335.00 59,520,600.00
8 - Galian tanah utk parit kabel feeder m' 445.00 89,227.07 39,706,045.38
III PEKERJAAN INSTALASI PENERANGAN : -
A Lantai 1 -
IV PEKERJAAN GROUNDING : -
4 Elektronika 430,655,706.80
I PEKERJAAN INSTALASI DATA (INTERNET, ETHERNET, WIFI&IP CAMERA)
A Lantai 1
Pekerjaan Instalasi dan pemasangan : -
1 - Pemasangan Data Rack unt 1.00 15,998,500.00 15,998,500.00
2 - Pemasangan Manageble Switch Hub 24 Port unt 0.00 42,595,000.00 -
3 - Pemasangan UPS Back Up 2000 VA unt 1.00 7,655,000.00 7,655,000.00
4 - Pemasangan monitor LCD 24" unt 1.00 11,756,425.00 11,756,425.00
5 - Pemasangan Decoder unt 1.00 23,130,500.00 23,130,500.00
6 - Penarikan kabel feeder FO SM 12 Core dr Utilitas Base Ops existing m' 340.00 106,665.00 36,266,100.00
7 - Penarikan kabel Data UTP CAT 6A + HIC 20mm ttk 10.00 425,230.00 4,252,300.00
8 - Penarikan kabel RG 6 Coaxial + HIC 20 mm ttk 9.00 600,000.00 5,400,000.00
9 - Penarikan Kabel Power CCTV NYM 3 x 1.5 + HIC 20 mm ttk 9.00 500,000.00 4,500,000.00
10 - Pemasangan Fixed camera unt 4.00 6,941,400.00 27,765,600.00
11 - Pemasangan Dome camera unt 5.00 6,939,675.00 34,698,375.00
12 - Pemasangan outlet data tipe dinding bh 6.00 243,900.00 1,463,400.00
13 - Pemasangan Acces Point (WIFI) unt 0.00 11,466,565.00 -
Switch Cisco WS-C2960-24T-S, 24Port GigE PoE 370WIP Base 4x1G SFP LAN
14 - Base, Include SmartNet SNTC8x5xNBD, Cisco Catalyst 3850-24 Port PoE IP unit 1.00 48,410,156.80 48,410,156.80
Base
15 - Cisco Catalayst 3850 4x1GE Network Modul bh 1.00 5,435,000.00 5,435,000.00
16 - 715W AC Confiq 1 Secondary Power Supply bh 1.00 19,312,400.00 19,312,400.00
17 - Catalyst Stack Power Cable 30CM bh 1.00 1,412,200.00 1,412,200.00
18 - 50CM Type Stacking Cable bh 1.00 1,412,200.00 1,412,200.00
19 - Cisco 1000Base-LX/LH SFP Transceiver, GLC-LH-SMD bh 1.00 14,366,000.00 14,366,000.00
B Lantai 2 -
Pekerjaan Instalasi dan pemasangan : -
1 - Instalasi kabel Data UTP CAT 6A + HIC 20mm ttk 7.00 425,230.00 2,976,610.00
2 - Penarikan kabel RG 6 Coaxial + HIC 20 mm ttk 0.00 600,000.00 -
3 - Penarikan Kabel Power CCTV NYM 3 x 1.5 + HIC 20 mm ttk 0.00 500,000.00 -
4 - Pemasangan Dome camera unt 2.00 6,939,675.00 13,879,350.00
5 - Pemasangan outlet data tipe dinding bh 7.00 243,900.00 1,707,300.00
6 - Pemasangan Acces Point (WIFI) unt 0.00 11,466,565.00 -
II PEKERJAAN INSTALASI TELEPON -
A Lantai 1 -
Pekerjaan Instalasi dan pemasangan : -
1 - Pemasangan Box Panel Telepon dgn Powder Coating IP.55, LSA 80 Pairs unt 1.00 1,976,850.00 1,976,850.00
2 - Pemasangan PABX 10 Direct Line + Extention Unit 1.00 132,000,000.00 132,000,000.00
3 - Penarikan kabel feeder UGTC 40 Pairs x 0,6mm2+HIC 20mm dr Utilitas Base Op m' 0.00 165,721.50 -
4 - Instalasi kabel telepon ITC 2 Pairs x 0,6mm2+HIC 20mm ttk 9.00 411,480.00 3,703,320.00
5 - Pemasangan outlet telepon tipe dinding bh 9.00 188,400.00 1,695,600.00
B Lantai 2 -
Pekerjaan Instalasi dan pemasangan : -
1 - Instalasi kabel telepon ITC 2 Pairs x 0,6mm2+HIC 20mm ttk 7.00 411,480.00 2,880,360.00
2 - Pemasangan outlet telepon tipe dinding bh 7.00 188,400.00 1,318,800.00
3 - Partial test pekerjaan elektronik ls 1.00 5,283,360.00 5,283,360.00
B.2 Canopy
1 Sipil + Arsitek 492,302,955.42
I Pekerjaan tanah
1 - Galian pondasi plat P2 M3 23.04 86,040.00 1,982,361.60
2 - Urugan tanah kembali M3 12.12 52,600.00 637,617.20
3 - Urugan tanah peninggian lantai dan Pemadatan M3 22.08 255,320.00 5,637,465.60
4 - Urugan limestone peninggian lantai dan Pemadatan M3 22.33 379,580.00 8,475,262.24
5 - Pasir urug di bawah pondasi, t = 10cm M3 2.30 273,720.00 630,650.88
6 - Pasir urug di bawah Plat Lantai, t = 10cm M2 10.96 273,720.00 2,999,971.20
II Pekerjaan Pondasi -
1 Pek. Pondasi plat P2 sz 1000x1000x300mm, Pembesian B:D13-200 : T:ø10-200 -
- Lantai kerja T = 5 cm M3 1.15 1,006,079.29 1,159,003.34
- Bekisting M2 19.20 153,792.54 2,952,816.77
- Pembesian Kg 433.46 19,701.40 8,539,753.08
- Beton K-250 M3 4.80 1,395,820.00 6,699,936.00
2 Pek. Kolom Pondasi K2 sz 250x250x1.200 mm, Pembesian 6D13 - ø8-150 -
- Bekisting M2 19.20 383,185.00 7,357,152.00
- Pembesian Kg 227.60 19,701.40 4,484,051.25
- Beton K-250 M3 1.20 1,395,820.00 1,674,984.00
3 Pek. Beton Sloof S1 200x400 mm, Pembesian 4D13 - ø8-150 -
- Lantai kerja t = 5 cm M3 1.33 1,006,079.29 1,340,097.61
- Bekisting M2 71.04 203,035.00 14,423,606.40
- Pembesian Kg 600.02 19,701.40 11,821,310.86
NO URAIAN PEKERJAAN UNIT VOLUME AKHIR HARGA SATUAN JUMLAH HARGA AKHIR
IV Pekerjaan Atap -
1 - Pek. Rangka atap / kuda-kuda baja ringan M2 168.00 292,717.57 49,176,552.35
2 - Pas. Listplank 2x 25/200 mm M1 80.00 325,280.00 26,022,400.00
3 - Pas. List ring 25/100 mm M1 80.00 161,336.00 12,906,880.00
4 - Pas. List Tatab 25/120 mm M1 80.00 161,336.00 12,906,880.00
5 - Pas. Genteng Jatiwangi M2 237.44 206,511.00 49,033,971.84
6 - Pas. Bubungan genteng Jatiwangi M1 57.52 234,334.50 13,478,920.44
7 - Pas. Murda Bh 4.00 545,584.00 2,182,336.00
8 - Pas. Ikut celedu Bh 8.00 620,584.00 4,964,672.00
V Pekerjaan plafond -
1 - Plafond Gypsum WR 9 mm + rangka metal furing M2 168.00 253,164.75 42,531,678.00
2 - List Plafond Gypsum M1 208.00 50,716.00 10,548,928.00
VI Pekerjaan pengecatan dan polituran -
1 - Cat plafond ICI M2 168.00 40,464.40 6,798,019.20
2 - Cat list plafond ICI M2 208.00 40,464.40 8,416,595.20
3 - Polituran List Plank Atap M1 80.00 41,162.00 3,292,960.00
4 - Polituran List Ring Atap M1 80.00 41,162.00 3,292,960.00
5 - Polituran List Tatab M1 80.00 41,162.00 3,292,960.00
3 Elektrikal 210,433,093.80
I PEKERJAAN PANEL TEGANGAN RENDAH :
Pekerjaan Pengadaan dan pemasangan termasuk asesoris
Pekerjaan Pemasangan : -
1 - Sekring box 12 group unit 7,500,000.00
2 - PP - SHL1 Unit 1.00 15,473,062.50 15,473,062.50
3 - PP - SHL2 Unit 1.00 15,473,062.50 15,473,062.50
II PEKERJAAN KABEL FEEDER : -
Pekerjaan pengadaan & penarikan kabel feede dari LVMDP ke : -
Pekerjaan Pemasangan : -
1 - Dari SDP BOL ke PP - SHL1 kabel NYFGbY 4x10mm2 m' 119.00 147,788.00 17,586,772.00
2 - Dari SDP BOL ke PP - SHL2 kabel NYFGbY 4x10mm2 m' 127.00 147,788.00 18,769,076.00
3 - NYA 1x10mm2 m' 246.00 44,335.00 10,906,410.00
4 - Galian tanah utk parit kabel feeder m' 246.00 89,227.07 21,949,858.80
III PEKERJAAN INSTALASI PENERANGAN : -
A Lantai 1 -
10 - Instalasi penerangan lampu, NYM 3 x 2,5 mm2 in HIC 20 mm2 ttk 33.00 323,510.00 10,675,830.00
11 - Instalasi stop kontak, NYM 3 x 2,5 mm2 in HIC 20 mm2 ttk 17.00 378,260.00 6,430,420.00
12 - Instalasi Exhaust Fan, NYM 3 x 2,5 mm2 in HIC 20 mm2 ttk 5.00 323,510.00 1,617,550.00
IV PEKERJAAN GROUNDING : -
Pengadaan dan Pemasangan Grounding Untuk Panel Tegangan Rendah
1 - Unit 2.00 3,730,750.00 7,461,500.00
Mengikuti Spesifikasi Teknis agar Mencapai ≤ 2 Ohm
2 - Grounding Box 40 x 40 x 40 cm Unit 2.00 764,698.00 1,529,396.00
3 - Pengurusan lisensi dari pihak terkait (sertifikat) Unit 2.00 3,500,000.00 7,000,000.00
4 - Partial test pekerjaan listrik ls 1.00 4,469,610.00 4,469,610.00
4 Elektronika 165,857,833.50
I PEKERJAAN INSTALASI DATA (INTERNET, ETHERNET, WIFI&IP CAMERA)
A Lantai 1
Pekerjaan Instalasi dan pemasangan : -
1 - Pemasangan Data Rack unt 1.00 15,998,500.00 15,998,500.00
2 - Pemasangan Manageble Switch Hub 8 Port unt 1.00 11,093,000.00 11,093,000.00
3 - Pemasangan UPS Back Up 1200 VA unt 1.00 6,905,000.00 6,905,000.00
4 - Penarikan kabel feeder FO SM 4 Core dr Base Ops m' 88.00 69,824.50 6,144,556.00
5 - Instalasi kabel Data UTP CAT 6A + HIC 20mm ttk 1.00 425,230.00 425,230.00
6 - Penarikan kabel RG 6 Coaxial + HIC 20 mm ttk 4.00 600,000.00 2,400,000.00
7 - Penarikan Kabel Power CCTV NYM 3 x 1.5 + HIC 20 mm ttk 4.00 500,000.00 2,000,000.00
8 - Pemasangan Fixed camera unt 5.00 6,941,400.00 34,707,000.00
9 - Pemasangan Dome camera unt 5.00 6,939,675.00 34,698,375.00
10 - Pemasangan outlet data tipe dinding bh 0.00 243,900.00 -
11 - Pemasangan Acces Point (WIFI) unt 0.00 11,466,565.00 -
B Lantai 2 -
Pekerjaan Instalasi dan pemasangan : -
1 - Instalasi kabel Data UTP CAT 6A + HIC 20mm ttk 5.00 425,230.00 2,126,150.00
2 - Penarikan kabel RG 6 Coaxial + HIC 20 mm ttk 2.00 600,000.00 1,200,000.00
3 - Penarikan Kabel Power CCTV NYM 3 x 1.5 + HIC 20 mm ttk 2.00 500,000.00 1,000,000.00
4 - Pemasangan Dome camera unt 2.00 6,939,675.00 13,879,350.00
5 - Pemasangan outlet data tipe dinding bh 5.00 243,900.00 1,219,500.00
6 - Pemasangan Acces Point (WIFI) unt 0.00 11,466,565.00 -
II PEKERJAAN INSTALASI TELEPON -
A Lantai 1 -
Pekerjaan Instalasi dan pemasangan : -
1 - Pemasangan Box Panel Telepon dgn Powder Coating IP.55, LSA 20 Pairs unt 0.00 920,600.00 -
2 - Penarikan kabel feeder UGTC 10 Pairs x 0,6mm2+HIC 20mm dr Base Ops m' 0.00 51,772.50 -
3 - Instalasi kabel telepon ITC 2 Pairs x 0,6mm2+HIC 20mm ttk 1.00 411,480.00 411,480.00
4 - Pemasangan outlet telepon tipe dinding bh 1.00 188,400.00 188,400.00
B Lantai 2 -
Pekerjaan Instalasi dan pemasangan : -
1 - Instalasi kabel telepon ITC 2 Pairs x 0,6mm2+HIC 20mm ttk 4.00 411,480.00 1,645,920.00
2 - Pemasangan outlet telepon tipe dinding bh 4.00 188,400.00 753,600.00
III PEKERJAAN INSTALASI TV -
Pekerjaan Instalasi dan pemasangan : -
1 - Pemasangan TV Booster unt 1.00 1,995,230.00 1,995,230.00
2 - Penarikan kabel feeder 2 x Coaxial RG - 11 + HIC dr Infrastruktur Base Ops exi m' 0.00 53,147.50 -
3 - Pemasangan TB TV Safe House splitter 3 way unt 1.00 288,980.00 288,980.00
4 - Penarikan kabel tv Coaxial 5C (RG - 6) + HIC 20mm m' 45.00 51,772.50 2,329,762.50
5 - Pemasangan outlet tv tipe dinding bh 2.00 198,900.00 397,800.00
6 - Partial test pekerjaan elektronik ls 1.00 24,050,000.00 24,050,000.00
H Pembersihan Lahan
1 - Pembersihan Lahan M2 1,166.67 30,000.00 35,000,000.00
I Pekerjaan Lain-lain
1 Pekerjaan Jembatan 332,145,441.14
1 - Pemasangan pagar perimeter m2 50.00 433,757.00 21,687,850.00
2 - Pembongkaran trotoar m2 54.00 125,000.00 6,750,000.00
3 - Galian Tanah Pondasi m3 27.00 86,040.00 2,322,914.80
4 - Pasangan batu kosong m3 10.12 520,980.00 5,274,547.39
5 - Beton lantai kerja m3 1.69 1,006,079.29 1,697,638.07
6 - Pekejaan Beton Pondasi 1000x400 mm m3 11.25 1,628,980.00 18,324,721.82
7 - Pekerjaan Besi Beton Pondasi 14D16/D13-150 kg 1,386.91 19,701.40 27,324,120.69
8 - Pekerjaan bekisting pondasi m2 22.50 153,792.54 3,460,086.08
9 - Pekerjaan Beton balok 300x900mm m3 7.59 1,628,980.00 12,369,187.23
10 - Pekerjaan Besi Beton balok 16D16/d10-150 kg 1,042.27 19,701.40 20,534,210.49
11 - Pekerjaan bekisting balok m2 43.59 386,862.00 16,863,566.04
12 - Pekerjaan Beton balok 300x500mm m3 5.42 1,628,980.00 8,831,189.27
13 - Lantai kerja m2 1.41 1,006,079.29 1,414,698.39
14 - Pekerjaan Besi Beton balok 12D16/d10-150 kg 855.02 19,701.40 16,845,077.16
15 - Pekerjaan bekisting balok m2 18.07 386,862.00 6,990,983.20
16 - Pekerjaan Beton balok 200x350mm m3 0.98 1,628,980.00 1,603,413.16
17 - Pekerjaan Besi Beton balok 7D16/d10-150 kg 187.27 19,701.40 3,689,562.94
18 - Pekerjaan bekisting balok m2 2.81 386,862.00 1,087,972.00
19 - Pekerjaan Lantai Beton 250mm m3 17.93 1,628,980.00 29,205,025.39
20 - Pekerjaan Besi Beton Lantai D13-150 2 layer kg 2,366.05 19,701.40 46,614,511.56
21 - Pekerjaan bekisting lantai m2 71.71 519,485.00 37,254,165.47
22 - Pekerjaan Railing Jembatan m1 28.00 1,500,000.00 42,000,000.00
5,157,000,000.00
370 587 607 590 590
NO URAIAN
1-Jul 2-Jul 3-Jul 4-Jul 5-Jul
I BANGUNAN VVIP 1
- ARSITEKTUR
- Lantai Marmer
- Tukang 4 4 2 4 4
- Pembantu Tukang 2 2 1 2 2
- Lantai Karpet
- Tukang
- Pembantu Tukang
- Lantai Homogenous Tile
- Tukang 4 3 2 3 3
- Pembantu Tukang 1 1 1 1 1
- Plesteran Dinding
- Tukang 3 3 2 3 3
- Pembantu Tukang 1 1 1 1 1
- Pengecatan Dinding
- Tukang
- Pembantu Tukang
- Wallpaper Dinding
- Tukang 3 4 3 3
- Pembantu Tukang 1 1 1 1
- Bata Palimanan
- Tukang 6 4 6 6
- Pembantu Tukang 4 2 4 4
- Homogenous Tile Dinding
- Tukang 2 6 8 6 6
- Pembantu Tukang 1 4 2 4 4
- Plafond Gypsum
- Tukang 2 4 8 4 4
- Pembantu Tukang 2 2 2 2 2
- Plafond Lambersering
- Tukang 5 6 7 6 6
- Pembantu Tukang 2 3 3 3 3
- Pas. Genteng, Ikut Celedu dan
Murda
- Tukang 1 2 4 2 2
- Pembantu Tukang 1 2 2 2 2
- INTERIOR
- Fabrikasi
- Tukang 12 19 12 12
- Pembantu Tukang 8 8 8 8
- Pemasangan
- Tukang 8 11 8 8
- Pembantu Tukang 3 3 3 3
- STYLE BALI
- Façade Bangunan
- Tukang 22 26 22 22
- Pembantu Tukang 12 10 12 12
- Ukiran
- Tukang 8 8 8 8
- Pembantu Tukang 4 4 4 4
- MEEP
- Tukang 12 10 12 12
- Pembantu Tukang 8 7 8 8
II BANGUNAN VVIP 2
- ARSITEKTUR
- Lantai Karpet
- Tukang 4 2 4 4
- Pembantu Tukang 2 1 2 2
- Lantai Homogenous Tile
- Tukang 3 6 8 6 6
- Pembantu Tukang 1 2 3 2 2
- Plesteran Dinding
- Tukang 2 4 6 4 4
- Pembantu Tukang 1 2 2 2 2
- Pengecatan Dinding
- Tukang 2 4 8 4 4
- Pembantu Tukang 1 2 2 2 2
- Wallpaper Dinding
- Tukang 3 6 2 6 6
- Pembantu Tukang 1 2 1 2 2
- Bata Palimanan
- Tukang 2 2 2
- Pembantu Tukang 1 1 1
- Homogenous Tile Dinding
- Tukang 2 2 2 2 2
- Pembantu Tukang 1 1 1 1 1
- Plafond Gypsum
- Tukang 4 6 2 6 6
- Pembantu Tukang 1 2 1 2 2
- Plafond Lambersering
- Tukang 4 5 5 5 5
- Pembantu Tukang 2 3 3 3 3
- Pas. Genteng, Ikut Celedu dan
Murda
- Tukang 2 2 2 2
- Pembantu Tukang 1 1 1 1
- INTERIOR
- Fabrikasi
- Tukang 4 5 4 4
- Pembantu Tukang 2 2 2 2
- Pemasangan
- Tukang 5 6 5 5
- Pembantu Tukang 1 1 1 1
- STYLE BALI
- Façade Bangunan
- Tukang 3 5 4 5 5
- Pembantu Tukang 1 2 1 2 2
- Ukiran
- Tukang 2 3 4 3 3
- Pembantu Tukang 1 1 1 1
- MEEP
- Tukang 3 4 4 4 4
- Pembantu Tukang 2 1 1 1 1
X CANDI BENTAR
- PAS. PARAS DAN BATU GOSOK
- Tukang 2 4 4 4 4
- UKIRAN PARAS
- Tukang 2 2 2 2 2
- PATUNG
- Tukang
V BANGUNAN GEDUNG A
- ARSITEKTUR
- Lantai Keramik
- Tukang 2 4 4 4 4
- Pembantu Tukang 1 1 1 1 1
- Plesteran Dinding
- Tukang 2 2 2 2 2
- Pembantu Tukang 1 1 1 1 1
- Pengecatan Dinding
- Tukang 3 3 3 3 3
- Pembantu Tukang 2 2 2 2 2
- Keramik Dinding
- Tukang 3 3 3 3 3
- Pembantu Tukang 1 1 1 1 1
- Plafond Gypsum
- Tukang 3 3 3 3 3
- Pembantu Tukang 2 2 2 2 2
- MEEP
- Tukang 3 3 3 3 3
- Pembantu Tukang 1 1 1 1 1
4 4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2 2
3 3 4 3 3 3 3 3 3 4
1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1
6 6 6 6 6 6 6 6
4 4 4 4 4 4 4 4
6 6 2 6 6 6 6 6 6 2
4 4 1 4 4 4 4 4 4 1
4 4 2 4 4 4 4 4 4 2
2 2 2 2 2 2 2 2 2 2
6 6 5 6 6 6 6 6 6 5
3 3 2 3 3 3 3 3 3 2
2 2 1 2 2 2 2 2 2 1
2 2 1 2 2 2 2 2 2 1
12 12 12 12 12 12 12 12
8 8 8 8 8 8 8 8
8 8 8 8 8 8 8 8
3 3 3 3 3 3 3 3
22 22 22 22 22 22 22 22
12 12 12 12 12 12 12 12
8 8 8 8 8 8 8 8
4 4 4 4 4 4 4 4
12 12 12 12 12 12 12 12
8 8 8 8 8 8 8 8
4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2
6 6 3 6 6 6 6 6 6 3
2 2 1 2 2 2 2 2 2 1
4 4 2 4 4 4 4 4 4 2
2 2 1 2 2 2 2 2 2 1
4 4 2 4 4 4 4 4 4 2
2 2 1 2 2 2 2 2 2 1
6 6 3 6 6 6 6 6 6 3
2 2 1 2 2 2 2 2 2 1
2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
6 6 4 6 6 6 6 6 6 4
2 2 1 2 2 2 2 2 2 1
5 5 4 5 5 5 5 5 5 4
3 3 2 3 3 3 3 3 3 2
2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2
5 5 5 5 5 5 5 5
1 1 1 1 1 1 1 1
5 5 3 5 5 5 5 5 5 3
2 2 1 2 2 2 2 2 2 1
3 3 2 3 3 3 3 3 3 2
1 1 1 1 1 1 1 1
4 4 3 4 4 4 4 4 4 3
1 1 2 1 1 1 1 1 1 2
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
5 5 5 5 5 5 5 5 5 5
2 2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
5 5 5 5 5 5 5 5 5 5
1 1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2 2
5 5 5 5 5 5 5 5 5 5
3 3 3 3 3 3 3 3 3 3
3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1
4 4 2 4 4 4 4 4 4 2
2 2 1 2 2 2 2 2 2 1
3 3 2 3 3 3 3 3 3 2
1 1 1 1 1 1 1 1 1 1
3 3 2 3 3 3 3 3 3 2
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1
3 3 2 3 3 3 3 3 3 2
1 1 1 1 1 1 1 1 1 1
3 3 2 3 3 3 3 3 3 2
1 1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4 4
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
4 4 6 4 4 4 4 4 4 6
2 2 2 2 2 2 2 2 2 2
4 4 5 4 4 4 4 4 4 5
2 2 1 2 2 2 2 2 2 1
3 3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4 4
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1 1
2 2 3 2 2 2 2 2 2 3
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4 4
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
3 3 2 3 3 3 3 3 3 2
1 1 1 1 1 1 1 1 1 1
3 3 2 3 3 3 3 3 3 2
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
3 3 2 3 3 3 3 3 3 2
2 2 1 2 2 2 2 2 2 1
4 4 2 4 4 4 4 4 4 2
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
4 4 2 4 4 4 4 4 4 2
2 2 1 2 2 2 2 2 2 1
2 2
2 2
1 1
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
7 7 7 7 7 7 7 7
4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2
4 4 2 4 4 4 4 4 4 2
2 2 2 2 2 2 2 2 2 2
6 6 4 6 6 6 6 6 6 4
2 2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2
4 4 2 4 4 4 4 4 4 2
2 2 1 2 2 2 2 2 2 1
2 2 2 2 2 2 2 2 2 2
4 4 2 4 4 4 4 4 4 2
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
5 5 4 5 5 5 5 5 5 4
2 2 3 2 2 2 2 2 2 3
2 2 3 2 2 2 2 2 2 3
1 1 2 1 1 1 1 1 1 2
2 2 3 2 2 2 2 2 2 3
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2 2
4 4 5 4 4 4 4 4 4 5
2 2 1 2 2 2 2 2 2 1
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
1 1
2 2
4 4 5 4 4 4 4 4 4 5
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
4 4 3 4 4 4 4 4 4 3
2 2 1 2 2 2 2 2 2 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
3 3 2 3 3 3 3 3 3 2
4 4 2 4 4 4 4 4 4 2
2 2 1 2 2 2 2 2 2 1
3 3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1 1
4 4 2 4 4 4 4 4 4 2
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2 2
590 590 590 590 590 590 370 590 590 590
JULI 2018
16-Jul 17-Jul 18-Jul 19-Jul 20-Jul 21-Jul 22-Jul 23-Jul 24-Jul 25-Jul
4 4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 4 3 3 3
1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1
6 6 6 6 6 6 6 6 6
4 4 4 4 4 4 4 4 4
6 6 6 6 6 6 2 6 6 6
4 4 4 4 4 4 1 4 4 4
4 4 4 4 4 4 2 4 4 4
2 2 2 2 2 2 2 2 2 2
6 6 6 6 6 6 5 6 6 6
3 3 3 3 3 3 2 3 3 3
2 2 2 2 2 2 1 2 2 2
2 2 2 2 2 2 1 2 2 2
12 12 12 12 12 12 12 12 12
8 8 8 8 8 8 8 8 8
8 8 8 8 8 8 8 8 8
3 3 3 3 3 3 3 3 3
22 22 22 22 22 22 22 22 22
12 12 12 12 12 12 12 12 12
8 8 8 8 8 8 8 8 8
4 4 4 4 4 4 4 4 4
12 12 12 12 12 12 12 12 12
8 8 8 8 8 8 8 8 8
4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2
6 6 6 6 6 6 3 6 6 6
2 2 2 2 2 2 1 2 2 2
4 4 4 4 4 4 2 4 4 4
2 2 2 2 2 2 1 2 2 2
4 4 4 4 4 4 2 4 4 4
2 2 2 2 2 2 1 2 2 2
6 6 6 6 6 6 3 6 6 6
2 2 2 2 2 2 1 2 2 2
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
6 6 6 6 6 6 4 6 6 6
2 2 2 2 2 2 1 2 2 2
5 5 5 5 5 5 4 5 5 5
3 3 3 3 3 3 2 3 3 3
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2
5 5 5 5 5 5 5 5 5
1 1 1 1 1 1 1 1 1
5 5 5 5 5 5 3 5 5 5
2 2 2 2 2 2 1 2 2 2
3 3 3 3 3 3 2 3 3 3
1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 3 4 4 4
1 1 1 1 1 1 2 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
5 5 5 5 5 5 5 5 5 5
2 2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
5 5 5 5 5 5 5 5 5 5
1 1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2 2
5 5 5 5 5 5 5 5 5 5
3 3 3 3 3 3 3 3 3 3
3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 2 4 4 4
2 2 2 2 2 2 1 2 2 2
3 3 3 3 3 3 2 3 3 3
1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 2 3 3 3
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 2 3 3 3
1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 2 3 3 3
1 1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4 4
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
4 4 4 4 4 4 6 4 4 4
2 2 2 2 2 2 2 2 2 2
4 4 4 4 4 4 5 4 4 4
2 2 2 2 2 2 1 2 2 2
3 3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4 4
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 3 2 2 2
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4 4
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 2 3 3 3
1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 2 3 3 3
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 2 3 3 3
2 2 2 2 2 2 1 2 2 2
4 4 4 4 4 4 2 4 4 4
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 2 4 4 4
2 2 2 2 2 2 1 2 2 2
2
1
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
7 7 7 7 7 7 7 7 7
4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2
4 4 4 4 4 4 2 4 4 4
2 2 2 2 2 2 2 2 2 2
6 6 6 6 6 6 4 6 6 6
2 2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2
4 4 4 4 4 4 2 4 4 4
2 2 2 2 2 2 1 2 2 2
2 2 2 2 2 2 2 2 2 2
4 4 4 4 4 4 2 4 4 4
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
5 5 5 5 5 5 4 5 5 5
2 2 2 2 2 2 3 2 2 2
2 2 2 2 2 2 3 2 2 2
1 1 1 1 1 1 2 1 1 1
2 2 2 2 2 2 3 2 2 2
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2 2
4 4 4 4 4 4 5 4 4 4
2 2 2 2 2 2 1 2 2 2
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 5 4 4 4
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 3 4 4 4
2 2 2 2 2 2 1 2 2 2
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 2 3 3 3
4 4 4 4 4 4 2 4 4 4
2 2 2 2 2 2 1 2 2 2
3 3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 2 4 4 4
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2 2
590 590 590 370 590 590 590 590 590 590
26-Jul 27-Jul 28-Jul 29-Jul 30-Jul 31-Jul 1-Aug 2-Aug 3-Aug 4-Aug
4 4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2 2
3 3 3 4 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1
6 6 6 6 6 6 6 6 6
4 4 4 4 4 4 4 4 4
6 6 6 2 6 6 6 6 6 6
4 4 4 1 4 4 4 4 4 4
4 4 4 2 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2 2
6 6 6 5 6 6 6 6 6 6
3 3 3 2 3 3 3 3 3 3
2 2 2 1 2 2 2 2 2 2
2 2 2 1 2 2 2 2 2 2
12 12 12 12 12 12 12 12 12
8 8 8 8 8 8 8 8 8
8 8 8 8 8 8 8 8 8
3 3 3 3 3 3 3 3 3
22 22 22 22 22 22 22 22 22
12 12 12 12 12 12 12 12 12
8 8 8 8 8 8 8 8 8
4 4 4 4 4 4 4 4 4
12 12 12 12 12 12 12 12 12
8 8 8 8 8 8 8 8 8
4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2
6 6 6 3 6 6 6 6 6 6
2 2 2 1 2 2 2 2 2 2
4 4 4 2 4 4 4 4 4 4
2 2 2 1 2 2 2 2 2 2
4 4 4 2 4 4 4 4 4 4
2 2 2 1 2 2 2 2 2 2
6 6 6 3 6 6 6 6 6 6
2 2 2 1 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
6 6 6 4 6 6 6 6 6 6
2 2 2 1 2 2 2 2 2 2
5 5 5 4 5 5 5 5 5 5
3 3 3 2 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2
5 5 5 5 5 5 5 5 5
1 1 1 1 1 1 1 1 1
5 5 5 3 5 5 5 5 5 5
2 2 2 1 2 2 2 2 2 2
3 3 3 2 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1
4 4 4 3 4 4 4 4 4 4
1 1 1 2 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
5 5 5 5 5 5 5 5 5 5
2 2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
5 5 5 5 5 5 5 5 5 5
1 1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2 2
5 5 5 5 5 5 5 5 5 5
3 3 3 3 3 3 3 3 3 3
3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1
4 4 4 2 4 4 4 4 4 4
2 2 2 1 2 2 2 2 2 2
3 3 3 2 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1 1
3 3 3 2 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
3 3 3 2 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1 1
3 3 3 2 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4 4
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
4 4 4 6 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2 2
4 4 4 5 4 4 4 4 4 4
2 2 2 1 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4 4
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1 1
2 2 2 3 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4 4
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
3 3 3 2 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1 1
3 3 3 2 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
3 3 3 2 3 3 3 3 3 3
2 2 2 1 2 2 2 2 2 2
4 4 4 2 4 4 4 4 4 4
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
4 4 4 2 4 4 4 4 4 4
2 2 2 1 2 2 2 2 2 2
2
1
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
7 7 7 7 7 7 7 7 7
4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2
4 4 4 2 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2 2
6 6 6 4 6 6 6 6 6 6
2 2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2
4 4 4 2 4 4 4 4 4 4
2 2 2 1 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
4 4 4 2 4 4 4 4 4 4
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
5 5 5 4 5 5 5 5 5 5
2 2 2 3 2 2 2 2 2 2
2 2 2 3 2 2 2 2 2 2
1 1 1 2 1 1 1 1 1 1
2 2 2 3 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2 2
4 4 4 5 4 4 4 4 4 4
2 2 2 1 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
4 4 4 5 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
4 4 4 3 4 4 4 4 4 4
2 2 2 1 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
3 3 3 2 3 3 3 3 3 3
4 4 4 2 4 4 4 4 4 4
2 2 2 1 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1 1
4 4 4 2 4 4 4 4 4 4
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2 2
370 590 590 590 590 590 590 370 590
AG
5-Aug 6-Aug 7-Aug 8-Aug 9-Aug 10-Aug 11-Aug 12-Aug 13-Aug
4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2
4 3 3 3 3 3 3 4 3
1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3
1 1 1 1 1 1 1
6 6 6 6 6 6 6
4 4 4 4 4 4 4
2 6 6 6 6 6 6 2 6
1 4 4 4 4 4 4 1 4
2 4 4 4 4 4 4 2 4
2 2 2 2 2 2 2 2 2
5 6 6 6 6 6 6 5 6
2 3 3 3 3 3 3 2 3
1 2 2 2 2 2 2 1 2
1 2 2 2 2 2 2 1 2
12 12 12 12 12 12 12
8 8 8 8 8 8 8
8 8 8 8 8 8 8
3 3 3 3 3 3 3
22 22 22 22 22 22 22
12 12 12 12 12 12 12
8 8 8 8 8 8 8
4 4 4 4 4 4 4
12 12 12 12 12 12 12
8 8 8 8 8 8 8
4 4 4 4 4 4 4
2 2 2 2 2 2 2
3 6 6 6 6 6 6 3 6
1 2 2 2 2 2 2 1 2
2 4 4 4 4 4 4 2 4
1 2 2 2 2 2 2 1 2
2 4 4 4 4 4 4 2 4
1 2 2 2 2 2 2 1 2
3 6 6 6 6 6 6 3 6
1 2 2 2 2 2 2 1 2
2 2 2 2 2 2 2
1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
4 6 6 6 6 6 6 4 6
1 2 2 2 2 2 2 1 2
4 5 5 5 5 5 5 4 5
2 3 3 3 3 3 3 2 3
2 2 2 2 2 2 2
1 1 1 1 1 1 1
4 4 4 4 4 4 4
2 2 2 2 2 2 2
5 5 5 5 5 5 5
1 1 1 1 1 1 1
3 5 5 5 5 5 5 3 5
1 2 2 2 2 2 2 1 2
2 3 3 3 3 3 3 2 3
1 1 1 1 1 1 1
3 4 4 4 4 4 4 3 4
2 1 1 1 1 1 1 2 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
5 5 5 5 5 5 5 5 5
2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
5 5 5 5 5 5 5 5 5
1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2
5 5 5 5 5 5 5 5 5
3 3 3 3 3 3 3 3 3
3 3 3 3 3 3 3
1 1 1 1 1 1 1
2 4 4 4 4 4 4 2 4
1 2 2 2 2 2 2 1 2
2 3 3 3 3 3 3 2 3
1 1 1 1 1 1 1 1 1
2 3 3 3 3 3 3 2 3
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2
1 1 1 1 1 1 1
2 2 2 2 2 2 2
1 1 1 1 1 1 1
2 3 3 3 3 3 3 2 3
1 1 1 1 1 1 1 1 1
2 3 3 3 3 3 3 2 3
1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2
1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2
6 4 4 4 4 4 4 6 4
2 2 2 2 2 2 2 2 2
5 4 4 4 4 4 4 5 4
1 2 2 2 2 2 2 1 2
3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1
3 2 2 2 2 2 2 3 2
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
2 3 3 3 3 3 3 2 3
1 1 1 1 1 1 1 1 1
2 3 3 3 3 3 3 2 3
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
2 3 3 3 3 3 3 2 3
1 2 2 2 2 2 2 1 2
2 4 4 4 4 4 4 2 4
1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1
2 4 4 4 4 4 4 2 4
1 2 2 2 2 2 2 1 2
2 2
2 2
1 1
2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
7 7 7 7 7 7 7
4 4 4 4 4 4 4
2 2 2 2 2 2 2
2 4 4 4 4 4 4 2 4
2 2 2 2 2 2 2 2 2
4 6 6 6 6 6 6 4 6
2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3
2 2 2 2 2 2 2
2 4 4 4 4 4 4 2 4
1 2 2 2 2 2 2 1 2
2 2 2 2 2 2 2 2 2
2 4 4 4 4 4 4 2 4
1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
4 5 5 5 5 5 5 4 5
3 2 2 2 2 2 2 3 2
3 2 2 2 2 2 2 3 2
2 1 1 1 1 1 1 2 1
3 2 2 2 2 2 2 3 2
2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2
5 4 4 4 4 4 4 5 4
1 2 2 2 2 2 2 1 2
2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
1 1
2 2
5 4 4 4 4 4 4 5 4
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
3 4 4 4 4 4 4 3 4
1 2 2 2 2 2 2 1 2
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
2 3 3 3 3 3 3 2 3
2 4 4 4 4 4 4 2 4
1 2 2 2 2 2 2 1 2
3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1
2 4 4 4 4 4 4 2 4
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2
590 590 590 590 590 370 590 590 590
AGUSTUS 2018
14-Aug 15-Aug 16-Aug 17-Aug 18-Aug 19-Aug 20-Aug 21-Aug 22-Aug
4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2
3 3 3 3 3 4 3 3 3
1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1
6 6 6 6 6 6 6 6
4 4 4 4 4 4 4 4
6 6 6 6 6 2 6 6 6
4 4 4 4 4 1 4 4 4
4 4 4 4 4 2 4 4 4
2 2 2 2 2 2 2 2 2
6 6 6 6 6 5 6 6 6
3 3 3 3 3 2 3 3 3
2 2 2 2 2 1 2 2 2
2 2 2 2 2 1 2 2 2
12 12 12 12 12 12 12 12
8 8 8 8 8 8 8 8
8 8 8 8 8 8 8 8
3 3 3 3 3 3 3 3
22 22 22 22 22 22 22 22
12 12 12 12 12 12 12 12
8 8 8 8 8 8 8 8
4 4 4 4 4 4 4 4
12 12 12 12 12 12 12 12
8 8 8 8 8 8 8 8
4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2
6 6 6 6 6 3 6 6 6
2 2 2 2 2 1 2 2 2
4 4 4 4 4 2 4 4 4
2 2 2 2 2 1 2 2 2
4 4 4 4 4 2 4 4 4
2 2 2 2 2 1 2 2 2
6 6 6 6 6 3 6 6 6
2 2 2 2 2 1 2 2 2
2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
6 6 6 6 6 4 6 6 6
2 2 2 2 2 1 2 2 2
5 5 5 5 5 4 5 5 5
3 3 3 3 3 2 3 3 3
2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2
5 5 5 5 5 5 5 5
1 1 1 1 1 1 1 1
5 5 5 5 5 3 5 5 5
2 2 2 2 2 1 2 2 2
3 3 3 3 3 2 3 3 3
1 1 1 1 1 1 1 1
4 4 4 4 4 3 4 4 4
1 1 1 1 1 2 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
5 5 5 5 5 5 5 5 5
2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
5 5 5 5 5 5 5 5 5
1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2
5 5 5 5 5 5 5 5 5
3 3 3 3 3 3 3 3 3
3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1
4 4 4 4 4 2 4 4 4
2 2 2 2 2 1 2 2 2
3 3 3 3 3 2 3 3 3
1 1 1 1 1 1 1 1 1
3 3 3 3 3 2 3 3 3
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1
3 3 3 3 3 2 3 3 3
1 1 1 1 1 1 1 1 1
3 3 3 3 3 2 3 3 3
1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2
4 4 4 4 4 6 4 4 4
2 2 2 2 2 2 2 2 2
4 4 4 4 4 5 4 4 4
2 2 2 2 2 1 2 2 2
3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1
2 2 2 2 2 3 2 2 2
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
3 3 3 3 3 2 3 3 3
1 1 1 1 1 1 1 1 1
3 3 3 3 3 2 3 3 3
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
3 3 3 3 3 2 3 3 3
2 2 2 2 2 1 2 2 2
4 4 4 4 4 2 4 4 4
1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1
4 4 4 4 4 2 4 4 4
2 2 2 2 2 1 2 2 2
2
1
2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
7 7 7 7 7 7 7 7
4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2
4 4 4 4 4 2 4 4 4
2 2 2 2 2 2 2 2 2
6 6 6 6 6 4 6 6 6
2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2
4 4 4 4 4 2 4 4 4
2 2 2 2 2 1 2 2 2
2 2 2 2 2 2 2 2 2
4 4 4 4 4 2 4 4 4
1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
5 5 5 5 5 4 5 5 5
2 2 2 2 2 3 2 2 2
2 2 2 2 2 3 2 2 2
1 1 1 1 1 2 1 1 1
2 2 2 2 2 3 2 2 2
2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2
4 4 4 4 4 5 4 4 4
2 2 2 2 2 1 2 2 2
2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
4 4 4 4 4 5 4 4 4
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
4 4 4 4 4 3 4 4 4
2 2 2 2 2 1 2 2 2
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
3 3 3 3 3 2 3 3 3
4 4 4 4 4 2 4 4 4
2 2 2 2 2 1 2 2 2
3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1
4 4 4 4 4 2 4 4 4
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2
590 590 590 370 590 590 590 590 590
4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2
3 3 3 4 3 3 3 3 3
1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1
6 6 6 6 6 6 6 6
4 4 4 4 4 4 4 4
6 6 6 2 6 6 6 6 6
4 4 4 1 4 4 4 4 4
4 4 4 2 4 4 4 4 4
2 2 2 2 2 2 2 2 2
6 6 6 5 6 6 6 6 6
3 3 3 2 3 3 3 3 3
2 2 2 1 2 2 2 2 2
2 2 2 1 2 2 2 2 2
12 12 12 12 12 12 12 12
8 8 8 8 8 8 8 8
8 8 8 8 8 8 8 8
3 3 3 3 3 3 3 3
22 22 22 22 22 22 22 22
12 12 12 12 12 12 12 12
8 8 8 8 8 8 8 8
4 4 4 4 4 4 4 4
12 12 12 12 12 12 12 12
8 8 8 8 8 8 8 8
4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2
6 6 6 3 6 6 6 6 6
2 2 2 1 2 2 2 2 2
4 4 4 2 4 4 4 4 4
2 2 2 1 2 2 2 2 2
4 4 4 2 4 4 4 4 4
2 2 2 1 2 2 2 2 2
6 6 6 3 6 6 6 6 6
2 2 2 1 2 2 2 2 2
2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
6 6 6 4 6 6 6 6 6
2 2 2 1 2 2 2 2 2
5 5 5 4 5 5 5 5 5
3 3 3 2 3 3 3 3 3
2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2
5 5 5 5 5 5 5 5
1 1 1 1 1 1 1 1
5 5 5 3 5 5 5 5 5
2 2 2 1 2 2 2 2 2
3 3 3 2 3 3 3 3 3
1 1 1 1 1 1 1 1
4 4 4 3 4 4 4 4 4
1 1 1 2 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
5 5 5 5 5 5 5 5 5
2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
5 5 5 5 5 5 5 5 5
1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2
5 5 5 5 5 5 5 5 5
3 3 3 3 3 3 3 3 3
3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1
4 4 4 2 4 4 4 4 4
2 2 2 1 2 2 2 2 2
3 3 3 2 3 3 3 3 3
1 1 1 1 1 1 1 1 1
3 3 3 2 3 3 3 3 3
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1
3 3 3 2 3 3 3 3 3
1 1 1 1 1 1 1 1 1
3 3 3 2 3 3 3 3 3
1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2
4 4 4 6 4 4 4 4 4
2 2 2 2 2 2 2 2 2
4 4 4 5 4 4 4 4 4
2 2 2 1 2 2 2 2 2
3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1
2 2 2 3 2 2 2 2 2
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
3 3 3 2 3 3 3 3 3
1 1 1 1 1 1 1 1 1
3 3 3 2 3 3 3 3 3
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
3 3 3 2 3 3 3 3 3
2 2 2 1 2 2 2 2 2
4 4 4 2 4 4 4 4 4
1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1
4 4 4 2 4 4 4 4 4
2 2 2 1 2 2 2 2 2
2
1
2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
7 7 7 7 7 7 7 7
4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2
4 4 4 2 4 4 4 4 4
2 2 2 2 2 2 2 2 2
6 6 6 4 6 6 6 6 6
2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2
4 4 4 2 4 4 4 4 4
2 2 2 1 2 2 2 2 2
2 2 2 2 2 2 2 2 2
4 4 4 2 4 4 4 4 4
1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
5 5 5 4 5 5 5 5 5
2 2 2 3 2 2 2 2 2
2 2 2 3 2 2 2 2 2
1 1 1 2 1 1 1 1 1
2 2 2 3 2 2 2 2 2
2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2
4 4 4 5 4 4 4 4 4
2 2 2 1 2 2 2 2 2
2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
4 4 4 5 4 4 4 4 4
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
4 4 4 3 4 4 4 4 4
2 2 2 1 2 2 2 2 2
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
3 3 3 2 3 3 3 3 3
4 4 4 2 4 4 4 4 4
2 2 2 1 2 2 2 2 2
3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1
4 4 4 2 4 4 4 4 4
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2
534 322 534 534 534 534 534 534 322 534
1-Sep 2-Sep 3-Sep 4-Sep 5-Sep 6-Sep 7-Sep 8-Sep 9-Sep 10-Sep
4 4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2 2
3 4 3 3 3 3 3 3 4 3
1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1
6 6 6 6 6 6 6 6
4 4 4 4 4 4 4 4
6 2 6 6 6 6 6 6 2 6
4 1 4 4 4 4 4 4 1 4
4 2 4 4 4 4 4 4 2 4
2 2 2 2 2 2 2 2 2 2
6 5 6 6 6 6 6 6 5 6
3 2 3 3 3 3 3 3 2 3
2 1 2 2 2 2 2 2 1 2
2 1 2 2 2 2 2 2 1 2
12 12 12 12 12 12 12 12
8 8 8 8 8 8 8 8
8 8 8 8 8 8 8 8
3 3 3 3 3 3 3 3
22 22 22 22 22 22 22 22
12 12 12 12 12 12 12 12
8 8 8 8 8 8 8 8
4 4 4 4 4 4 4 4
12 12 12 12 12 12 12 12
8 8 8 8 8 8 8 8
4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2
6 3 6 6 6 6 6 6 3 6
2 1 2 2 2 2 2 2 1 2
4 2 4 4 4 4 4 4 2 4
2 1 2 2 2 2 2 2 1 2
4 2 4 4 4 4 4 4 2 4
2 1 2 2 2 2 2 2 1 2
6 3 6 6 6 6 6 6 3 6
2 1 2 2 2 2 2 2 1 2
2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
6 4 6 6 6 6 6 6 4 6
2 1 2 2 2 2 2 2 1 2
5 4 5 5 5 5 5 5 4 5
3 2 3 3 3 3 3 3 2 3
2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2
5 5 5 5 5 5 5 5
1 1 1 1 1 1 1 1
5 3 5 5 5 5 5 5 3 5
2 1 2 2 2 2 2 2 1 2
3 2 3 3 3 3 3 3 2 3
1 1 1 1 1 1 1 1
4 3 4 4 4 4 4 4 3 4
1 2 1 1 1 1 1 1 2 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
5 5 5 5 5 5 5 5 5 5
2 2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
5 5 5 5 5 5 5 5 5 5
1 1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2 2
5 5 5 5 5 5 5 5 5 5
3 3 3 3 3 3 3 3 3 3
3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1
4 2 4 4 4 4 4 4 2 4
2 1 2 2 2 2 2 2 1 2
3 2 3 3 3 3 3 3 2 3
1 1 1 1 1 1 1 1 1 1
3 2 3 3 3 3 3 3 2 3
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1
3 2 3 3 3 3 3 3 2 3
1 1 1 1 1 1 1 1 1 1
3 2 3 3 3 3 3 3 2 3
1 1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4 4
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
4 6 4 4 4 4 4 4 6 4
2 2 2 2 2 2 2 2 2 2
4 5 4 4 4 4 4 4 5 4
2 1 2 2 2 2 2 2 1 2
3 3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4 4
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1 1
2 3 2 2 2 2 2 2 3 2
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4 4
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
3 2 3 3 3 3 3 3 2 3
1 1 1 1 1 1 1 1 1 1
3 2 3 3 3 3 3 3 2 3
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
3 2 3 3 3 3 3 3 2 3
2 1 2 2 2 2 2 2 1 2
4 2 4 4 4 4 4 4 2 4
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
4 2 4 4 4 4 4 4 2 4
2 1 2 2 2 2 2 2 1 2
2 2
2 2
1 1
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
7 7 7 7 7 7 7 7
4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2
4 2 4 4 4 4 4 4 2 4
2 2 2 2 2 2 2 2 2 2
6 4 6 6 6 6 6 6 4 6
2 2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2
4 2 4 4 4 4 4 4 2 4
2 1 2 2 2 2 2 2 1 2
2 2 2 2 2 2 2 2 2 2
4 2 4 4 4 4 4 4 2 4
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
5 4 5 5 5 5 5 5 4 5
2 3 2 2 2 2 2 2 3 2
2 3 2 2 2 2 2 2 3 2
1 2 1 1 1 1 1 1 2 1
2 3 2 2 2 2 2 2 3 2
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2 2
4 5 4 4 4 4 4 4 5 4
2 1 2 2 2 2 2 2 1 2
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
1 1
2 2
4 5 4 4 4 4 4 4 5 4
534 534 534 534 534 322 534 534 534 534
11-Sep 12-Sep 13-Sep 14-Sep 15-Sep 16-Sep 17-Sep 18-Sep 19-Sep 20-Sep
4 4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2 2
3 3 3 3 3 4 3 3 3 3
1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1
6 6 6 6 6 6 6 6 6
4 4 4 4 4 4 4 4 4
6 6 6 6 6 2 6 6 6 6
4 4 4 4 4 1 4 4 4 4
4 4 4 4 4 2 4 4 4 4
2 2 2 2 2 2 2 2 2 2
6 6 6 6 6 5 6 6 6 6
3 3 3 3 3 2 3 3 3 3
2 2 2 2 2 1 2 2 2 2
2 2 2 2 2 1 2 2 2 2
12 12 12 12 12 12 12 12 12
8 8 8 8 8 8 8 8 8
8 8 8 8 8 8 8 8 8
3 3 3 3 3 3 3 3 3
22 22 22 22 22 22 22 22 22
12 12 12 12 12 12 12 12 12
8 8 8 8 8 8 8 8 8
4 4 4 4 4 4 4 4 4
12 12 12 12 12 12 12 12 12
8 8 8 8 8 8 8 8 8
4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2
6 6 6 6 6 3 6 6 6 6
2 2 2 2 2 1 2 2 2 2
4 4 4 4 4 2 4 4 4 4
2 2 2 2 2 1 2 2 2 2
4 4 4 4 4 2 4 4 4 4
2 2 2 2 2 1 2 2 2 2
6 6 6 6 6 3 6 6 6 6
2 2 2 2 2 1 2 2 2 2
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
6 6 6 6 6 4 6 6 6 6
2 2 2 2 2 1 2 2 2 2
5 5 5 5 5 4 5 5 5 5
3 3 3 3 3 2 3 3 3 3
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2
5 5 5 5 5 5 5 5 5
1 1 1 1 1 1 1 1 1
5 5 5 5 5 3 5 5 5 5
2 2 2 2 2 1 2 2 2 2
3 3 3 3 3 2 3 3 3 3
1 1 1 1 1 1 1 1 1
4 4 4 4 4 3 4 4 4 4
1 1 1 1 1 2 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
5 5 5 5 5 5 5 5 5 5
2 2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
5 5 5 5 5 5 5 5 5 5
1 1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2 2
5 5 5 5 5 5 5 5 5 5
3 3 3 3 3 3 3 3 3 3
3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1
4 4 4 4 4 2 4 4 4 4
2 2 2 2 2 1 2 2 2 2
3 3 3 3 3 2 3 3 3 3
1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 2 3 3 3 3
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
3 3 3 3 3 2 3 3 3 3
1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 2 3 3 3 3
1 1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4 4
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
4 4 4 4 4 6 4 4 4 4
2 2 2 2 2 2 2 2 2 2
4 4 4 4 4 5 4 4 4 4
2 2 2 2 2 1 2 2 2 2
3 3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4 4
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 3 2 2 2 2
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4 4
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 2 3 3 3 3
1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 2 3 3 3 3
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 2 3 3 3 3
2 2 2 2 2 1 2 2 2 2
4 4 4 4 4 2 4 4 4 4
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
4 4 4 4 4 2 4 4 4 4
2 2 2 2 2 1 2 2 2 2
2
1
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
7 7 7 7 7 7 7 7 7
4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2
4 4 4 4 4 2 4 4 4 4
2 2 2 2 2 2 2 2 2 2
6 6 6 6 6 4 6 6 6 6
2 2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2
4 4 4 4 4 2 4 4 4 4
2 2 2 2 2 1 2 2 2 2
2 2 2 2 2 2 2 2 2 2
4 4 4 4 4 2 4 4 4 4
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
5 5 5 5 5 4 5 5 5 5
2 2 2 2 2 3 2 2 2 2
2 2 2 2 2 3 2 2 2 2
1 1 1 1 1 2 1 1 1 1
2 2 2 2 2 3 2 2 2 2
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 2 2 2
4 4 4 4 4 5 4 4 4 4
2 2 2 2 2 1 2 2 2 2
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
4 4 4 4 4 5 4 4 4 4
0 0 0 0 0 0 0 0 0 0
21-Sep 22-Sep 23-Sep 24-Sep 25-Sep 26-Sep 27-Sep 28-Sep 29-Sep 30-Sep