JOB MIX PASANGAN BATU ( MORTAR )

BALAI : SATUAN KERJA BALAI WILAYAH SUNGAI NUSA TENGGARA II


DIREKSI : KEGIATAN PENGEMBANGAN DAN KONSERVASI SUMBER DAYA AIR
PEKERJAAN : PEMBANGUNAN EMBUNG IRIGASI HAEKRIT KAB. BELU (PAKET NTT-3.5)
KONTRAKTOR : PT. WASKITA KARYA
KONSULTAN : NIPPON KOEI Co,. Ltd & Associated
LOKASI : Sungai Bauatok TANGGAL PENGAMBILAN : 13 Mei 2008
NO SAMPEL : 008 JAM PENGUJIAN : 10:00 WITA
JENIS MATRIAL : Pasir DIUJI OLEH : Sudadi

JOB MIX FORMULA 1 M³ PASANGAN BATU

* BJ Semen = 3.14 * Air ( W/C ) = 55 %


* BJ Pasir = 2.65

KEBUTUHAN MATERIAL UNTUK 1M³ SOIL CEMENT

BERAT VOLUME
NO MATERIAL PERHITUNGAN KODE PERHITUNGAN
(Kg) (m3)
1 Semen = Berat Semen Uji = PC 80.00 = PC / BJ Semen / 1000 0.025
2 Air ( W/C = 55% ) = ( Water Cement / 100 ) x Berat Semen = ( 20 / 100 ) x 104,00 =A 44.00 = A / 1000 0.044
3 Udara ( 2% ) = Presentase 2 % =U 0.020
4 Pasir = BJ Pasir x Volume ( m³ ) x 1000 = 2,650 x 0,710 x 1000 = PS 2,412.88 = 1 - 0.025 - 0.044 - 0.020 0.911

` VOLUME 1.000
KEBUTUHAN MATERIAL UNTUK 1 ZAK ( 40 KG ) SEMEN

BERAT BERAT ISI VOLUME


NO MATERIAL PERHITUNGAN PERHITUNGAN
( Kg ) ( Kg/L ) ( Liter )
1 Semen = Berat Semen 1 Zak 40.00 1.151
2 Air = ( PC / Berat Semen 1 Zak ) x A = ( 40,00 / 80,00 ) x 44,00 22.00 1.000 = 22,00 / 1,00 22.00
3 Pasir = ( PC / Berat Semen 1 Zak ) x PS = ( 40,00 / 80,00 ) x 2412,88 1,206.44 1.350 = 1206,44 / 1,350 893.66

D. UKURAN KOTAK DENGAN RENCANA CAMPURAN 1 : 25


Volume Kotak = 893.66 / 25 buah = 35.75 Liter

VM = Volume silinder mould = 3.14 x 0.075 x 0.075 x 0.30 = 0.00529875 m³


Direncanakan untuk sampel sebanyak 3 Buah
VS = Volume sampel yang akan dibuat = Vol. Kubus Uji x Banyak Sampel = 0.01589625 m³

E. KEBUTUHAN MATERIAL UNTUK TRIAL 1 : 4

BERAT
NO MATERIAL PERHITUNGAN
( Kg )
1 Semen = PC x Vol. Sampel = 80.00 x 0.01589625 m³ 1.27
2 Air = A x Vol. Sampel = 44.00 x 0.01589625 m³ 0.70
3 Pasir = PS x Vol. Sampel = 2412,88 x 0.01589625 m³ 38.36

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :


Direksi Pekerjaan Konsultan Supervisi Kontraktor
Nippon Koei Co. Ltd & Ass PT. Waskita Karya

…………………………….. ………………………………. ………………………….


Pengawas A/E Material Laboratory
BALAI : SATUAN KERJA BALAI WILAYAH SUNGAI NUSA TENGGARA II
DIREKSI : KEGIATAN PENGEMBANGAN DAN KONSERVASI SUMBER DAYA AIR
PEKERJAAN : PEMBANGUNAN EMBUNG IRIGASI HAEKRIT KAB. BELU (PAKET NTT-3.5)
KONTRAKTOR : PT. WASKITA KARYA
KONSULTAN : NIPPON KOEI Co,. Ltd & Associated

PERBANDINGAN VOLUME CAMPURAN MORTAR SESUAI DENGAN JOB MIX FORMULA (JMF)

1. KOMPOSISI UNTUK 1 ZAK SEMEN TIGA RODA @ 40 kg DENGAN PERBANDINGAN 1 : 4

Berat Berat Isi Volume Volume Kotak


Material Komposisi
(kg) (kg/ltr) (ltr) (cm3)

PC 40.00 1.151 34.75239 1.00 zak V = ( 60 + 56 ) / 2 x 20 x 30

Pasir 187.66 1.350 139.00956 4.00 ktk = 34.80 Liter

2. UKURAN KOTAK CAMPURAN / TAKARAN VOLUME : `

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :


Direksi Pekerjaan Konsultan Supervisi Kontraktor
Nippon Koei Co. Ltd & Ass PT. Waskita Karya

…………………………….. ………………………………. ………………………….


Pengawas A/E Material Laboratory
BALAI : SATUAN KERJA BALAI WILAYAH SUNGAI NUSA TENGGARA II
DIREKSI : KEGIATAN PENGEMBANGAN DAN KONSERVASI SUMBER DAYA AIR
PEKERJAAN : PEMBANGUNAN EMBUNG IRIGASI HAEKRIT KAB. BELU (PAKET NTT-3.5)
KONTRAKTOR : PT. WASKITA KARYA
KONSULTAN : NIPPON KOEI Co,. Ltd & Associated

PERBANDINGAN VOLUME CAMPURAN MORTAR SESUAI DENGAN JOB MIX FORMULA (JMF)

1. KOMPOSISI UNTUK 1 ZAK SEMEN TIGA RODA @ 40 kg DENGAN PERBANDINGAN 1 : 5

Berat Berat Isi Volume Volume Kotak


Material Komposisi
(kg) (kg/ltr) (ltr) (cm3)

PC 40.00 1.151 34.75239 1.00 zak V = ( 60 + 56 ) / 2 x 20 x 30

Pasir 234.58 1.350 173.76195 5.00 ktk = 34.80 Liter

2. UKURAN KOTAK CAMPURAN / TAKARAN VOLUME : `

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :


Direksi Pekerjaan Konsultan Supervisi Kontraktor
Nippon Koei Co. Ltd & Ass PT. Waskita Karya

…………………………….. ………………………………. ………………………….


Pengawas A/E Material Laboratory
BALAI : SATUAN KERJA BALAI WILAYAH SUNGAI NUSA TENGGARA II
DIREKSI : KEGIATAN PENGEMBANGAN DAN KONSERVASI SUMBER DAYA AIR
PEKERJAAN : PEMBANGUNAN EMBUNG IRIGASI HAEKRIT KAB. BELU (PAKET NTT-3.5)
KONTRAKTOR : PT. WASKITA KARYA
KONSULTAN : NIPPON KOEI Co,. Ltd & Associated

PERBANDINGAN VOLUME CAMPURAN MORTAR SESUAI DENGAN JOB MIX FORMULA (JMF)

1. KOMPOSISI UNTUK 1 ZAK SEMEN TIGA RODA @ 40 kg DENGAN PERBANDINGAN 1 : 6

Berat Berat Isi Volume Volume Kotak


Material Komposisi
(kg) (kg/ltr) (ltr) (cm3)

PC 40.00 1.151 34.75239 1.00 zak V = ( 60 + 56 ) / 2 x 20 x 30

Pasir 281.49 1.350 208.51434 6.00 ktk = 34.80 Liter

2. UKURAN KOTAK CAMPURAN / TAKARAN VOLUME : `

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :


Direksi Pekerjaan Konsultan Supervisi Kontraktor
Nippon Koei Co. Ltd & Ass PT. Waskita Karya

…………………………….. ………………………………. ………………………….


Pengawas A/E Material Laboratory
BALAI : SATUAN KERJA BALAI WILAYAH SUNGAI NUSA TENGGARA II
DIREKSI : KEGIATAN PENGEMBANGAN DAN KONSERVASI SUMBER DAYA AIR
PEKERJAAN : PEMBANGUNAN EMBUNG IRIGASI HAEKRIT KAB. BELU (PAKET NTT-3.5)
KONTRAKTOR : PT. WASKITA KARYA
KONSULTAN : NIPPON KOEI Co,. Ltd & Associated

PERBANDINGAN VOLUME CAMPURAN MORTAR SESUAI DENGAN JOB MIX FORMULA (JMF)

1. KOMPOSISI UNTUK 1 ZAK SEMEN TIGA RODA @ 40 kg DENGAN PERBANDINGAN 1 : 7

Berat Berat Isi Volume Volume Kotak


Material Komposisi
(kg) (kg/ltr) (ltr) (cm3)

PC 40.00 1.151 34.75239 1.00 zak V = ( 60 + 56 ) / 2 x 20 x 30

Pasir 328.41 1.350 243.26672 7.00 ktk = 34.80 Liter

2. UKURAN KOTAK CAMPURAN / TAKARAN VOLUME : `

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :


Direksi Pekerjaan Konsultan Supervisi Kontraktor
Nippon Koei Co. Ltd & Ass PT. Waskita Karya

…………………………….. ………………………………. ………………………….


Pengawas A/E Material Laboratory
BALAI : SATUAN KERJA BALAI WILAYAH SUNGAI NUSA TENGGARA II
DIREKSI : KEGIATAN PENGEMBANGAN DAN KONSERVASI SUMBER DAYA AIR
PEKERJAAN : PEMBANGUNAN EMBUNG IRIGASI HAEKRIT KAB. BELU (PAKET NTT-3.5)
KONTRAKTOR : PT. WASKITA KARYA
KONSULTAN : NIPPON KOEI Co,. Ltd & Associated

PERBANDINGAN VOLUME CAMPURAN MORTAR SESUAI DENGAN JOB MIX FORMULA (JMF)

1. KOMPOSISI UNTUK 1 ZAK SEMEN TIGA RODA @ 40 kg DENGAN PERBANDINGAN 1 : 8

Berat Berat Isi Volume Volume Kotak


Material Komposisi
(kg) (kg/ltr) (ltr) (cm3)

PC 40.00 1.151 34.75239 1.00 zak V = ( 60 + 56 ) / 2 x 20 x 30

Pasir 375.33 1.350 278.01911 8.00 ktk = 34.80 Liter

2. UKURAN KOTAK CAMPURAN / TAKARAN VOLUME : `

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :


Direksi Pekerjaan Konsultan Supervisi Kontraktor
Nippon Koei Co. Ltd & Ass PT. Waskita Karya

…………………………….. ………………………………. ………………………….


Pengawas A/E Material Laboratory
BALAI : SATUAN KERJA BALAI WILAYAH SUNGAI NUSA TENGGARA II
DIREKSI : KEGIATAN PENGEMBANGAN DAN KONSERVASI SUMBER DAYA AIR
PEKERJAAN : PEMBANGUNAN EMBUNG IRIGASI HAEKRIT KAB. BELU (PAKET NTT-3.5)
KONTRAKTOR : PT. WASKITA KARYA
KONSULTAN : NIPPON KOEI Co,. Ltd & Associated

PERBANDINGAN VOLUME CAMPURAN MORTAR SESUAI DENGAN JOB MIX FORMULA (JMF)

1. KOMPOSISI UNTUK 1 ZAK SEMEN TIGA RODA @ 40 kg DENGAN PERBANDINGAN 1 : 9

Berat Berat Isi Volume Volume Kotak


Material Komposisi
(kg) (kg/ltr) (ltr) (cm3)

PC 40.00 1.151 34.75239 1.00 zak V = ( 60 + 56 ) / 2 x 20 x 30

Pasir 422.24 1.350 312.77150 9.00 ktk = 34.80 Liter

2. UKURAN KOTAK CAMPURAN / TAKARAN VOLUME : `

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :


Direksi Pekerjaan Konsultan Supervisi Kontraktor
Nippon Koei Co. Ltd & Ass PT. Waskita Karya

…………………………….. ………………………………. ………………………….


Pengawas A/E Material Laboratory
BALAI : SATUAN KERJA BALAI WILAYAH SUNGAI NUSA TENGGARA II
DIREKSI : KEGIATAN PENGEMBANGAN DAN KONSERVASI SUMBER DAYA AIR
PEKERJAAN : PEMBANGUNAN EMBUNG IRIGASI HAEKRIT KAB. BELU (PAKET NTT-3.5)
KONTRAKTOR : PT. WASKITA KARYA
KONSULTAN : NIPPON KOEI Co,. Ltd & Associated

PERBANDINGAN VOLUME CAMPURAN MORTAR SESUAI DENGAN JOB MIX FORMULA (JMF)

1. KOMPOSISI UNTUK 1 ZAK SEMEN TIGA RODA @ 40 kg DENGAN PERBANDINGAN 1 : 10

Berat Berat Isi Volume Volume Kotak


Material Komposisi
(kg) (kg/ltr) (ltr) (cm3)

PC 40.00 1.151 34.75239 1.00 zak V = ( 60 + 56 ) / 2 x 20 x 30

Pasir 469.16 1.350 347.52389 10.00 ktk = 34.80 Liter

2. UKURAN KOTAK CAMPURAN / TAKARAN VOLUME : `

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :


Direksi Pekerjaan Konsultan Supervisi Kontraktor
Nippon Koei Co. Ltd & Ass PT. Waskita Karya

…………………………….. ………………………………. ………………………….


Pengawas A/E Material Laboratory