1.

KONTRAK/ SURAT PERJANJIAN KERJA, BAGIAN ADMINISTRASI PEMBUAT KONTRAK/ SPK WAJIB MENULISKAN
JADWAL PELAKSANAAN PEKERJAAN S/D PHO DI PAPAN YANG SUDAH DISEDIAKAN.
2. KELENGKAPAN DOKUMEN GAMBAR (PERENCANAAN GEDUNG) MINIMAL :
a) COVER GAMBAR
b) SITE LOKASI RENCANA PEKERJAAN (DOWNLOOD GEOGLE)
c) SITEPLAN LOKASI
d) BLOCKPLAN
e) DENAH LANTAI
f) TAMPAK DEPAN, BELAKANG, SAMPING KANAN, SAMPING KIRI
g) POTONGAN A – A; B – B ; C – C
h) DENAH PONDASI
i) DETAIL PONDASI
j) DENAH SLOOF, DENAH KOLOM, DENAH BALOK, DENAH PLAT LANTAI
k) DETAIL SLOOF, KOLOM, BALOK DAN PLAT LANTAI
l) DENAH PLAFOND
m) DETAIL PLAFOND
n) DENAH ATAP
o) DETAIL ATAP
p) DENAH KERAMIK
q) DENAH KUSEN
r) DETAIL KUSEN
s) DENAH PLUMBING (AIR BERSIH DAN AIR KOTOR )
t) DETAIL PLUMBING
u) DENAH DAN DETAIL MEKANIKAL ELEKTRIKAL
 UNTUK BANGUNAN BERLANTAI MENYESUAIKAN DENGAN JUMLAH LANTAI.
3. KELENGKAPAN DOKUMEN RENCANA DAN KERJA TEKNIS :
a) COVER RKS
b) SPESIFIKASI TEKNIS PEKERJAAN
c) BILL OF QUANTITY (BQ) : REKAPITULASI RAB, RAB, HARGA SATUAN PEKERJAAN, ANALISA HARGA
SATUAN, HARGA SATUAN BAHAN, HARGA SATUAN TENAGA, HARGA PERALATAN/ SEWA
4. KELENGKAPAN DOKUMEN RENCANA ANGGARAN BIAYA (RAB):
a) COVER RAB ENGGINEERING ESTIMATE (EE)
b) ENGINEERING ESTIMATE : BILL OF QUANTITY (BQ) : REKAPITULASI RAB, RAB, HARGA SATUAN PEKERJAAN,
ANALISA HARGA SATUAN, HARGA SATUAN BAHAN, HARGA SATUAN TENAGA, HARGA PERALATAN/ SEWA.
c) BACK UP PERHITUNGAN VOLUME
5. KELENGKAPAN DOKUMEN LAPORAN AKHIR PERENCANAAN :
a) RESUME PEKERJAAN PERENCANAAN
b) FOTO COPY SURAT PERJANJIAN KERJA/ KONTRAK
c) RAB ENGINEERING ESTIMATE (YANG SUDAH TERTANDA TANGAN).
d) GAMBAR : SITEPLAN, BLOCKPLAN, DENAH, TAMPAK DAN POTONGAN (YANG SUDAH TERTANDA TANGAN).
e) HASIL PENGUKURAN TOPOGRAFI (BILA ADA)
f) HASIL PERHITUNGAN STRUKTUR (BILA ADA)
g) HASIL PRESENTASI PEMAPARAN LAPORAN PENDAHULUAN, ANTARA DAN AKHIR (BILA ADA)
h) DOKUMENTASI PEKERJAAN.
6. KEPINGAN CD SEMUA LAPORAN HASIL PERENCANAAN
(TANGGAL SESUAIKAN DENGAN BATAS WAKTU PELAKSANAAN)