Anda di halaman 1dari 2

PT.

REITAMA ENGINEERING
IDENTIFIKASI BAHAYA DAN PENGENDALIAN RESIKO
INSTALASI CCTV
No.IBPR : IBPR
Revisi :0
Tanggal Issued :
Area :
Step 3: Penilaian Resiko Dept. :
Tabel Risiko / Risk Matrix Keparahan / Severity Petunjuk / Key

1 2 3 4 5
S = Severity 15 to 25 High
Step1 : Kemungkinan (Likelihood) Step2: Keparahan (Consequency)
1 1 2 3 4 5 Step 4:
L = Likelihood 8 to 12 Medium High
1 Tak Berarti (Insignificant) 1 Tak Berarti (Insignificant) Kemungkinan Kerugian 2 2 4 6 8 10 Menentukan kontrol resiko yang akan di lakukan
Rating = S x L 4 to 6 Medium Low
2 Rendah (Low) 2 Rendah (Low)
Likelihood of Harm 3 3 6 9 12 15
3 Sedang Rendah (Medium Low) 3 Sedang Rendah (Medium Low) 2 to 3 Low Step 5: Risiko sisa setelah dilakukan pengendalian
4 Sedang Tinggi (Medium High) 4 Sedang Tinggi (Medium HIgh) 4 4 8 12 16 20 1 Insignificant 15-25 = High
5 Tinggi (High) 5 Tinggi (High) 8-12 = Medium High
5 5 10 15 20 25
4-6 = Medium Low
2-3 = Low
1 = Insignificant

Penilaian Risiko

Penilaian Risiko
Kemungkinan

Kemungkinan
Dampak SHE Kontrol Resiko : Pengendalian bahaya yang telah dilakukan dan rencana yang akan dilakukan

Konsekuesi

Konsekuesi
Aspek SHE Tambahan kontrol Referensi /

(Ya/Tidak)
No Aktifitas Remark

Diterima
(Risiko) resiko Peraturan
Manusia Lingkungan Properti Eliminasi Subsitusi Rekayasa Teknik Administrasi APD
a.Melakukan pekerjaan rumah PPE Mandatory (Safety helmet, Pengawasan kerja Work
tangga a. Doing safety googgle, safety shoes) supervision
House keeping

1 Pembuatan area kerja Housekeeping Tersandung , Tergelincir 4 3 12 1 2 2 UU No. 1 Th. 1970


'Stumbling, Slipping

"A. Meningkatkan kesadaran PPE Wajib (Helm pengaman,


saat bekerja di ketinggian kacamata pengaman, sepatu
b. Pastikan pijakan dan keselamatan)
tahanan saat bekerja di
ketinggian aman atau PPE Mandatory (Safety
bermanfaat helmet, safety googgle, safety
"a. Increase awareness while shoes) Makesure sling memiliki
Tentukan titik CCTV yg akan di-instal sertifikat dan masih berlaku UU No. 1 Th. 1970;
sesuai drawing Determine the working at altitude
2
CCTV point that will be in-install
~Terjatuh dari ketinggian · · 4 3 12 b. Ensure foothold and custody 2 1 2 Makesure sling Permenaker No. Per.
while working at altitude   safe have sertificate and still 05/MEN/1985
according to drawing valid
or usable

Apakah memasuki area angkat, PPE Wajib (Helm pengaman,


area angkat barikade, berdiri kacamata pengaman, sepatu
Ukur panjang dari titik asal ke oleh supervisor keselamatan) PPE
CCTVsehingga untuk kebutuhan Do enter lifting area, Mandatory (Safety helmet,
panjang kabel dan pipa dapat diketahui Tersandung , Tergelincir ,Tersayat Kabel 'Stumbling, barricade lifting area, stand by safety googgle, safety shoes) UU No. 1 Th. 1970;
3 Measure · · 4 3 12 supervisor 2 1 2 Permenaker No. Per.
length from point of origin to CCTV so Slipping,Tired Cables 05/MEN/1985
for long needscables and pipes can be
known

"A. Pemeriksaan sling PPE Wajib (Helm pengaman, Pengawasan kerja Work
b. Izin sosialisasi, JSA dan SOP kacamata pengaman, sepatu supervision
Lifting " a. keselamatan) PPE
Ambil material yaitu kabel instalasi Inspection sling Mandatory (Safety helmet,
dan pipa, potong sesuai kebutuhan Bahan jatuh b. Socialization permit, JSA dan safety googgle, safety shoes) UU No. 1 1970; Permenaker
4 Take the material ie cable installation Falling materials · · 3 3 9 2 1 2 No. Per. 05/MEN/1985
SOP Lifting
and pipe, cut as needed

a. Izin sosialisasi, JSA dan PPE Wajib (Helm pengaman,


Metode Kerja kacamata pengaman, sepatu
a. Socialization permit, JSA keselamatan) PPE
dan work Method Mandatory (Safety helmet,
safety googgle, safety shoes)
Gunakan tangga untuk naik ke atas
untuk membuat lubang sebagai jalur
kabel, lubangi dari atas menggunakan Terjatuh dari ketinggian UU No. 1 Th. 1970;
5
pipa pvc Use the ladder to Falling from a height · · 5 3 15 2 1 2 Permenaker No. Per.
05/MEN/1985
go upstairs to make a hole as a path
cable, hole from the top use PVC pipe

a. Izin sosialisasi, JSA dan PPE Wajib (Helm pengaman,


Metode Kerja kacamata pengaman, sepatu
a. Socialization permit, JSA keselamatan) PPE
dan work Method Mandatory (Safety helmet,
safety googgle, safety shoes)

Instal Monitor dan CCTV di titik yg


telah ditentukan Install ~Terjatuh dari ketinggian ,Terkena alat potong Falling UU No. 1 Th. 1970;
6
Monitor and CCTV at the point you from a height, ~ Affected by cutting tool · · 3 3 9 1 1 2 Permenaker No. Per.
have determined 05/MEN/1985

F-FDH-HSE-001 Rev.00 Identifikasi Bahaya dan Pengendalian Risiko


a. Izin sosialisasi, JSA dan PPE Mandatory (Safety helmet,
Metode Kerja safety glasses, safety shoes)
a. Socialization permit, JSA PPE Mandatory (Safety
dan work Method helmet, safety googgle, safety
shoes)

Konek kabel yg tersambung ke monitor UU No. 1 Th. 1970;


dan CCTV Connect the Tersayat ,Tersenat arus listrik
7 cable connected to the monitor and Torn, Strained electric current · · 5 3 15 2 1 2 Permenaker No. Per.
05/MEN/1985
CCTV

a. Izin sosialisasi, JSA dan PPE Mandatory (Safety helmet,


Metode Kerja safety glasses, safety shoes)
a. Socialization permit, JSA PPE Mandatory (Safety
Konek kabel yg tersambung dari dan work Method helmet, safety googgle, safety
Server DVR dan Monitor ke CCTV yang shoes)
sudah terpasang Tersayat ,Tersenat arus listrik UU No. 1 Th. 1970;
8
Connect the connected cable from Torn, Strained electric current · · 5 3 15 2 1 2 Permenaker No. Per.
Server DVR and Monitor to CCTV 05/MEN/1985
already installed

a.Melakukan pekerjaan rumah PPE Wajib (Helm pengaman, Pengawasan kerja Work
tangga a. Doing kacamata pengaman, sepatu supervision
House keeping keselamatan) PPE
Mandatory (Safety helmet,
Tersandung , Tergelincir safety googgle, safety shoes)
9 Pembuatan area kerja Housekeeping 'Stumbling, Slipping · · 4 3 12 1 2 2 UU No. 1 Th. AC291970

Emergency Rescue Plan Tindakan Awal :


( Untuk pekerja yang terjatuh tertimpa material, 1 Hentikan pekerjaan dan amankan lokasi kerja
kesetrum,terhirup gas,dehidrasi,dll ) 2 Hubungi SHE PT.PP (0822 4444 7737 )
3 Hubungi Emergency Call PT.PP (081252474734)
4 Hubungi PIC PT.PP ( 081318879346 )
Menyebutkan Nama , Lokasi kejadian
Jumlah Korban dan Kondisi korban
Jenis Pertolongan yang dibutuhkan
Tindakan lebih lanjut,evakuasi oleh Tim Medis di bantu First Aider untuk di bawa ke klinik terdekat

PIC QSHE PM/SM/CM

F-FDH-HSE-001 Rev.00 Identifikasi Bahaya dan Pengendalian Risiko

Anda mungkin juga menyukai