Anda di halaman 1dari 1

PRE JOB SAFETY MEETING

Tanggal : ____________________________________
KelompokKerja : ____________________________________
Nama Supervisor : ____________________________________
Nama Foreman : ____________________________________
PEKERJAAN HARI INI (Plan for today)
REMOVE COUNTAINET WITH EXCAVATOR;

DESKRIPSI PENGARAHAN YANG DIBERIKAN DALAM TOOL BOX MEETING (JSA HarusDilampirkan)
PesertaHadir (Attendees)
No Nama Position TandaTangan No Nama Position TandaTangan
jabatan signature jabatan signature
1 26
2 27
3 28
4 29
5 30
6 31
7 32
8 33
9 34
10 35
11 36
12 37
13 38
14 39
15 40
16 41
17
18
19 Prepared by :
20
21
22 _____________________________________
23 PengawasKerja / Supervisor
24
25

Anda mungkin juga menyukai