NIM : 19021101031
No. Parameter
1 Umur Pelayanan 15 tahun
2 Faktor Distribusi Arah (DD) 100%
3 Faktor Distribusi Lajur (DL) 100%
4 Perkembangan lalu lintas (i) 2% per tahun
5 Beban gandar standar kumulatif (W’18) 3469
6 CBR 3,0 %
7 Koefisien Drainase (m2, m3) 1,3
8 Initial Present Serviceability Index (Po) 4,2
9 Terminal Serviceability Index (Pt) 2,0
10 Failure Serviceability Index (Pf) 1,5
11 Standard Deviate (So) 0,45
12 Reliability (R) 80 (ZR = -0.841)
13 Design Serviceability Loss (PSI) 2,2
14 Faktor Reabilitas 0,41836
𝑊18 = 𝐷𝐷 × 𝐷𝐿 𝑥 𝑤
̂18 = 1 × 1 × 3469 = 3469
(1+𝑖)𝑛 −1 (1+2%)15 −1
𝑊𝑡 = 𝑊18 × = 3469 × = 59990
𝑖 2%
SN = 1,3 (Laston)
SN = 1,7 (Batu Pecah Kelas B)
SN = 2,4 (Sirtu Kelas A)
Perhitungan Koefisien Drainase
𝑇𝑗𝑎𝑚 𝑇ℎ𝑎𝑟𝑖
𝑃ℎ𝑒𝑓𝑓 = 24
× 365
× 𝑊𝐿 × 100
3 146
𝑃ℎ𝑒𝑓𝑓 = × × 17,5 % × 100 = 0,88% < 1%
24 365
𝑆𝑁1 = 𝑎1 × 𝐷1
1,3 = 0,30 × 𝐷1
𝐷1 = 4,3 𝑖𝑛𝑐ℎ = 11 𝑐𝑚
𝑆𝑁2 = 𝑎1 × 𝐷1 + 𝑎2 × 𝐷2 × 𝑚2
1,7 = 0,30 × 4,3 + 0,12 × 𝐷2 × 1,3
1,7 = 1,29 + 0,156𝐷2
𝐷2 = 2,7 𝑖𝑛𝑐ℎ = 7 𝑐𝑚
𝑆𝑁3 = 𝑎1 × 𝐷1 + 𝑎2 × 𝐷2 × 𝑚2 + 𝑎3 × 𝐷3 × 𝑚3
2,4 = 0,30 × 4,3 + 0,12 × 2,7 × 1,3 + 0,11 × 𝐷3 × 1,3
2,4 = 1,29 + 0,4212 + 0,143𝐷3
𝐷3 = 4,8 𝑖𝑛𝑐ℎ = 12,2 𝑐𝑚