Anda di halaman 1dari 1

PT.

PERTAMINA GEOTHERMAL ENERGY

Checklist Harian Alat Berat


Nama Operator : HM / KM Awal :
Unit / No : HM / KM Akhir :
Hari / Tanggal : Shift :

Pemeriksaan Bahan Bakar, Pelumas Grease dan Roda


No Subyek Cukup Kurang Keterangan No Subyek Cukup Kurang Keterangan
1 Fuel / Bahan Bakar 10 Minyak Rem
2 Water / Air Radiator 11 Gemuk
3 Air Aki / Baterry 12 Tekanan Ban
4 Oli Mesin 13 Baut Roda
5 Oli Transmisi 14 APAR
6 Oli Hydraulic 15 Safety Belt
7 Oli Differential 16 Rambu
8 Oli Swing 17 Vessel
9 Oli Pivot Shaft 18 Tangga / Foot Step

Pemeriksaan Componen Unit


No Subyek Baik Rusak Keterangan No Subyek Baik Rusak Keterangan
1 Van Belt (Tali Kipas) 24 Gardan / Differential
2 Air Cleaner 25 Rubber Bushing Arm
3 Kabin 26 Safety Dolly
4 Service Meter 27 Rubber End
5 Kaca Spion 28 Blade
6 Klakson 29 Cutting Edge / End Bit
7 Wiper 30 Blade Cylinder
8 Lampu Depan 31 Bucket
9 Lampu Belakang 32 Teeth Bucket
10 Lampu Sign 33 Pin Bucket
11 Sistem Kemudi 34 Boom
12 Rem Parkir 35 Boom Cylinder
13 Retarder 36 Arm
14 Drage Link 37 Arm Cylinder
15 Exhaust Manipol 38 Carrier Roller
16 Spring / Suspensi 39 Track Roller
17 Tirod 40 Track Shoe
18 Seat Spring 41 Shank Ripper
19 U-Bolt Spring 42 S. Ripper Protector
20 Torque Rod 43 Point Ripper
21 Rubber Torque Rod 44 Pin Ripper
22 As / Cross Joint 45 Hose In-Out Mine Pump
23 Pemeriksaan Vessel 46 Kondisi Tali Gate

Catatan Operator :

Diperiksa Oleh : Dibuat Oleh :


Jabatan : Jabatan :
Tanda Tangan : Tanda Tangan :

Checklist Harian Alat Berat

Anda mungkin juga menyukai