Anda di halaman 1dari 1

Tulangan Utama Tulangan Utama

D12 - 90 D12 - 90

Tulangan Bagi
0.75 0.75 Selimut beton 0.75
Tulangan Bagi
D10 - 100 s = 100
D10 - 100

0.65 5.40
2.65
POTONGAN LANTAI HULU APRON
Skala 1 : 20
Tulangan Utama
1.25 D12 - 90

Selimut beton
s = 100
Tulangan Bagi
D10 - 100
0.75 0.65
0.75 Selimut beton
0.30 s = 100 0.15
POTONGAN PONDASI HULU APRON
Skala 1 : 20

1.00 1.00

2.00 Selimut beton 2.40


s = 100
1.28
1.00 1.00
Tulangan Utama
D12 - 90
Tulangan Bagi
D10 - 100
1.00 1.00 2.00 1.00 1.00
0.50
POTONGAN BENDUNG UTAMA
Skala 1 : 20 0.30

Tulangan Utama
D12 - 90

Tulangan Bagi Selimut beton


1.00 D10 - 100 s = 100 1.00

Sluice Gate
7.00 Pembilas Trash rack Siphon 1 x 1 m
0.30
POTONGAN LANTAI PEREDAM ENERGI
0.70
Skala 1 : 20

0.15 1.00
POTONGAN A-A KANTONG LUMPUR

anak Sungai Bungur


SKALA 1 :50 Total Panjang Kantong Lumpur, L = 82 meter

B
Trashrack

Sluice Gate

6.00 1.00 1.60

A A

B
1.00

DENAH KANTONG LUMPUR & SIPHON


6.00
SKALA 1 : 50

0.70 1.00

1.00

POTONGAN B-B KANTONG LUMPUR


SKALA 1 : 50

KEMENTERIAN PEKERJAAN UMUM Provinsi :


DIREKTORAT JENDERAL SUMBER DAYA AIR KALIMANTAN SELATAN
BALAI WILAYAH SUNGAI KALIMANTAN II Proyek Irigasi :
Jl. Tambun Bungai No. 26 Telp. (0513) 22085 - 22086 Kuala Kapuas. DESAIN PENINGKATAN
Kalteng 73514 JARINGAN IRIGASI
D.I. BUNGUR
DAERAH IRIGASI BUNGUR - SALURAN BEKAMBIT
Kabupaten Lokasi :
DETAIL PENULANGAN DAN KANTONG LUMPUR KOTABARU
No. Lembar :
Ketua Tim Yuli Milandari, ST No. Register :
Digambar Muhammad Fahmi K. Tanggal : No. Kontrak :
Di Periksa Ketua Direksi Athanasius Donny F., S.T. 4 April HK.02.03/BWS.KAL-II/
Di Setujui PPK Perenc. & Program Kalsel M. Ilyas F., S.T., M.Sc. 2019 PP.KS/01/2019