Laporan Akhir

Penyusunan Penilaian Kinerja Sungai BKT dan AKNOP Sungai

DAFTAR ISI

Halaman
KATA PENGANTAR.............................................................................................. ii
DAFTAR ISI............................................................................................................ iii
DAFTAR TABEL.................................................................................................... vi
DAFTAR GAMBAR................................................................................................ vii
BAB I. PENDAHULUANI................................................................................. I-1
1.1. Latar Belakang............................................................................ I-1
1.1.1. Maksud dan Tujuan....................................................... I-2
1.1.2. Sasaran......................................................................... I-2
1.1.3. Lokasi Pekerjaan........................................................... I-3
1.2. Lingkup Kegiatan......................................................................... I-5
1.2.1. Pekerjaan Pendahuluan................................................. I-5
1.2.2. Pekerjaan Pengukuran.................................................. I-5
1.2.3. Inventarisasi dan Penilaian kondisi fisik dan.................. I-7
kinerja aset prasarana sungai.
1.2.4. Perhitungan AKNOP dan Desain Usulan....................... I-7
Penanganan Lokasi Kritis

Daftar Isi - iii


Laporan Akhir
Penyusunan Penilaian Kinerja Sungai BKT dan AKNOP Sungai

1.2.5. Penentuan skala prioritas penanganan.......................... I-8


1.2.6. Pelaporan...................................................................... I-8
BAB II. METODOLOGI PELAKSANAAN......................................................... II - 1
2.1. Pendekatan Studi........................................................................ II - 1
2.1.1. Pendekatan Secara Umum............................................ II - 1
2.1.2. Pendekatan Teknis........................................................ II - 2
2.1.3. Dasar Hukum................................................................. II - 3
2.2. Metodologi Pelaksanaan Pekerjaan............................................ II - 4
2.2.1. Persiapan dan Pengumpulan Data................................ II - 4
2.2.2. Pemasangan Patok HM dan KM.................................... II - 6
2.2.3. Survey Topografi / Pengukuran Teknis Sungai.............. II - 7
2.2.4. Analisa Hidrologi............................................................ II - 11
2.2.5. Analisa Hidrolika............................................................ II - 16
2.2.6. Inventarisasi dan Penilaian Kondisi Fisik dan................ II - 17
Kinerja Asset Prasarana Sunga
2.2.7. Penilaian Teknis Kinerja Sungai & Prasarana Sungai.... II - 44
2.2.8. Penilaian Kinerja Organisasi OP SDA........................... II - 50
2.2.9. Review Prasaran Sungai............................................... II - 54
2.2.10. Penggambaran Desain.................................................. II - 54
2.2.11. Penyusunan Pedoman Operasi dan Pemeliharaan....... II - 54
BAB III. INVENTARISASI DATA....................................................................... III - 1

Daftar Isi - iv
Laporan Akhir
Penyusunan Penilaian Kinerja Sungai BKT dan AKNOP Sungai

3.1. SURVEY TOPOGRAFI.................................................................. III - 1


3.1.1. Persiapan......................................................................... III - 2
3.1.2. Survei Pendahuluan......................................................... III - 2
3.2. PELAKSANAAN PENGUKURAN TOPOGRAFI............................ III - 2
3.2.1. Pengukuran Kerangka Horizontal (Polygon).................... III - 2
3.2.2. Pengukuran Kerangka Vertikal (Waterpass).................... III - 5
3.2.3. Pengukuran Detil Situasi Dan Profil Melintang................. III - 7
3.3. PENGOLAHAN DATA................................................................... III - 8
3.3.1. Perhitungan Koordinat..................................................... III - 8
3.3.2. Perhitungan Elevasi......................................................... III - 11
3.3.3. Perhitungan Tachimetri.................................................... III - 12
3.3.4. Pekerjaan Penggambaran............................................... III - 12
3.4. ANALISA DATA HITUNGAN POLYGON....................................... III - 13
3.5. ANALISA DATA HITUNGAN WATERPASS.................................. III - 14
3.6. HASIL PENGUKURAN.................................................................. III - 14
3.6.1. Hasil Pengukuran dana Pemasangan Patok.................... III - 17
3.6.2. Pemasangan Patok HM dan KM...................................... III - 17
3.6.3. Pengukuran Alur Sungai.................................................. III - 22
3.7. SURVEY INVENTARISASI............................................................ III - 28
3.7.1. Lokasi 1 : HM. 28 + 700................................................ III - 28
3.7.2. Lokasi 2 : HM. 28 + 400................................................ III - 30

Daftar Isi - v
Laporan Akhir
Penyusunan Penilaian Kinerja Sungai BKT dan AKNOP Sungai

3.7.3. Lokasi 3 : HM. 27 + 500................................................ III - 32


3.7.4. Lokasi 4 : HM. 26 + 700................................................ III - 34
3.7.5. Lokasi 5 : HM. 25 + 000................................................ III - 36
3.7.6. Lokasi 6 : HM. 23 + 600................................................ III - 38
3.7.7. Lokasi 7 : HM. 15 + 100................................................ III - 40
3.7.8. Lokasi 8 : HM. 15 + 600................................................ III - 42
3.7.9. Lokasi 9 : HM. 14 + 800................................................ III - 43
3.7.10. Lokasi 10 : HM. 11 + 000.............................................. III - 47
3.7.11. Lokasi 11 : HM. 6 + 800................................................ III - 49
3.7.12. Lokasi 12 : HM. 5 + 500................................................ III - 51
3.7.13. Lokasi 13 : HM. 4 + 100................................................ III - 53
3.7.14. Lokasi 15 : HM. 2 + 600................................................ III - 56
3.7.15. Lokasi 16 : HM. 2 + 000................................................ III - 58
3.7.16. Lokasi 17 : HM. 1 + 600................................................ III - 60
3.7.17. Lokasi 18 : HM. 0 + 600................................................ III - 62
3.8. KESIMPULAN HASIL SURVEY INVENTARISASI......................... III - 65
BAB IV. ANALISA HIDROLOGI DAN HIDROLIKA........................................... IV - 1
4.1. Umum.......................................................................................... IV - 1
4.1.1. Lokasi Daerah Studi...................................................... IV - 1
4.1.2. Tata Guna Lahan........................................................... IV - 2
4.2. Analisa Curah Hujan Rancangan................................................ IV - 2

Daftar Isi - vi
Laporan Akhir
Penyusunan Penilaian Kinerja Sungai BKT dan AKNOP Sungai

4.2.1. Stasiun Curah Hujan...................................................... IV - 2


4.2.2. Curah Hujan Maksimum................................................ IV - 2
4.2.3. Curah Hujan Wilayah..................................................... IV - 3
4.2.4. Statistik Dasar Data Curah Hujan Wilayah..................... IV - 6
4.2.5. Jenis Distribusi Statistik................................................. IV - 12
4.2.6. Uji Keselarasan Distribusi.............................................. IV - 17
4.2.7. Distribusi Terpilih........................................................... IV - 27
4.2.8. Curah Hujan Rancangan............................................... IV - 27
4.2.9. Hujan Efektif.................................................................. IV - 28
4.2.10. Metode Distribusi Hujan Jam-Jaman............................. IV - 28
4.3. Analisa Debit Rancangan............................................................ IV - 30
4.3.1. HSS Nakayasu.............................................................. IV - 30
4.3.2. Hasil Perhitungan Hidrograf Nakayasu.......................... IV - 32
4.3.3. Hasil Perhitungan Hidrograf Nakayasu.......................... IV - 34
4.3.4. Pengaturan Bukaan Pintu BKT...................................... IV - 29
4.3.5. HSS ITB I dan II............................................................. IV - 35
4.3.6. Hasil Perhitungan HSS ITB I.......................................... IV - 36
4.3.7. Hasil Perhitungan HSS ITB II......................................... IV - 37
4.3.8. Metode Banjir Rancangan Terpilih................................. IV - 38
4.3.9. Perbandingan Dengan Hasil Studi Terdahulu................ IV - 39
4.3.10. Kesimpulan.................................................................... IV - 40

Daftar Isi - vii


Laporan Akhir
Penyusunan Penilaian Kinerja Sungai BKT dan AKNOP Sungai

4.4. Data Pasang Surut...................................................................... IV - 40


4.5. Analisa Hidrolika.......................................................................... IV - 40
4.5.1. Metode Analisa Hidraulika............................................. IV - 40
4.5.2. Software HEC-RAS....................................................... IV - 41
4.5.3. Persamaan Yang Digunakan......................................... IV - 41
4.5.4. Pelaksanaan Pemodelan............................................... IV - 42
4.5.5. Penampang Memanjang di Sungai Penggaron.............. IV - 47
4.5.6. Penampang Memanjang di Sungai BKT........................ IV - 48
4.6. Analisa Pembagian Aliran Di Bendung Pucang Gading............... IV - 49
4.6.1. Sistem Sungai Dolok - Penggaron................................. IV - 49
4.6.2. Kapasitas Sungai........................................................... IV - 49
4.6.3. Pembagian Aliran di Bendung Pucang Gading.............. IV - 50
4.6.4. Pengaturan Pintu Air BKT untuk Kondisi Saat ini........... IV - 53
4.7. Kesimpulan Dan Rekomendasi................................................... IV - 54
4.7.1. Kesimpulan.................................................................... IV - 54
4.7.2. Rekomendasi................................................................. IV - 55
BAB V. PENILAIAN KONDISI FISIK DAN FUNGSI......................................... V-1
5.1. Tata Cara Penilaian Kinerja Prasarana....................................... V-1
5.1.1. Prasarana Utama Sungai................................................. V-7
5.2. Penyusunan Prioritas.................................................................. V - 12
5.1.2. Pendahuluan.................................................................... V - 12
5.1.3. Kriteria Penyusunan Prioritas........................................... V - 12
5.1.4. Susunan Skala Prioritas................................................... V - 12
BAB VI. ANGKA KEBUTUHAN NYATA OPERASI DAN PEMELIHARAAN.. . . VI - 1
6.1. Pendahuluan............................................................................... VI - 1
6.2. Kegiatan Op Sungai Penggaron dan BKT................................... VI - 1
6.2.1 Operasional Prasarana Sungai...................................... VI - 1
6.2.2 Pemeliharaan Sungai.................................................... VI - 9
6.2.3 Pemeliharaan Prasarana Sungai................................... VI - 13
6.3. Angka Kebutuhan Nyata Operasional Dan Pemeliharaan........... VI - 17
6.3.1 Biaya Operasional Prasarana Sungai............................ VI - 17
6.3.2 Biaya Pemeliharaan Sungai........................................... VI - 19
6.4. Jadwal Kegiatan Operasi Dan Pemeliharaan Sungai.................. VI - 30
Penggaron dan Sungai BKT
BAB VII. KESIMPULAN...................................................................................... VII - 1
7.1. Kesimpulan.................................................................................. VII - 1
7.2. Rekomendasi.............................................................................. VII - 3

Daftar Isi - viii


Laporan Akhir
Penyusunan Penilaian Kinerja Sungai BKT dan AKNOP Sungai

DAFTAR TABEL

Halaman
Tabel 2.1. Parameter Pemantauan dan Evaluasi Pelaksanaan OP SDA............ II - 41
Tabel 2.2. Blangko Penilaian Kinerja OP SDA.................................................... II - 43
Tabel 3.1. Koordinat Referensi BM..................................................................... III - 3
Tabel 3.2. Koordinat Patok HM dan KM.............................................................. III - 17

Tabel 4.1. Tata Guna Lahan Kota Semarang...................................................... IV - 2


Tabel 4.2. Data Curah Hujan Maksimum Stasiun Curah Hujan (2007-2016)...... IV - 3
Tabel 4.3. Proporsi Pengaruh Stasiun Hujan terhadap Luasan DAS.................. IV - 5
Tabel 4.4. Perhitungan Curah Hujan Areal (Polygon Thiessen) DAS.................. IV - 6
Penggaron, Kali Candi, Kali Babak dan Kedung Mundu
Tabel 4.5. Statistik Dasar Data Curah Hujan DAS Penggaron............................ IV - 8
Tabel 4.6. Statistik Dasar Data Curah Hujan DAS Kali Candi............................. IV - 9
Tabel 4.7. Statistik Dasar Data Curah Hujan DAS Kali Bajak.............................. IV - 10
Tabel 4.8. Statistik Dasar Data Curah Hujan DAS Kali Kedung Mundu.............. IV - 11
Tabel 4.9. Faktor Frekuensi Normal.................................................................... IV - 13
Tabel 4.10. Standar Variabel (Kt).......................................................................... IV - 14
Tabel 4.11. Reduced Mean (Yn)........................................................................... IV - 15
Tabel 4.12. Reduced Standard Deviation (Sn)...................................................... IV - 15
Tabel 4.13. Reduced Variated (Yt)........................................................................ IV - 15
Tabel 4.14. Distribusi Log Pearson III untuk Koefisien Kemencengan Cs............. IV - 16
Tabel 4.15. Nilai Delta Kritis ntuk Uji Keselarasan Smirnov Kolmogorov.............. IV - 18
Tabel 4.16. Hasil Uji Smirnov Kolmogorov DAS Penggaron................................. IV - 19
Tabel 4.17. Hasil Uji Smirnov Kolmogorov DAS Kali Candi................................... IV - 19
Tabel 4.18. Hasil Uji Smirnov Kolmogorov DAS Kali Bajak................................... IV - 20
Tabel 4.19. Hasil Uji Smirnov Kolmogorov DAS Kali Kedung Mundu.................... IV - 20
Tabel 4.20. Nilai Kritis untuk Distribusi Chi Kuadrat.............................................. IV - 22
Tabel 4.21. Hasil Uji Square untuk Distribusi Normal DAS Penggaron................. IV - 23
Tabel 4.22. Hasil Uji Square untuk Distribusi Log Normal DAS Penggaron.......... IV - 23
Tabel 4.23. Hasil Uji Square untuk Distribusi Gumbel DAS Penggaron................ IV - 23
Tabel 4.24. Hasil Uji Square untuk Distribusi Log Pearson III DAS Penggaron..... IV - 24
Tabel 4.25. Hasil Uji Square untuk Distribusi Normal DAS Kali Candi.................. IV - 24
Tabel 4.26. Hasil Uji Square untuk Distribusi Log Normal DAS Kali Candi............ IV - 24
Tabel 4.27. Hasil Uji Square untuk Distribusi Gumbel DAS Kali Candi................. IV - 24
Tabel 4.28. Hasil Uji Square untuk Distribusi Log Pearson III DAS Kali Candi...... IV - 25
Tabel 4.29. Hasil Uji Square untuk Distribusi Normal DAS Kali Bajak................... IV - 25
Tabel 4.30. Hasil Uji Square untuk Distribusi Log Normal DAS Kali Bajak............ IV - 25
Tabel 4.31. Hasil Uji Square untuk Distribusi Gumbel DAS Kali Bajak.................. IV - 25
Tabel 4.32. Hasil Uji Square untuk Distribusi Log Pearson III DAS Kali Bajak...... IV - 26
Tabel 4.33. Hasil Uji Square untuk Distribusi Normal DAS Kali Kedung Mundu.... IV - 26
Tabel 4.34. Hasil Uji Square untuk Distribusi Log Normal DAS Kali Kedung......... IV - 26
Mundu
Tabel 4.35. Hasil Uji Square untuk Distribusi Gumbel DAS Kali Kedung Mundu... IV - 26
Tabel 4.36. Hasil Uji Square untuk Distribusi Log Pearson III DAS Kali................ IV - 27
Kedung Mundu
Tabel 4.37. Perhitungan Kala Ulang Data Hujan DAS Penggaron (kiri) dan......... IV - 27
DAS Kali Candi (kanan)
Tabel 4.38. Perhitungan Kala Ulang Data Hujan DAS Kali Bajak (kiri) dan........... IV - 28
Kali Kedung Mundu (kanan)
Tabel 4.39. Perhitungan Curve Number................................................................ IV - 28

Daftar Isi - ix
Laporan Akhir
Penyusunan Penilaian Kinerja Sungai BKT dan AKNOP Sungai

Tabel 4.40. Distribusi Hujan DAS Penggaron........................................................ IV - 29


Tabel 4.41. Distribusi Hujan DAS Kali Candi......................................................... IV - 29
Tabel 4.42. Distribusi Hujan DAS Kali Bajak......................................................... IV - 29
Tabel 4.43. Distribusi Hujan DAS Kali Kedung Mundu.......................................... IV - 29
Tabel 4.44. Hasil Perhitungan Debit Rencana DAS Penggaron............................ IV - 32
Tabel 4.45. Hasil Perhitungan Debit Rencana DAS Kali Candi............................. IV - 33
Tabel 4.46. Hasil Perhitungan Debit Rencana DAS Kali Bajak............................. IV - 33
Tabel 4.47. Hasil Perhitungan Debit Rencana DAS Kali Kedung Mundu.............. IV - 33
Tabel 4.48. Hasil Perhitungan Debit Rencana DAS Penggaron............................ IV - 34
Tabel 4.49. Hasil Perhitungan Debit Rencana DAS Kali Candi............................. IV - 34
Tabel 4.50. Hasil Perhitungan Debit Rencana DAS Kali Bajak............................. IV - 34
Tabel 4.51. Hasil Perhitungan Debit Rencana DAS Kali Kedung Mundu.............. IV - 35
Tabel 4.52. Debit Rencana DAS Penggaron Titik Kontrol Bendung...................... IV - 39
Pucang Gading
Tabel 4.53. Hasil Pemodelan................................................................................ IV - 52
Tabel 5.1. Indikator Kondisi Fisik Prasarana Sungai........................................... V-1
Tabel 5.2. Indikator Fungsional Prasarana Sungai.............................................. V-2
Tabel 5.3. Indikator Kebutuhan Biaya O & P Prasarana Sungai.......................... V-2
Tabel 5.4. Interval Indeks Kinerja Prasarana Sungai.......................................... V-3
Tabel 5.5. Indeks Lokasi Per Titik Menurut Desa / Kelurahan............................. V-5
Tabel 5.6. Form Catatan Inspeksi / Penelusuran Prasarana Sungai................... V-7
Tabel 6.1. Beban Kerja Pengamat dan Juru....................................................... VI -2
Tabel 6.2. Kebutuhan Pengamat, Juru da Petugas............................................. VI -2
Tabel 6.3. Standar Tindakan Pemeliharaan Pada Ruang Sungai....................... VI -10

Daftar Isi - x
Laporan Akhir
Penyusunan Penilaian Kinerja Sungai BKT dan AKNOP Sungai

DAFTAR GAMBAR

Halaman
Gambar 1.1. Lokasi Pekerjaan Penilaian Kinerja Sungai BKT & AKNOP Sungai I-3
Gambar 1.2. Lokasi Pekerjaan Penilaian Kinerja Sungai BKT & AKNOP Sungai I-4
Gambar 2.1. Patok KM....................................................................................... II - 5
Gambar 2.2. Patok HM....................................................................................... II - 5
Gambar 2.3. Cara Mendapatkan Sudut BM2 - BM1 - P8.................................... II - 6
Gambar 2.4. Bentuk Matematis Hitungan Koordinat........................................... II - 7
Gambar 2.5. Observasi Ketinggian..................................................................... II - 9
Gambar 2.6. Daerah aliran sungai dan sub daerah aliran sungai....................... II - 12
Gambar 2.7. Polygon Thiessen yang ada........................................................... II - 13
Gambar 3.1. Bagan Alir Pengukuran Topografi.................................................. III - 1
Gambar 3.2. Pengukuran Tachimetri.................................................................. III - 7
Gambar 3.3. Titik Pengukuran Profil................................................................... III - 8
Gambar 3.4. Peta Situasi Sungai BKT – Penggaron.......................................... III - 22
Gambar 3.5. Peta Situasi Sungai BKT – Penggaron.......................................... III - 64
Gambar 4.1. Peta DAS Lokasi AKNOP BKT...................................................... IV - 1
Gambar 4.2. Metode Polygon Thiessen............................................................. IV - 4
Gambar 4.3. Polygon Thiessen Wilayah Studi.................................................... IV - 5
Gambar 4.4. Statistik Dasar Data Hujan DAS Penggaron.................................. IV - 9
Gambar 4.5. Statistik Dasar Data Hujan DAS Kali Candi................................... IV - 10
Gambar 4.6. Statistik Dasar Data Hujan DAS Kali Bajak.................................... IV - 11
Gambar 4.7. Statistik Dasar Data Hujan DAS Kali Kedung Mundu..................... IV - 12
Gambar 4.8. Sketsa HSS Nakayasu................................................................... IV - 31
Gambar 4.9. Tampilan Layar Utama Software HEC-RAS................................... IV - 41
Gambar 4.10. Diagram Aliran Berubah Beraturan................................................ IV - 42
Gambar 4.11. Hasil Pemodelan Penampang Memanjang Kondisi Full Bank........ IV - 43
Capacity STA 3+100 (Sawah Besar)
Gambar 4.12. Hasil Pemodelan Penampang Melintang Kondisi Full Bank........... IV - 44
Capacity STA 3+100 (Sawah Besar)
Gambar 4.13. Hasil Pemodelan Penampang Memanjang Kondisi Eksisting)....... IV - 45
(dengan debit rencana Desain 2016
Gambar 4.14. Hasil Pemodelan Penampang Melintang Kondisi Eksisting........... IV - 45
(dengan debit rencana Desain 2016)
Gambar 4.15. Hasil Pemodelan Penampang Memanjang Kondisi Eksisting........ IV - 46
Sungai Penggaron (debit kala ulang 2 tahun)
Gambar 4.16. Hasil Pemodelan Penampang Memanjang Kondisi Eksisting........ IV - 47
Sungai Penggaron (debit kala ulang 50 tahun)
Gambar 4.17. Hasil Pemodelan Penampang Memanjang STA 14+700 s/d......... IV - 47
STA 29+500 Sungai Penggaron (debit kala ulang 2 s/d 50 tahun)
Gambar 4.18. Hasil Pemodelan Penampang Memanjang STA 0+000s/d STA.... IV - 49
14+700 Sungai BKT
Gambar 4.19. Grafik Hubungan Antara Elevasi Muka Air Dan Debit di................ IV - 50
Bendung Pucang Gading dan Bendung Gergaji
Gambar 4.20. Gambar Hasil Pemodelan Kondisi Full Bank Capacity Sta 3+550. IV - 53
Gambar 5.1. Peta Kategori Pemeliharaan................................................... V - 20

Daftar Isi - xi

Anda mungkin juga menyukai