Anda di halaman 1dari 61

PERENCANAAN

PERHITUNGAN DESAIN STRUKTUR


DED PUSDATIN 2022

DAFTAR ISI

1. Informasi Umum.................................................................................................................................................................... 4
1.1 Nama Pekerjaan................................................................................................................................................................ 4
1.2 Pendahuluan..................................................................................................................................................................... 4
1.3 Satuan............................................................................................................................................................................... 5
1.4 Metodologi Desain............................................................................................................................................................ 5
1.5 Standar Material................................................................................................................................................................ 5
1.6 Peraturan – Peraturan Standar yang digunakan...............................................................................................................5
1.7 Desain Beban SNI 1727:2020........................................................................................................................................... 6
1.7.1 Beban Hidup............................................................................................................................................................. 6
1.7.2 Beban Mati............................................................................................................................................................... 6
1.7.3 Beban Hidup Pada Atap........................................................................................................................................... 6
1.7.4 Beban Gempa........................................................................................................................................................... 7
1.7.5 Kombinasi Pembebanan......................................................................................................................................... 12
1.7.6 Pemodelan............................................................................................................................................................. 13
2. Analisis Program Struktur.................................................................................................................................................... 13
2.1 Pemodelan Struktur........................................................................................................................................................ 13
2.2 Input Pemodelan Struktur............................................................................................................................................... 13
2.2.1 Input Material......................................................................................................................................................... 13
2.2.2 Input Beban........................................................................................................................................................... 14
2.3 Pengecekan Pemodelan Struktur.................................................................................................................................... 19
2.3.1 Output ETABS........................................................................................................................................................ 19
 Output Gaya Momen Dari ETABS........................................................................................................................................ 21
 Output Gaya Geser Dari ETABS........................................................................................................................................... 21
 Output Gaya Axial Dari ETABS............................................................................................................................................. 22
3. Analisis Beton...................................................................................................................................................................... 22
3.1 Perhitungan Balok........................................................................................................................................................... 22
3.2 Perhitungan Balok (B400x800)....................................................................................................................................... 23
3.3 Perhitungan Balok (B 350x600)...................................................................................................................................... 27
3.4 Perhitungan Balok (B 250x450)...................................................................................................................................... 31
3.5 Perhitungan Balok (B 200x300)...................................................................................................................................... 35
3.6 Perhitungan Pelat Lantai (T=120 mm)........................................................................................................................... 39
3.7 Perhitungan Pelat Tangga (T=150 mm)......................................................................................................................... 41
3.8 Perhitungan Kolom (K 800x800)..................................................................................................................................... 43
3.9 Perhitungan Kolom (K 700x700)..................................................................................................................................... 45
3.10 Perhitungan Kolom 600x600........................................................................................................................................... 47
3.11 Perhitungan Kolom 500x500........................................................................................................................................... 49
3.12 Perhitungan Pondasi....................................................................................................................................................... 51
a) Perhitungan Pilecap (P1)................................................................................................................................................ 51
b) Perhitungan Pilecap (P2)................................................................................................................................................ 53
c) Perhitungan Pilecap P3................................................................................................................................................... 55
d) Perhitungan Pondasi Borepile......................................................................................................................................... 57

1
DED PUSDATIN 2022

DAFTAR GAMBAR

Gambar 1 Denah Lokasi...................................................................................................................................................................... 3


Gambar 2 Daerah Gempa Indonesia, Ss............................................................................................................................................. 7
Gambar 3 Daerah Gempa Indonesia, S1............................................................................................................................................. 8
Gambar 4 Spektrum Respons Desain.................................................................................................................................................. 9
Gambar 5 Respon Spektra............................................................................................................................................9

Gambar 2. 1 Pemodelan 3D.............................................................................................................................................................. 11


Gambar 2. 2 Input Material Beton.................................................................................................................................................... 12
Gambar 2. 3 Beban SDL (Dinding) (kg.m)........................................................................................................................................ 13
Gambar 2. 4 Beban SDL Pada Lantai (Lantai 1) (kg.m).................................................................................................................... 13
Gambar 2. 5 Beban SDL Pada Lantai (Lantai 2) (kg.m).................................................................................................................... 14
Gambar 2. 6 Beban SDL Pada Lantai (Lantai 3-Lantai 4) (kg.m)......................................................................................................14
Gambar 2. 7 Beban SDL Pada Lantai (Lantai 5-Lantai Rooftop) (kg.m)...........................................................................................15
Gambar 2. 8 Beban Hidup Pada Lantai (Lantai 1) (kg.m).................................................................................................................15
Gambar 2. 9 Beban Hidup Pada Lantai (Lantai 2) (kg.m).................................................................................................................16
Gambar 2. 10 Beban Hidup Pada Lantai (Lantai 3 – Lantai 4) (kg.m)..............................................................................................16
Gambar 2. 11 Beban Hidup Pada Lantai (Lantai 5 – Lantai Rooftop) (kg.m)...................................................................................17

DAFTAR TABEL

Tabel 1. 1 Beban Hidup....................................................................................................................................................................... 5


Tabel 1. 2 Beban Hidup Pada Atap..................................................................................................................................................... 5
Tabel 1. 3 Kategori Risiko Bangunan.................................................................................................................................................. 6
Tabel 1. 4 Faktor Keutamaan.............................................................................................................................................................. 6
Tabel 1. 5 Koefisien Situs, Fa.............................................................................................................................................................. 7
Tabel 1. 6 Koefisien Situs, Fv.............................................................................................................................................................. 7
Tabel 1. 7 KDS Parameter Respon Percepatan Periode Pendek........................................................................................................10
Tabel 1. 8 KDS Parameter Respon Percepatan Periode 1 detik........................................................................................................10

2
DED PUSDATIN 2022

1. Informasi Umum

1.1 Nama Pekerjaan


Laporan ini merupakan laporan perhitungan analisis detail struktur untuk Perencanaan Perkuatan
Struktur Gedung Pusdatin BPOM.

1.2 Pendahuluan
Secara umum, konsep desain struktur mengacu pada SNI 1726:2019 dengan mempertimbangkan
beban gempa. Berdasarkan konsep yang digunakan, saat gempa bumi terjadi sesuai dengan zona
gempa yang telah ditetapkan, kerusakan struktur diizinkan sebagai bentuk disipasi energi gempa.
Namun, struktur bangunan tidak boleh runtuh.
Dengan menggunakan konsep ini, saat gempa rencana terjadi kerusakan struktur diizinkan terjadi,
tetapi struktur tidak boleh runtuh dan masih dapat dievakuasi. Desain struktur menggunakan
perencanaan beton bertulang. Dengan pengembangan perencanaan desain, bangunan yang
direncanakan akan lebih efisien serta telah mempertimbangkan keamanan yang cukup.
Lokasi proyek ada di Jalan Percetakan Negara No.23 Jakarta Pusat, Indonesia.

Gambar 1 Denah Lokasi

1.3 Satuan

Satuan unit menggunakan satuan SI.

3
DED PUSDATIN 2022

1.4 Metodologi Desain

Analisis dan desain struktur didesain dengan memperhatikan kekuatan, stabilitas, dan daya dukung
sesuai dengan metodologi desain seperti peraturan, beban, dan lain halnya yang diakomodasi dalam
perhitungan desain.

1.5 Standar Material

a. Kuat tekan Beton :


 Tie Beam : K - 250
 Balok : K - 250
 Kolom : K - 300
 Plat Lantai : K - 250
 Tangga : K - 250
 Pilecap : K - 350
 Borepile : K - 350

b. Mutu baja Tulangan Beton :


Tulangan baja yang digunakan pada desain struktur bangunan yaitu baja dengan spesifikasi antara
lain :
 Tegangan leleh : BJTS – 37, Fy = 400 Mpa. Peraturan mensyaratkan tulangan yang
digunakan dalam perencanaan struktur (baik sebagai tulangan utama maupun tulangan
sengkang) adalah tulangan ulir. Dengan digunakannya tulangan ulir dalam perencanaan
elemen struktur, diharapkan elemen struktur memiliki tingkat lekatan yang memadai antara
material beton dengan baja tulangan ketika menahan gaya gempa (memenuhi syarat
kompatibilitas).
 Modulus Elastisitas : Es = 200000 Mpa

1.6 Peraturan – Peraturan Standar yang digunakan


1. SNI 2847:2019 tentang ”Persyaratan beton struktural untuk bangunan gedung dan
penjelasan”.
2. SNI 1726:2019 tentang ”Tata cara perencanaan ketahanan gempa untuk bangunan gedung
dan nongedung.
3. SNI 1727:2020 tentang ”Beban desain minimum dan kiteria terkait bangunan gedung dan
struktur lain”.
4. SNI 2052:2017 tentang ”Baja Tulangan Beton”.
5. Standar lain yang bersesuaian.

4
DED PUSDATIN 2022

1.7 Desain Beban SNI 1727:2020

1.7.1 Beban Hidup

Beban Area Ruang Kantor 2,4 kN/m2


Beban Area Ruang Server 4.79 kN/m2
Tabel 1. 1 Beban Hidup

1.7.2 Beban Mati

Beton 2.4 kN/m3


Baja 7.85 kN/m3
Keramik 0.24 kN/m2/cm
Mortar 0.21 kN/m2/cm
M/E 0.40 kN/m2/cm
Pasangan ½ Bata 2.5 kN/m2

1.7.3 Beban Hidup Pada Atap

Beban atap berasal dari :


a. Pemeliharaan, peralatan dan material; dan
b. Material struktur yang dapat dipindahkan, seperti pot tanaman dan perawatan.
c. Dan beban yang diperuntukan untuk tempat berkumpul
Beban hidup atap diatur dalam SNI Pembebanan seperti dibawah ini.

Tabel 1. 2 Beban Hidup Pada Atap

5
DED PUSDATIN 2022

1.7.4 Beban Gempa

1) Penentuan Kategori Resiko


Bangunan gedung dan struktur lain dapat diklasifikasikan berdasarkan resiko hidup manusia,
kesehatan, dan kesejahteraan terkait dengan kerusakan atau kegagalan oleh alam pada hunian
mereka atau penggunaan menurut Tabel 1.3 untuk tujuan ketetapan penerapan beban gempa.
Kategori resiko untuk seluruh bangunan termasuk kategori III dengan faktor keutamaan 1.25.

Tabel 1. 3 Kategori Risiko Bangunan

Tabel 1. 4 Faktor Keutamaan

6
DED PUSDATIN 2022

2) Menentukan Klasifikasi Situs


Berdasarkan data tanah, rata-rata nilai sondir maka klasifikasi tanah adalah SE (Tanah Lunak).

3) Menentukan Parameter Kecepatan


Parameter Ss dan S1 harus ditentukan dari 0,2 dan 1 detik respon spectra seperti ditunjukan pada
Gambar 2 dan gambar 3. Koefisien Lokasi (F a dan Fv) ditentukan dari Tabel 1.5 dan 1.6
berdasarkan klasifikasi tanah.

Tabel 1. 5 Koefisien Situs, Fa

Tabel 1. 6 Koefisien Situs, Fv

7
DED PUSDATIN 2022

Gambar 2 Daerah Gempa Indonesia, Ss

Gambar 3 Daerah Gempa Indonesia, S1

4) Penentuan Pertimbangan Maksimum Beban Gempa


Parameter spektra respon percepatan gempa MCE R untuk periode pendek (SMS) dan 1s (SM1),
menyesuaikan kepada Kelas Dampak Lokasi, harus ditentukan oleh :

Keterangan :
SS = Parameter respon spektra percepatan gempa MCE R terpetakan untuk periode pendek
S1 = Parameter respon spektra percepatan gempa MCE R terpetakan untuk periode 1 detik
Mengacu pada persamaan diatas, parameter lokasi (Jakarta) :

5) Penentuan Parameter Percepatan Spektra

8
DED PUSDATIN 2022

Desain parameter percepatan gempa respon spektra pada periode pendek, S DS, dan pada periode
1s, SD1, harus ditentukan dari perhitungan seperti dibawah berikut :

Mengacu pada persamaan diatas, parameter lokasi (Jakarta):

6) Desain Gempa Respon Spektra


Desain respon spektrum sesuai dengan standar ini, prosedur pergerakan spesifik tanah pada
lokasi tidak digunakan, kurva respon spektra harus dikembangkan seperti pada gambar di bawah.

Gambar 4 Spektrum Respons Desain

Terlampir adalah data untuk desain gempa pada proyek ini menggunakan program yang
dikembangkan oleh puskim untuk adaptasi SNI Gempa.

Gambar 5 Respon Spektra

9
DED PUSDATIN 2022

7) Menentukan Kategori Desain Gempa


Kategori desain gempa berdasarkan nilai SDS dan SD1. mengacu pada tabel di bawah maka kategori
desain gempa adalah D.

Tabel 1. 7 KDS Parameter Respon Percepatan Periode Pendek

Tabel 1. 8 KDS Parameter Respon Percepatan Periode 1 detik

8) Menentukan Sistem Struktur


Bedasarkan kategori desain seismik, maka dapat ditentukan sistem penahan-gaya gempa yang
digunakan pada lokasi. Sistem penahan-gaya gempa dengan kategori D untuk Gedung Pusdatin
adalah Sistem Rangka Beton Bertulang Pemikul Momen Khusus.

1.7.5 Kombinasi Pembebanan

Kombinasi Pembebanan Desain Struktur Utama :


Berdasarkan SNI, kombinasi pembebanan digunakan sebagai berikut :
1. 1,4 (DL+SDL)
2. 1,2 (DL+SDL) + 1,6LL + 0,5 (Lr atau S atau R)
3. 1,2 (DL+SDL) + 1,6(Lr atau S atau R) + (L atau 0,5W)
4. 1,2 (DL+SDL) + 1,0W + L + 0,5 (Lr atau S atau R)
5. 0,9 (DL+SDL) + 1,0W
6. 1,2 (DL+SDL) + Ev + Eh + L
7. 0,9 (DL+SDL) + Ev + Eh
dimana:
DL : Beban Mati
SDL : Beban Mati Tambahan
LL : Beban Hidup

10
DED PUSDATIN 2022

W : Beban Angin
Ev : Beban Gempa Vertikal
Eh : Beban Gempa Horizontal

Kombinasi Pembebanan Desain Pondasi :


1. D
2. D+L
3. D + (Lr atau R)
4. D + 0,75(L) + 0,75 (Lr atau R)
5. D + 0,6W
6. D + 0,75(0,6W) + 0,75L + 0,75(Lr atau R)
7. 0,6D + 0,6W
8. 1,0D + 0,7Ev + 0,7Eh
9. 1,0D + 0,525Ev + 0,525Eh + 0,75L
10. 0,6D + 0,7Ev + 0,7Eh

1.7.6 Pemodelan

Struktur bangunan beton dimodelkan 3 dimensi. Sistem struktur dimodelkan dengan menggunakan
ETABS 18.1. Model dibuat semirip mungkin dengan kondisi aktual.

2. Analisis Program Struktur

Struktur bangunan beton dimodelkan 3 dimensi. Sistem struktur dimodelkan dengan menggunakan
ETABS 18.1. Model dibuat semirip mungkin dengan kondisi aktual.

1.8 Pemodelan Struktur

Seluruh pemodelan struktur menggunakan program ETABS 18.1.

11
DED PUSDATIN 2022

Gambar 2. 1 Pemodelan 3D

1.9 Input Pemodelan Struktur

Beban dan material yang sudah dijabarkan pada bab sebelumnya akan dimasukan kedalam
pemodelan struktur pada Software ETABS 18.1.

1.9.1 Input Material

Terlampir input material pada Software ETABS 18.1.

Gambar 2. 2 Input Material Beton

12
DED PUSDATIN 2022

1.9.2 Input Beban

Terlampir input pembebanan pada masing-masing elemen struktur pada Software ETABS 18.1.

Gambar 2. 3 Beban SDL (Dinding) (kg.m)

Gambar 2. 4 Beban SDL Pada Lantai (Lantai 1) (kg.m)

13
DED PUSDATIN 2022

Gambar 2. 5 Beban SDL Pada Lantai (Lantai 2) (kg.m)

Gambar 2. 6 Beban SDL Pada Lantai (Lantai 3-Lantai 4) (kg.m)

14
DED PUSDATIN 2022

Gambar 2. 7 Beban SDL Pada Lantai (Lantai 5-Lantai Rooftop) (kg.m)

Gambar 2. 8 Beban Hidup Pada Lantai (Lantai 1) (kg.m)

15
DED PUSDATIN 2022

Gambar 2. 9 Beban Hidup Pada Lantai (Lantai 2) (kg.m)

Gambar 2. 10 Beban Hidup Pada Lantai (Lantai 3 – Lantai 4) (kg.m)

16
DED PUSDATIN 2022

Gambar 2. 11 Beban Hidup Pada Lantai (Lantai 5 – Lantai Rooftop) (kg.m)

1.10 Pengecekan Pemodelan Struktur

Pengecekan pemodelan struktur dilakukan untuk mengecek apakah desain yang sudah dilakukan
sudah memenuhi pengecekan pada masing-masing element.

1.10.1Output ETABS

Dari hasil analisis yang dilakukan dengan menggunakan software ETABS maka didapatkan
hasil output sebagai berikut.
 Analisis terhadap beban mati

17
DED PUSDATIN 2022

 Analisis terhadap beban hidup

 Analisis terhadap beban gempa arah x dan y

18
DED PUSDATIN 2022

19
DED PUSDATIN 2022

 Output Gaya Momen Dari ETABS

 Output Gaya Geser Dari ETABS

20
DED PUSDATIN 2022

 Output Gaya Axial Dari ETABS

2. Analisis Beton

2.1 Perhitungan Balok

21
DED PUSDATIN 2022

2.2 Perhitungan Balok (B400x800)

BAHAN STRUKTUR
Kuat tekan beton, fc' = 20,75 MPa
Tegangan leleh baja (deform) untuk tulangan lentur, fy = 400 MPa
Tegangan leleh baja (polos) untuk tulangan geser, fy = 240 MPa
DIMENSI BALOK
Lebar balok b= 400 mm
Tinggi balok h= 800 mm
Diameter tulangan (deform) yang digunakan, D= 22 mm

Diameter sengkang (polos) yang digunakan, P= 10 mm


Tebal bersih selimut beton, ts = 40 mm

MOMEN DAN GAYA GESER RENCANA


Momen rencana positif akibat beban terfaktor, Mu+ = 378,645 kNm
Momen rencana negatif akibat beban terfaktor, Mu - = 353,345 kNm
Gaya geser rencana akibat beban terfaktor, Vu = 278,513 kN

B. PERHITUNGAN TULANGAN

Untuk : f c ' ≤ 30 MPa, b1 = 0,85


Untuk : f c ' > 30 MPa, b 1 = 0.85 - 0.05 * ( f c' - 30) / 7 = -
Faktor bentuk distribusi tegangan beton,  b1 = 0,85
Rasio tulangan pada kondisi balance ,
rb = b 1* 0.85 * f c’/ fy * 600 / ( 600 + f y ) = 0,0225
Faktor tahanan momen maksimum,
Rmax = 0.75 * rb * f y * [1 – ½*0.75* rb * f y / ( 0.85 * f c’ ) ] = 5,4561
Faktor reduksi kekuatan lentur, f = 0,80
Jarak tulangan terhadap sisi luar beton, ds = ts +  + D/2 = 61,00 mm
Jumlah tulangan dlm satu baris, ns = ( b - 2 * ds) / ( 25 + D ) = 5,91
Digunakan jumlah tulangan dalam satu baris, ns = 2 bh
Jarak horisontal pusat ke pusat antara tulangan,
x = ( b - ns * D - 2 * ds ) / ( ns - 1 ) = 234,00 mm
Jarak vertikal pusat ke pusat antara tulangan, y = D + 25 = 47,00 mm

22
DED PUSDATIN 2022

1. TULANGAN MOMEN POSITIF

Momen positif nominal rencana, Mn = Mu+ / f = 473,306 kNm


Diperkirakan jarak pusat tulangan lentur ke sisi beton, d' = 40 mm
Tinggi efektif balok, d = h - d' = 760,00 mm
6 2
Faktor tahanan momen, Rn = Mn * 10 / ( b * d ) = 2,0486
Rn < Rmax  (OK)
Rasio tulangan yang diperlukan :
r = 0.85 * f c’ / f y * [ 1 -  * [1 – 2 * Rn / ( 0.85 * f c’ ) ] = 0,00546
Rasio tulangan minimum, rmin =  f c' / ( 4 * f y ) = 0,00285
Rasio tulangan minimum, rmin = 1.4 / f y = 0,00350
Rasio tulangan yang digunakan,  r = 0,00546
2
Luas tulangan yang diperlukan, As = r * b * d = 1660 mm
2
Jumlah tulangan yang diperlukan, n = As / ( p / 4 * D ) = 4,366
Digunakan tulangan, 5 D 22
2 2
Luas tulangan terpakai, As = n * p / 4 * D = 1901 mm
Jumlah baris tulangan, nb = n / ns = 2,50
nb < 3  (OK)
Baris Jumlah Jarak Juml. Jarak
ke ni yi ni * yi
1 5 61,00 305,00
2 0 0,00 0,00
3 0 0,00 0,00
n= 5 S [ ni * yi ] = 305
Letak titik berat tulangan,  d' = S [ ni * yi ] / n = 61,00 mm
61,00 > 40  perkirakan lagi d' (NG)
Tinggi efektif balok, d = h - d' = 739,00 mm
a = As * f y / ( 0.85 * f c' * b ) = 107,763 mm
Momen nominal, Mn = As * f y * ( d - a / 2 ) * 10-6 = 520,872 kNm
Tahanan momen balok, f * Mn = 416,698 kNm
Syarat : f * Mn ≥ Mu +

416,698 > 378,645  AMAN (OK)

23
DED PUSDATIN 2022

2. TULANGAN MOMEN NEGATIF

Momen negatif nominal rencana, Mn = Mu- / f = 441,681 kNm


Diperkirakan jarak pusat tulangan lentur ke sisi beton, d' = 40 mm
Tinggi efektif balok, d = h - d' = 760,00 mm
6 2
Faktor tahanan momen, Rn = Mn * 10 / ( b * d ) = 1,9117
Rn < Rmax  (OK)
Rasio tulangan yang diperlukan :
r = 0.85 * f c’ / f y * [ 1 -  * [1 – 2 * Rn / ( 0.85 * f c’ ) ] = 0,00507
Rasio tulangan minimum, rmin =  f c' / ( 4 * f y ) = 0,00285
Rasio tulangan minimum, r min = 1.4 / f y = 0,00350
Rasio tulangan yang digunakan,  r = 0,00507
2
Luas tulangan yang diperlukan, As = r * b * d = 1542 mm
2
Jumlah tulangan yang diperlukan, n = As / ( p / 4 * D ) = 4,055
Digunakan tulangan, 5 D 22
2 2
Luas tulangan terpakai, As = n * p / 4 * D = 1901 mm
Jumlah baris tulangan, nb = n / ns = 2,50
nb < 3  (OK)

Baris Jumlah Jarak Juml. Jarak


ke ni yi ni * yi
1 4 61,00 244,00
2 0 0,00 0,00
3 0 0,00 0,00
n= 4 S [ ni * yi ] = 244
Letak titik berat tulangan,  d' = S [ ni * yi ] / n = 61,00 mm
61,00 > 40  perkirakan lagi d' (NG)
Tinggi efektif balok, d = h - d' = 739,0 mm
a = As * f y / ( 0.85 * f c' * b ) = 107,763 mm
Momen nominal, Mn = As * f y * ( d - a / 2 ) * 10-6 = 520,872 kNm
Tahanan momen balok, f * Mn = 416,698 kNm
Syarat : f * Mn ≥ Mu -

416,698 > 353,345  AMAN (OK)

24
DED PUSDATIN 2022

3. TULANGAN GESER

Gaya geser ultimit rencana, Vu = 278,513 kN


Faktor reduksi kekuatan geser, f= 0,60
Tegangan leleh tulangan geser, fy = 240 MPa
Kuat geser beton, Vc = (√ f c') / 6 * b * d * 10-3 = 230,798 kN
Tahanan geser beton, f * Vc = 138,479 kN
 Perlu tulangan geser
Tahanan geser sengkang, f * Vs = Vu - f * Vc = 140,034 kN
Kuat geser sengkang, Vs = 233,390 kN
Digunakan sengkang berpenampang : 2 P 10
2 2
Luas tulangan geser sengkang, Av = ns * p / 4 * P = 157,08 mm
3
Jarak sengkang yang diperlukan : s = Av * f y * d / ( Vs * 10 ) = 122,76 mm
Jarak sengkang maksimum, smax = d / 2 = 369,50 mm
Jarak sengkang maksimum, smax = 250,00 mm
Jarak sengkang yang harus digunakan, s= 122,76 mm
Diambil jarak sengkang :  s= 120 mm
Digunakan sengkang, 2 P 10 120

25
DED PUSDATIN 2022

2.3 Perhitungan Balok (B 350x600)

BAHAN STRUKTUR
Kuat tekan beton, f c' = 20,75 MPa
Tegangan leleh baja (deform) untuk tulangan lentur, fy = 400 MPa
Tegangan leleh baja (polos) untuk tulangan geser, fy = 240 MPa
DIMENSI BALOK
Lebar balok b= 350 mm
Tinggi balok h= 600 mm
Diameter tulangan (deform) yang digunakan, D= 19 mm

Diameter sengkang (polos) yang digunakan, P= 10 mm


Tebal bersih selimut beton, ts = 40 mm

MOMEN DAN GAYA GESER RENCANA


Momen rencana positif akibat beban terfaktor, Mu+ = 181,389 kNm
Momen rencana negatif akibat beban terfaktor, Mu - = 169,429 kNm
Gaya geser rencana akibat beban terfaktor, Vu = 116,280 kN

B. PERHITUNGAN TULANGAN

Untuk : f c' ≤ 30 MPa, b1 = 0,85


Untuk : f c' > 30 MPa, b1 = 0.85 - 0.05 * ( f c' - 30) / 7 = -
Faktor bentuk distribusi tegangan beton,  b1 = 0,85
Rasio tulangan pada kondisi balance ,
rb = b 1* 0.85 * f c’/ f y * 600 / ( 600 + f y ) = 0,0225
Faktor tahanan momen maksimum,
Rmax = 0.75 * rb * f y * [1 – ½*0.75* rb * f y / ( 0.85 * f c’ ) ] = 5,4561
Faktor reduksi kekuatan lentur, f = 0,80
Jarak tulangan terhadap sisi luar beton, ds = ts +  + D/2 = 59,50 mm
Jumlah tulangan dlm satu baris, ns = ( b - 2 * ds) / ( 25 + D ) = 5,25
Digunakan jumlah tulangan dalam satu baris, ns = 2 bh
Jarak horisontal pusat ke pusat antara tulangan,
x = ( b - ns * D - 2 * ds ) / ( ns - 1 ) = 193,00 mm
Jarak vertikal pusat ke pusat antara tulangan, y = D + 25 = 44,00 mm

26
DED PUSDATIN 2022

1. TULANGAN MOMEN POSITIF

Momen positif nominal rencana, Mn = Mu+ / f = 226,736 kNm


Diperkirakan jarak pusat tulangan lentur ke sisi beton, d' = 40 mm
Tinggi efektif balok, d = h - d' = 560,00 mm
6 2
Faktor tahanan momen, Rn = Mn * 10 / ( b * d ) = 2,0657
Rn < Rmax  (OK)
Rasio tulangan yang diperlukan :
r = 0.85 * f c’ / f y * [ 1 -  * [1 – 2 * Rn / ( 0.85 * f c’ ) ] = 0,00551
Rasio tulangan minimum, rmin =  f c' / ( 4 * f y ) = 0,00285
Rasio tulangan minimum, rmin = 1.4 / f y = 0,00350
Rasio tulangan yang digunakan,  r = 0,00551
2
Luas tulangan yang diperlukan, As = r * b * d = 1080 mm
2
Jumlah tulangan yang diperlukan, n = As / ( p / 4 * D ) = 3,808
Digunakan tulangan, 4 D 19
2 2
Luas tulangan terpakai, As = n * p / 4 * D = 1134 mm
Jumlah baris tulangan, nb = n / ns = 2,00
nb < 3  (OK)
Baris Jumlah Jarak Juml. Jarak
ke ni yi ni * yi
1 4 59,50 238,00
2 0 0,00 0,00
3 0 0,00 0,00
n= 4 S [ ni * yi ] = 238
Letak titik berat tulangan,  d' = S [ ni * yi ] / n = 59,50 mm
59,50 > 40  perkirakan lagi d' (NG)
Tinggi efektif balok, d = h - d' = 540,50 mm
a = As * f y / ( 0.85 * f c' * b ) = 73,487 mm
Momen nominal, Mn = As * fy * ( d - a / 2 ) * 10-6 = 228,527 kNm
Tahanan momen balok, f * Mn = 182,822 kNm
Syarat : f * Mn ≥ Mu +

182,822 > 181,389  AMAN (OK)

27
DED PUSDATIN 2022

2. TULANGAN MOMEN NEGATIF

Momen negatif nominal rencana, Mn = Mu- / f = 211,786 kNm


Diperkirakan jarak pusat tulangan lentur ke sisi beton, d' = 40 mm
Tinggi efektif balok, d = h - d' = 560,00 mm
6 2
Faktor tahanan momen, Rn = Mn * 10 / ( b * d ) = 1,9295
Rn < Rmax  (OK)
Rasio tulangan yang diperlukan :
r = 0.85 * f c’ / f y * [ 1 -  * [1 – 2 * Rn / ( 0.85 * f c’ ) ] = 0,00512
Rasio tulangan minimum, rmin =  f c' / ( 4 * f y ) = 0,00285
Rasio tulangan minimum, r min = 1.4 / f y = 0,00350
Rasio tulangan yang digunakan,  r = 0,00512
2
Luas tulangan yang diperlukan, As = r * b * d = 1004 mm
2
Jumlah tulangan yang diperlukan, n = As / ( p / 4 * D ) = 3,540
Digunakan tulangan, 4 D 19
2 2
Luas tulangan terpakai, As = n * p / 4 * D = 1134 mm
Jumlah baris tulangan, nb = n / ns = 2,00
nb < 3  (OK)

Baris Jumlah Jarak Juml. Jarak


ke ni yi ni * yi
1 4 59,50 238,00
2 0 0,00 0,00
3 0 0,00 0,00
n= 4 S [ ni * yi ] = 238
Letak titik berat tulangan,  d' = S [ ni * yi ] / n = 59,50 mm
59,50 > 40  perkirakan lagi d' (NG)
Tinggi efektif balok, d = h - d' = 540,5 mm
a = As * f y / ( 0.85 * f c' * b ) = 73,487 mm
Momen nominal, Mn = As * f y * ( d - a / 2 ) * 10-6 = 228,527 kNm
Tahanan momen balok, f * Mn = 182,822 kNm
Syarat : f * Mn ≥ Mu -

182,822 > 169,429  AMAN (OK)

28
DED PUSDATIN 2022

3. TULANGAN GESER

Gaya geser ultimit rencana, Vu = 116,280 kN


Faktor reduksi kekuatan geser, f= 0,60
Tegangan leleh tulangan geser, fy = 240 MPa
Kuat geser beton, Vc = (√ f c') / 6 * b * d * 10-3 = 148,804 kN
Tahanan geser beton, f * Vc = 89,282 kN
 Perlu tulangan geser
Tahanan geser sengkang, f * Vs = Vu - f * Vc = 26,998 kN
Kuat geser sengkang, Vs = 44,996 kN
Digunakan sengkang berpenampang : 2 P 10
2 2
Luas tulangan geser sengkang, Av = ns * p / 4 * P = 157,08 mm
3
Jarak sengkang yang diperlukan : s = Av * f y * d / ( Vs * 10 ) = 469,19 mm
Jarak sengkang maksimum, smax = d / 2 = 270,25 mm
Jarak sengkang maksimum, smax = 250,00 mm
Jarak sengkang yang harus digunakan, s= 250,00 mm
Diambil jarak sengkang :  s= 250 mm
Digunakan sengkang, 2 P 10 250

29
DED PUSDATIN 2022

2.4 Perhitungan Balok (B 250x450)

BAHAN STRUKTUR
Kuat tekan beton, f c' = 20,75 MPa
Tegangan leleh baja (deform) untuk tulangan lentur, fy = 400 MPa
Tegangan leleh baja (polos) untuk tulangan geser, fy = 240 MPa
DIMENSI BALOK
Lebar balok b= 250 mm
Tinggi balok h= 450 mm
Diameter tulangan (deform) yang digunakan, D= 19 mm

Diameter sengkang (polos) yang digunakan, P= 10 mm


Tebal bersih selimut beton, ts = 40 mm

MOMEN DAN GAYA GESER RENCANA


Momen rencana positif akibat beban terfaktor, Mu+ = 73,798 kNm
Momen rencana negatif akibat beban terfaktor, Mu - = 111,075 kNm
Gaya geser rencana akibat beban terfaktor, Vu = 80,824 kN

B. PERHITUNGAN TULANGAN

Untuk : f c' ≤ 30 MPa, b1 = 0,85


Untuk : f c' > 30 MPa, b1 = 0.85 - 0.05 * ( f c' - 30) / 7 = -
Faktor bentuk distribusi tegangan beton,  b1 = 0,85
Rasio tulangan pada kondisi balance ,
rb = b 1* 0.85 * f c’/ f y * 600 / ( 600 + f y ) = 0,0225
Faktor tahanan momen maksimum,
Rmax = 0.75 * rb * f y * [1 – ½*0.75* rb * f y / ( 0.85 * f c’ ) ] = 5,4561
Faktor reduksi kekuatan lentur, f = 0,80
Jarak tulangan terhadap sisi luar beton, ds = ts +  + D/2 = 59,50 mm
Jumlah tulangan dlm satu baris, ns = ( b - 2 * ds) / ( 25 + D ) = 2,98
Digunakan jumlah tulangan dalam satu baris, ns = 2 bh
Jarak horisontal pusat ke pusat antara tulangan,
x = ( b - ns * D - 2 * ds ) / ( ns - 1 ) = 93,00 mm
Jarak vertikal pusat ke pusat antara tulangan, y = D + 25 = 44,00 mm

30
DED PUSDATIN 2022

1. TULANGAN MOMEN POSITIF

Momen positif nominal rencana, Mn = Mu+ / f = 92,247 kNm


Diperkirakan jarak pusat tulangan lentur ke sisi beton, d' = 40 mm
Tinggi efektif balok, d = h - d' = 410,00 mm
6 2
Faktor tahanan momen, Rn = Mn * 10 / ( b * d ) = 2,1950
Rn < Rmax  (OK)
Rasio tulangan yang diperlukan :
r = 0.85 * f c’ / f y * [ 1 -  * [1 – 2 * Rn / ( 0.85 * f c’ ) ] = 0,00588
Rasio tulangan minimum, rmin =  f c' / ( 4 * f y ) = 0,00285
Rasio tulangan minimum, rmin = 1.4 / f y = 0,00350
Rasio tulangan yang digunakan,  r = 0,00588
2
Luas tulangan yang diperlukan, As = r * b * d = 603 mm
2
Jumlah tulangan yang diperlukan, n = As / ( p / 4 * D ) = 2,126
Digunakan tulangan, 3 D 19
2 2
Luas tulangan terpakai, As = n * p / 4 * D = 851 mm
Jumlah baris tulangan, nb = n / ns = 1,50
nb < 3  (OK)
Baris Jumlah Jarak Juml. Jarak
ke ni yi ni * yi
1 3 59,50 178,50
2 0 0,00 0,00
3 0 0,00 0,00
n= 3 S [ ni * yi ] = 178,5
Letak titik berat tulangan,  d' = S [ ni * yi ] / n = 59,50 mm
59,50 > 40  perkirakan lagi d' (NG)
Tinggi efektif balok, d = h - d' = 390,50 mm
a = As * f y / ( 0.85 * f c' * b ) = 77,162 mm
Momen nominal, Mn = As * fy * ( d - a / 2 ) * 10-6 = 119,735 kNm
Tahanan momen balok, f * Mn = 95,788 kNm
Syarat : f * Mn ≥ Mu +

95,788 > 73,798  AMAN (OK)

31
DED PUSDATIN 2022

2. TULANGAN MOMEN NEGATIF

Momen negatif nominal rencana, Mn = Mu- / f = 138,844 kNm


Diperkirakan jarak pusat tulangan lentur ke sisi beton, d' = 40 mm
Tinggi efektif balok, d = h - d' = 410,00 mm
6 2
Faktor tahanan momen, Rn = Mn * 10 / ( b * d ) = 3,3039
Rn < Rmax  (OK)
Rasio tulangan yang diperlukan :
r = 0.85 * f c’ / f y * [ 1 -  * [1 – 2 * Rn / ( 0.85 * f c’ ) ] = 0,00922
Rasio tulangan minimum, rmin =  f c' / ( 4 * f y ) = 0,00285
Rasio tulangan minimum, r min = 1.4 / f y = 0,00350
Rasio tulangan yang digunakan,  r = 0,00922
2
Luas tulangan yang diperlukan, As = r * b * d = 946 mm
2
Jumlah tulangan yang diperlukan, n = As / ( p / 4 * D ) = 3,335
Digunakan tulangan, 4 D 19
2 2
Luas tulangan terpakai, As = n * p / 4 * D = 1134 mm
Jumlah baris tulangan, nb = n / ns = 2,00
nb < 3  (OK)

Baris Jumlah Jarak Juml. Jarak


ke ni yi ni * yi
1 4 59,50 238,00
2 0 0,00 0,00
3 0 0,00 0,00
n= 4 S [ ni * yi ] = 238
Letak titik berat tulangan,  d' = S [ ni * yi ] / n = 59,50 mm
59,50 > 40  perkirakan lagi d' (NG)
Tinggi efektif balok, d = h - d' = 390,5 mm
a = As * f y / ( 0.85 * f c' * b ) = 102,882 mm
Momen nominal, Mn = As * f y * ( d - a / 2 ) * 10-6 = 153,813 kNm
Tahanan momen balok, f * Mn = 123,050 kNm
Syarat : f * Mn ≥ Mu -

123,050 > 111,075  AMAN (OK)

32
DED PUSDATIN 2022

3. TULANGAN GESER

Gaya geser ultimit rencana, Vu = 80,824 kN


Faktor reduksi kekuatan geser, f= 0,60
Tegangan leleh tulangan geser, fy = 240 MPa
Kuat geser beton, Vc = (√ f c') / 6 * b * d * 10-3 = 77,818 kN
Tahanan geser beton, f * Vc = 46,691 kN
 Perlu tulangan geser
Tahanan geser sengkang, f * Vs = Vu - f * Vc = 34,133 kN
Kuat geser sengkang, Vs = 56,888 kN
Digunakan sengkang berpenampang : 2 P 10
2 2
Luas tulangan geser sengkang, Av = ns * p / 4 * P = 157,08 mm
3
Jarak sengkang yang diperlukan : s = Av * f y * d / ( Vs * 10 ) = 271,70 mm
Jarak sengkang maksimum, smax = d / 2 = 195,25 mm
Jarak sengkang maksimum, smax = 250,00 mm
Jarak sengkang yang harus digunakan, s= 195,25 mm
Diambil jarak sengkang :  s= 190 mm
Digunakan sengkang, 2 P 10 190

33
DED PUSDATIN 2022

2.5 Perhitungan Balok (B 200x300)

BAHAN STRUKTUR
Kuat tekan beton, f c' = 20,75 MPa
Tegangan leleh baja (deform) untuk tulangan lentur, fy = 400 MPa
Tegangan leleh baja (polos) untuk tulangan geser, fy = 240 MPa
DIMENSI BALOK
Lebar balok b= 200 mm
Tinggi balok h= 300 mm
Diameter tulangan (deform) yang digunakan, D= 19 mm

Diameter sengkang (polos) yang digunakan, P= 10 mm


Tebal bersih selimut beton, ts = 40 mm

MOMEN DAN GAYA GESER RENCANA


Momen rencana positif akibat beban terfaktor, Mu+ = 10,740 kNm
Momen rencana negatif akibat beban terfaktor, Mu - = 18,817 kNm
Gaya geser rencana akibat beban terfaktor, Vu = 32,309 kN

B. PERHITUNGAN TULANGAN

Untuk : f c' ≤ 30 MPa, b1 = 0,85


Untuk : f c' > 30 MPa, b1 = 0.85 - 0.05 * ( f c' - 30) / 7 = -
Faktor bentuk distribusi tegangan beton,  b1 = 0,85
Rasio tulangan pada kondisi balance ,
rb = b 1* 0.85 * f c’/ f y * 600 / ( 600 + f y ) = 0,0225
Faktor tahanan momen maksimum,
Rmax = 0.75 * rb * f y * [1 – ½*0.75* rb * f y / ( 0.85 * f c’ ) ] = 5,4561
Faktor reduksi kekuatan lentur, f = 0,80
Jarak tulangan terhadap sisi luar beton, ds = ts +  + D/2 = 59,50 mm
Jumlah tulangan dlm satu baris, ns = ( b - 2 * ds) / ( 25 + D ) = 1,84
Digunakan jumlah tulangan dalam satu baris, ns = 2 bh
Jarak horisontal pusat ke pusat antara tulangan,
x = ( b - ns * D - 2 * ds ) / ( ns - 1 ) = 43,00 mm
Jarak vertikal pusat ke pusat antara tulangan, y = D + 25 = 44,00 mm

34
DED PUSDATIN 2022

1. TULANGAN MOMEN POSITIF

Momen positif nominal rencana, Mn = Mu+ / f = 13,425 kNm


Diperkirakan jarak pusat tulangan lentur ke sisi beton, d' = 40 mm
Tinggi efektif balok, d = h - d' = 260,00 mm
6 2
Faktor tahanan momen, Rn = Mn * 10 / ( b * d ) = 0,9930
Rn < Rmax  (OK)
Rasio tulangan yang diperlukan :
r = 0.85 * f c’ / f y * [ 1 -  * [1 – 2 * Rn / ( 0.85 * f c’ ) ] = 0,00256
Rasio tulangan minimum, rmin =  f c' / ( 4 * f y ) = 0,00285
Rasio tulangan minimum, rmin = 1.4 / f y = 0,00350
Rasio tulangan yang digunakan,  r = 0,00350
2
Luas tulangan yang diperlukan, As = r * b * d = 182 mm
2
Jumlah tulangan yang diperlukan, n = As / ( p / 4 * D ) = 0,642
Digunakan tulangan, 1 D 19
2 2
Luas tulangan terpakai, As = n * p / 4 * D = 284 mm
Jumlah baris tulangan, nb = n / ns = 0,50
nb < 3  (OK)
Baris Jumlah Jarak Juml. Jarak
ke ni yi ni * yi
1 2 59,50 119,00
2 0 0,00 0,00
3 0 0,00 0,00
n= 2 S [ ni * yi ] = 119
Letak titik berat tulangan,  d' = S [ ni * yi ] / n = 59,50 mm
59,50 > 40  perkirakan lagi d' (NG)
Tinggi efektif balok, d = h - d' = 240,50 mm
a = As * f y / ( 0.85 * f c' * b ) = 32,151 mm
Momen nominal, Mn = As * fy * ( d - a / 2 ) * 10-6 = 25,452 kNm
Tahanan momen balok, f * Mn = 20,362 kNm
Syarat : f * Mn ≥ Mu +

20,362 > 10,740  AMAN (OK)

35
DED PUSDATIN 2022

2. TULANGAN MOMEN NEGATIF

Momen negatif nominal rencana, Mn = Mu- / f = 23,521 kNm


Diperkirakan jarak pusat tulangan lentur ke sisi beton, d' = 40 mm
Tinggi efektif balok, d = h - d' = 260,00 mm
6 2
Faktor tahanan momen, Rn = Mn * 10 / ( b * d ) = 1,7397
Rn < Rmax  (OK)
Rasio tulangan yang diperlukan :
r = 0.85 * f c’ / f y * [ 1 -  * [1 – 2 * Rn / ( 0.85 * f c’ ) ] = 0,00459
Rasio tulangan minimum, rmin =  f c' / ( 4 * f y ) = 0,00285
Rasio tulangan minimum, r min = 1.4 / f y = 0,00350
Rasio tulangan yang digunakan,  r = 0,00459
2
Luas tulangan yang diperlukan, As = r * b * d = 239 mm
2
Jumlah tulangan yang diperlukan, n = As / ( p / 4 * D ) = 0,841
Digunakan tulangan, 1 D 19
2 2
Luas tulangan terpakai, As = n * p / 4 * D = 284 mm
Jumlah baris tulangan, nb = n / ns = 0,50
nb < 3  (OK)

Baris Jumlah Jarak Juml. Jarak


ke ni yi ni * yi
1 2 59,50 119,00
2 0 0,00 0,00
3 0 0,00 0,00
n= 2 S [ ni * yi ] = 119
Letak titik berat tulangan,  d' = S [ ni * yi ] / n = 59,50 mm
59,50 > 40  perkirakan lagi d' (NG)
Tinggi efektif balok, d = h - d' = 240,5 mm
a = As * f y / ( 0.85 * f c' * b ) = 32,151 mm
Momen nominal, Mn = As * f y * ( d - a / 2 ) * 10-6 = 25,452 kNm
Tahanan momen balok, f * Mn = 20,362 kNm
Syarat : f * Mn ≥ Mu -

20,362 > 18,817  AMAN (OK)

36
DED PUSDATIN 2022

3. TULANGAN GESER

Gaya geser ultimit rencana, Vu = 32,309 kN


Faktor reduksi kekuatan geser, f= 0,60
Tegangan leleh tulangan geser, fy = 240 MPa
Kuat geser beton, Vc = (√ f c') / 6 * b * d * 10-3 = 39,479 kN
Tahanan geser beton, f * Vc = 23,687 kN
 Perlu tulangan geser
Tahanan geser sengkang, f * Vs = Vu - f * Vc = 8,622 kN
Kuat geser sengkang, Vs = 14,370 kN
Digunakan sengkang berpenampang : 2 P 10
2 2
Luas tulangan geser sengkang, Av = ns * p / 4 * P = 157,08 mm
3
Jarak sengkang yang diperlukan : s = Av * f y * d / ( Vs * 10 ) = 682,10 mm
Jarak sengkang maksimum, smax = d / 2 = 120,25 mm
Jarak sengkang maksimum, smax = 250,00 mm
Jarak sengkang yang harus digunakan, s= 120,25 mm
Diambil jarak sengkang :  s= 120 mm
Digunakan sengkang, 2 P 10 120

37
DED PUSDATIN 2022

2.6 Perhitungan Pelat Lantai (T=120 mm)

Kuat tekan beton, f c' = 20,75 MPa


Tegangan leleh baja untuk tulangan lentur, fy = 240 MPa

B. DATA PLAT LANTAI

Panjang bentang plat arah x, Lx = 2,50 m


Panjang bentang plat arah y, Ly = 4,00 m
Tebal plat lantai, h= 120 mm
Koefisien momen plat untuk : Ly / Lx = 1,60 KOEFISIEN MOMEN PLAT

DUA ARAH karena Ly/Lx>0.4


Lapangan x Clx = 58,00
Lapangan y Cly = 58,00
Tumpuan x Ctx = 36,00
Tumpuan y Cty = 36,00

Diameter tulangan yang digunakan, = 10 mm


Tebal bersih selimut beton, ts = 20 mm

C. BEBAN PLAT LANTAI

1. BEBAN MATI (DEAD LOAD )

2
No Jenis Beban Mati Berat satuan Tebal (m) Q (kN/m )
3
1 Berat sendiri plat lantai (kN/m ) 24,0 0,12 2,880
3
2 Berat finishing lantai (kN/m ) 22,0 0,05 1,100
2
3 Berat plafon dan rangka (kN/m ) 0,2 - 0,200
2
4 Berat instalasi ME (kN/m ) 0,4 - 0,400
Total beban mati, QD = 4,580
2. BEBAN HIDUP (LIVE LOAD )

2
Beban hidup pada lantai bangunan = 500 kg/m
2
 QL = 5,000 kN/m

3. BEBAN RENCANA TERFAKTOR

Beban rencana terfaktor,

4. MOMEN PLAT AKIBAT BEBAN TERFAKTOR

Momen lapangan arah x,


Momen lapangan arah y,
Momen tumpuan arah x,
38
Momen tumpuan arah y,
Momen rencana (maksimum) plat,
DED PUSDATIN 2022

3. BEBAN RENCANA TERFAKTOR

2
Beban rencana terfaktor, Qu = 1.2 * QD + 1.6 * QL = 13,496 kN/m

4. MOMEN PLAT AKIBAT BEBAN TERFAKTOR

Momen lapangan arah x, Mulx = Clx * 0.001 * Qu * Lx2 = 4,892 kNm/m


Momen lapangan arah y, Muly = Cly * 0.001 * Qu * Lx2 = 4,892 kNm/m
Momen tumpuan arah x, Mutx = Ctx * 0.001 * Qu * Lx2 = 3,037 kNm/m
Momen tumpuan arah y, Muty = Cty * 0.001 * Qu * Lx2 = 3,037 kNm/m
Momen rencana (maksimum) plat,  Mu = 3,037 kNm/m

D. PENULANGAN PLAT

Untuk : f c ' ≤ 30 MPa, b1 = 0,85


Untuk : f c ' > 30 MPa, b1 = 0.85 - 0.05 * ( f c ' - 30) / 7 = -
Faktor bentuk distribusi tegangan beton,  b1 = 0,85
Rasio tulangan pada kondisi balance ,
rb = b 1* 0.85 * f c '/ f y * 600 / ( 600 + f y ) = 0,0446
Faktor tahanan momen maksimum,
Rmax = 0.75 * rb * f y * [ 1 – ½* 0.75 * rb * f y / ( 0.85 * f c') ] = 6,2028
Faktor reduksi kekuatan lentur, f = 0,80
Jarak tulangan terhadap sisi luar beton, ds = ts +  / 2 = 25,0 mm
Tebal efektif plat lantai, d = h - ds = 95,0 mm
Ditinjau plat lantai selebar 1 m,  b= 1000 mm
Momen nominal rencana, Mn = Mu / f = 3,796 kNm
-6 2
Faktor tahanan momen, Rn = Mn * 10 / ( b * d ) = 0,42058
Rn < Rmax  (OK)

Rasio tulangan yang diperlukan :


r = 0.85 * f c' / f y * [ 1 -  [ 1 – 2 * Rn / ( 0.85 * f c' ) ] = 0,0018
Rasio tulangan minimum, rmin = 0,0025
Rasio tulangan yang digunakan,  r= 0,0025
2
Luas tulangan yang diperlukan, As = r * b * d = 238 mm
2
Jarak tulangan yang diperlukan, s = p / 4 *  * b / As = 331 mm
Jarak tulangan maksimum, s max = 2 * h = 240 mm
Jarak tulangan maksimum, s max = 150 mm
Jarak sengkang yang harus digunakan, s= 150 mm
Diambil jarak sengkang :  s= 150 mm
Digunakan tulangan,  10 - 150
As = p / 4 *  2 * b / s =
2
Luas tulangan terpakai, 524 mm

Modulus elastis beton,


Modulus elastis baja tulangan,
Beban merata (tak terfaktor) padaplat,
Panjang bentang plat,
Batas lendutan maksimum yang diijinkan,
39
Momen inersia brutto penampang plat,
Modulus keruntuhan lentur beton,
DED PUSDATIN 2022

E. KONTROL LENDUTAN PLAT

Modulus elastis beton, Ec = 4700*√ f c' = 21410 MPa


Modulus elastis baja tulangan, Es = 2,00E+05 MPa
Beban merata (tak terfaktor) padaplat, Q = Q D + QL = 9,580 N/mm
Panjang bentang plat, Lx = 2500 mm
Batas lendutan maksimum yang diijinkan, Lx / 240 = 10,417 mm
3 3
Momen inersia brutto penampang plat, I g = 1/12 * b * h = 144000000 mm
Modulus keruntuhan lentur beton, f r = 0.7 * √ fc' = 3,18865175 MPa
Nilai perbandingan modulus elastis, n = E s / Ec = 9,34
Jarak garis netral terhadap sisi atas beton, c = n * As / b = 4,891 mm
Momen inersia penampang retak yang ditransformasikan ke beton dihitung sbb. :
I cr = 1/3 * b * c3 + n * As * ( d - c )2 = 39754087
4
mm
yt = h / 2 = 60 mm
Momen retak : Mcr = f r * I g / yt = 7652764 Nmm
Momen maksimum akibat beban (tanpa faktor beban) :
Ma = 1 / 8 * Q * Lx2 = 7484375 Nmm
Inersia efektif untuk perhitungan lendutan,
I e = ( Mcr / Ma )3 * I g + [ 1 - ( Mcr / Ma )3 ] * I cr = 151195707 mm
4

Lendutan elastis seketika akibat beban mati dan beban hidup :


4
d e = 5 / 384 * Q * L x / ( Ec * I e ) = 1,505 mm
Rasio tulangan slab lantai : r = As / ( b * d ) = 0,0055
Faktor ketergantungan waktu untuk beban mati (jangka waktu > 5 tahun), nilai :
z= 2,0
l = z / ( 1 + 50 * r ) = 1,5679
Lendutan jangka panjang akibat rangkak dan susut :
4
d g = l * 5 / 384 * Q * L x / ( Ec * I e ) = 2,360 mm
Lendutan total, dtot = d e + dg = 3,865 mm
Syarat : dtot ≤ Lx / 240
3,865 < 10,417  AMAN (OK)

40
DED PUSDATIN 2022

2.7 Perhitungan Pelat Tangga (T=150 mm)

Data - data
- Balok diambil bentang yang terpanjang
- Tumpuan jepit-jepit
tebal plat 0,15 m fc' (beton) 20,75 Mpa
tebal spesi 2 cm fy' (baja) 320 Mpa
tebal tegel 3 cm d' 20 mm
beban plafond 0 kg/m2 L 1,5 m
beban penggantung 0 kg/m2 optred 0,3 m
beban AC + pipa 0 kg/m2 antrade 0,17 m
tebal air hujan 0 m a 31,8 derajat
beban guna 500 kg/m2
Gambar Rencana

1.689,76 kg/m

1.689,76 kg/m

4,15 m

0 6,7 m

BORDES FLIGHT/ANAK TANGGA


q = 1.689,76 kg/m2

Pembebanan
Beban terbagi rata
Beban mati
pelat =
[0,15/cosA + 0,17/2] x 2400 = 627,465 kg/m2
spesi = 2 x 21 = 42
keramik = 3 x 24 = 72
plafond = 0
penggantung = 0
AC + pipa = 0
DD = 741,465 kg/m2
Beban hidup
air hujan = 0 kg/m2
guna = 500
DL 500 kg/m2
Beban berfak tor
D = 1,2 x 741,46 + 1,6 x 500 = 1689,76 kg/m2

41
DED PUSDATIN 2022

Pembebanan
Beban terbagi rata
Beban mati
pelat =
[0,15/cosA + 0,17/2] x 2400 = 627,465 kg/m2
spesi = 2 x 21 = 42
keramik = 3 x 24 = 72
plafond = 0
penggantung = 0
AC + pipa = 0
DD = 741,465 kg/m2
Beban hidup
air hujan = 0 kg/m2
guna = 500
DL 500 kg/m2
Beban berfak tor
D = 1,2 x 741,46 + 1,6 x 500 = 1689,76 kg/m2

Statika
- Tumpuan jepit-jepit
- Beban merata
q = 1689,76 kg/m2
L = 1,5 m
- Beban terpusat plat anak tangga tengah 200 x 100 cm (bordes)
P = 1.5 x 0.5 x 2 x 1.689,76 = 2534,64 kg
L = 1,5 - 0.5 x 100 = 1m

Mtangga = 1/10 x 1.689,76 x 1,5^2 = 380,195 kgm


Mbordes = 0.9 x 2.534,64 x 1,000 = 1520,78 kgm
1,5
Penulangan
Penulangan tangga
Mu 380,20 kgm b 1000 mm
fc' (beton) 20,75 Mpa h 150 mm
fy' (baja) 320 Mpa d' 20 mm

pmin = 1,4 / 320 = 0,0044


pmaks = 0,75 x (0,85 x 20,75)/320 x 0,85 x [600/(600+320)]
= 0,0229

Mu = 380,20 kgm = 3,80 kNm


d = 150 - 20 = 130 mm
j = 0,8
Rn = (3,80 x 10^6) = 0,2812 Mpa
(0,8 x 1000 x 130^2)
W = 0,85 { 1 -sqrt[1 - (2,353 x 0,2812)/20,75]}
= 0,0137 As (mm2)
p= 0,0137 x 20,75/320 = 0,0009 > 0,0044 568,75
< 0,0229 2979,0241
ppakai = 0,0044
As = 0,0044 x 1000 x 130 = 568,75 mm2
As' = 0.002 x 1000 x 130 = 260,00 mm2

Tulangan (tul tekan 260,00 D8 - 150 ( 335 mm2 )

42
DED PUSDATIN 2022

ppakai = 0,0044
As = 0,0044 x 1000 x 130 = 568,75 mm2
As' = 0.002 x 1000 x 130 = 260,00 mm2

Tulangan (tul tarik) 568,75 D13 - 150 ( 885 mm2 )


Tulangan (tul tekan 260,00 D8 - 150 ( 335 mm2 )

Penulangan bordes
Mu 1520,78 kgm b 1000 mm
fc' (beton) 20,75 Mpa h 150 mm
fy' (baja) 320 Mpa d' 20 mm

pmin = 1,4 / 320 = 0,0044


pmaks = 0,75 x (0,85 x 20,75)/320 x 0,85 x [600/(600+320)]
= 0,0229

Mu = 1.520,78 kgm = 15,21 kNm


d = 150 - 20 = 130 mm
j = 0,8
Rn = (15,21 x 10^6) = 1,1248 Mpa
(0,8 x 1000 x 130^2)
W = 0,85 { 1 -sqrt[1 - (2,353 x 1,1248)/20,75]}
= 0,0561 As (mm2)
p= 0,0561 x 20,75/320 = 0,0036 > 0,0044 568,75
< 0,0229 2979,0241
ppakai = 0,0044
As = 0,0044 x 1000 x 130 = 568,75 mm2
As' = 0.002 x 1000 x 130 = 260,00 mm2

Tulangan (tul tarik) 568,75 D13 - 150 ( 885 mm2 )


Tulangan (tul tekan 260,00 D8 - 150 ( 335 mm2 )

43
DED PUSDATIN 2022

2.8 Perhitungan Kolom (K 800x800)

Data-data :
a. Penampang Beton
Lebar = 80 cm
Tinggi = 80 cm
b. Momen beban terfaktor
Pud = 698201,5783 kg
Mud = 2,18E+04 kg-cm
c. Penulangan 0
f = 19
nst = 36 buah
fs = 10 mm
selimut beton = 4 cm
2
fc ' = 300 kg/cm
2
fy = 4000 kg/cm
faktor reduksi = 0,65

Perhitungan :
Gaya-gaya nominal yang harus dipikul penampang :
Pnd = 1074156 kg
Mnd = 33580 kg-cm
Luas tulangan total :
2
Ast = 102,07 cm = 1,59% Ab
Kondisi penampang mengalami tekan murni :
Po = 2014253 kg

Gaya aksial maksimum yang boleh dipikul penampang kolom persegi :


Pmax = 1611403 kg (penampang kolom memenuhi)
Tinggi efektif penampang :
d = 74,05 cm
s = 5,95 cm
Luas tulangan tekan & tulangan tarik :
2
As = 51,04 cm
2
As ' = 51,04 cm
Tinggi garis netral pada kondisi berimbang :
xb = 45,29 cm
b1 = 0,85
ab = 38,50 cm
Regangan dan tegangan baja tulangan tekan :
es ' = 0,00261
ey = 0,00190
2
fs ' = 4000 kg/cm
Gaya-gaya nominal pada kondisi berimbang :

Pn > Pnb : Zona kontrol tekan

44
DED PUSDATIN 2022

Gaya-gaya nominal pada kondisi berimbang :


Cc = 785376 kg
Cs = 204141 kg
Ts = 204141 kg
Pnb = 785376 kg
Mnb = 30198995 kg-cm
Pn > Pnb : Zona kontrol tekan
Coba-coba :
x = 60,00 cm > 45,29 cm
a = 51,00 cm
Regangan dan tegangan baja tulangan :
es ' = 0,00270
ey = 0,00190
2
fs ' = 4000,00 kg/cm
es = 0,00070
2
fs = 1475,25 kg/cm
Gaya-gaya nominal penampang :
Cc = 1040400 kg
Cs = 204141 kg
Ts = 75290 kg
Pnk = 1169251 kg > 1074156 kg O.K. !
Mnk = 24600403 kg-cm > 33580 kg-cm O.K. !
Puk = 818 ton 751,91 ton
Muk = 172 ton-m 0,22 ton-m

45
DED PUSDATIN 2022

2.9 Perhitungan Kolom (K 700x700)


Data-data :
a. Penampang Beton
Lebar = 70 cm
Tinggi = 70 cm
b. Momen beban terfaktor
P ud = 399145,9701 kg
Mud = 22461,5462 kg-cm
c. Penulangan 0
f = 19
nst = 30 buah
fs = 10 mm
selimut beton = 4,5 cm
2
fc ' = 300 kg/cm
2
fy = 4000 kg/cm
faktor reduksi = 0,65

Perhitungan :
Gaya-gaya nominal yang harus dipikul penampang :
Pnd = 614071 kg
Mnd = 34556 kg-cm
Luas tulangan total :
2
Ast = 85,06 cm = 1,74% Ab
Kondisi penampang mengalami tekan murni :
Po = 1568045 kg

Gaya aksial maksimum yang boleh dipikul penampang kolom persegi :


Pmax = 1254436 kg (penampang kolom memenuhi)
Tinggi efektif penampang :
d = 63,55 cm
s = 6,45 cm
Luas tulangan tekan & tulangan tarik :
2
As = 42,53 cm
2
As ' = 42,53 cm
Tinggi garis netral pada kondisi berimbang :
xb = 38,87 cm
b1 = 0,85
ab = 33,04 cm
Regangan dan tegangan baja tulangan tekan :
es ' = 0,00250
ey = 0,00190
2
fs ' = 4000 kg/cm
Gaya-gaya nominal pada kondisi berimbang :
Cc = 589761 kg
Cs = 170117 kg
Ts = 170117 kg
Pnb = 589761 kg
Mnb = 20612527 kg-cm
Pn > Pnb : Zona kontrol tekan
Coba-coba :
x = 45,00 cm > 38,87 cm
a = 38,25 cm
Regangan dan tegangan baja tulangan : 46
DED PUSDATIN 2022

Pn > Pnb : Zona kontrol tekan


Coba-coba :
x = 45,00 cm > 38,87 cm
a = 38,25 cm
Regangan dan tegangan baja tulangan :
es ' = 0,00257
ey = 0,00190
2
fs ' = 4000,00 kg/cm
es = 0,00124
2
fs = 2597 kg/cm
Gaya-gaya nominal penampang :
Cc = 682763 kg
Cs = 170117 kg
Ts = 110449 kg
Pnk = 742431 kg > 614071 kg O.K. !
Mnk = 18849010 kg-cm > 34556 kg-cm O.K. !
Puk = 520 ton 429,85 ton
Muk = 132 ton-m 0,22 ton-m

47
DED PUSDATIN 2022

2.10 Perhitungan Kolom 600x600


Data-data :
a. Penampang Beton
Lebar = 60 cm
Tinggi = 60 cm
b. Momen beban terfaktor
P ud = 206984,4206 kg
Mud = 6812,606 kg-cm
c. Penulangan 0
f = 19
nst = 22 buah
fs = 10 mm
selimut beton = 4,5 cm
2
fc ' = 300 kg/cm
2
fy = 4000 kg/cm
faktor reduksi = 0,65

Perhitungan :
Gaya-gaya nominal yang harus dipikul penampang :
Pnd = 318438 kg
Mnd = 10481 kg-cm
Luas tulangan total :
2
Ast = 62,38 cm = 1,73% Ab
Kondisi penampang mengalami tekan murni :
Po = 1151599 kg

Gaya aksial maksimum yang boleh dipikul penampang kolom persegi :


Pmax = 921279 kg (penampang kolom memenuhi)
Tinggi efektif penampang :
d = 53,55 cm
s = 6,45 cm
Luas tulangan tekan & tulangan tarik :
2
As = 31,19 cm
2
As ' = 31,19 cm
Tinggi garis netral pada kondisi berimbang :
xb = 32,75 cm
b1 = 0,85
ab = 27,84 cm
Regangan dan tegangan baja tulangan tekan :
es ' = 0,00241
ey = 0,00190
2
fs ' = 4000 kg/cm
Gaya-gaya nominal pada kondisi berimbang :
Cc = 425964 kg
Cs = 124753 kg
Ts = 124753 kg
Pnb = 425964 kg
Mnb = 12725184 kg-cm

48
DED PUSDATIN 2022

Pn < Pnb : Zona kontrol tarik


Coba-coba :
x = 40,00 cm < 32,75 cm
a = 34,00 cm
Regangan dan tegangan baja tulangan :
es ' = 0,00252
ey = 0,00190
2
fs ' = 4000,00 kg/cm
es = 0,00102
2
fs = 2134,125 kg/cm
Gaya-gaya nominal penampang :
Cc = 520200 kg
Cs = 124753 kg
Ts = 66559 kg
Pnk = 578393 kg > 318438 kg O.K. !
Mnk = 11267999 kg-cm > 10481 kg-cm O.K. !
Puk = 405 ton 222,91 ton
Muk = 79 ton-m 0,07 ton-m

49
DED PUSDATIN 2022

2.11 Perhitungan Kolom 500x500

Data-data :
a. Penampang Beton
Lebar = 50 cm
Tinggi = 50 cm
b. Momen beban terfaktor
P ud = 104712,5601 kg
Mud = 6254,9269 kg-cm
c. Penulangan 0
f = 19
nst = 14 buah
fs = 10 mm
selimut beton = 4,5 cm
2
fc ' = 300 kg/cm
2
fy = 4000 kg/cm
faktor reduksi = 0,65

Perhitungan :
Gaya-gaya nominal yang harus dipikul penampang :
Pnd = 161096 kg
Mnd = 9623 kg-cm
Luas tulangan total :
2
Ast = 39,69 cm = 1,59% Ab
Kondisi penampang mengalami tekan murni :
Po = 786154 kg

Gaya aksial maksimum yang boleh dipikul penampang kolom persegi :


Pmax = 628923 kg (penampang kolom memenuhi)
Tinggi efektif penampang :
d = 43,55 cm
s = 6,45 cm
Luas tulangan tekan & tulangan tarik :
2
As = 19,85 cm
2
As ' = 19,85 cm
Tinggi garis netral pada kondisi berimbang :
xb = 26,64 cm
b1 = 0,85
ab = 22,64 cm
Regangan dan tegangan baja tulangan tekan :
es ' = 0,00227
ey = 0,00190
2
fs ' = 4000 kg/cm
Gaya-gaya nominal pada kondisi berimbang :
Cc = 288683 kg
Cs = 79388 kg
Ts = 79388 kg
Pnb = 288683 kg
Mnb = 6894219 kg-cm

50
DED PUSDATIN 2022

Pn < Pnb : Zona kontrol tarik


Coba-coba :
x = 30,00 cm < 26,64 cm
a = 25,50 cm
Regangan dan tegangan baja tulangan :
es ' = 0,00236
ey = 0,00190
2
fs ' = 4000,00 kg/cm
es = 0,00136
2
fs = 2845,5 kg/cm
Gaya-gaya nominal penampang :
Cc = 325125 kg
Cs = 79388 kg
Ts = 56475 kg
Pnk = 348038 kg > 161096 kg O.K. !
Mnk = 6503035 kg-cm > 9623 kg-cm O.K. !
Puk = 244 ton 112,77 ton
Muk = 46 ton-m 0,06 ton-m

51
DED PUSDATIN 2022

2.12 Perhitungan Pondasi

a) Perhitungan Pilecap (P1)

PERHITUNGAN PILE CAP TYPE P1

Pile Cap Type P1 (13 tiang ) ( 3600x3600x1200 mm2)


Data - data

fc' 29,05 Mpa Type P1


P 581574,23 kg 13 tiang
Selimut beton 60 mm Lx 3600 mm
Ht 1200 mm Ly 3600 mm
d 1140 mm
bc 1
bklm 800 mm
hklm 800 mm
bo = bklm + 2*0.5*Ht 2000 mm
ho = hklm + 2*0.5*Ht 2000 mm

Cek Geser Pons

A = 2*(bo+ho)*d
= 2*(2000+2000)*1140 = 9120000 mm2

Vc1 = (1+2/ bc) x (fc'0.5 /6) x A


= (1+2/1) x (29,05^0.5 /6) x 9120000
= 24577512 N ~ 2457751,2 kg

Vc2 = (fc'0.5 /3) x A


= (29,05^0.5 /3) x 9120000
= 16385008 N ~ 1638500,8 kg

Diambil yang terkecil ---> Vc = 1638500,8 kg


Cek : Vc > P/f
1638501 > 969290,38 (ok)
Berarti dimensi pile cap bisa dipakai.

52
DED PUSDATIN 2022

Penulangan Pile Cap

Data-data
fc' (beton) 29,05 Mpa Ht 1200 mm
fy' (baja) 400,00 Mpa b 3600 mm
d' (1) 60 mm

ALTERNATIVE 1
Q pile cap = 10368 kg/m

0,45 m 2P
0,9 m

L1 = 0,45 m 2P = 89473 kg
L= 0,90 m

Mu = 1.2 x ( 2P.L1 - 1/2.Q.L^2)


= 1.2 x (89472,9577846154x0,45-1/2x10368x0,9^2)
= 43276,55 kgm

Qpile cap = Ht x B x 2400


= 1,2 x 3,6 x 2400 = 10368 kg/m

pmin = = 0,0025
pmaks = 0,75 x (0,85 x 29,05)/400 x 0,85 x [600/(600+400)]
= 0,0236

Mu = 43276,5492036923 kgm = 432,77 kNm


d = 1200 - 60 = 1140,00 mm
j = 0,80

Rn = (432,77 x 10^6) = 0,1156 Mpa


(0,8 x 3600 x 1140^2)
W = 0,85 { 1 -sqrt[1 - (2,353 x 0,1156)/29,05]}
= 0,0040
p = 0,0040 x 29,05/400 = 0,0003 > 0,0025
< 0,0236
ppakai = 0,0025
As = 0,0025 x 3600 x 1140 = 10260,00 mm2

mm2 dipakai
As 10260,00 D19 - 150 ( 1.890 mm2 )
As pembagi 2052,00 D13 - 150 ( 885 mm2 )

53
DED PUSDATIN 2022

b) Perhitungan Pilecap (P2)

PERHITUNGAN PILE CAP TYPE P2

Pile Cap Type P2 (14 tiang ) ( 3400x4350x1200 mm2)


Data - data

fc' 29,05 Mpa Type P2


P 697218,62 kg 14 tiang
Selimut beton 60 mm Lx 3400 mm
Ht 1200 mm Ly 4350 mm
d 1140 mm
bc 1
bklm 800 mm
hklm 800 mm
bo = bklm + 2*0.5*Ht 2000 mm
ho = hklm + 2*0.5*Ht 2000 mm

Cek Geser Pons

A = 2*(bo+ho)*d
= 2*(2000+2000)*1140 = 9120000 mm2

Vc1 = (1+2/ bc) x (fc'0.5 /6) x A


= (1+2/1) x (29,05^0.5 /6) x 9120000
= 24577512 N ~ 2457751,2 kg

Vc2 = (fc'0.5 /3) x A


= (29,05^0.5 /3) x 9120000
= 16385008 N ~ 1638500,8 kg

Diambil yang terkecil ---> Vc = 1638500,8 kg


Cek : Vc > P/f
1638501 > 1162031 (ok)
Berarti dimensi pile cap bisa dipakai.

54
DED PUSDATIN 2022

Penulangan Pile Cap

Data-data
fc' (beton) 29,05 Mpa Ht 1200 mm
fy' (baja) 350,00 Mpa b 4350 mm
d' (1) 60 mm

ALTERNATIVE 1
Q pile cap = 12528 kg/m

0,375 m 2P
0,75 m

L1 = 0,38 m 2P = 99603 kg
L= 0,75 m

Mu = 1.2 x ( 2P.L1 - 1/2.Q.L^2)


= 1.2 x (99602,6597142857x0,375-1/2x12528x0,75^2)
= 40593,00 kgm

Qpile cap = Ht x B x 2400


= 1,2 x 4,35 x 2400 = 12528 kg/m

pmin = = 0,0025
pmaks = 0,75 x (0,85 x 29,05)/350 x 0,85 x [600/(600+350)]
= 0,0284

Mu = 40592,9968714286 kgm = 405,93 kNm


d = 1200 - 60 = 1140,00 mm
j = 0,80

Rn = (405,93 x 10^6) = 0,0898 Mpa


(0,8 x 4350 x 1140^2)
W = 0,85 { 1 -sqrt[1 - (2,353 x 0,0898)/29,05]}
= 0,0031
p = 0,0031 x 29,05/350 = 0,0003 > 0,0025
< 0,0284
ppakai = 0,0025
As = 0,0025 x 4350 x 1140 = 12397,50 mm2

mm2 dipakai
As 12397,50 D19 - 150 ( 1.890 mm2 )
As pembagi 2479,50 D13 - 150 ( 885 mm2 )

55
DED PUSDATIN 2022

c) Perhitungan Pilecap P3

PERHITUNGAN PILE CAP TYPE P3

Pile Cap Type P3 (16 tiang ) ( 3600x4350x1200 mm2)


Data - data

fc' 29,05 Mpa Type P3


P 688639,37 kg 16 tiang
Selimut beton 60 mm Lx 3600 mm
Ht 1200 mm Ly 4350 mm
d 1140 mm
bc 1
bklm 800 mm
hklm 800 mm
bo = bklm + 2*0.5*Ht 2000 mm
ho = hklm + 2*0.5*Ht 2000 mm

Cek Geser Pons

A = 2*(bo+ho)*d
= 2*(2000+2000)*1140 = 9120000 mm2

Vc1 = (1+2/ bc) x (fc'0.5 /6) x A


= (1+2/1) x (29,05^0.5 /6) x 9120000
= 24577512 N ~ 2457751,2 kg

Vc2 = (fc'0.5 /3) x A


= (29,05^0.5 /3) x 9120000
= 16385008 N ~ 1638500,8 kg

Diambil yang terkecil ---> Vc = 1638500,8 kg


Cek : Vc > P/f
1638501 > 1147732,3 (ok)
Berarti dimensi pile cap bisa dipakai.

56
DED PUSDATIN 2022

Penulangan Pile Cap

Data-data
fc' (beton) 29,05 Mpa Ht 1200 mm
fy' (baja) 350,00 Mpa b 4350 mm
d' (1) 60 mm

ALTERNATIVE 1
Q pile cap = 12528 kg/m

0,375 m 2P
0,75 m

L1 = 0,38 m 2P = 86080 kg
L= 0,75 m

Mu = 1.2 x ( 2P.L1 - 1/2.Q.L^2)


= 1.2 x (86079,921425x0,375-1/2x12528x0,75^2)
= 34507,76 kgm

Qpile cap = Ht x B x 2400


= 1,2 x 4,35 x 2400 = 12528 kg/m

pmin = = 0,0025
pmaks = 0,75 x (0,85 x 29,05)/350 x 0,85 x [600/(600+350)]
= 0,0284

Mu = 34507,76464125 kgm = 345,08 kNm


d = 1200 - 60 = 1140,00 mm
j = 0,80

Rn = (345,08 x 10^6) = 0,0763 Mpa


(0,8 x 4350 x 1140^2)
W = 0,85 { 1 -sqrt[1 - (2,353 x 0,0763)/29,05]}
= 0,0026
p = 0,0026 x 29,05/350 = 0,0002 > 0,0025
< 0,0284
ppakai = 0,0025
As = 0,0025 x 4350 x 1140 = 12397,50 mm2

mm2 dipakai
As 12397,50 D19 - 150 ( 1.890 mm2 )
As pembagi 2479,50 D13 - 150 ( 885 mm2 )

57
DED PUSDATIN 2022

d) Perhitungan Pondasi Borepile

Hitungan Daya Dukung Borepile berdasarkan Kekuatan Bahan

BAHAN STRUKTUR

Mutu beton = K -350 = 350 kg/cm2


Kuat tekan beton, fc' = 0.83 * K / 10 = 29 Mpa
Faktor reduksi = 0,33
Untuk menghitung kapasitas daya dukung pada borepile
digunakan persamaan sebagai berikut ini:
Qu = σtiang x Atiang
Dimensi borepile = 30 cm
σtiang = 115,5 kg/cm2
A tiang = 706,5 cm2
Didapat :
Q izin   = 81600,75 kg
Q izin   = 81,60 ton
Jadi, kapasitas daya dukung pada borepile
dengan ukuran (ɸ 30) cm berdasarkan desain adalah 81,6 ton.

Perh. Daya Dukung Borepile berdasarkan Data Sondir

Dari kedua titik sampel pemeriksaan sondir yang dipilih secara acak
dapat diketahui parameter-parameter fisik tanah yang nilai konus (qc)
dan jumlah hambatan lekat atau total friksi (JHP).
Sedangkan dari dimensi profil borepile,
didapat dimensi luas penampang (A), dan keliling tiang (O).                                

Menghitung kekuatan yang diizinkan borepile digunakan pers.:


Qizin = (qc x A)/3 + ( JHP x O )/5
Dari dimensi profil borepile (ɸ 25) cm, didapat:
A = 706,5 cm2
O = 94,2 cm
        Titik sondir 2
(qc) = 200 kg/cm2
(JHP) = 497,54 kg/cm
Qizin =  (qc x A)/3 +  ( JHP x O )/5 = 51617,47 kg
= 51,62 ton
Kolom P1 800X800
Beban yang bekerja = 550,0871 ton
Berat Pilecap = 37324,80 kg
B = 3,60 m
L = 3,60 m
H = 1,20 m
Panjang tiang = 26,00 m
Berat Sendiri 1 tiang = 3900 kg
Total Beban = 591 ton
Jumlah pancang = 12,46 Buah

Kolom P2 800X800
Beban yang bekerja = 547,5043 ton
Berat Pilecap = 42595,20 kg
B = 3,40 m
L = 4,35 m
H = 1,20 m
Panjang tiang = 26,00 m
58
Berat Sendiri 1 tiang = 3900 kg
Total Beban = 594 ton
Jumlah borepile = 12,51 Buah
DED PUSDATIN 2022

Kolom P2 800X800
Beban yang bekerja = 547,5043 ton
Berat Pilecap = 42595,20 kg
B = 3,40 m
L = 4,35 m
H = 1,20 m
Panjang tiang = 26,00 m
Berat Sendiri 1 tiang = 3900 kg
Total Beban = 594 ton
Jumlah borepile = 12,51 Buah

Kolom P3 800X800
Beban yang bekerja = 697,2186 ton
Berat Pilecap = 42595,20 kg
B = 3,40 m
L = 4,35 m
H = 1,20 m
Panjang tiang = 26,00 m
Berat Sendiri 1 tiang = 3900 kg
Total Beban = 744 ton
Jumlah borepile = 15,41 Buah

Kolom P4 800X800
Beban yang bekerja = 688,6394 ton
Berat Pilecap = 45100,80 kg
B = 3,60 m
L = 4,35 m
H = 1,20 m
Panjang tiang = 26,00 m
Berat Sendiri 1 tiang = 3900 kg
Total Beban = 738 ton
Jumlah borepile = 15,29 Buah

Kolom P5 800X800
Beban yang bekerja = 581,5742 ton
Berat Pilecap = 37324,80 kg
B = 3,60 m
L = 3,60 m
H = 1,20 m
Panjang tiang = 26,00 m
Berat Sendiri 1 tiang = 3900 kg
Total Beban = 623 ton
Jumlah borepile = 13,07 Buah

Kolom P6 800X800
Beban yang bekerja = 580,3755 ton
Berat Pilecap = 37324,80 kg
B = 3,60 m
L = 3,60 m
H = 1,20 m
Panjang tiang = 26,00 m
Berat Sendiri 1 tiang = 3900 kg
Total Beban = 622 ton
Jumlah borepile = 13,04
59 Buah
DED PUSDATIN 2022

Kolom P6 800X800
Beban yang bekerja = 580,3755 ton
Berat Pilecap = 37324,80 kg
B = 3,60 m
L = 3,60 m
H = 1,20 m
Panjang tiang = 26,00 m
Berat Sendiri 1 tiang = 3900 kg
Total Beban = 622 ton
Jumlah borepile = 13,04 Buah

60