No T KT X
1 2 3 4
1 2 0 105.09
2 5 0.84 105.09
3 10 1.28 105.09
4 25 1.71 105.09
5 50 2.05 105.09
6 100 2.33 105.09
Sd XT
5 6
26.935 105.09
26.935 127.7154
26.935 139.5668
26.935 151.14885
26.935 160.30675
26.935 167.84855
Tabel 3: Perkiraan Hujan Rencana DAS Batang Batahan dengan
Distribusi Probablitas Normal
No T KT X Sd
1 2 3 4 5
1 2 0 105.09 26.935
2 5 0.84 105.09 26.935
3 10 1.28 105.09 26.935
4 25 1.71 105.09 26.935
5 50 2.05 105.09 26.935
6 100 2.33 105.09 26.935
KT 2 0
5 0.84
10 1.28
25 1.71
50 2.05
100 2.33
XT
6
105.09
127.7154
139.5668
151.1489
160.3068
167.8486
Tabel 5: Perhitungan Parameter Statistika
No T Yn Sn Yt Yt-Yn
1 2 3 4 5 6=5-3
1 2 0.5128 1.0205 0.3665 -0.1463
2 5 0.5128 1.0205 1.4999 0.9871
3 10 0.5128 1.0205 2.2504 1.7376
4 25 0.5128 1.0205 3.1255 2.6127
5 50 0.5128 1.0205 3.9019 3.3891
6 100 0.5128 1.0205 4.6001 4.0873
AS Batang Batahan dengan
s Gumbel
0.0137
Tabel 8: Perkiraan Hujan Rencana DAS Batang Batahan d
Distribusi Log Normal
No T KT Log X S Log X
1 2 3 4 5
1 2 0 2.010 0.10191
2 5 0.84 2.010 0.10191
3 10 1.28 2.010 0.10191
4 25 1.71 2.010 0.10191
5 50 2.05 2.010 0.10191
6 100 2.33 2.010 0.10191
encana DAS Batang Batahan dengan
usi Log Normal
0.014 0.00124
0.836
Tabel 10: Perkiraan Hujan Rencana DAS Batang Batahan dengan Distribus
No T KT Log X S Log X
1 2 3 4 5
1 2 -0.132 2.010 0.10191
2 5 0.78 2.010 0.10191
3 10 1.336 2.010 0.10191
4 25 1.993 2.010 0.10191
5 50 2.453 2.010 0.10191
6 100 2.891 2.010 0.10191
tang Batahan dengan Distribusi Log Person III
3
Parameter (P) 2
Derajat Kebebasan 2
X^2cr 5.991 (lampiran 7)
4
Kelas Distribusi 20
Interval Distribusi 20% 40%
Persentase 20%
P(x) 0.2
Persentase 40%
P(x) 40%
Persentase 60%
P(x) 60%
Persentase 80%
P(x) 80%
5
a. Distribusi probablitas normal
T 5 KT
T 2.5 KT
T 1.67 KT
T 1.25 KT
T0 Yt
T 2.5 Yt
T 1.67 Yt
T 1.25 Yt
Nilai X rata-rata 105.09
Nilai SD 26.93
No XT Yn
1 2 3
1 5 0.5128
2 2.5 0.5128
3 1.67 0.5128
4 1.25 0.5128
T 5 KT
T 2.5 KT
T 1.67 KT
T 1.25 KT
Log X 2.010
S Log X 0.1019
No XT KT
1 2 3
1 5 0.84
2 2.5 0.25
3 1.67 -0.25
4 1.25 -0.84
Log X 2.010
S Log X 0.102
No XT KT
1 2 3
1 5 0.78
2 2.5 0.02
3 1.67 -0.451
4 1.25 -0.856
No Interval Ef
1 >127.712 3
2 111.820-127.712 3
3 98.35-111.820 3
4 82.461-98.353 3
5 < 82.461 3
15
b. Distribusi Gumbel
No Interval Ef
1 > 131.14 3
2 109.28-131.14 3
3 93.95-109.28 3
4 78.99-93.95 3
5 < 78.99 3
15
No Interval Ef
1 > 124.62 3
2 108,45-124,62 3
3 96,45-108,45 3
4 83,98-96,45 3
5 <83,98 3
15
No Interval Ef
1 > 122.82 3
2 102,82-122,82 3
3 92,00-102,82 3
4 80.372-86.048 3
5 < 80.372 3
15
No T Distribusi
Normal
1 2 3
1 2 105.09
2 5 127.72
3 10 139.57
4 25 151.15
5 50 160.31
6 100 167.85
T
1/P 79
16.000 87.1
8.000 87.2
5.333 85.7
4.000 93.2
3.200 87.4
2.667 97.7
2.286 74
2.000 98
1.778 125
1.600 143
1.455 121
1.333 174
1.231 112
1.143 112
1.067
60% 80%
T 5 tahun
T 2.5 tahun
T 1.67 tahun
T 1.25 tahun
0.84
0.25
-0.25
-0.84
Sd KT Hujan (XT)
4 5 6=3+(4x5)
26.93 0.84 127.71
26.93 0.25 111.82
26.93 -0.25 98.35
26.93 -0.84 82.46
1.4999 K 0.9673
0.6717 K 0.1557
0.0907 K -0.4136
-0.4759 K -0.9688
Sn Yt Yt-Yn k
4 5 6=4-3 7=6/4
1.0205 1.4999 0.9871 0.9673
1.0205 0.6717 0.1589 0.1557
1.0205 0.0907 -0.4221 -0.4136
1.0205 -0.4759 -0.9887 -0.9688
0.84
0.25
-0.25
-0.84
Sd Log X Log XT Hujan (mm)
4 5 6
0.1019 2.0954 124.56
0.1019 2.0352 108.45
0.1019 1.9843 96.45
0.1019 1.9242 83.98
\
0.78
0.02
-0.451
-0.856
Oi Oi-Ef (Oi-Ef)^2/Ef
2 -1 0.333
4 1 0.333
0 -3 3.000
7 4 5.333
2 -1 0.333
15 9.333
Oi Oi-Ef (Oi-Ef)^2/Ef
2 -1 0.333
4 1 0.333
3 0 0.000
5 2 1.333
1 -2 1.333
15 3.333
Oi Oi-Ef (Oi-Ef)^2/Ef
3 0 0.000
3 0 0.000
3 0 0.000
4 1 0.333
2 -1 0.333
15 0.667
Oi Oi-Ef (Oi-Ef)^2/Ef
3 0 0.000
3 0 0.000
3 0 0.000
4 1 0.333
2 -1 0.333
15 0.667
X^2cr Keterangan
5.991 Diterima
5.991 Diterima
5.991 Diterima
5.991 Diterima
174 1
143 2
125 3
121 4
112 5
112 6
98 7
97.7 8
97.4 9
93.2 10
87.2 11
87.1 12
85.7 13
79 14
74 15
1 Perhitungan Uji Distribusi Normal dengan Metode Smirnov Kolmogorof
No Urut dari Besar ke Kecil P(Xi) f(t) Luas dibawah kurva normal P'(Xi) Delta P
1 2 3 4 5 6 7
1 174 0.063 2.56 0.9948 0.00519999999999998 0.0578
2 143 0.125 1.41 0.9207 0.0793 0.0457
3 125 0.188 0.74 0.7704 0.2296 0.0416
4 121 0.250 0.59 0.7224 0.2776 0.0276
5 112 0.313 0.26 0.6026 0.3974 0.0844
6 112 0.375 0.26 0.6026 0.3974 0.0224
7 98 0.438 -0.26 0.3974 0.6026 0.1646
8 97.7 0.500 -0.27 0.3936 0.6064 0.1064
9 93.2 0.563 -0.44 0.3859 0.6141 0.0511
10 87.4 0.250 -0.66 0.33 0.67 0.4200
11 87.2 0.688 -0.66 0.2546 0.7454 0.0574
12 87.1 0.750 -0.67 0.2514 0.7486 0.0014
13 85.7 0.813 -0.72 0.2358 0.7642 0.0488
14 79 0.875 -0.97 0.166 0.834 0.0410
15 74 0.938 -1.15 0.1251 0.8749 0.0631
Jumlah 1576.3
X rata-rata 105.09
SD 26.93
Delta P, karena N=15 0.338
Jadi delta P maksimum < delta P kritis
0.1646 < 0.338
No Urut dari Besar ke Kecil Log (Xi) P(Xi) f(t) Luas dibawah kurva normal P'(Xi) delta P
1 2 3 4 5 6 7 8
1 174 2.2405 0.063 2.26 0.9881 0.01190 0.05110
2 143 2.1553 0.125 1.43 0.9236 0.07640 0.04860
3 125 2.0969 0.188 0.86 0.8051 0.19490 0.00690
4 121 2.0828 0.250 0.72 0.7642 0.23580 0.01420
5 112 2.0492 0.313 0.39 0.6517 0.34830 0.03530
6 112 2.0492 0.375 0.39 0.508 0.49200 0.11700
7 98 1.9912 0.438 -0.18 0.7286 0.27140 0.16660
8 97.7 1.9899 0.500 -0.19 0.4247 0.57530 0.07530
9 97.4 1.9886 0.563 -0.21 0.3446 0.65540 0.09240
10 93.2 1.9694 0.250 -0.40 0.2514 0.74860 0.49860
11 87.2 1.9405 0.688 -0.68 0.2483 0.75170 0.06370
12 87.1 1.9400 0.750 -0.68 0.2266 0.77340 0.02340
13 85.7 1.9330 0.813 -0.75 0.1357 0.86430 0.05130
14 79 1.8976 0.875 -1.10 0.1357 0.86430 0.01070
15 74 1.8692 0.938 -1.38 0.0838 0.91620 0.02180
X rata-rata 105.086666666667
26.93
Delta P, karena N=15 0.338
Jadi delta P maksimum < delta P kritis
0.105 < 0.338
4 Perhitungan Uji Distribusi Log Person III dengan Metode Smirnov Kolmogorof
No Urut dari Besar ke Kecil Log (Xi) P(Xi) f(t) P'(Xi) delta P
1 2 3 4 5 6 7
1 174 2.2405 0.063 2.26 0.0282 0.035
2 143 2.1553 0.125 1.43 0.0916 0.033
3 125 2.0969 0.188 0.86 0.1865 0.002
4 121 2.0828 0.250 0.72 0.2209 0.029
5 112 2.0492 0.313 0.39 0.3292 0.016
6 112 2.0492 0.375 0.39 0.3292 0.046
7 98 1.9912 0.438 -0.18 0.5207 0.083
8 97.7 1.9899 0.500 -0.19 0.5261 0.026
9 97.4 1.9886 0.563 -0.21 0.6094 0.046
10 93.2 1.9694 0.625 -0.40 0.7213 0.096
11 87.2 1.9405 0.688 -0.68 0.7269 0.039
12 87.1 1.9400 0.750 -0.68 0.8000 0.050
13 85.7 1.9330 0.813 -0.75 0.8000 0.013
14 79 1.8976 0.875 -1.10 0.8788 0.004
15 74 1.8692 0.938 -1.38 0.9624 0.024
Data:
Luas Catchment Areal (A): 80.87 Km2
Panjang Sungai Eff (L): 44.18 Km
Kemiringan Sungai Rata-rata (i): 0.0212
Beda Tinggi 239.49 m
No T α tc 1/β β Xi
1 2 0.480 6.578 1.254 0.797 99.154
2 5 0.480 6.578 1.254 0.797 122.815
3 10 0.480 6.578 1.254 0.797 139.931
4 25 0.480 6.578 1.254 0.797 163.255
5 50 0.480 6.578 1.254 0.797 181.864
6 100 0.480 6.578 1.254 0.797 201.550
Hasper
r I Q
86.069 3.635 112.544
106.608 4.502 139.400
121.465 5.129 158.827
141.712 5.984 185.301
157.865 6.666 206.422
174.953 7.388 228.767
Perhitungan Debit Rencana dengan Metode Hasper
Data:
A 80.870 km2
S 0.0054 km2
Perhitungan:
t coba I β α t hitung Q maks
m3/dt/km3 m3/detik
3.75 13.000 0.747 0.795 7.06 624.706
5.40 9.869 0.776 0.757 7.31 469.054
6.36 8.663 0.790 0.738 7.44 408.754
6.90 8.103 0.797 0.729 7.51 380.665
7.20 7.818 0.801 0.723 7.54 366.424
7.37 7.668 0.803 0.720 7.56 358.889
7.47 7.587 0.804 0.719 7.57 354.810
7.52 7.542 0.805 0.718 7.58 352.574
7.55 7.517 0.805 0.718 7.58 351.341
7.57 7.504 0.806 0.717 7.58 350.659
7.57 7.496 0.806 0.717 7.58 350.280
7.58 7.492 0.806 0.717 7.59 350.069
7.58 7.490 0.806 0.717 7.59 349.952
7.58 7.488 0.806 0.717 7.59 349.887
7.58 7.488 0.806 0.717 7.59 349.851
Xt Q maks Q
T mi mn Ri
mm m3/detik m3/detik
2 99.15 0.4 46.66 121.46
5 122.82 0.6 86.69 225.66
10 139.93 0.7 115.24 299.96
624.706 0.85
25 163.26 0.85 163.26 424.94
50 181.86 0.95 203.26 529.07
100 201.55 1 237.12 617.20
t+1 t+9 120+A A^3/8
Perhitungan
Durasi Hujan
I (mm/jam) Rt (mm) Rasio (%)
(Jam)
HSS Nakayasu
500.000
450.000
400.000
350.000
450.000
400.000
350.000
300.000
250.000
200.000
150.000
100.000
50.000
0.000
0 5 10 15 20 25
ode Hasper
α = 3
R0 = 1 mm
t = 5
-jaman (mm/jam)
T25 T50 T100 R2
46.781 52.114 57.755 28.413
12.159 13.545 15.012 17.899
8.530 9.502 10.530 13.660
6.790 7.564 8.383 11.276
5.734 6.388 7.079 9.717
8.605
114.279 127.305 141.085
0.7 0.7 0.7
163.255 181.864 201.550
kayasu
Periode 2 tahun
Periode 5 tahun
Periode 10 tahun
Periode 25 tahun
Periode 50 tahun
Periode 100 tahun
20 25 30
R5 R10 R25 R50 R100
35.193 40.098 46.781 52.114 57.755
22.170 25.260 29.470 32.830 36.383
16.919 19.277 22.490 25.054 27.766
13.966 15.913 18.565 20.681 22.920
12.036 13.713 15.999 17.823 19.752
10.658 12.144 14.168 15.783 17.491
Data lapangan
b 49.01 jarak 75
h 2.88 beda tinggi 0.161
m 1 k 40
A 149.4432 0.5
P 57.1558701 0.666667
R 2.61466057 i 0.002147
v 3.51737908
Q lapangan 525.6484
Rekap Debit Banjir Rencana
500.000
400.000 Hasper
Weduwen
300.000 HSS Nakayasu
200.000
100.000
0.000
0 10 20 30 40 50 60