Projek:
Nama
Kontraktor:
Gred Konkrit:
Makmal Penguji:
Lokasi Penuangan: Footing Plinth
Stump Road
Beam Lain-lain:
Saiz Sampel: 150mm x 150mm
Tarikh Tarikh No. Sampel/ Kekuatan (N/mm²)
No. Catatan
Penuangan Ujian Kelompok 7 Hari 14 Hari 28 Hari
1 25 16.25 22.5 25
2 30 19.5 27 30
3 50 32.5 45 50
* Please highlight concrete grade from table above based on concrete grade used on site