I. STANDAR SATUAN HARGA JASA KONSTRUKSI..............................................................................1


A. KLASIFIKASI BANGUNAN GEDUNG PEMERINTAHAN DAERAH.....................................................1
1. BANGUNAN SEDERHANA...................................................................................................................1
2. BANGUNAN TIDAK SEDERHANA.......................................................................................................1
3. BANGUNAN KHUSUS..........................................................................................................................1
B. STANDAR LUAS BANGUNAN GEDUNG NEGARA/PEMERINTAH.....................................................7
1. GEDUNG KANTOR...............................................................................................................................7
2. RUMAH NEGARA/PEMERINTAHAN....................................................................................................7
C. SPESIFIKASI DAN PERSYARATAN TEKNIS BANGUNAN GEDUNG NEGARA/ PEMERINTAHAN
DAN RUMAH NEGARA/ PEMERINTAHAN...........................................................................................8
D. KOMPONEN BIAYA PEMBANGUNAN...............................................................................................13
1. BIAYA PELAKSANAAN KONSTRUKSI..............................................................................................13
2. BIAYA MANAJEMEN KONSTRUKSI..................................................................................................14
3. BIAYA PERENCANAAN TEKNIS KONSTRUKSI...............................................................................15
4. BIAYA PENGAWASAN KONSTRUKSI...............................................................................................16
5. BIAYA PENGELOLAAN KEGIATAN...................................................................................................18
E. KEGIATAN PEKERJAAN NON STANDAR.........................................................................................23
F. HARGA SATUAN TERTINGGI PER M2 BANGUNAN GEDUNG PEMERINTAH DAERAH DAN
RUMAH DINAS....................................................................................................................................24
G. PEKERJAAN SWAKELOLA................................................................................................................29
1. PENGERTIAN SWAKELOLA..............................................................................................................29
2. TUJUAN SWAKELOLA.......................................................................................................................29
3. TIPE SWAKELOLA.............................................................................................................................29
4. BARANG/JASA YANG DIADAKAN MELALUI SWAKELOLA.............................................................30
5. PENYELENGGARA SWAKELOLA.....................................................................................................31
6. PENETAPAN.......................................................................................................................................31
7. PERSYARATAN PENYELENGGARA SWAKELOLA.........................................................................32
II. STANDAR SATUAN HARGA JASA KONSULTANSI.........................................................................34
A. BIAYA JASA KONSULTANSI..............................................................................................................34
1. BIAYA LANGSUNG PERSONIL..........................................................................................................34
2. BIAYA LANGSUNG NON PERSONIL.................................................................................................41
B. PEMBUATAN PETA SITUASI UNTUK PERENCANAAN TATA RUANG...........................................47
C. PEMBUATAN RENCANA STUDI AMDAL DAN UKL/UPL..................................................................54
1. BIDANG MULTISEKTOR....................................................................................................................54
2. BIDANG PERTANIAN.........................................................................................................................55
3. BIDANG PERIKANAN.........................................................................................................................56
4. BIDANG KEHUTANAN........................................................................................................................57
5. BIDANG PERHUBUNGAN..................................................................................................................57
6. BIDANG TEKNOLOGI SATELIT.........................................................................................................58
7. BIDANG PEKERJAAN UMUM............................................................................................................58
8. BIDANG PERUMAHAN DAN KAWASAN PERMUKIMAN..................................................................65
9. BIDANG ENERGI DAN SUMBER DAYA MINERAL...........................................................................66

1
10. BIDANG PARIWISATA........................................................................................................................70
11. BIDANG PENGELOLAAN LIMBAH BAHAN BERBAHAYA DAN BERACUN (LB3)...........................71
III. STANDAR SATUAN HARGA BAHAN/MATERIAL.............................................................................92
A. MATERIAL ALAM................................................................................................................................92
B. BATU BATA DAN ROOSTER..............................................................................................................93
C. SEMEN................................................................................................................................................94
D. BETON................................................................................................................................................95
E. KAYU DAN BAMBU............................................................................................................................96
F. CAT.....................................................................................................................................................98
G. MATERIAL LANTAI...........................................................................................................................101
H. BAHAN PLAFOND DAN PARTISI.....................................................................................................106
I. BAHAN LOGAM DAN BAHAN JADINYA..........................................................................................108
J. BAJA WIDE FLANGE (WF) DAN BAJA H BEAM..............................................................................110
K. BAJA CANAL.....................................................................................................................................111
L. BESI SIKU.........................................................................................................................................112
M. BESI PLAT.........................................................................................................................................113
N. SENG.................................................................................................................................................116
O. BESI PIPA.........................................................................................................................................118
P. BESI HOLLOW..................................................................................................................................121
Q. BAHAN PAKU DAN MUR BAUT.......................................................................................................122
R. BAHAN ATAP....................................................................................................................................123
S. KUSEN PINTU, JENDELA, KACA DAN AKSESORIS.......................................................................129
T. PIPA PVC DAN AKSESORIS............................................................................................................134
U. PENAMPUNG AIR.............................................................................................................................139
V. BAHAN SANITAIR.............................................................................................................................140
W. ASPAL, BAHAN BAKAR DAN PELUMAS.........................................................................................143
X. PAVING BLOK, CONBLOC...............................................................................................................144
Y. SALURAN DAN GORONG-GORONG..............................................................................................148
Z. BARRIER...........................................................................................................................................152
AA. PAGAR BRC......................................................................................................................................153
BB. PERALATAN TUKANG.....................................................................................................................155
CC. ELEKTRIKAL DAN MEKANIKAL.......................................................................................................156
DD. PCI GIRDER, VOIDED SLAB, TIANG PANCANG, SHEET PILE......................................................163
EE. TANAMAN.........................................................................................................................................173
IV. STANDAR HARGA UPAH.................................................................................................................194
V. STANDAR HARGA ALAT..................................................................................................................195
VI. REKAPITULASI ANALISA HARGA SATUAN PEKERJAAN.............................................................197
A. PEKERJAAN PERSIAPAN................................................................................................................197
B. PEKERJAAN TANAH........................................................................................................................197
C. PEKERJAAN PONDASI....................................................................................................................198
D. PEKERJAAN PEMBUATAN BETON................................................................................................198
E. PEKERJAAN PEMBESIAN DAN ALUMUNIUM................................................................................200
F. PEKERJAAN PASANGAN DINDING................................................................................................201
G. PEKERJAAN PLESTERAN...............................................................................................................202
2
H. PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING..........................................................203
I. PEKERJAAN LANGIT-LANGIT (PLAFOND).....................................................................................205
J. PEKERJAAN PENUTUP ATAP.........................................................................................................205
K. PEKERJAAN KAYU..........................................................................................................................207
L. PEKERJAAN KUNCI DAN KACA......................................................................................................208
M. PEKERJAAN PENGECATAN...........................................................................................................209
N. PEKERJAAN SANITASI DALAM GEDUNG......................................................................................210
O. PEKERJAAN PEMASANGAN PIPA DI LUAR GEDUNG.................................................................211
P. PEKERJAAN ELEKTRIKAL..............................................................................................................212
Q. PEKERJAAN PENANAMAN POHON...............................................................................................212
VII. ANALISA HARGA SATUAN PEKERJAAN........................................................................................213

3
LAMPIRAN I
KEPUTUSAN BUPATI BOGOR NOMOR :
TANGGAL :

STANDAR HARGA JASA KONSTRUKSI DAN JASA KONSULTANSI KABUPATEN BOGOR


TAHUN ANGGARAN 2020

I. STANDAR SATUAN HARGA JASA KONSTRUKSI


A. KLASIFIKASI BANGUNAN GEDUNG PEMERINTAHAN DAERAH
Bangunan Gedung adalah wujud fisik hasil pekerjaan konstruksi yang menyatu dengan tempat
kedudukannya, sebagian atau seluruhnya berada di atas dan/atau di dalam tanah dan/atau
air, yang berfungsi sebagai tempat manusia melakukan kegiatannya, baik untuk hunian atau
tempat tinggal, kegiatan keagamaan, kegiatan usaha, kegiatan sosial, budaya, maupun
kegiatan khusus.
Klasifikasi Bangunan Gedung adalah klasifikasi dari fungsi Bangunan Gedung berdasarkan
pemenuhan tingkat persyaratan administratif dan persyaratan teknisnya.
1. BANGUNAN SEDERHANA

Bangunan Gedung Negara dengan klasifikasi sederhana merupakan bangunan gedung dengan
teknologi dan spesifikasi sederhana meliputi:
a. Bangunan gedung kantor dan bangunan gedung negara lainnya dengan jumlah lantai
sampai dengan 2 (dua) lantai;
b. Bangunan gedung kantor dan bangunan gedung negara lainnya dengan luas sampai
dengan 500 m2 (lima ratus meter persegi); dan
c. Rumah Negara meliputi Rumah Negara Tipe C, Tipe D, dan Tipe E.
2. BANGUNAN TIDAK SEDERHANA
Bangunan Gedung Negara dengan klasifikasi tidak sederhana merupakan bangunan gedung
dengan teknologi dan spesifikasi tidak sederhana meliputi:
a. Bangunan gedung kantor dan bangunan gedung negara lainnya dengan jumlah lantai
lebih dari 2 (dua) lantai;
b. Bangunan gedung kantor dan bangunan gedung negara lainnya dengan luas lebih dari
500 m2 (lima ratus meter persegi); dan
c. Rumah Negara meliputi Rumah Negara Tipe A dan Tipe B.
3. BANGUNAN KHUSUS
Bangunan Gedung Negara klasifikasi khusus merupakan:
a. Bangunan Gedung Negara yang memiliki persyaratan khusus, serta dalam perencanaan
dan pelaksanaannya memerlukan penyelesaian atau teknologi khusus;
b. Bangunan Gedung Negara yang mempunyai tingkat kerahasiaan tinggi untuk
kepentingan nasional;
c. Bangunan Gedung Negara yang penyelenggaraannya dapat membahayakan
masyarakat disekitarnya; dan/atau
1
d. Bangunan Gedung Negara yang mempunyai resiko bahaya tinggi.
Bangunan Gedung Negara klasifikasi bangunan khusus meliputi:
a. istana negara;
b. rumah mantan jabatan presiden dan/atau mantan wakil presiden;
c. rumah jabatan menteri;
d. wisma negara;
e. gedung instalasi nuklir;
f. gedung yang menggunakan radio aktif;
g. gedung instalasi pertahanan;
h. bangunan Kepolisian Negara Republik Indonesia dengan
penggunaan dan persyaratan khusus;
i. gedung terminal udara, laut, dan darat;
j. stasiun kereta api;
k. stadion atau gedung olah raga;
l. rumah tahanan dengan tingkat keamanan tinggi (maximum security);
m. pusat data;
n. gudang benda berbahaya;
o. gedung bersifat monumental;
p. gedung cagar budaya; dan
q. gedung perwakilan negara Republik Indonesia.

2
Tabel 1.1. Spesifikasi Teknis Bangunan Gedung Negara Gedung Kementerian/Lembaga Negara

KLASIFIKASI
NO. URAIAN SEDERHANA TIDAK SEDERHANA KHUSUS KETERANGAN

A PERSYARATAN TATA BANGUNAN DAN LINGKUNGAN


minimal 4 m, untuk bangunan bertingkat dihitung berdasarkan
1. Jarak Antar Bangunan minimal 4 m Berdasarkan pertimbangan
pertimbangan keselamatan, kesehatan, dan kenyamanan.
keselamatan, kesehatan, dan
maksimum 8 lantai (di atas 8 lantai harus mendapat kenyamanan, serta ketentuan
2. Ketinggian Bangunan maksimum 2 lantai
rekomendasi Menteri) dalam Peraturan Daerah
3. Ketinggian Langit-langit min. 2,80 m min. 2,80 m sesuai fungsi setempat tentang Bangunan
4. Koefisien Dasar Bangunan Sesuai dengan ketentuan Peraturan Daerah setempat atau Rencana Tata Ruang
Wilayah Kabupaten/Kota, atau
5. Koefisien Lantai Bangunan Sesuai dengan ketentuan Peraturan Daerah setempat
Rencana Tata Bangunan dan
6. Koefisien Dasar Hijau Sesuai dengan ketentuan Peraturan Daerah setempat
Lingkungan untuk lokasi yang
7. Garis sempadan Sesuai dengan ketentuan Peraturan Daerah setempat bersangkutan.
8. Wujud Arsitektur sesuai fungsi & kaidah arsitektur (bentuk, tekstur, warna, bahan, teknologi, langgam/gaya, kearifan lokal)
Menggunakan bahan dinding batu bata/batako (1/2 batu) , baja/besi dilapis anti karat, kayu diawetkan, Tinggi pagar 1,5 m untuk pagar
9. Pagar Halaman **) papan fiber semen (Glassfibre Reinforced Cement/ GRC), dan bahan lainnya yang disesuaikan depan dan 2 m untuk pagar
dengan rancangan wujud arsitektur bangunan. samping dan pagar belakang
10. Kelengkapan Sarana dan Prasarana Lingkungan *)
minimal 1 parkir kendaraan untuk 100 m2 luas bangunan gedung atau sesuai dengan ketentuan Dihitung berdasarkan
- parkir kendaraan
peraturan daerah setempat. kebutuhan sesuai fungsi
tersedia sarana aksesibilitas bagi penyandang disabilitas Sesuai ketentuan peraturan perundang- bangunan serta ketentuan
- aksesibiltas
undangan dan standar peraturan perundang-
- drainase tersedia drainase sesuai ketentuan peraturan perundang-undangan dan standar undangan dan standar
- pembuangan sampah tersedia tempat pembuangan sampah sementara
- pembuangan limbah tersedia sarana pengolahan limbah, khususnya untuk limbah berbahaya
- penerangan halaman tersedia penerangan halaman

3
KLASIFIKASI
NO. URAIAN KETERANGAN
SEDERHANA TIDAK SEDERHANA KHUSUS
B PERSYARATAN BAHAN BANGUNAN
1. Bahan Penutup Lantai keramik, vinil, tegel PC, marmer lokal, keramik, vinil, marmer lokal, keramik, vinil, kayu, Diupayakan menggunakan
homogeneous tile (HT) kayu, homogeneous tile (HT), homogeneous tile (HT), granit, bahan bangunan setempat
granit floor hardener . atau produksi dalam negeri,
termasuk bahan bangunan
2. Bahan Dinding Luar bata, batako diplester dan bata, batako, bata ringan bata, batako, bata ringan sebagai bagian dari sistem
dicat, kaca diplester dicat/dilapis keramik, diplester dicat/dilapis keramik, pabrikasi komponen. Apabila
kaca, panil beton ringan kaca, panil beton ringan, bahan tersebut sulit diperoleh
beton bertulang atau harganya tidak sesuai,
3. Bahan Dinding Dalam bata, batako diplester dan dicat, bata, batako, bata ringan bata, batako, bata ringan dapat diganti dengan bahan
kaca, partisi kayu lapis, papan diplester dicat/dilapis keramik, diplester dicat/dilapis keramik, lain yang sederajat tanpa
gipsum, papan GRC kaca, papan gipsum, papan GRC kaca, papan gipsum, papan GRC mengurangi persyaratan
fungsi dan mutu setelah
4. Bahan Penutup Plafon kayu-lapis dicat, gipsum gipsum, kayu-lapis dicat, gipsum, kayu-lapis dicat, berkonsultasi dengan Instansi
papan GRC papan GRC Teknis Setempat.
5. Bahan Penutup Atap genteng, seng, sirap, metal, genteng keramik, genteng beton, genteng keramik, genteng beton,
aluminium metal, aluminium, metal, aluminium,
bitumen bitumen
6. Bahan Kosen kayu/bambu laminating kayu/bambu laminating kayu/bambu laminating
dicat/aluminium dicat/dipelitur/dimelamik, dicat/dipelitur/dimelamik,
aluminium aluminium
anodized/coating, beton anodized/coating, beton
7. Bahan Daun Pintu/Jendela Kaca, panel kayu, kayu Kaca, panel kayu, kayu lapis, Kaca, panel kayu, kayu lapis,
lapis, bambu laminating, engineering wood, bambu engineering wood, bambu
PVC laminating, aluminium, PVC laminating, metal, aluminium,
PVC

4
KLASIFIKASI
NO. URAIAN SEDERHANA TIDAK SEDERHANA KHUSUS KETERANGAN

C PERSYARATAN STRUKTUR BANGUNAN


batu kali, kayu, rollag bata, batu kali, kayu, beton- batu kali, kayu, beton-
1. Pondasi
beton-bertulang K-200 bertulang K-250 atau lebih bertulang K-300 atau lebih
2. Struktur Lantai (khusus untuk beton bertulang K-200, baja anti beton bertulang K-250 atau lebih, beton bertulang K-300 atau lebih,
bangunan gedung karat, kayu klas baja anti karat, kayu baja anti karat, kayu
bertingkat) kuat/awet II klas kuat/awet II klas kuat/awet II
beton bertulang K-250 atau beton bertulang K-300 atau
beton bertulang K-200, baja
3. Kolom lebih, baja anti karat, kayu klas lebih, baja anti karat, kayu klas Untuk daerah gempa, harus
anti karat, kayu klas kuat/awet II
kuat/awet II kuat/awet II direncanakan sebagai struktur
beton bertulang K-250 atau beton bertulang K-300 atau bangunan aman gempa sesuai
beton bertulang K-200, baja
4. Balok lebih, baja anti karat, kayu klas lebih, baja anti karat, kayu klas dengan SNI gempa.
anti karat, kayu klas kuat/awet II
kuat/awet II kuat/awet II
kayu klas kuat/awet II, baja kayu klas kuat/awet II, baja anti kayu klas kuat/awet II, baja anti
5. Rangka Atap
ringan, baja anti karat karat karat
genteng min. 30°, sirap genteng min. 30°, sirap genteng min. 30°, sirap
6. Kemiringan Atap min.22.5°, seng/aluminium/metal min.22.5°, seng/aluminium/metal min.22.5°,
min 15° min 15° seng/aluminium/metal min 15°
D PERSYARATAN UTILITAS dan PRASARANA DAN SARANA DALAM BANGUNAN
1. Air Bersih PAM, sumur pantek
2. Saluran air hujan talang, saluran lingkungan
3. Pembuangan Air Kotor bak penampung
4. Pembuangan Kotoran bak penampung
5. Bak Septik/septictank & resapan septictank, biopro dan septictank, biopro, atau septictank, biopro, atau
sejenisnya jenis lain berdasarkan jenis lain berdasarkan
kebutuhan kebutuhan

5
sesuai ketentuan ketentuan
sistem yang terdiri atas peralatan, kelengkapan dan sarana, baik yang terpasang maupun terbangun peraturan perundang-
6. Sarana Pengamanan terhadap pada bangunan yang digunakan baik untuk tujuan sistem proteksi aktif, sistem proteksi pasif undangan dan standar tentang
Bahaya Kebakaran*) maupun cara-cara pengelolaan dalam rangka melindungi bangunan dan lingkungannya terhadap sistem proteksi kebakaran
bahaya kebakaran pada bangunan gedung dan
lingkungan

KLASIFIKASI
NO. URAIAN SEDERHANA TIDAK SEDERHANA KHUSUS KETERANGAN
PLN, Generator (Penggunaan daya listrik harus memperhatikan prinsip hemat energi), serta mengikuti
7. Sumber daya listrik *)
ketentuan dalam SNI PUIL.
100-400 lux/m2, dihitung berdasarkan kebutuhan dan fungsi bangunan/fungsi ruang serta ketentuan
8. Penerangan penerangan alam dan buatan
peraturan perundang-undangan dan standar

9. Tata Udara 6-10% bukaan atau dengan tata udara buatan (AC*) dihitung sesuai SNI
10. Sarana Transportasi Vertikal dan untuk bangunan di atas 4 lantai dapat menggunakan Lift, dihitung sesuai kebutuhan dan
tangga
Horizontal *) eskalator, travelator /rollovator sesuai SNI fungsi bangunan
11. Aksesibilitas bagi Ram di dalam bangunan gedung memiliki kemiringan paling besar 6° (1:10) ram di luar Sesuai ketentuan dalam
disabilitas/penyandang cacat*) bangunan gedung memiliki kemiringan paling besar 5° (1:12) Peraturan Menteri Pekerjaan
Lebar efektif ram tidak boleh kurang dari 95 cm tanpa tepi pengaman/kanstin (low curb) dan 120 cm Umum dan Perumahan
dengan tepi pengaman/kanstin (low curb). Rakyat tentang Persyratan
Kemudahan Bangunan
Gedung
12. Telepon *) sesuai kebutuhan
13. Proteksi petir proteksi petir sesuai dengan ketentuan ketentuan peraturan perundang-undangan dan standar tetang
Sistem Proteksi Petir
E PERSYARATAN SARANA KESELAMATAN
1. Tangga Penyelamatan (khusus lebar minimal = 1, 20 m, dan bukan tangga putar jarak antar tangga maksimum
untuk bangunan bertingkat) 30 m (bila menggunakan
sprinkler
jarak bisa 1,5 kali)
2. Tanda Penunjuk Arah jelas, dasar putih huruf hijau
3. Pintu lebar minimal 0,90 m
6
4. Koridor/selasar lebar minimal 0,92 m (1 orang pengguna kursi roda) / lebar minimal 1,84 m (2 orang pengguna kursi
roda)

*) pembiayaannya tidak termasuk dalam standar harga satuan tertinggi per meter persegi, dan dianggarkan tersendiri sebagai biaya non standar.
**) pembiayaannya tidak termasuk dalam standar harga satuan tertinggi per meter persegi bangunan gedung negara, dan dianggarkan tersendiri sesuai dengan harga satuan
tertinggi per meter bangunan pagar gedung negara.

7
B. STANDAR LUAS BANGUNAN GEDUNG NEGARA/PEMERINTAH
1. GEDUNG KANTOR
Dalam menghitung luas ruangan bangunan gedung kantor yang diperlukan, dihitung
berdasarkan ketentuan sebagai berikut :
a. Standar luas ruang gedung kantor pemerintah yang termasuk klasifikasi
sederhana rata-rata 9,6 m2 per – personil.
b. Standar luas ruang gedung kantor pemerintah yang termasuk klasifikasi tidak
sederhana rata-rata sebesar 10 m2 per – personil.
Kebutuhan total luas gedung kantor dihitung berdasarkan jumlah personil yang akan
ditampung dikalikan standar luas sesuai dengan klasifikasi bangunannya. Untuk
bangunan gedung kantor yang ruang-ruang khusus atau ruang pelayanan
masyarakat, kebutuhannya dihitung secara tersendiri diluar luas ruangan untuk
seluruh personil yang akan ditampung
2. RUMAH NEGARA/PEMERINTAHAN
Tabel 1.2. Standar Luas Rumah Negara/ Pemerintah Ditentukan Sesuai Dengan
Type Peruntukannya:
Type Luas Bangunan Luas Lahan
*)
Khusus 400 m2 1.000 m2

A 250 m2 600 m2

B 120 m2 350 m2

C 70 m2 200 m2

D 50 m2 120 m2

E 36 m2 100 m2

Jenis dan jumlah ruang minimum yang harus ditampung dari tiap-tiap Rumah
Negara/ Pemerintah disesuaikan dengan kebutuhan luas teras beratap 50% (lima
puluh per seratus), sedangkan luas teras tidak beratap dihitung 30% (tiga puluh per
seratus).
*) Luas lahan disesuaikan dengan kondisi daerah/ketentuan yang dalam RT/RW
yang dituangkan dalam Peraturan Daerah

8
C. SPESIFIKASI DAN PERSYARATAN TEKNIS BANGUNAN GEDUNG NEGARA/
PEMERINTAHAN DAN RUMAH NEGARA/ PEMERINTAHAN

Secara umum persyaratan teknis bangunan gedung Negara/ pemerintahan memiliki


ketentuan dalam :
1. Undang-undang Nomor 28 Tahun 2002 tentang Bangunan Gedung;
2. Peraturan Pemerintah Nomor 36 Tahun 2005 tentang Peraturan Pelaksanaan UU
Nomor 28 Tahun 2002 tentang Bangunan Gedung;
3. Peraturan Presiden Nomor 73 Tahun 2011 Tentang Pembangunan Bangunan
Gedung Negara;
4. Keputusan Menteri Negara Pekerjaan Umum Nomor 10/KPTS/2000 tentang
Ketentuan Teknis Pengamanan terhadap Bahaya Kebakaran pada Bangunan
Gedung dan Lingkungan;
5. Keputusan Menteri Negara Pekerjaan Umum Nomor 11/KPTS/2000 tentang
Ketentuan Teknis Manajemen Penanggulangan Kebakaran di Perkotaan;
6. Peraturan Menteri Pekerjaan Umum Nomor 29/PRT/M/2006 tentang Pedoman
Persyaratan Teknis Bangunan Gedung;
7. Peraturan Menteri Pekerjaan Umum Nomor 30/PRT/M/2006 tentang Pedoman
Teknis Aksesibilitas dan Fasilitas pada Bangunan Gedung dan Lingkungan;
8. Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat Nomer 22 / PRT /
M / 2018 Tentang Pembangunan Bangunan Gedung Negara
9. Peraturan Menteri Pekerjaan Umum Nomor 06/PRT/M/2007 tentang Pedoman
Umum Penyusunan RTBL;
10. Peraturan daerah setempat tentang bangunan gedung; serta
11. Standar teknis dan pedoman teknis yang dipersyaratkan.
Secara garis besar, persyaratan teknis bangunan gedung Negara/ Pemerintahan dan
rumah Negara/ Pemerintahan adalah sebagai berikut:

9
Tabel 1.3. Ruang Kerja

JABATAN LUAS RUANG (m2) KETERANGAN


RG. RG. RG. RG. RG. RG. RG. RG. RG. JUMLAH
KERJA TAMU RAPAT RAPAT SEKRET TUNGGU SIMPAN ISTIRAHAT TOILET
UTAMA ARIS
1 2 3 4 5 6 7 8 9 10 11 12
1. Eselon IA 16.00 14.00 20.00 90.00 10.00 18.00 5.00 10.00 4.00 197.00 Standar luas
2. Eselon IB 16.00 14.00 20.00 90.00 7.00 9.00 5.00 5.00 3.00 82.00 ruang tersebut
3. Eselon IIA 14.00 12.00 14.00 40.00 7.00 12.00 3.00 5.00 3.00 73.00 merupakan acuan
4. Eselon IIB 14.00 12.00 10.00 40.00 7.00 6.00 3.00 5.00 3.00 58.00 dasar, yang dapat
5. Eselon IIIA 12.00 6.00 0.00 0.00 3.00 0.00 3.00 0.00 0.00 24.00
disesuaikan
6. Eselon IIIB 12.00 6.00 0.00 0.00 0.00 0.00 3.00 0.00 0.00 21.00
berdasarkan
7. Eselon IV 8.00 0.00 0.00 0.00 0.00 0.00 2.00 0.00 0.00 10.00
fungsi/ sifat tiap
8. Eselon V 4.00 0.00 0.00 0.00 0.00 0.00 2.00 0.00 0.00 6.00
eselon/ jabatan.
9. Staf 4.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.20

A. Ruang Penunjang :
1. Ruang Rapat = 40 m2
2. Ruang Studio = 4 m2 / orang (pemakai = 10% dari staf)
3. Ruang Arsip = 0,4 m2/ orang (pemakai = staf)
4. WC = 2 m2/ 25 orang
5. Musholla = 0,8 m2/ orang (pemakai 20% dari personil)

10
Tabel 1.4. Spesifikasi Teknis Bangunan Rumah Negara

KLASIFIKASI
NO. URAIAN KETERANGAN
Khusus & Tipe A Tipe B Tipe C,D, dan E
A PERSYARATAN TATA BANGUNAN DAN LINGKUNGAN
1. Jarak Antar Bangunan minimal 3 m, untuk bangunan bertingkat dihitung berdasarkan pertimbangan keselamatan, kesehatan, sesuai dengan ketentuan
dan kenyamanan. Peraturan Daerah setempat
2. Ketinggian Bangunan 1-2 lantai 1-2 lantai 1 lantai tentang Bangunan Gedung atau
Rencana Tata Ruang Wilayah
3. Ketinggian Langit-langit minimal 2,80 m
Kabupaten/Kota untuk lokasi
4. Koefisien Dasar Sesuai dengan ketentuan Peraturan Daerah setempat yang bersangkutan.
5. Koefisien Lantai
Sesuai dengan ketentuan Peraturan Daerah setempat
Bangunan
6. Koefisien Dasar Hijau Sesuai dengan ketentuan Peraturan Daerah setempat
7. Garis sempadan Sesuai dengan ketentuan Peraturan Daerah setempat
sesuai fungsi rumah & kaidah arsitektur (bentuk, tekstur, warna, bahan, teknologi, langgam/gaya, kearifan
8. Wujud Arsitektur
lokal)
9. Pagar Halaman Menggunakan bahan dinding batu bata/bataco (1/2 batu), besi, baja , kayu, dan bahan lainnya yang disesuaikan Biayanya mengikuti standar
dengan rancangan wujud arsitektur bangunan rumah negara. harga satuan per meter pagar
10 Tandon Air Bersih minimal 1000 liter minimal 750 liter minimal 500 liter
.
B PERSYARATAN BAHAN BANGUNAN
1. Bahan Penutup Lantai marmer lokal, homogeneous tile, homogeneous tile, keramik, vinil keramik, vinil, tegel PC Disarankan menggunakan
keramik, vinil, kayu bahan bangunan setempat
atau produksi dalam negeri,
termasuk bahan bangunan
atau komponen pabrikasi.

KLASIFIKASI

11
Khusus & Tipe A Tipe B Tipe C,D, dan E
NO. URAIAN KETERANGAN
bata, batako, bata ringan bata, batako, bata ringan bata, batako diplester dan dicat
2. Bahan Dinding
diplester dan dicat tembok, kaca diplester dan dicat tembok, kaca tembok, kaca
gipsum, papan GRC/kayu lapis gipsum, papan GRC/kayu lapis
3. Bahan Penutup Plafon Papan GRC/kayu lapis dicat
dicat dicat
genteng keramik berglazuur,
4. Bahan Penutup Atap genteng metal, seng, sirap, genteng tanah liat, genteng beton, genteng metal, seng, sirap
bitumen
kayu dipelitur/dicat kayu dicat
5. Bahan Kosen kayu dicat
anodized aluminium anodized aluminium
Kaca, panel kayu, kayu lapis,
Kaca, panel kayu, kayu lapis,
6. Bahan Daun Pintu/ engineering wood , bambu Kaca, panel kayu, kayu lapis,
engineering wood , bambu
Jendela laminating, metal, aluminium, bambu laminating, PVC
laminating, aluminium, PVC
PVC
C PERSYARATAN STRUKTUR BANGUNAN
1. Pondasi rollag bata, batu belah, batu kali, kayu klas kuat/awet II, beton bertulang K-200 Untuk daerah gempa, harus
2. Struktur Lantai (khusus untuk direncanakan sebagai struktur
beton bertulang K-200, baja anti karat, kayu klas kuat/awet II, keramik beton, beton ringan bangunan aman gempa sesuai
bangunan gedung bertingkat)
dengan SNI gempa
3. Kolom beton bertulang K-200, baja anti karat, kayu klas kuat/awet II
4. Balok beton bertulang K-200, baja anti karat, kayu klas kuat/awet II
5. Rangka Atap kayu klas kuat/awet II, baja anti karat, baja ringan
6. Kemiringan Atap genteng minimal 30°, sirap minimal 22.5°, seng/aluminium/metal minimal 15°
D PERSYARATAN UTILITAS Untuk Rumah Negara yang
1. Air Bersih PAM, sumur pantek PAM, sumur pantek PAM, sumur pantek dibangun dalam satu kompleks,
menggunakan septiktank
2. Saluran air hujan talang, saluran lingkungan talang, saluran lingkungan talang, saluran lingkungan Komunal
KLASIFIKASI

12
Khusus & Tipe A Tipe B Tipe C,D, dan E
NO. URAIAN KETERANGAN
C PERSYARATAN STRUKTUR BANGUNAN
3. Pembuangan Air Kotor bak penampung bak penampung bak penampung
4. Pembuangan Kotoran bak penampung bak penampung bak penampung
5. Bak SeptikTank & 6m 3
5m 3
2-4 m3
6. Sarana Pengamanan Bahaya Mengkuti ketentuan ketentuan peraturan perundang-undanganan dan standar tentang sistem proteksi
Kebakaran *) kebakaran
7. Sumber daya listrik *) PLN, 2200-4400 VA PLN, 1300-2200 VA PLN, 450 -1300 VA
8. Penerangan (alam & 100- 200 lux/m2
6-10% bukaan atau dengan tata
9. Tata Udara 6-10% bukaan
udara buatan (AC)*)
10 Telepon *) sesuai kebutuhan tidak disyaratkan
11 Penangkal petir proteksi petir lokal tidak disyaratkan
E PERSYARATAN SARANA PENYELAMATAN
1. Tangga Penyelamatan
(khusus untuk yang lebar min.=1, 20m
bertingkat)
2. Tanda Penunjuk Arah tidak dipersyaratkan
3. Pintu lebar min.=0,90 m
4. Koridor/selasar lebar min.=1,80 m
*) pembiayaannya tidak termasuk dalam standar harga satuan tertinggi per meter persegi, dan harus dianggarkan tersendiri sebagai biaya non standar.
- untuk Rumah Negara klas C, D, dan E, pelaksanaan pembangunannya disamping seperti ketentuan pada tabel tersebut diatas, dibangun berdasarkan "Dokumen Pelelangan Disain Prototip Daerah
Setempat" yang dikeluarkan oleh Direktorat Jenderal Cipta Karya atau menggunakan disain Perum Perumnas yang telah disetujui oleh Direktorat Jenderal Cipta Karya.
- untuk bangunan rumah negara yang dibangun dalam bangunan gedung bertingkat banyak (rumah susun), maka ketentuan-ketentuan teknisnya mengikuti ketentuan teknis untuk bangunan gedung negara.
- apabila bahan-bahan tersebut sulit diperoleh atau harganya tidak sesuai, dapat diganti dengan bahan lain yang sederajat tanpa mengurangi persyaratan fungsi dan mutu.

13
D. KOMPONEN BIAYA PEMBANGUNAN
Anggaran biaya pembangunan bangunan gedung negara ialah anggaran yang tersedia
dalam Dokumen Pembiayaan yang berupa Daftar Isian Pelaksanaan Anggaran (DIPA), atau
dokumen pembiayaan lainnya, yang terdiri ataskomponenbiaya konstruksi fisik, biaya
manajemen/ pengawasan konstruksi, biaya perencanaan teknis konstruksi, dan biaya
pengelolaan kegiatan.
1. BIAYA PELAKSANAAN KONSTRUKSI
Yaitu besarnya biaya yang dapat digunakan untuk membiayai pelaksanaan konstruksi fisik
bangunan gedung negara yang dilaksanakan oleh penyedia jasa pelaksanaan secara
kontraktual dari hasil tender, penunjukan langsung, atau pemilihan langsung. Biaya
pelaksanaan konstruksi terdiri dari biaya pekerjaan standar dan non standar.
Biaya pelaksanaan konstruksi selanjutnya diatur sebagai berikut:
a. Biaya pelaksanaan konstruksi merupakan biaya paling banyak yang digunakan untuk
membiayai pelaksanaan konstruksi fisik Bangunan Gedung Negara;
b. Biaya pelaksanaan konstruksi dibebankan pada biaya untuk komponen konstruksi fisik
kegiatan yang bersangkutan;
c. Biaya pelaksanaan konstruksi terdiri atas biaya standar dan biaya nonstandar;
d. Biaya standar dihitung dari hasil perkalian antara total luas Bangunan Gedung Negara
dengan koefisien atau faktor pengali jumlah lantai dan standar harga satuan per meter
persegi tertinggi.
e. Koefisien atau faktor pengali jumlah lantai ditetapkan dengan Keputusan Menteri.
f. Biaya nonstandar dihitung berdasarkan jenis pekerjaan, kebutuhan nyata, dan harga
pasar yang wajar.
g. Keseluruhan biaya nonstandar ditetapkan paling banyak 150% (seratus lima puluh per
seratus) dari keseluruhan biaya standar.
h. Pembayaran biaya pelaksanaan konstruksi dilakukan secara bulanan atau tahapan
tertentu yang didasarkan pada prestasi atau kemajuan pekerjaan fisik di lapangan.
i. Pembayaran dilakukan sebagai berikut :
1. pelaksanaan konstruksi sampai dengan serah terima pertama atau ( Provisional
Hand Over) pekerjaan konstruksi dibayarkan paling banyak 95% (sembilan puluh
lima per seratus) dari nilai kontrak
2. masa pemeliharaan konstruksi sampai dengan serah terima akhir atau ( Final
Hand Over) pekerjaan konstruksi dibayarkan 5% (lima per seratus) dari nilai
kontrak.
j. Tata cara pembayaran biaya pelaksanaan konstruksi mengikuti ketentuan peraturan
perundang-undangan

14
2. BIAYA MANAJEMEN KONSTRUKSI

Yaitu besarnya biaya maksimum yang dapat digunakan untuk membiayai kegiatan
manajemen konstruksi pembangunan bangunan gedung negara, yang dilakukan oleh
penyedia jasa manajemen konstruksi secara kontraktual dari hasil seleksi atau penunjukan
langsung.
Biaya manajemen konstruksi diatur sebagai berikut:
a. Biaya manajemen konstruksi dibebankan pada biaya untuk komponen kegiatan
manajemen konstruksi yang bersangkutan;
b. Besarnya nilai biaya manajemen konstruksi maksimum dihitung berdasarkan
prosentase biaya manajemen konstruksi terhadap biaya pelaksanaan konstruksi ;
c. Besarnya biaya manajemen konstruksi dihitung secara orang-bulan dan biaya langsung
yang bisa diganti, sesuai dengan ketentuan billingrate;
d. Biaya manajemen konstruksi ditetapkan dari hasil seleksi atau penunjukan langsung
pekerjaan yang bersangkutan, yang akan dicantumkan dalam kontrak, termasuk biaya
untuk:
1) honorarium tenaga ahli dan tenaga penunjang;
2) materi dan penggandaan laporan;
3) pembelian dan atau sewa peralatan;
4) sewa kendaraan;
5) biaya rapat-rapat;
6) perjalanan (lokal maupun luarkota);
7) biaya komunikasi
8) penyiapan dokumen sertifikat laik fungsi
9) penyiapan dokumen pendaftaran,
10) asuransi/pertanggungan (indemnityinsurance);
11) pajak dan iuran daerah lainnya.
e. Pembayaran biaya manajemen konstruksi dilakukan secara bulanan atau tahapan
tertentu yang didasarkan pada prestasi atau kemajuan pekerjaan perencanaan teknis
dan pelaksanaan konstruksi dilapangan, yaitu (maksimum):
1) tahap persiapan/pengadaan konsultan perencana : 5%;
2) tahap review rencana teknis sampai dengan serah terima dokumen
perencanaan : 10%;
3) tahap pelelangan penyedia jasa konstruksi fisik : 5%;
4) tahap pelaksanaan konstruksi fisik yang dibayarkan berdasarkan prestasi
pekerjaan konstruksi fisik di lapangan s.d. serah terima pertama pekerjaan :
70%
5) tahap pemeliharaan sampai dengan serah terima terakhir (FHO) pekerjaan

15
konstruksi : 10%

16
3. BIAYA PERENCANAAN TEKNIS KONSTRUKSI
Yaitu besarnya biaya maksimum yang dapat digunakan untuk membiayai
perencanaan bangunan gedungnegara, yang dilakukan oleh penyedia jasa
perencanaan secara kontraktual dari hasil seleksi, penunjukan langsung,atau
pemilihan langsung. Biaya perencanaan diatur sebagai berikut:
a. Biaya perencanaan dibebankan pada biaya untuk komponen kegiatan
perencanaan yang bersangkutan;
b. Besarnya nilai biaya perencanaan maksimum dihitung berdasarkan
prosentase biaya perencanaan teknis konstruksi terhadap nilai biaya
konstruksi fisik bangunan yang tercantum dalam tabel 1.5, 1.6 dan 1.7;
c. Biaya perencanaan teknis dihitung secara orang-bulan dan biaya langsung
yang bisa diganti, sesuai dengan ketentuan billingrate;
d. Biaya perencanaan teknis ditetapkan dari hasil seleksi atau penunjukan
langsung pekerjaan yang bersangkutan, yang akan dicantumkan dalam
kontrak termasuk biaya untuk:
1. honorarium tenaga ahli dan tenaga penunjang;
2. materi dan penggandaan laporan;
3. pembelian dan sewa peralatan;
4. sewa kendaraan;
5. biayarapat-rapat;
6. perjalanan (lokal maupun luar kota);
7. biaya komunikasi;
8. asuransi/pertanggungan (indemnity insurance);
9. pajak dan iuran daerah lainnya.
e. Untuk pekerjaan yang berada di wilayah yang sukar pencapaiannya/
sukar dijangkau transportasi (remote area), kebutuhan biaya untuk
transportasi/ dalam rangka survei, penjelasan pekerjaan/ aanwijzing,
pengawasan berkala, opname lapangan, koordinasi, monitoring dan evaluasi,
serta biaya ke lokasi tersebut, dapat diajukan sebagai biaya non standar, di
luar prosentase biaya perencanaan, yang tercantum dalam Tabel 1.5, 1.6
dan 1.7,dalam penyusunan kebutuhan anggaran tersebut agar berkonsultasi
dengan
instansi teknis setempat;
f. Pembayaran biaya perencanaan didasarkan pada pencapaian prestasi/
kemajuan perencanaan setiap tahapnya, yaitu (maksimum):

17
1. tahap konsep rancangan 10%
2. tahap pra-rancangan 20%
3. tahap pengembangan 25%
4. tahap rancangan gambar detail dan penyusunan RKS serta RAB 25%
5. tahap pelelangan 5%
6. tahap pengawasan berkala 15%

4. BIAYA PENGAWASAN KONSTRUKSI

Yaitu besarnya biaya maksimum yang dapat digunakan untuk membiayai


pengawasan pembangunan bangunan gedung negara, yang dilakukan oleh
penyedia jasa pengawasan secara kontraktual dari hasil seleksi atau penunjukan
langsung.

Biaya pengawasan diatur sebagai berikut:

g. Biaya pengawasan dibebankan pada biaya untuk komponen kegiatan


pengawasan yang bersangkutan;
h. Besarnya nilai biaya pengawasan maksimum dihitung berdasarkan
prosentase biaya pengawasan konstruksi terhadap nilai biaya konstruksi
fisik bangunan yang tercantum dalam tabel 1.5, 1.6 dan 1.7;
i. Biaya pengawasan dihitung secara orang-bulan dan biaya langsung yang
bisa diganti, sesuai dengan ketentuan billingrate;
j. Biaya pengawasan ditetapkan dari hasil seleksi atau penunjukan langsung
pekerjaan yang bersangkutan, yangakan dicantumkan dalam kontrak
termasuk biaya untuk:
1. honorarium tenaga ahli dan tenaga penunjang;
2. materi dan penggandaan laporan;
3. pembelian dan atau sewa peralatan;
4. sewa kendaraan;
5. biaya rapat-rapat;
6. perjalanan (lokal maupun luarkota);
7. biaya komunikasi;
8. penyiapan dokumen laik fungsi
9. penyiapan dokumen pendaftaran
10. asuransi/pertanggungan (indemnityinsurance);
11. pajak dan iuran daerah lainnya.
k. Untuk pekerjaan yang berada di wilayah yang sukar
pencapaiannya /sukar dijangkau transportasi (remotearea), kebutuhan biaya
untuk transportasi dalam rangka survei, penjelasan pekerjaan/aanwijzing,
pengawasan berkala, opname lapangan, koordinasi, monitoring dan
18
evaluasi, serta biaya ke lokasi tersebut, dapat diajukan sebagai biaya non
standar, di

19
luar prosentase biaya pengawasan, yang tercantum dalam Tabel 1.5, 1.6
dan 1.7 dalam penyusunan kebutuhan anggaran tersebut agar berkonsultasi
dengan instansi teknis setempat;
l. Pembayaran biaya pengawasan dapat dibayarkan secara bulanan atau
tahapan tertentu yang didasarkan pada pencapaian prestasi/kemajuan
pekerjaan konstruksi fisik di lapangan, atau penyelesaian tugas dan
kewajiban pengawasan.
m. Pembayaran biaya pengawasan konstruksi dilakukan sebagai berikut:
1. pengawasan konstruksi tahap pelaksanaan konstruksi fisik sampai
dengan serah terima pertama (Provisional Hand Over) pekerjaan
konstruksi paling banyak sebesar 90% (sembilan puluh per seratus);
dan
2. pengawasan konstruksi tahap pemeliharaan sampai dengan serah
terima akhir (Final Hand Over) pekerjaan konstruksi sebesar 10%
(sepuluh per seratus).

20
5. BIAYA PENGELOLAAN KEGIATAN
Yaitu besarnya biaya maksimum yang dapat digunakan untuk membiayai kegiatan
pengelolaan pembangunan bangunan gedung negara.
Biaya pengelolaan kegiatan diatur sebagai berikut:
a. Biaya pengelolaan kegiatan dibebankan pada biaya untuk komponen
pengelolaan kegiatan yang bersangkutan;
b. Besarnya nilai biaya pengelolaan kegiatan maksimum dihitung berdasarkan
prosentase biaya pengelolaan kegiatan terhadap nilai biaya konstruksi fisik
bangunan;
c. Biaya operasional unsur K/L atau OPD digunakan untuk keperluan:
1. honorarium staf dan panitia lelang;
2. perjalanan dinas;
3. rapat;
4. proses pelelangan;
5. bahan dan alat yang berkaitan dengan pengelolaan kegiatan sesuai
dengan pentahapannya;
6. penyusunan laporan;
7. dokumentasi; dan
8. persiapan dan pengiriman kelengkapan administrasi atau dokumen
pendaftaran Bangunan Gedung Negara.

21
Tabel 1.5. Prosentase Komponen Biaya Bangunan Gedung Pemerintah Daerah Klasifikasi Sederhana

BIAYA KONSTRUKSI FISIK


(JUTA RP) 0 250 500 1,000 2,500 5,000 10,000 25,000 50,000 100,000 250,000
sd sd sd sd sd sd sd sd sd sd sd > 500,000
KOMPONEN KEGIATAN 250 500 1,000 2,500 5,000 10,000 25,000 50,000 100,000 250,000 500,000

1 2 3 4 5 6 7 8 9 10 11 12 13
18.11 15.03 12.39 10.23 9.28 7.81 6.83 4.88 3.29 2.08
PERENCANAAN KONSTRUKSI sd sd sd sd sd sd sd sd sd sd
1
(dalam %) 18.11 1.80
15.03 12.39 10.23 9.28 7.81 6.83 4.88 3.29 2.08 1.80

10.59 9.15 7.72 6.47 5.41 4.49 4.03 3.63 2.48 1.59
PENGAWASAN KONSTRUKSI sd sd sd sd sd sd sd sd sd sd
2 10.59 1.49
(dalam %)
9.15 7.72 6.47 5.41 4.49 4.03 3.63 2.48 1.59 1.49

10.00
14.00 6.75 4.20 2.85 1.90 1.20 0.80 0.54 0.36
PENGELOLAAN KEGIATAN sd
3 sd sd sd sd sd sd sd sd sd
(dalam %) 14.00 6.7 0.25
10.00 4.20 2.85 1.90 1.20 0.80 0.54 0.36 0.25
5

Sesuai dengan Lampiran Peraturan Menteri Pekerjaan Umum Dan Perumahan Rakyat Republik Indonesia Nomor 22/PRT/M/2018 Tentang Pembangunan Bangunan Gedung Negara

22
Tabel 1.6. Prosentase Komponen Biaya Bangunan Gedung Pemerintah Daerah Klasifikasi Tidak Sederhana

BIAYA KONSTRUKSI FISIK


(JUTA RP) 0 250 500 1,000 2,500 5,000 10,000 25,000 50,000 100,000 250,000
sd sd sd sd sd sd sd sd sd sd sd > 500,000
250 500 1,000 2,500 5,000 10,000 25,000 50,000 100,000 250,000 500,000
KOMPONEN KEGIATAN
1 2 3 4 5 6 7 8 9 10 11 12 13

19.80 16.61 13.97 11.81 10.83 9.33 8.28 6.04 4.02 2.55
1 PERENCANAAN KONSTRUKSI sd sd sd sd sd sd sd sd sd sd
19.80 2.32
(dalam %) 16.61 13.97 11.81 10.83 9.33 8.28 6.04 4.02 2.55 2.32

28.57 24.43 20.69 17.73 14.97 10.47 7.34 4.89 3.25 2.03
2 MANAJEMEN KONSTRUKSI sd sd sd sd sd sd sd sd Sd sd
28.57 1.36
(dalam %) 24.43 20.69 17.73 14.97 10.47 7.34 4.89 3.25 2.03 1.36

21.08 18.20 15.37 12.88 10.76 7.62 5.13 3.50 2.39 1.50
3 PENGAWASAN KONSTRUKSI sd sd sd sd sd sd sd sd sd sd
21.08 1.10
(dalam %) 18.20 15.37 12.88 10.76 7.62 5.13 3.50 2.39 1.50 1.10

16.00 11.25 7.75 5.10 3.36 2.24 1.42 0.95 0.64 0.40
4 PENGELOLAAN KEGIATAN sd sd sd sd sd sd sd sd sd sd
16.00 0.28
(dalam %) 11.25 7.75 5.10 3.36 2.24 1.42 0.95 0.64 0.40 0.28

Sesuai dengan Lampiran Peraturan Menteri Pekerjaan Umum Dan Perumahan Rakyat Republik Indonesia Nomor 22/PRT/M/2018 Tentang Pembangunan Bangunan Gedung Negara

23
Tabel 1.7. Prosentase Komponen Biaya Bangunan Gedung Pemerintah Daerah Klasifikasi Khusus

BIAYA KONSTRUKSI FISIK


(JUTA RP) 0 250 500 1,000 2,500 5,000 10,000 25,000 50,000 100,000 250,000
sd sd sd sd sd sd sd sd sd sd sd >
500,000
250 500 1,000 2,500 5,000 10,000 25,000 50,000 100,000 250,000 500,000
KOMPONEN KEGIATAN

1 2 3 4 5 6 7 8 9 10 11 12 13

21.45 18.04 15.16 12.87 11.90 10.35 9.32 6.90 4.60 2.96

PERENCANAAN KONSTRUKSI sd sd sd sd sd sd sd Sd sd Sd
1 2.75
(dalam %) 21.45 18.04 15.16 12.87 11.90 10.35 9.32 6.90 4.60 2.96 2.75

15.74 13.23 11.29 9.64 8.71 7.56 6.82 4.60 3.14 2.90

MANAJEMEN KONSTRUKSI sd sd sd sd sd sd sd sd sd sd
2 15.74 2.73
(dalam %) 13.23 11.29 9.64 8.71 7.56 6.82 4.60 3.14 2.90 2.73

16.00 11.25 7.75 5.10 3.35 2.22 1.42 0.95 0.64 0.41

PENGELOLAAN KEGIATAN sd sd sd sd sd sd sd sd sd sd
3 16.00 0.28
(dalam %) 11.25 7.75 5.10 3.35 2.22 1.42 0.95 0.64 0.41 0.28

Sesuai dengan Lampiran Peraturan Menteri Pekerjaan Umum Dan Perumahan Rakyat Republik Indonesia Nomor 22/PRT/M/2018 Tentang Pembangunan Bangunan Gedung Negara

24
Tabel 1.8. Harga Satuan Tertinggi Rata-rata Per M2 Bangunan Bertingkat untuk Bangunan
Gedung Negara
Jumlah Lantai Harga Satuan Per M² Tertinggi
Bangunan
Bangunan 2 lantai 1,090 standar harga gedung bertingkat
Bangunan 3 lantai 1,120 standar harga gedung bertingkat
Bangunan 4lantai 1,135 standar harga gedung bertingkat
Bangunan 5 lantai 1,162 standar harga gedung bertingkat
Bangunan 6 lantai 1,197 standar harga gedung bertingkat
Bangunan 7 lantai 1,236 standar harga gedung bertingkat
Bangunan 8 lantai 1,265 standar harga gedung bertingkat

Tabel 1.9. Prosentase Komponen Pekerjaan Bangunan Gedung Negara

Komponen Gedung Rumah


Negara Negara
Pondasi 5% - 10% 3% - 7%
Stuktur 25% - 35% 20% - 25%
Lantai 5% - 10% 10% - 15%
Dinding 7% - 10% 10% - 15%
Plafond 6% - 8% 8% - 10%
Atap 8% - 10% 10% - 15%
Utilitas 5% - 8% 8% - 10%
Finishing 10% - 15% 15% - 20%

Tabel 1.10. Fungsi Bangunan Pekerjaan Bangunan Gedung Negara

Fungsi Bangunan/Ruang Harga Satuan Per M² Tertinggi


ICU/ ICCU/ UGD/ CMU 1,50 standar harga satuan bangunan
Ruang Operasi 2,00 standar harga satuan bangunan
Ruang Radiology 1,25 standar harga satuan bangunan
Rawat Inap 1,10 standar harga satuan bangunan
Laboratorium 1,10 standar harga satuan bangunan
Ruang Kebidanan dan Kandungan 1,20 standar harga satuan bangunan
Ruang Gawat Darurat 1,10 standar harga satuan bangunan
Power House 1,25 standar harga satuan bangunan
Ruang Rawat Jalan 1,10 standar harga satuan bangunan
Dapur dan Laundry 1,10 standar harga satuan bangunan
Bengkel 1,00 standar harga satuan bangunan
Selasar Luar Beratap/Teras 0,5 standar harga satuan bangunan
Lab. SLTP/SMA/SMK 1,15 standar harga satuan bangunan

25
E. KEGIATAN PEKERJAAN NON STANDAR
1. Besarnya biaya-biaya untuk pekerjaan tersebut dihitung berdasarkan rincian volume
kebutuhan nyata dan harga pasar yang wajar serta pajak-pajak yang berlaku, dengan
terlebih dahulu berkonsultasi dengan instansi teknis yang bertanggung jawab dalam
pembinaan gedung setempat.
2. Besarnya biaya perencanaan, manajemen konstruksi/pengawasan pekerjaan non standar
dihitung berdasarkan billingrate sesuai ketentuan yang tercantum dalam keputusan Menteri
Keuangan dan Ketua Bappenas yang berlaku.
3. Total biaya pekerjaan non standar maksimum sebesar 150% dari total biaya pekerjaan
standar bangunan gedung negara yang bersangkutan, yang dalam penyusunan
anggarannya perinciannya antara lain dapat berpedoman pada prosentase berikut :

Tabel 1.11. Standar Biaya Pekerjaan Non Standar


Jenis Pekerjaan Biaya Tertinggi
1. Alat Pengkondisian Udara 7-15% dari X
2. Lift, Escalator dan atau Lantai Berjalan (Moving Walk) 8-14% dari X
3. Tata Suara (Sound System) 2 - 4% dari X
4. Telephone dan PABX 1 - 3% dari X
5. Instalasi IT (Informasi dan Teknologi) 6-11% dari X
6. Electrikal (termasuk Genset) 7-12% dari X
7. Sistem Proteksi Kebakaran 7-12% dari X
8. Sistem Penangkal Petir Khusus 1 - 2%dari X
9. Instalasi Pengolahan Air Limbah (IPAL) 1 - 2% dari X
10 Interior (termasuk furniture) 15-25% dari X
11. Gas Pembakaran 1 - 2% dari X
12. Gas Medis 2 - 4% dari X
13. Pencegahan Bahaya Rayap 1 - 3% dari X
14. Fondasi Dalam 7-12% dari X
15. Fasilitas penyandang difabel dan berkebutuhan Khusus 3 - 5% dari X
16. Sarana dan Prasarana Lingkungan 3 - 8% dari X
17. Peningkatan Mutu * Max. 30% dari Z
18. Perizinan selain IMB Max. 1 % dari X
19. Penyiapan dan Pematangan Lahan Max. 3.5 % dari X
20. Pemenuhan persyaratan bangunan gedung hijau Max. 9.5 % dari X
21. Penyambungan Utilitas Max. 2 % dari X
Catatan:
*) = peningkatan mutu termasuk peningkatan penampilan arsitektur dan peningkatan struktur
terhadap aspek keselamatan bangunan,hanya dapat dilakukan dengan memberikan
penjelasan yang secara teknis dapat diterima dan harus mendapatkan rekomendasi
dari Instansi teknis.
X= total biaya konstruksi fisik pekerjaan standar.
Y= Standar Harga Satuan Tertinggi per m2.
Z= total biaya komponen pekerjaanyang ditingkatkan mutunya
Basement = Jumlah lapis paling banyak 3, Koefisien Tapak Basement (KTB) sesuai dengan Rencana
Tata Ruang dan Rencana Tata Bangunan dan Lingkungan
26
F. HARGA SATUAN TERTINGGI PER M2 BANGUNAN GEDUNG PEMERINTAH DAERAH DAN RUMAH
DINAS

Standar Harga Satuan Tertinggi merupakan biaya per m2 konstruksi fisik maksimum untuk
pembangunan bangunan gedung pemerintah daerah, khususnya untuk pekerjaan standar
bangunan gedung pemerintah daerah, yang meliputi pekerjaan struktur, arsitektur dan
finishing serta utilitas bangunan gedung pemerintah daerah.
Standar Harga Satuan Tertinggi, ditetapkan untuk biaya pelaksanaan konstruksi fisik per m2
pembangunan gedung pemerintah dan diberlakukan sesuai dengan klasifikasi, lokasi dan
tahun pembangunannya yang terdiri atas:
1. Harga Satuan per m2 Tertinggi untuk Pernbangunan Gedung Pemerintah Daerah Kiasifikasi
Sederhana dan Tidak Sederhana.
Harga satuan tertinggi untuk gedung Pemerintah Daerah dibedakan untuk setiap klasifikasi
gedung sederhana dan tidak sederhana, untuk bangunan yang bertingkat dan yang tidak
bertingkat. Disamping itu juga diberlakukan koefisien/faktor untuk bangunan gedung
bertingkat dan koefisien/faktor penggali untuk bangunan/ruang dengan fungsi khusus.
2. Harga Satuan per m2 Tertinggi untuk pembangunan bangunan rumah dinas. Harga satuan
per m2 teringgi untuk bangunan rumah dinas dibedakan untuk setiap tipe rumah dinas. Untuk
harga satuan per m2 tertingi untuk pembangunan rumah susun (pekerjaan standar)
menggunakan pedoman harga satuan per m 2 tertinggi untuk pembangunan gedung
pemerintah bertingkat tidak sederhana.
3. Harga Satuan per m tertinggi untuk Pembangunan Pagar Bangunan Gedung Pemerintah
Daerah.
a. Harga satuan per m tertinggi untuk pembangunan pagar rumah dinas ditetapkan sesuai
klasifikasi bangunan gedung dan letak pagar.
b. Harga satuan per m tertinggi untuk pembangunan pagar bangunan gedung pemerintah
daerah ditetapkan sesuai dengan tipe rumah dan letak pagar.
c. Harga satuan per m tersebut, dengan ketentuan tinggi pagar sebagai berikut:
1) Pagar depan dengan tinggi ± 1.5 m;
2) Pagar samping dengan tinggi minimum ± 2.0 m; dan
3) Pagar belakang dengan tinggi minimum± 2.0m.
Harga satuan tertinggi untuk bangunan gedung pemerintah daerah dengan klasifikasi
bangunan khusus, ditetapkan berdasarkan rincian anggaran biaya (RAB) yang dihitung
sesuai dengan kebutuhan dan kewajaran harga yang berlaku.

27
Tabel 1.12. Jenis Bangunan Negara

No Jenis Bangunan Klasifikasi Harga/M2 Keterangan


1 Gedung Bangunan 6.720.000 Faktor harga satuan per m2
Bertingkat
Sederhana Gedung Berlantai :
a. 1 lantai = 1,000 x
Bangunan Tidak b. 2 lantai = 1,090 x
8.750.000
Sederhana c. 3 lantai = 1,120 x
2 Gedung Tidak Bangunan 6.470.000
d. 4 lantai = 1,135 x
Bertingkat Sederhana
e. 5 lantai = 1,162 x
f. 6 lantai = 1,197 x
Bangunan
8.700.000 g. 7 lantai = 1,236 x
Tidak Sederhana
h. 8 lantai = 1,265 x
Tipe Bangunan :
1. Bangunan Sederhana
• Gedung kantor yang sudah ada disain prototipenya, atau bangunan
gedung kantor dengan jumlah lantai s.d. 2 lantai dengan luas sampai
dengan 500 m2;
• Bangunan rumah dinas tipe C, D, dan E yang tidak bertingkat;
• Gedung pelayanan kesehatan: puskesmas;
• Gedung pendidikan tingkat dasar dan/atau lanjutan dengan jumlah lantai
s.d. 2 lantai.
2. Bangunan Tidak Sederhana
• Gedung kantor yang belum ada disain prototipenya, atau gedung kantor
dengan luas di atas dari 500 m2, atau gedung kantor bertingkat lebih dari
2 lantai;
• Bangunan rumah dinas tipe A dan B; atau rumah dinas C, D, dan E yang
bertingkat lebih dari 2 lantai, rumah negara yang berbentuk rumah susun;
• Gedung Rumah Sakit Klas A, B, C, dan D;
• Gedung pendidikan tinggi universitas/akademi; atau gedung pendidikan
dasar/lanjutan bertingkat lebih dari 2 lantai.
3. Bangunan Khusus
• Istana negara dan rumah jabatan presiden dan wakil presiden;
• Wisma negara;
• Gedung instalasi nuklir;
• Gedung instalasi pertahanan, bangunan POLRI dengan penggunaan dan
persyaratan khusus;
• Gedung laboratorium;
• Gedung terminal udara/laut/darat;
• Stasiun kereta api;
• Stadion olah raga;
• Rumah tahanan;
• Gudang benda berbahaya;
• Gedung bersifat monumental; dan
• Gedung perwakilan negara R.I. di luar negeri.

28
No Jenis Bangunan Klasifikasi Harga/ Keterangan
M2
3 Rumah Dinas
Luas Bangunan = 400 m2
Khusus dihitung
Luas Lahan = 1.000 m2
Luas Bangunan = 250 m2
A 8.700.000
Luas Lahan = 600 m2
Luas Bangunan = 120 m2
B 8.310.000
Luas Lahan = 350 m2
Luas Bangunan = 70 m2
C 6.470.000
Luas Lahan = 200 m2
Luas Bangunan = 50 m2
D 6.470.000
Luas Lahan = 120 m2
Luas Bangunan = 36 m2
E 6.470.000
Luas Lahan = 100 m2
Khusus 1) Menteri, Kepala Lembaga Pemerintah Non-Departemen, Kepala
Lembaga Tinggi/Tertinggi Negara,
2) Pejabat-pejabat yang jabatannya setingkat dengan 1)
A 1) Sekjen, Dirjen, Irjen, Kepala Badan, Deputi,
2) Pejabat-pejabat yang jabatannya setingkat dengan 1)
B 1) Direktur, Kepala Biro, Inspektur, Kakanwil, Asisten Deputi
2) Pejabat-pejabat yang jabatannya setingkat dengan 1)
3) Pegawai Negeri Sipil yang golongannya IV/d dan IV/e.
C 1) Kepala Sub Direktorat, Kepala Bagian, Kepala Bidang
2) Pejabat-pejabat yang jabatannya setingkat dengan 1)
3) Pegawai Negeri Sipil yang golongannya IV/a s/d. IV/c.
D 1) Kepala Seksi, Kepala Sub Bagian, Kepala Sub Bidang
2) Pejabat-pejabat yang jabatannya setingkat dengan 1)
3) Pegawai Negeri Sipil yang golongannya III/a s/d. III/d.
E 1) Kepala Sub Seksi
2) Pejabat-pejabat yang jabatannya setingkat dengan 1)
3) Pegawai Negeri Sipil dengan golongan II/d kebawah

29
Tabel 1.13. Ketentuan Jenis dan Jumlah Ruang Bangunan Rumah Negara

TIPE
NO URAIAN KETERANGAN
Khusus A/250m2 B/120m2 C/70m2 D/50m2 E/36m2
1. Ruang Tamu 1 1 1 1 1 1 Di dalam hasil
2. Ruang Kerja 1 1 1 - - - rancangan
3. Ruang Duduk 1 1 1 - - - dimungkinkan adanya
4. Ruang Makan 1 1 1 1 1 1 penggabungan
5. Ruang Tidur 4 4 3 3 2 2
beberapa fungsi dalam
6. Kamar Mandi/WC 2 2 1 1 1 1
satu ruang, misalnya
7. Dapur 1 1 1 1 1 1
fungsi ruang duduk dan
8. Gudang 1 1 1 1 - -
ruang makan
9. Garasi 2 1 1 - - -
10. Ruang Tidur Pembantu 2 2 1 - - -
11. Ruang Cuci 1 1 1 1 1 1 Tidak dihitung dalam
12. KM Pembantu 1 1 1 - - - luas
bangunan standar.

30
Tabel 1.14. Harga Satuan Pagar Bangunan Gedung

Harga Pagar Depan Per – Harga Pagar Samping Per – Harga Pagar Belakang Per –
M1 (Tinggi 1,50 m ) M1 (Tinggi 2 m ) M1 (Tinggi 3 m )

3.690.000 2.960.000 3.120.000

Tabel 1.15. Harga Satuan Pagar Bangunan Rumah Dinas

Harga Pagar Depan Per – Harga Pagar Samping Per – Harga Pagar Belakang Per –
M1 (Tinggi 1,50 m ) M1 (Tinggi 2 m ) M1 (Tinggi 3 m )

3.400.000 1.850.000 1.980.000

Tabel 1.16. Harga Bangunan Gedung

Harga Gedung Bertingkat Per – M2 Harga Gedung Tidak Bertingkat Per – M2

Sederhana Tidak Sederhana Tidak


Sederhana Sederhana

6.720.000 8.750.000 6.470.000 8.700.000

Tabel 1.17. Harga Bangunan Rumah Dinas

Harga Rumah Dinas Per - M2


Kelas Kelas A Kelas B Kelas C, D dan
Khusus E
Dihitung 8.700.000 8.310.000 6.470.000

31
G. PEKERJAAN SWAKELOLA
1. PENGERTIAN SWAKELOLA
Pengadaan Barang/Jasa melalui Swakelola adalah cara memperoleh barang/jasa
yang dikerjakan sendiri oleh Kementerian/Lembaga/Perangkat Daerah, Kementerian/
Lembaga/ Perangkat Daerah lain, Ormas, atau Kelompok Masyarakat.
Swakelola dilaksanakan manakala barang/jasa yang dibutuhkan tidak dapat
disediakan atau tidak diminati oleh pelaku usaha. Swakelola dapat juga digunakan dalam
rangka mengoptimalkan pemanfaatan sumber daya/kemampuan teknis yang dimiliki
pemerintah, barang/jasa yang bersifat rahasia dan mampu dilaksanakan oleh Kementerian/
Lembaga/ Perangkat Daerah yang bersangkutan, serta dalam rangka peningkatan peran
serta/pemberdayaan Ormas dan Kelompok Masyarakat.
Dalam rangka mengoptimalkan pemanfaatan sumber daya/kemampuan teknis yang
dimiliki pemerintah, pelaksanaannya harus disesuaikan dengan tugas pokok dan fungsi
sesuai dengan tanggung jawab Kementerian/Lembaga/Perangkat Daerah pelaksana
swakelola.
Dalam rangka peningkatan peran serta/pemberdayaan Ormas, pelaksanaannya
harus disesuaikan dengan tujuan pendirian Ormas (visi dan misi) dan kompetensi dari
Ormas.
Dalam rangka peningkatan peran serta/pemberdayaan Kelompok Masyarakat,
pelaksanaannya harus disesuaikan dengan kebutuhan dan kompetensi Kelompok
Masyarakat.
2. TUJUAN SWAKELOLA
n. Memenuhi kebutuhan barang/jasa yang tidak disediakan oleh pelaku usaha;
o. Memenuhi kebutuhan barang/jasa yang tidak diminati oleh pelaku usaha karena nilai
pekerjaannya kecil dan/atau lokasi yang sulit dijangkau;
p. Memenuhi kebutuhan barang/jasa dengan mengoptimalkan penggunaan sumber daya
yang dimiliki Kementerian/Lembaga/Perangkat Daerah;
q. Meningkatkan kemampuan teknis sumber daya manusia di
Kementerian/Lembaga/Perangkat Daerah;
r. Meningkatkan partisipasi Ormas/Kelompok Masyarakat;
s. Meningkatkan efektifitas dan/atau efisiensi jika dilaksanakan melalui Swakelola;
dan/atau
t. Memenuhi kebutuhan barang/jasa yang bersifat rahasia yang mampu disediakan oleh
Kementerian/Lembaga/Perangkat Daerah yang bersangkutan.
3. TIPE SWAKELOLA
Tipe Swakelola terdiri atas:

32
a. Tipe I yaitu Swakelola yang direncanakan, dilaksanakan, dan diawasi oleh
Kementerian/Lembaga/Perangkat Daerah penanggung jawab anggaran;
b. Tipe II yaitu Swakelola yang direncanakan dan diawasi oleh
Kementerian/Lembaga/Perangkat Daerah penanggung jawab anggaran dan
dilaksanakan oleh Kementerian/Lembaga/Perangkat Daerah lain pelaksana
Swakelola;
c. Tipe III yaitu Swakelola yang direncanakan dan diawasi oleh
Kementerian/Lembaga/Perangkat Daerah penanggung jawab anggaran dan
dilaksanakan oleh Ormas pelaksana Swakelola; dan
d. Tipe IV yaitu Swakelola yang direncanakan oleh Kementerian/Lembaga/Perangkat
Daerah penanggung jawab anggaran dan/atau berdasarkan usulan Kelompok
Masyarakat, dan dilaksanakan serta diawasi oleh Kelompok Masyarakat pelaksana
Swakelola.
4. BARANG/JASA YANG DIADAKAN MELALUI SWAKELOLA
Contoh barang/jasa yang dapat diadakan melalui Swakelola tidak terbatas pada :
a. Barang/jasa yang dilihat dari segi nilai, lokasi, dan/atau sifatnya tidak diminati oleh
Pelaku Usaha, contoh: pemeliharaan rutin (skala kecil, sederhana), penanaman
gebalan rumput, pemeliharaan rambu suar, Pengadaan Barang/Jasa di lokasi
terpencil/pulau terluar, atau renovasi rumah tidak layak huni;
b. Jasa penyelenggaraan penelitian dan pengembangan, pendidikan dan/atau
pelatihan, kursus, penataran, seminar, lokakarya atau penyuluhan;
c. Penyelenggaraan sayembara atau kontes;
d. Barang/jasa yang dihasilkan oleh usaha ekonomi kreatif dan budaya dalam negeri
untuk kegiatan pengadaan festival, parade seni/budaya, contoh: pembuatan film,
tarian musik, olahraga;
e. Jasa sensus, survei, pemrosesan/pengolahan data, perumusan kebijakan publik,
pengujian laboratorium dan pengembangan sistem, aplikasi, tata kelola, atau
standar mutu tertentu;
f. Barang/jasa yang masih dalam pengembangan sehingga belum dapat disediakan
atau diminati oleh Pelaku Usaha;
g. Barang/jasa yang dihasilkan oleh Ormas, Kelompok Masyarakat, atau masyarakat,
contoh: produk kerajinan masyarakat, produk Kelompok Masyarakat, produk
Kelompok Masyarakat penyandang disabilitas, tanaman atau bibit milik
masyarakat atau produk warga binaan lembaga permasyarakatan;

33
u. Barang/jasa yang pelaksanaan pengadaannya memerlukan partisipasi masyarakat.
Dalam hal pengadaan yang memerlukan partisipasi masyarakat tersebut berupa
Pekerjaan Konstruksi maka hanya dapat berbentuk rehabilitasi, renovasi, dan
konstruksi sederhana. Konstruksi bangunan baru yang tidak sederhana, dibangun
oleh Kementerian/Lembaga/Pemerintah Daerah penanggung jawab anggaran
untuk selanjutnya diserahkan kepada Kelompok Masyarakat penerima sesuai
dengan peraturan perundang-undangan. contoh: pembangunan/pemeliharaan jalan
desa/kampung, pembangunan/pemeliharaan saluran irigrasi mikro/kecil,
pengelolaan sampah di pemukiman, atau pembangunan/ peremajaan kebun
rakyat;atau
v. Barang/jasa yang bersifat rahasia dan mampu dilaksanakan oleh
Kementerian/Lembaga/Perangkat Daerah yang bersangkutan, contoh: pembuatan
soal ujian dan pembuatan sistem keamanan informasi.
5. PENYELENGGARA SWAKELOLA
Swakelola dilaksanakan oleh Penyelenggara Swakelola yang terdiri dari Tim Persiapan,
Tim Pelaksana, dan Tim Pengawas yang memiliki tugas meliputi:
a. Tim Persiapan menyusun sasaran, rencana kegiatan, jadwal pelaksanaan, dan
rencana biaya.
b. Tim Pelaksana melaksanakan, mencatat, mengevaluasi, dan melaporkan
secara berkala kemajuan pelaksanaan kegiatan dan penyerapan anggaran.
c. Tim Pengawas mengawasi persiapan dan pelaksanaan fisik maupun
administrasi Swakelola.
6. PENETAPAN
Penyelenggara Swakelola ditetapkan oleh:
a. Swakelola Tipe I
Tim Persiapan, Tim Pelaksana, dan Tim Pengawas ditetapkan oleh PA/KPA;
b. Swakelola Tipe II
Tim Persiapan dan Tim Pengawas ditetapkan oleh PA/KPA, dan Tim Pelaksana
ditetapkan oleh Kementerian/Lembaga/ Perangkat Daerah pelaksana Swakelola.

Tim Pelaksana pada Kementerian/Lembaga/Perangkat Daerah pelaksana Swakelola


dapat ditetapkan oleh Pejabat sesuai dengan kewenangan yang dimiliki.
c. Swakelola Tipe III
Tim Persiapan dan Tim Pengawas ditetapkan oleh PA/KPA, dan Tim Pelaksana
ditetapkan oleh pimpinan Ormas pelaksana Swakelola;

34
d. Swakelola Tipe IV
Tim Persiapan, Tim Pelaksana, dan Tim Pengawas ditetapkan oleh pimpinan Kelompok
Masyarakat pelaksana Swakelola.
7. PERSYARATAN PENYELENGGARA SWAKELOLA
a. Swakelola Tipe I
Penyelenggara Swakelola Tipe I memiliki sumber daya yang cukup dan
kemampuan teknis untuk melaksanakan Swakelola.

b. Swakelola Tipe II
Penyelenggara Swakelola Tipe II memiliki sumber daya yang cukup dan
kemampuan teknis untuk menyediakan barang/jasa yang diswakelolakan.
Swakelola Tipe II dapat dilaksanakan oleh:
1) Kementerian/Lembaga/Perangkat Daerah yang mempunyai tugas dan
fungsi yang sesuai dengan pekerjaan Swakelola yang akan dilaksanakan;
2) Badan Layanan Umum (BLU);atau
3) Perguruan Tinggi Negeri.
c. Swakelola Tipe III
Persyaratan Penyelenggara Swakelola Tipe III yaitu:
1) Ormas yang berbadan hukum yayasan atau Ormas berbadan hukum
perkumpulan yang telah mendapatkan pengesahan badan hukum dari
Kementerian yang membidangi urusan hukum dan hak asasi manusia
sesuai dengan peraturan perundang-undangan;
2) Memiliki Nomor Pokok Wajib Pajak (NPWP) dan telah memenuhi kewajiban
perpajakan tahun terakhir dipenuhi dengan penyerahan SPT Tahunan;
3) memiliki struktur organisasi/pengurus;
4) memiliki Anggaran Dasar (AD) dan Anggaran Rumah Tangga (ART);
5) Mempunyai bidang kegiatan yang berhubungan dengan Barang/Jasa yang
diadakan, sesuai dengan AD/ART dan/atau Pengesahan Ormas;
6) Mempunyai kemampuan manajerial dan pengalaman teknis menyediakan
atau mengerjakan barang/jasa sejenis yang diswakelolakan dalam kurun
waktu selama 3 (tiga) tahun terakhir baik di dalam negeri dan/atau luar
negeri sebagai pelaksana secara sendiri dan/atau bekerjasama;
7) Memiliki neraca keuangan yang telah diaudit selama 3 (tiga) tahun terakhir
sesuai peraturan perundangundangan;
8) Mempunyai atau menguasai kantor dengan alamat yang benar, tetap dan
jelas berupa milik sendiri atau sewa; dan

35
9) Dalam hal Ormas akan melakukan kemitraan, harus mempunyai perjanjian
kerja sama kemitraan yang memuat tanggung jawab masing- masing yang
mewakili kemitraan tersebut.

d. Swakelola Tipe IV
Persyaratan Penyelenggara Swakelola Tipe IV yaitu:
1) Surat Pengukuhan yang dikeluarkan oleh Pejabat yang berwenang;
2) memiliki struktur organisasi/pengurus;
3) memiliki Anggaran Dasar (AD) dan Anggaran Rumah Tangga (ART);
4) memiliki sekretariat dengan alamat yang benar dan jelas di lokasi tempat
pelaksanaan kegiatan; dan/atau
5) memiliki kemampuan teknis untuk menyediakan atau mengerjakan
barang/jasa sejenis yang diswakelolakan.

36
II. STANDAR SATUAN HARGA JASA KONSULTANSI
Jasa konsultansi yaitu jasa konsultansi untuk studi analisis dan pekerjaan jasa konsultansi
lainnya, antara lain: survey, studi, perencanaan, perancangan, pengawasan, manajemen,
penelitian dan pelatihan.
Jasa konsultansi dapat dilakukan baik oleh perusahaan jasa konsultansi maupun oleh
konsultan perseorangan (individual consultant) yang terdaftar pada asosiasi profesi terkait
atau lembaga tertentu yang ditunjuk oleh pemerintah.
A. BIAYA JASA KONSULTANSI
Pembiayaan jasa konsultansi terdiri dari Biaya Personil (Billing Rate) dan Biaya Langsung
Non Personil yang dapat diganti (Direct Reimbursable Cost).
1. BIAYA LANGSUNG PERSONIL
a. Biaya Langsung Personil untuk jasa konsultansi dihitung dengan
mempertimbangkan dan berdasarkan Harga Pasar yang berlaku dan wajar serta
didukung dengan studi perbandingan, penelitian yang komprehensif serta dokumen-
dokumen yang dapat dipertanggungjawabkan.
b. Biaya Langsung Personil ini berlaku untuk Tenaga Ahli Nasional.
c. Biaya Langsung Personil bagi seorang Tenaga Ahli yang memberikan jasa
konsultansi dihitung menurut jumlah satuan waktu tertentu (bulan, minggu, hari, jam)
ditetapkan berdasarkan pengalaman profesional yang setara sejak lulus dari
pendidikan tinggi.
d. Biaya Langsung Personil (Tenaga Ahli Nasional dan Tenaga Sub Professional) yang
dihitung sudah mencakup Gaji Dasar termasuk PPh-21, Beban Biaya Sosial, Beban
Biaya Umum, dan Keuntungan.
e. Perhitungan Konversi Minimum Biaya Langsung Personil menurut satuan waktu
adalah sebagai berikut :
Perhitungan Konversi Maksimum Biaya Langsung Personil menurut satuan waktu,
sebagai berikut :
SBOM = SBOB / 4.1
SBOH = (SBOB / 22 ) X 1.1
SBOJ = (SBOH /8 ) X 1.3
Keterangan
SBOB = Satuan Biaya Orang Bulanan
SBOM = Satuan Biaya Orang Minggu
SBOH = Satuan Biaya Orang Hari
SBOJ = Satuan Biaya Orang Jam

37
Biaya Langsung Personil bagi seorang tenaga ahli yang memberikan jasa
konsultansi dihitung menurut satuan waktu tertentu (bulan/minggu/ hari/jam)
berdasarkan tingkat pendidikan, dan pengalaman profesional yang dipersyaratkan.
Biaya langsung personil untuk jasa konsultansi diatur sebagai berikut :
BLP = GD + BBS + BBU + TP + K

TABEL 2.1. PERHITUNGAN BIAYA LANGSUNG PERSONIL

KOMPONEN BLP
Gaji Dasar - GD (Basic Salary) 1 x GD
Beban Biaya Sosial – BBS (Social Charge) (0,3 – 0,4) x GD
Beban Biaya Umum – BBU (Overhead) (0,5 – 1,3) x GD
Tunjangan Penugasan – TP (0.1 – 0,3) x GD
Keuntungan – K 0,1 x (GD+BBS+BBU)
Total Biaya Langsung Personil (2,2 – 3,1) x GD

38
Tabel 2.2. Biaya Langsung Personil Untuk Tenaga Ahli Berpendidikan S1/S2/S3 Berdasarkan
Pengalaman Profesi
KUALIFIKASI TAHUN RUPIAH RUPIAH RUPIAH
TENAGA PENGALAMAN
PER-BLN PER-BLN PER-BLN
AHLI
S1/Setara**) S2/Setara**) S3/Setara**)

1 **) 19.192.500 24.737.000


2 **) 20.898.500 26.443.000
3 15.354.000 22.604.500 28.149.000
4 16.633.500 24.097.250 29.855.000
5 17.913.000 25.590.000 31.561.000
6 19.192.500 27.082.750 33.267.000
7 20.472.000 28.575.500 34.973.000
8 21.751.500 30.281.500 36.679.000
9 23.031.000 31.774.250 38.385.000
10 24.310.500 33.267.000 40.091.000
11 25.590.000 34.973.000 41.797.000
TENAGA 12 26.869.500 36.465.750 43.503.000
AHLI
13 28.149.000 37.958.500 45.209.000
(TIDAK
PUNYA 14 29.428.500 39.664.500 46.915.000
SKA/SKK)
15 30.708.000 41.157.250 48.621.000
16 31.987.500 42.650.000 50.327.000
17 33.267.000 44.356.000 52.033.000
18 34.546.500 45.848.750 53.739.000
19 35.826.000 47.341.500 55.445.000
20 37.105.500 49.047.500 57.151.000
21 38.385.000 50.540.250 58.857.000
22 39.664.500 52.033.000 60.563.000
23 40.944.000 53.739.000 62.269.000
24 42.223.500 55.231.750 63.975.000
25 43.503.000 56.724.500 65.681.000
**) S1 pengalaman 1-2 tahun dianggap Sub Professional

39
Tabel 2.3. Biaya Langsung Personil Untuk Tenaga Ahli Berpendidikan S1/S2/S3 Berdasarkan
Pengalaman Profesi dan Sertifikat Keahlian
RUPIAH RUPIAH RUPIAH
KUALIFIKASI TAHUN PER-BLN PER- BLN PER- BLN
TENAGA AHLI PENGALAMAN S1/Setara**) S2/Setara**) S3/Setara**)
1 15.354.000 22.604.500 26.443.000
2 16.633.500 24.097.250 28.149.000
3 17.913.000 25.590.000 29.855.000
4 19.192.500 27.082.750 31.561.000
5 20.472.000 28.575.500 33.267.000
6 21.751.500 30.281.500 36.679.000
7 23.031.000 31.774.250 38.385.000
8 24.310.500 33.267.000 40.091.000
9 25.590.000 34.973.000 41.797.000
10 26.869.500 36465750 43.503.000
11 28.149.000 37.958.500 45.209.000
12 29.428.500 39.664.500 46.915.000
13 30.708.000 41.157.250 48.621.000
14 31.987.500 42.650.000 50.327.000
15 33.267.000 44.356.000 52.033.000
16 34.546.500 45.848.750 53.739.000
17 35.826.000 47.341.500 55.445.000
AHLI MUDA 18 37.105.500 49.047.500 57.151.000
19 38.385.000 50.540.250 58.857.000
20 39.664.500 52.033.000 60.563.000
21 40.944.000 53.739.000 62.269.000
22 42.223.500 55.231.750 63.975.000
23 43.503.000 56.724.500 65.681.000
1 17.913.000 25.590.000 29.855.000
2 19.192.500 27.082.750 31.561.000
3 20.472.000 28.575.500 33.267.000
4 21.751.500 30.281.500 36.679.000
5 23.031.000 31.774.250 38.385.000
6 24.310.500 33.267.000 40.091.000
7 25.590.000 34.973.000 41.797.000
8 26.869.500 36465750 43.503.000
9 28.149.000 37.958.500 45.209.000
AHLI MADYA 10 29.428.500 39.664.500 46.915.000
11 30.708.000 41.157.250 48.621.000
12 31.987.500 42.650.000 50.327.000
13 33.267.000 44.356.000 52.033.000

40
RUPIAH RUPIAH RUPIAH
KUALIFIKASI TAHUN PER-BLN PER- BLN PER- BLN
TENAGA AHLI PENGALAMAN S1/Setara**) S2/Setara**) S3/Setara**)
14 34.546.500 45.848.750 53.739.000
15 35.826.000 47.341.500 55.445.000
16 37.105.500 49.047.500 57.151.000
17 38.385.000 50.540.250 58.857.000
18 39.664.500 52.033.000 60.563.000
19 40.944.000 53.739.000 62.269.000
AHLI MADYA
20 42.223.500 55.231.750 63.975.000
21 43.503.000 56.724.500 65.681.000
1 21.751.500 30.281.500 36.679.000
2 23.031.000 31.774.250 38.385.000
3 24.310.500 33.267.000 40.091.000
4 25.590.000 34.973.000 41.797.000
5 26.869.500 36465750 43.503.000
6 28.149.000 37.958.500 45.209.000
7 29.428.500 39.664.500 46.915.000
8 30.708.000 41.157.250 48.621.000
9 31.987.500 42.650.000 50.327.000
10 33.267.000 44.356.000 52.033.000
11 34.546.500 45.848.750 53.739.000
12 35.826.000 47.341.500 55.445.000
13 37.105.500 49.047.500 57.151.000
AHLI UTAMA 14 38.385.000 50.540.250 58.857.000
15 39.664.500 52.033.000 60.563.000
16 40.944.000 53.739.000 62.269.000
17 42.223.500 55.231.750 63.975.000
18 43.503.000 56.724.500 65.681.000

41
Tabel 2.4 Biaya Langsung Personil Untuk Tenaga Sub Profesional *)

NO PERSONIL PENDIDIKAN & RUPIAH PER BULAN


PENGALAMAN

D3 (>3 Tahun)
1 CAD / CAM OPERATOR 8.828.550
S1 (0-3 Tahun)

SOFTWARE D3 (>3 Tahun)


2 10.363.950
PROGRAMMER/ S1 (0-3 Tahun)
IMPLEMENTER
D3 (>3 Tahun)
3 HARDWARE TECHNICIAN 8.828.550
S1 (0-3 Tahun)
D3 (>3 Tahun)
4 FACILITATOR 8.828.550
S1 (0-3 Tahun)

SENIOR ASSISTANT D3 (>3 Tahun)


5 11.259.600
PROFESSIONAL S1 (0-3 Tahun)
STAFF
ASSISTANT D3 (>3 Tahun)
6 10.619.850
PROFESSIONAL STAFF S1 (0-3 Tahun)

SPECIAL D3 (>3 Tahun)


7 10.363.950
TECHNICIAN / S1 (0-3 Tahun)
INSPECTOR
D3 (>3 Tahun)
8 TECHNICIAN 8.828.550
S1 (0-3 Tahun)
D3 (>3 Tahun)
9 INSPECTOR 8.828.550
S1 (0-3 Tahun)
D3 (>3 Tahun)
10 SURVEYOR 7.932.900
S1 (0-3 Tahun)

Pendidikan Akademi Diploma (D4) setara dengan Pendidikan Tinggi Sarjana (S1).
*) Tenaga Sub Profesional
1. Pendidikan Tinggi Sarjana (S1) dengan pengalaman jasa konsultansi profesional
dibidangnya kurang dari 3 (tiga) tahun dikategorikan sebagai Tenaga Ahli Pemula
(Sub Professional).
2. Pendidikan Akademi Diploma (D3) dengan pengalaman jasa konsultansi profesional
dibidangnya minimal 3 (tiga) tahun.

42
Tabel 2.5. Biaya Langsung Personil Tenaga Pendukung

NO PERSONIL RUPIAH PER


BULAN
1 OFFICE MANAGER 9.255.050
2 8.402.050
SITE OFFICE MANAGER / ADMINISTRATOR
3 BILINGUAL SECRETARY 9.169.750
4 SECRETARY 5.672.450
5 COMPUTER OPERATOR/ TYPIST 5.032.700
6 DRAFTER (MANUAL) 4.691.500
7 MESSENGER 3.539.950
8 OFFICE BOY 3.284.050
9 DRIVER 3.795.850
10 OFFICE GUARD / SECURITY OFFICER 3.497.300

43
2. BIAYA LANGSUNG NON PERSONIL
Biaya Langsung Non Personil adalah biaya langsung yang diperlukan untuk menunjang
pelaksanaan kegiatan proyek yang dibuat dengan mempertimbangkan dan berdasarkan
Harga Pasar yang wajar dan dapat dipertanggungjawabkan serta sesuai dengan perkiraan
kegiatan. Biaya Langsung Non Personil ini terdiri dari 3 (tiga) komponen yaitu:
f. Reimbursable, adalah biaya yang dapat diganti yang sebenarnya dikeluarkan oleh
konsultan untuk pengeluaran-pengeluaran yang sesungguhnya (at cost) dan kegiatan
yang ditetapkan, seperti :
- Dokumen Perjalanan ke Luar Negeri
- Tiket Transportasi Darat / Laut / Udara
- Kelebihan Bagasi (Excess Baggage)
- Bagasi yang Tidak Dibawa Sendiri (Unaccompanied Baggage)
- Biaya Perjalanan Darat (Local / Inland Travel)
- Biaya Pembelian Kebutuhan Proyek
- Biaya Instalasi Telepon / Internet / Website
g. Fixed Unit Rate, adalah biaya yang sebenarnya dikeluarkan oleh konsultan
berdasarkan harga satuan yang pasti dan tetap untuk setiap item / unsur pekerjaan
dengan volume yang diperkirakan, seperti :
- Sewa Kendaraan dan O&M **)
- Sewa Kantor Proyek
- Sewa Peralatan Kantor **)
- Sewa Furniture Kantor **)
- Biaya Operasional Kantor Proyek
- Biaya ATK (Office Consumables) **)
- Biaya Komputer & Printer Consumables **)
- Biaya Komunikasi
- Tunjangan Harian (Per Diem Allowance)
- Tunjangan Perumahan (Housing Allowance)
- Penempatan Sementara (Temporary Lodging)
- Tunjangan Penempatan (Relocation Allowance)
- Tunjangan Tugas Luar (Out of Station Allowance / OSA)
- Penginapan Tugas Luar
- Cuti Tahunan (Annual Leave)
- Biaya Pelaporan
- Sewa Peralatan Penunjang **)
- Dan biaya-biaya lainnya untuk menunjang kebutuhan pekerjaan.

44
h. Lump Sum, adalah biaya suatu atau beberapa item / unsur pekerjaan dalam batas
waktu tertentu, dengan jumlah harga yang pasti dan tetap serta dibayarkan sekaligus
seperti :
- Pengumpulan Data Sekunder
- Seminar, Workshop, Sosialisasi, Training, Desiminasi, Loka Karya, Diskusi,
Koordinasi antar Instansi, FGD (Focus Group Discussion)
- Survey
- Biaya Test Laboratorium
- Hak Cipta
- Dll.

45
Tabel 2.6. Standar Biaya Langsung Non Personil Untuk Jenis Pengeluaran Fixed Unit Rate

NO JENIS PENGELUARAN SATUAN HARGA KETERANGAN


(RP)
1 Sewa Kendaraan dan Operation & Maintenance
Roda-4 Bulan 9.220.000 Tidak termasuk Operation & Maintenance, Driver
Roda-4 Hari 737.600 Termasuk Operation & Maintenance
Roda-2 Bulan 1.613.500 Tidak termasuk Operation & Maintenance
Roda-2 Hari 230.500 Termasuk Operation & Maintenance
Operation & Maintenance Roda-4 Bulan 4.149.000
Operation & Maintenance Roda-2 Bulan 783.700
2 Sewa Kantor Proyek M² / Bulan 150.000 Kebutuhan ruangan rata-rata 6 M² per Orang, maksimum untuk 25
orang, dan ruang rapat ± 30 M²
Untuk proyek < 6 Bulan, fasilitas Sewa Kantor diberikan jika lokasi
pelaksaanaan operasional pekerjaan / proyek berbeda kabupaten
dengan Kantor Perusahaan
Untuk proyek < 6 Bulan, minimal penyewaan dihitung untuk 6 Bulan
Untuk lokasi proyek terpencil / terisolir, harga dapat 1,5 s/d 2,5 kali
lebih besar
3 Sewa Peralatan Kantor **
Computer Desk Top Unit-Bulan 1.152.500
Laptop Unit-Bulan 1.844.000
Printer Laser Jet A-3 Unit-Bulan 1.383.000
Printer Laser Jet A-4 Unit-Bulan 783.700
Printer Color A-3 Unit-Bulan 875.900
Printer Color A-4 Unit-Bulan 691.500
Scanner A-3 Unit-Bulan 553.200

46
NO JENIS PENGELUARAN SATUAN HARGA KETERANGAN
(RP)
Scanner A-4 Unit-Bulan 414.900
Mesin Fotocopy Unit-Bulan 5.532.000
Mesin Fax Unit-Bulan 414.900
Mesin Ketik Unit-Bulan 322.700
LCD Proyektor Unit-Hari 691.500
Digital Camera Unit-Bulan 461.000
Plotter Unit-Bulan 4.840.500
4 Sewa Furniture Kantor
Meja dan Kursi Kerja Set-Bulan 1.613.500
Meja dan Kursi Rapat Set-Bulan 2.305.000
Air Conditioner Unit-Bulan 553.200
Filing Cabinet Unit-Bulan 230.500
White Board Unit-Bulan 92.200
Shelf Unit-Bulan 138.300
Water Dispenser Unit-Bulan 138.300
5 Biaya Operasional Kantor Proyek Bulan 5.250.000 Untuk biaya Listrik, Air, Kebersihan, dll (termasuk perawatan)

6 Biaya ATK (Office Consumables) Bulan 3.227.000

7 Biaya Komputer & Printer Consumables Unit-Bulan 2.305.000

8 Biaya Komunikasi Bulan 3.250.000 Untuk Telepon, Fax, Internet, Website


Belum termasuk biaya pemasangan / penyambungan Telepon,
Internet, Website

47
NO JENIS PENGELUARAN SATUAN HARGA KETERANGAN
(RP)
9 Tunjangan Harian (Per Diem Allowance) Org-Hari 600.000 ● Berlaku hanya untuk Lajang
Khusus Proyek < 3 bulan ● Untuk Biaya Akomodasi dan Uang Harian
● Tidak mendapat Housing Allowance
● Untuk proyek ≥ 3 bulan, mendapat Tunjangan Perumahan
10 Tunjangan Perumahan (Housing Allowance)
Proyek ≥ 3 bulan (Prof Staf): Org - Bulan 3.500.000 Untuk Lajang
Proyek ≥ 3 bulan (Sub Prof): Org - Bulan 2.500.000 Untuk Lajang
Proyek ≥12 bulan (Prof Staf) Kel - Bulan 6.000.000 Untuk Keluarga
11 Biaya Pelaporan Biaya Pelaporan tergantung dari jenis, macam, bentuk, dan banyak
Laporan Pendahuluan Buku 150.000 halaman laporan. Apabila dengan gambar teknik / peta, dapat
Laporan Antara Buku 200.000 dihitung sesuai pengeluaran
Konsep Lap. Akhir Buku 250.000
Laporan Akhir Buku 300.000
Ringkasan Eksekutif Buku 100.000
Laporan Bulanan Buku 100.000
Laporan Triwulan Buku 250.000
Laporan Teknis / Khusus Buku 750.000
Dokumen Tender Buku 2.500.000
Manual O&M Buku 400.000
CD Keping 10.000
Flash Disk Buku 100.000

48
NO JENIS PENGELUARAN SATUAN HARGA KETERANGAN
(RP)
12 Sewa Peralatan Penunjang**)
Thermometer Digital Laser Unit-Bulan 461.000
Hammer Test Unit-Bulan 368.800
Theodilite T0 Unit-Bulan 1.198.600
Theodolite T1 Unit-Bulan 1.475.200
Theodolite T2 Unit-Bulan 1.751.800
Theodolite TS Unit-Bulan 8.298.000
Waterpass Unit-Bulan 922.000
Hand GPS Unit-Bulan 461.000

49
B. PEMBUATAN PETA SITUASI UNTUK PERENCANAAN TATA RUANG
Kegiatan penyusunan harga satuan pembuatan peta situasi untuk perencanaan tata Ruang,
tergantung kepada: Jenis pemetaan, Skala Peta, Volume, Tenaga Ahli, Sewa Alat, Bahan
dan Akuisisi Data.

Tabel 2.7. Biaya Penyusunan Rencana Tata Ruang

No Jenis Rencana Biaya (Rp.)


1 Rencana Umum Tata Ruang (RUTR)
- Rencana Tata Ruang Wilayah (RTRW) Kabupaten 1.250.000.00
0
2 Rencana Rinci Tata Ruang
- Rencana Tata Ruang Kawasan Strategis
750.000.000
- Rencana Detail Tata Ruang (RDTR) dan Zoning
Regulation

Catatan :
Standar Biaya tidak termasuk pekerjaan pemetaan. Apabila dalam kegiatan termasuk pekerjaan
pemetaan maka biaya kegiatan ditambahkan biaya pemetaan berdasarkan harga standar
pemetaan.
Waktu pelaksanaan pekerjaan ditetapkan selama 6 (enam) bulan Tabel 2.8.

Harga Satuan Pembuatan Peta Situasi

Harga Satuan
No Jenis Pemetaan Skala Peta Volume (Ha)
(Rp./Ha)
1 Pemetaan Teristis 2.000 – 5.000 102.000

1 : 10.000 5.000 – 10.000 91.000

> 10.000 75.000

< 2.000 123.000

2.000 – 5.000 113.000


1 : 5.000
5.000 – 10.000 102.000

> 10.000 86.000

< 2.000 134.000

1 : 1.000 2.000 – 5.000 123.000

> 5.000 113.000

50
Tabel 2.9. Harga Pembuatan Peta Garis yang Bersumber Dari Foto Udara dan Citra Satelit

Jumlah Skala
NLP
1:1.00 1:5.00 1:25.000 1:50.000
0 0
1 81.352.000 203.469.000 271.133.000 301.688.000
2 89.135.000 333.120.000 471.203.000 527.636.000
3 98.969.000 466.308.000 668.213.000 760.965.000
4 111.344.000 595.674.000 871.108.000 985.041.000
5 121.315.000 722.658.000 1.071.198.000 1.212.625.000
6 128.355.000 860.686.000 1.268.208.000 1.435.573.000
7 140.267.000 993.131.000 1.471.103.000 1.672.948.000
8 144.267.000 1.118.988.000 1.671.193.000 1.897.023.000
9 157.346.000 1.252.891.000 1.868.203.000 2.127.688.000
10 164.633.000 1.388.141.000 2.071.098.000 2.351.763.000
15 216.218.000 2.040.436.000 3.068.193.000 3.494.658.000
20 268.462.000 2.698.038.000 4.071.173.000 4.630.716.000
25 315.135.000 3.357.554.000 5.071.073.000 5.779.413.000
30 360.505.000 4.014.771.000 6.068.168.000 6.914.426.000
40 458.872.000 5.326.141.000 8.071.048.000 9.197.586.000
50 555.716.000 6.636.038.000 10.071.123.000 11.476.923.000
60 656.229.000 7.954.448.000 12.068.118.000 13.755.326.000
70 750.031.000 9.272.061.000 14.070.998.000 16.043.161.000
80 848.003.000 10.582.590.000 16.071.073.000 18.323.241.000
90 945.738.000 11.897.866.000 18.068.068.000 20.600.901.000
100 1.040.640.000 13.215.534.000 20.070.948.000 22.885.188.000
Sumber : Badan Informasi Geospasial, 2015
Keterangan : NLP : Nomor Lembar Peta

51
Tabel 2.10 Pembelian Citra Satelit dan Pencetakan

JENIS LAYANAN TARIF


NO SATUAN
Rp US $ ¥ €
A Data Pengindraan Jarak Jauh
1 Quickbird, Geoeye dan Worldwide
a. Archive (>90 hr) Produk Standar
1) Panchromatic 13
2) 4 Band 16
3) 8 Band 29
b. Select Tasking/Fresh Archive
(<90 hr) Produk Standar
1) Panchromatic Per 22
2) 4 Band Km2 25
3) 8 Band Per 38

Km2
Per Km2
c. Single Shoot Tasking Produk
Standar
1) Panchromatic Per Km2 82
2) 4 Band Per Km2 85
d. Archive (>90 hr) Produk Stereo
1) Panchromatic Per Km2 26
2) 4 Band Per Km2 32
Per Km2
3) 8 Band 58
e. Select Tasking/Fresh Archive
(<90 hr) Produk Stereo
1) Panchromatic Per 44
2) 4 Band Km2 50
3) 8 Band Per 76

Km2
Per Km2
f. Select Plus Tasking Produk
Stereo
1) Panchromatic Per 84
2) 4 Band Km2 90
3) 8 Band Per 116

Km2
Per Km2
g. Handling Per transaksi 125
h. Administrasi Per transaksi 1.000.000
2 Pleiades
a. Archieve
1) 0,5 m B/W Per 10
2) 2 m Multispectral Km2 10
3) 0,5 m Natural Color Per 10
4) 0,5 m Color in 4 Bands 10
5) 0,5 m B/W and 2 m Multi Spectral Km2 10

52
6) Bundle Per 10
Km2
Per
Km2
Per
Km2
Per
Km2
b. Tasking Per
1) 0,5 m B/W 17
Km2
2) 2 m Multispectral 17
Per
3) 0,5 m Natural Color 17
Km2 17
4) 0,5 m Color in 4 Bands
Per
Km2
Per
Km2
Per Km2

53
NO JENIS LAYANAN SATUAN TARIF
Rp US $ ¥ €
5) 0,5 m B/W and 2 m Multi Spectral Per Km2 17
6) Bundle 17
i. Handling Per transaksi 100
j. Administrasi Per transaksi 1.000.000
3 Kompsat 2 Bundle (PAN 1.0 m/MS 4.0 m) Level 1R/1G
a. Standard Scene Per Km2 8
b. New Tasking Standard Per Km2 13,5
c. New Tasking Priority 20
Per Km2
d. Short Archive (< 60 hari) 5,5
Per Km2
e. Archive (> 60 hari) 4
1.000.000
f. Administrasi Per Km2

Per transaksi
4 Kompsat 3 Bundle (PAN 0.7 m/MS 2.8 m) Level 1R/1G
a. Standard Scene Per Km2 16
Per Km2
b. New Tasking Standard 26
Per Km2
c. New Tasking Priority 40
Per Km2
d. Short Archive (< 60 hari) 11
Per Km2
e. Archive (> 60 hari) 8
1.000.000
f. Administrasi Per transaksi

5 Ikonos
a. Geo
1) Standar Archive Per Km2 10

2) Select Tasking Per Km2 20

b. Geo Stereo
1) Standar Archive 20

2) Select Tasking 35

c. Handling Per transaksi 125


1.000.000
Per transaksi
d. Administrasi
6 SPOT 5
a. Level 2A/Basic Ortho-Natural Color
1) 10 Meter color
Per scene 4.200
a) New Image
Per ½ scene 3.500
Per ¼ scene 2.750
Per ⅛ scene 2.350
Per scene 3.350
b) Archive image
Per ½ scene 2.600
Per ¼ scene 1.800
Per ⅛ scene 1.450

54
55
NO JENIS LAYANAN SATUAN TARIF
Rp US $ ¥ €
2) 5 Meter color
a) New Image Per scene 7.700
Per ½ scene 5.800
Per ¼ scene 4.200
Per ⅛ scene 3.500
b) Archive image Per scene 6.450
Per ½ scene 4.800
Per ¼ scene 3.350
Per ⅛ scene 2.630
3) 2,5 Meter color
a) New Image Per scene 10.400
Per ½ scene 8.450
Per ¼ scene 6.150
Per ⅛ scene 5.000
b) Archive image Per scene 9.100
Per ½ scene 7.100
Per ¼ scene 4.850
Per ⅛ scene 3.700
b. Level 3 Ortho-Natural Color
1) 10 Meter color
a) New Image Per 55x55 km 5.100
Per 27x27 km 3.150
Per 13x13 km 2.350
b) Archive image Per 55x55 km 4.150
Per 27x27 km 2.250
Per 13x13 km 1.450
2) 5 Meter color
a) New Image Per 55x55 km 8.150
Per 27x27 km 4.400
Per 13x13 km 2.900
b) Archive image Per 55x55 km 7.250
Per 27x27 km 3.450
Per 13x13 km 2.000
3) 2,5 Meter color
a) New Image Per 55x55 km 11.900

Per 27x27 km 6.350


Per 13x13 km 4.050
b) Archive image Per 55x55 km 11.000

56
NO JENIS LAYANAN SATUAN TARIF
Rp US $ ¥ €
Per 27x27 km 5.400
Per 13x13 km 3.150
c. Administrasi Per transaksi 1.000.000

7 SPOT 6
a. Archive
Per 3,8
1) Mono
2) Mono – Rush Delivey Km2 5,7

3) Stereo Per 7,6


11,4
4) Stereo – Rush Delivery Km2
5) Tri Stereo 11,4
Per
6) Tri Stereo – Rush Delivery 17,1
Km2
b. Tasking
Per
1) Standard Service 4,6
Km2 9,2
2) Priority Service
Per 1.000.000 13,8
3) Emergency Service – Tailored
c. Administrasi Km2
Per

Km2

Per

Km2
Per

Km2
Per

Km2

Per transaksi
8 ALOS (Prism/Avnir-2/Palsar)
a. CEOS ALOS Per scene 25.000
b. GeoTIFF ALOS Per scene 30.000
c. NITF ALOS Per scene 30.000
d. RPC ALOS
Per scene
1) CEOS (Prism) + original (RPC) 30.000
Per scene
2) NITF (Prism + RPC) 35.000
Per scene
3) GeoTIFF (Prism)+original (RPC) 30.000
Per scene
4) GeoTIFF(Avnir-2)+original (RPC) 30.000
Per transaksi
e. Handling 1.000.000 3.000
Per transaksi
f. Administrasi
9 RAPIDEYE
Per
57
a. Archive Km2
01.05
b. Priority Tasking Per
01.40
c. Handling Km2 1.000.000 130
d. Administrasi
Per transaksi
Per transaksi
10 TerraSAR X
Per
a. DSM raw 16
b. CSM basic Km2 17
Per 20
c. Hydro Enforcement
d. Terrain editing (DTM) Km2 30
Per

Km2

Per Km2

58
NO JENIS LAYANAN SATUAN TARIF
Rp US $ ¥ €
e. Orthorectifield Radar Image Layer Per Km2 3
f. Administrasi Per transaksi 1.000.000
11 RADARSAT 2
a. Spotlight A (1m) Perscene 8.400
b. Ultra Fine (3m) Perscene 5.400
c. Wide Ultra Fine (3m) Perscene 7.800
d. Multi-look Fine (8m) Perscene 4.200
e. Wide Multi-look Fine (8m) Perscene 7.500
f. Fine (8m) Single Pol Perscene 3.600
g. Fine (8m) Double Pol Perscene 3.800
h. Wide Fine (8m) Single Pol Perscene 7.500
i. Wide Fine (8m) Double Pol Perscene 7.800
j. Standard (25m) Single Pol Perscene 3.600
k. Standar (25m) Double Pol Perscene 3.800
l. Wide (30m) Single Pol Perscene 3.600
m. Wide (30m) Double Pol Perscene 3.800
n. ScanSAR Narrow (50m) Single Pol Perscene 3.600
o. ScanSAR Narrow (50m) Double Pol Perscene 3.800
p. ScanSAR Wide (100m) Single Pol Perscene 3.600
q. ScanSAR Wide (100m) Double Pol Perscene 3.800
r. Extended High (25m) Perscene 3.600
s. Extended Low (25m) Perscene 3.600
t. Fine Quad-Pol (8m) Perscene 5.400
u. Wide Fine Quad-Pol (8m) Perscene 7.800
v. Standard Quad-Pol (25m) Perscene 5.400
w. Wide Standar Quad-Pol (25m) Perscene 7.800
x. Administrasi Per transaksi 1.000.000
B PENCETAKAN CITRA PENGINDRAAN JAUH
1 Ukuran A3 Per lembar 300.000
2 Ukuran A1 Per lembar 400.000
3 Ukuran A0 Per lembar 500.000
4 Ukuran 60” Per lembar 600.000
Sumber : Peraturan Menteri Keuangan Republik Indonesia nomor :187/PMK.05/2014 Tentang Tarif
Layanan Badan Layanan Umum Pusat Pemanfaatan Teknologi Dirgantara pada Lembaga
Penerbangan dan Antariksa Nasioanal

59
C. PEMBUATAN RENCANA STUDI AMDAL DAN UKL/UPL

1. BIDANG MULTISEKTOR
Bidang Multisektor berisi jenis kegiatan yang bersifat lintas sektor, Jenis kegiatan yang tercantum
dalam bidang multisektor merupakan kewenangan Kementerian/Lembaga Pemerintah Non
Kementerian terkait sesuai dengan ketentuan peraturan perundangan.

Tabel 2.11. Studi Analisis Mengenai Dampak Lingkungan (AMDAL) dan Studi UKL/UPL Multisektor

No Uraian Skala Besaran Alasan Ilmiah

1 Pembangunan ≥ 5 ha Besaran dipertimbangkan berdasarkan :


bangunan gedung
≥ 10.000m2 a. Pembebasan lahan.
- Luas Lahan, atau b. Daya dukung lahan.
c. Tingkat kebutuhan air sehari-hari.
- Bangunan d. Limbah yang dihasilkan.
e. Efek pembangunan terhadap
lingkungan sekitar (getar, kebisingan
polusi udara, dan lain- lain).
f. KDF (koefisien dasar bangunan) dan
KLB. (koefisien luas bangunan)
g. Jumlah dan jenis pohon yang
mungkin hilang.
h. Konflik sosial akibat pembebasan
lahan (umumnya berlokasi dekat
pusat kota yang memiliki kepadatan
tinggi).
i. Struktur bangunan bertingkat tinggi
dan basement menyebabkan
masalah dewatering dan gangguan
ting- tiang pancang terhadap akuifer
sumber air sekitar
j. Bangkitan pergerakan (traffic) dan
kebutuhan permukiman dari tenaga
kerja yang besar.
k. Genangan/banjir lokal.
*) Sumber : Peraturan Menteri Negara Lingkungan Hidup Republik Indonesia Nomor 5 Tahun 2012,
Tentang Jenis Usaha dan/atau kegiatan yang wajib memiliki analisis mengenai dampak lingkungan
hidup

60
2. BIDANG PERTANIAN
Pada umumnya dampak penting yang ditimbulkan usaha budidaya tanaman pangan, hortikultura,
dan perkebunan berupa erosi tanah, perubahan ketersediaan dan kualitas air akibat kegiatan
pembukaan lahan, persebaran hama, penyakit dan gulma pada saat beroperasi, serta perubahan
kesuburan tanah akibat pengguna pestisida/herbisida. Di samping itu sering pula muncul potensi
konflik social dan penyebaran penyakit endemik.

Skala/besaran yang tercantum dalam tabel dibawah ini telah memperhitungkan potensi dampak
penting kegiatan terhadap ekosistem, hidrologi, dan bentang alam. Skala/besaran tersebut
merupakan luasan rata-rata dari berbagai uji coba untuk masing- masing kegiatan dengan
mengambil lokasi di daerah dataran rendah, sedang, tinggi

Tabel 2.12. Studi Analisis Mengenai Dampak Lingkungan (AMDAL) dan Studi UKL/UPL Bidang Pertanian

No Uraian Skala Besaran Alasan Ilmiah


1 Budidaya tanaman pangan dengan Kegiatan akan
atau tanpa unit pengelolahannya, Berdampak terhadap
dengan luas ≥ 2.000 ha ekosistem, hidrologi dan
2 Budidaya tanaman hortikultura bentang alam
dengan atau tanpa unit
pengolahannya, dengan luas ≥5.000 ha
3 Budidaya tanaman perkebunan
a. Semusim dengan atau tanpa
unit pengolahannya :
1) Dalam kawasan budidaya non ≥ 2.000 ha
kehutanan, luas
2) Dalam kawasan
hutanproduksi yang dapat ≥ 2.000 ha
dikonversi (HPK), luas
b. Tahunan dengan atau tanpa
unit pengolahannya : ≥ 3.000 ha
1) Dalam kawasan budidaya non
kehutanan, luas
2) Dalam kawasan hutan produksi ≥ 3.000 ha
yang dapat dikonversi (HPK),
luas
*) Sumber : Peraturan Menteri Negara Lingkungan Hidup Republik Indonesia Nomor 5 Tahun 2012,
Tentang Jenis Usaha dan/atau kegiatan yang wajib memiliki analisis mengenai dampak lingkungan
hidup.

61
3. BIDANG PERIKANAN

Pada umumnya dampak penting yang ditimbulkan usaha budidaya tambak udang dan ikan adalah
perubahan ekosistem perairan dan pantai, hidrologi, dan bentang alam. Pembukaan hutan mangrove
akan berdampak terhadap habitat, jenis dan kelimpahan dari turnbuh- tumbuhan dan hewan yang
berbeda di kawasan tersebut. Pembukaan hutan mangrove maksud wajib sesuai dengan ketentuan
peraturan perundangan, seperti memperhatikan kelestarian sempadan pantai mangrove, tata cara
konversi mangrove yang baik dan benar untuk meminimalisasi dampak, dan lain sebagainya.

Tabel 2.13. Studi Analisis Mengenal Dampak Lingkungan (AMDAL) dan Studi UKL/UPL Bidang Perikanan

No Uraian Skala Besaran Alasan Ilmiah


1 Usaha a. Rusaknya ekosistem mangrove yang
budidaya menjadi tempat tempat pemijahan dan
perikanan pertumbuhan ikan (nursery areas) akan
a. Budidaya tambak mempengaruhi tingkat produktivitas
udang/ikan tingkat daerah setempat.
teknologi maju dan b. Beberapa komponen lingkungan yang
madya dengan atau akan terkena dampak adalah :
tanpa unit ≥ 50 ha kandungan bahan organik, perubahan
pengolahannya BOD, COD,DO, kecerahan air, jumlah,
- Luas phytoplankton maupun peningkatan
virus dan bakteri.
c. Semakin tinggi penerapan teknologi
maka produksi limbah yang
diindikasikan akan menyebabkan
dampak negatif terhadap perairan/
ekosistem disekitarnya.
b. Usaha budidaya a. Perubahan kualitas perairan.
perikanan terapung b. Pengaruh perubahan arus
(jaring apung dan dan penggunaan.
pen sistem) : c. Pengaruh terhadap estetika perairan.
- Di air d. Mengganggu alur pelayaran.
tawar (danau) ≥ 2,5 ha
 Luas, atau ≥ 500 unit
 Jumlah
- Di air laut ≥ 5 ha
 Luas, atau ≥ 1.000 unit
 Jumlah
*) Sumber : Peraturan Menteri Negara Lingkungan Hidup Republik Indonesia Nomor 5 Tahun 2012,
Tentang Jenis Usaha dan/atau kegiatan yang wajib memiliki analisis mengenai dampak lingkungan
hidup.

62
4. BIDANG KEHUTANAN

Pada umumnnya dampak penting yang ditimbulkan adalah gangguan terhadap ekosistem hutan,
hidrologi, keanekaragaman hayati, hama penyakit, bentang alam dan potensi konflik sosial.

Tabel 2.14. Studi Analisis Mengenai Dampak Lingkungan (AMDAL) dan Studi UKL/UPL Bidang Kehutanan

No Uraian Skala Besaran Alasan Ilmiah


Usaha Pemanfaatan Hasil
Hutan a. Pemanenan pohon dengan diameter tertentu
berpotensi merupakan struktur dankomposisi
1 a. Usaha Pemanfaatan tegakan.
Hasil Hutan Kayu Semua
Besaran b. Mempengaruhi kehidupan satwa liar dan
(UPHHK)dari Hutan habitatnya.
Alam (HA)
Usahakan hutan tanaman dilaksanakan melalui
b. Usaha Pemanfaatan
berpotensi menimbulkan dampak erosi serta
Hasil Kayu (UPHHK) ≥ 5.000 ha
perubahan komposisi tegakan (menjadi homogen).
dari Hutan Tanaman
Satwa liar dan habitatnya.
*) Sumber : Peraturan Menteri Negara Lingkungan Hidup Republik Indonesia Nomor 5 Tahun 2012,
Tentang Jenis Usaha dan/atau kegiatan yang wajib memiliki analisis mengenai dampak lingkungan
hidup.
5. BIDANG PERHUBUNGAN
Tabel 2.15. Studi Analisis Mengenai Dampak Lingkungan (AMDAL) dan Studi UKL/UPL Bidang Perhubungan

Skala
No Uraian Besaran Alasan Ilmiah
Pembangunan Jalur Kereta Api,
dengan atau tanpa stasiunnya Berpotensi menimbulkan dampak berupa emisi,
gangguan lalu lintas, kebisingan, getaran,
a. Pada permukaan tanah (at- ≥ 25 km gangguan, pandangan, ekologis, dampak sosial,
grade) panjang
1 gangguan jaringan prasarana sosial (gas, listrik,
b. Di bawah permukaan tanah Semua air minum, telekomunikasi) serta dampak
(underground), panjang besaran perubahan kestabilan lahan, land subsidence dan
c. Di atas permukaan tanah air tanah.
(elevated), panjang ≥ 5 km

Pembangunan terminal Berpotensi menimbulkan dampak berupa emisi,


2 penumpang dan terminal barang ≥ 5 ha gangguan lalu lintas, kebisingan, pencemaran
transportasi jalan udara, getaran, tata ruang, dan dampak sosial.

a. Pengerukan perairan dengan Berpotensi menimbulkan dampak penting


3 capital dredging terhadap sistem hidrologi dan ekologis yang lebih
≥ 500.000
- Volume luas dari batas tapak kegiatan itu sendiri,
m3
perubahan batimetri, ekosistem, dan mengganggu
b. Pengerukan perairan sungai proses-proses alamiah di daerah perairan
danatau laut capital dredging termasuk menurunnya produktivitas kawasan
≥ 250.000
yang memotong batu, yang yang dapat menimbulkan dampak sosial.
bukan termasuk m3 Kegiatan ini juga akan menimbulkan gangguan
materialkarang. terhadap lalu lintas pelayaran perairan.

*) Sumber : Peraturan Menteri Negara Lingkungan Hidup Republik Indonesia Nomor 5 Tahun 2012,
Tentang Jenis Usaha dan/atau kegiatan yang wajib memiliki analisis mengenai dampak lingkungan
hidup.

63
6. BIDANG TEKNOLOGI SATELIT
Tabel 2.16. Studi Analisis Mengenai Dampak Lingkungan (AMDAL) dan Studi UKL/UPL
BidangTeknologi Satelit

No Uraian Skala Besaran Alasan Ilmiah


1 Pembangunan - Semua Besaran 1. Termasuk kegiatan yang berteknologi
dan - Untuk tinggi, harus memperhatikanketentuan:
Pengoperasian tujuan a. Keamanan dan keselamatan
Bandar Antariksa peluncuran peluncuran dan terikat dengan
satelit konvensi internasional.
dapat b. Keselamatan penerbangan dan
ditunjukan untuk terikat dengan konvensi
komersial Internasional.
maupun c. Ketentuan telekomunikasi dan
tida terikat dengan konvensi
k (kepentingan Internasional.
Nasional).
2. Kegiatan ini memerlukan persyaratan
lokasi yang khusus (sepi penduduk, di
daerah katulistiwa/ekuator, dekat laut),
teknologi canggih, dan tingkat
pengaman yang tinggi.
3. Berpotensi menimbulkan dampak
berupa kebisingan, getaran, dampak
sosial, keamanan negara, emisi dan
kemungkinan kerusakan dan kerugian
yang tidak terprediksi di darat, laut dan
udara.
4. Bangunan peluncuran satelit dan
fasilitas pendukung, termasuk daerah
penyangga, tertutup bagi masyarakat.
5. Adanya ketentuan zona bahaya 1,2 dan
zona aman.
6. Zona bahaya 1 dan 2 ditetapkan
sebagai kawasan terbatas (restricted
area).
7. Berdampak sosial, ekonomi dan politik
baik nasional maupun internasional.
8. Merupakan kawasan strategisnasional.
*) Sumber : Peraturan Menteri Negara Lingkungan Hidup Republik Indonesia Nomor 5 Tahun 2012,
Tentang Jenis Usaha dan/atau kegiatan yang wajib memiliki analisis mengenai dampak lingkungan
hidup
7. BIDANG PEKERJAAN UMUM

Beberapa kegiatan pada bidang pekerjaan umum mempertimbangkan skala/besaran kawasan


perkotaan (metropolitan, besar, sedang, kecil) yang menggunakan kriteria yang diatur dalam
peraturan perundangan yang berlaku yang mengatur tentang penyelenggaraan penataan ruangan
(Peraturan Pemerintah Nomor 15 Tahun 2010 tentang Penyelenggaraan Penataan Ruangan) atau
penggantinya.

64
Tabel 2.17. Studi Analisis Mengenai Dampak Lingkungan (AMDAL) dan Studi UKL/UPL Bidang Pekerjaan Umum

No Uraian Skala Besaran Alasan Ilmiah


1 Pembangunan Bendungan/ Waduk atau Jenis Tampungan Air a. termasuk dalam kategori "large dam" (bendungan besar).
lainnya b. Pada skala ini dibutuhkan spesifikasi khusus baik bagi material dan
1) tinggi; atau desain konstruksinya.
c. Pada skala ini diperlukan quarry/borrow area yang besar, sehingga
≥ 15 m berpotensi menimbulkan dampak.
d. Jika terjadi failture maka akan menimbulkan bencana banjir.
2) daya tampung waduk, atau ≥ 500.000 m3 Kegagalan bendungan pada daya tampung ≥500.000 m 3.
3) Luas genangan, atau ≥ 200 ha a. Pengadaan tanah untuk tapak bendungan dan daerah
genangan waduk memerlukan pembebasan kawasan yang
relatif luas dan menyangkut keberlanjutan kehidupan penduduk
dan ekosistem.
b. Akan mempengaruhi pola iklim mikro pada kawasan
disekitarnya dan ekosistem pada daerah hulu dan hilir
bendungan/waduk.
2 Daerah irigasi a. Mengakibatkan perubahan pola iklim mikro dan ekosistem kawasan.
a. Pembangunan baru dengan luas ≥3.000 ha b. Selalu memerlukan bangunan utama (headworks) dan bangunan
penunjang (oppurtenants structures) yang besar sehingga berpotensi
untuk mengubah ekosistem yang ada.
c. Mengakibatkan mobilisasi tenaga kerja yang signifikan pada daerah
sekitarnya, baik pada saat pelaksanaan maupun setelah pelaksanaan.
d. Membutuhkan pembebasan lahan yang besar sehingga berpotensi
menimbulkan dampak sosial.
e. Menyesuaikan dengan PP Nomor 20 Tahun 2006 tentang irigasi, terkait
kewenangan dan tanggung jawab Pemerintah

65
No Uraian Skala Besaran Alasan Ilmiah
Pusat untuk pengembangan dan pengelolaan sistem irigasi
dengan
luas ≥ 3.000 ha.
b. Peningkatan dengan luas tambahan ≥ 1.000 ha a. Berpotensi menimbulkan dampak negatif akibat perubahan
ekosistem pada kawasan tersebut.
b. Memerlukan bangunan tambahan yang berpotensi untuk
mengubah ekosistem yang ada.
c. Mengakibatkan mobilitas manusia yang dapat menimbulkan
dampak sosial.
d. Perubahan neraca air.
c. pencetakan sawah, luas (perkelompok) ≥ 500 ha a. Memerlukan alat berat dalam jumlah yang cukup banyak.
b. Perubahan Tata Air.
3 Pengembangan Rawa : a. Berpotensi mengubah ekosistem dan iklim mikro
Reklamasi rawa untuk kepentingan irigasi ≥ 1.000 ha padakawasan tersebut dan berpengaruh pada kawasan
di sekitarnya.
b. Berpotensi mengubah sistem tata air yang ada pada
kawasan yang luas secara drastis.
4 Normalisasi sungai (termasuk sodetan) dan pembuatan Kanal a. Terjadi timbunan tanah galian di kanan kiri sungai yang
Banjir menimbulkan dampak lingkungan, dampak sosial, dan
a. Kota besar/metropolitan gangguan.
> 5 km b. Mobilitas alat besar dapat menimbulkan gangguan dan dampak.
- Panjang, atau
≥ 500.000 m3 c. Perubahan hidrologi dan pengaliran air hujan (run-off).
- Volume pengerukan
b. Kota sedang a. Terjadi timbunan tanah galian di kanan kiri sungai yang
- Panjang, atau
> 10 km menimbulkan dampak lingkungan, dampak sosial, dan
> 500.000 m3 gangguan.
- Volume pengerukan

b. Mobilitas alat besar dapat menimbulkan gangguan dan dampak.


c. Perubahan hidrologi dan pengaliran air hujan (run-off).

66
No Uraian Skala Besaran Alasan Ilmiah
c. Kota sedang a. Terjadi timbunan tanahgalian di kanan kiri sungai yang
- Panjang, atau
≥ 15 km menimbulkan dampaklingkungan, dampak sosial,dan gangguan.
- Volume pengerukan ≥500.000 m3 b. Mobilitas alat besar dapat menimbulkan gangguan dan dampak.
c. Perubahan hidrologi dan pengaliran air hujan (run-off).
5 Pembangunan dan/atau peningkatan jalan tol yang a. Luas wilayah kegiatan operasi produksi berkorelasi
membutuhkan pengadaan lahan diluar rumija (ruangan milik ≥ 5 km dengan luas penyebaran dampak.
jalan) dengan skala/besaran panjang (km) dan skala/besaran pengadaa b. Memicu fungsi lahan beririgasi teknis menjadi lahan
luas pengadaan lahan (ha): n lahan pemukiman dan industri.
a. di kota metropolitan/ besar ≥ 10 ha c. Bangkit lalu lintas, dampak kebisingan getaran, emisi yang
- panjang jalan dengan luas lahan pengadaan lahan; atau tinggi, gangguan visual dan dampak sosial.
- luas pengadaan lahan
≥ 30 ha
b. di kota sedang
- panjang jalan dengan luas lahan pengadaan lahan; atau
≥ 5 km a. Bangkitan lalu lintas, dampak kebisingan getaran, emisi yang
dengan tinggi, gangguan visual dan dampak sosial.
- luas pengadaan lahan
pengadaan b. Ahli fungsi lahan.
lahan
≥ 20 ha
≥ 30 ha
c. di pedesaan
- panjang jalan dengan luas lahan pengadaan lahan; atau
≥ 5 km a. Bangkitan lalu lintas, dampak kebisingan getaran, emisi yang
dengan tinggi, gangguan visual dan dampak sosial.
- luas pengadaan lahan
pengadaan b. Ahli fungsi lahan.
lahan
≥ 30 ha
≥ 40 ha

67
No Uraian Skala Besaran Alasan Ilmiah
6 Pembangunandan/atau peningkatan jalan dengan pelebaran Bangkitan lalu lintas, dampak kebisingan, getaran, emisi yang
yang membutuhkan pengadaan lahan (di luar rumija): ≥ 5 km tinggi, gangguan visual dan dampak sosial.
a. di kota metropolitan/besar dengan
- panjang jalan dengan luas lahan pengadaan lahan; atau
pengadaan
lahan
- luas pengadaan lahan
≥ 20 ha
≥ 30 ha
b. di kota sedang
- panjang jalan dengan luas lahan pengadaan lahan; atau
≥ 5 km
- luas pengadaan lahan
dengan
pengadaan
lahan
≥ 30 ha
≥ 40 ha
c. di pedesaan
- panjang jalan dengan luas lahan pengadaan lahan; atau
≥ 5 km
- luas pengadaan lahan
dengan
pengadaan
lahan
≥ 40 ha
≥ 50 ha
7 a. pembangunan subway/underpass, terowongan tonnel, ≥ 2 km Berpotensi menimbulkan dampak berupa perubahan kestabilan
jalan Iayang/flyover, dengan panjang lahan (land subsidrice), air tanah serta gangguan berupa dampak
b. pembangunan jembatan, dengan panjang ≥ 500 m terhadap emisi, lalu lintas; kebisingan, getaran, gangguan
pandangan, gangguanjaringan prasarana sosial (gas, listrik, air
minum, telekomunikasi) dan dampak sosial disekitar kegiatan
tersebut.

68
No Uraian Skala Besaran Alasan Ilmiah
8 Persampahan a. Penyesuaian terhadap luas kawasan TPA dengan daya tampung
a. pembangunan TPA sampah domestik pembuangan dengan TPA.
sistem controlled landfill/sanitary landfill termasuk instalasi b. Perubahan paradigms dari tempat pembuangan/penampungan
penunjangnya akhir menjadi tempat pengelolahan akhir.
- Luas kawasan TPA, atau c. UU 18 Tahun 2008 tentang pengelolaan Sampah dimana
> 10 ha konsep 3R menjadi bagian dari deskripsi kegiatan Amdal TPA.
- Kapasitas total
> 100.000 ton Bukan lagi "open dumping" tapi sebagai tempat pengolah akhir,
sehingga ada composting dan landfill gas (waste to energy).
Untuk incinerator biasanya untuk kapasitas yang kecil (<100 ton
per hari) prosesnya kurang sempurna sehingga dampaknya
dapat lebih penting.
b. TPA di daerah pasang surut, Semua Pengaturan TPA ini lebih ketat dari pada di wilayah lain. Secara
- Luas landfill, atau kapasitas teknis, daerah pasang surut tidak direkomendasikan untukmenjadi
/ besaran lahan TPA.
- Kapasitas total

Tetapi untuk beberapa wilayah lain maka tetap dapat diperbolehkan


membangun TPA didaerah pasang surut.
c. Pembangunan transfer station Lokasi transfer station pada umumnya terletak di dalam atau di
- Kapasitas ≥500 ton/hari pinggiran kota dan dibangun pada luas lahan yang terbatas.
d. Pembangunan instansi Pengolahan Sampah Terpadu Guna mendorong minat swasta/masyarakat.
- Kapasitas ≥500 ton/hari
e. Pengolahan dengan insinerator Pengolahan sampah domestik berapapun kapasitasnya harus
- Kapasitas semua dilengkapi dengan amdal karena saat ini sampah domestik masih
kapasita bercampur dengan sampah B3.
s
f. Composting Plant Kapasitasnya composting plant diperbesaran untuk mendorong
- Kapasitas ≥500 ton/hari minat siswa/masyarakat dalam komposting.
9 Air limbah domestik a. Setara dengan layanan untuk 100.000 orang.

69
No Uraian Skala Besaran Alasan Ilmiah
a. Pembangunan instalasi Pengolahan Lumpur Tinja b. Dampak potensial berupa bau, gangguan kesehatan, lumpur
(IPLT), termasuk fasilitas penunjangnya sisa yang tidak diolah dengan baik dan gangguan visual.
- Luas, atau ≥ 2ha
- Kapasitasnya ≥ 11 m3/hari
b. Pembangunan instalasi Pengolahan Lumpur Tinja Setara dengan layanan untuk 100.000 orang.
(IPLT), termasuk fasilitas penunjangnya
- Luas, atau
≥ 3ha
≥ 11 ton/hari
- Beban organik
c. Pembangunan sistem perpipaan air limbah, luas layanan Setara dengan layanan 100.000 orang.
a.
- Luas layanan, atau
≥ 500ha b. Setara dengan layanan 100.000 orang.
- Debit air limbah c. Dampak potensial berupa gangguan lalu lintas, kerusakan
≥16.000m3/hari prasarana umum, ketidak sesuaian atau nilai kompensiasi.
10 Pembangunan saluran drainase (primer dan/atau Berpotensi menimbulkan gangguan lalu lintas, kerusakan
sekunder) di permukiman prasarana dansaranan umum, pencemaran di daerah hilir,
a. Kota besar/metropolitan, panjang
≥ 5 km perubahan tata air di sekitar jaringan, bertambahnya aliran puncak
b. Kota sedang, panjang
≥ 10 km dan perubahan perilaku masyarakat di sekitar jaringan.
Pembangunan drainase sekunder di kota sedang yang melewati
pemukiman padat.
11 Jaringan air bersih di kota besar/metropolitan Berpotensial menimbulkan dampak hidrologi dan persoalan
a. Pembangunan jaringan distribusi keterbatasan air.
≥ 500ha Konflik sosial pemakaian air di sepanjang jaringan pipa.
- Luas Layanan
b. Pembangunan jaringan transmisi
- Panjang ≥ 10 km
Sumber : Peraturan Menteri Negara Lingkungan Hidup Republik Indonesia Nomor 5 Tahun 2012, Tentang Jenis Usaha dan/atau kegiatan yang wajib memiliki analisis
mengenai dampak lingkungan hidup.

70
8. BIDANG PERUMAHAN DAN KAWASAN PERMUKIMAN

Tabel 2.18. Studi Analisis Mengenai Dampak Lingkungan (AMDAL) dan Studi UKL/UPL
Bidang Perumahan dan Kawasan Permukiman

Skala
No Uraian Besara Alasan Ilmiah
n
1 Pembangunan perumahan dan a. Pembangunan perumahan dan kawasan
kawasan permukiman dengan permukiman berdasarkan :
pengelola tertentu: b. hubungan antar kawasan funsional
≥ 25 ha sebagai bagian lingkungan hidup diluar
a. Kota metropolitan, luas
≥ 50 ha kawasan lindung;
b. Kota besar, luas
≥ 100 ha c. keterkaitan lingkungan hunian perkotaan
c. Kota sedang dan kecil, luas ≥2000ha dengan lingkungan hunian pedesaan;
d. Untuk keperluan d. keterkaitan antara
settlement transmigrasi pengembanganlingkungan hunian
perkotaandengan

pengembangan lingkungan hunian


pedesaan;
e. keserasian tata kehidupan manusia
dengan lingkungan hidup;
f. keseimbangan antara kepentingan
publik dan kepentingan privat.
g. Analisis teknis; meliputi:
h. Tingkat pembebasan lahan.
i. Daya dukung lahan, seperti daya dukung
tanah, kapasitas resapan air tanah,
tingkat kepadatan bangunan per-hektar.
j. Tingkat kebutuhan air sehari-hari.
k. Limbah yang dihasilkan sebagai akibat
basil kegiatan perumahan dan
pemukiman.
l. Efek pembangunan terhadap lingkungan
sekitar (mobilisasi material, manusia,
dan lalu lintas).
m. KDB (koefisien dasar bangunan) dan KLB
(koefisien luas bangunan).
n. Peningkatan air larian (run-off)
yang mengakibatkan banjir
di hilirnya.
*) Sumber : Peraturan Menteri Negara Lingkungan Hidup Republik Indonesia Nomor 5
Tahun 2012, Tentang Jenis Usaha dan/atau kegiatan yang wajib memiliki analisis
mengenai dampak lingkungan hidup.

71
9. BIDANG ENERGI DAN SUMBER DAYA MINERAL

Tabel 2.19. Studi Analisis Mengenai Dampak Lingkungan (AMDAL) dan Studi
UKL/UPL Bidang Energi dan Sumber Daya Mineral
No Uraian Skala Alasan Ilmiah
Besaran
K.1 Mineral Batubara
1 Eksploitasi (Operasi Produksi) Jumlah pemindahan material
Mineral logam berpengaruh terhadap intensitas dampak
a. Kapasitas, dan/atau ≥ 300.000 ton/tahun yang akan terjadi.
b.Jumlah material penutup yang ≥ 1.000.000 ton/tahun
2 Eksploitasi (Operasi Produksi) Jumlah pemindahan material
Mineral bukan logam atau mineral berpengaruh terhadap intensitas dampak
batuan ≥ 500.000 m3/ tahun yang akan terjadi.
a. Kapasitas, dan/atau
≥ 1.000.000 m3/ tahun
b. Jumlah material penutup

yang dipindahkan
3 Pengelolahan dan pemurnian : a. Pengelolahan dan pemurnian bijih
Semua besaran
a. Mineral logam berpotensi menimbulkan dampak
b. Mineral bukan logam ≥ 500.000 m3/ tahun penting.
c. Batuan ≥ 500.000 m3/ tahun b. Besarnya dampak yang timbul
d. Batubara ≥ 1.000.000 m3/ tahun dipengaruhi oleh volume yang diolah.
e. Mineral radioaktif
4 Eksploitasi (Operasi Semua besaran a. Memberikan perubahan terhadap
Produksi) Mineral (ton/tahun), kecuali struktur dan stabilitas tanah.
radioaktif untuk tujuan b. Memberikan perubahan terhadap
penelitian struktur dan stabilitas geologi.
dan c. Meningkatkan paparan radiasi alam
pengembangan akibat peluasan sumber paparan.
d. Menghasilkan limbah galian yang
bersifat radioaktif.
e. Berpotensi mengakibatkan
pencemaran tanah dan air tanah
dalam jangka waktu yang sangat lama.
f. Bersifat strategis dan dapat
mempengaruhi pertahanan dan
keamanan Negara.

72
No Uraian Skala Alasan Ilmiah
Besaran
K.2 Minyak dan Gas Bumi
1 Eksploitasi Minyak dan Gas Bumi a.Berpotensi menimbulkan
serta pengembangan produksi dampak terhadap kualitas air,
a. Di Darat udara dan tanah.
Lapangan minyak bumi ≥ 5.000 BOPD
1) b.Berpotensi menyebabkan

perubahan ekosistem.
c. Berpotensi menimbulkan dampak

sosial dan ekonomi.


d.Pertimbangan ekonomis.

e.Berpotensi menimbulkan
dampak terhadap kualitas air,
≥ 30 MMSCFD udara dan tanah.
2) Lapangan gas bumi
f. Berpotensi menyebabkan

perubahan ekosistem.
g.Berpotensi menimbulkan dampak
sosial
2 Pembangunan Kilang a. Berpotensi menimbulkan dampak
≥ 50MMSCFD terhadap kualitas air, udara dan
a. Liquefied Petroleum
tanah.
≥ 550MMSCFD
Gas (LPG) b. Berpotensi menimbulkan dampak
b. Liquefied Natural Gas (LNG) ≥ 10.000 MMSCFD sosial dan ekonomi.
c. Membutuhkan area yang cukup luas.
c. Minyak Bumi
d. Menggunakan B3 dalam proses.

3 Kilang minyak pelumas ≥ 10.000 ton/tahun a. Kilang minyak pelumas yang


(termasuk fasilitas penunjang) menghasilkan produk pelumas jadi.
b. Produk sampingan kilang minyak
bumi umumnya berupa lube base oil
(bahan dasar pelumas), bukan
produk pelumas jadi.
4 Pengembangan lapangan Coal Semua besaran a. Penyusunan amdal dilakukan
Bed Methane (CBM)/Gas Metana bersamaan dengan pengajuan POD
Batubara pada tahan eksploitasi (Plan Of Development) ketika sudah
dan pengembangan produksi yang ada indikasi kelayakan
mencakup: pengembangan lapangan secara
a. Pemboran sumur produksi; ekonomis dan teknis.
b. Pembangunan fasilitas b. Berpotansi menimbulkan dampak
produksi dan fasilitas penting terhadap kualitas tanah, air
pendukung; dan udara.
c. Kegiatan operasi produksi; dan c. Berpotensi menimbulkan dampak
d. Pasca operasi. sosial dan ekonomi.
d. Berpotensi menyebabkan

73
Perubahan ekosistem.

74
No Uraian Skala Alasan Ilmiah
Besaran
K.3 Ketenagalistrikan
1 PembangunanJaringanTransmisi a. Keresahan Masyarakat karena
a. Saluran Udara > 150 Kv harga tanah turun.
Tegangan Tinggi b. Adanya medan magnet dan budaya
b. Saluran Kabel > 150 Kv terutama pada pembebasan lahan
Tegangan Tinggi > 150 Kv dan keresahan masyarakat.
c. Kabel Laut Tegangan Tinggi
2 Pembangunan ≥ 100 MW (dalam Berpotensi menimbulkan
a. PLTD/PLTG/PLTU/PLTGU satu lokasi) dampak pada:
a. Aspek fisika kimia, terutama pada
kualitas udara (emisi ambient dan
kebisingan) dan kualitas air (ceceran
minyak pelumas, limbah barang)
serta air tanah.
b. Aspek sosial, ekonomi dan budaya
terutama pada pembebasan lahan
dan keresahan masyarakat.
b. Pembangunan ≥ 55 MW Berpotensi menimbulkan dampak
PLTP
pada :
a. Aspek fisika kimia, terutama pada
kualitas udara (emisi, ambient dan
kebisingan) dan kualitas air (ceceran
minyak pelumas, limbah bahan)
serta air tanah.
b. Aspek sosial, ekonomi dan budaya,
terutama pada saat pembebasan
lahan
c. Pembangunan PLTA dengan: Berpotensi menimbulkan
- Tinggi bendung, atau ≥ 15 m dampak pada :
- luas genangan, atau ≥ 200 ha a. Aspek flsik-kimia, terutama pada
- kapasitas daya ≥ 50 MW kualitas udara (bau dan kebisingan)
(aliran langsung) dan kualitas air.
b. Aspek flora dan fauna.
c. Aspek sosial, ekonomi dan
budaya, terutama pada
pembebasan lahan.
d. PLT Sampah (PLTSa) ≥ 30 MW a. PLTSa merupakan kegiatan yang
dengan proses methane berada di kawasan Tempat
harvesting Pembuangan Akhir (TPA) Sampah,
yang telah diwajibkan menyusun
amdal.
b. Secara teknologi, dampak yang
timbul dapat ditanggulangi.
c. Pengelolaan limbah, masuk dalam
kawasan pengelolaan limbah TPA
sampah.

75
No Uraian Skala Alasan Ilmiah
Besaran
d. Pembangunan pembangkit listrik ≥ 10 MW (dalam satu a. Perubahan fungsi lahan.
dari jenis lain lokasi) b. Berpotensi menimbulkan dampak
(antara lain: PLT Surya, Angin, pada:
1) Aspek fisik-kimia, terutama pada
PLT Biomassa/Gambut, PLT
Bayu) kualitas udara (bau dan
kebisingan) dan kualitas air.
2) Aspek flora dan fauna.
3) Aspek sosial, ekonomi dan
budaya, terutama pada
pembebasan lahan.
c. Termasuk dalam kategori
"largendam" (bendungan besar).
d. Kegagalan bendungan (dam break),
akan mengakibatkan gelombang
banjir (flood surge) yang sangat
potensial untuk merusak lingkungan
dibagian hilirnya.
e. Pada Skala ini dibutuhkan
spesifikasi khusus baik bagi material
dan desain konstruksinya.
f. Pada skala ini diperlukan quarry/
burrow area yang besar, sehingga
berpotensi menimbulkan dampak.
g. Dampak pada hidrologi.
h. Membutuhkan areal yang sangat
luas.
i. Dampak visual (pandangan).
j. Dampak kebisingan.
k. Khusus penggunaan gambut
berpotensi menimbulkan gangguan
terhadap ekosistem gambut.
*) Sumber : Peraturan Menteri Negara Lingkungan Hidup Republik Indonesia Nomor 5 Tahun 2012,
Tentang Jenis Usaha dan/atau kegiatan yang wajib memiliki analisis mengenai dampak lingkungan
hidup.

76
10. BIDANG PARIWISATA

Pada umumnya dampak penting yang ditimbulkan adalah gangguan terhadap ekosistem, hidrologi,
bentang alam dan potensi konflik sosial.

Tabel 2.20. Studi Analisis Mengenai Dampak Lingkungan (AMDAL) dan Studi UKL/UPL Bidang Pariwisata

Skala
No Uraian Alasan Ilmiah
Besaran
1 a. Kawasan Pariwisata Semua besaran Berpotensi menimbulkan dampak berupa
b. Taman rekreasi, luas ≥ 100 ha perubahan fungsi lahan/kawasan,
gangguan lalu lintas, pembebasan lahan,
dan sampah.
2 Lapangan golf (tidak termasuk Semua besaran Berpotensi menimbulkan dampak dari
driving range) penggunaan pestisida/herbisida, limpahan
air permukaan (run-off), serta kebutuhan air
yang relatif besar.
*) Sumber : Peraturan Menteri Negara Lingkungan Hidup Republik Indonesia Nomor 5 Tahun 2012,
Tentang Jenis Usaha dan/atau kegiatan yang wajib memiliki analisis mengenai dampak lingkungan
hidup

77
11. BIDANG PENGELOLAAN LIMBAH BAHAN BERBAHAYA DAN BERACUN (LB3)

Kegiatan yang menghasilkan limbah B3 berpotensi menimbulkan dampak terhadap lingkungan dan
kesehatan manusia, terutama kegiatan yang dipastikan akan mengkonsentrasikan limbah B3 dalam
jumlah besar sebagaimana tercantum dalam tabel.

Tabel 2.21. Studi Analisis Mengenai Dampak Lingkungan (AMDAL) dan Studi UKL/UPL
Bidang Pengelolaan Limbah Bahan Berbahaya dan Beracun (LB3)

Skala
No Uraian Alasan Ilmiah
Besaran
1 Industri jasa pengelolaan limbah B3 yang Semua a. Berpotensi menimbulkan pencemaran
melakukan kombinasi 2 (dua) atau lebih besaran di udara berupa dioksin dan furans.
kegiatan meliputi: pemenfaatan, b. Berpotensi menimbulkan penurunan
pengolahan, dan/atau penimbunan limbah kualitas udara ambient (debu, SOx,
B3 NOx, HF, HCL, Asx, Cdx, Crx, Pbx, Hg,
DAN TI).
c. Beresiko terjadinya lindi dari produk
yang dihasilkan dan/atau landfill yang
menyebabkan terlepasnya unsur
dan/atau senyawa berbahaya dan
beracun ke
lingkungan.
2 Pemanfaatan Limbah B3
a. Pemanfaatan limbah B3 sebagai bahan Semua a. Berpotensi menimbulkan pencemaran
bakar sintesis pada kiln di industri semen, besaran di udara berupa dioksin dan furans.
kecuali pemanfaatan limbah B3 yang b. Berpotensi menimbulkan penurunan
dihasilkan sendiri dan berasal dari 1 (satu) kualitas udara ambient (debu, SO.,
lokasi kegiatan. NOx, HF, HCL, Asx, Cdx, Crx, Pbx, Hg,
Semua DAN TI).
besaran
b. Pemanfaatan limbah B3 dalam bentuk a. Berpotensi menimbulkan persebaran
pembuatan bahan bakar sintesis limbah B3 seperti limbah B3 yang
(fuelblending) dari limbah B3. memiliki radioaktif
b. Beresiko terjadinya lindi dari produk
yang
dihasilkan yang menyebabkan
terlepasnya

78
Skala
No Uraian Alasan Ilmiah
Besaran

c. Pemanfaatan limbah B3 sebagai material Semua Berpotensi menimbulkan pencemaran


alternatif pada industry semen, kecuali besaran lingkungan berupa terlepasnya senyawa
pemanfaatan yang hanya menggunakan organik dan/atau anorganik beracun ke
fly ash. udara ambient dan/atau pencemaran
lingkungan.
d. Pemanfaatan limbah B3 olibekas sebagai Semua
Berpotensi menimbulkan pencemaran
bahan baku industri daurulang pelumas besaran
lingkungan berupa terlepasnya senyawa
(lubricant), termasuk sebagai bahan baku
organik dan/atau anorganik beracun ke
pembuatan baseoil.
udara ambient dan/atau pencemaran
lingkungan.
e. Pemanfaatan limbah B3 pelarut bekas Semua
(used solvents) untuk industry daur ulang besaran
pelarut (solvents).
Berpotensi menimbulkan pencemaran
lingkungan berupa terlepasnya senyawa
f. Pemanfaatan limbah B3 aki bekas melalui Semua organik dan/atau anorganik beracun ke
proses peleburan timbul (Pb). besaran udara ambient dan/atau pencemaran
lingkungan.

a. Berpotensi menimbulkan pencemaran


di udara berupa dioksin dan furans.
g. Pemanfaatan limbah B3 batere dan/atau Semua b. Berpotensi menimbulkan penurunan
aki kering bekas dengan pembentukan besaran kualitas udara ambient (debu, SOx,
ingot. NOx, HF, HCL, Asx, Cdx, Crx, Pbx Hg,
DAN T1).

h. Pemanfaatan limbah B3 katalis bekas a. Berpotensi menimbulkan pencemaran


dalam bentuk daur ulang (recycle) Semua di udara berupa dioksin dan furans.
dan/atau perolehan kembali (recovery). besaran
b. Berpotensi menimbulkan penurunan
kualitas udara ambient (debu, SOx,
NOx, HF, HCL, Asx, Cdx, Crx, Pbx Hg,
DAN T1).

Pengolahan secara biologis berpotensi


menimbulkan pencemaran lingkungan,
terlepasnya senyawa organik dan/atau
anorganik beracun ke udara ambient,
pencemaran tanah dan air.
3 Pengolahan Limbah B3 Semua
a. Pengolahan limbah B3 secara termal besaran a. Berpotensi terjadinya kegagalan
menggunakan incinerator, kecuali reinjeksi yang dapat menyebabkan
mengolah limbah B3 yang dihasilkan pencemaran lingkungan.
sendiri dan berasal dari 1 (satu) lokasi b. Berpotensi menyebabkan gangguan
kegiatan. terhadap pola geohidrologi.

b. Pengolahan limbah B3 secara biologis Semua a. Keterbatasan pemanfaatan ruang yang


(composting, biopile, landfarming, besaran telah ditetapkan sebagai area landfill.
bioventing, biosparging, bioslurping, b. Pengelolaan dan pemantauan yang
alternate electron acceptors, dan/atau wajib dilakukan dalam jangka panjang
(minimal 30 tahun).

79
Skala
No Uraian Alasan Ilmiah
Besaran
fitoremediasi), sebagai kegiatan utama. c. Beresiko terjadinya pelindian
(jasa pengolahan limbah B3). dari landfill yang mencemari
Semua lingkungan.
c. Injeksi dan/atau Reinjeksi limbah B3 ke besaran
dalam formasi.
4 Penimbunan limbah B3 dengan landfill kelas Semua
1, besaran
kelas 2, dan/atau kelas 3.
*) Sumber : Peraturan Menteri Negara Lingkungan Hidup Republik Indonesia Nomor 5 Tahun 2012,
Tentang Jenis Usaha dan/atau kegiatan yang wajib memiliki analisis mengenai dampak lingkungan
hidup.
Catatan :
Daftar Singkatan :
m = meter
m 2 = meter persegi
m3 = meter kubik
bcm = bank cubic meter
km = kilometer
km2 = kilometer persegi
ha = hektar
I = liter
dt = detik
kW = kilowatt
kWh = kilowatt hour
kV = kilovolt
MW = megawatt
TBq = Terra Becquerel
BPOD = barrel oil per day = minyak barrel per hari
MMSCFD = million metric square cubic feet per day Juta metrik persegi kaki kubik
perhari DWT = dead weight tonnage = bobot mati KK = kepala keluarga
LPG = Liquiefied Petroleum Gas = gas minyak bumi yang
dicairkan LNG = Liquiefied Natural Gas = gas alam yang dicairkan
ROW = right of way = daerah milik jalan (damija)
BOD = biological oxygen demand = kebutuhan oksigen
biologis COD = chemical oxygen demand = kebutuhan oksigen kimiawi
DO = dissolved oxygen = oksigen terlarut
TSS = total suspended solid = total padatan tersuspensi
TDS = total dissolved solid = total padatan terlarut

Tabel. 2.22. Perencanaan Studi AMDAL

NO JENIS STUDI TARIF/paket

1 AMDAL 300.000.000 – 600.000.000


2 UKL/UPL 25.000.000 – 50.000.000

80
Tabel. 2.23 Standar Biaya Pengujian Yang Berkaitan Dengan Lingkungan Hidup

JENIS SATUAN TARIF


A. JASA LABORATORIUM PENGENDALIAN DAMPAK LINGKUNGAN
1. Pengujian Parameter Kualitas Lingkungan
a. Uji Udara Emisi
1) Total Partikel Debu Metode Isokinetik per sampel Rp 350.000,00
2) Total Partikel Debu Metode Isokinetik
dan Destruksi Logam per sampel Rp 475.000,00
3) Kobalt (Co) Metode Spektrofotometer per sampel Rp 100.000,00
Serapan Atom (SSA)
4) Kadmium (Cd) Metode SSA per sampel Rp 100.000,00
5) Tembaga (Cu) Metode SSA per sampel Rp 100.000,00
6) Kromium (Cr) Metode SSA per sampel Rp 100.000,00
7) Nikel (Ni) Metode SSA per sampel Rp 63.000,00
8) Selenium (Se) Metode SSA per sampel Rp 100.000,00
9) Seng (Zn) Metode SSA per sampel Rp 100.000,00
10) Stanum (Sn) Metode SSA per sampel Rp 100.000,00
11) Timah Hitam (Pb) Metode SSA per sampel Rp 100.000,00
12) Arsen (As) Metode SSA per sampel Rp 100.000,00
13) Amonia (NH3) Metode BiruIndofenol per sampel Rp 225.000,00
14) Klorin bebas (Cl2) & Klorin dioksida(ClO2)
Metode Iodometrik per sampel Rp 112.000,00
15) Klorin Bebas (Cl2) Metode Ortotoluidin per sampel Rp 204.750,00
16) Hidrogen Florida (HF) Metode Lanthanun
Alizarin per sampel Rp 204.750,00
17) Hidrogen Klorida (HCl) MetodeMercuri per sampel Rp 231.000,00
Thiosianate
18) Hidrogen Sulfida (H2S) Metode Biru
Metilen per sampel Rp 192.150,00
19) NOX Metode PDS per sampel Rp 202.650,00
20) Sulfurdioksida (SO2) Metode Turbidimetrik per sampel Rp 206.850,00
21) Opasitas per sampel Rp 220.500,00
22) Komposisi Gas (CO2, CO, O2) dengan
Metode Gas Analyzer, Temperatur, Laju per sampel Rp 144.900,00
Alir Gas, Kadar Air
23) Komposisi Gas (CO2, CO, O2) Metode
Gas Analyzer per sampel Rp 273.000,00
24) Kadar Air Metode Gravimetrik per sampel Rp 236.250,00
25) Laju Alir Gas per sampel Rp 105.000,00
26) Merkuri ( Hg) MetodeCV-SSA per sampel Rp 105.000,00
27) Hidro Carbon (HC)-CH4 Metode GC-FID per sampel Rp 1.200.000,00
28) TRS per sampel Rp 250.000,00

81
JENIS SATUAN TARIF
b. Uji Udara Ambien
1) Amonia (NH3) Metode Biru Indofenol per sampel Rp 220.000,00
2) Hidrogen Sulfida (H2S) Metode Biru Metilen per sampel Rp 231.000,00
3) Hidrokarbon (HC, THC, CH4 ) Metode GC- FID per sampel Rp 231.000,00
4) Karbondioksida (CO2) Metode Infra merah per sampel Rp 263.000,00
5) Karbonmonoksida (CO) Metode NDIR per sampel Rp 263.000,00
6) Nitrogendioksida (NO2) Metode Saltzman per sampel Rp 224.000,00
7) Oksidan (Ox) Metode Netral Buffer KI per sampel Rp 220.000,00
8) Sulfurdioksida (SO2) Metode Pararosanilin per sampel Rp 195.000,00
9) Timah Hitam (Pb) Metode SSA per sampel Rp 202.000,00
10) Total Partikulat (TSP)-Debu Metode Gravimetrik per sampel Rp 224.000,00
11) Kecepatan Angin MetodeAnemometer per sampel Rp 257.000,00
12) Oksigen (O2) Metode Inframerah per sampel Rp 224.000,00
13) Temperatur dan Kelembaban Metode Hygrometer per sampel Rp 224.000,00
14) Sulfat Indek per sampel Rp 224.000,00
15) Dustfall per sampel Rp 224.000,00
16) PM10 per sampel Rp 210.000,00
17) PM2,5 per sampel Rp 224.000,00
18) Passive Sampler NO2 per sampel Rp 220.000,00
19) Passive Sampler SO2 per sampel Rp 250.000,00
20) Pengukuran SO2, NOx, CO, PM10 & Ozon dengan
Alat Otomatis (Mobile Station) per sampel Rp 3.000.000,00
21) Deposisi kering (anion & kation: NA+, K+, NH 4+,
Ca2+, Mg2+, CL, NO3, So42-) per sampel Rp 500.000,00
22) Deposisi basah (anion & kation: NA+, K+, NH 4+,
Ca2+, Mg2+, CL, NO3, So42-) per sampel Rp 500.000,00

23) Rainfall Rate per sampel Rp 100.000,00

c. Pengukuran Kebisingan
1) Kebisingan Lingkungan Metode L (A) eq 24 jam per sampel Rp 150.000,00
2) Vibrasi Lingkungan untuk Kenyamanan & Kesehatan per sampel Rp 1.000.000,00
3) Kontur Kebisingan
a) Tenaga kerja per titik Rp 150.000,00
b) Mapping level bising per 100 m2 Rp 150.000,00
c) Mapping level bising untuk tiap frekuensi per 100 m2 Rp 500.000,00

82
JENIS SATUAN TARIF
4) Noise Criteria Indoor per ruangan Rp 263.000,00
5) Reverberation Time (Waktu Dengung) Ruangan per sampel Rp 263.000,00
6) Transmition Loss dan Absorption Test per sampel Rp 630.000,00
7) Insertion Loss per sampel Rp 420.000,00
8) Daya Suara Sumber Bunyi per sampel Rp 525.000,00
9) Emisi Bising Kendaraan Bermotor Secara Statis per sampel Rp 788.000,00
10) Emisi Bising Kendaraan Bermotor Secara Dinamis
a) Sepeda motor per sampel Rp 2.250.000,00
b) Mobil per sampel Rp 3.250.000,00
11) Kebisingan tenaga kerja metodeTWA per titik Rp 150.000,00
12) Vibrasi lingkungan untuk peralatan sensitive per titik Rp 500.000,00
13) Humanvibrator:
a) whole body per titik Rp 400.000,00
b) hand arm per titik Rp 400.000,00
14) Transmition loss: partisi insitu per titik Rp 400.000,00

d. Uji Air Limbah dan Limbah Cair


1) pH Metode Elektrometik per sampel Rp 10.000,00
2) Daya Hantar Listrik Metode Konduktrometrik per sampel Rp 10.000,00
3) Keasaman Metode Titrimetrik per sampel Rp 52.500,00
4) Kebasaan Metode Titrimetrik per sampel Rp 52.500,00
5) Kekeruhan Metode Nefelometrik per sampel Rp 31.500,00
6) Kesadahan Kalsium (CaCO3) Metode Kompleksometrik per sampel Rp 42.000,00
7) Kesadahan Magnesium (CaCO3) Metode
Kompleksometrik per sampel Rp 42.000,00
8) Kesadahan Total (CaCO3) Metode Kompleksometrik per sampel Rp 42.000,00
9) Klorin Bebas (Cl2) Metode DPD per sampel Rp 65.000,00
10) Oksigen Terlarut (DO) Metode Winkler per sampel Rp 42.000,00
11) Salinitas Metode Konduktometrik per sampel Rp 10.000,00
12) Temperatur (Suhu) Metode Termometrik per sampel Rp 10.000,00
13) Warna Metode Spektrofotometrik per sampel Rp 47.000,00
14) Zat Padat Terlarut (TDS) Metode Gravimetrik per sampel Rp 58.000,00
15) Zat Padat Tersuspensi (TSS) Metode Gravimetrik per sampel Rp 75.000,00
16) Zat Padat Total (TS) Metode Gravimetrik per sampel Rp 58.000,00
17) Alumunium (Al) Metode SSA per sampel Rp 123.000,00
18) Antimoni (Sb) Metode SSA per sampel Rp 123.000,00
19) Barium (Ba) Metode SSA per sampel Rp 123.000,00

83
JENIS SATUAN TARIF
20) Kromium (Cr) Metode SSA per sampel Rp 123.000,00
21) Merkuri (Hg) Metode Cold Vapour-SSA per sampel Rp 146.000,00
22) Magnesium (Mg) Metode SSA per sampel Rp 123.000,00
23) Kalium (K) Metode SSA per sampel Rp 123.000,00
24) Kalsium (Ca) Metode SSA per sampel Rp 123.000,00
25) Natrium (Na) Metode SSA per sampel Rp 123.000,00
26) Destruksi Arsen (As), Selenium (Se) per sampel Rp 90.000,00
27) Destruksi Cd, Fe, Cu, Ni, Zn, Pb, Ag, Co, Mn per sampel Rp 99.000,00
28) Arsenik (As) Metode SSA per sampel Rp 180.000,00
29) Selenium (Se) Metode SSA per sampel Rp 180.000,00
30) Kadmium (Cd) Metode SSA per sampel Rp 50.000,00
31) Besi (Fe) Metode SSA per sampel Rp 50.000,00
32) Tembaga (Cu) Metode SSA per sampel Rp 50.000,00
33) Nikel (Ni) Metode SSA per sampel Rp 50.000,00
34) Seng (Zn) Metode SSA per sampel Rp 74.000,00
35) Timbal (Pb) Metode SSA per sampel Rp 50.000,00
36) Perak (Ag) Metode SSA per sampel Rp 53.000,00
37) Kobal (Co) Metode SSA per sampel Rp 50.000,00
38) Mangan (Mn) Metode SSA per sampel Rp 50.000,00
39) Tembaga (Cu) Metode ICP MS per sampel Rp 350.000,00
40) Timbal (Pb) Metode ICP MS per sampel Rp 350.000,00
41) Kadmium (Kd) Metode ICP MS per sampel Rp 350.000,00
42) Nikel (Ni) Metode ICP MS per sampel Rp 350.000,00
43) Besi (Fe) Metode ICP MS per sampel Rp 350.000,00
44) Seng (Zn) Metode ICP MS per sampel Rp 350.000,00
45) Perak (Ag) Metode ICP MS per sampel Rp 350.000,00
46) Mangan (Mn) Metode ICP MS per sampel Rp 350.000,00
47) Arsenik (As) Metode ICP MS per sampel Rp 350.000,00
48) Selenium (Se)Metode ICP MS per sampel Rp 350.000,00
49) Amoniak (NH3-N) Metode Biru Indofenol per sampel Rp 100.000,00
50) Boron (B) Metode SSA per sampel Rp 126.000,00
51) Florida (F) Metode Spektofotometrik per sampel Rp 84.000,00
52) Klorida (Cl) Metode Titrimetrik per sampel Rp 60.000,00
53) Krom Heksavalen (Cr6+) Metode Spektrofometrik per sampel Rp 105.000,00
54) Krom Trivalen Cr3+ Metode Perhitungan per sampel Rp 95.000,00
55) Nitrat (NO3-N) Metode Reduksi Kadmium per sampel Rp 120.000,00

84
JENIS SATUAN TARIF
56) Nitrit (NO2-N) Metode Spektrofotometrik per sampel Rp 65.000,00
57) Nitrogen Total (TN) Metode Spektrofotometrik per sampel Rp 95.000,00
58) Total Fosfor (P) Metode Spektrofotometrik per sampel Rp 84.000,00
59) Sianida (CN-) Metoda Spektrofotometrik per sampel Rp 110.000,00
60) Sulfat (SO4) Metode Spektrofotometrik per sampel Rp 53.000,00
61) Sulfida (S2-) Metode Spektrofotometrik per sampel Rp 53.000,00
62) Biological Oxygen Demand (BOD) Metode Inkubasi-
per sampel Rp 170.000,00
Winkler
63) Chemical Oxygen Demand (COD) Metode
per sampel Rp 84.000,00
Spektrofotometrik
64) Detergen (MBAS) Metode Spektrofotometrik per sampel Rp 263.000,00
65) Fenol Metode Spektrofotometrik (destilasi) per sampel Rp 150.000,00
66) Fenol Metode Spektrofotometrik (destilasi + ekstraksi) per sampel Rp 180.000,00
67) DOC per sampel Rp 170.000,00
68) Karbon Organik Total (TOC) Metode Konduktometrik per sampel Rp 170.000,00
69) Minyak dan Lemak Metode Gravimetrik per sampel Rp 126.000,00
70) Zat Organik sebagai KMnO4 Metode Titrimetrik per sampel Rp 42.000,00
71) Potassium Absorption Ratio (PAR) Metode Titrimetrik- per sampel Rp 135.000,00
Perhitungan
72) Residu Sodium Carbonate (RSC) Metode Titrimetrik- per sampel Rp 87.000,00
Perhitungan
73) Sodium Absorption Ratio (SAR) Metode Titrimetrik- per sampel Rp 135.000,00
Perhitungan
74) Pestisida Organofosfat Metode GC per sampel Rp 1.260.000,00
75) Pestisida Organoklorin Metode GC per sampel Rp 1.260.000,00
76) Alkil Organik Halida (AOX) per sampel Rp 368.000,00
e. Uji Parameter Biologi
1) Benthos Metode Identifikasi (Kuantitatif) Air Sungai per sampel Rp 315.000,00
2) Coliform Metode Petrifilm per sampel Rp 210.000,00
3) Coliform Metode MPN per sampel Rp 190.000,00
4) E. Coli Metode MPN per sampel Rp 134.000,00
5) Plankton Metode Identifikasi (Kuantitatif) per sampel Rp 315.000,00
6) Salmonella Metode Media Selektif per sampel Rp 168.000,00
7) Klorofil a per sampel Rp 210.000,00
f. Uji Limbah Padat dan Limbah B3
1) Destruksi Pb, Cu, Cd, Zn, Mn, Ag, Co, Cr tot, Fe, Ni per sampel Rp 95.000,00
2) Destruksi As, Se, Al, Ba, B, Sn, V, Be, Ti, Sb, Bi per sampel Rp 95.000,00
3) Destruksi Mg, Na, K per sampel Rp 95.000,00
4) TCLP untuk Parameter Anorganik per sampel Rp 840.000,00
5) TCLP untuk Parameter Organik per sampel Rp 840.000,00

85
JENIS SATUAN TARIF
6) Explosive per sampel Rp 98.000,00
7) Reactivity (Sianida, Sulfida, Ph) per sampel Rp 147.000,00
8) Korosif per sampel Rp 95.000,00
9) Titik Nyala Metode PM per sampel Rp 300.000,00
10) Timbal (Pb) Metode SSA per sampel Rp 50.000,00
11) Tembaga (Cu) Metode SSA per sampel Rp 50.000,00
12) Kadmium (Cd) Metode SSA per sampel Rp 50.000,00
13) Seng (Zn) Metode SSA per sampel Rp 75.000,00
14) Mangan (Mn) Metode SSA per sampel Rp 50.000,00
15) Perak (Ag) Metode SSA per sampel Rp 50.000,00
16) Kobalt (Co) Metode SSA per sampel Rp 50.000,00
17) Krom Total (Cr tot) Metode SSA per sampel Rp 50.000,00
18) Besi (Fe) Metode SSA per sampel Rp 53.000,00
19) Nikel (Ni) Metode SSA per sampel Rp 50.000,00
20) Arsen (As) Metode SSA per sampel Rp 50.000,00
21) Selenium (Se) Metode SSA per sampel Rp 80.000,00
22) Aluminium (Al) Metode SSA per sampel Rp 80.000,00
23) Barium (Ba) Metode SSA per sampel Rp 63.000,00
24) Boron (B) Metode SSA per sampel Rp 63.000,00
25) Stanun (Sn) Metode SSA per sampel Rp 84.000,00
26) Berlium (Be) Metode SSA per sampel Rp 63.000,00
27) Titanum (Ti) Metode SSA per sampel Rp 63.000,00
28) Antimon (Sb) Metode SSA per sampel Rp 63.000,00
29) Bismut (Bi) Metode SSA per sampel Rp 63.000,00
30) Thalium (TL) Metode SSA per sampel Rp 63.000,00
31) Vanadium (V) Metode SSA per sampel Rp 63.000,00
32) Magnesium (Mg) Metode SSA per sampel Rp 63.000,00
33) Natrium (Na) Metode SSA per sampel Rp 63.000,00
34) Kalium (K) Metode SSA per sampel Rp 63.000,00
35) Merkuri/Raksa (Hg) MetodeSSA per sampel Rp 126.000,00
36) Krom Heksavalen (Cr 6+) Metode Spektrofotometrik per sampel Rp 126.000,00
37) Aromatic Hydrocarbon MetodeGC-MS per sampel Rp 1.155.000,00
38) Benzena (C6H6) MetodeGC per sampel Rp 1.250.000,00
39) Karbon Disulfida (CS2) MetodeGC-MS per sampel Rp 256.000,00
40) Karbon monoksida (CO) MetodeGC per sampel Rp 156.000,00
41) Letal Dosis (LD50) Metode ThomsonWail per sampel Rp 9.000.000,00

86
JENIS SATUAN TARIF
42) Letal Concentration (LC50) Metode USEPA per sampel Rp 7.000.000,00
43) Metana (CH4) Metode GC per sampel Rp 256.000,00
44) Oksigen (O2) Metode Gas Kromatografi per sampel Rp 255.000,00
45) Merkuri Organik Metode GC per sampel Rp 1.250.000,00
46) Organotin Metode GC per sampel Rp 1.250.000,00
47) Pestisida Organofosfat Metode GC per sampel Rp 1.250.000,00
48) Pestisida Organoklorin MetodeGC per sampel Rp 1.250.000,00
49) Phenol Metode GC per sampel Rp 1.250.000,00
50) Phenol Metode HPLC per sampel Rp 320.000,00
51) Poly Chlorynete Byphenil (PCB) MetodeGC per sampel Rp 1.250.000,00
52) Volatile Organic Compound (VOC) MetodeGC- MS per sampel Rp 1.250.000,00
53) Kadar Abu Metode Gravimetrik per sampel Rp 33.600,00
54) Kadar Air Metode Gravimetrik per sampel Rp 33.600,00
55) Minyak Lemak Metode Gravimetrik per sampel Rp 95.550,00
56) Orta, Meta, Para (Cressol) Metode HPLC per sampel Rp 303.450,00
57) Polysiklik Aromatik Hidrocarbon (PAH) Metode GC per sampel Rp 1.250.000,00
58) Monosiklik Aromatik Hidrocarbon (MAH) Metode GC per sampel Rp 1.250.000,00
g. Uji Profisiensi dan Bahan Acuan
1. Parameter air Per Parameter Rp 400.000,00
2. Parameter tanah Per Parameter Rp 500.000,00
2. Pengambilan Contoh Parameter Kualitas Lingkungan
a. Air dan Limbah Cair Per Paket Rp 1.750.000,00
b. Limbah Padat dan Tanah Per Paket Rp 1.750.000,00
c. Udara Ambien Per Paket Rp 1.750.000,00
d. Udara Emisi Per Paket Rp 3.300.000,00
e. Udara Emisi Metode USEPA Per Paket Rp 5.000.000,00
f. Kebisingan Per Paket Rp 1.750.000,00
g. Biologi Per Paket Rp 1.750.000,00
3. Kalibrasi Peralatan Pemantauan Kualitas Lingkungan
a. Monitor Udara Otomatis untuk SO2 Per alat Rp 3.725.000,00
b. Monitor Udara Otomatis untuk CO Per alat Rp 3.725.000,00
c. Monitor Udara Otomatis untuk NOx Per alat Rp 3.725.000,00
d. Monitor Udara Otomatis untuk NO3 Per alat Rp 3.725.000,00
e. Monitor Udara Otomatis untuk O3 Per alat Rp 3.725.000,00
f. Monitor Udara Otomatis untuk Volume per alat Rp 2.128.000,00

87
JENIS SATUAN TARIF
g. Monitor Udara Transfer Standar TransferStandar
(SO2,NOx, CO) per alat Rp 6.383.000,00
h. Sound Level Meter per alat Rp 500.000,00
i. High Volume Sampler per alat Rp 350.000,00
j. Flow Meter per alat Rp 200.000,00
k. Timbangan per alat Rp 800.000,00
l. Suhu per alat Rp 800.000,00
m. accelerometer
a) 0,8 Hz – 100 Hz per alat Rp 1.500.000,00
b) 100 Hz – 10 kHz per alat Rp 600.000,00
Sumber : PP No. 4 Tahun 2014 Tentang Jenis Dan Tarif Atas Jenis Penerimaan Negara Bukan
Pajak yang Berlaku Pada Kementerian Lingkungan Hidup
Keterangan : Biaya di atas tidak termasuk biaya konsumsi, akomodasi, transportasi, dan/atau
penilaian dokumen analisis mengenai dampak lingkungan hidup dan pemeriksaan upaya
pengelolaan lingkungan hidup dan upaya pemantauan lingkungan hidup.

Tabel 2.22 Standar Pengujian Sample Yang Berkaitan Dengan Penilaian Kualitas Lingkungan

NO PARAMETER PERATURAN DAN URAIAN KETERANGAN

PP. No. 41/1999


1 Udara Ambient SO2, NO2, NH3, CO, H2SO4, O3, Debu, Pb dan kebisingan
Permenkes No. 416/1990
pH, TDS, kekeruhan, rasa, bau, suhu, warna, Cl,
2 Air Bersih kesadahan, NO2, NO3, SO4, KMnO4, Hg, As, F, Cr6+,
Se, Zn, CN,
detergen, Fe, Mn, Cu, Pb, Cd dan total Coliform
SK Gubernur Jabar No. 6/1999
Suhu, pH, TDS, TSS, NH3, F, NO2, NO3, Cl, H2S,
3 Air Limbah Industri BOD, COD, Fe, Mn, Pb, Cd, Cu, Zn, Cr6+, Ni, CN,
Fenol, minyak dan lemak, detergen (MBAS), Ba, Total
Krom (Cr), Hg, Sn, As, Se, Co
Air Limbah Kep-58/MENLH/12/1995
4 Suhu, pH, BOD, COD, TSS, NH3, PO4 dan Coliform
Rumah Sakit
Kepmen-LH No. 112/2003
5 Air Limbah Domestik
pH, TSS, BOD, minyak dan lemak

88
NO PARAMETER PERATURAN DAN URAIAN KETERANGAN
PP 82/2011 Gol. 3
pH, suhu, DO, TDS, TSS, PO 4, NO2, NO3, NH3,
Sungai/Badan Cl, Cl2 (klorin bebas), SO4, BOD, COD, H2S,
6 Fenol, Detergen, Oil & Grease, As, Co, Ba, Se,
air Penerima
Hg, CN, F, Cr6+, Fe, Mn, Zn, B, Cd, Cu, Pb, Fecal
Coliform, Total Coliform dan Debit
PP 82/2011 Gol. 3
pH, suhu, DO, TDS, TSS, PO 4, NO2, NO3, NH3,
Cl,Cl2 (klorin bebas), SO4, BOD, COD, H2S,
7 Air Waduk/Danau Fenol, Detergen, Oil & Grease, As, Co, Ba, Se,
Hg, CN, F, Cr6+, Fe, Mn, Zn, B, Cd, Cu, Pb, Fecal
Coliform, Total Coliform , SAR, Klorofil, transparasi
Kepmen-LH 13/1995
8 Emisi Udara “Baku mutu emisi tidak bergerak”
SO4, NO2, NH3, CO, Cl, H2S, Opasitas, Debu
Analisa
Kualitas Lichenes, analisa vegetasi, arthropoda,
Lingkungan cacing tanah, plankton, makrozoobentos,
9
Dari faktor Fisika – Kimia Terestrial, faktor
Parameter Bio Fisika – Kimia Air
Indicator
Inorganic Parameter :
Arsenic, Barium, Boron, Cadmium, Chromium,
Copper, Free Cyanide, Fluoride, Lead Mercury,
Nitrate + Nitrite, Nitrite, Slennium, Silver, Zinc
Organic Parameter : Aldrine+Dieldrine Benzene,
Carbon Tetrachloride, Chlordane, Chloroform, 0-
Cresol, m- Cresol, p-Cresol, Total Cresol, 2,4-D,
Analisa Sample 1,4 Diclhorobenzene, 1,2 Dichloroethane, 1,1
10 Limbah B3 Dichloromethylene, 2,4 Dinitrotholuen, Endrine,
(Sludge) Hepthachlor II epoxide, Hexachlorobuladiene,
Hexachloroethane, Lindane, Metoxychlor, Methyl
Ethyl Kethon, Methyl Parathion, Nitrobenzene,
Nitriloiacetic Acid, Pentha chlorophenol, Phyridine,
Parathion, PCB, Tetrachloroethylene, Toxaphene,
Trichloroethylene, Trihalomethan 2,4,5,
Tricholophenol 2,4,6, Trichlorophenol 2,4,5 TP
(Silvex)
Analisa Smple
Limbah B3
11 Organochlor, Organofosfat, DDT, Karbamat
(Pestisida
Persistence)
Hidrogen Sulfida (FD), Hidrogen Klorida (HCL),
Analisa Karbon Monoksida (CO), Nitrogen Oksida (NO 2),
Kualitas Udara Opasitas Partikel, Sulfur Dioxsida (SO 2), Total
12
Emisi Hidrocarbon (Sbg. CH4), Arsen (As), Kadmium
Incenerator (Cd), Kromium (Cr), Merkuri (Hg), Talium (Ti),
Timah Hitam (Pb)
Amonia (NH3), Metil Merkaptan
13 Analisa Kebauan (CH3SH), Hidrogen Sulfida (H2S),
Styrena
Partikel (debu + Isokinetik test), Nitrogen Oksida
14 Analisa Genset (NO2), Opasitas, Sulfur Dioksida (SO2)
89
90
Tabel 2.25. Standar Biaya Pengujian untuk Geoteknik

JENIS PEKERJAAN SATUAN TARIF


1. Rekayasa Geoteknik dan Irigasi
a. Uji Lapangan
29) Pemboran Tangan Per meter Rp 120.000,00
30) Pengambilan Sampel Tanah per tabung Rp 90.000,00
31) Standpipe Penetrasi (SPT) per uji Rp 90.000,00
32) Pemboran Mesin (Tanah) per meter Rp 300.000,00
33) Pemboran Mesin (Batu) per meter Rp 380.000,00
34)Pengujian Kelulusan Air (Open End per uji Rp 120.000,00
Test)
35) Sumur Uji per uji Rp 230.000,00
36) Sondir Ringan per titik uji Rp 530.000,00
37) Sondir Berat per titik uji Rp 1.130.000,00
38) Pemetaan Geologi per hektar Rp 530.000,00
39) Plate Bearing Test per uji Rp 4.500.000,00
40) Pile Loading Test per uji Rp 11.250.000,00
41) Field Shear Test per uji Rp 7.500.000,00
42) Field Loading/Unloading Test per uji Rp 7.500.000,00
43) Pressuremeter
h. Uji Tekan Lateral (Lateral Loading Test) 25 per uji Rp 1.430.000,00
kg/cm2
i. Uji Tekan Lateral (Lateral Loading Test) 100 per uji Rp 3.000.000,00
kg/cm2
j. Uji Tekan Lateral (Lateral Loading Test) 200 per uji Rp 4.500.000,00
kg/cm2
k. Camkometer Self Boring per uji Rp 6.000.000,00
44) Vane Shear Test (VST) per uji Rp 150.000,00
Penyelidikan Pondasi dan Bahan Timbunan
1) Tanggul per km Rp 90.000.000,00
2) Bendung per uji layanan Rp 150.000.000,00
3) Bendungan
a) Kecil per uji layanan Rp 150.000.000,00
b) Sedang per uji layanan Rp 225.000.000,00
c) Besar per uji layanan Rp 375.000.000,00
Mekanika Tanah
1) Kadar Air Tanah per sampel Rp 15.000,00
2) Berat Jenis Tanah per sampel Rp 18.000,00
3) Atterberg Limit per sampel Rp 40.000,00

91
JENIS PEKERJAAN SATUAN TARIF
4) Analisa Saringan per sampel Rp 35.000,00
5) Pemadatan/Standar per sampel Rp 115.000,00
6) Pemadatan Modified per sampel Rp 175.000,00
7) California Bearing Ratio (CBR) Soaked per sampel Rp 125.000,00
8) California Bearing Ratio (CBR) Unsoaked per sampel Rp 85.000,00
9) California Bearing Ratio (CBR) Design Soaked per sampel Rp 300.000,00
10) California Bearing Ratio (CBR) Design
per sampel Rp 225.000,00
Unsoaked
11) California Bearing Ratio (CBR) Lapangan per sampel Rp 100.000,00
12) Hidrometer per sampel Rp 50.000,00
13) Double Hidrometer per sampel Rp 65.000,00
14) Shrinkage Limit per sampel Rp 25.000,00
15) Unconfined Comp. Test per sampel Rp 60.000,00
16) Konsolidasi per sampel Rp 90.000,00
17) Berat Isi per sampel Rp 15.000,00
18) Kuat Geser – Unconsolidated Undrained (UU) persampel Rp 80.000,00
19) Kuat Geser-Consolidated
Undrained persampel Rp 125.000,00
Consolidated Drained (CU/CD)
20) Kuat Geser Residual persampel Rp 250.000,00
21) Permeabilitas (Constant Head) persampel Rp 75.000,00
22) Permeabilitas (Falling Head) persampel Rp 75.000,00
23) Triaxial (Unconsolidated Undrained) persampel Rp 90.000,00
24) Triaxial (Consolidated Undrained) persampel Rp 150.000,00
Mekanika Batuan
1) Pengukuran sifat–sifat dasar batuan per sampel Rp 100.000,00
2) Kuat Lentur per sampel Rp 100.000,00
3) Kuat Tekan Tanpa Dial Gaude per sampel Rp 60.000,00
4) Kuat Tekan E per sampel Rp 80.000,00
5) Kuat Tekan E, µ per sampel Rp 100.000,00
6) Kuat geser tak langsung per sampel Rp 125.000,00
7) Kuat Geser Langsung per sampel Rp 200.000,00
8) Pengukuran Cepat Rambat
Gelombang per sampel Rp 100.000,00
Ultrasonik
9) Kuat Tekan Triaksial per sampel Rp 200.000,00
10) Slake Durability per sampel Rp 100.000,00
11) Analisa Petrologi per sampel Rp 100.000,00
12) Analisa Petrografi per sampel Rp 500.000,00
13) Punch Test per sampel Rp 100.000,00

92
JENIS PEKERJAAN SATUAN TARIF
14) Point Load Strength per sample Rp 50.000,00

Pengujian Bahan di Laboratorium. Aspal


1) Penetrasi dengan jarum per sampel Rp 75.000,00
2) Titik Lembek per sampel Rp 50.000,00
3) Titik Nyala per sampel Rp 50.000,00
4) Daktilitas per sampel Rp 80.000,00
5) Extraction (kelarutan C2HCL3) per sampel Rp 460.000,00
6) Berat Jenis Aspal per sampel Rp 410.000,00
7) Kekentalan per sampel Rp 65.000,00
8) Kelekatan per sampel Rp 50.000,00
9) Design Mix Aspal per sampel Rp 750.000,00
10) Kuat Tekan Campur Aspal (Marshal Test) per sampel Rp 50.000,00
Beton
1) Beton segar
a) Analisa ayak per sampel Rp 75.000,00
b) Berat jenis per sampel Rp 70.000,00
c) Bleading per sampel Rp 35.000,00
d) Faktor pemadatan per sampel Rp 600.000,00
e) Job mix. per sampel Rp 40.000,00
f) Kadar udara per sampel Rp 600.000,00
g) Mix. Design per sampel Rp 750.000,00
h) Slump per sampel Rp 40.000,00
i) Suhu per sampel Rp 100.000,00
j) Panas hidrasi per sampel Rp 75.000,00
2) Beton keras
a) Core Drill per titik Rp 400.000,00
b) Creep per sampel Rp 80.000,00
c) Hammer Test per sampel Rp 80.000,00
d) Modulus of Elasticity (MOE) per sampel Rp 100.000,00
e) Kuat lentur per sampel Rp 80.000,00
f) Kuat tarik per sampel Rp 80.000,00
g) Kuat tekan per sampel Rp 80.000,00
h) Ultra Sonic per sampel Rp 100.000,00
i) Analisa beton keras per sampel Rp 750.000,00

93
JENIS PEKERJAAN SATUAN TARIF
j) Permeabilitas per sampel Rp 125.000,00
k) R- Bar per sampel Rp 150.000,00
l) Korosifitas per sampel Rp 80.000,00

Jalan dan Jembatan


a. Pengujian bahan di laboratorium
Aspal keras
b) Destilasi per sampel Rp 100.000,00
c) Penetrasi dengan jarum per sampel Rp 100.000,00
d) Penetrasi dengan konus per sampel Rp 100.000,00
e) Ketahanan terhadap leleh per sampel Rp 60.000,00
f) Titik lembek per sampel Rp 75.000,00
g) Titik nyala per sampel Rp 75.000,00
h) Daktilitas per sampel Rp 130.000,00
i) Loss On Heating (LOH) per sampel Rp 120.000,00
j) Penetrasi LOH per sampel Rp 100.000,00
k) Titik lembek LOH per sampel Rp 75.000,00
l) Daktilitas LOH per sampel Rp 130.000,00
m) Kelarutan dalam Trichloor Etyleen (C2HCL3) per sampel Rp 500.000,00
n) Berat jenis per sampel Rp 70.000,00
o) Kekentalan per sampel Rp 110.000,00
p) Kadar paraffin per sampel Rp 1.035.000,00
q) Parameter malthene (PA) per sampel Rp 1.570.000,00
r) Kelekatan per sampel Rp 80.000,00
s) Kadar air per sampel Rp 230.000,00
t) Viscositas absolut per sampel Rp 125.000,00
u) Penurunan suhu per sampel Rp 75.000,00
v) Dinamic Shear Rheometer (DSR) per sampel Rp 1.000.000,00
w) Presure Ageing Vasel (PAV) per sampel Rp 175.000,00
x) Perkiraan suhu pencampuran dan pemadatan per sampel Rp 360.000,00
Aspal cair
a) Kekentalan per sampel Rp 110.000,00
b) Kadar air per sampel Rp 230.000,00
c) Titik nyala per sampel Rp 75.000,00
d) Berat jenis per sampel Rp 70.000,00
e) Penyulingan per sampel Rp 115.000,00

94
JENIS PEKERJAAN SATUAN TARIF
f) Penetrasi residu per sampel Rp 100.000,00
g) Daktilitas residu per sampel Rp 130.000,00
h) Kelarutan dalam C2HCL3 per sampel Rp 500.000,00
i) Kelekatan per sampel Rp 80.000,00
j) Perencanaan komposisi per sampel Rp 330.000,00
Aspal emulsi
a) Kekentalan per sampel Rp 110.000,00
b) Pengendapan per sampel Rp 75.000,00
c) Semen mixing per sampel Rp 75.000,00
d) Muatan listrik per sampel Rp 65.000,00
e) Analisa saringan per sampel Rp 80.000,00
f) Penyulingan per sampel Rp 115.000,00
g) Kadar minyak per sampel Rp 60.000,00
h) Penetrasi residu per sampel Rp 100.000,00
i) Daktilitas residu per sampel Rp 130.000,00
j) Kelarutan dalam C2HCL3 per sampel Rp 500.000,00
k) Klasifikasi per sampel Rp 95.000,00
Campuran beraspal
a) Ekstraksi (Pro Analys) per sampel Rp 1.890.000,00
b) Ekstraksi (teknis) per sampel Rp 200.000,00
c) Elastic Recovery per sampel Rp 70.000,00
d) Penetrasi per sampel Rp 55.000,00
e) Titik lembek per sampel Rp 35.000,00
f) Daktilitas per sampel Rp 60.000,00
g) Kadar aspal per sampel Rp 100.000,00
h) Analisa saringan per sampel Rp 40.000,00
i) Kadar air campuran per sampel Rp 205.000,00
j) Resilent modulus per sampel Rp 125.000,00

Pengujian perkerasan di lapangan


1) Lendutan dengan Benkelman beam (BB) per titik Rp 55.000,00
2) Lendutan dengan Falling Weight Deflectometer (FWD) per titik Rp 70.000,00
3) Kelicinan dengan British Pendulum Tester (BPT) per titik Rp 60.000,00
4) Texture dengan sand patch per titik Rp 50.000,00
5) Texture dengan mini texture- meter per km Rp 50.000,00
6) Kelicinan dengan MU-Meter per lajur per km Rp 85.000,00

95
JENIS PEKERJAAN SATUAN TARIF
7) Kerataan dengan NAASRA per lajur per km Rp 64.650,00
8) Kerataan dengan laser per lajur per km Rp 55.000,00
9) Kerataan dengan dipstick per lajur per km Rp 150.000,00
10) Survey kondisi visual per lajur per km Rp 145.000,00
11) Survey kondisi dengan view recon per km per lajur Rp 80.000,00
12) Pembuatan lubang uji per titik Rp 810.000,00
13) California Bearing Ratio (CBR) dengan Dynamic Cone
per titik Rp 100.000,00
Penetrimeter (DCP)
14) California Bearing Ratio (CBR) asli dengan silinder
per titik Rp 130.000,00
(tanpa penggalian)
15) California Bearing
Ratio (CBR) In- Situ (tanpa per titik Rp 110.000,00
penggalian)
16) Pengambilan sampel inti (core drill) per titik Rp 160.000,00
17) Pengambilan sampel blok per titik Rp 410.000,00
18) Kepadatan dengan sand cone per titik Rp 80.000,00
19) Kepadatan dengan rubber baloon per titik Rp 55.000,00
Pengujian tanah di laboratorium
1) Index Properties
a) Analisa saringan per sampel Rp 80.000,00
b) Hidrometer per sampel Rp 120.000,00
c) Atterberg limit per sampel Rp 70.000,00
d) Shrinkage limit per sampel Rp 40.000,00
e) Berat isi per sampel Rp 20.000,00
f) Berat jenis tanah per sampel Rp 40.000,00
g) Kadar air per sampel Rp 15.000,00
h) Kadar abu per sampel Rp 35.000,00
i) pH meter per sampel Rp 35.000,00
j) Kadar serat gambut per sampel Rp 50.000,00
k) Kadar organik per sampel Rp 40.000,00
l) Relatif dessity per sampel Rp 80.000,00
Soil compaction
a) Pemadatan standar per sampel Rp 120.000,00
b) Pemadatan modified per sampel Rp 185.000,00
c) California Bearing Ratio (CBR) standar soaked per sampel Rp 235.000,00
d) California Bearing Ratio (CBR) standar unsoaked per sampel Rp 275.000,00
e) California Bearing Ratio (CBR) modified soaked per sampel Rp 275.000,00
f) California Bearing Ratio (CBR) modified unsoaked per sampel Rp 140.000,00
g) Resistivity test per titik Rp 80.000,00

96
JENIS PEKERJAAN SATUAN TARIF
h) Relatif Dessity per sampel Rp 80.000,00
i) Subgrade modified resilent per sampel Rp 155.000,00
Mechanical properties (sifat teknis)
a) Kuat tekan bebas (UCS) per sampel Rp 70.000,00
b) Kuat geser langsung manual (UU) per sampel Rp 115.000,00
c) Kuat geser langsung automatic (CD) per sampel Rp 150.000,00
d) Kuat geser langsung manual (CU) per sampel Rp 150.000,00
e) Triaxial Unconsolidated Undrained manual per sampel Rp 115.000,00
f) Triaxial Unconsolidated Undrained automatic per sampel Rp 155.000,00
g) Triaxial Consolidated Undrained per sampel Rp 465.000,00
h) Triaxial Consolidated Undrained (D=35') per sampel Rp 180.000,00
i) Triaxial 3,5 CD per sampel Rp 300.000,00
j) Konsolidasi manual per sampel Rp 115.000,00
k) Konsolidasi automatic per sampel Rp 160.000,00
l) Rowe cells diameter 250 mm per sampel Rp 310.000,00
m) Rowe cells diameter 75 mm per sampel Rp 230.000,00
n) Moisture Condition Value (MCV) per sampel Rp 65.000,00
o) Swealing pressure per sampel Rp 155.000,00
p) Vane test per sampel Rp 80.000,00
q) Permeability falling head per sampel Rp 95.000,00
r) Permeability constant head per sampel Rp 110.000,00
s) Ring Shear per sampel Rp 230.000,00
t) Skale Durability per sampel Rp 115.000,00
b. Pengujian tanah dan batuan di lapangan
1) California Bearing Ratio (CBR) per titik Rp 165.000,00
2) Dynamic Cone Penetrometer (DCP) per titik Rp 115.000,00
3) Sand Cone per titik Rp 115.000,00
4) Piezocon per titik Rp 2.465.000,00
5) Piezocon Disipasi (per 4 jam) per titik Rp 1.115.000,00
6) Piston sampling per sampel Rp 145.000,00
7) Peat sampling per sampel Rp 160.000,00
8) Peat augering per sampel Rp 100.000,00
9) Pengambilan contoh tanah dengan tabung per tabung Rp 130.000,00
10) Pengambilan contoh batuan per tabung Rp 140.000,00
11) Standard Penetration Test(SPT) per uji Rp 105.000,00
12) Sumur uji per titik Rp 300.000,00

97
JENIS PEKERJAAN SATUAN TARIF
13) Seismic per meter Rp 60.000,00
14) Geolistrik per titik Rp 330.000,00
15) Pengukuran situasi per hektar Rp 1.500.000,00
16) Pemetaan geoteknik per hektar Rp 730.000,00
17) Vane Shear test per uji Rp 225.000,00
18) Loading test : 50 ton per titk Rp 15.030.000,00
19) Loading test : 51 s.d 100 ton per titk Rp 18.115.000,00
20) Loading test : 101 s.d 200 ton per titk Rp 22.165.000,00
21) Pemasangan instrumen Inklinometer per meter Rp 525.000,00
22) Pemasangan Pisometer Peneumatik per titik Rp 675.000,00
23) Pemasangan Pisometer Casagrande per titik Rp 685.000,00
24) Pemasangan instrumen Settlement Plate per titik Rp 695.000,00
25) Pemasangan instrumen Patok geser per patok Rp 455.000,00
26) Pemantauan inklinometer per titik Rp 615.000,00
27) Pemantauan instrumen Pisometer peneumatik per titik Rp 595.000,00
28) Pemantauan instrumen Pisometer casagrande per titik Rp 475.000,00
29) Pemantauan Settlement Plate per titik Rp 455.000,00
30) Pemantauan Patok Geser per titik Rp 360.000,00
31) Pemantauan Neutron Moisture Sensor per titik Rp 125.000,00
32) Pile Drive Analysis (PDA) per titik Rp 7.500.000,00
Pengujian beton dan jembatan di lapangan
1) Pengujian mutu beton dan cacat beton
a) Hammer test per titik Rp 75.000,00
b) Pundit per titik Rp 140.000,00
c) Impact echo per titik Rp 250.000,00
d) Windsor probe per titik Rp 500.000,00
2) Korosi beton
a) Karbonsasi beton per titik Rp 280.000,00
b) Resistyvity per titik Rp 200.000,00
3) Stress relief test Core drill + demec per titik Rp 1.015.000,00
4) Pengujian kekuatan jembatan
a) Lendutan per bentang Rp 13.500.000,00
b) Regangan per titik Rp 960.000,00
c) Getaran per bentang Rp 8.250.000,00
Sumber : Peraturan Pemerintah Nomor 32 Tahun 2012 Tentang Jenis Dan Tarif Atas Jenis
Penerimaan Negara Bukan Pajak Yang Berlaku Pada Kementerian Pekerjaan Umum
Catatan : Biaya tersebut di atas tidak termasuk biaya transportasi dan akomodasi, mobilitas peralatan

98
Tabel 2.26. Standar Biaya Sewa Alat- Alat Pemetaan

Surveying Instrument dan Mapping Harga Sewa/ Harga Sewa/


Equipment Hari Bulan
A. Total Station :
Total Station 350.000,00 8.298.000,00
B. Digital Theodolite :
Digital Theodolite 175.000,00 3.750.000,00
C. Gps Navigasi / Maps :
GPS geodetik Statik Base and Rover 250.000,00 4.500.000,00
GPS Geodetik RTK Base and Rover 500.000,00
GPSMAP Garmin 75.000,00
D. Compass :
Compass 45.000,00
Clinometer 45.000,00
Tandem Compass and Clinometer 10.000,00 200.000,00
Compass Geologi 10.000,00 200.000,00
E. Water Pass
Waterpass 100.000,00 1.200.000,00
F. Handy Cam
Handycam 120.000,00 -

Tabel 2.27. Standar Biaya Mobilisasi dan Demobilisasi Dari Pool Ke Lokasi
Proyek
Asal/Pool Kendaraan Tujuan/Lokasi Proyek Harga Angkut 1 Trip *)
Jakarta Kabupaten Bogor 2.680.000,00
Bandung Kabupaten Bogor 3.560.000,00
Bekasi Kabupaten Bogor 2.680.000,00
Catatan :
*) Harga 1 Trip adalah hanya satu kali jalan saja sudah termasuk BBM, Biaya Tol dan Ongkos
Bongkar Muat
Tabel 2.28. Standar Biaya Sewa Drone

Sewa Drone Harga Keterangan

1 Kali Terbang 10-15 Menit 1.000.000,00 Sewa Drone dengan Operator

1 Jam Terbang / 4 Kali


4.000.000,00 Sewa Drone dengan Operator
Terbang / 4 Battery
Satu Hari / 8 Jam / 15 Kali
10.000.000,00 Sewa Drone dengan Operator
Terbang/ 15 Battery

99
III. STANDAR SATUAN HARGA BAHAN/MATERIAL
A. MATERIAL ALAM
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN HARGA HARGA
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
1 Tanah Urug Pilihan m3 210.000 231.000
2 Sirtu m3 281.000 309.100
3 Pasir Teras m3 343.000 377.300
4 Pasir Pasang m3 370.000 407.000
5 Pasir Beton m3 389.000 427.900
6 Pasir urug m3 303.000 333.300
7 Abu Batu m3 323.000 355.300
8 Koral Beton m3 369.000 405.900
9 Batu Gosok (Apung) m3 259.000 284.900
10 Batu Pecah 5 - 7 cm m3 319.000 350.900
11 Batu Pecah 0,5 - 1 cm m3 380.000 418.000
12 Batu Pecah Mesin 1/2 m3 354.000 389.400
13 Batu Pecah Mesin 2/3 m3 390.000 429.000
14 Batu Pecah Mesin 3/5 m3 331.000 364.100
15 Batu Pecah Mesin 5/7 m3 339.000 372.900
16 Batu Pecah tersaring A m3 330.000 363.000
17 Batu Pecah tersaring B m3 437.000 480.700
18 Batu Belah ≥ 15 cm m3 274.000 301.400
19 Batu Belah Pondasi m3 343.000 377.300
20 Batu Bronjol (Untuk Bronjong) m3 242.000 266.200
21 Batu Koral Beton Kali m3 194.000 213.400
22 Batu Tempel Hitam m2 127.000 139.700
23 Batu Pinggir Beton 10 x 20 x 35 bh 38.000 41.800
24 Batu Pinggir Beton 15 x 35 x 50 K-225 bh 133.000 146.300
25 Batu Telor m3 199.000 218.900
26 Kapur Pasang/kapur Tembok m3 668.000 734.800
27 Kapur Sirih kg 71.000 78.100
28 Tanah Liat m3 249.000 273.900
29 Air liter 500 550
30 Kapur padam m3 668.000 734.800
31 Kerikil kg 455.000 500.500
32 Batu Granit kg 255.000 280.500
33 Batu Teraso kg 19.000 20.900

100
B. BATU BATA DAN ROOSTER
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN HARGA HARGA
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
1 Bata Merah Bakar bh 1.000 1.100
2 Bata Merah Oven (Klingker) bh 2.000 2.200
3 Bata Ringan tebal = 10 cm bh 10.000 11.000
4 Bata Ringan tebal = 7,5 cm bh 7.500 8.250
5 Bata Ringan m3 830.000 913.000
6 Batako Kecil 8 x 10 x 20 cm bh 2.000 2.200
7 Batako Besar 8 x 20 x 30 cm bh 3.000 3.300
8 Concrete Block Regular Full 390x190x90 mm bh 12.000 13.200
9 Concrete Block Regular Half 190x190x90 mm bh 7.000 7.700
10 Concrete Block Bond Beam 390x190x90 mm bh 17.000 18.700
11 Concrete Block C-Pilar 300x190x60 mm bh 12.000 13.200
12 Concrete Block Open End 390x190x90 mm bh 17.000 18.700
13 Concrete Block Regular Full 390x190x140 mm bh 18.000 19.800
14 Concrete Block Regular Half 190x190x140 mm bh 10.000 11.000
15 Concrete Block Bond Beam 390x190x140 mm bh 25.000 27.500
16 Concrete Block Regular Full 390x190x190 mm bh 25.000 27.500
17 Concrete Block Regular Half 190x190x190 mm bh 15.000 16.500
18 Concrete Block Bond Beam 390x190x190 mm bh 37.000 40.700
19 Roster Cisangkan 200x100x200 mm bh 11.000 12.100
20 Roster Cisangkan 280x100x75 mm bh 8.000 8.800
21 Roster Cisangkan 300x155x140 mm bh 15.000 16.500
22 Roster Cisangkan 230x155x140 mm bh 13.000 14.300
23 Roster Cisangkan 390x90x190 mm bh 22.000 24.200
24 Roster Cisangkan 185x140x185 mm bh 14.000 15.400
25 Roster Cisangkan 400x150x150 mm bh 26.000 28.600
26 Roster Cisangkan 200x150x150 mm bh 18.000 19.800
27 Roster Cisangkan 400x200x100 mm bh 30.000 33.000
28 Rooster Beton 20 x 20 bh 25.000 27.500
29 Rooster Beton 30 x 30 bh 30.000 33.000
30 Rooster Jalusi 39 x 18,5 x 9 bh 44.000 48.400
31 Rooster Motif 20 x 20 bh 26.000 28.600
32 Rooster Polos 20 x 20 bh 25.000 27.500
33 Rooster Silang 20 x 20 bh 25.000 27.500
34 Rooster Espana bh 33.000 36.300
35 Rooster / Bata Kerawang bh 27.000 29.700
36 Rooster Keramik 30 x 30 bh 87.000 95.700
37 Rooster Keramik 20 x 20 bh 63.000 69.300
38 Rooster Keramik 18 x 18 bh 40.000 44.000

101
C. SEMEN
SPESIFIKASI HARGA HARGA
NO BAHAN/MATERIAL SATUAN
BAHAN SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
1 Semen kg 1.700,00 1.870,00
2 Semen Tiga Roda 50 kg zak 80.000,00 88.000,00
3 Semen Holcim 50 kg zak 82.000,00 90.200,00
4 Semen Gresik (SGC) 50 kg zak 82.000,00 90.200,00
5 Semen Merah Putih 50 kg zak 75.000,00 82.500,00
6 Semen Garuda 50 kg zak 71.000,00 78.100,00
7 Semen Tiga Roda 40 kg zak 78.000,00 85.800,00
8 Semen Holcim 40 kg zak 71.000,00 78.100,00
9 Semen Gresik (SGC) 40 kg zak 70.000,00 77.000,00
10 Semen Merah Putih 40 kg zak 65.000,00 71.500,00
11 Semen Garuda 40 kg zak 65.000,00 71.500,00
12 Semen Putih Tiga Roda 40 kg zak 154.000,00 169.400,00
13 Semen Warna kg 26.000,00 28.600,00
14 MU-100 Plester 40 kg zak 145.000,00 159.500,00
15 MU-200 Acian Plester & Beton 5 kg zak 175.000,00 192.500,00
16 MU-200 Acian Plester & Beton 40 kg zak 176.000,00 193.600,00
17 MU-260 Acian Profil 25 kg zak 362.000,00 398.200,00
18 MU-270 Acian Putih 25 kg zak 299.000,00 328.900,00
19 MU-300 Pasangan Bata 40 kg zak 113.000,00 124.300,00
20 MU-301 Pas Bata & Plester 10 kg zak 119.000,00 130.900,00
21 MU-301 Pas Bata & Plester 40 kg zak 98.000,00 107.800,00
22 MU-380 Perekat Bata Ringan 5 kg zak 134.000,00 147.400,00
23 MU-380 Perekat Bata Ringan 40 kg zak 147.000,00 161.700,00
24 MU-400 Perekat Keramik Dinding 5 kg zak 106.000,00 116.600,00
25 MU-400 Perekat Keramik Dinding 25 kg zak 167.000,00 183.700,00
26 MU-408 Pengisi Nat 1 kg zak 24.000,00 26.400,00
27 MU-410 Self Leveling Floor 25 kg zak 226.000,00 248.600,00
28 MU-420 Perekat Keramik 25 kg zak 228.000,00 250.800,00
29 MU-440 Perata Lantai 40 kg zak 112.000,00 123.200,00
30 MU-445 Perata Lantai Premium 40 kg zak 136.000,00 149.600,00
31 MU-450 Perekat Keramik Lantai 5 kg zak 55.000,00 60.500,00
32 MU-450 Perekat Keramik Lantai 40 kg zak 381.000,00 419.100,00
33 MU-460 Perekat Keramik Daerah Basah 25 kg zak 653.000,00 718.300,00
34 MU-470 White Tile Addesive 25 kg zak 944.000,00 1.038.400,00
35 MU-480 Perekat Keramik diatas Keramik 5 kg zak 184.000,00 202.400,00
36 MU-480 Perekat Keramik diatas Keramik 25 kg zak 265.000,00 291.500,00
37 MU-500 Perekat Mortar & Beton 2 kg zak 293.000,00 322.300,00
38 MU-600 Pelapis Kedap Air 3 kg zak 161.000,00 177.100,00
39 MU-600 Pelapis Kedap Air 30 kg zak 1.729.000,00 1.901.900,00
40 MU-700 Floor Hardener 25 kg zak 283.000,00 311.300,00

102
D. BETON
SPESIFIKASI HARGA HARGA
NO BAHAN/MATERIAL SATUAN
BAHAN SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
1 Beton Mortar slump (12±2) cm m3 1.250.000 1.375.000
2 Beton B0 slump (12±2) cm m3 1.010.000 1.111.000
3 Beton K 100 slump (12±2) cm m3 1.040.000 1.144.000
4 Beton K 125 slump (12±2) cm m3 1.060.000 1.166.000
5 Beton K 150 slump (12±2) cm m3 1.080.000 1.188.000
6 Beton K 175 slump (12±2) cm m3 1.100.000 1.210.000
7 Beton K 200 slump (12±2) cm m3 1.120.000 1.232.000
8 Beton K 225 slump (12±2) cm m3 1.150.000 1.265.000
9 Beton K 250 slump (12±2) cm m3 1.180.000 1.298.000
10 Beton K 275 slump (12±2) cm m3 1.210.000 1.331.000
11 Beton K 300 slump (12±2) cm m3 1.240.000 1.364.000
12 Beton K 325 slump (12±2) cm m3 1.270.000 1.397.000
13 Beton K 350 slump (12±2) cm m3 1.300.000 1.430.000
14 Beton K 375 slump (12±2) cm m3 1.330.000 1.463.000
15 Beton K 400 slump (12±2) cm m3 1.360.000 1.496.000
16 Beton K 425 slump (12±2) cm m3 1.390.000 1.529.000
17 Beton K 450 slump (12±2) cm m3 1.420.000 1.562.000
18 Beton K 475 slump (12±2) cm m3 1.450.000 1.595.000
19 Beton K 500 slump (12±2) cm m3 1.580.000 1.738.000
20 Beton K 550 slump (12±2) cm m3 1.760.000 1.936.000
21 Beton K 600 slump (12±2) cm m3 1.860.000 2.046.000
22 Beton K 650 slump (12±2) cm m3 1.960.000 2.156.000
23 Beton FS 45 28 Hari m3 1.450.000 1.595.000
24 Beton FS 45 7 Hari m3 1.710.000 1.881.000
25 Beton FS 45 3 Hari m3 2.010.000 2.211.000
26 Beton FS 45 1 Hari m3 2.710.000 2.981.000

103
E. KAYU DAN BAMBU
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
1 Bambu 5 s/d 7 btg 28.000 30.800
2 Bambu 7 s/d 10 btg 33.000 36.300
3 Bambu Gombong btg 58.000 63.800
4 Kayu Kamper Singkil / kapur Kayu Samarinda Kls II m3 18.189.000 20.007.900
5 Kayu Balok Borneo Super m3 6.585.000 7.243.500
6 Kayu Papan Borneo Super m3 7.571.000 8.328.100
7 Kayu Balok Kamper Medan (Kruing) m3 10.232.000 11.255.200
8 Kayu Papan Kamper Medan (Kruing) m3 13.948.000 15.342.800
9 Kayu Balok Kamper Banjar m3 12.552.000 13.807.200
10 Kayu Papan Kamper Banjar m3 13.531.000 14.884.100
11 Kayu Balok Kamper Samarinda m3 18.905.000 20.795.500
12 Kayu Papan Kamper Samarinda m3 19.474.000 21.421.400
13 Kayu Balok Rasamala m3 6.584.000 7.242.400
14 Kayu Jati Jatim Tua dia. 40 cm m3 35.263.000 38.789.300
15 Kayu Jati Jateng Tua 40 cm m3 43.877.000 48.264.700
16 Kayu Jati Jabar Tua dia. 40 cm m3 35.551.000 39.106.100
17 Kayu Jati Jabar Tua dia. 40 cm Kebawah m3 24.488.000 26.936.800
18 Kayu Hutan Kelas I Segeng, Mahoni, Laban m3 9.556.000 10.511.600
19 Kayu Balok Albasia Kayu Balok Albasia m3 3.986.000 4.384.600
20 Kayu Papan Albasia Kayu Papan Albasia m3 4.110.000 4.521.000
21 Dolken 5 s/d 7 Dolken 5 s/d 7 btg 54.000 59.400
22 Dolken 7 s/d 10 Dolken 7 s/d 10 btg 78.000 85.800
23 List Profil Kamper 1 cm 1 cm m' 3.640.000 4.004.000
24 List Profil Kamper 2 cm 2 cm m' 3.802.000 4.182.200
25 List Profil Kamper 4 cm 4 cm m' 30.000 33.000
26 List Profil Kamper 5 cm 5 cm m' 34.000 37.400
27 List Profil Kamper 10 cm 10 cm m' 107.000 117.700
28 Pegangan Tangga Profil Jati m' 265.000 291.500
29 Pegangan Tangga Profil Kamper m' 208.000 228.800
30 Kayu Kaso 4/6 m3 5.513.000 6.064.300
31 Kayu Kaso 5/7 m3 5.313.000 5.844.300
32 Kayu Reng 2/3 Borneo Super m3 13.328.000 14.660.800
33 Kayu Reng 2/3 Kamper Banjar m3 13.595.000 14.954.500
34 Kayu Reng 3/4 Kamper Banjar m3 8.016.000 8.817.600
35 Kayu Papan Terentang m3 6.219.000 6.840.900
36 Kayu Balok Terentang m3 5.342.000 5.876.200
37 Batang Kelapa btg 897.000 986.700
38 Tali Ijuk kg 48.000 52.800
39 Lapisan Ijuk tebal 10 cm tebal 10 cm m2 73.000 80.300
40 Venetion Blind m2 1.069.000 1.175.900

104
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
41 Vertikal Blind m2 1.179.000 1.296.900
42 Kayu papan Kelas I m3 8.080.000 8.888.000
43 Kayu Balok Kelas I m3 5.641.000 6.205.100
44 Kayu Papan Kelas II m3 4.872.000 5.359.200
45 Kayu Balok Kelas II m3 4.436.000 4.879.600
46 Kayu papan Kelas III m3 5.329.000 5.861.900
47 Kayu Balok Kelas III m3 4.072.000 4.479.200
48 Dolken Kayu Galam Panjang 4 meter ukuran 8-10 btg 115.000 126.500
49 Kayu Papan 3/20 4 m m3 5.237.000 5.760.700
50 Pengawetan Kayu m3 784.000 862.400
51 Pengopenan Kayu bh 1.389.000 1.527.900
52 Triplek 3 mm 120 x 240 lbr 77.000 84.700
53 Triplek 4 mm 120 x 240 lbr 95.000 104.500
54 Triplek 6 mm 120 x 240 lbr 125.000 137.500
55 Triplek 9 mm 120 x 240 lbr 171.000 188.100
56 Jabar Wood 4 mm lbr 225.000 247.500
57 Bilik Bambu (Tanpa Kulit) m2 169.000 185.900
58 Bilik Bambu (dengan Kulit) m2 206.000 226.600
59 Bilik Bambu Hitam Variasi m2 261.000 287.100
60 Wall Paper (kelas Biasa) m2 234.000 257.400
61 Wall Paper (kelas Menengah/sedang) m2 291.000 320.100
62 Wall Paper (kelas Baik) m2 349.000 383.900
63 Multiplek 9 mm 120 x 240 lbr 209.000 229.900
64 Multiplek 12 mm 120 x 240 lbr 256.000 281.600
65 Multiplek 18 mm 120 x 240 lbr 387.000 425.700
66 Plywood 4 mm 120 x 240 lbr 264.000 290.400
67 Plywood 9 mm 120 x 240 lbr 433.000 476.300
68 Plywood 18 mm 120 x 240 lbr 538.000 591.800
69 TeakWood 3 mm 120 x 240 lbr 200.000 220.000
70 TeakWood 4 mm 120 x 240 lbr 207.000 227.700
71 Tacon (Bahan Bakar) m2 272.000 299.200
72 Supercon m2 184.000 202.400
73 Melamin 4 mm 120 x 240 lbr 176.000 193.600
74 Formika 120 x 240 lbr 424.000 466.400
75 Formika Ukuran Pintu lbr 341.000 375.100
76 Formika Warna 4" x 8" lbr 600.000 660.000

105
F. CAT
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
1 Plamir Tembok MATEX Interior Kg 24.000 26.400
2 Plamir Tembok MATEX Interior Per 4 Kg 65.000 71.500
3 Plamir Tembok MATEX Interior Per 20 Kg 311.000 342.100
4 Plamir Tembok DULUX Exterior, WEATHERSHIELD Per 3.5 Kg 139.000 152.900
5 Plamir Tembok DULUX Interior, WALL FILLER Per 3.5 Kg 108.000 118.800
6 Cat Dasar DULUX ALKALI Exterior, WEATHERSHIELD Per 2.5 Liter 162.000 178.200
7 Cat Dasar DULUX ALKALI Exterior, WEATHERSHIELD Per 25 Kg 1.296.000 1.425.600
8 Cat Dasar DULUX ALKALI KILLER Per 2.5 Liter 210.000 231.000
9 Cat Dasar DULUX CATYLAC Interior Per 21 Kg 864.000 950.400
10 Cat Dasar DULUX CATYLAC Exterior Per 21 Kg 736.000 809.600
11 Cat Dasar NIPPON SEALER ALKALI Per 2.5 Liter 156.000 171.600
12 Cat Dasar NIPPON SEALER ALKALI Per 20 Kg 1.093.000 1.202.300
13 Cat Dasar VINILEX WALL SEALER ALKALI RESISTING Per 5 Kg 176.000 193.600
14 Cat Dasar VINILEX WALL SEALER ALKALI RESISTING Per 25 Kg 871.000 958.100
15 Cat Dasar AVITEX AVIAN Alkali Primer Per 4 Kg 142.000 156.200
16 Cat Dasar AVITEX AVIAN Alkali Primer Per 21 Kg 672.000 739.200
17 Cat Dasar JOTUN JOTAPLAST Per 4 Liter 142.000 156.200
18 Cat Dasar JOTUN JOTAPLAST Per 18 Liter 639.000 702.900
19 Cat Dasar MOWILEX PRECOAT WALL SEALER Per 2.5 Liter 122.000 134.200
20 Cat Dasar MOWILEX PRECOAT UNDERCOAT Per 2.5 Liter 149.000 163.900
21 Cat Tembok DULUX Exterior, WEATHERSHIELD Per 2.5 Liter 357.000 392.700
22 Cat Tembok DULUX Exterior, WEATHERSHIELD Per 20 Liter 2.966.000 3.262.600
23 Cat Tembok DULUX Interior, Ambiance Per 2.5 Liter 313.000 344.300
24 Cat Tembok DULUX Interior, Ambiance Per 20 Liter 2.386.000 2.624.600
25 Cat Tembok DULUX PENTALITE Interior Per 2.5 Liter 247.000 271.700
26 Cat Tembok DULUX PENTALITE Interior Per 20 Liter 1.673.000 1.840.300
27 Cat Tembok DULUX CATYLAC Interior Per 5 Kg 286.000 314.600
28 Cat Tembok DULUX CATYLAC Interior Per 25 kg 806.000 886.600
29 Cat Tembok DULUX CATYLAC Interior, GLOW Per 4.5 kg 331.000 364.100
30 Cat Tembok DULUX CATYLAC Interior, GLOW Per 22 Kg 1.113.000 1.224.300
31 Cat Tembok DANASHIELD Exterior, Warna Standar Per 2.5 Liter 251.000 276.100
32 Cat Tembok DANASHIELD Exterior, Warna Standar Per 20 Liter 1.857.000 2.042.700
33 Cat Tembok DANASHIELD Exterior, Warna Khusus Per 2.5 Liter 289.000 317.900
34 Cat Tembok DANASHIELD Exterior, Warna Khusus Per 20 Liter 2.059.000 2.264.900
35 Cat Tembok DANACRYL Interior, Warna Standar Per 2.5 Liter 166.000 182.600
36 Cat Tembok DANACRYL Interior, Warna Standar Per 20 Liter 1.211.000 1.332.100
37 Cat Tembok DANACRYL Interior, Warna Khusus Per 2.5 Liter 195.000 214.500
38 Cat Tembok DANACRYL Interior, Warna Khusus Per 20 Liter 1.417.000 1.558.700
39 Cat Tembok DANABRITE Interior Per 5 Kg 119.000 130.900
40 Cat Tembok DANABRITE Interior Per 20 Kg 585.000 643.500

106
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
41 Cat Tembok NIPPON VINILEX Interior Per 5 Kg 243.000 267.300
42 Cat Tembok NIPPON VINILEX Interior Per 25 kg 911.000 1.002.100
43 Cat Tembok NIPPON VINILEX Exterior Per 5 Kg 366.000 402.600
44 Cat Tembok NIPPON VINILEX Exterior Per 25 kg 1.053.000 1.158.300
45 Cat Tembok JOTUN MAJESTIC Interior Per 20 Liter 2.690.000 2.959.000
46 Cat Tembok JOTUN MAJESTIC Interior Per 2.5 Liter 529.000 581.900
47 Cat Tembok JOTUN EASY WIPE Interior Per 18 Liter 1.127.000 1.239.700
48 Cat Tembok JOTUN EASY WIPE Interior Per 5 Kg 380.000 418.000
49 Cat Tembok JOTUN JOTAPLAST Per 25 kg 1.043.000 1.147.300
50 Cat Dasar Zinc Chromate Kansai Kg 73.000 80.300
51 Cat Dasar Zinc Chromate Kansai Per 5 Kg 340.000 374.000
52 Cat Dasar Zinc Chromate Kansai Per 25 kg 1.625.000 1.787.500
53 Cat Dasar Galvanised NIPPON ACTIVE PRIMER Per Liter 129.000 141.900
54 Cat Marka Jalan AVIAN ROADLINE Kg 95.000 104.500
55 Cat Marka Jalan NIPPON ROADLINE Kg 81.000 89.100
56 Cat Marka Jalan NIPPON ROADLINE Per 5 Kg 370.000 407.000
57 Cat Marka Jalan NIPPON ROADLINE Per 25 kg 1.889.000 2.077.900
58 Cat Marka Jalan PROPAN TRAFFIKOTE Waterbased Kg 112.000 123.200
59 Cat Marka Jalan PROPAN TRAFFIKOTE Waterbased Per 2.5 Kg 269.000 295.900
60 Cat Lapangan PROPAN TRAFFIKOTE Waterbased Per 25 kg 1.127.000 1.239.700
61 Cat Kayu dan Besi SEIV Kg 72.000 79.200
62 Cat Kayu dan Besi PENLUX Warna Standar Kg 65.000 71.500
63 Cat Kayu dan Besi PENLUX Warna Silver Kg 71.000 78.100
64 Cat Kayu dan Besi PENLUX Warna Emas Kg 115.000 126.500
65 Cat Kayu dan Besi JOTUN Gardex Per 5 Liter 586.000 644.600
66 Cat Kayu dan Besi JOTUN Gardex Kg 122.000 134.200
67 Cat Kayu dan Besi KANSAI Ftalit Per 20 Kg 1.474.000 1.621.400
68 Cat Kayu dan Besi KANSAI Ftalit Per 5 Kg 377.000 414.700
69 Cat Kayu dan Besi KANSAI Ftalit Kg 80.000 88.000
70 Cat Duco DANAPAINT Danagloss Kg 131.000 144.100
71 Cat Duco DANAPAINT Top Color Kg 88.000 96.800
72 Cat Duco PENTA Super Gloss Liter 95.000 104.500
73 Cat Duco NIPPON PAINT NIPPE Liter 122.000 134.200
74 Cat Genteng MATEX Per 2.5 Liter 169.000 185.900
75 Cat Genteng JOTUN Jotaroof Per 2.5 Liter 376.000 413.600
76 Cat Besi Anti Karat DULUX Hammerite Per 0.75 Ltr 331.000 364.100
77 Cat Besi Anti Karat NIPPON Bodelac Kg 131.000 144.100
78 Cat Besi Anti Karat SEIV FLINKOTE Kg 49.000 53.900
79 Dempul Kayu PROPAN AQUA WOOD FILLER Kg 41.000 45.100
80 Dempul Kayu PROPAN AQUA PUTTY Waterbased Kg 48.000 52.800
81 Dempul Kayu IMPRA  WOOD FILLER Kg 50.000 55.000
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL

107
1 2 3 4 5 6
82 Dempul Kayu IMPRA  WOOD FILLER Per 5 Kg 223.000 245.300
83 Dempul Plastik SAMURAI PAINT 300ml 68.000 74.800
84 Dempul Besi SAN POLAC 250 Gram 19.000 20.900
85 Dempul Besi SAN POLAC Kg 48.000 52.800
86 Dempul Besi SAN POLAC Per 4 Kg 154.000 169.400
87 THINNER IMPALA Liter 33.000 36.300
88 THINNER IMPALA Per 5 Liter 129.000 141.900
89 THINNER A  1 Drum = 200 Liter Drum 2.496.000 2.745.600
90 THINNER A SPECIAL  1 Drum = 200 Liter Drum 2.901.000 3.191.100
91 THINNER B  1 Drum = 200 Liter Drum 2.429.000 2.671.900
92 Melamik IMPRA  AQUA LACQUER Kg 108.000 118.800
93 Cat Pelapis Anti Bocor Aquaproof Kg 61.000 67.100
94 Cat Pelapis Anti Bocor Aquaproof Per 4 Kg 223.000 245.300
95 Cat Pelapis Anti Bocor Aquaproof Per 20 Kg 993.000 1.092.300
96 Cat Pelapis Anti Bocor No Drop Kg 61.000 67.100
97 Cat Pelapis Anti Bocor No Drop Per 4 Kg 232.000 255.200
98 Cat Pelapis Anti Bocor No Drop Per 20 Kg 1.057.000 1.162.700
99 Cat Pelapis Anti Bocor Dulux  Aquashield Kg 65.000 71.500
100 Cat Pelapis Anti Bocor Dulux  Aquashield Per 4 Kg 239.000 262.900
101 Cat Pelapis Anti Bocor Dulux  Aquashield Per 20 Kg 1.049.000 1.153.900
102 Politur Vernis AVIAN Boyo Liter 75.000 82.500
103 Politur Vernis ULTRAN Kg 52.000 57.200
104 Wood Stain IMPRA Liter 97.000 106.700
105 Sanding Sealer IMPRA Liter 92.000 101.200
106 Teak Oil PROPAN ULTRAN 0.8 Liter 59.000 64.900
107 Teak Oil WATCO Liter 518.000 569.800
108 AFDUNER Minyak Synthetic botol 11.000 12.100
109 Residu Liter 81.000 89.100
110 Spirtus Liter 48.000 52.800
111 Terpentin Liter 243.000 267.300
112 Sirlak India Kg 390.000 429.000
113 Water Profing Emulsion Kg 64.000 70.400
114 Water Profing Membrance m2 47.000 51.700
115 Kalkarium Kg 405.000 445.500

G. MATERIAL LANTAI
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL

108
1 2 3 4 5 6
1 Tegel PC 20 x 20 bh 4.000,00 4.400,00
2 Tegel Warna 20 x 20 bh 6.000,00 6.600,00
3 Tegel Wafel PC 20 x 20 bh 6.000,00 6.600,00
4 Tegel Wafel Warna 20 x 20 bh 9.000,00 9.900,00
5 Tegel PC 30 x 30 bh 5.000,00 5.500,00
6 Tegel Warna 30 x 30 bh 6.000,00 6.600,00
7 Tegel Badak PC 30 x 30 bh 9.000,00 9.900,00
8 Plin Tegel PC 10 x 20 bh 5.000,00 5.500,00
9 Plin Tegel PC 15 x 30 bh 7.000,00 7.700,00
10 Plin Tegel Warna 10 x 20 bh 6.000,00 6.600,00
11 Plin Tegel Warna 15 x 30 bh 8.000,00 8.800,00
12 Poslin 11 x 11 Warna Standar DN bh 5.000,00 5.500,00
13 Poslin 11 x 11 Warna Khusus DN bh 5.000,00 5.500,00
14 Keramik 10 x 10 Duz 85.000,00 93.500,00
15 Keramik 10 x 20 Putih/polos Duz 82.000,00 90.200,00
16 Keramik 10 x 20 Corak/Warna Duz 74.000,00 81.400,00
17 Keramik 20 x 25 Corak Duz 76.000,00 83.600,00
18 Keramik Lantai Mulia 20 x 20 Warna Tua Duz 52.000,00 57.200,00
19 Keramik Lantai Mulia 20 x 20 Warna Muda Duz 49.000,00 53.900,00
20 Keramik Lantai Mulia 30 x 30 Putih polos Duz 52.000,00 57.200,00
21 Keramik Lantai Mulia 30 x 30 Marble Duz 54.000,00 59.400,00
22 Keramik Lantai Mulia 30 x 30 Impresso Duz 57.000,00 62.700,00
23 Keramik Lantai Mulia 40 x 40 Polos Duz 65.000,00 71.500,00
24 Keramik Lantai Mulia 40 x 40 Warna/Corak Duz 76.000,00 83.600,00
25 Keramik Lantai Mulia 60 x 60 (Polos) Duz 156.000,00 171.600,00
26 Keramik Lantai Mulia 60 x 60 (Corak) Duz 169.000,00 185.900,00
27 Keramik Lantai Roman 20 x 20 Golongan A Duz 119.000,00 130.900,00
28 Keramik Lantai Roman 20 x 20 Golongan B Duz 126.000,00 138.600,00
29 Keramik Lantai Roman 20 x 20 Golongan D Duz 141.000,00 155.100,00
30 Keramik Lantai Roman 30 x 30 Golongan B Duz 115.000,00 126.500,00
31 Keramik Lantai Roman 30 x 30 Golongan C Duz 125.000,00 137.500,00
32 Keramik Lantai Roman 40 x 40 Golongan A Duz 131.000,00 144.100,00
33 Keramik Lantai Roman 40 x 40 Golongan B Duz 145.000,00 159.500,00
34 Keramik Lantai Roman 40 x 40 Golongan C Duz 148.000,00 162.800,00
35 Keramik Lantai Roman 40 x 40 Golongan D Duz 154.000,00 169.400,00
36 Keramik Lantai Roman 45 x 45 Golongan A Duz 146.000,00 160.600,00
37 Keramik Lantai Roman 45 x 45 Golongan B Duz 156.000,00 171.600,00
38 Keramik Lantai Roman 45 x 45 Golongan E Duz 206.000,00 226.600,00
39 Keramik Lantai Roman 50 x 50 Golongan A (4bh/duz) Duz 167.000,00 183.700,00
40 Keramik Lantai Roman 50 x 50 Golongan B (4bh/duz) Duz 179.000,00 196.900,00
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
41 Keramik Lantai Roman 50 x 50 Golongan C (4bh/duz) Duz 206.000,00 226.600,00

109
42 Keramik Lantai Roman 60 x 60 Golongan A (3bh/duz) Duz 212.000,00 233.200,00
43 Keramik Lantai Roman 60 x 60 Golongan B (3bh/duz) Duz 239.000,00 262.900,00
44 Keramik Lantai Roman 60 x 60 Golongan C (3bh/duz) Duz 270.000,00 297.000,00
45 Keramik Lantai Milan 40 x 40 Supermilan Gelap Duz 77.000,00 84.700,00
46 Keramik Lantai Milan 40 x 40 Supermilan Median Duz 73.000,00 80.300,00
47 Keramik Lantai Milan 40 x 40 Supermilan Putih Duz 71.000,00 78.100,00
48 Keramik Lantai Milan 50 x 50 Fancy Color Duz 156.000,00 171.600,00
49 Keramik Lantai Milan 50 x 50 Classy Color Duz 141.000,00 155.100,00
50 Keramik Lantai Milan 50 x 50 Supermilan Putih Duz 100.000,00 110.000,00
51 Keramik Lantai Masterina 60 x 60 (Polos) Duz 125.000,00 137.500,00
52 Keramik Lantai Masterina 60 x 60 (Corak) Duz 175.000,00 192.500,00
53 Keramik Lantai Masterina 60 x 60 (Muda) Duz 135.000,00 148.500,00
54 Keramik Lantai Masterina 60 x 60 (Tua) Duz 115.000,00 126.500,00
55 Keramik Lantai KIA 60 x 60 (Polos) Duz 156.000,00 171.600,00
56 Keramik Lantai KIA 60 x 60 (Corak) Duz 169.000,00 185.900,00
57 Keramik Lantai Platinum 50 x 50 (Corak) Duz 102.000,00 112.200,00
58 Keramik Lantai Platinum 60 x 60 (Corak) Duz 115.000,00 126.500,00
59 Granit Alam Ukuran Besar (LN) m2 2.809.000,00 3.089.900,00
60 Granit Alam LN Ukuran Kecil (LN) m2 2.522.000,00 2.774.200,00
61 Granit Alam Ukuran Besar (DN) m2 1.998.000,00 2.197.800,00
62 Granit Alam Ukuran Kecil (DN) m2 1.843.000,00 2.027.300,00
63 Granito Tile Essenza 30 x 30 Duz 495.000,00 544.500,00
64 Granito Tile Essenza 40 x 40 Polis Duz 495.000,00 544.500,00
65 Granito Tile Essenza 40 x 40 Unpolis Duz 452.000,00 497.200,00
66 Granito 60 x 60 Polis m2 495.000,00 544.500,00
67 Granito 60 x 60 Unpolis m2 452.000,00 497.200,00
68 Granito 80 x 80 Polis m2 496.000,00 545.600,00
69 Granito Type Salsa Greystone 60 x 60 Polished 1 duz= 4 bh Duz 570.000,00 627.000,00
70 Granito Type Salsa Greystone 60 x 60 Unpolished 1 duz= 4 bh Duz 502.000,00 552.200,00
71 Granito Type Salsa Pearl White 60 x 60 Polished 1 duz= 4 bh Duz 529.000,00 581.900,00
72 Granito Type Salsa Pearl White 60 x 60 Unpolished 1 duz= 4 bh Duz 458.000,00 503.800,00
73 Granito Type Salsa Pearl White 30 x 60 Polished 1 duz= 8 bh Duz 569.000,00 625.900,00
74 Granito Type Salsa Black 60 x 60 Polished 1 duz= 4 bh Duz 713.000,00 784.300,00
75 Granito Type Salsa Black 60 x 60 Unpolished 1 duz= 4 bh Duz 650.000,00 715.000,00
76 Granito Type Salsa Frost White 60 x 60 Polished 1 duz= 4 bh Duz 597.000,00 656.700,00
77 Granito Type Salsa Frost White 60 x 60 Unpolished 1 duz= 4 bh Duz 533.000,00 586.300,00
78 Granito Type Salsa Frost White 80 x 80 Polished 1 duz= 3 bh Duz 907.000,00 997.700,00
79 Granito Type Salsa Honey 60 x 60 Polished 1 duz= 4 bh Duz 597.000,00 656.700,00
80 Granito Type Salsa Honey 60 x 60 Unpolished 1 duz= 4 bh Duz 502.000,00 552.200,00

HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
81 Granito Type Salsa Ivory 60 x 60 Polished 1 duz= 4 bh Duz 529.000,00 581.900,00
82 Granito Type Salsa Ivory 60 x 60 Unpolished 1 duz= 4 bh Duz 458.000,00 503.800,00

110
83 Granito Type Salsa Coffee 60 x 60 Polished 1 duz= 4 bh Duz 597.000,00 656.700,00
84 Granito Type Salsa Coffee 60 x 60 Unpolished 1 duz= 4 bh Duz 533.000,00 586.300,00
85 Granito Type Salsa Steel 60 x 60 Polished 1 duz= 4 bh Duz 646.000,00 710.600,00
86 Granito Type Salsa Steel 60 x 60 Unpolished 1 duz= 4 bh Duz 533.000,00 586.300,00
87 Granito Type Salsa White 60 x 60 Polished 1 duz= 4 bh Duz 646.000,00 710.600,00
88 Granito Type Salsa Water 60 x 60 Polished 1 duz= 4 bh Duz 646.000,00 710.600,00
89 Granito Type Salsa Aluminium 60 x 60 Polished 1 duz= 4 bh Duz 597.000,00 656.700,00
90 Granito Type Salsa Aluminium 60 x 60 Unpolished 1 duz= 4 bh Duz 533.000,00 586.300,00
91 Granito Type Aurora 60 x 60 Polished 1 duz= 4 bh Duz 699.000,00 768.900,00
92 Granito Type Aurora 30 x 60 Polished 1 duz= 8 bh Duz 720.000,00 792.000,00
93 Granito Type Aurora 80 x 80 Polished 1 duz= 3 bh Duz 952.000,00 1.047.200,00
94 Granito Type Palazzo 60 x 60 Polished 1 duz= 4 bh Duz 621.000,00 683.100,00
95 Granito Type Palazzo 60 x 60 Unpolished 1 duz= 4 bh Duz 563.000,00 619.300,00
96 Granito Type Castello 60 x 60 Unpolished 1 duz= 4 bh Duz 570.000,00 627.000,00
97 Granito Type Ambience 80 x 80 Polished 1 duz= 3 bh Duz 1.079.000,00 1.186.900,00
98 Granito Type Ambience 60 x 120 Polished 1 duz= 2 bh Duz 1.348.000,00 1.482.800,00
99 Granito Cove Tile 10 x 20 1 duz= 25 bh = 5m' Duz 787.000,00 865.700,00
100 Marmer 30 x 30 bh 312.000,00 343.200,00
101 Marmer 40 x 40 bh 371.000,00 408.100,00
102 Marmer 50 x 50 bh 404.000,00 444.400,00
103 Marmer 60 x 60 bh 958.000,00 1.053.800,00
104 Marmer m2 1.068.000,00 1.174.800,00
105 Marmer Alam Lampung ukuran Besar m2 1.195.000,00 1.314.500,00
106 Marmer Alam Lampung ukuran Kecil m2 928.000,00 1.020.800,00
107 Marmer Alam ukuran Besar m2 754.000,00 829.400,00
108 Marmer Alam ukuran Kecil m2 537.000,00 590.700,00
109 Marmer Sintesis m2 477.000,00 524.700,00
110 Teraso 30 x 30 Cm bh 37.000,00 40.700,00
111 Teraso Kerang 30 x 30 Cm m2 405.000,00 445.500,00
112 Keramik Artistik 10 X 20 Cm bh 50.000,00 55.000,00
113 Keramik Artistik 5 X 20 Cm bh 55.000,00 60.500,00
114 Mozaik 30 x 30 Cm bh 38.000,00 41.800,00
115 Stepnosing Keramik (Berbagai ukuran) bh 24.000,00 26.400,00
116 Stepnosing Granito bh 38.000,00 41.800,00
117 Stairnosing Keramik 10 x 20 bh 18.000,00 19.800,00
118 Stairnosing Fiber m 29.000,00 31.900,00
119 Karpet Kelas baik LN m2 208.000,00 228.800,00
120 Karpet Kelas sedang LN m2 73.000,00 80.300,00

HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
121 Plin Keramik 10 x 20 bh 7.000,00 7.700,00
122 Plin Keramik 10 x 25 bh 13.000,00 14.300,00
123 Plin Keramik 10 x 30 bh 14.000,00 15.400,00

111
124 Plin Keramik 10 x 33 bh 15.000,00 16.500,00
125 Plin Keramik 10 x 40 bh 18.000,00 19.800,00
126 Plin Keramik 10 x 60 bh 22.000,00 24.200,00
127 Plin Keramik 15 x 30 bh 27.000,00 29.700,00
128 Plin Keramik 15 x 40 bh 41.000,00 45.100,00
129 Plin Granito 10 x 30 bh 27.000,00 29.700,00
130 Plin Granito 10 x 40 bh 31.000,00 34.100,00
131 Plin Granito 10 x 60 bh 36.000,00 39.600,00
132 Plin Granito 15 x 30 bh 38.000,00 41.800,00
133 Plin Granito 15 x 40 bh 48.000,00 52.800,00
134 Plin Teraso 10 x 30 bh 4.000,00 4.400,00
135 Plin Keramik Artistik 10 x 10 cm bh 28.000,00 30.800,00
136 Plin Keramik Artistik 10 X 20 Cm bh 31.000,00 34.100,00
137 Parquet Jati m2 446.000,00 490.600,00
138 Underlayer Rubber Corrugated m2 127.000,00 139.700,00
139 Gymfloor m2 275.000,00 302.500,00
140 Vinyl Lantai Dasar m2 55.000,00 60.500,00
141 Vinyl Kayu Kelas II (2 x 10) cm m2 89.000,00 97.900,00
142 Vinyl bh 88.000,00 96.800,00
143 Vinyl karet (15 x 30) cm bh 97.000,00 106.700,00
144 Floor hardener kg 37.000,00 40.700,00
145 Internal cove (5 x 5 x20) cm bh 45.000,00 49.500,00
146 Campuran untuk Kedap Air AM liter 125.000,00 137.500,00
147 Concrete Tile 400x400x40 mm bh 37.000,00 40.700
148 Concrete Tile 300x300x20 mm bh 15.000,00 16.500
149 Concrete Tile (Sandtein) 400x400x50 mm Natural bh 45.000,00 49.500
150 Concrete Tile (Sandtein) 400x400x50 mm Regular bh 52.000,00 57.200
151 Concrete Tile (Sandtein) 400x400x50 mm Khusus bh 57.000,00 62.700
152 Concrete Tile (Dot /Bar Tile) 300x300x30 mm Natural bh 25.000,00 27.500
153 Concrete Tile (Dot /Bar Tile) 300x300x30 mm Gold bh 27.000,00 29.700
154 Concrete Tile (Dot /Bar Pave) 300x300x60 mm Natural bh 34.000,00 37.400
155 Concrete Tile (Dot /Bar Pave) 300x300x60 mm Kuning bh 37.000,00 40.700

HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
BATU ANDESIT
1 Batu andesit 10x10cm tebal =1,4 cm m2 90.000,00 99.000,00
2 Batu andesit 10x20cm tebal =1,4 cm m2 90.000,00 99.000,00
3 Batu andesit 15x30cm tebal =1,4 cm m2 110.000,00 121.000,00

112
4 Batu andesit 20x40cm tebal =1,4 cm m2 120.000,00 132.000,00
5 Batu andesit 30x30cm tebal =1,4 cm m2 130.000,00 143.000,00
6 Batu andesit 30x30cm tebal =2,0 cm m2 170.000,00 187.000,00
7 Batu andesit 30x30cm tebal =3,0 cm m2 250.000,00 275.000,00
8 Batu andesit 30x60cm tebal =1,4 cm m2 140.000,00 154.000,00
9 Batu andesit 30x60cm tebal =2,0 cm m2 190.000,00 209.000,00
10 Batu andesit 30x60cm tebal =3,0 cm m2 270.000,00 297.000,00
11 Batu andesit 40x40cm tebal =1,4 cm m2 150.000,00 165.000,00
12 Batu andesit 40x40cm tebal =2,0 cm m2 190.000,00 209.000,00
13 Batu andesit 40x40cm tebal =3,0 cm m2 270.000,00 297.000,00
14 Batu andesit 40x60cm tebal =1,4 cm m2 180.000,00 198.000,00
15 Batu andesit 40x60cm tebal =2,0 cm m2 230.000,00 253.000,00
16 Batu andesit 40x60cm tebal =3,0 cm m2 340.000,00 374.000,00
17 Batu andesit 50x50cm tebal =1,4 cm m2 190.000,00 209.000,00
18 Batu andesit 50x50cm tebal =2,0 cm m2 260.000,00 286.000,00
19 Batu andesit 50x50cm tebal =3,0 cm m2 380.000,00 418.000,00
20 Batu andesit 60x60cm tebal =1,7 cm m2 220.000,00 242.000,00
21 Batu andesit 60x60cm tebal =2,0 cm m2 270.000,00 297.000,00
22 Batu andesit 60x60cm tebal =3,0 cm m2 410.000,00 451.000,00
23 Batu andesit 60x100cm tebal =1,7 cm m2 300.000,00 330.000,00
24 Batu andesit 60x100cm tebal =2,0 cm m2 370.000,00 407.000,00
25 Batu andesit 60x100cm tebal =3,0 cm m2 540.000,00 594.000,00
26 Batu andesit 60x120cm tebal =1,7 cm m2 370.000,00 407.000,00
27 Batu andesit 60x120cm tebal =2,0 cm m2 440.000,00 484.000,00
28 Batu andesit 60x120cm tebal =3,0 cm m2 650.000,00 715.000,00

H. BAHAN PLAFOND DAN PARTISI


HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
1 KalsiBoard tebal = 3mm ukuran 1 m x 1 m lembar 21.000,00 23.100,00
2 KalsiBoard tebal = 3mm ukuran 0.5 m x 1 m lembar 12.000,00 13.200,00
3 KalsiBoard tebal = 3mm ukuran 1 m x 2 m lembar 47.000,00 51.700,00
4 KalsiBoard tebal = 3mm ukuran 0.5 m x 2 m lembar 24.000,00 26.400,00

113
5 KalsiBoard tebal = 3.5 mm ukuran 1.22 m x 2.44 m lembar 85.000,00 93.500,00
6 KalsiBoard tebal = 3.5 mm ukuran 1.20 m x 2.40 m lembar 82.000,00 90.200,00
7 KalsiBoard tebal = 4.0 mm ukuran 1.22 m x 2.44 m lembar 97.000,00 106.700,00
8 KalsiBoard tebal = 4.0 mm ukuran 1.20 m x 2.40 m lembar 93.000,00 102.300,00
9 KalsiBoard tebal = 4.5 mm ukuran 1.22 m x 2.44 m lembar 117.000,00 128.700,00
10 KalsiBoard tebal = 4.5 mm ukuran 1.20 m x 2.40 m lembar 113.000,00 124.300,00
11 KalsiBoard tebal = 6.0 mm ukuran 1.22 m x 2.44 m lembar 166.000,00 182.600,00
12 KalsiBoard tebal = 6.0 mm ukuran 1.20 m x 2.40 m lembar 159.000,00 174.900,00
13 KalsiBoard tebal = 6.0 mm ukuran 1.20 m x 2.70 m lembar 179.000,00 196.900,00
14 KalsiBoard tebal = 6.0 mm ukuran 1.20 m x 3.00 m lembar 201.000,00 221.100,00
15 Enternit tebal = 4 mm ukuran 1 m x 1 m m2 73.000,00 80.300,00
16 Asbes Semen tebal = 3.5 mm ukuran 1 m x 1 m m2 47.000,00 51.700,00
17 Asbes Semen tebal = 5 mm ukuran 1 m x 1 m m2 45.000,00 49.500,00
18 Hardpleks tebal = 5 mm ukuran 1.20 m x 2.40 m lembar 91.000,00 100.100,00
19 Gypsum tebal = 9 mm ukuran 1.20 m x 2.40 m lembar 105.000,00 115.500,00
20 Gypsum tebal = 12 mm ukuran 1.20 m x 2.40 m lembar 125.000,00 137.500,00
21 GRC Board t = 4 mm ukuran 1.20 m x 2.40 m lembar 72.000,00 79.200,00
22 GRC Board t =6 mm ukuran 1.20 m x 2.40 m lembar 156.000,00 171.600,00
23 GRC Board t =8 mm ukuran 1.20 m x 2.40 m lembar 208.000,00 228.800,00
24 GRC Board t =9 mm ukuran 1.20 m x 2.40 m lembar 308.000,00 338.800,00
25 GRC Board t =12 mm ukuran 1.20 m x 2.40 m lembar 443.000,00 487.300,00
26 GRC Board t =15 mm ukuran 1.20 m x 2.40 m lembar 598.000,00 657.800,00
27 List Plafond Gypsum L = 8 cm P = 2.2 m btg 26.000,00 28.600,00
28 List Plafond Gypsum L = 10 cm P = 2.2 m btg 30.000,00 33.000,00
29 List Plafond Gypsum L = 12 cm P = 2.2 m btg 33.000,00 36.300,00
30 List Plafond Gypsum L = 14 cm P = 2.2 m btg 36.000,00 39.600,00
31 List Plafond Gypsum L = 16 cm P = 2.2 m btg 38.000,00 41.800,00
32 List Plafond Gypsum L = 18 cm P = 2.2 m btg 41.000,00 45.100,00
33 List Plafond Gypsum L = 20 cm P = 2.2 m btg 44.000,00 48.400,00
34 List Plafond Gypsum L = 22 cm P = 2.2 m btg 48.000,00 52.800,00
35 List Plafond Gypsum L = 24 cm P = 2.2 m btg 52.000,00 57.200,00
36 Plafon PVC SHUNDA L= 20 cm t=8 mm m 48.000,00 52.800,00
37 Plafon PVC SHUNDA L= 20 cm t=9 mm m 49.000,00 53.900,00
38 Plafon PVC SHUNDA L= 25 cm t=7 mm m 49.000,00 53.900,00
39 Plafon PVC SHUNDA L= 25 cm t=9 mm m 74.000,00 81.400,00
40 Plafon PVC SHUNDA L= 30 cm t=9 mm m 94.000,00 103.400,00
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN HARGA HARGA
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
41 List Plafon PVC L=1.5 cm P= 4 m btg 87.000,00 95.700,00
42 List Plafon PVC L=3.0 cm P= 4 m btg 114.000,00 125.400,00
43 List Plafon PVC L=3.5 cm P= 4 m btg 133.000,00 146.300,00
44 Hollow Meni t= 0.20 mm 20 x 40 mm P= 4 m btg 15.000,00 16.500,00
45 Hollow Meni t= 0.20 mm 40 x 40 mm P= 4 m btg 19.000,00 20.900,00
46 Hollow Meni t= 0.35 mm 20 x 40 mm P= 4 m btg 25.000,00 27.500,00

114
47 Hollow Meni t= 0.35 mm 40 x 40 mm P= 4 m btg 32.000,00 35.200,00
48 Hollow Meni t= 0.45 mm 20 x 40 mm P= 4 m btg 40.000,00 44.000,00
49 Hollow Meni t= 0.45 mm 40 x 40 mm P= 4 m btg 47.000,00 51.700,00
50 Hollow Galvanis t= 0.25 mm 20 x 40 mm P= 4 m btg 19.000,00 20.900,00
51 Hollow Galvanis t= 0.25 mm 40 x 40 mm P= 4 m btg 23.000,00 25.300,00
52 Hollow Galvanis t= 0.30 mm 20 x 40 mm P= 4 m btg 22.000,00 24.200,00
53 Hollow Galvanis t= 0.30 mm 40 x 40 mm P= 4 m btg 29.000,00 31.900,00
54 Hollow Galvalum t= 0.25 mm 20 x 40 mm P= 4 m btg 21.000,00 23.100,00
55 Hollow Galvalum t= 0.25 mm 40 x 40 mm P= 4 m btg 25.000,00 27.500,00
56 Hollow Galvalum t= 0.35 mm 20 x 40 mm P= 4 m btg 30.000,00 33.000,00
57 Hollow Galvalum t= 0.35 mm 40 x 40 mm P= 4 m btg 36.000,00 39.600,00
58 Tepung Gypsum kg 38.000,00 41.800,00
59 Acustik Amstrong 60 x 120 lbr 25.000,00 27.500,00
60 Cotton Plester bh 24.000,00 26.400,00
61 Cornice Coumpound zak 73.000,00 80.300,00

I. BAHAN LOGAM DAN BAHAN JADINYA


HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
1 Besi Beton U24 dia. 8 mm btg 66.360,00 72.996,00
2 Besi Beton U24 dia. 10 mm btg 103.600,00 113.960,00
3 Besi Beton U24 dia. 12 mm btg 149.800,00 164.780,00
4 Besi Beton U24 dia. 16 mm btg 266.000,00 292.600,00
5 Besi Beton U24 dia. 19 mm btg 375.200,00 412.720,00

115
6 Besi Beton U24 dia. 22 mm btg 501.200,00 551.320,00
7 Besi Beton U24 dia. 25 mm btg 646.800,00 711.480,00
8 Besi Beton U32 dia. 10 mm btg 118.400,00 130.240,00
9 Besi Beton U32 dia. 12 mm btg 171.200,00 188.320,00
10 Besi Beton U32 dia. 16 mm btg 304.000,00 334.400,00
11 Besi Beton U32 dia. 19 mm btg 428.800,00 471.680,00
12 Besi Beton U32 dia. 22 mm btg 572.800,00 630.080,00
13 Besi Beton U32 dia. 25 mm btg 739.200,00 813.120,00
14 Besi Beton Ulir 10 btg 111.000,00 122.100,00
15 Besi Beton Ulir 12 btg 160.500,00 176.550,00
16 Besi Beton Ulir 16 btg 285.000,00 313.500,00
17 Besi Beton Ulir 19 btg 402.000,00 442.200,00
18 Besi Beton Ulir 22 btg 537.000,00 590.700,00
19 Besi Beton Ulir 25 btg 693.000,00 762.300,00
20 Baja U 24 tengangan leleh 2.400 kg/cm2. kg 14.000,00 15.400,00
21 Baja U 32 tengangan leleh 3.200 kg/cm2. kg 16.000,00 17.600,00
22 Baja U 36 tengangan leleh 3.600 kg/cm2. kg 18.000,00 19.800,00
23 Baja U 42 tengangan leleh 4.200 kg/cm2. kg 20.000,00 22.000,00
24 Besi H- Beam kg 21.600,00 23.760,00
25 Besi WF kg 21.600,00 23.760,00
26 Besi Profil kg 18.000,00 19.800,00
27 Besi C Lip Chanel kg 18.000,00 19.800,00
28 Besi Strip kg 18.000,00 19.800,00
29 Kawat Beton kg 28.000,00 30.800,00
30 Kawat Duri kg 88.000,00 96.800,00
31 Kawat Duri 1 Roll = 60 m Rol 275.000,00 302.500,00
32 Kawat Pengikat m' 29.000,00 31.900,00
33 Bronjong Uk.2x1x0.5m; 8x10cm Kawat : anyam 2.7mm, sisi 3.4mm buah 350.000,00 385.000,00
34 Bronjong Uk.2x1x0.5m; 8x10cm Kawat : anyam 3.0mm, sisi 4.0mm buah 420.000,00 462.000,00
35 Bronjong Uk.2 x1x0.5m;10x12cm Kawat : anyam 2.7mm, sisi 3.4mm buah 320.000,00 352.000,00
36 Bronjong Uk.2 x1x0.5m;10x12cm Kawat : anyam 3.0mm, sisi 4.0mm buah 380.000,00 418.000,00
37 Bronjong Uk.2x1x1m; 8x10cm Kawat : anyam 2.7mm, sisi 3.4mm buah 540.000,00 594.000,00
38 Bronjong Uk.2x1x1m; 8x10cm Kawat : anyam 3.0mm, sisi 4.0mm buah 700.000,00 770.000,00
39 Bronjong Uk.2x1x1m; 10x12cm Kawat : anyam 2.7mm, sisi 3.4mm buah 500.000,00 550.000,00
40 Bronjong Uk.2x1x1m ; 10x12cm Kawat : anyam 3.0mm, sisi 4.0mm buah 670.000,00 737.000,00
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
41 Bronjong Uk.3x1x0.5m; 8x10cm Kawat : anyam 2.7mm, sisi 3.4mm buah 540.000,00 594.000,00
42 Bronjong Uk.3x1x0.5m; 8x10cm Kawat : anyam 3.0mm, sisi 4.0mm buah 710.000,00 781.000,00
43 Bronjong Uk.3x1x0.5m;10x12cm Kawat : anyam 2.7mm, sisi 3.4mm buah 500.000,00 550.000,00
44 Bronjong Uk.3x1x0.5m;10x12cm Kawat : anyam 3.0mm, sisi 4.0mm buah 680.000,00 748.000,00
45 Bronjong Uk.2x1x1m;8x10cm Kawat : anyam 3.8mm, sisi 4.5mm buah 790.000,00 869.000,00
46 Kawat Tembaga kg 42.100,00 46.310,00
47 Kawat Kasa 1 x 1 (Putih) m2 18.000,00 19.800,00

116
48 Kawat Harmonika 4 cm m2 33.000,00 36.300,00
49 Kawat Harmonika 2 cm m2 42.000,00 46.200,00
50 Kawat Harmonika 50 x 50 x 3 mm - 1.8 x 30 m Rol 3.382.000,00 3.720.200,00
51 Kawat Harmonika 50 x 50 x 2 mm - 1.8 x 30 m Rol 1.618.000,00 1.779.800,00
52 Kawat Las Listrik kg 44.500,00 48.950,00
53 Kawat Las Listrik Kobe Steel RB 260 - 2.6mm x 5kg Duz 184.000,00 202.400,00
54 Kawat Las Listrik Kobe Steel RB 260 - 3.2mm x 5kg Duz 171.000,00 188.100,00
55 Kawat Las Listrik Niko Steel RD 260 - 2.0mm x 2kg Duz 89.000,00 97.900,00
56 Kawat Las Listrik Niko Steel RD 260 - 2.6mm x 5kg Duz 159.000,00 174.900,00
57 Kawat Las Listrik Niko Steel RD 260 - 3.2mm x 5kg Duz 155.000,00 170.500,00
58 Wiremess M5 m2 49.000,00 53.900,00
59 Wiremess M6 m2 44.000,00 48.400,00
60 Wiremess M7 m2 78.000,00 85800
61 Wiremess M8 m2 74.000,00 81.400,00
62 Wiremess M10 m2 114.000,00 125.400,00
63 Wiremess M5 150x150 - 5,4mx2,1m Lembar 405.000,00 445.500,00
64 Wiremess M6 150x150 - 5,4mx2,1m Lembar 472.000,00 519.200,00
65 Wiremess M7 150x150 - 5,4mx2,1m Lembar 655.000,00 720.500,00
66 Wiremess M8 150x150 - 5,4mx2,1m Lembar 872.000,00 959.200,00
67 Wiremess M10 150x150 - 5,4mx2,1m Lembar 1.395.000,00 1.534.500,00
68 Wiremess M5 150x150 - 54mx2,1m Rol 4.048.000,00 4.452.800,00
69 Wiremess M6 150x150 - 54mx2,1m Rol 5.829.000,00 6.411.900,00
70 Ram Ayam m2 123.000,00 135.300,00
71 Ram Nyamuk Hijau m2 20.000,00 22.000,00
72 Ram Nyamuk Alluminium m2 30.000,00 33.000,00
73 Ram Kawat 1 x 1 (Putih) m2 27.000,00 29.700,00
74 Timah kg 23.000,00 25.300,00
75 Timah Hitam kg 82.000,00 90.200,00
76 Plat Alluminium 0.1 mm 0.1 mm Btg 83.000,00 91.300,00
77 Plat Alluminium 0.2 mm 0.2 mm Btg 85.000,00 93.500,00
78 Plat Alluminium 0.3 mm 0.3 mm Btg 123.000,00 135.300,00
79 Plat Alluminium 0.4 mm 0.4 mm Btg 139.000,00 152.900,00
80 Plat Alluminium 0.5 mm 0.5 mm Btg 239.000,00 262.900,00
81 Plat Alluminium 0.6 mm 0.6 mm Btg 228.000,00 250.800,00
J. BAJA WIDE FLANGE (WF) DAN BAJA H BEAM
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
1 WF 100 x 50 x 5 x 7 mm Panjang = 12m berat = 112 Kg Batang 2.418.000,00 2.659.800,00
2 WF 125 x 60 x 6 x 8 mm Panjang = 12m berat = 158,4 Kg Batang 3.419.000,00 3.760.900,00
3 WF 148 x 100 x 6 x 9 mm Panjang = 12m berat = 253,2 Kg Batang 5.466.000,00 6.012.600,00
4 WF 150 x 75 x 5 x 7 mm Panjang = 12m berat =168 Kg Batang 3.627.000,00 3.989.700,00
5 WF 175 x 90 x 5 x 8 mm Panjang = 12m berat = 217,2 Kg Batang 4.689.000,00 5.157.900,00
6 WF 194 x 150 x 6 x 9 mm Panjang = 12m berat = 367 Kg Batang 7.922.000,00 8.714.200,00
7 WF 198 x 99 x 4,7 x 7 mm Panjang = 12m berat = 218,4 Kg Batang 4.714.000,00 5.185.400,00

117
8 WF 200 x 100 x 5,7 x 8 mm Panjang = 12m berat = 256 Kg Batang 5.526.000,00 6.078.600,00
9 WF 244 x 175 x 7 x 11 mm Panjang = 12m berat = 529 Kg Batang 11.418.000,00 12.559.800,00
10 WF 248 x 124 x 5 x 8 mm Panjang = 12m berat = 308,4 Kg Batang 6.657.000,00 7.322.700,00
11 WF 250 x 125 x 6 x 9 mm Panjang = 12m berat = 355,2 Kg Batang 7.667.000,00 8.433.700,00
12 WF 294 x 200 x 8 x 12 mm Panjang = 12m berat = 681 Kg Batang 14.699.000,00 16.168.900,00
13 WF 298 x 149 x 6 x 8 mm Panjang = 12m berat = 384 Kg Batang 8.289.000,00 9.117.900,00
14 WF 200 x 150 x 6,7 x 9 mm Panjang = 12m berat = 440,4 Kg Batang 9.506.000,00 10.456.600,00
15 WF 346 x 174 x 6 x 9 mm Panjang = 12m berat = 497 Kg Batang 10.728.000,00 11.800.800,00
16 WF 350 x 175 x 7 x 11 mm Panjang = 12m berat = 595,2 Kg Batang 12.847.000,00 14.131.700,00
17 WF 396 x 199 x 7 x 11 mm Panjang = 12m berat = 679,5 Kg Batang 14.667.000,00 16.133.700,00
18 WF 400 x 200 x 8 x 13 mm Panjang = 12m berat = 792 Kg Batang 17.095.000,00 18.804.500,00
19 WF 446 x 199 x 8 x 12 mm Panjang = 12m berat = 794,4 Kg Batang 17.147.000,00 18.861.700,00
20 WF 450 x 200 x 9 x 14 mm Panjang = 12m berat = 912 Kg Batang 19.685.000,00 21.653.500,00
21 WF 500 x 200 x 10 x 16 mm Panjang = 12m berat = 1075 Kg Batang 23.203.000,00 25.523.300,00
22 WF 588 x 300 x 12 x 20 mm Panjang = 12m berat = 1812 Kg Batang 39.111.000,00 43.022.100,00
23 WF 600 x 200 x 11 x 17 mm Panjang = 12m berat = 1272 Kg Batang 27.455.000,00 30.200.500,00
24 WF 700 x 300 x 13 x 24 mm Panjang = 12m berat = 2220 Kg Batang 47.917.000,00 52.708.700,00
25 WF 800 x 300 x 14 x 26 mm Panjang = 12m berat = 2520 Kg Batang 54.392.000,00 59.831.200,00
26 WF 900 x 300 x 16 x 28 mm Panjang = 12m berat = 2916 Kg Batang 62.939.000,00 69.232.900,00
27 H beam 100 x 100 x 6 x 8 mm Panjang = 12m berat = 206 Kg Batang 4.447.000,00 4.891.700,00
28 H beam 125 x 125 x 5 x 7 mm Panjang = 12m berat = 222 Kg Batang 4.792.000,00 5.271.200,00
29 H beam 125 x 125 x 6,5 x 9 mm Panjang = 12m berat = 286 Kg Batang 6.174.000,00 6.791.400,00
30 H beam 150 x 150 x 7 x 10 mm Panjang = 12m berat = 378 Kg Batang 8.159.000,00 8.974.900,00
31 H beam 175 x 175 x 7 x 11 mm Panjang = 12m berat = 482 Kg Batang 10.404.000,00 11.444.400,00
32 H beam 200 x 200 x 8 x 12 mm Panjang = 12m berat = 599 Kg Batang 12.929.000,00 14.221.900,00
33 H beam 250 x 250 x 9 x 14 mm Panjang = 12m berat = 869 Kg Batang 18.757.000,00 20.632.700,00
34 H beam 300 x 300 x 10 x 15 mm Panjang = 12m berat = 1128 Kg Batang 24.347.000,00 26.781.700,00
35 H beam 350 x 350 x 12 x 19 mm Panjang = 12m berat = 1644 Kg Batang 35.485.000,00 39.033.500,00
36 H beam 400 x 400 x 13 x 21 mm Panjang = 12m berat = 2064 Kg Batang 44.550.000,00 49.005.000,00

K. BAJA CANAL
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
1 UNP 50x 38x 5 mm Panjang = 6 m berat =30 kg Batang 486.000,00 534.600,00
2 UNP 65x 42x 5 mm Panjang = 6 m berat =41 kg Batang 664.000,00 730.400,00
3 UNP 75x 40x 5 mm Panjang = 6 m berat =43 kg Batang 697.000,00 766.700,00
4 UNP 80x 45x 5 mm Panjang = 6 m berat =47,76 kg Batang 774.000,00 851.400,00
5 UNP 100x 50x 5 mm Panjang = 6 m berat =56,2 kg Batang 910.000,00 1.001.000,00
6 UNP 100x 50x 6 mm Panjang = 6 m berat =67,5 kg Batang 1.093.000,00 1.202.300,00
7 UNP 120x 55x 7 mm Panjang = 6 m berat =80,4 kg Batang 1.302.000,00 1.432.200,00
8 UNP 125x 65x 6 mm Panjang = 6 m berat =80,4 kg Batang 1.302.000,00 1.432.200,00

118
9 UNP 140x 60x 7 mm Panjang = 6 m berat =96 kg Batang 1.555.000,00 1.710.500,00
10 UNP 150x 75x 6,5 mm Panjang = 6 m berat =112 kg Batang 1.549.000,00 1.703.900,00
11 UNP 160x 65x 7,5 mm Panjang = 6 m berat =115,5 kg Batang 1.870.000,00 2.057.000,00
12 UNP 180x 75x 7 mm Panjang = 6 m berat =128 kg Batang 2.073.000,00 2.280.300,00
13 UNP 200x 80x 7,5 mm Panjang = 6 m berat =148 kg Batang 1.205.000,00 1.325.500,00
14 UNP 250x 90x 9 mm Panjang = 6 m berat =208 kg Batang 3.368.000,00 3.704.800,00
15 UNP 300x 90x 9 mm Panjang = 6 m berat =229 kg Batang 3.708.000,00 4.078.800,00
16 UNP 300x 100x 10 mm Panjang = 6 m berat =526 kg Batang 8.515.000,00 9.366.500,00
17 UNP 180x 70x 8 mm Panjang = 12m berat =271 kg Batang 4.387.000,00 4.825.700,00
18 UNP 200x 70x 8,5 mm Panjang = 12m berat =310 kg Batang 5.019.000,00 5.520.900,00
19 UNP 220x 80x 9 mm Panjang = 12m berat =371 kg Batang 6.006.000,00 6.606.600,00
20 UNP 240x 85x 9,5 mm Panjang = 12m berat =410 kg Batang 6.638.000,00 7.301.800,00
21 UNP 260x 90x 10 mm Panjang = 12m berat =456 kg Batang 7.382.000,00 8.120.200,00
22 UNP 280x 80x 10 mm Panjang = 12m berat =500 kg Batang 8.094.000,00 8.903.400,00
23 UNP 300x 100x 10 mm Panjang = 12m berat =556 kg Batang 9.001.000,00 9.901.100,00
24 UNP 320x 100x 14 mm Panjang = 12m berat =714 kg Batang 11.559.000,00 12.714.900,00
25 UNP 380x 100x 10,5 x16 mm Panjang = 12m berat =670 kg Batang 10.846.000,00 11.930.600,00
26 UNP 400x 110x 14 mm Panjang = 12m berat =862 kg Batang 13.955.000,00 15.350.500,00
27 CNP 60X30X10X1,6 mm Panjang = 6 m berat =9,76 kg Batang 158.000,00 173.800,00
28 CNP 75X35X15X1,6 mm Panjang = 6 m berat =12,4 kg Batang 201.000,00 221.100,00
29 CNP 75 X45X15X1,6 mm Panjang = 6 m berat =13,9 kg Batang 226.000,00 248.600,00
30 CNP 75X45X15X2,3 mm Panjang = 6 m berat =19,5 kg Batang 316.000,00 347.600,00
31 CNP 100X50X20X1,6 mm Panjang = 6 m berat =17,5 kg Batang 284.000,00 312.400,00
32 CNP 100X50X20X2,3 mm Panjang = 6 m berat =24,4 kg Batang 395.000,00 434.500,00
33 CNP 100X50X20X3,2 mm Panjang = 6 m berat =33 kg Batang 535.000,00 588.500,00
34 CNP 125X50X20X2,3 mm Panjang = 6 m berat =27,1 kg Batang 439.000,00 482.900,00
35 CNP 125X50X20X3,2 mm Panjang = 6 m berat =36,8 kg Batang 596.000,00 655.600,00
36 CNP 150X50X20X2,3 mm Panjang = 6 m berat =29,8 kg Batang 483.000,00 531.300,00
37 CNP 150X50X20X3,2 mm Panjang = 6 m berat =40,6 kg Batang 658.000,00 723.800,00
38 CNP 150X65X20X2,3 mm Panjang = 6 m berat =33 kg Batang 535.000,00 588.500,00
39 CNP 150X65X20X3,2 mm Panjang = 6 m berat =45,1 kg Batang 731.000,00 804.100,00
40 CNP 200X75X20X3,2 mm Panjang = 6 m berat =55,6 kg Batang 901.000,00 991.100,00
L. BESI SIKU
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
1 Besi Siku 25 x 25 x 3 mm Panjang = 6 m berat = 6,72 kg Batang 96.000,00 105.600,00
2 Besi Siku 30 x 30 x 3 mm Panjang = 6 m berat = 8,16 kg Batang 116.000,00 127.600,00
3 Besi Siku 40 x 40 x 3 mm Panjang = 6 m berat = 10,92 kg Batang 155.000,00 170.500,00
4 Besi Siku 40 x 40 x 4 mm Panjang = 6 m berat = 14,34 kg Batang 204.000,00 224.400,00
5 Besi Siku 40 x 40 x 5 mm Panjang = 6 m berat = 17,70 kg Batang 251.000,00 276.100,00
6 Besi Siku 45 x 45 x 4 mm Panjang = 6 m berat = 16,44 kg Batang 233.000,00 256.300,00
7 Besi Siku 45 x 45 x 5 mm Panjang = 6 m berat = 20,28 kg Batang 288.000,00 316.800,00
8 Besi Siku 50 x 50 x 4 mm Panjang = 6 m berat = 18,36 kg Batang 261.000,00 287.100,00
9 Besi Siku 50 x 50 x 5 mm Panjang = 6 m berat = 22,62 kg Batang 321.000,00 353.100,00

119
10 Besi Siku 50 x 50 x 6 mm Panjang = 6 m berat = 26,58 kg Batang 377.000,00 414.700,00
11 Besi Siku 60 x 60 x 5 mm Panjang = 6 m berat = 27,30 kg Batang 387.000,00 425.700,00
12 Besi Siku 60 x 60 x 6 mm Panjang = 6 m berat = 32,46 kg Batang 460.000,00 506.000,00
13 Besi Siku 65 x 65 x 6 mm Panjang = 6 m berat = 35,46 kg Batang 503.000,00 553.300,00
14 Besi Siku 70 x 70 x 6 mm Panjang = 6 m berat = 38,28 kg Batang 543.000,00 597.300,00
15 Besi Siku 70 x 70 x 7 mm Panjang = 6 m berat = 44,28 kg Batang 628.000,00 690.800,00
16 Besi Siku 75 x 75 x 6 mm Panjang = 6 m berat = 41,10 kg Batang 583.000,00 641.300,00
17 Besi Siku 75 x 75 x 7 mm Panjang = 6 m berat = 47,64 kg Batang 675.000,00 742.500,00
18 Besi Siku 75 x 75 x 8 mm Panjang = 6 m berat = 54,00 kg Batang 765.000,00 841.500,00
19 Besi Siku 80 x 80 x 6 mm Panjang = 6 m berat = 50,88 kg Batang 721.000,00 793.100,00
20 Besi Siku 80 x 80 x 8 mm Panjang = 6 m berat = 57,66 kg Batang 817.000,00 898.700,00
21 Besi Siku 90 x 90 x 8 mm Panjang = 6 m berat = 57,54 kg Batang 816.000,00 897.600,00
22 Besi Siku 90 x 90 x 9 mm Panjang = 6 m berat = 73,02 kg Batang 1.035.000,00 1.138.500,00
23 Besi Siku 100 x 100 x 8 mm Panjang = 6 m berat = 72,36 kg Batang 1.025.000,00 1.127.500,00
24 Besi Siku 100 x 100 x 10 mm Panjang = 6 m berat = 89,40 kg Batang 1.267.000,00 1.393.700,00
25 Besi Siku 100 x 100 x 11 mm Panjang = 6 m berat = 119,4 kg Batang 1.692.000,00 1.861.200,00
26 Besi Siku 120 x 120 x 12 mm Panjang = 6 m berat = 129,6 kg Batang 1.836.000,00 2.019.600,00
27 Besi Siku 130 x 130 x 12 mm Panjang = 6 m berat = 140,4 kg Batang 1.989.000,00 2.187.900,00
28 Besi Siku 150 x 150 x 12 mm Panjang = 6 m berat = 163,8 kg Batang 2.321.000,00 2.553.100,00
29 Besi Siku 150 x 150 x 15 mm Panjang = 6 m berat = 201,6 kg Batang 2.856.000,00 3.141.600,00
30 Besi Siku 175 x 175 x 15 mm Panjang = 6 m berat = 236,4 kg Batang 3.349.000,00 3.683.900,00
31 Besi Siku 200 x 200 x 15 mm Panjang = 6 m berat = 271,8 kg Batang 3.850.000,00 4.235.000,00
32 Besi Siku 200 x 200 x 20 mm Panjang = 6 m berat = 358,2 kg Batang 5.074.000,00 5.581.400,00

M. BESI PLAT
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
1 Plat Strip 3 x 19mm x 6 Meter berat = 2,68 Kg Batang 44.000,00 48.400,00
2 Plat Strip 3 x 25mm x 6 Meter berat = 3,54 Kg Batang 58.000,00 63.800,00
3 Plat Strip 3 x 30mm x 6 Meter berat = 4,21 Kg Batang 69.000,00 75.900,00
4 Plat Strip 4 x 19mm x 6 Meter berat = 3,56 Kg Batang 58.000,00 63.800,00
5 Plat Strip 4 x 25mm x 6 Meter berat = 4,68 Kg Batang 76.000,00 83.600,00
6 Plat Strip 4 x 30mm x 6 Meter berat = 5,61 Kg Batang 91.000,00 100.100,00
7 Plat Strip 4 x 32mm x 6 Meter berat = 6,00 Kg Batang 98.000,00 107.800,00
8 Plat Strip 4 x 38mm x 6 Meter berat = 7,15 Kg Batang 116.000,00 127.600,00
9 Plat Strip 4 x 50mm x 6 Meter berat = 9,40 Kg Batang 153.000,00 168.300,00
10 Plat Strip 5 x 19mm x 6 Meter berat = 4,50 Kg Batang 73.000,00 80.300,00

120
11 Plat Strip 5 x 25mm x 6 Meter berat = 5,89 Kg Batang 96.000,00 105.600,00
12 Plat Strip 5 x 30mm x 6 Meter berat = 7,06 Kg Batang 115.000,00 126.500,00
13 Plat Strip 5 x 32mm x 6 Meter berat = 7,53 Kg Batang 122.000,00 134.200,00
14 Plat Strip 5 x 38mm x 6 Meter berat = 8,95 Kg Batang 145.000,00 159.500,00
15 Plat Strip 5 x 50mm x 6 Meter berat = 11,77 Kg Batang 191.000,00 210.100,00
16 Plat Strip 6 x 19 mm x 6 Meter berat = 5,37 Kg Batang 87.000,00 95.700,00
17 Plat Strip 6 x 25 mm x 6 Meter berat = 7,10 Kg Batang 115.000,00 126.500,00
18 Plat Strip 6 x 32 mm x 6 Meter berat = 9,05 Kg Batang 147.000,00 161.700,00
19 Plat Strip 6 x 38mm x 6 Meter berat = 10,80 Kg Batang 175.000,00 192.500,00
20 Plat Strip 6x 50mm x 6 Meter berat = 14,15 Kg Batang 230.000,00 253.000,00
21 Plat Strip 6 x 65mm x 6 Meter berat = 18,37 Kg Batang 298.000,00 327.800,00
22 Plat Strip 6 x 75mm x 6 Meter berat = 21,20 Kg Batang 344.000,00 378.400,00
23 Plat Strip 6 x 100 mm x 6 Meter berat = 28,26 Kg Batang 458.000,00 503.800,00
24 Plat Strip 6 x 125mm x 6 Meter berat = 35,30 Kg Batang 572.000,00 629.200,00
25 Plat Strip 6 x 150mm x 6 Meter berat = 42,40 Kg Batang 687.000,00 755.700,00
26 Plat Strip 9 x 25mm x 6 Meter berat = 10,60 Kg Batang 172.000,00 189.200,00
27 Plat Strip 9 x 32mm x 6 Meter berat = 13,56 Kg Batang 220.000,00 242.000,00
28 Plat Strip 9 x 38mm x 6 Meter berat = 16,11 Kg Batang 261.000,00 287.100,00
29 Plat Strip 9 x 50mm x 6 Meter berat = 21,20 Kg Batang 344.000,00 378.400,00
30 Plat Strip 9 x 65mm x 6 Meter berat = 27,55 Kg Batang 446.000,00 490.600,00
31 Plat Strip 9 x 75mm x 6 Meter berat = 31,80 Kg Batang 515.000,00 566.500,00
32 Plat Strip 9x100mm x 6 Meter berat = 42,39 Kg Batang 687.000,00 755.700,00
33 Plat Strip 12 x 25mm x 6 Meter berat = 14,13 Kg Batang 229.000,00 251.900,00
34 Plat Strip 12 x 32mm x 6 Meter berat = 18,09 Kg Batang 293.000,00 322.300,00
35 Plat Strip 12 x 38mm x 6 Meter berat = 21,48 Kg Batang 348.000,00 382.800,00
36 Plat Strip 12 x 50mm x 6 Meter berat = 28,26 Kg Batang 458.000,00 503.800,00
37 Plat Strip 12 x 65mm x 6 Meter berat = 36,74 Kg Batang 595.000,00 654.500,00
38 Plat Strip 12 x 75mm x 6 Meter berat = 42,40 Kg Batang 687.000,00 755.700,00
39 Plat Strip 12 x 100mm x 6 Meter berat = 56,62 Kg Batang 917.000,00 1.008.700,00
40 Plat Strip 16 x 32 mm x 6 Meter berat = 24,12 Kg Batang 391.000,00 430.100,00
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
41 Plat Strip 16 x 38 mm x 6 Meter berat = 28,65 Kg Batang 464.000,00 510.400,00
42 Plat Strip 16 x 32 mm x 6 Meter berat = 24,12 Kg Batang 391.000,00 430.100,00
43 Plat Strip 16 x 38 mm x 6 Meter berat = 28,65 Kg Batang 464.000,00 510.400,00
44 Plat Strip 16 x 50 mm x 6 Meter berat = 37,80 Kg Batang 612.000,00 673.200,00
45 Plat Strip 16 x 65 mm x 6 Meter berat = 49,00 Kg Batang 794.000,00 873.400,00
46 Plat Strip 16 x 75 mm x 6 Meter berat = 56,60 Kg Batang 917.000,00 1.008.700,00
47 Plat Strip 16 x 100mm x 6 Meter berat = 75,50 Kg Batang 1.223.000,00 1.345.300,00
48 Plat Hitam 1,2mm x 1,2m x 2,4m berat = 28 Kg Lembar 510.000,00 561.000,00
49 Plat Hitam 1.35mm x 1,2m x2,4m berat = 31,5 Kg Lembar 574.000,00 631.400,00
50 Plat Hitam 1.4mm x 1,2 m x 2,4m berat = 33 Kg Lembar 601.000,00 661.100,00
51 Plat Hitam 1.5mm x 1,2 m x 2,4m berat = 35 Kg Lembar 638.000,00 701.800,00
52 Plat Hitam 1.6mm x 1,2 m x 2,4m berat = 37,5 Kg Lembar 683.000,00 751.300,00

121
53 Plat Hitam 1.8mm x 1,2 m x 2,4m berat = 42 Kg Lembar 765.000,00 841.500,00
54 Plat Hitam 1.9mm x 1,2 m x 2,4m berat = 45 Kg Lembar 820.000,00 902.000,00
55 Plat Hitam 2mm x 1,2 m x 2,4 m berat = 46,7 Kg Lembar 788.000,00 866.800,00
56 Plat Hitam 2.1mm x 1,2 m x 2,4m berat = 49 Kg Lembar 827.000,00 909.700,00
57 Plat Hitam 2.3mm x 1,2 m x 2,4m berat = 54 Kg Lembar 911.000,00 1.002.100,00
58 Plat Hitam 2.5mm x 1,2 m x 2,4m berat = 58,3 Kg Lembar 984.000,00 1.082.400,00
59 Plat Hitam 2.6mm x 1,2 m x 2,4m berat = 60,7 Kg Lembar 1.024.000,00 1.126.400,00
60 Plat Hitam 2.8mm x 1,2 m x 2,4m berat = 65,3 Kg Lembar 1.102.000,00 1.212.200,00
61 Plat Hitam 2.9mm x 1,2 m x 2,4m berat = 67,7 Kg Lembar 1.142.000,00 1.256.200,00
62 Plat Hitam 3mm x 1,2 m x 2,4 m berat = 70 Kg Lembar 1.181.000,00 1.299.100,00
63 Plat Hitam 3.2mm x 1,2 m x 2,4m berat = 74,7 Kg Lembar 1.260.000,00 1.386.000,00
64 Plat Hitam 3.6mm x 1,2 m x 2,4m berat = 84 Kg Lembar 1.417.000,00 1.558.700,00
65 Plat Hitam 3.8mm x 1,2 m x 2,4m berat = 88,7 Kg Lembar 1.496.000,00 1.645.600,00
66 Plat Hitam 4mm x 1,2 m x 2,4 m berat = 93,32 Kg Lembar 1.574.000,00 1.731.400,00
67 Plat Hitam 4.5mm x 1,2 m x 2,4m berat = 105 Kg Lembar 1.771.000,00 1.948.100,00
68 Plat Hitam 4.8mm x 1,2 m x 2,4m berat = 112 Kg Lembar 1.889.000,00 2.077.900,00
69 Plat Hitam 5mm x 1,2 m x 2,4 m berat = 117 Kg Lembar 1.973.000,00 2.170.300,00
70 Plat Hitam 5.8mm x 1,2m x 2,4 m berat = 135,32 Kg Lembar 2.282.000,00 2.510.200,00
71 Plat Hitam 6mm x 1,2 m x 2,4 m berat = 140 Kg Lembar 2.361.000,00 2.597.100,00
72 Plat Hitam 8mm x 1,2 m x 2,4 m berat = 187 Kg Lembar 3.154.000,00 3.469.400,00
73 Plat Hitam 9mm x 1,2 m x 2,4 m berat = 210 Kg Lembar 3.542.000,00 3.896.200,00
74 Plat Hitam 10mm x 1,2 m x 2,4 m berat = 233,3 Kg Lembar 3.935.000,00 4.328.500,00
75 Plat Hitam 11mm x 1,2 m x 2,4 m berat = 256,62 Kg Lembar 4.328.000,00 4.760.800,00
76 Plat Hitam 12mm x 1,2 m x 2,4 m berat = 280 Kg Lembar 4.722.000,00 5.194.200,00
77 Plat Hitam 13mm x 1,2 m x 2,4 m berat = 303,3 Kg Lembar 5.115.000,00 5.626.500,00
78 Plat Hitam 14mm x 1,2 m x 2,4 m berat = 326,62 Kg Lembar 5.508.000,00 6.058.800,00
79 Plat Hitam 15mm x 1,2 m x 2,4 m berat = 350 Kg Lembar 5.902.000,00 6.492.200,00
80 Plat Hitam 16mm x 1,2 m x 2,4 m berat = 373 Kg Lembar 6.290.000,00 6.919.000,00
81 Plat Hitam 18mm x 1,2 m x 2,4 m berat = 420 Kg Lembar 7.083.000,00 7.791.300,00
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
82 Plat Hitam 19mm x 1,2 m x 2,4 m berat = 443,3 Kg Lembar 7.476.000,00 8.223.600,00
83 Plat Hitam 20mm x 1,2 m x 2,4 m berat = 467 Kg Lembar 7.875.000,00 8.662.500,00
84 Plat Hitam 21mm x 1,2 m x 2,4 m berat = 490 Kg Lembar 8.263.000,00 9.089.300,00
85 Plat Hitam 22mm x 1,2 m x 2,4 m berat = 513,3 Kg Lembar 8.656.000,00 9.521.600,00
86 Plat Hitam 24mm x 1,2 m x 2,4 m berat = 560 Kg Lembar 9.443.000,00 10.387.300,00
87 Plat Hitam 25mm x 1,2 m x 2,4 m berat = 583,3 Kg Lembar 9.836.000,00 10.819.600,00
88 Plat Hitam 28mm x 1,2 m x 2,4 m berat = 653,24 Kg Lembar 11.016.000,00 12.117.600,00
89 Plat Hitam 30mm x 1,2 m x 2,4 m berat = 700 Kg Lembar 11.804.000,00 12.984.400,00
90 Plat Hitam 31mm x 1,2 m x 2,4 m berat = 723,3 Kg Lembar 12.197.000,00 13.416.700,00
91 Plat Hitam 32mm x 1,2 m x 2,4 m berat = 747 Kg Lembar 12.597.000,00 13.856.700,00
92 Plat Hitam 38mm x 1,2 m x 2,4 m berat = 887 Kg Lembar 14.958.000,00 16.453.800,00
93 Plat Hitam 40mm x 1,2 m x 2,4 m berat = 933,2 Kg Lembar 15.737.000,00 17.310.700,00
94 Plat Hitam 42mm x 1,2 m x 2,4 m berat = 980 Kg Lembar 16.526.000,00 18.178.600,00

122
95 Plat Hitam 45mm x 1,2 m x 2,4 m berat = 1050 Kg Lembar 17.706.000,00 19.476.600,00
96 Plat Hitam 50mm x 1,2 m x 2,4 m berat = 1167 Kg Lembar 19.679.000,00 21.646.900,00
97 Plat Hitam 65mm x 1,2 m x 2,4 m berat = 1516,5 Kg Lembar 25.572.000,00 28.129.200,00
98 Plat Hitam 75mm x 1,2 m x 2,4 m berat = 1750 Kg Lembar 29.510.000,00 32.461.000,00
99 Plat Hitam 80mm x 1,2 m x 2,4 m berat = 1870 Kg Lembar 31.533.000,00 34.686.300,00
100 Plat Hitam 85mm x 1,2 m x 2,4 m berat = 1983,1 Kg Lembar 33.441.000,00 36.785.100,00
101 Plat Hitam 90mm x 1,2 m x 2,4 m berat = 2100 Kg Lembar 35.412.000,00 38.953.200,00
102 Plat Hitam 100mm x 1,2m x 2,4m berat = 2333 Kg Lembar 39.341.000,00 43.275.100,00
103 Besi Plat Bordes 2,0 mm Uk.1,2m x 2,4m berat = 51,7 Kg Lembar 1.082.000,00 1.190.200,00
104 Besi Plat Bordes 2,3 mm Uk.1,2m x 2,4m berat = 59 Kg Lembar 1.234.000,00 1.357.400,00
105 Besi Plat Bordes 3,0 mm Uk.1,2m x 2,4m berat = 75 Kg Lembar 1.569.000,00 1.725.900,00
106 Besi Plat Bordes 3,2 mm Uk.1,2m x 2,4m berat = 79,6 Kg Lembar 1.665.000,00 1.831.500,00
107 Besi Plat Bordes 4,5 mm Uk.1,2m x 2,4m berat = 110 Kg Lembar 2.301.000,00 2.531.100,00
108 Besi Plat Bordes 6,0 mm Uk.1,2m x 2,4m berat = 145 Kg Lembar 3.032.000,00 3.335.200,00
109 Besi Plat Bordes 8,0 mm Uk.1,2m x 2,4m berat = 192 Kg Lembar 4.015.000,00 4.416.500,00
110 Besi Plat Bordes 9,0 mm Uk.1,2m x 2,4m berat = 215 Kg Lembar 4.496.000,00 4.945.600,00

N. SENG
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
1 Seng BJLS tebal = 0.40 mm Uk.1.2mx2.4m berat = 10.05 kg Lembar 521.000,00 573.100,00
2 Seng BJLS tebal = 0.45 mm Uk.1.2mx2.4m berat = 11.21 kg Lembar 581.000,00 639.100,00
3 Seng BJLS tebal = 0.50 mm Uk.1.2mx2.4m berat = 12.38 kg Lembar 642.000,00 706.200,00
4 Seng BJLS tebal = 0.60 mm Uk.1.2mx2.4m berat = 14.90 kg Lembar 768.000,00 844.800,00
5 Seng BJLS tebal = 0.70 mm Uk.1.2mx2.4m berat = 17.23 kg Lembar 888.000,00 976.800,00
6 Seng BJLS tebal = 0.75 mm Uk.1.2mx2.4m berat = 18.40 kg Lembar 949.000,00 1.043.900,00
7 Seng BJLS tebal = 0.80 mm Uk.1.2mx2.4m berat = 19.57 kg Lembar 1.009.000,00 1.109.900,00
8 Seng BJLS tebal = 0.90 mm Uk.1.2mx2.4m berat = 21.90 kg Lembar 1.129.000,00 1.241.900,00
9 Seng BJLS tebal = 1.00 mm Uk.1.2mx2.4m berat = 24.23 kg Lembar 1.243.000,00 1.367.300,00
10 Seng BJLS tebal = 1.10 mm Uk.1.2mx2.4m berat = 26.56 kg Lembar 1.362.000,00 1.498.200,00
11 Seng BJLS tebal = 1.20 mm Uk.1.2mx2.4m berat = 28.90 kg Lembar 1.482.000,00 1.630.200,00
12 Seng BJLS tebal = 1.40 mm Uk.1.2mx2.4m berat = 33.56 kg Lembar 1.716.000,00 1.887.600,00
13 Seng BJLS tebal = 1.50 mm Uk.1.2mx2.4m berat = 35.90 kg Lembar 1.836.000,00 2.019.600,00

123
14 Seng BJLS tebal = 1.60 mm Uk.1.2mx2.4m berat = 38.23 kg Lembar 1.955.000,00 2.150.500,00
15 Seng BJLS tebal = 1.80 mm Uk.1.2mx2.4m berat = 42.89 kg Lembar 2.193.000,00 2.412.300,00
16 Seng BJLS tebal = 2.00 mm Uk.1.2mx2.4m berat = 47.56 kg Lembar 2.432.000,00 2.675.200,00
17 Seng BJLS tebal = 2.30 mm Uk.1.2mx2.4m berat = 54.79 kg Lembar 2.757.000,00 3.032.700,00
18 Seng BJLS tebal = 2.50 mm Uk.1.2mx2.4m berat = 59.45 kg Lembar 2.992.000,00 3.291.200,00
19 Seng BJLS tebal = 2.60 mm Uk.1.2mx2.4m berat = 61.78 kg Lembar 3.109.000,00 3.419.900,00
20 Seng BJLS tebal = 2.80 mm Uk.1.2mx2.4m berat = 66.45 kg Lembar 3.344.000,00 3.678.400,00
21 Seng BJLS tebal = 3.00 mm Uk.1.2mx2.4m berat = 71.12 kg Lembar 3.579.000,00 3.936.900,00
22 Seng BJLS tebal = 3.20 mm Uk.1.2mx2.4m berat = 75.78 kg Lembar 3.814.000,00 4.195.400,00
23 Seng BJLS tebal = 3.60 mm Uk.1.2mx2.4m berat = 63.82 kg Lembar 3.212.000,00 3.533.200,00
24 Seng BJLS tebal = 3.80 mm Uk.1.2mx2.4m berat = 67.32 kg Lembar 3.388.000,00 3.726.800,00
25 Seng BJLS tebal = 0.40 mm Ukuran Lebar = 1,219 m per meter 225.000,00 247.500,00
26 Seng BJLS tebal = 0.45 mm Ukuran Lebar = 1,219 m per meter 251.000,00 276.100,00
27 Seng BJLS tebal = 0.50 mm Ukuran Lebar = 1,219 m per meter 277.000,00 304.700,00
28 Seng BJLS tebal = 0.60 mm Ukuran Lebar = 1,219 m per meter 331.000,00 364.100,00
29 Seng BJLS tebal = 0.70 mm Ukuran Lebar = 1,219 m per meter 383.000,00 421.300,00
30 Seng BJLS tebal = 0.75 mm Ukuran Lebar = 1,219 m per meter 409.000,00 449.900,00
31 Seng BJLS tebal = 0.80 mm Ukuran Lebar = 1,219 m per meter 434.000,00 477.400,00
32 Seng BJLS tebal = 0.90 mm Ukuran Lebar = 1,219 m per meter 486.000,00 534.600,00
33 Seng BJLS tebal = 1.00 mm Ukuran Lebar = 1,219 m per meter 536.000,00 589.600,00
34 Seng Gelombang BJLS uk: 0,25 mm x 80 cm x 180 cm Lembar 70.000,00 77.000,00
35 Seng Gelombang BJLS uk: 0,25 mm x 80 cm x 210 cm Lembar 96.000,00 105.600,00
36 Seng Gelombang BJLS uk: 0,25 mm x 80 cm x 240 cm Lembar 110.000,00 121.000,00
37 Seng Gelombang BJLS uk: 0,25 mm x 80 cm x 300 cm Lembar 149.000,00 163.900,00
38 Seng Gelombang BJLS uk: 0,30 mm x 80 cm x 180 cm Lembar 96.000,00 105.600,00
39 Seng Gelombang BJLS uk: 0,30 mm x 80 cm x 210 cm Lembar 108.000,00 118.800,00
40 Seng Gelombang BJLS uk: 0,30 mm x 80 cm x 240 cm Lembar 135.000,00 148.500,00
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
41 Seng Gelombang BJLS uk: 0,30 mm x 80 cm x 300 cm Lembar 156.000,00 171.600,00
42 Seng Plat BJLS Tebal 0.30 mm Lebar 60 cm m 65.000,00 71.500,00
43 Seng Plat BJLS Tebal 0.35 mm Lebar 60 cm m 79.000,00 86.900,00
44 Seng Plat BJLS Tebal 0.40 mm Lebar 60 cm m 92.000,00 101.200,00
45 Seng Plat BJLS Tebal 0.30 mm Lebar 90 cm m 71.000,00 78.100,00
46 Seng Plat BJLS Tebal 0.35 mm Lebar 90 cm m 84.000,00 92.400,00
47 Seng Plat BJLS Tebal 0.40 mm Lebar 90 cm m 98.000,00 107.800,00
48 Seng Plat BJLS Tebal 0.30 mm Lebar 120 cm m 81.000,00 89.100,00
49 Seng Plat BJLS Tebal 0.35 mm Lebar 120 cm m 95.000,00 104.500,00
50 Seng Plat BJLS Tebal 0.40 mm Lebar 120 cm m 108.000,00 118.800,00
51 Seng Plat BJLS ( 1 rol 25 m' ) Tebal 0.30 mm Lebar 60 cm roll 1.625.000,00 1.787.500,00
52 Seng Plat BJLS ( 1 rol 25 m' ) Tebal 0.30 mm Lebar 90 cm roll 1.775.000,00 1.952.500,00

124
O. BESI PIPA
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
1 Besi Pipa Galvanis 0.5" 0.5" x 0.80 Batang 48.500,00 53.350,00
2 0.5" x 1.10 Batang 82.100,00 90.310,00
3 0.5" x 1.50 Batang 108.800,00 119.680,00
4 0.5" x 1.70 Batang 115.400,00 126.940,00
5 0.5" x 2.00 Batang 153.100,00 168.410,00
6 Besi Pipa Galvanis 0.75" 0.75" x 0.80 Batang 72.700,00 79.970,00
7 0.75" x 1.10 Batang 109.000,00 119.900,00
8 0.75" x 1.50 Batang 144.200,00 158.620,00
9 0.75" x 1.70 Batang 152.200,00 167.420,00
10 0.75" x 2.00 Batang 179.300,00 197.230,00
11 Besi Pipa Galvanis 1" 1.0" x 0.80 Batang 102.900,00 113.190,00
12 1.0" x 1.10 Batang 135.400,00 148.940,00
13 1.0" x 1.50 Batang 182.000,00 200.200,00
14 1.0" x 1.70 Batang 189.600,00 208.560,00
15 1.0" x 2.00 Batang 244.100,00 268.510,00

125
16 Besi Pipa Galvanis 1.25" 1.25" x 1.10 Batang 173.100,00 190.410,00
17 1.25" x 1.50 Batang 230.800,00 253.880,00
18 1.25" x 1.70 Batang 244.100,00 268.510,00
19 1.25" x 2.00 Batang 317.300,00 349.030,00
20 Besi Pipa Galvanis 1.5" 1.5" x 0.80 Batang 153.300,00 168.630,00
21 1.5" x 1.10 Batang 189.100,00 208.010,00
22 1.5" x 1.50 Batang 259.600,00 285.560,00
23 1.5" x 1.70 Batang 324.700,00 357.170,00
24 1.5" x 2.00 Batang 355.000,00 390.500,00
25 Besi Pipa Galvanis 2" 2.0" x 0.80 Batang 189.600,00 208.560,00
26 2.0" x 1.10 Batang 241.900,00 266.090,00
27 2.0" x 1.50 Batang 328.400,00 361.240,00
28 2.0" x 1.70 Batang 397.400,00 437.140,00
29 2.0" x 2.00 Batang 454.800,00 500.280,00
30 2.0" x 2.80 Batang 632.300,00 695.530,00
31 Besi Pipa Galvanis 2.5" 2.5" x 0.90 Batang 342.900,00 377.190,00
32 2.5" x 1.10 Batang 351.000,00 386.100,00
33 2.5" x 1.50 Batang 432.600,00 475.860,00
34 2.5" x 1.70 Batang 522.400,00 574.640,00
35 2.5" x 2.00 Batang 565.800,00 622.380,00
36 2.5" x 2.80 Batang 787.600,00 866.360,00
37 Besi Pipa Galvanis 3" 3.0" x 1.10 Batang 433.700,00 477.070,00
38 3.0" x 1.30 Batang 443.700,00 488.070,00
39 3.0" x 1.50 Batang 470.400,00 517.440,00
40 3.0" x 2.00 Batang 687.800,00 756.580,00
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
41 3.0" x 2.80 Batang 942.900,00 1.037.190,00
42 Besi Pipa Galvanis 4" 4.0" x 2.00 Batang 1.012.500,00 1.113.750,00
43 Pipa Hitam 0.5" SCH 40 t= 2.77 mm Batang 149.200,00 164.120,00
44 Pipa Hitam 0.75" SCH 40 t= 2.87 mm Batang 196.300,00 215.930,00
45 Pipa Hitam 1" SCH 40 t= 3.35 mm Batang 290.500,00 319.550,00
46 Pipa Hitam 1.25" SCH 40 t= 3.56 mm Batang 396.500,00 436.150,00
47 Pipa Hitam 1.5" SCH 40 t= 3.68 mm Batang 471.000,00 518.100,00
48 Pipa Hitam 2" SCH 40 t= 3.91 mm Batang 630.000,00 693.000,00
49 Pipa Hitam 3" SCH 40 t= 5.49 mm Batang 1.307.000,00 1.437.700,00
50 Pipa Hitam 4" SCH 40 t= 6.02 mm Batang 1.858.500,00 2.044.350,00
51 Pipa Hitam 5" SCH 40 t= 6.55 mm Batang 2.515.800,00 2.767.380,00
52 Pipa Hitam 6" SCH 40 t= 7.11 mm Batang 3.251.800,00 3.576.980,00
53 Pipa Hitam 8" SCH 40 t= 8.18 mm Batang 4.974.900,00 5.472.390,00
54 Pipa Hitam 0.5" SCH 80 t= 3.73 mm Batang 312.600,00 343.860,00
55 Pipa Hitam 0.75" SCH 80 t= 3.91 mm Batang 403.400,00 443.740,00
56 Pipa Hitam 1" SCH 80 t= 4.55 mm Batang 524.400,00 576.840,00
57 Pipa Hitam 1.25" SCH 80 t= 4.85 mm Batang 705.900,00 776.490,00

126
58 Pipa Hitam 1.5" SCH 80 t= 5.08 mm Batang 877.300,00 965.030,00
59 Pipa Hitam 2" SCH 80 t= 5.54 mm Batang 1.101.200,00 1.211.320,00
60 Pipa Hitam 2.5" SCH 80 t= 7.01 mm Batang 1.714.300,00 1.885.730,00
61 Pipa Hitam 3" SCH 80 t= 7.62 mm Batang 2.073.200,00 2.280.520,00
62 Pipa Hitam 4" SCH 80 t= 8.56 mm Batang 3.128.100,00 3.440.910,00
63 Pipa Hitam 5" SCH 80 t= 9.53 mm Batang 4.330.500,00 4.763.550,00
64 Pipa Hitam 6" SCH 80 t= 10.97 mm Batang 5.831.900,00 6.415.090,00
65 Pipa Hitam 8" SCH 80 t= 12.7 mm Batang 8.210.300,00 9.031.330,00
66 Besi Pipa Hitam 0.5" t = 0.80 mm Batang 47.900,00 52.690,00
67 t = 1.10 mm Batang 66.000,00 72.600,00
68 t = 1.40 mm Batang 77.700,00 85.470,00
69 t = 1.70 mm Batang 81.700,00 89.870,00
70 t = 2.00 mm Batang 121.100,00 133.210,00
71 Besi Pipa Hitam 0.75" t = 0.80 mm Batang 57.500,00 63.250,00
72 t = 1.40 mm Batang 93.800,00 103.180,00
73 t = 1.70 mm Batang 98.900,00 108.790,00
74 t = 2.00 mm Batang 147.300,00 162.030,00
75 Besi Pipa Hitam 1" t = 0.60 mm Batang 70.500,00 77.550,00
76 t = 0.80 mm Batang 91.800,00 100.980,00
77 t = 1.10 mm Batang 102.900,00 113.190,00
78 t = 1.40 mm Batang 121.100,00 133.210,00
79 t = 1.70 mm Batang 128.500,00 141.350,00
80 t = 2.00 mm Batang 168.000,00 184.800,00
81 Besi Pipa Hitam 1.25" t = 1.40 mm Batang 154.100,00 169.510,00
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
82 t = 2.00 mm Batang 197.600,00 217.360,00
83 Besi Pipa Hitam 1.5" t = 0.80 mm Batang 119.700,00 131.670,00
84 t = 1.40 mm Batang 180.600,00 198.660,00
85 t = 1.70 mm Batang 193.700,00 213.070,00
86 t = 2.00 mm Batang 211.800,00 232.980,00
87 Besi Pipa Hitam 2" t = 0.80 mm Batang 137.600,00 151.360,00
88 t = 1.10 mm Batang 211.800,00 232.980,00
89 t = 1.40 mm Batang 227.900,00 250.690,00
90 t = 1.70 mm Batang 240.000,00 264.000,00
91 t = 2.00 mm Batang 302.600,00 332.860,00
92 Besi Pipa Hitam 2.5" t = 1.10 mm Batang 270.600,00 297.660,00
93 t = 1.40 mm Batang 292.500,00 321.750,00
94 t = 1.70 mm Batang 308.500,00 339.350,00
95 t = 2.00 mm Batang 403.400,00 443.740,00
96 Besi Pipa Hitam 3" t = 1.10 mm Batang 318.400,00 350.240,00
97 t = 1.40 mm Batang 342.900,00 377.190,00
98 t = 1.70 mm Batang 363.100,00 399.410,00
100 t = 2.00 mm Batang 504.200,00 554.620,00

127
101 Besi Pipa Hitam 4" t = 1.10 mm Batang 453.800,00 499.180,00
102 t = 1.40 mm Batang 524.400,00 576.840,00
103 t = 1.70 mm Batang 645.400,00 709.940,00

P. BESI HOLLOW
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
1 Besi Hollow 20 x 20 x 0.8 btg 71.000,00 78.100,00
2 Besi Hollow 20 x 20 x 1.0 btg 74.000,00 81.400,00
3 Besi Hollow 20 x 20 x 1.2 btg 82.000,00 90.200,00
4 Besi Hollow 20 x 20 x 1.4 btg 85.000,00 93.500,00
5 Besi Hollow 20 x 20 x 1.6 btg 96.000,00 105.600,00
6 Besi Hollow 20 x 20 x 2.0 btg 89.000,00 97.900,00
7 Besi Hollow 25 x 25 x 0.8 btg 134.000,00 147.400,00
8 Besi Hollow 25 x 25 x 1.0 btg 147.000,00 161.700,00
9 Besi Hollow 25 x 25 x 1.2 btg 110.000,00 121.000,00
10 Besi Hollow 25 x 25 x 1.6 btg 136.000,00 149.600,00
11 Besi Hollow 25 x 25 x 1.8 btg 167.000,00 183.700,00
12 Besi Hollow 20 x 40 x 0.8 btg 54.000,00 59.400,00
13 Besi Hollow 20 x 40 x 1.0 btg 80.000,00 88.000,00
14 Besi Hollow 20 x 40 x 1.3 btg 84.000,00 92.400,00
15 Besi Hollow 20 x 40 x 1.6 btg 59.000,00 64.900,00
16 Besi Hollow 20x 40x 1.8 btg 77.000,00 84.700,00
17 Besi Hollow 30 x 60 x 1.8 btg 398.000,00 437.800,00
18 Besi Hollow 30 x 60 x 1.6 btg 210.000,00 231.000,00

128
19 Besi Hollow 30 x 30 x 0.8 btg 73.000,00 80.300,00
20 Besi Hollow 30 x 30 x 1.0 btg 94.000,00 103.400,00
21 Besi Hollow 30 x 30 x 1.3 btg 115.000,00 126.500,00
22 Besi Hollow 30 x 30 x 1.6 btg 141.000,00 155.100,00
23 Besi Hollow 30 x 30 x 1.8 btg 146.000,00 160.600,00
24 Besi Hollow 40 x 60 x 1.8 btg 261.000,00 287.100,00
25 Besi Hollow 40 x 60 x 1.6 btg 22.000,00 24.200,00
26 Besi Hollow 40 x 40 x 1.8 btg 119.000,00 130.900,00
27 Besi Hollow 40 x 40 x 1.6 btg 125.000,00 137.500,00
28 Besi Hollow 40 x 40 x 1.3 btg 145.000,00 159.500,00
29 Besi Hollow 40 x 40 x 1.0 btg 181.000,00 199.100,00
30 Besi Hollow 40 x 40 x 0.8 btg 65.000,00 71.500,00
31 Besi Hollow 50 x 50 x 1.3 btg 214.000,00 235.400,00
32 Besi Hollow 50 x 50 x 1.6 btg 330.000,00 363.000,00
33 Besi Hollow 50 x 50 x 1.8 btg 262.000,00 288.200,00
34 Besi Hollow 60 x 60 x 1.6 btg 220.000,00 242.000,00
35 Besi Hollow 60 x 60 x 1.8 btg 453.000,00 498.300,00

Q. BAHAN PAKU DAN MUR BAUT


HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
1 Paku 1 cm s/d 3 cm kg 33.000,00 36.300,00
2 Paku 4 cm s/d 7 cm kg 24.000,00 26.400,00
3 Paku 8 cm s/d 15 cm kg 24.000,00 26.400,00
4 Paku Beton 2 cm s/d 5 cm bh 2.400,00 2.640,00
5 Paku Kait Lengkap bh 2.600,00 2.860,00
6 Paku Cacing kg 57.000,00 62.700,00
7 Paku GRC kg 50.000,00 55.000,00
8 Paku Gypsum kg 74.000,00 81.400,00
9 Paku Hak Panjang 15 cm kg 77.000,00 84.700,00
10 Paku Sekrup 3" bh 1.000,00 1.100,00
11 Besi Beugeul Kuda-kuda kg 58.000,00 63.800,00
12 Duk Angker bh 94.000,00 103.400,00
13 Angkur 16 x 40 dia. 16 - Panjang 40 cm bh 35.000,00 38.500,00
14 Angkur 16 x 50 dia. 16 - Panjang 50 cm bh 35.000,00 38.500,00
15 Angkur 16 x 60 dia. 16 - Panjang 60 cm bh 40.000,00 44.000,00
16 Angkur 19 x 40 dia. 19 - Panjang 40 cm bh 45.000,00 49.500,00
17 Angkur 19 x 50 dia. 19 - Panjang 50 cm bh 48.000,00 52.800,00
18 Angkur 19 x 60 dia. 19 - Panjang 60 cm bh 58.000,00 63.800,00
19 Angkur 22 x 40 dia. 22 - Panjang 40 cm bh 60.000,00 66.000,00

129
20 Angkur 22 x 50 dia. 22 - Panjang 50 cm bh 77.000,00 84.700,00
21 Angkur 22 x 60 dia. 22 - Panjang 60 cm bh 84.000,00 92.400,00
22 Angkur 25 x 40 dia. 25 - Panjang 40 cm bh 81.000,00 89.100,00
23 Angkur 25 x 50 dia. 25 - Panjang 50 cm bh 96.000,00 105.600,00
24 Angkur 25 x 60 dia. 25 - Panjang 60 cm bh 112.000,00 123.200,00
25 Mur Baut HTB dia. 19 s/d 16 (5 cm) bh 7.000,00 7.700,00
26 Mur Baut Biasa dia. 19 s/d 16 (5 cm) bh 7.000,00 7.700,00
27 Piser dia. 12 s/d 20 cm bh 13.000,00 14.300,00
28 Ramset / Dinabolt bh 5.000,00 5.500,00
29 Baut Besar bh 32.000,00 35.200,00
30 Baut Kecil bh 17.000,00 18.700,00
31 Sekrup Fixer bh 32.000,00 35.200,00
32 Paku Skrup 5 cm kg 56.000,00 61.600,00
33 Paku Seng kg 48.000,00 52.800,00

R. BAHAN ATAP
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
1 Atap Plastik Gelombang 80 x 180 lbr 69.000,00 75.900,00
2 Atap Fiber Glass Tipis 80 x 180 (Gelombang) lbr 74.000,00 81.400,00
3 Atap Fiber Glass Tebal 80 x 180 (Gelombang) lbr 82.000,00 90.200,00
4 Atap Aluminium Emmboss Lebar =1.219 m t=0.40 mm m' 114.000,00 125.400,00
5 Atap Aluminium Emmboss Lebar =1.219 m t=0.45 mm m' 126.000,00 138.600,00
6 Atap Aluminium Emmboss Lebar =1.219 m t=0.50 mm m' 137.000,00 150.700,00
7 Atap Aluminium Emmboss Lebar =1.219 m t=0.55 mm m' 149.000,00 163.900,00
8 Atap Aluminium Emmboss Lebar =1.219 m t=0.70 mm m' 183.000,00 201.300,00
9 Atap ZincAlumunium Lebar =1.219 m t=0.30 mm m' 80.000,00 88.000,00
12 Atap ZincAlumunium Lebar =1.219 m t=0.35 mm m' 91.000,00 100.100,00
11 Atap ZincAlumunium Lebar =1.219 m t=0.40 mm m' 100.000,00 110.000,00
10 Atap ZINCALUME Lebar =1.219 m t=0.30 mm m' 85.000,00 93.500,00
13 Atap ZINCALUME Lebar =1.219 m t=0.35 mm m' 96.000,00 105.600,00
16 Atap ZINCALUME Lebar =1.219 m t=0.40 mm m' 108.000,00 118.800,00
14 Atap ZINCALUME Lebar =1.219 m t=0.45 mm m' 122.000,00 134.200,00
15 Atap ZINCALUME Lebar =1.219 m t=0.50 mm m' 134.000,00 147.400,00
16 Atap Tegola Kubota Lengkap m2 719.000,00 790.900,00
17 Atap Tegola Kubota Kwalitas sedang m2 444.000,00 488.400,00
18 Atap Onduline Classic 200cm x 95cm T= 3mm lbr 238.000,00 261.800,00
19 Atap Onduvilla 106cm x 40cm T= 3mm lbr 75.000,00 82.500,00

130
20 Atap Onduline Tile Onduline Tile lbr 201.000,00 221.100,00
21 Nok / Ridge Onduline 100 X 50 cm lbr 135.000,00 148.500,00
22 Penutup Samping / Verge lbr 109.000,00 119.900,00
23 Paku Sekrup Atap bh 2.000,00 2.200,00
24 Atap UPVC Advanguard Lebar 1.13m Tebal 2mm m 230.000,00 253.000,00
25 Atap UPVC Advanguard Lebar 1.13m Tebal 1.5mm m 291.000,00 320.100,00
26 Atap UPVC Advanguard Lebar 0.82 m, Tebal 10mm m 257.000,00 282.700,00
27 Atap UPVC Alderon Doff * Lebar 0.82m, Tebal 10mm m 183.000,00 201.300,00
28 Atap UPVC Alderon RS Lebar 0.78 m, Tebal 1.2mm m 81.000,00 89.100,00
29 Atap UPVC Formax Doff Lebar1.13m Tebal 2.5mm m 196.000,00 215.600,00
30 Atap UPVC Formax Lebar1.13m Tebal 2.5mm m 277.000,00 304.700,00
31 Atap UPVC Sun Panel Doff Lebar 0.82 m, Tebal 10mm m 183.000,00 201.300,00
32 Atap UPVC Sun Panel Lebar 0.82m, Tebal 10mm m 223.000,00 245.300,00
33 Atap Genteng Plentong Pres Bakar KW 1 bh 3.000,00 3.300,00
34 Atap Genteng Plentong Pres Molen Oven KW 2 bh 11.000,00 12.100,00
35 Atap Genteng Flam pres Molen Oven Jatiwangi bh 315.000,00 346.500,00
36 Aluminium Foil m2 24.000,00 26.400,00
37 Genteng Metal Rainbow Roof m2 52.000,00 57.200,00
38 Genteng Metal Hana m2 46.000,00 50.600,00
39 Genteng Beton Warna 14.5/m2 m2 12.000,00 13.200,00
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
40 Genteng Beton Natural m2 11.000,00 12.100,00
41 Genteng Kodok bh 4.000,00 4.400,00
42 Genteng Murando Natural 1 m2 = 18 buah bh 5.000,00 5.500,00
43 Genteng Murando Glasur 1 m2 = 18 buah bh 6.000,00 6.600,00
44 Bubungan Genteng ex Jatiwangi pres Bulat bh 6.000,00 6.600,00
45 Bubungan Genteng ex Jatiwangi Segitiga bh 14.000,00 15.400,00
46 Bubungan Genteng Beton bh 22.000,00 24.200,00
47 Bubungan Murando Natural bh 12.000,00 13.200,00
48 Bubungan Murando Glasur bh 12.000,00 13.200,00
49 Bubungan Genteng Keramik bh 17.000,00 18.700,00
50 Bubungan Genteng Kodok bh 16.000,00 17.600,00
51 Bubungan Genteng Plentong bh 10.000,00 11.000,00
52 Bubungan Stel Gelombang bh 31.000,00 34.100,00
53 Genteng Keramik KIA (S-1 Standard Standard) bh 26.000,00 28.600,00
54 Genteng Keramik KIA (S-1 Standard Spesial) bh 29.000,00 31.900,00
55 Genteng Keramik KIA (S-1 Standard Premium) bh 36.000,00 39.600,00
56 Genteng Keramik KIA (S-1 Standard Exlusive) bh 41.000,00 45.100,00
57 Genteng Keramik KIA (S-2 Nok Unglassed) bh 35.000,00 38.500,00
58 Genteng Keramik KIA (S-2 Nok Natural) bh 37.000,00 40.700,00
59 Genteng Keramik KIA (S-2 Nok Standard) bh 40.000,00 44.000,00
60 Genteng Keramik KIA (S-2 Nok Spesial) bh 43.000,00 47.300,00
61 Genteng Keramik KIA (S-2 Nok Premium) bh 44.000,00 48.400,00

131
62 Genteng Keramik KIA (S-2 Nok Exlusive) bh 40.000,00 44.000,00
63 Genteng Keramik KIA (S-3 Listplang Unglassed) bh 42.000,00 46.200,00
64 Genteng Keramik KIA (S-3 List Plang Natural) bh 32.000,00 35.200,00
65 Genteng Keramik KIA (S-3 List Plang Standard) bh 28.000,00 30.800,00
66 Genteng Keramik KIA (S-3 List Plang Spesial) bh 29.000,00 31.900,00
67 Genteng Keramik KIA (S-3 List Plang Premium) bh 27.000,00 29.700,00
68 Genteng Keramik KIA (S-3 List Plang Exlusive) bh 29.000,00 31.900,00
69 Genteng Keramik M-Class (M-1 Standard Natural) bh 27.000,00 29.700,00
70 Genteng Keramik M-Class (M-1 Standard) bh 21.000,00 23.100,00
71 Genteng Keramik M-Class (M-1 Standard Special) bh 36.000,00 39.600,00
72 Genteng Keramik M-Class (M-1StandardPremium) bh 41.000,00 45.100,00
73 Genteng Keramik M-Class (M-2 NOK Natural) bh 34.000,00 37.400,00
74 Genteng Keramik M-Class (M-2 NOK Standard) bh 40.000,00 44.000,00
75 Genteng Keramik M-Class (M-2 NOK Special) bh 41.000,00 45.100,00
76 Genteng Keramik M-Class (M-2 NOK Premium) bh 44.000,00 48.400,00
77 Genteng Keraxnik M-Class (M-3 Listplang Natural) bh 52.000,00 57.200,00
78 Genteng Keramik M-Class (M-3ListplangStandard) bh 60.000,00 66.000,00
79 Genteng Keramik M-Class (M-3 Listplang Special) bh 69.000,00 75.900,00
80 Genteng Keramik M-Class (M-3ListplangPremium) bh 79.000,00 86.900,00
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
81 Genteng Beton Garuda Natural (9.5 Bh/m2) bh 86.000,00 94.600,00
82 Genteng Beton Garuda Cat Minyak (9.5 Bh/m2) bh 98.000,00 107.800,00
83 Genteng Beton Garuda Cat Air (9.5 Bh/m2) bh 109.000,00 119.900,00
84 Genteng Beton Flat Natural (10 Bh/m2) bh 125.000,00 137.500,00
85 Genteng Beton Flat Cat Minyak (10 Bh/m2) bh 23.000,00 25.300,00
86 Genteng Beton Flat Cat Air (10 Bh/m2) bh 27.000,00 29.700,00
87 Genteng Beton Nok Bulat Besar bh 33.000,00 36.300,00
88 Genteng Beton Nok Atas Besar bh 93.000,00 102.300,00
89 Genteng Keramik Sahara (Standard Unglazed) bh 64.000,00 70.400,00
90 Genteng Aspal bh 33.000,00 36.300,00
91 Sirap Kelas 1 bh 30.000,00 33.000,00
92 Nok Genteng Metal lbr 29.000,00 31.900,00
93 Nok Atap Seng lbr 49.000,00 53.900,00
94 Nok Standar 40 cm m2 6.000,00 6.600,00
95 Nok Atas Metal (Rainbow Roof) lbr 34.000,00 37.400,00
96 Nok Atas Metal Hana lbr 132.000,00 145.200,00
97 Nok Pinggir Metal (Rainbow Roof) lbr 34.000,00 37.400,00
98 Nok Pinggir Metal Hana lbr 196.000,00 215.600,00
99 Wall Flasing (Rainbow Roof) lbr 156.000,00 171.600,00
100 Wall Flasing Hana lbr 211.000,00 232.100,00
101 Pelat Asbes tebal 3.5 mm lbr 71.000,00 78.100,00
102 Pelat Asbes tebal 4 mm lbr 79.000,00 86.900,00
103 Acrilic m2 292.000,00 321.200,00

132
104 Policarbonate m2 172.598,87 189.858,76
105 Policarbonate Twinlite 11.8m x 2.1m x 5.1mm Lembar 4.277.000,00 4.704.700,00
106 Policarbonate Solarlite 11.8m x 2.1m x 5.1mm Lembar 3.219.000,00 3.540.900,00
107 Policarbonate X-Lite 11.8m x 2.1m x 4.0mm Lembar 2.478.000,00 2.725.800,00
108 Policarbonate Solite 11.8m x 2.1m x 4.0mm Lembar 2.160.000,00 2.376.000,00
109 Atap Zingkalum m2 191.000,00 210.100,00
110 Atap Spandek m2 127.000,00 139.700,00
111 Atap Superdek m2 131.000,00 144.100,00
112 Atap Bondek m2 244.000,00 268.400,00
113 Bubungan Atap Zingkalum m' 68.000,00 74.800,00
114 Bubungan Atap Spardek m' 41.000,00 45.100,00
115 Bubungan Atap Superdek m' 164.000,00 180.400,00
116 Bubungan Atap Bondek m' 154.000,00 169.400,00
117 Nok Genteng Aspal bh 7.000,00 7.700,00
118 Asbes Motif Genteng lbr 51.000,00 56.100,00
119 Nok Stel Gelombang 1000 mm Ibr 127.000,00 139.700,00
120 Nok Stel Rata lbr 97.000,00 106.700,00
121 Nok Paten Gelombang lbr 95.000,00 104.500,00
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
122 Nok Paten Rata Ibr 86.000,00 94.600,00
123 Hipcapping Besar lbr 58.000,00 63.800,00
124 Ujung Nok lbr 54.000,00 59.400,00
125 Shednok Natural 6 lbr 78.000,00 85.800,00
126 Penutup Atas lbr 94.000,00 103.400,00
127 Penutup Bawah Type B lbr 107.000,00 117.700,00
128 Penutup Bawah Type C lbr 102.000,00 112.200,00
129 Lisplang Simetris lbr 54.000,00 59.400,00
130 Lisplang Siku-siku lbr 61.000,00 67.100,00
131 Lisplang Kalsiplang (3000 x 200 x 8.0 mm) lbr 72.000,00 79.200,00
132 Lisplang Kalsiplang (2400 x 200 x 8.0 mm) lbr 57.000,00 62.700,00
133 Lisplang Kalsiplang (3000 x 200 x 12.0 mm) lbr 78.000,00 85.800,00
134 Lisplang Kalsiplang (2400 x 200 x 12.0 mm) lbr 52.000,00 57.200,00
135 Lisplang Kalsiplang (3000 x 300 x 8.0 mm) lbr 124.000,00 136.400,00
136 Lisplang Kalsiplang (2400 x 300 x 8.0 mm) lbr 124.000,00 136.400,00
137 Lisplang Kalsiplang (3000 x 300 x 12.0 mm) lbr 75.000,00 82.500,00
138 Lisplang Kalsiplang (2400 x 300 x 12.0 mm) lbr 68.000,00 74.800,00
139 Lisplang GRC lbr 46.000,00 50.600,00
140 Lisplang Kayu lbr 72.000,00 79.200,00
141 Rooflight 90x180 cm lbr 31.000,00 34.100,00
142 Atap Spandek Kepuh 1060 x 0.30 / meter m 82.000,00 90.200,00
143 Atap Spandek Kepuh 1060 x 0.35 / meter m 92.000,00 101.200,00

133
144 Atap Spandek Kepuh 1060 x 0.45 / meter m 120.000,00 132.000,00
145 Atap Spandek Kepuh 1060 x 0.50 / meter m 129.000,00 141.900,00
146 Atap Spandek CBM 1000 x 0.30 / meter m 84.000,00 92.400,00
147 Atap Spandek CBM 1000 x 0.35 / meter m 98.000,00 107.800,00
148 Atap Spandek CBM 1000 x 0.40 / meter m 109.000,00 119.900,00
149 Atap Spandek CBM 1000 x 0.45 / meter m 122.000,00 134.200,00
150 Atap Spandek CBM 1000 x 0.50 / meter m 134.000,00 147.400,00
151 Atap Spandek Kepuh 1060 x 0.30 x 3.0 m bh 247.000,00 271.700,00
152 Atap Spandek Kepuh 1060 x 0.30 x 3.5 m bh 241.000,00 265.100,00
153 Atap Spandek Kepuh 1060 x 0.30 x 4.0 m bh 329.000,00 361.900,00
154 Atap Spandek Kepuh 1060 x 0.30 x 4.5 m bh 310.000,00 341.000,00
155 Atap Spandek Kepuh 1060 x 0.30 x 5.0 m bh 412.000,00 453.200,00
156 Atap Spandek Kepuh 1060 x 0.30 x 5.5 m bh 379.000,00 416.900,00
157 Atap Spandek Kepuh 1060 x 0.30 x 6.0 m bh 494.000,00 543.400,00
158 Atap Spandek CBM 1000 x 0.30 x 3.0 m bh 238.000,00 261.800,00
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
159 Atap Spandek CBM 1000 x 0.30 x 3.5 m bh 277.000,00 304.700,00
160 Atap Spandek CBM 1000 x 0.30 x 4.0 m bh 317.000,00 348.700,00
161 Atap Spandek CBM 1000 x 0.30 x 4.5 m bh 357.000,00 392.700,00
162 Atap Spandek CBM 1000 x 0.30 x 5.0 m bh 396.000,00 435.600,00
163 Atap Spandek CBM 1000 x 0.30 x 5.5 m bh 436.000,00 479.600,00
164 Atap Spandek CBM 1000 x 0.30 x 6.0 m bh 475.000,00 522.500,00
165 Atap Spandek Pasir 1000 x 0.30 x 1.0 m bh 101.000,00 111.100,00
166 Baja Ringan Profil C75.60 H= 75 mm T= 0.60 mm P= 6 m btg 91.000,00 100.100,00
167 Baja Ringan Profil C75.65 H= 75 mm T= 0.65 mm P= 6 m btg 97.000,00 106.700,00
168 Baja Ringan Profil C75.70 H= 75 mm T= 0.70 mm P= 6 m btg 101.000,00 111.100,00
169 Baja Ringan Profil C75.75 H= 75 mm T = 0.75 mm P= 6 m btg 129.000,00 141.900,00
170 Baja Ringan Profil C75.100 H= 75 mm T =1.00 mm P= 6 m btg 178.000,00 195.800,00
171 Reng Baja Ringan 28.45 H= 28 mm T= 0.45 mm P= 6 m btg 38.000,00 41.800,00
172 Reng Baja Ringan 30.45 H= 30 mm T= 0.45 mm P= 6 m btg 44.000,00 48.400,00
173 Reng Baja Ringan 32.45 H= 32 mm T = 0.45 mm P= 6 m btg 61.000,00 67.100,00
174 Reng Baja Ringan 40.45 H= 40mm T= 0.45 mm P= 6 m btg 81.000,00 89.100,00
ATAP FIBER SEMEN -
175 Atap Gelombang Kecil 1500 x 800 x 3.5 mm Lembar 45.000,00 49.500,00
176 Atap Gelombang Kecil 1800 x 800 x 3.5 mm Lembar 52.000,00 57.200,00
177 Atap Gelombang Kecil 2100 x 800 x 3.5 mm Lembar 61.000,00 67.100,00
178 Atap Gelombang Kecil 2400 x 800 x 3.5 mm Lembar 69.000,00 75.900,00
179 Atap Gelombang Kecil 1500 x 1050 x 4 mm Lembar 66.000,00 72.600,00
180 Atap Gelombang Kecil 1800 x 1050 x 4 mm Lembar 78.000,00 85.800,00
181 Atap Gelombang Kecil 2100 x 1050 x 4 mm Lembar 91.000,00 100.100,00
182 Atap Gelombang Kecil 2400 x 1050 x 4 mm Lembar 104.000,00 114.400,00
183 Atap Gelombang Kecil 2700 x 1050 x 4 mm Lembar 117.000,00 128.700,00

134
184 Atap Gelombang Kecil 3000 x 1050 x 4 mm Lembar 132.000,00 145.200,00
185 Atap Gelombang Besar 1500 x 1000 x 5 mm Lembar 92.000,00 101.200,00
186 Atap Gelombang Besar 1800 x 1000 x 5 mm Lembar 115.000,00 126.500,00
187 Atap Gelombang Besar 2000 x 1000 x 5 mm Lembar 124.000,00 136.400,00
188 Atap Gelombang Besar 2250 x 1000 x 5 mm Lembar 134.000,00 147.400,00
189 Atap Gelombang Besar 2500 x 1000 x 5 mm Lembar 150.000,00 165.000,00
190 Atap Gelombang Besar 3050 x 1000 x 5 mm Lembar 183.000,00 201.300,00
191 Atap Gelombang Besar 1500 x 1000 x 6 mm Lembar 109.000,00 119.900,00
192 Atap Gelombang Besar 1800 x 1000 x 6 mm Lembar 131.000,00 144.100,00
193 Atap Gelombang Besar 2000 x 1000 x 6 mm Lembar 146.000,00 160.600,00
194 Atap Gelombang Besar 2250 x 1000 x 6 mm Lembar 161.000,00 177.100,00
195 Atap Gelombang Besar 2500 x 1000 x 6 mm Lembar 172.000,00 189.200,00
196 Atap Gelombang Besar 3050 x 1000 x 6 mm Lembar 219.000,00 240.900,00
197 Nok Stel Gelombang t=6mm P=985 mm bh 81.000,00 89.100,00
198 Nok Stel Rata t=6mm P=985 mm bh 84.000,00 92.400,00
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
199 Lisplank Simetris t=6mm P=2500 mm bh 136.000,00 149.600,00
200 Lisplank Siku t=6mm P=2500 mm bh 119.000,00 130.900,00
201 Ujung Nok stel t=6mm P=780 mm bh 114.000,00 125.400,00
202 Nok Stel Gelombang t=4mm P=1050 mm bh 65.000,00 71.500,00
203 Nok Stel Rata t=4mm P=1050 mm bh 65.000,00 71.500,00
204 Lisplank Siku t=4mm P=2600 mm bh 111.000,00 122.100,00
205 Ujung Nok stel t=4mm P=740 mm bh 43.000,00 47.300,00
206 Nok Stel Gelombang t=3.5mm P=800 mm bh 33.000,00 36.300,00
207 Lisplank Siku t=3.5mm P=2600 mm bh 111.000,00 122.100,00
208 Ujung Nok stel t=3.5mm P=740 mm bh 43.000,00 47.300,00

135
S. KUSEN PINTU, JENDELA, KACA DAN AKSESORIS
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
1 Kusen Aluminium YKK Ukuran 3" Warna Silver m' 210.000,00 231.000,00
2 Kusen Aluminium YKK Ukuran 3" Warna Cokelat m' 230.000,00 253.000,00
3 Kusen Aluminium YKK Ukuran 3" Warna Hitam m' 230.000,00 253.000,00
4 Kusen Aluminium YKK Ukuran 3" Warna Serat Kayu m' 320.000,00 352.000,00
5 Kusen Aluminium YKK Ukuran 4" Warna Silver m' 290.000,00 319.000,00
6 Kusen Aluminium YKK Ukuran 4" Warna Cokelat m' 330.000,00 363.000,00
7 Kusen Aluminium YKK Ukuran 4" Warna Hitam m' 330.000,00 363.000,00
8 Kusen Aluminium YKK Ukuran 4" Warna Serat Kayu m' 430.000,00 473.000,00
9 Kusen Aluminium Alexindo Ukuran 3" Warna Silver m' 140.000,00 154.000,00
10 Kusen Aluminium Alexindo Ukuran 3" Warna Cokelat m' 150.000,00 165.000,00
11 Kusen Aluminium Alexindo Ukuran 3" Warna Hitam m' 150.000,00 165.000,00
12 Kusen Aluminium Alexindo Ukuran 3" Warna Serat Kayu m' 220.000,00 242.000,00
13 Kusen Aluminium Alexindo Ukuran 4" Warna Silver m' 160.000,00 176.000,00
14 Kusen Aluminium Alexindo Ukuran 4" Warna Cokelat m' 170.000,00 187.000,00
15 Kusen Aluminium Alexindo Ukuran 4" Warna Hitam m' 170.000,00 187.000,00
16 Kusen Aluminium Alexindo Ukuran 4" Warna Serat Kayu m' 290.000,00 319.000,00
17 Daun Jendela Aluminium YKK Natural m2 290.000,00 319.000,00
18 Daun Jendela Aluminium YKK Warna m2 480.000,00 528.000,00
19 Daun Pintu Aluminium YKK Natural m2 810.000,00 891.000,00
20 Daun Pintu Aluminium YKK Warna m2 950.000,00 1.045.000,00
21 Jendela Aluminium Casement 60 x 150 cm Warna Natural bh 1.020.000,00 1.122.000,00
22 Jendela Aluminium Casement 60 x 150 cm Warna Cokelat bh 1.150.000,00 1.265.000,00
23 Jendela Aluminium Casement 60 x 150 cm Warna White bh 1.290.000,00 1.419.000,00
24 Jendela Aluminium Casement 60 x 150 cm Warna Serat Kayu bh 1.620.000,00 1.782.000,00
25 Jendela Aluminium Sliding 100X120 cm Tebal Kaca : 5mm bh 1.580.000,00 1.738.000,00
26 Jendela Aluminium Casement 60X150 cm Tebal Kaca : 5mm bh 1.380.000,00 1.518.000,00
27 Jendela Aluminium Awning 60X150 cm Tebal Kaca : 5mm bh 1.500.000,00 1.650.000,00
28 Jendela Aluminium Casement 100X120 cm Kaca : 5mm bh 1.780.000,00 1.958.000,00

136
29 Jendela Aluminium Casement 100X120 cm Kaca : 5mm bh 4.800.000,00 5.280.000,00
30 Jendela Nako Kaca Ryben 6 klips set 220.000,00 242.000,00
31 Jendela Nako Kaca Ryben 7 klips set 230.000,00 253.000,00
32 Jendela Nako Kaca Ryben 8 klips set 240.000,00 264.000,00
33 Jendela Nako Kaca Ryben 10 klips set 470.000,00 517.000,00
34 Jendela Nako Kaca Bening 4 klips set 270.000,00 297.000,00
35 Jendela Nako Kaca Bening 5 klips set 340.000,00 374.000,00
36 Jendela Nako Kaca Bening 6 klips set 320.000,00 352.000,00
37 Jendela Nako Kaca Bening 7 klips set 370.000,00 407.000,00
38 Jendela Nako Kaca Bening 8 klips set 390.000,00 429.000,00
39 Jendela Nako Kaca Bening 10 klips set 460.000,00 506.000,00
40 Jendela Besi m2 730.000,00 803.000,00
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
41 Jendela Besi Tahan Api m2 910.000,00 1.001.000,00
42 Jendela Nako bh 280.000,00 308.000,00
43 Pintu Swing Aluminium + Kaca 90 x 210 Warna Natural bh 2.500.000,00 2.750.000,00
44 Pintu Swing Aluminium + Kaca 90 x 210 Warna Cokelat/Hitam bh 2.640.000,00 2.904.000,00
45 Pintu Swing Aluminium + Kaca 90 x 210 Warna Coating White bh 2.840.000,00 3.124.000,00
46 Pintu Swing Aluminium + Kaca 90 x 210 Warna Serat Kayu bh 4.320.000,00 4.752.000,00
47 Pintu Swing Aluminium + Panel 90 x 210 Warna Coating White bh 3.180.000,00 3.498.000,00
48 Pintu Sliding Door + Rel Ukuran 90 x 210 bh 3.380.000,00 3.718.000,00
49 Pintu Kaca Tempered 12 mm Ukuran 90 x 210 bh 10.120.000,00 11.132.000,00
50 Pintu Panel UPVC Putih Ukuran : 80X200 cm bh 2.430.000,00 2.673.000,00
51 Pintu Aluminium Profil Ukuran : 80X200 cm bh 3.070.000,00 3.377.000,00
52 Pintu PVC Red Wood Ukuran : 71X195 cm bh 1.140.000,00 1.254.000,00
53 Pintu PVC bh 360.000,00 396.000,00
54 Pintu aluminium natural m2 730.000,00 803.000,00
55 Pintu Frameless tempered 12 mm polos m 880.000,00 968.000,00
56 Pintu Fitting tempered 12 mm polos m 5.880.000,00 6.468.000,00
57 Pintu Gulung Besi m2 1.170.000,00 1.287.000,00
58 Pintu Rolling Door m2 610.000,00 671.000,00
59 Pintu Folding Door m2 500.000,00 550.000,00
60 Tirai Venetion blind & vertical blind m2 750.000,00 825.000,00
61 Besi Strip Kaca Nako kg 80.000,00 57.000,00
62 Profil Aluminium m' 160.000,00 112.605,26
63 Handle Aluminium bh 170.000,00 187.000,00
64 Kait angin Aluminium ps 40.000,00 44.000,00
65 Karet Accesoris Kusen m' 30.000,00 33.000,00
66 Jalusi Aluminium m' 160.000,00 176.000,00
67 Sunscreen Aluminium m2 480.000,00 528.000,00
68 Kaca Polos 2 mm (ASAHI) m2 150.000,00 165.000,00
69 Kaca Polos 3 mm (ASAHI) m2 170.000,00 187.000,00
70 Kaca Polos 5 mm (ASAHI) m2 200.000,00 220.000,00

137
71 Kaca Polos 6 mm (ASAHI) m2 260.000,00 286.000,00
72 Kaca Polos 8 mm (ASAHI) m2 459.000,00 504.900,00
73 Kaca Polos 10 mm (ASAHI) m2 621.000,00 683.100,00
74 Kaca Polos 12 mm (ASAHI) m2 877.000,00 964.700,00
75 Kaca Reyband 5 mm (ASAHI) m2 241.000,00 265.100,00
76 Kaca Reyband 6 mm (ASAHI) m2 315.000,00 346.500,00
77 Kaca Reyband 8 mm (ASAHI) m2 408.000,00 448.800,00
78 Kaca Reyband 12 mm (ASAHI) m2 846.000,00 930.600,00
79 Kaca Polos Sanblas 5 mm m2 814.000,00 895.400,00
80 Kaca Es / Susu 3 mm m2 311.000,00 342.100,00
81 Kaca Es / Susu 5 mm m2 378.000,00 415.800,00
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
82 Kaca Cermin 5 mm m2 211.000,00 232.100,00
83 Kaca Cermin 6 mm m2 314.000,00 345.400,00
84 Kaca Cermin 8 mm m2 328.000,00 360.800,00
85 Kaca Patri Lokal Terpasang (ASAHI) m2 3.460.000,00 3.806.000,00
86 Kaca Patri ex Luar Negeri Terpasang m2 6.131.000,00 6.744.100,00
87 Kaca Gravver 6 mm m2 2.427.000,00 2.669.700,00
88 Kaca Lukis Terpasang m2 992.000,00 1.091.200,00
89 Kaca tempered t= 5 mm m2 354.000,00 389.400,00
90 Kaca tempered t= 6 mm m2 361.000,00 397.100,00
91 Kaca tempered t= 8 mm m2 520.000,00 572.000,00
92 Kaca tempered t= 10 mm m2 592.000,00 651.200,00
93 Kaca Laminated t= 5 mm m2 997.000,00 1.096.700,00
94 Kaca Laminated t= 6 mm m2 1.152.000,00 1.267.200,00
95 Kaca Laminated t= 8 mm m2 1.383.000,00 1.521.300,00
96 Kaca Laminated t= 10 mm m2 1.957.000,00 2.152.700,00
97 Kaca doubel Laminated t= 5 mm m2 1.282.000,00 1.410.200,00
98 Kaca doubel Laminated t= 6 mm m2 1.653.000,00 1.818.300,00
99 Kaca doubel Laminated t= 8 mm m2 2.226.000,00 2.448.600,00
100 Glass Block 20 x 20 bh 51.000,00 56.100,00
101 Glass Block 20 x 20 bh 121.000,00 133.100,00
102 Sealant kg 34.000,00 37.400,00
103 Wiredglass m2 885.000,00 973.500,00
104 Kunci Silinder ALFA bh 450.000,00 495.000,00
105 Kunci 2 Slaag ROYAL bh 161.000,00 177.100,00
106 Kunci 2 Slaag Silinder SEIS Asli bh 411.000,00 452.100,00
107 Kunci 2 Slaag Ancor Asli bh 268.000,00 294.800,00
108 Kunci 2 Slaag ISO bh 299.000,00 328.900,00
109 Kunci 2 Slaag Silinder bh 634.000,00 697.400,00
110 Kunci 2 Slaag Kuda Terbang bh 188.000,00 206.800,00
111 Kunci Gembok Besar bh 161.000,00 177.100,00
112 Kunci Lemari bh 80.000,00 88.000,00

138
113 Kunci Tanam biasa bh 86.000,00 94.600,00
114 Kunci Tanam antik bh 129.000,00 141.900,00
115 Kunci Tanam Kamar Mandi bh 102.000,00 112.200,00
116 Kunci KM Bulat Kualitas Biasa bh 102.000,00 112.200,00
117 Kunci KM Bulat ALFA bh 161.000,00 177.100,00
118 Kunci Espagnolette ps 136.000,00 149.600,00
119 Lockcase Stainless Steel Pintu Pelor bh 350.000,00 385.000,00
120 Lockcase Stainless Steel Pintu Swing bh 223.000,00 245.300,00
121 Lockcase Besi Pintu Pelor bh 179.000,00 196.900,00
122 Lockcase Besi Pintu Swing bh 179.000,00 196.900,00
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
123 Lockcase Besi Pintu Sliding bh 134.000,00 147.400,00
124 Lockcase Swing Pintu Alumunium bh 164.000,00 180.400,00
125 Lockset Sliding Pintu Alumunium bh 149.000,00 163.900,00
126 Lockset Swing Pintu Alumunium bh 149.000,00 163.900,00
127 Grendel 15 cm bh 161.000,00 177.100,00
128 Grendel 5 cm bh 150.000,00 165.000,00
129 Grendel 7 cm bh 150.000,00 165.000,00
130 Grendel Tanam Pintu 12" bh 243.000,00 267.300,00
131 Grendel Tanam Pintu 8" bh 138.000,00 151.800,00
132 Grendel Tanam Pintu 6" bh 134.000,00 147.400,00
133 Grendel Pintu 3" bh 77.000,00 84.700,00
134 Grendel Pintu 2" bh 72.000,00 79.200,00
135 Grendel WC Pintu Kamar Mandi bh 107.000,00 117.700,00
136 Grendel Rantai Pintu bh 122.000,00 134.200,00
137 Sloot Pintu Berikut Rantai bh 38.000,00 41.800,00
138 Engsel Pintu Belleza 5x3x3 bh 208.000,00 228.800,00
139 Engsel Pintu Belleza 4x3x3 bh 179.000,00 196.900,00
140 Engsel Pintu Belleza 3x2,5x2,5 bh 112.000,00 123.200,00
141 Engsel Pintu Union Standard ps 49.000,00 53.900,00
142 Engsel Patrun ps 22.000,00 24.200,00
143 Engsel Harmonika ps 38.000,00 41.800,00
144 Engsel Kupu Kupu bh 25.000,00 27.500,00
145 Floor Hinge ps 1.593.000,00 1.752.300,00
146 Door Closer Kelas Menengah unt 646.000,00 710.600,00
147 Door Closer Kelas Sedang unt 586.000,00 644.600,00
148 Door Closer Kelas Rendah unt 269.000,00 295.900,00
149 Door Holder unt 226.000,00 248.600,00
150 Door Stop Pintu unt 153.000,00 168.300,00
151 Door Guard Pintu unt 153.000,00 168.300,00
152 Door Viewer unt 92.000,00 101.200,00
153 Escutcheon Lubang Kunci unt 145.000,00 159.500,00
154 Escutcheon Lubang Kunci unt 69.000,00 75.900,00

139
155 Escutcheon Lubang Kunci unt 53.000,00 58.300,00
156 Handle Pintu Belleza set 320.000,00 352.000,00
157 Tarikan Pintu Alumunium bh 439.000,00 482.900,00
158 Tarikan Almari Rata-rata bh 27.000,00 29.700,00
159 Rel Henderson Lengkap bh 934.000,00 1.027.400,00
160 Rel maraton I Pintu unt 269.000,00 295.900,00
161 Engsel Jendela Centre Pivot set 289.000,00 317.900,00
162 Engsel Jendela Salon unt 49.000,00 53.900,00
163 Engsel Jendela set 61.000,00 67.100,00
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
164 Engsel Jendela Unilon ps 43.000,00 47.300,00
165 Sloot Jendela Tunggal bh 39.000,00 42.900,00
166 Sloot Handle Jendela bh 27.000,00 29.700,00
167 Casement 20" bh 282.000,00 310.200,00
168 Casement 16" bh 183.000,00 201.300,00
169 Casement 12" bh 126.000,00 138.600,00
170 Rambuncis bh 134.000,00 147.400,00
171 Ramskar bh 102.000,00 112.200,00
172 Spring Knip bh 69.000,00 75.900,00
173 Push Lock bh 42.000,00 46.200,00
174 Hak Angin Kait Jendela Biasa ps 27.000,00 29.700,00
175 Hak Angin Jendela Antik ps 38.000,00 41.800,00
176 Hak Angin Sendok Stainless bh 38.000,00 41.800,00

140
T. PIPA PVC DAN AKSESORIS
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
Klass AW (10 Kg/cm2) P= 4 m
1 Pipa PVC Klass AW Uk. 1/2", 22 mm btg 31.500,00 34.650,00
2 Pipa PVC Klass AW Uk. 3/4", 26 mm btg 42.800,00 47.080,00
3 Pipa PVC Klass AW Uk. 1", 32 mm btg 58.500,00 64.350,00
4 Pipa PVC Klass AW Uk. 1 - 1/4', 42 mm btg 87.500,00 96.250,00
5 Pipa PVC Klass AW Uk. 1 - 1/2", 48 mm btg 100.400,00 110.440,00
6 Pipa PVC Klass AW Uk. 2", 60 mm btg 128.500,00 141.350,00
7 Pipa PVC Klass AW Uk. 2 - 1/2", 76 mm btg 187.400,00 206.140,00
8 Pipa PVC Klass AW Uk. 3", 89 mm btg 263.900,00 290.290,00
9 Pipa PVC Klass AW Uk. 4", 114 mm btg 437.300,00 481.030,00
10 Pipa PVC Klass AW Uk. 5", 140 mm btg 692.800,00 762.080,00
11 Pipa PVC Klass AW Uk. 6", 165 mm btg 971.600,00 1.068.760,00
12 Pipa PVC Klass AW Uk. 8", 216 mm btg 1.630.500,00 1.793.550,00
13 Pipa PVC Klass AW Uk. 10", 267 mm btg 2.521.100,00 2.773.210,00
14 Pipa PVC Klass AW Uk. 12", 318 mm btg 3.554.700,00 3.910.170,00
Klass D ( 5 Kg/cm2) P= 4 m
15 Pipa PVC Klass D Uk. 1 - 1/4', 42 mm btg 55.000,00 60.500,00
16 Pipa PVC Klass D Uk. 1 - 1/2", 48 mm btg 62.100,00 68.310,00
17 Pipa PVC Klass D Uk. 2", 60 mm btg 79.600,00 87.560,00
18 Pipa PVC Klass D Uk. 2 - 1/2", 76 mm btg 107.600,00 118.360,00
19 Pipa PVC Klass D Uk. 3", 89 mm btg 142.800,00 157.080,00
20 Pipa PVC Klass D Uk. 4", 114 mm btg 224.500,00 246.950,00
21 Pipa PVC Klass D Uk. 5", 140 mm btg 345.800,00 380.380,00
22 Pipa PVC Klass D Uk. 6", 165 mm btg 456.100,00 501.710,00
23 Pipa PVC Klass D Uk. 8", 216 mm btg 802.200,00 882.420,00
24 Pipa PVC Klass D Uk. 10", 267 mm btg 1.321.300,00 1.453.430,00
25 Pipa PVC Klass D Uk. 12", 318 mm btg 1.854.700,00 2.040.170,00
PIPA PVC Tipe VP (10 Kg/ cm2) P= 4 m
26 PIPA PVC Tipe VP Uk. 1/2", 22 mm btg 57.000,00 62.700,00
27 PIPA PVC Tipe VP Uk. 3/4", 26 mm btg 68.300,00 75.130,00
28 PIPA PVC Tipe VP Uk. 1", 32 mm btg 99.300,00 109.230,00
29 PIPA PVC Tipe VP Uk. 1 - 1/4', 42 mm btg 133.900,00 147.290,00
30 PIPA PVC Tipe VP Uk. 1 - 1/2", 48 mm btg 174.100,00 191.510,00
31 PIPA PVC Tipe VP Uk. 2", 60 mm btg 247.200,00 271.920,00
32 PIPA PVC Tipe VP Uk. 2 - 1/2", 76 mm btg 318.000,00 349.800,00
33 PIPA PVC Tipe VP Uk. 3", 89 mm btg 506.600,00 557.260,00
34 PIPA PVC Tipe VP Uk. 4", 114 mm btg 782.900,00 861.190,00
35 PIPA PVC Tipe VP Uk. 5", 140 mm btg 980.100,00 1.078.110,00
36 PIPA PVC Tipe VP Uk 6", 165 mm btg 1.471.500,00 1.618.650,00
37 PIPA PVC Tipe VP Uk. 8", 216 mm btg 2.225.500,00 2.448.050,00
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN

141
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
38 PIPA PVC Tipe VP Uk. 10", 267 mm btg 3.390.800,00 3.729.880,00
39 PIPA PVC Tipe VP Uk. 12", 318 mm btg 4.809.900,00 5.290.890,00
PIPA PVC Tipe VU (5 Kg/ cm2)
40 PIPA PVC Tipe VU Uk. 1 - 1/2", 48 mm btg 91.200,00 100.320,00
41 PIPA PVC Tipe VU Uk. 2", 60 mm btg 115.100,00 126.610,00
42 PIPA PVC Tipe VU Uk. 2 - 1/2", 76 mm btg 182.200,00 200.420,00
43 PIPA PVC Tipe VU Uk. 3", 89 mm btg 266.200,00 292.820,00
44 PIPA PVC Tipe VU Uk. 4", 114 mm btg 399.600,00 439.560,00
45 PIPA PVC Tipe VU Uk. 5", 140 mm btg 601.700,00 661.870,00
46 PIPA PVC Tipe VU Uk 6", 165 mm btg 865.000,00 951.500,00
47 PIPA PVC Tipe VU Uk. 8", 216 mm btg 1.443.300,00 1.587.630,00
48 PIPA PVC Tipe VU Uk. 10", 267 mm btg 2.137.400,00 2.351.140,00
49 PIPA PVC Tipe VU Uk. 12", 318 mm btg 3.001.000,00 3.301.100,00
UNION SOCKET
50 Union Socket (AW) Uk. 1/2" bh 31.900,00 35.090,00
51 Union Socket (AW) Uk. 3/4" bh 39.000,00 42.900,00
52 Union Socket (AW) Uk. 1" bh 53.700,00 59.070,00
53 Union Socket (AW) Uk. 1 - 1/4" bh 89.100,00 98.010,00
54 Union Socket (AW) Uk. 1 - 1/2" bh 121.500,00 133.650,00
UNION THREAD
55 Union Thread (AW) Uk. 1/2" bh 31.900,00 35.090,00
56 Union Thread (AW) Uk. 3/4" bh 39.000,00 42.900,00
57 Union Thread (AW) Uk. 1" bh 53.700,00 59.070,00
58 Union Thread (AW) Uk. 1 - 1/4" bh 89.100,00 98.010,00
59 Union Thread (AW) Uk. 1 - 1/2" bh 121.500,00 133.650,00
FAUCET ELBOW
60 Faucet Elbow (AW) Uk. 1/2" bh 2.600,00 2.860,00
61 Faucet Elbow (AW) Uk. 1/2" x 3/4" bh 3.000,00 3.300,00
62 Faucet Elbow (AW) Uk. 3/4" bh 4.100,00 4.510,00
63 Faucet Elbow (AW) Uk. 1" bh 6.000,00 6.600,00
64 Faucet Elbow (AW) Uk. 1/2" With Metal Insert bh 11.900,00 13.090,00
65 Faucet Elbow Uk. 1/2" x 3/4" With Metal Insert bh 17.300,00 19.030,00
66 Faucet Elbow (AW) Uk. 3/4" With Metal Insert bh 20.200,00 22.220,00
VALVE SOCKET
67 Valve Socket (AW) Uk. 1/2" bh 1.800,00 1.980,00
68 Valve Socket (AW) Uk. 1/2" x 3/4" bh 2.900,00 3.190,00
69 Valve Socket (AW) Uk. 3/4" x 1/2" bh 2.500,00 2.750,00
70 Valve Socket (AW) Uk. 3/4" bh 2.500,00 2.750,00
71 Valve Socket (AW) Uk. 1 x 1/2" bh 2.900,00 3.190,00
72 Valve Socket (AW) Uk. 1 x 3/4" bh 3.000,00 3.300,00
73 Valve Socket (AW) Uk. 1" bh 3.400,00 3.740,00
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL

142
1 2 3 4 5 6
74 Valve Socket (AW) Uk. 1 - 1/4" bh 6.400,00 7.040,00
75 Valve Socket (AW) Uk. 1 - 1/2" bh 8.700,00 9.570,00
76 Valve Socket (AW) Uk. 2" bh 12.900,00 14.190,00
77 Valve Socket (AW) Uk. 2 - 1/2" bh 14.300,00 15.730,00
78 Valve Socket (AW) Uk. 3" bh 30.100,00 33.110,00
79 Valve Socket (AW) Uk. 4" bh 53.200,00 58.520,00
SOCKET
80 Socket (AW) Uk. 1/2" bh 2.200,00 2.420,00
81 Socket (AW) Uk. 3/4" bh 2.700,00 2.970,00
82 Socket (AW) Uk. 1" bh 4.200,00 4.620,00
83 Socket (AW) Uk. 1 - 1/4" bh 7.200,00 7.920,00
84 Socket (AW) Uk. 1 - 1/2" bh 10.300,00 11.330,00
85 Socket (AW) Uk. 2" bh 16.000,00 17.600,00
86 Socket (AW) Uk. 2 - 1/2" bh 26.800,00 29.480,00
87 Socket (AW) Uk. 3" bh 38.500,00 42.350,00
88 Socket (AW) Uk. 4" bh 76.300,00 83.930,00
89 Socket (AW) Uk. 6" bh 160.600,00 176.660,00
90 Socket (AW) Uk. 8" bh 324.200,00 356.620,00
91 Socket (AW) Uk. 10" bh 513.500,00 564.850,00
FAUCET SOCKET bh
92 Faucet Socket (AW) Uk. 1/2" With Metal Insert bh 11.400,00 12.540,00
93 Faucet Socket (AW) Uk. 1/2" x 3/4" With Metal Insert bh 16.900,00 18.590,00
94 Faucet Socket (AW) Uk. 3/4" With Metal Insert bh 19.200,00 21.120,00
Y- BRANCH
95 Y - Branch (AW) Uk. 2 - 1/2" bh 55.500,00 61.050,00
96 Y - Branch (AW) Uk. 3" bh 92.700,00 101.970,00
97 Y - Branch (AW) Uk. 4" bh 195.500,00 215.050,00
98 Y - Branch (AW) Uk. 8" bh 1.513.500,00 1.664.850,00
CAP
99 Cap (AW) Uk. 1/2" bh 1.400,00 1.540,00
100 Cap (AW) Uk. 3/4" bh 1.800,00 1.980,00
101 Cap (AW) Uk. 1" bh 2.700,00 2.970,00
102 Cap (AW) Uk. 2" bh 9.200,00 10.120,00
103 Cap (AW) Uk. 2 - 1/2" bh 19.100,00 21.010,00
104 Cap (AW) Uk. 3" bh 28.800,00 31.680,00
105 Cap (AW) Uk. 4" bh 60.200,00 66.220,00
106 Cap (AW) Uk. 6" bh 103.500,00 113.850,00
107 Cap (AW) Uk. 8" bh 202.900,00 223.190,00
108 Cap (D) Uk. 1 - 1/4" bh 4.400,00 4.840,00
109 Cap (D) Uk. 1 - 1/2" bh 7.900,00 8.690,00
110 Cap (D) Uk. 2" bh 8.300,00 9.130,00
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6

143
111 Cap (D) Uk. 3" bh 13.000,00 14.300,00
112 Cap (D) Uk. 4" bh 24.300,00 26.730,00
REDUCING SOCKET
113 Reducing Socket (AW) Uk. 3/4" x 1/2" bh 2.900,00 3.190,00
114 Reducing Socket (AW) Uk. 1 x 1/2" bh 3.000,00 3.300,00
115 Reducing Socket (AW) Uk. 1 x 3/4" bh 4.000,00 4.400,00
116 Reducing Socket (AW) Uk. 1 - 1/4" x 1/2" bh 4.400,00 4.840,00
117 Reducing Socket (AW) Uk. 1 - 1/4" x 3/4" bh 5.000,00 5.500,00
118 Reducing Socket (AW) Uk. 1 - 1/4" x 1" bh 6.000,00 6.600,00
119 Reducing Socket (AW) Uk. 1 - 1/2" x 1/2" bh 6.400,00 7.040,00
120 Reducing Socket (AW) Uk. 1 - 1/2" x 3/4" bh 6.700,00 7.370,00
121 Reducing Socket (AW) Uk. 1 - 1/2" x 1" bh 8.300,00 9.130,00
122 Reducing Socket (AW) Uk. 1 - 1/2" x 1 - 1/4" bh 9.400,00 10.340,00
123 Reducing Socket (AW) Uk. 2 x 1/2" bh 10.300,00 11.330,00
124 Reducing Socket (AW) Uk. 2 x 3/4" bh 9.400,00 10.340,00
125 Reducing Socket (AW) Uk. 2" x 1" bh 11.200,00 12.320,00
126 Reducing Socket (AW) Uk. 2" x 1 - 1/4" bh 13.100,00 14.410,00
127 Reducing Socket (AW) Uk. 2" x 1 - 1/2" bh 14.100,00 15.510,00
128 Reducing Socket (AW) Uk. 2 - 1/2" x 1 - 1/2" bh 20.600,00 22.660,00
129 Reducing Socket (AW) Uk. 2 - 1/2" x 2" bh 22.200,00 24.420,00
130 Reducing Socket (AW) Uk. 3" x 1" bh 17.000,00 18.700,00
131 Reducing Socket (AW) Uk. 3" x 1 - 1/4" bh 20.700,00 22.770,00
132 Reducing Socket (AW) Uk. 3" x 1 - 1/2" bh 23.000,00 25.300,00
133 Reducing Socket (AW) Uk. 3" x 2" bh 24.900,00 27.390,00
134 Reducing Socket (AW) Uk. 3" x 2 - 1/2" bh 36.900,00 40.590,00
135 Reducing Socket (AW) Uk. 4" x 1 - 1/2" bh 66.000,00 72.600,00
136 Reducing Socket (AW) Uk. 4" x 2" bh 60.900,00 66.990,00
137 Reducing Socket (AW) Uk. 4" x 2 - 1/2" bh 67.500,00 74.250,00
138 Reducing Socket (AW) Uk. 4" x 3" bh 70.700,00 77.770,00
139 Reducing Socket (AW) Uk. 6" x 3" bh 121.300,00 133.430,00
140 Reducing Socket (AW) Uk. 6" x 4" bh 132.400,00 145.640,00
141 Reducing Socket (AW) Uk. 6" x 5" bh 138.700,00 152.570,00
142 Reducing Socket (AW) Uk. 8" x 4" bh 238.100,00 261.910,00
143 Reducing Socket (AW) Uk. 8" x 5" bh 255.700,00 281.270,00
144 Reducing Socket (AW) Uk. 8" x 6" bh 271.600,00 298.760,00
145 Reducing Socket (AW) Uk. 10" x 8" bh 474.900,00 522.390,00
ELBOW
146 Elbow (AW) Uk. 1/2" bh 2.600,00 2.860,00
147 Elbow (AW) Uk. 3/4" bh 3.400,00 3.740,00
148 Elbow (AW) Uk. 1" bh 5.300,00 5.830,00
149 Elbow (AW) Uk. 1 - 1/4" bh 9.200,00 10.120,00
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
150 Elbow (AW) Uk. 1 - 1/2" bh 12.700,00 13.970,00

144
151 Elbow (AW) Uk. 2" bh 19.300,00 21.230,00
152 Elbow (AW) Uk. 2 - 1/2" bh 30.500,00 33.550,00
153 Elbow (AW) Uk. 3" bh 51.200,00 56.320,00
154 Elbow (AW) Uk. 4" bh 94.700,00 104.170,00
155 Elbow (AW) Uk. 5" bh 143.300,00 157.630,00
156 Elbow (AW) Uk. 6" bh 239.600,00 263.560,00
157 Elbow (AW) Uk. 8" bh 542.800,00 597.080,00
158 Elbow (AW) Uk. 10" bh 725.300,00 797.830,00
CLEAN OUT
159 Clean Out PVC Uk. 2" bh 8.000,00 8.800,00
160 Clean Out PVC Uk. 3" bh 13.000,00 14.300,00
161 Clean Out PVC Uk. 4" bh 34.000,00 37.400,00
WATERSTOP -
162 PVC Waterstop WSH 150 t=20mm l= 150 mm m' 88.200,00 97.020,00
163 PVC Waterstop WSF 150 t=20mm l= 150 mm m' 81.000,00 89.100,00
164 PVC Waterstop WSH 200 t=20mm l= 200 mm m' 108.200,00 119.020,00
165 PVC Waterstop WSF 200 t=20mm l= 200 mm m' 108.000,00 118.800,00
166 PVC Waterstop WSA 200 t=20mm l= 200 mm m' 108.000,00 118.800,00
167 PVC Waterstop WSRR 200 t=20mm l= 200 mm m' 121.100,00 133.210,00
168 PVC Waterstop WSRS 200 t=20mm l= 200 mm m' 121.100,00 133.210,00
169 PVC Waterstop WSA 220 t=20mm l= 220 mm m' 120.600,00 132.660,00
170 PVC Waterstop WSH 250 t=20mm l= 250 mm m' 138.900,00 152.790,00
171 PVC Waterstop WSA 250 t=20mm l= 250 mm m' 134.900,00 148.390,00
172 PVC Waterstop WSF 250 t=20mm l= 250 mm m' 148.400,00 163.240,00
173 PVC Waterstop WSRR 250 t=20mm l= 250 mm m' 148.400,00 163.240,00
174 PVC Waterstop WSRS 250 t=20mm l= 250 mm m' 148.400,00 163.240,00
175 PVC Waterstop WSA 300 t=20mm l= 300 mm m' 166.400,00 183.040,00
176 PVC Waterstop WSA 320 t=20mm l= 350 mm m' 186.200,00 204.820,00
177 PVC Waterstop WSA 400 t=20mm l= 400 mm m' 371.800,00 408.980,00

U. PENAMPUNG AIR
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
GENERAL TANK

145
1 Tangki Air TB 32 Kapasitas Volume 300 Liter Unit 1.484.000,00 1.632.400,00
2 Tangki Air TB 55 Kapasitas Volume 520 Liter Unit 2.564.000,00 2.820.400,00
3 Tangki Air TB 70 Kapasitas Volume 650 Liter Unit 2.968.000,00 3.264.800,00
4 Tangki Air TB 80 Kapasitas Volume 800 Liter Unit 3.508.000,00 3.858.800,00
5 Tangki Air TB 110 Kapasitas Volume 1.050 Liter Unit 4.182.000,00 4.600.200,00
6 Tangki Air TB 120 Kapasitas Volume 1.200 Liter Unit 4.857.000,00 5.342.700,00
7 Tangki Air TB 160 Kapasitas Volume 1.550 Liter Unit 6.206.000,00 6.826.600,00
8 Tangki Air TB 200 Kapasitas Volume 2.000 Liter Unit 8.162.000,00 8.978.200,00
9 Tangki Air TB 220 Kapasitas Volume 2.250 Liter Unit 8.634.000,00 9.497.400,00
10 Tangki Air TB 300 Kapasitas Volume 3.100 Liter Unit 12.141.000,00 13.355.100,00
11 Tangki Air TB 400 Kapasitas Volume 4.100 Liter Unit 14.165.000,00 15.581.500,00
12 Tangki Air TB 500 Kapasitas Volume 5.100 Liter Unit 18.886.000,00 20.774.600,00
13 Tangki Air TB 800 Kapasitas Volume 8.000 Liter Unit 35.074.000,00 38.581.400,00
14 Tangki Air TB 1000 Kapasitas Volume 11.000 Liter Unit 43.168.000,00 47.484.800,00
15 Tangki Air TB 1600 Kapasitas Volume 16.000 Liter Unit 64.078.000,00 70.485.800,00
16 Tangki Air TB 2000 Kapasitas Volume 19.800 Liter Unit 84.987.000,00 93.485.700,00
17 Tangki Air TB 3000 Kapasitas Volume 30.000 Liter Unit 164.578.000,00 181.035.800,00
HEAVY DUTY TANK -
18 Tangki Air TP 55 Kapasitas Volume 500 Liter Unit 3.238.000,00 3.561.800,00
19 Tangki Air TP 110 Kapasitas Volume 1.000 Liter Unit 5.801.000,00 6.381.100,00
20 Tangki Air TP 200 Kapasitas Volume 1.900 Liter Unit 12.007.000,00 13.207.700,00
21 Tangki Air TP 300 Kapasitas Volume 2.850 Liter Unit 14.839.000,00 16.322.900,00
22 Tangki Air TP 400 Kapasitas Volume 3.850 Liter Unit 25.362.000,00 27.898.200,00
UNDERGROUND TANK -
23 Tangki Air TQ 110 Kapasitas Volume 1.000 Liter Unit 7.285.000,00 8.013.500,00
24 Tangki Air TQ 200 Kapasitas Volume 2.000 Liter Unit 14.570.000,00 16.027.000,00
25 Tangki Air TQ 300 Kapasitas Volume 3.000 Liter Unit 19.156.000,00 21.071.600,00
26 Tangki Air TQ 400 Kapasitas Volume 3.700 Liter Unit 25.362.000,00 27.898.200,00
HORIZONTAL TANK -
27 Tangki Air TH 100 Kapasitas Volume 970 Liter Unit 6.880.000,00 7.568.000,00
28 Tangki Air TH 200 Kapasitas Volume 2.000 Liter Unit 12.141.000,00 13.355.100,00
29 Tangki Air TH 500 Kapasitas Volume 4.800 Liter Unit 229.330.000,00 252.263.000,00
CUBIC TANK
30 Tangki Air TE 50 Kapasitas Volume 450 Liter Unit 3.508.000,00 3.858.800,00
31 Tangki Air TE 55 Kapasitas Volume 500 Liter Unit 3.508.000,00 3.858.800,00
32 Tangki Air TE 100 Kapasitas Volume 1.000 Liter Unit 6.745.000,00 7.419.500,00
STAINLESS STEEL TANK
33 Tangki Air TBSK 500 Kapasitas Volume 500 Liter Unit 6.071.000,00 6.678.100,00
34 Tangki Air TBSK 500 Kapasitas Volume 1.000 Liter Unit 9.106.000,00 10.016.600,00
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
35 Tangki Air TBSK 500 Kapasitas Volume 1.500 Liter Unit 11.872.000,00 13.059.200,00
36 Tangki Air TBSK 500 Kapasitas Volume 2.000 Liter Unit 15.919.000,00 17.510.900,00
SILO TANK DENGAN RANGKA KAKI

146
37 Tangki Air TV 200 Kapasitas Volume 2.000 Liter Unit 31.702.000,00 34.872.200,00
38 Tangki Air TV 300 Kapasitas Volume 3.000 Liter Unit 37.098.000,00 40.807.800,00
39 Tangki Air TV 500 Kapasitas Volume 4.700 Liter Unit 60.705.000,00 66.775.500,00
40 Tangki Air TV 800 Kapasitas Volume 8.000 Liter Unit 94.430.000,00 103.873.000,00
SEPTICTANK BIOFIL
1 Biofill BF - 03 Kapasitas 2 - 4 Orang bh 11.200.000,00 12.320.000,00
Dimensi 0.90 x 0.90 x 1.25 m
Volume 1000 Liter
2 Biofill BF - 04 Kapasitas 4 - 6 Orang bh 12.960.000,00 14.256.000,00
Dimensi 1.175 x 1.05 x 1.50 m
Volume 1850 Liter
3 Biofill BF - 06 Kapasitas 6 - 8 Orang bh 15.790.000,00 17.369.000,00
Dimensi 1.143 x 1.00 x 1.50 m
Volume 2145 Liter
4 Biofill BF - 08 Kapasitas 8 - 12 Orang bh 18.350.000,00 20.185.000,00
Dimensi 2.00 x 1.00 x 1.50 m
Volume 3000 Liter

V. BAHAN SANITAIR
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
1 Stop Kran 3/4" KIT bh 68.000,00 74.800,00
2 Stop Kran 1" KIT bh 106.000,00 116.600,00
3 Stop Kran 1 1/2" KIT bh 133.000,00 146.300,00
4 Stop Kran 2" KIT bh 477.000,00 524.700,00
5 Stop Kran 2 1/2" KIT bh 337.000,00 370.700,00
6 Stop Kran 3" KIT bh 575.000,00 632.500,00
7 Check Valve 1/2" bh 99.000,00 108.900,00
8 Double Neple 1/2" bh 17.000,00 18.700,00
9 Water Mur 1/2" bh 20.000,00 22.000,00
10 Gate Walve 1/2" bh 83.000,00 91.300,00
11 Floor Drain Stainless Steel bh 43.000,00 47.300,00
12 Bathtub bh 7.562.000,00 8.318.200,00
13 Kran Stainless Lokal Kait bh 66.000,00 72.600,00
14 Shower dengan Tiang bh 353.000,00 388.300,00
15 Shower Tanpa Tiang bh 166.000,00 182.600,00
16 Kran Tembok Sun Eui dia. 1/2" bh 92.000,00 101.200,00
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
17 Kran Tembok ITAP dia. 1/2" bh 74.000,00 81.400,00
18 Kran Bebek Sun Eui 1/2" bh 98.000,00 107.800,00
19 Kran Bebek ITAP 1/2" bh 166.000,00 182.600,00
20 Kran Panas Dingin Sun Eui Standard bh 321.000,00 353.100,00

147
21 Bath Cape Washteren unit 1.191.000,00 1.310.100,00
22 Tempat Sabun Poslin bh 102.000,00 112.200,00
23 Wastafel Lengkap TOTO LW 230 unit 586.000,00 644.600,00
24 Wastafel Lengkap INA unit 486.000,00 534.600,00
25 Wastafel Bulat Warna Standard Lengkap unit 546.000,00 600.600,00
26 Wastafel American Standard bh 477.000,00 524.700,00
27 Wastafel Meja bh 722.000,00 794.200,00
28 Closet Jongkok Poslin Warna TOTO unit 372.000,00 409.200,00
29 Closet Jongkok Poslin Putih TOTO unit 365.000,00 401.500,00
30 Closet Jongkok Lengkap Sistem Jet TOTO unit 3.184.000,00 3.502.400,00
31 Closet Jongkok KIA warna bh 782.000,00 860.200,00
32 Closet Jongkok INA warna bh 217.000,00 238.700,00
33 Closet Jongkok Teraso unit 189.000,00 207.900,00
34 Closet Duduk KIA unit 706.000,00 776.600,00
35 Closet Duduk INA Ina (Warna Gelap) bh 1.704.000,00 1.874.400,00
36 Closet Duduk INA Warna Standar bh 2.226.000,00 2.448.600,00
37 Closet Duduk American Standard Type GR13CAxxK unit 2.363.000,00 2.599.300,00
38 Closet Duduk American Standard Granada Basic Dual Flush CCST unit 2.833.000,00 3.116.300,00
39 Closet Duduk American Standard Newton Smart washer unit 2.860.000,00 3.146.000,00
40 Closet Duduk American Standard Rough in 40/45/47 unit 3.306.000,00 3.636.600,00
41 Closet Duduk American Standard Winplus unit 3.399.000,00 3.738.900,00
42 Closet Duduk American Standard New Codio II One Piece unit 5.102.000,00 5.612.200,00
43 Closet Duduk American Standard Neo Modern unit 5.155.000,00 5.670.500,00
44 Closet Duduk American Standard Acacia CAA4YPC1 unit 8.379.000,00 9.216.900,00
45 Closet Duduk American Standard Acacia HAA4YQC10 unit 8.391.000,00 9.230.100,00
46 Closet Duduk American Standard MOMENTS HAM9YNC10 unit 8.664.000,00 9.530.400,00
47 Closet Duduk American Standard IMAGINE HA01YNC10 unit 9.338.000,00 10.271.800,00
48 Closet Duduk American Standard Acacia One Piece unit 9.739.000,00 10.712.900,00
49 Closet Duduk American Standard LA Vita LA01HA10K unit 12.034.000,00 13.237.400,00
50 Closet Duduk Duty Siram unit 429.000,00 471.900,00
51 Closet Duduk Duty Monoblok unit 1.182.000,00 1.300.200,00
52 Closet Duduk Duty Monoblok model kodok unit 1.289.000,00 1.417.900,00
53 Closet Duduk TOTO C 240 unit 2.916.000,00 3.207.600,00
54 Closet Duduk TOTO CW660NPJ/SW660J unit 2.645.000,00 2.909.500,00
55 Closet Duduk TOTO Monoblock Closet tipe 421 unit 2.778.000,00 3.055.800,00
56 Closet Duduk TOTO CW421J/SW420JP unit 2.912.000,00 3.203.200,00
57 Closet Duduk TOTO CW660PJ/SW660J unit 2.917.000,00 3.208.700,00
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
58 Closet Duduk TOTO CW702J/SW784JP unit 3.403.000,00 3.743.300,00
59 Closet Duduk TOTO CE9/TV150NWV12J unit 3.534.000,00 3.887.400,00
60 Urinoir Lengkap TOTO Warna Standard unit 2.124.000,00 2.336.400,00
61 Penyekat Poslin Urinoir TOTO lbr 623.000,00 685.300,00
62 Kitchen Zink Stainless Standard Lokal 1 Lubang bh 593.000,00 652.300,00

148
63 Kitchen Zink Stainless) Non Standard Franke 1 Lubang bh 501.000,00 551.100,00
64 Kitchen Zink Stainless Non Standard Franke 1 Lubang bh 168.000,00 184.800,00
65 Talang PVC U-15 cm btg 93.000,00 102.300,00
66 Water Drain + Acsesoris set 84.000,00 92.400,00
67 Bak Mandi Fiberglass unit 304.000,00 334.400,00
68 Bak KM Fiber 60 x 60 bh 186.000,00 204.600,00
69 Bak Taraso WC 40 x 40 bh 220.000,00 242.000,00
70 Bak KM Taraso 60 x 60 bh 61.000,00 67.100,00
71 Seal Tape bh 6.000,00 6.600,00
72 Spoel Hoek Stainless Steel Dimensi Sink : 560×456 bh 9.443.000,00 10.387.300,00
73 Spoel Hoek Keramik Dimensi Sink : 560×456 bh 13.288.000,00 14.616.800,00
74 Spoel Hoek TOTO SK322E Dimensi Sink : 560×456 bh 15.851.000,00 17.436.100,00
75 Spoel Hoek TOTO SK33 Dimensi Sink 508x660 bh 10.954.000,00 12.049.400,00
76 Spoel Hoek TOTO SK508 Dimensi Sink 595x500 bh 6.638.000,00 7.301.800,00

W. ASPAL, BAHAN BAKAR DAN PELUMAS


HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
1 Lataston / HRS ton 1.755.000,00 1.930.500,00
2 Laston / AC (Asphalt Concrete) ton 1.720.000,00 1.892.000,00
3 Laston / AC (Asphalt Concrete) Special ton 1.820.000,00 2.002.000,00
4 Laston AC-WC ton 1.650.000,00 1.815.000,00
5 Laston AC - BC ton 1.550.000,00 1.705.000,00

149
6 Laston AC-Base Ton 1.525.000,00 1.677.500,00
7 Shand Sheet ton 1.900.000,00 2.090.000,00
8 Shand Sheet Special ton 1.970.000,00 2.167.000,00
9 ATB (Asphalt Trade Base) ton 1.400.000,00 1.540.000,00
10 Coldmix ton 1.615.000,00 1.776.500,00
11 Emulsi 1 Drum 200 Liter drum 2.894.000,00 3.183.400,00
12 Tack Coat liter 17.000,00 18.700,00
13 Prime Coat liter 18.000,00 19.800,00
14 Aspal Pertamina KW 1 Pen. 60/ 70 - 1 Drum 155 kg drum 1.990.000,00 1.990.000,00
15 Aspal Pertamina KW 2 Pen. 60/ 70 - 1 Drum 155 kg drum 1.450.000,00 1.450.000,00
16 Aspal ESSO Pen. 60/ 70 - 1 Drum 155 kg drum 1.417.000,00 1.417.000,00
17 Aspal Shell Pen. 60/ 70 - 1 Drum 155 kg drum 1.457.000,00 1.457.000,00
18 Aspal Caltex Pen. 60/ 70 - 1 Drum 155 kg drum 1.484.000,00 1.484.000,00
19 Aspal Iran Pen. 60/ 70 - 1 Drum 155 kg drum 1.468.000,00 1.468.000,00
20 Aspal Araco Pen. 60/ 70 - 1 Drum 155 kg drum 1.754.000,00 1.754.000,00
21 Aspal Bitumen kg 19.000,00 19.000,00
22 Aspal ESSO kg 16.000,00 17.600,00
23 Aspal RC 70 (Cilacap) kg 18.000,00 19.800,00
24 Minyak Tanah Non Subsidi lt 15.600,00 17.160,00
25 Minyak Solar Non Subsidi lt 12.000,00 13.200,00
26 Bio Solar lt 7.000,00 7.700,00
27 Dexlite lt 12.200,00 13.420,00
28 Pertamina Dex lt 14.200,00 15.620,00
29 Bensin Premium lt 8.900,00 9.790,00
30 Pertalite lt 11.500,00 12.650,00
31 Pertamax lt 12.900,00 14.190,00
32 Pertamax Turbo lt 14.500,00 15.950,00
33 Pertamax Racing lt 56.700,00 62.370,00
34 Kayu Bakar m3 404.400,00 444.840,00
35 Bahan Bakar Residu lt 10.800,00 11.880,00
36 Plus Oil lt 136.000,00 149.600,00
37 Oil Mesran 40 SAE lt 95.000,00 104.500,00
38 Elpiji 15 Kg tabung 235.900,00 259.490,00
39 Asitilin 15 Kg tabung 472.200,00 519.420,00
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
40 Angin ( O2 ) tabung 111.700,00 122.870,00
41 Karbit kg 70.800,00 77.880,00
42 Minyak Bekisting ltr 54.400,00 59.840,00
43 Rapidrant Gln 27.000,00 29.700,00
44 Soda Api kg 27.000,00 29.700,00
45 Sabun kg 11.500,00 12.650,00
46 Arang Kayu kg 6.800,00 7.480,00

150
X. PAVING BLOK, CONBLOC
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
1 Conbloc 4 t=6 cm warna Abu P=21 cm L=10.5 cm 1 m2 = 45 bh m2 205.000,00 225.500,00
2 Conbloc 4 t= 6 cm warna Merah P=21 cm L=10.5 cm 1 m2 = 45 bh m2 239.000,00 262.900,00
3 Conbloc 4 t=6 cm warna Hijau P=21 cm L=10.5 cm 1 m2 = 45 bh m2 261.000,00 287.100,00
4 Conbloc 4 t=8 cm warna Abu P=21 cm L=10.5 cm 1 m2 = 45 bh m2 238.000,00 261.800,00
5 Conbloc 4 t=8 cm warna Merah P=21 cm L=10.5 cm 1 m2 = 45 bh m2 272.000,00 299.200,00
6 Conbloc 4 t=8 cm warna Hijau P=21 cm L=10.5 cm 1 m2 = 45 bh m2 302.000,00 332.200,00
7 Conbloc 4 t=10 cm warna Abu P=21 cm L=10.5 cm 1 m2 = 45 bh m2 307.000,00 337.700,00
8 Conbloc 4 t=10 cm warna Merah P=21 cm L=10.5 cm 1 m2 = 45 bh m2 344.000,00 378.400,00
9 Conbloc 4 t=10 cm warna Hijau P=21 cm L=10.5 cm 1 m2 = 45 bh m2 392.000,00 431.200,00
10 Conbloc 16 t=6 cm warna Abu P=22.5 cm L=11.5 cm 1 m2 = 40 bh m2 211.000,00 232.100,00
11 Conbloc 16 t=6 cm warna Merah P=22.5 cm L=11.5 cm 1 m2 = 40 bh m2 239.000,00 262.900,00
12 Conbloc 16 t=6 cm warna Hijau P=22.5 cm L=11.5 cm 1 m2 = 40 bh m2 268.000,00 294.800,00
13 Conbloc 16 t= 8 cm warna Abu P=22.5 cm L=11.5 cm 1 m2 = 40 bh m2 245.000,00 269.500,00
14 Conbloc 16 t=8 cm warna Merah P=22.5 cm L=11.5 cm 1 m2 = 40 bh m2 280.000,00 308.000,00
15 Conbloc 16 t=8 cm warna Hijau P=22.5 cm L=11.5 cm 1 m2 = 40 bh m2 307.000,00 337.700,00
16 Conbloc t= 8 cm warna Abu P=21 cm L=7 cm 1 m2 = 60 bh m2 251.000,00 276.100,00
17 Conbloc t=8 cm warna Merah P=21 cm L=7 cm 1 m2 = 60 bh m2 284.000,00 312.400,00
18 Conbloc t= 8 cm warna Hijau P=21 cm L=7 cm 1 m2 = 60 bh m2 313.000,00 344.300,00
19 Conbloc Veta t= 6 cm warna Abu P=10.5 cm L=10.5 cm 1 m2 = 90 bh m2 206.000,00 226.600,00
20 Conbloc Veta t= 6 cm warna Merah P=10.5 cm L=10.5 cm 1 m2 = 90 bh m2 242.000,00 266.200,00
21 Conbloc Veta t= 6 cm warna Hijau P=10.5 cm L=10.5 cm 1 m2 = 90 bh m2 268.000,00 294.800,00
22 Conbloc Veta t= 8 cm warna Abu P=10.5 cm L=10.5 cm 1 m2 = 90 bh m2 240.000,00 264.000,00
23 Conbloc Veta t= 8 cm warna Merah P=10.5 cm L=10.5 cm 1 m2 = 90 bh m2 277.000,00 304.700,00
24 Conbloc Veta t= 8 cm warna Hijau P=10.5 cm L=10.5 cm 1 m2 = 90 bh m2 307.000,00 337.700,00
25 Conbloc Munich t= 8 cm warna Abu P=22.5 cm L=13.5 cm 1 m2 = 39 bh m2 251.000,00 276.100,00
26 Conbloc Munich t= 8 cm warna Merah P=22.5 cm L=13.5 cm 1 m2 = 39 bh m2 284.000,00 312.400,00
27 Conbloc Munich t= 8 cm warna Hijau P=22.5 cm L=13.5 cm 1 m2 = 39 bh m2 313.000,00 344.300,00
28 Conbloc Roma t= 8 cm warna Abu P=20 cm L=16 cm 1 m2 = 35 bh m2 248.000,00 272.800,00
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
29 Conbloc Roma t= 8 cm warna Merah P=20 cm L=16 cm 1 m2 = 35 bh m2 276.000,00 303.600,00
30 Conbloc Roma t= 8 cm warna Hijau P=20 cm L=16 cm 1 m2 = 35 bh m2 297.000,00 326.700,00
31 Conbloc Zurrich t= 8 cm warna Abu P=21.9 cm L=6.5 cm 1 m2 = 30 bh m2 251.000,00 276.100,00
32 Conbloc Zurrich t= 8 cm warna Merah P=21.9 cm L=6.5 cm 1 m2 = 30 bh m2 285.000,00 313.500,00
33 Conbloc Zurrich t= 8 cm warna Hijau P=21.9 cm L=6.5 cm 1 m2 = 30 bh m2 313.000,00 344.300,00
Conbloc Topi Uskup t= 8 cm warna
34 P=21 cm L=30 cm 1 m2 = 25 bh m2 251.000,00 276.100,00
Abu
Conbloc Topi Uskup t=8cm warna
35 P=21 cm L=30 cm 1 m2 = 25 bh m2 295.000,00 324.500,00
Merah
Conbloc Topi Uskup t= 8 cm warna
36 P=21 cm L=30 cm 1 m2 = 25 bh m2 307.000,00 337.700,00
Hijau

151
37 Conbloc Milan t= 6 cm warna Abu P=20 cm L=11.5 cm 1 m2 = 29 bh m2 210.000,00 231.000,00
38 Conbloc Milan t= 6 cm warna Merah P=20 cm L=11.5 cm 1 m2 = 29 bh m2 241.000,00 265.100,00
39 Conbloc Milan t= 6 cm warna Hijau P=20 cm L=11.5 cm 1 m2 = 29 bh m2 274.000,00 301.400,00
40 Cobblestone 21 t= 8 cm warna Abu P=21 cm L=21 cm 1 m2 = 22.5 bh m2 250.000,00 275.000,00
41 Cobblestone 21 t= 8 cm warna Merah P=21 cm L=21 cm 1 m2 = 22.5 bh m2 280.000,00 308.000,00
42 Cobblestone 21 t= 8 cm warna Hijau P=21 cm L=21 cm 1 m2 = 22.5 bh m2 307.000,00 337.700,00
43 Cobblestone 31 t= 8 cm warna Abu P=31 cm L=31 cm 1 m2 = 10 bh m2 251.000,00 276.100,00
44 Cobblestone 31 t= 8 cm warna Merah P=31 cm L=31 cm 1 m2 = 10 bh m2 285.000,00 313.500,00
45 Cobblestone 31 t= 8 cm warna Hijau P=31 cm L=31 cm 1 m2 = 10 bh m2 313.000,00 344.300,00
46 Conbloc Viena t= 8 cm warna Abu P=21 cm L=21 cm 1 m2 = 24 bh m2 245.000,00 269.500,00
47 Conbloc Viena t= 8 cm warna Merah P=21 cm L=21 cm 1 m2 = 24 bh m2 278.000,00 305.800,00
48 Conbloc Viena t= 8 cm warna Hijau P=21 cm L=21 cm 1 m2 = 24 bh m2 307.000,00 337.700,00
CONSTONE & CONSLAB
1 Constone t= 5 cm Warna Shadow m2 459.000,00 504.900,00
2 Constone t= 5 cm Warna Abu m2 304.000,00 334.400,00
3 Constone t= 5 cm Warna Merah m2 351.000,00 386.100,00
4 Constone t= 5 cm Warna Hijau m2 385.000,00 423.500,00
5 Tactile Difable (Dot) bh 41.000,00 45.100,00
6 Tactile Difable (Stripe) bh 41.000,00 45.100,00
ECOBLOC
1 Grassbloc t= 8 cm warna Abu 1m2 = 12.5 bh m2 224.000,00 246.400,00
2 Grassbloc t= 10 cm warna Abu 1m2 = 12.5 bh m2 281.000,00 309.100,00
3 Grasstone t=8 cm warna Abu 1m2 = 6.25 bh m2 297.000,00 326.700,00
4 Grasstone t=8 cm warna Merah 1m2 = 6.25 bh m2 335.000,00 368.500,00
5 Grasstone t=8 cm warna Hijau 1m2 = 6.25 bh m2 367.000,00 403.700,00
6 Footprint t=8 cm warna Abu 1m2 = 21 bh m2 311.000,00 342.100,00
7 Footprint t=8 cm warna Merah 1m2 = 21 bh m2 344.000,00 378.400,00
8 Footprint t=8 cm warna Hijau 1m2 = 21 bh m2 376.000,00 413.600,00
KERB/KANSTEIN -
1 Kanstein 10.61 (Jepit) 1m = 2,57 bh Buah 34.000,00 37.400,00
2 Kanstein 15.25.20 (Tahu) 1m = 5 bh Buah 44.000,00 48.400,00
3 Kanstein 15.25.40 (Tahu) 1m = 2,5 bh Buah 75.000,00 82.500,00
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
4 Kanstein 15.30.20 (DKI) 1m = 5 bh Buah 47.000,00 51.700,00
5 Kanstein 15.30.40 (DKI) 1m = 2,5 bh Buah 79.000,00 86.900,00
6 Kanstein 15.30.60 (DKI) 1m = 1,67 bh Buah 130.000,00 143.000,00
7 Kanstein 15.30.80 (DKI) 1m = 1,25 bh Buah 173.000,00 190.300,00
8 Kanstein 19.20.20 (Kapuk) 1m = 5 bh Buah 40.000,00 44.000,00
9 Kanstein 19.20.40 (Kapuk) 1m = 2,5 bh Buah 68.000,00 74.800,00
10 Kanstein 19.20.80 (Kapuk) 1m = 1,25 bh Buah 149.000,00 163.900,00
11 Kanstein BCD 1m = 10 bh Buah 27.000,00 29.700,00
12 Kanstein 15.15.50 (Car Stoper) 1m = 2 bh Buah 81.000,00 89.100,00
13 Kanstein Pilar P= 15 cm T=50 cm L= 20 cm Buah 77.000,00 84.700,00

152
14 Mulut Air Kanstein 19.20.40 (Kapuk) 1m = 2,5 bh Buah 72.000,00 79.200,00
15 Tali Air A40 Buah 49.000,00 53.900,00
16 Tali Air A20 Buah 34.000,00 37.400,00
17 Mulut Air Kotak C Buah 44.000,00 48.400,00
18 Mulut Air Kotak D Buah 810.000,00 891.000,00
19 Mulut Air BSD Buah 420.000,00 462.000,00
20 Mulut Air MAP Buah 194.000,00 213.400,00
21 Mulut Air Kanstein 15.25.40 (Tahu) Buah 88.000,00 96.800,00
PAVING BLOCK
PAVING BLOCK MANUAL
1 Paving Blok Natural 8 cm m2 110.000,00 121.000,00
2 Paving Blok Warna 8 cm m2 125.000,00 137.500,00
3 Paving Blok Natural 6 cm m2 100.000,00 110.000,00
4 Paving Blok Warna 6 cm m2 115.000,00 126.500,00
PAVING BLOCK PRESS MESIN MUTU K-300
PAVING BLOCK TIPE BATA
5 Paving Block t=6 cm Natural P=21cm L=10.5cm 1m2= 44 bh m2 140.000,00 154.000,00
6 Paving Block t=6 cm Merah P=21cm L=10.5cm 1m2= 44 bh m2 156.000,00 171.600,00
7 Paving Block t=6 cm Hijau P=21cm L=10.5cm 1m2= 44 bh m2 160.000,00 176.000,00
8 Paving Block t=8 cm Natural P=21cm L=10.5cm 1m2= 44 bh m2 159.000,00 174.900,00
9 Paving Block t=8 cm Merah P=21cm L=10.5cm 1m2= 44 bh m2 175.000,00 192.500,00
10 Paving Block t=8 cm Hijau P=21cm L=10.5cm 1m2= 44 bh m2 179.000,00 196.900,00
11 Paving Block t=10 cm Natural P=21cm L=10.5cm 1m2= 44 bh m2 218.000,00 239.800,00
12 Paving Block t=10 cm Merah P=21cm L=10.5cm 1m2= 44 bh m2 234.000,00 257.400,00
13 Paving Block t=10 cm Hijau P=21cm L=10.5cm 1m2= 44 bh m2 238.000,00 261.800,00
PAVING TIPE HEXAGON
14 Paving Block t=6 cm Natural P=22.5cm L=11.2cm 1m2= 27 bh m2 144.000,00 158.400,00
15 Paving Block t=6 cm Merah P=22.5cm L=11.2cm 1m2= 27 bh m2 160.000,00 176.000,00
16 Paving Block t=6 cm Hijau P=22.5cm L=11.2cm 1m2= 27 bh m2 164.000,00 180.400,00
17 Paving Block t=8 cm Natural P=22.5cm L=11.2cm 1m2= 27 bh m2 163.000,00 179.300,00
18 Paving Block t=8 cm Merah P=22.5cm L=11.2cm 1m2= 27 bh m2 179.000,00 196.900,00
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
19 Paving Block t=8 cm Hijau P=22.5cm L=11.2cm 1m2= 27 bh m2 183.000,00 201.300,00
PAVING TIPE CACING
20 Paving Block t=6 cm Natural P=22.5cm L=11.2cm 1m2= 39 bh m2 144.000,00 158.400,00
21 Paving Block t=6 cm Merah P=22.5cm L=11.2cm 1m2= 39 bh m2 160.000,00 176.000,00
22 Paving Block t=6 cm Hijau P=22.5cm L=11.2cm 1m2= 39 bh m2 164.000,00 180.400,00
23 Paving Block t=8 cm Natural P=22.5cm L=11.2cm 1m2= 39 bh m2 163.000,00 179.300,00
24 Paving Block t=8 cm Merah P=22.5cm L=11.2cm 1m2= 39 bh m2 179.000,00 196.900,00
25 Paving Block t=8 cm Hijau P=22.5cm L=11.2cm 1m2= 39 bh m2 183.000,00 201.300,00
PAVING TIPE TRIHEX
26 Paving Block t=6 cm Natural P=22.5cm L=11.2cm 1m2= 39 bh m2 144.000,00 158.400,00
27 Paving Block t=6 cm Merah P=22.5cm L=11.2cm 1m2= 39 bh m2 160.000,00 176.000,00

153
28 Paving Block t=6 cm Hijau P=22.5cm L=11.2cm 1m2= 39 bh m2 164.000,00 180.400,00
29 Paving Block t=8 cm Natural P=22.5cm L=11.2cm 1m2= 39 bh m2 163.000,00 179.300,00
30 Paving Block t=8 cm Merah P=22.5cm L=11.2cm 1m2= 39 bh m2 179.000,00 196.900,00
31 Paving Block t=8 cm Hijau P=22.5cm L=11.2cm 1m2= 39 bh m2 183.000,00 201.300,00
PAVING TIPE UBIN
32 Paving Block Kecil t=6 cm Natural P=10.5cm L=10.5cm 1m2= 88 bh m2 157.000,00 172.700,00
33 Paving Block Kecil t=6 cm Merah P=10.5cm L=10.5cm 1m2= 88 bh m2 173.000,00 190.300,00
34 Paving Block Kecil t=6 cm Hijau P=10.5cm L=10.5cm 1m2= 88 bh m2 177.000,00 194.700,00
35 Paving Block Besar t=6 cm Natural P=21cm L=21cm 1m2= 22 bh m2 157.000,00 172.700,00
36 Paving Block Besar t=6 cm Merah P=21cm L=21cm 1m2= 22 bh m2 173.000,00 190.300,00
37 Paving Block Besar t=6 cm Hijau P=21cm L=21cm 1m2= 22 bh m2 177.000,00 194.700,00
38 Paving Block Besar t=8 cm Natural P=21cm L=21cm 1m2= 22 bh m2 176.000,00 193.600,00
39 Paving Block Besar t=8 cm Merah P=21cm L=21cm 1m2= 22 bh m2 192.000,00 211.200,00
40 Paving Block Besar t=8 cm Hijau P=21cm L=21cm 1m2= 22 bh m2 196.000,00 215.600,00
PAVING TIPE TOPI USKUP
41 Paving Block t=6 cm Natural P=30cm L=21cm 1m'= 3.3 bh m' 14.000,00 15.400,00
42 Paving Block t=8 cm Natural P=30cm L=21cm 1m'= 3.3 bh m' 15.000,00 16.500,00
GRASS BLOCK MANUAL
43 Grass Block 20 x 20 bh 28.000,00 30.800,00
44 Grass Block 30 x 30 bh 23.000,00 25.300,00
GRASS BLOCK PRESS MESIN K-250
45 Grass Block Lobang 8 t= 6 cm P=45cm L=30cm 1m2= 7.5 bh Buah 30.000,00 33.000,00
46 Grass Block Lobang 8 t= 8 cm P=45cm L=30cm 1m2= 7.5 bh Buah 32.000,00 35.200,00
47 Grass Block Lobang 5 t= 8 cm P=40cm L=40cm 1m2= 6.5 bh Buah 33.000,00 36.300,00
48 Grass Block Lobang 2 t= 8 cm P=20cm L=20cm 1m2= 13 bh Buah 21.000,00 23.100,00

154
Y. SALURAN DAN GORONG-GORONG
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
1 U-Ditch 30 - 30 - 120 cm btg 418.000,00 459.800,00
2 U-Ditch 30 - 40 - 120 cm btg 482.000,00 530.200,00
3 U-Ditch 30 - 50 - 120 cm btg 633.000,00 696.300,00
4 U-Ditch 40 - 30 - 120 cm btg 526.000,00 578.600,00
5 U-Ditch 40 - 40 - 120 cm btg 616.000,00 677.600,00
6 U-Ditch 40 - 50 - 120 cm btg 728.000,00 800.800,00
7 U-Ditch 40 - 60 - 120 cm btg 875.000,00 962.500,00
8 U-Ditch 50 - 30 - 120 cm btg 626.000,00 688.600,00
9 U-Ditch 50 - 40 - 120 cm btg 721.000,00 793.100,00
10 U-Ditch 50 - 50 - 120 cm btg 893.000,00 982.300,00
11 U-Ditch 50 - 60 - 120 cm btg 952.000,00 1.047.200,00
12 U-Ditch 50 - 70 - 120 cm btg 1.115.000,00 1.226.500,00
13 U-Ditch 60 - 40 - 120 cm btg 826.000,00 908.600,00
14 U-Ditch 60 - 50 - 120 cm btg 952.000,00 1.047.200,00
15 U-Ditch 60 - 60 - 120 cm btg 1.148.000,00 1.262.800,00
16 U-Ditch 60 - 70 - 120 cm btg 1.290.000,00 1.419.000,00
17 U-Ditch 60 - 80 - 120 cm btg 1.449.000,00 1.593.900,00
18 U-Ditch 80 - 60 - 120 cm btg 1.449.000,00 1.593.900,00
19 U-Ditch 80 - 70 - 120 cm btg 1.554.000,00 1.709.400,00
20 U-Ditch 80 - 80 - 120 cm btg 1.659.000,00 1.824.900,00
21 U-Ditch 80 - 100 - 120 cm btg 2.006.000,00 2.206.600,00
22 U-Ditch 80 - 120 - 120 cm btg 2.782.000,00 3.060.200,00
23 U-Ditch 100 - 80 - 120 cm btg 2.020.000,00 2.222.000,00
24 U-Ditch 100 - 100 - 120 cm btg 2.502.000,00 2.752.200,00
25 U-Ditch 100 - 120 - 120 cm btg 2.908.000,00 3.198.800,00
26 U-Ditch 100 - 140 - 120 cm btg 3.365.000,00 3.701.500,00
27 U-Ditch 120 - 100 - 120 cm btg 3.703.000,00 4.073.300,00
28 U-Ditch 120 - 120 - 120 cm btg 3.746.000,00 4.120.600,00
29 U-Ditch 120 - 140 - 120 cm btg 3.787.000,00 4.165.700,00
30 U-Ditch 120 - 160 - 120 cm btg 3.829.000,00 4.211.900,00
31 U-Ditch 140 - 120 - 120 cm btg 4.350.000,00 4.785.000,00
32 U-Ditch 140 - 140 - 120 cm btg 5.074.000,00 5.581.400,00
33 U-Ditch 140 - 160 - 120 cm btg 5.919.000,00 6.510.900,00
34 U-Ditch 140 - 180 - 120 cm btg 6.905.000,00 7.595.500,00
35 U-Ditch 150 - 150 - 120 cm btg 5.828.000,00 6.410.800,00
36 U-Ditch 160 - 140 - 120 cm btg 6.922.000,00 7.614.200,00
37 U-Ditch 160 - 160 - 120 cm btg 7.691.000,00 8.460.100,00
38 U-Ditch 160 - 180 - 120 cm btg 8.461.000,00 9.307.100,00
39 U-Ditch 160 - 200 - 120 cm btg 9.307.000,00 10.237.700,00
40 U-Ditch 180 - 180 - 120 cm btg 7.916.000,00 8.707.600,00

155
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
41 U-Ditch 200 - 200 - 100 cm btg 10.386.000,00 11.424.600,00
42 U-Ditch 250 - 230 - 100 cm btg 12.588.000,00 13.846.800,00
GORONG - GORONG PERSEGI / BOX CULVERT (BC)
1 BC 40 - 40 - 100 cm btg 1.359.000,00 1.494.900,00
2 BC 50 - 50 - 100 cm btg 1.810.000,00 1.991.000,00
3 BC 60 - 60 - 100 cm btg 2.273.000,00 2.500.300,00
4 BC 80 - 80 - 100 cm btg 3.455.000,00 3.800.500,00
5 BC 100 - 100 - 100 cm btg 4.882.000,00 5.370.200,00
6 BC 120 - 120 - 100 cm btg 6.328.000,00 6.960.800,00
7 BC 140 - 140 - 100 cm btg 8.595.000,00 9.454.500,00
8 BC 150 - 150 - 100 cm btg 10.170.000,00 11.187.000,00
9 BC 160 - 220 - 100 cm btg 13.764.000,00 15.140.400,00
10 BC 180 - 180 - 100 cm btg 11.801.000,00 12.981.100,00
11 BC 200 - 200 - 100 cm btg 16.141.000,00 17.755.100,00
12 BC 220 - 160 - 100 cm btg 14.559.000,00 16.014.900,00
13 BC 225 - 225 - 100 cm btg 20.049.000,00 22.053.900,00
14 BC 300 - 150 - 100 cm btg 26.477.000,00 29.124.700,00
15 BC 260 - 230 - 100 cm Top & Bottom btg 26.476.000,00 29.123.600,00
16 BC 260 - 250 - 100 cm Top & Bottom btg 26.644.000,00 29.308.400,00
17 BC 260 - 280 - 100 cm Top & Bottom btg 27.482.000,00 30.230.200,00
18 BC 300 - 250 - 100 cm Top & Bottom btg 29.417.000,00 32.358.700,00
19 BC 300 - 300 - 100 cm Top & Bottom btg 31.009.000,00 34.109.900,00
20 BC 300 - 400 - 100 cm Top & Bottom btg 35.524.000,00 39.076.400,00
21 BC 400 - 250 - 100 cm Top & Bottom btg 42.240.000,00 46.464.000,00
22 BC 400 - 300 - 100 cm Top & Bottom btg 44.614.000,00 49.075.400,00
TUTUP SALURAN U-DITCH STANDAR-BEBAN RINGAN / LIGHT-DUTY (LD)
1 Tutup STU 30 - 60 cm LD btg 113.000,00 124.300,00
2 Tutup STU 40 - 60 cm LD btg 165.000,00 181.500,00
3 Tutup STU 50 - 60 cm LD btg 218.000,00 239.800,00
4 Tutup STU 60 - 60 cm LD btg 270.000,00 297.000,00
5 Tutup STU 80 - 60 cm LD btg 370.000,00 407.000,00
6 Tutup STU 100 - 60 cm LD btg 520.000,00 572.000,00
7 Tutup STU 120 - 60 cm LD btg 639.000,00 702.900,00
8 Tutup STU 140 - 60 cm LD btg 764.000,00 840.400,00
9 Tutup STU 150 - 60 cm LD btg 871.000,00 958.100,00
10 Tutup STU 160 - 60 cm LD btg 950.000,00 1.045.000,00
11 Tutup STU 180 - 60 cm LD btg 1.164.000,00 1.280.400,00
12 Tutup STU 200 - 60 cm LD btg 1.373.000,00 1.510.300,00
TUTUP SALURAN U-DITCH STANDAR-BEBAN BERAT / HEAVY-DUTY (HD)
1 Tutup STU 30 - 60 cm HD btg 163.000,00 179.300,00
2 Tutup STU 40 - 60 cm HD btg 236.000,00 259.600,00
3 Tutup STU 50 - 60 cm HD btg 339.000,00 372.900,00

156
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
4 Tutup STU 60 - 60 cm HD btg 471.000,00 518.100,00
5 Tutup STU 80 - 60 cm HD btg 610.000,00 671.000,00
6 Tutup STU 100 - 60 cm HD btg 805.000,00 885.500,00
7 Tutup STU 120 - 60 cm HD btg 984.000,00 1.082.400,00
8 Tutup STU 140 - 60 cm HD btg 1.210.000,00 1.331.000,00
9 Tutup STU 150 - 60 cm HD btg 1.345.000,00 1.479.500,00
10 Tutup STU 160 - 60 cm HD btg 1.591.000,00 1.750.100,00
11 Tutup STU 180 - 60 cm HD btg 1.848.000,00 2.032.800,00
12 Tutup STU 200 - 60 cm HD btg 2.206.000,00 2.426.600,00
PIPA SOCKET JOINT CLASS 1 MUTU BETON K-500; BAJA TULANGAN U-50 HDDW
1 Pipa Socket Joint Class 1 Dia. 400mm P=2440mm buah 1.110.000,00 1.221.000,00
2 Pipa Socket Joint Class 1 Dia. 500mm P=2440mm buah 1.485.000,00 1.633.500,00
3 Pipa Socket Joint Class 1 Dia. 600mm P=2440mm buah 2.087.000,00 2.295.700,00
4 Pipa Socket Joint Class 1 Dia. 800mm P=2440mm buah 3.881.000,00 4.269.100,00
5 Pipa Socket Joint Class 1 Dia. 1000mm P=2440mm buah 6.815.000,00 7.496.500,00
PIPA SOCKET JOINT CLASS 2 MUTU BETON K-500; BAJA TULANGAN U-50 HDDW
1 Pipa Socket Joint Class 2 Dia. 400mm P=2440mm buah 1.545.000,00 1.699.500,00
2 Pipa Socket Joint Class 2 Dia. 500mm P=2440mm buah 2.036.000,00 2.239.600,00
3 Pipa Socket Joint Class 2 Dia. 600mm P=2440mm buah 3.190.000,00 3.509.000,00
4 Pipa Socket Joint Class 2 Dia. 800mm P=2440mm buah 4.795.000,00 5.274.500,00
5 Pipa Socket Joint Class 2 Dia. 1000mm P=2440mm buah 7.204.000,00 7.924.400,00
PIPA FLASH JOINT CLASS 1 MUTU BETON K-500; BAJA TULANGAN U-50 HDDW
1 Pipa Flash Joint Class 1 Dia. 400mm P=2440mm buah 968.000,00 1.064.800,00
2 Pipa Flash Joint Class 1 Dia. 500mm P=2440mm buah 1.349.000,00 1.483.900,00
3 Pipa Flash Joint Class 1 Dia. 600mm P=2440mm buah 1.826.000,00 2.008.600,00
4 Pipa Flash Joint Class 1 Dia. 800mm P=2440mm buah 2.546.000,00 2.800.600,00
5 Pipa Flash Joint Class 1 Dia. 1000mm P=2440mm buah 4.370.000,00 4.807.000,00
6 Pipa Flash Joint Class 1 Dia. 1200mm P=2440mm buah 5.753.000,00 6.328.300,00
7 Pipa Flash Joint Class 1 Dia. 1500mm P=2440mm buah 8.993.000,00 9.892.300,00

157
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
PIPA FLASH JOINT CLASS 2 MUTU BETON K-500; BAJA TULANGAN U-50 HDDW
1 Pipa Flash Joint Class 2 Dia. 400mm P=2440mm buah 1.078.000,00 1.185.800,00
2 Pipa Flash Joint Class 2 Dia. 500mm P=2440mm buah 1.465.000,00 1.611.500,00
3 Pipa Flash Joint Class 2 Dia. 600mm P=2440mm buah 1.955.000,00 2.150.500,00
4 Pipa Flash Joint Class 2 Dia. 800mm P=2440mm buah 3.128.000,00 3.440.800,00
5 Pipa Flash Joint Class 2 Dia. 1000mm P=2440mm buah 4.838.000,00 5.321.800,00
6 Pipa Flash Joint Class 2 Dia. 1200mm P=2440mm buah 6.295.000,00 6.924.500,00
7 Pipa Flash Joint Class 2 Dia. 1500mm P=2440mm buah 10.637.000,00 11.700.700,00
PANEL PAGAR BETON
1 Daun Panel Pagar Beton Polos Uk. 240 x 40 x 5 cm bh 205.000,00 225.500,00
2 Daun Panel Pagar Beton Motif 240 x 40 x 5 cm bh 215.000,00 236.500,00
3 Daun Panel Pagar Beton Tembus 240 x 40x 5 cm bh 215.000,00 236.500,00
4 Daun Panel Pagar Beton Polos 240 x 45 x 5 cm bh 226.000,00 248.600,00
5 Tiang Panel Pagar Beton T=220 cm Uk.17,5 x 17,5 cm bh 372.000,00 409.200,00
6 Tiang Panel Pagar Beton T=270 cm Uk 17,5 x 17,5 cm bh 435.000,00 478.500,00
7 Tiang Panel Pagar Beton T=300 cm Uk 17,5 x 17,5 cm bh 508.000,00 558.800,00
8 Tiang Panel Pagar Beton T=320 cm Uk 17,5 x 17,5 cm bh 524.000,00 576.400,00
9 Tiang Panel Pagar Beton T=370 cm Uk 17,5 x 17,5 cm bh 634.000,00 697.400,00
10 Tiang Panel Pagar Beton T=420 cm Uk 17,5 x 17,5 cm bh 707.000,00 777.700,00
BUIS BETON
1 Buis Beton Belah dia. 20 cm P=100 cm bh 68.000,00 74.800,00
2 Buis Beton Belah dia. 30 cm P=100 cm bh 88.000,00 96.800,00
3 Buis Beton Belah dia. 40 cm P=100 cm bh 108.000,00 118.800,00
4 Buis Beton Belah dia. 50 cm P=100 cm bh 169.000,00 185.900,00
5 Buis Beton Belah dia. 60 cm P=100 cm bh 230.000,00 253.000,00
6 Buis Beton Belah dia. 80 cm P=100 cm bh 459.000,00 504.900,00
7 Buis Beton Belah dia. 100 cm P=100 cm bh 540.000,00 594.000,00
8 Buis Beton dia. 20 cm P=100 cm bh 95.000,00 104.500,00
9 Buis Beton dia. 30 cm P=100 cm bh 129.000,00 141.900,00
10 Buis Beton dia. 40 cm P=100 cm bh 162.000,00 178.200,00
11 Buis Beton dia. 50 cm P=100 cm bh 250.000,00 275.000,00
12 Buis Beton dia. 60 cm P=100 cm bh 338.000,00 371.800,00
13 Buis Beton dia. 80 cm P=100 cm bh 675.000,00 742.500,00
14 Buis Beton dia. 100 cm P=100 cm bh 810.000,00 891.000,00

158
Z. BARRIER
HARGA HARGA
BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
BARRIER (BETON) MUTU BETON K-350; BAJA TULANGAN U-50 HDDW
1 Side Barrier 300x700x 2500 mm bh 2.141.000 1.587.000,00
2 Road Barrier 600x800x1000 mm bh 1.410.000 1.044.600,00
3 Road Barrier 600x1000x1000 mm bh 1.658.000 1.228.500,00
WATER BARRIER
1 Road Barrier tipe RTB 50 500x800x1020 mm Kap.120 liter bh 2.294.000 1.700.000,00
2 Road Barrier tipe RTB 50 450x900x1700 mm Kap.120 liter bh 2.698.000 2.000.000,00
TRAFFIC CONE
1 Traffic Cone TC 75 N 430x740 mm bh 405.000 300.000,00
2 Stick Cone ADP-1 370 x 1045 bh 338.000 250.000,00
BOLARD
1 Bollard Tasblock TAS BL 001 T= 800 mm bh 857.000 635.000,00
2 Bollard Tasblock TAS BL 002 T= 800 mm bh 911.000 675.000,00
3 Bollard Tasblock TAS BL 003 T= 470 mm bh 810.000 600.000,00
4 Bollard Tasblock TAS BL 004 T= 800 mm bh 850.000 630.000,00
GUARD RAIL
1 Guard Rail Beam 4.32 m 2.67 x 83 x 310 mm unit 1.437.000 1.064.500,00
2 Guard Rail Beam 4.00 m 2.67 x 83 x 310 mm unit 1.317.000 976.100,00
3 End Block P=0.75 m 2.67 x 83 x 310 mm unit 251.000 185.800,00
4 Post 6.0 6.0 x 175 x 75 mm P=1.8 m unit 794.000 588.300,00
5 Post 5.0 5.0 x 175 x 75 mm P=1.8 m unit 663.000 490.800,00
6 Post 4.5 4.5 x 175 x 75 mm P=1.8 m unit 596.000 441.100,00
7 Steel Block 6.0 6.0 x 175 x 75 mm P=0.35 m unit 154.000 114.000,00
8 Steel Block 5.0 5.0 x 175 x 75 mm P=0.35 m unit 129.000 95.500,00
9 Steel Block 4.5 4.5 x 175 x 75 mm P=0.35 m unit 117.000 86.700,00
10 Mur & Baut Guard Rail Dia. 5/8" x 1-1/4" unit 12.000 8.500,00
11 Mur & Baut Guard Rail Dia. 5/8" x 1-1/4" unit 12.000 8.600,00
12 Mur & Baut Hexagon Dia. 5/8" x 1-1/2" unit 5.000 3.500,00
13 Ring Guard Rail 4.5 x 45 x 75 unit 4.000 2.500,00
14 Guard Rail Reflector unit 25.000 18.000,00

159
AA. PAGAR BRC
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
1 Pagar BRC Hot Dip Type 60 Ø 6mm L =2.4 m T = 0.60 m Panel 336.000 369.600
2 Pagar BRC Hot Dip Type 60 Ø 7mm L =2.4 m T = 0.60 m Panel 447.000 491.700
3 Pagar BRC Hot Dip Type 90 Ø 6mm L =2.4 m T = 0.90 m Panel 385.000 423.500
4 Pagar BRC Hot Dip Type 90 Ø 7mm L =2.4 m T = 0.90 m Panel 509.000 559.900
5 Pagar BRC Hot Dip Type 90 Ø 8mm L =2.4 m T = 0.90 m Panel 653.000 718.300
6 Pagar BRC Hot Dip Type 120 Ø 6mm L =2.4 m T = 1.20 m Panel 474.000 521.400
7 Pagar BRC Hot Dip Type 120 Ø 7mm L =2.4 m T = 1.20 m Panel 629.000 691.900
8 Pagar BRC Hot Dip Type 120 Ø 8mm L =2.4 m T = 1.20 m Panel 815.000 896.500
9 Pagar BRC Hot Dip Type 150 Ø 6mm L =2.4 m T = 1.50 m Panel 571.000 628.100
10 Pagar BRC Hot Dip Type 150 Ø 7mm L =2.4 m T = 1.50 m Panel 759.000 834.900
11 Pagar BRC Hot Dip Type 150 Ø 8mm L =2.4 m T = 1.50 m Panel 976.000 1.073.600
12 Pagar BRC Hot Dip Type 175 Ø 6mm L =2.4 m T = 1.75 m Panel 625.000 687.500
13 Pagar BRC Hot Dip Type 175 Ø 7mm L =2.4 m T = 1.75 m Panel 831.000 914.100
14 Pagar BRC Hot Dip Type 175 Ø 8mm L =2.4 m T = 1.75 m Panel 1.071.000 1.178.100
15 Pagar BRC Hot Dip Type 190 Ø 6mm L =2.4 m T = 1.90 m Panel 662.000 728.200
16 Pagar BRC Hot Dip Type 190 Ø 7mm L =2.4 m T = 1.90 m Panel 877.000 964.700
17 Pagar BRC Hot Dip Type 190 Ø 8mm L =2.4 m T = 1.90 m Panel 1.129.000 1.241.900
1 Pagar BRC Elektroplating 60 Ø 5mm L =2.4 m T = 0.60 m Panel 183.000 201.300
2 Pagar BRC Elektroplating 60 Ø 6mm L =2.4 m T = 0.60 m Panel 283.000 311.300
3 Pagar BRC Elektroplating 60 Ø 7mm L =2.4 m T = 0.60 m Panel 377.000 414.700
4 Pagar BRC Elektroplating 60 Ø 8mm L =2.4 m T = 0.60 m Panel 428.000 470.800
5 Pagar BRC Elektroplating 90 Ø 5mm L =2.4 m T = 0.90 m Panel 218.000 239.800
6 Pagar BRC Elektroplating 90 Ø 6mm L =2.4 m T = 0.90 m Panel 322.000 354.200
7 Pagar BRC Elektroplating 90 Ø 7mm L =2.4 m T = 0.90 m Panel 431.000 474.100
8 Pagar BRC Elektroplating 90 Ø 8mm L =2.4 m T = 0.90 m Panel 555.000 610.500
9 Pagar BRC Elektroplating 120 Ø 5mm L =2.4 m T = 1.20 m Panel 264.000 290.400
10 Pagar BRC Elektroplating 120 Ø 6mm L =2.4 m T = 1.20 m Panel 393.000 432.300
11 Pagar BRC Elektroplating 120 Ø 7mm L =2.4 m T = 1.20 m Panel 524.000 576.400
12 Pagar BRC Elektroplating 120 Ø 8mm L =2.4 m T = 1.20 m Panel 677.000 744.700
13 Pagar BRC Elektroplating 150 Ø 6mm L =2.4 m T = 1.50 m Panel 467.000 513.700
14 Pagar BRC Elektroplating 150 Ø 7mm L =2.4 m T = 1.50 m Panel 630.000 693.000
15 Pagar BRC Elektroplating 150 Ø 8mm L =2.4 m T = 1.50 m Panel 813.000 894.300
16 Pagar BRC Elektroplating 175 Ø 6mm L =2.4 m T = = 1.75 m Panel 516.000 567.600
17 Pagar BRC Elektroplating 175 Ø 7mm L =2.4 m T = 1.75 m Panel 695.000 764.500
18 Pagar BRC Elektroplating 175 Ø 8mm L =2.4 m T = 1.75 m Panel 898.000 987.800
19 Pagar BRC Elektroplating 190 Ø 6mm L =2.4 m T = 1.90 m Panel 545.000 599.500
20 Pagar BRC Elektroplating 190 Ø 7mm L =2.4 m T = 1.90 m Panel 732.000 805.200
21 Pagar BRC Elektroplating 190 Ø 8mm L =2.4 m T = 1.90 m Panel 946.000 1.040.600
22 Pagar BRC Elektroplating 240 Ø 7mm L =2.4 m T = 2.40 m Panel 853.000 938.300
23 Pagar BRC Elektroplating 240 Ø 8mm L =2.4 m T = 2.40 m Panel 1.104.000 1.214.400

160
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
TIANG BRC
1 Tiang BRC 60 x 1.5" x 85cm Elektroplating Buah 202.000 222.200
2 Tiang BRC 60 x 2.0" x 85cm Elektroplating Buah 246.000 270.600
3 Tiang BRC 90 x 1.5" x 120cm Elektroplating Buah 216.000 237.600
4 Tiang BRC 90 x 2.0" x 120cm Elektroplating Buah 277.000 304.700
5 Tiang BRC 120 x 1.5" x 150cm Elektroplating Buah 277.000 304.700
6 Tiang BRC 120 x 2.0" x 150cm Elektroplating Buah 308.000 338.800
7 Tiang BRC 150 x 1.5" x 200cm Elektroplating Buah 338.000 371.800
8 Tiang BRC 150 x 2.0" x 200cm Elektroplating Buah 369.000 405.900
9 Tiang BRC 175 x 1.5" x 225cm Elektroplating Buah 369.000 405.900
10 Tiang BRC 175 x 2.0" x 225cm Elektroplating Buah 461.000 507.100
11 Tiang BRC 190 x 1.5" x 240cm Elektroplating Buah 400.000 440.000
12 Tiang BRC 190 x 2.0" x 240cm Elektroplating Buah 492.000 541.200
13 Tiang BRC 240 x 1.5" x 300cm Elektroplating Buah 446.000 490.600
14 Tiang BRC 240 x 2.0" x 300cm Elektroplating Buah 507.000 557.700
Pintu Tunggul BRC Galbani
1 Pintu Type SG.90 T1 Tunggal BRC Lebar 90 Tinggi 92 Panel 427.000 469.700
2 Pintu Type SG.90 T2 Tunggal BRC Lebar 90 Tinggi 122 Panel 450.000 495.000
3 Pintu Type SG.120 T1 Tunggal BRC Lebar 90 Tinggi 152 Panel 602.000 662.200
Pintu Tunggul BRC Galbani -
1 Pintu Type SG.120 T2 Tunggal BRC Lebar 90 Tinggi 177 Panel 516.000 567.600
2 Pintu Type SG.175 T1 Tunggal BRC Lebar 90 Tinggi 192 Panel 592.000 651.200
3 Pintu Type SG.175 T2 Tunggal BRC Anti Karat Panel 516.000 567.600
4 Pintu Type SG.190 T1 Tunggal BRC Anti Karat Panel 640.000 704.000
5 Pintu Type SG.190 T2 Tunggal BRC Anti Karat Panel 698.000 767.800
Pintu Ganda BRC Galbani
1 Pintu Type DG. 90 T1 Ganda Ex BRC Lebar 300 Tinggi 92 Panel 989.000 1.087.900
2 Pintu Type DG. 90 72 Ganda Ex BRC Anti Karat Panel 1.820.000 2.002.000
3 Pintu Type DG. 120 T1 Ganda Ex BRC Lebar 300 Tinggi 122 Panel 2.354.000 2.589.400
4 Pintu Type DG. 120 T2 Ganda Ex BRC Anti Karat Panel 1.048.000 1.152.800
5 Pintu Type DG. 175 T1 Ganda Ex BRC Lebar 300 Tinggi 152 Panel 3.806.000 4.186.600
6 Pintu Type DO. 175 T2 Ganda Ex BRC Anti Karat Panel 3.539.000 3.892.900
7 Pintu Type DG. 190 T1 Ganda Ex BRC Lebar 330 Tinggi 177 Panel 3.580.000 3.938.000
8 Pintu Type DG. 190 T2 Ganda Ex BRC Lebar 330 Tinggi 192 Panel 3.571.000 3.928.100

161
BB. PERALATAN TUKANG
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
1 Palu 0.5 kg bh 54.000,00 59.400,00
2 Cangkul bh 76.000,00 83.600,00
3 Singkup bh 100.000,00 110.000,00
4 Sekop bh 102.000,00 112.200,00
5 Pengki bh 16.000,00 17.600,00
6 Linggis bh 69.000,00 75.900,00
7 Rool Meter 30 meter Bahan Plastik bh 115.000,00 126.500,00
8 Rool Meter 5 meter ( Bahan Besi ) bh 40.000,00 44.000,00
9 Selang Plastik Waterpass dia. 0.5cm m 6.000,00 6.600,00
10 Water Pas Alumunium 60 cm bh 86.000,00 94.600,00
PERALATAN K3
1 Bendera K3 bh 228.000,00 250.800,00
2 Sepatu Safety KING'S Safety Shoes bh 539.000,00 592.900,00
3 Sepatu Boot Karet AP Boot bh 122.000,00 134.200,00
4 Safety Line Garis Polisi Barricade Tape 2" x 300mtr bh 48.000,00 52.800,00
5 Sarung Tangan Proyek bh 3.000,00 3.300,00
6 Masker Debu bh 42.000,00 46.200,00
7 Kacamata Medical & Safety bh 75.000,00 82.500,00
8 Kacamata Pelindung Wajah Face Shiled Mask bh 102.000,00 112.200,00
9 Helm Proyek (Safety Helmet) bh 162.000,00 178.200,00
10 Rompi Keselamatan (Safety Fest) bh 61.000,00 67.100,00
SCAFOLDING/PERANCAH DAN BEKISTING
1 Main Frame 190 cm sewa/bln 14.000,00 15.400,00
2 Main Frame 170 cm sewa/bln 14.000,00 15.400,00
3 Leader 90 cm sewa/bln 13.000,00 14.300,00
4 Crose Brase 220cm sewa/bln 12.000,00 13.200,00
5 Crose Brase 190 cm sewa/bln 12.000,00 13.200,00
6 Join Pint sewa/bln 7.000,00 7.700,00
7 Jack Base 40 cm sewa/bln 13.000,00 14.300,00
8 Jack Base 60 cm sewa/bln 14.000,00 15.400,00
9 Pipa Support sewa/bln 67.000,00 73.700,00
10 U-Head 40 cm sewa/bln 12.000,00 13.200,00
11 U-Head 60 cm sewa/bln 14.000,00 15.400,00
12 Catwalk sewa/bln 60.000,00 66.000,00
13 Clam Dia sewa/bln 9.000,00 9.900,00
14 Roller Catter/Roda sewa/bln 46.000,00 50.600,00
15 Stair Frame/Tangga sewa/bln 67.000,00 73.700,00
16 Bekisting Jalan Beton Bekisting Plat t=20cm P=2.2m sewa/bln 150.000,00 165.000,00
17 Bekisting Jalan Beton Bekisting Plat t=25cm P=2.2m sewa/bln 175.000,00 192.500,00
18 Bekisting Jalan Beton Bekisting Plat t=27cm P=2.2m sewa/bln 200.000,00 220.000,00
19 Bekisting Jalan Beton Bekisting Plat t=30cm P=2.2m sewa/bln 225.000,00 247.500,00

162
CC.ELEKTRIKAL DAN MEKANIKAL
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
KABEL NYA
1 Kabel NYA 1 x 1.5 m 4.900,00 5.390,00
2 Kabel NYA 1 x 2.5 m 7.800,00 8.580,00
3 Kabel NYA 1 x 4 m 12.200,00 13.420,00
4 Kabel NYA 1 x 6 m 18.100,00 19.910,00
5 Kabel NYA 1 x 10 m 29.900,00 32.890,00
6 Kabel NYA 1 x 16 m 48.600,00 53.460,00
7 Kabel NYA 1 x 25 m 76.900,00 84.590,00
8 Kabel NYA 1 x 35 m 105.300,00 115.830,00
9 Kabel NYA 1 x 50 m 145.700,00 160.270,00
10 Kabel NYA 1 x 70 m 210.500,00 231.550,00
11 Kabel NYA 1 x 95 m 287.400,00 316.140,00
12 Kabel NYA 1 x 120 m 356.200,00 391.820,00
13 Kabel NYA 1 x 150 m 445.200,00 489.720,00
KABEL NYAF
14 Kabel NYAF 1 x 0.75 m 4.100,00 4.510,00
15 Kabel NYAF 1 x 1.5 m 5.900,00 6.490,00
16 Kabel NYAF 1 x 2.5 m 10.400,00 11.440,00
17 Kabel NYAF 1 x 4 m 15.200,00 16.720,00
18 Kabel NYAF 1 x 6 m 22.600,00 24.860,00
19 Kabel NYAF 1 x 10 m 41.000,00 45.100,00
20 Kabel NYAF 1 x 16 m 48.600,00 53.460,00
21 Kabel NYAF 1 x 25 m 77.800,00 85.580,00
22 Kabel NYAF 1 x 35 m 103.700,00 114.070,00
23 Kabel NYAF 1 x 50 m 170.000,00 187.000,00
24 Kabel NYAF 1 x 70 m 242.900,00 267.190,00
25 Kabel NYAF 1 x 95 m 334.300,00 367.730,00
26 Kabel NYAF 1 x 120 m 450.900,00 495.990,00
27 Kabel NYAF 1 x 150 m 566.600,00 623.260,00
28 Kabel NYAF 1 x 185 m 647.600,00 712.360,00
29 Kabel NYAF 1 x 240 m 901.700,00 991.870,00
KABEL NYM
30 Kabel NYM 2 x 1.5 m' 9.800,00 10.780,00
31 Kabel NYM 2 x 2.5 m' 13.000,00 14.300,00
32 Kabel NYM 2 x 4 m' 35.000,00 38.500,00
33 Kabel NYM 2 x 6 m' 46.200,00 50.820,00
34 Kabel NYM 2 x 10 m' 81.700,00 89.870,00
35 Kabel NYM 3 x 1.5 m' 12.300,00 13.530,00
36 Kabel NYM 3 x 2.5 m' 16.100,00 17.710,00
37 Kabel NYM 3 x 4 m' 23.500,00 25.850,00

163
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
38 Kabel NYM 3 x 6 m' 64.200,00 70.620,00
39 Kabel NYM 3 x 10 m' 108.500,00 119.350,00
40 Kabel NYM 4 x 1.5 m' 16.500,00 18.150,00
41 Kabel NYM 4 x 2.5 m' 20.900,00 22.990,00
42 Kabel NYM 4 x 4 m' 60.400,00 66.440,00
43 Kabel NYM 4 x 6 m' 84.900,00 93.390,00
44 Kabel NYM 4 x 10 m' 138.200,00 152.020,00
45 Kabel NYM 4 x 16 m' 179.300,00 197.230,00
KABEL NYY
46 Kabel NYY 1 x 16 m' 36.500,00 40.150,00
47 Kabel NYY 1 x 25 m' 58.100,00 63.910,00
48 Kabel NYY 1 x 35 m' 95.600,00 105.160,00
49 Kabel NYY 1 x 50 m' 132.800,00 146.080,00
50 Kabel NYY 1 x 70 m' 178.100,00 195.910,00
51 Kabel NYY 1 x 95 m' 232.300,00 255.530,00
52 Kabel NYY 1 x 120 m' 288.200,00 317.020,00
53 Kabel NYY 1 x 150 m' 365.100,00 401.610,00
54 Kabel NYY 1 x 185 m' 469.500,00 516.450,00
55 Kabel NYY 1 x 240 m' 578.800,00 636.680,00
56 Kabel NYY 1 x 300 m' 719.600,00 791.560,00
57 Kabel NYY 1 x 400 m' 951.100,00 1.046.210,00
58 Kabel NYY 1 x 500 m' 1.206.100,00 1.326.710,00
59 Kabel NYY 1 x 630 m' 1.379.400,00 1.517.340,00
60 Kabel NYY 2 x 1.5 m' 12.300,00 13.530,00
61 Kabel NYY 2 x 2.5 m' 16.900,00 18.590,00
62 Kabel NYY 2 x 4 m' 44.500,00 48.950,00
63 Kabel NYY 2 x 6 m' 56.800,00 62.480,00
64 Kabel NYY 2 x 10 m' 79.700,00 87.670,00
65 Kabel NYY 2 x 16 m' 111.600,00 122.760,00
66 Kabel NYY 3 x 1.5 m' 15.500,00 17.050,00
67 Kabel NYY 3 x 2.5 m' 20.800,00 22.880,00
68 Kabel NYY 3 x 4 m' 56.700,00 62.370,00
69 Kabel NYY 3 x 6 m' 75.000,00 82.500,00
70 Kabel NYY 3 x 10 m' 111.400,00 122.540,00
71 Kabel NYY 3 x 16 m' 134.900,00 148.390,00
72 Kabel NYY 4 x 1.5 m' 18.500,00 20.350,00
73 Kabel NYY 4 x 2.5 m' 25.000,00 27.500,00
74 Kabel NYY 4 x 4 m' 68.700,00 75.570,00
75 Kabel NYY 4 x 6 m' 89.200,00 98.120,00
76 Kabel NYY 4 x 10 m' 151.100,00 166.210,00
77 Kabel NYY 4 x 16 m' 179.300,00 197.230,00

164
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
78 Kabel NYY 4 x 25 m' 282.300,00 310.530,00
79 Kabel NYY 4 x 35 m' 373.900,00 411.290,00
80 Kabel NYY 4 x 50 m' 507.400,00 558.140,00
81 Kabel NYY 4 x 70 m' 707.500,00 778.250,00
82 Kabel NYY 4 x 95 m' 981.300,00 1.079.430,00
83 Kabel NYY 4 x 120 m' 1.372.700,00 1.509.970,00
28 NSFB FUJI EA - 100 A bh 1.124.600,00 1.237.060,00
29 NSFB FUJI EA - 150 A bh 2.263.400,00 2.489.740,00
30 Rumah Panel 30 x 60 cm unt 259.600,00 285.560,00
31 Skring Kas 2 grop Biasa unt 379.900,00 417.890,00
32 Skring Kas 3 grop Biasa unt 421.500,00 463.650,00
33 Skring Kas 5 grop Biasa unt 690.500,00 759.550,00
34 MCB 1 PAS bh 105.100,00 115.610,00
35 MCB 3 PAS bh 161.400,00 177.540,00
36 Tahanan 50 A Merk Fuji bh 653.200,00 718.520,00
37 Saklar Broko Tunggal Standard bh 23.100,00 25.410,00
38 Saklar Brocco Ganda Standard bh 24.800,00 27.280,00
39 Stop Kontak Broko Standard ( 1 Phase ) bh 27.100,00 29.810,00
40 Stop Kontak Broko 3 Phase (Out Bow) bh 53.100,00 58.410,00
41 Stop Kontak Broko 3 Phase ( In Bow) bh 80.800,00 88.880,00
42 Stop Kontak Handle 3 Phase bh 84.000,00 92.400,00
43 Instalasi Titik Lampu ttk 140.800,00 154.880,00
44 Lampu pijar 25 Watt s/d 100 Watt bh 56.700,00 62.370,00
45 Lampu Neon Phillips 20 Watt bh 37.300,00 41.030,00
46 Lampu Neon Phillips 40 Watt bh 51.600,00 56.760,00
47 Travo TL 20 W (Phillips) bh 51.300,00 56.430,00
48 Travo TL 40 W (Phillips) bh 53.200,00 58.520,00
49 Travo TL 20 W (Sinar) bh 47.800,00 52.580,00
50 Travo TL 40 W (sinar) bh 52.400,00 57.640,00
51 Stater Neon Phillips bh 16.400,00 18.040,00
52 Stater Neon Biasa bh 10.400,00 11.440,00
53 Rumah TL In Bow / Out Bow 2 x 20 W bh 220.700,00 242.770,00
54 Down Light + SL 25 W bh 200.300,00 220.330,00
55 Lampu SL Philip 25 W bh 159.400,00 175.340,00
56 Lampu Sirkel TL 20 W Lengkap bh 110.500,00 121.550,00
57 Lampu Mercuri 80 W bh 121.400,00 133.540,00
58 Lampu Taman + Tiang bh 473.300,00 520.630,00
59 Lampu Baret 30 cm + Neon bh 255.300,00 280.830,00
60 Lampu Neon Arcrilik 2 x 40 W Lengkap bh 589.300,00 648.230,00
61 Jarum Penangkal Petir 16 bh 151.200,00 166.320,00
62 Kawat BC ( Tembaga ) kg 85.200,00 93.720,00
63 Pentanahan Penangkal Petir ttk 627.700,00 690.470,00

165
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
64 Pentanahan Panel ttk 338.900,00 372.790,00
65 Balk TL 1 x 18 W bh 1.129.400,00 1.242.340,00
66 Balk TL 1 x 36 W bh 1.188.400,00 1.307.240,00
67 TKO TL 1 x 18 W bh 125.800,00 138.380,00
68 TKO TL 2 x 18 W bh 210.000,00 231.000,00
69 TKO TL 1 x 36 W bh 91.600,00 100.760,00
70 TKO TL 2 x 36 W bh 173.700,00 191.070,00
71 Kabel NYGBY ml 176.500,00 194.150,00
72 Panel ACB 4 Pase Jenis Tarik 1000 A bh 36.746.200,00 40.420.820,00
73 Panel ACB 4 Pase Jenis Tetap 1000 A bh 36.624.000,00 40.286.400,00
74 Panel ACB 4 Pase Jenis Tetap 1250 A bh 35.921.500,00 39.513.650,00
75 Panel ACB 4 Pase Jenis Tetap 1250 A bh 36.379.700,00 40.017.670,00
76 Panel ACB 4 Pase Jenis Tetap 2500 A bh 59.594.200,00 65.553.620,00
77 Panel ACB 4 Pase Jenis Tetap 2500 A bh 59.502.600,00 65.452.860,00
78 Panel ACB 4 Pase Jenis Tetap 1000 A bh 38.151.300,00 41.966.430,00
79 Panel ACB 4 Pase Jenis Tetap 3200 A bh 67.688.800,00 74.457.680,00
80 Panel MCCB 3 Pase MCCB 125-160 A, 36 KA (NS160N) MG bh 5.622.400,00 6.184.640,00
81 Panel MCCB 3 Pase MCCB 50 - 63 A, 25 KA (NS100N) MG bh 5.402.100,00 5.942.310,00
82 Panel MCCB 3 Pase MCCB 40 - 50 A, 25 KA (NS100N) MG bh 1.265.800,00 1.392.380,00
83 Panel MCCB 3 Pase MCCB 32 - 50 A, 25 KA (NS100N) MG bh 944.500,00 1.038.950,00
84 Panel MCCB 3 Pase MCCB 32 - 50 A, 10 KA (NC45H) MG bh 6.887.200,00 7.575.920,00
85 Panel MCCB 3 Pase MCCB 20 - 10 A, 10 KA (NC45H) MG bh 4.610.000,00 5.071.000,00
86 Panel MCCB 3 Pase MCCB 160-200 A, 36 KA (NS250N) MG bh 4.473.300,00 4.920.630,00
87 Panel MCCB 3 Pase MCCB 80 - 100 A, 26 KA (NS100) MG bh 2.606.400,00 2.867.040,00
88 Panel MCCB 3 Pase MCCB 20 - 25 A, KA (NS100) MG bh 441.500,00 485.650,00
89 Panel MCCB 3 Pase MCCB 13 - 16 A, KA (NS100) MG bh 434.800,00 478.280,00
90 Panel MCCB 3 Pase MCCB 16 A, 5 KA (NC45a) MG bh 393.500,00 432.850,00
91 Panel MCCB 3 Pase MCCB 10 A, 5 KA (NC45a) MG bh 343.100,00 377.410,00
92 Panel MCCB 3 Pase MCCB 6 A, 5 KA (NC45a) MG bh 284.000,00 312.400,00
93 Panel MCCB 3 Pase MCCB 25 A, 25 KA (NS100N) MG bh 535.200,00 588.720,00
94 Panel MCCB 3 Pase MCCB 16 A, 5 KA (NS100N) MG bh 3.730.300,00 4.103.330,00
95 Panel MCCB 3 Pase MCCB 32 A, 25 KA MG bh 3.923.200,00 4.315.520,00
96 Panel MCCB 3 Pase MCCB 80 - 100 A, 25 KA (NS100) MG bh 732.000,00 805.200,00
97 Panel MCCB 3 Pase MCCB 50 - 63 A,(NS100) MG bh 609.300,00 670.230,00
98 Panel MCCB 3 Pase MCCB 350-500 A/70 KA/3 Pole bh 664.800,00 731.280,00
99 Panel MCCB 3 Pase MCCB 224 - 320 A / 70 KA / 3 Pole bh 596.000,00 655.600,00
100 Panel MCCB 3 Pase MCCB 175 -.250 A / 70 KA / 3 Pole bh 670.800,00 737.880,00
101 Panel MCCB 3 Pase MCCB 160 - 300 A / 70 KA / 3 Pole bh 704.600,00 775.060,00
102 Panel MCCB 3 Pase MCCB 64 - 80 A / 70 KA / 3 Pole bh 631.800,00 694.980,00
103 Panel MCCB 3 Pase MCCB 44 - 63 A / 70 KA / 3 Pole bh 723.600,00 795.960,00
104 Panel MCCB 3 Pase MCCB 32 - 40 A / 70 KA / 3 Pole bh 948.200,00 1.043.020,00
105 Panel MCCB 3 Pase 400 A / 3 Pole LCI - F3304 bh 2.026.400,00 2.229.040,00

166
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
106 Panel MCCB 3 Pase 250 A / 3 Pole LCI - F1504 bh 2.372.400,00 2.609.640,00
107 Panel MCCB 3 Pase 200 A / 3 Pole LCI - F1154 bh 618.000,00 679.800,00
108 Panel MCCB 3 Pase 160 A / 3 Pole LCI - F1154 bh 622.100,00 684.310,00
109 Panel MCB 3 Pase MCB 16 A, 5 KA (NC45a) MG bh 451.500,00 496.650,00
110 Panel MCB 3 Pase MCB 10 A, 5 KA (NC45a) MG bh 416.300,00 457.930,00
111 Panel MCB 3 Pase MCB 6 A, 5 KA (NC45a) MG bh 319.900,00 351.890,00
112 Panel MCB 3 Pase MCB 10 A, 6 KA, 10 A, 6 K MG bh 410.200,00 451.220,00
113 Panel MCB 3 Pase MCB 50 A, 10 A (NC100H) MG bh 599.400,00 659.340,00
114 Panel MCB 3 Pase MCB 16 A, 6 KA (NC45aD) MG bh 318.400,00 350.240,00
115 Panel MCB 3 Pase MCB 6 A, 6 KA (NC45aD) MG bh 418.000,00 459.800,00
116 Panel MCB 3 Pase MCB 63 A, 10 KA (NC100H) MG bh 616.100,00 677.710,00
117 Panel MCB 3 Pase MCB 32 A, 10 KA (NC100H) MG bh 360.500,00 396.550,00
118 Panel MCB 3 Pase MCB 16 A, 8 KA (NC10014) MG bh 358.900,00 394.790,00
119 Panel MCB 3 Pase MCB 16 A, 5 KA (NC45N) MG bh 357.500,00 393.250,00
120 Panel MCB 3 Pase MCB 16 A, 10 KA (NC100H) MG bh 343.800,00 378.180,00
121 Panel MCB 3 Pase MCB 25 A, 8 KA (NC45N) MG bh 340.400,00 374.440,00
122 Panel MCB 3 Pase MCB 40 A, 8 KA L (NC45N) MG bh 322.800,00 355.080,00
123 Panel MCB 3 Pase MCB 10 A, 8 KA (NC45N) MG bh 324.400,00 356.840,00
124 Panel MCB 1 Pase MCB 20 A, 10 KA (NC45N) MG bh 170.700,00 187.770,00
125 Panel MCB 1 Pase MCB 10 A, 8 KA (NC45N) MG bh 77.100,00 84.810,00
126 Panel MCB 1 Pase MCB 6 A, 8 KA (NC45N) MG bh 68.200,00 75.020,00
127 Panel MCB 1 Pase MCB 20 A, 8 KA (NC45N) MG bh 69.700,00 76.670,00
128 Panel MCB 1 Pase MCB 20 A, 5 KA (NC45Na) MG bh 73.400,00 80.740,00
129 Panel MCB 1 Pase MCB 10 A, 5 KA (NC45Na) MG bh 79.000,00 86.900,00
130 Panel MCB 1 Pase MCB 6 A, 5 KA (NC45Na) MG bh 79.800,00 87.780,00
131 Panel MCB 1 Pase MCB 25 A, 5 KA (NC45Na) MG bh 87.800,00 96.580,00
132 Panel MCB 1 Pase MCB 16 A, 5 KA (NC45Na) MG bh 86.900,00 95.590,00
133 Panel MCB 1 Pase MCB 16 A, 5 KA (NC45N) MG bh 86.800,00 95.480,00
134 Panel MCB 1 Pase MCB 6 A, 6 KA (NC45aD) MG bh 86.800,00 95.480,00
135 Panel MCB 1 Pase MCB 20 A, 8 KA (NC45N) MG bh 87.100,00 95.810,00
136 Panel MCB 1 Pase MCB 10 A, 8 KA (NC45N) MG bh 86.800,00 95.480,00
137 Panel MCB 1 Pase MCB 16 A, 5 KA (NC45N) MG bh 91.700,00 100.870,00
138 Panel MCB 1 Pase MCB 6 A, 5 KA (NC45N) MG bh 186.500,00 205.150,00
139 Panel MCB 1 Pase MCB 25 A, 5 KA (NC45N) MG bh 206.600,00 227.260,00
140 Panel MCB 1 Pase MCB 50 A, 10 KA (NC100H) MG bh 624.000,00 686.400,00
141 T Dus bh 10.100,00 11.110,00
142 L Bow bh 5.700,00 6.270,00
143 Lasdop bh 44.400,00 48.840,00
144 Klem Biasa bh 8.400,00 9.240,00
145 Mangkok Listrik bh 10.900,00 11.990,00
146 Fitting bh 14.600,00 16.060,00
147 Pipa Listrik 5/8 btg 13.400,00 14.740,00

167
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
PENANGKAL PETIR
1 EF Lighting Terminal Radius >110 m2 unit 1.050.000,00 1.155.000,00
2 Counecting Sleeve bh 330.000,00 363.000,00
3 EF Coaxcial Cable ml 1.070.000,00 1.177.000,00
4 Grounding unit 69.710.000,00 76.681.000,00
5 Indelek Prevectron 2 Type S 4.50 unit 7.430.000,00 8.173.000,00
6 Grounding System Max. 2 OHM + Box unit 320.000,00 352.000,00
7 Biaya Instalasi unit 3.340.000,00 3.674.000,00
MEKANIKAL
1 Jockey Pump kap. 80 gln/menit 100 ml unit 54.650.000,00 60.115.000,00
2 Electrical Pump kap. 750 gln/menit 120 ml unit 191.980.000,00 211.178.000,00
3 Diesel Pump kap. 750 gln/menit 120 ml unit 456.030.000,00 501.633.000,00
4 Presure Tank kap. 500 liter lengkap unit 28.890.000,00 31.779.000,00
5 Hydran Box dlm Gedung Lengkap unit 22.110.000,00 24.321.000,00
6 Fire House 1.5 x 30 m + nose unit 12.390.000,00 13.629.000,00
7 Ceiling Exhaust Fan Dimensi : 25 x 25 x 12 cm; unit 380.000,00 418.000,00
8 Wall Exhaust Fan Dimensi Fan : 22 x 22 x 18 cm; unit 770.000,00 847.000,00
9 Wall Exhaust Fan Dimensi Fan : 17 x 18 x 19 cm; unit 600.000,00 660.000,00
10 Wall Exhaust Fan Dimensi Fan : 22 x 22 x 12 cm; unit 850.000,00 935.000,00
11 Wall Exhaust Fan Dimensi : 40 x 40 x 17 cm; unit 560.000,00 616.000,00
12 Wall Exhaust Fan Diameter baling-baling : 40 cm unit 930.000,00 1.023.000,00
13 AC Cassette 3 PK 3.0 PK Setara TOSHIBA unit 26.720.000,00 29.392.000,00
14 AC Cassette 1.5 PK 1.5 PK Setara TOSHIBA unit 24.490.000,00 26.939.000,00
15 AC Inverter 2.5 PK 2.5 PK Setara TOSHIBA unit 14.840.000,00 16.324.000,00
16 AC Inverter 2.0 PK 2 PK Setara TOSHIBA unit 13.490.000,00 14.839.000,00
17 AC Inverter 1.5 PK 1.5 PK Setara TOSHIBA unit 8.910.000,00 9.801.000,00
18 AC Inverter 1.0 PK 1.0 PK Setara TOSHIBA unit 8.100.000,00 8.910.000,00
19 AC 3/4 PK 3/4 PK Setara TOSHIBA unit 5.200.000,00 5.720.000,00
20 AC 1/2 PK unit 4.790.000,00 5.269.000,00
21 AC Daikin High Inverter 3PK unit 25.270.000,00 27.797.000,00
22 AC Daikin High Inverter 2.5PK unit 20.580.000,00 22.638.000,00
23 AC Daikin High Inverter 2.0PK unit 14.410.000,00 15.851.000,00
24 AC Daikin High Inverter 1.5PK unit 9.660.000,00 10.626.000,00
25 AC Daikin High Inverter 1.0PK unit 7.290.000,00 8.019.000,00
26 AC Daikin Standard 1PK unit 4.490.000,00 4.939.000,00
27 AC Daikin Standard 3/4PK unit 4.290.000,00 4.719.000,00
28 AC Daikin Standard 1/2PK unit 4.120.000,00 4.532.000,00

168
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
PENGISAP AIR
1 Pompa Kodok unit 675.000,00 742.500,00
2 Pompa Dragon Tegal unit 675.000,00 742.500,00
3 Pompa Dragon Asli unit 1.100.000,00 1.210.000,00
4 Mesin Pompa Air 100 W - Sanyo unit 1.499.000,00 1.648.900,00
5 Mesin Pompa Air 150 W - Sanyo unit 2.049.000,00 2.253.900,00
6 Pompa Jet Pump 250 W - Sanyo unit 6.091.000,00 6.700.100,00
7 Pompa Jet Pump 450 W - Sanyo unit 10.185.000,00 11.203.500,00
8 Pompa. Submersible kap. 150 liter / menit 3 KW unit 33.621.000,00 36.983.100,00
9 Gear Pump Kap. 60 liter / menit unit 22.673.000,00 24.940.300,00
10 Deep Well (Lengkap) kap. 150 liter / menit unit 237.974.000,00 261.771.400,00
11 Hand Oil Pump unit 7.504.000,00 8.254.400,00
12 Pompa Turbine Kapasitas 60Liter/Menit unit 7.487.000,00 8.235.700,00
13 Pompa Compact Kapasitas 27Liter/Menit unit 3.751.000,00 4.126.100,00
14 Pompa Compact Kapasitas 34Liter/Menit unit 4.182.000,00 4.600.200,00
15 Pompa Compact Kapasitas 40Liter/Menit unit 4.587.000,00 5.045.700,00
16 Pompa Compact Kapasitas 44Liter/Menit unit 4.951.000,00 5.446.100,00
17 Pompa Sumur Dangkal Kapasitas 43Liter/Menit unit 6.745.000,00 7.419.500,00
18 Pompa Sumur Dangkal Kapasitas 47Liter/Menit unit 7.083.000,00 7.791.300,00
19 Pompa Sumur Dangkal Kapasitas 31Liter/Menit unit 3.474.000,00 3.821.400,00
20 Pompa Sumur Dangkal Kapasitas 43Liter/Menit unit 4.425.000,00 4.867.500,00
21 Pompa Sumur Dangkal Kapasitas 47Liter/Menit unit 4.655.000,00 5.120.500,00
22 Pompa Sumur Dangkal Kapasitas 56Liter/Menit unit 8.836.000,00 9.719.600,00
23 Pompa Sumur Dalam Kapasitas 20Liter/Menit unit 6.611.000,00 7.272.100,00
24 Pompa Sumur Dalam Kapasitas 20Liter/Menit unit 8.769.000,00 9.645.900,00
AB FIRE ALARM
1 Alarm Bell unit 3.810.000,00 4.191.000,00
2 Break Glass Push Button unit 840.000,00 924.000,00
3 Sirine unit 1.290.000,00 1.419.000,00
4 Smoke Detector unit 2.780.000,00 3.058.000,00
5 Heat Detector unit 5.350.000,00 5.885.000,00

169
DD.PCI GIRDER, VOIDED SLAB, TIANG PANCANG, SHEET PILE
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
PCI GIRDER POST TENSION H=0.90 m Ctc=1,85 m Strand 0,5"
1 Bentang (L) 12.6 m (H) 90 cm Strand 14 bh; Mutu Beton K-500 bh 87.551.000,00 96.306.100,00
2 Bentang (L) 13.6 m (H) 90 cm Strand 16 bh; Mutu Beton K-500 bh 93.486.000,00 102.834.600,00
3 Bentang (L) 14.6 m (H) 90 cm Strand 19 bh; Mutu Beton K-500 bh 114.261.000,00 125.687.100,00
4 Bentang (L) 15.6 m (H) 90 cm Strand 23 bh; Mutu Beton K-500 bh 129.100.000,00 142.010.000,00
5 Bentang (L) 16.6 m (H) 90 cm Strand 24 bh; Mutu Beton K-500 bh 135.035.000,00 148.538.500,00
PCI GIRDER POST TENSION H=1.25 m Ctc=1.85 m Strand 0.5"
1 Bentang (L) 16.6 m (H) 125 cm Strand 19 bh; Mutu Beton K-500 bh 138.003.000,00 151.803.300,00
2 Bentang (L) 17.6 m (H) 125 cm Strand 19 bh; Mutu Beton K-500 bh 142.455.000,00 156.700.500,00
3 Bentang (L) 18.6 m (H) 125 cm Strand 22 bh; Mutu Beton K-500 bh 151.358.000,00 166.493.800,00
4 Bentang (L) 19.6 m (H) 125 cm Strand 24 bh; Mutu Beton K-500 bh 157.294.000,00 173.023.400,00
5 Bentang (L) 20.6 m (H) 125 cm Strand 26 bh; Mutu Beton K-500 bh 166.197.000,00 182.816.700,00
6 Bentang (L) 21.6 m (H) 125 cm Strand 30 bh; Mutu Beton K-500 bh 175.101.000,00 192.611.100,00
7 Bentang (L) 22.6 m (H) 125 cm Strand 31 bh; Mutu Beton K-500 bh 182.520.000,00 200.772.000,00
8 Bentang (L) 23.6 m (H) 125 cm Strand 36 bh; Mutu Beton K-500 bh 195.875.000,00 215.462.500,00
9 Bentang (L) 24.6 m (H) 125 cm Strand 37 bh; Mutu Beton K-500 bh 210.714.000,00 231.785.400,00
10 Bentang (L) 25.6 m (H) 125 cm Strand 38 bh; Mutu Beton K-500 bh 215.166.000,00 236.682.600,00
PCI GIRDER POST TENSION H=1.60m Ctc=1.85m Strand 0.5"
1 Bentang (L) 22.6 m (H) 160 cm Strand 23 bh; Mutu Beton K-500 bh 246.328.000,00 270.960.800,00
2 Bentang (L) 23.6 m (H) 160 cm Strand 28 bh; Mutu Beton K-500 bh 256.715.000,00 282.386.500,00
3 Bentang (L) 24.6 m (H) 160 cm Strand 30 bh; Mutu Beton K-500 bh 264.809.000,00 291.289.900,00
4 Bentang (L) 25.6 m (H) 160 cm Strand 33 bh; Mutu Beton K-500 bh 276.006.000,00 303.606.600,00
5 Bentang (L) 26.6 m (H) 160 cm Strand 36 bh; Mutu Beton K-500 bh 287.877.000,00 316.664.700,00
6 Bentang (L) 27.6 m (H) 160 cm Strand 38 bh; Mutu Beton K-500 bh 296.780.000,00 326.458.000,00
7 Bentang (L) 28.6 m (H) 160 cm Strand 39 bh; Mutu Beton K-500 bh 311.619.000,00 342.780.900,00
8 Bentang (L) 29.6 m (H) 160 cm Strand 41 bh; Mutu Beton K-500 bh 322.007.000,00 354.207.700,00
9 Bentang (L) 30.6 m (H) 160 cm Strand 45 bh; Mutu Beton K-500 bh 324.975.000,00 357.472.500,00
10 Bentang (L) 31.6 m (H) 160 cm Strand 48 bh; Mutu Beton K-500 bh 338.330.000,00 372.163.000,00
PCI GIRDER POST TENSION H=1.70m Ctc=1.85m Strand 0.5"
1 Bentang (L) 30.6 m (H) 170 cm Strand 45 bh; Mutu Beton K-500 bh 387.298.000,00 426.027.800,00
2 Bentang (L) 31.6 m (H) 170 cm Strand 48 bh; Mutu Beton K-500 bh 402.137.000,00 442.350.700,00
3 Bentang (L) 32.6 m (H) 170 cm Strand 51 bh; Mutu Beton K-500 bh 418.190.000,00 460.009.000,00
4 Bentang (L) 33.6 m (H) 170 cm Strand 53 bh; Mutu Beton K-500 bh 431.815.000,00 474.996.500,00
5 Bentang (L) 34.6 m (H) 170 cm Strand 57 bh; Mutu Beton K-500 bh 452.590.000,00 497.849.000,00
6 Bentang (L) 35.6 m (H) 170 cm Strand 62 bh; Mutu Beton K-500 bh 482.268.000,00 530.494.800,00
7 Bentang (L) 36.6 m (H) 170 cm Strand 65 bh; Mutu Beton K-500 bh 506.010.000,00 556.611.000,00
8 Bentang (L) 37.6 m (H) 170 cm Strand 72 bh; Mutu Beton K-550 bh 538.656.000,00 592.521.600,00
9 Bentang (L) 38.6 m (H) 170 cm Strand 76 bh; Mutu Beton K-550 bh 560.915.000,00 617.006.500,00
10 Bentang (L) 39.6 m (H) 170 cm Strand 78 bh; Mutu Beton K-600 bh 566.850.000,00 623.535.000,00
11 Bentang (L) 40.6 m (H) 170 cm Strand 80 bh; Mutu Beton K-600 bh 631.332.000,00 694.465.200,00

170
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
PCI GIRDER POST TENSION H=1.70m Ctc=1.4m Strand 0.5"
12 Bentang (L) 41.6 m (H) 170 cm Strand 67 bh; Mutu Beton K-600 bh 641.045.000,00 705.149.500,00
PCI GIRDER POST TENSION H=2.10m Ctc=1.85m Strand 0.5"
1 Bentang (L) 40.6 m (H) 210 cm Strand 64 bh; Mutu Beton K-500 bh 668.565.000,00 735.421.500,00
2 Bentang (L) 41.6 m (H) 210 cm Strand 67 bh; Mutu Beton K-500 bh 696.084.000,00 765.692.400,00
3 Bentang (L) 42.6 m (H) 210 cm Strand 72 bh; Mutu Beton K-500 bh 721.985.000,00 794.183.500,00
4 Bentang (L) 43.6 m (H) 210 cm Strand 75 bh; Mutu Beton K-500 bh 746.267.000,00 820.893.700,00
5 Bentang (L) 44.6 m (H) 210 cm Strand 81 bh; Mutu Beton K-600 bh 788.356.000,00 867.191.600,00
6 Bentang (L) 45.6 m (H) 210 cm Strand 88 bh; Mutu Beton K-600 bh 825.588.000,00 908.146.800,00
7 Bentang (L) 46.6 m (H) 210 cm Strand 90 bh; Mutu Beton K-650 bh 841.776.000,00 925.953.600,00
8 Bentang (L) 47.6 m (H) 210 cm Strand 92 bh; Mutu Beton K-650 bh 857.964.000,00 943.760.400,00
9 Bentang (L) 48.6 m (H) 210 cm Strand 94 bh; Mutu Beton K-700 bh 874.152.000,00 961.567.200,00
10 Bentang (L) 49.6 m (H) 210 cm Strand 96 bh; Mutu Beton K-800 bh 890.340.000,00 979.374.000,00
11 Bentang (L) 50.6 m (H) 210 cm Strand 100bh;Mutu Beton K-800 bh 914.622.000,00 1.006.084.200,00
PC VOIDED SLAB PRETENSION
PENGADAAN
1 Voided slab H-57 cm K-600 Bentang L = 6.60 m - 9.60 m bh 53.960.000,00 59.356.000,00
2 Voided slab H-62 cm K-600 Bentang L = 10.6 m - 13.6 m bh 87.685.000,00 96.453.500,00
3 Voided slab H-67 cm K-600 Bentang L = 14.6 m - 16.6 m bh 105.222.000,00 115.744.200,00
PEMASANGAN
1 Voided slab H-57 cm K-600 Bentang L = 6.60 m - 9.60 m bh 20.235.000,00 22.258.500,00
2 Voided slab H-62 cm K-600 Bentang L = 10.6 m - 13.6 m bh 33.725.000,00 37.097.500,00
3 Voided slab H-67 cm K-600 Bentang L = 14.6 m - 16.6 m bh 51.262.000,00 56.388.200,00

171
NO BAHAN/MATERIAL SPESIFIKASI SATUAN HARGA HARGA
BAHAN SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
SPUN PILE Ø 300 mm
SPUN PILE BOTTOM Ø 300 mm MUTU BETON K-600
1 Tipe A2 Ø 300 mm Panjang 6 - 8 m 6 PC Bar 7mm m 326.000,00 358.600,00
2 Tipe A2 Ø 300 mm Panjang 9 - 11 m 6 PC Bar 7mm m 311.000,00 342.100,00
3 Tipe A2 Ø 300 mm Panjang 12 m 6 PC Bar 7mm m 284.000,00 312.400,00
4 Tipe A3 Ø 300 mm Panjang 6 - 8 m 10 PC Bar 7mm m 362.000,00 398.200,00
5 Tipe A3 Ø 300 mm Panjang 9 - 11 m 10 PC Bar 7mm m 347.000,00 381.700,00
6 Tipe A3 Ø 300 mm Panjang 12 m 10 PC Bar 7mm m 322.000,00 354.200,00
7 Tipe B Ø 300 mm Panjang 6 - 8 m 12 PC Bar 7mm m 381.000,00 419.100,00
8 Tipe B Ø 300 mm Panjang 9 - 11 m 12 PC Bar 7mm m 366.000,00 402.600,00
9 Tipe B Ø 300 mm Panjang 12 m 12 PC Bar 7mm m 339.000,00 372.900,00
10 Tipe C Ø 300 mm Panjang 6 - 8 m 10 PC Bar 9mm m 428.000,00 470.800,00
11 Tipe C Ø 300 mm Panjang 9 - 11 m 10 PC Bar 9mm m 409.000,00 449.900,00
12 Tipe C Ø 300 mm Panjang 12 m 10 PC Bar 9mm m 381.000,00 419.100,00
SPUN PILE MIDDLE/UPPER Ø 300 mm MUTU BETON K-600
13 Tipe A2 Ø 300 mm Panjang 6 - 8 m 6 PC Bar 7mm m 340.000,00 374.000,00
14 Tipe A2 Ø 300 mm Panjang 9 - 11 m 6 PC Bar 7mm m 320.000,00 352.000,00
15 Tipe A2 Ø 300 mm Panjang 12 m 6 PC Bar 7mm m 292.000,00 321.200,00
16 Tipe A3 Ø 300 mm Panjang 6 - 8 m 10 PC Bar 7mm m 378.000,00 415.800,00
17 Tipe A3 Ø 300 mm Panjang 9 - 11 m 10 PC Bar 7mm m 358.000,00 393.800,00
18 Tipe A3 Ø 300 mm Panjang 12 m 10 PC Bar 7mm m 328.000,00 360.800,00
19 Tipe B Ø 300 mm Panjang 6 - 8 m 12 PC Bar 7mm m 397.000,00 436.700,00
20 Tipe B Ø 300 mm Panjang 9 - 11 m 12 PC Bar 7mm m 377.000,00 414.700,00
21 Tipe B Ø 300 mm Panjang 12 m 12 PC Bar 7mm m 347.000,00 381.700,00
22 Tipe C Ø 300 mm Panjang 6 - 8 m 10 PC Bar 9mm m 452.000,00 497.200,00
23 Tipe C Ø 300 mm Panjang 9 - 11 m 10 PC Bar 9mm m 425.000,00 467.500,00
24 Tipe C Ø 300 mm Panjang 12 m 10 PC Bar 9mm m 394.000,00 433.400,00
SPUN PILE Ø 350 mm
SPUN PILE BOTTOM Ø 350 mm MUTU BETON K-600
25 Tipe A1 Ø 350 mm Panjang 6 - 8 m 8 PC Bar 7mm m 427.000,00 469.700,00
26 Tipe A1 Ø 350 mm Panjang 9 - 11 m 8 PC Bar 7mm m 389.000,00 427.900,00
27 Tipe A1 Ø 350 mm Panjang 12 m 8 PC Bar 7mm m 357.000,00 392.700,00
28 Tipe A3 Ø 350 mm Panjang 6 - 8 m 10 PC Bar 7mm m 446.000,00 490.600,00
29 Tipe A3 Ø 350 mm Panjang 9 - 11 m 10 PC Bar 7mm m 408.000,00 448.800,00
30 Tipe A3 Ø 350 mm Panjang 12 m 10 PC Bar 7mm m 376.000,00 413.600,00
31 Tipe B Ø 350 mm Panjang 6 - 8 m 14 PC Bar 7mm m 483.000,00 531.300,00
32 Tipe B Ø 350 mm Panjang 9 - 11 m 14 PC Bar 7mm m 446.000,00 490.600,00
33 Tipe B Ø 350 mm Panjang 12 m 14 PC Bar 7mm m 412.000,00 453.200,00
34 Tipe C Ø 350 mm Panjang 6 - 8 m 12 PC Bar 9mm m 554.000,00 609.400,00
35 Tipe C Ø 350 mm Panjang 9 - 11 m 12 PC Bar 9mm m 501.000,00 551.100,00
36 Tipe C Panjang 12 m 12 PC Bar 9mm m 466.000,00 512.600,00

172
NO BAHAN/MATERIAL SPESIFIKASI SATUAN HARGA HARGA
BAHAN SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
SPUN PILE MIDDLE/UPPER Ø 350 mm MUTU BETON K-600
37 Tipe A1 Ø 350 mm Panjang 6 - 8 m 8 PC Bar 7mm m 427.000,00 469.700,00
38 Tipe A1 Ø 350 mm Panjang 9 - 11 m 8 PC Bar 7mm m 405.000,00 445.500,00
39 Tipe A1 Ø 350 mm Panjang 12 m 8 PC Bar 7mm m 367.000,00 403.700,00
40 Tipe A3 Ø 350 mm Panjang 6 - 8 m 10 PC Bar 7mm m 446.000,00 490.600,00
41 Tipe A3 Ø 350 mm Panjang 9 - 11 m PC Bar 7mm m 423.000,00 465.300,00
42 Tipe A3 Ø 350 mm Panjang 12 m 10 PC Bar 7mm m 386.000,00 424.600,00
43 Tipe B Ø 350 mm Panjang 6 - 8 m 14 PC Bar 7mm m 483.000,00 531.300,00
44 Tipe B Ø 350 mm Panjang 9 - 11 m 14 PC Bar 7mm m 461.000,00 507.100,00
45 Tipe B Ø 350 mm Panjang 12 m 14 PC Bar 7mm m 424.000,00 466.400,00
46 Tipe C Ø 350 mm Panjang 6 - 8 m 12 PC Bar 9mm m 554.000,00 609.400,00
47 Tipe C Ø 350 mm Panjang 9 - 11 m 12 PC Bar 9mm m 524.000,00 576.400,00
48 Tipe C Ø 350 mm Panjang 12 m 12 PC Bar 9mm m 483.000,00 531.300,00
SPUN PILE Ø 400 mm
SPUN PILE BOTTOM Ø 400 mm MUTU BETON K-600
49 Tipe A2 Ø 400 mm Panjang 6 - 8 m 10 PC Bar 7mm m 482.000,00 530.200,00
50 Tipe A2 Ø 400 mm Panjang 9 - 11 m 10 PC Bar 7mm m 463.000,00 509.300,00
51 Tipe A2 Ø 400 mm Panjang 12 m 10 PC Bar 7mm m 425.000,00 467.500,00
52 Tipe A3 Ø 400 mm Panjang 6 - 8 m 14 PC Bar 7mm m 519.000,00 570.900,00
53 Tipe A3 Ø 400 mm Panjang 9 - 11 m 14 PC Bar 7mm m 501.000,00 551.100,00
54 Tipe A3 Ø 400 mm Panjang 12 m 14 PC Bar 7mm m 463.000,00 509.300,00
55 Tipe B Ø 400 mm Panjang 6 - 8 m 18 PC Bar 7mm m 556.000,00 611.600,00
56 Tipe B Ø 400 mm Panjang 9 - 11 m 18 PC Bar 7mm m 537.000,00 590.700,00
57 Tipe B Ø 400 mm Panjang 12 m 18 PC Bar 7mm m 500.000,00 550.000,00
58 Tipe C Ø 400 mm Panjang 6 - 8 m 16 PC Bar 9mm m 648.000,00 712.800,00
59 Tipe C Ø 400 mm Panjang 9 - 11 m 16 PC Bar 9mm m 622.000,00 684.200,00
60 Tipe C Ø 400 mm Panjang 12 m 16 PC Bar 9mm m 581.000,00 639.100,00
SPUN PILE MIDDLE/UPPER Ø 400 mm MUTU BETON K-600
61 Tipe A2 Ø 400 mm Panjang 6 - 8 m 10 PC Bar 7mm m 514.000,00 565.400,00
62 Tipe A2 Ø 400 mm Panjang 9 - 11 m 10 PC Bar 7mm m 485.000,00 533.500,00
63 Tipe A2 Ø 400 mm Panjang 12 m 10 PC Bar 7mm m 442.000,00 486.200,00
64 Tipe A3 Ø 400 mm Panjang 6 - 8 m 14 PC Bar 7mm m 551.000,00 606.100,00
65 Tipe A3 Ø 400 mm Panjang 9 - 11 m 14 PC Bar 7mm m 523.000,00 575.300,00
66 Tipe A3 Ø 400 mm Panjang 12 m 14 PC Bar 7mm m 479.000,00 526.900,00
67 Tipe B Ø 400 mm Panjang 6 - 8 m 18 PC Bar 7mm m 589.000,00 647.900,00
68 Tipe B Ø 400 mm Panjang 9 - 11 m 18 PC Bar 7mm m 559.000,00 614.900,00
69 Tipe B Ø 400 mm Panjang 12 m 18 PC Bar 7mm m 516.000,00 567.600,00
70 Tipe C Ø 400 mm Panjang 6 - 8 m 16 PC Bar 9mm m 702.000,00 772.200,00
71 Tipe C Ø 400 mm Panjang 9 - 11 m 16 PC Bar 9mm m 659.000,00 724.900,00
72 Tipe C Ø 400 mm Panjang 12 m 16 PC Bar 9mm m 608.000,00 668.800,00

173
NO BAHAN/MATERIAL SPESIFIKASI SATUAN HARGA HARGA
BAHAN SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
SPUN PILE Ø 500 mm
SPUN PILE BOTTOM Ø 500 mm MUTU BETON K-600
73 Tipe A1 Ø 500 mm Panjang 6 - 8 m 14 PC Bar 7mm m 702.000,00 772.200,00
74 Tipe A1 Ø 500 mm Panjang 9 - 11 m 14 PC Bar 7mm m 683.000,00 751.300,00
75 Tipe A1 Ø 500 mm Panjang 12 m 14 PC Bar 7mm m 626.000,00 688.600,00
76 Tipe A2 Ø 500 mm Panjang 6 - 8 m 22 PC Bar 7mm m 776.000,00 853.600,00
77 Tipe A2 Ø 500 mm Panjang 9 - 11 m 22 PC Bar 7mm m 757.000,00 832.700,00
78 Tipe A2 Ø 500 mm Panjang 12 m 22 PC Bar 7mm m 701.000,00 771.100,00
79 Tipe A3 Ø 500 mm Panjang 6 - 8 m 26 PC Bar 7mm m 813.000,00 894.300,00
80 Tipe A3 Ø 500 mm Panjang 9 - 11 m 26 PC Bar 7mm m 795.000,00 874.500,00
81 Tipe A3 Ø 500 mm Panjang 12 m 26 PC Bar 7mm m 738.000,00 811.800,00
82 Tipe B Ø 500 mm Panjang 6 - 8 m 18 PC Bar 9mm m 863.000,00 949.300,00
83 Tipe B Ø 500 mm Panjang 9 - 11 m 18 PC Bar 9mm m 837.000,00 920.700,00
84 Tipe B Ø 500 mm Panjang 12 m 18 PC Bar 9mm m 775.000,00 852.500,00
85 Tipe C Ø 500 mm Panjang 6 - 8 m 22 PC Bar 9mm m 922.000,00 1.014.200,00
86 Tipe C Ø 500 mm Panjang 9 - 11 m 22 PC Bar 9mm m 896.000,00 985.600,00
87 Tipe C Ø 500 mm Panjang 12 m 22 PC Bar 9mm m 836.000,00 919.600,00
SPUN PILE MIDDLE/UPPER Ø 500 mm MUTU BETON K-600
88 Tipe A1 Ø 500 mm Panjang 6 - 8 m 14 PC Bar 7mm m 767.000,00 843.700,00
89 Tipe A1 Ø 500 mm Panjang 9 - 11 m 14 PC Bar 7mm m 728.000,00 800.800,00
90 Tipe A1 Ø 500 mm Panjang 12 m 14 PC Bar 7mm m 659.000,00 724.900,00
91 Tipe A2 Ø 500 mm Panjang 6 - 8 m 22 PC Bar 7mm m 841.000,00 925.100,00
92 Tipe A2 Ø 500 mm Panjang 9 - 11 m 22 PC Bar 7mm m 802.000,00 882.200,00
93 Tipe A2 Ø 500 mm Panjang 12 m 22 PC Bar 7mm m 733.000,00 806.300,00
94 Tipe A3 Ø 500 mm Panjang 6 - 8 m 26 PC Bar 7mm m 879.000,00 966.900,00
95 Tipe A3 Ø 500 mm Panjang 9 - 11 m 26 PC Bar 7mm m 838.000,00 921.800,00
96 Tipe A3 Ø 500 mm Panjang 12 m 26 PC Bar 7mm m 771.000,00 848.100,00
97 Tipe B Ø 500 mm Panjang 6 - 8 m 18 PC Bar 9mm m 952.000,00 1.047.200,00
98 Tipe B Ø 500 mm Panjang 9 - 11 m 18 PC Bar 9mm m 896.000,00 985.600,00
99 Tipe B Ø 500 mm Panjang 12 m 18 PC Bar 9mm m 821.000,00 903.100,00
100 Tipe C Ø 500 mm Panjang 6 - 8 m 22 PC Bar 9mm m 1.011.000,00 1.112.100,00
101 Tipe C Ø 500 mm Panjang 9 - 11 m 22 PC Bar 9mm m 956.000,00 1.051.600,00
102 Tipe C Ø 500 mm Panjang 12 m 22 PC Bar 9mm m 880.000,00 968.000,00
SPUN PILE Ø 600 mm
SPUN PILE BOTTOM Ø 600 mm MUTU BETON K-600
103 Tipe A1 Ø 600 mm Panjang 6 - 8 m 20 PC Bar 7mm m 922.000,00 1.014.200,00
104 Tipe A1 Ø 600 mm Panjang 9 - 11 m 20 PC Bar 7mm m 911.000,00 1.002.100,00
105 Tipe A1 Ø 600 mm Panjang 12 m 20 PC Bar 7mm m 844.000,00 928.400,00
106 Tipe A2 Ø 600 mm Panjang 6 - 8 m 24 PC Bar 7mm m 960.000,00 1.056.000,00
107 Tipe A2 Ø 600 mm Panjang 9 - 11 m 24 PC Bar 7mm m 947.000,00 1.041.700,00
108 Tipe A2 Ø 600 mm Panjang 12 m 24 PC Bar 7mm m 880.000,00 968.000,00
109 Tipe A3 Ø 600 mm Panjang 6 - 8 m 20 PC Bar 9mm m 1.065.000,00 1.171.500,00

174
NO BAHAN/MATERIAL SPESIFIKASI SATUAN HARGA HARGA
BAHAN SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
110 Tipe A3 Ø 600 mm Panjang 9 - 11 m 20 PC Bar 9mm m 1.042.000,00 1.146.200,00
111 Tipe A3 Ø 600 mm Panjang 12 m 20 PC Bar 9mm m 970.000,00 1.067.000,00
112 Tipe B Ø 600 mm Panjang 6 - 8 m 24 PC Bar 9mm m 1.124.000,00 1.236.400,00
113 Tipe B Ø 600 mm Panjang 9 - 11 m 24 PC Bar 9mm m 1.103.000,00 1.213.300,00
114 Tipe B Ø 600 mm Panjang 12 m 24 PC Bar 9mm m 1.030.000,00 1.133.000,00
115 Tipe C Ø 600mm Panjang 6 - 8 m 32 PC Bar 9mm m 1.244.000,00 1.368.400,00
116 Tipe C Ø 600 mm Panjang 9 - 11 m 32 PC Bar 9mm m 1.223.000,00 1.345.300,00
117 Tipe C Ø 600 mm Panjang 12 m 32 PC Bar 9mm m 1.148.000,00 1.262.800,00
SPUN PILE MIDDLE/UPPER Ø 600 mm MUTU BETON K-600
118 Tipe A1 Ø 600 mm Panjang 6 - 8 m 20 PC Bar 7mm m 1.016.000,00 1.117.600,00
119 Tipe A1 Ø 600 mm Panjang 9 - 11 m 20 PC Bar 7mm m 973.000,00 1.070.300,00
120 Tipe A1 Ø 600 mm Panjang 12 m 20 PC Bar 7mm m 889.000,00 977.900,00
121 Tipe A2 Ø 600 mm Panjang 6 - 8 m 24 PC Bar 7mm m 1.053.000,00 1.158.300,00
122 Tipe A2 Ø 600 mm Panjang 9 - 11 m 24 PC Bar 7mm m 1.011.000,00 1.112.100,00
123 Tipe A2 Ø 600 mm Panjang 12 m 24 PC Bar 7mm m 927.000,00 1.019.700,00
124 Tipe A3 Ø 600 mm Panjang 6 - 8 m 20 PC Bar 9mm m 1.189.000,00 1.307.900,00
125 Tipe A3 Ø 600 mm Panjang 9 - 11 m 20 PC Bar 9mm m 1.126.000,00 1.238.600,00
126 Tipe A3 Ø 600 mm Panjang 12 m 20 PC Bar 9mm m 1.032.000,00 1.135.200,00
127 Tipe B Ø 600 mm Panjang 6 - 8 m 24 PC Bar 9mm m 1.248.000,00 1.372.800,00
128 Tipe B Ø 600 mm Panjang 9 - 11 m 24 PC Bar 9mm m 1.185.000,00 1.303.500,00
129 Tipe B Ø 600 mm Panjang 12 m 24 PC Bar 9mm m 1.092.000,00 1.201.200,00
130 Tipe C Ø 600 mm Panjang 6 - 8 m 32 PC Bar 9mm m 1.370.000,00 1.507.000,00
131 Tipe C Ø 600 mm Panjang 9 - 11 m 32 PC Bar 9mm m 1.305.000,00 1.435.500,00
132 Tipe C Ø 600 mm Panjang 12 m 32 PC Bar 9mm m 1.212.000,00 1.333.200,00

175
NO BAHAN/MATERIAL SPESIFIKASI SATUAN HARGA HARGA
BAHAN SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
TIANG PANCANG 25x25 cm MUTU BETON K-500
133 Tiang Pancang 25x25 Panjang 6 - 8 m 4 bh PC Strand 3/8" m 295.000,00 324.500,00
134 Tiang Pancang 25x25 Panjang 9 -11m 4 bh PC Strand 3/8" m 273.000,00 300.300,00
135 Tiang Pancang 25x25 Panjang 6 - 8 m 5 bh PC Strand 3/8" m 309.000,00 339.900,00
136 Tiang Pancang 25x25 Panjang 9 -11m 5 bh PC Strand 3/8" m 288.000,00 316.800,00
137 Plat Joint TP 25 set 473.000,00 520.300,00
TIANG PANCANG 30x30 cm MUTU BETON K-500
138 Tiang Pancang 30x30 Panjang 6 - 8 m 4 bh PC Strand 1/2" m 397.000,00 436.700,00
139 Tiang Pancang 30x30 Panjang 9 -11m 4 bh PC Strand 1/2" m 384.000,00 422.400,00
140 Tiang Pancang 30x30 Panjang 12 m 4 bh PC Strand 1/2" m 258.000,00 283.800,00
141 Tiang Pancang 30x30 Panjang 6 - 8 m 5 bh PC Strand 1/2" m 423.000,00 465.300,00
142 Tiang Pancang 30x30 Panjang 9 -11m 5 bh PC Strand 1/2" m 409.000,00 449.900,00
143 Tiang Pancang 30x30 Panjang 12 m 5 bh PC Strand 1/2" m 278.000,00 305.800,00
144 Tiang Pancang 30x30 Panjang 6 - 8 m 6 bh PC Strand 1/2" m 448.000,00 492.800,00
145 Tiang Pancang 30x30 Panjang 9 -11m 6 bh PC Strand 1/2" m 436.000,00 479.600,00
146 Tiang Pancang 30x30 Panjang 12 m 6 bh PC Strand 1/2" m 299.000,00 328.900,00
147 Plat Joint TP 30 set 742.000,00 816.200,00
TIANG PANCANG 35x35 cm MUTU BETON K-500
148 Tiang Pancang 35x35 Panjang 6 - 8 m 4 bh PC Strand 1/2" m 482.000,00 530.200,00
149 Tiang Pancang 35x35 Panjang 9 -11m 4 bh PC Strand 1/2" m 466.000,00 512.600,00
150 Tiang Pancang 35x35 Panjang 12 m 4 bh PC Strand 1/2" m 309.000,00 339.900,00
151 Tiang Pancang 35x35 Panjang 6 - 8 m 5 bh PC Strand 1/2" m 508.000,00 558.800,00
152 Tiang Pancang 35x35 Panjang 9 -11m 5 bh PC Strand 1/2" m 492.000,00 541.200,00
153 Tiang Pancang 35x35 Panjang 12 m 5 bh PC Strand 1/2" m 330.000,00 363.000,00
154 Tiang Pancang 35x35 Panjang 6 - 8 m 6 bh PC Strand 1/2" m 535.000,00 588.500,00
155 Tiang Pancang 35x35 Panjang 9 -11m 6 bh PC Strand 1/2" m 517.000,00 568.700,00
156 Tiang Pancang 35x35 Panjang 12 m 6 bh PC Strand 1/2" m 349.000,00 383.900,00
157 Plat Joint TP 35 set 877.000,00 964.700,00
TIANG PANCANG 40x40 cm MUTU BETON K-500
158 Tiang Pancang 40x40 Panjang 6 - 8 m 4 bh PC Strand 1/2" m 572.000,00 629.200,00
159 Tiang Pancang 40x40 Panjang 9 -11m 4 bh PC Strand 1/2" m 555.000,00 610.500,00
160 Tiang Pancang 40x40 Panjang 12 m 4 bh PC Strand 1/2" m 365.000,00 401.500,00
161 Tiang Pancang 40x40 Panjang 6 - 8 m 5 bh PC Strand 1/2" m 599.000,00 658.900,00
162 Tiang Pancang 40x40 Panjang 9 -11m 5 bh PC Strand 1/2" m 581.000,00 639.100,00
163 Tiang Pancang 40x40 Panjang 12 m 5 bh PC Strand 1/2" m 385.000,00 423.500,00
164 Tiang Pancang 40x40 Panjang 6 - 8 m 6 bh PC Strand 1/2" m 625.000,00 687.500,00
165 Tiang Pancang 40x40 Panjang 9 -11m 6 bh PC Strand 1/2" m 606.000,00 666.600,00
166 Tiang Pancang 40x40 Panjang 12 m 6 bh PC Strand 1/2" m 404.000,00 444.400,00
167 Tiang Pancang 40x40 Panjang 6 - 8 m 7 bh PC Strand 1/2" m 651.000,00 716.100,00
168 Tiang Pancang 40x40 Panjang 9 -11m 7 bh PC Strand 1/2" m 633.000,00 696.300,00
169 Tiang Pancang 40x40 Panjang 12 m 7 bh PC Strand 1/2" m 424.000,00 466.400,00
170 Plat Joint TP 40 1.012.000,00 1.113.200,00

176
NO BAHAN/MATERIAL SPESIFIKASI SATUAN HARGA HARGA
BAHAN SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
TIANG PANCANG 45x45 cm MUTU BETON K-500
171 Tiang Pancang 45x45 Panjang 6 - 8 m 5 bh PC Strand 1/2" m 701.000,00 771.100,00
172 Tiang Pancang 45x45 Panjang 9 -11m 5 bh PC Strand 1/2" m 706.000,00 776.600,00
173 Tiang Pancang 45x45 Panjang 12 m 5 bh PC Strand 1/2" m 448.000,00 492.800,00
174 Tiang Pancang 45x45 Panjang 6 - 8 m 6 bh PC Strand 1/2" m 726.000,00 798.600,00
175 Tiang Pancang 45x45 Panjang 9 -11m 6 bh PC Strand 1/2" m 732.000,00 805.200,00
176 Tiang Pancang 45x45 Panjang 12 m 6 bh PC Strand 1/2" m 467.000,00 513.700,00
177 Tiang Pancang 45x45 Panjang 6 - 8 m 7 bh PC Strand 1/2" m 752.000,00 827.200,00
178 Tiang Pancang 45x45 Panjang 9 -11m 7 bh PC Strand 1/2" m 757.000,00 832.700,00
179 Tiang Pancang 45x45 Panjang 12 m 7 bh PC Strand 1/2" m 487.000,00 535.700,00
180 Tiang Pancang 45x45 Panjang 6 - 8 m 8 bh PC Strand 1/2" m 778.000,00 855.800,00
181 Tiang Pancang 45x45 Panjang 9 -11m 8 bh PC Strand 1/2" m 784.000,00 862.400,00
182 Tiang Pancang 45x45 Panjang 12 m 8 bh PC Strand 1/2" m 506.000,00 556.600,00
183 Plat Joint TP 45 set 1.349.000,00 1.483.900,00
TIANG PANCANG 50x50 cm MUTU BETON K-500
184 Tiang Pancang 50x50 Panjang 6 - 8 m 6 bh PC Strand 1/2" m 733.000,00 806.300,00
185 Tiang Pancang 50x50 Panjang 9 -11m 6 bh PC Strand 1/2" m 715.000,00 786.500,00
186 Tiang Pancang 50x50 Panjang 12 m 6 bh PC Strand 1/2" m 539.000,00 592.900,00
187 Tiang Pancang 50x50 Panjang 6 - 8 m 7 bh PC Strand 1/2" m 759.000,00 834.900,00
188 Tiang Pancang 50x50 Panjang 9 -11m 7 bh PC Strand 1/2" m 741.000,00 815.100,00
189 Tiang Pancang 50x50 Panjang 12 m 7 bh PC Strand 1/2" m 558.000,00 613.800,00
190 Tiang Pancang 50x50 Panjang 6 - 8 m 8 bh PC Strand 1/2" m 784.000,00 862.400,00
191 Tiang Pancang 50x50 Panjang 9 -11m 8 bh PC Strand 1/2" m 767.000,00 843.700,00
192 Tiang Pancang 50x50 Panjang 12 m 8 bh PC Strand 1/2" m 578.000,00 635.800,00
193 Plat Joint TP 50 set 1.619.000,00 1.780.900,00
CORRUGATED SHEET PILE
CORRUGATED SHEET PILE W325 MUTU BETON K-700
194 CCSP W325 Tipe A Panjang 6 - 8 m 10 PC Strand 0.5" m 881.000,00 969.100,00
195 CCSP W325 Tipe A Panjang 9 - 11 m 10 PC Strand 0.5" m 858.000,00 943.800,00
196 CCSP W325 Tipe A Panjang 12 m 10 PC Strand 0.5" m 807.000,00 887.700,00
197 CCSP W325 Tipe B Panjang 6 - 8 m 12 PC Strand 0.5" m 933.000,00 1.026.300,00
198 CCSP W325 Tipe B Panjang 9 - 11 m 12 PC Strand 0.5" m 911.000,00 1.002.100,00
199 CCSP W325 Tipe B Panjang 12 m 12 PC Strand 0.5" m 858.000,00 943.800,00
CORRUGATED SHEET PILE W350 MUTU BETON K-700
200 CCSP W350 Tipe A Panjang 6 - 8 m 14 PC Strand 0.5" m 1.030.000,00 1.133.000,00
201 CCSP W350 Tipe A Panjang 9 - 11 m 14 PC Strand 0.5" m 996.000,00 1.095.600,00
202 CCSP W350 Tipe A Panjang 12 m 14 PC Strand 0.5" m 957.000,00 1.052.700,00
203 CCSP W350 Tipe B Panjang 6 - 8 m 16 PC Strand 0.5" m 1.082.000,00 1.190.200,00
204 CCSP W350 Tipe B Panjang 9 - 11 m 16 PC Strand 0.5" m 1.049.000,00 1.153.900,00
205 CCSP W350 Tipe B Panjang 12 m 16 PC Strand 0.5" m 1.008.000,00 1.108.800,00

177
NO BAHAN/MATERIAL SPESIFIKASI SATUAN HARGA HARGA
BAHAN SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
CORRUGATED SHEET PILE W400 MUTU BETON K-700
206 CCSP W400 Tipe A Panjang 6 - 8 m 14 PC Strand 0.5" m 1.112.000,00 1.223.200,00
207 CCSP W400 Tipe A Panjang 9 - 11 m 14 PC Strand 0.5" m 1.089.000,00 1.197.900,00
208 CCSP W400 Tipe A Panjang 12 m 14 PC Strand 0.5" m 1.022.000,00 1.124.200,00
209 CCSP W400 Tipe B Panjang 6 - 8 m 18 PC Strand 0.5" m 1.216.000,00 1.337.600,00
210 CCSP W400 Tipe B Panjang 9 - 11 m 18 PC Strand 0.5" m 1.193.000,00 1.312.300,00
211 CCSP W400 Tipe B Panjang 12 m 18 PC Strand 0.5" m 1.126.000,00 1.238.600,00
CORRUGATED SHEET PILE W450 MUTU BETON K-700
212 CCSP W450 Tipe A Panjang 6 - 8 m 18 PC Strand 0.5" m 1.259.000,00 1.384.900,00
213 CCSP W450 Tipe A Panjang 9 - 11 m 18 PC Strand 0.5" m 1.239.000,00 1.362.900,00
214 CCSP W450 Tipe A Panjang 12 m 18 PC Strand 0.5" m 1.174.000,00 1.291.400,00
215 CCSP W450 Tipe B Panjang 6 - 8 m 22 PC Strand 0.5" m 1.363.000,00 1.499.300,00
216 CCSP W450 Tipe B Panjang 9 - 11 m 22 PC Strand 0.5" m 1.343.000,00 1.477.300,00
217 CCSP W450 Tipe B Panjang 12 m 22 PC Strand 0.5" m 1.278.000,00 1.405.800,00
CORRUGATED SHEET PILE W500 MUTU BETON K-700
218 CCSP W500 Tipe A Panjang 6 - 8 m 22 PC Strand 0.5" m 1.370.000,00 1.507.000,00
219 CCSP W500 Tipe A Panjang 9 - 11 m 22 PC Strand 0.5" m 1.349.000,00 1.483.900,00
220 CCSP W500 Tipe A Panjang 12 m 22 PC Strand 0.5" m 1.283.000,00 1.411.300,00
221 CCSP W500 Tipe B Panjang 6 - 8 m 26 PC Strand 0.5" m 1.474.000,00 1.621.400,00
222 CCSP W500 Tipe B Panjang 9 - 11 m 26 PC Strand 0.5" m 1.453.000,00 1.598.300,00
223 CCSP W500 Tipe B Panjang 12 m 26 PC Strand 0.5" m 1.387.000,00 1.525.700,00
CORRUGATED SHEET PILE W600 MUTU BETON K-700
224 CCSP W600 Tipe A Panjang 6 - 8 m 26 PC Strand 0.5" m 1.635.000,00 1.798.500,00
225 CCSP W600 Tipe A Panjang 9 - 11 m 26 PC Strand 0.5" m 1.619.000,00 1.780.900,00
226 CCSP W600 Tipe A Panjang 12 m 26 PC Strand 0.5" m 1.528.000,00 1.680.800,00
227 CCSP W600 Tipe B Panjang 6 - 8 m 32 PC Strand 0.5" m 1.789.000,00 1.967.900,00
228 CCSP W600 Tipe B Panjang 9 - 11 m 32 PC Strand 0.5" m 1.774.000,00 1.951.400,00
229 CCSP W600 Tipe B Panjang 12 m 32 PC Strand 0.5" m 1.684.000,00 1.852.400,00
FLAT SHEET PILE
FPC 220 x 500 MUTU BETON K-500
230 FPC 220 x 500 Tipe A Panjang 6-8 m 4 PC Strand 0.5" m 497.000,00 546.700,00
231 FPC 220 x 500 Tipe A Panjang 9-11m 4 PC Strand 0.5" m 483.000,00 531.300,00
232 FPC 220 x 500 Tipe A Panjang 12 m 4 PC Strand 0.5" m 475.000,00 522.500,00
233 FPC 220 x 500 Tipe B Panjang 6-8 m 5 PC Strand 0.5" m 523.000,00 575.300,00
234 FPC 220 x 500 Tipe B Panjang 9-11m 5 PC Strand 0.5" m 509.000,00 559.900,00
235 FPC 220 x 500 Tipe B Panjang 12 m 5 PC Strand 0.5" m 501.000,00 551.100,00
236 FPC 220 x 500 Tipe C Panjang 6-8 m 6 PC Strand 0.5" m 550.000,00 605.000,00
237 FPC 220 x 500 Tipe C Panjang 9-11m 6 PC Strand 0.5" m 536.000,00 589.600,00
238 FPC 220 x 500 Tipe C Panjang 12 m 6 PC Strand 0.5" m 527.000,00 579.700,00
239 FPC 220 x 500 Tipe D Panjang 6-8 m 7 PC Strand 0.5" m 575.000,00 632.500,00
240 FPC 220 x 500 Tipe D Panjang 9-11m 7 PC Strand 0.5" m 562.000,00 618.200,00
241 FPC 220 x 500 Tipe D Panjang 12 m 7 PC Strand 0.5" m 552.000,00 607.200,00

178
NO BAHAN/MATERIAL SPESIFIKASI SATUAN HARGA HARGA
BAHAN SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
242 FPC 220 x 500 Tipe E Panjang 6-8 m 8 PC Strand 0.5" m 601.000,00 661.100,00
243 FPC 220 x 500 Tipe E Panjang 9-11m 8 PC Strand 0.5" m 587.000,00 645.700,00
244 FPC 220 x 500 Tipe E Panjang 12 m 8 PC Strand 0.5" m 579.000,00 636.900,00
245 FPC 220 x 500 Tipe F Panjang 6-8 m 9 PC Strand 0.5" m 626.000,00 688.600,00
246 FPC 220 x 500 Tipe F Panjang 9-11 m 9 PC Strand 0.5" m 613.000,00 674.300,00
247 FPC 220 x 500 Tipe F Panjang 12 m 9 PC Strand 0.5" m 605.000,00 665.500,00
248 FPC 220 x 500 Tipe G Panjang 6-8 m 10 PC Strand 0.5" m 653.000,00 718.300,00
249 FPC 220 x 500 Tipe G Panjang 9-11m 10 PC Strand 0.5" m 640.000,00 704.000,00
250 FPC 220 x 500 Tipe G Panjang 12 m 10 PC Strand 0.5" m 630.000,00 693.000,00
FPC 320 x 500 MUTU BETON K-500
251 FPC 320 x 500 Tipe A Panjang 6-8 m 4 PC Strand 0.5" m 625.000,00 687.500,00
252 FPC 320 x 500 Tipe A Panjang 9-11m 4 PC Strand 0.5" m 612.000,00 673.200,00
253 FPC 320 x 500 Tipe A Panjang 12 m 4 PC Strand 0.5" m 601.000,00 661.100,00
254 FPC 320 x 500 Tipe B Panjang 6-8 m 5 PC Strand 0.5" m 641.000,00 705.100,00
255 FPC 320 x 500 Tipe B Panjang 9-11m 5 PC Strand 0.5" m 632.000,00 695.200,00
256 FPC 320 x 500 Tipe B Panjang 12 m 5 PC Strand 0.5" m 622.000,00 684.200,00
257 FPC 320 x 500 Tipe C Panjang 6-8 m 6 PC Strand 0.5" m 667.000,00 733.700,00
258 FPC 320 x 500 Tipe C Panjang 9-11m 6 PC Strand 0.5" m 657.000,00 722.700,00
259 FPC 320 x 500 Tipe C Panjang 12 m 6 PC Strand 0.5" m 648.000,00 712.800,00
260 FPC 320 x 500 Tipe D Panjang 6-8 m 7 PC Strand 0.5" m 693.000,00 762.300,00
261 FPC 320 x 500 Tipe D Panjang 9-11m 7 PC Strand 0.5" m 683.000,00 751.300,00
262 FPC 320 x 500 Tipe D Panjang 12 m 7 PC Strand 0.5" m 674.000,00 741.400,00
263 FPC 320 x 500 Tipe E Panjang 6-8 m 8 PC Strand 0.5" m 718.000,00 789.800,00
264 FPC 320 x 500 Tipe E Panjang 9-11m 8 PC Strand 0.5" m 709.000,00 779.900,00
265 FPC 320 x 500 Tipe E Panjang 12 m 8 PC Strand 0.5" m 699.000,00 768.900,00
266 FPC 320 x 500 Tipe F Panjang 6-8 m 9 PC Strand 0.5" m 745.000,00 819.500,00
267 FPC 320 x 500 Tipe F Panjang 9-11 m 9 PC Strand 0.5" m 734.000,00 807.400,00
268 FPC 320 x 500 Tipe F Panjang 12 m 9 PC Strand 0.5" m 726.000,00 798.600,00
269 FPC 320 x 500 Tipe G Panjang 6-8 m 10 PC Strand 0.5" m 771.000,00 848.100,00
270 FPC 320 x 500 Tipe G Panjang 9-11m 10 PC Strand 0.5" m 761.000,00 837.100,00
271 FPC 320 x 500 Tipe G Panjang 12 m 10 PC Strand 0.5" m 752.000,00 827.200,00

179
EE. TANAMAN
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6

1 RUMPUT (LAWN)
Rumput Embun
1 (Politryas amaura) dia. 25 x 25 m2 132.000,00 145.200,00
Rumput Gajah (Axonopus
2 compressus) m2 24.000,00 26.400,00

3 Tandur 100 Titik/ m2 m2 42.000,00 46.200,00


Lempeng,
4 Jarak Lempeng ± 2 cm dia. 25 x 25 m2 54.000,00 59.400,00
Rumput Bermuda/Golf (Cynodon
5 dactylon) 100 Titik/m2 m2 54.000,00 59.400,00
Rumput Manila
6 (Zoysia matrella) dia. 25 x 25 m2 42.000,00 46.200,00
Rumput Manila
7 (Zoysia matrella) 100 Titik/m2 m2 36.000,00 39.600,00
Rumput Peking
8 (Agrostis stolonifera) dia. 25 x 25 m2 48.000,00 52.800,00
Rumput Jepang
9 (Zoysia japonica) dia. 25 x 25 m2 48.000,00 52.800,00
Rumput Gajah Mini (Axonopus
10 compressus 'Dwarf') 1m m2 42.000,00 46.200,00

2 PENUTUP TANAH
Anggrek Tanah Tinggi 35 - 40 cm,
1 (Spathoglotis plicata) 2 Btg, 3 Anakan Polybag 185.000,00 203.500,00
Bayam Merah Tinggi 20 - 25 cm, Polybag
2 (Alternanthera amoena) 1 Btg/Rpn 30.000,00 33.000,00
Beludru Coklat Tinggi 7 - 10 cm, Polybag
3 (Episcia cupreata) dia. Tajuk 10 - 15 30.000,00 33.000,00
Beludru Hijau Tinggi 7 - 10 cm, Polybag
4 (Episcia cupreata 'Frosty') dia. Tajuk 10 - 15 42.000,00 46.200,00
Bunga Perak/Tanaman Putri Salju Tinggi 25 - 30 cm, Polybag
5 (Centaurea ceneraria) 1 Btg 36.000,00 39.600,00
Cendrawasih (Phylantus Tinggi 15 - 20 cm, Polybag
6 myrtifoliu) dia. Tajuk 20 - 25 47.000,00 51.700,00
Tinggi 15 - 20 cm, Polybag
7 Coleus 1 Btg 42.000,00 46.200,00
Krosandra Tinggi 20 - 40 cm, Polybag
8 (Crossandra infundibuliformis) dia. Tajuk 20 - 25 47.000,00 51.700,00
Dinding Ari Tinggi 7 - 10 cm, Polybag
9 (Hemigraphis) 3 sd 4 Btg/Rpn 36.000,00 39.600,00
Tinggi 15 cm, 3 sd 4 Polybag
10 Gandarusa (Gendarusa vulgaris) Btg/Rpn 83.000,00 91.300,00
Jengger Ayam Air Mancur Daun Tinggi 15 - 20 cm, Polybag
11 Besar (Celosia sp.) Dia 1 Btg 59.000,00 64.900,00
Jengger Ayam Air Mancur Daun Tinggi 15 - 20 cm, Polybag
12 Kecil (Celosia sp.) Dia 1 Btg 38.000,00 41.800,00

180
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
Jengger Ayam a.m. Protol Besar Tinggi 20 - 25 cm, Dia Polybag
13 (Celosia sp.) 1 Btg 36.000,00 39.600,00
Jengger Ayam a.m. Protol Kecil Tinggi 20 - 25 cm, Dia Polybag
14 (Celosia sp.) 1 Btg 38.000,00 41.800,00
Tinggi 15 - 20 cm, Polybag
15 Bawang brojol (Zephyranthes sp.) Tajuk 15 - 20 53.000,00 58.300,00
Tinggi 15 - 20 cm, Polybag
16 Bawang brojol (Zephyranthes sp.) Tajuk 15 -20 53.000,00 58.300,00
Tinggi 10 cm, Polybag
17 Krokot (Althernantera ficoides) 5 Btg/ Rpn 30.000,00 33.000,00
Lili Paris Bintang Tinggi 10 - 12 cm, Polybag
18 (Chlorophytum sp.) 1 Btg /Rpn 12.000,00 13.200,00
Kucai-kucaian Tinggi 20 -25 cm, Polybag
19 (Ophipogon Jaburan) 5 sd 7 Btg / Rpn 88.000,00 96.800,00
Tinggi 10 cm, Polybag
20 Lili paris Kucai (Chorophytum sp.) 3 sd 5 Btg / Rpn 18.000,00 19.800,00
Tinggi 10 cm, Polybag
21 Lili pans Umbi (Chorophytum sp.) 3 sd 5 Btg / Rpn 15.000,00 16.500,00
Tinggi 15 - 20 cm, Polybag
22 Lili paris Brazil (Chorophytum sp.) 3 sd 5 Btg / Rpn 24.000,00 26.400,00
Kucai-kucaian mini Tinggi 10 cm, Polybag
23 (Ophiopogon japonicus) 3 sd 5 Btg / Rpn 24.000,00 26.400,00
Tinggi 20 - 25 cm, Polybag
24 Mirten Perak (Malphigia sp.) 3 sd 5 Btg / Rpn 30.000,00 33.000,00
Tinggi 10 - 15 cm, Polybag
25 Mirten Rebah (Malphigia sp.) Dia Tajuk 10 -15 36.000,00 39.600,00
Tinggi 30 - 35 cm, Polybag
26 Mirten Tegak (Malphigia sp.) 3 Btg / Rpn 30.000,00 33.000,00
Adam Hawa/Nanas Kerang Polybag
27 (Rhoeo discolor) Tinggi 20 cm, 1 Btg 36.000,00 39.600,00
Tinggi 25 - 30 cm, Polybag
28 Nanas Merah (Ananas sp.) Dia Tajuk 20 - 25 42.000,00 46.200,00
Tinggi 30 - 35 cm, Polybag
29 Sugi Putih (Dracaena sandersii) 3 Btg / Rpn 42.000,00 46.200,00
Sutra Bombai Banci Tinggi 7 - 10 cm, Polybag
30 (Portulaca sp.) 3 sd 5 Btg / Rpn 36.000,00 39.600,00
Sutra Bombai Ungu Tinggi 7 - 10 cm, Polybag
31 (Portulaca grandiflora) 3 sd 5 Btg / Rpn 36.000,00 39.600,00
Bunga Tahi Kotok (Tagetes Tinggi 20 - 25 cm, Polybag
32 patula) Dia Tajuk 15 - 20 36.000,00 39.600,00
Tinggi 15 cm, Polybag
33 Verbena (Verbena lanciniata) Dia 3 sd 5 Btg / Rpn 293.000,00 322.300,00
Katis Kodok Hijau Tinggi 10 cm, Polybag
34 (Sansevieria mini) Dia 10 Btg / pot 40.000,00 44.000,00
Katis Kodok Kuning Tinggi 10 cm, Polybag
35 (Sansevieria Mini) Dia 10 Btg / pot 40.000,00 44.000,00
Pedang - Pedangan Strip Kuning Tinggi 30 - 35 cm, Polybag
36 (Sansevieria tryfasciata) 5 sd 7 Btg / Rpn 36.000,00 39.600,00

181
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
Pedang - Pedangan Strip Hijau Tinggi 30 - 35 cm, Polybag
37 24.000,00 26.400,00
(Sansevieria tryfasciata) 5 sd 7 Btg / Rpn
Lantana Saudi (Lantana Tinggi 15 cm, Polybag
38 36.000,00 39.600,00
montevidensis) 3 sd 5 Btg / Rpn
Taiwan Beauty Bunga Ungu Tinggi 15 cm, Polybag
39 18.000,00 19.800,00
(Cuphea hyssopifolia) Dia. Tajuk 15
Taiwan Beauty Bunga Putih Tinggi 15 cm, Polybag
40 18.000,00 19.800,00
(Cuphea hyssopifolia) Dia. Tajuk 15
Anggrek Tanah Kecil Polybag
41 36.000,00 39.600,00
(Spathoglotis plicata 'Dwarf')
Jengger Ayam Biasa (Celosia Polybag
42 24.000,00 26.400,00
spicata)
Tinggi 40 cm, Polybag
43 Agave Putih (Agave sp.) 71.000,00 78.100,00
Dia. Tajuk 30
Tinggi 50 cm, Polybag
44 Agave Biala (Agave sp.) 77.000,00 84.700,00
Dia. Tajuk 40
Pandan Hijau Jepang
45 Tinggi 50 cm. 1 Rpn Pot 59.000,00 64.900,00
(Pandanus sp.)
Pandan Kuning Africa
46 Tinggi 50 cm. 1 Rpn Pot 59.000,00 64.900,00
(Pandanus sp.)

3 PERDU
Aglonema/Sri rezeki Polybag
1 Tinggi 40 cm, 3 Btg 71.000,00 78.100,00
(Aglaonema sp.)
Ekor Kucing Polybag
2 Tinggi 30 cm, 3 Btg 59.000,00 64.900,00
(Acalypha hispida)
Daun encok/Paksor Tinggi 10 - 15 cm, Polybag
3 59.000,00 64.900,00
(Plumbago zeylanica) 3 Btg
Bugenvil Berbunga Bentukan Tinggi 60 cm, Polybag
4 135.000,00 148.500,00
Penuh (Bougainvillea sp.) Dia. Tajuk 60
Bugenvil Berbunga Bentukan Polybag
5 Tinggi 200 cm. 335.000,00 368.500,00
Penuh (Bougainvillea sp.)
Bugenvil Berbunga Bentukan Polybag
6 Tinggi 300 cm. 480.000,00 528.000,00
Penuh (Bougainvillea sp.)
Bugenvil Hawai Tinggi 60 cm, Polybag
7 100.000,00 110.000,00
(Bougainvillea sp.) Dia. Tajuk 60
Tinggi 15 - 20 cm, Polybag
8 Dendron Biasa (Philodendron sp.) 36.000,00 39.600,00
1 Btg
Mawar Denrose/Matador Tinggi 20 - 40 cm, Polybag
9 18.000,00 19.800,00
(Rosa sp.) Dia. Tajuk 10 - 15
Balenceng India Polybag
10 Tinggi 30 cm, 12.000,00 13.200,00
(Dieffenbachia sp.)
Dracena Tricolor Tinggi 30 cm, Polybag
11 36.000,00 39.600,00
(Dracaena marginata) Dia. Tajuk 30
Tinggi 50 cm, Polybag
12 Kacapiring (Gardenia augusta) 53.000,00 58.300,00
Dia. Tajuk 30

182
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
Tinggi 50 cm, Polybag
13 Pisang hias (Heliconia sp.) 59.000,00 64.900,00
2 sd 3 Btg / Rpn
Spatyphylum Lokal Tinggi 15 - 20 cm, Polybag
14 59.000,00 64.900,00
(Spatiphylum sp) 3 Btg/ Pot
Spatyphylum Luar Tinggi 15 - 20 cm, Polybag
15 59.000,00 64.900,00
(Spatyphylum sp) 3 Btg
Beringin Kecil Tinggi 30 cm, Polybag
16 59.000,00 64.900,00
(Ficus benjamina) Dia. Tajuk 15 - 20
Kamboja Jepang Tinggi 30 cm, Polybag
17 176.000,00 193.600,00
(Adenium Cutanium) Bercabang Dia. Tajuk 15 - 20
Kamboja Jepang Polybag
18 Tinggi 50 - 75 cm. 235.000,00 258.500,00
(Adenium Cutanium)
Kamboja Jepang Polybag
19 Tinggi 100 - 150 cm. 177.000,00 194.700,00
(Adenium Cutanium)
Tinggi 100 cm, Polybag
20 Kamboja Putih (Plumeria sp.) 165.000,00 181.500,00
Dia. 3 Btg.
Tinggi 100 cm, Polybag
21 Kamboja Rantai (Plumeria sp.) 171.000,00 188.100,00
Dia. 3 Btg.
Kamboja Banci Polybag
22 Tinggi 300 cm. 236.000,00 259.600,00
(Plumeria sp.)
Tinggi 40 cm. 2 sd 3 Polybag
23 Kanna (Canna Hibrida) 21.000,00 23.100,00
Btg / Rpn
Tinggi 25 - 30 cm. Dia. Polybag
24 Kastuba (Euphorbia Pulcherima) 36.000,00 39.600,00
Tajuk 30
Kembang Sepatu Putih Tinggi 30 cm. 1 Btg / Polybag
25 176.000,00 193.600,00
(Hibicus Mutabilis) Pot
Kembang Sepatu Putih Polybag
26 Tinggi 75 cm 176.000,00 193.600,00
(Hibicus Mutabilis)
Kembang Sepatu Putih Polybag
27 Tinggi 80 cm 188.000,00 206.800,00
(Hibicus Mutabilis)
Kol Banda Polybag
28 Tinggi 350 - 400 cm 42.000,00 46.200,00
(Pisona Alba)
Sanrego Tinggi 30 - 40 cm. Dia. Polybag
29 30.000,00 33.000,00
(Lunasia amara) Btg 1.5
Sanrego Tinggi 50 - 75 cm. Dia. Polybag
30 30.000,00 33.000,00
(Lunasia amara) Btg 1.5
Sanrego Polybag
31 Tinggi 15 cm. 30.000,00 33.000,00
(Lunasia amara)
Sanrego Polybag
32 Tinggi 50 cm. 30.000,00 33.000,00
(Lunasia amara)
Sanrego Polybag
33 Tinggi 100 cm. 30.000,00 33.000,00
(Lunasia amara)
Tinggi 25 cm. Polybag
34 Mawar Putih (Rosa sp.) 176.000,00 193.600,00
Dia. Tajuk 15 - 20
Tinggi 30 cm. Polybag
35 Mawar Merah (Rosa sp.) 71.000,00 78.100,00
Dia. Tajuk 15 - 20
Tinggi 50 cm. 2 Anakan Polybag
36 Melati Costa (Brunfelsia calycina) 59.000,00 64.900,00
/ Rpn

183
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
Melati Gambir (Jasminum Tinggi 50 cm. 2 Anakan Polybag
37 59.000,00 64.900,00
pubescens) / Rpn
Oleander Polybag
38 Tinggi 50 cm. 1 Rpn 48.000,00 52.800,00
(Nerium oleander)
Sambang darah Tinggi 50 cm. Dia. Polybag
39 42.000,00 46.200,00
(Iresine herbstii) Tajuk 15 - 20
Wall Songo Daun Kecil Tinggi 50 cm.1 Btg / Polybag
40 83.000,00 91.300,00
(Scheffera sp) Pot
Tinggi 20 cm. 1 Btg / Polybag
41 Soka Bangkok (Ixora sp) 42.000,00 46.200,00
Pot
Soka Jepang Bunga Orange Tinggi 20 cm.1 Btg / Polybag
42 42.000,00 46.200,00
(Ixora sp) Pot
Tinggi 20 cm. 1 Btg / Polybag
43 Soka Philipina (Ixora sp) 42.000,00 46.200,00
Pot
Tinggi 20 cm. 1 Btg / Polybag
44 Soka Siantan (Ixora sp) 42.000,00 46.200,00
Pot
Tinggi 30 cm.1 Btg / Polybag
45 Soka Singapura (Ixora Cocineae) 42.000,00 46.200,00
Pot
Soka Jawa / Hawai Tinggi 30 cm. 3 sd 5 Polybag
46 47.000,00 51.700,00
(Ixora javanica) Btg / Rpn
Terang Bulan Daun Putih / Kuning Tinggi 25 cm. 3 sd 5 Polybag
47 53.000,00 58.300,00
(Duranta variegata) Btg / Rpn
Tombak Raja Tinggi 40 cm. 3 sd 5 Polybag
48 97.000,00 106.700,00
(Yucca gloriosa) Btg / Rpn
Tombak Raja Polybag
49 Tinggi 50 cm. 94.000,00 103.400,00
(Yucca gloriosa)
Tinggi 10 - 15 cm. 3 sd Polybag
50 Tapak Dara (Vinca rosea) 88.000,00 96.800,00
5 Btg / Rpn

4 TANAMAN PAGAR
Kedodong Laut Tinggi 60 - 75 cm. Polybag
1 59.000,00 64.900,00
(Nothopanax fruticosum) 3 sd 4 Btg / Rpn
Kemuning Tinggi 75 cm, Polybag
2 48.000,00 52.800,00
(Murraya paniculata) 1 Btg / Rpn
Lantana Pagar Tinggi 30 cm, Polybag
3 24.000,00 26.400,00
(Lantana camara) I Rpn
Lantana Pagar Polybag
4 Tinggi 40 cm. 24.000,00 26.400,00
(Lantana camara)
Mangkokan Tinggi 50 cm, Polybag
5 30.000,00 33.000,00
(Nothopanax scultellarium) 3 sd 4 Btg / Rpn
Mangkokan Polybag
6 Tinggi 70 cm. 30.000,00 33.000,00
(Nothopanax scultellarium)
Mirten Pagar 75 cm, 3 sd Tinggi 4 Polybag
7 30.000,00 33.000,00
(Malphigia sp.) Btg / Rpn
Tinggi 30 cm, Polybag
8 Teh-tehan (Acalypha siamensis) 18.000,00 19.800,00
3 sd 4 Btg / Rpn

184
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
Tinggi 50 cm, 3 sd 4 Polybag
9 Teh-tehan (Acalypha siamensis) 30.000,00 33.000,00
Btg / Rpn
Tinggi 75 cm, 3 sd 4 Polybag
10 Teh-tehan (Acalypha siamensis) 42.000,00 46.200,00
Btg / Rpn
Kemuning Rimbun Polybag
11 Tinggi 1 Meter 147.000,00 161.700,00
(Murraya paniculata)
Kemuning Biasa Polybag
12 Tinggi 40 cm 53.000,00 58.300,00
(Murraya paniculata)
Teh - Tehan Bulat Polybag
13 Tinggi 1 Meter 59.000,00 64.900,00
(Acalypha siamensis)
Teh - Tehan Bulat Polybag
14 Tinggi 50 cm 42.000,00 46.200,00
(Acalypha siamensis)
Pangkas Kuning (Duranta Tinggi 50 cm-3 m, Polybag
15 30.000,00 33.000,00
repens) 3 sd 5 Btg / Rpn

5 TANAMAN MERAMBAT
Air Mata Pengantin Tinggi 50 cm. Polybag
1 59.000,00 64.900,00
(Antigonon leptopus) Dia. Tajuk 40
Alamanda Tinggi 50 cm. Polybag
2 47.000,00 51.700,00
(Alamanda cathartica) Dia. Tajuk 40
Arabidea Tinggi 40 cm. Polybag
3 55.000,00 60.500,00
(Arabidea) Dia. Tajuk 30
Kuku Macan/Flame Of Irian Tinggi 40 cm. Polybag
4 10.000,00 11.000,00
(Mucuna benneti) Dia. Tajuk 30
Kembang Kelinci Tinggi 40 cm. Polybag
5 36.000,00 39.600,00
(Ipomea sp.) Dia. Tajuk 30
Kembang Sungsang Tinggi 30 cm. Polybag
6 30.000,00 33.000,00
(Gloriosa superba) Dia. Tajuk 20
Tinggi 40 cm. Polybag
7 Kongea (Congea tomentosa) 24.000,00 26.400,00
Dia. Tajuk 30
Lantana Rambat Ungu Tinggi 20 cm, Polybag
8 30.000,00 33.000,00
(Lantana sp.) 3 sd 4 Btg / Rpn
Lee Kuan Yu Tinggi 20 cm, Polybag
9 36.000,00 39.600,00
(Fernonia eliptica) 3 sd 4 Btg / Rpn
Tinggi 60 cm. Dia. Polybag
10 Pasiflora (Passiflora sp.) 24.000,00 26.400,00
Tajuk 40
Sirih Belanda/Kelembahang Tinggi 30 cm, 3 sd 4 Polybag
11 24.000,00 26.400,00
(Scindapsus sp.) Btg / Rpn
Stephanot Bunga Putih Tinggi 30 cm. Dia. Polybag
12 30.000,00 33.000,00
(Stephanotis floribunda) Tajuk 40

6 TANAMAN HIAS
Hanjuang Merah (Cordyline Tinggi 60 cm. Dia. Polybag
1 30.000,00 33.000,00
terminalis) Tajuk 40
Daun Suji/Hanjuang Merak Tinggi 60 cm. Dia. Polybag
2 42.000,00 46.200,00
(Pleomele angustifolia) Tajuk 40
Tinggi 30 cm. Dia.
3 Azalea (Rhododendron sp.) Polybag 24.000,00 26.400,00
Tajuk 40

185
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
Tinggi 20 cm. Polybag
4 Bakung Kecil (Hymenocallis sp.) 24.000,00 26.400,00
Dia Tajuk 40
Air Mancur (Russelia Tinggi 50 cm. Polybag
5 24.000,00 26.400,00
equisetiformis) Dia. Tajuk 20
Tinggi 100 - 200 cm.
6 Beringin Bonsai (Ficus benjamina) Phn 589.000,00 647.900,00
Dia.Tajuk 100
Beringin Bonsai Bentukan Tinggi 100 - 200 cm.
7 Phn 881.000,00 969.100,00
(Ficus benjamina) Dia.Tajuk 100
Beringin Bonsai Puttli Tinggi 250 cm. Dia
8 Phn 589.000,00 647.900,00
(Ficus benjamina) Tajuk 100
Bonsai Tanaman Serut Tinggi 100 - 150 cm.
9 Phn 5.852.000,00 6.437.200,00
(Streblus asper) Dia.Tajuk 100
Bonsai Tanaman Serut Tinggi 151 - 200 cm.
10 Phn 5.851.000,00 6.436.100,00
(Streblus asper) Dia.Tajuk 100
Nusa indah Merah / Putih Tinggi 50 cm.
11 Phn 18.706.000,00 20.576.600,00
(Mussaenda sp.) Dia. Tajuk 40
Palis Kelabang Hijau Tinggi 40 cm, 5 sd , 7 Polybag
12 118.000,00 129.800,00
(Nephrolepis sp.) Btg / Rpn
Pakis Kelabang Kuning Tinggi 40 cm, 5 sd 7 Polybag
13 118.000,00 129.800,00
(Nephrolepis sp.) Btg / Rpn
Tinggi 40 cm, 5 sd 7 Polybag
14 Pakis Krol (Nephrolepis bisserata) 118.000,00 129.800,00
Btg / Rpn
Pakis Monyet (Dicksonia Tinggi 150 - 200 cm. Polybag
15 235.000,00 258.500,00
squarrosa) Dia.Tajuk 40
Pisang Kipas (Ravenala Tinggi 200 - 250 cm.
16 Phn 674.000,00 741.400,00
Madagascariensis) Dia. Btg 10
Pisang Kipas (Ravenala
17 Tinggi 150 cm Phn 587.000,00 645.700,00
Madagascariensis)
Tinggi 75 cm. Polybag
18 Puring Bor (Codiaeum sp.) 176.000,00 193.600,00
Dia Tajuk 30
Tinggi 75 cm. Polybag
19 Puring Butut (Codiaeum sp.) 176.000,00 193.600,00
Dia Tajuk 30
Tinggi 75 cm. Polybag
20 Puring Gelatik (Codiaeum sp 176.000,00 193.600,00
Dia Tajuk 30
Tinggi 75 cm. Polybag
21 Puring jet (Codiaeum sp.) 176.000,00 193.600,00
Dia Tajuk 30
Tinggi 50 cm. Polybag
22 Puring Kelapang (Codiaeum sp.) 176.000,00 193.600,00
Dia Tajuk 30
Tinggi 60 cm. Polybag
23 Puring Nuri (Codiaeum sp.) 176.000,00 193.600,00
Dia Tajuk 30
Sianto/Dewadaru Tinggi 100 - 150 cm.
24 Btg 189.000,00 207.900,00
(Eugenia uniflora) Dia. Btg 10
Sikas / Pakis Haji Halus (Cycas Tinggi 100 cm.
25 Btg 1.173.000,00 1.290.300,00
revoluta) Dia. Btg 7.5
Tinggi 100 cm.
26 Sikas (Cycas sp.) Btg 822.000,00 904.200,00
Dia. Btg 10
Tinggi 50 cm.
27 Sikas Medan (Cycas sp.) Btg 412.000,00 453.200,00
Dia. Btu 10

186
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
Sikas / Pakis Haji Kasar
28 Tinggi 50 cm Btg 235.000,00 258.500,00
(Cycas rumpii)
sikas / Pakis Haji Kasar Tinggi 50 - 100 cm.
29 Btg 472.000,00 519.200,00
(Cycas rumpii) Dia. Btg 7.5
Kamboja Kuning (Bali) Tinggi Tinggi 150 - 200 cm.
30 Btg 200.000,00 220.000,00
(Plumeria sp.) Dia. Btg 3
Kamboja Orange Tinggi Tinggi 150 - 200 cm.
31 Btg 200.000,00 220.000,00
(Plumeria sp.) Dia. Btg 3
Kembang Kancing Tinggi 30 40 cm. Polybag
32 48.000,00 52.800,00
(Gomphrena globusa) Dia. Tajuk 20

7 PALEM
Kelapa Gading (Cocos nucifera Tinggi 200 - 250 cm.
1 Phn 1.172.000,00 1.289.200,00
var. Eburnea) Dia. Btg 20
2 Kelapa Sawit (Elais Guineensis) Tinggi 150 Phn 1.172.000,00 1.289.200,00
Tinggi 200 - 250 cm.
3 Kelapa Sawit (Elais Guineensis) Pim 1.758.000,00 1.933.800,00
Dia. Btg 40
4 Kelapa Sawit (Elais Guineensis) Tinggi 200 - 300 cm. Phn 2.107.000,00 2.317.700,00
Tinggi 200 - 250 cm.
5 Kelapa (Cocos nucifera) Phn 1.055.000,00 1.160.500,00
Dia. Btg 30
Tinggi 100 cm.
6 Kurma (Phoenix dactylifera) Phn 1.762.000,00 1.938.200,00
Dia. Btg 30
Kurma
7 > 200, Dia Btg 40 Phn 3.535.000,00 3.888.500,00
(Phoenix dactylifera)
Pohon Lontar Tinggi 300 cm.
8 Phn 61.000,00 67.100,00
(Borassus flabellifer) Dia. Btg 25
Tinggi 100 cm.
9 Palm Anggur (Latania lontaroides) Phn 5.870.000,00 6.457.000,00
Dia. Btg 15
Tinggi 150 cm.
10 Palm Anggur (Latania lontaroides) Phn 7.043.000,00 7.747.300,00
Dia. Btg 10
Palm Alexander Tinggi 150 cm.
11 Phn 5.870.000,00 6.457.000,00
(Archontophoenix alexandrae) Dia. Btg 10
Palm Botol Tinggi 150 - 200 cm.
12 Phn 1.054.000,00 1.159.400,00
(Mascarena lagenicaulis) Dia. Btg 30
Palm Botol Tinggi 50 cm.
13 Phn 470.000,00 517.000,00
(Mascarena lagenicaulis) Dia. Btg 50
Palm Kamaedorea Tinggi 100 cm. 3 sd 5
14 Phn 235.000,00 258.500,00
(Chamaedorea sp.) Btg / Rpn
Palm Kamaedorea Tinggi 200 cm. 3 sd 5
15 Phn 880.000,00 968.000,00
(Chamaedorea sp.) Btg / Rpn
Palm Tupai Tinggi 200 cm.
16 Phn 530.000,00 583.000,00
(Wodyetia bifurcata) Dia. Btg 15
Palm Jepang Tinggi 100 - 150 cm,
17 Rmp 293.000,00 322.300,00
(Ptychosperma Macarthurii) 5 sd 7 Btg / Rpn
Palm Jepang Tinggi 150 - 250 cm,
18 Rmp 470.000,00 517.000,00
(Ptychosperma Macarthurii) 5 sd 7 Btg / Rpn
Palm Kol Tinggi 100 cm,
19 Phn 254.000,00 279.400,00
(Licuali Grandis) Dia. Btg 10

187
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
Palm Kol
20 Tinggi 150 Phn 412.000,00 453.200,00
(Licuali Grandis)
Palm Kuning Tinggi 50 - 100 cm,
21 Phn 188.000,00 206.800,00
(Chysalidocarpus lutescens) 3 sd 5 Btg/ Rpn
Palm Kuning Tinggi 100 - 150 cm,
22 Phn 188.000,00 206.800,00
(Chysalidocarpus lutescens) 3 sd 5 Btg / Rpn
Palm Kuning
23 Tinggi 150 - 200 cm Phn 294.000,00 323.400,00
(Chysalidocarpus lutescens)
Palm Merah
24 Tinggi 100 cm. Phn 587.000,00 645.700,00
(Cyrtotachis lakka)
Palm Merah Tinggi 100 - 200 cm,
25 Phn 705.000,00 775.500,00
(Cyrtotachis lakka) 3 sd 5 Btg / Rpn
Palm Merah Tinggi 300 - 350 cm,
26 Phn 1.759.000,00 1.934.900,00
(Cyrtotachis lakka) 5 sd 7 Btg / Rpn
Palm Phoniex Tinggi 100 - 150 cm.
27 Phn 938.000,00 1.031.800,00
(Phonix sp.) Dia. Btg 8
Palm Phoniex Tinggi 150 - 200 cm.
28 Phn 939.000,00 1.032.900,00
(Phonix sp.) Dia. Btg 10
Palm Putri Tinggi 150 - 200 cm.
29 Phn 938.000,00 1.031.800,00
(Veitchia merilii) Dia. Btg 10
Palm Kurma Pigmi Tinggi 100 - 150 cm.
30 Phn 354.000,00 389.400,00
(Phoenix roebelenii) Dia. Btg 10
Tinggi 300 cm.
31 Palm Raja (Roystonea regia) Phn 937.000,00 1.030.700,00
Dia. Btg 75
Tinggi 200 cm.
32 Palm Raja (Roystonea regia) Phn 352.000,00 387.200,00
Dia. Btg 60
Tinggi 60 cm.
33 Palm Raja (Roystonea regia) Phn 236.000,00 259.600,00
Dia. Btg 25
Tinggi 100 cm.
34 Palm Raja (Roystonea regia) Phn 354.000,00 389.400,00
Dia. Btg 35
Tinggi 200 - 300 cm.
35 Palm Raja (Roystonea regia) Phn 940.000,00 1.034.000,00
Dia. Btg 25
Palm Ratu
36 Tinggi 100 - 150 cm. Phn 195.000,00 214.500,00
(Syagrus romanzoffiana)
Palm Ratu Tinggi 70 - 200 cm.
37 Phn 295.000,00 324.500,00
(Syagrus romanzoffiana) Dia. Btg 30
Palm Sadeng Tinggi 50 cm.
38 Phn 703.000,00 773.300,00
(Livistona rotundifolia) Dia Btg 5
Palm Seledri/Sarai Jawa Tinggi 150 cm.
39 Phn 706.000,00 776.600,00
(Caryota maxima) Dia. Btg 8
Palm Seledri/Sarai Jawa Tinggi 150 cm.
40 Phn 706.000,00 776.600,00
(Caryota maxima) Dia. Btg 8
Palm Seledri/Sarai Jawa Tinggi 200 cm.
41 Phn 706.000,00 776.600,00
(Caryota maxima) Dia. Btg 8
Palm Udang (Chrysalidocarpus Tinggi 50 cm.3 sd 5 Btg
42 Phn 944.000,00 1.038.400,00
lutescens var. elegans) / Rpn
Tinggi 150 cm.5 sd 7
43 Palm Waregu (Rhapis excelsa) Rmp 1.170.000,00 1.287.000,00
Btg / Rpn
Tinggi 200 cm. Dia. Btg
44 Pinang Sirih/Aren (Areca catechu) Phn 1.055.000,00 1.160.500,00
10

188
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6

8 BAMBU DAN CEMARA


Bambu Cina Tinggi 50 cm.
1 Dpr 141.000,00 155.100,00
(Bambusa vulagaris) 5 sd 7 Btg / Rpn
Bambu Daging Tinggi 150 cm.
2 Dpr 141.000,00 155.100,00
(Bambusa Venticossa) 5 sd 7 Btg / Rpn
Bambu Jepang Tinggi 200 cm.
3 Dpr 141.000,00 155.100,00
(Arundinaria pumila) 5 sd 7 Btg / Rpn
Bambu Kuning Tinggi 150 cm.
4 Dpr 212.000,00 233.200,00
(Phylostachys sulphrurea) 5 sd 7 Btg / Rpn
Cemara Angin Tinggi 200 cm.
5 Phn 1.007.000,00 1.107.700,00
(Cassuarina junghuhniana) Dia. Btg 4
Cemara Gembel Tinggi 150 cm.
6 Phn 1.009.000,00 1.109.900,00
(Cupressus Papuana) Dia. Btg 4
Cemara Embun Tinggi 150 cm.
7 Phn 823.000,00 905.300,00
(Casuarina equisetifolia) Dia. Btg 4
Cemara Kipas Tinggi 100 - 150 cm.
8 Phn 820.000,00 902.000,00
(Thuja orientalis) Dia. Btg 4
Cemara Kipas Daun Emas Tinggi 150 cm.
9 Phn 821.000,00 903.100,00
(Thuja Orientalis) Dia. Btg 4
Cemara Lilin/ Cemara Tretes Tinggi 100 cm.
10 Phn 527.000,00 579.700,00
(Mediterranean cypress) Dia. Btg 3
Cemara Laut Tinggi 150 cm.
11 Phn 822.000,00 904.200,00
(Casuarina equisetifolia) Dia. Btg 4
Cemara Natal Tinggi 75 cm.
12 Phn 821.000,00 903.100,00
(Cupressus sp) Dia. Tajuk 50
Cemara Natal
13 Tinggi 150 cm. Phn 178.000,00 195.800,00
(Cupressus sp)
Cemara Norflox Tinggi 75 cm.
14 Phn 177.000,00 194.700,00
(Araucaria heterophylla) Dia. Tajuk 50
Cemara Norflox Tinggi 100 - 150 cm.
15 Phn 353.000,00 388.300,00
(Araucaria heterophylla) Dia.Tajuk 60
Cemara Norflox Tinggi 400 - 600 cm.
16 Phn 1.060.000,00 1.166.000,00
(Araucaria heterophylla) Dia.Tajuk 200
Cemara Pensil Tinggi 75 cm.
17 Phn 353.000,00 388.300,00
(Cupressus sempervirens) Dia. Tajuk 60
Pinus
18 Tinggi 200 cm. Btg 4 Phn 820.000,00 902.000,00
(Pinus Merkusii)
Pinus
19 Tinggi 200 cm. Btg 5 Phn 821.000,00 903.100,00
(Pinus Merkusii)

9 TANAMAN PEMEKAT BURUNG


Pinang Sirih/Aren
1 Tinggi 100 cm. Btg 3 Phn 527.000,00 579.700,00
(Areca catechu)
Pinang Sirih/Aren Tinggi + 200-300 cm.
2 Phn 549.000,00 603.900,00
(Areca catechu) Btg 3
Belimbing
3 Tinggi 75 cm. Btg 3 Phn 410.000,00 451.000,00
(Averhoa caerambola)

189
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
Bintaro/Buah Simalakama
4 Tinggi 50 cm. Btg 3 Phn 75.000,00 82.500,00
(Carbera manghas)
Bintaro/Buah Simalakama
5 Tinggi 100 cm. Btg 3 Phn 150.000,00 165.000,00
(Carbera manghas)
Bintaro/Buah Simalakama
6 Tinggi 150 cm. Btg 4 Phn 225.000,00 247.500,00
(Carbera manghas)
Buni/Huni Tinggi 200 - 300 cm.
7 Phn 411.000,00 452.100,00
(Atidesma bunius) Btg 5
Buni/Huni Tinggi 400 - 500 cm.
8 Phn 705.000,00 775.500,00
(Atidesma bunius) Btg 10
Pohon Cannonball Tinggi 200 - 300 cm.
9 Phn 237.000,00 260.700,00
(Couroupita guianensis) Btg 5
Duku
10 Tinggi 100 cm. Btg 3 Phn 936.000,00 1.029.600,00
(Lansium domesticum)
Durian
11 Tinggi 100 cm. Btg 4 Phn 936.000,00 1.029.600,00
(Durio zibethinus)
Gatep/Gayam Tinggi 200 - 300 cm.
12 Phn 878.000,00 965.800,00
(Inocarpus edulis) Btg 5
Gowok
13 Tinggi 100 cm. Btg 3 Phn 235.000,00 258.500,00
(Eugenia polycephala)
Jamblang Tinggi 300 - 400 cm.
14 Phn 1.757.000,00 1.932.700,00
(Eugenia caminii) Btg 8
Jambu Air Tinggi 400 - 500 cm.
15 Phn 1.872.000,00 2.059.200,00
(Syzygium aqacum) Btg 10
Jambu Bol
16 Tinggi 100 cm. Btg 3 Phn 1.871.000,00 2.058.100,00
(Syzygiyum malaccense)
Jambu Mawar/Jambu Kraton
17 Tinggi 100 cm. Btg 3 Phn 1.638.000,00 1.801.800,00
(Syzygium jambos)
Kaliandra
18 Tinggi 100 cm. Big 3 Phn 1.761.000,00 1.937.100,00
(Calliandra sp.)
Kantil/Cempaka Putih
19 Tinggi 100 cm. Btg 3 Phn 1.638.000,00 1.801.800,00
(Michelia alba)
Katilayu
20 Tinggi 100 cm. Btg 3 Phn 1.713.000,00 1.884.300,00
(Erioglossum rubiginosum)
Kawista/Kawis Tinggi 200 - 300 cm.
21 Phn 1.765.000,00 1.941.500,00
(Limonia acidissima) Btg 5
Kecapi/Sentul
22 Tinggi 150 cm. Btg 4 Phn 1.756.000,00 1.931.600,00
(Sandoricum koetjape)
Kecapi/Sentul
23 Tinggi 500 - 600 cm Phn 1.993.000,00 2.192.300,00
(Sandoricum koetjape)
Kecubung
24 Tinggi 100 cm. Btg 3 Phn 707.000,00 777.700,00
(Datura metel)
Kedondong
25 Tinggi 500 cm. Btg 4 Phn 1.756.000,00 1.931.600,00
(Spondias dulcis)
Kemang
26 Tinggi 50 cm. Btg 3 Phn 938.000,00 1.031.800,00
(Mangifera caesia)
Kenanga
27 Tinggi 50 cm. Btg 3 Phn 118.000,00 129.800,00
(Cananga odorata)

190
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
Kersen/Serry
28 Tinggi 150 cm. Btg 4 Phn 176.000,00 193.600,00
(Mutinggia calabura)
Kersen/Serry
29 Tinggi 300 - 400 cm. Phn 586.000,00 644.600,00
(Mutinggia calabura)
Ketapang
30 Tinggi 500 cm. Btg 4 Phn 880.000,00 968.000,00
(Terminalia cattapa)
Lengkeng
31 Tinggi 100 cm. Btg 4 Phn 469.000,00 515.900,00
(Nephelium longana)
Kluwih Tinggi 150 - 200 cm.
32 Phn 235.000,00 258.500,00
(Arthocarpus altilis) Dia Btg 4
Lobi-lobi
33 Tinggi 100 cm. Btg 4 Phn 235.000,00 258.500,00
(Flacourtia inermis)
Melinjo
34 Tinggi 500 cm. Btg 4 Phn 469.000,00 515.900,00
(Gnetum gnemon)
Menteng Tinggi 200 cm.
35 Phn 703.000,00 773.300,00
(Baccaurea dulcis) Dia Btg 4
Menteng
36 Tinggi 300 cm. Phn 822.000,00 904.200,00
(Baccaurea dulcis)
Nam-nam/Kateng
37 Tinggi 100 cm. Phn 235.000,00 258.500,00
(Cynometra iripa)
Nam-nam/Kateng Tinggi 200 cm.
38 Phn 235.000,00 258.500,00
(Cynometra iripa) Dia Btg 5
Nangka (Atocarpus
39 Tinggi 100 cm. Btg 3 Phn 235.000,00 258.500,00
Heterophyllum)
Pala Tinggi 200 - 300 cm.
40 Phn 411.000,00 452.100,00
(Myristica frangrans) Dia Btg 5
Pala
41 Tinggi 300 - 400 cm. Phn 528.000,00 580.800,00
(Myristica frangrans)
Petai Cina Tinggi 200 - 300 cm.
42 Phn 323.000,00 355.300,00
(Parkis speciasa) Dia Btg 5
Rambutan
43 Tinggi 50 cm. Btg 3 Phn 235.000,00 258.500,00
(Nephelium lappaceum)
Rambutan (Nephelium
44 Tinggi 100 cm. Phn 469.000,00 515.900,00
lappaceum)
Rukam/Rukem
45 Tinggi 100 cm. Btg 3 Phn 236.000,00 259.600,00
(Flacourtia rukam)
Salam Tinggi 200 - 300 cm.
46 Phn 352.000,00 387.200,00
(Eugenia polyantha) Dia Btg 5
Salam
47 Tinggi 400 - 500 cm. Phn 586.000,00 644.600,00
(Eugenia polyantha)
Sawo Kecik Tinggi 200 cm. Dia Btg
48 Phn 352.000,00 387.200,00
(Manilkara kauki) 4
Sawo Kecik Tinggi 300 - 400 cm.
49 Phn 588.000,00 646.800,00
(Manilkara kauki) Dia Btg 3
Serikaya/Buah Nona
50 Tinggi 50 cm. Btg 3 Phn 176.000,00 193.600,00
(Annona squamosa)
Serikaya/Buah Nona
51 Tinggi 100 cm. Phn 294.000,00 323.400,00
(Annona squamosa)

191
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
Yangliu/Liang Liu Tinggi 150 - 200 cm.
52 Phn 295.000,00 324.500,00
(Salix babylonica) Dia Btg 4
Maja/Brenuk Tinggi 200 cm.
53 Phn 236.000,00 259.600,00
(Crescentia cuyete) Dia Btg 5

11 BUNGA POTONG
Amarylis
1 Dia. 1 Tangkai 89.000,00 97.900,00
(Hippeastrum hybrida)
Anggrek Macan
2 Dia. 1 Tangkai 703.000,00 773.300,00
(Gramatophyllum scriptum)
Anyelir
3 Dia. 1 Tangkai 88.000,00 96.800,00
(Dianthus deitoides)
Apple Blossom
4 Dia. 1 Tangkai 89.000,00 97.900,00
(Hippeastrum)
Aster
5 Dia. 1 Tangkai 89.000,00 97.900,00
(Callistephus chinensis)
Anggrek
6 Dia. 1 Tangkai 89.000,00 97.900,00
(Dendrobium sp.)
Anggrek Vanda Douglas
7 Dia. 1 Tangkai 89.000,00 97.900,00
(Vanda sp.)
Gladiol
8 Dia. 1 Tangkai 89.000,00 97.900,00
(Gladiolus sp.)
Golden Shower
9 Dia. 1 Tangkai 89.000,00 97.900,00
(Cassia fistula)
Krisan
10 Dia. 1 Tangkai 88.000,00 96.800,00
(Chrysanthemum sp.)
Mawar
11 Dia. 1 Tangkai 89.000,00 97.900,00
(Rosa sp.)
TANAMAN TEDUH
12
(INDOOR PLANT)
Anggrek Bulan/Puspa Pesona Tinggi 40 - 50 cm.
1 Polybag 235.000,00 258.500,00
(Phalaenopsis amabilis) 3 sd 5 Btg / Rpn
Anggrek Calanthe Tinggi 40 - 50 cm. Polybag
2 235.000,00 258.500,00
(Calanthe sp.) 3 sd 5 Btg / Rpn
Anggrek Vanda Douglas Tinggi 40 - 50 cm. Polybag
3 71.000,00 78.100,00
(Vanda sp.) 3 sd 5 Btg / Rpn
Apple Blossom Polybag
4 Tinggi 30 - 40 cm. 703.000,00 773.300,00
(Hippeastrum)
Aparagus Tinggi 30 - 40 cm. Polybag
5 54.000,00 59.400,00
(Asparagus densiflorus) Dia. Tajuk 20
Begonia Daun Besar Tinggi 40 - 50 cm. Polybag
6 83.000,00 91.300,00
(Begonia sp.) Dia. Tajuk 20
Begonia Daun Kecil Tinggi 40 - 50 cm. Polybag
7 83.000,00 91.300,00
(Begonia sp.) Dia. Tajuk 20
Begonia Perak Tinggi 40 - 50 cm. Polybag
8 83.000,00 91.300,00
(Begonia sp.) Dia. Tajuk 20
Belanceng Tinggi 40 - 50 cm. Polybag
9 83.000,00 91.300,00
(Dieffenbachia sp.) 4 sd 5 Daun / Pot

192
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
Belanceng Tinggi 40 - 50 cm. Polybag
10 50.000,00 55.000,00
(Dieffenbachia sp.) 4 sd 5 Daun / Pot
Golden Shower Tinggi 50 cm. Polybag
11 118.000,00 129.800,00
(Cassia fistula) Dia. Tajuk 20
Legundi/Gandasari Tinggi 30 - 40 cm. Polybag
12 42.000,00 46.200,00
(Vitex trifolia) Dia. Tajuk 15
Hortensia Tinggi 30 - 40 cm. Polybag
13 27.000,00 29.700,00
(Hydrangea macrophylla) Dia. Tajuk 30
Kencuran Tinggi 30 - 40 cm. Polybag
14 10.000,00 11.000,00
(Capparis micracantha) Dia Tajuk 21
Krisdoren Tinggi 30 - 40 cm. Polybag
15 71.000,00 78.100,00
(Asparagus sprengeri) Dia. Tajuk 15
Kuping Gajah Tinggi 30 - 40 cm. Polybag
16 71.000,00 78.100,00
(Anthurium crystallinum) 4 sd 5 Daun / Pot
Tinggi 30 - 40 cm. 4 sd Polybag
17 Kuping Keledai 48.000,00 52.800,00
5 Daun / Pot
Maranta Macan Tinggi 30 - 40 cm. Polybag
18 30.000,00 33.000,00
(Marantha sp.) Dia. Tajuk 25
Maranta Batik Tinggi 30 - 40 cm. Polybag
19 30.000,00 33.000,00
(Marantha sp.) Dia Tajuk 25
Maranta Buntut Ayam Tinggi 30 - 40 cm. Polybag
20 30.000,00 33.000,00
(Marantha sp.) Dia. Tajuk 25
Maranta Keris Tinggi 30 - 40 cm. Polybag
21 31.000,00 34.100,00
(Calathea rufibarba) Dia. Tajuk 25
Maranta Sepat Tinggi 30 - 40 cm. Polybag
22 31.000,00 34.100,00
(Marantha sp.) Dia. Tajuk 25
Daun Mutiara Tinggi 40 - 50 cm. Polybag
23 33.000,00 36.300,00
(Pilea sp.) Dia. Tajuk 20
Pacing Tinggi 40 - 50 cm. Dia. Polybag
24 30.000,00 33.000,00
(Costus sp.) Tajuk 20
Teplan Putih/Peperomia Tinggi 30 - 40 cm. Dia. Polybag
25 30.000,00 33.000,00
(Peperomia sp.) Tajuk 15
Sabrina/Rimput Belang Tinggi 20 - 30 cm. Dia. Polybag
26 36.000,00 39.600,00
(Zebrina pendula) Tajuk 15
Paku Tanduk Rusa Tinggi 40 - 50 cm. Dia. Polybag
27 83.000,00 91.300,00
(Platycerium bifurcatum) Tajuk 20
Kaktur Sinterklas Tinggi 40 - 50 cm. Dia. Polybag
28 71.000,00 78.100,00
(Opuntia vestita) Tajuk 20
Supelir Foster Kasar Tinggi 30 - 40 cm. Dia. Polybag
29 24.000,00 26.400,00
(Adiantum sp.) Tajuk 15
Supelir Halus Tinggi 30 - 40 cm. Dia. Polybag
30 24.000,00 26.400,00
(Adiantum sp.) Tajuk 15
Walisongo Biasa Tinggi 50 - 100 cm. Polybag
31 71.000,00 78.100,00
(Schefflera sp.) Dia. Btg 2
Walisongo Kuning Tinggi 100 - 150 cm. Polybag
32 89.000,00 97.900,00
(Schefflera sp.) Dia. Btg 3

193
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6

13 POHON PENEDUH
Angsana Tinggi 100 - 200 cm.
1 Phn 118.000,00 129.800,00
(Pterocarpus indicus) Dia. Btg 3
Asem Keranji Tinggi 150 - 200 cm.
2 Phn 206.000,00 226.600,00
(Pitchelobirum dulces) Dia Btg 2.5 sd 4
Asem Tinggi 150 - 200 cm.
3 Phn 352.000,00 387.200,00
(Tamarindus Indica) Dia. Btg 2.5 sd 4
Biola Cantik
4 Tinggi 10 - 25 cm. Phn 36.000,00 39.600,00
(Ficus lyrata)
Pasak Bumi
5 Tinggi 10 - 25 cm. Phn 48.000,00 52.800,00
(Eurycoma longifolia)
Batavia Tinggi 300
6 Phn 147.000,00 161.700,00
(Jatropha integerimma) Dia. Btg 5 cm.
Beringin Tinggi 150 200 cm. Dia.
7 Phn 293.000,00 322.300,00
(Ficus benjamina) Btg 2.5 sd 4
Tinggi 200 – 300 cm.
8 Beringin (Ficus benjamina) Phn 411.000,00 452.100,00
Dia. Btg 4 sd 5
Tinggi 200 cm.
9 Beringin pub (Ficus benjamina) Phn 353.000,00 388.300,00
Dia. Btg 3.5
Tinggi 150 - 250 cm.
10 Biola Cantik (Ficus lyrata) Phn 411.000,00 452.100,00
Dia. Btg 2.5 sd 4
Tinggi 100 - 200 cm.
11 Bisbul (Diospyros Dyscolor) Phn 352.000,00 387.200,00
Dia. Btg 3
Bunga Kupu - Kupu Tinggi 400 - 500 cm.
12 Phn 586.000,00 644.600,00
(Beuhinia Purperea) Dia. Btg 8 sd 10
Pohon Sapu Tangan Tinggi 150 - 250 cm.
13 Phn 353.000,00 388.300,00
(Maniltoa grandiflora) Dia. Btg 3.5
Pohon Sapu Tangan Tinggi 300 - 400 cm.
14 Phn 411.000,00 452.100,00
(Maniltoa grandiflora) Dia. Btg 5 sd 8
15 Bungur (Langerstromia indica) Tinggi 10 - 25 cm. Phn 54.000,00 59.400,00

Tinggi 150 - 250 cm.


16 Bungur (Langerstromia indica) Phn 177.000,00 194.700,00
Dia. Btg 3.5
Tinggi 200 - 300 cm.
17 Bungur (Langerstromia indica) Phn 703.000,00 773.300,00
Dia. Btg 4 sd 5
Tinggi 300 - 400 cm.
18 Bungur (Langerstromia indica) Phn 586.000,00 644.600,00
Dia Btg 5 sd 8
Tinggi 100 - 150 cm.
19 Johor/Sena (Cassia gIauca) Phn 352.000,00 387.200,00
Dia. Btg 3
Tinggi 200 - 300 cm.
20 Johor/Sena (Cassia gIauca) Phn 469.000,00 515.900,00
Dia. Btg 4 sd 5
Cempaka Kuning
21 Tinggi 150 - 200 cm. Phn 142.000,00 156.200,00
(Magnolia champaka)
Cempaka Kuning Tinggi 300 - 400 cm.
22 Phn 470.000,00 517.000,00
(Magnolia champaka) Dia. Btg 5 sd 8
Kerai Payung
23 1/2 Meter 150.000,00 165.000,00
(Filicium decipiens)
Tinggi 400 - 500 cm.
24 Ceremai (Phyllanthus acidus) Phn 821.000,00 903.100,00
Dia. Btg 8 sd 10

194
195
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
Tinggi 300 - 400 cm.
25 Dadap Hutan (Erythrina sp) Phn 352.000,00 387.200,00
Dia. Btg 5 sd 8
Dadap Merah Tinggi 150 - 200 cm.
26 Phn 189.000,00 207.900,00
(Erythrina Christagali) Dia. Btg 3.5
Dadap Merah Tinggi 300 - 400 cm.
27 Phn 295.000,00 324.500,00
(Erythrina Christagali) Dia Btg 5 sd 8
Tinggi 150 cm.
28 Damar (Agathis Alba) Phn 259.000,00 284.900,00
Dia. Btg 3
Tinggi 600 - 700 cm.
29 Damar (Agathis Alba) Phn 1.413.000,00 1.554.300,00
Dia. > 10
Tinggi 150 cm.
30 Flamboyant (Delonix Regia) Phn 206.000,00 226.600,00
Dia. Btg 2.5
31 Tinggi 300 cm.
Gemelina (Gmelina arborea) Phn 236.000,00 259.600,00
Dia. Btg 5
Glodogan (Polyalthea Longifolia) Tinggi 10 - 25 cm. Phn 702.000,00 772.200,00
32
Tinggi 150 - 200 cm.
33 Glodogan (Polythea Longifolia) Phn 703.000,00 773.300,00
Dia. Btg 3.5
Tinggi 200 - 300 cm.
34 Glodogan (Polythea Longifolia) Phn 704.000,00 774.400,00
Dia. Btg 4 sd 5
Tinggi 300 - 400 cm.
35 Glodogan (Polythea Longifolia) Phn 704.000,00 774.400,00
Dia. Btg 5 sd 8
Glodogan Tiang (Polyalthea
36 Tinggi 100 - 150 cm. Phn 644.000,00 708.400,00
Longifolia)
Glodogan Tiang (Polyalthea Tinggi 150 - 300 cm.
37 Phn 587.000,00 645.700,00
Longifolia) Dia. Btg 4
Tinggi 200 - 300 cm.
38 Jatimas (Cordia sebestena) Phn 353.000,00 388.300,00
Dia. Btg 4 sd 5
Jambu Mede
39 Tinggi 400 - 500 cm Phn 589.000,00 647.900,00
(Anacardium Occidendale)
Tinggi 100 cm.
40 Karet Kebo (Ficus elastica) Phn 878.000,00 965.800,00
Dia. Btg 3
Tinggi 200 - 300 cm.
41 Kastuba (Euphorbia Pulcherrima) Phn 470.000,00 517.000,00
Dia. Btg 4 sd 5
Tinggi 200 cm.
42 Kayu Manis (Cinnamon Bumanni) Phn 878.000,00 965.800,00
Dia. Btg 3.5
Tinggi 400 - 600 cm.
43 Kayu Manis (Cinnamon Bumanni) Phn 938.000,00 1.031.800,00
Dia. Btg 8 sd 10
Kayu Putih Tinggi 200 - 300 cm.
44 Phn 587.000,00 645.700,00
(Maleucaa. Leucandredon) Dia. Btg 4 sd 5
Kembang Merak Tinggi 200 cm.
45 Phn 294.000,00 323.400,00
(Caesalpina Pulcherrima) Dia. Btg 3

196
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
Kembang Sepatu Kuning Tinggi 100 - 200 cm.
46 Phn 176.000,00 193.600,00
(Hibicus Hybridus) Dia. Btg 3.5
Tinggi 100 - 150 cm.
47 Kenari (Canarium Commune) Phn 411.000,00 452.100,00
Dia. Btg 3
Tinggi 300 - 400 cm.
48 Kenari (Canarium Commune) Phn 588.000,00 646.800,00
Dia. Btg 5 sd 8
Tinggi 150 - 200 cm.
49 Ketapang (Terminalia Cattapa) Phn 294.000,00 323.400,00
Dia. Btg 3.5
Tinggi 500 - 600 cm.
50 Ketapang (Terminalia Cattapa) Phn 587.000,00 645.700,00
Dia. > 10
Tinggi 150 - 200 cm.
51 Kiara Payung (Filicium Decipiens) Phn 469.000,00 515.900,00
Dia. Btg 3.5
Tinggi 50 cm. Dia. Btg
52 Kurma (Phoenix dactylifera) Phn 177.000,00 194.700,00
3
Lampeni/Kayu Lampiko Tinggi 150 - 200 cm.
53 Phn 353.000,00 388.300,00
(Ardisia elliptica) Dia. Btg 3.5
Tinggi 300 - 400 cm.
54 Mahoni (Swietania Mahagoni) Phn 703.000,00 773.300,00
Dia. Btg 5 sd 8 (1 m)
Tinggi 600 - 700 cm.
55 Mahoni (Swietania Mahagoni) Phn 353.000,00 388.300,00
Dia. > 10
Tinggi 60 - 70 cm. Dia.
56 Mahoni Diameter
Btg 4 Phn 3.508.000,00 3.858.800,00
(Swietania Mahagoni)
sd 5
Tinggi 500 - 600 cm.
Mangga (Mangifera Indica) Phn 1.171.000,00 1.288.100,00
57 Dia. > 10
Tinggi 300 - 400 cm.
58 Matoa Irian (Pometia Pinata) Phn 189.000,00 207.900,00
Dia. Btg 5 sd 8
Tinggi 100 - 200 cm.
59 Nipah (Nipa Frutican) Phn 177.000,00 194.700,00
Dia. Btg 3.5
Nyamplung Tinggi 100 - 250 cm.
60 Phn 177.000,00 194.700,00
(Calophyllum Inopyllum) Dia. Btg 4 sd 5
Tinggi 300 - 400 cm.
61 Pule (Alstonia scholaris) Phn 235.000,00 258.500,00
Dia. Btg 5 sd 8
Tinggi 600 - 700 cm.
62 Pule (Alstonia scholaris) Phn 1.407.000,00 1.547.700,00
Dia. > 10
Tinggi 50 - 100 cm.
63 Salam (Eugenia polyantha) Phn 89.000,00 97.900,00
Dia. Btg 3
Salam (Eugenia polyantha) Tinggi 10 - 25 cm. Phn 100.000,00 110.000,00
64
65 Tinggi 200 - 300 cm.
Sikat Botol (Callistemon viminalis) Phn 586.000,00 644.600,00
Dia Btg 4 sd 5
Kecapi/Sentul Tinggi 500 - 600 cm.
66 Phn 236.000,00 259.600,00
(Sandoricum koetjape) Dia. > 10
Sawo Duren Tinggi 150 - 200 cm.
67 Phn 200.000,00 220.000,00
(Chrysophyilum cainito) Dia. Btg 3.5
Tinggi 200 cm. Dia. Btg
68 Sawo Kecik (Manilkara kauki) Phn 353.000,00 388.300,00
3.5
Sono Keling / Sengon (Abazia) Tinggi 150 - 200 cm.
69 Phn 468.000,00 514.800,00
(Albazia falcataria) Dia. Btg 3.5

197
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
Kembang Kecrutan Tinggi 150 - 200 cm.
70 Phn 95.000,00 104.500,00
(Spathodea campanulata) Dia. Btg 3.5
Kembang Kecrutan Tinggi 500 - 600 cm.
71 Phn 355.000,00 390.500,00
(Spathodea campanulata) Dia. > 10
Tinggi 100 - 200 cm.
72 Tabebuia (Tabebuia argenthea) Phn 235.000,00 258.500,00
Dia.Tajuk 50 - 70
Tanjung (Mimusops elengi) Tinggi 10 - 25 cm. Phn 235.000,00 258.500,00
73
Tinggi 400 - 500 cm.
74 Tanjung (Mimusops elengi) Phn 412.000,00 453.200,00
Dia. Btg 8 sd 10
Tinggi 150 - 200 cm.
75 Tanjung (Mimusops elengi) Phn 236.000,00 259.600,00
Dia Btg 3.5
Tinggi 200 - 300 cm.
76 Tanjung (Mimusops elengi) Phn 236.000,00 259.600,00
Dia. Btg 4 sd 5
Trembesi/Kihujan (Samanea
77 Tinggi 10 - 25 cm. Phn 42.000,00 46.200,00
saman)
Trembesi/Kihujan (Samanea Tinggi 200 an.
78 Phn 235.000,00 258.500,00
saman) Dia. Btg 3.5
Trembesi/Kihujan (Samanea Tinggi 400 - 500 cm.
79 Phn 470.000,00 517.000,00
saman) Dia. Btg 8 sd 10
Trembesi/Kihujan (Samanea Tinggi 600 - 700 cm.
80 Phn 588.000,00 646.800,00
saman) Dia. > 10
Tinggi 50 - 100 cm.
81 Walisongo (Brassaia actinophylla) Phn 71.000,00 78.100,00
Dia. Btg 3
Tinggi 200 cm.
82 Walisongo (Brassaia actinophylla) Phn 94.000,00 103.400,00
Dia. Btg 3.5
Tinggi 300 cm.
83 Walisongo (Brassaia actinophylla) Phn 176.000,00 193.600,00
Dia. Btg 5
Tinggi 500 - 600 cm.
84 Waru (Hibiscus macrophyllus) Phn 588.000,00 646.800,00
Dia. > 10

14 BIJI
Kesumba
1 Dia, 1 Kg 65.000,00 71.500,00
(Bixa orellana)
Bunga Kupu - Kupu
2 Dia, 1 Kg 71.000,00 78.100,00
(Bauhinia purpurea)
Glodogan
3 Dia. 1 Kg 75.000,00 82.500,00
(Polyalthia longifolia)
Mahoni
4 Dia 1 Kg 65.000,00 71.500,00
(Switenia mahagoni)
Salam
5 Dia. 1 Kg 142.000,00 156.200,00
(Eugenia polyantha)
Tanjung
6 Dia. 1 Kg 65.000,00 71.500,00
(Mimusops elengi)
Trembesi/Kihujan
7 Dia. 1 Kg 705.000,00 775.500,00
(Samanea saman)

198
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
TANAMAN HIAS YANG
15
MEMILIKI NILAI KHUSUS
tinggi 50 cm, kondisi
1 Anturium (Anthurium andraenum) pot 410.000,00 451.000,00
optimal
Belanceng yongmay tinggi 50 cm, kondisi
2 pot 71.000,00 78.100,00
(Dieffenbachia sp.) optimal
Cemara udang (Casuarina tinggi 50-100 cm,
3 phn 941.000,00 1.035.100,00
equisetifolia) kondisi optimal
tinggi 10-30 cm, kondisi
4 Lotus (Nelumbo nucifera) rmp 294.000,00 323.400,00
optimal
tinggi 40-50 cm, kondisi
5 Melati air (Echinodorus sp.) rmp 293.000,00 322.300,00
optimal
tinggi 100 cm, kondisi
6 Nolina (Nolina stricta) phn 293.000,00 322.300,00
optimal
tinggi 150 cm, kondisi
7 Pacira (Pachira offinis) phn 119.000,00 130.900,00
optimal
tinggi 150-200 cm,
8 Palem Segitiga (Dypsis Decaryi) phn 295.000,00 324.500,00
kondisi optimal
Pandan Bali cabang tinggi tinggi 150-200 cm,
9 phn 822.000,00 904.200,00
(Dracaena draco) kondisi optimal
Pandan Bali tunggal tinggi tinggi 100 cm, kondisi
10 phn 258.000,00 283.800,00
(Dracaena draco) optimal
Philodendron hijau tinggi 50 cm, kondisi
11 phn 118.000,00 129.800,00
(Philodendron sp.) optimal
Philodendron kuning tinggi 50 cm, kondisi
12 phn 118.000,00 129.800,00
(Philodendron sp.) optimal
Philodendron merah tinggi 50 cm, kondisi
13 phn 118.000,00 129.800,00
(Philodendron sp.) optimal
tinggi 50 cm, kondisi
14 Puring kuning (Codiaeum sp.) phn 118.000,00 129.800,00
optimal
tinggi 100 cm, kondisi
15 Sikas antik tinggi (Cycas sp.) phn 706.000,00 776.600,00
optimal
tinggi 100 cm, kondisi
16 Silas halus (cycas revoluta) phn 881.000,00 969.100,00
optimal
tinggi 50 cm, kondisi
17 Sikas kasar (cycas sp.) phn 493.000,00 542.300,00
optimal
tinggi 50 cm, kondisi
18 Sikas medan (cycas sp.) phn 504.000,00 554.400,00
optimal
Srikit/Putri Salju tinggi 40-50 cm, kondisi
19 phn 271.000,00 298.100,00
(Senecio cineraria) optimal
tinggi 10-20 cm, kondisi
20 Teratai (Nymphaea lotus) rmp 65.000,00 71.500,00
optimal
Alang-alang air/Tipha tinggi 100 cm, kondisi
21 rmp 118.000,00 129.800,00
(Typa angustifolia) optimal
Kembang Kertas/Zennia tinggi 50 cm, kondisi
22 phn 89.000,00 97.900,00
(Zinnia elegans) optimal
Kembang Kertas/Zennia
23 phn 6.000,00 6.600,00
(Zinnia elegans)

199
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6

16 BATU TAMAN & PUPUK


tinggi 25-40 cm,
1 Batu api sedang bh 59.000,00 64.900,00
dia. 1 cm
tinggi 40-75 cm,
2 Batu api besar bh 118.000,00 129.800,00
dia. 1 cm
Bambu penunjang
3 tinggi 200 cm batang 36.000,00 39.600,00
(steger bambu bulat)
4 Batu ares dia. 3 cm krg 60.000,00 66.000,00

5 Batu bintang dia. 1 cm krg 60.000,00 66.000,00

6 Batu brojol hitam bengkulu dia. 3-5 cm krg 77.000,00 84.700,00

7 Batu brojol merah anti dia. 3-5 cm krg 77.000,00 84.700,00

8 Batu brojol putih ambon dia. 3-5 cm krg 77.000,00 84.700,00

9 Batu kayu besar tinggi 75 cm, dia. 1 cm bh 27.000,00 29.700,00

10 Batu kayu kecil tinggi 40, dia. 1 cm bh 24.000,00 26.400,00

Batu tempel cirebon alam


11 dia. 8x20 cm m2 118.000,00 129.800,00
berbagai jenis ukuran
Batu tempel palimanan
12 dia. 10x20 cm m2 142.000,00 156.200,00
hijau dan putih
13 Gentong teratai besar dia 1 cm bh 48.000,00 52.800,00

14 Gentong teratai kecil dia 1 cm bh 48.000,00 52.800,00

15 Gentong teratai sedang dia. 1 cm bh 48.000,00 52.800,00

16 Kantong plastik dia. 20 cm kg 24.000,00 26.400,00

17 Plashic belling tebal 8 mikron m2 355.000,00 390.500,00

18 Pot dekoratif terra cotta claris dia. Pot 60 cm bh 83.000,00 91.300,00

Pot plastik diameter terra cotta


19 dia. Pot 30 cm bh 31.000,00 34.100,00
claris
Pot plastik diameter terra cotta
20 dia. Pot 40 cm bh 36.000,00 39.600,00
claris
21 Pupuk majemuk butir - p rill dia. 1 cm kg 24.000,00 26.400,00

22 Pupuk majemuk kaplet uk. 10 gr kg 24.000,00 26.400,00

23 Pupuk kandang (uk_ Kecil) 5 kg krg 24.000,00 26.400,00

24 Pupuk kompos (uk. Kea) 5 kg krg 48.000,00 52.800,00

25 Pupuk NPK kg 31.000,00 34.100,00

200
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
26 Pupuk TSP kg 6.000,00 6.600,00

27 Pupuk Urea kg 31.000,00 34.100,00

28 Pupuk ZA kg 30.000,00 33.000,00

29 Serbuk gergaji krg 42.000,00 46.200,00

30 Organik Pitsar 5 kg kg 223.000,00 245.300,00

31 Sekam Bakar krg 30.000,00 33.000,00

32 Pupuk GEET Leuhu Plastik 30.000,00 33.000,00

201
202
IV. STANDAR HARGA UPAH

NO. URAIAN UPAH (SWAKELOLA) UPAH (KONTRAKTUAL)


Org/jam Org/hari Org/jam Org/hari
1 2 3 4 5 6

1 Mandor 41.075,00 287.525,00 45.182,50 316.277,50

2 Kepala Tukang Batu 35.207,14 246.450,00 38.727,86 271.095,00

3 Kepala Tukang Kayu 35.207,14 246.450,00 38.727,86 271.095,00

4 Kepala Tukang Besi 35.207,14 246.450,00 38.727,86 271.095,00

5 Kepala Tukang Cat 35.207,14 246.450,00 38.727,86 271.095,00

6 Kepala Tukang Listrik 35.207,14 246.450,00 38.727,86 271.095,00

7 Tukang Batu 29.339,29 205.375,00 32.273,21 225.912,50

8 Tukang Kayu 29.339,29 205.375,00 32.273,21 225.912,50

9 Tukang Besi/Baja 29.339,29 205.375,00 32.273,21 225.912,50

10 Tukang Aluminium 29.339,29 205.375,00 32.273,21 225.912,50

11 Tukang Cat 29.339,29 205.375,00 32.273,21 225.912,50

12 Tukang Listrik 29.339,29 205.375,00 32.273,21 225.912,50

13 Tukang Pipa 29.339,29 205.375,00 32.273,21 225.912,50

14 Tukang Plitur 29.339,29 205.375,00 32.273,21 225.912,50

15 Tukang Taman 29.339,29 205.375,00 32.273,21 225.912,50

16 Pembantu Tukang 23.471,43 164.300,00 25.818,57 180.730,00

17 Pekerja Biasa 23.471,43 164.300,00 25.818,57 180.730,00

18 Penjaga Malam 29.339,29 205.375,00 32.273,21 225.912,50

19 Sopir 35.207,14 246.450,00 38.727,86 271.095,00

20 Operator 41.075,00 287.525,00 45.182,50 316.277,50

21 Mekanik 41.075,00 287.525,00 45.182,50 316.277,50

22 Pembantu Sopir 23.471,43 164.300,00 25.818,57 180.730,00

23 Pembantu Operator 23.471,43 164.300,00 25.818,57 180.730,00

24 Pembantu Mekanik 23.471,43 164.300,00 25.818,57 180.730,00

V. STANDAR HARGA ALAT

203
BIAYA SEWA
NO URAIAN HP KAPASITAS HARGA ALAT
ALAT/JAM
1 Asphalt Mixing Plant 294 60,0 T/jam 7.479.254.000,00 6.374.000,00
2 Asphalt Finisher 72,4 10,0 Ton 4.413.405.000,00 1.184.000,00
3 Asphal Sprayer 4 850 Liter 282.982.000,00 160.000,00
4 Bulldozer 100-150 HP 155 - Hp 2.397.566.000,00 1.087.000,00
5 Compressor 4000-6500 L/M 60 5.000 Liter 250.560.000,00 266.000,00
6 Concrete Mixer 0.3-0.6 M3 20 500 Liter 200.278.000,00 222.000,00
7 Crane 10-15 Ton 138 15 Ton 1.635.185.000,00 1.016.000,00
8 Dump Truck 3.5 Ton 100 3,5 Ton 416.855.000,00 568.000,00
9 Dump Truck 10Ton 190 10 Ton 1.067.127.000,00 1.088.000,00
10 Excavator 80-140 HP 133 0,9 M3 1.603.944.000,00 988.000,00
11 Flat Bed Truck 3-4 M3 190 10 Ton 1.411.451.000,00 869.000,00
12 Generator Set 180 135 KVA 789.458.000,00 981.000,00
13 Motor Grader > 100 HP 135 10.800 HP 2.854.545.000,00 1.278.000,00
14 Track Loader 75-100 HP 70 0,8 M3 1.330.788.000,00 688.000,00
15 Wheel Loader 1.0-1.6 M3 96 1,5 M3 1.571.789.000,00 831.000,00
16 Three Wheel Roller 6-8 T 55 8 Ton 591.248.000,00 357.000,00
17 Tandem Roller 6-8 T 82 8,1 Ton 1.976.732.000,00 703.000,00
18 Tire Roller 8-10 T 100,5 9 Ton 1.636.010.000,00 843.000,00
19 Vibratory Roller 5-8 T 82 7,1 Ton 1.799.320.000,00 705.000,00
20 Concrete Vibrator 5,5 25 HP 41.838.000,00 114.000,00
21 Stone Crusher 220 50 T/jam 1.731.491.000,00 1.252.000,00
22 Water Pump 70-100 mm 6 - - 358.170.000,00 198.000,00
23 Water Tanker 3000 - 4500 L 100 4.000 Liter 805.354.000,00 662.000,00
24 Pedestrian Roller 8,8 835 Ton 223.240.000,00 168.000,00
25 Tamper 4,7 121 Ton 54.405.000,00 111.000,00
26 Jack Hammer 0 1.330 HP 98.410.000,00 100.000,00
27 Fulvi Mixer 345 2.005 HP 1.988.053.000,00 2.762.000,00
28 Concrete Pump 100 8 M3 357.520.000,00 495.000,00
29 Trailer 20 Ton 175 20 Ton 966.911.000,00 1.003.000,00
30 Pile Driver + Hammer 25 2.5 Ton 399.898.000,00 267.000,00
BIAYA SEWA
NO URAIAN HP KAPASITAS HARGA ALAT
ALAT/JAM

204
31 Pile Driver + Hammer 150 15 Ton 268.886.000,00 402.000,00
32 Crane On Track 35 Ton 125 35 Ton 1.013.373.000,00 813.000,00
33 Welding Set 40 250 Amp 246.111.000,00 285.000,00
34 Bore Pile Machine 150 2.000 Meter 5.013.704.000,00 2.241.000,00
35 Asphal Liqued Mixer 5 1.000 Liter 158.007.000,00 120.000,00
36 Tronton 150 15 Ton 541.330.000,00 965.000,00
37 Cold Milling 248 1.000 m 3.309.140.000,00 2.194.000,00
38 Rock Drill Breaker 3 - - 1.831.707.000,00 663.000,00
39 Cold Recycler 900 2,2 m 14.250.718.000,00 8.049.000,00
40 Hot Recycler 400 3 m 10.820.238.000,00 8.837.000,00
41 Aggregat (Chip) Spreader 115 3,5 m 688.668.000,00 862.000,00
42 Asphal Distributor 115 4.000 Liter 635.282.000,00 633.000,00
43 Slip Form Paver 105 2,5 m 1.996.518.000,00 899.000,00
44 Concrete Pan Mixer 134 600 Liter 1.361.889.000,00 899.000,00
45 Concrete Breaker 290 20 m3/jam 1.765.766.000,00 1.467.000,00
46 Asphalt Tanker 190 4.000 Liter 664.347.000,00 871.000,00
47 Cement Tanker 190 4.000 Liter 667.527.000,00 824.000,00
48 Concrete Mixer (350) 20 350 Liter 104.291.000,00 169.000,00
49 Vibrating Rammer 4,2 80 Kg 61.776.000,00 112.000,00
50 Truck Mixer (Agitator 220 5 m3 1.065.648.000,00 1.026.000,00
51 Bore Pile Machine 125 60 Cm 4.530.723.000,00 1.948.000,00
52 Crane On Track 75-100 Ton 200 75 Ton 4.961.979.000,00 1.903.000,00
53 Blending Equipment 50 30 Ton 929.161.000,00 391.000,00
54 Asphalt Liquid Mixer 40 20.000 Liter 143.382.000,00 294.000,00
55 Flat Bed Truck With Crane 219.450.000,00 616.000,00
56 Pick Up 15 1 u 82.191.000,00 109.000,00
57 Concrette Cutter 5,5 25 Ton 156.797.000,00 57.000,00
58 Mini Bore Pile Machine 7,5 3 m 212.725.000,00 119.000,00

205
VI. REKAPITULASI ANALISA HARGA SATUAN PEKERJAAN
A. PEKERJAAN PERSIAPAN

HARGA
NO URAIAN KODE SATUAN
PEKERJAAN
1 Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter A. 1. 550.677,05
2 Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter A. 2. 647.838,40
3 Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter A. 3. 318.809,70
4 Pengukuran dan pemasangan 1 m’ Bouwplank A. 4. 117.994,39
5 Pembuatan 1 m2 Kantor sementara Lantai plester A. 5. 2.499.018,56
6 Pembuatan 1 m2 Rumah jaga (konstruksi kayu) A. 6. 1.441.074,25
7 Pembuatan 1 m2 gudang semen dan peralatan A. 7. 1.704.049,88
8 Pembuatan 1 m2 Bedeng Pekerja A. 8. 1.795.833,88
9 Pembersihan 1 m2 lapangan dan perataan A. 9. 23.960,75
10 Pembersihan 1 m2 Perancah dari Bambu A. 10. 741.226,48
11 Pembuatan 1 buah kotak adukan ukuran 40 cm x 50 cm x 25 cm A. 11. 208.705,20
12 Pembuatan 1 m2 jalan sementara A. 12. 263.172,39
13 Pembongkaran 1 m3 beton bertulang A. 13. 1.749.616,00
14 Pembongkaran 1 m3 dinding bata A. 14. 874.808,00
15 Pemasangan 1 m2 pagar kawat jaring galvanis panjang 240 cm A. 15. 28.992,56
16 Pemasangan 1 m2 Panel beton pracetak 50x50x240 untuk pagar A. 16. 743.673,43

B. PEKERJAAN TANAH

HARGA
NO URAIAN KODE SATUAN
PEKERJAAN
1 Menggali 1 m3 tanah biasa sedalam 1 m B. 1. 143.454,44
2 Menggali 1 m3 tanah biasa sedalam 2 m B. 2. 176.889,49
3 Menggali 1 m3 tanah biasa sedalam 3 m B. 3. 210.957,09
4 Menggali 1 m3 tanah keras sedalam 1 m B. 4. 190.850,88
5 Menggali 1 m3 tanah keras sedalam 2 m B. 5. 290.071,65
6 Menggali 1 m3 tanah lumpur sedalam 1 m B. 6. 231.108,49
7 Pengerjaan stripping 1 m2 tanah tebing setinggi 1 meter B. 7. 10.617,89
8 Pembuangan 1 m3 tanah sejauh 30 m B. 8. 62.803,68
9 Pengurugan kembali 1 m3 galian tanah B. 9. 106.178,88
10 Pemadatan tanah 1 m3 tanah ( per 20 cm) B. 10. 106.178,88
11 Pengurugan 1 m3 pasir urug B. 11. 481.827,78
12 Pemasangan 1 m3 lapisan pudel campuran 1KP : 3PP : 7TL B. 12. 792.750,20
13 Pemasangan 1 m2 lapisan ijuk tebal 20 cm untuk bidang resapan B. 13. 276.053,66
14 Pengurugan 1 m3 sirtu padat B. 14. 424.009,44

206
C. PEKERJAAN PONDASI

HARGA
NO URAIAN KODE SATUAN
PEKERJAAN
1 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP C. 1. 1.512.477,31
2 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP C. 2. 1.453.792,31
3 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP C. 3. 1.413.070,31
4 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 6PP C. 4. 1.384.459,31
5 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 8PP C. 5. 1.345.200,31
6 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 1KP : 2PP C. 6. 1.200.956,21
7 Pemasangan 1 m3 pondasi batu belah campuran 1 SP : 3 KP : 10 PP C. 7. 1.359.671,91
8 Pemasangan 1 m3 pondasi batu belah campuran ¼ SP : 1 KP : 4PP C. 8. 1.323.132,11
9 (K3) Pemasangan 1 m3 batu kosong (anstamping ) C. 9. 848.728,40
10 Pemasangan 1 m3 pondasi siklop, 60% beton 1SP:2PB:3Kr dan 40% batu belah C.10. 2.913.818,88
11 Pemasangan 1 m3 pondasi sumuran, diameter 100 cm C. 11. 1.484.535,22

D. PEKERJAAN PEMBUATAN BETON

HARGA
NO URAIAN KODE SATUAN
PEKERJAAN
1 1 m³ beton untuk lantai kerja (bedding), menggunakan campuran beton : D.01. 1.235.816,67
Tipe-1: fc' = 1,8 s.d 3,7 (B0: K- 40 s.d. K-60) atau setara 1PC : 3PB : 5Kr D.01a 1.263.911,77
Tipe-2: fc' = 5,6 s.d 7,4 Mpa (K-80 s.d. K-100) atau setara 1PC : 2PB : 3Kr D.01b 1.285.978,87
Tipe-3: fc' ~ 7,4 MPa (K-100) atau setara 1PC : 2PB : 3Kr D.01c
2 1 m³ beton mutu, f’c = 7,4 MPa (K100), slump (12±2) cm, w/c = 0,87 D.02 1.525.638,79
Manual D.02a 1.482.992,09
Menggunakan Molen D.02b
3 1 m³ Beton mutu, f’c = 9,8 MPa (K125), slump (12±2) cm, w/c = 0,78 D.03. 1.570.594,21
Manual D.03a 1.527.947,51
Menggunakan Molen D.03b
4 1 m³ Beton mutu, f’c = 12,2 MPa (K150), slump (12±2) cm, w/c = 0,72 D.04. 1.606.040,19
Manual D.04a 1.563.393,50
Menggunakan Molen D.04b
5 1 m³ beton mutu f’c=14,5 MPa (K175), slump (12±2) cm, w/c = 0,66 D.05. 1.647.729,23
Manual D.05a 1.605.082,54
Menggunakan Molen D.05b
6 1 m³ Beton mutu, f’c = 16,9 MPa (K200), slump (12±2) cm, w/c = 0,61 D.06 1.688.005,44
Manual D.06a 1.645.358,75
Menggunakan Molen D.06b 1.235.816,67

207
HARGA
NO URAIAN KODE SATUAN
PEKERJAAN
7 1 m³ Beton mutu, f’c = 19,3 MPa (K225), slump (12±2) cm, w/c = 0,58 D.07. 1.717.608,04
Manual D.07.a 1.674.961,35
Menggunakan Molen D.07.b
8 1 m³ Beton mutu, f’c = 21,7 MPa (K250), slump (12±2) cm, w/c = 0,56 D.08. 1.738.004,78
Manual D.08.a 1.695.358,08
Menggunakan Molen D.08.b
9 1 m³ Beton mutu, f’c = 24,0 MPa (K275) , slump (12±2) cm, w/c = 0,53 D.09. 1.773.320,60
Manual D.09.a 1.730.673,90
Menggunakan Molen D.09.b
10 1 m³ Beton mutu, f’c = 26,4 MPa (K300) , slump (12±2) cm, w/c = 0,52 D.10. 1.784.194,04
Manual D.10.a 1.741.547,34
Menggunakan Molen D.10.b
11 1 m³ Beton mutu, f’c = 28,8 MPa, (K325) , slump (12±2) cm, w/c = 0,49 D.11. 1.939.955,17
Manual D.11.a 1.871.690,00
Menggunakan Molen D.11.b
12 1 m³ Beton mutu, f’c = 31,2 MPa, (K350) , slump (12±2) cm, w/c = 0,48 D.12. 1.954.308,69
Manual D.12.a 1.886.043,51
Menggunakan Molen D.12.b. 1.717.608,04
13 1 m³ Beton menggunakan Ready Mixed dan bahan aditif D.13.
1 m³ Beton menggunakan Ready Mixed dan pompa beton D.13.a

208
HARGA
NO URAIAN KODE SATUAN
PEKERJAAN
1 Pembesian 10 kg dengan besi polos atau besi ulir E.1. 238.702,75
2 Pemasangan 1 kg besi profil E.2. 49.743,95
3 Pemasangan 1 kg rangka kuda-kuda baja IWF E.3. 49.743,95
4 Pengerjaan 100 kg pekerjaan perakitan E.4. 66.166,73
5 Pembuatan 1 m2 pintu besi pelat baja tebal 2 mm rangkap, rangka baja siku E.5. 4.589.213,53
6 Pengerjaan 10 cm pengelasan dengan las listrik E.6. 40.642,20
7 Pembuatan 1 m2 rangka jendela besi square tube E.7. 616.391,60
8 Pemasangan 1 m2 pintu rolling door besi E.8. 3.272.400,07
9 Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC E.9. 3.101.808,99
10 Pemasangan 1 m2 sunscreen alluminium E.10. 746.141,11
11 Pemasangan 1 m2 rolling door alluminium E.11. 3.199.565,88
12 Pemasangan 1 m kusen pintu alluminium E.12. 610.125,52
13 Pemasangan 1 m2 pintu alluminium strip lebar 8 cm E.13. 6.023.077,29
14 Pemasangan 1 m2 pintu kaca rangka alluminium E.14. 907.008,36
15 Pemasangan 1 m2 venetions blinds dan vertical blinds E.15. 3.281.506,20
16 Pemasangan 1 m2 terali besi strip (2 x 3) mm E.16. 858.112,58
17 Pemasangan 1 m2 kawat nyamuk E.17. 625.445,61
18 Pemasangan 1 m2 jendela nako & tralis E.18. 6.041.421,68
19 Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm E.19. 218.548,58
20 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng pelat bjls 30 lebar 45 cm E.20. 196.730,82
21 Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, 60x120 cm, untuk partisi E.21. 181.849,61
22 Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, 60 x 60 cm, untuk plafon E.22. 236.706,20
E. PEKERJAAN PEMBESIAN DAN ALUMUNIUM

209
F. PEKERJAAN PASANGAN DINDING

HARGA
NO URAIAN KODE SATUAN
PEKERJAAN
Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal 1 batu
1 F.1. 436.435,73
camp. 1SP : 2PP
Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal 1 batu
2 F.2. 421.184,23
camp. 1SP : 3PP
Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal 1 batu
3 F.3. 410.030,23
camp. 1SP : 4PP
Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal 1 batu
4 F.4. 405.558,73
camp. 1SP : 5PP
Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal 1 batu
5 F.5. 406.779,73
camp. 1SP : 6PP
Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal 1 batu
6 F.6. 399.234,83
camp. 1SP:3KP:10PP
Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu
7 F.7. 212.167,86
camp. 1SP : 2PP
Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu
8 F.8. 204.417,26
camp. 1SP : 3PP
Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu
9 F.9. 200.271,36
camp. 1SP :4PP
Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu
10 F.10. 197.681,96
camp. 1SP :5PP
Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu
11 F.11. 196.766,76
camp. 1SP : 6PP
Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu
12 F.12. 193.770,36
camp. 1SP : 8PP
Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu
13 F.13. 201.052,36
camp.1SP:3KP:10PP
Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu
14 F.14. 181.851,42
camp. 1SM:1KP:1PP
Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu
15 F.15. 182.974,74
camp. 1SM:1KP:2PP
16 Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 3PP F.16. 567.333,20
17 Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 4PP F.17. 573.909,00
18 Pemasangan 1m2 dinding conblock HB15 campuran 1SP : 3PP F.18. 446.442,48
19 Pemasangan 1m2 dinding conblock HB15 campuran F.19. 450.976,68
20 Pemasangan 1m2 dinding conblock HB10 campuran F.20. 333.824,56
21 Pemasangan 1m2 dinding conblock HB10 campuran F.21. 337.926,46
22 Pemasangan 1m2 dinding terawang (rooster) 12x11x24 campuran 1SP:3PP F.22. 614.080,36
23 Pemasangan 1m2 dinding terawang (rooster) 12x11x24 campuran 1SP:4PP F.23. 614.080,36
Pemasangan 1m2 dinding bata berongga ekspose 12x11x24
24 F.24. 1.291.120,46
campuran 1SP :3PP
25 Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai F.25 528.813,36
26 Pemasangan 1 m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai F.26 554.223,36

210
G. PEKERJAAN PLESTERAN

HARGA
NO URAIAN KODE SATUAN
PEKERJAAN
1 Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm G.1. 132.420,94
2 Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm G.2. 124.175,34
3 Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15 mm G.3. 120.818,58
4 Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm G.4. 118.353,26
5 Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm G.5. 117.192,54
6 Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm G.6. 116.163,38
7 Pemasangan 1 m2 plesteran 1SP : 7PP tebal 15 mm G.7. 115.672,78
8 Pemasangan 1 m2 plesteran 1SP : 8PP tebal 15 mm G.8. 115.182,18
9 Pemasangan 1 m2 plesteran 1SP : 1/2KP : 3PP tebal 15 mm G.9. 119.385,04
10 Pemasangan 1 m2 plesteran 1SP : 2KP : 8PP tebal 15 mm G.10. 118.542,44
11 Pemasangan 1 m2 plesteran 1SM : 1KP : 1PP tebal 15 mm G.11. 123.769,64
12 Pemasangan 1 m2 plesteran 1SM : 1KP : 2PP tebal 15 mm G.12. 126.689,04
13 Pemasangan 1 m2 plesteran 1SP : 1PP tebal 20 mm G.13. 166.335,35
14 Pemasangan 1 m2 plesteran 1SP : 3PP tebal 20 mm G.14. 133.710,97
15 Pemasangan 1 m2 plesteran 1SP : 4PP tebal 20 mm G.15. 158.436,91
16 Pemasangan 1 m2 plesteran 1SP : 5PP tebal 20 mm G.16. 157.024,95
17 Pemasangan 1 m2 plesteran 1SP : 6PP tebal 20 mm G.17. 155.517,07
18 Pemasangan 1 m2 plesteran 1SM : 1KP : 2PP tebal 20 mm G.18. 193.287,55
19 Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm G.19. 69.028,00
20 Pemasangan 1 m’ plesteran skoning 1SP : 3PP lebar 10 cm G.20. 123.158,31
21 Pemasangan 1 m2 plesteran granit 1SP : 2 granit tebal 1cm G.21. 305.443,38
22 Pemasangan 1 m2 plesteran traso 1SP : 2 traso tebal 1cm G.22. 774.868,38
23 Pemasangan 1 m2 plesteran ciprat 1SP : 2PP G.23. 94.785,76
24 Pemasangan 1 m2 finishing siar pasangan bata merah G.24. 43.133,08
25 Pemasangan 1 m2 finishing siar pasangan conblock ekspose G.25. 25.899,53
26 Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP G.26. 113.656,26
27 Pemasangan 1 m2 acian G.27. 70.688,48

211
H. PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING

HARGA
NO URAIAN KODE SATUAN
PEKERJAAN
1 Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 40cm x 40 cm H.1. 171.046,70
2 Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 30 cm x30 cm H.2. 235.585,41
3 Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 20 cm x 20 cm H.3. 241.881,50
4 Pemasangan 1 m2 lantai ubin warna ukuran 40 cm x 40 cm H.4. 215.081,41
5 Pemasangan 1 m2 lantai ubin warna ukuran 30 cm x 30 cm H.5. 216.511,27
6 Pemasangan 1 m2 lantai ubin warna ukuran 20 cm x 20 cm H.6. 328.781,50
7 Pemasangan 1 m2 lantai ubin teraso ukuran 40 cm x 40 cm H.7. 647.155,91
8 Pemasangan 1 m2 lantai ubin teraso ukuran 30 cm x 30 cm H.8. 644.644,27
9 Pemasangan 1 m2 lantai ubin granit ukuran 40 cm x 40 cm H.9. 756.550,91
10 Pemasangan 1 m2 lantai ubin granit ukuran 30 cm x 30 cm H.10. 751.474,27
11 Pemasangan 1 m2 lantai ubin teralux marmer ukuran 40 cm x 40 cm H.11. 2.860.581,41
12 Pemasangan 1 m2 lantai ubin teralux marmer ukuran 30 cm x 30 cm H.12. 4.237.693,27
13 Pemasangan 1 m2 lantai ubin teralux marmer ukuran 60 cm x 60 cm H.13. 3.423.480,17
14 Pemasangan 1 m2 lantai ubin teralux marmer ukuran 40 cm x 40 cm H.14. 2.860.581,41
15 Pemasangan 1 m2 lantai ubin teralux marmer ukuran 30 cm x 30 cm H.15. 4.237.693,27
16 Pemasangan 1 m’ plint ubin PC abu-abu ukuran 15 cm x 20 cm H.16. 80.312,57
17 Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 10 cm x 30 cm H.17. 75.222,87
18 Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 10cm x 40cm H.18. 67.478,87
19 Pemasangan 1 m’ plint ubin warna ukuran 10cm x 20cm H.19. 65.751,87
20 Pemasangan 1 m’ plint ubin warna ukuran 10cm x 30cm H.20. 77.895,87
21 Pemasangan 1 m’ plint ubin warna ukuran 10 cm x 40 cm H.21. 70.151,87
22 Pemasangan 1 m’ plint ubin teraso ukuran 10cm x 30cm H.22. 62.363,87
23 Pemasangan 1 m’ plint ubin teraso ukuran 10 cm x 40 cm H.23. 58.491,87
24 Pemasangan 1 m’ plint ubin granit ukuran 10 cm x 40 cm H.24. 137.196,87
25 Pemasangan 1 m’ plint ubin granit ukuran 10 cm x 30 cm H.25. 101.193,87
26 Pemasangan 1 m’ plint ubin teralux kerang ukuran 10cm x 40cm H.26. 58.403,87
27 Pemasangan 1 m’ plint ubin teralux kerang ukuran 10 cm x 30 cm H.27. 62.363,87
28 Pemasangan 1 m’ plint ubin teralux marmer ukuran 10 cm x 60 cm H.28. 154.896,36
29 Pemasangan 1 m’ plint ubin teralux marmer ukuran 10 cm x 40 cm H.29. 137.196,87
30 Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 30cm H.30. 194.385,87
31 Pemasangan 1m2 lantai teraso cor di tempat, tebal 3 cm H.31. 139.850,76
32 Pemasangan 1m2 lantai keramik artistik 10 cm x 20 cm H.32. 396.718,71
33 Pemasangan 1 m2 lantai keramik artistik 10 cm x 10 cm atau 5 cm x 20 cm H.33. 415.418,71
34 Pemasangan 1 m2 lantai keramik ukuran 33 cm x 33 cm H.34. 343.368,71
35 Pemasangan 1m2 lantai keramik ukuran 30 cm x 30 cm H.35. 346.753,41

212
HARGA
NO URAIAN KODE SATUAN
PEKERJAAN
36 Pemasangan 1m2 lantai keramik ukuran 20 cm x 20 cm H.36. 1.009.324,31
37 Pemasangan 1m2 lantai keramik ukuran 10 cm x 33 cm untuk variasi/border H.37. 821.837,91
38 Pemasangan 1m2 lantai keramik mozaik ukuran 30 cm x 30 cm H.38. 98.375,34
39 Pemasangan 1 m’ plint keramik ukuran 10 cm x 20 cm H.39. 145.730,34
40 Pemasangan 1 m’ plint keramik ukuran 10 cm x 10 cm H.40. 96.355,74
41 Pemasangan 1 m’ plint keramik ukuran 5 cm x 20 cm H.41. 605.895,35
42 Pemasangan 1 m’ plint internal cove artistik 5 cm x 5 cm x 20 cm H.42. 1.656.971,11
43 Pemasangan 1 m2 lantai marmer ukuran 100cm x 100cm H.43. 764.964,34
44 Pemasangan 1 m2 lantai karpet H.44. 293.032,91
45 Pemasangan 1 m2 underlayer (pelapis bawah karpet) H.45. 899.668,41
46 Pemasangan 1 m2 lantai parquet kayu H.46. 899.668,41
47 Pemasangan 1 m2 lantai kayu gymfloor H.47. 835.621,88
48 Pemasangan 1 m2 dinding porselen 11 cm x 11 cm H.48. 714.766,39
49 Pemasangan 1 m2 dinding porselen 10 cm x 20 cm H.49. 516.810,39
50 Pemasangan 1 m2 dinding porselen 20 cm x 20 cm H.50. 452.416,39
51 Pemasangan 1 m2 dinding keramik artistik 10 cm x 20 cm H.51. 462.536,39
52 Pemasangan 1 m2 dinding keramik artistik 5 cm x 20 cm H.52. 487.396,39
53 Pemasangan 1 m2 dinding keramik 10 cm x 20 cm H.53. 465.687,89
54 Pemasangan 1 m2 dinding keramik 20 cm x 20 cm H.54. 1.938.695,14
55 Pemasangan 1 m2 dinding marmer 100 cm x 100 cm H.55. 559.882,68
56 Pemasangan 1 m2 dinding bata pelapis 3 cm x 7 cm x 24 cm H.56. 486.205,91
57 Pemasangan 1 m2 dinding batu paras H.57. 416.025,91
58 Pemasangan 1 m2 dinding batu tempel hitam H.58. 202.342,02
59 Pemasangan 1 m2 lantai vynil ukuran 30 cm x 30 cm H.59. 186.883,72
60 Pemasangan 1 m2 wallpaper lebar 50 cm H.60. 257.447,91
61 Pemasangan 1m2 floor harderner H.61. 212.986,07
62 Pemasangan 1 m’ plint vynil 15cm x 30cm H.62. 71.364,21
63 Pemasangan 1 m’ plint kayu tebal 2 cm lebar 10 cm H.63. 359.818,62
64 Pemasangan 1 m2 paving block natural tebal 6 cm H.64. 522.278,28
65 Pemasangan 1 m2 paving block natural tebal 8 cm H.65. 377.594,62
66 Pemasangan 1 m2 paving block berwarna tebal 6 cm H.66. 540.054,28
67 Pemasangan 1 m2 paving block berwarna tebal 8 cm H.67. 1.009.324,31

213
I. PEKERJAAN LANGIT-LANGIT (PLAFOND)

HARGA
NO URAIAN KODE SATUAN
PEKERJAAN
1 Pemasangan 1 m2 langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm I.1. 113.025,55

2 Pemasangan 1 m2 langit-langit akustik ukuran (30 x 30) cm I.2. 522.618,44

3 Pemasangan 1 m2 langit-langit akustik ukuran (30 x 60) cm I.3. 507.045,59

4 Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm I.4. 513.627,13

5 Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3, 4 & 6 mm I.5. 93.285,09

6 Pemasangan 1 m2 langit-langit lambrisering kayu, tebal 9 mm I.6. 398.658,70


Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 69.923,29
7 I.7.
mm
Pemasangan 1 m2 langit-langit akustik ukuran (60 x120) cm berikut rangka 2.602.833,48
8 I.8.
alluminium
9 Pemasangan 1 m’ list langit-langit kayu profil I.9. 51.753,43

J. PEKERJAAN PENUTUP ATAP

HARGA
NO URAIAN KODE SATUAN
PEKERJAAN
1 Pemasangan 1 m2 atap genteng palentong kecil J.1. 103.616,37
2 Pemasangan 1 m2 atap genteng kodok glazuur J.2. 158.751,92
3 Pemasangan 1 m2 atap genteng palentong besar/super J.3. 101.551,92
4 Pemasangan 1 m’ bubung genteng palentong J.4. 212.012,96
5 Pemasangan 1 m’ bubung genteng kodok glazuur J.5. 168.012,96
6 Pemasangan 1 m’ bubung genteng palentong besar J.6. 199.912,96
7 Pemasangan 1 m2 roof light fibreglass 90 x 180 J.7. 66.494,95
8 Pemasangan 1 m2 atap asbes gelombang 0,92 m x 2 ,5 m x 5 mm J.8. 135.780,62
9 Pemasangan 1 m2 atap asbes gelombang 0,92 m x 2,25 m x 5 mm J.9. 141.720,62
10 Pemasangan 1 m2 atap asbes gelombang 0,92 m x 2,00 m x 5 mm J.10. 133.403,68
11 Pemasangan 1 m2 atap asbes gelombang 0,92 m x 1,80 m x 5 mm J.11. 146.438,68
12 Pemasangan 1 m2 atap asbes gelombang 1,05 m x 3,00 m x 4 mm J.12. 102.383,68
13 Pemasangan 1 m2 atap asbes gelombang 1,05 m x 2,70 m x 4 mm J.13. 105.617,68
14 Pemasangan 1 m2 atap asbes gelombang 1,05 m x 2,40 m x 4 mm J.14. 101.899,68
15 Pemasangan 1 m2 atap asbes gelombang 1,05 m x 2,10 m x 4 mm J.15. 102.614,68
16 Pemasangan 1 m2 atap asbes gelombang 1,05 m x 1,50 m x 4 mm J.16. 109.643,68
17 Pemasangan 1 m2 atap asbes gelombang 1,08 m x 3,00 m x 6 mm J.17. 140.696,68
18 Pemasangan 1 m2 atap asbes gelombang 1,08 m x 2,70 m x 6 mm J.18. 123.459,68
19 Pemasangan 1 m2 atap asbes gelombang 1,08 m x 2,40 m x 6 mm J.19. 133.029,68
20 Pemasangan 1 m2 atap asbes gelombang 1,08 m x 2,10 m x 6 mm J.20. 130.257,68
21 Pemasangan 1 m2 atap asbes gelombang 1,08 m x 1,80 m x 6 mm J.21. 133.700,68

214
HARGA
NO URAIAN KODE SATUAN
PEKERJAAN
22 Pemasangan 1 m’ bubung stel gelombang 0,92 m J.22. 886.409,73
23 Pemasangan 1 m’ bubung stel gelombang 1,05 m J.23. 782.459,73
24 Pemasangan 1 m’ bubung stel gelombang 1,08 m J.24. 765.134,73
25 Pemasangan 1 m’ nok paten 0,92 m J.25. 189.449,73
26 Pemasangan 1 m’ nok paten 1,05 m J.26. 189.449,73
27 Pemasangan 1 m’ nok paten 1,08 m J.27. 189.449,73
28 Pemasangan 1 m’ nok stel rata 0,92 m J.28. 186.769,22
29 Pemasangan 1 m’ nok stel rata 1,05 m J.29. 178.229,73
30 Pemasangan 1 m2 genteng beton J.30. 416.236,98
31 Pemasangan 1 m2 genteng aspal J.31. 449.071,81
32 Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap pelana J.32. 142.064,48
33 Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap jurai J.33. 182.104,48
34 Pemasangan 1 m2 atap sirap kayu J.34. 266.726,90
35 Pemasangan 1 m’ nok genteng beton J.35. 273.376,95
36 Pemasangan 1 m’ nok genteng aspal J.36. 230.559,62
37 Pemasangan 1 m’ nok genteng metal J.37. 138.342,41
38 Pemasangan 1 m’ nok sirap J.38. 132.679,42
39 Pemasangan 1 m2 atap seng gelombang J.39. 113.280,59
40 Pemasangan 1 m’nok atap seng J.40. 79.586,71
41 Pemasangan 1 m2 atap alumunium J.41. 393.918,14
42 Pemasangan 1 m’ nok alumunium J.42. 358.936,88
43 Pemasangan 1 m2 alumunium foil/sisalation J.43. 70.010,82
44 Pemasangan 1m2 Genteng Bitumen ( kemiringan atap > 15o ) J.44 367.363,98
45 Pemasangan 1m2 Atap Bitumen ( kemiringan atap Minimum 10 o - 15o ) J.45 235.417,68
46 Pemasangan 1m2 Pasang Genteng Bitumen ( kemiringan atap > 10 o ) J.46 209.207,98
47 Pemasangan 1 m1 nok bitumen Monolayer J.47 252.173,93
48 Pemasangan 1 m1 Penutup Samping Atap Bitumen Bergelombang Monolayer J.48 191.484,73

215
K. PEKERJAAN KAYU

HARGA
NO URAIAN KODE SATUAN
PEKERJAAN
1 Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I K.1. 12.003.479,13
Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II
2 K.2. 11.524.829,25
atau III
3 Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II K.3. 498.191,60
4 Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III K.4. 439.055,60
5 Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II K.5. 1.190.393,88
6 Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II K.6. 905.358,30
7 Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi, kayu kelas I atau II K.7. 1.320.044,28
8 Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup K.8. 1.015.492,91
9 Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II K.9. 1.147.872,66
10 Pemasangan 1 m2 jalusi kusen, kayu kelas I atau II K.10. 1.061.667,06
11 Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I K.11. 1.106.351,40
12 Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II K.12. 1.303.312,53
13 Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III K.13. 9.463.101,59
14 Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I K.14. 12.520.208,25
15 Pemasangan 1 m3 konstruksi gordeng, kayu kelas II K.15. 10.627.548,25
16 Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II K.16. 485.867,39
17 Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II K.17. 702.452,99
18 Pemasangan 1 m2 rangka atap sirap, kayu kelas II K.18. 95.349,55
19 Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III K.19. 201.505,23
20 Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III K.20. 195.280,42
21 Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II K.21. 131.021,47
22 Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II K.22. 130.891,89
23 Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III K.23. 246.244,02
24 Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II K.25. 508.740,38
25 Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas I K.26. 617.395,63
26 Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120 x 240) cm K.27. 115.631,73
27 Pemasangan 1 m2 dinding bilik, rangka kayu kelas III atau IV K.28. 161.372,89

216
L. PEKERJAAN KUNCI DAN KACA

HARGA
NO URAIAN KODE SATUAN
PEKERJAAN
1 Pemasangan 1 buah kunci tanam antik L.1. 275.805,83
2 Pemasangan 1 buah kunci tanam biasa L.2. 242.099,69
3 Pemasangan 1 buah kunci kamar mandi L.3. 335.163,48
4 Pemasangan 1 buah kunci silinder L.4. 580.463,48
5 Pemasangan 1 buah engsel pintu L.5. 188.317,27
6 Pemasangan 1 buah engsel jendela kupu-kupu L.6. 161.467,64
7 Pemasangan 1 buah engsel angin L.7. 98.535,54
8 Pemasangan 1 buah spring knip L.8. 119.094,47
9 Pemasangan 1 buah kait angin L.9. 72.894,47
10 Pemasangan 1 buah door closer L.10. 781.096,33
11 Pemasangan 1 buah kunci slot L.11. 93.915,28
12 Pemasangan 1 buah door holder L.12. 385.096,33
13 Pemasangan 1 buah door stop L.13. 196.990,89
14 Pemasangan 1 buah rel pintu sorong L.14. 408.905,83
15 Pemasangan 1 buah kunci lemari L.15. 210.084,91
16 Pemasangan 1 m2 kaca tebal 3 mm L.16. 248.487,27
17 Pemasangan 1 m2 kaca tebal 5 mm L.17. 284.787,27
18 Pemasangan 1 m2 kaca tebal 8 mm L.18. 604.378,80
19 Pemasangan 1 m2 kaca buram tebal 12 mm L.19. 1.094.462,91
20 Pemasangan 1 m2 kaca cermin tebal 5 mm L.20. 298.504,47
21 Pemasangan 1 m2 kaca cermin tebal 8 mm L.21. 445.812,65
22 Pemasangan 1 m2 kaca wireglassed tebal 5 mm L.22. 1.114.044,47
23 Pemasangan 1 m2 kaca patri tebal 5 mm L.23. 4.241.243,16

217
M. PEKERJAAN PENGECATAN

HARGA SATUAN
NO URAIAN KODE PEKERJAAN
1 1 m2 Pengikisan/pengerokan permukaan cat lama M.1. 29.543,33
2 1 m2 Pencucian bidang permukaan tembok yang pernah dicat M.2. 28.690,83
3 1 m2 Pengerokan karat pada permukaan baja cara manual M.3. 30.272,22
Pengecatan 1 m2 kayu baru (1 lapis plamuur,1 lapis cat dasar, 2 lapis cat
4 M..4. 74.591,65
penutup)
Pengecatan 1 m2 kayu baru (1 lapis plamuur,1 lapis cat dasar, 3 lapis cat
5 M.5. 102.865,06
penutup)
6 Pelaburan 1 m2 bidang kayu dengan teak oil M.6. 244.617,51
7 Pelaburan 1 m2 bidang kayu dengan politur M.7. 88.095,34
8 Pelaburan 1 m2 bidang kayu dengan cat residu dan ter M.8. 43.455,67
9 Pelaburan 1 m2 bidang kayu dengan vernis M.9. 85.221,15
Pengecatan 1 m2 tembok baru (1 lapis plamur,1 lapis cat dasar, 2 lapis cat
10 M.10. 64.694,59
penutup)
11 Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup) M.11. 47.100,48
12 Pelaburan 1 m2 tembok dengan kalkarium M.12. 20.156,20
13 Pelaburan 1 m2 tembok dengan kapur sirih M.13. 49.438,22
14 Pelaburan 1 m2 tembok lama dengan kapur sirih (pemeliharaan) M.14. 43.055,00
15 Pemasangan 1 m2 wallpaper M.15. 285.872,71
16 Pengecatan 1 m2 permukaan baja dengan menie besi M.16. 63.292,69
17 Pengecatan 1 m2 permukaan baja dengan menie besi dengan perancah M.17. 119.070,53
18 Pengecatan 1 m2 permukaan baja galvanis secara manual 4 lapis M.18. 124.218,91
19 Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis M.19. 72.963,52
20 Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 3 lapis M.20. 308.854,15
21 Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis M.21. 272.452,95
22 Plituran 10 m2 dengan plitur melamic M.22. 4.331.021,75

218
N. PEKERJAAN SANITASI DALAM GEDUNG
HARGA SATUAN
NO URAIAN KODE PEKERJAAN
1 Pemasangan 1 buah closet duduk/monoblock N.1. 4.298.284,10
2 Pemasangan 1 buah closet jongkok porselen N.2. 1.035.357,40
3 Pemasangan 1 buah closet jongkok teraso N.3. 1.375.666,88
4 Pemasangan 1 buah urinoir N.4. 3.502.175,88
5 Pemasangan 1 buah wastafel N.5. 1.686.784,83
6 Pemasangan 1 buah bathcuip porselen N.6. 10.186.110,08
7 Pemasangan 1 buah bak fiberglass vol 1 m3 N.7. 2.231.528,75
8 Pemasangan 1 buah bak mandi batu bata vol 0,30 m3 N.8. 4.516.034,33
9 Pemasangan 1 buah bak mandi teraso vol 0,30 m3 N.9. 2.231.528,75
10 Pemasangan 1 buah bak air fiberglass vol 1 m3 N.10. 547.351,06
11 Pemasangan 1 buah bak beton volume 1 m3 N.11. 7.656.191,98
12 Pemasangan 1 buah bak cuci piring stainlessteel N.12. 830.772,66
13 Pemasangan 1 buah bak cuci piring teraso N.13. 945.904,44
14 Pemasangan 1 buah floor drain N.14. 121.090,89
15 Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm N.15. 805.678,69
16 Pemasangan 1 buah bak kontrol pasangan bata 45cm x 45cm tinggi 50 cm N.16. 1.205.646,86
17 Pemasangan 1 buah bak kontrol pasangan bata 60 cm x 60 cm tinggi 65 cm N.17. 1.407.163,56
18 Pemasangan 1 m’ pipa galvanis diameter ½” N.18. 86.541,59
19 Pemasangan 1 buah kran diameter ½” atau ¾ ” N.19. 179.562,49
20 Pemasangan 1 m’ pipa galvanis diameter ¾ ” N.20. 94.322,99
21 Pemasangan 1 m’ pipa galvanis diameter 1” N.21. 113.568,59
22 Pemasangan 1 m’ pipa galvanis diameter 1 ½” N.22. 172.079,19
23 Pemasangan 1 m’ pipa galvanis diameter 3” N.23. 363.719,29
24 Pemasangan 1 m’ pipa galvanis diameter 4” N.24. 384.390,49
25 Pemasangan 1 m’ pipa PVC tipe AW diameter ½ ” N.25. 36.353,41
26 Pemasangan 1 m’ pipa PVC tipe AW diameter ¾ ” N.26. 90.387,22
27 Pemasangan 1 m’ pipa PVC tipe AW diameter 1” N.27. 48.381,91
28 Pemasangan 1 m’ pipa PVC tipe AW diameter 1 ½ ” N.28. 78.208,43
29 Pemasangan 1 m’ pipa PVC tipe AW diameter 2” N.29. 90.726,98
30 Pemasangan 1 m’ pipa PVC tipe AW diameter 2 ½ ” N.30. 133.548,91
31 Pemasangan 1 m’ pipa PVC tipe AW diameter 3” N.31. 167.629,66
32 Pemasangan 1 m’ pipa PVC tipe AW diameter 4” N.32. 244.879,36
33 Pemasangan 1 m’ pipa air limbah jenis pipa tanah Ǿ 20 cm N.33. 129.642,59
34 Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 15 cm N.34. 57.596,19
35 Pemasangan 1 m’ pipa beton diameter 15 – 20 cm N.35. 198.328,98
36 Pemasangan 1 m’ pipa beton diameter 30 – 100 cm N.36. 1.170.551,55

219
O. PEKERJAAN PEMASANGAN PIPA DI LUAR GEDUNG

HARGA SATUAN
NO URAIAN KODE PEKERJAAN
1 (K3) Pemasangan 1 m pipa PVC Ø 63 mm O.1 79.549,44
2 (K3) Pemasangan 1 m pipa PVC Ø 90 mm O.2 105.135,75
3 (K3) Pemasangan 1 m pipa PVC Ø 110 mm O.3 157.324,37
4 (K3) Pemasangan 1 m pipa PVC Ø 150 mm O.4 232.135,67
5 (K3) Pemasngan 1 m pipa PVC Ø 200 mm O.5 516.347,15
6 (K3) Pemasangan 1 m pipa PVC Ø 250 mm O.6 785.677,92
7 (K3) Pemasangan 1 m pipa PVC Ø 300 mm O.7 1.083.609,51
8 (K3) Pemasangan 1 m pipa PVC Ø 400 mm O.8 3.358.152,11
9 (K3) Pemasangan 1 m pipa PVC Ø 450 mm O.9 3.037.442,65
10 (K3) Pemasangan 1 m pipa PVC Ø 500 mm O.10 3.757.338,97
11 (K3) Pemasangan 1 m pipa PVC Ø 600 mm O.11 5.881.175,44
12 (K3) Pemasangan 1 m pipa HDPE Ø 63 mm O.12 23.368,57
13 (K3) Pemasangan 1 m pipa HDPE Ø 100 mm O.13 32.852,93
14 (K3) Pemasangan 1 m pipa HDPE Ø 125 mm O.14 42.222,35
15 (K3) Pemasangan 1 m pipa HDPE Ø 150 mm O.15 72.247,53
16 (K3) Pemasangan 1 m pipa HDPE Ø 200 mm O.16 110.778,99
17 (K3) Pemasangan 1 m pipa HDPE Ø 250 mm O.17 168.164,10
18 (K3) Pemasangan 1 m pipa HDPE Ø 300 mm O.18 253.265,43
19 (K3) Pemasangan 1 m pipa HDPE Ø 400 mm O.19 426.753,47
20 (K3) Pemasangan 1 m pipa HDPE Ø 450 mm O.20 538.218,01
21 (K3) Pemasangan 1 m pipa HDPE Ø 500 mm O.21 663.903,10
22 (K3) Pemasangan 1 m pipa HDPE Ø 600 mm O.22 955.799,87
23 (K3) Pemasangan 1 m pipa HDPE Ø 800 mm O.23 1.584.966,10
24 (K3) Pemasangan 1 m pipa HDPE Ø 900 mm O.24 2.886.562,86
25 (K3) Pemasangan 1 m pipa HDPE Ø 1000 mm O.25 3.557.409,90
26 (K3) Pemasangan 1 m pipa HDPE Ø 1200 mm O.26 4.388.340,00
27 (K3) Pemasangan 1 m pipa GIP Ø 63 mm O.27 378.079,74
28 (K3) Pemasangan 1 m pipa GIP Ø 100 mm O.28 627.683,10
29 (K3) Pemasangan 1 m pipa GIP Ø 125 mm O.29 815.401,43
30 (K3) Pemasangan 1 m pipa GIP Ø 150 mm O.30 961.795,40
31 (K3) Pemasangan 1 m pipa GIP Ø 200 mm O.31 1.521.518,96

220
P. PEKERJAAN ELEKTRIKAL

HARGA SATUAN
NO URAIAN KODE
PEKERJAAN
1 Pemasangan 1 buah titik lampu P.1. 876.550,40
2 Pemasangan 1 buah MCB P.2. 661.390,40

Q. PEKERJAAN PENANAMAN POHON

HARGA SATUAN
NO URAIAN KODE
PEKERJAAN
1 1 Lubang (70 x 70 x 70) cm, tanam pohon pelindung tinggi 2m Q.1 113.583,71
2 1 Lubang (70 x 70 x 70) cm, tanam bambu krisik/jepang Q. 2 134.783,71
3 1 Lubang (40 x 40 x 40) cm, tanam pohon perdu Q. 3 68.860,45
4 1 M2 Tanam Rumput Gajah (silang papan catur) Q. 4 30.337,60

221