Anda di halaman 1dari 27

TECHNICAL 

QUERY LIST from PT WIKA  Date : 24 Juni 2022

Page Clause Subject/


No Discipline Part / Section Bidder's Question Client's Response
No. / Para. Description
BBPP‐EE‐55‐TDS‐ Pada General Specification Trafo menggunakan trafo Dry (AN), sedangkan pada Sesuai dengan datasheet menggunakan type ONAN
002_R2 Datasheet  Datasheet Trafo menggunakan trafo Oil (ONAN). Mohon konfirmasi menggunakan
Power  ketentuan yang mana?
Transformer dan 
1 Electrical BPP‐EE‐52‐SPE‐
002_R2 
Transformer 
design 
Specification 

BBPP‐EE‐52‐SPE‐ Pada Electrical Installation Specification Cable Tray menggunakan material SS316. Hanya area food grade, untuk area plant keseluruhan 
006_R2 Electrical  Apakah spesifikasi ini hanya untuk area food grade atau seluruh plant? menggunakan hot deep galvanised
2 Electrical
Installation 
Specification
BBPP‐EE‐52‐SPE‐ Pada General spec terdapat pengujian hipot untuk alternator. Bidder mengajukan untuk HIPOT test harus dilakukan saat FAT. Pada saat SAT bisa 
003_R2  hipot test hanya untuk EDG MV saja. Please confirm menggunakan insulation resistance test.
3 Electrical Emergency Diesel 
Generator 
Specification
BBPP‐EE‐54‐DWG‐ Apakah diperbolehkan mengubah SLD acuan yang diberikan ? SLD digunakan sebagai acuan dan kontraktor harus melakukan 
002 R2 MV & LV  re‐kalkulasi berdasarkan beban aktual
4 Electrical
Single Line 
Diagram
BBPP‐IE‐SPE‐ Mohon informasinya untuk Emergency Shutdown System (ESD) panel apakah Untuk Emergency Shutdown System (ESD), CPU & I/O terpisah 
001_R3 General  menggunakan CPU dan I/O yang terpisah atau sama dengan PCS? dari PCS
5 Instrument
Specification 
Instrument
BBPP‐IE‐SPE‐ Apakah ada kebutuhan redundant untuk sistem DCS? Sistem DCS menggunakan redundant
001_R3 General 
6 Instrument
Specification 
Instrument
Pada PnID tanki terdapat instrument yang belum ada pada datasheet seperti : Pada fase FEED tidak dibuat datasheet untuk instrument PVV 
- PVV (Pressure Vaccuum relief Valve), dan EEG
7 Instrument P&ID
- EEG (Voltage Earthing Gauge)
Mohon dapat di share datasheetnya bila ada
BBPP‐IE‐SPE‐ Apakah di izinkan menggunakan PLC dengan OPC Server sebagai PCS? Tidak diizinkan. PLC dan OPC Server harus terpisah
001_R3 General 
8 Instrument
Specification 
Instrument
Apabila terdapat perbedaan dalam dokumen teknis (spec, datasheet dan P&ID), Selama proses tender dan belum diikat pada ketentuan Kontrak, maka
Engineering  bagaimana hierarki tertinggi dalam tender ini? setiap isi dokumen IKP maupun Spesifikasi Proyek akan saling
9  
General melengkapi, kecuali persyaratan yang saling bertentangan.
BBPP‐PE‐26‐LST‐ Pada Equipment list distate untuk CPO Storage Tank TK-001 A/B/C insulated CPO Storage Tank TK-001 A/B/C tidak diinsulasi sesuai dokumen
001_R2  sedangkan pada PID kondisi uninsulated, mohon klarifikasinya bidder follow yang PID
10 Process Equipment List  mana atau apakah bidder diberikan kebebasan menggunakan konsep desain sendiri?
(IFT) versus PID 
CPO Storage Tank
7.14. Cooling Water System P.47/152 Untuk dosing yang dimaksud pada point 7.14 adalah dituang secara
"The cooling water quality is maintained by chemical injection for anti‐ manual dari drum
11 Process   scaling, corrosion inhibitor, and anti‐bacterial which provided in the cooling
water treatment package"
Apakah dosing yang dimaksud disini secara manual dituang melalui drum?
BBPP‐PE‐24‐PID‐ Mohon konfirmasinya terkait tangki 20-TK-905 Kapasitas terkait terjadi perbedaan, Untuk tangki 20-TK-905 dengan kapasitas 10 MT, apa yang tertulis di
antara pada PID 6,6 MT dengan Datasheet-Storage tank, 11.15MT Begitu juga dengan PID adalah Net Capacity yaitu sebesar 6.6 MT, sedangkan 11.15 MT
003‐08 VS BBPP‐
adalah untuk actual capacity.
ME‐35‐TDS‐ tangki Process Water 23-TK-002. Begitu juga untuk tangki 23-TK-002 dengan kapasitas 1500 MT, apa
12 Process
003_R2 Datasheet  yang tertulis di PID adalah Net Capacity yaitu sebesar 1666.67 MT,
‐ Storage Tanks  sedangkan 1649.62 MT adalah untuk actual capacity.
(IFT)
BBPP‐PE‐24‐PID‐ Mohon konfrimasi terkait kapasitas yang digunakan pada Compressed Air & Nitrogen Untuk satuan pada Compressed Air & Nitrogen package
002‐01 S/D 09 VS   package, Pada PID tertera dengan satuan m3/h sedangkan pada Document Mechanical menggunakan Nm3/h
13 Process
BBPP‐ME‐32‐SPE‐ specification Nm3/h. Mohon konfirmasinya
005 S/D 006
12-TK-004 A/B Hydrochloric Acid storage tank Bisa, merefer ke dokumen Process Datasheet Atmospheric Storage
20-TK-906 Hydrochloric Acid Intermediate tank Tanks BBPP-PE-25-SPE-002-R2.
Dokumen sudah diupload ke gooogle drive pada 28 Juni 2022
12-TK-005 Citric Acid Storage tank
14 Process  
Apakah dapat ditambahkan kembali terkait data sheet storage tank untuk keperluan
tender?
PID vs Mechanical  Berkaitan dengan kapasitas volume di tangki mengikuti PID sebagai volume m3 atau Mengikuti dokumen PID yang merupakan net volume tanki
15 Process datasheet tangki MT berdasarkan density dari jenis fluida di dalam tangki tersebut
Data Sheet 
BBPP‐PE‐24‐PID‐ Mohon cantumkan kapasitas tangki pada PID BBPP-PE-24-pid-001-009 tangki 11-tk- Untuk tangki 11-TK-1610A/B mempunyai actual capacity 1508 MT
16 Process dan net volume 1209 m3
001‐009 1610A/B Kapasitas berapa m3?
Layout vs PID  Konfirmasi terkait pompa 13-P-912A/B di layout di state future akan tetapi pada PNID Untuk pompa13-P-912A/B mengikuti dokumen PID, sehingga tetap
tertera (tidak match) diperlukan sebagai transfer pump sterol glucoside dan masuk ke scope
17 Process BBPP‐PE‐24‐PID‐ Kontraktor
001‐07
Konfirmasi terkait pompa P-101A/B di pnid tertulis by oil tek di layout tidak ada, Pompa P-101A merupakan scope Oiltek, sedangkan pompa P-101B
18 Process Layout vs PNID merupakan scope Kontraktor
apakah ini menjadi oil tek
DI layout ada beberapa pompa tertulis 1 by oiltek 1 by BEN, mohon ditambahakan Untuk spesifikasi pompa, bisa mengacu pada Pump Datasheet dengan
datasheet dan merk terkait pompa yg 1 di supply Oiltek dan 1 disupply kontraktor, agar nomor dokumen BBPP-ME-35-TDS-001 Datasheet - Centrifugal
Pumps & BBPP-ME-35-TDS-002 Datasheet - Rotary Pumps. Dokumen
19 Mechanical Layout spesifikasi yg kontraktor supply equal dengan yg di supply Oiltek sudah diupload ke gooogle drive pada 04 Juni 2022
Sedangkan untuk merk bisa mengacu pada dokumen Approved
Vendor List. Dokumen sudah diupload ke gooogle drive pada 23 Juni
2022
Ada perbedaan kapasitas antara PID dan Datasheet untuk Tanki 23-TK-002 Process Di dokumen PID terdapat typo (akan diupdate), bukan 2000 MT. Jadi
PID vs Mechanical  kontraktor mengacu pada dokumen datasheet yaitu kapasitas 1500 MT
20 Mechanical Water tank. DI PID 2000 MT di Datasheet 1500 MT. Kontraktor harus mengacu
Data Sheet 
dokumen yang mana?
BBPP‐PE‐24‐PID‐ Mohon konfirmasi terkait kebutuhan jumlah Pig Foam per Set (Launcer and Receiving) Kebutuhan pig foam akan dihitung berdasarkan kebutuhan saat fase
? DED.
21 Mechanical 001‐04_R2 P_ID 
Loading to Jetty  Dalam gambar PID tidak ada pig signal,hanya ada Pig Indicator.
(IFT)  Mohon konfirmasi kepada kami apakah dalam gambar tidak ada pig signal ?
BBPP‐PE‐24‐PID‐
001‐13_R2 P_ID  Mohon konfirmasi kepada kami, apakah setelah dilakukan loading nantinya akan
Unloading from  dilakukan pigging.
Jetty (IFT)
Jika Iya, maka kami menyarankan tidak perlu ditambahkan dilakukan pemasangan
Steam Treacing dan Insulation.
Mohon konfirmasi , apakah Desain piping isometric dalam ISBL menjadi scope Iya, untuk dokumen piping isometric disuplai oleh Lisensor.
lisensor ?
22 Process   Untuk scope line check menjadi scope Kontraktor. Tetapi untuk
Jika iya, maka mohon konfirmasi terkait scope line check (Orientation Equipment) orientation equipment akan diinformasikan oleh Lisensor.
apakah menjadi tanggung jawab pihak Lisesnsor (Oiltek)
Mohon konfirmasinya terkait perbedaan kebutuhan insulasi antara P&ID dan Data Untuk list tangki yang diinsulasi adalah sebagai berikut :
P&ID VS  Sheet. di P&ID beberapa tanki terdapat simbol adanya insulasi sedangkan di 1. PFAD (11-TK-502.A/B)
2. ACID OIL (11-TK-911.A/B)
23 Mechanical Mechanical Data  mechanical data sheet dan drawing semua tanki tidak ada insulasinya. 3.STEROL GLY (11-TK-912.A/B)
Sheet 4. CRUDE GLYCERIN (11-TK-1501.A/B)
5. ACID OIL (20-TK-908)
Apakah di izinkan menggunakan flexible hose sebagai pengganti MLA pada line CPO Owner akan mempertimbangkan usulan Bidder, namun demikian untuk
dan Methanol? Terlampir referensi bidder menggunakan flexible hose proses tender ini Owner berkeinginan para Bidder untuk semaksimal
mungkin mengikuti requirement yang diberikan oleh Owner.

24 Mechanical  

Reability run untuk seluruh sistem antara ISBL dan OSBL nanti akan diuji selama Periode Commissioning keseluruhan pabrik akan berdasarkan kepada
berapa jam? pelaksanaan commissioning untuk ISBL dengan durasi 14 hari,
termasuk training dan performance test.
25 General  
Performance test adalah pencapaian kriteria "performance guarantees"
secara terus menerus non-stop selama 3 x 24 jam.
Untuk listrik yang di tie in ke KPC, dalam rangka testing dan commissioning diusulkan Biaya listriknya menjadi beban dan tanggung jawab Owner, tetapi
26 General   pelaksanaan tie-in-nya menjadi beban dan tanggung jawab Kontraktor
menjadi beban biaya owner
Feedstock commissioning di supply oleh siapa? Feedstock commissioning merupakan scope dan tanggung jawab
27 General   Owner
28 General   Apa ada fasilitas Master list? Tidak ada fasilitas Master List
Reability run untuk seluruh sistem antara ISBL dan OSBL nanti akan diuji selama Pertanyaan dan jawaban yang sama dengan No. 25 di atas
29 General  
berapa jam?
TECHNICAL QUERY LIST from PT IKPT  Date : 24 Juni 2022

Discipline Page Clause / Para.


No Part / Section Subject/ Description Bidder's Question  Owner's Response 
No.
1  General  Tender Document, Part  81 of  8.7.2 Training Requirements  Contractor and Vendor  "Contractor and Vendor Package will be training OSBL  Contractor may identify "other" training deemed 
2 ‐ Project Specification  152  Package Training  scope with package unit: Boiler, Compress Air, WWTP,  required, such as firefighting system, emergency 
WTP, Nitrogen Package, Cooling Tower, Others".  diesel generator, etc., and this training option shall be 
  included by the Vendor Package in their proposal 
Please kindly Owner to clarify "Others" equipment  submitted to the Bidders. 
that may require training or whether Contractor can 
identify themselves for other necessary training or 
not. 
2  Process  BBPP‐PE‐26‐LST‐001  9 of 30  PROCESS EQUIPMENT LIST PRESSURE  Material of STEAM TRACING  Please kindly Owner to confirm whether material is  For item 29‐TK‐201 material is made from concrete 
VESSEL  CONDENSATE TANK (29‐TK‐ concrete or A36. 
201) 
3  Process  BBPP‐PE‐26‐LST‐001     PROCESS EQUIPMENT LIST  FIRE WATER TANK  Please kindly Owner to share information of Fire  Tank capacity is 2000 MT, 2 units, and material made 
ATMOSPHERIC TANK  Water Tank in Equipment List document.  from A‐36. 
For more detail information, please refer to document 
BBPP‐ME‐35‐TDS‐003 Datasheet ‐ Storage Tanks. 
Document already uploaded to Google drive by June, 
04th 2022 
4  Process  BBPP‐PE‐26‐LST‐001     PROCESS EQUIPMENT LIST PUMP  FIRE WATER PUMP  Please kindly Owner to share information of Fire  For detail process specification of Fire Water Pump, 
Water Pump in Equipment List document.  please refer to document BBPP‐PE‐25‐SPE‐001 Process 
Datasheet Pumps. 
Document already uploaded to google drive by June, 
28th 2022 
5  Process  BBPP‐PE‐26‐LST‐001     PROCESS EQUIPMENT LIST  HOTWELL scope of supply  Please kindly Owner to confirm scope of supply of  Hotwell 26‐TB‐001 at Pretreatment Plant shall be 
Hotwell, whether Contractor or Licensor.  Contractor's scope 
6  Process  BBPP‐PE‐26‐LST‐001     PROCESS EQUIPMENT LIST  Hydrochloric acid tank (12‐TK‐ Please kindly Owner to share Daatasheet.  Please refer to BBPP‐PE‐25‐SPE‐002 Process Datasheet 
004A/B)  Atmospheric Storage Tanks & BBPP‐ME‐35‐TDS‐003 
Datasheet ‐ Storage Tanks 
Document already uploaded to google drive by June, 
28th & 04th 2022 
7  Process  BBPP‐PE‐23‐CAL‐002     Utility Consumption  Steam Tracing for Tank:  Please kindly Owner to share steam consumption for  Document already uploaded to google drive by June, 
Acid Oil Daily Tank (20‐TK‐908)  each Tank.  28th 2022. Folder location is in Additional 28 June 
Acid Oil Tank (11‐TK‐911A/B)  2022 
Sterol Glycoside Tank (11‐TK‐
912A/B) 
CPO Tank (11‐TK‐001A/B/C) 
Crude Glycerine Tank(11‐TK‐
1501A/B) 
PFAD Tank (11‐TK‐502A/B) 
8  Process  BBPP‐ME‐32‐SPE‐011  38‐40  Appendix 1‐3  Ambient Temperature  Please kindly Owner to confirm Ambient Tempearture  For ambient temperature, please use 28 C 
related to insulation thickness. 
9  Process  BBPP‐PE‐26‐LST‐001     PROCESS EQUIPMENT LIST ‐ 11‐TK‐  11‐TK‐101 A/B , RBDPO Tank  Theres no equiped with Coil/heating system; Please   Output from Pre Treatment plant to RBDPO Tank is 60 
101 A/B RBDPO Tank  Operating temperature = 60  confirm there are no need Steam Coil Heater  C (refer to Tie In list data from Oiltek, document 
deg   already uploaded to google drive). 
Confirm. No need for steam coil heater. 
10  Process Safety  BBPP‐EE‐56‐LST‐001  Sheet 9  Appendix A Summary Electrical Motor  Refer to doc. no. BBPP‐EE‐56‐ Refer to aforementioned documents, Bidder  Confirm. 
Electrical Load List  and Load List  LST‐001 Electrical Load List,  2  understand that only 1 (one) jokcey pump is required.  Only 1 (one) unit of jockey pump is required. 
(two) jockey pump is  Please kindly Owner to confirm. 
indicated. 
But in Drawing No. BBPP‐FF‐
84‐PID‐001‐01 Piping & 
Instrument Diagram Fire 
Fighting System and 
Document No. BBPP‐FF‐82‐
SPE‐001 Specification Fire 
Fighting System (sheet 5), 1 
(one) jockey pump is 
mentioned.  
11  Process Safety  Tender Document, Part  63  8.3.4. Engineering Data  Hazard classification drawings  Please kindly Owner to inform what applicable code  API 500 and API 505 are Classification of Locations for 
2 ‐ Project Specification  shall be provided by  i.e API 500 or API 505, to be used to develop the  Electrical Installations at Petroleum Facilities, whereas 
Contractor.   hazard classification.  Biodiesel plant is not petroleum facilities.  
For applicable code please use ATEX 137, NFPA,497‐
08, IEC 60079‐10 

12  Process Safety  BBPP‐FF‐82‐SPE‐001  7  6.4 Foam System  Refer to doc. no. BBPP‐FF‐82‐ Refer to NFPA 15, table 5.9.2.2, the supplementary  Confirm. 


Specification Fire  a) Foam System at Tank Farm Area  SPE‐001 Specification Fire  foam hose stream for tank with diameter up to 19.5  Please use 1 hose stream for supplementary 
Fighting System  Fighting System, its  m, only require 1 (one) hose stream for 
mentioned: " Minimum of  supplementary. 
supplemental hose stream is 2  Please kindly owner to clarify this matter. 
number of hose stream (based 
on diameter of largest tank)." 
But in doc. no. BBPP‐FF‐83‐
CAL‐001 Fire Water Demand 
Calculation, sheet 7, its  
mentioned in the table that 
no. of foam hose stream 
protection is 1 (one). 

13  Process Safety  BBPP‐FF‐84‐PID‐001‐01  ‐  ‐  Drawing No. BBPP‐FF‐84‐PID‐ Bidder understand that filling duration of fire water  Confirm. 


Piping & Instrument  001‐01 Piping & Instrument  tank shall be based on capacity of Raw Water Feed  Capacity for feed pump 23‐P‐002A/B is 40 m3/h. 
Diagram Fire Fighting  Diagram Fire Fighting System  Pump (23‐P‐002A/B) i.e. 40 m3/hr as indicated in 
System  indicate net capacity of fire  Drawing No. BBPP‐PE‐24‐PID‐002‐10‐R2 Piping & 
water tank (24‐TK‐001A/B) is  Instrument Diagram RO Water Generation & 
2000 m3.  Distribution System. 
Please kindly Owner to confirm. 
14  Process Safety  BBPP‐IE‐64‐DWG‐ ‐  Note 13  Refer to note 3 in drawing  Please kindly Owner to share  Schematic Fire Alarm  Document already uploaded to google drive by June, 
001_R3 Control System  no.xxxxx mentioned:  System Drawing, document no. BBPP‐EE‐54‐DWG‐007  20th 2022 
Architecture  " 13. For detail location and 
schematic see BBPP‐EE‐54‐
DWG‐007 Schematic Fire 
Alarm System and BBPP‐EE‐
54‐DWG‐009 Fire Alarm 
System Layout " 
But in the FEED (ITB) 
document, BBPP‐EE‐54‐DWG‐
007 Schematic Fire Alarm 
System is not available. 

15  Process Safety  BBPP‐FF‐82‐SPE‐001  7 of  7  6.4 Foam System  Document BBPP‐FF‐82‐SPE‐ Please kindly Owner to confirm if the application rate  Confirm. 


Specification Fire  001 mentioned that  for foam is 4.1 lpm/m2.  Rate for foam system is 4.1 lpm/m2 
Fighting System  application rate for foam at 
Tank Farm area is 4.1 lpm/m2. 
But in document BBPP‐ME‐32‐
SPE‐003, "General 
Specification – Atmospheric 
Storage Tanks", the 
application rate for foam 
system is 5 lpm/m2. 
 
Refer to NFPA 11 table. 
5.2.5.2.2, the application rate 
foam system for fixed roof 
tank is 4.1 lpm/m2. 
 

16  Process Safety  BBPP‐PE‐21‐DES‐001   23 from  15.1 GAS LIMIT  Document BBPP‐PE‐21‐DES‐ Please kindly Owner to confirm which requirement for  For NOX and SOX max allowance follow regulation 


Basic Engineering  30  001 mentioned that the  allowance maximum of NOx and SOx shall be  from Kementerian Lingkungan Hidup (NOMOR 
Design Data  maximum allowable NOx and  followed.  P.15/MENLHK/SETJEN/KUM.1/4/2019) 
SOx content from the     
chimneys shall be 1000  Please kindly Owner to also confirm if Partikulat and  Particulate & Mercury shall be considered into 
mg/Nm³ and 1500 mg/Nm³  Mercury shall be considered into chimney/boiler  chimney/boiler design 
respectively.  design. 
 
But refer to Indonesia 
Regulation no. NOMOR 
P.15/MENLHK/SETJEN/KUM.1/
4/2019, related to emision 
from boiler with fuel oil or 
coal have max allowance for 
SOx and NOx as below:  
 
 
 
 
 
 
 
17  Process Safety  ‐  ‐  ‐  Bidder could find in the ITB  Please kindly owner to share the MSDS of each of  Please refer to MSDS data. 
package the MSDS of each of  chemical, raw material, by product and product  Document already uploaded to google drive by June, 
chemical, raw material, by  properties, especially for chemical properties for flash  30th 2022. Folder location is in Additional 30 June 
product and product  point, Auto Ignition temperature and gas/division  2022 
properties, especially for  group. The properties chemicals are required to 
chemical properties for flash  prepare hazardous source list as part of hazardous 
point, Auto Ignition  area classficiation. 
temperature and gas/division 
group. The properties 
chemicals are required to 
prepare hazardous source list 
as part of hazardous area 
classficiation. 
18  Process Safety  BBPP‐FF‐83‐CAL‐001  sheet 7  Appendix A  Please kindly owner to share  Please kindly Owner to confirm if Partikulat and  Particulate and Mercury shall be considered into 
Fire Water Demand  Summary Fire Water Demand  following information which is  Mercury shall be considered into chimney/boiler  chimney boiler design and follow Kementerian 
Calculation   Calculation  not show the basis in the fire  design.  Lingkungan Hidup norm 
FIRE WATER DEMAND CALCULATION  water demand calculation. 
FOR ATMOSPHERIC TANK  1. Spray system application 
rate  for roof and shell area of 
tank.  
    Refer to fire water demand 
application rate for spray is 
4.1 lpm/m2. But the result of 
is not the same if the 
application rate multiply by 
surface area (shell).  
2. Scenario to determined 
biggest fire water demand i.e 
1500 Usgpm (341 m3/hr) 
which is indicated as fire 
pump capacity in BBPP‐FF‐84‐
PID‐001‐01 Piping & 
Instrument Diagram Fire 
Fighting System. 
3. Fire water tank duration to 
supply fire water demand i.e. 
1500USgpm (341 m3/hr).  
    If refer to BBPP‐FF‐84‐PID‐
001‐01_R2 PID Fire Fighting 
System with FW Tank cap 
2000m3 and Fire water pump 
cap 1500 USgpm (341 m3/hr), 
the duration of fire water tank 
is 5.9 hr.  
19  Process Safety  BBPP‐PI‐42‐SPE‐001     11.1 Piping General point e.  The document BBPP‐PI‐42‐ Please owner to confirm that the lastest allocation of  Yes. 
Specification ‐ Piping    SPE‐001 mentioned that  hydrant in the document BBPP‐PI‐44‐DWG‐006 is final  Document BBPP‐PI‐44‐DWG‐006 shall be used as basis 
General Design    spacing between hydrant is 60  and shall be used as basis for estimate hydrant  for estimate hydrant quantity. 
    m  quantity.  
BBPP‐PE‐21‐DES‐001   16.13 Fire Hydrant and Foam System   
Basic Engineering    The document BBPP‐PE‐21‐
Design Data    DES‐001 mentioned that 
    spacing between hydrant is 
    max 50 m in all areas of the 
BBPP‐PI‐44‐DWG‐006  ‐  complex. For utilities, building 
Piping Layout Hydrant  and other low hazard areas, 
and Fire Water System  spacing between hydrants is 
max 70 m.  
 
The drwaing BBPP‐PI‐44‐DWG‐
006, it showed that spacing 
between hydrant is 35 m 
(main road) and 70 m (in some 
area). 
 

20  Mechanical  BBPP‐PE‐25‐SPE‐ 7 ‐ 10 of     Quality water for Dirty & clean  Please inform Quality water for Dirty & clean water  Please refer to Cooling Tower technical specification. 


Rotating‐ 004_R2 Datasheet  15  water Cooling Tower  Cooling tower, for selecting filler type  Inside, mentioned water quality criteria. Document 
Package  Cooling Tower (IFT)  already uploaded to google drive by June, 28th 2022. 
Folder location is in Additional 28 June 2022 

21  Mechanical  BBPP‐PE‐25‐SPE‐ 11 ‐ 14     Quality water for HYBRID  Please inform Quality water for HYBRID BIODIESEL  Please refer to Cooling Tower Design Data for water 


Rotating‐ 004_R2 Datasheet  of 15  BIODIESEL Plant & Glycerin  Plant  & Glycerin Cooling Tower, for selecting filler  quality criteria. Document already uploaded to google 
Package  Cooling Tower (IFT)  Cooling tower  type  drive by June, 28th 2022. Folder location is in 
Additional 28 June 2022 (4 documents COOLING 
TOWER DESIGN DATA) 
22  Mechanical  BBPP‐ME‐32‐SPE‐ 6 of 28     BBPP‐PE‐25‐SPE‐001 PDS ‐  In Appendix A ‐ Deliverable List Document FEED  Document already uploaded to google drive by June, 
Rotating‐ 001_R2 General  Pumps  Project Biodiesel Plant and documents from owner,  28th 2022. Folder location is in A. OSBL Documents, 
Package  Specification ‐  we didn't get this document (BBPP‐PE‐25‐SPE‐001 PDS  process documents 
Centrifugal Pumps (IFT)  ‐ Pumps). Please Owner to provide bidder this 
document. 
23  Mechanical   BBPP‐PE‐24‐PID‐001‐       Base on PID  BBPP‐PE‐24‐PID‐ Please confirm that Marine Loading Arm 29‐MLA‐003  4 units of Marine Loading Arm (MLA) will be used in 
Rotating‐ 04  001‐04, it is shown Marine  will be by contractor , while MLA‐305B will be  this project. 
Package  Loading Arm 29‐MLA‐003 and  supplied and installed by PET (out of contractor's  3 units (29‐MLA‐001, 29‐MLA‐002, 29‐MLA‐003) shall 
MLA‐305B,   scope).   be Contractor's scope supply. 
Note1 shown : MLA‐305B  MLA‐305B shall be under 3rd party scope. 
Supplied by PET 
24  Mechanical  BBPP‐PI‐44‐DWG‐005‐       In Piping Layout drawing is  Base on PID  BBPP‐PE‐24‐PID‐001‐04, and BBPP‐PE‐24‐ 4 units of Marine Loading Arm (MLA) will be used in 
Rotating‐ 01 PIPING LAYOUT  shown 5 Marine Loading Arm  PID‐001‐13, shown there are only 4 (four) MLA, such  this project. 
Package  DRAWING (Jetty Aera)  (MLA), 29‐MLA‐001, 29‐MLA‐ as , 29‐MLA‐003,  MLA‐305B (supplied and installed by  3 units (29‐MLA‐001, 29‐MLA‐002, 29‐MLA‐003) shall 
002, 29‐MLA‐003, and 2 MLAs  PET) , 29‐MLA‐001, and 29‐MLA‐002. The other one is  be Contractor's scope supply. MLA‐350B shall be 
without Tag No.  not specified & shown in both of P&ID.  under 3rd party scope. 
Please owner to confirm if only 29‐MLA‐001, 002 and  Specification sample shared via Google Drive on 30 
003 are under contractor's scope and also please  Jun 2022. Folder location is in Additional 30 June 2022 
provide the specification & data sheet for them.  

24  Mechanical  BEDD & Pump Data        Dew Point Plant/instrument  Please advise wich value will be used for each dew  Dew Point for Nitrogen package is ‐40 C (dry gas) 


Rotating‐ sheet vs Specification  Air & Nitrogen is ‐ 20 C at  point (for plant air, Instrument Air & Nitrogen) 
Package  for centrifugal Pump  atmospheric pressure  
Spec for Compressed 
Instrument Air Package, dew 
Point: 
10.10.d. The air dryer's outlet 
air dew point shall be ‐40°F at 
operating pressure 
10.10.1.1. h. Air dryer 
packages for instrument air 
service shall deliver air at a 
maximum pressure dew point, 
which is at least 10 °C (18 °F) 
below the minimum 
temperature 
 
Specification for Nitrogen, 
dew Point: 
10.1. Dew point: (‐) 40 Deg C 
(dry gas) 
25  Mechanical  BEDD & Specification          Please confirm Coal Boiler design and operating  In OSBL area, use boiler capacity with steam output 2 
Rotating‐ for Boiler     pressure is LP steam for OSBL (min. 3, Nor. 4 and Max.  x 25 ton/h and operating pressure 16 barg 
Package  5 and design 7 kg/cm2 G, since in Specification for 
boiler para 9.2. only specify capacity steam without 
operation & design pressure 

26  Mechanical  BEDD vs Specifcation        BEDD para 13.1.J.:  Please confirm space heater shall be provided for  Confirm. 


Rotating‐ for Compressed  Space Heater for Electric  motor above 30 KW  Space heater shall be applied at motor above 30 KW. 
Package  Instrument Air  Equipment (space heater shall 
Package,  be provided for motor above 
30 KW) 
Specifcation for Compressed 
Instrument Air Package para 
9.s : 
Electric drive motor completes 
with Coupling and guard 
(including space heater of 
motor capacity is 7.5 kW and 
above). 

27  Mechanical  BBPP‐ME‐32‐SPE‐ 13 of 26 9.2.c It is mentioned that Boiler is In document Main Package Vendor, specify 2 units Please use boiler with steam output/capacity at 2 x 25 
Rotating‐ 010_R4  Water Tube Saturated Steam Boiler with capcity 25 ton/h. ton/h 
Boiler which steam output
Package  Specification ‐ Boiler 
capacity 40 ton/h. Please advise whitch capacity shall be considered by
(IFT)  contractor

28  Mechanical  BBPP‐ME‐35‐TDS‐    Datasheet for 12‐TK‐022 A/B  Completeness GA drawing/  Bidder request Owner to provide GA drawing  Document already uploaded to google drive by June, 


Static  003_R2 Datasheet ‐  Hydrochloric Acid Tank and 20‐TK‐906  datasheet  /datasheet  28th 2022. Folder location is in Additional 28 June 
Storage Tanks (IFT)  HYDROCHLORIC ACID DAILY TANK  2022 
29  Mechanical  BBPP‐ME‐35‐TDS‐    datasheet for 12‐TK‐005 Citric Acid  Completeness GA drawing/  Bidder request Owner to provide GA drawing  Document already uploaded to google drive by June, 
Static  003_R2 Datasheet ‐  Tank   datasheet  /datasheet  28th 2022. Folder location is in Additional 28 June 
Storage Tanks (IFT)  2022 
30  Mechanical  BBPP‐ME‐35‐TDS‐    Material for 29‐TK‐201 Condensate  Material  Bidder request Owner to conform that material for   Condensate Tank can be made from concrete, since it 
Static  003_R2 Datasheet ‐  Collection Tank  29‐TK‐201 Condensate Collection Tank is concrete  operates in atmospheric pressure 
Storage Tanks (IFT)  instead of A36/CS as mentioned in Equipment list 
BBPP‐PE‐26‐LST‐001_R2 Equipment List (IFT) 
31  Mechanical  Berita ACARA Meeting  2  Datasheet for chimney in area of ISBL  1.  HP   Boiler  (80   bar)   for  Bidder request Owner to provide GA drawing or  Chimney specification is dia. 16 inch and height is 30 
Static  Aanwijzing Penjelasan  pre‐treament   datasheet for this Chimney, for Contractor's  meter 
Biodiesel Plant PT Bumi  plant,  use diesel fuel.   estimation work. 
Energi Nabati   This Boiler is in The Licensor's 
/ Oiltek scope of supply.  
Chimney scope will be by 
Contractor.  
32  Mechanical  BBPP‐ME‐32‐SPE‐003‐ 31  10.4.2.c HYDROSTATIC TEST  c.A suitable rust inhibitor and  Bidder request Owner to confirm that water from   After doing hydrotest, water waste shall be 
Static  R4 General  wetting agent shall be added  Hydrostatic test will be thrown away directly to pond  treated/neutralized before directed into pond. 
Specification for Tank  to the test water.  without any treatment for applying rust inhibitor and 
wetting agent. 
33  Mechanical  BBPP‐ME‐32‐SPE‐003‐ 31  10.4.2.d and f. HYDROSTATIC TEST  d. When testing tanks with  Bidder request Owner to confrom which value to be  Please use chloride content not more than 20 ppm 
Static  R4 General  stainless steel materials fresh  used 20 ppm or 30 ppm max.chloride content. 
Specification for Tank  water should be used. In any 
cases the maximum allowable 
chloride content of the test 
water shall be 20 ppm. 
f. When stainless steel 
equipment is  tested  the  test  
fluid  shall  not  contain  more  
than  30  chlorides  unless  
agreed otherwise by the 
COMPANY. 
34  Mechanical  BBPP‐ME‐32‐SPE‐003‐ 31  10.4.2. f. HYDROSTATIC TEST  f. Test water to be inhibited  Bidder request Owner to conform that Bidder will  Please refer to paragraph 10.4.2.f 
Static  R4 General  and oxygen scavenged.  apply paragraph 10.4.2.c instead of paragraph 10.4.2.f 
Specification for Tank 
35  Mechanical  BBPP‐ME‐32‐SPE‐003‐ 19  9.13.d. EXTERNAL DETAILS  d. The minimum size of anchor  Bidder request Owner to delete this sentence and  Confirm. Bidder shall carry out re‐calculation for 
Static  R4 General  bolts shall be 1" diameter.  anchor bolt sizing will be performed by Bidder without  anchor bolt requirement based on actual design 
Specification for Tank  Anchor bolt sizing shall be  any size restriction because some of Tank have small  condition 
performed by the VENDOR.  inside diameter. 
36  Mechanical  BBPP‐ME‐32‐SPE‐003‐    Datasheet for Tank Mixer/Agitator   Completeness GA drawing/  Bidder request Owner to provide datasheet for each  See list below for tank with agitator/mixer : 
Static  R4 General  datasheet  Tank mixer as minimum as attached table  1. CPO (11‐TK‐001.A/B/C) 
Specification for Tank  2. PFAD (11‐TK‐502.A/B) 
3. RBDPO (11‐TK‐101.A/B) 
4. Refined Gly (20‐TK‐909) 
5. Yellow Gly (20‐TK‐910) 
6. Citric Acid (12‐TK‐005) 
7. Citric Acid Daily (20‐TK‐904) 
 
Datasheet for Agitator/Mixer already uploaded to 
Google drive, by June 30th 2022. Folder location is in 
Additional 30 June 2022 
37  Mechanical  BBPP‐ME‐32‐SPE‐003‐ 8  8.c Scope of Supply / Work  Under tank Leak Detection  Bidder request Owner to inform which tank will be  For this project, we are using Automatic Tank Gauging 
Static  R4 General  System  applied leak detection system and type of leak  to detect leakage on the tank. Please refer to each 
Specification for Tank  detection system  tank’s PID.  
38  Mechanical  BBPP‐ME‐35‐TDS‐    Datasheet for 25‐TK‐002 Diesel  Completeness GA drawing/  Bidder request Owner to provide GA drawing  Document already uploaded to google drive by June, 
Static  003_R2 Datasheet ‐  Intermediate Tank   datasheet  /datasheet  28th 2022. Folder location is in Additional 28 June 
Storage Tanks (IFT)  2022 
39  Instrument  BBPP‐IE‐64‐DWG‐ 1 of 1     Metering system complete  Bidde understanding that flow metering with flow  4 (Four) Custody Coriolis flow meter for CPO, 
001_R3 Control System  with Flow computer at Jetty  computer will be provided for trasfering biodiesel  Methanol, FAME and Refine Glycerine 
Architecture (IFT)  area and workstation station  product to customer.   
in CCR are shown.  Bidder request owner confirmation for this metering  Datasheet for Coriolis flow meter already uploaded to 
due to inconsitency with BBPP‐PE‐21‐DES‐001_R3  google drive by June, 30th 2022. Folder location is in 
Basic Engineering Design Data section 14.8 and 14.12  Additional 30 June 2022 
(NO metering device and NO Flowmetering for 
custody transfer) and information in Datasheet is 
Coriolis FM w/o info metering. 
Also owner kidly requested to provide metering skid 
specfification/data sheet  
40  Instrument  BBPP‐IE‐64‐DWG‐ 1 of 1     4 (four) ISBL main process  Bidder understanding that each ISBL main process  PLC for ISBL will be supplied by Oiltek. Contractor 
001_R3 Control System  plants: Pretreatment Plant,  plant will be completed with dedicated local PLC/Local  responsibility is to integrate between OSBL and ISBL 
Architecture (IFT)  Hybrid Biodesel Plant,  Process control system which provided by licensor.  
Enzymatic Biodiesel Plant, and  Serial communicaiton configuration at local PLC side 
Glycerin Refining Plant shown  to enable flawless interface with PCS, will be 
with dedicated controller and  responsibility of Licensor. 
comunicated to Main Process  Please owner to confirm this matter.  
Constrol system in Control 
room (PCS)  , as shown with 
note 10 (oiltek scope). 
41  Instrument  BBPP‐IE‐62‐SPE‐001_R3  13 of 27  5.2  The hardware and software  Bidder request owner confirmation for applicable  For OPC requirement is mandatory. 
General Specification  shall be field proven in  OPC, MIS (Management Information System) and AMS  For other requirement, bidders may propose the most 
for Instrument _  similar installations and  (Asset Management System) requirement.  optimum configuration.  
Control System (RE‐IFT)  locations. As a minimum, 
following software shall be 
provided: 
a) Engineering and System 
Generation Software 
b) SER (Sequence of Events 
Recorder) 
c) PLC Integration Software 
d) OPC server & OPC Owner 
Software 
e) Management Information 
System software Server & 
Owner 
f) Microsoft Office 
g) Antivirus 
h) Simple Network Time 
Protocol (SNTP) Owner 
software (for GPS) 
i) Adobe Acrobat Professional 
j) Asset Management System 
software 
42  Instrument  PROJECT     Appendix A  Datasheet self actuating  Bidder understanding for selt actuating control valve  Datasheet for Temperature Control Valve were not 
SPECIFICATION  temperature control valve not  which shown on P&ID is self actuating pressure  generated in FEED stage. Please refer to document for 
(003/BEN/TENDER/VI‐ available  control valve and Self actuating temperature contol  Steam Consumption Utility document (uploaded 28 
22)  valve, Please owner to confirm and provide datasheet  Jun 2022). Folder location is in Additional 28 June 
for self actuating temperature control valve.  2022 & BBPP‐PE‐23‐CAL‐001 Heat and Material 
Balance for relevant process data. Folder location is in 
A. OSBL Documents, process documents.   
Contractor shall prepare Instrument Datasheet in DED 
phase 
43  Electrical  BBPP‐EE‐54‐DWG‐      Scope tie‐in point at 11kV.  Overall Single line Diagram (BBPP‐EE‐54‐DWG‐001)  The scope as shown by "ME Contractor (New)" is 
001_R2 Overall Single  Scope of supply and work 11kV  Rev.R2, shown there is scope to supply and install  Contractor's scope. 
Line Diagram (3  switchgear at Electrical Room of  11kV Switchgear for tie‐in. Please kindly Owner to   
Sheets)_IFT  PLTU Tanjung Bara KPC  confirm that the scope as shown by "ME Contractor  For detail layout please refer to document 600E001 
(New)" , is Contractor's scope or not.  POWER SYSTEM GENERAL STN, PORT & TJG. BARA 
  SINGLE LINE DIAGRAM (hardcopy during site visit) 
If it's scope of Contractor, Contractor request existing  drawing uploaded to google drive by June, 30th 2022. 
layout to verify the space and installation method.  Folder location is in Additional 30 June 2022. For 
installation method in Tie‐in using cable feeder at 
spare cubicle. 

 
44  Electrical  BBPP‐EE‐54‐DWG‐    Scope tie‐in point at Void‐J  1) Please kindly Owner to share layout and location of  1. Tie in to 11kV network at last electrical pole nearby 
001_R2 Overall Single    area.  Tie‐in to Existing Panel in PANEL SUB DISTRIBUSI  J‐Void as shown during site visit. Contractor to install 
Line Diagram (3  Layout of  Void Jupiter and  VOID‐J AREA.  step down transformer and panel. 
Sheets)_IFT;  transformer size.    2. Contractor shall carry out re‐calculation and 
20220609 BEN ‐ BA  2) SLD shown for transformer rating is 100KVA, with  propose based on actual condition or best practice 
Rapat Penjelasan  biggest motor is 45kW. Based on our estimation, the 
Tender (Aanwijzing) ‐  size of transformer and Diesel generator shall be 
Biodiesel Plant Project  biggger than 100kVA even though the motor will be 
in Rabu, 8 Juni 2022;  started by sofstarter. Please Owner to confirm the size 
BBPP‐EE‐56‐LST‐ of transfomer size and Diesel Generator is 100kVA, or, 
001_R5 Electrical Load  else, please advise other wise. 
List (RE‐IFT)   

45  Electrical  BBPP‐EE‐55‐TDS‐      Scope at Tie‐in point  1) Please kindly Owner to confirm if power supply to  1). Power supply to jetty will be taken from 


002_R2 Datasheet  Layout of  Void Jupiter and  jetty will be taken from New Main substation (LVMDP  Switchgear in Jetty, not from LVMDP Biodiesel. This 
Power Transformers  transformer size.  Biodiesel), Bidder cannot find the feeder to jetty in  switchgear would be provided by 3rd party. 
(IFT);  drawing BBPP‐EE‐54‐DWG‐002_R2 MV _ LV Single Line                         
BBPP‐EE‐56‐LST‐ Diagram.  2). Contractor shall carry out recalculation for 
001_R5 Electrical Load    transformer rating based on actual condition in DED 
List (RE‐IFT);  2) Data sheet of Transfromer specified rating 400kVA  stage. 
BBPP‐EE‐54‐DWG‐ and Biggest motor rating in Load list is 273kW 
002_R2 MV _ LV Single  (218.4HP). Please kindly Owner to confirm the size of 
Line Diagram (3  transformer shall be as per data sheet or to be 
Sheets)_IFT  calculated by Contractor. Based on our estimation, the 
 
size of transformer shall be more than 400kVA. 
46  Electrical  BBPP‐EE‐54‐DWG‐    Electrical scope inside ISBL  Electrical scope inside ISBL  Bidder understanding that Switchgear, MCC, cable  MCC switchgear and electro motor will be supplied by 
002_R2 MV _ LV Single  tray, cable tray support, lighting fixtures, grounding,  licensor. However, cable powers, cable controls, cable 
Line Diagram (3  etc for ISBL will be supplied by Licensor, Bidder's  trays, lighting fixtures, grounding, etc. shall be 
Sheets)_IFT  scope of supply is only for cable and it’s accessories.  supplied by contractor 
Please kindly Owner to confirm. 
47  Electrical  20220606 BEN ‐ Project     vi) Detailed engineering design of  Electrical DED scope inside  Bidder understanding that Electrical DED deliverables  Detailed design in ISBL area for cable tray layout, 
Specification for  OSBL project scope. While DED for  ISBL  for ISBL such as cable tray layout, lighting layout,  lighting layout, grounding layout will be Contractor's 
Biodiesel Plant EPCC  ISBL will be provided by the Licensor.   grounding layout and other deliverable required for  scope 
Project  ISBL shall be provided by Licensor. 
Please kindly owner to confirm. 
48  Electrical  20220606 BEN ‐ Project     The Contractor is also responsible for  MTO list for ISBL  Owner/Licensor requested to provide MTO/BOQ list  MTO/BOQ for electrical accessories in ISBL area shall 
Specification for  installing all ISBL equipment in the  which will be installed by Contractor.  be developed by contractor. Licensor will provide 
Biodiesel Plant EPCC  structural building of each main  equipment list, motor list, I/O List, loading list and 
Project  process plant that has previously been  utilities list only 
designed and built by the Contractor, 
including in the scope of Contractor 
responsibilities are, but not limited to, 
ISBL piping installation (the isometric 
drawings and the pipe materials will 
be provided by the Licensor).  
The ISBL cabling and wiring (electrical 
& instrument cables) and the scope of 
work other than those stated earlier 
are the responsibility of the 
Contractor to perform the 
procurement and installation.  
49  Electrical  BBPP‐EE‐52‐SPE‐    Area classification shall reflect the  Hazardous area classification.  1). Owner kindly requested to send Haardous Area  1. For hazardous classification, please refer to code 
001_R3 Electrical  latest philosophies contained in API‐ Classifiction layout for ISBL  IEC 60079 Electrical apparatus for explosive gas 
General Design  RP‐500 including due recognition of    atmospheres. Furthermore, hazardous area layout 
Specification (IFT)  any lighter‐than‐air gases and heavier  2). Bidder is alllowed to provide IP class code as  shall be detailed after DED stage. 
than air gases.  equivalent for equipment enclosure instead of NEMA  2. Bidder is allowed to provide equipment enclosure 
  code. Please Owner to confirm.  using IP class code instead of NEMA code with Owner 
All electrical equipment installed on  approval. 
the process plant shall as a minimum 
be certified for use in a Class 1 
Division 2 Area (using NEMA type 4X, 
7 or 9 enclosures to NEMA standard 
250). 
50  Piping  A. PART 1 –  Page 4     The Contractor is also  As basis design for the engineering for the location of  a. The licensor will provide piping installation drawing 
INSTRUCTION TO  of 62  responsible for installing all  Tie‐in will be maintain from end of skird of package  exclude fire system line by Sep 2022.  
BIDDERS (ITB)  ISBL equipment in the  (outside of package building)  Piping & Fitting material for ISBL will be on site by Feb 
SECTION 1  structural building of each  a. The licenseor will provide spool Piping at Sep 2022,  2023.  
INTRODUCTION  main process plant that has  installation work for Piping ISBL for contractor scope is  Contractor's scope is to install the spool piping, field 
previously been designed and  install the spool piping and field joint work  joint work, painting, & to install pipe support. 
built by the Contractor,  b. Pipe Spool already painted by Licensor  b. Pipe material will come to site without painting.  
including in the scope of  c. The fire system line scope will be maintain also from  Contractor will do painting works for piping in ISBL 
Contractor responsibilities are,  skid or include inside the package?  also. 
but not    c. Fire system line scope will be maintained included 
limited to, ISBL piping  Please Owner to confirm above item a, b & c  inside the package of fire system (refer document: 
installation (the isometric  MAIN PACKAGE VENDOR LIST) Uploaded to google 
drawings and the pipe  drive by June, 21st 2022. Folder location is in 
materials will be provided by  Additional 21 June 2022 
the Licensor). The ISBL cabling 
and wiring (electrical & 
instrument cables) and the 
scope of work other than 
those stated earlier are the 
responsibility of the 
Contractor to perform the 
procurement and installation. 
51  Piping  B. PART 2 – PROJECT  Page 43  7.11. Process and Reverse Osmosis  Raw water is supplied from  The drawing as built for arrangement of conveyor  installation method of HDPE Pipe is only laying at 
SPECIFICATION  of 152  (RO) Water System  existing water pond (void J) to  from KPC to Void J shall provide by Owner, Contractor  above ground (refer to Drawing no 141W001‐B). 
SECTION 7 ‐ OSBL AREA  Raw Water Tank (23‐TK‐ will use the latest Latest Drawing for basis of design,  Folder Location is in Additional 22 June 2022, Posisi 
001.A/B) with capacity of  and the arrangement of Pipe HDP will be layying on  Jalur Sumber Air Baku (Void J) 
3000MT by Raw Water Pump  above ground beside of Conveyor (left side or righ side 
(23‐P‐001.A/B) with  conveyor) 
capacity 95m3/hr.  Please Owner to infom the drawing and confirm for 
methode installation of HDPE Pipe (only laying at 
aboveground) 
52  Piping  BBPP‐PI‐42‐SPE‐001‐ Page 17  6.2 Clearance  The effective spatial height  1. For item  No. 1  comparing with Civil document  Confirm. We use Overhead clearance around 5.5 m, 
Specification – Piping  of 37   and horizontal distance to be  sectional drawing (BBPP‐CE‐74‐DWG‐007_R3  refer to Civil document sectional drawing (BBPP‐CE‐
General Design  observed in piping layout  (Sht.3of3) the overhead clearence around 5. 5 m  74‐DWG‐007_R3 (Sht.3of3) 
shall be based on the   
following standard, including   
support structure such as pipe   
rack, platform and etc.   
a. Over head clearance   
(1) For main road : min. 4 m   
(13.1 ft)   
(2) At pump row access way   
(under pipe way for) : 2.75 m   
(9 ft)   
(3) Overhead walkways,   
passageways and platform :   
2.15 m (7 ft)   
to nearest obstruction (except  Please Owner to confirm for the discripancy 
at dead ends) 

53  Piping  BBPP‐PI‐42‐SPE‐001‐ Page 21  6.7 Underground Piping  a. The earth covering shall be  1. The cooling water line below 26" , is it allowed to be  1. Cooling water line below size 26", shall be installed 


Specification – Piping  of 37   minimum 600 mm(23.5 in.). In  designed as UG installation ? (example size 8", 10",  at above ground  
General Design  the case of under ground  12", 16" and 18")  2. Main ring piping hydrants & Fire Water System, 
piping is protected by sheath  2. As refer to FEED document PID (BBPP‐FF‐84‐PID‐ shall be installed at above ground  
pipe and etc., the covering  001‐02_R2 P_ID Fire Fighting System (IFT)) and Layout 
may be less than 600 mm  (BBPP‐PI‐44‐DWG‐006_R2 Piping Layout Hydrants _ 
(23.5 in.).  Fire Water System ) the main ring will be running at 
b. For the waste water line in  above ground area 
the process area, the covering   
shall be minimum 200 mm  Please Owner to confirm item 1 & 2 
(8in.), considering the depth 
of sump tank. 
c. When underground piping 
cross each other (not 
connected each other), the 
clearance between both outer 
surfaces of each pipe line shall 
be minimum 300 mm (11.8 
in.) or shock absorption shall 
be provided by such means as 
sheath pipe for lower piping. 
d. Following line shall be 
located under ground; 
(1) Cooling water lines 26” 
and larger 
(2) Firewater mains 
(3) Drain sewer line from catch 
basins to main and man holes 
e. All underground metallic 
piping shall be coated and 
wrapped. If the piping to be 
equipped with sacrificial 
cathodic protection, the 
permanent testing 
arrangement shall be 
provided. 
f. For unpressurised line (i.e. 
drain sewer line and oily 
sewer line ) may utilize 

54  Civil Structure  DWG NO. : BBPP‐CE‐ 1 of 3       Bidder kindly request to owner to inform Plot Plan  Please referred to BBPP‐CE‐74‐DWG‐003 SITE 


and Building  74‐DWG‐002  Plant coordinate.  boundary coordinate, to be stated at point A,B,C & D.  GRADING_0 Plan Drawing. 
GENERAL LAYOUT  Document already uploaded to google drive by June, 
28th 2022. Folder location is in A. OSBL Documents, 
Civil Drawings 

55  Civil Structure  BBPP‐CE‐72‐SPE‐003  Sheet 5  3. MATERIALS  Table‐1 Material for Structural  Bidder  kindly request Owner confirmation, in the case  Yes, it is allowed.  


and Building  REV.2  from 29  Steel Work  bidder using equivalent specification material other  Equivalent material is allowed, as long as it has same 
Specification Steel  …  than stated on the Table‐1. Will it be allowed?   minimum specification. Owner’s approval is required 
Structural Work  …  Please owner to confirm this matter.  before procurement and installation. 
 

56  Civil Structure  D. Final Topografi  Sheet 1  Topographic data  Bidder kindly request Owner confirmation, the value  The value "1" listed in the data represents elevation 


and Building  Report  of 1  "1" listed in the data represents what elevation to  related to .00 MSL (as reference level) 
Drawing no. NS‐BEN‐ MSL? 
SGT‐002, General Lay 
out 
57  Civil Structure  Final Report BEN Soil  Page 45  APPENDIX ‐B Borlog Data    Bidder kindly request Owner to inform, what are the  All Ground Level related to 0.00 MSL (as reference) 
and Building  Investigation 07062022  to 57  Ground Elevation value (relatif to MSL) for each 
GEOTECHNICAL  Borlog data listed in APPENDIX ‐B Borlog Data. 
INVESTIGATION 
BEN – SOIL 
INVESTIGATION 
KPC TANJUNG BARA 
East Kalimantan 
58  Civil Structure  BBPP‐CE‐74‐DWG‐002           Bidder kindly request Owner to inform, the exact  All Ground Level related to 0.00 MSL (as reference). 
and Building  General layout  Reference of Elevation value . Currently still shown as  And, "TBA" could be seen in every related drawings  
= MSL + TBA  

59  Civil Structure  Part 2 ‐ Project  44 of  Existing Void Pit Jupiter ‐ Intake  Raw water is supplied from  Bidder understand during site survey that design of   Please refer to 141W001‐B Posisi Jalur Sumber Air 


and Building  Specification  152  Floating Pump  and Pump House   existing water pond (void J) to  raw water intake should be similar with existing one.  Baku (Void J).dwg for as built drawings 
Raw Water Tank (23‐TK‐  Bidder kindly request Owner to provide related  Document already uploaded to Google drive by June, 
001.A/B) with capacity of  existing drawing for Bidder reference.  28th 2022. Folder location is in A. OSBL Documents, 
3000MT by Raw Water Pump  Civil Drawings 
(23‐P‐001.A/B) with capacity 
95m3/hr. 
60  Civil Structure  Laporan Final Topografi  ‐  ‐  Elevation reference  Bidder understand that elevation information  Confirm 
and Building  Survey Area Pabrik BEN  provided in topography map refers to MSL. 
1.000 Biodiesel   
Sangatta  Please Owner kindly to confirm. 

61  Civil Structure  BBPP‐PI‐44‐DWG‐005‐ 1 of 1  ‐  Battery limit scope of work  Bidder understanding that causeway and all civil,  Causeway and all civil, structural  and all support work 


and Building  09 PIPING LAYOUT  EPC Contractor & Jetty  structural  and all support work of jetty shall be out of  of jetty are not Contractor's scope 
DRAWING  Contractor  scope of Bidder. 
( CAUSEWAY AREA )   
Please Owner to confirm. 
62  Civil Structure  BBPP‐CE‐72‐SPE‐ Sheet 5  Mansory wall  Local manufactured material  1. Material of mansory  1. Both of  material can be used, which is available 
and Building  009_R2 General Design  from 15  and locally available materials  Bidder  kindly request Owner to confirm, related  material on local market 
Specification for  shall be used to the greatest  material of mansory, as per drawing is brickwall 
Buildings (IFT)  extend in the design. For  meanwhile as per doc BBPP‐CE‐72‐SPE‐009_R2 
finishing materials such as  General Design Specification for Buildings (IFT 
roof, wall etc., refer to each  mention  hollow concrete block. Which one is the 
exterior and interior finishing  correct one to be applied? 
schedule drawing. 
1) Masonry wall 
Exterior masonry walls shall 
be made of hollow concrete 
blocks, finished with plasters 
and weather shield painted. 
Total thickness of exterior 
masonry walls shall be a 
minimum of 200 mm. Exterior 
cement plaster shall be a 
minimum of 16mm thick with 
a steel trowel finish. 
Interior masonry walls shall be 
made of hollow concrete 
blocks. Thickness of interior 
masonry walls shall be a 
minimum of 100 mm. Interior 
cement plaster shall be a 
minimum of 16 mm thick with 
a steel trowel finish. Hollow 
concrete block material shall 
conform to ASTM C90 or 
approved equal, unless 
otherwise specified. Hollow 
concrete block 150 mm 
thickness of local 
product will be used for 
masonri material mansory and 
thickness at concret building 
 

               2. Total thickness wall based on exterior table dwg is  2. Use 200 mm instead of 150 mm 
150 mm, meanwhile as per BBPP‐CE‐72‐SPE‐009_R2 
General Design Specification for Buildings (IFT, 
minimum thikness is 200 mm,Bidder  request Owner 
confirmation, which one is correct? 
                    Use 200 mm instead of 150 mm 

63  Civil Structure  BBPP‐CE‐72‐SPE‐ Sheet 4  Scope of work  Furniture  Bidder  kindly request Owner to confirm, that, scope  All of furniture will be supplied by Owner 


and Building  009_R2 General Design  from 15  of work and supply of  furniture, it will be done by 
Specification for  owner. 
Buildings (IFT) 
64  Civil Structure  BBPP‐CE‐74‐DWG‐    Material roofing and siding/clading    Bidder  request Owner confirmation, related material  Use 1 layer only/without double skin since there is no 
and Building  005_R2 Preliminary  roofing and siding/clading at WTP shelter, there is  required for damper 
Water Treatment Area  discrepancy between note at roof plan and finishing 
Plan _ Typical Section  schedule, in the roof plan mention "roofing 
(IFT)  corrugated zincalume sheet 0,7 mm thk without 
double skin.  
Owner please kindly to confirm , if double skin on the 
roof and siding/clading at WTP shleter will be applied 
or not?  

65  Civil Structure  shelter drawing     Material roofing and siding/clading  Bidder  understanding all thicknes  roofing and  No, it is base material thickness with coating minimum 


and Building  siding/clading will be base material thikness (BMT).  thickness 
66  Operation  SECTION 10 ‐ ERECTION  134  10.23.2 Start‐up Planning  Commissioning Plan &  Bidder understanding as per SECTION 8 ‐ SCOPE  The Licensor will prepare the start‐up & 
& START UP  When basic engineering, particularly  Sequence  SERVICE AND ENGINEERING PROCEDURE  commissioning sequences for the ISBL scope, 
10.23 START‐UP AND  that of the Offsites, has been  8.6. START ‐ UP, AND OPERATING ASSISTANCE AFTER  consequently the Contractor will prepare his OSBL 
PERFORMANCE  completed, Contractor, shall prepare a  START‐UP, 8.6.1. Start‐up Personal  start‐up sequences which preceded the ISBL start‐up. 
TESTING  start‐up plan. This plan shall define  "start‐up Commissioning and performance test shall  For this purpose, the Contractor may submit a 
the various systems and the proposed  be performed under the overall direction and  proposal to carry out partial commissioning for the 
sequence for startup.  coordination of the Licensor's personnel supervising  package equipment prior to the overall plant start‐up 
Owner's operators". In that case Startup Sequence will  & commissioning, such as for water treatment plant, 
be prepared by Licensor. Please confirm.  steam boiler, compressed air, etc. where applicable. 

67  Operation  SECTION 10 ‐ ERECTION  135  10.23.3 Start‐Up Preparation  Utility for commissioning  Bidder understanding that During Commissioning and  The Owner's scope at the commissioning stage 


& START UP  Contractor and Licensor personnel  Startup, Utility (Steam, Water, Electricity, Fuel) shall  includes feedstock, chemicals, fuels, including 
10.23 START‐UP AND  shall assist Owner in preparing and  be within the scope of Owner. Please confirm.  electricity supply from KPC. Meanwhile, the water 
PERFORMANCE  training the initial group of operators  requirement (including for pre‐commissioning) is the 
TESTING  required at the start of  responsibility of the Contractor by using the source 
commissioning. Depending on timing,  from Void J. 
this may be done as part of overall 
Site training to be carried out on 
return of trainees from training away 
from the Site. If the return is too late 
for such training, it will be done ahead 
of the main Site operator training. 
68  Operation  SECTION 10 ‐ ERECTION  135  10.23.3 Start‐Up Preparation  Contractor Assist during  Please inform requirement for Assist commissioning:   In general, the Contractor will be responsible for 
& START UP  Contractor and Licensor personnel  commissioning  ‐ Manpower requirement, qualification and duration.  providing their support, including through the 
10.23 START‐UP AND  shall assist Owner in preparing and  ‐ Requirement for tools and equipment  equipment package vendors support in completing 
PERFORMANCE  training the initial group of operators  ‐ Requirement and specification for consummable  the commissioning phase for overall of ISBL & OSBL 
TESTING  required at the start of  material.  plants, including the fulfillment of the OSBL 
commissioning. Depending on timing,  ‐ Other.  performance guarantees and to execute the 
this may be done as part of overall  commissioning punch list. 
Site training to be carried out on   
return of trainees from training away  With regards to the responses at No. 66 and 67 above, 
from the Site. If the return is too late  the Contractor will asked to decide himself the 
for such training, it will be done ahead  requirement of manpower, tools, etc. so that the 
of the main Site operator training.  commissioning process will run smoothly and 
successfully. 

69  Operation  SECTION 8 ‐ SCOPE  81  8.7.2. Training Requirements  Training Unit.  Bidder understanding that the scope contractor for  Yes, confirmed. 


SERVICE AND  The Licensor, Contractor and vendor  Boiler Training is for Coal Fired Boiler only. Diesel fuel  Coal Fired Boiler training by Contractor, Diesel Boiler 
ENGINEERING  shall assume that the training in site  boiler training scope will be by Licensor.  Please  training by Licensor 
PROCEDURE  plant shall be for approximately the  confirm. 
8.7. TRAINING  numbers, duration and program as 
SERVICES  follows but within the 
overall. 
Contractor and vendor package will be 
training OSBL scope with package unit: 
1. Boiler, 2. Compress air, 3. WWTP, 4. 
WTP, 5. Nitrogen Package, 6. Cooling 
Tower, 7. Others 

70  Operation  SECTION 10 ‐ ERECTION  131  As tests are to be conducted,  The definition of  Bidder kindly request owner to inform the definition  Please refer to Owner's Response No. 66, 67, and 68 


& START UP  Contractor shall notify Owner giving  Commissioning Activity   of commissioning activity, such as, what  above. 
10.19 FIELD  48 hours notice, and Owner shall  items/activities are included,  by then, it will help 
INSPECTION  witness and sign off as tests are  bidder to provide proper estimation and planning. 
successfully completed. In such a way  Please owner to provide the above. 
systems can be checked as complete, 
and the commissioning and start‐up 
phase commenced. 
71  Operation  BERITA ACARA     Untuk boiler dan steam generation,  HP Boiler Utility Consumption  Please owner to inform the HP Boiler Utility  Licensor will share detail for information HP Boiler will 
No. 3  akan menjadi scope siapa?  and Commissioning  consumption during pre‐commissioning and Required  be shared later before Pre‐Comm/Comm. activity 
Ando – PP ETI  BEN membutuhkan dua boiler:  Requirement  activity for Pre‐commissioning and Commissioning. 
1. HP Boiler (80 bar) untuk pre‐
treament plant, menggunakan bahan 
bakar diesel. Boiler ini termasuk ke 
scope Oiltek. Chimney menjadi scope 
Kontraktor. 
2. MP Boiler (2x25 TPH, 20 bar) untuk 
steam generation OSBL, menggunakan 
bahan bakar coal. Boiler ini termasuk 
ke scope Kontraktor EPC. 
72  Construction  20220606 BEN ‐ ITB for     SECTION 10 ‐ ERECTION & START UP  Available jetty  Bidders understand that Tanjung Bara Service  The Contractor will be asked to provide the docking 
Biodiesel Plant EPCC  terminal for jetty 2,3 & are available for loading &  schedule of their vessels two months in advance, then 
Project  unloading of bidder equipment, material and etc.  the KPC authority will organize and arrange slots for 
Please provide the port schedule to be used as basis  those demands. 
of bidder's loading & unloading scheme/planning. 

73  Construction  20220606 BEN ‐ ITB for     SECTION 2 ‐ SCOPE OF SUPPLY  Site preparation for Laydown  Bidders understand For Land clearing, preparation and  Yes, confirmed. 


Biodiesel Plant EPCC  and Site Area  compacted to elevation of design for laydown, 
Project  temporary access and the site area will be prepared 
by Owner. Kindly to confirm 

74  Construction  20220606 BEN ‐ Project     SECTION 2 ‐ SCOPE OF SUPPLY  Laydown Area  Bidders to confirm Available lay down and new  Basically the Owner has considered the adequacy of 


Specification for  laydown to be construct in KPC area which can be  the laydown area provided and free of charge, 
Biodiesel Plant EPCC  used for contractor is free of charge  however, if the Contractor later requires an additional 
Project  laydown area, the provision will be the burden and 
responsibility of the Contractor. 
75  Construction  20220606 BEN ‐ Project     SECTION 2 ‐ SCOPE OF SUPPLY  Road Maintenance  Bidders understand that road maintenance in KPC  Road maintenance caused by the Contractor's 
Specification for  area is scope by KPC. Kindly to confirm  activities will be the burden and responsibility of the 
Biodiesel Plant EPCC  Contractor.  However, all parties (Owner, KPC and 
Project  Contractor) will verify first before determining the 
road repair action. 

76  Construction  20220606 BEN ‐ Project     10.13 CONSTRUCTION UTILITIES  Water and Electricity resource  Bidders would like to request owner to inform tapping  In Construction phase, the contractor must provide 


Specification for  point location for New Electricity resource (pole) near  their own electricity source 
Biodiesel Plant EPCC  site area.   
Project 
77  Construction  20220606 BEN ‐ Project     10.13 CONSTRUCTION UTILITIES  Water and Electricity resource  Bidders would like to request owner to inform unit  Please refer to Site Survey's minutes point 3 dated 
Specification for  rate for water and electricity which will be provided to  June 14th, 2022 : 
Biodiesel Plant EPCC  bidder during construction work . Bidder will use the  ‐ Basically for construction activities, water is provided 
Project  billing rate for the cost estimation basis.  unlimited from a source in Void J and is free of charge 
or the closest one is from a location near laydown 
area road 1 but in this option there will be cost 
charged to the Contractor (the unit rate will be 
confirmed later). 
‐ For daily electricity needs during construction, the 
Contractor must provide it himself by providing 
portable generators. 

78  Construction  20220606 BEN ‐ Project     10.13 CONSTRUCTION UTILITIES  Water and Electricity resource  Bidders would like owner to inform capacity for  Please refer to Owner's response No. 77 above, also 


Specification for  tapping water and electricity source for laydown area  applies to the laydown area. 
Biodiesel Plant EPCC  that will be used by the contractor 
Project 
79  Construction  20220606 BEN ‐ Project     10.13 CONSTRUCTION UTILITIES  Water and Electricity resource  Bidders understand KPC will provide electricity source  Similar to the Owner's response above, the Owner 
Specification for  in laydown area (magazine, Adjacent to Pond and  confirms that the electricity and water demands in the 
Biodiesel Plant EPCC  Adjacent to Road 1) but charge to contractor. Kindly  laydown area are the burden and responsibility of the 
Project  owner to confirm  Contractor, including the provision of portable 
generators. 

80  Construction  20220606 BEN ‐ Project     10.13 CONSTRUCTION UTILITIES  Water and Electricity resource  Bidders understand KPC will provide water and  Confirm, with the Owner understanding that the use 


Specification for  electricity for precommisioning (flushing & hydrotest)  of electricity and water for the relatively large pre‐
Biodiesel Plant EPCC  activity. Kindly owner confirm  commissioning phase, the Contractor can utilize and 
Project  has installed the raw water pipe and pump from Void J 
to the Project Site and has installed the electricity 
tapping from the KPC grid. 

81  Construction  20220606 BEN ‐ ITB for  10     Temporary Facility  Bidders understand For temporary facility of owner  The total manpower involving Owner and Consultant 


Biodiesel Plant EPCC  and consultant will be provided by contranctor. Please  will be around 35 people. The Owner and Consultant 
Project  inform for Total manpower, room design  have no specific requirement for the room design 
requirement, furniture requirement, and etc.  needs as well as the furniture, etc. 
82  Construction  Aanwijzing Meeting  "21. Mohon info terkait Sertifikat Laik SLO boilers, fire fighting Bidders propose for SLO Listrik by Owner. And Yes confirmed, the Owner will organize the SLO Listrik 
Operasi (SLO) termasuk ke dalam equipment and pressure Bidders will provide all document supporting related by himself with the supporting of the Contractor for 
scope siapa?" vessels are the responsibility for SLO listrik process. Kindly Owner to confirm
providing related documents. 
of Owner. For electricity/power
SLO, Owner will first check the
power source. It is possible
that the electric SLO will be
included in the EPC scope, for
the time being, please include
the electricity SLO in the EPC
offer.
83  Project Control  20220606 BEN ‐ ITB for  6.2.1.  Man‐hours and rates shall valid for the  Unit Rate for Changes  Owner is requested to provide any form for Unit Rate  The Owner requested the Bidders to provide and 
Biodiesel Plant EPCC  Prices  duration of the Contract, both for  for Changes to be filled by Bidder.  decide for themselves the type of Changes which will 
Project.pdf  local and foreign parts (if any), which  include among others are manpower rates and 
will be applied for additions to or  construction equipment tariffs. 
deletions from the scope of work or 
Changes with respect to the project 
management, design, procurement, 
and other home office services which 
from time to time may be agreed. 
Rates should include all charges such 
as payroll costs, overheads and 
burdens, profits, etc. 
The categories of chargeable 
personnel will include standard fees 
for telecommunications, document 
printing, CAD (computer aided 
design), computer use and the like to 
be indicated along with the 
procedures for estimating the costs 
and impact on the project 
implementation schedules due to the 
Changes in the scope of work, as 
appropriate. 
Man‐months and rates shall valid for 
the duration of the Contract both for 
local and foreign (if any) parts, which 
will be applied for the Changes in 
scope of work or modification to the 
Agreement with respect to 
construction management, start‐up 
and other field services. Rates are to 
be all inclusive as for Home Office 
Rates. 
84  SHES        General Requirement  Health :  ‐ Bidder request for MCU requirement ( matrix  ‐ Owner will provide the MCU requirement once 
checking) and is there    any specific medical facility  obtained from the KPC authority. 
recommend by Owner?  ‐ The Owner does not provide an age limit for 
‐ Is there any age limitation for personnel who are  personnel as long as they pass the MCU examination, 
allowed to mobilize to site?  however the Owner recommends that they do not 
exceed 55 years of age. 
85  SHES        General Requirement  Tools and Equipment :  ‐ AS survey report, all tools and equipment shall be  ‐ Yes, confirmed, the inspection/commissioning of 
commissioned by KPC. Bidder's understanding this  Contractor's construction heavy equipment, vehicles, 
commissiong of Tools and Equipment is for Heavy  and power tools may held in Contractor's place by 
Equipment, vehicles and Power Tools and bidder can  inviting the representative of Owner and/or KPC as 
invite Owner or KPC representatif to conduct  per explanation and procedure given by KPC on June 
commissiong/inspection in bidder place. Please  24, 2022. 
confirm for bidder understanding and share for the  ‐Similar as above, the explanation has been given by 
detail procedure?  KPC on June 24, 2022. Basically all heavy 
‐ Considering site location, is there any particular  equipment/vehicles shall passed the 
requirement for Heavy Equipment and Vehicle ( Age,  inspection/assessment by KPC authority and no 
Condition, type of wheel drives) as well as for  restriction for the age or other particular requirement, 
electrical standard?  but the KPC recommends the Bidders will propose 
‐ Bidder could not find specific requirement for  their heavy equipment/vehicles for age of less than 10 
scaffolding material as well as temporary access and  years old. 
hard barricading procedure. Could owner share the  ‐ as per KPC HSES explanation on 24 Jun 2022, 
requirement?  scaffolding requirement, among others, is 3.2 mm 
‐ Considering the site location is within the KPC  thickness min. Owner will extend further information 
premisses which mining based. What shall be used as  once received from KPC. 
referenced for Equipment certification include for  ‐ as per KPC HSES explanation on 24 Jun 2022, heavy 
operator certification (Kemenaker, Migas or  equipment operator required to have BNSP certificate 
Tambang).?  (SIO). While for the equipment shall have Migas or 
Does Bidder SHE/HSE personil is subject for owner  Kemnaker certification and passed KPC 
approval?  commissioning.  
 If so, could owner share the qualification?  ‐ Qualification requires at least HSE personnel who 
possess a certificate of K3 Konstruksi and POP 
(Pengawas Operasional Pratama) or POM (Pengawas 
Operasional Madya) for managerial level. 
86  SHES        General Requirement  Induction and training  ‐ Bidder understand that all personel shall recieved  ‐ Majorities of training are free or requires only 
competence  KPC Induction and training competence, is there any  minimum cost for material/paper. 
particular requirement for induction and training?  ‐ In accordance with their needs, the Contractor is 
Include for the training investement/cost shall be  obliged to provide workers who have a TKBT (Tenaga 
covered by bidder for each training subject?  Kerja Bangunan Tinggi) certificate as well as confined 
‐ Relate to above, bidder understanding that TKBT 1  space, as per KPC explanation on June 24, 2022. 
and 2 is not Mandatory as well as Petugas Kerja ruang 
terbatas. Please owner to confirmed bidder 
understanding? 
87  SHES        General Requirement  Working Procedure  ‐ Bidder understanding that all Permit to work will be  ‐ Basically a permit to work will be approved and 
issued by Owner/KPC, is there any particular  issued by the Owner, except for works that involve of 
requirement how to propose it and what requirement  working at height of higher than 20 m, working at 
shall be prepared for permit to work submission?  roof, hot work, confined space, and vicinity permits, 
  then this type of work shall be approved first by KPC 
‐ as Survey information, the capacity of crane  authority (as per explanation on June 24, 2022). 
utilization in Jetty is shall be no more than 80%, how  ‐ Considering the work safety factor, this provision will 
about other area, is there any limitation for maximum  also apply for other areas. 
load rating capacity for crane utilization?  ‐ This environmental requirement will refer to 
  government regulations, including applicable local 
Environment :  government regulations (please refer to Owner's 
‐ can bidder recieve Environmental requirement as  response to previous TQ list). 
reference for project excecution?  ‐ KPC has expressed that BEN and its contractor may 
  use KPC incinerator to handle B3 where suitable. 
‐ Bidder understanding that for hazardoua waste,  Charges will apply and will be informed further. For 
Bidder shall use approved third party, is there any  domestic waste, the disposal location will be provided 
recommended third party which already verified by  by the KPC authority (see Owner's response to the 
owner? And how about domestic waste, can bidder  previous TQ list).  
used owner facility? 
88  Business        Permit  IMB for Permanent Facilities  There is no specific item in ITB documents related to  The IMB of Permanent Plant will be the Owner's scope 
provision of IMB Permanent Plant, Contractor assume  with the support of the Contractor for providing the 
that the Permit arrangement – included but not  related documents required. 
limited to its cost ‐will be Owner’s scope 
89  Business        PART 2 ‐ Project Specification  8.8.1 Accommodation  1. Contractor assume the meaning of "Home Office"  1. Yes confirmed. 
8.8 Miscellaneous  "Contractor shall provide  for Jakarta based office, kindly Owner to confirm.  2. Please refer to Owner's response at No. 81 above. 
accommodation in its Home    3. PC/laptop arrangement does not include in 
Offices for Owner and its  2. Kindly Owner to also inform following items:  Contractor's scope.  
advisors' personnel, together  a. Total manpower of Owner's and its Advisors 
with appropriate steno‐clerical  personnel 
support, and normal  b. Esimation period of duration 
office supplies and services  c. Room design requirement 
within the Lump Sum Fixed  d. Furniture requirement 
Price. Contractors should   
provide a free of charge  3. Please Owner to inform who will arrange PC/laptop 
services to Owner for  for Owner's and Advisor's personnel. 
distribution of documentation 
as 
required for the Project. At 
least the following shall be 
provided at each home Office 
location: 
‐ Adequately sized offices 
located for convenient liaison 
with Contractor's 
project staff, for reasonable 
numbers and durations 
required by Owner to 
administer the Project. 
‐ access to a suitable 
conference room. 
‐ 1 secretary (stenographer) 
who shall be fluent in English 
for each location, for 
the periods indicated in (a) 
above. 
‐ sufficient 4‐drawer filing 
cabinets, drawing racks, 
general office stationery 
and equipment. 
‐ at least 2 direct line 
telephones, and necessary 
internal telephones with 
directories. 
‐ access to fax machines, 
internet and photocopier 
‐ parking spaces at each 
location. 
‐ hotel and travel booking 
services. 
‐ assistance for 
visa/immigration permits." 
90  PROCUREMENT   SITE SURVEY        Utilization Jetty of Tanjung  1. Bidder would like ask Owner to inform congestion  1. The basic response please refer to Point 72 above. 
Bara  vessel/vessel schedule for berthing at Jetty, how long  2. Contractor may conduct and arrange equipment 
the available time will be given to Contractor for  unloading on its own with prior approval from KPC 
berthing at Jetty ? And, Is there regular date that the 
jetty is not allowed to be utilized such as every 
Monday, etc 
2. For utilizing Jetty, Bidder would like to ask Owner to 
inform whether there is mandatory to use registered 
stevedore company in that location ? If so, Bidder 
would like to have information stevedore company 
from Owner. 

Anda mungkin juga menyukai