KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT

DIREKTORAT JENDERAL BINA MARGA


BALAI BESAR PELAKSANAAN JALAN NASIONAL JAWA TIMUR - BALI
SATKER PELAKSANAN JALAN NASIONAL WILAYAH II PROVINSI JAWA TIMUR
PEJABAT PEMBUAT KOMITMEN 2.6 PROVINSI JAWA TIMUR
KONSULTAN SUPERVISI PENYEDIA JASA

PT Virama Karya (Persero) PP - GORIP, JV

Berat Isi Beton Segar ( UW )


Tanggal : 27-08-2.22
Lokasi : Lab Baching Plant
Mutu Beton : Fc. 10 Slump : 12.0 cm
Nomor Tes
No Uraian Satuan Keterangan
1 2

1 Berat Material + Mold gr 12.44 12.52


2 Berat Mold gr 0 0 Trial Mix Plant
3 Berat Material gr 12.44 12.52
4 Volume Mold cm³ 5.30 5.30
5 Berat Isi gr/cm³ 2.347 2.362
Rata - rata : gr/cm³ 2.355

Mutu Beton : Fc. 20 Slump : 11.0 cm


Nomor Tes
No Uraian Satuan Keterangan
1 2

1 Berat Material + Mold gr 12.45 12.41


2 Berat Mold gr 0 0 Trial Mix Plant
3 Berat Material gr 12.45 12.41
4 Volume Mold cm³ 5.30 5.30
5 Berat Isi gr/cm³ 2.349 2.342
Rata - rata : gr/cm³ 2.345

Mutu Beton : Fc. 30 Slump : 10.0 cm


Nomor Tes
No Uraian Satuan Keterangan
1 2

1 Berat Material + Mold gr 12.52 12.49


2 Berat Mold gr 0 0 Trial Mix Plant
3 Berat Material gr 12.52 12.49
4 Volume Mold cm³ 5.30 5.30
5 Berat Isi gr/cm³ 2.362 2.357
Rata - rata : gr/cm³ 2.359
Pemberi Tugas : Konsultan : Kontraktor :
PPK. 2.6 Provinsi Jawa Timur Pt. Virama Karya Pt. PP - GORIP. JV
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL JAWA TIMUR - BALI
SATKER PELAKSANAN JALAN NASIONAL WILAYAH II PROVINSI JAWA TIMUR
PEJABAT PEMBUAT KOMITMEN 2.6 PROVINSI JAWA TIMUR
KONSULTAN SUPERVISI PENYEDIA JASA

PT Virama Karya (Persero) PP - GORIP, JV

Berat Isi Beton Segar ( UW )


Tanggal : 27-08-2.22
Lokasi : Lab Baching Plant
Mutu Beton : Fc. 30/16 Slump : 17.1 cm
Nomor Tes
No Uraian Satuan Keterangan
1 2

1 Berat Material + Mold gr 12.38 12.34


2 Berat Mold gr 0 0 Trial Mix Plant
3 Berat Material gr 12.38 12.34
4 Volume Mold cm³ 5.30 5.30
5 Berat Isi gr/cm³ 2.336 2.328
Rata - rata : gr/cm³ 2.332

Mutu Beton : Fc. 20 Slump :


Nomor Tes
No Uraian Satuan Keterangan
1 2

1 Berat Material + Mold gr 12.45 12.41


2 Berat Mold gr 0 0
3 Berat Material gr 12.45 12.41
4 Volume Mold cm³ 5.30 5.30
5 Berat Isi gr/cm³ 2.349 2.342
Rata - rata : gr/cm³ 2.345

Mutu Beton : Fc. 30 Slump :


Nomor Tes
No Uraian Satuan Keterangan
1 2

1 Berat Material + Mold gr 12.52 12.49


2 Berat Mold gr 0 0
3 Berat Material gr 12.52 12.49
4 Volume Mold cm³ 5.30 5.30
5 Berat Isi gr/cm³ 2.362 2.357
Rata - rata : gr/cm³ 2.359
Pemberi Tugas : Konsultan : Kontraktor :
PPK. 2.6 Provinsi Jawa Timur Pt. Virama Karya Pt. PP - GORIP. JV
Berat Isi Material ( UW )

Tanggal : 26-08-2022
Lokasi : Stock Pile Material Plant

Jenis Material : Batu Pecah 2/3


Nomor Tes
No Uraian Satuan 1 2 Keterangan
Lepas Padat
1 Berat Material + Mold gr 6.87 7.91
2 Berat Mold gr 0 0
3 Berat Material gr 6.87 7.91
4 Volume Mold cm³ 5.30 5.30
5 Berat Isi gr/cm³ 1.296 1.492
Rata - rata : gr/cm³ 1.394

Jenis Material : Batu Pecah 1/2


Nomor Tes
No Uraian Satuan 1 2 Keterangan
Lepas Padat
1 Berat Material + Mold gr 6.48 7.09
2 Berat Mold gr 0 0
3 Berat Material gr 6.48 7.09
4 Volume Mold cm³ 5.30 5.30
5 Berat Isi gr/cm³ 1.223 1.338
Rata - rata : gr/cm³ 1.280

Jenis Material : Pasir


Nomor Tes
No Uraian Satuan 1 2 Keterangan
Lepas Padat
1 Berat Material + Mold gr 8.58 8.9
2 Berat Mold gr 0 0
3 Berat Material gr 8.58 8.9
4 Volume Mold cm³ 5.30 5.30
5 Berat Isi gr/cm³ 1.619 1.679
Rata - rata : gr/cm³ 1.649

Ka. Laboratorium
Plant Ngunut