(Schmertmann, 1978)
Sudut geser
SPT, N60 Sudut geser
Kepadatan CPT dalam Peck,
Tipe Pasir (Terzaghi and dalam
Relatif, Dr (%) (kN/m2) Hanson, and
Peck 1967) Meyerhof
Torburn 1974
Lepas 20-40 4-10 0-5000 30-35 29-30
(Bowles, 1988)
Kepadatan
Tipe Pasir SPT N'70 ɸ gwet
Relatif, Dr (%)
medium medium 14-18
Lepas 15-35
4-7 30-32 kN/m3
2 Parameter Desain
Pompa
Skid (Beton) a
qc 12.00 kg/
Footing (Beton) h
c= 0.00 t/m2
B Tanah f= 30 o
gm = 1.80 t/m3
b Geometri Tapak
a= 0.100 m
Tapak : Bf = 2.300 m
Lf = 4.300 m
h= 0.200 m
d= 0.1275 m
Perhitungan Beban
Beban Pondasi (D)
Berat Footing 7.1208 ton
Berat Pedestal 0 ton
Berat Total 7.1208 ton
Beban Gempa
Ketinggian di atas permukaan tanah hn = 1
Waktu getar alami fundamental, Ct.(hn)3/4 T = 0.0488
Faktor respons gempa C1 = 0.3
Faktor daktilitas m = 4
Faktor reduksi gempa R = 6.4
Faktor Keutamaan I = 2
Berat struktur Wt = 19.12
Beban Gempa EQ = 1.79
Momen akibat beban gempa, EQ*(hf+he/ M-EQ = 0.90
Rekap Beban
Simbol Deskripsi Aksial Lateral Momen
ton ton tonm
D Beban Mati 7.12 0 0
E(E) Beban Peralatan Saat Instalasi/Kosong 6.00 0 0
E(O) Beban Peralatan Saat Operasi 18.00 3.00 1.50
E(T) Beban Peralatan Saat Percobaan 18.00 0 0
W Beban Angin 0 0 0
EQ Beban Gempa 0 1.79 0.90
P(E) Beban Pipa Saat Kosong 0 0 0
P(O) Beban Pipa Saat Operasi 0 0 0
P(T) Beban Pipa Saat Percobaan 0 0 0
L Beban Hidup 0 0 0
TF Beban Termal 0 0 0
TB Tube Bundle 0 0 0
Dimensi tapak :
Lebar Tapak, B = 2.30 m
Panjang Tapak, L = 4.30 m
Kedalaman dasar tapak, Df = 0.30 m
b= 0o
Hasil perhitungan :
qult = 48.56 t/m2
qall = 16.19 t/m2
P
B min = 0.36 m
q all L f
gunakan B = 2.30 m
- Cek kedalaman minimum tulangan tarik (d) berdasarkan two-way action shear
B= 2.3 m
L= 4.3 m
( 4 v c q )d 2 ( 2 v c q )( L p b p )d ( BL b p L p )q 0
f c'
vc = 107.89 t/m2
3
(4v c q) = 436.02
( 2 v c q )( L p b p ) = 0.00
( BL b p L p )q = 44.17
d= 0.32 m
digunakan d = 0.9275 m
- Penulangan lentur
s L' = (Bf-bp)/2 = 1.150 m
s Mu = 0.5qL'2 = 2.953 ton.m
s Material Properties
fy = 400.00 M Pa
fc' = 29.10 M Pa
fy
1.70fc ' b
= 8.08571
d= 0.92750
As = 0.94 cm2/m
Mu
f y
= 0.00009
Cek Asmin
- Asmin1 = 0.0018*b*d Asmin1 = 16.70 cm2/m
- Asmin2 = 1.33*As Asmin2 = 1.25 cm2/m
s 200
digunakan tula 13 As = 14.18 cm2/m
digunakan tulangan 13 - 200
F Cek terhadap two-way action (punching) shear
2 fc' fc'
Vc 1 bo d bo d
c 6 3
bc = Lp/bp bc = 1.87
bo = 2x[(bp+d)+(Lp+d)] bo = 3.71 m
2 fc '
Vc 1 bo d = 556.87 ton
c 6
fc ' = 371.25 ton
Vc bo d
3