PEDOMAN PEMBANGUNAN
& P E N I N G K ATA N
FUNGSIBANGUNANPUSKESMAS
KEMENTERIAN KESEHAT AN REPUBL IK
INDONESIA
PE GSI il r U N PLJ5 H ,S

KAi A F ENGAN ,.a.JR

Ir ta, BS!ffllgBI 'bulw p,!!IXlmllll


mcmb.rA.1 kiiba1 - d- in- !i';Wian
di
September 2018
MATERIDISEMINASI/SOSIALISASI

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN

I. PEDOMAN PEMBANGUNAN & PENINGKATAN FUNGSI BANGUNAN PUSKESMAS ( BUKU )

II. RENCANA KERJA DAN SYARAT TEKNIS BANGUNAN PUSKESMAS ( CD )

III. GAMBAR TEKNIS BANGUNAN PUSKESMAS ( CD )

IV. PENJELASAN TEKNIS PELAKSANAAN PENYELENGGARAAN PEMBANGUNAN PUSKESMAS

V. DESK DESAIN
DAFTARIS

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
KATA
PENGANTAR
DAFTAR ISI

I. PENDAHULUAN LATAR
BELAKANG
DEFINISI
PUSKESMAS
JENIS BANGUNAN PUSKESMAS
124 TITIK LOKASI PUSKESMAS PERBATASAN

II. ARSITEKTUR ZONASI &


SIRKULASI
ALUR KEGIATAN
PROGRAM
RUANG
MODEL PROTOTIPE
LAYOUT 1 FASAD
BANGUNAN 1
MODEL PROTOTIPE
LAYOUT 2 FASAD
BANGUNAN 2
MODEL PROTOTIPE LAYOUT 3
FASAD BANGUNAN 3
MODEL PROTOTIPE LAYOUT 4
FASAD BANGUNAN 4
MODEL PROTOTIPE LAYOUT 5
FASAD BANGUNAN 5
DAFTARIS

PENYESUAIAN BANGUNAN EKSISTING DENGAN


PROTOTIPE PERSYARATAN RUANG
SPESIFIKASI MATERIAL FINISHING
SIGNAGE (PENANDA PUSKESMAS)
DAFTARIS

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
III. STRUKTUR KONSTRUKSI BANGUNAN
STRUKTUR PONDASI BANGUNAN PUSKESMAS
SATU LANTAI STRUKTUR PONDASI BANGUNAN
PUSKESMAS DUA LANTAI STRUKTUR ATAS
BANGUNAN PUSKESMAS SATU LANTAI
STRUKTUR ATAS BANGUNAN PUSKESMAS DUA
LANTAI KONSTRUKSI ATAP BANGUNAN
PETA GEMPA INDONESIA
STRUKTUR BANGUNAN TAHAN
GEMPA METODA PENGERJA
PONDASI
BAHAN MATERIAL UNTUK
PONDASI DETAIL TULANGAN
BALOK PONDASI
DETAIL SAMBUNGAN PEMBESIAN
TAHAN GEMPA METODA PEMBUATAN
CAMPURAN BETON STANDARD MINIMAL
PEKERJAAN STRUKTUR

IV. PRASARANA SISTEM PENGHAWAAN


SISTEM SANITASI
IPAL
BIOPORI
PLUMBING
SISTEM KELISTRIKAN
SISTEM PENCAHAYAAN
PANEL SURYA
SISTEM KOMUNIKASI
SISTEM GAS MEDIK
DAFTARIS

SISTEM PROTEKSI PETIR


GROUNDING
DAFTARIS

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
V. LAMPIRAN
GAMBAR DED
ARSITEKTUR
GAMBAR DED
STRUKTUR
GAMBAR DED SARANA PRASARANA

V. REFERENSI BUKU
WEBSITE
PENDAHULUA I-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
LATARBELAKA
NG
Puskesmas sebagai salah satu jenis fasilitas pelayanan kesehatan tingkat pertama, memiliki peranan penting dalam sistem kesehatan nasional
khususnya subsistem upaya kesehatan. Dalam rangka memenuhi ketersediaan Puskesmas yang sesuai dengan Permenkes nomor 75 Tahun 2014
tentang Puskesmas untuk meningkatkan pelayanan kesehatan kepada masyarakat di daerah perbatasan, diperlukan adanya upaya peningkatan
fasilitas fisik Puskesmas baik melalui pembangunan maupun rehabilitasi dan renovasi bangunan Puskesmas. Bangunan Puskesmas dan
prasarana penunjang lainnya dibangun oleh Kementerian Kesehatan sebagai fasilitas pelayanan kesehatan kepada masyarakat yang ditempatkan
di daerah perbatasan.
Sebagaimana diketahui bahwa Puskesmas merupakan suatu institusi pelayanan kesehatan publik yang penuh dengan berbagai disiplin ilmu,
padat modal, padat karya, dan padat teknologi. Namun demikian untuk membangun suatu prasarana Puskesmas yang memenuhi Permenkes
Nomor 75 Tahun 2014 diharapkan tetap dapat dilaksanakan dalam waktu yang seoptimal mungkin mengingat keberadaannya yang sangat
diperlukan oleh masyarakat. Selain itu, bangunan Puskesmas juga harus memenuhi beberapa kriteria, antara lain mempunyai ciri khas yang
dapat diseragamkan, sehingga menjadi penanda keberadaan bangunan Puskesmas ; selalu memasukkan unsur langgam daerah sebagai jati diri
keberadaannya ; serta mampu mengakomodasi kebutuhan responsif gender dan disabilitas. Guna mempercepat ketersediaan fasilitas Puskesmas
di daerah perbatasan yang sesuai dengan ketentuan ketentuan tersebut di atas, maka diperlukan ketersediaan desain dalam bentuk prototipe ;
monitoring dan evaluasi yang efektif dan efisien dari pemrakarsa, konsultan manajemen konstruksi, konsultan perencana, konsultan pengawas
di masing masing daerah ; serta kemampuan kontraktor yang memahami bangunan fasilitas pelayanan kesehatan.
DEFINISIPUSKESMAS
Pusat Kesehatan Masyarakat atau Puskesmas adalah fasilitas pelayanan kesehatan yang menyelenggarakan upaya kesehatan masyarakat dan
upaya kesehatan perseorangan tingkat pertama dengan lebih mengutamakan upaya promotif dan preventif untuk mencapai derajat kesehatan
masyarakat setinggi tingginya di wilayah kerjanya.
JENISBANGUNANPUSKESMAS
Pembangunan bangunan Puskesmas harus menyesuaikan dengan kondisi perbatasan masing masing daerah melalui 5 (lima) pilihan jenis
Desain Bangunan Puskesmas, yaitu bangunan Puskesmas 2 Lantai dengan Rawat Inap 10 Tempat Tidur (TT), bangunan Puskesmas 2 Lantai
dengan Rawat Inap 6 Tempat Tidur (TT), dan bangunan Puskesmas Tidak Bertingkat dengan Rawat Inap 4 Tempat Tidur (TT), bangunan
Puskesmas Tidak Bertingkat Non Rawat Inap.
JENISBANGUNANPUSKESMAS I-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN

JENIS BANGUNAN PUSKESMAS

I. PUSKESMAS RAWAT INAP

1. PUSKESMAS RAWAT INAP - 10 TT/ T980


2. PUSKESMAS RAWAT INAP - 6 TT/ T880
3. PUSKESMAS RAWAT INAP - 4 TT/ T560

II. PUSKESMAS NON RAWAT INAP

1. PUSKESMAS NON RAWAT INAP T600


2. PUSKESMAS NON RAWAT INAP T460
ARSITEKTU II-1

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN

ARSITEKTUR
ARSITEKTU II-2

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN

• ZONASI & SIRKULASI


• ALUR KEGIATAN
• PROGRAM RUANG
• MODEL PROTOTIPE LAYOUT 1
• FASAD BANGUNAN 1
• MODEL PROTOTIPE LAYOUT 2
• FASAD BANGUNAN 2
• MODEL PROTOTIPE LAYOUT 3
• FASAD BANGUNAN 3
• MODEL PROTOTIPE LAYOUT 4
• FASAD BANGUNAN 4
• MODEL PROTOTIPE LAYOUT 5
• FASAD BANGUNAN 5
• PENYESUAIAN BANGUNAN EKSISTING DENGAN PROTOTIPE
• PERSYARATAN RUANG
• SPESIFIKASI MATERIAL FINISHING
• SIGNAGE (PENANDA PUSKESMAS)
ZONASI&SIRKULAS II-3

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
SITEPLANMODEL
1

PARKIR MOTOR
MASUK

BANGUNAN
UTILITAS

BANGUNAN PARKIR
PUSKESMA S MOBIL
DROP OFF
ALTERNATI
F
BANGUNAN
UTILITAS

KETERANGAN :

Umum
RUMAH Lapangan KELUAR
Servis DINAS Olahraga
RUMAH
DINAS
ZONASI&SIRKULAS II-4

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
SITEPLANMODEL
2

RUMAH RUMAH
DINAS DINAS
BANGUNAN
UTILITAS

BANGUNAN
PUSKESMAS
DROP OFF

Lapangan ALTERNATI
PARKIR MOTOR
Olahraga F
KETERANGAN : BANGUNA
PARKIR
N UTILITAS
MOBIL
Umum

Servis

MASUK KELUAR
ZONASIDANSIRKULASI II-5

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
SITEPLANMODEL3

KETERANGAN:
1. BANGUNAN PUSKESMAS
2. RUMAH DINAS
3. PARKIR MOBIL
4. PARKIR MOTOR
5. RUANG UTILITAS
6. AREA IPAL
7. DROP OFF
8. MASUK
9. KELUAR
10. PARKIR AMBULAN
ALURKEGIATA II-6

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
PUSKESMASRAWATIN
AP

GAWAT DARURAT/
R. PENDAFTARAN TINDAKAN
& REKAM MEDIK

R. PERSALINAN

R A WAT
JALAN
RUANG RAWAT INAP
TUNGGU
KLINIK PENGOBATAN UMUM

KLINIK KESEHATAN IBU & KB

KLINIK ANAK & IMUNISASI APOTEK/FARMASI

PULANG
KLINIK GIGI & MULUT LABORATORIUM

KLINIK LAINNYA/R. DOTS,


KONSELING,DIETETIK,DLL
ALURKEGIATA II-7

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
PUSKESMASNONRAWATIN
AP

GAWAT DARURAT/
R. PENDAFTARAN TINDAKAN
& REKAM MEDIK

R. PERSALINAN

R A WAT
JALAN
RUANG R. PERAWATAN
TUNGGU PASKA PERSALINAN
KLINIK PENGOBATAN UMUM

KLINIK KESEHATAN IBU & KB

KLINIK ANAK & IMUNISASI APOTEK/FARMASI

PULANG
KLINIK GIGI & MULUT LABORATORIUM

KLINIK LAINNYA/R. DOTS,


KONSELING,DIETETIK,DLL
PROGRAMRUAN II-8

PEDOMAN PEMBANGUNAN & PENINGKATAN FUNGSI&BANGUNAN PUSKESMASBANGUNAN PUSKESMAS


B U K U P A N D U A N P EPEDOMAN
M B A N G U PEMBANGUNAN
N A N & P E N I N G K PENINGKATAN
A T A N F U N G SFUNGSI
IPUSKESMASPERBATASAN
PERBATASAN
LUAS
STANDAR
NO460 NAMA RAWAT RAWAT RAWAT NON RAWAT NON RAWAT SATUAN
RUANG SATUAN INAP 2 LT INAP 2 LT INAP 1 LT INAP INAP 1LT
980 860 560 600 460 m²
1 Ruang Kantor :
a. Ruang Administrasi Kantor 18 18 15 12 12 m²
b. Ruang Kepala Puskesmas 15 15 9 9 9 m²
c. Ruang Rapat 24 24 10.2 12 9 m²
2 Ruang Pendaftaran & Ruang Tunggu 4x4 m² 16 16 63 16 50 m²
3 Ruang Rekam Medik 6 x 12 m² 72 72 48 10 m²
4 Ruang Pengobatan Umum 3x4 m² 12 12 13.6 12 13.6 m²
5 Ruang Pelayanan Tindakan/Kegawatdaruratan 5x5 m² 25 25 26 25 26 m²
6 Ruang Kesehatan Anak & Imunisasi 3x4 m² 12 12 12 m²
7 Ruang Kesehatan Ibu & KB 3x4 m² 12 12 12 m²
8 Ruang Kesehatan Gigi & Mulut 3.5 x 3.5 m² 24.5 24.5 13.6 24.5 13.6 m²
9 Ruang Laktasi/ASI 3x4 m² 12 12 12 m²
10 Ruang Promosi Kesehatan (Konsultasi/Konseling) 3x4 m² 54 54 13.6 12 13.6 m²
11 Ruang Farmasi 3x4 m² 12 12 4.8 12 4.8 m²
- distribusi obat
- gudang obat 13.6 13.6
12 Ruang Persalinan 27 27 17 15 17 m²
13 Ruang Pasca Persalinan min. 7.2 m² 27 27 17 27 m²
14 Ruang Rawat Inap
- ruang rawat inap pasien pria min. 7.2 m² 42 30 22.5 0 m²
- ruang rawat inap pasien wanita min. 7.2 m² 42 30 22.5 0 m²
- ruang rawat inap pasien anak m²
15 Ruang Dokter/Perawat 12 12 12 m²
16 Ruang Laboratorium 3x7 m² 21 21 6.6 21 6.6 m²
- ruang administrasi
- ruang pengambilan sampel darah 6 6 m²
PROGRAMRUAN II-9

PEDOMAN PEMBANGUNAN & PENINGKATAN FUNGSI&BANGUNAN PUSKESMASBANGUNAN PUSKESMAS


B U K U P A N D U A N P EPEDOMAN
M B A N G U PEMBANGUNAN
N A N & P E N I N G K PENINGKATAN
A T A N F U N G SFUNGSI
IPUSKESMASPERBATASAN
PERBATASAN
LUAS
STANDAR RAWAT RAWAT RAWAT NON RAWAT NON RAWAT SATUAN
NO NAMA
RUANG SATUAN INAP 2 LT INAP 2 LT INAP 1 LT INAP INAP 1 LT
980 860 560 560 460 m²
17 Ruang Sterilisasi 3x4 m² 12 12 12 m²
- Ruang Spoelhoek 8 8
- Ruang Steril 4.8 4.8
18 Pos Perawat (Nurse Station) 3x4 m² 12 12 12 m²
- Penyimpanan Obat
- Alkes
- Linen
19 Ruang Cuci 6 6 11.9 6 11.9 m²
20 Gudang Linen 6 6 4.4 6 4.4 m²
21 Dapur/Pantry 3x3 m² 9 9 12.75 9 11.9 m²
22 Ruang Toilet
- Ruang Toilet Disabilitas 2 x 2.25 m² 9 9 3,1 4.5 m²
- Ruang Toilet Pasien Wanita 2 x 2.25 m² 18 18 2,7 9 m²
- Ruang Toilet Pasien Pria 2 x 2.25 m² 13.5 13.5 2,7 9 m²
- Ruang Toilet 1 2 x 2.25 m² 4.5 4.5 4 4.5 m²
- Ruang Toilet 2 2 x 2.25 m² 4.5 4.5 4 4.5 m²
23 Janitor min. 3-8 m² 8 8 1.87 8 m²
24 Gudang 36 36 10.6 18 12.5 m²

Luas Keseluruhan 618 594 400 396 328 m²


Sirkulasi 40% 362 266 160 204 132 m²
Total Luas Keseluruhan 980 860 560 600 460 m²

1 Parkir Ambulan 12.5 m²/mobil 62.5 62.5 12.5 25 12.5 m²


2 Bangunan Utilitas 32 32 m²
3 Rumah Dinas 54/90 54 m²/unit 54 54 45 54 45 m²
MODELFASAD 1 II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
MODELFASAD 2 II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
MODELPROTOTYPELAYOUT1 II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMAS2LANTAIRAWATINAP10T T

• Luas Tanah : 3.150 m2


• Luas Lantai Bangunan : 980 m2
• Jumlah Lantai : 2 Lantai
MODELPROTOTYPELAYOUT1 II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMAS2LANTAIRAWATINAP10T T

• Luas Tanah : 3.150 m2


• Luas Lantai Bangunan : 980 m2
• Jumlah Lantai : 2 Lantai
FASADBANGUNAN1 II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMAS2LANTAIRAWATINAP10TT
FASADBANGUNAN1 II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMAS2LANTAIRAWATINAP10TT
FASADBANGUNAN1 II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMAS2LANTAIRAWATINAP10TT
MODELPROTOTYPELAYOUT2 II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMAS2LANTAIRAWATINAP6T T

• Luas Tanah : 3.150 m2


• Luas Lantai Bangunan : 860 m2
• Jumlah Lantai : 2 Lantai
MODELPROTOTYPELAYOUT2 II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMAS2LANTAIRAWATINAP6T T

• Luas Tanah : 3.150 m2


• Luas Lantai Bangunan : 860 m2
• Jumlah Lantai : 2 Lantai
FASADBANGUNAN2 II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMAS2LANTAIRAWATINAP6TT
FASADBANGUNAN2 II-

PEDOMAN
PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &
K&PENINGKATAN
PENINGKATAN
APENINGKATAN FUNGSI
T A N F U N G SFUNGSI
FUNGSI
IP BANGUNAN
U S K BANGUNAN PUSKESMAS
M A S P E RPUSKESMAS
E SBANGUNAN B PUSKESMAS
A TASAN
PERBATASAN
BANGUNANPUSKESMAS2LANTAIRAWATINAP6TT
FASADBANGUNAN2 II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMAS2LANTAIRAWATINAP6TT
MODELPROTOTYPELAYOUT3 II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASTIDAKBERTINGKATNONRAWATINAP

• Luas Tanah : 3.150 m2


• Luas Lantai Bangunan : 600 m2
• Jumlah Lantai : 1 Lantai
MODELPROTOTYPELAYOUT3 II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASTIDAKBERTINGKATNONRAWATINAP

• Luas Tanah : 3.150 m2


• Luas Lantai Bangunan : 600 m2
• Jumlah Lantai : 1 Lantai

ATAP
FASADBANGUNAN3 II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
FASADBANGUNA II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASTIDAKBERTINGKATNONRAWATINAP
FASADBANGUNAN3 II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASTIDAKBERTINGKATNONRAWATINAP
MODELPROTOTYPELAYOUT4 II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASTIDAKBERTINGKATRAWATINAP4TT

• Luas Tanah : 1.980 m2


• Luas Lantai Bangunan : 560 m2
• Jumlah Lantai : 1 Lantai
FASADBANGUNAN4 II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASTIDAKBERTINGKATDENGANRAWATINAP

TAMPAKDEPAN

TAMPAKSAMPINGKIRI
FASADBANGUNAN4 II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASTIDAKBERTINGKATDENGANRAWATINAP

TAMPAKBELAKANG

TAMPAKSAMPINGKANAN
FASADBANGUNAN4 II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASTIDAKBERTINGKATDENGANRAWATINAP

TAMPAKPOTONGAN1-1

TAMPAKPOTONGAN2-2
MODELPROTOTYPELAYOUT5 II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASTIDAKBERTINGKATNONRAWATINAP

• Luas Tanah : 1.980 m2


• Luas Lantai Bangunan : 460 m2
• Jumlah Lantai : 1 Lantai
FASADBANGUNAN5 II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASTIDAKBERTINGKATDENGANRAWATINAP

TAMPAKDEPAN

TAMPAKSAMPINGKIRI
FASADBANGUNAN5 II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASTIDAKBERTINGKATDENGANRAWATINAP

TAMPAKBELAKANG

TAMPAKSAMPINGKANAN
FASADBANGUNAN5 II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASTIDAKBERTINGKATDENGANRAWATINAP

TAMPAKPOTONGAN1-1

TAMPAKPOTONGAN2-2
PENYESUAIANBANGUNANEKSISTINGDENGANPROTOTIPE II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
PENDEKATAN1 PENDEKATAN2

• Bangunan eksisting dalam kondisi baru (tidak dapat dibongkar), • Menambah fasilitas yang kurang hingga mencapai standar yang
sehingga hanya menyesuaikan dengan fasad prototipe disyaratkan oleh Permenkes Nomor 75 Tahun 2014, kemudian
Puskesmas. disesuaikan dengan fasade prototipe Puskesmas.

Fasad
Baru 1
BANGUNAN
EKSISTING

KETERANGAN :
1. Bangunan Baru
2. Bangunan Eksisting
PENYESUAIANBANGUNANEKSISTINGDENGANPROTOTIPE II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
PENDEKATAN 3TAMBAH BERDASARKAN
SITEPLANBARU

• Penyesuaian bentuk bangunan dengan kondisi site atau lahan.

1
3 2

2
KETERANGAN :
1. Bangunan Baru
2. Bangunan Eksisting
3. Bangunan Utilitas
PERSYARATAN RUAN II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
RUANGTINDAKANGAWATDARURAT
Persyaratan Teknis :

a. Persyaratan Bangunan :
• Ukuran ruangan (menyesuaikan sesuai type pada tabel program
ruang)
• Tirai minimal 10 cm dari lantai serta terdiri dari tirai masif
setinggi 250 cm dari lantai dan sisa sampai langit-langit tirai jala.
• Berdekatan dengan ruang Spoel Hook dan Sterilisasi

a. Persyaratan Ventilasi :
• Bukaan menggunakan Jendela Swing dengan bukaan 100%
• Jendela Bouvenlight.
• Menggunakan AC Split Type Wall Mounted.

b. Persyaratan Instalasi Listrik.


• Kotak Kontak minimal 6 (Enam) buah (3 buah di back up
genset) jika PLN padam.

c. Persyaratan Pencahayaan :
• Intensitas cahaya minimal 300 Lux (6 buah Lampu Tipe
Standard / LED 2 x 14 W).
• Jenis lampu yang disarankan menggunakan Lampu LED.
• Penerangan dan AC di back up 100% oleh Genset, jika PLN
Padam.
PERSYARATAN RUAN II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
RUANGTINDAKANGAWATDARURAT

d. Persyaratan Sanitasi :
• Tersedia instalasi air bersih dan buangan.
• Tersedia tempat cuci tangan yang berdekatan dengan area
kerja petugas medis dilengkapi dengan saluran buangan air
kotor.

e. Persyaratan Instalasi Gas Medis :


• Oxigen.
• Nitrogen.

f. Sistem Grounding Untuk Peralatan :


• Disiapkan khusus terminal sambungan di JB - Grounding (Junction
Box Grounding Pentanahan) dengan tahanan pentanahan max. 0,2
ohm.
.

PERSYARATAN RUANG II-39


PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
RUANGTINDAKANPERSALINAN
Persyaratan Teknis :

a. Persyaratan Bangunan :
• Ukuran ruangan (menyesuaikan sesuai type pada Tabel Program
Ruang)
• Tirai minimal 10 cm dari lantai serta terdiri dari tirai masif
setinggi 250 cm dari lantai dan sisa sampai langit-langit tirai jala.
• Berdekatan dengan ruang Spoel Hook dan Sterilisasi
• Area bersih bayi berada dalam 1 ruangan dengan area melahirkan
dan tanpa sekat

b. Persyaratan Ventilasi :
• Bukaan menggunakan Jendela Swing dengan bukaan 100%
• Jendela Bouvenlight
• Menggunakan AC Split type Wall Mounted.

c. Persyaratan instalasi listrik.


• Kotak kontak minimal 6 (Enam) buah (3 buah di back up
genset) jika PLN padam.

d. Persyaratan Pencahayaan :
• Intensitas cahaya minimal 300 Lux (5 buah Lampu Tipe Standard
/ LED 2 x 14 W).
• Jenis lampu yang disarankan menggunakan Lampu LED.
• Penerangan dan AC di back up 100% oleh Genset, jika PLN
Padam.
PERSYARATAN RUAN II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
RUANGTINDAKANPERSALINAN

e. Persyaratan Sanitasi :
• Tersedia instalasi air bersih dan buangan.
• Tersedia tempat cuci tangan yang berdekatan dengan area
kerja petugas medis dilengkapi dengan saluran buangan air
kotor.

f. Sistem Grounding Untuk Peralatan :


• Disiapkan khusus terminal sambungan di JB - Grounding (Junction
Box Grounding Pentanahan) dengan tahanan pentanahan max. 0,2
ohm.
PERSYARATAN RUAN II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
RUANGPEMERIKSAANUMUM

Persyaratan Teknis :

a. Persyaratan Bangunan :
• Ukuran ruangan (menyesuaikan sesuai type pada tabel program
ruang)
• Tirai minimal 10 cm dari lantai serta terdiri dari tirai masif
setinggi 250 cm dari lantai dan sisa sampai langit-langit tirai jala. R. KLINIK UMUM

b. Persyaratan Ventilasi :
• Bukaan menggunakan jendela swing dengan bukaan 100%
• Fan yang dipakai adalah fan meja ukuran 30 cm atau fan dinding
ukuran 35 cm.
• Arah angin fan dari belakang dokter.

c. Persyaratan Instalasi Listrik :


• Kotak kontak minimal 4 (Empat) buah (2 buah di back up genset)
jika PLN padam.

d. Persyaratan Pencahayaan :
• Intensitas cahaya minimal 200 Lux (2 buah Lampu Tipe Standard
/ LED 2 x 14 W).
• Jenis lampu yang disarankan menggunakan Lampu LED.
• Penerangan di back up 100% oleh Genset, jika PLN Padam.
PERSYARATAN RUAN II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
RUANGPEMERIKSAANUMUM

e. Persyaratan Sanitasi :
• Tersedia tempat cuci tangan yang berdekatan dengan area kerja
petugas medis dilengkapi dengan saluran buangan air kotor.

f. Persyaratan Peralatan :
• Kompresor penunjang peralatan pemeriksaan gigi suplai untuk daya
listriknya bersumber dari listrik tenaga surya.
PERSYARATAN RUAN II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
RUANGKLINIKGIGI&MULUT

Persyaratan Teknis :

a. Persyaratan Bangunan :
• Ukuran ruangan (menyesuaikan sesuai type pada Tabel Program
Ruang)
• Tirai minimal 10 cm dari lantai serta terdiri dari tirai masif
setinggi 250 cm dari lantai dan sisa sampai langit-langit tirai jala.

b. Persyaratan Ventilasi :
• Bukaan menggunakan jendela swing dengan bukaan 100%
• Fan yang dipakai adalah fan meja ukuran 30 cm atau fan dinding
ukuran 35 cm.
• Arah angin fan dari belakang dokter.

c. Persyaratan Instalasi Listrik :


• Kotak kontak minimal 4 (Empat) buah (2 buah di back up
genset) jika PLN padam.
• Daya dan instalasi listrik harus sesuai alat yang dipakai.

d. Persyaratan Pencahayaan :
• Intensitas cahaya minimal 200 Lux (2 buah Lampu PLC
18 Watt/LED 14 Watt).
• Jenis lampu yang disarankan menggunakan Lampu LED.
• Penerangan di back up 100% oleh Genset, jika PLN Padam.
PERSYARATAN RUAN II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
RUANGKLINIKGIGI&MULUT

e. Persyaratan Sanitasi :
• Tersedia instalasi air bersih dan buangan pada dental unit.
• Tersedia tempat cuci tangan dan alat yang berdekatan dengan area
kerja petugas medis dilengkapi dengan saluran buang air kotor

f. Sistem Grounding Untuk Peralatan :


• Disiapkan khusus terminal sambungan di JB - Grounding
(Junction Box Grounding Pentanahan) dengan tahanan pentanahan
max. 0,2 ohm.

g. Persyaratan Kompressor Untuk Peralatan Gigi :


• Kotak kontaknya / daya listrik bersumber dari PLTS (Pembangkit
Listrik Tenaga Surya)
PERSYARATAN RUAN II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
RUANGFARMASI/GUDANGOBAT

Persyaratan Teknis :

a. Persyaratan Bangunan :
• Ukuran ruangan (menyesuaikan sesuai type pada Tabel
Program Ruang)

b. Persyaratan Ventilasi :
• Bukaan menggunakan Jendela Swing dengan bukaan
100%, dilengkapi dengan Bouvenlight
• Menggunakan AC Split Type Wall Mounted.

c. Persyaratan Instalasi Listrik :


• Kotak kontak minimal 4 (Empat) buah (2 buah di back
up genset) jika .PLN padam.

d. Persyaratan Pencahayaan :
• Intensitas cahaya minimal 200 Lux (3 buah Lampu
Tipe Standard / LED 2 x 14 W).
• Jenis lampu yang disarankan menggunakan Lampu LED.
Penerangan dan AC di back up 100% oleh Genset, jika
PLN Padam.

e. Portable Fire Extinguisher.


PERSYARATAN RUAN II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN

R. FARMAS I

GUDANG
OBAT
PERSYARATAN RUAN II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
RUANGRAWATINAP

Persyaratan Teknis :

a. Persyaratan Bangunan :
• Ukuran ruangan (menyesuaikan sesuai type pada tabel program
ruang)
• Tirai minimal 10 cm dari lantai serta terdiri dari tirai masif
setinggi 250 cm dari lantai dan sisa sampai langit-langit tirai jala.

b. Persyaratan Ventilasi :
• Bukaan menggunakan Jendela Swing dengan bukaan 100%,
dilengkapi dengan Bouvenlight.
• Dapat ditambahkan Exhaust Fan dinding minimal ukuran 35 cm
x 35 cm, yang dipasang + 20 cm dari lantai

c. Persyaratan Sanitasi :
• Toilet pasien ukuran 2m x 2 m
• Alat Sanitair Wastafel, Closet, Air bersih
• Pintu toilet menghadap ke luar
• Terdapat pegangan tangan di area closet

d. Persyaratan Instalasi Listrik :


• Kotak kontak minimal 2 (dua) buah per tempat tidur yang
terhubung dengan sumber listrik (1 buah di back up genset)
jika PLN padam.
PERSYARATAN RUAN II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
RUANGRAWATINAP

e. Persyaratan Pencahayaan :
• Lampu pasien minimal 200 Lux (Lampu dipasang pada setiap
tempat tidur pasien di posisi segaris dengan kaki tempat
tidur minimal 1 buah Lampu Tipe Standard / LED 2 x 24 W).
• Lampu ruangan minimal 200 Lux (Lampu minimal 2 buah
Lampu LED 2 x 14 W).
• Lampu kamar mandi minimal 200 Lux (1 buah Lampu Tipe Standard
/ LED 1 x 14 W).
• Jenis lampu yang disarankan menggunakan Lampu LED.
• Penerangan di back up 100% oleh Genset, jika PLN Padam.

f. Persyaratan Instalasi Gas Medis :


• Oxigen (Tabung).
• Nitrogen (Tabung).
PERSYARATAN RUAN II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
RUANGPASCAMELAHIRKAN/NIFAS

Persyaratan Teknis :

a. Persyaratan Bangunan :
• Ukuran ruangan (menyesuaikan sesuai type pada Tabel Program
Ruang)
• Tirai minimal 10 cm dari lantai serta terdiri dari tirai masif
setinggi 250 cm dari lantai dan sisa sampai langit-langit tirai jala.

b. Persyaratan Ventilasi :
• Bukaan menggunakan Jendela Tipe Swing dengan bukaan 100%
dengan Bouvenlight.
• Dapat ditambahkan Exhaust Fan Dinding
• Terdapat tempat tidur bayi didalam ruang rawat

c. Persyaratan Sanitasi :
• Toilet pasien ukuran 2 m x 2 m
• Alat sanitair Wastafel, Closet, Air bersih
• Pintu toilet menghadap ke luar
• Terdapat pegangan tangan di area closet

d. Persyaratan Instalasi Listrik :


• Kotak kontak minimal 2 (dua) buah per tempat tidur yang
terhubung dengan sumber listrik.
PERSYARATAN RUAN II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
RUANGPASCAMELAHIRKAN/NIFAS

e. Persyaratan Pencahayaan :
• Lampu pasien minimal 200 Lux (Lampu dipasang pada setiap tempat
tidur pasien di posisi segaris dengan kaki tempat tidur minimal type
PLC 18 Watt atau LED 14 W).
• Lampu ruangan minimal 200 Lux (Lampu minimal type PLC 2 x 18
Watt atau LED 2 x 14 W).
• Lampu kamar mandi minimal 200 Lux ( 1 buah Lampu PLC 18 Watt
atau LED 14 W).
PERSYARATAN RUAN II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
RUANGNURSESTATION

Persyaratan Teknis :

a. Persyaratan Bangunan :
• Ukuran ruangan (menyesuaikan sesuai type pada Tabel
Program Ruang, termasuk Ruang Penyimpanan Obat,
Alkes, dan Linen).

b. Persyaratan Ventilasi :
• Bukaan menggunakan jendela swing dengan bukaan
100%
• Fan yang dipakai adalah fan dinding/meja ukuran 35 cm.
• Arah angin fan harus mengarah ke luar

c. Persyaratan Instalasi Listrik :


• Kotak kontak minimal 3 (tiga) buah dengan 1 (satu) buah
yang terhubung dengan sumber listrik darurat (Genset).

d. Persyaratan Pencahayaan :
• Intensitas cahaya minimal 200 Lux (2 buah Lampu PLC
18 Watt/LED 14 W).

e. Persyaratan Sanitasi :
• Tersedia tempat cuci tangan yang berdekatan dengan area
kerja petugas medis dilengkapi dengan saluran buangan
air kotor.
PERSYARATAN RUAN II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
RUANGLABORATORIUM&PENGAMBILANSPESIMEN

Persyaratan Teknis :

a. Persyaratan Bangunan : R.AMBIL


SPESIMEN
• Ukuran ruangan (menyesuaikan sesuai type pada tabel program ruang,
termasuk ruangan administrasi dan ruangan pengambilan sampel darah).
• Lantai ruangan laboratorium tidak berpori, warna terang, dan mudah
dibersihkan.
• Loket penyerahan dahak Terpisah
• Dilengkapi meja kerja lapis keramik berwarna terang

b. Persyaratan Ventilasi :
• Bukaan menggunakan jendela tipe swing dengan bukaan 100%
• Fan yang dipakai adalah fan berdiri ukuran 30cm dan fan dinding ukuran
35 cm untuk ruangan pengambilan sampel dan administrasi.
• Menggunakan AC Split type wall mounted.
• Arah angin fan harus mengarah ke pasien.
• Di atas meja laboratorium menggunakan fan jenis exhaust hood.

c. Persyaratan Instalasi Listrik :


• Kotak kontak minimal 8 (delapan) buah (3 buah di back up genset)
jika PLN padam.
PERSYARATAN RUAN II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
RUANGLABORATORIUM&PENGAMBILANSPESIMEN

d. Persyaratan Pencahayaan :
• Intensitas cahaya minimal 300 Lux (2 buah Lampu Tipe Standard /
LED 2 x 14 W).
• Jenis lampu yang disarankan menggunakan Lampu LED.
• Penerangan dan AC di back up 100% oleh Genset, jika PLN Padam.

e. Persyaratan Sanitasi :
• Tersedia tempat cuci tangan yang berdekatan dengan area kerja
petugas medis dilengkapi dengan saluran buangan air kotor.
• Tersedia tempat untuk mencuci alat.

f. Sistem Grounding Untuk Peralatan :


• Disiapkan khusus terminal sambungan di JB -
Grounding (Junction Box Grounding Pentanahan)
dengan tahanan pentanahan max. 0,2 ohm.
PERSYARATAN RUAN II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
SPUTUMBOOTH(PENGAMBILANDAH
AK)

a. Perletakan Sputum Booth di lahan sesuai kondisi setempat serta


tidak di lokasi umum dengan ukuran ruang minimal 1.5m x 1.5m.
b. Wastafel pada ruangan pengambilan dahak dilengkapi dengan zat
pencuci tangan, tisu pembersih, dan disarankan kran
menggunakan sistem sentuh (no hands basin).
c. Sputum Booth dilengkapi dengan tempat sabun, tempat tisu dan
tempat sampah tertutup.
d. Material bangunan digunakan material yang mudah dibersihkan /
dicuci dan hindari detail sambungan material yang sulit
dibersihkan dan dapat menjadi tempat hidupnya bakteri.
PERSYARATAN RUAN II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
RUANGVAKSIN&DO
T

Persyaratan Teknis :

a. Persyaratan Bangunan :
• Ukuran ruangan (menyesuaikan sesuai type pada Tabel Program Ruang)

b. Persyaratan Ventilasi :
• Bukaan menggunakan Jendela Tipe Swing dengan bukaan 100%

c. Persyaratan Instalasi Listrik :


• Kotak kontak minimal 6 (Enam) buah (4 buah di back up genset)
jika PLN padam.
• Khusus untuk Kotak Kontak Box Pendingin (Refrgerator) Vaksin
daya listrik bersumber dari PLTS (Pembangkit Listrik Tenaga
Surya).
• Daya dan instalasi listrik harus sesuai alat yang dipakai.

d. Persyaratan Pencahayaan :
• Intensitas cahaya minimal 200 Lux (2 buah Lampu Tipe Standard /
LED 2 x 14 W).
• Jenis lampu yang disarankan menggunakan Lampu LED.
• Penerangan di back up 100% oleh Genset, jika PLN Padam.

e. Persyaratan Sanitasi :
• Tersedia instalasi air bersih dan buangan pada Dental Unit.
• Tersedia tempat cuci tangan dan alat yang berdekatan dengan area
kerja petugas medis dilengkapi dengan saluran buang air kotor.
PERSYARATAN RUAN II-

.
PERSYARATAN RUAN II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
RUANGVAKSIN&DO
T

f. Persyaratan Peralatan :
• Refrigerator Vaksin (Box Pendingin Vaksin) daya listriknya
bersumber dari listrik tenaga surya.
PERSYARATAN RUAN II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
DAPUR

Persyaratan Teknis :

a. Persyaratan Bangunan :
• Ukuran ruangan (menyesuaikan sesuai type pada Tabel Program
Ruang)
• Lantai ruangan Dapur tidak berpori, warna terang, dan mudah
dibersihkan.
• Area kerja tidak saling bersilangan
• Dilengkapi meja kerja lapis keramik berwarna terang

b. Persyaratan Ventilasi :
• Bukaan menggunakan jendela tipe swing dengan bukaan 100%
• Fan yang dipakai adalah fan berdiri ukuran 30cm dan fan dinding
ukuran 35 cm
• Arah angin fan harus mengarah ke luar.

c. Persyaratan Instalasi Listrik :


• Kotak kontak minimal 6 (enam) buah dengan 1 (Satu) buah yang
terhubung dengan sumber listrik darurat (Genset) untuk lemari es

d. Persyaratan Pencahayaan :
• Intensitas cahaya minimal 300 Lux (4 buah Lampu PLC 18
Watt/LED 14 Watt).
PERSYARATAN RUAN II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
DAPUR

e. Persyaratan Sanitasi :
• Tersedia tempat cuci bahan makanan dan alat makan.
• Tersedia tempat untuk mencuci alat
PERSYARATAN RUAN II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
RUANGLAUNDRY;CUCIDANSETRIKA
Persyaratan Teknis :

a. Persyaratan Bangunan :
• Ukuran ruangan (menyesuaikan sesuai type pada tabel program
ruang)
• Lantai ruangan cuci tidak berpori, warna terang, dan mudah
dibersihkan, dan tidak licin.
• Area kerja tidak saling bersilangan
• Ruang cuci dan penyimpanan linen berada pada area yang
terpisah

b. Persyaratan Ventilasi :
• Bukaan menggunakan Jendela Tipe Swing dengan bukaan 100%
• Fan yang dipakai adalah Fan Berdiri ukuran 30cm dan Fan
Dinding ukuran 35 cm
• Arah angin fan harus mengarah ke luar
• Area Cuci menggunakan Dinding Roster

c. Persyaratan Instalasi Listrik :


• Kotak kontak minimal 6 (enam) buah

d. Persyaratan Pencahayaan :
• Intensitas cahaya minimal 300 Lux (3 buah Lampu Tipe Standard
/ LED 2 x 14 W).
• Jenis lampu yang disarankan menggunakan Lampu LED.
PERSYARATAN RUAN II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
RUANGLAUNDRY;CUCIDANSETRIKA

• Penerangan, Kotak Kontak tidak di back up 100% oleh Genset,


jika PLN Padam.

e. Persyaratan Sanitasi :
• Tersedia rendam linen dan cuci linen.
• Tersedia tempat simpan bahan kimia
PERSYARATAN RUAN II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
RUANGSTERILISASI

Persyaratan Teknis :

a. Persyaratan Bangunan :
• Ukuran ruangan (menyesuaikan sesuai type pada Tabel Program
Ruang)

b. Persyaratan Ventilasi :
• Fan yang dipkai adalah Exhaust Fan ukuran 30 cm terletak 20 cm
dari lantai.
• Arah angin fan harus mengarah ke luar bangunan menggunakan
ducting.
• Bukaan menggunakan Jendela Tipe Swing dengan bukaan 100%

c. Persyaratan Instalasi Listrik :


• Kotak kontak minimal 3 (tiga) buah 2 buah di back up genset) jika
PLN padam.

d. Persyaratan Pencahayaan :
• Intensitas cahaya minimal 100 Lux (2 buah Lampu Tipe Standard
/ LED 2 x 14 W).
• Jenis lampu yang disarankan menggunakan Lampu LED.
• Penerangan, Kotak Kontak dan Fan di back up 100% oleh Genset,
jika PLN Padam.
PERSYARATAN RUAN II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
RUANGLOBBY,PENDAFTARAN,TUNGGU

Persyaratan Teknis :

a. Persyaratan Bangunan :
• Ukuran ruangan (menyesuaikan sesuai type pada Tabel
Program Ruang)
• Lantai dan dinding berwarna terang, permukaan rata, tidak
licin, mudah dibersihkan.
• Tinggi langit-langit ruang tunggu minimal 3,2 m dari lantai.

b. Persyaratan Ventilasi :
• Bukaan menggunakan jendela tipe swing dengan bukaan 100%

c. Persyaratan Instalasi Listrik :


• Kotak kontak minimal 2 (dua) buah.

d. Persyaratan Pencahayaan :
• Intensitas cahaya minimal 200 Lux (12 buah Lampu Tipe
Standard / LED 2 x 14 W).
• Jenis lampu yang disarankan menggunakan Lampu LED.
• Penerangan dan Kotak Kontak di back up 50% oleh Genset,
jika PLN Padam.

e. Persyaratan Instalasi Data :


• Server.
• Outlet Data (Komputer / Internet).
PERSYARATAN RUAN II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
RUANGLOBBY,PENDAFTARAN,TUNGGU

f. Persyaratan Instalasi Telepon :


• Outlet Telepon (Extention).
PERSYARATAN RUAN II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
RUANGREKAMMEDIK

Persyaratan Teknis :

a. Persyaratan Bangunan :
• Ukuran ruangan (menyesuaikan sesuai type pada Tabel Program
Ruang)

b. Persyaratan Ventilasi :
• Bukaan menggunakan Jendela Tipe Swing dengan bukaan 100%

c. Persyaratan Instalasi Listrik :


• Kotak kontak minimal 6 (enam) buah (3 buah di back up genset)
jika PLN padam.

d. Persyaratan Pencahayaan :
• intensitas cahaya minimal 200 Lux (2 buah lampu Tipe Standard /
LED 2 x 14 W).
• Jenis lampu yang disarankan menggunakan Lampu LED.
• Penerangan di back up 100% oleh Genset, jika PLN Padam.
PERSYARATAN RUAN II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
RUANGGUDANG

Persyaratan Teknis :

a. Persyaratan Bangunan :
• Ukuran ruangan (menyesuaikan sesuai type pada Tabel Program
Ruang)

b. Persyaratan Ventilasi :
• Bukaan menggunakan Jendela Tipe Swing dengan bukaan
100%, dilengkapi dengan Bouvenlight.

c. Persyaratan instalasi Listrik :


• Kotak kontak minimal 1 (Satu) buah.

d. Persyaratan Pencahayaan :
• Intensitas cahaya minimal 200 Lux (2 buah Lampu Tipe
Standard / LED 2 x 14 W).
• Jenis lampu yang disarankan menggunakan Lampu LED.
• Penerangan dan Kotak Kontak tidak di back up 100% oleh
Genset, jika PLN Padam.

e. Portable Fire Extinguisher.


PERSYARATAN RUAN II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
RUANGPENYULUHAN

Persyaratan Teknis :

a. Persyaratan Bangunan :
• Ukuran ruangan (menyesuaikan sesuai type pada Tabel Program Ruang)

b. Persyaratan Ventilasi :
• Bukaan menggunakan Jendela Tipe Swing dengan bukaan
100%, dilengkapi dengan Bouvenlight.

c.P ersyaratan Instalasi Listrik :


• Kotak kontak minimal 3 (tiga) buah tidak di back up genset.

d.P ersyaratan Pencahayaan :


• Intensitas cahaya minimal 200 Lux (3 buah Lampu Tipe Standard / LED 2
x 18 W).
• Jenis lampu yang disarankan menggunakan Lampu LED.
• Penerangan di back up 100% oleh Genset, jika PLN Padam.
PERSYARATAN RUAN II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
RUANGADMINISTRASI
Persyaratan Teknis :

a. Persyaratan Bangunan :
• Ukuran ruangan (menyesuaikan sesuai type pada tabel program
ruang)

b. Persyaratan Ventilasi :
• Bukaan menggunakan jendela tipe swing dengan bukaan 100%,
• dilengkapi dengan bouvenlight.

c. Persyaratan Instalasi Listrik :


• Kotak kontak minimal 4 (empat) buah (2 buah di back up genset) jika
PLN padam.

d. Persyaratan Pencahayaan :
• Intensitas cahaya minimal 200 Lux (3 buah Lampu Tipe Standard /
LED 2 x 14 W).
• Jenis lampu yang disarankan menggunakan Lampu LED.
• Penerangan di back up 100% oleh Genset, jika PLN Padam.

e. Persyaratan Instalasi Nurse Call :


• Paging

f. Persyaratan Instalasi Telepon :


• Outlet Telepon (Extention).
PERSYARATAN RUAN II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
RUANGADMINISTRASI
g. Persyaratan Instalasi Data :
• Outlet Data (Komputer / Internet).

ALTERNATIF LAY OUT RUANG KERJA


PERSYARATAN RUAN II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
RUANGRAPAT
Persyaratan Teknis :

a. Persyaratan Bangunan :
• Ukuran ruangan (menyesuaikan sesuai type pada Tabel Program
Ruang)

b. Persyaratan Ventilasi :
• Bukaan menggunakan Jendela Tipe Swing dengan bukaan 100%,
dilengkapi dengan Bouvenlight.

c.P ersyaratan Instalasi Listrik :


• Kotak kontak minimal 3 (tiga) buah.

d.P ersyaratan Pencahayaan :


• Intensitas cahaya minimal 200 Lux (2 buah Lampu Tipe
Standard / LED 2 x 14 W).
• Jenis lampu yang disarankan menggunakan Lampu LED.
• Penerangan tidak di back up 100% oleh Genset, jika PLN Padam.
PERSYARATAN RUAN II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
RUANGKEPALAPUSKESMAS
Persyaratan Teknis :

a. Persyaratan Bangunan :
• Ukuran ruangan (menyesuaikan sesuai type pada Tabel Program Ruang)
b. Persyaratan Ventilasi :
• Bukaan menggunakan Jendela Tipe Swing dengan bukaan
100%, dilengkapi dengan Bouvenlight.
c. Persyaratan Instalasi Listrik :
• Kotak kontak minimal 3 (tiga) buah (1 buah di back up genset) jika
PLN padam.
d. Persyaratan Pencahayaan :
• Intensitas cahaya minimal 200 Lux (2 buah Lampu Tipe Standard /
LED 2 x 14 W).
• Jenis lampu yang disarankan menggunakan Lampu LED.
• Penerangan di back up 100% oleh Genset, jika PLN Padam.
e. Persyaratan Instalasi Nurse Call :
• Paging
f. Persyaratan Instalasi TV :
• Outlet TV
g. Persyaratan Instalasi Telepon :
• Outlet Telepon (Extention).
h. Persyaratan Instalasi Data :
• Outlet Data (Komputer / Internet).
SPESIFIKASIMATERIALFINISHIN II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP M A S P E RPUSKESMAS
E SBANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
ATA ALUMUNIUMCOMPOSITEDPANEL
P

Hindari penggunaan material seng dan asbes. a. Sistem panel terdiri atas 2 lapis almunium tebal 0,5 mm,
Metal : diantara ke 2 lapisan tersebut direkatkan polythirene dengan
a. Bahan dasar : ZINCALUME yang terdiri dari unsur Seng : thermo setting adhesive, Tebal total : 4 - 6 mm.
43,50% ; Aluminium : 55% ; Silikon : 1,50%. b. Bahan : Alloy 5005.
b. Tipe : Klip-Lok HI-TEN ; tebal : 0,55mm (BMT), Colorbond. c. Finishing : KYNAR 500. PVDF
c. Insulasi menggunakan Glass wool dengan density : 32kg/m3 dan d. Bending strength : 45-50 kg / 5mm.
tebal : 50mm ; Aluminium foil double side dengan buble + kawat e. Heat deformation : 200 °C.
ayam f. Warna : Setara QS 3102 Sub Silver.
d. Setara : LYSAGHT KLIP LOK g. Setara : SEVEN, ALUCOBOND, ALPOLIC,
RAYNOBOND, HOWSOLPAN.
Bitumen : h. Rangka Almunium
a. Bahan dasar : Selulosa bitumen.
b. Tebal : 3 mm.
c. Tinggi gelombang : 38 mm.
d. Setara : ONDULINE.
SPESIFIKASIMATERIALFINISHIN II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
PLAFO KERAMIK
N a. Keramik ukuran 30cm x 30cm atau 40cm x 40cm, tipe Matt
a. Gymsum board ukuran 1200mm x 2400mm tebal 9 mm untuk surface (tidak licin) untuk lantai area service.
ruang umum. b. Keramik ukuran 20cm x 20cm, tipe Structure surface untuk
b. Gypsum board ukuran 1200mm x 2400mm tebal 12 mm tipe lantai toilet.
wet area untuk toilet. c. Keramik ukuran 20cm x 20cm, tipe Matt surface (tidak licin)
c. Calcium Board ukuran 1200mm x 2400mm tebal 6 mm untuk dinding toilet.
d. Rangka penggantung Galvanized hollow steel 40mm x 40mm x d. Keramik ukuran 10cm x 30 cm untuk Plint.
1,2 mm kombinasi ukuran 40mm x 60mm x 1,2 mm dicat anti e. Setara : ROMAN, KIA, IKAD, MULIA, MASTERINA.
karat. Jarak 60 x 60
e. Alternatif rangka penggantung : Metal-furing. HOMOGENEOUSTILE
f. List langit-langit menggunakan Wall engle dari bahan a. Ukuran 60cm x 60cm atau 40cm x 40cm, tipe Matt surface
aluminium (tidak licin) untuk lantai area pelayanan.
powder-coating 60 mikron. b. Keramik ukuran 30cm x 30cm, tipe Structure surface untuk
g. Setara : JAYABOARD, KNAUFF, KALSIBOARD, GRC lantai toilet, gudang.
c. Keramik ukuran 30cm x 60cm, untuk dinding toilet.
d. Setara : Granito, Roman, NiroGranit
SPESIFIKASIMATERIALFINISHIN II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
KUSENALUMUNIU KACA
M

a. Billet yang dipakai dari billet utama (primery) dengan standar a. Daun pintu dan jendela rangka / frame aluminium exterior,
SNI menggunakan kaca berwarna, jenis PANASAP glass dengan tebal
07-0734-1989. : 8mm dan warna : Blue green.
b. Joint Backer : PolyureTahunane foam yang tidak menyerap air b. Daun pintu dan jendela rangka / frame aluminium interior,
dengan kepadatan 65-96kg/m3 dan penampang 25% lebih besar menggunakan kaca clear dengan variasi ketebalan 6mm dan
dari celah yang terjadi. 8mm.
c. Neoprene : Jenis extrusion yang tahan terhadap matahari, c. Joint-sealant antarkaca menggunakan sealant tipe elastosil 121-
kekerasan 60-80 durometer. transparan.
d. Setting block untuk kaca : EPDM 80 durometer. d. Setara : MULIA GLASS, MAGI, ASAHI GLASS.
e. Sealent Single komponen : Silicone (Non acid).
f. Sekrup : Stainless-steel.
g. Kebocoran air : Tidak terlihat kebocoran sampai tekanan 137 Pa
(positif) dengan jangka waktu 15 menit.
h. Finishing : Powder-coating, warna : Broken white.
i. Jendela Tipe swing
j. Setara : INDALEX, YKK, ALEXINDO.

RAGAMHIAS

a. Mengambil pola ragam hias dari budaya lokal.


b. Bahan material : Permanen dan tersedia di daerah tersebut.
c. Contoh : Kayu, Batu, GRC, Alumunium Cutting Laser, metal,
dan lain lain.
SIGNAG II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
LAMBANGPUSKESM
AS

Pengertian lambang Puskesmas berdasarkan Peraturan Menteri 5. Bentuk palang hijau berbentuk segi enam melambangkan
Kesehatan (PMK) Nomor 75 Tahun 2014 adalah : pelayanan kesehatan yang mengutamakan promotif preventif.
1. Bentuk segi enam (hexagonal) melambangkan : 6. Warna hijau melambangkan tujuan pembangunan kesehatan
• Keterpaduan dan kesinambungan yang terintegrasi dari 6 yang diselenggarakan Puskesmas, dalam rangka mencapai
prinsip yang melandasi penyelenggaraan Puskesmas. derajat kesehatan masyarakat yang setinggi-tingginya.
• Makna pemerataan pelayanan kesehatan yang mudah di
akses masyarakat. 7. Warna putih melambangkan pengabdian luhur Puskesmas.
• Pergerakan dan pertanggungjawaban Puskesmas di wilayah
kerjanya.
2. Irisan dua buah bentuk lingkaran melambangkan dua unsur
upaya kesehatan, yaitu :
• Upaya Kesehatan Masyarakat (UKM) untuk memelihara dan
meningkatkan kesehatan serta mencegah dan menanggulangi
7
timbulnya masalah kesehatan masyarakat.
• Upaya Kesehatan Perseorangan (UKP) untuk memelihara 4
1,5 2
dan meningkatkan kesehatan serta mencegah dan
menanggulangi timbulnya masalah kesehatan perorangan. 3
3. Stilasi bentuk sebuah bangunan, melambangkan Puskesmas
sebagai tempat atau wadah diberlakukannya semua prinsip dan
upaya dalam proses penyelenggaraan kesehatan.
4. Bidang segitiga mewakili tiga faktor yang memengaruhi status
derajat kesehatan masyarakat yaitu genetik, lingkungan, dan
perilaku.
SIGNAG II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
SIGNAGEBANGUNANPUSKESMAS2LANTA I PEDOMAN PEMBANGUNAN & PENINGKATAN FUNGSI BANGUNAN PUSKESMAS

JENIS HURUF : ARIAL


500cm
4.72m
BLACK UKURAN HURUF
: TINGGI 60
CM
110.000
mcm
TEBAL 15 cm
0.60m WARNA : HIJAU
50cm TUA (PERMENKES
NO. 75 TH.
2014) UKURAN LOGO :
TINGGI 100 CM
TEBAL 15cm

RAGAM HIAS
DISESUAIKAN DENGAN
BUDAYA SETEMPAT
SIGNAG II-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
SIGNAGEBANGUNANPUSKESMASTIDAKBERTINGKAT

JENIS HURUF : ARIAL


500cm
4.72m BLACK UKURAN HURUF :
TINGGI 60 CM
TEBAL 15 cm
110.0 mc WARNA : HIJAU TUA
0.60m (PERMENKES NO. 75
m
50cm TH. 2014)
UKURAN LOGO : TINGGI 100 CM
TEBAL 15cm

RAGAM HIAS
DISESUAIKAN DENGAN
BUDAYA SETEMPAT
KONSTRUKSIBANGUNA III-1

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN

KONSTRUKSI BANGUNAN
KONSTRUKSIBANGUNA III-2

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN

• KONSTRUKSI BANGUNAN
• STRUKTUR PONDASI BANGUNAN PUSKESMAS SATU LANTAI
• STRUKTUR PONDASI BANGUNAN PUSKESMAS DUA LANTAI
• STRUKTUR ATAS BANGUNAN PUSKESMAS SATU LANTAI
• STRUKTUR ATAS BANGUNAN PUSKESMAS DUA LANTAI
• KONSTRUKSI ATAP BANGUNAN
• PETA GEMPA INDONESIA
• STRUKTUR BANGUNAN TAHAN GEMPA
• METODA PENGERJA PONDASI
• BAHAN MATERIAL UNTUK PONDASI
• DETAIL TULANGAN BALOK PONDASI
• DETAIL SAMBUNGAN PEMBESIAN TAHAN GEMPA
• METODA PEMBUATAN CAMPURAN BETON
• STANDARD MINIMAL PEKERJAAN STRUKTUR
KONSTRUKSIBANGUNA III-3

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
PEDOMAN PERENCANAAN KONSTRUKSI /STRUKTUR BANGUNAN

Perencanaan Konstruksi bangunan Gedung memerlukan landasan teori berupa Analisa struktur, ilmu tentang kekuatan bahan serta hal
lain yang perbedoman pada peraturan-peraturan yang berlaku di Indonesia.

Survey dan penyelidikan tanah (soil investigation) merupakan tahap awal Perencanaan dari stuktur konstuksi bangunan.
Perencanaan konstruksi bangunan harus memenuhi berbagai syarat konstruksi yang ditentukan yaitu kuat, kaku, bentuk yang serasi
dan dapat dilaksanakan dengan biaya yang ekonomis tetapi tidak mengurangi mutu bangunan tersebut

Pondasi adalah suatu bagian dari konstruksi bangunan yang berfungsi untuk menempatkan bangunan dan meneruskan beban yang
disalurkan dari struktur atas ke tanah dasar pondasi yang cukup kuat menahannya tanpa terjadinya differential settlement pada sistem
strukturnya.

Pondasi merupakan bagian paling bawah pada sebuah bangunan. Keberadaannya tentu menjadi hal yang harus paling dimatangkan,
karena akan menopang seluruh beban bangunan. Semakin tinggi bangunan yang dibangun, tentunya semakin besar pula tekanan yang
diberikan terhadap pondasi bangunan, sehingga pemilihan pondasi bangunan haruslah tepat karena mencakup keselamatan dan
kekokohan sebuah bangunan.
KONSTRUKSIBANGUNA III-4

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BEBERAPA REFERENSI YANG DIPERGUNAKAN DALAM PERHITUNGAN KEKUATAN STUKTUR BANGUNAN

Referensi SNI Judul Referensi


SNI 1726:2012 Tata Cara Perencanaan Ketahanan Gempa Untuk Struktur Bangunan gedung dan Non gedung

SNI 1727:2013 Beban Minimum Untuk Perancangan Bangunan Gedung dan Struktur Lain

SNI 2847:2013 Persyaratan Beton Struktural Untuk Bangunan Gedung


SNI 1729:2015 Tata Cara Perencanaan Struktur Baja Untuk Bangunan Gedung
SNI 1726:2012 Tata Cara Perencanaan Ketahanan Gempa untuk Struktur Bangunan Gedung dan Non Gedung.

SNI 1727:2013. Beban Minimum untuk Perancangan Bangunan Gedung dan Struktur Lain
PRINSIPPERENCANAANPONDASI III-5

PERECANAAN PONDASI PEDOMAN PEMBANGUNAN & PENINGKATAN FUNGSI BANGUNAN PUSKESMAS


BANGUNAN
Dalam pemilihan Pondasi adalah B U K U P A N D U A N P EPEDOMAN
M B A N G U PEMBANGUNAN
N A N & P E N I N G&
K PENINGKATAN
A T A N F U N G SFUNGSI
I P U S K BANGUNAN
E S M A S P E RPUSKESMAS
BATASAN
Sbb: PERBATASAN

• Kondisi tanah tempat bangunan akan dibangun


• Jenis bangunan yang akan ditopang oleh struktur (upper struktur)
• Faktor Lingkungan Proyek
• Biaya Pekerjaan
• Tersedianya material bangunan
• Waktu saat pekerjaan Pondasi
Penyelidikan tanah adalah kegiatan untuk mengetahui daya dukung dan karateristik Pekerjaan Sondir
tanah serta kondisi geologi, seperti mengetahui susunan lapisan tanah/sifat tanah,
mengetahui kekuatan lapisan tanah dalam rangka penyelidikan tanah dasar untuk
keperluan pondasi bangunan, jalan,dll, kepadatan dan daya dukung tanah serta
mengetahui sifat korosivitas tanah.

Penyelidikan tanah dilakukan untuk mengetahui jenis pondasi yang akan digunakan
untuk konstruksi bangunan, selain itu dari hasil penyelidikan tanah dapat ditentukan
perlakuan terhadap tanah agar daya dukung dapat mendukung konstruksi yang akan
dibangun, Dari hasil penyelidikan tanah ini akan dipilih alternatif /jenis , kedalaman
serta dimensi pondasi yang paling ekonomis tetapi masih aman. Pekerjaan Boring
Jadi penyelidikan tanah sangat penting dan mutlak dilakukan sebelum struktur itu
mulai dikerjakan. Dengan mengetahui kondisi daya dukung tanah kita bisa
merencanakan suatu struktur yang kokoh dan tahan gempa, yang pada akhirnya akan
memberi rasa kenyamanan dan keamanan bila berada didalam gedung. Penyelidikan
tanah yang dilakukan dilapangan yaitu bisa Sondir (DCP), Uji Boring, Uji Penetrasi
Test (SPT) dan lain-lain. Dari sampel tanah yang diambil dilapangan untuk
mengetahui sifat- sifat dan karakteristik tanah maka dilakukan uji laboratorium.
dengan menggunakan Test.
PRINSIPPERENCANAANPONDASI III-6

Pekerjaan Penetrasi Test


PRINSIPPERENCANAANPONDASI III-7

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
Jadi penyelidikan tanah sangat penting dan mutlak dilakukan sebelum struktur itu mulai dikerjakan. Dengan mengetahui kondisi daya
dukung tanah kita bisa merencanakan suatu struktur yang kokoh dan tahan gempa, yang pada akhirnya akan memberi rasa kenyamanan dan
keamanan bila berada didalam gedung.

Penyelidikan tanah yang dilakukan dilapangan yaitu bisa Sondir (DCP), Uji Boring, Uji Penetrasi Test (SPT) dan lain-lain. Dari sampel
tanah yang diambil dilapangan untuk mengetahui sifat-sifat dan karakteristik tanah maka dilakukan uji laboratorium. dengan menggunakan
Test.

Pekerjaan Sondir Pekerjaan Boring Pekerjaan Penetrasi Test


PRINSIPPERENCANAANPONDASI III-8

PEMILIHAN PONDASI BERDASARKAN DAYA


B U K U P A N D U A N P EPEDOMAN
M B A N G UPEMBANGUNAN
NAN&PENINGK &APENINGKATAN
TANFUNGSIP FUNGSI
U S K E BANGUNAN
S M A S P E R B PUSKESMAS
ATASAN
DUKUNG TANAH PEDOMAN PEMBANGUNAN & PENINGKATAN FUNGSI BANGUNAN PUSKESMAS
PERBATASAN
• Bila tanah keras terletak pada permukaan tanah atau 2-3 meter di bawah permukaan tanah maka jenis pondasinya adalah
pondasi dangkal. (misal: pondasi jalur, pondasi telapak atau pondasi strauss).

Pondasi Lajur Pondasi Telapak Pondasi Strauss

• Bila tanah keras terletak pada kedalaman sekitar 10 meter atau lebih di bawah permukaan tanah maka jenis pondasinya adalah
pondasi dalam, jenis – jenisnya yaitu pondasi tiang minipile, pondasi sumuran atau pondasi bored pile.

Pondasi Mini pile Pondasi Sumuran atau Bored Pile


PRINSIPPERENCANAANPONDASI III-9

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN

• Bila tanah keras terletak pada kedalaman 20 meter atau lebih di bawah permukaan tanah maka jenis pondasinya adalah pondasi tiang
pancang atau pondasi bored pile.

Pondasi Tiang Pancang Pondasi Bored Pile

Untuk bangunan puskesmas yang mempunyai jumlah lantai 1-2 maka pondasi dalam menjadi tidak efisien dan
efektif. Standar daya dukung tanah menurut Peraturan Pembebanan Indonesia Untuk Gedung tahun 1983 adalah :
• Tanah keras (lebih dari 5 kg/cm2).
• Tanah sedang (2-5 kg/cm2)
• Tanah lunak (0,5-2 Kg/cm2)
• Tanah Sangat lunak (0-0,5 kg/cm2)
STRUKTURPONDASITANAHRAWA III-9

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
PONDASI UNTUK TANAH RAWA DENGAN PONDASI CERUCUT
Untuk di daerah pantai, rawa dan daerah pasang surut dapat menggunakan cerucuk bambu/dolken sebagai pondasi atau perkuatan tanah untuk
bangunan rumah/gedung,

Sampai sekarang ini belum ada penjelasan ilmiah, bagaimana sistim cerucuk tersebut dapat meningkatkan kapasitas daya dukung tanah dan dapat
mengurangi penurunan tanah, akan tetapi dalam praktek dilapangan telah menunjukkan peningkatan daya dukung tanah lunak/lembek bilamana
menggunakan cerucuk bambu/dolken dengan jarak tertentu.

Pemerintah melalui Departemen Pekerjaan Umum telah menerbitkan pedoman teknis “Tata cara Pelaksanaan Pondasi Cerucut Kayu di Atas Tanah
Lembek dan Tanah Gambut” No.029/T/BM1999 Lampiran No. 6 Keputusan Direktur Jendral Bina Marga No. 76/KPTS/Db/1999 Tanggal 20
Desember 1999. Dari pedoman teknis tersebut tidak menjelaskan tentang Perencanaan.

Metoda Pelakasanaan cerucuk


PERENCANAANKONSTRUKSIBANGUNA III-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN P U S K BANGUNAN
I FUNGSI S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
PERENCANAAN STRUKTUR (KONSTRUKSI)
BANGUNAN

Dalam perencanaan struktur , perencana struktur mulai menghitung komponen-komponen struktur berdasarkan dari bentuk arsitektural
yang telah didapat perencanaan mulai dari dimensi serta menyesuaikan komponen-komponen struktur tersebut agar memenuhi syarat-
syarat konstruksi yang aman, kuat, dana nyaman untuk dipergunakan namum berdasarkan prinsip-prinsip yang ekonomis.

Struktur adalah suatu kesatuan dan rangkaian dari berberapa elemen yag direncanakan agar mampu menerima beban luar maupun beban sendiri
tanpa mengalami perubahan bentuk yang melampaui batas persyaratan.:

Ada dua struktur pendukung bangunan yaitu :

1. Struktur bangunan atas ( Upper Struktur)


Struktur banguan atas harus sanggup mewujudkan perencanaan dari segi arsitektur dan harus mampu menjamin mutu baik dari segi
keamanan maupung kenyamanan bagi penggunanya. Untuk itu, bahan bangunan yang akan digunakan untuk konstuksi bangunan harus
memenuhi kriteria sebagai berikut:
• Tahan Api
• Kuat
• Mudah diperoleh dalam arti tidak memerlukan biaya mobilisasi bahan yang terlalu mahal
• Awet untuk jangka waktu pemakaian yang lama
• Ekonomisi dan mudah perwatannya.
PERENCANAANKONSTRUKSIBANGUNA III-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
Dari Kriteria-kriteria tersebut diatas , maka komponen struktur utama
dari bangunan ini dapat menggunakan beton bertulang, dan dapat juga
dipergunakan struktur rangka baja dan komposit dengan pertimbangan-
pertimbangan tertentu. Perhitungan perencanaan untuk banguan struktur
atas ini meliputi : RANGKA ATAP

a. Perhitungan Pelat lantai


b. Perhitungan Tangga
c. Perhitungan Portal
d. Perhitungan Balok
e. Perhitungan Kolom.
STRUKT
2. Struktur bangunan bawah (Sub Structure) UR ATAS
Struktur bangunan bawah merupakan sistem pendukung bangunan yang
menerima beban struktur atas, untuk diteruskan ke tanah dibawahnya.
Perhitungan perencanaan struktur bagian bawah (Sub Structure) ini
meliputi:
a. Perhitungan Sloof. STRUKTUR
b. Perhitungan pondasi BAWAH
PONDASIBANGUNANPUSKESMASSATULANTA I III-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
DENAH PONDASI BANGUNAN 1 LANTAI
KONDISI TANAH BAGUS

KETERANGAN:
Untuk daerah tanah bagus, tanah pasir keras, tanah merah, daya dukung ijin
1-2 kg/ cm2
PONDASIBANGUNANPUSKESMASSATULANTA I III-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
DETAIL STRUKTUR PONDASI DAN
KOLOM PADA TANAH BAGUS
PONDASIBANGUNANPUSKESMASSATULANTA I III-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
DENAH PONDASI BANGUNAN 1
LANTAI KONDISI TANAH RAWA

KETERANGAN:
Untuk daerah tanah gambut/rawa-rawa, tanah sangat lunak, daya dukung ijin
0,1 kg/cm2
PONDASIBANGUNANPUSKESMASSATULANTA I III-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
DETAIL STRUKTUR PONDASI DAN
KOLOM PADA TANAH RAWA
PONDASIBANGUNANPUSKESMASSATULANTA I III-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
DENAH PONDASI BANGUNAN 1 LANTAI
KONDISI TANAH SEDANG

KETERANGAN:
Untuk daerah bukan rawa tetapi tanah lunak s/d sedang daya dukung ijin 0,3
s/d 0,5 kg/cm
PONDASIBANGUNANPUSKESMASSATULANTA I III-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
DETAIL PONDASI DAN
KOLOM PADA TANAH
SEDANG
PONDASIBANGUNANPUSKESMASDUALANTAI III-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
DENAH PONDASI BANGUNAN 2 LANTAI
KONDISI TANAH BAGUS
PONDASIBANGUNANPUSKESMASDUALANTAI III-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
DETAIL PONDASI DAN KOLOM
KONDISI TANAH BAGUS
PONDASIBANGUNANPUSKESMASDUALANTAI III-

B U K U P A N D U A N P EPEDOMAN
M B A N G U PEMBANGUNAN
N A N & P E N I N G&
K PENINGKATAN
A T A N F U N G SFUNGSI
I P U S K BANGUNAN
E S M A S P E RPUSKESMAS
B A T A S A N PERBATASAN

DENAH PONDASI BANGUNAN 2 LANTAI


KONDISI TANAH SEDANG
PONDASIBANGUNANPUSKESMASDUALANTAI III-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
DETAIL PONDASI DAN KOLOM
KONDISI TANAH SEDANG
PONDASIBANGUNANPUSKESMASDUALANTAI III-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
DENAH PONDASI BANGUNAN 2 LANTAI
KONDISI TANAH RAWA
PONDASIBANGUNANPUSKESMASDUALANTAI III-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
DETAIL PONDASI DAN KOLOM
KONDISI TANAH RAWA
STRUKTURATASBANGUNANPUSKESMASSATULANTAI III-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
MODEL DETAIL BALOK, PLAT KANTILEVER
DAN TALANG
STRUKTURATASBANGUNANPUSKESMASDUALANTAI III-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
MODEL DETAIL BALOK, PLAT KANTILEVER
DAN TALANG
KONSTRUKSIATAPBANGUNA III-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
3. Struktur Atap
Bangunan
KONSTRUKSIATAPBANGUNA III-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
3. Struktur Atap
Bangunan
PETAGEMPAINDONESI III-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP M A S P E RPUSKESMAS
E SBANGUNAN B PUSKESMAS
ATASAN
PERENCANAAN BANGUNAN TAHAN PERBATASAN
GEMPA

Untuk perencanaan bangunan tahan gempa harus mengacu ke SNI 1726:2012 Tata Cara Perencanaan Ketahanan Gempa Untuk
Struktur Bangunan gedung dan Non gedung.

Untuk mengetauhi spectrum kekuatan Gempa pada suatu lokasi di Indonesia dapat dilakukan dengan membuka website :
http://puskim.pu.go.id /Aplikasi/desain_spektra_Indonesia_2011
PETAGEMPAINDONESI III-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
STRUKTURBANGUNANTAHANGEMPA III-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
DASARPEMBANGUNAN
BANGUNANTAHANGEMPA

1. Mutu bahan bangunan yang baik


2. Mutu pengerjaan yang baik
3. Semua komponen bangunan, pondasi, kolom, balok, dinding, rangka atap, atap harus di sambung satu dengan lainnya agar kalau
diguncang gempa bangunan bergetar sebagai satu kesatuan.
BAHANMATERIALUNTUKPONDASI III-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN P U S K BANGUNAN
I FUNGSI S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BAHANBANGUNAN

1. Pasir
Berasal dari sungai / darat ; bebas tanah / lumpur ; bebas dari bahan organik/bebas garam.
2. Kerikil
Berasal dari sungai / darat, bebas tanah / lumpur ; bebas dari bahan organik ; memiliki diameter 1-2 cm.
3. Semen
Portland semen ; tidak mengeras ; kering, biasanya dengan kemasan 40/50 kg ; tidak tercampur bahan material lain ; warna
seragam.
4. Air
Bersih, tidak berwarna dan berbau ; tidak boleh mengandung minyak, asam, alkali , garam, bahan organik yang merusak beton &
besi tulangan ; dapat diminum.
5. Batu Bata
Dibakar sempurna ; rata / tidak melengkung ; tidak mudah pecah / retak ; ukuran seragam ; sudut sudutnya tidak gompal ;
ukuran min. 20cm x 10cm x 5cm.
6. Batu Belah
Ukuran seseragam mungkin ; permukaan kasar, tidak halus.
7. Besi Tulangan
Ukuran seragam ; memenuhi syarat syarat yang berlaku ; tidak karatan ; lurus ; diameter sesuai gambar. Besi Tulangan sesuai
standrad SNI, Mutu Tulangan utama menggunakan BJTP 40 dan sengkang BJTP 24
STANDARDMINIMALBAHANBANGUNAN III-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN

Standard minimal pekerjaan struktur


(Harus dihitung ulang dan dipertanggung jawabkan oleh konsultan perencana berdasarkan kondisi lapangan masing masing lokasi)

Standard Rasio Besi Tulangan/m3 min. :


Pondasi Telapak : 140 Standard Mutu Beton :
Kg/m3 Beton fc’ 20Mpa atau campuran 1pc:2ps:3split
Sloof : 180
Kg/m3
Kolom Struktur : 250 Standard Mutu Besi Tulangan:
Kg/m3 Kolom Praktis : 180 Kg/m3 BJTP 24, Untuk Sengkang
Balok Portal : 200 Kg/m3 BJTP 40, Untuk Tulangan Utama
Balok Anak : 175
Kg/m3
Tangga : 150
Kg/m3
Plat lantai t=12 cm : 110
Kg/m3
METODAPENGERJAPONDASIBATUKALI III-

B U K U P A N D U A N P EPEDOMAN
M B A N G U PEMBANGUNAN
N A N & P E N I N G&
K PENINGKATAN
A T A N F U N G SFUNGSI
I P U S K BANGUNAN
E S M A S P E RPUSKESMAS
B A T A S A N PERBATASAN

PONDASI BATU KALI / GUNUNG


DETAILTULANGANBALOKPONDASI III-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN

SAMBUNGAN TENGAH SAMBUNGAN SUDUT


DETAILSAMBUNGANPEMBESIANTAHANGEMPA III-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
PANJANG&PEMBENGKOKANBESI
DETAILSAMBUNGANPEMBESIANTAHANGEMPA III-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
METODAPEMBUATANCAMPURANBETON III-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
MEMBUAT CAMPURAN BET ON DETAILTULANGANBALOKPONDASI
PRASARANAPUSKESMA IV-1

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN

PRASARANA PUSKESMAS
PRASARANAPUSKESMA IV-2

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN

• SISTEM PENGHAWAAN
• SISTEM SANITASI
• BIOPORI
• SISTEM PLUMBING
• SISTEM KELISTRIKAN
• SISTEM PENCAHAYAAN
• SISTEM PANEL SURYA
• SISTEM KOMUNIKASI
• SISTEM GAS MEDIK
• SISTEM PROTEKSI PETIR
• SISTEM GROUNDING
SISTEMPENGHAWAA IV-3

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
PERHITUNGANBEBANPENDINGIN

Perhitungan Ventilasi untuk Ruang Toile


- Luas = 3,42 m²
- Air Change = 15 x
- Tinggi = 3 m²
- Kapasitas = Luas x Tinggi x A/C
1,7
= 3,42 x 3 x 15
1,7
= 90,5 cfm
(kapasitas exhaust fan yang ada
dipasaran dibulatkan menjadi 100
cfm) Type Fan Ceiling.

Sistem AC diperuntukan untuk ruang-ruang tertentu :

• Ruang Tindak Gawat Darurat


• Ruang Bersalin
• Ruang Farmasi & Gudang Obat
• Ruang Daftar Ambil Sampel & Laboratorium

- Ruang-ruang selain yang tercantum diatas menggunakan sistem ventilasi udara


natural (buka jendela).

- Sistem Ventilasi Mekanis (Exhaust Fan)


hanya diperuntukan untuk ventilasi toilet.
SISTEMPENGHAWAA IV-4

PEDOMAN PEMBANGUNAN & PENINGKATAN FUNGSI&BANGUNAN PUSKESMASBANGUNAN PUSKESMAS


B U K U P A N D U A N P EPEDOMAN
M B A N G U PEMBANGUNAN
N A N & P E N I N G K PENINGKATAN
A T A N F U N G SFUNGSI
IPUSKESMASPERBATASAN
PERBATASAN
No URAIAN Spesifikasi Standard Merk
A. PERALATAN UTAMA
1 AC Split Unit Kompressor : Scroll (Garansi 3 tahun) ARI 210 / 240 - 94 Fujiaire
Refrigerant : R-410 a ISO 5151 : 1994 Daikin
Range Kapasitas : 5.000 BTU/h - 24.000 BTU/h Mitshubishi
Type Indoor Unit : Wall Samsung
Thermostat LG
Type Indoor Unit Wall : Wireless
Type Indoor Unit Cassette : Wired
2 Fan Ventilasi
Ceiling Fan AMCA Vanco
S & P
Kruger
Nicotra
Fantech
System Air
B. PIPA & DUCTING
1 Pipa Refrigerant Type : Seameless Coil(non integrated) ASTM B 280 Denji
Working Pressure : '65 - 250 Psi Mueller
Refrigerant : R-410 a Elgin
Type : Seameless Coil(integrated) JIS H 3300 Inaba
Working Pressure : '390 - 1690 Psi Denji
Refrigerant : R - 22 Toyoda
2 Pipa Drain Class AW Standard Pabrik Unilon
Wavin
Pralon
Vinilon
Intilon
3 Pipa Exhaust Toilet Class AW Standard Pabrik Unilon
Wavin
Pralon
Vinilon
Intilon
4 Isolasi Pipa Refrigerant 1. Elastomeric : DIN, ASTM Insulflex
Closed cell elastomeric, class 1 Aeroflex
Density minimum 64 kg/m³ K-flex
 =  4.500 Thermaflex
Ambient temp. : '35C Armaflex
Relative humidity : '90% Kem-flex
Temp. permukaan pipa : '2.5 - 5C
Tebal : 19 mm
Untuk Pipa ditanam di dinding tebal isolasi 10 mm
menggunakan bahan isolasi tipe Polytylene
2. Polytylene : DIN, ASTM, JIS Inaba
Closed cell polytylene, class 1 (Integrated) Denji
Density minimum 30 kg/m³
 =  4.500
Ambient temp. : '35C
Relative humidity : '90%
Temp. permukaan pipa : '2.5 - 5C
Tebal : 10 mm (3/8")
SISTEMPENGHAWAA IV-5

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
INSTALASIPENDINGINRUANGAN
SISTEMPENGHAWAA IV-6

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
JENISIPENDINGINRUANGAN
SISTEMSANITAS IV-7

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
FUNGSIIPAL

Instalasi pengolahan air limbah (IPAL)

adalah sebuah struktur yang dirancang untuk membuang limbah


biologis dan kimiawi dari air sehingga memungkinkan air tersebut
untuk digunakan pada aktivitas yang lain.

Fungsi dari IPAL mencakup :

a. Pengolahan air limbah puskesmas, untuk membuang limbah


manusia, limbah laboratorium dan lainnya.
b. Pengolahan air limbah medis.

CARAKERJAIPAL

a. Pompa Air Baku (Raw Water Pump)


Pompa air baku yang digunakan jenis setrifugal dengan kapasitas
maksimum yang dibutuhkan untuk unit pengolahan. Air baku
yang dipompa berasal dari bak akhir dari proses pengendapan
pada hasil buangan limbah.

b. Pompa Dosing (Dosing Pump)


Merupakan peralatan untuk mengijeksi bahan kimia (ferrosulfat
dan PAC) dengan pengaturan laju alir dan konsentrasi tertentu
untuk mengatur dosis bahan kimia tersebut. Tujuan dari
pemberian bahan kimia ini adalah sebagai oksidator.
SISTEMSANITAS IV-8

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN P U S K BANGUNAN
I FUNGSI S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
c. Pencampur Statik (Static h. Saringan Penukar Ion
Mixer)
Dalam peralatan ini bahan-bahan kimia dicampur Pada proses pertukaran ion, kalsium dan magnesium
sampai
ditukardengan sodium. Pertukaran ini berlangsung dengan cara
homogen dengan kecepatan pengadukan tertentu untuk
melewatkan air sadah ke dalam unggun butiran yang terbuat
menghindari pecah flok.
dari bahan yang mempunyai kemampuan menukarkan ion.
d. Bak Koagulasi – Flokulasi PAC. Bahan kimia berfungsi sebagai oksidator.
Dalam unit ini terjadi pemisahan padatan tersuspensi yang
terkumpul dalam bentuk-bentuk flok dan mengendap, i. Sistem Jaringan Perpipaan
sedangkan air mengalir overflow menuju proses berikutnya. Sistem jaringan perpipaan terdiri dari empat bagian, yaitu
jaringan inlet (air masuk), jaringan outlet (air hasil olahan),
e. Pompa Filter jaringan bahan kimia dari pompa dosing dan jaringan pipa
Pompa yang digunakan mirip dengan pompa air baku. pembuangan air pencucian.
Pompa ini harus dapat melalui saringan multimedia,
saringan karbon aktif dan saringan penukar ion. J. Tangki Bahan – Bahan Kimia
Tangki bahan kimia terdiri dari 2 buah tangki fiberglas dengan
f. Saringan Multimedia volume masing-masing 30 liter. Bahan-bahan kimia adalah
Unit filter berbentuk silinder dan terbuat dari bahan fiberglas. ferrosulfat dan PAC. Bahan kimia berfungsi sebagai oksidator.

g. Saringan Karbon Aktif


Unit ini khusus digunakan untuk penghilang bau, warna dan
pengotor-pengotor organik lainnya. Media penyaring yang
digunakan adalah karbon aktif granular atau butiran dengan
ukuran 1 – 2,5 mm atau resin sintetis.
BIOPO IV-9

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BIOPORI

Luang Biopri adalah Lubang Silinder yang dibuat secara vertical ke


dalam tanah dengan diameter 10- 30 cm dan ke dalaman sekitar 100
cm atau dalam kasus tanah dengan permukaaan air dangkal

Luang Biopri diisi dengan sampah organik yang kemudian memicu


terbentuknya biopori yang akan membentuk ruang untuk aktifitas
organisme tanah dan akar tanah
SISTEMPLUMBIN IV-

B U K U P A N D U A N P EPEDOMAN
M B A N G U PEMBANGUNAN
N A N & P E N I N G&
K PENINGKATAN
A T A N F U N G SFUNGSI
I P U S K BANGUNAN
E S M A S P E RPUSKESMAS
B A T A S A N PERBATASAN

SISTEM INSTALASI AIR BERSIH

GWT = Ground Water Tank/Tangki Air Bawah


SISTEMPLUMBIN IV-

PEDOMAN PEMBANGUNAN & PENINGKATAN FUNGSI&BANGUNAN PUSKESMASBANGUNAN PUSKESMAS


B U K U P A N D U A N P EPEDOMAN
M B A N G U PEMBANGUNAN
N A N & P E N I N G K PENINGKATAN
A T A N F U N G SFUNGSI
IPUSKESMASPERBATASAN
PERBATASAN
BAGIAN : SISTEM PLAMBING
PERIHAL : PERHITUNGAN KEBUTUHAN AIR BERSIH & AIR KOTOR

Luas Elevasi Hunian Kebutuhan Air Bersih Beban Air Kotor


No. Uraian Unit Total Total
(m²) (mm) (Orang) (ltr/org/hari) Faktor
(ltr/hari) (ltr/hari)

1 LANTAI 1 822 + 0,00


Teras 1 2 LANTAI 2 288 + 4,20
Promosi Kesehatan Serbagun 50 1 25 5 125 80% 100
Ruang Tunggu Pasien 1 65 15 975 80% 780 R Rapat 14 2 28 5 280 80% 224
Pendaftaran 1 2 50 100 80% 80 R Kepala Puskesmas 14 1 1 50 50 80% 40
Rekam medik 1 2 50 100 80% 80 R Administrasi 30 1 8 50 375 80% 300
Ruang Dokter Perawat 1 2 50 100 80% 80 Toilet Pria 1
Toilet 2 Toilet Wanita 1
Perawatan Anak 12 1 6 15 90 80% 72 Gudang 1
R.Tindakan Gawat Darurat 28 1 14 15 210 80% 168 Tangki Air/Atap Beton 1
Spoel hoek 30 1 4 3 11 80% 9
TOTAL 8.836 7.069
Ruang Steril 1
-
Ruang ALAT 1
DIBULATKAN 9 8
Ruang Bersalin 1 1 500 500 80% 400
Paska Bersalin 1 2 500 1.000 80% 800
- Faktor Hunian (Occupancy) = 100 %
Toilet 1
- Kebutuhan Harian Air Bersih (Qd) = 9 m3/hari
Ruang Linen 1
- Kebutuhan Harian Air Bersih Rata-rata per Jam (Qh) = 1 m3/jam
Nurse Station 1 4 50 200 80% 160 - Kapasitas Tangki Atas = 3 m3
Toilet Pria 1 - Kapasitas Tangki Septik (STP) = 8 m3
Toilet Wanita 1
Perawatan Pria 1 4 500 2.000 80% 1.600
Perawatan Wanita 1 4 500 2.000 80% 1.600
Ruang Farmasi 1 1 50 50 80% 40
Ruang obat 1 2 50 100 80% 80
Klinik 1 1 1 50 50 80% 40
Ruang Laktasi 1 2 50 100 80% 80
Klinik 2 1 1 50 50 80% 40
Klinik 3 1 1 50 50 80% 40
Klinik 1 1 1 50 50 80% 40
Klinik Gigi Mulut 1 1 50 50 80% 40
Daftar Ambil Sample 1 1 50 50 80% 40
Laboratorium 1 1 50 50 80% 40
Toilet Pria 1
Toilet Wanita 1
Dapur 1 4 15 60 80% 48
Laundry 1 4 15 60 80% 48
Rendam 1
Cuci 1
SISTEMKELISTRIKA IV-

B U K U P A N D U A N P EPEDOMAN
M B A N G U PEMBANGUNAN
N A N & P E N I N G&
K PENINGKATAN
A T A N F U N G SFUNGSI
I P U S K BANGUNAN
E S M A S P E RPUSKESMAS
B A T A S A N PERBATASAN

Sistem Kelistrikan
:

1. Bangunan Puskesmas memiliki sistem kelistrikan dengan PLN sebagai sumber utama dengan generator set (Genset) sebagai cadangan. Jika
PLN mengalami gangguan (Padam), maka generator set (Genset) sebagai back up.

2. Sumber daya listrik akan diambil dari gardu PLN (Jaringan) yang tersedia dengan tegangan sistem distribusi tenaga listrik sampai dengan
ke titik beban adalah : 380 / 220 Volt, 50 Hz.

3. Faktor kebutuhan adalah angka pengali terhadap daya pengenal berdasarkan kemungkinan penggunaan maksimum dalam durasi 1 hari.
Nilai berkisar pada 0,5 – 1,25 dan berdasarkan refrensi dari PUIL 2011 yaitu sebagai berikut :
a. Penerangan : 0,8
b. Kotak Kontak: 0,6
c. AC / Ventilasi : 0,8
d. Motor Pompa: 0,75 – 1,25
e. Peralatan Kesehatan: 0,5

4. Faktor tidak keserempakan adalah angka pembagi yang menjadi penggambaran terhadap kemungkinan seluruh beban terpasang dijalankan
pada saat yang bersamaan nilai berkisar dari 1,0 – 1,35 dengan 1,0 menjadi kemungkinan terbesar beban terpasang dijalankan pada saat
yang bersamaan dan 1,35 menjadi kemungkinan beban terkecil seluruh beban terpasang dijalankan pada saat bersamaan.

5. Peralihan daya dari PLN menuju Genset menggunakan sistem manual dengan masing-masing ditandai / indikasinya dengan lampu indicator
/ pilot lamp disetiap sumbernya (PLN & GENSET) dan mengubah sumber daya listrik dari sumber daya listrik PLN menjadi sumber genset
melalui COS (Change Over Switch).
SISTEMKELISTRIKA IV-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
A.Sistem Distribusi Daya Listrik Tegangan
Rendah

Peralatan tegangan rendah yang digunakan antara lain :


1. Panel Tegangan Rendah
- Tegangan Kerja : 380 / 220 Volt, 3 Phase + Netra, 50 Hz
- Kapasitas : Sesuai gambar
2. Kabel Tegangan Rendah
- Tegangan Kerja : 600 – 1.000 Volt
- Isolasi : PVC & XLPE
- Conductor : Tembaga
- Temperatur Maksimum : 70C
- Standard : IEC, SII, SPLN
- Jenis : NYFGBY, NYY, NYM, BC
3. Komponen Pemutus Daya
- Tegangan Kerja : 380 Volt, 3 Phase / 220 Volt 1 Phase
- Jenis : MCCB, MCB
4. Kabel Rak
- Bahan : Perforated steel plate 2 mm
- Support : Besi Siku / Hanger
- Jenis : Kabel Tray

B.Sistem Pembumian

- Sistem Pembumian yang digunakan adalah sistem PP (Pembumian Pengaman).


- Arus hubung singkat akan dicegah degan menggunakan pemutus daya.
SISTEMKELISTRIKA IV-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
KABELLISTRIK

a. Kabel instalasi yang dipakai dalam instalasi adalah jenis


kawat tembaga, bukan kabel serabut.
b. Yaitu tipe kabel NYA, NYM dan NYY.
c. Ukuran diameter kabel harus sesuai dengan SNI dan
PUIL, serta perhitungan listrik oleh konsultan.
d. Setara : Supreme / Kabel Metal / Tranka.
SISTEMKELISTRIKA IV-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
SISTEMKELISTRIKA IV-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
SISTEM INSTALASI GENSET DAN PLN

SPESIFIKASI GENSET
SISTEMPENERANGA IV-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
INSTALASIPENERANGANDANKOTAKKONTAK
SISTEMPENERANGA IV-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
LAMPUPENERANGAN

a. Jenis Lampu yang dipakai disarankan menggunakan jenis LED


b. Setara : Philips/OSRAM/GE/Panasonic
c. Color Temperature (kelvin, K) = 6500k (cool daylight / Putih).
SISTEMPANELSURY IV-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
SISTEM INSTALASI PANEL SURYA – RUANG KLINIK GIGI
SISTEMKELISTRIKA IV-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
SISTEM INSTALASI PANEL SURYA – RUANG VAKSIN
SISTEMKOMUNIKAS IV-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
SISTEM INSTALASI TELEPON
SISTEMKOMUNIKAS IV-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
SISTEM INSTALASI NURSE CALL
SISTEMPROTEKSIPETIR IV-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
Sistem Perlindungan Bahaya Petir :

Sistem yang diterapkan adalah sistem konvensional dengan menggunakan


splitzen tembaga sebagai terminasi udara, dengan metode bola bergulir
sesuai SNI 03-7015-2004 A
B
C

A. Splitzen tembaga langkap tiang penyangga, di pasang pada bangunan yang tertinggi (sistem konvensional).
B. Kawat BC  50 mm sebagai penghantar penurun dari tiang proteksi petir (splitzen tembaga) menuju box control pentanahan (di klem
tiap jarak 50 cm / modul).
C. Box control grounding penatanahan c/w cooper ROD  1” sebagai elektroda conductor dengan tahanan pentanahan max. 2 ohm.
SISTEMGROUNDIN IV-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN P U S K BANGUNAN
I FUNGSI S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
SISTEM INSTALASI GROUNDING PERALATAN
LAMPIRA V-1

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN

LAMPIRAN DED ARSITEKTUR


BANGUNAN PUSKESMAS BERTINGKAT RAWAT INAP - 10 TT/ T980
GAMBARDEDDENAHARSITEKTUR V-2

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASBERTINGKATRAWATINAP-10TT/T980
GAMBARDEDDENAHARSITEKTUR V-3

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASBERTINGKATRAWATINAP-10TT/T980
GAMBARDEDDENAHARSITEKTUR V-4

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASBERTINGKATRAWATINAP-10TT/T980
GAMBARDEDTAMPAKARSITEKTUR V-5

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASBERTINGKATRAWATINAP-10TT/T980
GAMBARDEDPOTONGANARSITEKTUR V-6

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASBERTINGKATRAWATINAP-10TT/T980
LAMPIRA VI-1

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN

LAMPIRAN DED ARSITEKTUR


BANGUNAN PUSKESMAS TIDAK BERTINGKAT RAWAT INAP - 4 TT/ T560
GAMBARDEDDENAHARSITEKTUR VI-2

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASTIDAKBERTINGKATRAWATINAP-4TT/T560
GAMBARDEDDENAHARSITEKTUR VI-3

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASTIDAKBERTINGKATRAWATINAP-4TT/T560
GAMBARDEDTAMPAKARSITEKTUR VI-4

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASTIDAKBERTINGKATRAWATINAP-4TT/T560
GAMBARDEDTAMPAKARSITEKTUR VI-5

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASTIDAKBERTINGKATRAWATINAP-4TT/T560
GAMBARDEDPOTONGANARSITEKTUR VI-6

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASTIDAKBERTINGKATRAWATINAP-4TT/T560
GAMBARDEDPOTONGANARSITEKTUR VI-7

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASTIDAKBERTINGKATRAWATINAP-4TT/T560
GAMBARDEDPOTONGANARSITEKTUR VI-8

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASTIDAKBERTINGKATRAWATINAP-4TT/T560
LAMPIRA VII-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN

LAMPIRAN DED STRUKTUR


BANGUNAN PUSKESMAS BERTINGKAT RAWAT INAP - 10 TT/ T980
GAMBARDEDDENAHPONDASISTRUKTUR VII-02
PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASBERTINGKATRAWATINAP-10TT/T980
DENAH PONDASI BANGUNAN 2
LANTAI KONDISI TANAH BAGUS
GAMBARDEDDETAILPONDASISTRUKTUR VII-3

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASBERTINGKATRAWATINAP-10TT/T980
GAMBARDEDDETAILPONDASISTRUKTUR VII-4

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASBERTINGKATRAWATINAP-10TT/T980
GAMBARDEDKOLOMDANBALOKSTRUKTUR VII-5

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASBERTINGKATRAWATINAP-10TT/T980
GAMBARDEDKOLOMDANBALOKSTRUKTUR VII-6

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASBERTINGKATRAWATINAP-10TT/T980
GAMBARDEDDETAILPEMBALOKANSTRUKTUR VII-7

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASBERTINGKATRAWATINAP-10TT/T980
GAMBARDEDKOLOMDANBALOKSTRUKTUR VII-8

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASBERTINGKATRAWATINAP-10TT/T980
GAMBARDEDRANGKAATAPSTRUKTUR VII-9

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASBERTINGKATRAWATINAP-10TT/T980
GAMBARDEDCANOPYSTRUKTUR VII-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASBERTINGKATRAWATINAP-10TT/T980
LAMPIRA VIII-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN

LAMPIRAN DED STRUKTUR


BANGUNAN PUSKESMAS TIDAK BERTINGKAT RAWAT INAP - 4 TT/ T560
GAMBARDEDDENAHPONDASISTRUKTUR VIII-02
PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASTIDAKBERTINGKATRAWATINAP-4TT/T560
DENAH PONDASI BANGUNAN 1
LANTAI KONDISI TANAH BAGUS
GAMBARDEDDETAILPONDASISTRUKTUR VIII-3

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASTIDAKBERTINGKATRAWATINAP-4TT/T560
GAMBARDEDKOLOMDANBALOKSTRUKTUR VIII-4

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASTIDAKBERTINGKATRAWATINAP-4TT/T560
GAMBARDEDKOLOMDANBALOKSTRUKTUR VIII-5

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASTIDAKBERTINGKATRAWATINAP-4TT/T560
GAMBARDEDDETAILPEMBALOKANSTRUKTUR VIII-6

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASTIDAKBERTINGKATRAWATINAP-4TT/T560
GAMBARDEDKOLOMDANBALOKSTRUKTUR VIII-7

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASTIDAKBERTINGKATRAWATINAP-4TT/T560
GAMBARDEDRANGKAATAPSTRUKTUR VIII-8

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASTIDAKBERTINGKATRAWATINAP-4TT/T560
GAMBARDEDRANGKAATAPSTRUKTUR VIII-9

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASTIDAKBERTINGKATRAWATINAP-4TT/T560
LAMPIRA IX-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN

LAMPIRAN DED PRASARANA


BANGUNAN PUSKESMAS BERTINGKAT RAWAT INAP - 10 TT/ T980
GAMBARDEDPRASARANAPENGHAWAAN IX-2

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASBERTINGKATRAWATINAP-10TT/T980
GAMBARDEDPRASARANAPENCAHAYAAN IX-3

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASBERTINGKATRAWATINAP-10TT/T980
GAMBARDEDPRASARANAPENCAHAYAAN IX-4

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASBERTINGKATRAWATINAP-10TT/T980
GAMBARDEDPRASARANAPUMBING IX-5

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASBERTINGKATRAWATINAP-10TT/T980
GAMBARDEDPRASARANAPUMBING IX-6

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASBERTINGKATRAWATINAP-10TT/T980
GAMBARDEDPRASARANAPUMBING IX-7

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASBERTINGKATRAWATINAP-10TT/T980
GAMBARDEDPRASARANAPUMBING IX-8

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASBERTINGKATRAWATINAP-10TT/T980
GAMBARDEDPRASARANAPLUMBING IX-9

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASBERTINGKATRAWATINAP-10TT/T980
GAMBARDEDPRASARANAKELISTRIKAN IX-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNA NPUSKESMASBERTINGKATRAWATINAP-10TT/T980
GAMBARDEDPRASARANAKELISTRIKAN IX-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASBERTINGKATRAWATINAP-10TT/T980
GAMBARDEDPRASARANAKOMUNIKASI IX-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASBERTINGKATRAWATINAP-10TT/T980
GAMBARDEDPRASARANAGASMEDIK IX-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASBERTINGKATRAWATINAP-10TT/T980
GAMBARDEDPRASARANAPROTEKSIPETIR IX-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASBERTINGKATRAWATINAP-10TT/T980
LAMPIRA X-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN

LAMPIRAN DED PRASARANA


BANGUNAN PUSKESMAS TIDAK BERTINGKAT RAWAT INAP - 4 TT/
T560
GAMBARDEDPRASARANAPENGHAWAAN X-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASTIDAKBERTINGKATRAWATINAP-4TT/T560
GAMBARDEDPRASARANAPENCAHAYAAN X-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASTIDAKBERTINGKATRAWATINAP-4TT/T560
GAMBARDEDPRASARANASANITASI X-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASTIDAKBERTINGKATRAWATINAP-4TT/T560
GAMBARDEDPRASARANABIOPORI X-5

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASTIDAKBERTINGKATRAWATINAP-4TT/T560
GAMBARDEDPRASARANAPLUMBING X-6

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASTIDAKBERTINGKATRAWATINAP-4TT/T560
GAMBARDEDPRASARANAPLUMBING X-7

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASTIDAKBERTINGKATRAWATINAP-4TT/T560
GAMBARDEDPRASARANAPLUMBING X-8

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASTIDAKBERTINGKATRAWATINAP-4TT/T560
GAMBARDEDPRASARANAKELISTRIKAN X-9

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASTIDAKBERTINGKATRAWATINAP-4TT/T560
GAMBARDEDPRASARANAKOMUNIKASI X-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASTIDAKBERTINGKATRAWATINAP-4TT/T560
GAMBARDEDPRASARANAGASMEDIK X-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASTIDAKBERTINGKATRAWATINAP-4TT/T560
GAMBARDEDPRASARANAPROTEKSIPETIR X-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASTIDAKBERTINGKATRAWATINAP-4TT/T560
GAMBARDEDPRASARANAPROTEKSIPETIR X-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BANGUNANPUSKESMASTIDAKBERTINGKATRAWATINAP-4TT/T560
REFEREN X1-

PEDOMAN
B U K U P A N D U A N P EPEDOMAN PEMBANGUNAN
N A N & P E N I N G&
M B A N G UPEMBANGUNAN &PENINGKATAN
K T A N F U N G SFUNGSI
APENINGKATAN U S K BANGUNAN
FUNGSI
IP S M A S P E RPUSKESMAS
E BANGUNAN B PUSKESMAS
ATASAN
PERBATASAN
BUK
U

• Kementerian Kesehatan RI. 2014. Pedoman Teknis: Bangunan dan Prasarana Fasilitas Pelayanan Kesehatan Tingkat Pertama untuk Mencegah
Infeksi yang Ditransmisikan Melalui Udara (Airborne Infection) Edisi Pertama. Jakarta.
• Teddy Boen & Associates. 2009. Constructing Seismic Resistant Masonry Houses Third Edition. UNCRD dan Disaster Management
Planning Hyogo Office.

WEBSITE

• depkes.go.id
• rumahdangriya.blogspot.com
• http://puskim.pu.go.id /Aplikasi/desain_spektra_Indonesia_2011