IGP
SUPPLIER QUALITY
Edition : 5th Rev. : 00
ASSURANCE MANUAL
Page : 1 of 64
(5th Edition)
Rear Axle & Associated parts for Passenger Cars, SUV’s and Comercial
PENDAHULUAN
Supplier Quality Assurance Manual (SQAM) PT. IGP dibuat dan dikembangkan
berdasarkan pada persyaratan ISO/TS16949 dan bertujuan meningkatkan kepuasan
pelanggan terutama dalam aktivitas pengelolaan Supplier yang terintegrasi demi
kepentingan dan kerjasama yang menguntungkan melalui evaluasi kinerja,
pengelolaan tanggung jawab dan kesesuaian terhadap spesifikasi produk yang
dihasilkan oleh Supplier.
PT. IGP berharap setiap Supplier dapat memahami secara detail dari isi persyaratan-
persyaratan didalam SQAM ini dan bila ada yang perlu penjelasan lebih lanjut dapat
menghubungi QA Division atau Purchasing Division PT. IGP.
DAFTAR ISI
DAFTAR ISI ........................................................................................................... 4
KATA PENGANTAR ............................................................................................. 6
1. PENDAHULUAN................................................................................................ 7
1.1. TUJUAN, SASARAN DAN RUANG LINGKUP ............................................................. 7
1.2. KOORDINASI DAN MANAJEMEN............................................................................... 8
1.3. PENENTUAN PERWAKILAN SUPPLIER .................................................................... 8
2. AKTIVITAS PERSIAPAN PRODUKSI SUPPLIER ..................................... 10
PHASE I : PLAN AND DEFINE (RENCANA DAN LINGKUP) ................................... 10
PHASE 2 : PRODUCT DESIGN & DEVELOPMENT (DESAIN PRODUK &
PENGEMBANGAN) ......................................................................................................... 11
PHASE 3 : PROCESS DESIGN & DEVELOPMENT (PERENCANAAN PROCESS &
PENGEMBANGAN) ......................................................................................................... 12
PHASE 4 : PRODUCT & PROCESS VALIDATION (VALIDASI PRODUK &
PROSES)............................................................................................................................ 13
PHASE 5 : FEEDBACK, ASSESSMENT & CORRECTIVE ACTION (UMPAN
BALIK, EVALUASI & TINDAKAN PERBAIKAN) ...................................................... 15
2.2. SUPPLIER PART TRACKING TEAM (SPTT) ............................................................ 16
3. KONTROL KUALITAS PRODUKSI MASSAL ............................................ 17
3.1. SISTEM INSPEKSI ........................................................................................................ 17
3.2. IDENTIFIKASI PRODUK UNTUK DAPAT DITELUSURI ....................................... 18
3.3. MASALAH KUALITAS PRODUK ............................................................................... 19
3.4. SPECIAL QUALITY ACCEPTANCE .......................................................................... 23
3.5. PERMINTAAN PERUBAHAN PROSES ( PCR ) ......................................................... 25
3.6. PERMINTAAN PERUBAHAN SPESIFIKASI PRODUK (ECR) ................................ 27
4. EVALUASI SUPPLIER & PENGEMBANGAN ........................................... 30
4.1. SUPPLIER PERFORMANCE EVALUATION ............................................................ 31
4.2. PENGEMBANGAN SUPPLIER .................................................................................... 33
4.3. AUDIT SUPPLIER ......................................................................................................... 36
4.4. SUPPLIER ENVIRONMENT & SAFETY CONCERN................................................ 38
APPENDIX 1 (SUPPLIER REPRESENTATIVE INFORMATION) ............... 40
APPENDIX 2 (PRODUCTION PREPARATION PLAN).................................. 41
APPENDIX 3 (DESIGN FAILURE MODE & EFFECTS ANALYSIS) ........... 42
APPENDIX 4 (PROCESS FLOW CHART) ....................................................... 42
APPENDIX 5 (PROCESS FAILURE MODE & EFFECTS ANALYSIS) ........ 43
APPENDIX 6 (PART INSPECTION STANDARD) ........................................... 44
Prepared by : QAS – PT . IGP
SUPPLIER QUALITY
Edition : 5th Rev. : 00
ASSURANCE MANUAL
Page : 5 of 64
KATA PENGANTAR
Kebutuhan dasar terhadap SQAM yang dipersyaratkan oleh PT. IGP akan terpenuhi
melalui terjalinnya kerjasama yang saling menguntungkan, perjanjian kinerja dan
pengelolaan tanggung jawab antara PT.IGP dan supplier.
Buku manual ini dipersiapkan sebagai pegangan supplier mengenai aturan dan
prosedur terhadap Kesepakatan Bersama antara PT. IGP dan supplier, dimana tujuan
akhirnya adalah kepuasan Customer PT.IGP dengan cara :
Semua part yang disuplai ke PT. IGP harus sesuai dengan standar desain di drawing
dan Inspection Standard PT. IGP.
SQAM ini menjelaskan prosedur dan dokumen yang dibutuhkan supplier untuk
menghasilkan standar kualitas dari PT. IGP. Prosedur yang dimaksud adalah Trial
Production Preparation, Start dan Volume Production serta pengukuran untuk
menjamin kualitas setiap part yang disuplai ke PT. IGP dari supplier.
Supplier harus memahami buku manual ini sebagai pedoman kerja dalam
menghasilkan produk berkualitas terbaik mulai dari proses trial production sampai
dengan proses mass production. Perwakilan Supplier untuk SQAM ini, bertanggung
jawab untuk mendistribusikan dan memberikan pelatihan kepada semua bagian
terkait dalam pelaksanaan manual ini di supplier.
1. PENDAHULUAN
1.1. TUJUAN, SASARAN DAN RUANG LINGKUP
TUJUAN
Tujuan dari SQAM PT. IGP ,adalah memberikan informasi ke semua Supplier PT.
IGP tentang persyaratan minimal yang harus dipenuhi untuk menjamin kualitas,
servis, pengiriman dan harga terhadap part yang dikirimkan ke PT. IGP sesuai
dengan persyaratan dari PT. IGP, dari mulai tahapan trial hingga tahapan produksi
masal.
SASARAN
5. Menjamin kualitas produk PT. IGP secara menyeluruh mulai dari supplier,
sehingga memenuhi persyaratan kualitas dan kepuasan customer dari PT. IGP.
Prepared by : QAS – PT . IGP
SUPPLIER QUALITY
Edition : 5th Rev. : 00
ASSURANCE MANUAL
Page : 8 of 64
RUANG LINGKUP
Manual ini berlaku untuk semua supplier yang memproduksi material dan part yang
akan digunakan pada produk PT. IGP.
b. Untuk menjamin distribusi informasi diterima tepat waktu dan tepat sasaran.
RUANG LINGKUP
Alur informasi kualitas antara PT. IGP dengan Supplier, dalam hal :
a. Menentukan personel yang bertanggung jawab terhadap semua fungsi dan aspek
kualitas serta delivery produk.
RUANG LINGKUP
Aktivitas koordinasi antara PT. IGP dengan Supplier pada setiap tahapan langkah
aktivitas persiapan produksi dan dokumen apa saja yang harus disiapkan oleh
Supplier untuk diserahkan ke PT. IGP.
Memastikan seluruh persyaratan SQAM PT. IGP telah dipelajari dan dipahami
oleh supplier, dikonfirmasi dapat dipenuhi oleh supplier, serta memastikan
perencanaan di supplier sinkron dengan rencana persiapan produksi dari PT. IGP.
Prepared by : QAS – PT . IGP
SUPPLIER QUALITY
Edition : 5th Rev. : 00
ASSURANCE MANUAL
Page : 11 of 64
RUANG LINGKUP
Dimulai sejak Supplier menerima LOI (Letter of Intent) sampai dengan pembuatan
rencana persiapan produksi.
Memastikan produk yang di desain oleh Supplier sesuai dengan persyaratan produk,
spesifikasi produk dan jadwal desain yang di minta oleh PT. IGP.
RUANG LINGKUP
Sejak diterimanya persyaratan produk (Design Goals, Reliability & Quality Goals,
Product Assurance plan) dari PT. IGP, sampai dengan dikirimnya output desain
(Design Failure Mode and Effects Analysis, Prototype, Engineering Drawing, dll.)
kepada PT. IGP.
c. Prototype
d. Engineering Specification
e. Material Specification
f. Testing Plan
g. Testing Result
RUANG LINGKUP
1. Membuat Draft Part Inspection Standard (PIS) dan mengirimkan ke PT. IGP
untuk persetujuan. Untuk Form PIS lihat Appendix 6.
Prepared by : QAS – PT . IGP
SUPPLIER QUALITY
Edition : 5th Rev. : 00
ASSURANCE MANUAL
Page : 13 of 64
2. Melakukan desain proses dan membuat Process Flow Chart (PFC, lihat Appendix
4) dan Floor Plan Layout.
Untuk menjamin bahwa proses produksi massal sudah siap dijalankan oleh Supplier
dan sesuai dengan spesifikasi yang dipersyaratkan oleh PT. IGP.
RUANG LINGKUP
Aktivitas dimulai dari trial produksi, evaluasi dan produksi massal serta initial
control.
3. Mengirimkan produk hasil trial beserta inspection sheet ke PT. IGP untuk
dievaluasi. Apabila hasil evaluasi oleh Supplier Quality Engineering PT. IGP
(SQE IGP) menyatakan OK berarti boleh untuk dilakukan produksi massal.
Tetapi apabila hasilnya NG maka Supplier harus melakukan tindakan perbaikan
yang diperlukan dan melakukan trial lagi.
4. Supplier harus menyiapkan PPAP submission level 3 dan dikirim ke SQE IGP
yang meliputi :
PPAP List
11. Investigation Sheet and SoC Free Lab Test (lihat Appendix 8)……… S
19. Record of Compliance with Cust. Specific Req. (if any) …………… S
Remarks
S (Submit) = Supplier harus mengirimkan dokumen yang diminta oleh PT. IGP dan
mengendalikan salinan termasuk waktu yang dibutuhkan pada saat proses produksi.
R (Retain) = Supplier harus mengendalikan dokumen ini termasuk waktu yang dibutuhkan pada
saat proses produksi sehingga mudah untuk ditemukan serta bisa dibaca dan tersedia saat diminta
oleh PT. IGP.
Mengidentifikasi masalah yang timbul dan segera memperbaikinya agar tidak terjadi
masalah pada tahap produksi berikutnya.
RUANG LINGKUP
Pengendalian awal pada saat produksi massal, identifikasi masalah dan tindakan
perbaikannya.
Prepared by : QAS – PT . IGP
SUPPLIER QUALITY
Edition : 5th Rev. : 00
ASSURANCE MANUAL
Page : 16 of 64
1. Menentukan kriteria dan batasan periode pengendalian awal bersama PT. IGP
pada saat awal proyek.
4. Jika diperlukan oleh PT. IGP, Supplier wajib mengirimkan man power
sebagai Quality Residence Engineer selama tahap pengendalian awal.
SPTT adalah tim lintas bagian dari PT. IGP yang bertujuan untuk memastikan setiap
tahapan persiapan produksi di Supplier memenuhi persyaratan dari PT. IGP dalam
hal pemenuhan target waktu, jumlah & kualitas produk.
RUANG LINGKUP
Untuk memastikan bahwa produk yang dikirim ke PT. IGP telah dilakukan inspeksi
sesuai dengan spesifikasi yang telah ditentukan.
RUANG LINGKUP
a. Incoming inspection
b. In process inspection
2. Semua material maupun produk yang dikirim ke PT. IGP status hasil
inspeksinya OK.
3. Hasil inspeksi harus dicatat dalam lembar inspeksi (inspection sheet) dan
semua record harus disimpan dalam jangka waktu minimal 3 tahun atau
rentang waktu khusus jika diminta oleh PT. IGP.
4. Material maupun produk yang dikirim ke PT. IGP harus diberi label yang
sesuai untuk mengidentifikasi: nama produk, nomor produk, tanggal
pengiriman, kuantitas dan status hasil inspeksi (OK) dan/atau sistem
identifikasi mampu telusur yang lain.
Prepared by : QAS – PT . IGP
SUPPLIER QUALITY
Edition : 5th Rev. : 00
ASSURANCE MANUAL
Page : 18 of 64
1. Untuk memastikan bahwa setiap material maupun produk yang dikirim ke PT.
IGP dapat teridentifikasi secara jelas dan mampu dilakukan penelusuran.
RUANG LINGKUP
Identifikasi ini berlaku untuk material, produk setengah jadi (WIP), produk jadi yang
ada di tempat Supplier maupun produk yang dikirimkan ke PT. IGP.
1. Menerapkan sistem identifikasi produk yang sesuai sehingga tiap produk yang
dihasilkan dapat ditelusuri tanggal pembuatan, dies/cetakan yang digunakan dan
material yang digunakan serta informasi lainnya yang relevan.
3. Mampu melokalisir apabila ada produk yang bermasalah baik di PT. IGP,
Customer PT. IGP, Pemakai Akhir maupun di internal Supplier.
Prepared by : QAS – PT . IGP
SUPPLIER QUALITY
Edition : 5th Rev. : 00
ASSURANCE MANUAL
Page : 19 of 64
RUANG LINGKUP
1. Melakukan tindakan segera untuk memeriksa lot produk yang terlibat di PT. IGP
dan bila perlu dilakukan sortir atau repair untuk mencegah terjadinya shortage di
PT. IGP.
7. Jika terjadi masalah yang berulang atau membutuhkan waktu perbaikan yang
lama maka Supplier harus menempatkan Quality Residence Engineer di
receiving area PT. IGP sampai masalah tersebut dianggap selesai.
1. Bersama PT.IGP memeriksa lot produk di customer PT. IGP dan bila perlu
melakukan sortir atau repair untuk mencegah terjadinya shortage di customer PT.
IGP.
7. Jika terjadi masalah yang berulang atau membutuhkan waktu perbaikan yang
lama maka Supplier harus menempatkan Quality Residence Engineer di
receiving area PT. IGP sampai masalah tersebut dianggap selesai.
Prepared by : QAS – PT . IGP
SUPPLIER QUALITY
Edition : 5th Rev. : 00
ASSURANCE MANUAL
Page : 22 of 64
yes
no
Supplier make Problem NG part separated from PICA Monitoring should be held
Report, if; OK part after all problem was closed
1. Part from PT. IGP
NOTE
CAR
Investigation
PICA
SUPPLIER
yes
CAR
QA- PT. IGP
Special Quality Acceptance bertujuan untuk mencegah terjadinya Line Stop di PT.
IGP akibat shortage material akibat tidak tersedianya waktu yang mencukupi bagi
Supplier untuk menangani problem penyimpangan kualitas tersebut.
RUANG LINGKUP
2. Bila RFSA disetujui, memberikan identitas khusus pada produk tersebut saat
delivery.
4. Ikut menanggung kerugian yang dialami oleh PT. IGP sehubungan dengan claim
dari Customer PT. IGP terhadap kualitas produk tersebut.
Prepared by : QAS – PT . IGP
SUPPLIER QUALITY
Edition : 5th Rev. : 00
ASSURANCE MANUAL
Page : 24 of 64
Prepared by : QAS – PT . IGP
SUPPLIER QUALITY
Edition : 5th Rev. : 00
ASSURANCE MANUAL
Page : 25 of 64
Untuk memastikan bahwa setiap perubahan proses terkendali dalam jangka waktu
sesuai jadwal guna mengantisipasi potensi terjadinya masalah QCD dan safety yang
akan terjadi.
RUANG LINGKUP
Meliputi:
3. Dalam pengajuan PCR, supplier harus melampirkan data evaluasi efek dari
perubahan ( kapasitas dan kapabilitas proses manufaktur, inspection item /
system, man power, sub-supplier ) & data safety stock untuk pengiriman
selama proses perubahan.
4. Melakukan trial serta menyerahkan trial result dan PPAP ke SQE IGP untuk
persetujuan produk.
RUANG LINGKUP
Meliputi:
4. Apabila ECR disetujui, PT. IGP akan menerbitkan ECI dan Supplier dapat
melakukan perubahan serta mengimplementasikan perubahan sesuai jadwal
dan mereview perkembangannya dalam waktu 2 minggu kerja.
5. Menyerahkan laporan hasil trial dan PPAP ke SQE IGP untuk persetujuan
produk.
5. Menyerahkan laporan hasil trial dan PPAP ke SQE IGP untuk persetujuan
produk.
6. Melaksanakan join trial di PT. IGP, apabila diperlukan.
7. Jika produk sudah disetujui, menginformasikan ke SQE IGP untuk pengiriman
pertama produk mass production.
Supplier akan dievaluasi jika supplier tersebut menyebabkan line stop di PT.
IGP atau Customer PT. IGP. Target pencapaian adalah tidak ada line stop di PT. IGP
Prepared by : QAS – PT . IGP
SUPPLIER QUALITY
Edition : 5th Rev. : 00
ASSURANCE MANUAL
Page : 32 of 64
maupun Customer PT. IGP. Jika Supplier menyebabkan line stop, supplier tersebut
akan mendapatkan kriteria E atau “sangat buruk”.
Rejection Ratio (RR) adalah perbandingan antara jumlah part reject dari
supplier setiap bulan dan jumlah part yang dikirim setiap bulan (%). Target
pencapaian harus dicapai sesuai dengan klausul perjanjian jual-beli yang telah
disepakati.
Quantity Ratio (QR) adalah perbandingan antara jumlah total part yang
dikirim oleh supplier setiap bulan dan jumlah part yang tercatat dalam Purchase
Order (PO) setiap bulan. Target pencapaian adalah 100%.
Jika terjadi problem kualitas, PT. IGP akan menerbitkan Quality Problem
Report (QPR). Setiap QPR yang diterbitkan memerlukan jawaban atau balasan. PT.
IGP akan memonitor setiap jawaban atau balasan dari QPR tersebut. QPR Reply
adalah perbandingan antara QPR yang diterbitkan oleh PT. IGP dan QPR yang
sudah terjawab atau dibalas oleh supplier. Target pencapaian QPR reply adalah
100%.
Metode pengembangan:
Metode Pengembangan:
Audit Supplier.
Metode :
TUJUAN
RUANG LINGKUP
Audit ini dilaksanakan ke setiap Supplier dan disesuaikan dengan kebutuhan dan
kemampuan dari PT. IGP. Pelaksanaan audit mencakup sistem manajemen mutu,
produk, proses, pengelolaan lingkungan dan sistem manajemen K3.
4. Supplier melakukan self assessment sesuai dengan checklist dari PT. IGP di
internal Supplier untuk mereview sistem manajemen di Supplier sebelum
pelaksanaan audit.
Audit Team
develop audit Lead Auditor Selects Lead
plan selects Audit Auditor
Team
Audit Team
Audit Team Supplier meet
reports
conducts minimum
findings to
audit requirements
Supplier
Supplier
Implements
corrective
action
Prepared by : QAS – PT . IGP
SUPPLIER QUALITY
Edition : 5th Rev. : 00
ASSURANCE MANUAL
Page : 38 of 64
TUJUAN
RUANG LINGKUP
Supplier
Representative
Quality
Engineering
SUPPLIER QUALITY
Production
ASSURANCE MANUAL
We as management appoint Supplier Representative (s) with Authority and Responsibility to establish effectiveness of information flow between all of our internal
Page : 40 of 64
-Installation
3. Outline of Manufacturing Process -Final tuning
-Inspection/audit
(5)Prepare C/F
3) Prod Prep Plan
SUPPLIER QUALITY
(1)Production Trial
ASSURANCE MANUAL
(2)Worker training
5) Develop/submit/approve PIC
4. Production Capacity (monthly) 6) Manufacturing quality check
(1)Regular capacity (1)First article inspection
(2)Max capacity (2)Reliability test
(3)Initial variation control
7) ECI
Edition : 5th
9) Limit Sample
10) Countermeasures
against defects
RPN
Failure Failure
RPN
Date
Severity
Prevention Detection Completion Date
Severity
Detection
Detection
Occurence
Classification
Occurrence
Front Door LH Maintain Integrity Integrity breach Corroded interior 5 Upper edge of Design 3 Vehicle 7 105 Laboratory A. Tote (Body Based on test 5 2 3 30
H8HX-000-A of Inner door allows environ lower door panels protective wax requirements durability test. T- accelerated Engineer) results (test no.
panel access of Inner application (#31268) and S18 (7) corrosion test 0X 09 03 1481) upper
door panel specified for inner best practice edge spec raised
door panels is too (BP3455) 125
low 0X 09 30
Insufficient wax Design 3 Vehicle 7 105 Laboratory A. Tote (Body Based on test 5 2 3 30
thickness specified requirements durability test. T- accelerated Engineer) results (test no.
(#31268) and S18 (7) corrosion test 0X 09 03 1481) upper
best practice edge spec raised
Deteriorated life of (BP3455) 125
door leading to: 0X 09 30
- Unsatisfactory Design of J. Smythe (Body DOE shows 25% 5 2 3 30
appearance due to Experiments (DOE) Engineer) variation in
rust through paint on Wax Thickness 0X 10 18 specified
over time thickness is
- Impaired function acceptable
of Interior door 0X 10 25
SUPPLIER QUALITY
hardware
ASSURANCE MANUAL
Panduan pengisian dan Evaluasi all areas Vehicle and specified wax 0X 10 25 affected areas
durability test. T- (errorr-proofed)
Page : 42 of 64
between panels for evaluation of using design aid Assy Ops showed adequate
Analysis” 4th Edition yang spray head access spray head buck and spray 0X 11 15 access
access (4) head 0X 12 15
diterbitkan oleh Chrysler, Ford & Vehicle
General Motor durability test T-
Rev. : 00
Prepared by : QAS – PT . IGP
118 (7)
PROCESS FLOW CHART SUPPLIER :
PREPARED :
WSP- CUTTING
1.1 CUTTING 1 NEW MACHINE
0000 MACHINE
ROBOT
WSP-
1.2 MACHINING ARCH 1 NEW MACHINE
0000
WELDING
APPENDIX 4 (Process Flow Chart)
SUPPLIER QUALITY
ASSURANCE MANUAL
ROBOT
WSP-
1.2 WELDING ARCH 1 NEW MACHINE
0000
WELDING
STORAGE
Edition : 5th
Page : 43 of 64
Item: xxxxxxxxxxxxxxxxxx Process Responsibility : Mfg Engineering Prepared by : A. Tote - Mfg Engineering
Team: T. Fender - Mfg. Engineering., C. Childers - Manufacturing., J. Ford - Assy Ops Date (Rev.) : 03/03/03
e
Mode of Failure Failure Actions R.P.N
Date
Severity
Prevention Detection Completion Date
Detection
Function
Classification
Occurenc
Severity
Occurence
Detection
OP 70: Cover inner Insufficient w ax Allow s integrity 7 Manually inserted spray None 8 Variables check for 5 280 Add positive depth Mfg Eningeering by Stop added sprayer 7 2 5 70
Manual door panel coverage over breach of inner door head not inserted far film thickness stop to sprayer 0X 10 15 checked online
application of low er surfaces specified surfaces panel enough Visual check for
w ax inside w ith w ax to coverage
door panel specification Corroded Interior Automate spraying Mfg Engineering by Rejected due
thickness low er door panel 0X 12 15 complexity of
different doors on
Deteriorated life of the same line
door leading to: Spray head clogged Test spray at start- 5 Variable check for 5 175 Use Design of Mfg Engineering by Temp and Press 7 1 5 35
SUPPLIER QUALITY
- Unsatisfactory - Viscosity too high up and after idle film thickness experiments (DOE) 0X 10 01 Limits w ere
ASSURANCE MANUAL
appearance due to - Temperature too low periods and on viscosity vs determined and limit
rust through paint - Pressure too low preventive Visual check for temperature vs controls have been
over time maintenance coverage pressure installed.
- Impaired function of program to cleam Control charts show
Interior door heads process is in control
hardw are Cpk=1.85
Spray head deformed due Preventive 5 Variable check for 5 70 None
to Impact maintenance film thickness
Edition : 5th
Note :
programs to maintain
Page : 44 of 64
- TS (Toyota Standards)
- dan lain-lain
2. Panduan Pengisian
2.1 Isi halaman judul dengan data yang sesuai (Part Name, Part Number, Material,
Weight, nomor dokumen, dll)
2.2 Isi kolom Drawing dengan gambar yang disertai nomor-nomor penunjukan
setiap karakteristik produk yang sesuai.
- Fungsi
- Performance:
> Material
> Torque/Pengencangan
- Appearance/penampakan
- dan lain-lain
2.3.4 RANK :
- Metode dan jumlah pengambilan sampel inspeksi baik pada saat proses
maupun saat delivery
- Diisi sesuai dengan kebutuhan PT. IGP (diisi oleh PT. IGP)
2.3.7 REMARKS :
2.4 Isi kolom nama PT dan tanda tangan pada kolom approval pada bagian bawah
form
Prepared by : QAS – PT . IGP
SUPPLIER QUALITY
Edition : 5th Rev. : 00
ASSURANCE MANUAL
Page : 48 of 64
x FINAL
SUPPLIER QUALITY ASSURANCE
Prepared by : QAS – PT . IGP
SUPPLIER QUALITY
Edition : 5th Rev. : 00
ASSURANCE MANUAL
Page : 49 of 64
Page 2 of 2
MODEL
PART INSPECTION STANDARD
XXXX DOC. NO. : 001/PIS/XXXX/RA/I/05
PART NO : PART NAME : MATERIAL GENERAL TOL. WEIGHT
X33X-Z22Z
TUBE, R/L STKM 13 B JIS 0000 25 kg
X32X-Z11Z
SKETCH:
Q
Prepared by : QAS – PT . IGP
SUPPLIER QUALITY
Edition : 5th Rev. : 00
ASSURANCE MANUAL
Page : 50 of 64
Control Plan / Quality Control Process Chart adalah dokumentasi sistem atau proses
yang diperlukan dalam rangka mengendalikan produk agar sesuai dengan
persyaratan pelanggan. Tujuan dibuatnya Control Plan/Quality Control Process
Chart adalah mengidentifikasi setiap tahapan proses dan metode yang digunakan
untuk mengendalikan kualitas proses manufaktur untuk menjamin agar produk yang
dihasilkan sesuai dengan keinginan pelanggan.
1. KOLOM HEADER
- Isi kolom header dengan informasi yang sesuai (Nomor Produk, Nama Produk,
Model, Nama Supplier, dll
- Kolom Core Team diisi dengan nama manpower yang ikut serta dalam
mereview atau menyusun Control Plan/Quality Control Process Chart
- Isi dengan nomor proses (identifikasi urutan proses) dan beri simbol proses
seperti dalam Process Flow Chart
- Diisi dengan nama proses sesuai urutan proses dalam Process Flow Chart (raw
material sampai dengan delivery):
* Material
* Persiapan produksi
* Proses assembling
* Proses finishing
* Final Inspection
* Packaging
* Storage
* Delivery
- Diisi dengan item kontrol yang bisa dikonfirmasi pada produk (Misal :
Dimensi, Hardness, Appearance, Penetrasi Welding dll)
- Diisi dengan item kontrol dari proses yang berpengaruh pada karakteristik
produk namun tidak bisa dilakukan konfirmasi pada produk dengan pengecekan
100%. (Misal : Penetrasi Welding Item kontrol dari proses adalah Ampere,
Voltage, Jarak Torch, Gas Flow Rate dll)
- Diisi dengan standard dari item kontrol produk maupun proses dan toleransi
yang diijinkan.
- Diisi dengan metode kontrol yang digunakan untuk mengontrol setiap item
kontrol (misal; Pemeriksaan visual, pengukuran dengan vernier caliper,
pengukuran dengan mistar, dll)
- Diisi dengan jumlah part yang disampling/data yang diambil (SIZE) dan
frekuensi pengambilan sample (FREQ). (misal; 1 / 50pcs, 1 / jam, 1 / lot, dll)
- Diisi dengan cara mengontrol setiap item kontrol baik proses maupun produk.
(misal; pencatatan pada checksheet oleh operator, pengecekan oleh group
leader, pemberian tanda pemeriksaan pada produk, dll)
Char.
Operation
Special
Number Tools For Mfg Tolerance Size Freq Method
Description Technique
Receiving 1 Outer Diameter Ø 57 ±0,20 Vernier Caliper 5
Inspection by
+0,25
1.1 QCO 2 Thickness 4,5 Vernier Caliper
+0,10
No Dent, Rust, Scratch,
6 Appearance Visual Check AQL 2,5
Crack
C : 0.25 Max, Every Quarantine and return
Checksheet
Receiving to Supplier
Chemical Si : 0.35 Max,
composition
7 Mn : 0.30 ~ 0.90, Mill Sheet 100%
( STKM 13B ) P : 0.040 Max
S : 0.040 Max
Cutting Cutting Appearance Free from scratch Visual Check
1 100% 100% by Operator Quarantine, Repair or
Machine
Check Sheet Reject Produk
1.2 2 Length 150 ±0,5 Vernier Caliper 1 Hour
by Operator
Welding Arc Welding Must be continue, no
1 Bead Condition Visual Check 100% 100% by Operator
Robot crack, blow hole, under
5 ±2,0 Every Start
1.3 2 Length of welding Steel Ruler 1 by Operator
Production Quarantine, Repair or
SUPPLIER QUALITY
4 Parameter Welding
Final Appropriate within Appropriate within Appropriate within Checksheet Quarantine, Repair or
1 1 100
Page : 53 of 64
Inspection Inspection Std Inspection Std Inspection Std by Inspector Reject Produk
Storage - Saving of finish goods Must be keeped under Visual Inspection Move to under roof (Dry
1 100% 100% by Operator
roof area (Dry Area) Area)
2 Flow part Must be FIFO In Out Fifo Card 100% 100% by Operator Return to storage
Symbol : REVISON RECORD :
Process Quality Inspection
Transportation Quantity Inspection
Delivery Process & Quality Inspection
0
Rev. : 00
PACKING SPECIFICATION
UNIQUE NO.
Order system E- Kanban Part
X33X-Z111Z-01
Model No.
Order of Man
Part Number Part Name Supplier Q'TY(s) Part Name STOPPER
Packing Hours
7 PC Rack
8 Line Rack
2
Supplier :
Engineering Quality Delivery
4
Prepared by : QAS – PT . IGP
SUPPLIER QUALITY
Edition : 5th Rev. : 00
ASSURANCE MANUAL
Page : 56 of 64
Safet y and/or
Government Regulat ion : Yes No Engineering Drawing Change Level : Revisi 1 Dat ed :
Applicat ion :
City /State/Postal Code
Not e : Does t his part cont ain any rest rict ed or report able subst ances YES NO
Are plast ic part s indent ified wit h appropriat e ISO making code YES NO
REAS O N FO R S UBMIS S IO N
Init ial Submission Change t o Opt ional Const rruct ion or Mat erial
Engineering Change(s) Sub-Supplier or Mat erial Source Change
T ooling: T ransfer, Replacement , Refurbishment , or addit ional Change in P art P rocessing
Correct ion of Discrepancy P art s P roduced at Addit ional Locat ion
T ooling inact ive > t han 1 year Ot her - please spcify
Level 1 - Warrant only (and for designat ed appearance it ems, an Appearance Approval Report ) submit t ed t o cust omer
Level 2 - Warrant wit h product samples and limit t ed support ing dat a submit t ed t o cust omer
Level 3 - Warrant wit h product samples and complet e support ing dat a submit t ed t o cust omer
Level 5 - Warrant wit h product samples and complet e support ing dat a reviewed at supplier's manufact uring locat ion
T he result s for dimensional measurement s mat erial and funct ional t est appearance crit eria st at ist ical process package
t he result s meet all drawing and specificat ion requirement s : Yes No (if "NO" - Explanat ion Required)
Mold / Cavit y / P roduct ion P rocess……………………………..
DEC LARATIO N
I hereby affirm t hat t he samples represent ed by t his warrent are represent at ive of our part s and have been made t o t he applicable
P roduct ion P art Approval P rocess Manual 3rd Edit ion Requirement s. I furt her warrant t hese samples were
produce at product ion rat e of……300…./ 8 hours. I have not ed any deviat ion from t his declarat ion bellow
P art Disposit ion Approved Reject ed P art Funct ion Approval : Approved
Ot her Waived
Judgement
ACCEPTANCE NON ACCEPTANCE
PROBLEM :
Identif ication of special acceptance product Expected due date Order No.
of judgement
Manager Manager
Model Part No. Part Name Part cetegory
No inspection / Saf ety / Essential Quality /
History control / General
Issue date …………………………………
APPROVAL STAGE: A B PCR No …………………………………
PROCESS CHANGE REQUEST
To: PROCUREMENT & VENDOR DEV DIVISION ATTN : SUBMISSION DATE :
MODEL : SUPPORTING DOCUMENTS ATTACHED : PARTS CHARACTERISTIC TO BE AFFECTED : ESTIMATED
SUB-SUPPLIER CHANGE REQUEST PRICE CHANGE
PART NO : QC PROCESS CHART +
Piece
INSPECTION STANDARD -
PART NAME : PART EVALUATION RESULT PROPOSED IMPLEMENTATION DATE :
PPAP SCHEDULE
REASON : CHANGE ITEM : FROM :
QUALITY ECI ( No. ) SOURCE CHANGE TOOLING SUPPLIER :
COST OTHERS MFG LOCATION MAN POWER
CAPACITY ( ) MFG PROCESS OTHERS ( ) MANUFACTURING LOCATION :
CHANGE CONTENTS DESCRIPTION
COMPLETED BY SUPPLIER
PREVIOUS PROCESS : NEW PROCESS : CONTACT PERSON : APPROVED CHECKED PREPARED
NAME :
PLAN STAGE
DEPT/DIV :
PHONE/MOBILE:
EMAIL :
MEETING BEFORE DELIVERY INADEQUATE,RE-SUBMIT PLAN PRC Dept. H. ENG Dept. H. QAS Dept H.
SUPPLIER QUALITY
IGP APPROVAL
SAMPLE SUBMISSION APPROVED NOT APPROVED
ASSURANCE MANUAL
APPROVAL STAGE
MASS APPROVED CHECKED PREPARED INITIAL QUALITY CONFIRMED PRC Dept. H. ENG Dept. H. QAS Dept H.
B PRODUCTION QTY :__________ Product Identification DATE
(INITIAL CONTROL)
SAMPLE ID: '
ROUTING : SUPPLIER PT. IGP PRC PT. IGP Tech. Admin PT. IGP Proc. ENG & SQE PT. IGP PRC SUPPLIER ( REPEAT FOR EACH REQUIRED APPROVAL STAGE )
Rev. : 00
Prepared by : QAS – PT . IGP
Prepared by : QAS – PT . IGP
SUPPLIER QUALITY
Edition : 5th Rev. : 00
ASSURANCE MANUAL
Page : 60 of 64
DIVISION
Performance Improvement
Productivity Improvement
Cost Reduction
Others ( Describe )
CONTENTS OF REQUEST
DATE :
APPROVED PREPARED
Issue date …………………………………
APPROVAL STAGE: A B PCR No …………………………………
ENGINEERING CHANGE REQUEST
To: PROCUREMENT & VENDOR DEV DIVISION ATTN : SUBMISSION DATE :
MODEL : SUPPORTING DOCUMENTS ATTACHED : PARTS CHARACTERISTIC TO BE AFFECTED : ESTIMATED ESTIMATED
MERIT COST ANALYSIS SCHEDULE MASS CHANGE PRICE CHANGE
PART NO : QC PROCESS CHART CYCLE TIME + +
Piece Piece
INSPECTION STANDARD EVALUATION - -
PART NAME : PART EVALUATION RESULT PROPOSED IMPLEMENTATION DATE :
PPAP
REASON : CHANGE ITEM : FROM :
QUALITY PERFORMANCE DIMENSION /SPECIFICATION SUPPLIER :
COST IMPROVEMENT MATERIAL
CAPACITY OTHERS HEAT TREATMENT MANUFACTURING LOCATION :
PRODUCTIVITY OTHERS ( )
CHANGE CONTENTS DESCRIPTION
COMPLETED BY SUPPLIER
CURRENT CONDITION : FUTURE CONDITION CONTACT PERSON : APPROVED CHECKED PREPARED
PLAN STAGE
NAME :
DEPT/DIV :
PHONE/MOBILE:
EMAIL :
MEETING BEFORE DELIVERY INADEQUATE,RE-SUBMIT PLAN PRC Dept. H. ENG Dept. H. QAS Dept H.
SUPPLIER QUALITY
IGP APPROVAL
SAMPLE SUBMISSION APPROVED NOT APPROVED
ASSURANCE MANUAL
SUPPLIER DATE
SHIP DATE: '
APPROVAL STAGE
MASS APPROVED CHECKED PREPARED INITIAL QUALITY CONFIRMED PRC Dept. H. ENG Dept. H. QAS Dept H.
C PRODUCTION QTY :__________
(INITIAL CONTROL)
SAMPLE ID: '
ROUTING : SUPPLIER PT. IGP PRC PT. IGP Tech. Admin PT. IGP Proc. ENG & SQE PT. IGP PRC SUPPLIER ( REPEAT FOR EACH REQUIRED APPROVAL STAGE )
Rev. : 00
Prepared by : QAS – PT . IGP
Prepared by : QAS – PT . IGP
SUPPLIER QUALITY
Edition : 5th Rev. : 00
ASSURANCE MANUAL
Page : 62 of 64
DIVISION
Performance Improvement
Productivity Improvement
Cost Reduction
Others ( Describe )
CONTENTS OF REQUEST
DATE :
APPROVED PREPARED
Prepared by : QAS – PT . IGP
SUPPLIER QUALITY
Edition : 5th Rev. : 00
ASSURANCE MANUAL
Page : 63 of 64
Supllier : Material :
Model : Weight : gr
Part name :
Part number : ECR\PCR\ECI No : _____________________________
ALL REQUIRED QUALITY DOCUMENT HAVE BEEN SUBMITTED AND APPROVED BY FOLLOWING DETAILS :
1.PRODUCTION PREPARATION
QUALITY DOCUMENT AVAILABLE REMARK
Process Flow Chart
Quality control process ( QCPC )
Proses Failure Methode Effect Analysis(PFMEA)
Supplier :
EXPLANATION OF TEMPORARY COUNTERMEASURE Approved Checked Incharge
TO BE TAKEN ABOVE CATEGORIES WHICH DO NOT
MEET REQUIREMENTS ARE ATTACHED
REJECT Resubmition