Ket : Segmen A terletak di depan Rumah Sakit Andi Jemma Masamba, Segmen B
terletak di depan Pasar Sentral Masamba.
Volume LHR maksimum terjadi hari senin dengan hari kamis pukul 07.00–08.00
sebesar 1.967 smp/jam.
PROYEKSI PERTUMBUHAN LALU LINTAS
Pertumbuhan Kendaraan 9 % (Rata2 Sulsel). Kondisi kritis (VCR ˃0,75) Dicapai pada
Tahun 2025
Sumber: Sardin, Jinca M.Y, 2018, Performance on The Arterial Road in North Luwu
Regency, Published on IOSR Journal of Mechanical and Civil Engineering Vol. 15,
Issue 3, May 2018.