Anda di halaman 1dari 140

DAFTAR HARGA SATUAN BAHAN

LOKASI PEKERJAAN : KOTA MERAUKE - DISTRIK MERAUKE

KEGIATAN : HARGA SATUAN DINAS PEKERJAAN UMUM, PENATAAN RUANG DAN PERTANAHAN
PEKERJAAN : PERHITUNGAN HARGA SATUAN BAHAN, UPAH, PEKERJAAN DAN KEGIATAN
LOKASI : KOTA MERAUKE - DISTRIK MERAUKE
KABUPATEN / PROPINSI : MERAUKE - PAPUA
TAHUN ANGGARAN : 2017
SUMBER DANA : ---

PERIODE : JANUARI - JUNI 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


Kode Harga Tingkat Ongkos Harga Dasar + Overhead Harga Satuan
No. Nama Bahan/Barang Barang Satuan Dasar Inflasi Angkut Inflasi + + on Site Project Ket.
( Rp. ) ( %. ) (Rp) Ongkos angkut Profit (Tanpa PPN)
1 2 3 4 5 6 7 8 9 10 11

A. BAHAN BAKAR DAN PENCAMPUR


1 Bensin Industri MA.1 Liter 8,069.00 0.00% 335.00 8,404.00 1,260.00 9,664.00
2 Solar Industri MA.2 Liter 10,307.00 0.00% 335.00 10,642.00 1,596.00 12,238.00
3 Minyak Tanah Industri MA.3 Liter 9,044.00 0.00% 335.00 9,379.00 1,406.00 10,785.00
4 Minyak Pelumas / Olie MA.4 Liter 30,000.00 0.00% 335.00 30,335.00 4,550.00 34,885.00
5 Minyak Bekisting / Oli Bekas MA.5 Buah 500.00 0.00% 335.00 835.00 125.00 960.00
6 Polimer MA.6 Liter 17,500.00 0.00% 475.00 17,975.00 2,696.00 20,671.00
7 Aspal MA.7 Kg 17,700.00 0.00% 355.00 18,055.00 2,708.00 20,763.00
8 Residu / Teer MA.8 Liter 21,066.00 0.00% 711.00 21,777.00 3,266.00 25,043.00

B. BAHAN PASIR, BATU DAN SEMEN


1 Pasir semen (Import) MB.1 M3 ### 0.00% 40,655.00 1,165,655.00 174,848.00 1,340,503.00
2 Pasir semen (Pasang-lokal) MB.2 M3 600,000.00 0.00% 200,660.00 800,660.00 120,099.00 920,759.00
3 Tanah timbun biasa/urug MB.3 M3 200,000.00 0.00% 80,130.00 280,130.00 42,019.00 322,149.00
4 Tanah pilihan (Selmat) MB.4 M3 250,000.00 0.00% 80,130.00 330,130.00 49,519.00 379,649.00
5 Batu kerikil/ koral beton (Import) MB.5 M3 ### 0.00% 60,240.00 1,185,240.00 177,786.00 1,363,026.00
6 Batu kali/Gunung - Import MB.6 M3 ### 0.00% 60,240.00 1,310,240.00 196,536.00 1,506,776.00
7 Batu bata merah MB.7 Buah 1,200.00 0.00% 200.00 1,400.00 210.00 1,610.00
8 Batu cetak 10 x 20 x 30 Cm MB.8 Buah 2,000.00 0.00% 430.00 2,430.00 364.00 2,794.00
9 Paving blok (tidak Warna) MB.9 Buah 5,500.00 0.00% 200.00 5,700.00 855.00 6,555.00
10 Semen Portland (PC) @ 50 Kg MB.10 Zak 97,500.00 0.00% 7,560.00 105,060.00 15,759.00 120,819.00
11 Semen PC Putih / Warna MB.11 Zak 126,250.00 0.00% 7,560.00 133,810.00 20,071.00 153,881.00
12 Tepung Gypsum MB.12 Zak 89,750.00 0.00% 9,280.00 99,030.00 14,854.00 113,884.00

C. BAHAN KAYU, TRIPLEKS DLL


1 Balok Kayu Kelas III (Kayu Bus) MC.1 M3 ### 0.00% 138,100.00 2,721,433.00 408,214.00 3,129,647.00
2 Balok Kayu Kelas II (Kayu Rahay) MC.2 M3 ### 0.00% 159,340.00 3,576,006.00 536,400.00 4,112,406.00
3 Balok Kayu Kelas I (Kayu Besi) MC.3 M3 ### 0.00% 180,590.00 7,180,590.00 1077088 8,257,678.00
4 Balok Kayu Kelas IV (Kayu Putih, Susu, MC.4 M3 ### 0.00% 106,230.00 2,272,896.00 340,934.00 2,613,830.00
5 Papan Kayu Kelas III (Kayu Bus) t = 2-5 MC.5 M3 ### 0.00% 138,100.00 2,721,433.00 408,214.00 3,129,647.00
6 Papan Kayu Kelas II (Kayu Rahay) t = 2 MC.6 M3 ### 0.00% 159,340.00 3,659,340.00 548,901.00 4,208,241.00
7 Papan Kayu Kelas II (Kayu Rahay) t = 3 MC.7 M3 ### 0.00% 159,340.00 3,826,006.00 573,900.00 4,399,906.00
8 Papan Kayu Kelas I (Kayu Besi) t = 2 - 3 MC.8 M3 ### 0.00% 180,590.00 7,680,590.00 1152088 8,832,678.00
9 Papan Kayu Kelas IV (tebal = 2-5 cm) MC.9 M3 ### 0.00% 106,230.00 2,272,896.00 340,934.00 2,613,830.00
10 Kayu Lat/Reng/List, Kayu Kelas II MC.10 Batang 25,000.00 0.00% 330.00 25,330.00 3,799.00 29,129.00
11 Tripleks (1,22 x 2,44) cm - tebal 3 mm MC.11 Lembar 61,937.00 0.00% 1,270.00 63,207.00 9,481.00 72,688.00
12 Tripleks (1,22 x 2,44) cm - tebal 4 mm MC.12 Lembar 78,500.00 0.00% 1,700.00 80,200.00 12,030.00 92,230.00
13 Tripleks (1,22 x 2,44) cm - tebal 6 mm MC.13 Lembar 101,214.00 0.00% 2,550.00 103,764.00 15,564.00 119,328.00
14 Tripleks (1,22 x 2,44) cm - tebal 9 mm MC.14 Lembar 158,142.00 0.00% 3,830.00 161,972.00 24,295.00 186,267.00
15 Tripleks (1,22 x 2,44) cm - tebal 12 mm MC.15 Lembar 217,142.00 0.00% 5,110.00 222,252.00 33,337.00 255,589.00
16 Tripleks (1,22 x 2,44) cm - tebal 15 mm MC.16 Lembar 266,428.00 0.00% 6,390.00 272,818.00 40,922.00 313,740.00
17 Tripleks (1,22 x 2,44) cm - tebal 18 mm MC.17 Lembar 300,714.00 0.00% 8,090.00 308,804.00 46,320.00 355,124.00
18 Tripleks (1,22 x 2,44) cm - tebal 22 mm MC.18 Lembar 300,000.00 0.00% 9,370.00 309,370.00 46,405.00 355,775.00
19 Teak - Wood (1.22 x 2.44 Cm) - 3 mm MC.19 Lembar 131,000.00 0.00% 1,270.00 132,270.00 19,840.00 152,110.00
20 Teak - Wood (0.92 x 2.44 Cm) - 4 mm MC.20 Lembar 114,000.00 0.00% 1,700.00 115,700.00 17,355.00 133,055.00
21 Plywood - Multiplex MC.21 Lembar 286,250.00 0.00% 3,140.00 289,390.00 43,408.00 332,798.00
22 Melamin MC.22 Lembar 116,666.00 0.00% 3,140.00 119,806.00 17,970.00 137,776.00
23 Formika Polos (122 x 244) Cm MC.23 Lembar 565,000.00 0.00% 2,550.00 567,550.00 85,132.00 652,682.00
24 Pelat Asbes Tebal 6 mm MC.24 Lembar 70,000.00 0.00% 2,660.00 72,660.00 10,899.00 83,559.00
25 Pelat Asbes Tebal 5 mm MC.25 Lembar 65,000.00 0.00% 2,210.00 67,210.00 10,081.00 77,291.00
26 Pelat Asbes Tebal 4 mm MC.26 Lembar 60,000.00 0.00% 2,210.00 62,210.00 9,331.00 71,541.00
27 Gypsum Board tebal 9 mm MC.27 Lembar 89,625.00 0.00% 2,370.00 91,995.00 13,799.00 105,794.00
28 List profil Gypsum Lebar Sampai 5 cm MC.28 M' 35,000.00 0.00% 270.00 35,270.00 5,290.00 40,560.00
29 Hard Board MC.29 Lembar 80,000.00 0.00% 2,370.00 82,370.00 12,355.00 94,725.00
30 Tiang Kayu Bulat (Dia 20 cm, L=4-6 m) MC.30 Batang 100,000.00 0.00% 20,130.00 120,130.00 18,019.00 138,149.00
31 Tiang Kayu Bulat (Dia 25-30 cm, L=4-6 MC.31 Batang 125,000.00 0.00% 76,140.00 201,140.00 30,171.00 231,311.00
32 Kayu dolken Ø 8-10, L=4 M Kayu Bus MC.32 Batang 12,500.00 0.00% 3,760.00 16,260.00 2,439.00 18,699.00
33 Patok kayu bulat (Dia = 3 cm, L= 1 m) MC.33 Batang 3,000.00 0.00% - 3,000.00 450.00 3,450.00
34 Patok kayu bulat (Dia = 5 cm, L= 5 m) MC.34 Batang 5,000.00 0.00% - 5,000.00 750.00 5,750.00
35 Kayu Bakar (Bus Campuran) MC.35 M3 400,000.00 0.00% - 400,000.00 60,000.00 460,000.00

D. BAHAN BESI, PAKU DAN KAWAT


1 Besi Beton Dia.6 mm (SNI) MD.1 Kg 12,199.00 0.00% 220.00 12,419.00 1,862.00 14,281.00
2 Besi Beton Dia.8 mm (SNI) MD.2 Kg 11,063.00 0.00% 240.00 11,303.00 1,695.00 12,998.00
3 Besi Beton Dia.10 mm (SNI) MD.3 Kg 11,137.00 0.00% 260.00 11,397.00 1,709.00 13,106.00
4 Besi Beton Dia.12 mm (SNI) MD.4 Kg 11,258.00 0.00% 360.00 11,618.00 1,742.00 13,360.00
5 Besi Beton Dia.14 mm (SNI) MD.5 KG 9,511.00 0.00% 310.00 9,821.00 1,473.00 11,294.00
6 Besi Beton Dia.16 mm (SNI) MD.6 KG 10,675.00 0.00% 460.00 11,135.00 1,670.00 12,805.00
7 Besi Beton Dia.19 mm (SNI) MD.7 KG 10,333.00 0.00% 370.00 10,703.00 1,605.00 12,308.00
8 Besi Beton Dia.22 mm (SNI) MD.8 KG 10,000.00 0.00% 340.00 10,340.00 1,551.00 11,891.00
9 Kawat Beton MD.9 KG 18,666.00 0.00% 260.00 18,926.00 2,838.00 21,764.00
10 Kawat beton / bindrat 4 mm MD.10 KG 18,100.00 0.00% 260.00 18,360.00 2,754.00 21,114.00
Kode Harga Tingkat Ongkos Harga Dasar + Overhead Harga Satuan
No. Nama Bahan/Barang Barang Satuan Dasar Inflasi Angkut Inflasi + + on Site Project Ket.
( Rp. ) ( %. ) (Rp) Ongkos angkut Profit (Tanpa PPN)
1 2 3 4 5 6 7 8 9 10 11
11 Paku 1" (2,5 - 3 cm) MD.11 KG 16,571.00 0.00% 250.00 16,821.00 2,523.00 19,344.00
12 Paku 2" (5 cm) MD.12 KG 13,875.00 0.00% 250.00 14,125.00 2,118.00 16,243.00
13 Paku 3" (7 cm) MD.13 KG 13,875.00 0.00% 250.00 14,125.00 2,118.00 16,243.00
14 Paku 4" (10 cm) MD.14 KG 13,812.00 0.00% 250.00 14,062.00 2,109.00 16,171.00
15 Paku 5" (12 - 15 cm) MD.15 KG 14,437.00 0.00% 250.00 14,687.00 2,203.00 16,890.00
16 Paku Campur MD.16 KG 14,500.00 0.00% 250.00 14,750.00 2,212.00 16,962.00
17 Paku Seng MD.17 KG 20,375.00 0.00% 290.00 20,665.00 3,099.00 23,764.00
18 Paku Ardex Ulir MD.18 KG 26,250.00 0.00% 250.00 26,500.00 3,975.00 30,475.00
19 Paku Sirap MD.19 Buah 15,000.00 0.00% 250.00 15,250.00 2,287.00 17,537.00
20 Paku Ondoline MD.20 KG 20,000.00 0.00% 250.00 20,250.00 3,037.00 23,287.00
21 Paku Tembok / Kecil 2/3 MD.21 Buah 400.00 0.00% 250.00 650.00 97.00 747.00
22 Paku/Skrup 5 cm MD.22 KG 35,000.00 0.00% 250.00 35,250.00 5,287.00 40,537.00
23 Kawat Nyamuk (Plastik / Nylon) MD.23 M 19,100.00 0.00% 146.00 19,246.00 2,886.00 22,132.00
24 Kawat Has / Bankhas dia 12 mm MD.24 M2 35,000.00 0.00% 162.00 35,162.00 5,274.00 40,436.00
25 Kawat Harmonika Has 40x40 mm MD.25 M 42,875.00 0.00% 818.00 43,693.00 6,553.00 50,246.00
26 Kawat burung MN.26 M² 19,750.00 0.00% 818.00 20,568.00 3,085.00 23,653.00
27 Kawat Duri Baja 30 M MD.27 KG 15,780.00 0.00% 230.00 16,010.00 2,401.00 18,411.00
28 Kawat Las 0.26 MD.28 Dos 172,200.00 0.00% 260.00 172,460.00 25,869.00 198,329.00
29 Timah Solder MD.29 KG 60,000.00 0.00% 90.00 60,090.00 9,013.00 69,103.00
30 Baut Jembatan Dia. 19 mm MD.30 KG 10,000.00 0.00% 250.00 10,250.00 1,537.00 11,787.00
31 Baut Dia, 3/8" - 17.5 + Mur - Ring MD.31 Buah 4,175.00 0.00% 250.00 4,425.00 663.00 5,088.00
32 Baut Dia, 3/8" - 12.0/15.0 + Mur - Ring MD.32 Buah 3,425.00 0.00% 250.00 3,675.00 551.00 4,226.00
33 Baut Dia, 3/8" - 20.0 + Mur - Ring MD.33 Buah 4,600.00 0.00% 250.00 4,850.00 727.00 5,577.00
34 Baut Dia, 3/8" - 35.0 + Mur - Ring MD.34 Buah 6,000.00 0.00% 250.00 6,250.00 937.00 7,187.00
35 Besi angkur dia. 8 mm MN.35 Buah 10,000.00 0.00% 250.00 10,250.00 1,537.00 11,787.00
36 Kasa (Ram Ayam) Dia, 10 mm MD.36 M 20,166.00 0.00% 346.00 20,512.00 3,076.00 23,588.00
37 Besi Siku 30 . 30 . 3 - L = 6 Meter MD.37 Batang 66,750.00 0.00% 2,400.00 69,150.00 10,372.00 79,522.00
38 Besi Siku 50 . 50 . 5 - L = 6 Meter MD.38 Batang 172,000.00 0.00% 7,080.00 179,080.00 26,862.00 205,942.00
39 Besi Siku 50 . 50 . 6 - L = 6 Meter MD.39 Batang 185,000.00 0.00% 7,410.00 192,410.00 28,861.00 221,271.00
40 Besi Siku 40 . 40 . 4 - L = 6 Meter MD.40 Batang 113,300.00 0.00% 3,760.00 117,060.00 17,559.00 134,619.00
41 Besi Siku 40 . 40 . 5 - L = 6 Meter MD.41 Batang 101,500.00 0.00% 6,750.00 108,250.00 16,237.00 124,487.00
42 Besi Siku 20 . 20 . 3 - L = 6 Meter MD.42 Batang 82,250.00 0.00% 1,480.00 83,730.00 12,559.00 96,289.00
43 Besi Plat 1.0 mm - 120 x 240 Cm MD.43 Lembar 305,000.00 0.00% 7,010.00 312,010.00 46,801.00 358,811.00
44 Besi Plat 1.2 mm - 120 x 240 Cm MD.44 Lembar 359,750.00 0.00% 7,330.00 367,080.00 55,062.00 422,142.00
45 Besi Plat 2.0 mm - 120 x 240 Cm MD.45 Lembar 541,500.00 0.00% 11,130.00 552,630.00 82,894.00 635,524.00
46 Besi Plat 3.0 mm - 120 x 240 Cm MD.46 Lembar 833,750.00 0.00% 13,020.00 846,770.00 127,015.00 973,785.00
47 Besi Plat 12 mm -120 x 240 cm MD.47 Lembar 400,000.00 0.00% 41,580.00 441,580.00 66,237.00 507,817.00
48 Besi Strip 20.2 MD.48 Batang 33,166.00 0.00% 390.00 33,556.00 5,033.00 38,589.00
49 Besi Strip 30.3 MD.49 Batang 53,000.00 0.00% 920.00 53,920.00 8,088.00 62,008.00
50 Besi Strip 40.4 MD.50 Batang 51,500.00 0.00% 1,790.00 53,290.00 7,993.00 61,283.00
51 Besi Strip 50.5 MD.51 Batang 82,000.00 0.00% 2,470.00 84,470.00 12,670.00 97,140.00
52 Waltermur Dia 16 mm MD.52 Buah 16,750.00 0.00% 3,600.00 20,350.00 3,052.00 23,402.00
53 Gording lips chanel 150.65.20.2,3 ( 6 N ) MD.53 Batang 725,000.00 0.00% 3,600.00 728,600.00 109,290.00 837,890.00
54 Baja profil IWF MD.54 KG 21,000.00 0.00% 210.00 21,210.00 3,181.00 24,391.00
55 Besi gording canal MD.55 KG 24,500.00 0.00% 210.00 24,710.00 3,706.00 28,416.00
56 Water mur MD.56 KG 35,000.00 0.00% 210.00 35,210.00 5,281.00 40,491.00
57 Sealent MD.57 Tube 22,500.00 0.00% 210.00 22,710.00 3,406.00 26,116.00

E. BAHAN PENUTUP ATAP


1 Seng Gelombang BJLS 0,30 ME.1 Lembar 65,000.00 0.00% 660.00 65,660.00 9,849.00 75,509.00
2 Seng Gelombang BJLS 0,22 ME.2 Lembar 59,500.00 0.00% 600.00 60,100.00 9,015.00 69,115.00
3 Seng Gelombang BJLS 0,20 ME.3 Lembar 43,312.00 0.00% 530.00 43,842.00 6,576.00 50,418.00
4 Atap Seng Plastik Gelombang Kecil ME.4 Lembar 58,000.00 0.00% 290.00 58,290.00 8,743.00 67,033.00
5 Atap Seng Gelombang Besar Fiber Glass ME.5 Lembar 67,625.00 0.00% 1,210.00 68,835.00 10,325.00 79,160.00
6 Seng Plat BJLS 0.30 ME.6 Lembar 40,000.00 0.00% 660.00 40,660.00 6,099.00 46,759.00
7 Seng Plat BJLS 0.20 ME.7 Lembar 44,833.00 0.00% 530.00 45,363.00 6,804.00 52,167.00
8 Genteng Metal - Multiroof ME.8 Lembar 54,333.00 0.00% 1,200.00 55,533.00 8,329.00 63,862.00
9 Nok Genteng Metal - Multiroof ME.9 Bh 40,500.00 0.00% 1,200.00 41,700.00 6,255.00 47,955.00
10 Atap Allumunium Gelombang ME.10 M2 59,750.00 0.00% 1,200.00 60,950.00 9,142.00 70,092.00
11 Nok Atap Allumunium ME.11 M 40,500.00 0.00% 1,200.00 41,700.00 6,255.00 47,955.00
12 Karet Talang ME.12 M1 9,750.00 0.00% 270.00 10,020.00 1,503.00 11,523.00

F. BAHAN KERAMIK
1 Ubin Abu-Abu 20 x 20 Cm MF.1 Buah 2,640.00 0.00% 110.00 2,750.00 412.00 3,162.00
2 Ubin Abu-Abu 30 x 30 Cm MF.2 Buah 6,166.00 0.00% 190.00 6,356.00 953.00 7,309.00
3 Ubin Abu-Abu 40 x 40 Cm MF.3 Buah 14,145.00 0.00% 340.00 14,485.00 2,172.00 16,657.00
4 Ubin Warna 20 x 20 Cm MF.4 Buah 2,633.00 0.00% 110.00 2,743.00 411.00 3,154.00
5 Ubin Warna 30 x 30 Cm MF.5 Buah 6,159.00 0.00% 190.00 6,349.00 952.00 7,301.00
6 Ubin Warna 40 x 40 Cm MF.6 Buah 13,888.00 0.00% 340.00 14,228.00 2,134.00 16,362.00
7 Ubin Teraso Ukuran 30 x 30 cm MF.7 Buah 6,318.00 0.00% 190.00 6,508.00 976.00 7,484.00
8 Ubin Teraso Ukuran 40 x 40 cm MF.8 Buah 13,666.00 0.00% 340.00 14,006.00 2,100.00 16,106.00
9 Ubin Granito Ukuran 30 x 30 cm MF.9 Buah 6,113.00 0.00% 190.00 6,303.00 945.00 7,248.00
10 Ubin Granito Ukuran 40 x 40 cm MF.10 Buah 12,166.00 0.00% 340.00 12,506.00 1,875.00 14,381.00
11 Ubin Teralux Kerang Ukuran 30 x 30 cm MF.11 Buah 6,704.00 0.00% 190.00 6,894.00 1,034.00 7,928.00
12 Ubin Teralux Kerang Ukuran 40 x 40 cm MF.12 Buah 13,958.00 0.00% 340.00 14,298.00 2,144.00 16,442.00
13 Ubin Teralux Marmer Ukuran 30 x 30 c MF.13 Buah 8,750.00 0.00% 190.00 8,940.00 1,341.00 10,281.00
14 Ubin Teralux Marmer Ukuran 40 x 40 c MF.14 Buah 21,458.00 0.00% 340.00 21,798.00 3,269.00 25,067.00
15 Ubin Teralux Marmer Ukuran 60 x 60 c MF.15 Buah 66,222.00 0.00% 1,320.00 67,542.00 10,131.00 77,673.00
16 Keramik Artistik 10x20; 15x15 cm MF.16 Buah 1,175.00 0.00% 90.00 1,265.00 189.00 1,454.00
17 Keramik Artistik 10x10 atau 5x20 cm MF.17 Buah 650.00 0.00% 90.00 740.00 111.00 851.00
18 Keramik Lantai 20 x 20 cm MF.18 Buah 2,765.00 0.00% 110.00 2,875.00 431.00 3,306.00
19 Keramik Lantai 20 x 30 cm MF.19 Buah 4,062.00 0.00% 150.00 4,212.00 631.00 4,843.00
20 Keramik Lantai 30 x 30 cm MF.20 Buah 6,500.00 0.00% 190.00 6,690.00 1,003.00 7,693.00
Kode Harga Tingkat Ongkos Harga Dasar + Overhead Harga Satuan
No. Nama Bahan/Barang Barang Satuan Dasar Inflasi Angkut Inflasi + + on Site Project Ket.
( Rp. ) ( %. ) (Rp) Ongkos angkut Profit (Tanpa PPN)
1 2 3 4 5 6 7 8 9 10 11
21 Keramik Lantai 30 x 30 berglasir MF.21 Buah 5,909.00 0.00% 190.00 6,099.00 914.00 7,013.00
22 Keramik Lantai 30 x 30 berglasir (Mozai MF.22 Buah 6,659.00 0.00% 190.00 6,849.00 1,027.00 7,876.00
23 Keramik Lantai 40 x 40 cm MF.23 Buah 12,916.00 0.00% 340.00 13,256.00 1,988.00 15,244.00
24 Keramik Lantai 50 x 50 cm MF.24 Buah 23,700.00 0.00% 670.00 24,370.00 3,655.00 28,025.00
25 Keramik Lantai 60 x 60 cm MF.25 Buah 55,666.00 0.00% 1,320.00 56,986.00 8,547.00 65,533.00
26 Keramik Dinding 10 x 20 cm MF.26 Buah 1,250.00 0.00% 90.00 1,340.00 201.00 1,541.00
27 Keramik Dinding 20x20 atau 20x25 cm MF.27 Buah 3,004.00 0.00% 110.00 3,114.00 467.00 3,581.00
28 Ubin Dinding Porselin 11 x 11 MF.28 Buah 670.00 0.00% 90.00 760.00 114.00 874.00
29 Ubin Dinding Porselin 10 x 20 cm MF.29 Buah 853.00 0.00% 90.00 943.00 141.00 1,084.00
30 Ubin Dinding Porselin 20 x 20 MF.30 Buah 2,650.00 0.00% 110.00 2,760.00 414.00 3,174.00
31 Plint Ubin Abu-Abu 15 x 20 cm MF.31 Buah 12,500.00 0.00% 150.00 12,650.00 1,897.00 14,547.00
32 Plint Ubin Abu-Abu 10 x 30 cm MF.32 Buah 10,000.00 0.00% 150.00 10,150.00 1,522.00 11,672.00
33 Plint Ubin Abu-Abu 10 x 40 cm MF.33 Buah 11,500.00 0.00% 150.00 11,650.00 1,747.00 13,397.00
34 Plint Ubin Warna 10 x 20 cm MF.34 Buah 5,000.00 0.00% 90.00 5,090.00 763.00 5,853.00
35 Plint Ubin Warna 10 x 30 cm MF.35 Buah 7,500.00 0.00% 150.00 7,650.00 1,147.00 8,797.00
36 Plint Ubin Warna 10 x 40 cm MF.36 Buah 7,500.00 0.00% 150.00 7,650.00 1,147.00 8,797.00
37 Plint Ubin Teraso 10 x 30 cm MF.37 Buah 7,500.00 0.00% 150.00 7,650.00 1,147.00 8,797.00
38 Plint Ubin Teraso 10 x 40 cm MF.38 Buah 12,500.00 0.00% 150.00 12,650.00 1,897.00 14,547.00
39 Plint Ubin Granito 10 x 40 cm MF.39 Buah 12,500.00 0.00% 150.00 12,650.00 1,897.00 14,547.00
40 Plint Ubin Granito 10 x 30 cm MF.40 Buah 7,500.00 0.00% 150.00 7,650.00 1,147.00 8,797.00
41 Plint Ubin Teralux Kerang 10 x 40 cm MF.41 Buah 7,500.00 0.00% 150.00 7,650.00 1,147.00 8,797.00
42 Plint Ubin Teralux Kerang 10 x 30 cm MF.42 Buah 7,500.00 0.00% 150.00 7,650.00 1,147.00 8,797.00
43 Plint Ubin Teralux Marmer 10 x 60 cm MF.43 Buah 15,000.00 0.00% 160.00 15,160.00 2,274.00 17,434.00
44 Plint Ubin Teralux Marmer 10 x 40 cm MF.44 Buah 10,000.00 0.00% 150.00 10,150.00 1,522.00 11,672.00
45 Plint Ubin Teralux Marmer 10 x 30 cm MF.45 Buah 7,500.00 0.00% 150.00 7,650.00 1,147.00 8,797.00
46 Plint Keramik Artistik 10 x 20 cm MF.46 Buah 4,750.00 0.00% 90.00 4,840.00 726.00 5,566.00
47 Plint Keramik Artistik 10 x 10 cm MF.47 Buah 4,500.00 0.00% 90.00 4,590.00 688.00 5,278.00
48 Plint Keramik Artistik 5 x 20 cm MF.48 Buah 4,000.00 0.00% 90.00 4,090.00 613.00 4,703.00
49 Plint Keramik Artistik 10 x 30 cm MF.49 Buah 7,500.00 0.00% 150.00 7,650.00 1,147.00 8,797.00
50 Marmer Ukuran 100 x 100 cm MF.50 Buah 350,000.00 0.00% 7,350.00 357,350.00 53,602.00 410,952.00
51 Wall paper (Lebar 50 cm) MF.51 M2 155,000.00 0.00% 307.00 155,307.00 23,296.00 178,603.00
52 Batu Paras MF.52 Buah 22,272.00 0.00% 190.00 22,462.00 3,369.00 25,831.00
53 Batu Tempel Hitam MF.53 Buah 27,727.00 0.00% 190.00 27,917.00 4,187.00 32,104.00

G. BAHAN KACA
1 Kaca Polos 3 mm MG.1 M2 150,000.00 0.00% 1,700.00 151,700.00 22,755.00 174,455.00
2 Kaca Polos 5 mm MG.2 M2 180,200.00 0.00% 2,390.00 182,590.00 27,388.00 209,978.00
3 Kaca Buram 3 mm MG.3 M2 100,000.00 0.00% 1,700.00 101,700.00 15,255.00 116,955.00
4 Kaca Buram 4 mm MG.4 M2 150,000.00 0.00% 2,050.00 152,050.00 22,807.00 174,857.00
5 Kaca Buram 5 mm MG.5 M2 213,000.00 0.00% 2,390.00 215,390.00 32,308.00 247,698.00
6 Kaca Naco / Louver - 7 Clips (polos) MG.6 Buah 128,000.00 0.00% 2,610.00 130,610.00 19,591.00 150,201.00
7 Kaca Naco / Louver - 8 Clips (polos) MG.7 Buah 146,000.00 0.00% 2,940.00 148,940.00 22,341.00 171,281.00
8 Kaca Naco / Louver - 9 Clips (polos) MG.8 Buah 161,750.00 0.00% 3,270.00 165,020.00 24,753.00 189,773.00
9 Kaca Naco / Louver - 10 Clips (polos) MG.9 Buah 201,500.00 0.00% 3,620.00 205,120.00 30,768.00 235,888.00
10 Kaca Rayban 25 % - tebal 5 mm MG.10 M2 12,000.00 0.00% 2,390.00 14,390.00 2,158.00 16,548.00
11 Kaca Acrylic (Kaca Plastik) - 5 mm MG.11 Lembar ### 0.00% 2,330.00 1,002,330.00 150,349.00 1,152,679.00

H. BAHAN/ALAT PENGGANTUNG
1 Kunci Tanam (Setara Cap Kuda Terbang MH.1 Set 73,875.00 0.00% 290.00 74,165.00 11,124.00 85,289.00
2 Kunci Tanam - 2 Slaagh MH.2 Set 125,750.00 0.00% 290.00 126,040.00 18,906.00 144,946.00
3 Kunci Tanam - 1 Slaagh MH.3 Set 56,500.00 0.00% 290.00 56,790.00 8,518.00 65,308.00
4 Kunci Tanam (Setara Cap Anchor / Yale MH.4 Set 89,000.00 0.00% 290.00 89,290.00 13,393.00 102,683.00
5 Kunci Gembok 1" MH.5 Set 55,500.00 0.00% 140.00 55,640.00 8,346.00 63,986.00
6 Engsel 4" Kuningan (Untuk Pintu) MH.6 Pasang 27,000.00 0.00% 140.00 27,140.00 4,071.00 31,211.00
7 Engsel 3" Kuningan (Untuk Jendela) MH.7 Pasang 20,428.00 0.00% 140.00 20,568.00 3,085.00 23,653.00
8 Engsel Kupu-Kupu T MH.8 Pasang 15,714.00 0.00% 140.00 15,854.00 2,378.00 18,232.00
9 Engsel Nylon Kuningan 4" MH.9 Pasang 11,500.00 0.00% 140.00 11,640.00 1,746.00 13,386.00
10 Engsel Biasa 3" (Untuk Jendela) MH.10 Pasang 12,916.00 0.00% 140.00 13,056.00 1,958.00 15,014.00
11 Hak Angin / Kait Angin MH.11 Buah 10,142.00 0.00% 140.00 10,282.00 1,542.00 11,824.00
12 Espagnolet MH.12 Set 65,000.00 0.00% 140.00 65,140.00 9,771.00 74,911.00
13 Grendel Tanam (Pintu) MH.13 Buah 65,000.00 0.00% 140.00 65,140.00 9,771.00 74,911.00
14 Grendel Besar / Kecil MH.14 Buah 9,000.00 0.00% 140.00 9,140.00 1,371.00 10,511.00
15 Tarikan Pintu MH.15 Buah 100,250.00 0.00% 140.00 100,390.00 15,058.00 115,448.00
16 Tarikan Jendela MH.16 Buah 13,500.00 0.00% 140.00 13,640.00 2,046.00 15,686.00

I. BAHAN CAT
1 Amplas Kertas (Amplas Kayu) MI.1 Lembar 4,312.00 0.00% 15.00 4,327.00 649.00 4,976.00
2 Amplas Besi MI.2 Lembar 4,250.00 0.00% 15.00 4,265.00 639.00 4,904.00
3 Dempul Kayu MI.3 Kg 31,571.00 0.00% 270.00 31,841.00 4,776.00 36,617.00
4 Cat Meny Kayu MI.4 Kg 30,825.00 0.00% 270.00 31,095.00 4,664.00 35,759.00
5 Cat Meny Besi MI.5 Kg 31,312.00 0.00% 270.00 31,582.00 4,737.00 36,319.00
6 Cat Kayu MI.6 Kg 55,500.00 0.00% 270.00 55,770.00 8,365.00 64,135.00
7 Cat Besi MI.7 Kg 58,375.00 0.00% 270.00 58,645.00 8,796.00 67,441.00
8 Cat Kilat LN MI.8 Kg 56,000.00 0.00% 270.00 56,270.00 8,440.00 64,710.00
9 Minyak Cat / Thinner (Setara Lauguer) MI.9 Kg 29,833.00 0.00% 270.00 30,103.00 4,515.00 34,618.00
10 Minyak Cat / Thinner (Biasa) Afduner MI.10 Kg 27,800.00 0.00% 270.00 28,070.00 4,210.00 32,280.00
11 Palmur Tembok MI.11 Zak 186,700.00 0.00% 7,500.00 194,200.00 29,130.00 223,330.00
12 Cat Tembok (1 Klg @ 5 Kg) MI.12 Kaleng 89,125.00 0.00% 1,540.00 90,665.00 13,599.00 104,264.00
13 Cat Besi Crom MI.13 Kg 45,428.00 0.00% 270.00 45,698.00 6,854.00 52,552.00
14 Cat Besi (Setara Nippon Paint) MI.14 Kg 65,400.00 0.00% 270.00 65,670.00 9,850.00 75,520.00
15 Politur Kaleng (Setara Apache) MI.15 Kg 58,142.00 0.00% 270.00 58,412.00 8,761.00 67,173.00
16 Floor Hardener MI.16 KG 60,000.00 0.00% 270.00 60,270.00 9,040.00 69,310.00
Kode Harga Tingkat Ongkos Harga Dasar + Overhead Harga Satuan
No. Nama Bahan/Barang Barang Satuan Dasar Inflasi Angkut Inflasi + + on Site Project Ket.
( Rp. ) ( %. ) (Rp) Ongkos angkut Profit (Tanpa PPN)
1 2 3 4 5 6 7 8 9 10 11
J. BAHAN LISTRIK DAN ELEKTRONIKA
1 Kabel Listrik NYM/NYA 3x2.5 mm MJ.1 Roll ### 0.00% 20,800.00 1,244,466.00 186,669.00 1,431,135.00
2 Kabel Listrik NYM/NYA 2x1.5 mm MJ.2 Roll 689,250.00 0.00% 20,800.00 710,050.00 106,507.00 816,557.00
3 Pipa Listrik dia, 5/8 MJ.3 Batang 8,166.00 0.00% 100.00 8,266.00 1,239.00 9,505.00
4 Saklar Double - Tempel MJ.4 Buah 19,150.00 0.00% 450.00 19,600.00 2,940.00 22,540.00
5 Saklar Tunggal / Engkel - Tempel MJ.5 Buah 15,000.00 0.00% 450.00 15,450.00 2,317.00 17,767.00
6 Stop Kontak 500 Watt - Tempel MJ.6 Buah 16,300.00 0.00% 450.00 16,750.00 2,512.00 19,262.00
7 Stop Kontak 1000 Watt - Tempel MJ.7 Buah 26,875.00 0.00% 450.00 27,325.00 4,098.00 31,423.00
8 Home Saklar 1 Fase Komplit MJ.8 Buah 195,833.00 0.00% 720.00 196,553.00 29,482.00 226,035.00
9 Lampu TL 1 x 40 Watt Komplit MJ.9 Buah 143,583.00 0.00% 90.00 143,673.00 21,550.00 165,223.00
10 Lampu TL 1 x 20 Watt Komplit MJ.10 Buah 103,750.00 0.00% 90.00 103,840.00 15,576.00 119,416.00
11 Lampu Pijar 40 Watt Komplit MJ.11 Buah 8,857.00 0.00% 90.00 8,947.00 1,342.00 10,289.00
12 Lampu Pijar 60 Watt Komplit MJ.12 Buah 9,714.00 0.00% 90.00 9,804.00 1,470.00 11,274.00
13 Lampu Pijar 100 Watt Komplit MJ.13 Buah 10,500.00 0.00% 90.00 10,590.00 1,588.00 12,178.00
14 Vitting Lampu MJ.14 Buah 14,050.00 0.00% 90.00 14,140.00 2,121.00 16,261.00
15 Lampu XL 40 Watt MJ.15 Set 100,500.00 0.00% 90.00 100,590.00 15,088.00 115,678.00
16 Lampu XL 20 Watt MJ.16 Set 46,500.00 0.00% 90.00 46,590.00 6,988.00 53,578.00
17 Lampu SL 23 Watt MJ.17 Set 45,875.00 0.00% 90.00 45,965.00 6,894.00 52,859.00
18 Lampu SL 14 Watt MJ.18 Set 37,000.00 0.00% 90.00 37,090.00 5,563.00 42,653.00
19 Sekring Kas 1 Group (Biasa) MJ.19 Buah 73,000.00 0.00% 270.00 73,270.00 10,990.00 84,260.00
20 Klem Kabel MJ.20 Dus 18,428.00 0.00% 140.00 18,568.00 2,785.00 21,353.00
21 Isolasi Listrik MJ.21 Buah 9,857.00 0.00% 140.00 9,997.00 1,499.00 11,496.00
22 Sekrup MJ.22 Dus 17,750.00 0.00% 140.00 17,890.00 2,683.00 20,573.00
23 Panil Distribusi MJ.23 Buah ### 0.00% 720.00 6,500,720.00 975,108.00 7,475,828.00

K. BAHAN PIPA DAN SANITAIR


1 Pipa GIP (Leideng) Dia. 1/2" - 6 Meter MK.1 Batang 95,800.00 0.00% 1,060.00 96,860.00 14,529.00 111,389.00
2 Pipa GIP (Leideng) Dia. 3/4" - 6 Meter MK.2 Batang 123,400.00 0.00% 1,450.00 124,850.00 18,727.00 143,577.00
3 Pipa GIP (Leideng) Dia. 1" - 6 Meter MK.3 Batang 151,000.00 0.00% 2,090.00 153,090.00 22,963.00 176,053.00
4 Pipa GIP (Leideng) Dia. 1.25" - 6 Meter MK.4 Batang 198,800.00 0.00% 3,250.00 202,050.00 30,307.00 232,357.00
5 Pipa GIP (Leideng) Dia. 1.5" - 6 Meter MK.5 Batang 237,500.00 0.00% 4,040.00 241,540.00 36,231.00 277,771.00
6 Pipa GIP (Leideng) Dia. 2" - 6 Meter MK.6 Batang 280,000.00 0.00% 5,690.00 285,690.00 42,853.00 328,543.00
7 Pipa GIP (Leideng) Dia. 3" - 6 Meter MK.7 Batang 439,000.00 0.00% 16,890.00 455,890.00 68,383.00 524,273.00
8 Pipa GIP (Leideng) Dia. 4" - 6 Meter MK.8 Batang 585,000.00 0.00% 19,770.00 604,770.00 90,715.00 695,485.00
9 Pipa PVC Dia. 5" - 4 Meter (AW) MK.9 Batang 885,000.00 0.00% 2,450.00 887,450.00 133,117.00 1,020,567.00
10 Pipa PVC Dia. 4" - 4 Meter (AW) MK.10 Batang 284,750.00 0.00% 1,550.00 286,300.00 42,945.00 329,245.00
11 Pipa PVC Dia. 4" - 4 Meter (D) MK.11 Batang 161,642.00 0.00% 1,550.00 163,192.00 24,478.00 187,670.00
12 Pipa PVC Dia. 3" - 4 Meter (D) MK.12 Batang 117,714.00 0.00% 920.00 118,634.00 17,795.00 136,429.00
13 Pipa PVC Dia. 2" - 4 Meter (D) MK.13 Batang 58,285.00 0.00% 530.00 58,815.00 8,822.00 67,637.00
14 Pipa PVC Dia. 1" - 4 Meter (D) MK.14 Batang 39,285.00 0.00% 260.00 39,545.00 5,931.00 45,476.00
15 Pipa PVC Dia. 1/2" - 4 M MK.15 Batang 24,666.00 0.00% 130.00 24,796.00 3,719.00 28,515.00
16 Pipa PVC Dia. 3/4" - 4 M MK.16 Batang 30,500.00 0.00% 200.00 30,700.00 4,605.00 35,305.00
17 Pipa PVC Dia. 2,5" - 4 M MK.17 Batang 95,700.00 0.00% 710.00 96,410.00 14,461.00 110,871.00
18 Talang PVC Oval 6" - 4 Meter MK.18 Batang 80,000.00 0.00% 1,340.00 81,340.00 12,201.00 93,541.00
19 Talang PVC Oval 8" - 4 Meter MK.19 Batang 101,166.00 0.00% 1,790.00 102,956.00 15,443.00 118,399.00
20 Talang PVC Kotak 4" - 6 Meter MK.20 Batang 120,714.00 0.00% 2,120.00 122,834.00 18,425.00 141,259.00
21 Talang PVC Kotak 8" - 6 Meter MK.21 Batang 362,500.00 0.00% 2,590.00 365,090.00 54,763.00 419,853.00
22 Closed Duduk Porselin Komplit MK.22 Buah ### 0.00% 3,900.00 1,545,400.00 231,810.00 1,777,210.00
23 Closet duduk (siram) MK.23 Buah 543,571.00 0.00% 3,110.00 546,681.00 82,002.00 628,683.00
24 Closed Jongkok Porselin (Standar) MK.24 Buah 185,714.00 0.00% 3,150.00 188,864.00 28,329.00 217,193.00
25 Closed Jongkok Fiber Glass / Plastik MK.25 Buah 85,200.00 0.00% 1,550.00 86,750.00 13,012.00 99,762.00
26 Urinoir MK.26 Buah ### 0.00% 2,520.00 1,745,020.00 261,753.00 2,006,773.00
27 Wastafel Porselin MK.27 Buah 483,000.00 0.00% 2,520.00 485,520.00 72,828.00 558,348.00
28 Bak Air / Fiber Glass 1 M3 MK.28 Buah 495,000.00 0.00% 3,150.00 498,150.00 74,722.00 572,872.00
29 Bak Air / Fiber Glass 1/2 M3 MK.29 Buah 250,000.00 0.00% 2,520.00 252,520.00 37,878.00 290,398.00
30 Bak Air / Fiber Glass 1/4 M3 MK.30 Buah 277,500.00 0.00% 2,100.00 279,600.00 41,940.00 321,540.00
31 Tangki Air / Fiber Glass 1 M3 MK.31 Buah ### 0.00% 6,310.00 1,848,810.00 277,321.00 2,126,131.00
32 Kran Air 3/4" MK.32 Buah 21,571.00 0.00% 140.00 21,711.00 3,256.00 24,967.00
33 Kran Air 1/2" MK.33 Buah 16,785.00 0.00% 140.00 16,925.00 2,538.00 19,463.00
34 Kran Air 1" MK.34 Buah 18,000.00 0.00% 140.00 18,140.00 2,721.00 20,861.00
35 Stop Kran 1/2" MK.35 Buah 17,500.00 0.00% 140.00 17,640.00 2,646.00 20,286.00
36 Doble Neple GIP 1/2" MK.36 Buah 23,166.00 0.00% 140.00 23,306.00 3,495.00 26,801.00
37 Soccet 1/2" MK.37 Buah 6,250.00 0.00% 140.00 6,390.00 958.00 7,348.00
38 Elbow GIP 90º x 1/2" ( PE ) MK.38 Buah 7,750.00 0.00% 140.00 7,890.00 1,183.00 9,073.00
39 Tee 1/2" x 1/2" MK.39 Buah 9,000.00 0.00% 140.00 9,140.00 1,371.00 10,511.00
40 Hand Kran 1/2" Besi MK.40 Buah 41,500.00 0.00% 140.00 41,640.00 6,246.00 47,886.00
41 Dop GIP 1/2" MK.41 Buah 6,500.00 0.00% 140.00 6,640.00 996.00 7,636.00
42 Water Meter 1/2" MK.42 Buah 450,000.00 0.00% 1,050.00 451,050.00 67,657.00 518,707.00
43 Clamp Sadle 2" mm x 1/2" ( PE ) MK.43 Buah 80,000.00 0.00% 1,050.00 81,050.00 12,157.00 93,207.00
44 Pengaman Box Meter MK.44 Buah 250,000.00 0.00% 1,050.00 251,050.00 37,657.00 288,707.00
45 Pipa HDPE Ø 150 mm MK.45 M 398,000.00 0.00% 1,830.00 399,830.00 59,974.00 459,804.00
46 Pipa HDPE Ø 100 mm MK.46 M 196,000.00 0.00% 700.00 196,700.00 29,505.00 226,205.00
47 Pipa HDPE Ø 75 mm MK.47 M 107,000.00 0.00% 320.00 107,320.00 16,098.00 123,418.00
48 Pipa HDPE Ø 50-63 mm MK.48 M 60,000.00 0.00% 130.00 60,130.00 9,019.00 69,149.00
49 Tee All Flange Ø 50 x 50 mm (HDPE) MK.49 Buah 450,000.00 0.00% 4,860.00 454,860.00 68,229.00 523,089.00
50 Tee All Flange Ø 75 x 50 mm (HDPE) MK.50 Buah 475,000.00 0.00% 4,950.00 479,950.00 71,992.00 551,942.00
51 Tee All Flange Ø 75 x 75 mm (HDPE) MK.51 Buah 500,000.00 0.00% 5,020.00 505,020.00 75,753.00 580,773.00
52 Tee All Flange Ø 100 x 75 mm (HDPE) MK.52 Buah 650,000.00 0.00% 5,110.00 655,110.00 98,266.00 753,376.00
53 Bend 90 All Flange Ø 50 mm (HDPE) MK.53 Buah 210,000.00 0.00% 1,330.00 211,330.00 31,699.00 243,029.00
54 Bend 90 All Flange Ø 75 mm (HDPE) MK.54 Buah 335,000.00 0.00% 4,380.00 339,380.00 50,907.00 390,287.00
55 Bend 90 All Flange Ø 100 mm (HDPE) MK.55 Buah 50,000.00 0.00% 4,520.00 54,520.00 8,178.00 62,698.00
56 Gate Valve Flange Ø 50 mm MK.56 Buah ### 0.00% 11,380.00 1,861,380.00 279,207.00 2,140,587.00
57 Gate Valve Flange Ø 75 mm MK.57 Buah ### 0.00% 12,000.00 2,362,000.00 354,300.00 2,716,300.00
58 Gate Valve Flange Ø 1/2" MK.58 Buah 200,000.00 0.00% 150.00 200,150.00 30,022.00 230,172.00
Kode Harga Tingkat Ongkos Harga Dasar + Overhead Harga Satuan
No. Nama Bahan/Barang Barang Satuan Dasar Inflasi Angkut Inflasi + + on Site Project Ket.
( Rp. ) ( %. ) (Rp) Ongkos angkut Profit (Tanpa PPN)
1 2 3 4 5 6 7 8 9 10 11
59 Stub Flange Ø 50 mm MK.59 Buah 200,000.00 0.00% 940.00 200,940.00 30,141.00 231,081.00
60 Stub Flange Ø 75 mm MK.60 Buah 600,000.00 0.00% 1,830.00 601,830.00 90,274.00 692,104.00
61 Stub Flange Ø 100 mm MK.61 Buah 840,000.00 0.00% 2,280.00 842,280.00 126,342.00 968,622.00
62 End Cap (Dop) Ø 50 mm (HDPE) MK.62 Buah 37,009.00 0.00% 230.00 37,239.00 5,585.00 42,824.00
63 End Cap (Dop) Ø 75 mm (HDPE) MK.63 Buah 86,873.00 0.00% 940.00 87,813.00 13,171.00 100,984.00
64 Stop Cock (PIT Kran) 1/2" MK.64 Buah 950,000.00 0.00% 340.00 950,340.00 142,551.00 1,092,891.00
65 Reducer All Flange Ø 75 x 75 mm (HDPEMK.65 Buah 525,000.00 0.00% 3,390.00 528,390.00 79,258.00 607,648.00
66 Reducer All Flange Ø 75 x 50 mm (HDPEMK.66 Buah 500,000.00 0.00% 3,340.00 503,340.00 75,501.00 578,841.00
67 Quil Elbow HDPE (adaptor) Ø 15 mm (1/ MK.67 Buah 48,000.00 0.00% 1,330.00 49,330.00 7,399.00 56,729.00
68 Pipa Input HDPE Ø 1/2" MK.68 Buah 38,400.00 0.00% 1,330.00 39,730.00 5,959.00 45,689.00

M. BETON PRACETAK
1 Dwiker Sumur/Gorong2 Ø 1 m, H 60 cm MM.1 Buah 412,500.00 0.00% 39,310.00 451,810.00 67,771.00 519,581.00
2 Dwiker Sumur/Gorong2 Ø 0,8 m, H 60 c MM.2 Buah 362,500.00 0.00% 32,690.00 395,190.00 59,278.00 454,468.00
3 Dwiker Sumur/Gorong2 Ø 0,6 m, H 80 c MM.3 Buah 357,500.00 0.00% 34,430.00 391,930.00 58,789.00 450,719.00
4 Dwiker Sumur/Gorong2 Ø 0,4 m, H 80 c MM.4 Buah 332,500.00 0.00% 25,880.00 358,380.00 53,757.00 412,137.00

N. BAHAN BANGUNAN LAIN


1 Lem Aica Aibon MN.1 KG 39,000.00 0.00% 270.00 39,270.00 5,890.00 45,160.00
2 Lem Fox MN.2 KG 30,416.00 0.00% 270.00 30,686.00 4,602.00 35,288.00
3 Lem Vinyl MN.3 KG 20,000.00 0.00% 270.00 20,270.00 3,040.00 23,310.00
4 Ijuk MN.4 KG 45,000.00 0.00% 340.00 45,340.00 6,801.00 52,141.00
5 Pipa Plastik dia, 3" (AW) MN.5 Batang 169,833.00 0.00% 260.00 170,093.00 25,513.00 195,606.00
6 Galvanies / Lysplank MN.6 Lembar 56,500.00 0.00% 2,600.00 59,100.00 8,865.00 67,965.00
7 Mata bor MN.7 Buah 20,000.00 0.00% 50.00 20,050.00 3,007.00 23,057.00
8 Mata gurinda MN.8 Buah 14,250.00 0.00% 70.00 14,320.00 2,148.00 16,468.00
9 Gas elpiji (12 KG) MN.9 KG 15,000.00 0.00% 470.00 15,470.00 2,320.00 17,790.00
10 Oksigen (@50 kg/btl) MN.10 KG 350,000.00 0.00% 560.00 350,560.00 52,584.00 403,144.00
11 Kuas Cat Minyak MN.11 Buah 10,000.00 0.00% 70.00 10,070.00 1,510.00 11,580.00
12 Kuas Roll (Cat Tembok) MN.12 Buah 25,000.00 0.00% 70.00 25,070.00 3,760.00 28,830.00
13 Air Bersih MN.13 Liter 50.00 0.00% - 50 7.00 57.00

Merauke, Januari 2017


Diperiksa oleh :
Koordinator Tim Penyusun Dihitung oleh :
Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan Estimator Dinas

MOCH. YUNUS ANIS, S.ST VICTOR M. HATIGORAN, ST


NIP. 19700403 199003 1 007 NIP. 19800908 200909 1 001

Mengetahui / menyetujui :
Kepala Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan
Kabupaten Merauke

Ir. H.B.L TOBING, M.Eng


Pembina Utama Muda (IV/c)
NIP. 19601216 199103 1 008
DAFTAR HARGA SATUAN UPAH
LOKASI KEGIATAN : KOTA MERAUKE - DISTRIK MERAUKE

KEGIATAN : HARGA SATUAN DINAS PEKERJAAN UMUM, PENATAAN RUANG DAN PERTANAHAN
PEKERJAAN : PERHITUNGAN HARGA SATUAN BAHAN, UPAH, PEKERJAAN DAN KEGIATAN
LOKASI : KOTA MERAUKE - DISTRIK MERAUKE
KABUPATEN / PROPINSI : MERAUKE - PAPUA
TAHUN ANGGARAN : 2017
SUMBER DANA : ---

PERIODE : JANUARI - JUNI 2017


Harga Dasar Harga Satuan + OH
No. Uraian Tenaga Kode Tenaga on Site Project Keterangan
(per hari) (per jam) (per hari) (per jam)
1 2 3 4 5 6 7 8

1 Mandor Bangunan / Lapangan L-1 178,000.00 25,429.00 204,700.00 29,243.00


2 Kepala Tukang (Batu, Pasir, Kayu, dsb) L-2 163,000.00 23,286.00 187,450.00 26,779.00
3 Tukang (Batu, Pasir, Kayu, dsb) L-3 146,000.00 20,858.00 167,900.00 23,986.00
4 Pekerja L-4 114,000.00 16,286.00 131,100.00 18,729.00
5 Mandor Alat Berat (F. Equipment) (*) L-5 200,000.00 28,572.00 230,000.00 32,858.00
6 Operator Alat Berat (*) L-6 163,000.00 23,286.00 187,450.00 26,779.00
7 Pembantu Operator (*) L-7 114,000.00 16,286.00 131,100.00 18,729.00
8 Sopir / Driver (*) L-8 146,000.00 20,858.00 167,900.00 23,986.00
9 Pembantu Sopir / Driver (*) L-9 114,000.00 16,286.00 131,100.00 18,729.00
10 Mekanik (*) L - 10 146,000.00 20,858.00 167,900.00 23,986.00
11 Pembantu Mekanik (*) L - 11 114,000.00 16,286.00 131,100.00 18,729.00
12 Surveyor L - 12 163,000.00 23,286.00 187,450.00 26,779.00
13 Pembantu Surveyor L - 13 114,000.00 16,286.00 131,100.00 18,729.00

Jam kerja efektif per hari = 7.00 Jam


Jumlah hari per bulan = 25.00 Hari
Overhead + profit = 15.00%
DAFTAR HARGA ALAT BARU
LOKASI : SITE PLANE

KEGIATAN : HARGA SATUAN DINAS PEKERJAAN UMUM


PEKERJAAN : PERHITUNGAN HARGA SATUAN BAHAN, UPAH, PEKERJAAN DAN KEGIATAN
LOKASI : KOTA MERAUKE - DISTRIK MERAUKE
KABUPATEN / PROPINSI : MERAUKE - PAPUA
TAHUN ANGGARAN : 2016
SUMBER DANA : ---

PERIODE : JANUARI - JUNI 2016


E
Kapasitas Umur Umur Jam Kerja
No. Jenis Alat Kode HP Alat/Produksi Ekonomis Alat Dalam 1 tahun HARGA ALAT
(tahun) (tahun) (Jam)

1 DUMP TRUCK 3-4 M3 E-1 115.0 3.50 Ton 6.00 6.00 1,500.00 Rp E - 1 391,000,000.00
2 EXCAVATOR 80-140 HP E-2 135.0 0.90 M3 5.00 5.00 1,500.00 Rp E - 2 1,751,530,000.00
3 BULLDOZER 100-150 HP E-3 155.0 - - 5.00 5.00 1,500.00 Rp E - 3 3,315,180,000.00
4 MOTOR GRADER >100 HP E-4 135.0 - - 5.00 5.00 1,500.00 Rp E - 4 2,381,500,000.00
5 VIBRATOR ROLLER 5-8 T. E-5 100.0 8.00 Ton 5.00 5.00 1,500.00 Rp E - 5 1,240,000,000.00
6 PNEUMATIC T. ROLLER 8-15 T. E-6 129.0 8.00 Ton 5.00 5.00 1,500.00 Rp E - 6 1,423,300,000.00
7 TANDEM ROLER 6-8 T E-7 83.0 8.00 Ton 5.00 5.00 1,500.00 Rp E - 7 1,315,000,000.00
8 CONCRETE MIXER 0.3-0.6 M3 E-8 10.0 500.00 Liter 5.00 5.00 1,500.00 Rp E - 8 75,515,000.00
9 WATER PUMP 70-100 mm E-9 8.0 30.00 M3/hari 5.00 5.00 1,500.00 Rp E - 9 7,500,000.00
10 WATER TANKER 3000-4500 L. E - 10 115.0 4,000.00 Liter 5.00 5.00 1,500.00 Rp E - 10 350,000,000.00
11 CHAIN SAW (MESIN POTONG E - 11 10.0 - - 5.00 5.00 1,200.00 Rp E - 11 5,500,000.00
12 COMPRESSOR 4000-6500 L\M E - 12 80.0 - - 5.00 5.00 2,000.00 Rp E - 12 50,000,000.00
13 ASPHALT SPRAYER E - 13 15.0 800.00 Liter 5.00 5.00 1,200.00 Rp E - 13 45,000,000.00
14 FARM TRACTOR (ROTARI) M 5 E - 14 50.0 2.00 Ton 5.00 5.00 1,200.00 Rp E - 14 295,000,000.00
15 STAMPER E - 15 5.0 0.20 Ton 5.00 5.00 1,200.00 Rp E - 15 32,500,000.00
16 WHELL LOADER E - 16 95.0 1.50 M3 5.00 5.00 1,200.00 Rp E - 16 1,696,580,000.00
17 ASPHALT FINIZHER E - 17 144.0 - - 5.00 5.00 1,200.00 Rp E - 17 1,977,960,000.00
18 GENERATOR ZET E - 18 50.0 - - 5.00 5.00 1,200.00 Rp E - 18 35,000,000.00
19 ASPHAL MIXING PLANT (AMP) E - 19 150.0 30.00 Ton/Jam 10.00 10.00 1,200.00 Rp E - 19 3,220,525,000.00
20 MINI EXCAVATOR - COBELCO E - 20 50.0 - - 5.00 5.00 800.00 Rp E - 20 554,400,000.00

KETERANGAN :
1 Tingkat Suku Bunga i = 10.00 % per-tahun
2 Asuransi, Pajak, dll i = 0.0020
3 Jam kerja efektif per hari Tk = 7 Jam
4 Jarak Merauke ke lokasi Proyek L = 5.00 Kilo Meter
5 Upah Operator / Sopir / Mekanik L-6 = 26,858.00 Rupiah per-orang/jam
6 Upah Pembantu Operator/Sopir/Mekan L-7 = 18,858.00 Rupiah per-orang/jam
7 Harga Bahan Bakar Bensin MA.1 = 11,113.60 Rupiah per-liter
8 Harga Bahan Bakar Solar MA.2 = 14,073.70 Rupiah per-liter
9 Minyak Pelumas MA.4 = 40,117.75 Rupiah per-liter
10 Khusus AMP, biaya bahan bakar ditambah (untuk pemanasan material) sebesar : 12 Liter x (Kapasitas AMP Riil = 0.7 x Kapasitas AMP/Jam) x Harga BBM Solar
URAIAN ANALISA ALAT

JENIS PERALATAN = DUMP TRUCK 3-4 M3 KODE = E - 1

NO. URAIAN KODE KOEF. SATUAN KETERANGAN

A. URAIAN PERALATAN
1. Jenis Peralatan = DUMP TRUCK 3-4 M3 E-1
2. Tenaga Pw 115.0 HP
3. Kapasitas Cp 3.5 Ton
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 391,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam
c. Harga Alat (*) B' 391,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 39,100,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.22961 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a Biaya Pengembalian Modal = ( B' - C ) x D E 53,865.89 Rupiah
W'

b Asuransi, pajak, dll = 0.0020 x B' F 521.33 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 54,387.22 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 202,309.44 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 46,135.41 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 32,583.33 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 26,858.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 18,858.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 326,744.18 Rupiah


TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) 381,131.41 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM (DIBULATKAN) S1 381,131.00 Rupiah
E. TOTAL BIAYA SEWA ALAT / HARI = ( S1 x Tk ) S2 2,667,917.00 Rupiah

F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 18,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 11,113.60 Liter
6 Bahan Bakar Solar MA.2 14,073.70 Liter
7 Minyak Pelumas MA.4 40,117.75 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT

JENIS PERALATAN = EXCAVATOR 80-140 HP KODE = E - 2

NO. URAIAN KODE KOEF. SATUAN KETERANGAN

A. URAIAN PERALATAN
1. Jenis Peralatan : EXCAVATOR 80-140 HP E-2
2. Tenaga Pw 135.0 HP
3. Kapasitas Cp 0.90 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 1,751,530,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam
c. Harga Alat (*) B' 1,751,530,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 175,153,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.26380 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a Biaya Pengembalian Modal = ( B' - C ) x D E 277,229.52 Rupiah
W'

b Asuransi, pajak, dll = 0.0020 x B' F 2,335.37 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 279,564.89 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 237,493.69 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 54,158.96 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 145,960.83 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 26,858.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 18,858.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 483,329.48 Rupiah


TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) 762,894.38 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM (DIBULATKAN) S1 762,894.00 Rupiah
E. TOTAL BIAYA SEWA ALAT / HARI = ( S1 x Tk ) S2 5,340,258.00 Rupiah

F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 18,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 11,113.60 Liter
6 Bahan Bakar Solar MA.2 14,073.70 Liter
7 Minyak Pelumas MA.4 40,117.75 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT

JENIS PERALATAN = BULLDOZER 100-150 HP KODE = E - 3

NO. URAIAN KODE KOEF. SATUAN KETERANGAN

A. URAIAN PERALATAN
1. Jenis Peralatan : BULLDOZER 100-150 HP E-3
2. Tenaga Pw 155.0 HP
3. Kapasitas Cp - -
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 3,315,180,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam
c. Harga Alat (*) B' 3,315,180,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 331,518,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.26380 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a Biaya Pengembalian Modal = ( B' - C ) x D E 524,721.68 Rupiah
W'

b Asuransi, pajak, dll = 0.0020 x B' F 4,420.24 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 529,141.92 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 272,677.94 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 62,182.51 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 276,265.00 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 26,858.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 18,858.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 656,841.45 Rupiah


D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) 1,185,983.37 Rupiah
TOTAL BIAYA SEWA ALAT / JAM (DIBULATKAN) S1 1,185,983.00 Rupiah
E. TOTAL BIAYA SEWA ALAT / HARI = ( S1 x Tk ) S2 8,301,881.00 Rupiah

F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 18,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 11,113.60 Liter
6 Bahan Bakar Solar MA.2 14,073.70 Liter
7 Minyak Pelumas MA.4 40,117.75 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT

JENIS PERALATAN = MOTOR GRADER >100 HP KODE = E - 4

NO. URAIAN KODE KOEF. SATUAN KETERANGAN

A. URAIAN PERALATAN
1. Jenis Peralatan : MOTOR GRADER >100 HP E-4
2. Tenaga Pw 135.0 HP
3. Kapasitas Cp -
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 2,381,500,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam
c. Harga Alat (*) B' 2,381,500,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 238,150,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.26380 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a Biaya Pengembalian Modal = ( B' - C ) x D E 376,940.22 Rupiah
W'

b Asuransi, pajak, dll = 0.0020 x B' F 3,175.33 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 380,115.55 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 237,493.69 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 54,158.96 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 198,458.33 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 26,858.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 18,858.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 535,826.98 Rupiah


D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) 915,942.54 Rupiah
TOTAL BIAYA SEWA ALAT / JAM (DIBULATKAN) S1 915,942.00 Rupiah
E. TOTAL BIAYA SEWA ALAT / HARI = ( S1 x Tk ) S2 6,411,594.00 Rupiah

F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 18,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 11,113.60 Liter
6 Bahan Bakar Solar MA.2 14,073.70 Liter
7 Minyak Pelumas MA.4 40,117.75 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT

JENIS PERALATAN = VIBRATOR ROLLER 5-8 T. KODE = E - 5

NO. URAIAN KODE KOEF. SATUAN KETERANGAN

A. URAIAN PERALATAN
1. Jenis Peralatan : VIBRATOR ROLLER 5-8 T. E-5
2. Tenaga Pw 100.0 HP
3. Kapasitas Cp 8.00 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 1,240,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam
c. Harga Alat (*) B' 1,240,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 124,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.26380 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a Biaya Pengembalian Modal = ( B' - C ) x D E 196,265.33 Rupiah
W'

b Asuransi, pajak, dll = 0.0020 x B' F 1,653.33 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 197,918.66 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 175,921.25 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 40,117.75 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 103,333.33 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 26,858.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 18,858.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 365,088.33 Rupiah


D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) 563,006.99 Rupiah
TOTAL BIAYA SEWA ALAT / JAM (DIBULATKAN) S1 563,006.00 Rupiah
E. TOTAL BIAYA SEWA ALAT / HARI = ( S1 x Tk ) S2 3,941,042.00 Rupiah

F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 18,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 11,113.60 Liter
6 Bahan Bakar Solar MA.2 14,073.70 Liter
7 Minyak Pelumas MA.4 40,117.75 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT

JENIS PERALATAN = PNEUMATIC T. ROLLER 8-15 T. KODE = E - 6

NO. URAIAN KODE KOEF. SATUAN KETERANGAN

A. URAIAN PERALATAN
1. Jenis Peralatan : PNEUMATIC T. ROLLER 8-15 T. E-6
2. Tenaga Pw 129.0 HP
3. Kapasitas Cp 8.00 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 1,423,300,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam
c. Harga Alat (*) B' 1,423,300,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 142,330,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.26380 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a Biaya Pengembalian Modal = ( B' - C ) x D E 225,277.77 Rupiah
W'

b Asuransi, pajak, dll = 0.0020 x B' F 1,897.73 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 227,175.51 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 226,938.41 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 51,751.90 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 118,608.33 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 26,858.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 18,858.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 443,014.64 Rupiah


D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) 670,190.15 Rupiah
TOTAL BIAYA SEWA ALAT / JAM (DIBULATKAN) S1 670,190.00 Rupiah
E. TOTAL BIAYA SEWA ALAT / HARI = ( S1 x Tk ) S2 4,691,330.00 Rupiah

F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 18,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 11,113.60 Liter
6 Bahan Bakar Solar MA.2 14,073.70 Liter
7 Minyak Pelumas MA.4 40,117.75 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT

JENIS PERALATAN = TANDEM ROLER 6-8 T KODE = E - 7

NO. URAIAN KODE KOEF. SATUAN KETERANGAN

A. URAIAN PERALATAN
1. Jenis Peralatan : TANDEM ROLER 6-8 T E-7
2. Tenaga Pw 83.0 HP
3. Kapasitas Cp 8.00 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 1,315,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam
c. Harga Alat (*) B' 1,315,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 131,500,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.26380 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a Biaya Pengembalian Modal = ( B' - C ) x D E 208,136.21 Rupiah
W'

b Asuransi, pajak, dll = 0.0020 x B' F 1,753.33 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 209,889.55 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 146,014.64 Rupiah
= 12.50% x Ltr/HP/Jam x Pw x HDA-02

2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 33,297.73 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 109,583.33 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 26,858.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 18,858.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 334,611.70 Rupiah


D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) 544,501.25 Rupiah
TOTAL BIAYA SEWA ALAT / JAM (DIBULATKAN) S1 544,501.00 Rupiah
E. TOTAL BIAYA SEWA ALAT / HARI = ( S1 x Tk ) S2 3,811,507.00 Rupiah

F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 18,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 11,113.60 Liter
6 Bahan Bakar Solar MA.2 14,073.70 Liter
7 Minyak Pelumas MA.4 40,117.75 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT

JENIS PERALATAN = CONCRETE MIXER 0.3-0.6 M3 KODE = E - 8

NO. URAIAN KODE KOEF. SATUAN KETERANGAN

A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE MIXER 0.3-0.6 M3 E-8
2. Tenaga Pw 10.0 HP
3. Kapasitas Cp 500.0 Liter
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 75,515,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam
c. Harga Alat (*) B' 75,515,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 7,551,500 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.26380 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a Biaya Pengembalian Modal = ( B' - C ) x D E 11,952.40 Rupiah
W'

b Asuransi, pajak, dll = 0.0020 x B' F 100.69 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 12,053.09 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 17,592.13 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 4,011.78 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 6,292.92 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 26,858.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 18,858.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 73,612.82 Rupiah


D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) 85,665.90 Rupiah
TOTAL BIAYA SEWA ALAT / JAM (DIBULATKAN) S1 85,665.00 Rupiah
E. TOTAL BIAYA SEWA ALAT / HARI = ( S1 x Tk ) S2 599,655.00 Rupiah

F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 18,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 11,113.60 Liter
6 Bahan Bakar Solar MA.2 14,073.70 Liter
7 Minyak Pelumas MA.4 40,117.75 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT

JENIS PERALATAN = WATER PUMP 70-100 mm KODE = E - 9

NO. URAIAN KODE KOEF. SATUAN KETERANGAN

A. URAIAN PERALATAN
1. Jenis Peralatan WATER PUMP 70-100 mm E-9
2. Tenaga Pw 8.0 HP
3. Kapasitas Cp 30.0 M3/hari
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 7,500,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam
c. Harga Alat (*) B' 7,500,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 750,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.26380 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a Biaya Pengembalian Modal = ( B' - C ) x D E 1,187.09 Rupiah
W'

b Asuransi, pajak, dll = 0.0020 x B' F 10.00 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 1,197.09 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Bensin H 11,113.60 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 3,209.42 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 625.00 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 26,858.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 18,858.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 60,664.02 Rupiah


D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) 61,861.11 Rupiah
TOTAL BIAYA SEWA ALAT / JAM (DIBULATKAN) S1 61,861.00 Rupiah
E. TOTAL BIAYA SEWA ALAT / HARI = ( S1 x Tk ) S2 433,027.00 Rupiah

F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 18,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 11,113.60 Liter
6 Bahan Bakar Solar MA.2 14,073.70 Liter
7 Minyak Pelumas MA.4 40,117.75 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT

JENIS PERALATAN = WATER TANKER 3000-4500 L. KODE = E - 10

NO. URAIAN KODE KOEF. SATUAN KETERANGAN

A. URAIAN PERALATAN
1. Jenis Peralatan WATER TANKER 3000-4500 L. E - 10
2. Tenaga Pw 115.0 HP
3. Kapasitas Cp 4,000.0 Liter
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 350,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam
c. Harga Alat (*) B' 350,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 35,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.26380 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a Biaya Pengembalian Modal = ( B' - C ) x D E 55,397.47 Rupiah
W'

b Asuransi, pajak, dll = 0.0020 x B' F 466.67 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 55,864.14 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 202,309.44 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 46,135.41 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 29,166.67 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 26,858.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 18,858.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 323,327.52 Rupiah


D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) 379,191.65 Rupiah
TOTAL BIAYA SEWA ALAT / JAM (DIBULATKAN) S1 379,191.00 Rupiah
E. TOTAL BIAYA SEWA ALAT / HARI = ( S1 x Tk ) S2 2,654,337.00 Rupiah

F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 18,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 11,113.60 Liter
6 Bahan Bakar Solar MA.2 14,073.70 Liter
7 Minyak Pelumas MA.4 40,117.75 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT

JENIS PERALATAN = CHAIN SAW (MESIN POTONG KAYU) KODE = E - 11

NO. URAIAN KODE KOEF. SATUAN KETERANGAN

A. URAIAN PERALATAN
1. Jenis Peralatan : CHAIN SAW (MESIN POTONG KAYU) E - 11
2. Tenaga Pw 10.0 HP
3. Kapasitas Cp -
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200.0 Jam
c. Harga Alat B 5,500,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,200.0 Jam
c. Harga Alat (*) B' 5,500,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 550,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.26380 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a Biaya Pengembalian Modal = ( B' - C ) x D E 1,088.16 Rupiah
W'

b Asuransi, pajak, dll = 0.0020 x B' F 9.17 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 1,097.33 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Bensin H 13,892.00 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 4,011.78 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 572.92 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 26,858.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 18,858.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 64,192.69 Rupiah


D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) 65,290.02 Rupiah
TOTAL BIAYA SEWA ALAT / JAM (DIBULATKAN) S1 65,290.00 Rupiah
E. TOTAL BIAYA SEWA ALAT / HARI = ( S1 x Tk ) S2 457,030.00 Rupiah

F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 18,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 11,113.60 Liter
6 Bahan Bakar Solar MA.2 14,073.70 Liter
7 Minyak Pelumas MA.4 40,117.75 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT

JENIS PERALATAN = COMPRESSOR 4000-6500 L\M KODE = E - 12

NO. URAIAN KODE KOEF. SATUAN KETERANGAN

A. URAIAN PERALATAN
1. Jenis Peralatan COMPRESSOR 4000-6500 L\M E - 12
2. Tenaga Pw 80.0 HP
3. Kapasitas Cp - -
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 50,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam
c. Harga Alat (*) B' 50,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 5,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.26380 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a Biaya Pengembalian Modal = ( B' - C ) x D E 5,935.44 Rupiah
W'

b Asuransi, pajak, dll = 0.0020 x B' F 50.00 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 5,985.44 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Bensin H 111,136.00 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 32,094.20 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 3,125.00 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 26,858.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 18,858.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 192,071.20 Rupiah


D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) 198,056.64 Rupiah
TOTAL BIAYA SEWA ALAT / JAM (DIBULATKAN) S1 198,056.00 Rupiah
E. TOTAL BIAYA SEWA ALAT / HARI = ( S1 x Tk ) S2 1,386,392.00 Rupiah

F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 18,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 11,113.60 Liter
6 Bahan Bakar Solar MA.2 14,073.70 Liter
7 Minyak Pelumas MA.4 40,117.75 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT

JENIS PERALATAN = ASPHALT SPRAYER KODE = E - 13

NO. URAIAN KODE KOEF. SATUAN KETERANGAN

A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT SPRAYER E - 13
2. Tenaga Pw 15.0 HP
3. Kapasitas Cp 800.0 Liter
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200.0 Jam
c. Harga Alat B 45,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,200.0 Jam
c. Harga Alat (*) B' 45,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 4,500,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.26380 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a Biaya Pengembalian Modal = ( B' - C ) x D E 8,903.16 Rupiah
W'

b Asuransi, pajak, dll = 0.0020 x B' F 75.00 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 8,978.16 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 26,388.19 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 6,017.66 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 4,687.50 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 26,858.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 18,858.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 82,809.35 Rupiah


D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) 91,787.51 Rupiah
TOTAL BIAYA SEWA ALAT / JAM (DIBULATKAN) S1 91,787.00 Rupiah
E. TOTAL BIAYA SEWA ALAT / HARI = ( S1 x Tk ) S2 642,509.00 Rupiah

F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 18,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 11,113.60 Liter
6 Bahan Bakar Solar MA.2 14,073.70 Liter
7 Minyak Pelumas MA.4 40,117.75 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT

JENIS PERALATAN = FARM TRACTOR (ROTARI) M 5000 KODE = E - 14

NO. URAIAN KODE KOEF. SATUAN KETERANGAN

A. URAIAN PERALATAN
1. Jenis Peralatan FARM TRACTOR (ROTARI) M 5000 E - 14
2. Tenaga Pw 50.0 HP
3. Kapasitas Cp 2.0 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200.0 Jam
c. Harga Alat B 295,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,200.0 Jam
c. Harga Alat (*) B' 295,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 29,500,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.26380 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a Biaya Pengembalian Modal = ( B' - C ) x D E 58,365.19 Rupiah
W'

b Asuransi, pajak, dll = 0.0020 x B' F 491.67 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 58,856.86 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 87,960.63 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 20,058.88 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 30,729.17 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 26,858.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 18,858.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 184,464.67 Rupiah


D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) 243,321.53 Rupiah
TOTAL BIAYA SEWA ALAT / JAM (DIBULATKAN) S1 243,321.00 Rupiah
E. TOTAL BIAYA SEWA ALAT / HARI = ( S1 x Tk ) S2 1,703,247.00 Rupiah

F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 18,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 11,113.60 Liter
6 Bahan Bakar Solar MA.2 14,073.70 Liter
7 Minyak Pelumas MA.4 40,117.75 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT

JENIS PERALATAN = STAMPER KODE = E - 15

NO. URAIAN KODE KOEF. SATUAN KETERANGAN

A. URAIAN PERALATAN
1. Jenis Peralatan STAMPER E - 15
2. Tenaga Pw 5.0 HP
3. Kapasitas Cp 0.2 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200.0 Jam
c. Harga Alat B 32,500,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,200.0 Jam
c. Harga Alat (*) B' 32,500,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 3,250,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.26380 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a Biaya Pengembalian Modal = ( B' - C ) x D E 6,430.06 Rupiah
W'

b Asuransi, pajak, dll = 0.0020 x B' F 54.17 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 6,484.23 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 6,946.00 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 2,005.89 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 3,385.42 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 26,858.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 18,858.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 58,053.30 Rupiah


D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) 64,537.53 Rupiah
TOTAL BIAYA SEWA ALAT / JAM (DIBULATKAN) S1 64,537.00 Rupiah
E. TOTAL BIAYA SEWA ALAT / HARI = ( S1 x Tk ) S2 451,759.00 Rupiah

F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 18,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 11,113.60 Liter
6 Bahan Bakar Solar MA.2 14,073.70 Liter
7 Minyak Pelumas MA.4 40,117.75 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT

JENIS PERALATAN = WHELL LOADER KODE = E - 16

NO. URAIAN KODE KOEF. SATUAN KETERANGAN

A. URAIAN PERALATAN
1. Jenis Peralatan WHELL LOADER E - 16
2. Tenaga Pw 95.0 HP
3. Kapasitas Cp 1.5 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200.0 Jam
c. Harga Alat B 1,696,580,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,200.0 Jam
c. Harga Alat (*) B' 1,696,580,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 169,658,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.26380 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a Biaya Pengembalian Modal = ( B' - C ) x D E 335,665.15 Rupiah
W'

b Asuransi, pajak, dll = 0.0020 x B' F 2,827.63 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 338,492.78 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 167,125.19 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 38,111.86 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 176,727.08 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 26,858.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 18,858.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 427,680.13 Rupiah


D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) 766,172.91 Rupiah
TOTAL BIAYA SEWA ALAT / JAM (DIBULATKAN) S1 766,172.00 Rupiah
E. TOTAL BIAYA SEWA ALAT / HARI = ( S1 x Tk ) S2 5,363,204.00 Rupiah

F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 18,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 11,113.60 Liter
6 Bahan Bakar Solar MA.2 14,073.70 Liter
7 Minyak Pelumas MA.4 40,117.75 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT

JENIS PERALATAN = ASPHALT FINIZHER KODE = E - 17

NO. URAIAN KODE KOEF. SATUAN KETERANGAN

A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT FINIZHER E - 17
2. Tenaga Pw 144.0 HP
3. Kapasitas Cp - -
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200.0 Jam
c. Harga Alat B 1,977,960,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,200.0 Jam
c. Harga Alat (*) B' 1,977,960,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 197,796,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.26380 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a Biaya Pengembalian Modal = ( B' - C ) x D E 391,335.65 Rupiah
W'

b Asuransi, pajak, dll = 0.0020 x B' F 3,296.60 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 394,632.25 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 253,326.60 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 57,769.56 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 206,037.50 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 26,858.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 18,858.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 562,849.66 Rupiah


D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) 957,481.91 Rupiah
TOTAL BIAYA SEWA ALAT / JAM (DIBULATKAN) S1 957,481.00 Rupiah
E. TOTAL BIAYA SEWA ALAT / HARI = ( S1 x Tk ) S2 6,702,367.00 Rupiah

F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 18,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 11,113.60 Liter
6 Bahan Bakar Solar MA.2 14,073.70 Liter
7 Minyak Pelumas MA.4 40,117.75 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT

JENIS PERALATAN = GENERATOR ZET KODE = E - 18

NO. URAIAN KODE KOEF. SATUAN KETERANGAN

A. URAIAN PERALATAN
1. Jenis Peralatan GENERATOR ZET E - 18
2. Tenaga Pw 50.0 HP
3. Kapasitas Cp - -
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200.0 Jam
c. Harga Alat B 35,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,200.0 Jam
c. Harga Alat (*) B' 35,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 3,500,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.26380 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a Biaya Pengembalian Modal = ( B' - C ) x D E 6,924.68 Rupiah
W'

b Asuransi, pajak, dll = 0.0020 x B' F 58.33 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 6,983.02 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 87,960.63 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 20,058.88 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 3,645.83 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 26,858.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 18,858.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 157,381.33 Rupiah


D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) 164,364.35 Rupiah
TOTAL BIAYA SEWA ALAT / JAM (DIBULATKAN) S1 164,364.00 Rupiah
E. TOTAL BIAYA SEWA ALAT / HARI = ( S1 x Tk ) S2 1,150,548.00 Rupiah

F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 18,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 11,113.60 Liter
6 Bahan Bakar Solar MA.2 14,073.70 Liter
7 Minyak Pelumas MA.4 40,117.75 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT

JENIS PERALATAN = ASPHAL MIXING PLANT (AMP) KODE = E - 19

NO. URAIAN KODE KOEF. SATUAN KETERANGAN

A. URAIAN PERALATAN
1. Jenis Peralatan ASPHAL MIXING PLANT (AMP) E - 19
2. Tenaga Pw 150.0 HP
3. Kapasitas Cp 30.0 Ton/Jam
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200.0 Jam
c. Harga Alat B 3,220,525,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,200.0 Jam
c. Harga Alat (*) B' 3,220,525,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 322,052,500 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.16275 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a Biaya Pengembalian Modal = ( B' - C ) x D E 393,094.21 Rupiah
W'

b Asuransi, pajak, dll = 0.0020 x B' F 5,367.54 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 398,461.75 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar Minyak


a. Mesin Produksi = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 316,658.25 Rupiah
b. Mesin Pemanas Material = 20 Capasitas alat x Rp. Solar Ha 8,444,220.00 Rupiah

2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 90,264.94 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 402,565.63 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 26,858.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 18,858.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 9,299,424.81 Rupiah


D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) 9,697,886.56 Rupiah
TOTAL BIAYA SEWA ALAT / JAM (DIBULATKAN) S1 9,697,886.00 Rupiah
E. TOTAL BIAYA SEWA ALAT / HARI = ( S1 x Tk ) S2 67,885,202.00 Rupiah

F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 18,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 11,113.60 Liter
6 Bahan Bakar Solar MA.2 14,073.70 Liter
7 Minyak Pelumas MA.4 40,117.75 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT

JENIS PERALATAN = MINI EXCAVATOR - COBELCO KODE = E - 20

NO. URAIAN KODE KOEF. SATUAN KETERANGAN

A. URAIAN PERALATAN
1. Jenis Peralatan MINI EXCAVATOR - COBELCO E - 20
2. Tenaga Pw 50.0 HP
3. Kapasitas Cp - -
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 800.0 Jam
c. Harga Alat B 554,400,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 800.0 Jam
c. Harga Alat (*) B' 554,400,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 55,440,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.26380 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a Biaya Pengembalian Modal = ( B' - C ) x D E 164,530.49 Rupiah
W'

b Asuransi, pajak, dll = 0.0020 x B' F 1,386.00 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 165,916.49 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar Minyak


a. Mesin Produksi = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 87,960.63 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 20,058.88 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 86,625.00 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 26,858.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 18,858.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 240,360.50 Rupiah


D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) 406,276.99 Rupiah
TOTAL BIAYA SEWA ALAT / JAM (DIBULATKAN) S1 406,276.00 Rupiah
E. TOTAL BIAYA SEWA ALAT / HARI = ( S1 x Tk ) S2 2,843,932.00 Rupiah

F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 18,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 11,113.60 Liter
6 Bahan Bakar Solar MA.2 14,073.70 Liter
7 Minyak Pelumas MA.4 40,117.75 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Harga Satuan Bahan, Upah dan Alat

ANALISA BIAYA SEWA PERALATAN PER JAM KERJA


LOKASI PEKERJAAN : KOTA MERAUKE - DISTRIK MERAUKE

KEGIATAN : HARGA SATUAN DINAS PEKERJAAN UMUM


LOKASI : KOTA MERAUKE - DISTRIK MERAUKE
KABUPATEN / PROPINSI : MERAUKE - PAPUA
TAHUN ANGGARAN : 2016

PERIODE : JANUARI - JUNI 2016


ALAT YANG DIPAKAI NILAI FAKTOR BIAYA PASTI PER JAM BIAYA OPERASI PER JAM KERJA TOTAL
TENAGA KAPASITAS HARGA JAM SISA PENGEM- BIAYA ASURANSI TOTAL BAHAN BAKAR & PELUMAS, WORKSHOP PERBAIKAN & PERAWATAN UPAH TOTAL BIAYA
ALAT ALAT ALAT UMUR KERJA HARGA ALAT BALIAN PENGEM- DAN BIAYA BAHAN MINYAK OPERATOR PEMBANTU BIAYA SEWA ALAT
ALAT 1 TAHUN ALAT MODAL BALIAN LAIN-LAIN PASTI / JAM BAKAR PELUMAS BIAYA KOEF. BIAYA / SOPIR OPERATOR OPERASI PER
MODAL / SOPIR / JAM JAM KERJA
(HP) - (Tahun) (Tahun) (Jam) (Rp.) (Rp.) - (Rp.) (Rp.) (Rp.) Lt/HP/Jam Ltr/HP/Jam (Rp.) - (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) KET.

No. JENIS PERALATAN KODE f1 x HP x


ALAT i(1+i)^A (B - C) x D 0.033 x B 0.125 0.01 Harga BBM 0.125 (g1 x B') 1 Orang 1 Orang
(10% X B) ----------- ----------- ----------- (e1 + e2) s/d s/d + s/d ----------- Per Per F+G+H+I E+J
(1+i)^A-1 W W 0.175 0.02 f2 x HP x 0.175 W Jam Kerja Jam Kerja
Harga Olie
HP Cp B A W B C D e1 e2 E f1 f2 F g1 G H I J K L
1 2 2a 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

1 DUMP TRUCK 3-4 M3 E-1 115 3.50 Ton 391,000,000.00 6 1500 391,000,000.00 39,100,000.00 0.22961 53,865.89 521.33 54,387.22 0.125 0.010 248,444.85 0.125 32,583.33 26,858.00 18,858.00 326,744.18 381,131.00 0
2 EXCAVATOR 80-140 HP E-2 135 0.90 M3 1,751,530,000.00 5 1500 1,751,530,000.00 175,153,000.00 0.26380 277,229.52 2,335.37 279,564.89 0.125 0.010 291,652.65 0.125 145,960.83 26,858.00 18,858.00 483,329.48 762,894.00 0
3 BULLDOZER 100-150 HP E-3 155 - - 3,315,180,000.00 5 1500 3,315,180,000.00 331,518,000.00 0.26380 524,721.68 4,420.24 529,141.92 0.125 0.010 334,860.45 0.125 276,265.00 26,858.00 18,858.00 656,841.45 1,185,983.00 0
4 MOTOR GRADER >100 HP E-4 135 - - 2,381,500,000.00 5 1500 2,381,500,000.00 238,150,000.00 0.26380 376,940.22 3,175.33 380,115.55 0.125 0.010 291,652.65 0.125 198,458.33 26,858.00 18,858.00 535,826.98 915,942.00 0
5 VIBRATOR ROLLER 5-8 T. E-5 100 8.00 Ton 1,240,000,000.00 5 1500 1,240,000,000.00 124,000,000.00 0.26380 196,265.33 1,653.33 197,918.66 0.125 0.010 216,039.00 0.125 103,333.33 26,858.00 18,858.00 365,088.33 563,006.00 0
6 PNEUMATIC T. ROLLER 8-15 T. E-6 129 8.00 Ton 1,423,300,000.00 5 1500 1,423,300,000.00 142,330,000.00 0.26380 225,277.77 1,897.73 227,175.51 0.125 0.010 278,690.31 0.125 118,608.33 26,858.00 18,858.00 443,014.64 670,190.00 0
7 TANDEM ROLER 6-8 T E-7 83 8.00 Ton 1,315,000,000.00 5 1500 1,315,000,000.00 131,500,000.00 0.26380 208,136.21 1,753.33 209,889.55 0.125 0.010 179,312.37 0.125 109,583.33 26,858.00 18,858.00 334,611.70 544,501.00 0
8 CONCRETE MIXER 0.3-0.6 M3 E-8 10 500.00 Liter 75,515,000.00 5 1500 75,515,000.00 7,551,500.00 0.26380 11,952.40 100.69 12,053.09 0.125 0.010 21,603.90 0.125 6,292.92 26,858.00 18,858.00 73,612.82 85,665.00 0
9 WATER PUMP 70-100 mm E-9 8 30.00M3/hari 7,500,000.00 5 1500 7,500,000.00 750,000.00 0.26380 1,187.09 10.00 1,197.09 0.125 0.010 14,323.02 0.125 625.00 26,858.00 18,858.00 60,664.02 61,861.00 0
10 WATER TANKER 3000-4500 L. E - 10 115 4000.00 Liter 350,000,000.00 5 1500 350,000,000.00 35,000,000.00 0.26380 55,397.47 466.67 55,864.14 0.125 0.010 248,444.85 0.125 29,166.67 26,858.00 18,858.00 323,327.52 379,191.00 0
11 CHAIN SAW (MESIN POTONG KAYU) E - 11 10 - - 5,500,000.00 5 1200 5,500,000.00 550,000.00 0.26380 1,088.16 9.17 1,097.33 0.125 0.010 17,903.78 0.125 572.92 26,858.00 18,858.00 64,192.69 65,290.00 0
12 COMPRESSOR 4000-6500 L\M E - 12 80 - - 50,000,000.00 5 2000 50,000,000.00 5,000,000.00 0.26380 5,935.44 50.00 5,985.44 0.125 0.010 143,230.20 0.125 3,125.00 26,858.00 18,858.00 192,071.20 198,056.00 0
13 ASPHALT SPRAYER E - 13 15 800.00 Liter 45,000,000.00 5 1200 45,000,000.00 4,500,000.00 0.26380 8,903.16 75.00 8,978.16 0.125 0.010 32,405.85 0.125 4,687.50 26,858.00 18,858.00 82,809.35 91,787.00 0
14 FARM TRACTOR (ROTARI) M 5000 E - 14 50 2.00 Ton 295,000,000.00 5 1200 295,000,000.00 29,500,000.00 0.26380 58,365.19 491.67 58,856.86 0.125 0.010 108,019.50 0.125 30,729.17 26,858.00 18,858.00 184,464.67 243,321.00 0
15 STAMPER E - 15 5 0.20 Ton 32,500,000.00 5 1200 32,500,000.00 3,250,000.00 0.26380 6,430.06 54.17 6,484.23 0.125 0.010 8,951.89 0.125 3,385.42 26,858.00 18,858.00 58,053.30 64,537.00 0
16 WHELL LOADER E - 16 95 1.50 M3 1,696,580,000.00 5 1200 1,696,580,000.00 169,658,000.00 0.26380 335,665.15 2,827.63 338,492.78 0.125 0.010 205,237.05 0.125 176,727.08 26,858.00 18,858.00 427,680.13 766,172.00 0
17 ASPHALT FINIZHER E - 17 144 - - 1,977,960,000.00 5 1200 1,977,960,000.00 197,796,000.00 0.26380 391,335.65 3,296.60 394,632.25 0.125 0.010 311,096.16 0.125 206,037.50 26,858.00 18,858.00 562,849.66 957,481.00 0
18 GENERATOR ZET E - 18 50 - - 35,000,000.00 5 1200 35,000,000.00 3,500,000.00 0.26380 6,924.68 58.33 6,983.02 0.125 0.010 108,019.50 0.125 3,645.83 26,858.00 18,858.00 157,381.33 164,364.00 0
19 ASPHAL MIXING PLANT (AMP) E - 19 150 30.00Ton/Jam 3,220,525,000.00 10 1200 3,220,525,000.00 322,052,500.00 0.16275 393,094.21 5,367.54 398,461.75 0.150 0.015 8,851,143.19 0.150 402,565.63 26,858.00 18,858.00 9,299,424.81 9,697,886.00 0
20 MINI EXCAVATOR - COBELCO E - 20 50 - - 554,400,000.00 5 800 554,400,000.00 55,440,000.00 0.26380 164,530.49 1,386.00 165,916.49 0.125 0.010 108,019.50 0.125 86,625.00 26,858.00 18,858.00 240,360.50 406,276.00 0

KETERANGAN : 1 Tingkat Suku Bunga i = 10.00 % per-tahun


2 Asuransi, Pajak, dll i = 0.0020
3 Jam kerja efektif per hari Tk = 7.00 Jam/Hari
4 Jarak Merauke ke lokasi Proyek L = 5.00 Kilo Meter
5 Upah Operator / Sopir / Mekanik L-6 = 26,858.00 Rupiah per-orang/jam
6 Upah Pembantu Operator/Sopir/Mekanik L-7 = 18,858.00 Rupiah per-orang/jam
7 Harga Bahan Bakar Bensin MA.1 = 11,113.60 Rupiah per-liter
8 Harga Bahan Bakar Solar MA.2 = 14,073.70 Rupiah per-liter
9 Minyak Pelumas MA.4 = 40,117.75 Rupiah per-liter
10 Khusus AMP, biaya bahan bakar ditambah (untuk pemanasan material) sebesar : 12 Liter x (Kapasitas AMP Riil = 0.7 x Kapasitas AMP/Jam) x Harga BBM Solar
ANALISA ANGKUT BAHAN

ANALISA ONGKOS ANGKUT BAHAN/MATERIAL

KEGIATAN : HARGA SATUAN DINAS PEKERJAAN UMUM


PEKERJAAN : PERHITUNGAN HARGA SATUAN BAHAN, UPAH, PEKERJAAN DAN KEGIATAN
LOKASI : KOTA MERAUKE - DISTRIK MERAUKE
KABUPATEN / PROPINSI : MERAUKE - PAPUA
TAHUN ANGGARAN : 2016
SUMBER DANA : ---
JARAK ANGKUT DARAT : KM
PERIODE : JANUARI - JUNI 2016 KOTA MERAUKE - DISTRIK MERAUKE
HARGA ANALISA BIAYA MUAT DAN ANGKUTAN ----- L A U T ------- ANALISA BIAYA MUAT DAN ANGKUTAN ---- S U N G A I ------- ANALISIS BIAYA MUAT DAN ANGKUTAN ----- D A R A T -------- Jumlah Total Harga Dasar + OVERHEAD HARGA
URAIAN BAHAN/MATERIAL YANG DASAR TINGKAT Kode Jumlah Angkut 50.00 Perkiraan Biaya Jumlah Harga Jumlah Angkut 2.00 Perkiraan Biaya Jumlah Harga Kode Jarak Angkut Perkiraan Kuantitas Perkiraan Biaya Jumlah biaya Ongkos Inflasi + + SATUAN
No. KODE SATUAN
DIANGKUT BARANG INFLASI Analisa Maksimal Ton Packing Angkut/Ton-M3 Bongkar Muat Pikul Barang Jumlah Total per satu satuan Maksimal Ton Packing Angkut/Ton-M3Bongkar MuatPikul Barang Jumlah Total per satu satuan Analisa Truck Traktor Excavator Dump Tracktor Alat Mandor Pekerja Excavator Dump Tracktor Mandor Pekerja Biaya Biaya alat+tenaga Angkut Ongkos angkut PROFIT BAHAN
( Rp. ) Angkut Kapal Satuan (Rp) (Rp) (Rp) (Rp) (Rp) bahan/material Kapal Satuan (Rp) (Rp) (Rp) (Rp) (Rp) bahan/material Angkut (km) (km) Truck Bantu Truck Alat Bantu Lain-lain (Rupiah) (Rupiah) (Rupiah) (Rupiah) (Rupiah)
1 2 2 5 19 20 20 7 6 6 8 9 10 11 12 13 14 17 21 22 23

A. BAHAN BAKAR DAN PENCAMPUR


1 Bensin Industri MA.1 Liter #REF! #REF! AAL.A.1 48,400.00 Liter - - - - - - 1,800.00 Liter - - - - - - AAD.A.1 #REF! #REF! 0.0010 0.0010 1.0000 - 0.0020 - 272.85 - - 28.52 - 301.00 301.00 #REF! #REF! #REF!
2 Solar Industri MA.2 Liter #REF! #REF! AAL.A.2 44,000.00 Liter - - - - - - 1,600.00 Liter - - - - - - AAD.A.2 #REF! #REF! 0.0010 0.0010 1.0000 - 0.0020 - 272.85 - - 28.52 - 301.00 301.00 #REF! #REF! #REF!
3 Minyak Tanah Industri MA.3 Liter #REF! #REF! AAL.A.3 45,200.00 Liter - - - - - - 1,800.00 Liter - - - - - - AAD.A.3 #REF! #REF! 0.0010 0.0010 1.0000 - 0.0020 - 272.85 - - 28.52 - 301.00 301.00 #REF! #REF! #REF!
4 Minyak Pelumas / Olie MA.4 Liter #REF! #REF! AAL.A.4 43,000.00 Liter - - - - - - 1,600.00 Liter - - - - - - AAD.A.4 #REF! #REF! 0.0010 0.0010 1.0000 - 0.0020 - 272.85 - - 28.52 - 301.00 301.00 #REF! #REF! #REF!
5 Minyak Bekisting / Oli Bekas MA.5 Buah #REF! #REF! AAL.A.5 47,600.00 Liter - - - - - - 1,800.00 Liter - - - - - - AAD.A.5 #REF! #REF! 0.0010 0.0010 1.0000 - 0.0020 - 272.85 - - 28.52 - 301.00 301.00 #REF! #REF! #REF!
6 Polimer MA.6 Liter #REF! #REF! AAL.A.6 23,400.00 Liter - - - - - - 800.00 Liter - - - - - - AAD.A.6 #REF! #REF! 0.0014 0.0012 1.0000 - 0.0028 - 387.00 - - 40.45 - 427.00 427.00 #REF! #REF! #REF!
7 Aspal MA.7 Kg #REF! #REF! AAL.A.7 24,955.00 Liter - - - - - - 930.00 Liter - - - - - - AAD.A.7 #REF! #REF! 0.0009 0.0005 1.0000 - 0.0038 - 264.42 - - 55.28 - 319.00 319.00 #REF! #REF! #REF!
8 Residu / Teer MA.8 Liter #REF! #REF! AAL.A.8 21,390.00 Liter - - - - - - 775.00 Liter - - - - - - AAD.A.8 #REF! #REF! 0.0019 0.0010 1.0000 - 0.0076 - 528.84 - - 110.56 - 639.00 639.00 #REF! #REF! #REF!

B. BAHAN PASIR, BATU DAN SEMEN


1 Pasir semen (Import) MB.1 M3 #REF! #REF! AAL.B.1 35.00 M3 - - - - - - 1.43 M3 - - - - - - AAD.B.1 #REF! #REF! 0.0080 0.0977 1.0962 1.0000 0.0077 0.0077 5,156.58 27,253.13 - 237.31 112.07 - 10,000 42,759.00 42,759.00 #REF! #REF! #REF!
2 Pasir semen (Pasang-lokal) MB.2 M3 #REF! #REF! AAL.B.2 33.00 M3 - - - - - - 1.33 M3 - - - - - - AAD.B.2 #REF! #REF! 0.0071 0.5048 1.0962 1.0000 0.0071 0.0071 4,862.90 158,026.34 - 219.76 103.78 - 10,000 173,210.00 173,210.00 #REF! #REF! #REF!
3 Pasir semen ayakan/ halus (lokal) MB.3 M3 #REF! #REF! AAL.B.3 33.00 M3 - - - - - - 1.33 M3 - - - - - - AAD.B.3 #REF! #REF! 0.0071 0.5048 1.0962 1.0000 0.0071 0.0071 4,862.90 158,026.34 - 219.76 103.78 - 10,000 173,210.00 173,210.00 #REF! #REF! #REF!
4 Tanah timbun biasa/urug MB.4 M3 #REF! #REF! AAL.B.4 - - - - - - - - AAD.B.4 #REF! #REF! 0.0071 0.2019 1.0962 1.0000 0.0071 0.0071 4,862.90 63,210.53 - 219.76 103.78 - 10,000 78,390.00 78,390.00 #REF! #REF! #REF!
5 Tanah pilihan (Selmat) MB.5 M3 #REF! #REF! AAL.B.5 - - - - - - - - AAD.B.5 #REF! #REF! 0.0071 0.2019 1.0962 1.0000 0.0071 0.0071 4,862.90 63,210.53 - 219.76 103.78 - 10,000 78,390.00 78,390.00 #REF! #REF! #REF!
6 Batu kerikil/ koral beton (Import) MB.6 M3 #REF! #REF! AAL.B.6 37.00 M3 - - - - - - 1.48 M3 - - - - - - AAD.B.6 #REF! #REF! 0.0076 0.1609 1.0962 1.0000 0.0076 0.0076 4,889.20 44,874.06 - 234.42 110.70 - 10,000 60,100.00 60,100.00 #REF! #REF! #REF!
7 Batu kali/Gunung - Import MB.7 M3 #REF! #REF! AAL.B.7 37.00 M4 - - - - - - 1.48 M4 - - - - - - AAD.B.7 #REF! #REF! 0.0076 0.1609 1.0962 1.0000 0.0076 0.0076 4,889.20 44,874.06 - 234.42 110.70 - 10,000 60,100.00 60,100.00 #REF! #REF! #REF!
8 Batu bata merah MB.8 Buah #REF! #REF! AAL.B.8 33,333.00 Buah - - - - - - 1,333.33 Buah - - - - - - AAD.B.8 #REF! #REF! 0.0004 0.0003 1.0000 - 0.0029 - 100.90 - - 42.19 - 140.00 140.00 #REF! #REF! #REF!
9 Batu cetak 10 x 20 x 30 Cm MB.9 Buah #REF! #REF! AAL.B.9 16,666.00 Buah - - - - - - 666.67 Buah - - - - - - AAD.B.9 #REF! #REF! 0.0007 0.0006 1.0000 0.0007 0.0058 - 201.86 - 16.55 84.40 - 300.00 300.00 #REF! #REF! #REF!
10 Paving blok (tidak Warna) MB.10 Buah #REF! #REF! AAL.B.10 20,000.00 Buah - - - - - - 800.00 Buah - - - - - - AAD.B.10 #REF! #REF! 0.0004 0.0005 1.0000 0.0004 0.0035 - 121.24 - 9.94 50.69 - 180.00 180.00 #REF! #REF! #REF!
11 Semen Portland (PC) @ 50 Kg MB.11 Zak #REF! #REF! AAL.B.11 1,000.00 Zak - - - - - - 40.00 Zak - - - - - - AAD.B.11 #REF! #REF! 0.0172 0.0472 1.0000 - 0.1374 - 4,790.20 - - 2,002.85 - 6,790.00 6,790.00 #REF! #REF! #REF!
12 Semen PC Putih / Warna MB.12 Zak #REF! #REF! AAL.B.12 1,000.00 Zak - - - - - - 40.00 Zak - - - - - - AAD.B.12 #REF! #REF! 0.0172 0.0472 1.0000 - 0.1374 - 4,790.20 - - 2,002.85 - 6,790.00 6,790.00 #REF! #REF! #REF!
13 Tepung Gypsum MB.13 Zak #REF! #REF! AAL.B.13 2,500.00 Zak - - - - - - 100.00 Zak - - - - - - AAD.B.13 #REF! #REF! 0.0124 0.0203 1.0000 - 0.0494 - 3,445.38 - - 720.28 - 4,160.00 4,160.00 #REF! #REF! #REF!

C. BAHAN KAYU, TRIPLEKS DLL


1 Balok Kayu Kelas III (Kayu Bus) MC.1 M3 #REF! #REF! AAL.C.1 76.00 M3 - - - - - - 3.08 M3 - - - - - - AAD.C.1 #REF! #REF! 0.3639 0.3279 1.0000 - 1.8196 - 101,468.43 - - 26,515.85 - 127,980.00 127,980.00 #REF! #REF! #REF!
2 Balok Kayu Kelas II (Kayu Rahay) MC.2 M3 #REF! #REF! AAL.C.2 66.00 M3 - - - - - - 2.67 M3 - - - - - - AAD.C.2 #REF! #REF! 0.4199 0.3784 1.0000 - 2.0996 - 117,078.95 - - 30,595.21 - 147,670.00 147,670.00 #REF! #REF! #REF!
3 Balok Kayu Kelas I (Kayu Besi) MC.3 M3 #REF! #REF! AAL.C.3 58.00 M3 - - - - - - 2.35 M3 - - - - - - AAD.C.3 #REF! #REF! 0.4759 0.4288 1.0000 - 2.3795 - 132,689.48 - - 34,674.57 - 167,360.00 167,360.00 #REF! #REF! #REF!
4 Balok Kayu Kelas IV (Kayu Putih, Susu, dll) MC.4 M3 #REF! #REF! AAL.C.4 100.00 M3 - - - - - - 4.00 M3 - - - - - - AAD.C.4 #REF! #REF! 0.2799 0.2522 1.0000 - 1.3997 - 78,052.64 - - 20,396.81 - 98,440.00 98,440.00 #REF! #REF! #REF!
5 Papan Kayu Kelas III (Kayu Bus) t = 2-5 cm MC.5 M3 #REF! #REF! AAL.C.5 76.00 M3 - - - - - - 3.08 M3 - - - - - - AAD.C.5 #REF! #REF! 0.3639 0.3279 1.0000 - 1.8196 - 101,468.43 - - 26,515.85 - 127,980.00 127,980.00 #REF! #REF! #REF!
6 Papan Kayu Kelas II (Kayu Rahay) t = 2 cm MC.6 M3 #REF! #REF! AAL.C.6 66.00 M3 - - - - - - 2.67 M3 - - - - - - AAD.C.6 #REF! #REF! 0.4199 0.3784 1.0000 - 2.0996 - 117,078.95 - - 30,595.21 - 147,670.00 147,670.00 #REF! #REF! #REF!
7 Papan Kayu Kelas II (Kayu Rahay) t = 3 cm MC.7 M3 #REF! #REF! AAL.C.7 66.00 M3 - - - - - - 2.67 M3 - - - - - - AAD.C.7 #REF! #REF! 0.4199 0.3784 1.0000 - 2.0996 - 117,078.95 - - 30,595.21 - 147,670.00 147,670.00 #REF! #REF! #REF!
8 Papan Kayu Kelas I (Kayu Besi) t = 2 - 3 cm MC.8 M3 #REF! #REF! AAL.C.8 58.00 M3 - - - - - - 2.35 M3 - - - - - - AAD.C.8 #REF! #REF! 0.4759 0.4288 1.0000 - 2.3795 - 132,689.48 - - 34,674.57 - 167,360.00 167,360.00 #REF! #REF! #REF!
9 Papan Kayu Kelas IV (tebal = 2-5 cm) MC.9 M3 #REF! #REF! AAL.C.9 100.00 M3 - - - - - - 4.00 M3 - - - - - - AAD.C.9 #REF! #REF! 0.2799 0.2522 1.0000 - 1.3997 - 78,052.64 - - 20,396.81 - 98,440.00 98,440.00 #REF! #REF! #REF!
10 Kayu Lat/Reng/List, Kayu Kelas II MC.10 Batang #REF! #REF! AAL.C.10 31,666.67 Batang - - - - - - 1,282.05 Batang - - - - - - AAD.C.10 #REF! #REF! 0.0009 0.0008 1.0000 - 0.0044 - 243.52 - - 63.64 - 300.00 300.00 #REF! #REF! #REF!
11 Tripleks (1,22 x 2,44) cm - tebal 3 mm MC.11 Lembar #REF! #REF! AAL.C.11 8,613.00 Lembar - - - - - - 344.00 Lembar - - - - - - AAD.C.11 #REF! #REF! 0.0034 0.0029 1.0000 - 0.0136 - 949.84 - - 198.57 - 1,140.00 1,140.00 #REF! #REF! #REF!
12 Tripleks (1,22 x 2,44) cm - tebal 4 mm MC.12 Lembar #REF! #REF! AAL.C.12 6,460.00 Lembar - - - - - - 258.00 Lembar - - - - - - AAD.C.12 #REF! #REF! 0.0045 0.0039 1.0000 - 0.0182 - 1,266.46 - - 264.76 - 1,530.00 1,530.00 #REF! #REF! #REF!
13 Tripleks (1,22 x 2,44) cm - tebal 6 mm MC.13 Lembar #REF! #REF! AAL.C.13 4,306.00 Lembar - - - - - - 172.00 Lembar - - - - - - AAD.C.13 #REF! #REF! 0.0068 0.0059 1.0000 - 0.0273 - 1,899.69 - - 397.14 - 2,290.00 2,290.00 #REF! #REF! #REF!
14 Tripleks (1,22 x 2,44) cm - tebal 9 mm MC.14 Lembar #REF! #REF! AAL.C.14 2,871.00 Lembar - - - - - - 114.00 Lembar - - - - - - AAD.C.14 #REF! #REF! 0.0102 0.0088 1.0000 - 0.0409 - 2,849.53 - - 595.71 - 3,440.00 3,440.00 #REF! #REF! #REF!
15 Tripleks (1,22 x 2,44) cm - tebal 12 mm MC.15 Lembar #REF! #REF! AAL.C.15 2,153.00 Lembar - - - - - - 86.00 Lembar - - - - - - AAD.C.15 #REF! #REF! 0.0136 0.0117 1.0000 - 0.0545 - 3,799.38 - - 794.29 - 4,590.00 4,590.00 #REF! #REF! #REF!
16 Tripleks (1,22 x 2,44) cm - tebal 15 mm MC.16 Lembar #REF! #REF! AAL.C.16 1,722.00 Lembar - - - - - - 68.00 Lembar - - - - - - AAD.C.16 #REF! #REF! 0.0170 0.0146 1.0000 - 0.0681 - 4,749.22 - - 992.86 - 5,740.00 5,740.00 #REF! #REF! #REF!
17 Tripleks (1,22 x 2,44) cm - tebal 18 mm MC.17 Lembar #REF! #REF! AAL.C.17 1,435.00 Lembar - - - - - - 57.00 Lembar - - - - - - AAD.C.17 #REF! #REF! 0.0216 0.0185 1.0000 - 0.0863 - 6,015.68 - - 1,257.62 - 7,270.00 7,270.00 #REF! #REF! #REF!
18 Tripleks (1,22 x 2,44) cm - tebal 22 mm MC.18 Lembar #REF! #REF! AAL.C.18 1,174.00 Lembar - - - - - - 46.00 Lembar - - - - - - AAD.C.18 #REF! #REF! 0.0250 0.0215 1.0000 - 0.0999 - 6,965.53 - - 1,456.19 - 8,420.00 8,420.00 #REF! #REF! #REF!
19 Teak - Wood (1.22 x 2.44 Cm) - 3 mm MC.19 Lembar #REF! #REF! AAL.C.19 8,613.00 Lembar - - - - - - 344.00 Lembar - - - - - - AAD.C.19 #REF! #REF! 0.0034 0.0029 1.0000 - 0.0136 - 949.84 - - 198.57 - 1,140.00 1,140.00 #REF! #REF! #REF!
20 Teak - Wood (0.92 x 2.44 Cm) - 4 mm MC.20 Lembar #REF! #REF! AAL.C.20 11,422.00 Lembar - - - - - - 456.00 Lembar - - - - - - AAD.C.20 #REF! #REF! 0.0045 0.0039 1.0000 - 0.0182 - 1,266.46 - - 264.76 - 1,530.00 1,530.00 #REF! #REF! #REF!
21 Plywood - Multiplex MC.21 Lembar #REF! #REF! AAL.C.21 3,499.00 Lembar - - - - - - 139.00 Lembar - - - - - - AAD.C.21 #REF! #REF! 0.0084 0.0072 1.0000 - 0.0335 - 2,338.08 - - 488.79 - 2,820.00 2,820.00 #REF! #REF! #REF!
22 Melamin MC.22 Lembar #REF! #REF! AAL.C.22 3,499.00 Lembar - - - - - - 139.00 Lembar - - - - - - AAD.C.22 #REF! #REF! 0.0084 0.0072 1.0000 - 0.0335 - 2,338.08 - - 488.79 - 2,820.00 2,820.00 #REF! #REF! #REF!
23 Formika Polos (122 x 244) Cm MC.23 Lembar #REF! #REF! AAL.C.23 4,306.00 Lembar - - - - - - 172.00 Lembar - - - - - - AAD.C.23 #REF! #REF! 0.0068 0.0059 1.0000 - 0.0273 - 1,899.69 - - 397.14 - 2,290.00 2,290.00 #REF! #REF! #REF!
24 Pelat Asbes Tebal 6 mm MC.24 Lembar #REF! #REF! AAL.C.24 4,133.00 Lembar - - - - - - 165.00 Lembar - - - - - - AAD.C.24 #REF! #REF! 0.0071 0.0061 1.0000 - 0.0284 - 1,979.29 - - 413.78 - 2,390.00 2,390.00 #REF! #REF! #REF!
25 Pelat Asbes Tebal 5 mm MC.25 Lembar #REF! #REF! AAL.C.25 4,960.00 Lembar - - - - - - 198.00 Lembar - - - - - - AAD.C.25 #REF! #REF! 0.0059 0.0051 1.0000 - 0.0237 - 1,649.41 - - 344.82 - 1,990.00 1,990.00 #REF! #REF! #REF!
26 Pelat Asbes Tebal 4 mm MC.26 Lembar #REF! #REF! AAL.C.26 6,200.00 Lembar - - - - - - 248.00 Lembar - - - - - - AAD.C.26 #REF! #REF! 0.0059 0.0051 1.0000 - 0.0237 - 1,649.41 - - 344.82 - 1,990.00 1,990.00 #REF! #REF! #REF!
27 Gypsum Board tebal 9 mm MC.27 Lembar #REF! #REF! AAL.C.27 2,871.00 Lembar - - - - - - 114.00 Lembar - - - - - - AAD.C.27 #REF! #REF! 0.0063 0.0047 1.0000 - 0.0254 - 1,768.00 - - 369.61 - 2,130.00 2,130.00 #REF! #REF! #REF!
28 List profil Gypsum Lebar Sampai 5 cm MC.28 M' #REF! #REF! AAL.C.28 66,664.00 M - - - - - - 2,664.00 M - - - - - - AAD.C.28 #REF! #REF! 0.0029 0.0048 1.0000 - 0.0115 - 803.27 - - 167.93 - 242.50 242.50 #REF! #REF! #REF!
29 Hard Board MC.29 Lembar #REF! #REF! AAL.C.29 6,677.00 Lembar - - - - - - 267.00 Lembar - - - - - - AAD.C.29 #REF! #REF! 0.0063 0.0047 1.0000 - 0.0254 - 1,768.00 - - 369.61 - 2,130.00 2,130.00 #REF! #REF! #REF!
30 Tiang Kayu Bulat (Dia 20 cm, L=4-6 m) MC.30 Batang #REF! #REF! AAL.C.30 - 0 - - - - AAD.C.30 #REF! #REF! 0.0480 0.0454 1.0000 - 0.2883 - 15,041.91 - - 4,200.75 - 19,240.00 19,240.00 #REF! #REF! #REF!
31 Tiang Kayu Bulat (Dia 25-30 cm, L=4-6 m) MC.31 Batang #REF! #REF! AAL.C.31 - 0 - - - - AAD.C.31 #REF! #REF! 0.1817 0.1716 1.0000 - 1.0900 - 56,877.22 - - 15,884.07 - 72,760.00 72,760.00 #REF! #REF! #REF!
32 Kayu dolken Ø 8-10, L=4 M Kayu Bus MC.32 Batang #REF! #REF! AAL.C.32 - 0 - - - - AAD.C.32 #REF! #REF! 0.0097 0.0147 1.0000 - 0.0390 - 3,050.98 - - 568.03 - 3,610.00 3,610.00 #REF! #REF! #REF!
33 Patok kayu bulat (Dia = 3 cm, L= 1 m) MC.33 Batang #REF! #REF! AAL.C.33 - 0 - - - - AAD.C.33 #REF! #REF! - #REF! #REF! #REF!
34 Patok kayu bulat (Dia = 5 cm, L= 5 m) MC.34 Batang #REF! #REF! AAL.C.34 - 0 - - - - AAD.C.34 #REF! #REF! - #REF! #REF! #REF!
35 Kayu Bakar (Bus Campuran) MC.35 M3 #REF! #REF! AAL.C.35 - 0 - - - - AAD.C.35 #REF! #REF! - #REF! #REF! #REF!

D. BAHAN BESI, PAKU DAN KAWAT


1 Besi Beton Dia.6 mm (SNI) MD.1 Kg #REF! #REF! AAL.D.1 49,997.95 KG - - - - - - 1,998.00 KG - - - - - - AAD.D.1 #REF! #REF! 0.0005 0.0008 1.0000 - 0.0033 - 151.36 - - 47.47 - 190.00 190.00 #REF! #REF! #REF!
2 Besi Beton Dia.8 mm (SNI) MD.2 Kg #REF! #REF! AAL.D.2 49,998.11 KG - - - - - - 1,997.84 KG - - - - - - AAD.D.2 #REF! #REF! 0.0006 0.0009 1.0000 - 0.0037 - 169.84 - - 53.26 - 220.00 220.00 #REF! #REF! #REF!
3 Besi Beton Dia.10 mm (SNI) MD.3 Kg #REF! #REF! AAL.D.3 49,999.09 KG - - - - - - 1,999.96 KG - - - - - - AAD.D.3 #REF! #REF! 0.0006 0.0010 1.0000 - 0.0039 - 180.48 - - 56.60 - 230.00 230.00 #REF! #REF! #REF!
4 Besi Beton Dia.12 mm (SNI) MD.4 Kg #REF! #REF! AAL.D.4 49,997.53 KG - - - - - - 1,993.08 KG - - - - - - AAD.D.4 #REF! #REF! 0.0009 0.0015 1.0000 - 0.0054 - 248.81 - - 78.02 - 320.00 320.00 #REF! #REF! #REF!
5 Besi Beton Dia.14 mm (SNI) MD.5 Kg #REF! #REF! AAL.D.5 49,992.36 KG - - - - - - 1,989.24 KG - - - - - - AAD.D.5 #REF! #REF! 0.0008 0.0012 1.0000 - 0.0046 - 213.99 - - 67.10 - 280.00 280.00 #REF! #REF! #REF!
6 Besi Beton Dia.16 mm (SNI) MD.6 Kg #REF! #REF! AAL.D.6 49,997.52 KG - - - - - - 1,990.80 KG - - - - - - AAD.D.6 #REF! #REF! 0.0011 0.0020 1.0000 - 0.0069 - 319.60 - - 100.22 - 410.00 410.00 #REF! #REF! #REF!
7 Besi Beton Dia.19 mm (SNI) MD.7 Kg #REF! #REF! AAL.D.7 49,987.68 KG - - - - - - 1,980.24 KG - - - - - - AAD.D.7 #REF! #REF! 0.0009 0.0016 1.0000 - 0.0056 - 259.69 - - 81.43 - 340.00 340.00 #REF! #REF! #REF!
8 Besi Beton Dia.22 mm (SNI) MD.8 Kg #REF! #REF! AAL.D.8 49,992.48 KG - - - - - - 1,966.80 KG - - - - - - AAD.D.8 #REF! #REF! 0.0008 0.0014 1.0000 - 0.0050 - 234.16 - - 73.43 - 300.00 300.00 #REF! #REF! #REF!
9 Kawat Beton MD.9 Kg #REF! #REF! AAL.D.9 50,000.00 KG - - - - - - 2,000.00 KG - - - - - - AAD.D.9 #REF! #REF! 0.0007 0.0013 1.0000 - 0.0039 - 182.29 - - 57.16 - 230.00 230.00 #REF! #REF! #REF!
10 Kawat beton / bindrat 4 mm MD.10 KG #REF! #REF! AAL.D.10 50,000.00 KG - - - - - - 2,000.00 KG - - - - - - AAD.D.10 #REF! #REF! 0.0007 0.0013 1.0000 - 0.0039 - 182.29 - - 57.16 - 230.00 230.00 #REF! #REF! #REF!
11 Paku 1" MD.11 Kg #REF! #REF! AAL.D.11 49,980.00 KG - - - - - - 1,980.00 KG - - - - - - AAD.D.11 #REF! #REF! 0.0006 0.0011 1.0000 - 0.0038 - 177.10 - - 55.54 - 230.00 230.00 #REF! #REF! #REF!
12 Paku 2" MD.12 Kg #REF! #REF! AAL.D.12 49,980.00 KG - - - - - - 1,980.00 KG - - - - - - AAD.D.12 #REF! #REF! 0.0006 0.0011 1.0000 - 0.0038 - 177.10 - - 55.54 - 230.00 230.00 #REF! #REF! #REF!
13 Paku 3" MD.13 Kg #REF! #REF! AAL.D.13 49,980.00 KG - - - - - - 1,980.00 KG - - - - - - AAD.D.13 #REF! #REF! 0.0006 0.0011 1.0000 - 0.0038 - 177.10 - - 55.54 - 230.00 230.00 #REF! #REF! #REF!
14 Paku 4" MD.14 Kg #REF! #REF! AAL.D.14 49,980.00 KG - - - - - - 1,980.00 KG - - - - - - AAD.D.14 #REF! #REF! 0.0006 0.0011 1.0000 - 0.0038 - 177.10 - - 55.54 - 230.00 230.00 #REF! #REF! #REF!
15 Paku 5" MD.15 Kg #REF! #REF! AAL.D.15 49,980.00 KG - - - - - - 1,980.00 KG - - - - - - AAD.D.15 #REF! #REF! 0.0006 0.0011 1.0000 - 0.0038 - 177.10 - - 55.54 - 230.00 230.00 #REF! #REF! #REF!
16 Paku Campur MD.16 Kg #REF! #REF! AAL.D.16 49,980.00 KG - - - - - - 1,980.00 KG - - - - - - AAD.D.16 #REF! #REF! 0.0006 0.0011 1.0000 - 0.0038 - 177.10 - - 55.54 - 230.00 230.00 #REF! #REF! #REF!
17 Paku Seng MD.17 Kg #REF! #REF! AAL.D.17 49,992.00 KG - - - - - - 1,992.00 KG - - - - - - AAD.D.17 #REF! #REF! 0.0007 0.0013 1.0000 - 0.0043 - 199.83 - - 62.67 - 260.00 260.00 #REF! #REF! #REF!
18 Paku Ardex Ulir MD.18 Kg #REF! #REF! AAL.D.18 50,000.00 KG - - - - - - 2,000.00 KG - - - - - - AAD.D.18 #REF! #REF! 0.0006 0.0011 1.0000 - 0.0038 - 177.64 - - 55.70 - 230.00 230.00 #REF! #REF! #REF!
19 Paku Sirap MD.19 Buah #REF! #REF! AAL.D.19 50,000.00 KG - - - - - - 2,000.00 KG - - - - - - AAD.D.19 #REF! #REF! 0.0006 0.0011 1.0000 - 0.0038 - 177.64 - - 55.70 - 230.00 230.00 #REF! #REF! #REF!
20 Paku Ondoline MD.20 Kg #REF! #REF! AAL.D.20 50,000.00 KG - - - - - - 2,000.00 KG - - - - - - AAD.D.20 #REF! #REF! 0.0006 0.0011 1.0000 - 0.0038 - 177.64 - - 55.70 - 230.00 230.00 #REF! #REF! #REF!
21 Paku Tembok / Kecil 2/3 MD.21 Buah #REF! #REF! AAL.D.21 1,500,000.00 Buah - - - - - - 2,000.00 Buah - - - - - - AAD.D.21 #REF! #REF! 0.0006 0.0011 1.0000 - 0.0038 - 177.64 - - 55.70 - 230.00 230.00 #REF! #REF! #REF!
22 Paku/Skrup 5 cm MD.22 KG #REF! #REF! AAL.D.22 50,000.00 KG - - - - - - 2,000.00 Buah - - - - - - AAD.D.22 #REF! #REF! 0.0006 0.0011 1.0000 - 0.0038 - 177.64 - - 55.70 - 230.00 230.00 #REF! #REF! #REF!
23 Kawat Nyamuk (Plastik / Nylon) MD.23 M #REF! #REF! AAL.D.23 75,000.00 M - - - - - - 3,000.00 M - - - - - - AAD.D.23 #REF! #REF! 0.0096 0.0246 1.0000 - 0.0860 - 2,664.74 - - 1,253.43 - 131.00 131.00 #REF! #REF! #REF!
24 Kawat Has / Bankhas dia 12 mm MD.24 M2 #REF! #REF! AAL.D.24 61,200.00 M - - - - - - 2,430.00 M - - - - - - AAD.D.24 #REF! #REF! 0.0106 0.0144 1.0000 - 0.0956 - 2,962.31 - - 1,393.41 - 146.00 146.00 #REF! #REF! #REF!
25 Kawat Harmonika Has 40x40 mm MD.25 M #REF! #REF! AAL.D.25 14,280.00 M - - - - - - 570.00 M - - - - - - AAD.D.25 #REF! #REF! 0.0538 0.1023 1.0000 - 0.4838 - 14,988.72 - - 7,050.36 - 734.00 734.00 #REF! #REF! #REF!
ANALISA ANGKUT BAHAN
HARGA ANALISA BIAYA MUAT DAN ANGKUTAN ----- L A U T ------- ANALISA BIAYA MUAT DAN ANGKUTAN ---- S U N G A I ------- ANALISIS BIAYA MUAT DAN ANGKUTAN ----- D A R A T -------- Jumlah Total Harga Dasar + OVERHEAD HARGA
URAIAN BAHAN/MATERIAL YANG DASAR TINGKAT Kode Jumlah Angkut 50.00 Perkiraan Biaya Jumlah Harga Jumlah Angkut 2.00 Perkiraan Biaya Jumlah Harga Kode Jarak Angkut Perkiraan Kuantitas Perkiraan Biaya Jumlah biaya Ongkos Inflasi + + SATUAN
No. KODE SATUAN
DIANGKUT BARANG INFLASI Analisa Maksimal Ton Packing Angkut/Ton-M3 Bongkar Muat Pikul Barang Jumlah Total per satu satuan Maksimal Ton Packing Angkut/Ton-M3Bongkar MuatPikul Barang Jumlah Total per satu satuan Analisa Truck Traktor Excavator Dump Tracktor Alat Mandor Pekerja Excavator Dump Tracktor Mandor Pekerja Biaya Biaya alat+tenaga Angkut Ongkos angkut PROFIT BAHAN
( Rp. ) Angkut Kapal Satuan (Rp) (Rp) (Rp) (Rp) (Rp) bahan/material Kapal Satuan (Rp) (Rp) (Rp) (Rp) (Rp) bahan/material Angkut (km) (km) Truck Bantu Truck Alat Bantu Lain-lain (Rupiah) (Rupiah) (Rupiah) (Rupiah) (Rupiah)
1 2 2 5 19 20 20 7 6 6 8 9 10 11 12 13 14 17 21 22 23

26 Kawat burung MN.26 M² #REF! #REF! AAL.D.26 13,620.00 M - - - - - - 540.00 M - - - - - - AAD.D.26 #REF! #REF! 0.0538 0.1023 1.0000 - 0.4838 - 14,988.72 - - 7,050.36 - 734.00 734.00 #REF! #REF! #REF!
27 Kawat Duri Baja 30 M MD.27 KG #REF! #REF! AAL.D.27 50,000.00 KG - - - - - - 2,000.00 KG - - - - - - AAD.D.27 #REF! #REF! 0.0006 0.0011 1.0000 - 0.0035 - 162.16 - - 50.85 - 210.00 210.00 #REF! #REF! #REF!
ANALISA ANGKUT BAHAN
HARGA ANALISA BIAYA MUAT DAN ANGKUTAN ----- L A U T ------- ANALISA BIAYA MUAT DAN ANGKUTAN ---- S U N G A I ------- ANALISIS BIAYA MUAT DAN ANGKUTAN ----- D A R A T -------- Jumlah Total Harga Dasar + OVERHEAD HARGA
URAIAN BAHAN/MATERIAL YANG DASAR TINGKAT Kode Jumlah Angkut 50.00 Perkiraan Biaya Jumlah Harga Jumlah Angkut 2.00 Perkiraan Biaya Jumlah Harga Kode Jarak Angkut Perkiraan Kuantitas Perkiraan Biaya Jumlah biaya Ongkos Inflasi + + SATUAN
No. KODE SATUAN
DIANGKUT BARANG INFLASI Analisa Maksimal Ton Packing Angkut/Ton-M3 Bongkar Muat Pikul Barang Jumlah Total per satu satuan Maksimal Ton Packing Angkut/Ton-M3Bongkar MuatPikul Barang Jumlah Total per satu satuan Analisa Truck Traktor Excavator Dump Tracktor Alat Mandor Pekerja Excavator Dump Tracktor Mandor Pekerja Biaya Biaya alat+tenaga Angkut Ongkos angkut PROFIT BAHAN
( Rp. ) Angkut Kapal Satuan (Rp) (Rp) (Rp) (Rp) (Rp) bahan/material Kapal Satuan (Rp) (Rp) (Rp) (Rp) (Rp) bahan/material Angkut (km) (km) Truck Bantu Truck Alat Bantu Lain-lain (Rupiah) (Rupiah) (Rupiah) (Rupiah) (Rupiah)
1 2 2 5 19 20 20 7 6 6 8 9 10 11 12 13 14 17 21 22 23

28 Kawat Las 0.26 MD.28 Dos #REF! #REF! AAL.D.28 25,000.00 Dus - - - - - - 1,000.00 Dus - - - - - - AAD.D.28 #REF! #REF! 0.0007 0.0013 1.0000 - 0.0039 - 182.29 - - 57.16 - 230.00 230.00 #REF! #REF! #REF!
29 Timah Solder MD.29 Kg #REF! #REF! AAL.D.29 50,000.00 KG - - - - - - 2,000.00 KG - - - - - - AAD.D.29 #REF! #REF! 0.0002 0.0004 1.0000 - 0.0010 - 66.93 - - 13.99 - 80.00 80.00 #REF! #REF! #REF!
30 Baut Jembatan Dia. 19 mm MD.30 Kg #REF! #REF! AAL.D.30 50,000.00 KG - - - - - - 2,000.00 KG - - - - - - AAD.D.30 #REF! #REF! 0.0006 0.0011 1.0000 - 0.0038 - 177.64 - - 55.70 - 230.00 230.00 #REF! #REF! #REF!
31 Baut Dia, 3/8" - 17.5 + Mur - Ring MD.31 Buah #REF! #REF! AAL.D.31 500,000.00 Buah - - - - - - 2,000.00 Buah - - - - - - AAD.D.31 #REF! #REF! 0.0006 0.0011 1.0000 - 0.0038 - 177.64 - - 55.70 - 230.00 230.00 #REF! #REF! #REF!
32 Baut Dia, 3/8" - 12.0/15.0 + Mur - Ring MD.32 Buah #REF! #REF! AAL.D.32 500,000.00 Buah - - - - - - 2,000.00 Buah - - - - - - AAD.D.32 #REF! #REF! 0.0006 0.0011 1.0000 - 0.0038 - 177.64 - - 55.70 - 230.00 230.00 #REF! #REF! #REF!
33 Baut Dia, 3/8" - 20.0 + Mur - Ring MD.33 Buah #REF! #REF! AAL.D.33 500,000.00 Buah - - - - - - 2,000.00 Buah - - - - - - AAD.D.33 #REF! #REF! 0.0006 0.0011 1.0000 - 0.0038 - 177.64 - - 55.70 - 230.00 230.00 #REF! #REF! #REF!
34 Baut Dia, 3/8" - 35.0 + Mur - Ring MD.34 Buah #REF! #REF! AAL.D.34 500,000.00 Buah - - - - - - 2,000.00 Buah - - - - - - AAD.D.34 #REF! #REF! 0.0006 0.0011 1.0000 - 0.0038 - 177.64 - - 55.70 - 230.00 230.00 #REF! #REF! #REF!
35 Besi angkur dia. 8 mm MN.35 Buah #REF! #REF! AAL.D.35 200,000.00 Buah - - - - - - 8,000.00 Buah - - - - - - AAD.D.35 #REF! #REF! 0.0006 0.0011 1.0000 - 0.0038 - 177.64 - - 55.70 - 230.00 230.00 #REF! #REF! #REF!
36 Kasa (Ram Ayam) Dia, 10 mm MD.36 M #REF! #REF! AAL.D.36 60,000.00 M - - - - - - 2,000.00 M - - - - - - AAD.D.36 #REF! #REF! 0.0277 0.0145 1.0000 - 0.1107 - 7,716.61 - - 1,613.21 - 310.00 310.00 #REF! #REF! #REF!
37 Besi Siku 30 . 30 . 3 - L = 6 Meter MD.37 Batang #REF! #REF! AAL.D.37 5,927.00 Batang - - - - - - 237.00 Batang - - - - - - AAD.D.37 #REF! #REF! 0.0064 0.0050 1.0000 - 0.0256 - 1,784.82 - - 373.13 - 2,150.00 2,150.00 #REF! #REF! #REF!
38 Besi Siku 50 . 50 . 5 - L = 6 Meter MD.38 Batang #REF! #REF! AAL.D.38 2,134.00 Batang - - - - - - 85.00 Batang - - - - - - AAD.D.38 #REF! #REF! 0.0189 0.0147 1.0000 - 0.0755 - 5,261.08 - - 1,099.87 - 6,360.00 6,360.00 #REF! #REF! #REF!
39 Besi Siku 50 . 50 . 6 - L = 6 Meter MD.39 Batang #REF! #REF! AAL.D.39 1,778.00 Batang - - - - - - 71.00 Batang - - - - - - AAD.D.39 #REF! #REF! 0.0198 0.0153 1.0000 - 0.0790 - 5,509.46 - - 1,151.79 - 6,660.00 6,660.00 #REF! #REF! #REF!
40 Besi Siku 40 . 40 . 4 - L = 6 Meter MD.40 Batang #REF! #REF! AAL.D.40 3,334.00 Batang - - - - - - 133.00 Batang - - - - - - AAD.D.40 #REF! #REF! 0.0100 0.0077 1.0000 - 0.0402 - 2,799.55 - - 585.27 - 3,380.00 3,380.00 #REF! #REF! #REF!
41 Besi Siku 40 . 40 . 5 - L = 6 Meter MD.41 Batang #REF! #REF! AAL.D.41 2,667.00 Batang - - - - - - 106.00 Batang - - - - - - AAD.D.41 #REF! #REF! 0.0180 0.0142 1.0000 - 0.0720 - 5,017.02 - - 1,048.84 - 6,060.00 6,060.00 #REF! #REF! #REF!
42 Besi Siku 20 . 20 . 3 - L = 6 Meter MD.42 Batang #REF! #REF! AAL.D.42 8,891.00 Batang - - - - - - 355.00 Batang - - - - - - AAD.D.42 #REF! #REF! 0.0039 0.0031 1.0000 - 0.0158 - 1,099.83 - - 229.93 - 1,320.00 1,320.00 #REF! #REF! #REF!
43 Besi Plat 1.0 mm - 120 x 240 Cm MD.43 Lembar #REF! #REF! AAL.D.43 2,222.00 Lembar - - - - - - 88.00 Lembar - - - - - - AAD.D.43 #REF! #REF! 0.0187 0.0171 1.0000 - 0.0747 - 5,209.52 - - 1,089.09 - 6,290.00 6,290.00 #REF! #REF! #REF!
44 Besi Plat 1.2 mm - 120 x 240 Cm MD.44 Lembar #REF! #REF! AAL.D.44 1,852.00 Lembar - - - - - - 74.00 Lembar - - - - - - AAD.D.44 #REF! #REF! 0.0195 0.0176 1.0000 - 0.0781 - 5,447.23 - - 1,138.78 - 6,580.00 6,580.00 #REF! #REF! #REF!
45 Besi Plat 2.0 mm - 120 x 240 Cm MD.45 Lembar #REF! #REF! AAL.D.45 1,111.00 Lembar - - - - - - 44.00 Lembar - - - - - - AAD.D.45 #REF! #REF! 0.0253 0.0197 1.0000 - 0.2023 - 7,051.72 - - 2,948.42 - 10,000.00 10,000.00 #REF! #REF! #REF!
46 Besi Plat 3.0 mm - 120 x 240 Cm MD.46 Lembar #REF! #REF! AAL.D.46 740.00 Lembar - - - - - - 29.00 Lembar - - - - - - AAD.D.46 #REF! #REF! 0.0296 0.0181 1.0000 - 0.2366 - 8,245.33 - - 3,447.48 - 11,690.00 11,690.00 #REF! #REF! #REF!
47 Besi Plat 12 mm -120 x 240 cm MD.47 Lembar #REF! #REF! AAL.D.47 185.00 Lembar - - - - - - 7.00 Lembar - - - - - - AAD.D.47 #REF! #REF! 0.0879 0.0435 1.0000 - 0.8793 - 24,515.83 - - 12,813.01 - 37,320.00 37,320.00 #REF! #REF! #REF!
48 Besi Strip 20.2 MD.48 Batang #REF! #REF! AAL.D.48 32,010.00 Batang - - - - - - 1,280.00 Batang - - - - - - AAD.D.48 #REF! #REF! 0.0011 0.0010 1.0000 - 0.0042 - 293.71 - - 61.40 - 350.00 350.00 #REF! #REF! #REF!
49 Besi Strip 30.3 MD.49 Batang #REF! #REF! AAL.D.49 14,226.00 Batang - - - - - - 569.00 Batang - - - - - - AAD.D.49 #REF! #REF! 0.0025 0.0024 1.0000 - 0.0099 - 687.47 - - 143.72 - 830.00 830.00 #REF! #REF! #REF!
50 Besi Strip 40.4 MD.50 Batang #REF! #REF! AAL.D.50 8,002.00 Batang - - - - - - 320.00 Batang - - - - - - AAD.D.50 #REF! #REF! 0.0048 0.0047 1.0000 - 0.0191 - 1,334.34 - - 278.95 - 1,610.00 1,610.00 #REF! #REF! #REF!
51 Besi Strip 50.5 MD.51 Batang #REF! #REF! AAL.D.51 5,121.00 Batang - - - - - - 204.00 Batang - - - - - - AAD.D.51 #REF! #REF! 0.0066 0.0065 1.0000 - 0.0264 - 1,842.33 - - 385.15 - 2,220.00 2,220.00 #REF! #REF! #REF!
52 Waltermur Dia 16 mm MD.52 Buah #REF! #REF! AAL.D.52 5,000.00 Buah - - - - - - 200.00 Buah - - - - - - AAD.D.52 #REF! #REF! 0.0096 0.0159 1.0000 - 0.0384 - 2,679.30 - - 560.13 - 3,230.00 3,230.00 #REF! #REF! #REF!
53 Gording lips chanel 150.65.20.2,3 ( 6 N ) MD.53 Batang #REF! #REF! AAL.D.53 5,000.00 Batang - - - - - - 200.00 Batang - - - - - - AAD.D.53 #REF! #REF! 0.0096 0.0159 1.0000 - 0.0384 - 2,679.30 - - 560.13 - 3,230.00 3,230.00 #REF! #REF! #REF!
54 Baja profil IWF MD.54 KG #REF! #REF! AAL.D.54 46,860.00 KG - - - - - - 2,000.00 KG - - - - - - AAD.D.54 #REF! #REF! 0.0006 0.0014 1.0000 - 0.0023 - 163.00 - - 34.08 - 190.00 190.00 #REF! #REF! #REF!
55 Besi gording canal MD.55 KG #REF! #REF! AAL.D.55 46,860.00 KG - - - - - - 2,000.00 KG - - - - - - AAD.D.55 #REF! #REF! 0.0006 0.0014 1.0000 - 0.0023 - 163.00 - - 34.08 - 190.00 190.00 #REF! #REF! #REF!
56 Water mur MD.56 KG #REF! #REF! AAL.D.56 46,860.00 KG - - - - - - 2,000.00 KG - - - - - - AAD.D.56 #REF! #REF! 0.0006 0.0014 1.0000 - 0.0023 - 163.00 - - 34.08 - 190.00 190.00 #REF! #REF! #REF!
57 Sealent MD.57 Tube #REF! #REF! AAL.D.57 46,860.00 Tube - - - - - - 2,000.00 Tube - - - - - - AAD.D.57 #REF! #REF! 0.0006 0.0014 1.0000 - 0.0023 - 163.00 - - 34.08 - 190.00 190.00 #REF! #REF! #REF!

E. BAHAN PENUTUP ATAP


1 Seng Gelombang BJLS 0,30 ME.1 Lembar #REF! #REF! AAL.E.1 18,181.00 Lembar - - - - - - 727.00 Lembar - - - - - - AAD.E.1 #REF! #REF! 0.0015 0.0015 1.0000 - 0.0121 - 422.81 - - 176.78 - 590.00 590.00 #REF! #REF! #REF!
2 Seng Gelombang BJLS 0,22 ME.2 Lembar #REF! #REF! AAL.E.2 20,000.00 Lembar - - - - - - 800.00 Lembar - - - - - - AAD.E.2 #REF! #REF! 0.0014 0.0013 1.0000 - 0.0111 - 385.72 - - 161.28 - 540.00 540.00 #REF! #REF! #REF!
3 Seng Gelombang BJLS 0,20 ME.3 Lembar #REF! #REF! AAL.E.3 22,222.00 Lembar - - - - - - 888.00 Lembar - - - - - - AAD.E.3 #REF! #REF! 0.0012 0.0012 1.0000 - 0.0098 - 339.86 - - 142.10 - 480.00 480.00 #REF! #REF! #REF!
4 Atap Seng Plastik Gelombang Kecil ME.4 Lembar #REF! #REF! AAL.E.4 25,000.00 Lembar - - - - - - 1,000.00 Lembar - - - - - - AAD.E.4 #REF! #REF! 0.0007 0.0006 1.0000 - 0.0053 - 185.09 - - 77.39 - 260.00 260.00 #REF! #REF! #REF!
5 Atap Seng Gelombang Besar Fiber Glass ME.5 Lembar #REF! #REF! AAL.E.5 10,000.00 Lembar - - - - - - 400.00 Lembar - - - - - - AAD.E.5 #REF! #REF! 0.0028 0.0027 1.0000 - 0.0221 - 771.81 - - 322.70 - 1,090.00 1,090.00 #REF! #REF! #REF!
6 Seng Plat BJLS 0.30 ME.6 Lembar #REF! #REF! AAL.E.6 8,127.00 Lembar - - - - - - 325.00 Lembar - - - - - - AAD.E.6 #REF! #REF! 0.0015 0.0015 1.0000 - 0.0121 - 422.81 - - 176.78 - 590.00 590.00 #REF! #REF! #REF!
7 Seng Plat BJLS 0.20 ME.7 Lembar #REF! #REF! AAL.E.7 12,191.00 Lembar - - - - - - 487.00 Lembar - - - - - - AAD.E.7 #REF! #REF! 0.0012 0.0012 1.0000 - 0.0098 - 339.86 - - 142.10 - 480.00 480.00 #REF! #REF! #REF!
8 Genteng Metal - Multiroof ME.8 Lembar #REF! #REF! AAL.E.8 20,000.00 Lembar - - - - - - 800.00 Lembar - - - - - - AAD.E.8 #REF! #REF! 0.0027 0.0027 1.0000 - 0.0218 - 761.35 - - 318.33 - 1,070.00 1,070.00 #REF! #REF! #REF!
9 Nok Genteng Metal - Multiroof ME.9 Bh #REF! #REF! AAL.E.9 20,000.00 Bh - - - - - - 800.00 Bh - - - - - - AAD.E.9 #REF! #REF! 0.0027 0.0027 1.0000 - 0.0218 - 761.35 - - 318.33 - 1,070.00 1,070.00 #REF! #REF! #REF!
10 Atap Allumunium Gelombang ME.10 M2 #REF! #REF! AAL.E.10 10,000.00 M2 - - - - - - 400.00 M2 - - - - - - AAD.E.10 #REF! #REF! 0.0027 0.0027 1.0000 - 0.0218 - 761.35 - - 318.33 - 1,070.00 1,070.00 #REF! #REF! #REF!
11 Nok Atap Allumunium ME.11 M #REF! #REF! AAL.E.11 16,666.00 M - - - - - - 666.00 M - - - - - - AAD.E.11 #REF! #REF! 0.0027 0.0027 1.0000 - 0.0218 - 761.35 - - 318.33 - 1,070.00 1,070.00 #REF! #REF! #REF!
12 Karet Talang ME.12 M1 #REF! #REF! AAL.E.12 66,666.00 M1 - - - - - - 2,666.00 M1 - - - - - - AAD.E.12 #REF! #REF! 0.0007 0.0012 1.0000 - 0.0029 - 200.79 - - 41.98 - 240.00 240.00 #REF! #REF! #REF!
-

F. BAHAN KERAMIK -

1 Ubin Abu-Abu 20 x 20 Cm MF.1 Buah #REF! #REF! AAL.F.1 125,000.00 Buah - - - - - - 5,000.00 Buah - - - - - - AAD.F.1 #REF! #REF! 0.0003 0.0004 1.0000 - 0.0013 - 88.22 - - 18.44 - 100.00 100.00 #REF! #REF! #REF!
2 Ubin Abu-Abu 30 x 30 Cm MF.2 Buah #REF! #REF! AAL.F.2 44,000.00 Buah - - - - - - 1,760.00 Buah - - - - - - AAD.F.2 #REF! #REF! 0.0005 0.0006 1.0000 - 0.0021 - 143.92 - - 30.09 - 170.00 170.00 #REF! #REF! #REF!
3 Ubin Abu-Abu 40 x 40 Cm MF.3 Buah #REF! #REF! AAL.F.3 18,181.00 Buah - - - - - - 727.00 Buah - - - - - - AAD.F.3 #REF! #REF! 0.0009 0.0009 1.0000 - 0.0037 - 255.22 - - 53.36 - 300.00 300.00 #REF! #REF! #REF!
4 Ubin Warna 20 x 20 Cm MF.4 Buah #REF! #REF! AAL.F.4 125,000.00 Buah - - - - - - 5,000.00 Buah - - - - - - AAD.F.4 #REF! #REF! 0.0003 0.0004 1.0000 - 0.0013 - 88.22 - - 18.44 - 100.00 100.00 #REF! #REF! #REF!
5 Ubin Warna 30 x 30 Cm MF.5 Buah #REF! #REF! AAL.F.5 44,000.00 Buah - - - - - - 1,760.00 Buah - - - - - - AAD.F.5 #REF! #REF! 0.0005 0.0006 1.0000 - 0.0021 - 143.92 - - 30.09 - 170.00 170.00 #REF! #REF! #REF!
6 Ubin Warna 40 x 40 Cm MF.6 Buah #REF! #REF! AAL.F.6 18,181.00 Buah - - - - - - 727.00 Buah - - - - - - AAD.F.6 #REF! #REF! 0.0009 0.0009 1.0000 - 0.0037 - 255.22 - - 53.36 - 300.00 300.00 #REF! #REF! #REF!
7 Ubin Teraso Ukuran 30 x 30 cm MF.7 Buah #REF! #REF! AAL.F.7 44,000.00 Buah - - - - - - 1,760.00 Buah - - - - - - AAD.F.7 #REF! #REF! 0.0005 0.0006 1.0000 - 0.0021 - 143.92 - - 30.09 - 170.00 170.00 #REF! #REF! #REF!
8 Ubin Teraso Ukuran 40 x 40 cm MF.8 Buah #REF! #REF! AAL.F.8 18,181.00 Buah - - - - - - 727.00 Buah - - - - - - AAD.F.8 #REF! #REF! 0.0009 0.0009 1.0000 - 0.0037 - 255.22 - - 53.36 - 300.00 300.00 #REF! #REF! #REF!
9 Ubin Granito Ukuran 30 x 30 cm MF.9 Buah #REF! #REF! AAL.F.9 44,000.00 Buah - - - - - - 1,760.00 Buah - - - - - - AAD.F.9 #REF! #REF! 0.0005 0.0006 1.0000 - 0.0021 - 143.92 - - 30.09 - 170.00 170.00 #REF! #REF! #REF!
10 Ubin Granito Ukuran 40 x 40 cm MF.10 Buah #REF! #REF! AAL.F.10 18,181.00 Buah - - - - - - 727.00 Buah - - - - - - AAD.F.10 #REF! #REF! 0.0009 0.0009 1.0000 - 0.0037 - 255.22 - - 53.36 - 300.00 300.00 #REF! #REF! #REF!
11 Ubin Teralux Kerang Ukuran 30 x 30 cm MF.11 Buah #REF! #REF! AAL.F.11 44,000.00 Buah - - - - - - 1,760.00 Buah - - - - - - AAD.F.11 #REF! #REF! 0.0005 0.0006 1.0000 - 0.0021 - 143.92 - - 30.09 - 170.00 170.00 #REF! #REF! #REF!
12 Ubin Teralux Kerang Ukuran 40 x 40 cm MF.12 Buah #REF! #REF! AAL.F.12 18,181.00 Buah - - - - - - 727.00 Buah - - - - - - AAD.F.12 #REF! #REF! 0.0009 0.0009 1.0000 - 0.0037 - 255.22 - - 53.36 - 300.00 300.00 #REF! #REF! #REF!
13 Ubin Teralux Marmer Ukuran 30 x 30 cm MF.13 Buah #REF! #REF! AAL.F.13 44,000.00 Buah - - - - - - 1,760.00 Buah - - - - - - AAD.F.13 #REF! #REF! 0.0005 0.0006 1.0000 - 0.0021 - 143.92 - - 30.09 - 170.00 170.00 #REF! #REF! #REF!
14 Ubin Teralux Marmer Ukuran 40 x 40 cm MF.14 Buah #REF! #REF! AAL.F.14 18,181.00 Buah - - - - - - 727.00 Buah - - - - - - AAD.F.14 #REF! #REF! 0.0009 0.0009 1.0000 - 0.0037 - 255.22 - - 53.36 - 300.00 300.00 #REF! #REF! #REF!
15 Ubin Teralux Marmer Ukuran 60 x 60 cm MF.15 Buah #REF! #REF! AAL.F.15 5,000.00 Buah - - - - - - 200.00 Buah - - - - - - AAD.F.15 #REF! #REF! 0.0035 0.0024 1.0000 - 0.0141 - 985.73 - - 206.07 - 1,190.00 1,190.00 #REF! #REF! #REF!
16 Keramik Artistik 10x20; 15x15 cm MF.16 Buah #REF! #REF! AAL.F.16 294,117.00 Buah - - - - - - 11,764.00 Buah - - - - - - AAD.F.16 #REF! #REF! 0.0003 0.0004 1.0000 - 0.0011 - 73.64 - - 15.39 - 80.00 80.00 #REF! #REF! #REF!
17 Keramik Artistik 10x10 atau 5x20 cm MF.17 Buah #REF! #REF! AAL.F.17 588,235.00 Buah - - - - - - 23,529.00 Buah - - - - - - AAD.F.17 #REF! #REF! 0.0003 0.0003 1.0000 - 0.0010 - 70.59 - - 14.76 - 80.00 80.00 #REF! #REF! #REF!
18 Keramik Lantai 20 x 20 cm MF.18 Buah #REF! #REF! AAL.F.18 125,000.00 Buah - - - - - - 5,000.00 Buah - - - - - - AAD.F.18 #REF! #REF! 0.0003 0.0004 1.0000 - 0.0013 - 88.22 - - 18.44 - 100.00 100.00 #REF! #REF! #REF!
19 Keramik Lantai 20 x 30 cm MF.19 Buah #REF! #REF! AAL.F.19 72,727.00 Buah - - - - - - 2,909.00 Buah - - - - - - AAD.F.19 #REF! #REF! 0.0004 0.0004 1.0000 - 0.0017 - 115.44 - - 24.13 - 130.00 130.00 #REF! #REF! #REF!
20 Keramik Lantai 30 x 30 cm MF.20 Buah #REF! #REF! AAL.F.20 44,000.00 Buah - - - - - - 1,760.00 Buah - - - - - - AAD.F.20 #REF! #REF! 0.0005 0.0006 1.0000 - 0.0021 - 143.92 - - 30.09 - 170.00 170.00 #REF! #REF! #REF!
21 Keramik Lantai 30 x 30 berglasir MF.21 Buah #REF! #REF! AAL.F.21 44,000.00 Buah - - - - - - 1,760.00 Buah - - - - - - AAD.F.21 #REF! #REF! 0.0005 0.0006 1.0000 - 0.0021 - 143.92 - - 30.09 - 170.00 170.00 #REF! #REF! #REF!
22 Keramik Lantai 30 x 30 berglasir (Mozaik) MF.22 Buah #REF! #REF! AAL.F.22 44,000.00 Buah - - - - - - 1,760.00 Buah - - - - - - AAD.F.22 #REF! #REF! 0.0005 0.0006 1.0000 - 0.0021 - 143.92 - - 30.09 - 170.00 170.00 #REF! #REF! #REF!
23 Keramik Lantai 40 x 40 cm MF.23 Buah #REF! #REF! AAL.F.23 18,181.00 Buah - - - - - - 727.00 Buah - - - - - - AAD.F.23 #REF! #REF! 0.0009 0.0009 1.0000 - 0.0037 - 255.22 - - 53.36 - 300.00 300.00 #REF! #REF! #REF!
24 Keramik Lantai 50 x 50 cm MF.24 Buah #REF! #REF! AAL.F.24 8,888.00 Buah - - - - - - 355.00 Buah - - - - - - AAD.F.24 #REF! #REF! 0.0018 0.0015 1.0000 - 0.0072 - 501.15 - - 104.77 - 600.00 600.00 #REF! #REF! #REF!
25 Keramik Lantai 60 x 60 cm MF.25 Buah #REF! #REF! AAL.F.25 5,000.00 Buah - - - - - - 200.00 Buah - - - - - - AAD.F.25 #REF! #REF! 0.0035 0.0024 1.0000 - 0.0141 - 985.73 - - 206.07 - 1,190.00 1,190.00 #REF! #REF! #REF!
26 Keramik Dinding 10 x 20 cm MF.26 Buah #REF! #REF! AAL.F.26 294,117.00 Buah - - - - - - 11,764.00 Buah - - - - - - AAD.F.26 #REF! #REF! 0.0003 0.0004 1.0000 - 0.0011 - 73.64 - - 15.39 - 80.00 80.00 #REF! #REF! #REF!
27 Keramik Dinding 20x20 atau 20x25 cm MF.27 Buah #REF! #REF! AAL.F.27 125,000.00 Buah - - - - - - 5,000.00 Buah - - - - - - AAD.F.27 #REF! #REF! 0.0003 0.0004 1.0000 - 0.0013 - 88.22 - - 18.44 - 100.00 100.00 #REF! #REF! #REF!
28 Ubin Dinding Porselin 11 x 11 MF.28 Buah #REF! #REF! AAL.F.28 410,000.00 Buah - - - - - - 16,400.00 Buah - - - - - - AAD.F.28 #REF! #REF! 0.0003 0.0003 1.0000 - 0.0010 - 70.59 - - 14.76 - 80.00 80.00 #REF! #REF! #REF!
29 Ubin Dinding Porselin 10 x 20 cm MF.29 Buah #REF! #REF! AAL.F.29 410,000.00 Buah - - - - - - 16,400.00 Buah - - - - - - AAD.F.29 #REF! #REF! 0.0003 0.0004 1.0000 - 0.0011 - 73.64 - - 15.39 - 80.00 80.00 #REF! #REF! #REF!
30 Ubin Dinding Porselin 20 x 20 MF.30 Buah #REF! #REF! AAL.F.30 125,000.00 Buah - - - - - - 5,000.00 Buah - - - - - - AAD.F.30 #REF! #REF! 0.0003 0.0004 1.0000 - 0.0013 - 88.22 - - 18.44 - 100.00 100.00 #REF! #REF! #REF!
31 Plint Ubin Abu-Abu 15 x 20 cm MF.31 Buah #REF! #REF! AAL.F.31 103,125.00 Buah - - - - - - 4,125.00 Buah - - - - - - AAD.F.31 #REF! #REF! 0.0004 0.0004 1.0000 - 0.0016 - 111.57 - - 23.32 - 130.00 130.00 #REF! #REF! #REF!
32 Plint Ubin Abu-Abu 10 x 30 cm MF.32 Buah #REF! #REF! AAL.F.32 128,571.00 Buah - - - - - - 5,142.00 Buah - - - - - - AAD.F.32 #REF! #REF! 0.0004 0.0004 1.0000 - 0.0016 - 114.46 - - 23.93 - 130.00 130.00 #REF! #REF! #REF!
33 Plint Ubin Abu-Abu 10 x 40 cm MF.33 Buah #REF! #REF! AAL.F.33 100,000.00 Buah - - - - - - 4,000.00 Buah - - - - - - AAD.F.33 #REF! #REF! 0.0004 0.0004 1.0000 - 0.0016 - 112.53 - - 23.52 - 130.00 130.00 #REF! #REF! #REF!
34 Plint Ubin Warna 10 x 20 cm MF.34 Buah #REF! #REF! AAL.F.34 175,000.00 Buah - - - - - - 7,000.00 Buah - - - - - - AAD.F.34 #REF! #REF! 0.0003 0.0004 1.0000 - 0.0011 - 73.64 - - 15.39 - 80.00 80.00 #REF! #REF! #REF!
35 Plint Ubin Warna 10 x 30 cm MF.35 Buah #REF! #REF! AAL.F.35 128,571.00 Buah - - - - - - 5,142.00 Buah - - - - - - AAD.F.35 #REF! #REF! 0.0004 0.0004 1.0000 - 0.0016 - 114.46 - - 23.93 - 130.00 130.00 #REF! #REF! #REF!
36 Plint Ubin Warna 10 x 40 cm MF.36 Buah #REF! #REF! AAL.F.36 100,000.00 Buah - - - - - - 4,000.00 Buah - - - - - - AAD.F.36 #REF! #REF! 0.0004 0.0004 1.0000 - 0.0016 - 112.53 - - 23.52 - 130.00 130.00 #REF! #REF! #REF!
37 Plint Ubin Teraso 10 x 30 cm MF.37 Buah #REF! #REF! AAL.F.37 128,571.00 Buah - - - - - - 5,142.00 Buah - - - - - - AAD.F.37 #REF! #REF! 0.0004 0.0004 1.0000 - 0.0016 - 114.46 - - 23.93 - 130.00 130.00 #REF! #REF! #REF!
38 Plint Ubin Teraso 10 x 40 cm MF.38 Buah #REF! #REF! AAL.F.38 100,000.00 Buah - - - - - - 4,000.00 Buah - - - - - - AAD.F.38 #REF! #REF! 0.0004 0.0004 1.0000 - 0.0016 - 112.53 - - 23.52 - 130.00 130.00 #REF! #REF! #REF!
39 Plint Ubin Granito 10 x 40 cm MF.39 Buah #REF! #REF! AAL.F.39 100,000.00 Buah - - - - - - 4,000.00 Buah - - - - - - AAD.F.39 #REF! #REF! 0.0004 0.0004 1.0000 - 0.0016 - 112.53 - - 23.52 - 130.00 130.00 #REF! #REF! #REF!
40 Plint Ubin Granito 10 x 30 cm MF.40 Buah #REF! #REF! AAL.F.40 94,285.00 Buah - - - - - - 3,771.00 Buah - - - - - - AAD.F.40 #REF! #REF! 0.0004 0.0004 1.0000 - 0.0016 - 114.46 - - 23.93 - 130.00 130.00 #REF! #REF! #REF!
41 Plint Ubin Teralux Kerang 10 x 40 cm MF.41 Buah #REF! #REF! AAL.F.41 100,000.00 Buah - - - - - - 4,000.00 Buah - - - - - - AAD.F.41 #REF! #REF! 0.0004 0.0004 1.0000 - 0.0016 - 112.53 - - 23.52 - 130.00 130.00 #REF! #REF! #REF!
42 Plint Ubin Teralux Kerang 10 x 30 cm MF.42 Buah #REF! #REF! AAL.F.42 128,571.00 Buah - - - - - - 5,142.00 Buah - - - - - - AAD.F.42 #REF! #REF! 0.0004 0.0004 1.0000 - 0.0016 - 114.46 - - 23.93 - 130.00 130.00 #REF! #REF! #REF!
43 Plint Ubin Teralux Marmer 10 x 60 cm MF.43 Buah #REF! #REF! AAL.F.43 98,000.00 Buah - - - - - - 3,920.00 Buah - - - - - - AAD.F.43 #REF! #REF! 0.0004 0.0004 1.0000 - 0.0018 - 122.15 - - 25.54 - 140.00 140.00 #REF! #REF! #REF!
44 Plint Ubin Teralux Marmer 10 x 40 cm MF.44 Buah #REF! #REF! AAL.F.44 100,000.00 Buah - - - - - - 4,000.00 Buah - - - - - - AAD.F.44 #REF! #REF! 0.0004 0.0004 1.0000 - 0.0016 - 112.53 - - 23.52 - 130.00 130.00 #REF! #REF! #REF!
45 Plint Ubin Teralux Marmer 10 x 30 cm MF.45 Buah #REF! #REF! AAL.F.45 128,571.00 Buah - - - - - - 5,142.00 Buah - - - - - - AAD.F.45 #REF! #REF! 0.0004 0.0004 1.0000 - 0.0016 - 114.46 - - 23.93 - 130.00 130.00 #REF! #REF! #REF!
46 Plint Keramik Artistik 10 x 20 cm MF.46 Buah #REF! #REF! AAL.F.46 175, R
K m A m M R
K m A m M R
K m A m M R
M m U m M R
W m M M M M R
M R
ANALISA ANGKUT BAHAN
HARGA ANALISA BIAYA MUAT DAN ANGKUTAN ----- L A U T ------- ANALISA BIAYA MUAT DAN ANGKUTAN ---- S U N G A I ------- ANALISIS BIAYA MUAT DAN ANGKUTAN ----- D A R A T -------- Jumlah Total Harga Dasar + OVERHEAD HARGA
URAIAN BAHAN/MATERIAL YANG DASAR TINGKAT Kode Jumlah Angkut 50.00 Perkiraan Biaya Jumlah Harga Jumlah Angkut 2.00 Perkiraan Biaya Jumlah Harga Kode Jarak Angkut Perkiraan Kuantitas Perkiraan Biaya Jumlah biaya Ongkos Inflasi + + SATUAN
No. KODE SATUAN
DIANGKUT BARANG INFLASI Analisa Maksimal Ton Packing Angkut/Ton-M3 Bongkar Muat Pikul Barang Jumlah Total per satu satuan Maksimal Ton Packing Angkut/Ton-M3Bongkar MuatPikul Barang Jumlah Total per satu satuan Analisa Truck Traktor Excavator Dump Tracktor Alat Mandor Pekerja Excavator Dump Tracktor Mandor Pekerja Biaya Biaya alat+tenaga Angkut Ongkos angkut PROFIT BAHAN
( Rp. ) Angkut Kapal Satuan (Rp) (Rp) (Rp) (Rp) (Rp) bahan/material Kapal Satuan (Rp) (Rp) (Rp) (Rp) (Rp) bahan/material Angkut (km) (km) Truck Bantu Truck Alat Bantu Lain-lain (Rupiah) (Rupiah) (Rupiah) (Rupiah) (Rupiah)
1 2 2 5 19 20 20 7 6 6 8 9 10 11 12 13 14 17 21 22 23

53 Batu Tempel Hitam MF.53 Buah #REF! #REF! AAL.F.53 44,000.00 Buah - - - - - - 1,760.00 Buah - - - - - - AAD.F.53 #REF! #REF! 0.0005 0.0006 1.0000 - 0.0021 - 143.92 - - 30.09 - 170.00 170.00 #REF! #REF! #REF!
ANALISA ANGKUT BAHAN
HARGA ANALISA BIAYA MUAT DAN ANGKUTAN ----- L A U T ------- ANALISA BIAYA MUAT DAN ANGKUTAN ---- S U N G A I ------- ANALISIS BIAYA MUAT DAN ANGKUTAN ----- D A R A T -------- Jumlah Total Harga Dasar + OVERHEAD HARGA
URAIAN BAHAN/MATERIAL YANG DASAR TINGKAT Kode Jumlah Angkut 50.00 Perkiraan Biaya Jumlah Harga Jumlah Angkut 2.00 Perkiraan Biaya Jumlah Harga Kode Jarak Angkut Perkiraan Kuantitas Perkiraan Biaya Jumlah biaya Ongkos Inflasi + + SATUAN
No. KODE SATUAN
DIANGKUT BARANG INFLASI Analisa Maksimal Ton Packing Angkut/Ton-M3 Bongkar Muat Pikul Barang Jumlah Total per satu satuan Maksimal Ton Packing Angkut/Ton-M3Bongkar MuatPikul Barang Jumlah Total per satu satuan Analisa Truck Traktor Excavator Dump Tracktor Alat Mandor Pekerja Excavator Dump Tracktor Mandor Pekerja Biaya Biaya alat+tenaga Angkut Ongkos angkut PROFIT BAHAN
( Rp. ) Angkut Kapal Satuan (Rp) (Rp) (Rp) (Rp) (Rp) bahan/material Kapal Satuan (Rp) (Rp) (Rp) (Rp) (Rp) bahan/material Angkut (km) (km) Truck Bantu Truck Alat Bantu Lain-lain (Rupiah) (Rupiah) (Rupiah) (Rupiah) (Rupiah)
1 2 2 5 19 20 20 7 6 6 8 9 10 11 12 13 14 17 21 22 23

G. BAHAN KACA
1 Kaca Polos 3 mm MG.1 M2 #REF! #REF! AAL.G.1 6,462.00 M2 - - - - - - 258.00 M2 - - - - - - AAD.G.1 #REF! #REF! 0.0039 0.0074 1.0000 - 0.0310 - 1,080.20 - - 451.65 - 1,530.00 1,530.00 #REF! #REF! #REF!
2 Kaca Polos 5 mm MG.2 M2 #REF! #REF! AAL.G.2 3,877.00 M2 - - - - - - 155.00 M2 - - - - - - AAD.G.2 #REF! #REF! 0.0054 0.0083 1.0000 - 0.0436 - 1,519.17 - - 635.19 - 2,150.00 2,150.00 #REF! #REF! #REF!
3 Kaca Buram 3 mm MG.3 M2 #REF! #REF! AAL.G.3 6,462.00 M2 - - - - - - 258.00 M2 - - - - - - AAD.G.3 #REF! #REF! 0.0039 0.0074 1.0000 - 0.0310 - 1,080.20 - - 451.65 - 1,530.00 1,530.00 #REF! #REF! #REF!
4 Kaca Buram 4 mm MG.4 M2 #REF! #REF! AAL.G.4 4,846.00 M2 - - - - - - 193.00 M2 - - - - - - AAD.G.4 #REF! #REF! 0.0047 0.0078 1.0000 - 0.0373 - 1,299.52 - - 543.35 - 1,840.00 1,840.00 #REF! #REF! #REF!
5 Kaca Buram 5 mm MG.5 M2 #REF! #REF! AAL.G.5 3,877.00 M2 - - - - - - 155.00 M2 - - - - - - AAD.G.5 #REF! #REF! 0.0054 0.0083 1.0000 - 0.0436 - 1,519.17 - - 635.19 - 2,150.00 2,150.00 #REF! #REF! #REF!
6 Kaca Naco / Louver - 7 Clips (polos) MG.6 Buah #REF! #REF! AAL.G.6 2,934.00 Buah - - - - - - 117.00 Buah - - - - - - AAD.G.6 #REF! #REF! 0.0059 0.0090 1.0000 - 0.0475 - 1,655.94 - - 692.37 - 2,340.00 2,340.00 #REF! #REF! #REF!
7 Kaca Naco / Louver - 8 Clips (polos) MG.7 Buah #REF! #REF! AAL.G.7 2,567.00 Buah - - - - - - 102.00 Buah - - - - - - AAD.G.7 #REF! #REF! 0.0067 0.0094 1.0000 - 0.0535 - 1,866.10 - - 780.24 - 2,640.00 2,640.00 #REF! #REF! #REF!
8 Kaca Naco / Louver - 9 Clips (polos) MG.8 Buah #REF! #REF! AAL.G.8 2,282.00 Buah - - - - - - 91.00 Buah - - - - - - AAD.G.8 #REF! #REF! 0.0074 0.0099 1.0000 - 0.0596 - 2,076.57 - - 868.24 - 2,940.00 2,940.00 #REF! #REF! #REF!
9 Kaca Naco / Louver - 10 Clips (polos) MG.9 Buah #REF! #REF! AAL.G.9 2,054.00 Buah - - - - - - 82.00 Buah - - - - - - AAD.G.9 #REF! #REF! 0.0082 0.0103 1.0000 - 0.0658 - 2,292.49 - - 958.52 - 3,250.00 3,250.00 #REF! #REF! #REF!
10 Kaca Rayban 25 % - tebal 5 mm MG.10 M2 #REF! #REF! AAL.G.10 3,877.00 M2 - - - - - - 155.00 M2 - - - - - - AAD.G.10 #REF! #REF! 0.0054 0.0083 1.0000 - 0.0436 - 1,519.17 - - 635.19 - 2,150.00 2,150.00 #REF! #REF! #REF!
11 Kaca Acrylic (Kaca Plastik) - 5 mm MG.11 Lembar #REF! #REF! AAL.G.11 4,761.00 Lembar - - - - - - 190.00 Lembar - - - - - - AAD.G.11 #REF! #REF! 0.0053 0.0079 1.0000 - 0.0424 - 1,478.58 - - 618.22 - 2,090.00 2,090.00 #REF! #REF! #REF!

H. BAHAN/ALAT PENGGANTUNG
1 Kunci Tanam (Setara Cap Kuda Terbang) MH.1 Set #REF! #REF! AAL.H.1 50,000.00 Set - - - - - - 2,000.00 Set - - - - - - AAD.H.1 #REF! #REF! 0.0007 0.0016 1.0000 - 0.0043 - 200.39 - - 62.84 - 260.00 260.00 #REF! #REF! #REF!
2 Kunci Tanam - 2 Slaagh MH.2 Set #REF! #REF! AAL.H.2 50,000.00 Set - - - - - - 2,000.00 Set - - - - - - AAD.H.2 #REF! #REF! 0.0007 0.0016 1.0000 - 0.0043 - 200.39 - - 62.84 - 260.00 260.00 #REF! #REF! #REF!
3 Kunci Tanam - 1 Slaagh MH.3 Set #REF! #REF! AAL.H.3 50,000.00 Set - - - - - - 2,000.00 Set - - - - - - AAD.H.3 #REF! #REF! 0.0007 0.0016 1.0000 - 0.0043 - 200.39 - - 62.84 - 260.00 260.00 #REF! #REF! #REF!
4 Kunci Tanam (Setara Cap Anchor / Yale) MH.4 Set #REF! #REF! AAL.H.4 50,000.00 Set - - - - - - 2,000.00 Set - - - - - - AAD.H.4 #REF! #REF! 0.0007 0.0016 1.0000 - 0.0043 - 200.39 - - 62.84 - 260.00 260.00 #REF! #REF! #REF!
5 Kunci Gembok 1" MH.5 Set #REF! #REF! AAL.H.5 100,000.00 Set - - - - - - 4,000.00 Set - - - - - - AAD.H.5 #REF! #REF! 0.0004 0.0008 1.0000 - 0.0022 - 100.19 - - 31.42 - 130.00 130.00 #REF! #REF! #REF!
6 Engsel 4" Kuningan (Untuk Pintu) MH.6 Pasang #REF! #REF! AAL.H.6 100,000.00 Pasang - - - - - - 4,000.00 Pasang - - - - - - AAD.H.6 #REF! #REF! 0.0004 0.0008 1.0000 - 0.0022 - 100.19 - - 31.42 - 130.00 130.00 #REF! #REF! #REF!
7 Engsel 3" Kuningan (Untuk Jendela) MH.7 Pasang #REF! #REF! AAL.H.7 100,000.00 Pasang - - - - - - 4,000.00 Pasang - - - - - - AAD.H.7 #REF! #REF! 0.0004 0.0008 1.0000 - 0.0022 - 100.19 - - 31.42 - 130.00 130.00 #REF! #REF! #REF!
8 Engsel Kupu-Kupu T MH.8 Pasang #REF! #REF! AAL.H.8 250,000.00 Pasang - - - - - - 10,000.00 Pasang - - - - - - AAD.H.8 #REF! #REF! 0.0004 0.0008 1.0000 - 0.0022 - 100.19 - - 31.42 - 130.00 130.00 #REF! #REF! #REF!
9 Engsel Nylon Kuningan 4" MH.9 Pasang #REF! #REF! AAL.H.9 250,000.00 Pasang - - - - - - 10,000.00 Pasang - - - - - - AAD.H.9 #REF! #REF! 0.0004 0.0008 1.0000 - 0.0022 - 100.19 - - 31.42 - 130.00 130.00 #REF! #REF! #REF!
10 Engsel Biasa 3" (Untuk Jendela) MH.10 Pasang #REF! #REF! AAL.H.10 250,000.00 Pasang - - - - - - 10,000.00 Pasang - - - - - - AAD.H.10 #REF! #REF! 0.0004 0.0008 1.0000 - 0.0022 - 100.19 - - 31.42 - 130.00 130.00 #REF! #REF! #REF!
11 Hak Angin / Kait Angin MH.11 Buah #REF! #REF! AAL.H.11 200,000.00 Buah - - - - - - 8,000.00 Buah - - - - - - AAD.H.11 #REF! #REF! 0.0004 0.0008 1.0000 - 0.0022 - 100.19 - - 31.42 - 130.00 130.00 #REF! #REF! #REF!
12 Espagnolet MH.12 Set #REF! #REF! AAL.H.12 200,000.00 Set - - - - - - 8,000.00 Set - - - - - - AAD.H.12 #REF! #REF! 0.0004 0.0008 1.0000 - 0.0022 - 100.19 - - 31.42 - 130.00 130.00 #REF! #REF! #REF!
13 Grendel Tanam (Pintu) MH.13 Buah #REF! #REF! AAL.H.13 200,000.00 Buah - - - - - - 8,000.00 Buah - - - - - - AAD.H.13 #REF! #REF! 0.0004 0.0008 1.0000 - 0.0022 - 100.19 - - 31.42 - 130.00 130.00 #REF! #REF! #REF!
14 Grendel Besar / Kecil MH.14 Buah #REF! #REF! AAL.H.14 200,000.00 Buah - - - - - - 8,000.00 Buah - - - - - - AAD.H.14 #REF! #REF! 0.0004 0.0008 1.0000 - 0.0022 - 100.19 - - 31.42 - 130.00 130.00 #REF! #REF! #REF!
15 Tarikan Pintu MH.15 Buah #REF! #REF! AAL.H.15 250,000.00 Buah - - - - - - 10,000.00 Buah - - - - - - AAD.H.15 #REF! #REF! 0.0004 0.0008 1.0000 - 0.0022 - 100.19 - - 31.42 - 130.00 130.00 #REF! #REF! #REF!
16 Tarikan Jendela MH.16 Buah #REF! #REF! AAL.H.16 250,000.00 Buah - - - - - - 10,000.00 Buah - - - - - - AAD.H.16 #REF! #REF! 0.0004 0.0008 1.0000 - 0.0022 - 100.19 - - 31.42 - 130.00 130.00 #REF! #REF! #REF!

I. BAHAN CAT
1 Amplas Kertas (Amplas Kayu) MI.1 Lembar #REF! #REF! AAL.I.1 1,250,000.00 Lembar - - - - - - 50,000.00 Lembar - - - - - - AAD.I.1 #REF! #REF! 0.0019 0.0032 1.0000 - 0.0077 - 535.51 - - 111.95 - 13.00 13.00 #REF! #REF! #REF!
2 Amplas Besi MI.2 Lembar #REF! #REF! AAL.I.2 1,250,000.00 Lembar - - - - - - 50,000.00 Lembar - - - - - - AAD.I.2 #REF! #REF! 0.0019 0.0032 1.0000 - 0.0077 - 535.51 - - 111.95 - 13.00 13.00 #REF! #REF! #REF!
3 Dempul Kayu MI.3 Kg #REF! #REF! AAL.I.3 50,000.00 Kg - - - - - - 2,000.00 Kg - - - - - - AAD.I.3 #REF! #REF! 0.0007 0.0018 1.0000 - 0.0030 - 207.26 - - 43.33 - 250.00 250.00 #REF! #REF! #REF!
4 Cat Meny Kayu MI.4 Kg #REF! #REF! AAL.I.4 50,000.00 Kg - - - - - - 2,000.00 Kg - - - - - - AAD.I.4 #REF! #REF! 0.0007 0.0018 1.0000 - 0.0030 - 207.26 - - 43.33 - 250.00 250.00 #REF! #REF! #REF!
5 Cat Meny Besi MI.5 Kg #REF! #REF! AAL.I.5 50,000.00 Kg - - - - - - 2,000.00 Kg - - - - - - AAD.I.5 #REF! #REF! 0.0007 0.0018 1.0000 - 0.0030 - 207.26 - - 43.33 - 250.00 250.00 #REF! #REF! #REF!
6 Cat Kayu MI.6 Kg #REF! #REF! AAL.I.6 50,000.00 Kg - - - - - - 2,000.00 Kg - - - - - - AAD.I.6 #REF! #REF! 0.0007 0.0018 1.0000 - 0.0030 - 207.26 - - 43.33 - 250.00 250.00 #REF! #REF! #REF!
7 Cat Besi MI.7 Kg #REF! #REF! AAL.I.7 50,000.00 Kg - - - - - - 2,000.00 Kg - - - - - - AAD.I.7 #REF! #REF! 0.0007 0.0018 1.0000 - 0.0030 - 207.26 - - 43.33 - 250.00 250.00 #REF! #REF! #REF!
8 Cat Kilat LN MI.8 Kg #REF! #REF! AAL.I.8 50,000.00 Kg - - - - - - 2,000.00 Kg - - - - - - AAD.I.8 #REF! #REF! 0.0007 0.0018 1.0000 - 0.0030 - 207.26 - - 43.33 - 250.00 250.00 #REF! #REF! #REF!
9 Minyak Cat / Thinner (Setara Lauguer) MI.9 Kg #REF! #REF! AAL.I.9 50,000.00 Kg - - - - - - 2,000.00 Kg - - - - - - AAD.I.9 #REF! #REF! 0.0007 0.0018 1.0000 - 0.0030 - 207.26 - - 43.33 - 250.00 250.00 #REF! #REF! #REF!
10 Minyak Cat / Thinner (Biasa) Afduner MI.10 Kg #REF! #REF! AAL.I.10 50,000.00 Kg - - - - - - 2,000.00 Kg - - - - - - AAD.I.10 #REF! #REF! 0.0007 0.0018 1.0000 - 0.0030 - 207.26 - - 43.33 - 250.00 250.00 #REF! #REF! #REF!
11 Palmur Tembok MI.11 Zak #REF! #REF! AAL.I.11 2,500.00 Zak - - - - - - 100.00 Zak - - - - - - AAD.I.11 #REF! #REF! 0.0219 0.0203 1.0000 - 0.0438 - 6,103.23 - - 637.96 - 6,740.00 6,740.00 #REF! #REF! #REF!
12 Cat Tembok (1 Klg @ 5 Kg) MI.12 Kaleng #REF! #REF! AAL.I.12 50,000.00 Kg - - - - - - 2,000.00 Kg - - - - - - AAD.I.12 #REF! #REF! 0.0041 0.0089 1.0000 - 0.0165 - 1,149.04 - - 240.22 - 1,380.00 1,380.00 #REF! #REF! #REF!
13 Cat Besi Crom MI.13 Kg #REF! #REF! AAL.I.13 50,000.00 Kg - - - - - - 2,000.00 Kg - - - - - - AAD.I.13 #REF! #REF! 0.0007 0.0018 1.0000 - 0.0030 - 207.26 - - 43.33 - 250.00 250.00 #REF! #REF! #REF!
14 Cat Besi (Setara Nippon Paint) MI.14 Kg #REF! #REF! AAL.I.14 50,000.00 Kg - - - - - - 2,000.00 Kg - - - - - - AAD.I.14 #REF! #REF! 0.0007 0.0018 1.0000 - 0.0030 - 207.26 - - 43.33 - 250.00 250.00 #REF! #REF! #REF!
15 Politur Kaleng (Setara Apache) MI.15 Kg #REF! #REF! AAL.I.15 50,000.00 Kg - - - - - - 2,000.00 Kg - - - - - - AAD.I.15 #REF! #REF! 0.0007 0.0018 1.0000 - 0.0030 - 207.26 - - 43.33 - 250.00 250.00 #REF! #REF! #REF!
16 Floor Hardener MI.16 KG #REF! #REF! AAL.I.16 50,000.00 KG - - - - - - 2,000.00 KG - - - - - - AAD.I.16 #REF! #REF! 0.0007 0.0018 1.0000 - 0.0030 - 207.26 - - 43.33 - 250.00 250.00 #REF! #REF! #REF!

J. BAHAN LISTRIK DAN ELEKTRONIKA


1 Kabel Listrik NYM/NYA 3x2.5 mm MJ.1 Roll #REF! #REF! AAL.J.1 1,000.00 Roll - - - - - - 40.00 Roll - - - - - - AAD.J.1 #REF! #REF! 0.0555 0.0507 1.0000 - 0.2218 - 15,460.80 - - 3,232.19 - 18,690.00 18,690.00 #REF! #REF! #REF!
2 Kabel Listrik NYM/NYA 2x1.5 mm MJ.2 Roll #REF! #REF! AAL.J.2 1,666.00 Roll - - - - - - 66.00 Roll - - - - - - AAD.J.2 #REF! #REF! 0.0555 0.0507 1.0000 - 0.2218 - 15,460.80 - - 3,232.19 - 18,690.00 18,690.00 #REF! #REF! #REF!
3 Pipa Listrik dia, 5/8 MJ.3 Batang #REF! #REF! AAL.J.3 200,000.00 Batang - - - - - - 8,000.00 Buah - - - - - - AAD.J.3 #REF! #REF! 0.0003 0.0002 1.0000 - 0.0011 - 79.88 - - 16.70 - 90.00 90.00 #REF! #REF! #REF!
4 Saklar Double - Tempel MJ.4 Buah #REF! #REF! AAL.J.4 480,000.00 Buah - - - - - - 19,200.00 Buah - - - - - - AAD.J.4 #REF! #REF! 0.0012 0.0020 1.0000 - 0.0048 - 334.68 - - 69.97 - 400.00 400.00 #REF! #REF! #REF!
5 Saklar Tunggal / Engkel - Tempel MJ.5 Buah #REF! #REF! AAL.J.5 480,000.00 Buah - - - - - - 19,200.00 Buah - - - - - - AAD.J.5 #REF! #REF! 0.0012 0.0020 1.0000 - 0.0048 - 334.68 - - 69.97 - 400.00 400.00 #REF! #REF! #REF!
6 Stop Kontak 500 Watt - Tempel MJ.6 Buah #REF! #REF! AAL.J.6 480,000.00 Buah - - - - - - 19,200.00 Buah - - - - - - AAD.J.6 #REF! #REF! 0.0012 0.0020 1.0000 - 0.0048 - 334.68 - - 69.97 - 400.00 400.00 #REF! #REF! #REF!
7 Stop Kontak 1000 Watt - Tempel MJ.7 Buah #REF! #REF! AAL.J.7 480,000.00 Buah - - - - - - 19,200.00 Buah - - - - - - AAD.J.7 #REF! #REF! 0.0012 0.0020 1.0000 - 0.0048 - 334.68 - - 69.97 - 400.00 400.00 #REF! #REF! #REF!
8 Home Saklar 1 Fase Komplit MJ.8 Buah #REF! #REF! AAL.J.8 25,000.00 Buah - - - - - - 1,000.00 Buah - - - - - - AAD.J.8 #REF! #REF! 0.0019 0.0032 1.0000 - 0.0077 - 535.51 - - 111.95 - 640.00 640.00 #REF! #REF! #REF!
9 Lampu TL 1 x 40 Watt Komplit MJ.9 Buah #REF! #REF! AAL.J.9 200,000.00 Buah - - - - - - 8,000.00 Buah - - - - - - AAD.J.9 #REF! #REF! 0.0002 0.0004 1.0000 - 0.0010 - 66.93 - - 13.99 - 80.00 80.00 #REF! #REF! #REF!
10 Lampu TL 1 x 20 Watt Komplit MJ.10 Buah #REF! #REF! AAL.J.10 200,000.00 Buah - - - - - - 8,000.00 Buah - - - - - - AAD.J.10 #REF! #REF! 0.0002 0.0004 1.0000 - 0.0010 - 66.93 - - 13.99 - 80.00 80.00 #REF! #REF! #REF!
11 Lampu Pijar 40 Watt Komplit MJ.11 Buah #REF! #REF! AAL.J.11 200,000.00 Buah - - - - - - 8,000.00 Buah - - - - - - AAD.J.11 #REF! #REF! 0.0002 0.0004 1.0000 - 0.0010 - 66.93 - - 13.99 - 80.00 80.00 #REF! #REF! #REF!
12 Lampu Pijar 60 Watt Komplit MJ.12 Buah #REF! #REF! AAL.J.12 200,000.00 Buah - - - - - - 8,000.00 Buah - - - - - - AAD.J.12 #REF! #REF! 0.0002 0.0004 1.0000 - 0.0010 - 66.93 - - 13.99 - 80.00 80.00 #REF! #REF! #REF!
13 Lampu Pijar 100 Watt Komplit MJ.13 Buah #REF! #REF! AAL.J.13 200,000.00 Buah - - - - - - 8,000.00 Buah - - - - - - AAD.J.13 #REF! #REF! 0.0002 0.0004 1.0000 - 0.0010 - 66.93 - - 13.99 - 80.00 80.00 #REF! #REF! #REF!
14 Vitting Lampu MJ.14 Buah #REF! #REF! AAL.J.14 200,000.00 Buah - - - - - - 8,000.00 Buah - - - - - - AAD.J.14 #REF! #REF! 0.0002 0.0004 1.0000 - 0.0010 - 66.93 - - 13.99 - 80.00 80.00 #REF! #REF! #REF!
15 Lampu XL 40 Watt MJ.15 Set #REF! #REF! AAL.J.15 200,000.00 Set - - - - - - 8,000.00 Set - - - - - - AAD.J.15 #REF! #REF! 0.0002 0.0004 1.0000 - 0.0010 - 66.93 - - 13.99 - 80.00 80.00 #REF! #REF! #REF!
16 Lampu XL 20 Watt MJ.16 Set #REF! #REF! AAL.J.16 200,000.00 Set - - - - - - 8,000.00 Set - - - - - - AAD.J.16 #REF! #REF! 0.0002 0.0004 1.0000 - 0.0010 - 66.93 - - 13.99 - 80.00 80.00 #REF! #REF! #REF!
17 Lampu SL 23 Watt MJ.17 Set #REF! #REF! AAL.J.17 200,000.00 Set - - - - - - 8,000.00 Set - - - - - - AAD.J.17 #REF! #REF! 0.0002 0.0004 1.0000 - 0.0010 - 66.93 - - 13.99 - 80.00 80.00 #REF! #REF! #REF!
18 Lampu SL 14 Watt MJ.18 Set #REF! #REF! AAL.J.18 200,000.00 Set - - - - - - 8,000.00 Set - - - - - - AAD.J.18 #REF! #REF! 0.0002 0.0004 1.0000 - 0.0010 - 66.93 - - 13.99 - 80.00 80.00 #REF! #REF! #REF!
19 Sekring Kas 1 Group (Biasa) MJ.19 Buah #REF! #REF! AAL.J.19 66,666.00 Buah - - - - - - 2,666.00 Buah - - - - - - AAD.J.19 #REF! #REF! 0.0007 0.0012 1.0000 - 0.0029 - 200.79 - - 41.98 - 240.00 240.00 #REF! #REF! #REF!
20 Klem Kabel MJ.20 Dus #REF! #REF! AAL.J.20 200,000.00 Dos - - - - - - 8,000.00 Dus - - - - - - AAD.J.20 #REF! #REF! 0.0004 0.0008 1.0000 - 0.0022 - 100.19 - - 31.42 - 130.00 130.00 #REF! #REF! #REF!
21 Isolasi Listrik MJ.21 Buah #REF! #REF! AAL.J.21 200,000.00 Buah - - - - - - 8,000.00 Buah - - - - - - AAD.J.21 #REF! #REF! 0.0004 0.0008 1.0000 - 0.0022 - 100.19 - - 31.42 - 130.00 130.00 #REF! #REF! #REF!
22 Sekrup MJ.22 Dus #REF! #REF! AAL.J.22 200,000.00 Dos - - - - - - 8,000.00 Dus - - - - - - AAD.J.22 #REF! #REF! 0.0004 0.0008 1.0000 - 0.0022 - 100.19 - - 31.42 - 130.00 130.00 #REF! #REF! #REF!
23 Panil Distribusi MJ.23 Buah #REF! #REF! AAL.J.23 25,000.00 Buah - - - - - - 1,000.00 Buah - - - - - - AAD.J.23 #REF! #REF! 0.0019 0.0032 1.0000 - 0.0077 - 535.51 - - 111.95 - 640.00 640.00 #REF! #REF! #REF!

K. BAHAN PIPA DAN SANITAIR


1 Pipa GIP (Leideng) Dia. 1/2" - 6 Meter MK.1 Batang #REF! #REF! AAL.K.1 17,837.00 Batang - - - - - - 713.00 Batang - - - - - - AAD.K.1 #REF! #REF! 0.0028 0.0024 1.0000 - 0.0113 - 790.22 - - 165.20 - 950.00 950.00 #REF! #REF! #REF!
2 Pipa GIP (Leideng) Dia. 3/4" - 6 Meter MK.2 Batang #REF! #REF! AAL.K.2 13,721.00 Batang - - - - - - 548.00 Batang - - - - - - AAD.K.2 #REF! #REF! 0.0039 0.0029 1.0000 - 0.0155 - 1,081.43 - - 226.08 - 1,300.00 1,300.00 #REF! #REF! #REF!
3 Pipa GIP (Leideng) Dia. 1" - 6 Meter MK.3 Batang #REF! #REF! AAL.K.3 10,291.00 Batang - - - - - - 411.00 Batang - - - - - - AAD.K.3 #REF! #REF! 0.0056 0.0038 1.0000 - 0.0223 - 1,554.15 - - 324.91 - 1,870.00 1,870.00 #REF! #REF! #REF!
4 Pipa GIP (Leideng) Dia. 1.25" - 6 Meter MK.4 Batang #REF! #REF! AAL.K.4 8,232.00 Batang - - - - - - 329.00 Batang - - - - - - AAD.K.4 #REF! #REF! 0.0087 0.0052 1.0000 - 0.0347 - 2,419.41 - - 505.79 - 2,920.00 2,920.00 #REF! #REF! #REF!
5 Pipa GIP (Leideng) Dia. 1.5" - 6 Meter MK.5 Batang #REF! #REF! AAL.K.5 6,860.00 Batang - - - - - - 274.00 Batang - - - - - - AAD.K.5 #REF! #REF! 0.0108 0.0054 1.0000 - 0.0431 - 3,004.69 - - 628.15 - 3,630.00 3,630.00 #REF! #REF! #REF!
6 Pipa GIP (Leideng) Dia. 2" - 6 Meter MK.6 Batang #REF! #REF! AAL.K.6 5,145.00 Batang - - - - - - 205.00 Batang - - - - - - AAD.K.6 #REF! #REF! 0.0152 0.0068 1.0000 - 0.0607 - 4,231.77 - - 884.68 - 5,110.00 5,110.00 #REF! #REF! #REF!
7 Pipa GIP (Leideng) Dia. 3" - 6 Meter MK.7 Batang #REF! #REF! AAL.K.7 2,972.00 Batang - - - - - - 118.00 Batang - - - - - - AAD.K.7 #REF! #REF! 0.0450 0.0133 1.0000 - 0.1801 - 12,555.55 - - 2,624.83 - 15,180.00 15,180.00 #REF! #REF! #REF!
8 Pipa GIP (Leideng) Dia. 4" - 6 Meter MK.8 Batang #REF! #REF! AAL.K.8 1,286.00 Batang - - - - - - 51.00 Batang - - - - - - AAD.K.8 #REF! #REF! 0.0527 0.0274 1.0000 - 0.2108 - 14,690.39 - - 3,071.13 - 17,760.00 17,760.00 #REF! #REF! #REF!
9 Pipa PVC Dia. 5" - 4 Meter (AW) MK.9 Batang #REF! #REF! AAL.K.9 8,091.00 Batang - - - - - - 323.00 Batang - - - - - - AAD.K.9 #REF! #REF! 0.0065 0.0052 1.0000 - 0.0262 - 1,825.22 - - 381.58 - 2,200.00 2,200.00 #REF! #REF! #REF!
10 Pipa PVC Dia. 4" - 4 Meter (AW) MK.10 Batang #REF! #REF! AAL.K.10 13,148.00 Batang - - - - - - 525.00 Batang - - - - - - AAD.K.10 #REF! #REF! 0.0041 0.0033 1.0000 - 0.0165 - 1,152.98 - - 241.04 - 1,390.00 1,390.00 #REF! #REF! #REF!
11 Pipa PVC Dia. 4" - 4 Meter (D) MK.11 Batang #REF! #REF! AAL.K.11 13,148.00 Batang - - - - - - 525.00 Batang - - - - - - AAD.K.11 #REF! #REF! 0.0041 0.0033 1.0000 - 0.0165 - 1,152.98 - - 241.04 - 1,390.00 1,390.00 #REF! #REF! #REF!
12 Pipa PVC Dia. 3" - 4 Meter (D) MK.12 Batang #REF! #REF! AAL.K.12 21,913.00 Batang - - - - - - 876.00 Batang - - - - - - AAD.K.12 #REF! #REF! 0.0025 0.0019 1.0000 - 0.0098 - 684.28 - - 143.05 - 820.00 820.00 #REF! #REF! #REF!
13 Pipa PVC Dia. 2" - 4 Meter (D) MK.13 Batang #REF! #REF! AAL.K.13 40,456.00 Batang - - - - - - 1,618.00 Batang - - - - - - AAD.K.13 #REF! #REF! 0.0014 0.0010 1.0000 - 0.0057 - 398.72 - - 83.35 - 480.00 480.00 #REF! #REF! #REF!
14 Pipa PVC Dia. 1" - 4 Meter (D) MK.14 Batang #REF! #REF! AAL.K.14 80,912.00 Batang - - - - - - 3,236.00 Batang - - - - - - AAD.K.14 #REF! #REF! 0.0007 0.0005 1.0000 - 0.0029 - 199.36 - - 41.68 - 240.00 240.00 #REF! #REF! #REF!
15 Pipa PVC Dia. 1/2" - 4 M MK.15 Batang #REF! #REF! AAL.K.15 161,825.00 Batang - - - - - - 6,473.00 Batang - - - - - - AAD.K.15 #REF! #REF! 0.0004 0.0003 1.0000 - 0.0014 - 98.81 - - 20.66 - 110.00 110.00 #REF! #REF! #REF!
16 Pipa PVC Dia. 3/4" - 4 M MK.16 Batang #REF! #REF! AAL.K.16 107,883.00 Batang - - - - - - 4,315.00 Batang - - - - - - AAD.K.16 #REF! #REF! 0.0005 0.0004 1.0000 - 0.0021 - 149.52 - - 31.26 - 180.00 180.00 #REF! #REF! #REF!
17 Pipa PVC Dia. 2,5" - 4 M MK.17 Batang #REF! #REF! AAL.K.17 30,053.00 Batang - - - - - - 1,202.00 Batang - - - - - - AAD.K.17 #REF! #REF! 0.0019 0.0014 1.0000 - 0.0076 - 532.42 - - 111.31 - 640.00 640.00 #REF! #REF! #REF!
18 Talang PVC Oval 6" - 4 Meter MK.18 Batang #REF! #REF! AAL.K.18 13,485.00 Batang - - - - - - 539.00 Batang - - - - - - AAD.K.18 #REF! #REF! 0.0036 0.0029 1.0000 - 0.0144 - 1,001.33 - - 209.33 - 1,210.00 1,210.00 #REF! #REF! #REF!
19 Talang PVC Oval 8" - 4 Meter MK.19 Batang #REF! #REF! AAL.K.19 10,114.00 Batang - - - - - - 404.00 Batang - - - - - - AAD.K.19 #REF! #REF! 0.0048 0.0038 1.0000 - 0.0192 - 1,335.37 - - 279.17 - 1,610.00 1,610.00 #REF! #REF! #REF!
20 Talang PVC Kotak 4" - 6 Meter MK.20 Batang #REF! #REF! AAL.K.20 8,877.00 Batang - - - - - - 355.00 Batang - - - - - - AAD.K.20 #REF! #REF! 0.0057 0.0044 1.0000 - 0.0227 - 1,582.49 - - 330.83 - 1,910.00 1,910.00 #REF! #REF! #REF!
21 Talang PVC Kotak 8" - 6 Meter MK.21 Batang #REF! #REF! AAL.K.21 7,989.00 Batang - - - - - - 319.00 Batang - - - - - - AAD.K.21 #REF! #REF! 0.0069 0.0052 1.0000 - 0.0276 - 1,926.60 - - 402.77 - 2,320.00 2,320.00 #REF! #REF! #REF!
22 Closed Duduk Porselin Komplit MK.22 Buah #REF! #REF! AAL.K.22 5,000.00 Buah - - - - - - 200.00 Buah - - - - - - AAD.K.22 #REF! #REF! 0.0104 0.0087 1.0000 - 0.0417 - 2,903.79 - - 607.06 - 3,510.00 3,5 R
m MK R
ANALISA ANGKUT BAHAN
HARGA ANALISA BIAYA MUAT DAN ANGKUTAN ----- L A U T ------- ANALISA BIAYA MUAT DAN ANGKUTAN ---- S U N G A I ------- ANALISIS BIAYA MUAT DAN ANGKUTAN ----- D A R A T -------- Jumlah Total Harga Dasar + OVERHEAD HARGA
URAIAN BAHAN/MATERIAL YANG DASAR TINGKAT Kode Jumlah Angkut 50.00 Perkiraan Biaya Jumlah Harga Jumlah Angkut 2.00 Perkiraan Biaya Jumlah Harga Kode Jarak Angkut Perkiraan Kuantitas Perkiraan Biaya Jumlah biaya Ongkos Inflasi + + SATUAN
No. KODE SATUAN
DIANGKUT BARANG INFLASI Analisa Maksimal Ton Packing Angkut/Ton-M3 Bongkar Muat Pikul Barang Jumlah Total per satu satuan Maksimal Ton Packing Angkut/Ton-M3Bongkar MuatPikul Barang Jumlah Total per satu satuan Analisa Truck Traktor Excavator Dump Tracktor Alat Mandor Pekerja Excavator Dump Tracktor Mandor Pekerja Biaya Biaya alat+tenaga Angkut Ongkos angkut PROFIT BAHAN
( Rp. ) Angkut Kapal Satuan (Rp) (Rp) (Rp) (Rp) (Rp) bahan/material Kapal Satuan (Rp) (Rp) (Rp) (Rp) (Rp) bahan/material Angkut (km) (km) Truck Bantu Truck Alat Bantu Lain-lain (Rupiah) (Rupiah) (Rupiah) (Rupiah) (Rupiah)
1 2 2 5 19 20 20 7 6 6 8 9 10 11 12 13 14 17 21 22 23

24 Closed Jongkok Porselin (Standar) MK.24 Buah #REF! #REF! AAL.K.24 6,666.00 Buah - - - - - - 266.00 Buah - - - - - - AAD.K.24 #REF! #REF! 0.0084 0.0065 1.0000 - 0.0336 - 2,345.39 - - 490.32 - 2,830.00 2,830.00 #REF! #REF! #REF!
25 Closed Jongkok Fiber Glass / Plastik MK.25 Buah #REF! #REF! AAL.K.25 14,285.00 Buah - - - - - - 571.00 Buah - - - - - - AAD.K.25 #REF! #REF! 0.0041 0.0029 1.0000 - 0.0166 - 1,155.99 - - 241.67 - 1,390.00 1,390.00 #REF! #REF! #REF!
26 Urinoir MK.26 Buah #REF! #REF! AAL.K.26 8,333.00 Buah - - - - - - 333.00 Buah - - - - - - AAD.K.26 #REF! #REF! 0.0067 0.0062 1.0000 - 0.0269 - 1,875.93 - - 392.18 - 2,260.00 2,260.00 #REF! #REF! #REF!
27 Wastafel Porselin MK.27 Buah #REF! #REF! AAL.K.27 8,333.00 Buah - - - - - - 333.00 Buah - - - - - - AAD.K.27 #REF! #REF! 0.0067 0.0062 1.0000 - 0.0269 - 1,875.93 - - 392.18 - 2,260.00 2,260.00 #REF! #REF! #REF!
28 Bak Air / Fiber Glass 1 M3 MK.28 Buah #REF! #REF! AAL.K.28 6,666.00 Buah - - - - - - 266.00 Buah - - - - - - AAD.K.28 #REF! #REF! 0.0084 0.0065 1.0000 - 0.0336 - 2,345.39 - - 490.32 - 2,830.00 2,830.00 #REF! #REF! #REF!
29 Bak Air / Fiber Glass 1/2 M3 MK.29 Buah #REF! #REF! AAL.K.29 8,333.00 Buah - - - - - - 333.00 Buah - - - - - - AAD.K.29 #REF! #REF! 0.0067 0.0052 1.0000 - 0.0269 - 1,875.93 - - 392.18 - 2,260.00 2,260.00 #REF! #REF! #REF!
30 Bak Air / Fiber Glass 1/4 M3 MK.30 Buah #REF! #REF! AAL.K.30 10,000.00 Buah - - - - - - 400.00 Buah - - - - - - AAD.K.30 #REF! #REF! 0.0056 0.0043 1.0000 - 0.0224 - 1,563.60 - - 326.88 - 1,890.00 1,890.00 #REF! #REF! #REF!
31 Tangki Air / Fiber Glass 1 M3 MK.31 Buah #REF! #REF! AAL.K.31 3,333.00 Buah - - - - - - 133.00 Buah - - - - - - AAD.K.31 #REF! #REF! 0.0168 0.0130 1.0000 - 0.0673 - 4,690.79 - - 980.64 - 5,670.00 5,670.00 #REF! #REF! #REF!
32 Kran Air 3/4" MK.32 Buah #REF! #REF! AAL.K.32 142,857.00 Buah - - - - - - 5,714.00 Buah - - - - - - AAD.K.32 #REF! #REF! 0.0004 0.0006 1.0000 - 0.0016 - 110.14 - - 23.03 - 130.00 130.00 #REF! #REF! #REF!
33 Kran Air 1/2" MK.33 Buah #REF! #REF! AAL.K.33 142,857.00 Buah - - - - - - 5,714.00 Buah - - - - - - AAD.K.33 #REF! #REF! 0.0004 0.0006 1.0000 - 0.0016 - 110.14 - - 23.03 - 130.00 130.00 #REF! #REF! #REF!
34 Kran Air 1" MK.34 Buah #REF! #REF! AAL.K.34 142,857.00 Buah - - - - - - 5,714.00 Buah - - - - - - AAD.K.34 #REF! #REF! 0.0004 0.0006 1.0000 - 0.0016 - 110.14 - - 23.03 - 130.00 130.00 #REF! #REF! #REF!
35 Stop Kran 1/2" MK.35 Buah #REF! #REF! AAL.K.35 142,857.00 Buah - - - - - - 5,714.00 Buah - - - - - - AAD.K.35 #REF! #REF! 0.0004 0.0006 1.0000 - 0.0016 - 110.14 - - 23.03 - 130.00 130.00 #REF! #REF! #REF!
36 Doble Neple GIP 1/2" MK.36 Buah #REF! #REF! AAL.K.36 142,857.00 Buah - - - - - - 5,714.00 Buah - - - - - - AAD.K.36 #REF! #REF! 0.0004 0.0006 1.0000 - 0.0016 - 110.14 - - 23.03 - 130.00 130.00 #REF! #REF! #REF!
37 Soccet 1/2" MK.37 Buah #REF! #REF! AAL.K.37 142,857.00 Buah - - - - - - 5,714.00 Buah - - - - - - AAD.K.37 #REF! #REF! 0.0004 0.0006 1.0000 - 0.0016 - 110.14 - - 23.03 - 130.00 130.00 #REF! #REF! #REF!
38 Elbow GIP 90º x 1/2" ( PE ) MK.38 Buah #REF! #REF! AAL.K.38 142,857.00 Buah - - - - - - 5,714.00 Buah - - - - - - AAD.K.38 #REF! #REF! 0.0004 0.0006 1.0000 - 0.0016 - 110.14 - - 23.03 - 130.00 130.00 #REF! #REF! #REF!
39 Tee 1/2" x 1/2" MK.39 Buah #REF! #REF! AAL.K.39 142,857.00 Buah - - - - - - 5,714.00 Buah - - - - - - AAD.K.39 #REF! #REF! 0.0004 0.0006 1.0000 - 0.0016 - 110.14 - - 23.03 - 130.00 130.00 #REF! #REF! #REF!
40 Hand Kran 1/2" Besi MK.40 Buah #REF! #REF! AAL.K.40 142,857.00 Buah - - - - - - 5,714.00 Buah - - - - - - AAD.K.40 #REF! #REF! 0.0004 0.0006 1.0000 - 0.0016 - 110.14 - - 23.03 - 130.00 130.00 #REF! #REF! #REF!
41 Dop GIP 1/2" MK.41 Buah #REF! #REF! AAL.K.41 142,857.00 Buah - - - - - - 5,714.00 Buah - - - - - - AAD.K.41 #REF! #REF! 0.0004 0.0006 1.0000 - 0.0016 - 110.14 - - 23.03 - 130.00 130.00 #REF! #REF! #REF!
42 Water Meter 1/2" MK.42 Buah #REF! #REF! AAL.K.42 20,000.00 Buah - - - - - - 800.00 Buah - - - - - - AAD.K.42 #REF! #REF! 0.0028 0.0040 1.0000 - 0.0112 - 781.66 - - 163.41 - 940.00 940.00 #REF! #REF! #REF!
43 Clamp Sadle 2" mm x 1/2" ( PE ) MK.43 Buah #REF! #REF! AAL.K.43 20,000.00 Buah - - - - - - 800.00 Buah - - - - - - AAD.K.43 #REF! #REF! 0.0028 0.0040 1.0000 - 0.0112 - 781.66 - - 163.41 - 940.00 940.00 #REF! #REF! #REF!
44 Pengaman Box Meter MK.44 Buah #REF! #REF! AAL.K.44 20,000.00 Buah - - - - - - 800.00 Buah - - - - - - AAD.K.44 #REF! #REF! 0.0028 0.0040 1.0000 - 0.0112 - 781.66 - - 163.41 - 940.00 940.00 #REF! #REF! #REF!
45 Pipa HDPE Ø 150 mm MK.45 M #REF! #REF! AAL.K.45 10,660.00 M - - - - - - 426.00 M - - - - - - AAD.K.45 #REF! #REF! 0.0049 0.0048 1.0000 - 0.0196 - 1,363.37 - - 285.02 - 1,640.00 1,640.00 #REF! #REF! #REF!
46 Pipa HDPE Ø 100 mm MK.46 M #REF! #REF! AAL.K.46 22,421.00 M - - - - - - 896.00 M - - - - - - AAD.K.46 #REF! #REF! 0.0019 0.0024 1.0000 - 0.0076 - 526.28 - - 110.02 - 630.00 630.00 #REF! #REF! #REF!
47 Pipa HDPE Ø 75 mm MK.47 M #REF! #REF! AAL.K.47 48,076.00 M - - - - - - 1,923.00 M - - - - - - AAD.K.47 #REF! #REF! 0.0009 0.0011 1.0000 - 0.0035 - 244.59 - - 51.13 - 290.00 290.00 #REF! #REF! #REF!
48 Pipa HDPE Ø 50 mm MK.48 M #REF! #REF! AAL.K.48 106,382.00 M - - - - - - 4,255.00 M - - - - - - AAD.K.48 #REF! #REF! 0.0004 0.0005 1.0000 - 0.0014 - 98.40 - - 20.57 - 110.00 110.00 #REF! #REF! #REF!
49 Tee All Flange Ø 50 x 50 mm MK.49 Buah #REF! #REF! AAL.K.49 4,761.00 Buah - - - - - - 190.00 Buah - - - - - - AAD.K.49 #REF! #REF! 0.0130 0.0160 1.0000 - 0.0519 - 3,615.17 - - 755.78 - 4,370.00 4,370.00 #REF! #REF! #REF!
50 Tee All Flange Ø 75 x 50 mm MK.50 Buah #REF! #REF! AAL.K.50 4,291.00 Buah - - - - - - 171.00 Buah - - - - - - AAD.K.50 #REF! #REF! 0.0132 0.0162 1.0000 - 0.0528 - 3,678.98 - - 769.12 - 4,440.00 4,440.00 #REF! #REF! #REF!
51 Tee All Flange Ø 75 x 75 mm MK.51 Buah #REF! #REF! AAL.K.51 3,937.00 Buah - - - - - - 157.00 Buah - - - - - - AAD.K.51 #REF! #REF! 0.0134 0.0163 1.0000 - 0.0536 - 3,736.12 - - 781.06 - 4,510.00 4,510.00 #REF! #REF! #REF!
52 Tee All Flange Ø 100 x 75 mm MK.52 Buah #REF! #REF! AAL.K.52 3,617.00 Buah - - - - - - 144.00 Buah - - - - - - AAD.K.52 #REF! #REF! 0.0136 0.0165 1.0000 - 0.0545 - 3,801.06 - - 794.64 - 4,590.00 4,590.00 #REF! #REF! #REF!
53 Bend 90 All Flange Ø 50 mm MK.53 Buah #REF! #REF! AAL.K.53 12,500.00 Buah - - - - - - 500.00 Buah - - - - - - AAD.K.53 #REF! #REF! 0.0036 0.0054 1.0000 - 0.0142 - 991.80 - - 207.34 - 1,190.00 1,190.00 #REF! #REF! #REF!
54 Bend 90 All Flange Ø 75 mm MK.54 Buah #REF! #REF! AAL.K.54 4,901.00 Buah - - - - - - 196.00 Buah - - - - - - AAD.K.54 #REF! #REF! 0.0117 0.0143 1.0000 - 0.0468 - 3,260.45 - - 681.62 - 3,940.00 3,940.00 #REF! #REF! #REF!
55 Bend 90 All Flange Ø 100 mm MK.55 Buah #REF! #REF! AAL.K.55 4,166.00 Buah - - - - - - 166.00 Buah - - - - - - AAD.K.55 #REF! #REF! 0.0121 0.0146 1.0000 - 0.0482 - 3,361.04 - - 702.65 - 4,060.00 4,060.00 #REF! #REF! #REF!
56 Gate Valve Flange Ø 50 mm MK.56 Buah #REF! #REF! AAL.K.56 2,649.00 Buah - - - - - - 105.00 Buah - - - - - - AAD.K.56 #REF! #REF! 0.0303 0.0293 1.0000 - 0.1214 - 8,460.35 - - 1,768.70 - 10,220.00 10,220.00 #REF! #REF! #REF!
57 Gate Valve Flange Ø 75 mm MK.57 Buah #REF! #REF! AAL.K.57 1,851.00 Buah - - - - - - 74.00 Buah - - - - - - AAD.K.57 #REF! #REF! 0.0320 0.0304 1.0000 - 0.1279 - 8,917.48 - - 1,864.26 - 10,780.00 10,780.00 #REF! #REF! #REF!
58 Gate Valve Flange Ø 1/2" MK.58 Buah #REF! #REF! AAL.K.58 100,000.00 Buah - - - - - - 4,000.00 Buah - - - - - - AAD.K.58 #REF! #REF! 0.0004 0.0007 1.0000 - 0.0017 - 117.56 - - 24.58 - 140.00 140.00 #REF! #REF! #REF!
59 Stub Flange Ø 50 mm MK.59 Buah #REF! #REF! AAL.K.59 16,666.00 Buah - - - - - - 666.00 Buah - - - - - - AAD.K.59 #REF! #REF! 0.0025 0.0043 1.0000 - 0.0101 - 705.42 - - 147.47 - 850.00 850.00 #REF! #REF! #REF!
60 Stub Flange Ø 75 mm MK.60 Buah #REF! #REF! AAL.K.60 9,596.00 Buah - - - - - - 383.00 Buah - - - - - - AAD.K.60 #REF! #REF! 0.0049 0.0072 1.0000 - 0.0196 - 1,367.08 - - 285.80 - 1,650.00 1,650.00 #REF! #REF! #REF!
61 Stub Flange Ø 100 mm MK.61 Buah #REF! #REF! AAL.K.61 7,936.00 Buah - - - - - - 317.00 Buah - - - - - - AAD.K.61 #REF! #REF! 0.0061 0.0086 1.0000 - 0.0243 - 1,697.01 - - 354.77 - 2,050.00 2,050.00 #REF! #REF! #REF!
62 End Cap (Dop) Ø 50 mm MK.62 Buah #REF! #REF! AAL.K.62 66,666.00 Buah - - - - - - 2,666.00 Buah - - - - - - AAD.K.62 #REF! #REF! 0.0006 0.0011 1.0000 - 0.0025 - 176.34 - - 36.86 - 210.00 210.00 #REF! #REF! #REF!
63 End Cap (Dop) Ø 75 mm MK.63 Buah #REF! #REF! AAL.K.63 16,666.00 Buah - - - - - - 666.00 Buah - - - - - - AAD.K.63 #REF! #REF! 0.0025 0.0043 1.0000 - 0.0101 - 705.42 - - 147.47 - 850.00 850.00 #REF! #REF! #REF!
64 Stop Cock (PIT Kran) 1/2" MK.64 Buah #REF! #REF! AAL.K.64 50,000.00 Buah - - - - - - 2,000.00 Buah - - - - - - AAD.K.64 #REF! #REF! 0.0009 0.0016 1.0000 - 0.0037 - 257.57 - - 53.85 - 310.00 310.00 #REF! #REF! #REF!
65 Reducer All Flange Ø 75 x 75 mm MK.65 Buah #REF! #REF! AAL.K.65 5,555.00 Buah - - - - - - 222.00 Buah - - - - - - AAD.K.65 #REF! #REF! 0.0090 0.0122 1.0000 - 0.0362 - 2,520.78 - - 526.99 - 3,040.00 3,040.00 #REF! #REF! #REF!
66 Reducer All Flange Ø 75 x 50 mm MK.66 Buah #REF! #REF! AAL.K.66 5,952.00 Buah - - - - - - 238.00 Buah - - - - - - AAD.K.66 #REF! #REF! 0.0089 0.0121 1.0000 - 0.0357 - 2,487.76 - - 520.08 - 3,000.00 3,000.00 #REF! #REF! #REF!
67 Quil Elbow HDPE (adaptor) Ø 15 mm (1/2") MK.67 Buah #REF! #REF! AAL.K.67 12,500.00 Buah - - - - - - 500.00 Buah - - - - - - AAD.K.67 #REF! #REF! 0.0036 0.0054 1.0000 - 0.0142 - 991.80 - - 207.34 - 1,190.00 1,190.00 #REF! #REF! #REF!
68 Pipa Input HDPE Ø 1/2" MK.68 Buah #REF! #REF! AAL.K.68 12,500.00 Buah - - - - - - 500.00 Buah - - - - - - AAD.K.68 #REF! #REF! 0.0036 0.0054 1.0000 - 0.0142 - 991.80 - - 207.34 - 1,190.00 1,190.00 #REF! #REF! #REF!

M. BETON PRACETAK
1 Dwiker Sumur/Gorong2 Ø 1 m, H 60 cm MM.1 Buah #REF! #REF! AAL.M.1 110.00 Buah - - - - - - 4.00 Buah - - - - - - AAD.M.1 #REF! #REF! 0.1095 0.1268 1.0000 - 0.3286 - 30,539.52 - - 4,788.37 - 35,320.00 35,320.00 #REF! #REF! #REF!
2 Dwiker Sumur/Gorong2 Ø 0,8 m, H 60 cm MM.2 Buah #REF! #REF! AAL.M.2 138.00 Buah - - - - - - 5.00 Buah - - - - - - AAD.M.2 #REF! #REF! 0.0911 0.1130 1.0000 - 0.2733 - 25,399.20 - - 3,982.41 - 29,380.00 29,380.00 #REF! #REF! #REF!
3 Dwiker Sumur/Gorong2 Ø 0,6 m, H 80 cm MM.3 Buah #REF! #REF! AAL.M.3 138.00 Buah - - - - - - 5.00 Buah - - - - - - AAD.M.3 #REF! #REF! 0.0959 0.1130 1.0000 - 0.2878 - 26,746.13 - - 4,193.60 - 30,930.00 30,930.00 #REF! #REF! #REF!
4 Dwiker Sumur/Gorong2 Ø 0,4 m, H 80 cm MM.4 Buah #REF! #REF! AAL.M.4 276.00 Buah - - - - - - 11.00 Buah - - - - - - AAD.M.4 #REF! #REF! 0.0721 0.0855 1.0000 - 0.2164 - 20,107.70 - - 3,152.74 - 23,260.00 23,260.00 #REF! #REF! #REF!

N. BAHAN BANGUNAN LAIN


1 Lem Aica Aibon MN.1 KG #REF! #REF! AAL.N.1 50,000.00 KG - - - - - - 2,000.00 KG - - - - - - AAD.N.1 #REF! #REF! 0.0007 0.0018 1.0000 - 0.0030 - 207.26 - - 43.33 - 250.00 250.00 #REF! #REF! #REF!
2 Lem Fox MN.2 KG #REF! #REF! AAL.N.2 50,000.00 KG - - - - - - 2,000.00 KG - - - - - - AAD.N.2 #REF! #REF! 0.0007 0.0018 1.0000 - 0.0030 - 207.26 - - 43.33 - 250.00 250.00 #REF! #REF! #REF!
3 Lem Vinyl MN.3 KG #REF! #REF! AAL.N.3 50,000.00 KG - - - - - - 2,000.00 KG - - - - - - AAD.N.3 #REF! #REF! 0.0007 0.0018 1.0000 - 0.0030 - 207.26 - - 43.33 - 250.00 250.00 #REF! #REF! #REF!
4 Ijuk MN.4 KG #REF! #REF! AAL.N.4 50,000.00 KG - - - - - - 2,000.00 KG - - - - - - AAD.N.4 #REF! #REF! 0.0009 0.0016 1.0000 - 0.0037 - 257.53 - - 53.84 - 310.00 310.00 #REF! #REF! #REF!
5 Pipa Plastik dia, 3" (AW) MN.5 Batang #REF! #REF! AAL.N.5 66,666.00 Batang - - - - - - 2,666.00 Batang - - - - - - AAD.N.5 #REF! #REF! 0.0007 0.0007 1.0000 - 0.0028 - 196.38 - - 41.05 - 230.00 230.00 #REF! #REF! #REF!
6 Galvanies / Lysplank MN.6 Lembar #REF! #REF! AAL.N.6 7,142.00 Lembar - - - - - - 285.00 Lembar - - - - - - AAD.N.6 #REF! #REF! 0.0069 0.0054 1.0000 - 0.0278 - 1,934.35 - - 404.39 - 2,330.00 2,330.00 #REF! #REF! #REF!
7 Mata bor MN.7 Buah #REF! #REF! AAL.N.7 333,333.00 Buah - - - - - - 13,333.00 Buah - - - - - - AAD.N.7 #REF! #REF! 0.0002 0.0001 1.0000 - 0.0006 - 42.64 - - 8.91 - 50.00 50.00 #REF! #REF! #REF!
8 Mata gurinda MN.8 Buah #REF! #REF! AAL.N.8 250,000.00 Buah - - - - - - 10,000.00 Buah - - - - - - AAD.N.8 #REF! #REF! 0.0002 0.0002 1.0000 - 0.0008 - 56.86 - - 11.89 - 60.00 60.00 #REF! #REF! #REF!
9 Gas elpiji (12 KG) MN.9 KG #REF! #REF! AAL.N.9 3,333.00 KG - - - - - - 133.00 KG - - - - - - AAD.N.9 #REF! #REF! 0.0013 0.0014 1.0000 - 0.0050 - 351.23 - - 73.43 - 420.00 420.00 #REF! #REF! #REF!
10 Oksigen (@50 kg/btl) MN.10 KG #REF! #REF! AAL.N.10 909.00 KG - - - - - - 36.00 KG - - - - - - AAD.N.10 #REF! #REF! 0.0015 0.0015 1.0000 - 0.0060 - 421.70 - - 88.16 - 500.00 500.00 #REF! #REF! #REF!

NB : Harga belum termasuk PPN

A. Alat Muat dan Angkut D. Biaya Bongkar muat CATATAN :


Kode Harga Sewa Harga Sewa di BIAYA BONGKAR MUAT -KAPAL - Hari
No Uraian Komponen
di Merauke Lok. Pekerjaan Tenaga Jumlah volume Harga Satuan Jumlah
1 Excavator E-2 644,572 683,846 Mandor - Orang - 160,000 -
2 Dump Truk E-1 278,814 313,074 Pekerja - Orang - 102,000 -
3 Traktor Pengangkut E - 14 - - Jumlah Total -
B. Tenaga
Kode Harga Sewa Harga Sewa BIAYA BONGKAR MUAT - PERAHU/SPEED - Hari
No Uraian Komponen
Per Hari Per Jam Tenaga Jumlah volume Harga Satuan Jumlah
1 Mandor L-1 160,000 22,858 Mandor - Orang - 160,000 -
2 Mandor Alat Berat (F. Equipment) L-5 216,000 30,858 Pekerja - Orang - 102,000 -
3 Pekerja L-4 102,000 14,572 Jumlah Total -
C. Transportasi Laut/Sungai
Kode Harga Sewa
No Uraian Komponen
di Merauke
1 Kapal KP -
2 Perahu/speed SP -
3 Packing Barang PKG -
Analisa Harga Satuan Pekerjaan (AHSP) Analisa Yang Dipakai

ANALISA HARGA SATUAN

A. PEKERJAAN PERSIAPAN
PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH

(Rp.) (Rp.) (Rp.) (Rp.)

1 2 3 4 5 6 7 8
1 1 M2 Membersihkan Lapangan dan Perataan
RSNI T-12-2002
Pekerja OH 0.1000 132,000.00 13,200.00
Mandor OH 0.0050 205,000.00 1,025.00
Jumlah harga pekerjaan - 14,225.00 14,225.00
Jumlah harga dibulatkan 14,225.00

2 1 M' Pengukuran dan Pasangan Bouwplank


RSNI T-12-2002
Balok Kayu Bus M3 0.0120 3,599,094.05 43,189.13
Kayu Papan Bus M3 0.0070 3,599,094.05 25,193.66
Paku Biasa Campur 2" - 5" KG 0.0200 19,506.30 390.13
Pekerja kayu OH 0.1000 132,000.00 13,200.00
Tukang kayu OH 0.1000 168,000.00 16,800.00
Kepala Tukang Kayu OH 0.0100 188,000.00 1,880.00
Mandor OH 0.0050 205,000.00 1,025.00
Jumlah harga pekerjaan 68,772.91 32,905.00 101,677.91
Jumlah harga dibulatkan 101,677.00

3 1 M2 Pembongkaran Lantai
Pekerja OH 0.1000 132,000.00 13,200.00
Mandor OH 0.0100 205,000.00 2,050.00
Jumlah harga pekerjaan - 15,250.00 15,250.00
Jumlah harga dibulatkan 15,250.00

4 1 M2 Pembongkaran Plafond + Rangka


Mandor OH 0.0400 205,000.00 8,200.00
Pekerja OH 0.0400 132,000.00 5,280.00
Jumlah harga pekerjaan - 13,480.00 13,480.00
Jumlah harga dibulatkan 13,480.00

5 1 M2 Pembongkaran Atap
Pekerja OH 0.0100 132,000.00 1,320.00
Tukang OH 0.0500 168,000.00 8,400.00
Jumlah harga pekerjaan - 9,720.00 9,720.00
Jumlah harga dibulatkan 9,720.00

6 1 M' Pembongkaran Lisplank


Mandor OH 0.0150 205,000.00 3,075.00
Pekerja OH 0.0300 132,000.00 3,960.00
Jumlah harga pekerjaan - 7,035.00 7,035.00
Jumlah harga dibulatkan 7,035.00

7 1 M2 Pembongkaran Rangka Kuda-kuda Kayu


Kepala Tukang OH 0.0200 205,000.00 4,100.00
Tukang OH 0.2000 168,000.00 33,600.00
Pekerja OH 0.1000 132,000.00 13,200.00
Jumlah harga pekerjaan - 50,900.00 50,900.00
Jumlah harga dibulatkan 50,900.00

8 1 M2 Pembongkaran Gording
Mandor OH 0.0050 205,000.00 1,025.00
Kepala tukang OH 0.0250 188,000.00 4,700.00
Tukang OH 0.0025 168,000.00 420.00
Pekerja OH 0.1000 132,000.00 13,200.00
Jumlah harga pekerjaan - 19,345.00 19,345.00
Jumlah harga dibulatkan 19,345.00

9 1 M2 Bongkar dinding 1/2 batu


Pekerja OH 0.2000 132,000.00 26,400.00
Mandor OH 0.0100 205,000.00 2,050.00
Jumlah harga pekerjaan - 28,450.00 28,450.00
Jumlah harga dibulatkan 28,450.00

10 1 M3 Pembongkaran Kusen
Kepala tukang OH 0.1000 188,000.00 18,800.00
Tukang OH 1.0000 168,000.00 168,000.00
Jumlah harga pekerjaan - 186,800.00 186,800.00
Jumlah harga dibulatkan 186,800.00

11 1 M3 Bongkar Beton bertulang


Pekerja OH 8.0000 132,000.00 1,056,000.00
Tukang OH 0.1600 168,000.00 26,880.00
Kepala Tukang OH 0.1600 188,000.00 30,080.00
Mandor OH 0.4000 205,000.00 82,000.00
Jumlah harga pekerjaan - 1,194,960.00 1,194,960.00
Jumlah harga dibulatkan 1,194,960.00

II PEKERJAAN TANAH
1 1 M3 Galian Tanah Biasa
SNI 2835:2008
Pekerja OH 0.7500 132,000.00 99,000.00
Mandor OH 0.0250 205,000.00 5,125.00
Jumlah harga pekerjaan - 104,125.00 104,125.00
Jumlah harga dibulatkan 104,125.00

2 1 M3 Urug Kembali Tanah Biasa


SNI 2835:2008
Dihitung 1/3 kali Galian Tanah Biasa M3 0.3333 104,125.00 34,708.33
Jumlah harga dibulatkan 34,708.00
Analisa Harga Satuan Pekerjaan (AHSP) Analisa Yang Dipakai

PERKIRAAN HARGA JUMLAH HARGA


NO. KOMPONEN SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
3 1 M3 Timbunan dan pemadatan Tanah Pilihan (Mekanis
HPS.PU. 2017
Tanah pilihan (Selmat) M3 1.2000 436,596.35 523,915.62
Pekerja Jam 0.3200 18,858.00 6,034.56
Mandor (F. Equipment) Jam 0.3200 32,858.00 10,514.56
Stamper Jam 0.3200 64,537.00 20,651.84
Jumlah harga pekerjaan 523,915.62 37,200.96 561,116.58
Jumlah harga dibulatkan 561,116.00

4 1 M3 Urugan Pasir Bawah Pondasi/Lantai/Konstruksi


SNI 2835:2008
Pasir semen (lokal) M3 1.2000 1,058,872.85 1,270,647.42
Pekerja OH 0.3000 132,000.00 39,600.00
Mandor OH 0.0100 205,000.00 2,050.00
Jumlah harga pekerjaan 1,270,647.42 41,650.00 1,312,297.42
Jumlah harga dibulatkan 1,312,297.00

III PEKERJAAN BETON / PASANGAN / PLESTERAN


1 1 M3 Pasangan Bata, Camp. 1PC : 3PS - Pasir Import
HPS.PU. 2017
Batu bata Buah 649.0000 1,851.50 1,201,623.50
Semen Portland (PC) @ 50 Kg Zak 4.2874 138,941.85 595,695.81
Pasir semen (import) M3 0.4594 1,541,578.45 708,141.95
Mandor pasir/batu OH 0.1429 205,000.00 29,285.71
Kepala tukang pasir/batu OH 0.4286 188,000.00 80,571.43
Tukang pasir/batu OH 1.2857 168,000.00 216,000.00
Pekerja pasir/batu OH 2.8571 132,000.00 377,142.86
Jumlah harga pekerjaan 2,505,461.27 703,000.00 3,208,461.27
Jumlah harga dibulatkan 3,208,461.00

2 1 M3 Campuran beton 1PC : 2PS : 3KR, Import (mekan


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg Zak 7.5000 138,941.85 1,042,063.88
Pasir semen (import) M3 0.5357 1,541,578.45 825,845.60
Kerikil/batu pecah (import) M3 0.8333 1,567,479.90 1,306,233.25
Mandor Jam 1.6000 29,286.00 46,857.60
Kepala tukang Jam 1.6000 26,858.00 42,972.80
Tukang pasir/batu Jam 4.8000 24,000.00 115,200.00
Pekerja Jam 16.0000 18,858.00 301,728.00
Concrete Mixer Jam 1.6000 85,665.00 137,064.00
Truck tanki air Jam 0.0678 379,191.00 25,698.19
Water Pump Jam 1.6000 61,861.00 98,977.60
Alat bantu Set 1.0000 5,000.00 5,000.00
Jumlah harga pekerjaan 3,174,142.72 773,498.19 3,947,640.91
Jumlah harga dibulatkan 3,947,640.00

3 1 M3 Campuran Beton 1PC : 3PS - Pasir Import (mekan


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg Zak 11.2500 138,941.85 1,563,095.81
Pasir semen (import) M3 1.2054 1,541,578.45 1,858,152.60
Mandor Jam 1.6000 29,286.00 46,857.60
Kepala tukang Jam 1.6000 26,858.00 42,972.80
Tukang pasir/batu Jam 4.8000 24,000.00 115,200.00
Pekerja Jam 16.0000 18,858.00 301,728.00
Concrete Mixer Jam 1.6000 85,665.00 137,064.00
Truck tanki air Jam 0.1288 379,191.00 48,826.55
Water Pump Jam 1.6000 61,861.00 98,977.60
Alat bantu Set 1.0000 5,000.00 5,000.00
Jumlah harga pekerjaan 3,421,248.41 796,626.55 4,217,874.96
Jumlah harga dibulatkan 4,217,874.00

4 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/2 Bata, 1PC :


HPS.PU. 2017
Bata merah (5 x 10 x 20) cm Buah 70.0000 1,851.50 129,605.00
Semen Portland (PC) @ 50 Kg Zak 0.4579 138,941.85 63,618.00
Pasir semen (import) M3 0.0491 1,541,578.45 75,626.81
Pekerja pasir/batu OH 0.0143 132,000.00 1,885.71
Tukang pasir/batu OH 0.0429 168,000.00 7,200.00
Kepala tukang pasir/batu OH 0.1286 188,000.00 24,171.43
Mandor pasir/batu OH 0.2857 205,000.00 58,571.43
Jumlah harga pekerjaan 268,849.81 91,828.57 360,678.38
Jumlah harga dibulatkan 360,678.00

5 1 M2 Plesteran 1PC : 3PS, Tebal 15 mm - Pasir Import


SNI 2837:2008
Semen Portland (PC) @ 50 Kg KG 7.7760 2,778.84 21,608.24
Pasir semen (import) M3 0.0230 1,541,578.45 35,456.30
Pekerja pasir/batu OH 0.3000 132,000.00 39,600.00
Tukang pasir/batu OH 0.1500 168,000.00 25,200.00
Kepala tukang pasir/batu OH 0.0150 188,000.00 2,820.00
Mandor pasir/batu OH 0.0150 205,000.00 3,075.00
Jumlah harga pekerjaan 57,064.54 70,695.00 127,759.54
Jumlah harga dibulatkan 127,759.00

6 1 M2 Lantai Keramik Ukuran 60 x 60 cm


SNI 7395-2008
Keramik 60x60 Buah 3.3333 89,323.95 297,746.50
Semen Portland (PC) @ 50 Kg KG 19.6000 2,778.84 54,465.21
Pasir Semen (Import) M3 0.0900 1,541,578.45 138,742.06
Semen Warna KG 1.3000 8,848.16 11,502.60
Pekerja OH 0.2500 132,000.00 33,000.00
Tukang batu OH 0.1250 168,000.00 21,000.00
Kepala tukang OH 0.0130 188,000.00 2,444.00
Mandor OH 0.0130 205,000.00 2,665.00
502,456.37 59,109.00 561,565.37
Jumlah harga dibulatkan 561,565.00
Analisa Harga Satuan Pekerjaan (AHSP) Analisa Yang Dipakai

PERKIRAAN HARGA JUMLAH HARGA


NO. KOMPONEN SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
7 1 M2 Pasang Paving Block
HPS.PU. 2017
Paving blok (10 x 20 cm) M2 1.0100 376,912.50 380,681.63
Pasir semen (lokal) M3 0.1000 1,058,872.85 105,887.29
Pekerja OH 0.2000 132,000.00 26,400.00
Tukang batu OH 0.3000 168,000.00 50,400.00
Kepala tukang OH 0.0300 188,000.00 5,640.00
Mandor OH 0.0250 205,000.00 5,125.00
Peralatan LS 0.0500 10,000.00 500.00
486,568.91 88,065.00 574,633.91
Jumlah harga dibulatkan 574,633.00

8 1 M2 Dinding Batu Tempel Hitam


SNI 7395-2008
Batu Tempel Hitam M2 1.1000 191,895.00 211,084.50
Semen Portland (PC) @ 50 Kg KG 11.7500 2,778.84 32,651.33
Pasir Semen (lokal) M3 0.0350 1,058,872.85 37,060.55
Pekerja OH 0.7000 132,000.00 92,400.00
Tukang batu OH 0.3500 168,000.00 58,800.00
Kepala tukang OH 0.0350 188,000.00 6,580.00
Mandor OH 0.0350 205,000.00 7,175.00
280,796.38 164,955.00 445,751.38
Jumlah harga dibulatkan 445,751.00

9 1 M2 Dinding Batu Paras


SNI 7395-2008
Batu Paras M2 1.1000 191,895.00 211,084.50
Semen Portland (PC) @ 50 Kg KG 11.7500 2,778.84 32,651.33
Pasir Semen (lokal) M3 0.0350 1,058,872.85 37,060.55
Pekerja OH 0.7000 132,000.00 92,400.00
Tukang batu OH 0.3500 168,000.00 58,800.00
Kepala tukang OH 0.0350 188,000.00 6,580.00
Mandor OH 0.0350 205,000.00 7,175.00
280,796.38 164,955.00 445,751.38
Jumlah harga dibulatkan 445,751.00

10 1 M2 Lantai Ubin PC Teraso Ukuran 40 x 40 cm


SNI 7395-2008
Ubin Teraso Ukuran 40 x 40 cm Buah 6.6300 18,521.90 122,800.20
Semen Portland (PC) @ 50 Kg KG 9.8000 2,778.84 27,232.60
Pasir Semen (Import) M3 0.0450 1,541,578.45 69,371.03
Semen Warna KG 1.3000 8,848.16 11,502.60
Pekerja OH 0.2500 132,000.00 33,000.00
Tukang batu OH 0.1250 168,000.00 21,000.00
Kepala tukang OH 0.0130 188,000.00 2,444.00
Mandor OH 0.0130 205,000.00 2,665.00
230,906.43 59,109.00 290,015.43
Jumlah harga dibulatkan 290,015.00

11 1 KG Pembesian Besi polos/ulir Ø. 8 mm SNI


SNI 7394:2008
Besi Beton Dia.8 SNI (P=12 m) KG 1.0500 14,947.70 15,695.09
Kawat beton Kg 0.0150 25,028.60 375.43
Pekerja OH 0.0070 132,000.00 924.00
Tukang besi OH 0.0070 168,000.00 1,176.00
Kepala tukang OH 0.0007 188,000.00 131.60
Mandor OH 0.0004 205,000.00 82.00
Jumlah harga pekerjaan 16,070.51 2,313.60 18,384.11
Jumlah harga dibulatkan 18,384.00

12 1 KG Pembesian Besi polos/ulir Ø. 10 mm SNI


SNI 7394:2008
Besi Beton Dia.10 SNI (P=12 m) KG 1.0500 15,071.90 15,825.50
Kawat beton Kg 0.0150 25,028.60 375.43
Pekerja OH 0.0070 132,000.00 924.00
Tukang besi OH 0.0070 168,000.00 1,176.00
Kepala tukang OH 0.0007 188,000.00 131.60
Mandor OH 0.0004 205,000.00 82.00
Jumlah harga pekerjaan 16,200.92 2,313.60 18,514.52
Jumlah harga dibulatkan 18,514.00

13 1 KG Pembesian Besi polos/ulir Ø. 12 mm SNI


SNI 7394:2008
Besi Beton Dia.12 SNI (P=12 m) KG 1.0500 15,364.00 16,132.20
Kawat beton Kg 0.0150 25,028.60 375.43
Pekerja OH 0.0070 132,000.00 924.00
Tukang besi OH 0.0070 168,000.00 1,176.00
Kepala tukang OH 0.0007 188,000.00 131.60
Mandor OH 0.0004 205,000.00 82.00
Jumlah harga pekerjaan 16,507.63 2,313.60 18,821.23
Jumlah harga dibulatkan 18,821.00

14 1 M2 Bekisting untuk Pondasi


SNI 7394:2008
Kayu Bekisting Kelas 3 M3 0.0400 3,599,094.05 143,963.76
Paku Campur Biasa 5 cm - 10 cm KG 0.3000 19,506.30 5,851.89
Minyak Bekisting/oli bekas Liter 0.1000 1,104.00 110.40
Pekerja Kayu OH 0.5200 132,000.00 68,640.00
Tukang Kayu OH 0.2600 168,000.00 43,680.00
Kepala Tukang Kayu OH 0.0260 188,000.00 4,888.00
Mandor OH 0.0260 205,000.00 5,330.00
Jumlah harga pekerjaan 149,926.05 122,538.00 272,464.05
Jumlah harga dibulatkan 272,464.00
Analisa Harga Satuan Pekerjaan (AHSP) Analisa Yang Dipakai

PERKIRAAN HARGA JUMLAH HARGA


NO. KOMPONEN SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
15 1 M2 Bekisting untuk Sloof
SNI 7394:2008
Kayu Bekisting Kelas 3 M3 0.0450 3,599,094.05 161,959.23
Paku Campur Biasa 5 cm - 10 cm KG 0.3000 19,506.30 5,851.89
Minyak Bekisting/oli bekas Liter 0.1000 1,104.00 110.40
Pekerja Kayu OH 0.5200 132,000.00 68,640.00
Tukang Kayu OH 0.2600 168,000.00 43,680.00
Kepala Tukang Kayu OH 0.0260 188,000.00 4,888.00
Mandor OH 0.0260 205,000.00 5,330.00
Jumlah harga pekerjaan 167,921.52 122,538.00 290,459.52
Jumlah harga dibulatkan 290,459.00

16 1 M2 Bekisting untuk Kolom


SNI 7394:2008
Kayu Bekisting Kelas 3 M3 0.0400 3,599,094.05 143,963.76
Paku Campur Biasa 5 cm - 10 cm KG 0.4000 19,506.30 7,802.52
Minyak Bekisting/oli bekas Liter 0.2000 1,104.00 220.80
Balok Kayu Kelas 2 M3 0.0150 4,729,266.90 70,939.00
Plywood 9 mm Lembar 0.3500 382,717.70 133,951.20
Kayu dolken Ø 8-10, Panjang 400 cm - Kayu Kelas Batang 2.0000 21,503.85 43,007.70
Pekerja Kayu OH 0.6600 132,000.00 87,120.00
Tukang Kayu OH 0.3300 168,000.00 55,440.00
Kepala Tukang Kayu OH 0.0330 188,000.00 6,204.00
Mandor OH 0.0330 205,000.00 6,765.00
Jumlah harga pekerjaan 399,884.98 155,529.00 555,413.98
Jumlah harga dibulatkan 555,413.00

17 1 M2 Bekisting untuk Balok


SNI 7394:2008
Kayu Bekisting Kelas 3 M3 0.0400 3,599,094.05 143,963.76
Paku Campur Biasa 5 cm - 10 cm KG 0.4000 19,506.30 7,802.52
Minyak Bekisting/oli bekas Liter 0.2000 1,104.00 220.80
Balok Kayu Kelas 2 M3 0.0180 4,729,266.90 85,126.80
Plywood 9 mm Lembar 0.3500 382,717.70 133,951.20
Kayu dolken Ø 8-10, Panjang 400 cm - Kayu Kelas Batang 2.0000 21,503.85 43,007.70
Pekerja Kayu OH 0.6600 132,000.00 87,120.00
Tukang Kayu OH 0.3300 168,000.00 55,440.00
Kepala Tukang Kayu OH 0.0330 188,000.00 6,204.00
Mandor OH 0.0330 205,000.00 6,765.00
Jumlah harga pekerjaan 414,072.78 155,529.00 569,601.78
Jumlah harga dibulatkan 569,601.00

18 1 M2 Bekisting untuk Pelat Lantai


SNI 7394:2008
Kayu Bekisting Kelas 3 M3 0.0400 3,599,094.05 143,963.76
Paku Campur Biasa 5 cm - 10 cm KG 0.4000 19,506.30 7,802.52
Minyak Bekisting/oli bekas Liter 0.2000 1,104.00 220.80
Balok Kayu Kelas 2 M3 0.0150 4,729,266.90 70,939.00
Plywood 9 mm Lembar 0.3500 382,717.70 133,951.20
Kayu dolken Ø 8-10, Panjang 400 cm - Kayu Kelas Batang 6.0000 21,503.85 129,023.10
Pekerja Kayu OH 0.6600 132,000.00 87,120.00
Tukang Kayu OH 0.3300 168,000.00 55,440.00
Kepala Tukang Kayu OH 0.0330 188,000.00 6,204.00
Mandor OH 0.0330 205,000.00 6,765.00
Jumlah harga pekerjaan 485,900.38 155,529.00 641,429.38
Jumlah harga dibulatkan 641,429.00

IV PEKERJAAN KAYU
1 1 M2 Rangka Plafond (60 x 60), Kayu Kelas III
SNI 3434:2008
Balok Kayu Kelas III (Kayu Bus) M3 0.0163 3,599,094.05 58,665.23
Paku Campuran KG 0.2500 19,506.30 4,876.58
Pekerja Kayu OH 0.2000 132,000.00 26,400.00
Tukang Kayu OH 0.3000 168,000.00 50,400.00
Kepala Tukang OH 0.0300 188,000.00 5,640.00
Mandor OH 0.0100 205,000.00 2,050.00
Jumlah harga pekerjaan 63,541.81 84,490.00 148,031.81
Jumlah harga dibulatkan 148,031.00

2 1 M3 Kusen Pintu dan Jendela Kayu Kelas II


SNI 3434:2008
Balok Kayu Kelas II (Kayu Rahay) M3 1.2000 4,729,266.90 5,675,120.28
Paku Campuran KG 1.2500 19,506.30 24,382.88
Lem Kayu KG 1.0000 51,934.00 51,934.00
Pekerja Kayu OH 6.0000 132,000.00 792,000.00
Tukang Kayu OH 18.0000 168,000.00 3,024,000.00
Kepala Tukang OH 1.8000 188,000.00 338,400.00
Mandor OH 0.3000 205,000.00 61,500.00
Jumlah harga pekerjaan 5,751,437.16 4,215,900.00 9,967,337.16
Jumlah harga dibulatkan 9,967,337.00

3 1 M2 Jalusi Kusen, Kayu Kelas II


SNI 3434:2008
Papan Kayu Kelas II (Kayu Rahay) tebal = 2 Cm M3 0.0600 4,839,477.15 290,368.63
Paku Campuran KG 0.1500 19,506.30 2,925.95
Pekerja Kayu OH 0.6700 132,000.00 88,440.00
Tukang Kayu OH 2.0000 168,000.00 336,000.00
Kepala Tukang OH 0.2000 188,000.00 37,600.00
Mandor OH 0.3350 205,000.00 68,675.00
Jumlah harga pekerjaan 293,294.57 530,715.00 824,009.57
Jumlah harga dibulatkan 824,009.00
Analisa Harga Satuan Pekerjaan (AHSP) Analisa Yang Dipakai

PERKIRAAN HARGA JUMLAH HARGA


NO. KOMPONEN SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
4 1 M2 Rangka Dinding Pemisah Plywood Rangkap,
SNI 3434:2008
Rangka Kayu Kelas II
Balok Kayu Kelas II (Kayu Rahay) M3 0.0280 4,729,266.90 132,419.47
Paku Campuran KG 0.1500 19,506.30 2,925.95
Plywood - Tripleks (1,22 x 2,44) cm - tebal 4 mm Lembar 0.8600 293,927.35 252,777.52
Lem kayu (putih) Fox KG 0.5600 51,934.00 29,083.04
Pekerja Kayu OH 0.2000 132,000.00 26,400.00
Tukang Kayu OH 0.6000 168,000.00 100,800.00
Kepala Tukang OH 0.0600 188,000.00 11,280.00
Mandor OH 0.0100 205,000.00 2,050.00
Jumlah harga pekerjaan 417,205.98 140,530.00 557,735.98
Jumlah harga dibulatkan 557,735.00

V PEKERJAAN PASANG MEMASANG


1 1 M2 Penutup Atap Genteng Metal - Multiroof
SNI 03-3436-2002
Genteng Metal - Multiroof Lembar 1.0500 73,441.30 77,113.37
Paku Campuran KG 0.2000 19,506.30 3,901.26
Pekerja OH 0.2000 132,000.00 26,400.00
Tukang Kayu OH 0.1000 168,000.00 16,800.00
Kepala Tukang OH 0.0100 188,000.00 1,880.00
Mandor OH 0.0010 205,000.00 205.00
Jumlah harga pekerjaan 81,014.63 45,285.00 126,299.63
Jumlah harga dibulatkan 126,299.00

2 1 M' Bubungan/Nok Atap Genteng Metal - Multiroof


SNI 03-3436-2002
Bubungan Genteng Metal - Multiroof Buah 1.1000 55,148.25 60,663.08
Paku Campuran KG 0.0500 19,506.30 975.32
Pekerja OH 0.2500 132,000.00 33,000.00
Tukang Kayu OH 0.1500 168,000.00 25,200.00
Kepala Tukang OH 0.0150 188,000.00 2,820.00
Mandor OH 0.0130 205,000.00 2,665.00
Jumlah harga pekerjaan 61,638.39 63,685.00 125,323.39
Jumlah harga dibulatkan 125,323.00

3 1 M2 Langit-langit Gypsum Board Ukuran (1200 x 240


SNI 2839:2008
Gypsum Board (1200 x 2400 x 9) mm Lembar 0.3640 121,663.10 44,285.37
Paku Skrup KG 0.1100 35,046.25 3,855.09
Pekerja OH 0.1000 132,000.00 13,200.00
Tukang OH 0.0500 168,000.00 8,400.00
Kepala Tukang OH 0.0050 188,000.00 940.00
Mandor OH 0.0050 205,000.00 1,025.00
Jumlah harga pekerjaan 48,140.46 23,565.00 71,705.46
Jumlah harga dibulatkan 71,705.00

4 1 M' Pasang list plafond gypsum profil


SNI 2839:2008
List profil Gypsum Lebar Sampai 5 cm M' 1.0500 46,644.00 48,976.20
Tepung gypsum KG 0.1500 6,548.33 982.25
Pekerja OH 0.0600 132,000.00 7,920.00
Tukang OH 0.0600 168,000.00 10,080.00
Kepala Tukang OH 0.0060 188,000.00 1,128.00
Mandor OH 0.0030 205,000.00 615.00
Jumlah harga pekerjaan 49,958.45 19,743.00 69,701.45
Jumlah harga dibulatkan 69,701.00

1 M2 Pasang Kuda-Kuda Baja Ringan + Reng Untuk Atap Genteng Biasa/Mental


C-75,08 M 1.488 27,168.75 40,427.10
C-75,06 M 2.232 16,531.25 36,897.75
Bau (srew Driver) Bh 28.000 92,000.00 2,576,000.00
Dynabolt Bh 1.600 97,750.00 156,400.00
Reng M 5.400 16,531.25 89,268.75
Talang Jurai M 0.124 25,443.75 3,155.03
Pekerja OH 0.200 132,000.00 26,400.00
Tukang besi OH 0.450 168,000.00 75,600.00
Kepala Tukang OH 0.010 188,000.00 1,880.00
Mandor OH 0.050 205,000.00 10,250.00
Jumlah harga pekerjaan 2,902,148.63 114,130.00 3,016,278.63
Jumlah harga dibulatkan 3,016,278.00

VI PEKERJAAN PINTU/ JENDELA


1 1 Unit Pintu Panel 80 x 210 cm
HPS.PU. 2017
Papan kayu Rahay M3 0.075 5,059,891.90 379,491.89
Engsel 4" Kuningan (untuk pintu) Buah 1.500 35,892.65 53,838.98
Kait angin Buah 1.000 13,597.60 13,597.60
Kunci tanam (setara kuda terbang) Buah 1.000 98,082.35 98,082.35
Grendel besar Buah 1.000 12,087.65 12,087.65
Paku Campur KG 0.220 19,506.30 4,291.39
Mandor kayu OH 0.1133 205,000.00 23,226.50
Kepala tukang kayu OH 0.6972 188,000.00 131,073.60
Tukang kayu OH 6.972 168,000.00 1,171,296.00
Pekerja kayu OH 2.2659 132,000.00 299,098.80
Jumlah harga pekerjaan 561,389.85 1,624,694.90 2,186,084.75
Jumlah harga dibulatkan 2,186,084.00

2 1 M2 Kaca raiben tebal 5 mm


Pt T-30-2000-C
Kaca raiben tebal 5 mm M2 1.100 19,030.20 20,933.22
Kayu Lat Batang 0.000 33,498.35 0.00
Paku Campur KG 0.000 19,506.30 0.00
Pekerja kayu OH 0.160 132,000.00 21,120.00
Tukang kayu OH 0.160 168,000.00 26,880.00
Kepala tukang OH 0.016 188,000.00 3,008.00
Mandor kayu OH 0.008 205,000.00 1,640.00
Jumlah harga pekerjaan 20,933.22 52,648.00 73,581.22
Jumlah harga dibulatkan 73,581.00
Analisa Harga Satuan Pekerjaan (AHSP) Analisa Yang Dipakai

PERKIRAAN HARGA JUMLAH HARGA


NO. KOMPONEN SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH

VII PEKERJAAN PENGECATAN


1 1 M2 Pelapisan Bidang Kayu Dengan Meny
Pt.T-38-2000-C
Cat meny kayu KG 0.170 41,122.85 6,990.88
Minyak Cat Liter 0.100 39,810.70 3,981.07
Kuas Buah 0.015 10,000.00 150.00
Mandor cat OH 0.004 205,000.00 820.00
Pekerja cat OH 0.075 132,000.00 9,900.00
Jumlah harga pekerjaan 11,121.95 10,720.00 21,841.95
Jumlah harga dibulatkan 21,841.00

2 1 M2 Mengecat Penutup 2 Lapis Pada Kayu


Pt.T-38-2000-C
Cat tutup/cat kayu KG 0.300 73,755.25 22,126.58
Minyak Cat Liter 0.200 39,810.70 7,962.14
Kuas Buah 0.020 10,000.00 200.00
Mandor cat OH 0.008 205,000.00 1,640.00
Kepala tukang cat OH 0.015 188,000.00 2,820.00
Tukang cat OH 0.150 168,000.00 25,200.00
Pekerja cat OH 0.150 132,000.00 19,800.00
Jumlah harga pekerjaan 30,288.72 49,460.00 79,748.72
Jumlah harga dibulatkan 79,748.00

3 1 M2 Cat tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis c


HPS.PU. 2017
Plamur KG 0.100 11,126.00 1,112.60
Cat dasar KG 0.100 12,766.00 1,276.60
Cat penutup 2 kali KG 0.260 12,766.00 3,319.16
Mandor cat OH 0.0025 205,000.00 512.50
Kepala tukang cat OH 0.006 188,000.00 1,184.40
Tukang cat OH 0.063 168,000.00 10,584.00
Pekerja cat OH 0.020 132,000.00 2,640.00
Jumlah harga pekerjaan 5,708.36 14,920.90 20,629.26
Jumlah harga dibulatkan 20,629.00

4 1 M2 Cat Plafond 2 Lapis dgn cat tembok menggunakan


Pt.T-38-2000-C
Plamur KG 0.100 11,126.00 1,112.60
Cat tembok KG 0.470 12,766.00 6,000.02
Kertas amplas (kayu) Lembar 0.500 5,722.40 2,861.20
Kuas roll Buah 0.010 35,000.00 350.00
Kapek Buah 0.050 5,000.00 250.00
Mandor cat OH 0.0030 205,000.00 615.00
Kepala tukang cat OH 0.004 188,000.00 752.00
Tukang cat OH 0.040 168,000.00 6,720.00
Pekerja cat OH 0.060 132,000.00 7,920.00
Jumlah harga pekerjaan 10,573.82 16,007.00 26,580.82
Jumlah harga dibulatkan 26,580.00

VII PEKERJAAN INSTALASI LISTRIK


1 1 Titik Instalasi Lampu SL 18 - 23 VA+ Pitting
HPS.PU. 2017
Vetting lampu Buah 1.000 18,700.15 18,700.15
Kabel NYA 2x1,5 mm M 7.000 4,630.93 32,416.51
Lampu SL 23 VA Buah 1.000 60,787.85 60,787.85
Klem Kabel Dos 0.200 24,555.95 4,911.19
Isolasi Buah 0.100 13,220.40 1,322.04
Sekrup Dos 0.100 23,658.95 2,365.90
Upah Memasang LS 1.000 60,000.00 60,000.00
Jumlah harga pekerjaan 120,503.64 60,000.00 180,503.64
Jumlah harga dibulatkan 180,503.00

2 1 Titik Instalasi Stop Kontak


HPS.PU. 2017
Stop Kontak Buah 1.000 22,151.30 22,151.30
Kabel NYA 3x2.5 mm M 3.000 12,826.59 38,479.77
Klem Kabel Dos 0.200 24,555.95 4,911.19
Isolasi Buah 0.100 13,220.40 1,322.04
Sekrup Dos 0.100 23,658.95 2,365.90
Upah Memasang LS 1.000 60,000.00 60,000.00
Jumlah harga pekerjaan 69,230.20 60,000.00 129,230.20
Jumlah harga dibulatkan 129,230.00

3 1 Titik Saklar Ganda


HPS.PU. 2017
Saklar Ganda Buah 1.000 25,921.00 25,921.00
Upah Memasang OH 1.000 264,000.00 264,000.00
Alat Bantu + Aksesoris LS 1.000 2,592.10 2,592.10
Jumlah harga pekerjaan 25,921.00 266,592.10 292,513.10
Jumlah harga dibulatkan 292,513.00

4 1 Unit MCB
HPS.PU. 2017
MCB Buah 1.000 45,000.00 45,000.00
Box Buah 1.000 7,500.00 7,500.00
Kabel NYA 3x2.5 mm M 15.000 12,826.59 192,398.85
Klem Kabel Dos 0.400 24,555.95 9,822.38
Isolasi Buah 0.500 13,220.40 6,610.20
Sekrup Dos 0.100 23,658.95 2,365.90
Upah Memasang LS 1.000 60,000.00 60,000.00
Jumlah harga pekerjaan 263,697.33 60,000.00 323,697.33
Jumlah harga dibulatkan 323,697.00

5 1 Titik Saklar Tunggal


HPS.PU. 2017
Saklar Tunggal Buah 1.000 20,432.05 20,432.05
Upah Memasang OH 1.000 264,000.00 264,000.00
Alat Bantu + Aksesoris LS 1.000 2,043.21 2,043.21
Jumlah harga pekerjaan 20,432.05 266,043.21 286,475.26
Jumlah harga dibulatkan 286,475.00
Analisa Harga Satuan Pekerjaan (AHSP) Analisa Yang Dipakai

PERKIRAAN HARGA JUMLAH HARGA


NO. KOMPONEN SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH

IX NITAIR
1 1 Unit Septictank (2x1x1,8cm), Pas. Bata 1PC:4PS, Pasir
HPS.PU. 2017
Galian Tanah Biasa Sedalam 1 - 2 M M3 3.0000 128,025.00 384,075.00
Semen Portland (PC) @ 50 Kg Zak 5.5000 138,941.85 764,180.18
Pasir semen (import) M3 2.5000 1,541,578.45 3,853,946.13
Batu bata Buah 1,216.0000 1,851.50 2,251,424.00
Besi beton dia 10 mm KG 112.4000 15,071.90 1,694,081.56
Kawat ikat beton KG 0.5000 25,028.60 12,514.30
Papan begisting kayu bus M2 2.0000 89,977.35 179,954.70
Besi Pipa Dia 2" PVC M 2.0000 17,699.25 35,398.50
Paku Campur KG 0.1000 19,506.30 1,950.63
Mandor pasir/batu OH 0.2500 205,000.00 51,250.00
Kepala tukang pasir/batu OH 0.5000 188,000.00 94,000.00
Tukang pasir/batu OH 5.0000 168,000.00 840,000.00
Pekerja pasir/batu OH 2.5000 132,000.00 330,000.00
Jumlah harga pekerjaan 9,177,524.99 1,315,250.00 10,492,774.99
Jumlah harga dibulatkan 10,492,774.00

2 1 Unit Bak air Uk. 60 x 60 x 80


HPS.PU. 2017
Pasangan Batu Bata 1PC : 2 PS M3 0.1440 3,328,344.00 479,281.54
Plesteran 1PC : 3PS, tebal 15 mm (import) M2 3.8700 127,759.00 494,427.33
Jumlah harga pekerjaan 973,708.87 - 973,708.87
Jumlah harga dibulatkan 973,708.00

3 1 BH Closet jongkok porselin


RSNI T-15-2002
Closet jongkok porselin Buah 1.0000 722,985.45 722,985.45
Semen Portland (PC) @ 50 Kg KG 6.0000 2,778.84 16,673.02
Pasir semen (lokal) M3 0.0100 1,058,872.85 10,588.73
Pekerja pasir/batu OH 1.0000 132,000.00 132,000.00
Tukang pasir/batu OH 1.5000 168,000.00 252,000.00
Kepala tukang pasir/batu OH 0.1500 188,000.00 28,200.00
Mandor pasir/batu OH 0.1600 205,000.00 32,800.00
Jumlah harga pekerjaan 750,247.20 445,000.00 1,195,247.20
Jumlah harga dibulatkan 1,195,247.00
Analisa Harga Satuan Pekerjaan (AHSP) analisa pembongkaran

P. PEKERJAAN PEMBONGKARAN

PERKIRAAN HARGA JUMLAH HARGA


NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)
1 1 M2 Bongkar dinding 1/2 batu

Pekerja L-4 OH 0.2000 132,000.00 26,400.00


Mandor L-1 OH 0.0100 205,000.00 2,050.00
Jumlah harga pekerjaan - 28,450.00 28,450.00
Jumlah harga dibulatkan 28,450.00

2 M3 Bongkar Beton bertulang


Pekerja L-4 OH 8.0000 132,000.00 1,056,000.00
Tukang L-3 OH 0.1600 168,000.00 26,880.00
Kepala Tukang L-2 OH 0.1600 188,000.00 30,080.00
Mandor L-1 OH 0.4000 205,000.00 82,000.00
Jumlah harga pekerjaan - 1,194,960.00 1,194,960.00
Jumlah harga dibulatkan 1,194,960.00

3 1 M2 Pembongkaran Lantai

Pekerja L-4 OH 0.1000 132,000.00 13,200.00


Mandor L-1 OH 0.0100 205,000.00 2,050.00
Jumlah harga pekerjaan - 15,250.00 15,250.00
Jumlah harga dibulatkan 15,250.00
5 1 M2 Pembongkaran Atap
Pekerja L-4 OH 0.0100 132,000.00 1,320.00
Tukang L-3 OH 0.0500 168,000.00 8,400.00
Jumlah harga pekerjaan - 9,720.00 9,720.00
Jumlah harga dibulatkan 9,720.00
6 1 M2 Pembongkaran Rangka Kuda-kuda Kayu
Kepala Tukang L-2 OH 0.0200 205,000.00 4,100.00
Tukang L-3 OH 0.2000 168,000.00 33,600.00
Pekerja L-4 OH 0.1000 132,000.00 13,200.00
Jumlah harga pekerjaan - 50,900.00 50,900.00
Jumlah harga dibulatkan 50,900.00

7 1 M2 Pembongkaran Gording
Mandor L-1 OH 0.0050 205,000.00 1,025.00
Kepala tukang L-2 OH 0.0250 188,000.00 4,700.00
Tukang L-3 OH 0.0025 168,000.00 420.00
Pekerja L-4 OH 0.1000 132,000.00 13,200.00
Jumlah harga pekerjaan - 19,345.00 19,345.00
Jumlah harga dibulatkan 19,345.00

8 1 M2 Pembongkaran Plafond + Rangka


Mandor L-1 OH 0.0400 205,000.00 8,200.00
Pekerja L-4 OH 0.0400 132,000.00 5,280.00
Jumlah harga pekerjaan - 13,480.00 13,480.00
Jumlah harga dibulatkan 13,480.00

9 1 M' Pembongkaran Lisplank


Mandor L-1 OH 0.0150 205,000.00 3,075.00
Pekerja L-4 OH 0.0300 132,000.00 3,960.00
Jumlah harga pekerjaan - 7,035.00 7,035.00
Jumlah harga dibulatkan 7,035.00

10 1 M3 Pembongkaran Kusen
Kepala tukang L-2 OH 0.1000 188,000.00 18,800.00
Tukang L-3 OH 1.0000 168,000.00 168,000.00
Jumlah harga pekerjaan - 186,800.00 186,800.00
Jumlah harga dibulatkan 186,800.00
Analisa Harga Satuan Pekerjaan (AHSP) A. Pekerjaan Persiapan

ANALISA HARGA SATUAN

### #REF!
### #REF!
### #REF!
A. PEKERJAAN PERSIAPAN
PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)
1 1 M2 Membersihkan Lapangan dan Perataan PU.A.1
RSNI T-12-2002
Pekerja L-4 OH 0.1000 132,000.00 13,200.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
Jumlah harga pekerjaan - 14,225.00 14,225.00
Jumlah harga dibulatkan 14,225.00

2 1 M' Pengukuran dan Pasangan Bouwplank PU.A.2


RSNI T-12-2002
Balok Kayu Bus MC.1 M3 0.0120 3,599,094.05 43,189.13
Kayu Papan Bus MC.5 M3 0.0070 3,599,094.05 25,193.66
Paku Biasa Campur 2" - 5" MD.16 KG 0.0200 19,506.30 390.13
Pekerja kayu L-4 OH 0.1000 132,000.00 13,200.00
Tukang kayu L-3 OH 0.1000 168,000.00 16,800.00
Kepala Tukang Kayu L-2 OH 0.0100 188,000.00 1,880.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
Jumlah harga pekerjaan 68,772.91 32,905.00 101,677.91
Jumlah harga dibulatkan 101,677.00

3 1 M3 Galian Tanah Biasa PU.A.3


SNI 2835:2008
Pekerja L-4 OH 0.7500 132,000.00 99,000.00
Mandor L-1 OH 0.0250 205,000.00 5,125.00
Jumlah harga pekerjaan - 104,125.00 104,125.00
Jumlah harga dibulatkan 104,125.00
4 1 M3 Urug Kembali Tanah Biasa PU.A.4
SNI 2835:2008
Dihitung 1/3 kali 1/3 M3 0.3333 104,125.00 34,708.33
Jumlah harga dibulatkan 34,708.00
5 1 M3 Timbunan dan pemadatan Tanah Pilihan (Mekanis) - Stamper PU.A.5
HPS.PU. 2017
Tanah pilihan (Selmat) MB.5 M3 1.2000 436,596.35 523,915.62
Pekerja L-4 Jam 0.3200 18,858.00 6,034.56
Mandor (F. Equipment) L-5 Jam 0.3200 32,858.00 10,514.56
Stamper E - 15 Jam 0.3200 64,537.00 20,651.84
Jumlah harga pekerjaan 523,915.62 37,200.96 561,116.58
Jumlah harga dibulatkan 561,116.00
6 1 M3 Urugan Pasir Bawah Pondasi/Lantai/Konstruksi PU.A.6
SNI 2835:2008
Pasir semen (lokal) MB.2 M3 1.2000 1,058,872.85 1,270,647.42
Pekerja L-4 OH 0.3000 132,000.00 39,600.00
Mandor L-1 OH 0.0100 205,000.00 2,050.00
Jumlah harga pekerjaan 1,270,647.42 41,650.00 1,312,297.42
Jumlah harga dibulatkan 1,312,297.00

7 1 M3 Pasangan Bata, Camp. 1PC : 2PS - Pasir Import PU.A.7


HPS.PU. 2017
Batu bata MB.8 Buah 649.0000 1,851.50 1,201,623.50
Semen Portland (PC) @ 50 Kg MB.11 Zak 5.7165 138,941.85 794,261.09
Pasir semen (import) MB.1 M3 0.4083 1,541,578.45 629,459.51
Mandor pasir/batu L-1 OH 0.1429 205,000.00 29,285.71
Kepala tukang pasir/batu L-2 OH 0.4286 188,000.00 80,571.43
Tukang pasir/batu L-3 OH 1.2857 168,000.00 216,000.00
Pekerja pasir/batu L-4 OH 2.8571 132,000.00 377,142.86
Jumlah harga pekerjaan 2,625,344.10 703,000.00 3,328,344.10
Jumlah harga dibulatkan 3,328,344.00

8 1 M3 Pasangan Bata, Camp. 1PC : 3PS - Pasir Import PU.A.8


HPS.PU. 2017
Batu bata MB.8 Buah 649.0000 1,851.50 1,201,623.50
Semen Portland (PC) @ 50 Kg MB.11 Zak 4.2874 138,941.85 595,695.81
Pasir semen (import) MB.1 M3 0.4594 1,541,578.45 708,141.95
Mandor pasir/batu L-1 OH 0.1429 205,000.00 29,285.71
Kepala tukang pasir/batu L-2 OH 0.4286 188,000.00 80,571.43
Tukang pasir/batu L-3 OH 1.2857 168,000.00 216,000.00
Pekerja pasir/batu L-4 OH 2.8571 132,000.00 377,142.86
Jumlah harga pekerjaan 2,505,461.27 703,000.00 3,208,461.27
Jumlah harga dibulatkan 3,208,461.00

9 1 M3 Pasangan Bata, Camp. 1PC : 4PS - Pasir Import PU.A.9


HPS.PU. 2017
Batu bata MB.8 Buah 649.0000 1,851.50 1,201,623.50
Semen Portland (PC) @ 50 Kg MB.11 Zak 3.4299 138,941.85 476,556.65
Pasir semen (import) MB.1 M3 0.4900 1,541,578.45 755,351.42
Mandor pasir/batu L-1 OH 0.1429 205,000.00 29,285.71
Kepala tukang pasir/batu L-2 OH 0.4286 188,000.00 80,571.43
Tukang pasir/batu L-3 OH 1.2857 168,000.00 216,000.00
Pekerja pasir/batu L-4 OH 2.8571 132,000.00 377,142.86
Jumlah harga pekerjaan 2,433,531.57 703,000.00 3,136,531.57
Jumlah harga dibulatkan 3,136,531.00
Analisa Harga Satuan Pekerjaan (AHSP) A. Pekerjaan Persiapan

PERKIRAAN HARGA JUMLAH HARGA


NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)
10 1 M3 Pasangan Bata, Camp. 1PC : 2PS - Pasir Lokal PU.A.10
HPS.PU. 2017
Batu bata MB.8 Buah 649.0000 1,851.50 1,201,623.50
Semen Portland (PC) @ 50 Kg MB.11 Zak 5.7165 138,941.85 794,261.09
Pasir semen (lokal) MB.2 M3 0.4083 1,058,872.85 432,360.47
Mandor pasir/batu L-1 OH 0.1429 205,000.00 29,285.71
Kepala tukang pasir/batu L-2 OH 0.4286 188,000.00 80,571.43
Tukang pasir/batu L-3 OH 1.2857 168,000.00 216,000.00
Pekerja pasir/batu L-4 OH 2.8571 132,000.00 377,142.86
Jumlah harga pekerjaan 2,428,245.06 703,000.00 3,131,245.06
Jumlah harga dibulatkan 3,131,245.00

11 1 M3 Pasangan Bata, Camp. 1PC : 3PS - Pasir Lokal PU.A.11


HPS.PU. 2017
Batu bata MB.8 Buah 649.0000 1,851.50 1,201,623.50
Semen Portland (PC) @ 50 Kg MB.11 Zak 4.2874 138,941.85 595,695.81
Pasir semen (lokal) MB.2 M3 0.4594 1,058,872.85 486,405.53
Mandor pasir/batu L-1 OH 0.1429 205,000.00 29,285.71
Kepala tukang pasir/batu L-2 OH 0.4286 188,000.00 80,571.43
Tukang pasir/batu L-3 OH 1.2857 168,000.00 216,000.00
Pekerja pasir/batu L-4 OH 2.8571 132,000.00 377,142.86
Jumlah harga pekerjaan 2,283,724.85 703,000.00 2,986,724.85
Jumlah harga dibulatkan 2,986,724.00

12 1 M3 Pasangan Bata, Camp. 1PC : 4PS - Pasir Lokal PU.A.12


HPS.PU. 2017
Batu bata MB.8 Buah 649.0000 1,851.50 1,201,623.50
Semen Portland (PC) @ 50 Kg MB.11 Zak 3.4299 138,941.85 476,556.65
Pasir semen (lokal) MB.2 M3 0.4900 1,058,872.85 518,832.57
Mandor pasir/batu L-1 OH 0.1429 205,000.00 29,285.71
Kepala tukang pasir/batu L-2 OH 0.4286 188,000.00 80,571.43
Tukang pasir/batu L-3 OH 1.2857 168,000.00 216,000.00
Pekerja pasir/batu L-4 OH 2.8571 132,000.00 377,142.86
Jumlah harga pekerjaan 2,197,012.72 703,000.00 2,900,012.72
Jumlah harga dibulatkan 2,900,012.00

13 1 M3 Pondasi Pasangan Batu Belah, 1PC : 3PS PU.A.13


SNI 2836:2008
Batu Kali / Batu Belah 15/20 MB.7 M3 1.2000 1,732,792.40 2,079,350.88
Semen Portland (PC) @ 50 Kg MB.11 KG 202.0000 2,778.84 561,325.07
Pasir Semen (import) MB.1 M3 0.4850 1,541,578.45 747,665.55
Mandor pasir/batu L-1 OH 0.0750 205,000.00 15,375.00
Kepala tukang pasir/batu L-2 OH 0.0750 188,000.00 14,100.00
Tukang pasir/batu L-3 OH 0.7500 168,000.00 126,000.00
Pekerja pasir/batu L-4 OH 1.5000 132,000.00 198,000.00
Jumlah harga pekerjaan 3,388,341.50 353,475.00 3,741,816.50
Jumlah harga dibulatkan 3,741,816.00

14 1 M3 Pondasi Pasangan Batu Belah, 1PC : 4PS PU.A.14


SNI 2836:2008
Batu Kali / Batu Belah 15/20 MB.7 M3 1.2000 1,732,792.40 2,079,350.88
Semen Portland (PC) @ 50 Kg MB.11 KG 163.0000 2,778.84 452,950.43
Pasir Semen (import) MB.1 M3 0.5200 1,541,578.45 801,620.79
Mandor pasir/batu L-1 OH 0.0750 205,000.00 15,375.00
Kepala tukang pasir/batu L-2 OH 0.0750 188,000.00 14,100.00
Tukang pasir/batu L-3 OH 0.7500 168,000.00 126,000.00
Pekerja pasir/batu L-4 OH 1.5000 132,000.00 198,000.00
Jumlah harga pekerjaan 3,333,922.11 353,475.00 3,687,397.11
Jumlah harga dibulatkan 3,687,397.00

15 1 M3 Pasangan Pondasi Batu Kosong (Anstamping) PU.A.15


SNI 2836:2008
Batu Kali / Batu Belah 15/20 MB.7 M3 1.2000 1,732,792.40 2,079,350.88
Pasir Urug (tanah pilihan) MB.5 M3 0.4320 436,596.35 188,609.62
Mandor pasir/batu L-1 OH 0.0390 205,000.00 7,995.00
Kepala tukang pasir/batu L-2 OH 0.0390 188,000.00 7,332.00
Tukang pasir/batu L-3 OH 0.3900 168,000.00 65,520.00
Pekerja pasir/batu L-4 OH 0.7800 132,000.00 102,960.00
Jumlah harga pekerjaan 2,267,960.50 183,807.00 2,451,767.50
Jumlah harga dibulatkan 2,451,767.00

16 1 M3 Pasangan Bata, Camp. 1PC : 3PS - Pasir Import PU.16


HPS.PU. 2017
Batu bata MB.8 Buah 649.000 1,851.50 1,201,623.50
Semen Portland (PC) @ 50 Kg MB.11 Zak 4.287 138,941.85 595,695.81
Pasir semen (Lokal) MB.1 M3 0.459 1,058,872.85 486,405.53
Mandor pasir/batu L-1 OH 0.143 205,000.00 29,285.71
Kepala tukang pasir/batu L-2 OH 0.429 188,000.00 80,571.43
Tukang pasir/batu L-3 OH 1.286 168,000.00 216,000.00
Pekerja pasir/batu L-4 OH 2.857 132,000.00 377,142.86
Jumlah harga pekerjaan 2,283,724.85 703,000.00 2,986,724.85
Jumlah harga dibulatkan 2,986,724.00
1 1 M3 Campuran beton 1PC : 2PS : 3KR, Import (mekanis) PU.1
HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 Zak 7.500 138,941.85 1,042,063.88
Pasir semen (import) MB.1 M3 0.536 1,541,578.45 825,845.60
Kerikil/batu pecah (import) MB.6 M3 0.833 1,567,479.90 1,306,233.25
Mandor L-1 Jam 1.600 29,286.00 46,857.60
Kepala tukang L-2 Jam 1.600 26,858.00 42,972.80
Tukang pasir/batu L-3 Jam 4.800 24,000.00 115,200.00
Pekerja L-4 Jam 16.000 18,858.00 301,728.00
Concrete Mixer E-8 Jam 1.600 85,665.00 137,064.00
Truck tanki air E - 10 Jam 0.068 379,191.00 25,698.19
Water Pump E-9 Jam 1.600 61,861.00 98,977.60
Alat bantu Set 1.000 5,000.00 5,000.00
Jumlah harga pekerjaan 3,174,142.72 773,498.19 3,947,640.91
Jumlah harga dibulatkan 3,947,640.00
Analisa Harga Satuan Pekerjaan (AHSP) A. Pekerjaan Persiapan

PERKIRAAN HARGA JUMLAH HARGA


NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)
2 1 M3 Campuran Beton 1PC : 3PS - Pasir Import (mekanis) PU.2
HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 Zak 11.2500 138,941.85 1,563,095.81
Pasir semen (import) MB.1 M3 1.2054 1,541,578.45 1,858,152.60
Mandor L-1 Jam 1.6000 29,286.00 46,857.60
Kepala tukang L-2 Jam 1.6000 26,858.00 42,972.80
Tukang pasir/batu L-3 Jam 4.8000 24,000.00 115,200.00
Pekerja L-4 Jam 16.0000 18,858.00 301,728.00
Concrete Mixer E-8 Jam 1.6000 85,665.00 137,064.00
Truck tanki air E - 10 Jam 0.1288 379,191.00 48,826.55
Water Pump E-9 Jam 1.6000 61,861.00 98,977.60
Alat bantu Set 1.0000 5,000.00 5,000.00
Jumlah harga pekerjaan 3,421,248.41 796,626.55 4,217,874.96
Jumlah harga dibulatkan 4,217,874.00

1 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/2 Bata, 1PC : 3PS - Pasir Lokal PU.1
HPS.PU. 2017
Bata merah (5 x 10 x 20) cm MB.8 Buah 70.0000 1,851.50 129,605.00
Semen Portland (PC) @ 50 Kg MB.11 Zak 0.4579 138,941.85 63,618.00
Pasir semen (Lokal) MB.1 M3 0.0491 1,058,872.85 51,946.22
Pekerja pasir/batu L-4 OH 0.0143 132,000.00 1,885.71
Tukang pasir/batu L-3 OH 0.0429 168,000.00 7,200.00
Kepala tukang pasir/batu L-2 OH 0.1286 188,000.00 24,171.43
Mandor pasir/batu L-1 OH 0.2857 205,000.00 58,571.43
Jumlah harga pekerjaan 245,169.22 91,828.57 336,997.79
Jumlah harga dibulatkan 336,997.00

1 1 M2 Plesteran 1PC : 3PS, Tebal 15 mm - Pasir Import PU.1


SNI 2837:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 7.7760 2,778.84 21,608.24
Pasir semen (import) MB.1 M3 0.0230 1,541,578.45 35,456.30
Pekerja pasir/batu L-4 OH 0.3000 132,000.00 39,600.00
Tukang pasir/batu L-3 OH 0.1500 168,000.00 25,200.00
Kepala tukang pasir/batu L-2 OH 0.0150 188,000.00 2,820.00
Mandor pasir/batu L-1 OH 0.0150 205,000.00 3,075.00
Jumlah harga pekerjaan 57,064.54 70,695.00 127,759.54
Jumlah harga dibulatkan 127,759.00

1 1 M2 Lantai Keramik Ukuran 60 x 60 cm PU.1


SNI 7395-2008
Keramik 60x60 MF.8 Buah 3.3333 89,323.95 297,746.50
Semen Portland (PC) @ 50 Kg MB.11 KG 19.6000 2,778.84 54,465.21
Pasir Semen (Import) MB.2 M3 0.0900 1,541,578.45 138,742.06
Semen Warna MB.12 KG 1.3000 8,848.16 11,502.60
Pekerja L-4 OH 0.2500 132,000.00 33,000.00
Tukang batu L-3 OH 0.1250 168,000.00 21,000.00
Kepala tukang L-2 OH 0.0130 188,000.00 2,444.00
Mandor L-1 OH 0.0130 205,000.00 2,665.00
502,456.37 59,109.00 561,565.37
Jumlah harga dibulatkan 561,565.00

1 1 M2 Pasang Paving Block PU.1


HPS.PU. 2017
Paving blok (10 x 20 cm) M2 1.0100 376,912.50 380,681.63
Pasir semen (lokal) MB.2 M3 0.1000 1,058,872.85 105,887.29
Pekerja L-4 OH 0.2000 132,000.00 26,400.00
Tukang batu L-3 OH 0.3000 168,000.00 50,400.00
Kepala tukang L-2 OH 0.0300 188,000.00 5,640.00
Mandor L-1 OH 0.0250 205,000.00 5,125.00
Peralatan LS 0.0500 10,000.00 500.00
486,568.91 88,065.00 574,633.91
Jumlah harga dibulatkan 574,633.00

2 1 M2 Dinding Batu Tempel Hitam PU.2


SNI 7395-2008
Batu Tempel Hitam MF.53 M2 1.1000 191,895.00 211,084.50
Semen Portland (PC) @ 50 Kg MB.11 KG 11.7500 2,778.84 32,651.33
Pasir Semen (lokal) MB.2 M3 0.0350 1,058,872.85 37,060.55
Pekerja L-4 OH 0.7000 132,000.00 92,400.00
Tukang batu L-3 OH 0.3500 168,000.00 58,800.00
Kepala tukang L-2 OH 0.0350 188,000.00 6,580.00
Mandor L-1 OH 0.0350 205,000.00 7,175.00
280,796.38 164,955.00 445,751.38
Jumlah harga dibulatkan 445,751.00
1 1 M2 Lantai Ubin PC Teraso Ukuran 40 x 40 cm PU.1
SNI 7395-2008
Ubin Teraso Ukuran 40 x 40 cm MF.8 Buah 6.6300 18,521.90 122,800.20
Semen Portland (PC) @ 50 Kg MB.11 KG 9.8000 2,778.84 27,232.60
Pasir Semen (Import) MB.2 M3 0.0450 1,541,578.45 69,371.03
Semen Warna MB.12 KG 1.3000 8,848.16 11,502.60
Pekerja L-4 OH 0.2500 132,000.00 33,000.00
Tukang batu L-3 OH 0.1250 168,000.00 21,000.00
Kepala tukang L-2 OH 0.0130 188,000.00 2,444.00
Mandor L-1 OH 0.0130 205,000.00 2,665.00
230,906.43 59,109.00 290,015.43
Jumlah harga dibulatkan 290,015.00

2 1 KG Pembesian Besi polos/ulir Ø. 6 mm SNI PU.2


SNI 7394:2008
Besi Beton Dia.6 SNI (P=12 m) MD.1 KG 1.0500 16,423.15 17,244.31
Kawat beton MD.9 Kg 0.0150 25,028.60 375.43
Pekerja L-4 OH 0.0070 132,000.00 924.00
Tukang besi L-3 OH 0.0070 168,000.00 1,176.00
Kepala tukang L-2 OH 0.0007 188,000.00 131.60
Mandor L-1 OH 0.0004 205,000.00 82.00
Jumlah harga pekerjaan 17,619.74 2,313.60 19,933.34
Jumlah harga dibulatkan 19,933.00

3 1 KG Pembesian Besi polos/ulir Ø. 8 mm SNI PU.3


SNI 7394:2008
Besi Beton Dia.8 SNI (P=12 m) MD.2 KG 1.0500 14,947.70 15,695.09
Kawat beton MD.9 Kg 0.0150 25,028.60 375.43
Pekerja L-4 OH 0.0070 132,000.00 924.00
Tukang besi L-3 OH 0.0070 168,000.00 1,176.00
Kepala tukang L-2 OH 0.0007 188,000.00 131.60
Mandor L-1 OH 0.0004 205,000.00 82.00
Jumlah harga pekerjaan 16,070.51 2,313.60 18,384.11
Jumlah harga dibulatkan 18,384.00
Analisa Harga Satuan Pekerjaan (AHSP) A. Pekerjaan Persiapan

PERKIRAAN HARGA JUMLAH HARGA


NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)
4 1 KG Pembesian Besi polos/ulir Ø. 10 mm SNI PU.4
SNI 7394:2008
Besi Beton Dia.10 SNI (P=12 m) MD.3 KG 1.0500 15,071.90 15,825.50
Kawat beton MD.9 Kg 0.0150 25,028.60 375.43
Pekerja L-4 OH 0.0070 132,000.00 924.00
Tukang besi L-3 OH 0.0070 168,000.00 1,176.00
Kepala tukang L-2 OH 0.0007 188,000.00 131.60
Mandor L-1 OH 0.0004 205,000.00 82.00
Jumlah harga pekerjaan 16,200.92 2,313.60 18,514.52
Jumlah harga dibulatkan 18,514.00

5 1 KG Pembesian Besi polos/ulir Ø. 12 mm SNI PU.5


SNI 7394:2008
Besi Beton Dia.12 SNI (P=12 m) MD.4 KG 1.0500 15,364.00 16,132.20
Kawat beton MD.9 Kg 0.0150 25,028.60 375.43
Pekerja L-4 OH 0.0070 132,000.00 924.00
Tukang besi L-3 OH 0.0070 168,000.00 1,176.00
Kepala tukang L-2 OH 0.0007 188,000.00 131.60
Mandor L-1 OH 0.0004 205,000.00 82.00
Jumlah harga pekerjaan 16,507.63 2,313.60 18,821.23
Jumlah harga dibulatkan 18,821.00

6 1 KG Pembesian Besi polos/ulir Ø. 14 mm SNI PU.6


SNI 7394:2008
Besi Beton Dia.14 SNI (P=12 m) MD.5 KG 1.0500 12,988.10 13,637.51
Kawat beton MD.9 Kg 0.0150 25,028.60 375.43
Pekerja L-4 OH 0.0070 132,000.00 924.00
Tukang besi L-3 OH 0.0070 168,000.00 1,176.00
Kepala tukang L-2 OH 0.0007 188,000.00 131.60
Mandor L-1 OH 0.0004 205,000.00 82.00
Jumlah harga pekerjaan 14,012.93 2,313.60 16,326.53
Jumlah harga dibulatkan 16,326.00

7 1 KG Pembesian Besi polos/ulir Ø. 16 mm SNI PU.7


SNI 7394:2008
Besi Beton Dia.16 SNI (P=12 m) MD.6 KG 1.0500 14,725.75 15,462.04
Kawat beton MD.9 Kg 0.0150 25,028.60 375.43
Pekerja L-4 OH 0.0070 132,000.00 924.00
Tukang besi L-3 OH 0.0070 168,000.00 1,176.00
Kepala tukang L-2 OH 0.0007 188,000.00 131.60
Mandor L-1 OH 0.0004 205,000.00 82.00
Jumlah harga pekerjaan 15,837.47 2,313.60 18,151.07
Jumlah harga dibulatkan 18,151.00

8 1 KG Pembesian Besi polos/ulir Ø. 19 mm SNI PU.8


SNI 7394:2008
Besi Beton Dia.19 SNI (P=12 m) MD.7 KG 1.0500 14,154.20 14,861.91
Kawat beton MD.9 Kg 0.0150 25,028.60 375.43
Pekerja L-4 OH 0.0070 132,000.00 924.00
Tukang besi L-3 OH 0.0070 168,000.00 1,176.00
Kepala tukang L-2 OH 0.0007 188,000.00 131.60
Mandor L-1 OH 0.0004 205,000.00 82.00
Jumlah harga pekerjaan 15,237.34 2,313.60 17,550.94
Jumlah harga dibulatkan 17,550.00

9 1 KG Pembesian Besi polos/ulir Ø. 22 mm SNI PU.9


SNI 7394:2008
Besi Beton Dia.22 SNI (P=12 m) MD.8 KG 1.0500 13,674.65 14,358.38
Kawat beton MD.9 Kg 0.0150 25,028.60 375.43
Pekerja L-4 OH 0.0070 132,000.00 924.00
Tukang besi L-3 OH 0.0070 168,000.00 1,176.00
Kepala tukang L-2 OH 0.0007 188,000.00 131.60
Mandor L-1 OH 0.0004 205,000.00 82.00
Jumlah harga pekerjaan 14,733.81 2,313.60 17,047.41
Jumlah harga dibulatkan 17,047.00

10 1 M2 Bekisting untuk Pondasi PU.10


SNI 7394:2008
Kayu Bekisting Kelas 3 MC.5 M3 0.0400 3,599,094.05 143,963.76
Paku Campur Biasa 5 cm - 10 cm MD.16 KG 0.3000 19,506.30 5,851.89
Minyak Bekisting/oli bekas MA.5 Liter 0.1000 1,104.00 110.40
Pekerja Kayu L-4 OH 0.5200 132,000.00 68,640.00
Tukang Kayu L-3 OH 0.2600 168,000.00 43,680.00
Kepala Tukang Kayu L-2 OH 0.0260 188,000.00 4,888.00
Mandor L-1 OH 0.0260 205,000.00 5,330.00
Jumlah harga pekerjaan 149,926.05 122,538.00 272,464.05
Jumlah harga dibulatkan 272,464.00

11 1 M2 Bekisting untuk Sloof PU.11


SNI 7394:2008
Kayu Bekisting Kelas 3 MC.5 M3 0.0450 3,599,094.05 161,959.23
Paku Campur Biasa 5 cm - 10 cm MD.16 KG 0.3000 19,506.30 5,851.89
Minyak Bekisting/oli bekas MA.5 Liter 0.1000 1,104.00 110.40
Pekerja Kayu L-4 OH 0.5200 132,000.00 68,640.00
Tukang Kayu L-3 OH 0.2600 168,000.00 43,680.00
Kepala Tukang Kayu L-2 OH 0.0260 188,000.00 4,888.00
Mandor L-1 OH 0.0260 205,000.00 5,330.00
Analisa Harga Satuan Pekerjaan (AHSP) A. Pekerjaan Persiapan

PERKIRAAN HARGA JUMLAH HARGA


NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)
Jumlah harga pekerjaan 167,921.52 122,538.00 290,459.52
Jumlah harga dibulatkan 290,459.00

12 1 M2 Bekisting untuk Kolom PU.12


SNI 7394:2008
Kayu Bekisting Kelas 3 MC.5 M3 0.0400 3,599,094.05 143,963.76
Paku Campur Biasa 5 cm - 10 cm MD.16 KG 0.4000 19,506.30 7,802.52
Minyak Bekisting/oli bekas MA.5 Liter 0.2000 1,104.00 220.80
Balok Kayu Kelas 2 MC.2 M3 0.0150 4,729,266.90 70,939.00
Plywood 9 mm MC.21 Lembar 0.3500 382,717.70 133,951.20
Kayu dolken Ø 8-10, Panjang 400 cm - Kayu Kelas 3 MC.32 Batang 2.0000 21,503.85 43,007.70
Pekerja Kayu L-4 OH 0.6600 132,000.00 87,120.00
Tukang Kayu L-3 OH 0.3300 168,000.00 55,440.00
Kepala Tukang Kayu L-2 OH 0.0330 188,000.00 6,204.00
Mandor L-1 OH 0.0330 205,000.00 6,765.00
Jumlah harga pekerjaan 399,884.98 155,529.00 555,413.98
Jumlah harga dibulatkan 555,413.00

13 1 M2 Bekisting untuk Balok PU.13


SNI 7394:2008
Kayu Bekisting Kelas 3 MC.5 M3 0.0400 3,599,094.05 143,963.76
Paku Campur Biasa 5 cm - 10 cm MD.16 KG 0.4000 19,506.30 7,802.52
Minyak Bekisting/oli bekas MA.5 Liter 0.2000 1,104.00 220.80
Balok Kayu Kelas 2 MC.2 M3 0.0180 4,729,266.90 85,126.80
Plywood 9 mm MC.21 Lembar 0.3500 382,717.70 133,951.20
Kayu dolken Ø 8-10, Panjang 400 cm - Kayu Kelas 3 MC.32 Batang 2.0000 21,503.85 43,007.70
Pekerja Kayu L-4 OH 0.6600 132,000.00 87,120.00
Tukang Kayu L-3 OH 0.3300 168,000.00 55,440.00
Kepala Tukang Kayu L-2 OH 0.0330 188,000.00 6,204.00
Mandor L-1 OH 0.0330 205,000.00 6,765.00
Jumlah harga pekerjaan 414,072.78 155,529.00 569,601.78
Jumlah harga dibulatkan 569,601.00

14 1 M2 Bekisting untuk Pelat Lantai PU.14


SNI 7394:2008
Kayu Bekisting Kelas 3 MC.5 M3 0.0400 3,599,094.05 143,963.76
Paku Campur Biasa 5 cm - 10 cm MD.16 KG 0.4000 19,506.30 7,802.52
Minyak Bekisting/oli bekas MA.5 Liter 0.2000 1,104.00 220.80
Balok Kayu Kelas 2 MC.2 M3 0.0150 4,729,266.90 70,939.00
Plywood 9 mm MC.21 Lembar 0.3500 382,717.70 133,951.20
Kayu dolken Ø 8-10, Panjang 400 cm - Kayu Kelas 3 MC.32 Batang 6.0000 21,503.85 129,023.10
Pekerja Kayu L-4 OH 0.6600 132,000.00 87,120.00
Tukang Kayu L-3 OH 0.3300 168,000.00 55,440.00
Kepala Tukang Kayu L-2 OH 0.0330 188,000.00 6,204.00
Mandor L-1 OH 0.0330 205,000.00 6,765.00
Jumlah harga pekerjaan 485,900.38 155,529.00 641,429.38
Jumlah harga dibulatkan 641,429.00

15 1 M2 Bekisting untuk Pelat Dinding PU.15


SNI 7394:2008
Kayu Bekisting Kelas 3 MC.5 M3 0.0300 3,599,094.05 107,972.82
Paku Campur Biasa 5 cm - 10 cm MD.16 KG 0.4000 19,506.30 7,802.52
Minyak Bekisting/oli bekas MA.5 Liter 0.2000 1,104.00 220.80
Balok Kayu Kelas 2 MC.2 M3 0.0200 4,729,266.90 94,585.34
Plywood 9 mm MC.21 Lembar 0.3500 382,717.70 133,951.20
Kayu dolken Ø 8-10, Panjang 400 cm - Kayu Kelas 3 MC.32 Batang 3.0000 21,503.85 64,511.55
Formite/penjaga jarak bekisting/spacer Buah 4.0000 20,000.00 80,000.00
Pekerja Kayu L-4 OH 0.6600 132,000.00 87,120.00
Tukang Kayu L-3 OH 0.3300 168,000.00 55,440.00
Kepala Tukang Kayu L-2 OH 0.0330 188,000.00 6,204.00
Mandor L-1 OH 0.0330 205,000.00 6,765.00
Jumlah harga pekerjaan 489,044.22 155,529.00 644,573.22
Jumlah harga dibulatkan 644,573.00

16 1 M2 Bekisting untuk Tangga PU.16


SNI 7394:2008
Kayu Bekisting Kelas 3 MC.5 M3 0.0300 3,599,094.05 107,972.82
Paku Campur Biasa 5 cm - 10 cm MD.16 KG 0.4000 19,506.30 7,802.52
Minyak Bekisting/oli bekas MA.5 Liter 0.1500 1,104.00 165.60
Balok Kayu Kelas 2 MC.2 M3 0.0150 4,729,266.90 70,939.00
Plywood 9 mm MC.21 Lembar 0.3500 382,717.70 133,951.20
Kayu dolken Ø 8-10, Panjang 400 cm - Kayu Kelas 3 MC.32 Batang 2.0000 21,503.85 43,007.70
Pekerja Kayu L-4 OH 0.6600 132,000.00 87,120.00
Tukang Kayu L-3 OH 0.3300 168,000.00 55,440.00
Kepala Tukang Kayu L-2 OH 0.0330 188,000.00 6,204.00
Mandor L-1 OH 0.0330 205,000.00 6,765.00
Jumlah harga pekerjaan 363,838.84 155,529.00 519,367.84
Jumlah harga dibulatkan 519,367.00

1 1 M2 Rangka Plafond (60 x 60), Kayu Kelas III PU.1


SNI 3434:2008
Balok Kayu Kelas III (Kayu Bus) MC.1 M3 0.0163 3,599,094.05 58,665.23
Paku Campuran MD.16 KG 0.2500 19,506.30 4,876.58
Pekerja Kayu L-4 OH 0.2000 132,000.00 26,400.00
Tukang Kayu L-3 OH 0.3000 168,000.00 50,400.00
Kepala Tukang L-2 OH 0.0300 188,000.00 5,640.00
Mandor L-1 OH 0.0100 205,000.00 2,050.00
Jumlah harga pekerjaan 63,541.81 84,490.00 148,031.81
Jumlah harga dibulatkan 148,031.00

1 1 M3 Kusen Pintu dan Jendela Kayu Kelas II PU.1


SNI 3434:2008
Balok Kayu Kelas II (Kayu Rahay) MC.2 M3 1.2000 4,729,266.90 5,675,120.28
Paku Campuran MD.16 KG 1.2500 19,506.30 24,382.88
Lem Kayu MN.1 KG 1.0000 51,934.00 51,934.00
Pekerja Kayu L-4 OH 6.0000 132,000.00 792,000.00
Tukang Kayu L-3 OH 18.0000 168,000.00 3,024,000.00
Kepala Tukang L-2 OH 1.8000 188,000.00 338,400.00
Mandor L-1 OH 0.3000 205,000.00 61,500.00
Jumlah harga pekerjaan 5,751,437.16 4,215,900.00 9,967,337.16
Jumlah harga dibulatkan 9,967,337.00
Analisa Harga Satuan Pekerjaan (AHSP) A. Pekerjaan Persiapan

PERKIRAAN HARGA JUMLAH HARGA


NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

1 1 M2 Jalusi Kusen, Kayu Kelas II PU.1


SNI 3434:2008
Papan Kayu Kelas II (Kayu Rahay) tebal = 2 Cm MC.6 M3 0.0600 4,839,477.15 290,368.63
Paku Campuran MD.16 KG 0.1500 19,506.30 2,925.95
Pekerja Kayu L-4 OH 0.6700 132,000.00 88,440.00
Tukang Kayu L-3 OH 2.0000 168,000.00 336,000.00
Kepala Tukang L-2 OH 0.2000 188,000.00 37,600.00
Mandor L-1 OH 0.3350 205,000.00 68,675.00
Jumlah harga pekerjaan 293,294.57 530,715.00 824,009.57
Jumlah harga dibulatkan 824,009.00

1 1 M2 Rangka Dinding Pemisah Plywood Rangkap, PU.1


SNI 3434:2008
Rangka Kayu Kelas II
Balok Kayu Kelas II (Kayu Rahay) MC.2 M3 0.0280 4,729,266.90 132,419.47
Paku Campuran MD.16 KG 0.1500 19,506.30 2,925.95
Plywood - Tripleks (1,22 x 2,44) cm - tebal 4 mm MC.12 Lembar 0.8600 293,927.35 252,777.52
Lem kayu (putih) Fox MN.1 KG 0.5600 51,934.00 29,083.04
Pekerja Kayu L-4 OH 0.2000 132,000.00 26,400.00
Tukang Kayu L-3 OH 0.6000 168,000.00 100,800.00
Kepala Tukang L-2 OH 0.0600 188,000.00 11,280.00
Mandor L-1 OH 0.0100 205,000.00 2,050.00
Jumlah harga pekerjaan 417,205.98 140,530.00 557,735.98
Jumlah harga dibulatkan 557,735.00

1 1 M2 Penutup Atap Genteng Metal - Multiroof PU.1


SNI 03-3436-2002
Genteng Metal - Multiroof ME.8 Lembar 1.0500 73,441.30 77,113.37
Paku Campuran MD.16 KG 0.2000 19,506.30 3,901.26
Pekerja L-4 OH 0.2000 132,000.00 26,400.00
Tukang Kayu L-3 OH 0.1000 168,000.00 16,800.00
Kepala Tukang L-2 OH 0.0100 188,000.00 1,880.00
Mandor L-1 OH 0.0010 205,000.00 205.00
Jumlah harga pekerjaan 81,014.63 45,285.00 126,299.63
Jumlah harga dibulatkan 126,299.00

2 1 M' Bubungan/Nok Atap Genteng Metal - Multiroof PU.2


SNI 03-3436-2002
Bubungan Genteng Metal - Multiroof ME.9 Buah 1.1000 55,148.25 60,663.08
Paku Campuran MD.16 KG 0.0500 19,506.30 975.32
Pekerja L-4 OH 0.2500 132,000.00 33,000.00
Tukang Kayu L-3 OH 0.1500 168,000.00 25,200.00
Kepala Tukang L-2 OH 0.0150 188,000.00 2,820.00
Mandor L-1 OH 0.0130 205,000.00 2,665.00
Jumlah harga pekerjaan 61,638.39 63,685.00 125,323.39
Jumlah harga dibulatkan 125,323.00

3 1 M2 Penutup Atap Alumunium Gelombang PU.3


SNI 03-3436-2002
Atap Allumunium Gelombang ME.10 M2 1.1000 80,605.80 88,666.38
Angker / Baut MD.33 Buah 2.0000 6,413.55 12,827.10
Pekerja L-4 OH 0.1200 132,000.00 15,840.00
Tukang Kayu L-3 OH 0.0600 168,000.00 10,080.00
Kepala Tukang L-2 OH 0.0060 188,000.00 1,128.00
Mandor L-1 OH 0.0060 205,000.00 1,230.00
Jumlah harga pekerjaan 101,493.48 28,278.00 129,771.48
Jumlah harga dibulatkan 129,771.00

4 1 M' Bubungan/Nok Atap Alumunium Gelombang PU.4


SNI 03-3436-2002
Nok Atap Allumunium ME.11 Buah 1.1000 55,148.25 60,663.08
Angker / Baut MD.33 Buah 4.0000 6,413.55 25,654.20
Pekerja L-4 OH 0.1000 132,000.00 13,200.00
Tukang Kayu L-3 OH 0.1000 168,000.00 16,800.00
Kepala Tukang L-2 OH 0.0100 188,000.00 1,880.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
Jumlah harga pekerjaan 86,317.28 32,905.00 119,222.28
Jumlah harga dibulatkan 119,222.00
1 1 M2 Langit-langit Gypsum Board Ukuran (1200 x 2400 x 9) mm PU.1
SNI 2839:2008
Gypsum Board (1200 x 2400 x 9) mm MC.27 Lembar 0.3640 121,663.10 44,285.37
Paku Skrup MD.18 KG 0.1100 35,046.25 3,855.09
Pekerja L-4 OH 0.1000 132,000.00 13,200.00
Tukang L-3 OH 0.0500 168,000.00 8,400.00
Kepala Tukang L-2 OH 0.0050 188,000.00 940.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
Jumlah harga pekerjaan 48,140.46 23,565.00 71,705.46
Jumlah harga dibulatkan 71,705.00

2 1 M' Pasang list plafond gypsum profil PU.2


SNI 2839:2008
List profil Gypsum Lebar Sampai 5 cm MC.28 M' 1.0500 46,644.00 48,976.20
Tepung gypsum MB.13 KG 0.1500 6,548.33 982.25
Pekerja L-4 OH 0.0600 132,000.00 7,920.00
Tukang L-3 OH 0.0600 168,000.00 10,080.00
Kepala Tukang L-2 OH 0.0060 188,000.00 1,128.00
Mandor L-1 OH 0.0030 205,000.00 615.00
Jumlah harga pekerjaan 49,958.45 19,743.00 69,701.45
Jumlah harga dibulatkan 69,701.00

3 1 M' List Langit - langit Kayu lat/profil PU.3


SNI 2839:2008
List kayu profil MC.10 M' 1.0500 16,749.18 17,586.63
Paku Campuran MD.16 KG 0.0100 19,506.30 195.06
Pekerja L-4 OH 0.0500 132,000.00 6,600.00
Tukang Kayu L-3 OH 0.0500 168,000.00 8,400.00
Kepala Tukang L-2 OH 0.0050 188,000.00 940.00
Mandor L-1 OH 0.0030 205,000.00 615.00
Jumlah harga pekerjaan 17,781.70 16,555.00 34,336.70
Jumlah harga dibulatkan 34,336.00
Analisa Harga Satuan Pekerjaan (AHSP) A. Pekerjaan Persiapan

PERKIRAAN HARGA JUMLAH HARGA


NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)
1 M2 Pasang Kuda-Kuda Baja Ringan + Reng Untuk Atap Genteng Biasa/Mental
C-75,08 M 1.488 27,168.75 40,427.10
C-75,06 M 2.232 16,531.25 36,897.75
Bau (srew Driver) Bh 28.000 92,000.00 2,576,000.00
Dynabolt Bh 1.600 97,750.00 156,400.00
Reng M 5.400 16,531.25 89,268.75
Talang Jurai M 0.124 25,443.75 3,155.03
Pekerja L-4 OH 0.200 132,000.00 26,400.00
Tukang besi L-3 OH 0.450 168,000.00 75,600.00
Kepala Tukang L-2 OH 0.010 188,000.00 1,880.00
Mandor L-1 OH 0.050 205,000.00 10,250.00
Jumlah harga pekerjaan 2,902,148.63 114,130.00 3,016,278.63
Jumlah harga dibulatkan 3,016,278.00
1 1 M3 Konstruksi Kuda-Kuda Konvensional, Kayu Kelas II PU.1
SNI 3434:2008
Balok Kayu Kelas II (Kayu Rahay) MC.2 M3 1.1000 4,729,266.90 5,202,193.59
Besi Strip Tebal 5 cm MD.51 KG 15.0000 8,802.00 132,030.00
Paku Campuran MD.16 KG 5.6000 19,506.30 109,235.28
Pekerja Kayu L-4 OH 4.0000 132,000.00 528,000.00
Tukang Kayu L-3 OH 12.0000 168,000.00 2,016,000.00
Kepala Tukang L-2 OH 1.2000 188,000.00 225,600.00
Mandor L-1 OH 0.2000 205,000.00 41,000.00
Jumlah harga pekerjaan 5,443,458.87 2,810,600.00 8,254,058.87
Jumlah harga dibulatkan 8,254,058.00

2 1 M3 Konstruksi Gordeng - Kayu Kelas II PU.2


SNI 3434:2008
Balok Kayu Kelas II (Kayu Rahay) MC.2 M3 1.1000 4,729,266.90 5,202,193.59
Besi Strip Tebal 5 cm MD.51 KG 15.0000 8,802.00 132,030.00
Paku Campuran MD.16 KG 3.0000 19,506.30 58,518.90
Pekerja Kayu L-4 OH 2.4000 132,000.00 316,800.00
Tukang Kayu L-3 OH 7.2000 168,000.00 1,209,600.00
Kepala Tukang L-2 OH 0.7200 188,000.00 135,360.00
Mandor L-1 OH 0.1200 205,000.00 24,600.00
Jumlah harga pekerjaan 5,392,742.49 1,686,360.00 7,079,102.49
Jumlah harga dibulatkan 7,079,102.00

1 1 M' Lisplank Ukuran 2 x (3x20) cm, Kayu Kelas II PU.1


HPS.PU. 2017
Papan Kayu Kelas II (Kayu Rahay) tebal = 2 Cm MC.6 M3 0.0145 4,839,477.15 70,172.42
Paku Campuran MD.16 KG 0.0600 19,506.30 1,170.38
Pekerja Kayu L-4 OH 0.1500 132,000.00 19,800.00
Tukang Kayu L-3 OH 0.2500 168,000.00 42,000.00
Kepala Tukang L-2 OH 0.0250 188,000.00 4,700.00
Mandor L-1 OH 0.0075 205,000.00 1,537.50
Jumlah harga pekerjaan 71,342.80 68,037.50 139,380.30
Jumlah harga dibulatkan 139,380.00

1 1 Buah Kunci Pintu Tanam Antik PU.1


Pt T-30-2000-C
Kunci Tanam Antik MH.2 Buah 1.000 166,687.90 166,687.90
Tukang L-3 OH 0.600 168,000.00 100,800.00
Kepala tukang L-2 OH 0.060 188,000.00 11,280.00
Jumlah harga pekerjaan 166,687.90 112,080.00 278,767.90
Jumlah harga dibulatkan 278,767.00

2 1 Buah Kunci Pintu Tanam Biasa PU.2


Pt T-30-2000-C
Kunci Tanam Biasa MH.1 Buah 1.000 98,082.35 98,082.35
Tukang L-3 OH 0.500 168,000.00 84,000.00
Kepala tukang L-2 OH 0.050 188,000.00 9,400.00
Jumlah harga pekerjaan 98,082.35 93,400.00 191,482.35
Jumlah harga dibulatkan 191,482.00

3 1 Buah Kunci Slot Untuk Kamar Mandi atau WC PU.3


Pt T-30-2000-C
Kunci Slot - Buah 1.000 - 0.00
Tukang L-3 OH 0.250 168,000.00 42,000.00
Kepala tukang L-2 OH 0.025 188,000.00 4,700.00
Jumlah harga pekerjaan - 46,700.00 46,700.00
Jumlah harga dibulatkan 46,700.00

4 1 Buah Engsel Pintu PU.4


Pt T-30-2000-C
Engsel Pintu MH.6 Buah 1.000 35,892.65 35,892.65
Tukang L-3 OH 0.125 168,000.00 21,000.00
Kepala tukang L-2 OH 0.013 188,000.00 2,444.00
Jumlah harga pekerjaan 35,892.65 23,444.00 59,336.65
Jumlah harga dibulatkan 59,336.00

5 1 Buah Engsel Pintu Klamp PU.5


Pt T-30-2000-C
Engsel Pintu Klamp MH.6 Buah 1.000 35,892.65 35,892.65
Pekerja L-4 OH 0.250 132,000.00 33,000.00
Tukang L-3 OH 0.250 168,000.00 42,000.00
Kepala tukang L-2 OH 0.025 188,000.00 4,700.00
Mandor L-1 OH 0.013 205,000.00 2,665.00
Jumlah harga pekerjaan 35,892.65 82,365.00 118,257.65
Jumlah harga dibulatkan 118,257.00

6 1 Buah Engsel Jendela PU.6


Pt T-30-2000-C
Engsel Jendela MH.7 Buah 1.000 27,200.95 27,200.95
Tukang L-3 OH 0.100 168,000.00 16,800.00
Kepala tukang L-2 OH 0.010 188,000.00 1,880.00
Jumlah harga pekerjaan 27,200.95 18,680.00 45,880.95
Jumlah harga dibulatkan 45,880.00

7 1 Buah Kait Angin PU.7


Pt T-30-2000-C
Kait Angin MH.11 Buah 1.000 13,597.60 13,597.60
Tukang L-3 OH 0.100 168,000.00 16,800.00
Kepala tukang L-2 OH 0.010 188,000.00 1,880.00
Jumlah harga pekerjaan 13,597.60 18,680.00 32,277.60
Jumlah harga dibulatkan 32,277.00

8 1 Buah Grendel PU.8


Pt T-30-2000-C
Analisa Harga Satuan Pekerjaan (AHSP) A. Pekerjaan Persiapan

PERKIRAAN HARGA JUMLAH HARGA


NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)
Grendel MH.13 Buah 1.000 86,147.65 86,147.65
Tukang L-3 OH 0.100 168,000.00 16,800.00
Kepala tukang L-2 OH 0.010 188,000.00 1,880.00
Jumlah harga pekerjaan 86,147.65 18,680.00 104,827.65
Jumlah harga dibulatkan 104,827.00

9 1 M2 Kaca polos tebal 3 mm PU.9


Pt T-30-2000-C
Kaca polos tebal 3 mm MG.1 M2 1.100 200,623.25 220,685.58
Kayu Lat MC.10 Batang 0.000 33,498.35 0.00
Paku Campur MD.16 KG 0.000 19,506.30 0.00
Pekerja L-4 OH 0.160 132,000.00 21,120.00
Tukang L-3 OH 0.160 168,000.00 26,880.00
Kepala tukang L-2 OH 0.016 188,000.00 3,008.00
Mandor L-1 OH 0.008 205,000.00 1,640.00
Jumlah harga pekerjaan 220,685.58 52,648.00 273,333.58
Jumlah harga dibulatkan 273,333.00

10 1 M2 Kaca mati polos tebal 5 mm PU.10


Pt T-30-2000-C
Kaca polos tebal 5 mm MG.2 M2 1.100 241,474.70 265,622.17
Kayu Lat MC.10 Batang 0.000 33,498.35 0.00
Paku Campur MD.16 KG 0.000 19,506.30 0.00
Pekerja kayu L-4 OH 0.160 132,000.00 21,120.00
Tukang kayu L-3 OH 0.160 168,000.00 26,880.00
Kepala tukang L-2 OH 0.016 188,000.00 3,008.00
Mandor kayu L-1 OH 0.008 205,000.00 1,640.00
Jumlah harga pekerjaan 265,622.17 52,648.00 318,270.17
Jumlah harga dibulatkan 318,270.00

11 1 M2 Kaca raiben tebal 5 mm PU.11


Pt T-30-2000-C
Kaca raiben tebal 5 mm MG.10 M2 1.100 19,030.20 20,933.22
Kayu Lat MC.10 Batang 0.000 33,498.35 0.00
Paku Campur MD.16 KG 0.000 19,506.30 0.00
Pekerja kayu L-4 OH 0.160 132,000.00 21,120.00
Tukang kayu L-3 OH 0.160 168,000.00 26,880.00
Kepala tukang L-2 OH 0.016 188,000.00 3,008.00
Mandor kayu L-1 OH 0.008 205,000.00 1,640.00
Jumlah harga pekerjaan 20,933.22 52,648.00 73,581.22
Jumlah harga dibulatkan 73,581.00

12 1 M2 Kaca buram tebal 3 mm PU.12


Pt T-30-2000-C
Kaca buram tebal 3 mm MG.3 M2 1.100 134,498.25 147,948.08
Kayu Lat MC.10 Batang 0.000 33,498.35 0.00
Paku Campur MD.16 KG 0.000 19,506.30 0.00
Pekerja kayu L-4 OH 0.160 132,000.00 21,120.00
Tukang kayu L-3 OH 0.160 168,000.00 26,880.00
Kepala tukang L-2 OH 0.016 188,000.00 3,008.00
Mandor kayu L-1 OH 0.008 205,000.00 1,640.00
Jumlah harga pekerjaan 147,948.08 52,648.00 200,596.08
Jumlah harga dibulatkan 200,596.00

13 1 M2 Kaca buram tebal 5 mm PU.13


Pt T-30-2000-C
Kaca buram tebal 5 mm MG.5 M2 1.100 284,852.70 313,337.97
Kayu Lat MC.10 Batang 0.000 33,498.35 0.00
Paku Campur MD.16 KG 0.000 19,506.30 0.00
Pekerja kayu L-4 OH 0.160 132,000.00 21,120.00
Tukang kayu L-3 OH 0.160 168,000.00 26,880.00
Kepala tukang L-2 OH 0.016 188,000.00 3,008.00
Mandor kayu L-1 OH 0.008 205,000.00 1,640.00
Jumlah harga pekerjaan 313,337.97 52,648.00 365,985.97
Jumlah harga dibulatkan 365,985.00

14 1 Unit Jendela Ungkit (75 x 115 cm), bingkai 3x8 cm, kaca polos 5 mm PU.14
HPS.PU. 2017
Balok kayu Rahay (Bingkai 3 x 8 cm + les) MC.2 M3 0.030 4,729,266.90 141,878.01
Kaca polos tebal 5 mm MG.2 M2 0.620 241,474.70 149,714.31
Tarikan jendela aluminium MH.16 Buah 2.000 18,038.90 36,077.80
Kait angin 6" MH.11 Buah 2.000 13,597.60 27,195.20
Grendel jendela MH.14 Buah 2.000 12,087.65 24,175.30
Paku Campur MD.16 KG 0.065 19,506.30 1,267.91
Mandor kayu L-1 OH 0.150 205,000.00 30,750.00
Kepala tukang kayu L-2 OH 0.150 188,000.00 28,200.00
Tukang kayu L-3 OH 1.500 168,000.00 252,000.00
Pekerja kayu L-4 OH 0.300 132,000.00 39,600.00
Jumlah harga pekerjaan 380,308.53 350,550.00 730,858.53
Jumlah harga dibulatkan 730,858.00

15 1 Unit Untuk Jendela gantung hanya 1 bh kait angin dan 1 grendel PU.15 1 730,858.00 730,858.00
HPS.PU. 2017 Jumlah harga pekerjaan - 730,858.00 730,858.00
Jumlah harga dibulatkan 730,858.00

16 1 Unit Jendela Jalusi 75 x 120 cm PU.16


HPS.PU. 2017
Balok kayu Rahay (Bingkai 3 x 8 cm + les) MC.2 M3 0.060 4,729,266.90 283,756.01
Engsel jendela 3" MH.10 Buah 2.000 17,266.10 34,532.20
Kait angin MH.11 Buah 1.000 13,597.60 13,597.60
Grendel jendela MH.14 Buah 1.000 12,087.65 12,087.65
Paku Campur MD.16 KG 0.850 19,506.30 16,580.36
Mandor kayu L-1 OH 0.500 205,000.00 102,500.00
Kepala tukang kayu L-2 OH 1.000 188,000.00 188,000.00
Tukang kayu L-3 OH 2.000 168,000.00 336,000.00
Pekerja kayu L-4 OH 1.000 132,000.00 132,000.00
Jumlah harga pekerjaan 360,553.82 758,500.00 1,119,053.82
Jumlah harga dibulatkan 1,119,053.00

17 1 Unit Pintu Panel 80 x 210 cm PU.17


HPS.PU. 2017
Papan kayu Rahay MC.7 M3 0.075 5,059,891.90 379,491.89
Engsel 4" Kuningan (untuk pintu) MH.6 Buah 1.500 35,892.65 53,838.98
Kait angin MH.11 Buah 1.000 13,597.60 13,597.60
Kunci tanam (setara kuda terbang) MH.1 Buah 1.000 98,082.35 98,082.35
Grendel besar MH.14 Buah 1.000 12,087.65 12,087.65
Paku Campur MD.16 KG 0.220 19,506.30 4,291.39
Mandor kayu L-1 OH 0.1133 205,000.00 23,226.50
Kepala tukang kayu L-2 OH 0.6972 188,000.00 131,073.60
Analisa Harga Satuan Pekerjaan (AHSP) A. Pekerjaan Persiapan

PERKIRAAN HARGA JUMLAH HARGA


NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)
Tukang kayu L-3 OH 6.972 168,000.00 1,171,296.00
Pekerja kayu L-4 OH 2.2659 132,000.00 299,098.80
Jumlah harga pekerjaan 561,389.85 1,624,694.90 2,186,084.75
Jumlah harga dibulatkan 2,186,084.00

18 1 Unit Pintu double tripleks 80 x 210 cm, bingkai kayu 3,5 x 9 cm PU.18
HPS.PU. 2017
Balok kayu Rahay (Bingkai 3 x 8 cm + les) MC.2 M3 0.064 4,729,266.90 302,673.08
Tripleks (1,22 x 2,44) cm - tebal 3 mm MC.11 Lembar 1.800 83,591.20 150,464.16
Engsel 4" Kuningan (untuk pintu) MH.6 Buah 1.500 35,892.65 53,838.98
Kait angin MH.11 Buah 1.000 13,597.60 13,597.60
Kunci tanam 2 slangh MH.2 Buah 1.000 166,687.90 166,687.90
Grendel besar MH.14 Buah 1.000 12,087.65 12,087.65
Paku Campur MD.16 KG 0.200 19,506.30 3,901.26
Mandor kayu L-1 OH 0.0425 205,000.00 8,712.50
Kepala tukang kayu L-2 OH 0.260 188,000.00 48,880.00
Tukang kayu L-3 OH 2.600 168,000.00 436,800.00
Pekerja kayu L-4 OH 0.850 132,000.00 112,200.00
Jumlah harga pekerjaan 703,250.63 606,592.50 1,309,843.13
Jumlah harga dibulatkan 1,309,843.00

19 1 Unit Pintu double tripleks 80x210 cm, bingkai kayu 3,5x9 cm lapis seng pl PU.19
HPS.PU. 2017
Pintu double tripleks 80 x 210 cm, bingkai kayu 3,5 x 9 cm PU.18 Buah 1.000 1,309,843.13 1,309,843.13
Seng Plat BJLS 0.30 ME.6 Lembar 1.200 53,772.85 64,527.42
Paku Campur MD.16 KG 0.100 19,506.30 1,950.63
Jumlah harga pekerjaan 1,376,321.18 - 1,376,321.18
Jumlah harga dibulatkan 1,376,321.00

20 1 Unit Pintu double tripleks 70 x 210 cm, bingkai kayu 3,5 x 9 cm PU.20
HPS.PU. 2017
Balok kayu Rahay (Bingkai 3 x 8 cm + les) MC.2 M3 0.057 4,729,266.90 269,568.21
Tripleks (1,22 x 2,44) cm - tebal 3 mm MC.11 Lembar 1.800 83,591.20 150,464.16
Engsel 4" Kuningan (untuk pintu) MH.6 Buah 1.500 35,892.65 53,838.98
Kait angin 8" MH.11 Buah 1.000 13,597.60 13,597.60
Kunci tanam 2 slangh MH.2 Buah 1.000 166,687.90 166,687.90
Grendel besar MH.14 Buah 1.000 12,087.65 12,087.65
Paku Campur MD.16 KG 0.2 19506.3 3901.26
Mandor kayu L-1 OH 0.0425 205000 8,712.50
Kepala tukang kayu L-2 OH 0.260 188,000.00 48,880.00
Tukang kayu L-3 OH 2.600 168,000.00 436,800.00
Pekerja kayu L-4 OH 0.850 132,000.00 112,200.00
Jumlah harga pekerjaan 670,145.76 606,592.50 1,276,738.26
Jumlah harga dibulatkan 1,276,738.00

21 1 Unit Pintu double tripleks 70x210 cm, bingkai kayu 3,5x9 cm lapis seng pl PU.21
HPS.PU. 2017
Pintu double tripleks 70 x 210 cm, bingkai kayu 3,5 x 9 cm PU.20 Buah 1.000 1,276,738.26 1,276,738.26
Seng Plat BJLS 0.30 ME.6 Lembar 1.200 53,772.85 64,527.42
Paku Campur MD.16 KG 0.100 19,506.30 1,950.63
Jumlah harga pekerjaan 1,343,216.31 - 1,343,216.31
Jumlah harga dibulatkan 1,343,216.00

22 1 Unit Pintu double tekwood 80 x 210 cm, bingkai kayu 3,5 x 9 cm PU.22
HPS.PU. 2017
Pintu tanpa triplek PU.18 Buah 1.000 1,309,843.13 1,309,843.13
Teakwood MC.20 Lembar 1.800 153,013.25 275,423.85
Jumlah harga pekerjaan 1,585,266.98 - 1,585,266.98
Jumlah harga dibulatkan 1,585,266.00

23 1 Unit Pintu kisi kaca kayu rahay 80 x 210 cm PU.23


HPS.PU. 2017
Balok kayu Rahay MC.2 M3 0.070 4,729,266.90 331,048.68
Kaca 5 mm ( 30 x 40 + upah potong ) MG.2 Lembar 8.000 28,976.96 231,815.71
Engsel pintu 4" (1 buah = 0,5 Pasang) MH.6 Buah 3.000 35,892.65 107,677.95
Kait angin besar MH.11 Buah 1.000 13,597.60 13,597.60
Kunci tanam 2 slangh MH.2 Buah 1.000 166,687.90 166,687.90
Grendel besar MH.14 Buah 1.000 12,087.65 12,087.65
Paku Campur MD.16 KG 0.300 19,506.30 5,851.89
Mandor kayu L-1 OH 0.100 205,000.00 20,500.00
Kepala tukang kayu L-2 OH 0.600 188,000.00 112,800.00
Tukang kayu L-3 OH 6.000 168,000.00 1,008,000.00
Pekerja kayu L-4 OH 2.000 132,000.00 264,000.00
Jumlah harga pekerjaan 868,767.39 1,405,300.00 2,274,067.39
Jumlah harga dibulatkan 2,274,067.00

24 1 Unit Pintu klam 80 x 210 cm ( tempel ) PU.24


HPS.PU. 2017
Balok kayu Rahay (diketam) MC.2 M3 0.103 4,729,266.90 487,114.49
Engsel pintu 4" (1 buah = 0,5 Pasang) MH.6 Buah 3.000 35,892.65 107,677.95
Kait angin besar MH.11 Buah 1.000 13,597.60 13,597.60
Kunci tanam 3 slangh MH.2 Buah 1.000 166,687.90 166,687.90
Grendel besar MH.14 Buah 1.000 12,087.65 12,087.65
Paku campuran MD.16 KG 0.100 19,506.30 1,950.63
Mandor kayu L-1 OH 0.250 205,000.00 51,250.00
Kepala tukang kayu L-2 OH 1.000 188,000.00 188,000.00
Tukang kayu L-3 OH 2.000 168,000.00 336,000.00
Pekerja kayu L-4 OH 2.500 132,000.00 330,000.00
Jumlah harga pekerjaan 789,116.22 905,250.00 1,694,366.22
Jumlah harga dibulatkan 1,694,366.00
Analisa Harga Satuan Pekerjaan (AHSP) A. Pekerjaan Persiapan

PERKIRAAN HARGA JUMLAH HARGA


NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)
1 1 Titik Instalasi Lampu SL 18 - 23 VA+ Pitting PU.1
HPS.PU. 2017
Vetting lampu MJ.14 Buah 1.000 18,700.15 18,700.15
Kabel NYA 2x1,5 mm MJ.2 M 7.000 4,630.93 32,416.51
Saklar MJ.4 Buah 1.000
Lampu SL 23 VA MJ.17 Buah 1.000 60,787.85 60,787.85
Klem Kabel MJ.20 Dos 0.200 24,555.95 4,911.19
Isolasi MJ.21 Buah 0.100 13,220.40 1,322.04
Sekrup MJ.22 Dos 0.100 23,658.95 2,365.90
Upah Memasang LS 1.000 60,000.00 60,000.00
Jumlah harga pekerjaan 120,503.64 60,000.00 180,503.64
Jumlah harga dibulatkan 180,503.00

2 1 Titik Instalasi Lampu SL 8 - 14 VA+ Pitting PU.2


HPS.PU. 2017
Vetting lampu MJ.14 Buah 1.000 18,700.15 18,700.15
Kabel NYA 2x1,5 mm MJ.2 M 7.000 4,630.93 32,416.51
Saklar MJ.4 Buah 1.000
Lampu SL 14 VA MJ.18 Buah 1.000 49,050.95 49,050.95
Klem Kabel MJ.20 Dos 0.200 24,555.95 4,911.19
Isolasi MJ.21 Buah 0.100 13,220.40 1,322.04
Sekrup MJ.22 Dos 0.100 23,658.95 2,365.90
Upah Memasang LS 1.000 60,000.00 60,000.00
Jumlah harga pekerjaan 108,766.74 60,000.00 168,766.74
Jumlah harga dibulatkan 168,766.00

3 1 Titik Instalasi Stop Kontak PU.3


HPS.PU. 2017
Stop Kontak MJ.6 Buah 1.000 22,151.30 22,151.30
Kabel NYA 3x2.5 mm MJ.1 M 3.000 12,826.59 38,479.77
Klem Kabel MJ.20 Dos 0.200 24,555.95 4,911.19
Isolasi MJ.21 Buah 0.100 13,220.40 1,322.04
Sekrup MJ.22 Dos 0.100 23,658.95 2,365.90
Upah Memasang LS 1.000 60,000.00 60,000.00
Jumlah harga pekerjaan 69,230.20 60,000.00 129,230.20
Jumlah harga dibulatkan 129,230.00

4 1 Unit MCB PU.4


HPS.PU. 2017
MCB Buah 1.000 45,000.00 45,000.00
Box Buah 1.000 7,500.00 7,500.00
Kabel NYA 3x2.5 mm MJ.1 M 15.000 12,826.59 192,398.85
Klem Kabel MJ.20 Dos 0.400 24,555.95 9,822.38
Isolasi MJ.21 Buah 0.500 13,220.40 6,610.20
Sekrup MJ.22 Dos 0.100 23,658.95 2,365.90
Upah Memasang LS 1.000 60,000.00 60,000.00
Jumlah harga pekerjaan 263,697.33 60,000.00 323,697.33
Jumlah harga dibulatkan 323,697.00

5 1 Titik Saklar Ganda PU.5


HPS.PU. 2017
Saklar Ganda MJ.4 Buah 1.000 25,921.00 25,921.00
Upah Memasang 2xL-4 OH 1.000 264,000.00 264,000.00
Alat Bantu + Aksesoris LS 1.000 2,592.10 2,592.10
Jumlah harga pekerjaan 25,921.00 266,592.10 292,513.10
Jumlah harga dibulatkan 292,513.00

6 1 Titik Saklar Tunggal PU.6


HPS.PU. 2017
Saklar Tunggal MJ.5 Buah 1.000 20,432.05 20,432.05
Upah Memasang 2xL-4 OH 1.000 264,000.00 264,000.00
Alat Bantu + Aksesoris LS 1.000 2,043.21 2,043.21
Jumlah harga pekerjaan 20,432.05 266,043.21 286,475.26
Jumlah harga dibulatkan 286,475.00

7 1 Unit Panel Box PU.7


HPS.PU. 2017
Panel Box MJ.23 Buah 1.000 8,597,202.20 8,597,202.20
Upah Memasang 2,5 x L - 4 OH 1.000 330,000.00 330,000.00
Alat Bantu + Aksesoris LS 1.000 4,298,601.10 4,298,601.10
Jumlah harga pekerjaan 8,597,202.20 4,628,601.10 13,225,803.30
Jumlah harga dibulatkan 13,225,803.00

8 1 M' Kabel NYA 2.5 mm PU.8


HPS.PU. 2017
Kabel NYA 2.5 mm MJ.2 M 1.100 4,630.93 5,094.02
Pipa PVC Ø 1/2" MK.15 M' 1.050 7,194.75 7,554.49
Upah Memasang 0,1 x L - 4 OH 1.000 13,200.00 13,200.00
Alat Bantu + Aksesoris LS 1.000 231.55 231.55
Jumlah harga pekerjaan 12,648.51 13,431.55 26,080.06
Jumlah harga dibulatkan 26,080.00
Analisa Harga Satuan Pekerjaan (AHSP) A. Pekerjaan Persiapan

PERKIRAAN HARGA JUMLAH HARGA


NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)
1 1 BH Closet duduk / monoblok PU.1
RSNI T-15-2002
Closet duduk / monoblok - Buah 1.0000 2,043,791.50 2,043,791.50
Perlengkapan 6%x0 Set 1.0000 122,627.49 122,627.49
Pekerja pasir/batu L-4 OH 3.3000 132,000.00 435,600.00
Tukang pasir/batu L-3 OH 1.1000 168,000.00 184,800.00
Kepala tukang pasir/batu L-2 OH 0.0010 188,000.00 188.00
Mandor pasir/batu L-1 OH 0.1600 205,000.00 32,800.00
Jumlah harga pekerjaan 2,043,791.50 776,015.49 2,819,806.99
Jumlah harga dibulatkan 2,819,806.00

2 1 BH Closet jongkok porselin PU.2


RSNI T-15-2002
Closet jongkok porselin MK.23 Buah 1.0000 722,985.45 722,985.45
Semen Portland (PC) @ 50 Kg MB.11 KG 6.0000 2,778.84 16,673.02
Pasir semen (lokal) MB.2 M3 0.0100 1,058,872.85 10,588.73
Pekerja pasir/batu L-4 OH 1.0000 132,000.00 132,000.00
Tukang pasir/batu L-3 OH 1.5000 168,000.00 252,000.00
Kepala tukang pasir/batu L-2 OH 0.1500 188,000.00 28,200.00
Mandor pasir/batu L-1 OH 0.1600 205,000.00 32,800.00
Jumlah harga pekerjaan 750,247.20 445,000.00 1,195,247.20
Jumlah harga dibulatkan 1,195,247.00

3 1 BH Closet jongkok plastik PU.3


RSNI T-15-2002
Closet jongkok plastik MK.25 Buah 1.0000 114,726.30 114,726.30
Sambungan L bough MK.38 Buah 1.0000 10,433.95 10,433.95
Pipa PVC dia 4" ( AW ) MK.10 Meter 2.0000 87,296.50 174,593.00
Mandor pasir/batu L-1 OH 0.1500 205,000.00 30,750.00
Kepala tukang pasir/batu L-2 OH 0.0100 188,000.00 1,880.00
Tukang pasir/batu L-3 OH 1.0000 168,000.00 168,000.00
Pekerja pasir/batu L-4 OH 1.5000 132,000.00 198,000.00
Jumlah harga pekerjaan 299,753.25 398,630.00 698,383.25
Jumlah harga dibulatkan 698,383.00

4 1 BH Memasang Urinoir PU.4


RSNI T-15-2002
Memasang Urinoir MK.26 Buah 1.0000 2,307,788.95 2,307,788.95
Perlengkapan 30%xMK.26 Set 1.0000 692,336.69 692,336.69
Semen Portland (PC) @ 50 Kg MB.11 KG 6.0000 2,778.84 16,673.02
Pasir semen (lokal) MB.2 M3 0.0100 1,058,872.85 10,588.73
Pekerja pasir/batu L-4 OH 1.0000 132,000.00 132,000.00
Tukang pasir/batu L-3 OH 1.0000 168,000.00 168,000.00
Kepala tukang pasir/batu L-2 OH 1.1000 188,000.00 206,800.00
Mandor pasir/batu L-1 OH 0.1000 205,000.00 20,500.00
Jumlah harga pekerjaan 2,335,050.70 1,219,636.69 3,554,687.39
Jumlah harga dibulatkan 3,554,687.00

5 1 BH Memasang Wastafel PU.5


RSNI T-15-2002
Memasang Wastafel MK.27 Buah 1.0000 642,100.20 642,100.20
Perlengkapan 12%xMK.27 Set 1.0000 77,052.02 77,052.02
Semen Portland (PC) @ 50 Kg MB.11 KG 6.0000 2,778.84 16,673.02
Pasir semen (lokal) MB.2 M3 0.0100 1,058,872.85 10,588.73
Pekerja pasir/batu L-4 OH 1.2000 132,000.00 158,400.00
Tukang pasir/batu L-3 OH 1.4500 168,000.00 243,600.00
Kepala tukang pasir/batu L-2 OH 0.1500 188,000.00 28,200.00
Mandor pasir/batu L-1 OH 0.1000 205,000.00 20,500.00
Jumlah harga pekerjaan 669,361.95 527,752.02 1,197,113.97
Jumlah harga dibulatkan 1,197,113.00

6 1 Buah Bak Mandi Fiberglass 0,3 M3 PU.6


RSNI T-15-2002
Bak Mandi Fiberglass 0,3 M3 MK.30 Buah 1.0000 369,771.00 369,771.00
Perlengkapan 18%xMK.30 Set 1.0000 66,558.78 66,558.78
Pekerja pasir/batu L-4 OH 1.8000 132,000.00 237,600.00
Tukang pasir/batu L-3 OH 2.7000 168,000.00 453,600.00
Kepala tukang pasir/batu L-2 OH 0.5400 188,000.00 101,520.00
Mandor pasir/batu L-1 OH 0.1100 205,000.00 22,550.00
Jumlah harga pekerjaan 369,771.00 881,828.78 1,251,599.78
Jumlah harga dibulatkan 1,251,599.00

7 1 Buah Bak Air Fiberglass 1 M3 PU.7


RSNI T-15-2002
Bak Air Fiberglass 1 M3 - Buah 1.0000 658,802.80 658,802.80
Perlengkapan 12%x0 Set 1.0000 79,056.34 79,056.34
Pekerja pasir/batu L-4 OH 3.0000 132,000.00 396,000.00
Tukang pasir/batu L-3 OH 4.5000 168,000.00 756,000.00
Kepala tukang pasir/batu L-2 OH 0.9000 188,000.00 169,200.00
Mandor pasir/batu L-1 OH 0.9000 205,000.00 184,500.00
Jumlah harga pekerjaan 658,802.80 1,584,756.34 2,243,559.14
Jumlah harga dibulatkan 2,243,559.00
Analisa Harga Satuan Pekerjaan (AHSP) A. Pekerjaan Persiapan

PERKIRAAN HARGA JUMLAH HARGA


NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)
8 1 BH Bak Mandi Batu Bata Volume 0,3 M3 PU.8
RSNI T-15-2002
Batu Bata - Buah 400.0000 1,851.50 740,600.00
Semen Portland (PC) @ 50 Kg MB.11 KG 120.0000 2,778.84 333,460.44
Pasir semen (lokal) MB.2 M3 0.3000 1,058,872.85 317,661.86
Porselin (11x11) Cm - Buah 360.0000 1,005.10 361,836.00
Semen Nat - KG 6.0000 - 0.00
Pekerja pasir/batu L-4 OH 6.0000 132,000.00 792,000.00
Tukang pasir/batu L-3 OH 3.0000 168,000.00 504,000.00
Kepala tukang pasir/batu L-2 OH 0.3000 188,000.00 56,400.00
Mandor pasir/batu L-1 OH 0.3000 205,000.00 61,500.00
Jumlah harga pekerjaan 1,753,558.30 1,413,900.00 3,167,458.30
Jumlah harga dibulatkan 3,167,458.00

9 1 M Pipa penyalur air limbah jenis pipa tanah Dia. 15 cm PU.9


RSNI T-15-2002
Pipa PVC Dia. 5" - 4 Meter (AW) - Buah 1.6000 1,173,652.05 1,877,843.28
Semen Portland (PC) @ 50 Kg MB.11 KG 0.8700 2,778.84 2,417.59
Pasir semen (lokal) MB.2 M3 0.0140 1,058,872.85 14,824.22
Pasir urug - M3 0.0140 1,058,872.85 0.00
Mandor pasir/batu L-1 OH 0.0070 205,000.00 1,435.00
Kepala tukang pasir/batu L-2 OH 0.0040 188,000.00 752.00
Tukang pasir/batu L-3 OH 0.0400 168,000.00 6,720.00
Pekerja pasir/batu L-4 OH 0.0800 132,000.00 10,560.00
Jumlah harga pekerjaan 1,895,085.09 19,467.00 1,914,552.09
Jumlah harga dibulatkan 1,914,552.00

10 1 BH Bak Kontrol Pasangan Bata Ukuran (30 x 30) x 50 cm PU.10


RSNI T-15-2002
Batu Bata (0,145 M3) MB.8 Buah 145.0000 1,851.50 268,467.50
Semen Portland (PC) @ 50 Kg MB.11 KG 44.0000 2,778.84 122,268.83
Pasir semen (lokal) MB.2 M3 0.0700 1,058,872.85 74,121.10
Kerikil/batu pecah (import) MB.6 M3 0.0700 1,567,479.90 109,723.59
Besi tulangan beton dia. 10 mm MD.3 KG 1.6000 15,071.90 24,115.04
Pasir semen (import) MB.1 M3 0.0600 1,541,578.45 92,494.71
Pekerja pasir/batu L-4 OH 3.2000 132,000.00 422,400.00
Tukang pasir/batu L-3 OH 1.0150 168,000.00 170,520.00
Kepala tukang pasir/batu L-2 OH 0.0015 188,000.00 282.00
Mandor pasir/batu L-1 OH 0.0160 205,000.00 3,280.00
Jumlah harga pekerjaan 691,190.77 596,482.00 1,287,672.77
Jumlah harga dibulatkan 1,287,672.00

11 1 BH Bak Kontrol Pasangan Bata Ukuran (45 x 45) x 50 cm PU.11


RSNI T-15-2002
Batu Bata (0,25 M3) MB.8 M3 250.0000 1,851.50 462,875.00
Semen Portland (PC) @ 50 Kg MB.11 KG 77.0000 2,778.84 213,970.45
Pasir semen (lokal) MB.2 M3 0.1300 1,058,872.85 137,653.47
Kerikil/batu pecah (import) MB.6 M3 0.0200 1,567,479.90 31,349.60
Besi tulangan beton dia. 10 mm MD.3 KG 2.6000 15,071.90 39,186.94
Pasir semen (import) MB.1 M3 0.0900 1,541,578.45 138,742.06
Pekerja pasir/batu L-4 OH 1.4200 132,000.00 187,440.00 187,440.00
Tukang pasir/batu L-3 OH 0.4730 168,000.00 79,464.00 79,464.00
Kepala tukang pasir/batu L-2 OH 0.0470 188,000.00 8,836.00 8,836.00
Mandor pasir/batu L-1 OH 0.0710 205,000.00 14,555.00 14,555.00
Jumlah harga pekerjaan 1,314,072.52 290,295.00 1,604,367.52
Jumlah harga dibulatkan 1,604,367.00

12 1 BH Bak Kontrol Pasangan Bata Ukuran (60 x 60) x 65 cm PU.12


RSNI T-15-2002
Batu Bata (0,371 M3) MB.8 Buah 371.0000 1,851.50 686,906.50
Semen Portland (PC) @ 50 Kg MB.11 KG 114.0000 2,778.84 316,787.42
Pasir semen (lokal) MB.2 M3 0.1840 1,058,872.85 194,832.60
Kerikil/batu pecah (import) MB.6 M3 0.0330 1,567,479.90 51,726.84
Besi tulangan beton dia. 10 mm MD.3 KG 4.8500 15,071.90 73,098.72
Pasir semen (import) MB.1 M3 0.1200 1,541,578.45 184,989.41
Pekerja pasir/batu L-4 OH 2.1600 132,000.00 285,120.00
Tukang gali L-3 OH 0.1000 168,000.00 16,800.00
Tukang pasir/batu L-3 OH 0.7200 168,000.00 120,960.00
Kepala tukang pasir/batu L-2 OH 0.0720 188,000.00 13,536.00
Mandor pasir/batu L-1 OH 0.1080 205,000.00 22,140.00 22,140.00
Jumlah harga pekerjaan 1,530,481.49 458,556.00 1,989,037.49
Jumlah harga dibulatkan 1,989,037.00

13 1 M Memasang Pipa Galvanis Dia. 1/2" PU.13


RSNI T-15-2002
Pipa Galvanis Dia. 1/2" - M 1.2000 18,582.00 22,298.40
Perlengkapan 35%x0 Set 1.0000 6,503.70 6,503.70
Pekerja L-4 OH 0.0540 132,000.00 7,128.00
Tukang pipa L-3 OH 0.0900 168,000.00 15,120.00
Kepala tukang L-2 OH 0.0090 188,000.00 1,692.00
Mandor L-1 OH 0.0270 205,000.00 5,535.00
Jumlah harga pekerjaan 22,298.40 35,978.70 58,277.10
Jumlah harga dibulatkan 58,277.00

14 1 M Memasang Pipa Galvanis Dia. 3/4" PU.14


RSNI T-15-2002
Pipa Galvanis Dia. 3/4" MK.2 M 1.2000 - 0.00
Perlengkapan 35%xMK.2 Set 1.0000 - 0.00
Pekerja L-4 OH 0.0540 132,000.00 7,128.00
Tukang pipa L-3 OH 0.0900 168,000.00 15,120.00
Kepala tukang L-2 OH 0.0090 188,000.00 1,692.00
Mandor L-1 OH 0.0270 205,000.00 5,535.00
Jumlah harga pekerjaan - 29,475.00 29,475.00
Jumlah harga dibulatkan 29,475.00
Analisa Harga Satuan Pekerjaan (AHSP) A. Pekerjaan Persiapan

PERKIRAAN HARGA JUMLAH HARGA


NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)
15 1 M Memasang Pipa Galvanis Dia. 1" PU.15
RSNI T-15-2002
Pipa Galvanis Dia. 1" MK.3 M 1.2000 30,354.17 36,425.00
Perlengkapan 35%xMK.3 Set 1.0000 10,623.96 10,623.96
Pekerja L-4 OH 0.0540 132,000.00 7,128.00
Tukang pipa L-3 OH 0.0900 168,000.00 15,120.00
Kepala tukang L-2 OH 0.0090 188,000.00 1,692.00
Mandor L-1 OH 0.0027 205,000.00 553.50
Jumlah harga pekerjaan 36,425.00 35,117.46 71,542.46
Jumlah harga dibulatkan 71,542.00

16 1 M Memasang Pipa Galvanis Dia. 1,5" PU.16


RSNI T-15-2002
Pipa Galvanis Dia. 1,5" MK.5 M 1.2000 47,414.50 56,897.40
Perlengkapan 35%xMK.5 Set 1.0000 16,595.08 16,595.08
Pekerja L-4 OH 0.1080 132,000.00 14,256.00
Tukang pipa L-3 OH 0.1800 168,000.00 30,240.00
Kepala tukang L-2 OH 0.0180 188,000.00 3,384.00
Mandor L-1 OH 0.0054 205,000.00 1,107.00
Jumlah harga pekerjaan 56,897.40 65,582.08 122,479.48
Jumlah harga dibulatkan 122,479.00

17 1 M Memasang Pipa Galvanis Dia. 3" PU.17


RSNI T-15-2002
Pipa Galvanis Dia. 3" MK.7 M 1.2000 93,711.50 112,453.80
Perlengkapan 35%xMK.7 Set 1.0000 32,799.03 32,799.03
Pekerja L-4 OH 0.1080 132,000.00 14,256.00
Tukang pipa L-3 OH 0.1800 168,000.00 30,240.00
Kepala tukang L-2 OH 0.0180 188,000.00 3,384.00
Mandor L-1 OH 0.0054 205,000.00 1,107.00
Jumlah harga pekerjaan 112,453.80 81,786.03 194,239.83
Jumlah harga dibulatkan 194,239.00

18 1 M Memasang Pipa Galvanis Dia. 4" PU.18


RSNI T-15-2002
Pipa Galvanis Dia. 4" MK.8 M 1.2000 123,914.33 148,697.20
Perlengkapan 35%xMK.8 Set 1.0000 43,370.02 43,370.02
Pekerja L-4 OH 0.1350 132,000.00 17,820.00
Tukang pipa L-3 OH 0.2250 168,000.00 37,800.00
Kepala tukang L-2 OH 0.0225 188,000.00 4,230.00
Mandor L-1 OH 0.0068 205,000.00 1,394.00
Jumlah harga pekerjaan 148,697.20 104,614.02 253,311.22
Jumlah harga dibulatkan 253,311.00

19 1 M Memasang Pipa PVC Tipe AW Dia. 1/2" PU.19


RSNI T-15-2002
Pipa PVC Tipe AW Dia. 1/2" - M 1.2000 7,194.75 8,633.70
Perlengkapan 35%x0 Set 1.0000 2,518.16 2,518.16
Pekerja L-4 OH 0.0360 132,000.00 4,752.00
Tukang pipa L-3 OH 0.0600 168,000.00 10,080.00
Kepala tukang L-2 OH 0.0060 188,000.00 1,128.00
Mandor L-1 OH 0.0018 205,000.00 369.00
Jumlah harga pekerjaan 8,633.70 18,847.16 27,480.86
Jumlah harga dibulatkan 27,480.00

20 1 M Memasang Pipa PVC Tipe AW Dia. 3/4" PU.20


RSNI T-15-2002
Pipa PVC Tipe AW Dia. 3/4" - M 1.2000 8,916.00 10,699.20
Perlengkapan 35%x0 Set 1.0000 3,120.60 3,120.60
Pekerja L-4 OH 0.0360 132,000.00 4,752.00
Tukang pipa L-3 OH 0.0600 168,000.00 10,080.00
Kepala tukang L-2 OH 0.0060 188,000.00 1,128.00
Mandor L-1 OH 0.0018 205,000.00 369.00
Jumlah harga pekerjaan 10,699.20 19,449.60 30,148.80
Jumlah harga dibulatkan 30,148.00

21 1 M Memasang Pipa PVC Tipe AW Dia. 1" PU.21


RSNI T-15-2002
Pipa PVC Tipe AW Dia. 1" - M 1.2000 11,664.50 13,997.40
Perlengkapan 35%x0 Set 1.0000 4,082.58 4,082.58
Pekerja L-4 OH 0.0360 132,000.00 4,752.00
Tukang pipa L-3 OH 0.0600 168,000.00 10,080.00
Kepala tukang L-2 OH 0.0060 188,000.00 1,128.00
Mandor L-1 OH 0.0018 205,000.00 369.00
Jumlah harga pekerjaan 13,997.40 20,411.58 34,408.98
Jumlah harga dibulatkan 34,408.00

22 1 M Memasang Pipa PVC Tipe AW Dia. 1,5" PU.22


RSNI T-15-2002
Pipa PVC Tipe AW Dia. 1,5" - M 1.2000 17,699.25 21,239.10
Perlengkapan 35%x0 Set 1.0000 6,194.74 6,194.74
Pekerja L-4 OH 0.0360 132,000.00 4,752.00
Tukang pipa L-3 OH 0.0600 168,000.00 10,080.00
Kepala tukang L-2 OH 0.0060 188,000.00 1,128.00
Mandor L-1 OH 0.0018 205,000.00 369.00
Jumlah harga pekerjaan 21,239.10 22,523.74 43,762.84
Jumlah harga dibulatkan 43,762.00

23 1 M Memasang Pipa PVC Tipe AW Dia. 2" PU.23


RSNI T-15-2002
Pipa PVC Tipe AW Dia. 2" - M 1.2000 17,699.25 21,239.10
Perlengkapan 35%x0 Set 1.0000 6,194.74 6,194.74
Pekerja L-4 OH 0.0540 132,000.00 7,128.00
Tukang pipa L-3 OH 0.0900 168,000.00 15,120.00
Kepala tukang L-2 OH 0.0090 188,000.00 1,692.00
Mandor L-1 OH 0.0027 205,000.00 553.50
Jumlah harga pekerjaan 21,239.10 30,688.24 51,927.34
Jumlah harga dibulatkan 51,927.00
Analisa Harga Satuan Pekerjaan (AHSP) A. Pekerjaan Persiapan

PERKIRAAN HARGA JUMLAH HARGA


NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

24 1 M Memasang Pipa PVC Tipe AW Dia. 3" PU.24


RSNI T-15-2002
Pipa PVC Tipe AW Dia. 3" - M 1.2000 36,843.75 44,212.50
Perlengkapan 35%x0 Set 1.0000 12,895.31 12,895.31
Pekerja L-4 OH 0.0810 132,000.00 10,692.00
Tukang pipa L-3 OH 0.1350 168,000.00 22,680.00
Kepala tukang L-2 OH 0.1350 188,000.00 25,380.00
Mandor L-1 OH 0.0041 205,000.00 840.50
Jumlah harga pekerjaan 44,212.50 72,487.81 116,700.31
Jumlah harga dibulatkan 116,700.00

25 1 M Memasang Pipa PVC Tipe AW Dia. 4" PU.25


RSNI T-15-2002
Pipa PVC Tipe AW Dia. 4" - M 1.2000 51,454.50 61,745.40
Perlengkapan 35%x0 Set 1.0000 18,009.08 18,009.08
Pekerja L-4 OH 0.0810 132,000.00 10,692.00
Tukang pipa L-3 OH 0.1350 168,000.00 22,680.00
Kepala tukang L-2 OH 0.1350 188,000.00 25,380.00
Mandor L-1 OH 0.0041 205,000.00 840.50
Jumlah harga pekerjaan 61,745.40 77,601.58 139,346.98
Jumlah harga dibulatkan 139,346.00

26 1 BH Kran air Dia. 3/4" atau 1/2" PU.26


RSNI T-15-2002
Kran air Dia. 3/4" atau 1/2" - Buah 1.2000 28,712.05 34,454.46
Seal Tape Buah 0.0250 5,000.00 125.00
Pekerja L-4 OH - 132,000.00 0.00
Tukang pipa L-3 OH 0.1000 168,000.00 16,800.00
Kepala tukang L-2 OH 0.0100 188,000.00 1,880.00
Mandor L-1 OH - 205,000.00 0.00
Jumlah harga pekerjaan 34,454.46 18,805.00 53,259.46
Jumlah harga dibulatkan 53,259.00

27 1 Unit Bak air volume 1 m3 - (Pasir Import) PU.27


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 Zak 5.5000 138,941.85 764,180.18
Pasir semen (import) MB.1 M3 1.0000 1,541,578.45 1,541,578.45
Batu bata MB.8 Buah 600.0000 1,851.50 1,110,900.00
Mandor pasir/batu L-1 OH 0.1000 205,000.00 20,500.00
Kepala tukang pasir/batu L-2 OH 0.3000 188,000.00 56,400.00
Tukang pasir/batu L-3 OH 3.0000 168,000.00 504,000.00
Pekerja pasir/batu L-4 OH 2.0000 132,000.00 264,000.00
Jumlah harga pekerjaan 3,416,658.63 844,900.00 4,261,558.63
Jumlah harga dibulatkan 4,261,558.00

28 1 Unit Bak air volume 1 m3 - (Pasir Lokal) PU.28


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 Zak 5.5000 138,941.85 764,180.18
Pasir semen (lokal) MB.2 M3 1.0000 1,058,872.85 1,058,872.85
Batu bata MB.8 Buah 600.0000 1,851.50 1,110,900.00
Mandor pasir/batu L-1 OH 0.1000 205,000.00 20,500.00
Kepala tukang pasir/batu L-2 OH 0.3000 188,000.00 56,400.00
Tukang pasir/batu L-3 OH 3.0000 168,000.00 504,000.00
Pekerja pasir/batu L-4 OH 2.0000 132,000.00 264,000.00
Jumlah harga pekerjaan 2,933,953.03 844,900.00 3,778,853.03
Jumlah harga dibulatkan 3,778,853.00

29 1 M Talang air pvc 8" PU.29


HPS.PU. 2017
Talang Plastik PVC 8" -Oval (1 Btg = 4 Meter) MK.19 M 1.1000 136,158.85 149,774.74
Gantungan talang besi strip Buah 2.0000 20,000.00 40,000.00
Paku Campur MD.16 KG 0.0500 19,506.30 975.32
Mandor kayu L-1 OH 0.0100 205,000.00 2,050.00
Kepala tukang kayu L-2 OH 0.0300 188,000.00 5,640.00
Tukang kayu L-3 OH 0.3000 168,000.00 50,400.00
Pekerja kayu L-4 OH 0.2000 132,000.00 26,400.00
Jumlah harga pekerjaan 190,750.05 84,490.00 275,240.05
Jumlah harga dibulatkan 275,240.00

30 1 M Talang jurai/talang got PU.30


HPS.PU. 2017
Papan kayu Rahay MC.6 M3 0.0100 4,839,477.15 48,394.77
Seng Plat BJLS 0.30 ME.6 Lembar 0.5000 3,889.83 1,944.92
Paku Campur MD.16 KG 0.0500 19,506.30 975.32
Kepala tukang kayu L-2 OH 0.0200 188,000.00 3,760.00
Tukang kayu L-3 OH 0.2000 168,000.00 33,600.00
Pekerja kayu L-4 OH 0.1250 132,000.00 16,500.00
Jumlah harga pekerjaan 51,315.00 53,860.00 105,175.00
Jumlah harga dibulatkan 105,175.00

31 1 Unit Septictank (2x1x1,8cm), Pas. Bata 1PC:4PS, Pasir Import PU.31


HPS.PU. 2017
Galian Tanah Biasa Sedalam 1 - 2 M #REF! M3 3.0000 128,025.00 384,075.00
Semen Portland (PC) @ 50 Kg MB.11 Zak 5.5000 138,941.85 764,180.18
Pasir semen (import) MB.1 M3 2.5000 1,541,578.45 3,853,946.13
Batu bata MB.8 Buah 1,216.0000 1,851.50 2,251,424.00
Besi beton dia 10 mm MD.3 KG 112.4000 15,071.90 1,694,081.56
Kawat ikat beton MD.9 KG 0.5000 25,028.60 12,514.30
Papan begisting kayu bus MC.5 M2 2.0000 89,977.35 179,954.70
Besi Pipa Dia 2" PVC MK.13 M 2.0000 17,699.25 35,398.50
Paku Campur MD.16 KG 0.1000 19,506.30 1,950.63
Mandor pasir/batu L-1 OH 0.2500 205,000.00 51,250.00
Kepala tukang pasir/batu L-2 OH 0.5000 188,000.00 94,000.00
Tukang pasir/batu L-3 OH 5.0000 168,000.00 840,000.00
Pekerja pasir/batu L-4 OH 2.5000 132,000.00 330,000.00
Jumlah harga pekerjaan 9,177,524.99 1,315,250.00 10,492,774.99
Jumlah harga dibulatkan 10,492,774.00
Analisa Harga Satuan Pekerjaan (AHSP) A. Pekerjaan Persiapan

PERKIRAAN HARGA JUMLAH HARGA


NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

32 1 Unit Septictank (2x1x1,8m), Pas. Bata 1PC:4PS, Pasir Lokal PU.32


HPS.PU. 2017
Galian Tanah Biasa Sedalam 1 - 2 M #REF! M3 3.0000 128,025.00 384,075.00
Semen Portland (PC) @ 50 Kg MB.11 Zak 5.5000 138,941.85 764,180.18
Pasir semen (lokal) MB.2 M3 2.5000 1,058,872.85 2,647,182.13
Batu bata MB.8 Buah 1,216.0000 1,851.50 2,251,424.00
Besi beton dia 10 mm MD.3 KG 112.4000 15,071.90 1,694,081.56
Kawat ikat beton MD.9 KG 0.5000 25,028.60 12,514.30
Papan begisting kayu bus MC.5 M2 2.0000 89,977.35 179,954.70
Besi Pipa Dia 2" PVC MK.13 M 2.0000 17,699.25 35,398.50
Paku Campur MD.16 KG 0.1000 19,506.30 1,950.63
Mandor pasir/batu L-1 OH 0.2500 205,000.00 51,250.00
Kepala tukang pasir/batu L-2 OH 0.5000 188,000.00 94,000.00
Tukang pasir/batu L-3 OH 5.0000 168,000.00 840,000.00
Pekerja pasir/batu L-4 OH 2.5000 132,000.00 330,000.00
Jumlah harga pekerjaan 7,970,760.99 1,315,250.00 9,286,010.99
Jumlah harga dibulatkan 9,286,010.00

33 1 Unit Septictank (1,5x1,5x1,5 m) dinding papan PU.33


HPS.PU. 2017
Galian Tanah Biasa Sedalam 1 - 2 M M3 4.0960 #REF! #REF!
Urug Kembali Bekas Galian Tanah Biasa Sedalam 1 - 2 M M3 1.3650 #REF! #REF!
Rangka kayu Bus/Kelas III Uk 8 x 8 cm M3 0.0864 #REF! #REF!
Dinding papan kayu Bus/Kelas III Uk 2,5 x 20 cm M2 11.2500 #REF! #REF!
Pipa PVC dia 4" MK.10 M 1.5000 87,296.50 130,944.75
Pipa PVC untuk pipa udara MK.13 M 1.0000 17,699.25 17,699.25
Jumlah harga pekerjaan #REF! - #REF!
Jumlah harga dibulatkan #REF!

33 1 Unit Septictank 2x(75 x 75) cm, Dalam 1,5 m dan peresapan PU.33
HPS.PU. 2017
Galian Tanah Biasa Sedalam 1 - 2 M #REF! M3 1.6880 - 0.00
Batu bata MB.8 Buah 366.3000 1,851.50 678,204.45
Semen Portland (PC) @ 50 Kg MB.11 Zak 2.4070 138,941.85 334,433.03
Pasir semen (import) MB.1 M3 0.4570 1,541,578.45 704,501.35
Besi beton dia 10 mm MD.3 KG 5.0820 15,071.90 76,595.40
Kawat ikat beton MD.9 KG 0.1240 25,028.60 3,103.55
Papan begisting kayu bus MC.5 M2 0.2500 89,977.35 22,494.34
Patok kayu bus MC.4 M3 0.0250 3,005,904.50 75,147.61
Besi Pipa Dia 2" PVC MK.13 M 2.0000 17,699.25 35,398.50
Paku Campur MD.16 KG 0.1000 19,506.30 1,950.63
Pipa peresapan PVC dia 4" MK.10 M 2.0000 87,296.50 174,593.00
Mandor pasir/batu L-1 OH 0.2500 205,000.00 51,250.00
Kepala tukang pasir/batu L-2 OH 0.3400 188,000.00 63,920.00
Tukang pasir/batu L-3 OH 3.4000 168,000.00 571,200.00
Pekerja pasir/batu L-4 OH 2.4000 132,000.00 316,800.00
Jumlah harga pekerjaan 2,106,421.86 1,003,170.00 3,109,591.86
Jumlah harga dibulatkan 3,109,591.00

34 1 Unit Bak Peresapan Uk.1 x 1 m, jarak 2 m dari septictank PU.34


HPS.PU. 2017
Galian Tanah Biasa Sedalam 1 M #REF! M3 1.5000 - 0.00
Pipa PVC dia 2" diberi lobang MK.13 M 2.0000 17,699.25 35,398.50
Batu bata MB.8 Buah 500.0000 1,851.50 925,750.00
Pasir timbun (lokal) MB.4 M3 0.5000 370,471.35 185,235.68
Urugan tanah kembali #REF! M3 1.0000 - 0.00
Jumlah harga pekerjaan 1,146,384.18 - 1,146,384.18
Jumlah harga dibulatkan 1,146,384.00

35 1 Unit Bak air Uk. 60 x 60 x 80 PU.35


HPS.PU. 2017
Pasangan Batu Bata 1PC : 2 PS PU.C.1 M3 0.1440 3,328,344.00 479,281.54
Plesteran 1PC : 3PS, tebal 15 mm (import) #REF! M2 3.8700 - 0.00
Jumlah harga pekerjaan 479,281.54 - 479,281.54
Jumlah harga dibulatkan 479,281.00

36 1 Unit Pompa dragon/pompa tangan PU.36


HPS.PU. 2017
Pompa Dragon Buah 1.0000 650000 650,000.00
Shock ulir Buah 1.0000 25000 25,000.00
L Bough 2" MK.38 Buah 2.0000 10433.95 20,867.90
Pipa PVC dia 1" ( D ) MK.14 Batang 2.0000 52297.4 104,594.80
Lem PVC Buah 0.1000 5000 500.00
Campuran 1PC : 3PS - import ( 0,4 x 0,4 x 0,4 ) Upah kerja #REF! M3 0.0640 0 0.00
Alat bantu LS 1.0000 25000 25,000.00
Jumlah harga pekerjaan 800,962.70 25,000.00 825,962.70
Jumlah harga dibulatkan 825,962.00

37 1 M Memasang Pipa HDPE Ø 50 mm - 63 mm PU.37


PAHSP PU 2013
Pekerja L-4 OH 0.0350 132000 4,620.00
Tukang Pipa L-3 OH 0.0170 168000 2,856.00
Mandor L-1 OH 0.0030 205000 615.00
Perlengkapan Pemasangan (Sewa Tripot/teckel dll) Hari 0.0190 750000 14,250.00
Jumlah harga pekerjaan - 22,341.00 22,341.00
Jumlah harga dibulatkan 22,341.00

38 1 M Memasang Pipa HDPE Ø 75 mm PU.38


PAHSP PU 2013
Pekerja L-4 OH 0.0375 132000 4,950.00
Tukang Pipa L-3 OH 0.0185 168000 3,108.00
Mandor L-1 OH 0.0035 205000 717.50
Perlengkapan Pemasangan (Sewa Tripot/teckel dll) Hari 0.0190 750000 14,250.00
Jumlah harga pekerjaan - 23,025.50 23,025.50
Jumlah harga dibulatkan 23,025.00

39 1 M Memasang Pipa HDPE Ø 100 mm PU.39


PAHSP PU 2013
Pekerja L-4 OH 0.0400 132000 5,280.00
Tukang Pipa L-3 OH 0.0200 168000 3,360.00
Mandor L-1 OH 0.0040 205000 820.00
Perlengkapan Pemasangan (Sewa Tripot/teckel dll) Hari 0.0190 750000 14,250.00
Jumlah harga pekerjaan - 23,710.00 23,710.00
Jumlah harga dibulatkan 23,710.00
Analisa Harga Satuan Pekerjaan (AHSP) A. Pekerjaan Persiapan

PERKIRAAN HARGA JUMLAH HARGA


NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

40 1 M Pengetesan Pipa PU.40


HPS.PU. 2017
Air Test (Air Bersih) Liter 18 50.00 900.00
Mandor L-1 OH 0.0010 205000 205.00
Kepala Tukang L-2 OH 0.0100 188000 1,880.00
Tukang Pipa L-3 OH 0.0010 168000 168.00
Pekerja L-4 OH 0.0170 132000 2,244.00
Air Compressor E - 12 Jam 0.01 198056 1,980.56
Alat Bantu Set 1.0000 4,951.40 4,951.40
Jumlah harga pekerjaan 900.00 11,428.96 12,328.96
Jumlah harga dibulatkan 12,328.00

41 1 M Memasang PVC Water Stop Lebar 230 - 320 mm PU.41


HPS.PU. 2017
Water Stop Lebar 230 - 320 mm - M 1.0500 125,000.00 131,250.00
Mandor L-1 OH 0.0040 205000 820.00
Kepala tukang L-2 OH 0.0040 188000 752.00
Tukang pipa L-3 OH 0.0417 168000 7,000.00
Pekerja L-4 OH 0.0833 132000 11,000.00
Perlengkapan Set 1.0000 4,200.00 4,200.00
Jumlah harga pekerjaan 131,250.00 23,772.00 155,022.00
Jumlah harga dibulatkan 155,022.00
Analisa Harga Satuan Pekerjaan (AHSP) B. Pekerjaan Tanah dan Pasir

B. PEKERJAAN TANAH DAN PASIR


PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE
PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUANKUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

1 1 M3 Galian Tanah Biasa Sedalam 1 M PU.B.1


SNI 2835:2008
Pekerja L-4 OH 0.7500 132,000.00 99,000.00
Mandor L-1 OH 0.0250 205,000.00 5,125.00
Jumlah harga pekerjaan - 104,125.00 104,125.00
Jumlah harga dibulatkan 104,125.00
`
2 1 M3 Urug Kembali Tanah Biasa Sedalam 1 M PU.B.2
SNI 2835:2008
Dihitung 1/3 kali Galian Tanah Biasa Sedalam 1 M 1/3PU.B.1 M3 0.3333 104,125.00 34,708.33
Jumlah harga dibulatkan 34,708.00

3 1 M3 Galian Tanah Biasa Sedalam 1 - 2 M PU.B.3


SNI 2835:2008
Pekerja L-4 OH 0.9000 132,000.00 118,800.00
Mandor L-1 OH 0.0450 205,000.00 9,225.00
Jumlah harga pekerjaan - 128,025.00 128,025.00
Jumlah harga dibulatkan 128,025.00

4 1 M3 Urug Kembali Tanah Biasa Sedalam 1 - 2 M PU.B.4


SNI 2835:2008
Dihitung 1/3 kali Galian Tanah Biasa Sedalam 1 - 2 M 1/3PU.B.3 M3 0.3333 128,025.00 42,675.00
Jumlah harga dibulatkan 42,675.00

5 1 M3 Galian Tanah Biasa Sedalam 2 - 3 M PU.B.5


SNI 2835:2008
Pekerja L-4 OH 1.0500 132,000.00 138,600.00
Mandor L-1 OH 0.0670 205,000.00 13,735.00
Jumlah harga pekerjaan - 152,335.00 152,335.00
Jumlah harga dibulatkan 152,335.00

6 1 M3 Urug Kembali Tanah Biasa Sedalam 2 - 3 M PU.B.6


SNI 2835:2008
Dihitung 1/3 kali Galian Tanah Biasa Sedalam 2 - 3 M 1/3PU.B.5 M3 0.3333 152,335.00 50,778.33
Jumlah harga dibulatkan 50,778.00

7 1 M3 Galian Tanah Keras Sedalam 1 M PU.B.7


SNI 2835:2008
Pekerja L-4 OH 1.0000 132,000.00 132,000.00
Mandor L-1 OH 0.0320 205,000.00 6,560.00
Jumlah harga pekerjaan - 138,560.00 138,560.00
Jumlah harga dibulatkan 138,560.00

8 1 M3 Urug Kembali Tanah Keras Sedalam 1 M PU.B.8


SNI 2835:2008
Dihitung 1/3 kali Galian Tanah Keras Sedalam 1 M 1/3PU.B.7 M3 0.3333 138,560.00 46,186.67
Jumlah harga dibulatkan 46,186.00

9 1 M3 Galian Tanah Cadas Sedalam 1 M PU.B.9


SNI 2835:2008
Pekerja L-4 OH 1.0000 132,000.00 132,000.00
Mandor L-1 OH 0.0600 205,000.00 12,300.00
Jumlah harga pekerjaan - 144,300.00 144,300.00
Jumlah harga dibulatkan 144,300.00

10 1 M3 Urug Kembali Tanah Cadas Sedalam 1 M PU.B.10


SNI 2835:2008
Dihitung 1/3 kali Galian Tanah Cadas Sedalam 1 M 1/3PU.B.9 M3 0.3333 144,300.00 48,100.00
Jumlah harga dibulatkan 48,100.00

11 1 M3 Galian Tanah Lumpur Sedalam 1 M PU.B.11


SNI 2835:2008
Pekerja L-4 OH 1.2000 132,000.00 158,400.00
Mandor L-1 OH 0.0450 205,000.00 9,225.00
Jumlah harga pekerjaan - 167,625.00 167,625.00
Jumlah harga dibulatkan 167,625.00

12 1 M3 Urug Kembali Tanah Lumpur Sedalam 1 M PU.B.12


SNI 2835:2008
Dihitung 1/3 kali Galian Tanah Lumpur Sedalam 1 M 1/3PU.B.11 M3 0.3333 167,625.00 55,875.00
Jumlah harga dibulatkan 55,875.00

13 1 M3 Memadatkan Tanah Per 20 cm PU.B.13


SNI 2835:2008
Pekerja L-4 OH 0.5000 132,000.00 66,000.00
Mandor L-1 OH 0.0500 205,000.00 10,250.00
Jumlah harga pekerjaan - 76,250.00 76,250.00
Jumlah harga dibulatkan 76,250.00
Analisa Harga Satuan Pekerjaan (AHSP) B. Pekerjaan Tanah dan Pasir

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUANKUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

14 1 M3 Urugan Tanah Urug (material didatangkan) PU.B.14


SNI 2835:2008
Tanah timbun biasa/urug MB.4 M3 1.2000 370,471.35 444,565.62
Untuk pemadatan per 20 cm
Pekerja L-4 OH 0.5000 132,000.00 66,000.00
Mandor L-1 OH 0.0500 205,000.00 10,250.00
Jumlah harga pekerjaan 444,565.62 76,250.00 520,815.62
Jumlah harga dibulatkan 520,815.00

15 1 M3 Urugan Tanah Pilihan (Selmat) - Manual PU.B.15


SNI 2835:2008
Tanah pilihan (Selmat) MB.5 M3 1.2000 436,596.35 523,915.62
Untuk pemadatan per 20 cm
Pekerja L-4 OH 0.5000 132,000.00 66,000.00
Mandor L-1 OH 0.0500 205,000.00 10,250.00
Jumlah harga pekerjaan 523,915.62 76,250.00 600,165.62
Jumlah harga dibulatkan 600,165.00

16 1 M3 Urugan Pasir Bawah Pondasi/Lantai/Konstruksi PU.B.16


SNI 2835:2008
Pasir semen (lokal) MB.2 M3 1.2000 ### 1,270,647.42
Pekerja L-4 OH 0.3000 132,000.00 39,600.00
Mandor L-1 OH 0.0100 205,000.00 2,050.00
Jumlah harga pekerjaan 1,270,647.42 41,650.00 1,312,297.42
Jumlah harga dibulatkan 1,312,297.00

17 1 M3 Urugan Sirtu / Kerikil PU.B.17


SNI 2835:2008
Sirtu MB.6 M3 1.2000 ### 1,880,975.88
Pekerja L-4 OH 0.2500 132,000.00 33,000.00
Mandor L-1 OH 0.0250 205,000.00 5,125.00
Jumlah harga pekerjaan 1,880,975.88 38,125.00 1,919,100.88
Jumlah harga dibulatkan 1,919,100.00

18 1 M3 Pengangkutan Tanah Sampai Dengan Sejauh 15 M PU.B.18


SNI 2835:2008
Pekerja L-4 OH 0.3300 132,000.00 43,560.00
Mandor L-1 OH 0.0100 205,000.00 2,050.00
Jumlah harga pekerjaan - 45,610.00 45,610.00
Jumlah harga dibulatkan 45,610.00

19 1 M3 Lapisan Ijuk Tebal 10 cm Untuk Peresapan PU.B.19


SNI 2835:2008
Ijuk KG 6.0000 10,000.00 60,000.00
Pekerja L-4 OH 0.1500 132,000.00 19,800.00
Mandor L-1 OH 0.0150 205,000.00 3,075.00
Jumlah harga pekerjaan 60,000.00 22,875.00 82,875.00
Jumlah harga dibulatkan 82,875.00

20 1 M2 Land Clearing (Mekanis) - Bulldozer PU.B.20


HPS.PU. 2017
Mandor (F. Equipment) L-5 Jam 0.0020 32,858.00 65.31
Bulldozer E-3 Jam 0.0020 ### 2,357.23
Jumlah harga pekerjaan - 2,422.54 2,422.54
Jumlah harga dibulatkan 2,422.00

21 1 M3 Galian Tanah (Mekanis) - Excavator PU.B.21


HPS.PU. 2017
Mandor (F. Equipment) L-5 Jam 0.0315 32,858.00 1,033.43
Excavator E-2 Jam 0.0315 762,894.00 23,994.00
Jumlah harga pekerjaan - 25,027.43 25,027.43
Jumlah harga dibulatkan 25,027.00

22 1 M2 Pembentukan dan Pemadatan Badan Jalan - Greder PU.B.22


HPS.PU. 2017
Pekerja L-4 Jam 0.0100 18,858.00 189.10
Mandor (F. Equipment) L-5 Jam 0.0100 32,858.00 329.48
Motor Grader E-4 Jam 0.0025 915,942.00 2,265.52
Vibrator Roller E-5 Jam 0.0100 563,006.00 5,645.50
Water Tank Truck E - 10 Jam 0.0093 379,191.00 3,539.12
Jumlah harga pekerjaan - 11,968.71 11,968.71
Jumlah harga dibulatkan 11,968.00

23 1 M2 Pembentukan dan Pemadatan Badan Jalan - Mini Grader (Cob PU.B.23


HPS.PU. 2017
Pekerja L-4 Jam 0.0100 18,858.00 189.10
Mandor (F. Equipment) L-5 Jam 0.0100 32,858.00 329.48
Mini Excavator + Blade (Cobelco) E - 20 Jam 0.0038 406,276.00 1,562.14
Vibrator Roller E-5 Jam 0.0100 563,006.00 5,645.50
Water Tank Truck E - 10 Jam 0.0093 379,191.00 3,539.12
Jumlah harga pekerjaan - 11,265.33 11,265.33
Jumlah harga dibulatkan 11,265.00
Analisa Harga Satuan Pekerjaan (AHSP) B. Pekerjaan Tanah dan Pasir

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUANKUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

24 1 M3 Penimbunan dan pemadatan Tanah Biasa (Mekanis) - Greder PU.B.24


HPS.PU. 2017
Tanah Urug Biasa (didatangkan) MB.4 M3 1.2000 370,471.35 444,565.62
Pekerja L-4 Jam 0.0313 18,858.00 590.93
Mandor (F. Equipment) L-5 Jam 0.0313 32,858.00 1,029.63
Motor Grader E-4 Jam 0.0066 915,942.00 6,017.78
Vibrator Roller E-5 Jam 0.0313 563,006.00 17,642.18
Water Tank Truck E - 10 Jam 0.0187 379,191.00 7,078.23
Jumlah harga pekerjaan 444,565.62 32,358.75 476,924.37
Jumlah harga dibulatkan 476,924.00

25 1 M3 Penimbunan dan pemadatan Tanah Biasa Borrow Pit PU.B.25


HPS.PU. 2017
Tanah Biasa Hasil Galian Setempat (Borrow Pit) MB.4 M3 1.2000 35,000.00 42,000.00
Pekerja L-4 Jam 0.0313 18,858.00 590.93
Mandor (F. Equipment) L-5 Jam 0.0313 32,858.00 1,029.63
Motor Grader E-4 Jam 0.0066 915,942.00 6,017.78
Vibrator Roller E-5 Jam 0.0313 563,006.00 17,642.18
Water Tank Truck E - 10 Jam 0.0187 379,191.00 7,078.23
Jumlah harga pekerjaan 42,000.00 32,358.75 74,358.75
Jumlah harga dibulatkan 74,358.00

26 1 M3 Timbunan dan pemadatan Tanah Biasa (Mekanis) - Mini Blade (Cobelco) PU.B.26
HPS.PU. 2017
Tanah Biasa Hasil Galian Setempat MB.4 M3 1.2000 370,471.35 444,565.62
Pekerja L-4 Jam 0.0313 18,858.00 590.93
Mandor (F. Equipment) L-5 Jam 0.0313 32,858.00 1,029.63
Mini Excavator + Blade (Cobelco) E - 20 Jam 0.0266 406,276.00 10,814.80
Vibrator Roller E-5 Jam 0.0313 563,006.00 17,642.18
Water Tank Truck E - 10 Jam 0.0187 379,191.00 7,078.23
Jumlah harga pekerjaan 444,565.62 37,155.77 481,721.39
Jumlah harga dibulatkan 481,721.00

27 1 M3 Timbunan dan pemadatan Tanah Pilihan (Mekanis) - Stamper PU.B.27


HPS.PU. 2017
Tanah pilihan (Selmat) MB.5 M3 1.2000 436,596.35 523,915.62
Pekerja L-4 Jam 0.3200 18,858.00 6,034.56
Mandor (F. Equipment) L-5 Jam 0.3200 32,858.00 10,514.56
Stamper E - 15 Jam 0.3200 64,537.00 20,651.84
Jumlah harga pekerjaan 523,915.62 37,200.96 561,116.58
Jumlah harga dibulatkan 561,116.00

28 1 M3 Timbunan dan pemadatan Tanah Pilihan (Mekanis) - Grader PU.B.28


HPS.PU. 2017
Tanah pilihan (Selmat) MB.5 M3 1.2000 436,596.35 523,915.62
Pekerja L-4 Jam 0.0313 18,858.00 590.93
Mandor (F. Equipment) L-5 Jam 0.0313 32,858.00 1,029.63
Motor Grader E-4 Jam 0.0066 915,942.00 6,017.78
Vibrator Roller E-5 Jam 0.0313 563,006.00 17,642.18
Water Tank Truck E - 10 Jam 0.0187 379,191.00 7,078.23
Jumlah harga pekerjaan 523,915.62 32,358.75 556,274.37
Jumlah harga dibulatkan 556,274.00

29 1 M3 Timbunan dan pemadatan Tanah Pilihan (Mekanis) - Mini Gr PU.B.29


HPS.PU. 2017
Tanah pilihan (Selmat) MB.5 M3 1.2000 436,596.35 523,915.62
Pekerja L-4 Jam 0.0313 18,858.00 590.93
Mandor (F. Equipment) L-5 Jam 0.0313 32,858.00 1,029.63
Mini Excavator + Blade (Cobelco) E - 20 Jam 0.0266 406,276.00 10,814.80
Vibrator Roller E-5 Jam 0.0313 563,006.00 17,642.18
Water Tank Truck E - 10 Jam 0.0187 379,191.00 7,078.23
Jumlah harga pekerjaan 523,915.62 37,155.77 561,071.39
Jumlah harga dibulatkan 561,071.00

30 1 M3 Soil Semen (termasuk penghamparan dan pemadatan mekanis PU.B.30


HPS.PU. 2017
Tanah pilihan (Selmat) MB.5 M3 1.2000 436,596.35 523,915.62
Semen Portland (PC) @ 50 Kg MB.11 Zak 4.0000 138,941.85 555,767.40
Pekerja L-4 Jam 0.2350 18,858.00 4,431.96
Mandor (F. Equipment) L-5 Jam 0.0470 32,858.00 1,544.44
Motor Grader E-4 Jam 0.0533 915,942.00 48,850.24
Tractor Rotari E - 14 Jam 0.3243 243,321.00 78,914.92
Vibrator Roller E-5 Jam 0.0470 563,006.00 26,463.27
Water Tank Truck E - 10 Jam 0.0187 379,191.00 7,078.23
Alat Bantu LS 1.0000 1,000.00 1,000.00
Jumlah harga pekerjaan 1,079,683.02 168,283.06 1,247,966.08
Jumlah harga dibulatkan 1,247,966.00

31 1 M' Pembentukan Badan Tanggul (Bulldozer) PU.B.31


HPS.PU. 2017
Mandor (F. Equipment) L-5 Jam 0.0205 32,858.00 673.44
Bulldozer E-3 Jam 0.0205 ### 24,307.38
Jumlah harga pekerjaan - 24,980.83 24,980.83
Jumlah harga dibulatkan 24,980.00
Analisa Harga Satuan Pekerjaan (AHSP) B. Pekerjaan Tanah dan Pasir

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUANKUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

32 1 M' Perapihan Tanggul Saluran (Excavator); lebar melintang 5.5 PU.B.32


HPS.PU. 2017
Mandor (F. Equipment) L-5 Jam 0.0141 32,858.00 464.88
Excavator E-2 Jam 0.0141 762,894.00 10,793.57
Jumlah harga pekerjaan - 11,258.45 11,258.45
Jumlah harga dibulatkan 11,258.00
33 1 M' Perapihan Tanggul Saluran (Excavator); lebar melintang 6.89 PU.B.33
HPS.PU. 2017
Mandor (F. Equipment) L-5 Jam 0.0175 32,858.00 574.52
Excavator E-2 Jam 0.0175 762,894.00 13,339.25
Jumlah harga pekerjaan - 13,913.78 13,913.78
Jumlah harga dibulatkan 13,913.00
34 1 M' Perapihan Tanggul Saluran (Excavator); lebar melintang 8.03 PU.B.34
HPS.PU. 2017
Mandor (F. Equipment) L-5 Jam 0.0204 32,858.00 669.54
Excavator E-2 Jam 0.0204 762,894.00 15,545.40
Jumlah harga pekerjaan - 16,214.94 16,214.94
Jumlah harga dibulatkan 16,214.00
35 1 M' Perapihan Tanggul Saluran (Excavator); lebar melintang 8.94 PU.B.35
HPS.PU. 2017
Mandor (F. Equipment) L-5 Jam 0.0227 32,858.00 745.76
Excavator E-2 Jam 0.0227 762,894.00 17,314.92
Jumlah harga pekerjaan - 18,060.68 18,060.68
Jumlah harga dibulatkan 18,060.00
36 1 M' Perapihan Tanggul Saluran (Excavator); lebar melintang 11.0 PU.B.36
HPS.PU. 2017
Mandor (F. Equipment) L-5 Jam 0.0234 32,858.00 768.84
Excavator E-2 Jam 0.0234 762,894.00 17,850.95
Jumlah harga pekerjaan - 18,619.80 18,619.80
Jumlah harga dibulatkan 18,619.00
Analisa Harga Satuan Pekerjaan (AHSP) B. Pekerjaan Tanah dan Pasir

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUANKUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

37 1 M' Perapihan Tanggul Saluran (Excavator); lebar melintang 12.9 PU.B.37


HPS.PU. 2017
Mandor (F. Equipment) L-5 Jam 0.0329 32,858.00 1,082.14
Excavator E-2 Jam 0.0329 762,894.00 25,124.91
Jumlah harga pekerjaan - 26,207.05 26,207.05
Jumlah harga dibulatkan 26,207.00
38 1 M' Perapihan Tanggul Saluran (Excavator); lebar melintang 16.0 PU.B.38
HPS.PU. 2017
Mandor (F. Equipment) L-5 Jam 0.0407 32,858.00 1,338.68
Excavator E-2 Jam 0.0407 762,894.00 31,081.29
Jumlah harga pekerjaan - 32,419.96 32,419.96
Jumlah harga dibulatkan 32,419.00

39 1 M3 Pemindahan Tanah Mekanis (Excavator) PU.B.39


HPS.PU. 2017
Mandor (F. Equipment) L-5 Jam 0.0161 32,858.00 529.11
Excavator E-2 Jam 0.0161 762,894.00 12,284.93
Jumlah harga pekerjaan - 12,814.04 12,814.04
Jumlah harga dibulatkan 12,814.00

40 1 M3 Pemindahan Tanah Mekanis (Bulldozer) PU.B.40


HPS.PU. 2017
Jarak tanah yang dipindahkan/digusur (arah melintang) = 20 M
Mandor (F. Equipment) L-5 Jam 0.0072 32,858.00 236.35
Bulldozer E-3 Jam 0.0072 ### 8,530.94
Jumlah harga pekerjaan - 8,767.29 8,767.29
Jumlah harga dibulatkan 8,767.00

41 1 M' Pemadatan Tanggul (Mekanis) PU.B.41


HPS.PU. 2017
Pekerja L-4 Jam 0.0313 18,858.00 590.93
Mandor (F. Equipment) L-5 Jam 0.0313 32,858.00 1,029.63
Motor Grader E-4 Jam 0.0066 915,942.00 6,017.78
Vibrator Roller E-5 Jam 0.0313 563,006.00 17,642.18
Water Tank Truck E - 10 Jam 0.0187 379,191.00 7,078.23
Jumlah harga pekerjaan - 32,358.75 32,358.75
Jumlah harga dibulatkan 32,358.00
Analisa Harga Satuan Pekerjaan (AHSP) C. Pekerjaan Pondasi

C. PEKERJAAN PONDASI PASANGAN BATU


PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE
PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

1 1 M3 Pasangan Bata, Camp. 1PC : 2PS - Pasir Import PU.C.1


HPS.PU. 2017
Batu bata MB.8 Buah 649.0000 1,851.50 1,201,623.50
Semen Portland (PC) @ 50 Kg MB.11 Zak 5.7165 138,941.85 794,261.09
Pasir semen (import) MB.1 M3 0.4083 1,541,578.45 629,459.51
Mandor pasir/batu L-1 OH 0.1429 205,000.00 29,285.71
Kepala tukang pasir/batu L-2 OH 0.4286 188,000.00 80,571.43
Tukang pasir/batu L-3 OH 1.2857 168,000.00 216,000.00
Pekerja pasir/batu L-4 OH 2.8571 132,000.00 377,142.86
Jumlah harga pekerjaan 2,625,344.10 703,000.00 3,328,344.10
Jumlah harga dibulatkan 3,328,344.00

2 1 M3 Pasangan Bata, Camp. 1PC : 3PS - Pasir Import PU.C.2


HPS.PU. 2017
Batu bata MB.8 Buah 649.0000 1,851.50 1,201,623.50
Semen Portland (PC) @ 50 Kg MB.11 Zak 4.2874 138,941.85 595,695.81
Pasir semen (import) MB.1 M3 0.4594 1,541,578.45 708,141.95
Mandor pasir/batu L-1 OH 0.1429 205,000.00 29,285.71
Kepala tukang pasir/batu L-2 OH 0.4286 188,000.00 80,571.43
Tukang pasir/batu L-3 OH 1.2857 168,000.00 216,000.00
Pekerja pasir/batu L-4 OH 2.8571 132,000.00 377,142.86
Jumlah harga pekerjaan 2,505,461.27 703,000.00 3,208,461.27
Jumlah harga dibulatkan 3,208,461.00

3 1 M3 Pasangan Bata, Camp. 1PC : 4PS - Pasir Import PU.C.3


HPS.PU. 2017
Batu bata MB.8 Buah 649.0000 1,851.50 1,201,623.50
Semen Portland (PC) @ 50 Kg MB.11 Zak 3.4299 138,941.85 476,556.65
Pasir semen (import) MB.1 M3 0.4900 1,541,578.45 755,351.42
Mandor pasir/batu L-1 OH 0.1429 205,000.00 29,285.71
Kepala tukang pasir/batu L-2 OH 0.4286 188,000.00 80,571.43
Tukang pasir/batu L-3 OH 1.2857 168,000.00 216,000.00
Pekerja pasir/batu L-4 OH 2.8571 132,000.00 377,142.86
Jumlah harga pekerjaan 2,433,531.57 703,000.00 3,136,531.57
Jumlah harga dibulatkan 3,136,531.00

4 1 M3 Pasangan Bata, Camp. 1PC : 2PS - Pasir Lokal PU.C.4


HPS.PU. 2017
Batu bata MB.8 Buah 649.0000 1,851.50 1,201,623.50
Semen Portland (PC) @ 50 Kg MB.11 Zak 5.7165 138,941.85 794,261.09
Pasir semen (lokal) MB.2 M3 0.4083 1,058,872.85 432,360.47
Mandor pasir/batu L-1 OH 0.1429 205,000.00 29,285.71
Kepala tukang pasir/batu L-2 OH 0.4286 188,000.00 80,571.43
Tukang pasir/batu L-3 OH 1.2857 168,000.00 216,000.00
Pekerja pasir/batu L-4 OH 2.8571 132,000.00 377,142.86
Jumlah harga pekerjaan 2,428,245.06 703,000.00 3,131,245.06
Jumlah harga dibulatkan 3,131,245.00

5 1 M3 Pasangan Bata, Camp. 1PC : 3PS - Pasir Lokal PU.C.5


HPS.PU. 2017
Batu bata MB.8 Buah 649.0000 1,851.50 1,201,623.50
Semen Portland (PC) @ 50 Kg MB.11 Zak 4.2874 138,941.85 595,695.81
Pasir semen (lokal) MB.2 M3 0.4594 1,058,872.85 486,405.53
Mandor pasir/batu L-1 OH 0.1429 205,000.00 29,285.71
Kepala tukang pasir/batu L-2 OH 0.4286 188,000.00 80,571.43
Tukang pasir/batu L-3 OH 1.2857 168,000.00 216,000.00
Pekerja pasir/batu L-4 OH 2.8571 132,000.00 377,142.86
Jumlah harga pekerjaan 2,283,724.85 703,000.00 2,986,724.85
Jumlah harga dibulatkan 2,986,724.00

6 1 M3 Pasangan Bata, Camp. 1PC : 4PS - Pasir Lokal PU.C.6


HPS.PU. 2017
Batu bata MB.8 Buah 649.0000 1,851.50 1,201,623.50
Semen Portland (PC) @ 50 Kg MB.11 Zak 3.4299 138,941.85 476,556.65
Pasir semen (lokal) MB.2 M3 0.4900 1,058,872.85 518,832.57
Mandor pasir/batu L-1 OH 0.1429 205,000.00 29,285.71
Kepala tukang pasir/batu L-2 OH 0.4286 188,000.00 80,571.43
Tukang pasir/batu L-3 OH 1.2857 168,000.00 216,000.00
Pekerja pasir/batu L-4 OH 2.8571 132,000.00 377,142.86
Jumlah harga pekerjaan 2,197,012.72 703,000.00 2,900,012.72
Jumlah harga dibulatkan 2,900,012.00

7 1 M3 Pondasi Pasangan Batu Belah, 1PC : 3PS PU.C.7


SNI 2836:2008
Batu Kali / Batu Belah 15/20 MB.7 M3 1.2000 1,732,792.40 2,079,350.88
Semen Portland (PC) @ 50 Kg MB.11 KG 202.0000 2,778.84 561,325.07
Pasir Semen (import) MB.1 M3 0.4850 1,541,578.45 747,665.55
Mandor pasir/batu L-1 OH 0.0750 205,000.00 15,375.00
Kepala tukang pasir/batu L-2 OH 0.0750 188,000.00 14,100.00
Tukang pasir/batu L-3 OH 0.7500 168,000.00 126,000.00
Pekerja pasir/batu L-4 OH 1.5000 132,000.00 198,000.00
Jumlah harga pekerjaan 3,388,341.50 353,475.00 3,741,816.50
Jumlah harga dibulatkan 3,741,816.00
Analisa Harga Satuan Pekerjaan (AHSP) C. Pekerjaan Pondasi

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

8 1 M3 Pondasi Pasangan Batu Belah, 1PC : 4PS PU.C.8


SNI 2836:2008
Batu Kali / Batu Belah 15/20 MB.7 M3 1.2000 1,732,792.40 2,079,350.88
Semen Portland (PC) @ 50 Kg MB.11 KG 163.0000 2,778.84 452,950.43
Pasir Semen (import) MB.1 M3 0.5200 1,541,578.45 801,620.79
Mandor pasir/batu L-1 OH 0.0750 205,000.00 15,375.00
Kepala tukang pasir/batu L-2 OH 0.0750 188,000.00 14,100.00
Tukang pasir/batu L-3 OH 0.7500 168,000.00 126,000.00
Pekerja pasir/batu L-4 OH 1.5000 132,000.00 198,000.00
Jumlah harga pekerjaan 3,333,922.11 353,475.00 3,687,397.11
Jumlah harga dibulatkan 3,687,397.00

9 1 M3 Pasangan Pondasi Batu Kosong (Anstamping) PU.C.9


SNI 2836:2008
Batu Kali / Batu Belah 15/20 MB.7 M3 1.2000 1,732,792.40 2,079,350.88
Pasir Urug (tanah pilihan) MB.5 M3 0.4320 436,596.35 188,609.62
Mandor pasir/batu L-1 OH 0.0390 205,000.00 7,995.00
Kepala tukang pasir/batu L-2 OH 0.0390 188,000.00 7,332.00
Tukang pasir/batu L-3 OH 0.3900 168,000.00 65,520.00
Pekerja pasir/batu L-4 OH 0.7800 132,000.00 102,960.00
Jumlah harga pekerjaan 2,267,960.50 183,807.00 2,451,767.50
Jumlah harga dibulatkan 2,451,767.00
Analisa Harga Satuan Pekerjaan (AHSP) D. Pekerjaan Beton

D. PEKERJAAN COR BETON


PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE
PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

1 1 M3 Campuran Beton 1PC : 2PS Pasir Import - Manual PU.D.1


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 Zak 15.0000 138,941.85 2,084,127.75
Pasir semen (import) MB.1 M3 1.0714 1,541,578.45 1,651,691.20
Mandor pasir/batu L-1 OH 0.3000 205,000.00 61,500.00
Kepala tukang pasir/batu L-2 OH 0.1000 188,000.00 18,800.00
Tukang pasir/batu L-3 OH 1.0000 168,000.00 168,000.00
Pekerja pasir/batu L-4 OH 6.0000 132,000.00 792,000.00
Jumlah harga pekerjaan 3,735,818.95 1,040,300.00 4,776,118.95
Jumlah harga dibulatkan 4,776,118.00

2 1 M3 Campuran Beton 1PC : 3PS Pasir Import - Manual PU.D.2


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 Zak 11.2500 138,941.85 1,563,095.81
Pasir semen (import) MB.1 M3 1.2054 1,541,578.45 1,858,152.60
Mandor pasir/batu L-1 OH 0.3000 205,000.00 61,500.00
Kepala tukang pasir/batu L-2 OH 0.1000 188,000.00 18,800.00
Tukang pasir/batu L-3 OH 1.0000 168,000.00 168,000.00
Pekerja pasir/batu L-4 OH 6.0000 132,000.00 792,000.00
Jumlah harga pekerjaan 3,421,248.41 1,040,300.00 4,461,548.41
Jumlah harga dibulatkan 4,461,548.00

3 1 M3 Campuran Beton 1PC : 4PS Pasir Import - Manual PU.D.3


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 Zak 9.0000 138,941.85 1,250,476.65
Pasir semen (import) MB.1 M3 1.2857 1,541,578.45 1,982,029.44
Mandor pasir/batu L-1 OH 0.3000 205,000.00 61,500.00
Kepala tukang pasir/batu L-2 OH 0.1000 188,000.00 18,800.00
Tukang pasir/batu L-3 OH 1.0000 168,000.00 168,000.00
Pekerja pasir/batu L-4 OH 6.0000 132,000.00 792,000.00
Jumlah harga pekerjaan 3,232,506.09 1,040,300.00 4,272,806.09
Jumlah harga dibulatkan 4,272,806.00

4 1 M3 Campuran Beton 1PC : 5PS Pasir Import - Manual PU.D.4


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 Zak 7.5000 138,941.85 1,042,063.88
Pasir semen (import) MB.1 M3 1.3393 1,541,578.45 2,064,614.00
Mandor pasir/batu L-1 OH 0.3000 205,000.00 61,500.00
Kepala tukang pasir/batu L-2 OH 0.1000 188,000.00 18,800.00
Tukang pasir/batu L-3 OH 1.0000 168,000.00 168,000.00
Pekerja pasir/batu L-4 OH 6.0000 132,000.00 792,000.00
Jumlah harga pekerjaan 3,106,677.87 1,040,300.00 4,146,977.87
Jumlah harga dibulatkan 4,146,977.00

5 1 M3 Campuran Beton 1PC : 6PS Pasir Import - Manual PU.D.5


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 Zak 6.4286 138,941.85 893,197.61
Pasir semen (import) MB.1 M3 1.3776 1,541,578.45 2,123,602.97
Mandor pasir/batu L-1 OH 0.3000 205,000.00 61,500.00
Kepala tukang pasir/batu L-2 OH 0.1000 188,000.00 18,800.00
Tukang pasir/batu L-3 OH 1.0000 168,000.00 168,000.00
Pekerja pasir/batu L-4 OH 6.0000 132,000.00 792,000.00
Jumlah harga pekerjaan 3,016,800.57 1,040,300.00 4,057,100.57
Jumlah harga dibulatkan 4,057,100.00

6 1 M3 Campuran Beton 1PC : 2PS Pasir Lokal - Manual PU.D.6


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 Zak 15.0000 138,941.85 2,084,127.75
Pasir semen (lokal) MB.2 M3 1.0000 1,058,872.85 1,058,872.85
Mandor pasir/batu L-1 OH 0.3000 205,000.00 61,500.00
Kepala tukang pasir/batu L-2 OH 0.1000 188,000.00 18,800.00
Tukang pasir/batu L-3 OH 1.0000 168,000.00 168,000.00
Pekerja pasir/batu L-4 OH 6.0000 132,000.00 792,000.00
Jumlah harga pekerjaan 3,143,000.60 1,040,300.00 4,183,300.60
Jumlah harga dibulatkan 4,183,300.00

7 1 M3 Campuran Beton 1PC : 3PS Pasir Lokal - Manual PU.D.7


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 Zak 11.2500 138,941.85 1,563,095.81
Pasir semen (lokal) MB.2 M3 1.1250 1,058,872.85 1,191,231.96
Mandor pasir/batu L-1 OH 0.3000 205,000.00 61,500.00
Kepala tukang pasir/batu L-2 OH 0.1000 188,000.00 18,800.00
Tukang pasir/batu L-3 OH 1.0000 168,000.00 168,000.00
Pekerja pasir/batu L-4 OH 6.0000 132,000.00 792,000.00
Jumlah harga pekerjaan 2,754,327.77 1,040,300.00 3,794,627.77
Jumlah harga dibulatkan 3,794,627.00

8 1 M3 Campuran Beton 1PC : 4PS Pasir Lokal - Manual PU.D.8


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 Zak 9.0000 138,941.85 1,250,476.65
Pasir semen (lokal) MB.2 M3 1.2000 1,058,872.85 1,270,647.42
Mandor pasir/batu L-1 OH 0.3000 205,000.00 61,500.00
Kepala tukang pasir/batu L-2 OH 0.1000 188,000.00 18,800.00
Tukang pasir/batu L-3 OH 1.0000 168,000.00 168,000.00
Pekerja pasir/batu L-4 OH 6.0000 132,000.00 792,000.00
Jumlah harga pekerjaan 2,521,124.07 1,040,300.00 3,561,424.07
Jumlah harga dibulatkan 3,561,424.00
Analisa Harga Satuan Pekerjaan (AHSP) D. Pekerjaan Beton

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

9 1 M3 Campuran Beton 1PC : 5PS Pasir Lokal - Manual PU.D.9


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 Zak 7.5000 138,941.85 1,042,063.88
Pasir semen (lokal) MB.2 M3 1.2500 1,058,872.85 1,323,591.06
Mandor pasir/batu L-1 OH 0.3000 205,000.00 61,500.00
Kepala tukang pasir/batu L-2 OH 0.1000 188,000.00 18,800.00
Tukang pasir/batu L-3 OH 1.0000 168,000.00 168,000.00
Pekerja pasir/batu L-4 OH 6.0000 132,000.00 792,000.00
Jumlah harga pekerjaan 2,365,654.94 1,040,300.00 3,405,954.94
Jumlah harga dibulatkan 3,405,954.00

10 1 M3 Campuran Beton 1PC : 6PS Pasir Lokal - Manual PU.D.10


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 Zak 6.4286 138,941.85 893,197.61
Pasir semen (lokal) MB.2 M3 1.2857 1,058,872.85 1,361,407.95
Mandor pasir/batu L-1 OH 0.3000 205,000.00 61,500.00
Kepala tukang pasir/batu L-2 OH 0.1000 188,000.00 18,800.00
Tukang pasir/batu L-3 OH 1.0000 168,000.00 168,000.00
Pekerja pasir/batu L-4 OH 6.0000 132,000.00 792,000.00
Jumlah harga pekerjaan 2,254,605.56 1,040,300.00 3,294,905.56
Jumlah harga dibulatkan 3,294,905.00

11 1 M3 Campuran Beton 1PC : 2PS - Pasir Import (mekanis) PU.D.11


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 Zak 15.0000 138,941.85 2,084,127.75
Pasir semen (import) MB.1 M3 1.0714 1,541,578.45 1,651,691.20
Mandor L-1 Jam 1.6000 29,286.00 46,857.60
Kepala tukang L-2 Jam 1.6000 26,858.00 42,972.80
Tukang pasir/batu L-3 Jam 4.8000 24,000.00 115,200.00
Pekerja L-4 Jam 16.0000 18,858.00 301,728.00
Concrete Mixer E-8 Jam 1.6000 85,665.00 137,064.00
Truck tanki air E - 10 Jam 0.1717 379,191.00 65,102.07
Water Pump E-9 Jam 1.6000 61,861.00 98,977.60
Alat bantu Set 1.0000 5,000.00 5,000.00
Jumlah harga pekerjaan 3,735,818.95 812,902.07 4,548,721.02
Jumlah harga dibulatkan 4,548,721.00

12 1 M3 Campuran Beton 1PC : 3PS - Pasir Import (mekanis) PU.D.12


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 Zak 11.2500 138,941.85 1,563,095.81
Pasir semen (import) MB.1 M3 1.2054 1,541,578.45 1,858,152.60
Mandor L-1 Jam 1.6000 29,286.00 46,857.60
Kepala tukang L-2 Jam 1.6000 26,858.00 42,972.80
Tukang pasir/batu L-3 Jam 4.8000 24,000.00 115,200.00
Pekerja L-4 Jam 16.0000 18,858.00 301,728.00
Concrete Mixer E-8 Jam 1.6000 85,665.00 137,064.00
Truck tanki air E - 10 Jam 0.1288 379,191.00 48,826.55
Water Pump E-9 Jam 1.6000 61,861.00 98,977.60
Alat bantu Set 1.0000 5,000.00 5,000.00
Jumlah harga pekerjaan 3,421,248.41 796,626.55 4,217,874.96
Jumlah harga dibulatkan 4,217,874.00

13 1 M3 Campuran Beton 1PC : 4PS - Pasir Import (mekanis) PU.D.13


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 Zak 9.0000 138,941.85 1,250,476.65
Pasir semen (import) MB.1 M3 1.2857 1,541,578.45 1,982,029.44
Mandor L-1 Jam 1.6000 29,286.00 46,857.60
Kepala tukang L-2 Jam 1.6000 26,858.00 42,972.80
Tukang pasir/batu L-3 Jam 4.8000 24,000.00 115,200.00
Pekerja L-4 Jam 16.0000 18,858.00 301,728.00
Concrete Mixer E-8 Jam 1.6000 85,665.00 137,064.00
Truck tanki air E - 10 Jam 0.1030 379,191.00 39,061.24
Water Pump E-9 Jam 1.6000 61,861.00 98,977.60
Alat bantu Set 1.0000 5,000.00 5,000.00
Jumlah harga pekerjaan 3,232,506.09 786,861.24 4,019,367.33
Jumlah harga dibulatkan 4,019,367.00

14 1 M3 Campuran Beton 1PC : 5PS - Pasir Import (mekanis) PU.D.14


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 Zak 7.5000 138,941.85 1,042,063.88
Pasir semen (import) MB.1 M3 1.3393 1,541,578.45 2,064,614.00
Mandor L-1 Jam 1.6000 29,286.00 46,857.60
Kepala tukang L-2 Jam 1.6000 26,858.00 42,972.80
Tukang pasir/batu L-3 Jam 4.8000 24,000.00 115,200.00
Pekerja L-4 Jam 16.0000 18,858.00 301,728.00
Concrete Mixer E-8 Jam 1.6000 85,665.00 137,064.00
Truck tanki air E - 10 Jam 0.0858 379,191.00 32,551.03
Water Pump E-9 Jam 1.6000 61,861.00 98,977.60
Alat bantu Set 1.0000 5,000.00 5,000.00
Jumlah harga pekerjaan 3,106,677.87 780,351.03 3,887,028.91
Jumlah harga dibulatkan 3,887,028.00
Analisa Harga Satuan Pekerjaan (AHSP) D. Pekerjaan Beton

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

15 1 M3 Campuran Beton 1PC : 6PS - Pasir Import (mekanis) PU.D.15


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 Zak 6.4286 138,941.85 893,197.61
Pasir semen (import) MB.1 M3 1.3776 1,541,578.45 2,123,602.97
Mandor L-1 Jam 1.6000 29,286.00 46,857.60
Kepala tukang L-2 Jam 1.6000 26,858.00 42,972.80
Tukang pasir/batu L-3 Jam 4.8000 24,000.00 115,200.00
Pekerja L-4 Jam 16.0000 18,858.00 301,728.00
Concrete Mixer E-8 Jam 1.6000 85,665.00 137,064.00
Truck tanki air E - 10 Jam 0.0736 379,191.00 27,900.89
Water Pump E-9 Jam 1.6000 61,861.00 98,977.60
Alat bantu Set 1.0000 5,000.00 5,000.00
Jumlah harga pekerjaan 3,016,800.57 775,700.89 3,792,501.46
Jumlah harga dibulatkan 3,792,501.00

16 1 M3 Campuran Beton 1PC : 2PS - Pasir Lokal (mekanis) PU.D.16


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 Zak 15.0000 138,941.85 2,084,127.75
Pasir semen (lokal) MB.2 M3 1.0000 1,058,872.85 1,058,872.85
Mandor L-1 Jam 1.6000 29,286.00 46,857.60
Kepala tukang L-2 Jam 1.6000 26,858.00 42,972.80
Tukang pasir/batu L-3 Jam 4.8000 24,000.00 115,200.00
Pekerja L-4 Jam 16.0000 18,858.00 301,728.00
Concrete Mixer E-8 Jam 1.6000 85,665.00 137,064.00
Truck tanki air E - 10 Jam 0.1717 379,191.00 65,102.07
Water Pump E-9 Jam 1.6000 61,861.00 98,977.60
Alat bantu Set 1.0000 5,000.00 5,000.00
Jumlah harga pekerjaan 3,143,000.60 812,902.07 3,955,902.67
Jumlah harga dibulatkan 3,955,902.00

17 1 M3 Campuran Beton 1PC : 3PS - Pasir Lokal (mekanis) PU.D.17


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 Zak 11.2500 138,941.85 1,563,095.81
Pasir semen (lokal) MB.2 M3 1.1250 1,058,872.85 1,191,231.96
Mandor L-1 Jam 1.6000 29,286.00 46,857.60
Kepala tukang L-2 Jam 1.6000 26,858.00 42,972.80
Tukang pasir/batu L-3 Jam 4.8000 24,000.00 115,200.00
Pekerja L-4 Jam 16.0000 18,858.00 301,728.00
Concrete Mixer E-8 Jam 1.6000 85,665.00 137,064.00
Truck tanki air E - 10 Jam 0.1288 379,191.00 48,826.55
Water Pump E-9 Jam 1.6000 61,861.00 98,977.60
Alat bantu Set 1.0000 5,000.00 5,000.00
Jumlah harga pekerjaan 2,754,327.77 796,626.55 3,550,954.32
Jumlah harga dibulatkan 3,550,954.00
Analisa Harga Satuan Pekerjaan (AHSP) D. Pekerjaan Beton

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

18 1 M3 Campuran Beton 1PC : 4PS - Pasir Lokal (mekanis) PU.D.18


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 Zak 9.0000 138,941.85 1,250,476.65
Pasir semen (lokal) MB.2 M3 1.2000 1,058,872.85 1,270,647.42
Mandor L-1 Jam 1.6000 29,286.00 46,857.60
Kepala tukang L-2 Jam 1.6000 26,858.00 42,972.80
Tukang pasir/batu L-3 Jam 4.8000 24,000.00 115,200.00
Pekerja L-4 Jam 16.0000 18,858.00 301,728.00
Concrete Mixer E-8 Jam 1.6000 85,665.00 137,064.00
Truck tanki air E - 10 Jam 0.1030 379,191.00 39,061.24
Water Pump E-9 Jam 1.6000 61,861.00 98,977.60
Alat bantu Set 1.0000 5,000.00 5,000.00
Jumlah harga pekerjaan 2,521,124.07 786,861.24 3,307,985.31
Jumlah harga dibulatkan 3,307,985.00

19 1 M3 Campuran Beton 1PC : 5PS - Pasir Lokal (mekanis) PU.D.19


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 Zak 7.5000 138,941.85 1,042,063.88
Pasir semen (lokal) MB.2 M3 1.2500 1,058,872.85 1,323,591.06
Mandor L-1 Jam 1.6000 29,286.00 46,857.60
Kepala tukang L-2 Jam 1.6000 26,858.00 42,972.80
Tukang pasir/batu L-3 Jam 4.8000 24,000.00 115,200.00
Pekerja L-4 Jam 16.0000 18,858.00 301,728.00
Concrete Mixer E-8 Jam 1.6000 85,665.00 137,064.00
Truck tanki air E - 10 Jam 0.0858 379,191.00 32,551.03
Water Pump E-9 Jam 1.6000 61,861.00 98,977.60
Alat bantu Set 1.0000 5,000.00 5,000.00
Jumlah harga pekerjaan 2,365,654.94 780,351.03 3,146,005.97
Jumlah harga dibulatkan 3,146,005.00

20 1 M3 Campuran Beton 1PC : 6PS - Pasir Lokal (mekanis) PU.D.20


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 Zak 6.4286 138,941.85 893,197.61
Pasir semen (lokal) MB.2 M3 1.2857 1,058,872.85 1,361,407.95
Mandor L-1 Jam 1.6000 29,286.00 46,857.60
Kepala tukang L-2 Jam 1.6000 26,858.00 42,972.80
Tukang pasir/batu L-3 Jam 4.8000 24,000.00 115,200.00
Pekerja L-4 Jam 16.0000 18,858.00 301,728.00
Concrete Mixer E-8 Jam 1.6000 85,665.00 137,064.00
Truck tanki air E - 10 Jam 0.0736 379,191.00 27,900.89
Water Pump E-9 Jam 1.6000 61,861.00 98,977.60
Alat bantu Set 1.0000 5,000.00 5,000.00
Jumlah harga pekerjaan 2,254,605.56 775,700.89 3,030,306.44
Jumlah harga dibulatkan 3,030,306.00

21 1 M3 Campuran Beton 1PC : 2PS : 3KR, Import - Manual PU.D.21


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 Zak 7.5000 138,941.85 1,042,063.88
Pasir semen (import) MB.1 M3 0.5357 1,541,578.45 825,845.60
Kerikil/batu pecah (import) MB.6 M3 0.8333 1,567,479.90 1,306,233.25
Mandor pasir/batu L-1 OH 0.3000 205,000.00 61,500.00
Kepala tukang pasir/batu L-2 OH 0.1000 188,000.00 18,800.00
Tukang pasir/batu L-3 OH 1.0000 168,000.00 168,000.00
Pekerja pasir/batu L-4 OH 6.0000 132,000.00 792,000.00
Jumlah harga pekerjaan 3,174,142.72 1,040,300.00 4,214,442.72
Jumlah harga dibulatkan 4,214,442.00

22 1 M3 Campuran Beton 1PC : 3PS : 5KR, Import - Manual PU.D.22


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 Zak 5.0000 138,941.85 694,709.25
Pasir semen (import) MB.1 M3 0.5357 1,541,578.45 825,845.60
Kerikil/batu pecah (import) MB.6 M3 0.9259 1,567,479.90 1,451,370.28
Mandor pasir/batu L-1 OH 0.3000 205,000.00 61,500.00
Kepala tukang pasir/batu L-2 OH 0.1000 188,000.00 18,800.00
Tukang pasir/batu L-3 OH 1.0000 168,000.00 168,000.00
Pekerja pasir/batu L-4 OH 6.0000 132,000.00 792,000.00
Jumlah harga pekerjaan 2,971,925.13 1,040,300.00 4,012,225.13
Jumlah harga dibulatkan 4,012,225.00

23 1 M3 Campuran Beton 1PC : 4PS : 6KR, Import - Manual PU.D.23


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 Zak 4.0909 138,941.85 568,398.48
Pasir semen (import) MB.1 M3 0.5844 1,541,578.45 900,922.47
Kerikil/batu pecah (import) MB.6 M3 0.9091 1,567,479.90 1,424,981.73
Mandor pasir/batu L-1 OH 0.3000 205,000.00 61,500.00
Kepala tukang pasir/batu L-2 OH 0.1000 188,000.00 18,800.00
Tukang pasir/batu L-3 OH 1.0000 168,000.00 168,000.00
Pekerja pasir/batu L-4 OH 6.0000 132,000.00 792,000.00
Jumlah harga pekerjaan 2,894,302.68 1,040,300.00 3,934,602.68
Jumlah harga dibulatkan 3,934,602.00

24 1 M3 Campuran beton 1PC : 2PS : 3KR, Import (mekanis) PU.D.24


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 Zak 7.5000 138,941.85 1,042,063.88
Pasir semen (import) MB.1 M3 0.5357 1,541,578.45 825,845.60
Kerikil/batu pecah (import) MB.6 M3 0.8333 1,567,479.90 1,306,233.25
Mandor L-1 Jam 1.6000 29,286.00 46,857.60
Kepala tukang L-2 Jam 1.6000 26,858.00 42,972.80
Tukang pasir/batu L-3 Jam 4.8000 24,000.00 115,200.00
Pekerja L-4 Jam 16.0000 18,858.00 301,728.00
Concrete Mixer E-8 Jam 1.6000 85,665.00 137,064.00
Truck tanki air E - 10 Jam 0.0678 379,191.00 25,698.19
Water Pump E-9 Jam 1.6000 61,861.00 98,977.60
Alat bantu Set 1.0000 5,000.00 5,000.00
Jumlah harga pekerjaan 3,174,142.72 773,498.19 3,947,640.91
Jumlah harga dibulatkan 3,947,640.00
Analisa Harga Satuan Pekerjaan (AHSP) D. Pekerjaan Beton

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

25 1 M3 Campuran beton 1PC : 3PS : 5KR, Import (mekanis) PU.D.25


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 Zak 5.0000 138,941.85 694,709.25
Pasir semen (import) MB.1 M3 0.5357 1,541,578.45 825,845.60
Kerikil/batu pecah (import) MB.6 M3 0.9259 1,567,479.90 1,451,370.28
Mandor L-1 Jam 1.6000 29,286.00 46,857.60
Kepala tukang L-2 Jam 1.6000 26,858.00 42,972.80
Tukang pasir/batu L-3 Jam 4.8000 24,000.00 115,200.00
Pekerja L-4 Jam 16.0000 18,858.00 301,728.00
Concrete Mixer E-8 Jam 1.6000 85,665.00 137,064.00
Truck tanki air E - 10 Jam 0.0452 379,191.00 17,132.12
Water Pump E-9 Jam 1.6000 61,861.00 98,977.60
Alat bantu Set 1.0000 5,000.00 5,000.00
Jumlah harga pekerjaan 2,971,925.13 764,932.12 3,736,857.25
Jumlah harga dibulatkan 3,736,857.00

26 1 M3 Campuran beton 1PC : 4PS : 6KR, Import (mekanis) PU.D.26


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 Zak 4.0909 138,941.85 568,398.48
Pasir semen (import) MB.1 M3 0.5844 1,541,578.45 900,922.47
Kerikil/batu pecah (import) MB.6 M3 0.9091 1,567,479.90 1,424,981.73
Mandor L-1 Jam 1.6000 29,286.00 46,857.60
Kepala tukang L-2 Jam 1.6000 26,858.00 42,972.80
Tukang pasir/batu L-3 Jam 4.8000 24,000.00 115,200.00
Pekerja L-4 Jam 16.0000 18,858.00 301,728.00
Concrete Mixer E-8 Jam 1.6000 85,665.00 137,064.00
Truck tanki air E - 10 Jam 0.0370 379,191.00 14,017.19
Water Pump E-9 Jam 1.6000 61,861.00 98,977.60
Alat bantu Set 1.0000 5,000.00 5,000.00
Jumlah harga pekerjaan 2,894,302.68 761,817.19 3,656,119.87
Jumlah harga dibulatkan 3,656,119.00

ANALISA MUTU BETON (MUTU K) MANUAL


27 1 M3 Beton mutu f’'c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0 PU.D.27
SNI 7394:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 247.0000 2,778.84 686,372.74
Pasir semen (import) MB.1 M3 0.6207 1,541,578.45 956,879.77
Kerikil/batu pecah (import) MB.6 M3 0.7400 1,567,479.90 1,159,935.13
Air Liter 215.0000 50.00 10,750.00
Pekerja pasir/batu L-4 OH 1.6500 132,000.00 217,800.00
Tukang pasir/batu L-3 OH 0.2750 168,000.00 46,200.00
Kepala tukang pasir/batu L-2 OH 0.0275 188,000.00 5,170.00
Mandor pasir/batu L-1 OH 0.0825 205,000.00 16,912.50
Jumlah harga pekerjaan 2,813,937.63 286,082.50 3,100,020.13
Jumlah harga dibulatkan 3,100,020.00

28 1 M3 Beton mutu f’ = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,7 PU.D.28
SNI 7394:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 276.0000 2,778.84 766,959.01
Pasir semen (import) MB.1 M3 0.5914 1,541,578.45 911,733.54
Kerikil/batu pecah (import) MB.6 M3 0.7496 1,567,479.90 1,175,029.38
Air Liter 215.0000 50.00 10,750.00
Pekerja pasir/batu L-4 OH 1.6500 132,000.00 217,800.00
Tukang pasir/batu L-3 OH 0.2750 168,000.00 46,200.00
Kepala tukang pasir/batu L-2 OH 0.0275 188,000.00 5,170.00
Mandor pasir/batu L-1 OH 0.0825 205,000.00 16,912.50
Jumlah harga pekerjaan 2,864,471.93 286,082.50 3,150,554.43
Jumlah harga dibulatkan 3,150,554.00

29 1 M3 Beton mutu f’'c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = PU.D.29
SNI 7394:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 299.0000 2,778.84 830,872.26
Pasir semen (import) MB.1 M3 0.5707 1,541,578.45 879,800.84
Kerikil/batu pecah (import) MB.6 M3 0.7533 1,567,479.90 1,180,834.86
Air Liter 215.0000 50.00 10,750.00
Pekerja pasir/batu L-4 OH 1.6500 132,000.00 217,800.00
Tukang pasir/batu L-3 OH 0.2750 168,000.00 46,200.00
Kepala tukang pasir/batu L-2 OH 0.0275 188,000.00 5,170.00
Mandor pasir/batu L-1 OH 0.0825 205,000.00 16,912.50
Jumlah harga pekerjaan 2,902,257.96 286,082.50 3,188,340.46
Jumlah harga dibulatkan 3,188,340.00

30 1 M3 Lantai kerja Beton mutu f’'c = 7,4 MPa (K 100), slump (3-6) cm w/c = 0,8 PU.D.30
SNI 7394:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 230.0000 2,778.84 639,132.51
Pasir semen (import) MB.1 M3 0.6379 1,541,578.45 983,306.83
Kerikil/batu pecah (import) MB.6 M3 0.7607 1,567,479.90 1,192,445.82
Air Liter 200.0000 50.00 10,000.00
Pekerja pasir/batu L-4 OH 1.2000 132,000.00 158,400.00
Tukang pasir/batu L-3 OH 0.2000 168,000.00 33,600.00
Kepala tukang pasir/batu L-2 OH 0.0200 188,000.00 3,760.00
Mandor pasir/batu L-1 OH 0.0600 205,000.00 12,300.00
Jumlah harga pekerjaan 2,824,885.16 208,060.00 3,032,945.16
Jumlah harga dibulatkan 3,032,945.00
Analisa Harga Satuan Pekerjaan (AHSP) D. Pekerjaan Beton

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

31 1 M3 Beton mutu f’'c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = PU.D.31
SNI 7394:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 326.0000 2,778.84 905,900.86
Pasir semen (import) MB.1 M3 0.5429 1,541,578.45 836,856.87
Kerikil/batu pecah (import) MB.6 M3 0.7622 1,567,479.90 1,194,768.01
Air Liter 215.0000 50.00 10,750.00
Pekerja pasir/batu L-4 OH 1.6500 132,000.00 217,800.00
Tukang pasir/batu L-3 OH 0.2750 168,000.00 46,200.00
Kepala tukang pasir/batu L-2 OH 0.0275 188,000.00 5,170.00
Mandor pasir/batu L-1 OH 0.0825 205,000.00 16,912.50
Jumlah harga pekerjaan 2,948,275.75 286,082.50 3,234,358.25
Jumlah harga dibulatkan 3,234,358.00

32 1 M3 Beton mutu f’'c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = PU.D.32
SNI 7394:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 352.0000 2,778.84 978,150.62
Pasir semen (import) MB.1 M3 0.5221 1,541,578.45 804,924.18
Kerikil/batu pecah (import) MB.6 M3 0.7637 1,567,479.90 1,197,090.21
Air Liter 215.0000 50.00 10,750.00
Pekerja pasir/batu L-4 OH 1.6500 132,000.00 217,800.00
Tukang pasir/batu L-3 OH 0.2750 168,000.00 46,200.00
Kepala tukang pasir/batu L-2 OH 0.0275 188,000.00 5,170.00
Mandor pasir/batu L-1 OH 0.0825 205,000.00 16,912.50
Jumlah harga pekerjaan 2,990,915.01 286,082.50 3,276,997.51
Jumlah harga dibulatkan 3,276,997.00

33 1 M3 Beton mutu f’'c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = PU.D.33
SNI 7394:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 371.0000 2,778.84 1,030,948.53
Pasir semen (import) MB.1 M3 0.4986 1,541,578.45 768,586.97
Kerikil/batu pecah (import) MB.6 M3 0.7756 1,567,479.90 1,215,667.74
Air Liter 215.0000 50.00 10,750.00
Pekerja pasir/batu L-4 OH 1.6500 132,000.00 217,800.00
Tukang pasir/batu L-3 OH 0.2750 168,000.00 46,200.00
Kepala tukang pasir/batu L-2 OH 0.0275 188,000.00 5,170.00
Mandor pasir/batu L-1 OH 0.0825 205,000.00 16,912.50
Jumlah harga pekerjaan 3,025,953.24 286,082.50 3,312,035.74
Jumlah harga dibulatkan 3,312,035.00
Analisa Harga Satuan Pekerjaan (AHSP) D. Pekerjaan Beton

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

34 1 M3 Beton mutu f’'c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = PU.D.34
SNI 7394:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 384.0000 2,778.84 1,067,073.41
Pasir semen (import) MB.1 M3 0.4943 1,541,578.45 761,980.21
Kerikil/batu pecah (import) MB.6 M3 0.7696 1,567,479.90 1,206,378.97
Air Liter 215.0000 50.00 10,750.00
Pekerja pasir/batu L-4 OH 1.6500 132,000.00 217,800.00
Tukang pasir/batu L-3 OH 0.2750 168,000.00 46,200.00
Kepala tukang pasir/batu L-2 OH 0.0275 188,000.00 5,170.00
Mandor pasir/batu L-1 OH 0.0825 205,000.00 16,912.50
Jumlah harga pekerjaan 3,046,182.59 286,082.50 3,332,265.09
Jumlah harga dibulatkan 3,332,265.00

35 1 M3 Beton mutu f’'c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = PU.D.35
SNI 7394:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 406.0000 2,778.84 1,128,207.82
Pasir semen (import) MB.1 M3 0.4886 1,541,578.45 753,171.19
Kerikil/batu pecah (import) MB.6 M3 0.7600 1,567,479.90 1,191,284.72
Air Liter 215.0000 50.00 10,750.00
Pekerja pasir/batu L-4 OH 1.6500 132,000.00 217,800.00
Tukang pasir/batu L-3 OH 0.2750 168,000.00 46,200.00
Kepala tukang pasir/batu L-2 OH 0.0275 188,000.00 5,170.00
Mandor pasir/batu L-1 OH 0.0825 205,000.00 16,912.50
Jumlah harga pekerjaan 3,083,413.73 286,082.50 3,369,496.23
Jumlah harga dibulatkan 3,369,496.00

36 1 M3 Beton mutu f’'c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = PU.D.36
SNI 7394:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 413.0000 2,778.84 1,147,659.68
Pasir semen (import) MB.1 M3 0.4864 1,541,578.45 749,867.80
Kerikil/batu pecah (import) MB.6 M3 0.7563 1,567,479.90 1,185,479.24
Air Liter 215.0000 50.00 10,750.00
Pekerja pasir/batu L-4 OH 1.6500 132,000.00 217,800.00
Tukang pasir/batu L-3 OH 0.2750 168,000.00 46,200.00
Kepala tukang pasir/batu L-2 OH 0.0275 188,000.00 5,170.00
Mandor pasir/batu L-1 OH 0.0825 205,000.00 16,912.50
Jumlah harga pekerjaan 3,093,756.73 286,082.50 3,379,839.23
Jumlah harga dibulatkan 3,379,839.00

37 1 M3 Beton mutu f’'c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = PU.D.37
SNI 7394:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 439.0000 2,778.84 1,219,909.44
Pasir semen (import) MB.1 M3 0.4786 1,541,578.45 737,755.40
Kerikil/batu pecah (import) MB.6 M3 0.7452 1,567,479.90 1,168,062.80
Air Liter 215.0000 50.00 10,750.00
Pekerja pasir/batu L-4 OH 2.1000 132,000.00 277,200.00
Tukang pasir/batu L-3 OH 0.3500 168,000.00 58,800.00
Kepala tukang pasir/batu L-2 OH 0.0350 188,000.00 6,580.00
Mandor pasir/batu L-1 OH 0.1050 205,000.00 21,525.00
Jumlah harga pekerjaan 3,136,477.64 364,105.00 3,500,582.64
Jumlah harga dibulatkan 3,500,582.00

38 1 M3 Beton mutu f’'c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = PU.D.38
SNI 7394:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 448.0000 2,778.84 1,244,918.98
Pasir semen (import) MB.1 M3 0.4764 1,541,578.45 734,452.02
Kerikil/batu pecah (import) MB.6 M3 0.7407 1,567,479.90 1,161,096.22
Air Liter 215.0000 50.00 10,750.00
Pekerja pasir/batu L-4 OH 2.1000 132,000.00 277,200.00
Tukang pasir/batu L-3 OH 0.3500 168,000.00 58,800.00
Kepala tukang pasir/batu L-2 OH 0.0350 188,000.00 6,580.00
Mandor pasir/batu L-1 OH 0.1050 205,000.00 21,525.00
Jumlah harga pekerjaan 3,151,217.22 364,105.00 3,515,322.22
Jumlah harga dibulatkan 3,515,322.00

39 1 KG Pembesian Besi polos/ulir Ø. 6 mm SNI PU.D.39


SNI 7394:2008
Besi Beton Dia.6 SNI (P=12 m) MD.1 KG 1.0500 16,423.15 17,244.31
Kawat beton MD.9 Kg 0.0150 25,028.60 375.43
Pekerja L-4 OH 0.0070 132,000.00 924.00
Tukang besi L-3 OH 0.0070 168,000.00 1,176.00
Kepala tukang L-2 OH 0.0007 188,000.00 131.60
Mandor L-1 OH 0.0004 205,000.00 82.00
Jumlah harga pekerjaan 17,619.74 2,313.60 19,933.34
Jumlah harga dibulatkan 19,933.00

40 1 KG Pembesian Besi polos/ulir Ø. 8 mm SNI PU.D.40


SNI 7394:2008
Besi Beton Dia.8 SNI (P=12 m) MD.2 KG 1.0500 14,947.70 15,695.09
Kawat beton MD.9 Kg 0.0150 25,028.60 375.43
Pekerja L-4 OH 0.0070 132,000.00 924.00
Tukang besi L-3 OH 0.0070 168,000.00 1,176.00
Kepala tukang L-2 OH 0.0007 188,000.00 131.60
Mandor L-1 OH 0.0004 205,000.00 82.00
Jumlah harga pekerjaan 16,070.51 2,313.60 18,384.11
Jumlah harga dibulatkan 18,384.00
Analisa Harga Satuan Pekerjaan (AHSP) D. Pekerjaan Beton

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

41 1 KG Pembesian Besi polos/ulir Ø. 10 mm SNI PU.D.41


SNI 7394:2008
Besi Beton Dia.10 SNI (P=12 m) MD.3 KG 1.0500 15,071.90 15,825.50
Kawat beton MD.9 Kg 0.0150 25,028.60 375.43
Pekerja L-4 OH 0.0070 132,000.00 924.00
Tukang besi L-3 OH 0.0070 168,000.00 1,176.00
Kepala tukang L-2 OH 0.0007 188,000.00 131.60
Mandor L-1 OH 0.0004 205,000.00 82.00
Jumlah harga pekerjaan 16,200.92 2,313.60 18,514.52
Jumlah harga dibulatkan 18,514.00

42 1 KG Pembesian Besi polos/ulir Ø. 12 mm SNI PU.D.42


SNI 7394:2008
Besi Beton Dia.12 SNI (P=12 m) MD.4 KG 1.0500 15,364.00 16,132.20
Kawat beton MD.9 Kg 0.0150 25,028.60 375.43
Pekerja L-4 OH 0.0070 132,000.00 924.00
Tukang besi L-3 OH 0.0070 168,000.00 1,176.00
Kepala tukang L-2 OH 0.0007 188,000.00 131.60
Mandor L-1 OH 0.0004 205,000.00 82.00
Jumlah harga pekerjaan 16,507.63 2,313.60 18,821.23
Jumlah harga dibulatkan 18,821.00

43 1 KG Pembesian Besi polos/ulir Ø. 14 mm SNI PU.D.43


SNI 7394:2008
Besi Beton Dia.14 SNI (P=12 m) MD.5 KG 1.0500 12,988.10 13,637.51
Kawat beton MD.9 Kg 0.0150 25,028.60 375.43
Pekerja L-4 OH 0.0070 132,000.00 924.00
Tukang besi L-3 OH 0.0070 168,000.00 1,176.00
Kepala tukang L-2 OH 0.0007 188,000.00 131.60
Mandor L-1 OH 0.0004 205,000.00 82.00
Jumlah harga pekerjaan 14,012.93 2,313.60 16,326.53
Jumlah harga dibulatkan 16,326.00

44 1 KG Pembesian Besi polos/ulir Ø. 16 mm SNI PU.D.44


SNI 7394:2008
Besi Beton Dia.16 SNI (P=12 m) MD.6 KG 1.0500 14,725.75 15,462.04
Kawat beton MD.9 Kg 0.0150 25,028.60 375.43
Pekerja L-4 OH 0.0070 132,000.00 924.00
Tukang besi L-3 OH 0.0070 168,000.00 1,176.00
Kepala tukang L-2 OH 0.0007 188,000.00 131.60
Mandor L-1 OH 0.0004 205,000.00 82.00
Jumlah harga pekerjaan 15,837.47 2,313.60 18,151.07
Jumlah harga dibulatkan 18,151.00

45 1 KG Pembesian Besi polos/ulir Ø. 19 mm SNI PU.D.45


SNI 7394:2008
Besi Beton Dia.19 SNI (P=12 m) MD.7 KG 1.0500 14,154.20 14,861.91
Kawat beton MD.9 Kg 0.0150 25,028.60 375.43
Pekerja L-4 OH 0.0070 132,000.00 924.00
Tukang besi L-3 OH 0.0070 168,000.00 1,176.00
Kepala tukang L-2 OH 0.0007 188,000.00 131.60
Mandor L-1 OH 0.0004 205,000.00 82.00
Jumlah harga pekerjaan 15,237.34 2,313.60 17,550.94
Jumlah harga dibulatkan 17,550.00

46 1 KG Pembesian Besi polos/ulir Ø. 22 mm SNI PU.D.46


SNI 7394:2008
Besi Beton Dia.22 SNI (P=12 m) MD.8 KG 1.0500 13,674.65 14,358.38
Kawat beton MD.9 Kg 0.0150 25,028.60 375.43
Pekerja L-4 OH 0.0070 132,000.00 924.00
Tukang besi L-3 OH 0.0070 168,000.00 1,176.00
Kepala tukang L-2 OH 0.0007 188,000.00 131.60
Mandor L-1 OH 0.0004 205,000.00 82.00
Jumlah harga pekerjaan 14,733.81 2,313.60 17,047.41
Jumlah harga dibulatkan 17,047.00

47 1 M2 Bekisting untuk Pondasi PU.D.47


SNI 7394:2008
Kayu Bekisting Kelas 3 MC.5 M3 0.0400 3,599,094.05 143,963.76
Paku Campur Biasa 5 cm - 10 cm MD.16 KG 0.3000 19,506.30 5,851.89
Minyak Bekisting/oli bekas MA.5 Liter 0.1000 1,104.00 110.40
Pekerja Kayu L-4 OH 0.5200 132,000.00 68,640.00
Tukang Kayu L-3 OH 0.2600 168,000.00 43,680.00
Kepala Tukang Kayu L-2 OH 0.0260 188,000.00 4,888.00
Mandor L-1 OH 0.0260 205,000.00 5,330.00
Jumlah harga pekerjaan 149,926.05 122,538.00 272,464.05
Jumlah harga dibulatkan 272,464.00

48 1 M2 Bekisting untuk Sloof PU.D.48


SNI 7394:2008
Kayu Bekisting Kelas 3 MC.5 M3 0.0450 3,599,094.05 161,959.23
Paku Campur Biasa 5 cm - 10 cm MD.16 KG 0.3000 19,506.30 5,851.89
Minyak Bekisting/oli bekas MA.5 Liter 0.1000 1,104.00 110.40
Pekerja Kayu L-4 OH 0.5200 132,000.00 68,640.00
Tukang Kayu L-3 OH 0.2600 168,000.00 43,680.00
Kepala Tukang Kayu L-2 OH 0.0260 188,000.00 4,888.00
Mandor L-1 OH 0.0260 205,000.00 5,330.00
Jumlah harga pekerjaan 167,921.52 122,538.00 290,459.52
Jumlah harga dibulatkan 290,459.00
Analisa Harga Satuan Pekerjaan (AHSP) D. Pekerjaan Beton

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

49 1 M2 Bekisting untuk Kolom PU.D.49


SNI 7394:2008
Kayu Bekisting Kelas 3 MC.5 M3 0.0400 3,599,094.05 143,963.76
Paku Campur Biasa 5 cm - 10 cm MD.16 KG 0.4000 19,506.30 7,802.52
Minyak Bekisting/oli bekas MA.5 Liter 0.2000 1,104.00 220.80
Balok Kayu Kelas 2 MC.2 M3 0.0150 4,729,266.90 70,939.00
Plywood 9 mm MC.21 Lembar 0.3500 382,717.70 133,951.20
Kayu dolken Ø 8-10, Panjang 400 cm - Kayu Kelas 3 MC.32 Batang 2.0000 21,503.85 43,007.70
Pekerja Kayu L-4 OH 0.6600 132,000.00 87,120.00
Tukang Kayu L-3 OH 0.3300 168,000.00 55,440.00
Kepala Tukang Kayu L-2 OH 0.0330 188,000.00 6,204.00
Mandor L-1 OH 0.0330 205,000.00 6,765.00
Jumlah harga pekerjaan 399,884.98 155,529.00 555,413.98
Jumlah harga dibulatkan 555,413.00

50 1 M2 Bekisting untuk Balok PU.D.50


SNI 7394:2008
Kayu Bekisting Kelas 3 MC.5 M3 0.0400 3,599,094.05 143,963.76
Paku Campur Biasa 5 cm - 10 cm MD.16 KG 0.4000 19,506.30 7,802.52
Minyak Bekisting/oli bekas MA.5 Liter 0.2000 1,104.00 220.80
Balok Kayu Kelas 2 MC.2 M3 0.0180 4,729,266.90 85,126.80
Plywood 9 mm MC.21 Lembar 0.3500 382,717.70 133,951.20
Kayu dolken Ø 8-10, Panjang 400 cm - Kayu Kelas 3 MC.32 Batang 2.0000 21,503.85 43,007.70
Pekerja Kayu L-4 OH 0.6600 132,000.00 87,120.00
Tukang Kayu L-3 OH 0.3300 168,000.00 55,440.00
Kepala Tukang Kayu L-2 OH 0.0330 188,000.00 6,204.00
Mandor L-1 OH 0.0330 205,000.00 6,765.00
Jumlah harga pekerjaan 414,072.78 155,529.00 569,601.78
Jumlah harga dibulatkan 569,601.00

51 1 M2 Bekisting untuk Pelat Lantai PU.D.51


SNI 7394:2008
Kayu Bekisting Kelas 3 MC.5 M3 0.0400 3,599,094.05 143,963.76
Paku Campur Biasa 5 cm - 10 cm MD.16 KG 0.4000 19,506.30 7,802.52
Minyak Bekisting/oli bekas MA.5 Liter 0.2000 1,104.00 220.80
Balok Kayu Kelas 2 MC.2 M3 0.0150 4,729,266.90 70,939.00
Plywood 9 mm MC.21 Lembar 0.3500 382,717.70 133,951.20
Kayu dolken Ø 8-10, Panjang 400 cm - Kayu Kelas 3 MC.32 Batang 6.0000 21,503.85 129,023.10
Pekerja Kayu L-4 OH 0.6600 132,000.00 87,120.00
Tukang Kayu L-3 OH 0.3300 168,000.00 55,440.00
Kepala Tukang Kayu L-2 OH 0.0330 188,000.00 6,204.00
Mandor L-1 OH 0.0330 205,000.00 6,765.00
Jumlah harga pekerjaan 485,900.38 155,529.00 641,429.38
Jumlah harga dibulatkan 641,429.00
Analisa Harga Satuan Pekerjaan (AHSP) D. Pekerjaan Beton

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

52 1 M2 Bekisting untuk Pelat Dinding PU.D.52


SNI 7394:2008
Kayu Bekisting Kelas 3 MC.5 M3 0.0300 3,599,094.05 107,972.82
Paku Campur Biasa 5 cm - 10 cm MD.16 KG 0.4000 19,506.30 7,802.52
Minyak Bekisting/oli bekas MA.5 Liter 0.2000 1,104.00 220.80
Balok Kayu Kelas 2 MC.2 M3 0.0200 4,729,266.90 94,585.34
Plywood 9 mm MC.21 Lembar 0.3500 382,717.70 133,951.20
Kayu dolken Ø 8-10, Panjang 400 cm - Kayu Kelas 3 MC.32 Batang 3.0000 21,503.85 64,511.55
Formite/penjaga jarak bekisting/spacer Buah 4.0000 20,000.00 80,000.00
Pekerja Kayu L-4 OH 0.6600 132,000.00 87,120.00
Tukang Kayu L-3 OH 0.3300 168,000.00 55,440.00
Kepala Tukang Kayu L-2 OH 0.0330 188,000.00 6,204.00
Mandor L-1 OH 0.0330 205,000.00 6,765.00
Jumlah harga pekerjaan 489,044.22 155,529.00 644,573.22
Jumlah harga dibulatkan 644,573.00

53 1 M2 Bekisting untuk Tangga PU.D.53


SNI 7394:2008
Kayu Bekisting Kelas 3 MC.5 M3 0.0300 3,599,094.05 107,972.82
Paku Campur Biasa 5 cm - 10 cm MD.16 KG 0.4000 19,506.30 7,802.52
Minyak Bekisting/oli bekas MA.5 Liter 0.1500 1,104.00 165.60
Balok Kayu Kelas 2 MC.2 M3 0.0150 4,729,266.90 70,939.00
Plywood 9 mm MC.21 Lembar 0.3500 382,717.70 133,951.20
Kayu dolken Ø 8-10, Panjang 400 cm - Kayu Kelas 3 MC.32 Batang 2.0000 21,503.85 43,007.70
Pekerja Kayu L-4 OH 0.6600 132,000.00 87,120.00
Tukang Kayu L-3 OH 0.3300 168,000.00 55,440.00
Kepala Tukang Kayu L-2 OH 0.0330 188,000.00 6,204.00
Mandor L-1 OH 0.0330 205,000.00 6,765.00
Jumlah harga pekerjaan 363,838.84 155,529.00 519,367.84
Jumlah harga dibulatkan 519,367.00

54 1 M2 Pasang Jembatan untuk Pengecoran Beton PU.D.54


SNI 7394:2008
Kayu Bekisting Kelas 3 MC.5 m3 0.0264 3,599,094.05 95,016.08
Paku Campur Biasa 5 cm - 12 cm MD.16 KG 0.6000 19,506.30 11,703.78
Kayu dolken Ø 8-10, Panjang 400 cm - Kayu Kelas 3 MC.32 Batang 0.5000 21,503.85 10,751.93
Pekerja Kayu L-4 OH 0.1500 132,000.00 19,800.00
Tukang Kayu L-3 OH 0.0500 168,000.00 8,400.00
Kepala Tukang Kayu L-2 OH 0.0050 188,000.00 940.00
Mandor L-1 OH 0.0080 205,000.00 1,640.00
Jumlah harga pekerjaan 117,471.79 30,780.00 148,251.79
Jumlah harga dibulatkan 148,251.00

55 1 M2 Cetakan Beton / Begisting Memakai Papan PU.D.55


HPS.PU. 2017
Balok Kayu Kelas 2 MC.2 M3 0.0170 4,729,266.90 80,397.54
Papan Kayu Kelas 2 MC.6 M3 0.0240 4,839,477.15 116,147.45
Paku Campur Biasa MD.16 KG 0.4000 19,506.30 7,802.52
Pekerja Kayu L-4 OH 0.2000 132,000.00 26,400.00
Tukang Kayu L-3 OH 0.5000 168,000.00 84,000.00
Kepala Tukang Kayu L-2 OH 0.0500 188,000.00 9,400.00
Mandor L-1 OH 0.0100 205,000.00 2,050.00
Jumlah harga pekerjaan 204,347.51 121,850.00 326,197.51
Jumlah harga dibulatkan 326,197.00

56 1 M2 Cetakan Beton / Begisting Memakai Multiplek PU.D.56


HPS.PU. 2017
Balok Kayu Kelas 2 MC.2 M3 0.0170 4,729,266.90 80,397.54
Tripleks (1,22 x 2,44) cm - tebal 22 mm MC.18 Lembar 0.3470 409,141.25 141,972.01
Paku Campur Biasa MD.16 KG 0.4000 19,506.30 7,802.52
Pekerja Kayu L-4 OH 0.2000 132,000.00 26,400.00
Tukang Kayu L-3 OH 0.5000 168,000.00 84,000.00
Kepala Tukang Kayu L-2 OH 0.0500 188,000.00 9,400.00
Mandor L-1 OH 0.0100 205,000.00 2,050.00
Jumlah harga pekerjaan 230,172.07 121,850.00 352,022.07
Jumlah harga dibulatkan 352,022.00

57 1 M3 Membongkar cetakan / Bekisting Beton PU.D.57


HPS.PU. 2017
Pekerja Kayu L-4 OH 4.0000 132,000.00 528,000.00
Jumlah harga pekerjaan - 528,000.00 528,000.00
Jumlah harga dibulatkan 528,000.00

58 1 Set Stutwerk utk 1 M3 Beton, h = 3 - 4 m (Memakai Kayu Dolken PU.D.58


HPS.PU. 2017
Kayu dolken Ø 8-10, Panjang 400 cm - Kayu Kelas 3 MC.32 *40 M3 0.7000 860,154.00 602,107.80
Pekerja Kayu L-4 OH 3.5000 132,000.00 462,000.00
Tukang Kayu L-3 OH 10.5000 168,000.00 1,764,000.00
Kepala Tukang Kayu L-2 OH 1.0500 188,000.00 197,400.00
Mandor L-1 OH 0.1750 205,000.00 35,875.00
Jumlah harga pekerjaan 602,107.80 2,459,275.00 3,061,382.80
Jumlah harga dibulatkan 3,061,382.00
Analisa Harga Satuan Pekerjaan (AHSP) D. Pekerjaan Beton

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

59 1 Set Stutwerk utk 1 M3 Beton, h = 3 - 4 m (Memakai Scafolding) PU.D.59


Scafolding Unit 32.0000 20,000.00 640,000.00
Pekerja Kayu L-4 OH 2.2000 132,000.00 290,400.00
Tukang Kayu L-3 OH 3.5000 168,000.00 588,000.00
Kepala Tukang Kayu L-2 OH 0.3500 188,000.00 65,800.00
Mandor L-1 OH 0.1200 205,000.00 24,600.00
Jumlah harga pekerjaan 640,000.00 968,800.00 1,608,800.00
Jumlah harga dibulatkan 1,608,800.00

ANALISA PU.D.60 s/d PU.D.67 UNTUK GAMBAR RENCANA YANG BELUM MEMPUNYAI GAMBAR DETAIL

60 1 M3 Pondasi beton bertulang (150 kg besi + bekisting) PU.D.60


SNI 7394:2008
Kayu Bekisting Kelas 3 MC.5 M3 0.2000 3,599,094.05 719,818.81
Paku Campur Biasa MD.16 KG 1.5000 19,506.30 29,259.45
Minyak Bekisting Liter 0.4000 1,104.00 441.60
Besi tulangan beton dia. 10 mm MD.3 KG 157.0000 15,071.90 2,366,288.30
Kawat ikat besi beton MD.9 KG 2.2500 25,028.60 56,314.35
Semen Portland (PC) @ 50 Kg MB.11 KG 336.0000 2,778.84 933,689.23
Pasir semen (import) MB.1 M3 0.5400 1,541,578.45 832,452.36
Kerikil/batu pecah (import) MB.6 M3 0.8100 1,567,479.90 1,269,658.72
Pekerja L-4 OH 5.3000 132,000.00 699,600.00
Tukang Batu L-3 OH 0.2750 168,000.00 46,200.00
Tukang Kayu L-3 OH 1.3000 168,000.00 218,400.00
Tukang Besi L-3 OH 1.0500 168,000.00 176,400.00
Kepala Tukang L-2 OH 0.2620 188,000.00 49,256.00
Mandor L-1 OH 0.2650 205,000.00 54,325.00
Jumlah harga pekerjaan 6,207,922.82 1,244,181.00 7,452,103.82
Jumlah harga dibulatkan 7,452,103.00

61 1 M3 Sloof beton bertulang (200 kg besi + bekisting) PU.D.61


SNI 7394:2008
Kayu Bekisting Kelas 3 MC.5 M3 0.2700 3,599,094.05 971,755.39
Paku Campur Biasa MD.16 KG 2.0000 19,506.30 39,012.60
Minyak Bekisting Liter 0.6000 1,104.00 662.40
Besi tulangan beton dia. 10 mm MD.3 KG 210.0000 15,071.90 3,165,099.00
Kawat ikat besi beton MD.9 KG 3.0000 25,028.60 75,085.80
Semen Portland (PC) @ 50 Kg MB.11 KG 336.0000 2,778.84 933,689.23
Pasir semen (import) MB.1 M3 0.5400 1,541,578.45 832,452.36
Kerikil/batu pecah (import) MB.6 M3 0.8100 1,567,479.90 1,269,658.72
Pekerja L-4 OH 5.6500 132,000.00 745,800.00
Tukang Batu L-3 OH 0.2750 168,000.00 46,200.00
Tukang Kayu L-3 OH 1.5600 168,000.00 262,080.00
Tukang Besi L-3 OH 1.4000 168,000.00 235,200.00
Kepala Tukang L-2 OH 0.3230 188,000.00 60,724.00
Mandor L-1 OH 0.2830 205,000.00 58,015.00
Jumlah harga pekerjaan 7,287,415.51 1,408,019.00 8,695,434.51
Jumlah harga dibulatkan 8,695,434.00

62 1 M3 Kolom beton bertulang (300 kg besi + bekisting) PU.D.62


SNI 7394:2008
Kayu Bekisting Kelas 3 MC.5 M3 0.4000 3,599,094.05 1,439,637.62
Paku Campur Biasa MD.16 KG 4.0000 19,506.30 78,025.20
Minyak Bekisting Liter 2.0000 1,104.00 2,208.00
Besi tulangan beton dia. 10 mm MD.3 KG 315.0000 15,071.90 4,747,648.50
Kawat ikat besi beton MD.9 KG 4.5000 25,028.60 112,628.70
Semen Portland (PC) @ 50 Kg MB.11 KG 336.0000 2,778.84 933,689.23
Pasir semen (import) MB.1 M3 0.5400 1,541,578.45 832,452.36
Kerikil/batu pecah (import) MB.6 M3 0.8100 1,567,479.90 1,269,658.72
Balok Kayu Kelas 2 MC.2 M3 0.1500 4,729,266.90 709,390.04
Plywood 9 mm MC.21 Lembar 3.5000 382,717.70 1,339,511.95
Kayu dolken Ø 8-10, Panjang 400 cm - Kayu Kelas 3 MC.32 Batang 20.0000 21,503.85 430,077.00
Pekerja L-4 OH 7.0500 132,000.00 930,600.00
Tukang Batu L-3 OH 0.2750 168,000.00 46,200.00
Tukang Kayu L-3 OH 1.6500 168,000.00 277,200.00
Tukang Besi L-3 OH 2.1000 168,000.00 352,800.00
Kepala Tukang L-2 OH 0.4030 188,000.00 75,764.00
Mandor L-1 OH 0.3530 205,000.00 72,365.00
Jumlah harga pekerjaan 11,894,927.32 1,754,929.00 13,649,856.32
Jumlah harga dibulatkan 13,649,856.00
Analisa Harga Satuan Pekerjaan (AHSP) D. Pekerjaan Beton

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

63 1 M3 Balok beton bertulang (200 kg besi + bekisting) PU.D.63


SNI 7394:2008
Kayu Bekisting Kelas 3 MC.5 M3 0.3200 3,599,094.05 1,151,710.10
Paku Campur Biasa MD.16 KG 3.2000 19,506.30 62,420.16
Minyak Bekisting Liter 1.6000 1,104.00 1,766.40
Besi tulangan beton dia. 10 mm MD.3 KG 210.0000 15,071.90 3,165,099.00
Kawat ikat besi beton MD.9 KG 3.0000 25,028.60 75,085.80
Semen Portland (PC) @ 50 Kg MB.11 KG 336.0000 2,778.84 933,689.23
Pasir semen (import) MB.1 M3 0.5400 1,541,578.45 832,452.36
Kerikil/batu pecah (import) MB.6 M3 0.8100 1,567,479.90 1,269,658.72
Balok Kayu Kelas 2 MC.2 M3 0.1400 4,729,266.90 662,097.37
Plywood 9 mm MC.21 Lembar 2.8000 382,717.70 1,071,609.56
Kayu dolken Ø 8-10, Panjang 400 cm - Kayu Kelas 3 MC.32 Batang 16.0000 21,503.85 344,061.60
Pekerja L-4 OH 6.3500 132,000.00 838,200.00
Tukang Batu L-3 OH 0.2750 168,000.00 46,200.00
Tukang Kayu L-3 OH 1.6500 168,000.00 277,200.00
Tukang Besi L-3 OH 1.4000 168,000.00 235,200.00
Kepala Tukang L-2 OH 0.3330 188,000.00 62,604.00
Mandor L-1 OH 0.3180 205,000.00 65,190.00
Jumlah harga pekerjaan 9,569,650.30 1,524,594.00 11,094,244.30
Jumlah harga dibulatkan 11,094,244.00

64 1 M3 Plat beton bertulang (150 kg besi + bekisting) PU.D.64


SNI 7394:2008
Kayu Bekisting Kelas 3 MC.5 M3 0.3200 3,599,094.05 1,151,710.10
Paku Campur Biasa MD.16 KG 3.2000 19,506.30 62,420.16
Minyak Bekisting Liter 1.6000 1,104.00 1,766.40
Besi tulangan beton dia. 10 mm MD.3 KG 157.5000 15,071.90 2,373,824.25
Kawat ikat besi beton MD.9 KG 2.2500 25,028.60 56,314.35
Semen Portland (PC) @ 50 Kg MB.11 KG 336.0000 2,778.84 933,689.23
Pasir semen (import) MB.1 M3 0.5400 1,541,578.45 832,452.36
Kerikil/batu pecah (import) MB.6 M3 0.8100 1,567,479.90 1,269,658.72
Balok Kayu Kelas 2 MC.2 M3 0.1200 4,729,266.90 567,512.03
Plywood 9 mm MC.21 Lembar 2.8000 382,717.70 1,071,609.56
Kayu dolken Ø 8-10, Panjang 400 cm - Kayu Kelas 3 MC.32 Batang 32.0000 21,503.85 688,123.20
Pekerja L-4 OH 5.3000 132,000.00 699,600.00
Tukang Batu L-3 OH 0.2750 168,000.00 46,200.00
Tukang Kayu L-3 OH 1.3000 168,000.00 218,400.00
Tukang Besi L-3 OH 1.0500 168,000.00 176,400.00
Kepala Tukang L-2 OH 0.2650 188,000.00 49,820.00
Mandor L-1 OH 0.2650 205,000.00 54,325.00
Jumlah harga pekerjaan 9,009,080.36 1,244,745.00 10,253,825.36
Jumlah harga dibulatkan 10,253,825.00

65 1 M3 Dinding beton bertulang (150 kg besi + bekisting) PU.D.65


SNI 7394:2008
Kayu Bekisting Kelas 3 MC.5 M3 0.2400 3,599,094.05 863,782.57
Paku Campur Biasa MD.16 KG 3.2000 19,506.30 62,420.16
Minyak Bekisting Liter 1.6000 1,104.00 1,766.40
Besi tulangan beton dia. 10 mm MD.3 KG 157.0000 15,071.90 2,366,288.30
Kawat ikat besi beton MD.9 KG 2.2500 25,028.60 56,314.35
Semen Portland (PC) @ 50 Kg MB.11 KG 336.0000 2,778.84 933,689.23
Pasir semen (import) MB.1 M3 0.5400 1,541,578.45 832,452.36
Kerikil/batu pecah (import) MB.6 M3 0.8100 1,567,479.90 1,269,658.72
Balok Kayu Kelas 2 MC.2 M3 0.1600 4,729,266.90 756,682.70
Plywood 9 mm MC.21 Lembar 2.8000 382,717.70 1,071,609.56
Kayu dolken Ø 8-10, Panjang 400 cm - Kayu Kelas 3 MC.32 Batang 24.0000 21,503.85 516,092.40
Pekerja L-4 OH 5.3000 132,000.00 699,600.00
Tukang Batu L-3 OH 0.2750 168,000.00 46,200.00
Tukang Kayu L-3 OH 1.3000 168,000.00 218,400.00
Tukang Besi L-3 OH 1.0500 168,000.00 176,400.00
Kepala Tukang L-2 OH 0.2620 188,000.00 49,256.00
Mandor L-1 OH 0.2650 205,000.00 54,325.00
Jumlah harga pekerjaan 8,730,756.76 1,244,181.00 9,974,937.76
Jumlah harga dibulatkan 9,974,937.00
Analisa Harga Satuan Pekerjaan (AHSP) D. Pekerjaan Beton

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

66 1 M3 Dinding beton bertulang (200 kg besi + bekisting) PU.D.66


SNI 7394:2008
Kayu Bekisting Kelas 3 MC.5 M3 0.2500 3,599,094.05 899,773.51
Paku Campur Biasa MD.16 KG 3.0000 19,506.30 58,518.90
Minyak Bekisting Liter 1.2000 1,104.00 1,324.80
Besi tulangan beton dia. 10 mm MD.3 KG 210.0000 15,071.90 3,165,099.00
Kawat ikat besi beton MD.9 KG 3.0000 25,028.60 75,085.80
Semen Portland (PC) @ 50 Kg MB.11 KG 336.0000 2,778.84 933,689.23
Pasir semen (import) MB.1 M3 0.5400 1,541,578.45 832,452.36
Kerikil/batu pecah (import) MB.6 M3 0.8100 1,567,479.90 1,269,658.72
Balok Kayu Kelas 2 MC.2 M3 0.1050 4,729,266.90 496,573.02
Plywood 9 mm MC.21 Lembar 2.5000 382,717.70 956,794.25
Kayu dolken Ø 8-10, Panjang 400 cm - Kayu Kelas 3 MC.32 Batang 14.0000 21,503.85 301,053.90
Pekerja L-4 OH 5.6500 132,000.00 745,800.00
Tukang Batu L-3 OH 0.2750 168,000.00 46,200.00
Tukang Kayu L-3 OH 1.5600 168,000.00 262,080.00
Tukang Besi L-3 OH 1.4000 168,000.00 235,200.00
Kepala Tukang L-2 OH 0.3230 188,000.00 60,724.00
Mandor L-1 OH 0.2830 205,000.00 58,015.00
Jumlah harga pekerjaan 8,990,023.50 1,408,019.00 10,398,042.50
Jumlah harga dibulatkan 10,398,042.00

67 1 M3 Tangga beton bertulang (150 kg besi + bekisting) PU.D.67


HPS.PU. 2017
Kayu Bekisting Kelas 3 MC.5 M3 0.2500 3,599,094.05 899,773.51
Paku Campur Biasa MD.16 KG 3.0000 19,506.30 58,518.90
Minyak Bekisting Liter 1.2000 1,104.00 1,324.80
Besi tulangan beton dia. 10 mm MD.3 KG 200.0000 15,071.90 3,014,380.00
Kawat ikat besi beton MD.9 KG 3.0000 25,028.60 75,085.80
Semen Portland (PC) @ 50 Kg MB.11 KG 323.0000 2,778.84 897,564.35
Pasir semen (import) MB.1 M3 0.5200 1,541,578.45 801,620.79
Kerikil/batu pecah (import) MB.6 M3 0.7800 1,567,479.90 1,222,634.32
Balok Kayu Kelas 2 MC.2 M3 0.1050 4,729,266.90 496,573.02
Plywood 9 mm MC.21 Lembar 2.5000 382,717.70 956,794.25
Kayu dolken Ø 8-10, Panjang 400 cm - Kayu Kelas 3 MC.32 Batang 14.0000 21,503.85 301,053.90
Pekerja L-4 OH 5.6000 132,000.00 739,200.00
Tukang Batu L-3 OH 0.3500 168,000.00 58,800.00
Tukang Kayu L-3 OH 2.3000 168,000.00 386,400.00
Tukang Besi L-3 OH 1.4000 168,000.00 235,200.00
Kepala Tukang L-2 OH 0.4050 188,000.00 76,140.00
Mandor L-1 OH 0.2020 205,000.00 41,410.00
Jumlah harga pekerjaan 8,725,323.65 1,537,150.00 10,262,473.65
Jumlah harga dibulatkan 10,262,473.00

68 1 M' Kolom penguat/praktis beton bertulang (11 x 11) cm PU.D.68


SNI 7394:2008
Kayu Bekisting Kelas 3 MC.5 M3 0.0020 3,599,094.05 7,198.19
Paku Campur Biasa MD.16 KG 0.0100 19,506.30 195.06
Besi tulangan beton dia. 10 mm MD.3 KG 3.0000 15,071.90 45,215.70
Kawat ikat besi beton MD.9 KG 0.0450 25,028.60 1,126.29
Semen Portland (PC) @ 50 Kg MB.11 KG 4.0000 2,778.84 11,115.35
Pasir semen (import) MB.1 M3 0.0060 1,541,578.45 9,249.47
Kerikil/batu pecah (import) MB.6 M3 0.0090 1,567,479.90 14,107.32
Pekerja L-4 OH 0.1800 132,000.00 23,760.00
Tukang Batu L-3 OH 0.0200 168,000.00 3,360.00
Tukang Kayu L-3 OH 0.0200 168,000.00 3,360.00
Tukang Besi L-3 OH 0.0200 168,000.00 3,360.00
Kepala Tukang L-2 OH 0.0060 188,000.00 1,128.00
Mandor L-1 OH 0.0090 205,000.00 1,845.00
Jumlah harga pekerjaan 88,207.38 36,813.00 125,020.38
Jumlah harga dibulatkan 125,020.00

69 1 M' Sloof/Ring balok beton bertulang (10 x 15) cm PU.D.69


SNI 7394:2008
Kayu Bekisting Kelas 3 MC.5 M3 0.0030 3,599,094.05 10,797.28
Paku Campur Biasa MD.16 KG 0.0200 19,506.30 390.13
Besi tulangan beton dia. 10 mm MD.3 KG 3.6000 15,071.90 54,258.84
Kawat ikat besi beton MD.9 KG 0.0500 25,028.60 1,251.43
Semen Portland (PC) @ 50 Kg MB.11 KG 5.5000 2,778.84 15,283.60
Pasir semen (import) MB.1 M3 0.0090 1,541,578.45 13,874.21
Kerikil/batu pecah (import) MB.6 M3 0.0150 1,567,479.90 23,512.20
Pekerja L-4 OH 0.2970 132,000.00 39,204.00
Tukang Batu L-3 OH 0.0330 168,000.00 5,544.00
Tukang Kayu L-3 OH 0.0330 168,000.00 5,544.00
Tukang Besi L-3 OH 0.0330 168,000.00 5,544.00
Kepala Tukang L-2 OH 0.0100 188,000.00 1,880.00
Mandor L-1 OH 0.0150 205,000.00 3,075.00
Jumlah harga pekerjaan 119,367.69 60,791.00 180,158.69
Jumlah harga dibulatkan 180,158.00
Analisa Harga Satuan Pekerjaan (AHSP) D. Pekerjaan Beton

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

70 1 M' Kolom 15 x 15 (1PC : 3PS) - Pasir Import PU.D.70


HPS.PU. 2017
Analisa per 1 M3 Kolom
Begisting beton (kolom) LS 1.0000 2,000,000.00 2,000,000.00
Tulangan Sengkang (polos) Dia. 8 mm PU.D.40 KG 65.9935 18,384.00 1,213,223.67
Tulangan Utama (polos) Dia. 10 mm PU.D.41 KG 109.9349 18,514.00 2,035,334.76
Campuran Beton 1PC : 3PS (import) PU.D.12 M3 1.1000 4,217,874.00 4,639,661.40
Jumlah harga pekerjaan per 1 M3 9,888,219.83 - 9,888,219.83
Volume Kolom per 1 M' 0.0225
Jumlah harga kolom per 1 M' 222,484.95
Jumlah harga dibulatkan 222,484.00

71 1 M' Kolom 15 x 15 (1PC : 3PS) - Pasir Lokal PU.D.71


HPS.PU. 2017
Analisa per 1 M3 Kolom
Begisting beton (kolom) LS 1.0000 2,000,000.00 2,000,000.00
Tulangan Sengkang (polos) Dia. 8 mm PU.D.40 KG 65.9935 18,384.00 1,213,223.67
Tulangan Utama (polos) Dia. 10 mm PU.D.41 KG 109.9349 18,514.00 2,035,334.76
Campuran Beton 1PC : 3PS (lokal) PU.D.17 M3 1.1000 3,550,954.00 3,906,049.40
Jumlah harga pekerjaan per 1 M3 9,154,607.83 - 9,154,607.83
Volume Kolom per 1 M' 0.0225
Jumlah harga kolom per 1 M' 205,978.68
Jumlah harga dibulatkan 205,978.00

72 1 M' Balok 15 x 15 (1PC : 3PS) - Pasir Import PU.D.72


HPS.PU. 2017
Analisa per 1 M3 Balok
Begisting beton (balok) LS 1.0000 2,000,000.00 2,000,000.00
Tulangan Sengkang (polos) Dia. 8 mm PU.D.40 KG 65.9935 18,384.00 1,213,223.67
Tulangan Utama (polos) Dia. 10 mm PU.D.41 KG 109.9349 18,514.00 2,035,334.76
Campuran Beton 1PC : 3PS (import) PU.D.12 M3 1.1000 4,217,874.00 4,639,661.40
Jumlah harga pekerjaan per 1 M3 9,888,219.83 - 9,888,219.83
Volume Kolom per 1 M' 0.0225
Jumlah harga kolom per 1 M' 222,484.95
Jumlah harga dibulatkan 222,484.00

73 1 M' Balok 15 x 15 (1PC : 3PS) - Pasir Lokal PU.D.73


HPS.PU. 2017
Analisa per 1 M3 Balok
Begisting beton (balok) LS 1.0000 2,000,000.00 2,000,000.00
Tulangan Sengkang (polos) Dia. 8 mm PU.D.40 KG 65.9935 18,384.00 1,213,223.67
Tulangan Utama (polos) Dia. 10 mm PU.D.41 KG 109.9349 18,514.00 2,035,334.76
Campuran Beton 1PC : 3PS (lokal) PU.D.17 M3 1.1000 3,550,954.00 3,906,049.40
Jumlah harga pekerjaan per 1 M3 9,154,607.83 - 9,154,607.83
Volume Kolom per 1 M' 0.0225
Jumlah harga kolom per 1 M' 205,978.68
Jumlah harga dibulatkan 205,978.00

74 1 Btg Tiang Pancang Beton 20x20; L=5 M (1PC : 2PS : 3KR) PU.D.74
HPS.PU. 2017
Begisting beton (kolom) PU.D.49 M2 4.0000 555,413.00 2,221,652.00
Tulangan Sengkang (polos) Dia. 8 mm PU.D.40 KG 50.4916 18,384.00 928,238.24
Tulangan Utama (polos) Dia. 10 mm PU.D.41 KG 123.8496 18,514.00 2,292,951.49
Campuran Beton 1PC : 2PS : 3KR (import) PU.D.12 M3 0.2300 4,217,874.00 970,111.02
Jumlah harga pekerjaan per 1 M3 6,412,952.76 - 6,412,952.76
Jumlah harga dibulatkan 6,412,952.00

75 1 M' Bantalan Pelat Beton (1PC : 3PS) - Pasir Import PU.D.75


HPS.PU. 2017
Analisa per 1 M3 Bantalan
Begisting beton (balok) LS 1.0000 2,000,000.00 2,000,000.00
Tulangan Sengkang (polos) Dia. 8 mm PU.D.40 KG 2.0564 18,384.00 37,804.19
Tulangan Utama (polos) Dia. 10 mm PU.D.41 KG 35.1845 18,514.00 651,406.67
Campuran Beton 1PC : 3PS (import) PU.D.12 M3 1.1000 4,217,874.00 4,639,661.40
Jumlah harga pekerjaan per 1 M3 7,328,872.26 - 7,328,872.26
Volume Kolom per 1 M' 0.0225
Jumlah harga kolom per 1 M' 164,899.63
Jumlah harga dibulatkan 164,899.00

76 1 M' Bantalan Pelat Beton (1PC : 3PS) - Pasir Lokal PU.D.76


HPS.PU. 2017
Analisa per 1 M3 Bantalan
Begisting beton (balok) LS 1.0000 2,000,000.00 2,000,000.00
Tulangan Sengkang (polos) Dia. 8 mm PU.D.40 KG 2.0564 18,384.00 37,804.19
Tulangan Utama (polos) Dia. 10 mm PU.D.41 KG 35.1845 18,514.00 651,406.67
Campuran Beton 1PC : 3PS (lokal) PU.D.17 M3 1.1000 3,550,954.00 3,906,049.40
Jumlah harga pekerjaan per 1 M3 6,595,260.26 - 6,595,260.26
Volume Kolom per 1 M' 0.0225
Jumlah harga kolom per 1 M' 148,393.36
Jumlah harga dibulatkan 148,393.00
Analisa Harga Satuan Pekerjaan (AHSP) E. Pekerjaan Dinding

E. PEKERJAAN DINDING BATU

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

1 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1 Bata, 1PC : 2PS - Pasir Lokal PU.E.1
SNI 6897:2008
Bata merah (5 x 11 x 22) cm MB.8 Buah 140.0000 1,851.50 259,210.00
Semen Portland (PC) @ 50 Kg MB.11 KG 43.5000 2,778.84 120,879.41
Pasir semen (lokal) MB.2 M3 0.0800 1,058,872.85 84,709.83
Pekerja pasir/batu L-4 OH 0.6000 132,000.00 79,200.00
Tukang pasir/batu L-3 OH 0.2000 168,000.00 33,600.00
Kepala tukang pasir/batu L-2 OH 0.0200 188,000.00 3,760.00
Mandor pasir/batu L-1 OH 0.0300 205,000.00 6,150.00
Jumlah harga pekerjaan 464,799.24 122,710.00 587,509.24
Jumlah harga dibulatkan 587,509.00

2 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1 Bata, 1PC : 3PS - Pasir Lokal PU.E.2
SNI 6897:2008
Bata merah (5 x 11 x 22) cm MB.8 Buah 140.0000 1,851.50 259,210.00
Semen Portland (PC) @ 50 Kg MB.11 KG 32.9500 2,778.84 91,562.68
Pasir semen (lokal) MB.2 M3 0.0910 1,058,872.85 96,357.43
Pekerja pasir/batu L-4 OH 0.6000 132,000.00 79,200.00
Tukang pasir/batu L-3 OH 0.2000 168,000.00 33,600.00
Kepala tukang pasir/batu L-2 OH 0.0200 188,000.00 3,760.00
Mandor pasir/batu L-1 OH 0.0300 205,000.00 6,150.00
Jumlah harga pekerjaan 447,130.11 122,710.00 569,840.11
Jumlah harga dibulatkan 569,840.00

3 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1 Bata, 1PC : 4PS - Pasir Lokal PU.E.3
SNI 6897:2008
Bata merah (5 x 11 x 22) cm MB.8 Buah 140.0000 1,851.50 259,210.00
Semen Portland (PC) @ 50 Kg MB.11 KG 26.5500 2,778.84 73,778.12
Pasir semen (lokal) MB.2 M3 0.0930 1,058,872.85 98,475.18
Pekerja pasir/batu L-4 OH 0.6000 132,000.00 79,200.00
Tukang pasir/batu L-3 OH 0.2000 168,000.00 33,600.00
Kepala tukang pasir/batu L-2 OH 0.0200 188,000.00 3,760.00
Mandor pasir/batu L-1 OH 0.0300 205,000.00 6,150.00
Jumlah harga pekerjaan 431,463.30 122,710.00 554,173.30
Jumlah harga dibulatkan 554,173.00

4 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1 Bata, 1PC : 5PS - Pasir Lokal PU.E.4
SNI 6897:2008
Bata merah (5 x 11 x 22) cm MB.8 Buah 140.0000 1,851.50 259,210.00
Semen Portland (PC) @ 50 Kg MB.11 KG 22.2000 2,778.84 61,690.18
Pasir semen (lokal) MB.2 M3 0.1020 1,058,872.85 108,005.03
Pekerja pasir/batu L-4 OH 0.6000 132,000.00 79,200.00
Tukang pasir/batu L-3 OH 0.2000 168,000.00 33,600.00
Kepala tukang pasir/batu L-2 OH 0.0200 188,000.00 3,760.00
Mandor pasir/batu L-1 OH 0.0300 205,000.00 6,150.00
Jumlah harga pekerjaan 428,905.21 122,710.00 551,615.21
Jumlah harga dibulatkan 551,615.00

5 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1 Bata, 1PC : 6PS - Pasir Lokal PU.E.5
SNI 6897:2008
Bata merah (5 x 11 x 22) cm MB.8 Buah 140.0000 1,851.50 259,210.00
Semen Portland (PC) @ 50 Kg MB.11 KG 18.5000 2,778.84 51,408.48
Pasir semen (lokal) MB.2 M3 0.1220 1,058,872.85 129,182.49
Pekerja pasir/batu L-4 OH 0.6000 132,000.00 79,200.00
Tukang pasir/batu L-3 OH 0.2000 168,000.00 33,600.00
Kepala tukang pasir/batu L-2 OH 0.0200 188,000.00 3,760.00
Mandor pasir/batu L-1 OH 0.0300 205,000.00 6,150.00
Jumlah harga pekerjaan 439,800.97 122,710.00 562,510.97
Jumlah harga dibulatkan 562,510.00

6 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1/2 Bata, 1PC : 2PS - Pasir Lok PU.E.6
SNI 6897:2008
Bata merah (5 x 11 x 22) cm MB.8 Buah 70.0000 1,851.50 129,605.00
Semen Portland (PC) @ 50 Kg MB.11 KG 18.9500 2,778.84 52,658.96
Pasir semen (lokal) MB.2 M3 0.0380 1,058,872.85 40,237.17
Pekerja pasir/batu L-4 OH 0.3000 132,000.00 39,600.00
Tukang pasir/batu L-3 OH 0.1000 168,000.00 16,800.00
Kepala tukang pasir/batu L-2 OH 0.0100 188,000.00 1,880.00
Mandor pasir/batu L-1 OH 0.0150 205,000.00 3,075.00
Jumlah harga pekerjaan 222,501.13 61,355.00 283,856.13
Jumlah harga dibulatkan 283,856.00

7 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1/2 Bata, 1PC : 3PS - Pasir Lok PU.E.7
SNI 6897:2008
Bata merah (5 x 11 x 22) cm MB.8 Buah 70.0000 1,851.50 129,605.00
Semen Portland (PC) @ 50 Kg MB.11 KG 14.3700 2,778.84 39,931.89
Pasir semen (lokal) MB.2 M3 0.0400 1,058,872.85 42,354.91
Pekerja pasir/batu L-4 OH 0.3000 132,000.00 39,600.00
Tukang pasir/batu L-3 OH 0.1000 168,000.00 16,800.00
Kepala tukang pasir/batu L-2 OH 0.0100 188,000.00 1,880.00
Mandor pasir/batu L-1 OH 0.0150 205,000.00 3,075.00
Jumlah harga pekerjaan 211,891.80 61,355.00 273,246.80
Jumlah harga dibulatkan 273,246.00

8 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1/2 Bata, 1PC : 4PS - Pasir Lok PU.E.8
SNI 6897:2008
Bata merah (5 x 11 x 22) cm MB.8 Buah 70.0000 1,851.50 129,605.00
Semen Portland (PC) @ 50 Kg MB.11 KG 11.5000 2,778.84 31,956.63
Pasir semen (lokal) MB.2 M3 0.0430 1,058,872.85 45,531.53
Pekerja pasir/batu L-4 OH 0.3000 132,000.00 39,600.00
Tukang pasir/batu L-3 OH 0.1000 168,000.00 16,800.00
Kepala tukang pasir/batu L-2 OH 0.0100 188,000.00 1,880.00
Mandor pasir/batu L-1 OH 0.0150 205,000.00 3,075.00
Jumlah harga pekerjaan 207,093.16 61,355.00 268,448.16
Jumlah harga dibulatkan 268,448.00
Analisa Harga Satuan Pekerjaan (AHSP) E. Pekerjaan Dinding
PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE
PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

9 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1/2 Bata, 1PC : 5PS - Pasir Lok PU.E.9
SNI 6897:2008
Bata merah (5 x 11 x 22) cm MB.8 Buah 70.0000 1,851.50 129,605.00
Semen Portland (PC) @ 50 Kg MB.11 KG 9.6800 2,778.84 26,899.14
Pasir semen (lokal) MB.2 M3 0.0450 1,058,872.85 47,649.28
Pekerja pasir/batu L-4 OH 0.3000 132,000.00 39,600.00
Tukang pasir/batu L-3 OH 0.1000 168,000.00 16,800.00
Kepala tukang pasir/batu L-2 OH 0.0100 188,000.00 1,880.00
Mandor pasir/batu L-1 OH 0.0150 205,000.00 3,075.00
Jumlah harga pekerjaan 204,153.42 61,355.00 265,508.42
Jumlah harga dibulatkan 265,508.00

10 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1/2 Bata, 1PC : 6PS - Pasir Lok PU.E.10
SNI 6897:2008
Bata merah (5 x 11 x 22) cm MB.8 Buah 70.0000 1,851.50 129,605.00
Semen Portland (PC) @ 50 Kg MB.11 KG 8.3200 2,778.84 23,119.92
Pasir semen (lokal) MB.2 M3 0.0490 1,058,872.85 51,884.77
Pekerja pasir/batu L-4 OH 0.3000 132,000.00 39,600.00
Tukang pasir/batu L-3 OH 0.1000 168,000.00 16,800.00
Kepala tukang pasir/batu L-2 OH 0.0100 188,000.00 1,880.00
Mandor pasir/batu L-1 OH 0.0150 205,000.00 3,075.00
Jumlah harga pekerjaan 204,609.69 61,355.00 265,964.69
Jumlah harga dibulatkan 265,964.00

11 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1/2 Bata, 1PC : 8PS - Pasir Lok PU.E.11
SNI 6897:2008
Bata merah (5 x 11 x 22) cm MB.8 Buah 70.0000 1,851.50 129,605.00
Semen Portland (PC) @ 50 Kg MB.11 KG 6.5000 2,778.84 18,062.44
Pasir semen (lokal) MB.2 M3 0.0500 1,058,872.85 52,943.64
Pekerja pasir/batu L-4 OH 0.3000 132,000.00 39,600.00
Tukang pasir/batu L-3 OH 0.1000 168,000.00 16,800.00
Kepala tukang pasir/batu L-2 OH 0.0100 188,000.00 1,880.00
Mandor pasir/batu L-1 OH 0.0150 205,000.00 3,075.00
Jumlah harga pekerjaan 200,611.08 61,355.00 261,966.08
Jumlah harga dibulatkan 261,966.00

ANALISA MENGGUNAKAN PASANGAN BATU BATA LOKAL


12 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/2 Bata, 1PC : 2PS - Pasir Imp PU.E.12
HPS.PU. 2017
Bata merah (5 x 10 x 20) cm MB.8 Buah 70.0000 1,851.50 129,605.00
Semen Portland (PC) @ 50 Kg MB.11 Zak 0.6105 138,941.85 84,824.00
Pasir semen (import) MB.1 M3 0.0436 1,541,578.45 67,223.83
Pekerja pasir/batu L-4 OH 0.0143 132,000.00 1,885.71
Tukang pasir/batu L-3 OH 0.0429 168,000.00 7,200.00
Kepala tukang pasir/batu L-2 OH 0.1286 188,000.00 24,171.43
Mandor pasir/batu L-1 OH 0.2857 205,000.00 58,571.43
Jumlah harga pekerjaan 281,652.83 91,828.57 373,481.40
Jumlah harga dibulatkan 373,481.00

13 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/2 Bata, 1PC : 3PS - Pasir Imp PU.E.13
HPS.PU. 2017
Bata merah (5 x 10 x 20) cm MB.8 Buah 70.0000 1,851.50 129,605.00
Semen Portland (PC) @ 50 Kg MB.11 Zak 0.4579 138,941.85 63,618.00
Pasir semen (import) MB.1 M3 0.0491 1,541,578.45 75,626.81
Pekerja pasir/batu L-4 OH 0.0143 132,000.00 1,885.71
Tukang pasir/batu L-3 OH 0.0429 168,000.00 7,200.00
Kepala tukang pasir/batu L-2 OH 0.1286 188,000.00 24,171.43
Mandor pasir/batu L-1 OH 0.2857 205,000.00 58,571.43
Jumlah harga pekerjaan 268,849.81 91,828.57 360,678.38
Jumlah harga dibulatkan 360,678.00

14 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/2 Bata, 1PC : 4PS - Pasir Imp PU.E.14
HPS.PU. 2017
Bata merah (5 x 10 x 20) cm MB.8 Buah 70.0000 1,851.50 129,605.00
Semen Portland (PC) @ 50 Kg MB.11 Zak 0.3663 138,941.85 50,894.40
Pasir semen (import) MB.1 M3 0.0523 1,541,578.45 80,668.60
Pekerja pasir/batu L-4 OH 0.0143 132,000.00 1,885.71
Tukang pasir/batu L-3 OH 0.0429 168,000.00 7,200.00
Kepala tukang pasir/batu L-2 OH 0.1286 188,000.00 24,171.43
Mandor pasir/batu L-1 OH 0.2857 205,000.00 58,571.43
Jumlah harga pekerjaan 261,168.00 91,828.57 352,996.57
Jumlah harga dibulatkan 352,996.00

15 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/2 Bata, 1PC : 2PS - Pasir Lok PU.E.15
HPS.PU. 2017
Bata merah (5 x 10 x 20) cm MB.8 Buah 70.0000 1,851.50 129,605.00
Semen Portland (PC) @ 50 Kg MB.11 Zak 0.6105 138,941.85 84,824.00
Pasir semen (lokal) MB.2 M3 0.0436 1,058,872.85 46,174.42
Pekerja pasir/batu L-4 OH 0.0143 132,000.00 1,885.71
Tukang pasir/batu L-3 OH 0.0429 168,000.00 7,200.00
Kepala tukang pasir/batu L-2 OH 0.1286 188,000.00 24,171.43
Mandor pasir/batu L-1 OH 0.2857 205,000.00 58,571.43
Jumlah harga pekerjaan 260,603.42 91,828.57 352,431.99
Jumlah harga dibulatkan 352,431.00

16 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/2 Bata, 1PC : 3PS - Pasir Lok PU.E.16
HPS.PU. 2017
Bata merah (5 x 10 x 20) cm MB.8 Buah 70.0000 1,851.50 129,605.00
Semen Portland (PC) @ 50 Kg MB.11 Zak 0.4579 138,941.85 63,618.00
Pasir semen (lokal) MB.2 M3 0.0491 1,058,872.85 51,946.22
Pekerja pasir/batu L-4 OH 0.0143 132,000.00 1,885.71
Tukang pasir/batu L-3 OH 0.0429 168,000.00 7,200.00
Kepala tukang pasir/batu L-2 OH 0.1286 188,000.00 24,171.43
Mandor pasir/batu L-1 OH 0.2857 205,000.00 58,571.43
Jumlah harga pekerjaan 245,169.22 91,828.57 336,997.79
Jumlah harga dibulatkan 336,997.00
Analisa Harga Satuan Pekerjaan (AHSP) E. Pekerjaan Dinding
PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE
PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

17 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/2 Bata, 1PC : 4PS - Pasir Lok PU.E.17
HPS.PU. 2017
Bata merah (5 x 10 x 20) cm MB.8 Buah 70.0000 1,851.50 129,605.00
Semen Portland (PC) @ 50 Kg MB.11 Zak 0.3663 138,941.85 50,894.40
Pasir semen (lokal) MB.2 M3 0.0523 1,058,872.85 55,409.30
Pekerja pasir/batu L-4 OH 0.0143 132,000.00 1,885.71
Tukang pasir/batu L-3 OH 0.0429 168,000.00 7,200.00
Kepala tukang pasir/batu L-2 OH 0.1286 188,000.00 24,171.43
Mandor pasir/batu L-1 OH 0.2857 205,000.00 58,571.43
Jumlah harga pekerjaan 235,908.70 91,828.57 327,737.27
Jumlah harga dibulatkan 327,737.00

18 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/4 Bata, 1PC : 2PS - Pasir Imp PU.E.18
HPS.PU. 2017
Bata merah (5 x 10 x 20) cm MB.8 Buah 40.0000 1,851.50 74,060.00
Semen Portland (PC) @ 50 Kg MB.11 Zak 0.2516 138,941.85 34,961.24
Pasir semen (import) MB.1 M3 0.0180 1,541,578.45 27,707.12
Pekerja pasir/batu L-4 OH 0.0071 132,000.00 942.86
Tukang pasir/batu L-3 OH 0.0214 168,000.00 3,600.00
Kepala tukang pasir/batu L-2 OH 0.0643 188,000.00 12,085.71
Mandor pasir/batu L-1 OH 0.1429 205,000.00 29,285.71
Jumlah harga pekerjaan 136,728.36 45,914.29 182,642.65
Jumlah harga dibulatkan 182,642.00

19 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/4 Bata, 1PC : 3PS - Pasir Imp PU.E.19
HPS.PU. 2017
Bata merah (5 x 10 x 20) cm MB.8 Buah 40.0000 1,851.50 74,060.00
Semen Portland (PC) @ 50 Kg MB.11 Zak 0.1887 138,941.85 26,220.93
Pasir semen (import) MB.1 M3 0.0202 1,541,578.45 31,170.51
Pekerja pasir/batu L-4 OH 0.0071 132,000.00 942.86
Tukang pasir/batu L-3 OH 0.0214 168,000.00 3,600.00
Kepala tukang pasir/batu L-2 OH 0.0643 188,000.00 12,085.71
Mandor pasir/batu L-1 OH 0.1429 205,000.00 29,285.71
Jumlah harga pekerjaan 131,451.44 45,914.29 177,365.73
Jumlah harga dibulatkan 177,365.00

20 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/4 Bata, 1PC : 4PS - Pasir Imp PU.E.20
HPS.PU. 2017
Bata merah (5 x 10 x 20) cm MB.8 Buah 40.0000 1,851.50 74,060.00
Semen Portland (PC) @ 50 Kg MB.11 Zak 0.1510 138,941.85 20,976.75
Pasir semen (import) MB.1 M3 0.0216 1,541,578.45 33,248.54
Pekerja pasir/batu L-4 OH 0.0143 132,000.00 1,885.71
Tukang pasir/batu L-3 OH 0.0429 168,000.00 7,200.00
Kepala tukang pasir/batu L-2 OH 0.1286 188,000.00 24,171.43
Mandor pasir/batu L-1 OH 0.2857 205,000.00 58,571.43
Jumlah harga pekerjaan 128,285.29 91,828.57 220,113.86
Jumlah harga dibulatkan 220,113.00

21 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/4 Bata, 1PC : 2PS - Pasir Lok PU.E.21
HPS.PU. 2017
Bata merah (5 x 10 x 20) cm MB.8 Buah 40.0000 1,851.50 74,060.00
Semen Portland (PC) @ 50 Kg MB.11 Zak 0.2516 138,941.85 34,961.24
Pasir semen (lokal) MB.2 M3 0.0180 1,058,872.85 19,031.35
Pekerja pasir/batu L-4 OH 0.0071 132,000.00 942.86
Tukang pasir/batu L-3 OH 0.0214 168,000.00 3,600.00
Kepala tukang pasir/batu L-2 OH 0.0643 188,000.00 12,085.71
Mandor pasir/batu L-1 OH 0.1429 205,000.00 29,285.71
Jumlah harga pekerjaan 128,052.59 45,914.29 173,966.88
Jumlah harga dibulatkan 173,966.00

22 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/4 Bata, 1PC : 3PS - Pasir Lok PU.E.22
HPS.PU. 2017
Bata merah (5 x 10 x 20) cm MB.8 Buah 40.0000 1,851.50 74,060.00
Semen Portland (PC) @ 50 Kg MB.11 Zak 0.1887 138,941.85 26,220.93
Pasir semen (lokal) MB.2 M3 0.0202 1,058,872.85 21,410.27
Pekerja pasir/batu L-4 OH 0.0071 132,000.00 942.86
Tukang pasir/batu L-3 OH 0.0214 168,000.00 3,600.00
Kepala tukang pasir/batu L-2 OH 0.0643 188,000.00 12,085.71
Mandor pasir/batu L-1 OH 0.1429 205,000.00 29,285.71
Jumlah harga pekerjaan 121,691.20 45,914.29 167,605.49
Jumlah harga dibulatkan 167,605.00

23 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/4 Bata, 1PC : 4PS - Pasir Lok PU.E.23
HPS.PU. 2017
Bata merah (5 x 10 x 20) cm MB.8 Buah 40.0000 1,851.50 74,060.00
Semen Portland (PC) @ 50 Kg MB.11 Zak 0.1510 138,941.85 20,976.75
Pasir semen (lokal) MB.2 M3 0.0216 1,058,872.85 22,837.62
Pekerja pasir/batu L-4 OH 0.0143 132,000.00 1,885.71
Tukang pasir/batu L-3 OH 0.0429 168,000.00 7,200.00
Kepala tukang pasir/batu L-2 OH 0.1286 188,000.00 24,171.43
Mandor pasir/batu L-1 OH 0.2857 205,000.00 58,571.43
Jumlah harga pekerjaan 117,874.36 91,828.57 209,702.94
Jumlah harga dibulatkan 209,702.00
Analisa Harga Satuan Pekerjaan (AHSP) F. Pekerjaan Plesteran

F. PEKERJAAN PLESTERAN

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

1 1 M2 Plesteran 1PC : 1PS, Tebal 15 mm - Pasir Import PU.F.1


SNI 2837:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 15.5040 2,778.84 43,083.09
Pasir semen (import) MB.1 M3 0.0160 1,541,578.45 24,665.26
Pekerja pasir/batu L-4 OH 0.3000 132,000.00 39,600.00
Tukang pasir/batu L-3 OH 0.1500 168,000.00 25,200.00
Kepala tukang pasir/batu L-2 OH 0.0150 188,000.00 2,820.00
Mandor pasir/batu L-1 OH 0.0150 205,000.00 3,075.00
Jumlah harga pekerjaan 67,748.34 70,695.00 138,443.34
Jumlah harga dibulatkan 138,443.00

2 1 M2 Plesteran 1PC : 2PS, Tebal 15 mm - Pasir Import PU.F.2


SNI 2837:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 10.2240 2,778.84 28,410.83
Pasir semen (import) MB.1 M3 0.0200 1,541,578.45 30,831.57
Pekerja pasir/batu L-4 OH 0.3000 132,000.00 39,600.00
Tukang pasir/batu L-3 OH 0.1500 168,000.00 25,200.00
Kepala tukang pasir/batu L-2 OH 0.0150 188,000.00 2,820.00
Mandor pasir/batu L-1 OH 0.0150 205,000.00 3,075.00
Jumlah harga pekerjaan 59,242.40 70,695.00 129,937.40
Jumlah harga dibulatkan 129,937.00

3 1 M2 Plesteran 1PC : 3PS, Tebal 15 mm - Pasir Import PU.F.3


SNI 2837:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 7.7760 2,778.84 21,608.24
Pasir semen (import) MB.1 M3 0.0230 1,541,578.45 35,456.30
Pekerja pasir/batu L-4 OH 0.3000 132,000.00 39,600.00
Tukang pasir/batu L-3 OH 0.1500 168,000.00 25,200.00
Kepala tukang pasir/batu L-2 OH 0.0150 188,000.00 2,820.00
Mandor pasir/batu L-1 OH 0.0150 205,000.00 3,075.00
Jumlah harga pekerjaan 57,064.54 70,695.00 127,759.54
Jumlah harga dibulatkan 127,759.00

4 1 M2 Plesteran 1PC : 4PS, Tebal 15 mm - Pasir Import PU.F.4


SNI 2837:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 6.2400 2,778.84 17,339.94
Pasir semen (import) MB.1 M3 0.0240 1,541,578.45 36,997.88
Pekerja pasir/batu L-4 OH 0.3000 132,000.00 39,600.00
Tukang pasir/batu L-3 OH 0.1500 168,000.00 25,200.00
Kepala tukang pasir/batu L-2 OH 0.0150 188,000.00 2,820.00
Mandor pasir/batu L-1 OH 0.0150 205,000.00 3,075.00
Jumlah harga pekerjaan 54,337.83 70,695.00 125,032.83
Jumlah harga dibulatkan 125,032.00

5 1 M2 Plesteran 1PC : 5PS, Tebal 15 mm - Pasir Import PU.F.5


SNI 2837:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 5.1840 2,778.84 14,405.49
Pasir semen (import) MB.1 M3 0.0260 1,541,578.45 40,081.04
Pekerja pasir/batu L-4 OH 0.3000 132,000.00 39,600.00
Tukang pasir/batu L-3 OH 0.1500 168,000.00 25,200.00
Kepala tukang pasir/batu L-2 OH 0.0150 188,000.00 2,820.00
Mandor pasir/batu L-1 OH 0.0150 205,000.00 3,075.00
Jumlah harga pekerjaan 54,486.53 70,695.00 125,181.53
Jumlah harga dibulatkan 125,181.00

6 1 M2 Plesteran 1PC : 1PS, Tebal 15 mm - Pasir Lokal PU.F.6


SNI 2837:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 15.5040 2,778.84 43,083.09
Pasir semen (lokal) MB.2 M3 0.0160 1,058,872.85 16,941.97
Pekerja pasir/batu L-4 OH 0.3000 132,000.00 39,600.00
Tukang pasir/batu L-3 OH 0.1500 168,000.00 25,200.00
Kepala tukang pasir/batu L-2 OH 0.0150 188,000.00 2,820.00
Mandor pasir/batu L-1 OH 0.0150 205,000.00 3,075.00
Jumlah harga pekerjaan 60,025.05 70,695.00 130,720.05
Jumlah harga dibulatkan 130,720.00

7 1 M2 Plesteran 1PC : 2PS, Tebal 15 mm - Pasir Lokal PU.F.7


SNI 2837:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 10.2240 2,778.84 28,410.83
Pasir semen (lokal) MB.2 M3 0.0200 1,058,872.85 21,177.46
Pekerja pasir/batu L-4 OH 0.3000 132,000.00 39,600.00
Tukang pasir/batu L-3 OH 0.1500 168,000.00 25,200.00
Kepala tukang pasir/batu L-2 OH 0.0150 188,000.00 2,820.00
Mandor pasir/batu L-1 OH 0.0150 205,000.00 3,075.00
Jumlah harga pekerjaan 49,588.29 70,695.00 120,283.29
Jumlah harga dibulatkan 120,283.00

8 1 M2 Plesteran 1PC : 3PS, Tebal 15 mm - Pasir Lokal PU.F.8


SNI 2837:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 7.7760 2,778.84 21,608.24
Pasir semen (lokal) MB.2 M3 0.0230 1,058,872.85 24,354.08
Pekerja pasir/batu L-4 OH 0.3000 132,000.00 39,600.00
Tukang pasir/batu L-3 OH 0.1500 168,000.00 25,200.00
Kepala tukang pasir/batu L-2 OH 0.0150 188,000.00 2,820.00
Mandor pasir/batu L-1 OH 0.0150 205,000.00 3,075.00
Jumlah harga pekerjaan 45,962.31 70,695.00 116,657.31
Jumlah harga dibulatkan 116,657.00
Analisa Harga Satuan Pekerjaan (AHSP) F. Pekerjaan Plesteran

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

9 1 M2 Plesteran 1PC : 4PS, Tebal 15 mm - Pasir Lokal PU.F.9


SNI 2837:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 6.2400 2,778.84 17,339.94
Pasir semen (lokal) MB.2 M3 0.0240 1,058,872.85 25,412.95
Pekerja pasir/batu L-4 OH 0.3000 132,000.00 39,600.00
Tukang pasir/batu L-3 OH 0.1500 168,000.00 25,200.00
Kepala tukang pasir/batu L-2 OH 0.0150 188,000.00 2,820.00
Mandor pasir/batu L-1 OH 0.0150 205,000.00 3,075.00
Jumlah harga pekerjaan 42,752.89 70,695.00 113,447.89
Jumlah harga dibulatkan 113,447.00

10 1 M2 Plesteran 1PC : 5PS, Tebal 15 mm - Pasir Lokal PU.F.10


SNI 2837:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 5.1840 2,778.84 14,405.49
Pasir semen (lokal) MB.2 M3 0.0260 1,058,872.85 27,530.69
Pekerja pasir/batu L-4 OH 0.3000 132,000.00 39,600.00
Tukang pasir/batu L-3 OH 0.1500 168,000.00 25,200.00
Kepala tukang pasir/batu L-2 OH 0.0150 188,000.00 2,820.00
Mandor pasir/batu L-1 OH 0.0150 205,000.00 3,075.00
Jumlah harga pekerjaan 41,936.19 70,695.00 112,631.19
Jumlah harga dibulatkan 112,631.00

11 1 M2 Plesteran 1PC : 6PS, Tebal 15 mm - Pasir Lokal PU.F.11


SNI 2837:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 4.4160 2,778.84 12,271.34
Pasir semen (lokal) MB.2 M3 0.0270 1,058,872.85 28,589.57
Pekerja pasir/batu L-4 OH 0.3000 132,000.00 39,600.00
Tukang pasir/batu L-3 OH 0.1500 168,000.00 25,200.00
Kepala tukang pasir/batu L-2 OH 0.0150 188,000.00 2,820.00
Mandor pasir/batu L-1 OH 0.0150 205,000.00 3,075.00
Jumlah harga pekerjaan 40,860.91 70,695.00 111,555.91
Jumlah harga dibulatkan 111,555.00

12 1 M2 Plesteran 1PC : 7PS, Tebal 15 mm - Pasir Lokal PU.F.12


SNI 2837:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 3.9360 2,778.84 10,937.50
Pasir semen (lokal) MB.2 M3 0.0280 1,058,872.85 29,648.44
Pekerja pasir/batu L-4 OH 0.3000 132,000.00 39,600.00
Tukang pasir/batu L-3 OH 0.1500 168,000.00 25,200.00
Kepala tukang pasir/batu L-2 OH 0.0150 188,000.00 2,820.00
Mandor pasir/batu L-1 OH 0.0150 205,000.00 3,075.00
Jumlah harga pekerjaan 40,585.94 70,695.00 111,280.94
Jumlah harga dibulatkan 111,280.00

13 1 M2 Plesteran 1PC : 8PS, Tebal 15 mm - Pasir Lokal PU.F.13


SNI 2837:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 3.4560 2,778.84 9,603.66
Pasir semen (lokal) MB.2 M3 0.0290 1,058,872.85 30,707.31
Pekerja pasir/batu L-4 OH 0.3000 132,000.00 39,600.00
Tukang pasir/batu L-3 OH 0.1500 168,000.00 25,200.00
Kepala tukang pasir/batu L-2 OH 0.0150 188,000.00 2,820.00
Mandor pasir/batu L-1 OH 0.0150 205,000.00 3,075.00
Jumlah harga pekerjaan 40,310.97 70,695.00 111,005.97
Jumlah harga dibulatkan 111,005.00

14 1 M2 Plesteran 1PC : 2PS, Tebal 20 mm - Pasir Import PU.F.14


SNI 2837:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 13.6320 2,778.84 37,881.11
Pasir semen (import) MB.1 M3 0.0270 1,541,578.45 41,622.62
Pekerja pasir/batu L-4 OH 0.4000 132,000.00 52,800.00
Tukang pasir/batu L-3 OH 0.2000 168,000.00 33,600.00
Kepala tukang pasir/batu L-2 OH 0.0200 188,000.00 3,760.00
Mandor pasir/batu L-1 OH 0.0220 205,000.00 4,510.00
Jumlah harga pekerjaan 79,503.72 94,670.00 174,173.72
Jumlah harga dibulatkan 174,173.00

15 1 M2 Plesteran 1PC : 3PS, Tebal 20 mm - Pasir Import PU.F.15


SNI 2837:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 10.3680 2,778.84 28,810.98
Pasir semen (import) MB.1 M3 0.0310 1,541,578.45 47,788.93
Pekerja pasir/batu L-4 OH 0.4000 132,000.00 52,800.00
Tukang pasir/batu L-3 OH 0.2000 168,000.00 33,600.00
Kepala tukang pasir/batu L-2 OH 0.0200 188,000.00 3,760.00
Mandor pasir/batu L-1 OH 0.0220 205,000.00 4,510.00
Jumlah harga pekerjaan 76,599.91 94,670.00 171,269.91
Jumlah harga dibulatkan 171,269.00

16 1 M2 Plesteran 1PC : 4PS, Tebal 20 mm - Pasir Import PU.F.16


SNI 2837:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 8.3200 2,778.84 23,119.92
Pasir semen (import) MB.1 M3 0.0320 1,541,578.45 49,330.51
Pekerja pasir/batu L-4 OH 0.4000 132,000.00 52,800.00
Tukang pasir/batu L-3 OH 0.2000 168,000.00 33,600.00
Kepala tukang pasir/batu L-2 OH 0.0200 188,000.00 3,760.00
Mandor pasir/batu L-1 OH 0.0220 205,000.00 4,510.00
Jumlah harga pekerjaan 72,450.43 94,670.00 167,120.43
Jumlah harga dibulatkan 167,120.00
Analisa Harga Satuan Pekerjaan (AHSP) F. Pekerjaan Plesteran

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

17 1 M2 Plesteran 1PC : 5PS, Tebal 20 mm - Pasir Import PU.F.17


SNI 2837:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 6.9120 2,778.84 19,207.32
Pasir semen (import) MB.1 M3 0.0350 1,541,578.45 53,955.25
Pekerja pasir/batu L-4 OH 0.4000 132,000.00 52,800.00
Tukang pasir/batu L-3 OH 0.2000 168,000.00 33,600.00
Kepala tukang pasir/batu L-2 OH 0.0200 188,000.00 3,760.00
Mandor pasir/batu L-1 OH 0.0220 205,000.00 4,510.00
Jumlah harga pekerjaan 73,162.57 94,670.00 167,832.57
Jumlah harga dibulatkan 167,832.00

18 1 M2 Plesteran 1PC : 2PS, Tebal 20 mm - Pasir Lokal PU.F.18


SNI 2837:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 13.6320 2,778.84 37,881.11
Pasir semen (lokal) MB.2 M3 0.0270 1,058,872.85 28,589.57
Pekerja pasir/batu L-4 OH 0.4000 132,000.00 52,800.00
Tukang pasir/batu L-3 OH 0.2000 168,000.00 33,600.00
Kepala tukang pasir/batu L-2 OH 0.0200 188,000.00 3,760.00
Mandor pasir/batu L-1 OH 0.0220 205,000.00 4,510.00
Jumlah harga pekerjaan 66,470.67 94,670.00 161,140.67
Jumlah harga dibulatkan 161,140.00

19 1 M2 Plesteran 1PC : 3PS, Tebal 20 mm - Pasir Lokal PU.F.19


SNI 2837:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 10.3680 2,778.84 28,810.98
Pasir semen (lokal) MB.2 M3 0.0310 1,058,872.85 32,825.06
Pekerja pasir/batu L-4 OH 0.4000 132,000.00 52,800.00
Tukang pasir/batu L-3 OH 0.2000 168,000.00 33,600.00
Kepala tukang pasir/batu L-2 OH 0.0200 188,000.00 3,760.00
Mandor pasir/batu L-1 OH 0.0220 205,000.00 4,510.00
Jumlah harga pekerjaan 61,636.04 94,670.00 156,306.04
Jumlah harga dibulatkan 156,306.00

20 1 M2 Plesteran 1PC : 4PS, Tebal 20 mm - Pasir Lokal PU.F.20


SNI 2837:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 8.3200 2,778.84 23,119.92
Pasir semen (lokal) MB.2 M3 0.0320 1,058,872.85 33,883.93
Pekerja pasir/batu L-4 OH 0.4000 132,000.00 52,800.00
Tukang pasir/batu L-3 OH 0.2000 168,000.00 33,600.00
Kepala tukang pasir/batu L-2 OH 0.0200 188,000.00 3,760.00
Mandor pasir/batu L-1 OH 0.0220 205,000.00 4,510.00
Jumlah harga pekerjaan 57,003.86 94,670.00 151,673.86
Jumlah harga dibulatkan 151,673.00

21 1 M2 Plesteran 1PC : 5PS, Tebal 20 mm - Pasir Lokal PU.F.21


SNI 2837:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 6.9120 2,778.84 19,207.32
Pasir semen (lokal) MB.2 M3 0.0350 1,058,872.85 37,060.55
Pekerja pasir/batu L-4 OH 0.4000 132,000.00 52,800.00
Tukang pasir/batu L-3 OH 0.2000 168,000.00 33,600.00
Kepala tukang pasir/batu L-2 OH 0.0200 188,000.00 3,760.00
Mandor pasir/batu L-1 OH 0.0220 205,000.00 4,510.00
Jumlah harga pekerjaan 56,267.87 94,670.00 150,937.87
Jumlah harga dibulatkan 150,937.00

22 1 M2 Plesteran 1PC : 6PS, Tebal 20 mm - Pasir Lokal PU.F.22


SNI 2837:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 5.8880 2,778.84 16,361.79
Pasir semen (lokal) MB.2 M3 0.0360 1,058,872.85 38,119.42
Pekerja pasir/batu L-4 OH 0.4000 132,000.00 52,800.00
Tukang pasir/batu L-3 OH 0.2000 168,000.00 33,600.00
Kepala tukang pasir/batu L-2 OH 0.0200 188,000.00 3,760.00
Mandor pasir/batu L-1 OH 0.0220 205,000.00 4,510.00
Jumlah harga pekerjaan 54,481.21 94,670.00 149,151.21
Jumlah harga dibulatkan 149,151.00

23 1 M2 Plesteran 1PC : 2PS, Tebal 25 mm - Pasir Import PU.F.23


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 KG 15.5000 2,778.84 43,071.97
Pasir semen (import) MB.1 M3 0.0130 1,541,578.45 20,040.52
Pekerja pasir/batu L-4 OH 0.3000 132,000.00 39,600.00
Tukang pasir/batu L-3 OH 0.2000 168,000.00 33,600.00
Kepala tukang pasir/batu L-2 OH 0.0200 188,000.00 3,760.00
Mandor pasir/batu L-1 OH 0.0125 205,000.00 2,562.50
Jumlah harga pekerjaan 63,112.49 79,522.50 142,634.99
Jumlah harga dibulatkan 142,634.00

24 1 M2 Plesteran 1PC : 3PS, Tebal 25 mm - Pasir Import PU.F.24


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 KG 11.7500 2,778.84 32,651.33
Pasir semen (import) MB.1 M3 0.0350 1,541,578.45 53,955.25
Pekerja pasir/batu L-4 OH 0.3000 132,000.00 39,600.00
Tukang pasir/batu L-3 OH 0.2000 168,000.00 33,600.00
Kepala tukang pasir/batu L-2 OH 0.0200 188,000.00 3,760.00
Mandor pasir/batu L-1 OH 0.0130 205,000.00 2,665.00
Jumlah harga pekerjaan 86,606.58 79,625.00 166,231.58
Jumlah harga dibulatkan 166,231.00
Analisa Harga Satuan Pekerjaan (AHSP) F. Pekerjaan Plesteran

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

25 1 M2 Plesteran 1PC : 4PS, Tebal 25 mm - Pasir Import PU.F.25


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 KG 9.4800 2,778.84 26,343.37
Pasir semen (import) MB.1 M3 0.0380 1,541,578.45 58,579.98
Pekerja pasir/batu L-4 OH 0.3000 132,000.00 39,600.00
Tukang pasir/batu L-3 OH 0.2000 168,000.00 33,600.00
Kepala tukang pasir/batu L-2 OH 0.0200 188,000.00 3,760.00
Mandor pasir/batu L-1 OH 0.0130 205,000.00 2,665.00
Jumlah harga pekerjaan 84,923.36 79,625.00 164,548.36
Jumlah harga dibulatkan 164,548.00

26 1 M2 Plesteran 1PC : 5PS, Tebal 25 mm - Pasir Import PU.F.26


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 KG 7.9400 2,778.84 22,063.97
Pasir semen (import) MB.1 M3 0.0390 1,541,578.45 60,121.56
Pekerja pasir/batu L-4 OH 0.3000 132,000.00 39,600.00
Tukang pasir/batu L-3 OH 0.2000 168,000.00 33,600.00
Kepala tukang pasir/batu L-2 OH 0.0200 188,000.00 3,760.00
Mandor pasir/batu L-1 OH 0.0130 205,000.00 2,665.00
Jumlah harga pekerjaan 82,185.53 79,625.00 161,810.53
Jumlah harga dibulatkan 161,810.00

27 1 M2 Plesteran 1PC : 2PS, Tebal 25 mm - Pasir Lokal PU.F.27


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 KG 15.5000 2,778.84 43,071.97
Pasir semen (lokal) MB.2 M3 0.0130 1,058,872.85 13,765.35
Pekerja pasir/batu L-4 OH 0.3000 132,000.00 39,600.00
Tukang pasir/batu L-3 OH 0.2000 168,000.00 33,600.00
Kepala tukang pasir/batu L-2 OH 0.0200 188,000.00 3,760.00
Mandor pasir/batu L-1 OH 0.0125 205,000.00 2,562.50
Jumlah harga pekerjaan 56,837.32 79,522.50 136,359.82
Jumlah harga dibulatkan 136,359.00

28 1 M2 Plesteran 1PC : 3PS, Tebal 25 mm - Pasir Lokal PU.F.28


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 KG 11.7500 2,778.84 32,651.33
Pasir semen (lokal) MB.2 M3 0.0350 1,058,872.85 37,060.55
Pekerja pasir/batu L-4 OH 0.3000 132,000.00 39,600.00
Tukang pasir/batu L-3 OH 0.2000 168,000.00 33,600.00
Kepala tukang pasir/batu L-2 OH 0.0200 188,000.00 3,760.00
Mandor pasir/batu L-1 OH 0.0130 205,000.00 2,665.00
Jumlah harga pekerjaan 69,711.88 79,625.00 149,336.88
Jumlah harga dibulatkan 149,336.00

29 1 M2 Plesteran 1PC : 4PS, Tebal 25 mm - Pasir Lokal PU.F.29


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 KG 9.4800 2,778.84 26,343.37
Pasir semen (lokal) MB.2 M3 0.0380 1,058,872.85 40,237.17
Pekerja pasir/batu L-4 OH 0.3000 132,000.00 39,600.00
Tukang pasir/batu L-3 OH 0.2000 168,000.00 33,600.00
Kepala tukang pasir/batu L-2 OH 0.0200 188,000.00 3,760.00
Mandor pasir/batu L-1 OH 0.0130 205,000.00 2,665.00
Jumlah harga pekerjaan 66,580.54 79,625.00 146,205.54
Jumlah harga dibulatkan 146,205.00

30 1 M2 Plesteran 1PC : 5PS, Tebal 25 mm - Pasir Lokal PU.F.30


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 KG 7.9400 2,778.84 22,063.97
Pasir semen (lokal) MB.2 M3 0.0390 1,058,872.85 41,296.04
Pekerja pasir/batu L-4 OH 0.3000 132,000.00 39,600.00
Tukang pasir/batu L-3 OH 0.2000 168,000.00 33,600.00
Kepala tukang pasir/batu L-2 OH 0.0200 188,000.00 3,760.00
Mandor pasir/batu L-1 OH 0.0130 205,000.00 2,665.00
Jumlah harga pekerjaan 63,360.01 79,625.00 142,985.01
Jumlah harga dibulatkan 142,985.00

31 1 M2 Plesteran 1PC : 2PS, Tebal 30 mm - Pasir Import PU.F.31


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 KG 18.6500 2,778.84 51,825.31
Pasir semen (import) MB.1 M3 0.0350 1,541,578.45 53,955.25
Pekerja pasir/batu L-4 OH 0.3200 132,000.00 42,240.00
Tukang pasir/batu L-3 OH 0.2500 168,000.00 42,000.00
Kepala tukang pasir/batu L-2 OH 0.0250 188,000.00 4,700.00
Mandor pasir/batu L-1 OH 0.0150 205,000.00 3,075.00
Jumlah harga pekerjaan 105,780.56 92,015.00 197,795.56
Jumlah harga dibulatkan 197,795.00

32 1 M2 Plesteran 1PC : 3PS, Tebal 30 mm - Pasir Import PU.F.32


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 KG 14.1500 2,778.84 39,320.54
Pasir semen (import) MB.1 M3 0.0390 1,541,578.45 60,121.56
Pekerja pasir/batu L-4 OH 0.3200 132,000.00 42,240.00
Tukang pasir/batu L-3 OH 0.2500 168,000.00 42,000.00
Kepala tukang pasir/batu L-2 OH 0.0250 188,000.00 4,700.00
Mandor pasir/batu L-1 OH 0.0150 205,000.00 3,075.00
Jumlah harga pekerjaan 99,442.10 92,015.00 191,457.10
Jumlah harga dibulatkan 191,457.00
Analisa Harga Satuan Pekerjaan (AHSP) F. Pekerjaan Plesteran

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

33 1 M2 Plesteran 1PC : 2PS, Tebal 30 mm - Pasir Lokal PU.F.33


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 KG 18.6500 2,778.84 51,825.31
Pasir semen (lokal) MB.2 M3 0.0350 1,058,872.85 37,060.55
Pekerja pasir/batu L-4 OH 0.3200 132,000.00 42,240.00
Tukang pasir/batu L-3 OH 0.2500 168,000.00 42,000.00
Kepala tukang pasir/batu L-2 OH 0.0250 188,000.00 4,700.00
Mandor pasir/batu L-1 OH 0.0150 205,000.00 3,075.00
Jumlah harga pekerjaan 88,885.86 92,015.00 180,900.86
Jumlah harga dibulatkan 180,900.00

34 1 M2 Plesteran 1PC : 3PS, Tebal 30 mm - Pasir Lokal PU.F.34


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 KG 14.1500 2,778.84 39,320.54
Pasir semen (lokal) MB.2 M3 0.0390 1,058,872.85 41,296.04
Pekerja pasir/batu L-4 OH 0.3200 132,000.00 42,240.00
Tukang pasir/batu L-3 OH 0.2500 168,000.00 42,000.00
Kepala tukang pasir/batu L-2 OH 0.0250 188,000.00 4,700.00
Mandor pasir/batu L-1 OH 0.0150 205,000.00 3,075.00
Jumlah harga pekerjaan 80,616.58 92,015.00 172,631.58
Jumlah harga dibulatkan 172,631.00

35 1 M2 Plesteran 1PC : 4PS, Tebal 30 mm - Pasir Lokal PU.F.35


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 KG 11.3800 2,778.84 31,623.17
Pasir semen (lokal) MB.2 M3 0.0420 1,058,872.85 44,472.66
Pekerja pasir/batu L-4 OH 0.3200 132,000.00 42,240.00
Tukang pasir/batu L-3 OH 0.2500 168,000.00 42,000.00
Kepala tukang pasir/batu L-2 OH 0.0250 188,000.00 4,700.00
Mandor pasir/batu L-1 OH 0.0150 205,000.00 3,075.00
Jumlah harga pekerjaan 76,095.82 92,015.00 168,110.82
Jumlah harga dibulatkan 168,110.00

36 1 M2 Plesteran 1PC : 5PS, Tebal 30 mm - Pasir Lokal PU.F.36


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 KG 8.1900 2,778.84 22,758.68
Pasir semen (lokal) MB.2 M3 0.0450 1,058,872.85 47,649.28
Pekerja pasir/batu L-4 OH 0.3200 132,000.00 42,240.00
Tukang pasir/batu L-3 OH 0.2500 168,000.00 42,000.00
Kepala tukang pasir/batu L-2 OH 0.0250 188,000.00 4,700.00
Mandor pasir/batu L-1 OH 0.0150 205,000.00 3,075.00
Jumlah harga pekerjaan 70,407.95 92,015.00 162,422.95
Jumlah harga dibulatkan 162,422.00

37 1 M2 Barapen 1PC : 3PS, Tebal 30 mm - Pasir Import PU.F.37


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 KG 7.0700 2,778.84 19,646.38
Pasir semen (import) MB.1 M3 0.0210 1,541,578.45 32,373.15
Pekerja pasir/batu L-4 OH 0.1500 132,000.00 19,800.00
Tukang pasir/batu L-3 OH 0.0700 168,000.00 11,760.00
Kepala tukang pasir/batu L-2 OH 0.0070 188,000.00 1,316.00
Mandor pasir/batu L-1 OH 0.0080 205,000.00 1,640.00
Jumlah harga pekerjaan 52,019.53 34,516.00 86,535.53
Jumlah harga dibulatkan 86,535.00

38 1 M2 Barapen 1PC : 3PS, Tebal 30 mm - Pasir Lokal PU.F.38


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 KG 7.0700 2,778.84 19,646.38
Pasir semen (lokal) MB.2 M3 0.0210 1,058,872.85 22,236.33
Pekerja pasir/batu L-4 OH 0.1500 132,000.00 19,800.00
Tukang pasir/batu L-3 OH 0.0700 168,000.00 11,760.00
Kepala tukang pasir/batu L-2 OH 0.0070 188,000.00 1,316.00
Mandor pasir/batu L-1 OH 0.0080 205,000.00 1,640.00
Jumlah harga pekerjaan 41,882.71 34,516.00 76,398.71
Jumlah harga dibulatkan 76,398.00

39 1 M2 Barapen 1PC : 5PS, Tebal 30 mm - Pasir Lokal PU.F.39


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 KG 5.6700 2,778.84 15,756.01
Pasir semen (lokal) MB.2 M3 0.0230 1,058,872.85 24,354.08
Pekerja pasir/batu L-4 OH 0.1500 132,000.00 19,800.00
Tukang pasir/batu L-3 OH 0.0700 168,000.00 11,760.00
Kepala tukang pasir/batu L-2 OH 0.0070 188,000.00 1,316.00
Mandor pasir/batu L-1 OH 0.0080 205,000.00 1,640.00
Jumlah harga pekerjaan 40,110.08 34,516.00 74,626.08
Jumlah harga dibulatkan 74,626.00

40 1 M2 Plesteran Batu Kali 1PC : 3PS - Pasir Lokal PU.F.40


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 KG 8.1600 2,778.84 22,675.31
Pasir semen (lokal) MB.2 M3 0.0194 1,058,872.85 20,542.13
Pekerja pasir/batu L-4 OH 0.4000 132,000.00 52,800.00
Tukang pasir/batu L-3 OH 0.2000 168,000.00 33,600.00
Kepala tukang pasir/batu L-2 OH 0.0200 188,000.00 3,760.00
Mandor pasir/batu L-1 OH 0.0200 205,000.00 4,100.00
Jumlah harga pekerjaan 43,217.44 94,260.00 137,477.44
Jumlah harga dibulatkan 137,477.00
Analisa Harga Satuan Pekerjaan (AHSP) F. Pekerjaan Plesteran

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

41 1 M2 Plesteran Batu Kali 1PC : 4PS - Pasir Lokal PU.F.41


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 KG 6.5110 2,778.84 18,093.01
Pasir semen (lokal) MB.2 M3 0.0209 1,058,872.85 22,130.44
Pekerja pasir/batu L-4 OH 0.4000 132,000.00 52,800.00
Tukang pasir/batu L-3 OH 0.2000 168,000.00 33,600.00
Kepala tukang pasir/batu L-2 OH 0.0200 188,000.00 3,760.00
Mandor pasir/batu L-1 OH 0.0200 205,000.00 4,100.00
Jumlah harga pekerjaan 40,223.45 94,260.00 134,483.45
Jumlah harga dibulatkan 134,483.00

42 1 M2 Plesteran Skoning 1PC : 2PS, Tebal 10 mm - Pasir Lo PU.F.42


SNI 2837:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 0.5000 2,778.84 1,389.42
Pasir semen (lokal) MB.2 M3 0.0130 1,058,872.85 13,765.35
Pekerja pasir/batu L-4 OH 0.0800 132,000.00 10,560.00
Tukang pasir/batu L-3 OH 0.4000 168,000.00 67,200.00
Kepala tukang pasir/batu L-2 OH 0.0400 188,000.00 7,520.00
Mandor pasir/batu L-1 OH 0.0040 205,000.00 820.00
Jumlah harga pekerjaan 15,154.77 86,100.00 101,254.77
Jumlah harga dibulatkan 101,254.00

43 1 M2 Plesteran Ciprat 1PC : 2PS, Tebal 10 mm - Pasir Lok PU.F.43


SNI 2837:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 4.3200 2,778.84 12,004.58
Pasir semen (lokal) MB.2 M3 0.0060 1,058,872.85 6,353.24
Pekerja pasir/batu L-4 OH 0.3000 132,000.00 39,600.00
Tukang pasir/batu L-3 OH 0.1000 168,000.00 16,800.00
Kepala tukang pasir/batu L-2 OH 0.0100 188,000.00 1,880.00
Mandor pasir/batu L-1 OH 0.0150 205,000.00 3,075.00
Jumlah harga pekerjaan 18,357.81 61,355.00 79,712.81
Jumlah harga dibulatkan 79,712.00

44 1 M2 Finishing Siar Pasangan Dinding Bata Merah 20 M' PU.F.44


SNI 2837:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 3.1080 2,778.84 8,636.63
Pekerja pasir/batu L-4 OH 0.1500 132,000.00 19,800.00
Tukang pasir/batu L-3 OH 0.0750 168,000.00 12,600.00
Kepala tukang pasir/batu L-2 OH 0.0080 188,000.00 1,504.00
Mandor pasir/batu L-1 OH 0.0080 205,000.00 1,640.00
Jumlah harga pekerjaan 8,636.63 35,544.00 44,180.63
Jumlah harga dibulatkan 44,180.00

45 1 M2 Finishing Siar Pasangan Dinding Coneblock Ekspose 8 M' PU.F.45


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 KG 1.6000 2,778.84 4,446.14
Pekerja pasir/batu L-4 OH 0.0700 132,000.00 9,240.00
Tukang pasir/batu L-3 OH 0.0350 168,000.00 5,880.00
Kepala tukang pasir/batu L-2 OH 0.0040 188,000.00 752.00
Mandor pasir/batu L-1 OH 0.0040 205,000.00 820.00
Jumlah harga pekerjaan 4,446.14 16,692.00 21,138.14
Jumlah harga dibulatkan 21,138.00
Analisa Harga Satuan Pekerjaan (AHSP) F. Pekerjaan Plesteran

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

46 1 M2 Finishing Siar Pasangan Batu Kali/Belah Adukan 1PC : 2PS PU.F.46


SNI 2837:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 6.3400 2,778.84 17,617.83
Pasir semen (lokal) MB.2 M3 0.0120 1,058,872.85 12,706.47
Pekerja pasir/batu L-4 OH 0.3000 132,000.00 39,600.00
Tukang pasir/batu L-3 OH 0.1500 168,000.00 25,200.00
Kepala tukang pasir/batu L-2 OH 0.0150 188,000.00 2,820.00
Mandor pasir/batu L-1 OH 0.0150 205,000.00 3,075.00
Jumlah harga pekerjaan 30,324.30 70,695.00 101,019.30
Jumlah harga dibulatkan 101,019.00

47 1 M2 Acian PU.F.47
SNI 2837:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 3.2500 2,778.84 9,031.22
Pekerja pasir/batu L-4 OH 0.2000 132,000.00 26,400.00
Tukang pasir/batu L-3 OH 0.1000 168,000.00 16,800.00
Kepala tukang pasir/batu L-2 OH 0.0100 188,000.00 1,880.00
Mandor pasir/batu L-1 OH 0.0100 205,000.00 2,050.00
Jumlah harga pekerjaan 9,031.22 47,130.00 56,161.22
Jumlah harga dibulatkan 56,161.00

48 1 M' Benangan PU.F.48


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 KG 1.7500 2,778.84 4,862.96
Tukang pasir/batu L-3 OH 0.0700 168,000.00 11,760.00
Mandor pasir/batu L-1 OH 0.0080 205,000.00 1,640.00
Jumlah harga pekerjaan 4,862.96 13,400.00 18,262.96
Jumlah harga dibulatkan 18,262.00
Analisa Harga Satuan Pekerjaan (AHSP) G. Pekerjaan Kayu

G. PEKERJAAN KAYU
PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE
PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

1 1 M3 Kusen Pintu dan Jendela Kayu Kelas I PU.G.1


SNI 3434:2008
Balok Kayu Kelas I (Kayu Besi) MC.3 M3 1.1000 9,496,329.70 10,445,962.67
Paku Campuran MD.16 KG 1.2500 19,506.30 24,382.88
Lem Kayu MN.1 KG 1.0000 51,934.00 51,934.00
Pekerja Kayu L-4 OH 7.0000 132,000.00 924,000.00
Tukang Kayu L-3 OH 21.0000 168,000.00 3,528,000.00
Kepala Tukang L-2 OH 2.1000 188,000.00 394,800.00
Mandor L-1 OH 0.3500 205,000.00 71,750.00
Jumlah harga pekerjaan 10,522,279.55 4,918,550.00 15,440,829.55
Jumlah harga dibulatkan 15,440,829.00

2 1 M3 Kusen Pintu dan Jendela Kayu Kelas II PU.G.2


SNI 3434:2008
Balok Kayu Kelas II (Kayu Rahay) MC.2 M3 1.2000 4,729,266.90 5,675,120.28
Paku Campuran MD.16 KG 1.2500 19,506.30 24,382.88
Lem Kayu MN.1 KG 1.0000 51,934.00 51,934.00
Pekerja Kayu L-4 OH 6.0000 132,000.00 792,000.00
Tukang Kayu L-3 OH 18.0000 168,000.00 3,024,000.00
Kepala Tukang L-2 OH 1.8000 188,000.00 338,400.00
Mandor L-1 OH 0.3000 205,000.00 61,500.00
Jumlah harga pekerjaan 5,751,437.16 4,215,900.00 9,967,337.16
Jumlah harga dibulatkan 9,967,337.00

3 1 M3 Kusen Pintu dan Jendela Kayu Kelas III PU.G.3


SNI 3434:2008
Balok Kayu Kelas III (Kayu Bus) MC.1 M3 1.2000 3,599,094.05 4,318,912.86
Paku Campuran MD.16 KG 1.2500 19,506.30 24,382.88
Lem Kayu MN.1 KG 1.0000 51,934.00 51,934.00
Pekerja Kayu L-4 OH 6.0000 132,000.00 792,000.00
Tukang Kayu L-3 OH 18.0000 168,000.00 3,024,000.00
Kepala Tukang L-2 OH 1.8000 188,000.00 338,400.00
Mandor L-1 OH 0.3000 205,000.00 61,500.00
Jumlah harga pekerjaan 4,395,229.74 4,215,900.00 8,611,129.74
Jumlah harga dibulatkan 8,611,129.00

4 1 M2 Pintu Klamp Standar Kayu Kelas II PU.G.4


SNI 3434:2008
Papan Kayu Kelas II (Kayu Rahay) tebal = 2 Cm MC.6 M3 0.0400 4,839,477.15 193,579.09
Paku Campuran MD.16 KG 0.0500 19,506.30 975.32
Pekerja Kayu L-4 OH 0.3500 132,000.00 46,200.00
Tukang Kayu L-3 OH 1.0500 168,000.00 176,400.00
Kepala Tukang L-2 OH 0.1050 188,000.00 19,740.00
Mandor L-1 OH 0.0180 205,000.00 3,690.00
Jumlah harga pekerjaan 194,554.40 246,030.00 440,584.40
Jumlah harga dibulatkan 440,584.00

5 1 M2 Pintu Klamp Sederhana Kayu Kelas III PU.G.5


SNI 3434:2008
Papan Kayu Kelas III (Kayu Bus) t = 2 - 5 cm MC.5 M3 0.0400 3,599,094.05 143,963.76
Paku Campuran MD.16 KG 0.0500 19,506.30 975.32
Pekerja Kayu L-4 OH 0.3500 132,000.00 46,200.00
Tukang Kayu L-3 OH 1.0500 168,000.00 176,400.00
Kepala Tukang L-2 OH 0.1050 188,000.00 19,740.00
Mandor L-1 OH 0.0180 205,000.00 3,690.00
Jumlah harga pekerjaan 144,939.08 246,030.00 390,969.08
Jumlah harga dibulatkan 390,969.00

6 1 M2 Daun Pintu Panel Kayu Kelas I PU.G.6


SNI 3434:2008
Papan Kayu Kelas I (Kayu Besi) MC.8 M3 0.0400 10,157,579.70 406,303.19
Lem Kayu MN.1 KG 0.5000 51,934.00 25,967.00
Pekerja Kayu L-4 OH 1.0000 132,000.00 132,000.00
Tukang Kayu L-3 OH 3.0000 168,000.00 504,000.00
Kepala Tukang L-2 OH 0.3000 188,000.00 56,400.00
Mandor L-1 OH 0.0500 205,000.00 10,250.00
Jumlah harga pekerjaan 432,270.19 702,650.00 1,134,920.19
Jumlah harga dibulatkan 1,134,920.00

7 1 M2 Daun Pintu Panel Kayu Kelas II PU.G.7


SNI 3434:2008
Papan Kayu Kelas II (Kayu Rahay) tebal = 2 Cm MC.6 M3 0.0400 4,839,477.15 193,579.09
Lem Kayu MN.1 KG 0.5000 51,934.00 25,967.00
Pekerja Kayu L-4 OH 1.0000 132,000.00 132,000.00
Tukang Kayu L-3 OH 3.0000 168,000.00 504,000.00
Kepala Tukang L-2 OH 0.3000 188,000.00 56,400.00
Mandor L-1 OH 0.0500 205,000.00 10,250.00
Jumlah harga pekerjaan 219,546.09 702,650.00 922,196.09
Jumlah harga dibulatkan 922,196.00
Analisa Harga Satuan Pekerjaan (AHSP) G. Pekerjaan Kayu

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

8 1 M2 Pintu dan Jendela Kaca, Kayu Kelas I PU.G.8


SNI 3434:2008
Papan Kayu Kelas I (Kayu Besi) MC.8 M3 0.0240 10,157,579.70 243,781.91
Kaca Rayben 5 mm MG.5 M2 1.0000 284,852.70 284,852.70
Lem Kayu MN.1 KG 0.3000 51,934.00 15,580.20
Pekerja Kayu L-4 OH 0.8000 132,000.00 105,600.00
Tukang Kayu L-3 OH 2.4000 168,000.00 403,200.00
Kepala Tukang L-2 OH 0.2400 188,000.00 45,120.00
Mandor L-1 OH 0.0400 205,000.00 8,200.00
Jumlah harga pekerjaan 544,214.81 562,120.00 1,106,334.81
Jumlah harga dibulatkan 1,106,334.00

9 1 M2 Pintu dan Jendela Kaca, Kayu Kelas II PU.G.9


SNI 3434:2008
Papan Kayu Kelas II (Kayu Rahay) tebal = 2 Cm MC.6 M3 0.0240 4,839,477.15 116,147.45
Kaca Rayben 5 mm MG.5 M2 1.0000 284,852.70 284,852.70
Lem Kayu MN.1 KG 0.3000 51,934.00 15,580.20
Pekerja Kayu L-4 OH 0.8000 132,000.00 105,600.00
Tukang Kayu L-3 OH 2.4000 168,000.00 403,200.00
Kepala Tukang L-2 OH 0.2400 188,000.00 45,120.00
Mandor L-1 OH 0.0400 205,000.00 8,200.00
Jumlah harga pekerjaan 416,580.35 562,120.00 978,700.35
Jumlah harga dibulatkan 978,700.00

10 1 M2 Pintu dan Jendela Jalusi, Kayu Kelas I PU.G.10


SNI 3434:2008
Papan Kayu Kelas I (Kayu Besi) MC.8 M3 0.0640 10,157,579.70 650,085.10
Lem Kayu MN.1 KG 0.5000 51,934.00 25,967.00
Pekerja Kayu L-4 OH 1.0000 132,000.00 132,000.00
Tukang Kayu L-3 OH 3.0000 168,000.00 504,000.00
Kepala Tukang L-2 OH 0.3000 188,000.00 56,400.00
Mandor L-1 OH 0.0500 205,000.00 10,250.00
Jumlah harga pekerjaan 676,052.10 702,650.00 1,378,702.10
Jumlah harga dibulatkan 1,378,702.00

11 1 M2 Pintu dan Jendela Jalusi, Kayu Kelas II PU.G.11


SNI 3434:2008
Papan Kayu Kelas II (Kayu Rahay) tebal = 2 Cm MC.6 M3 0.0640 4,839,477.15 309,726.54
Lem Kayu MN.1 KG 0.5000 51,934.00 25,967.00
Pekerja Kayu L-4 OH 1.0000 132,000.00 132,000.00
Tukang Kayu L-3 OH 3.0000 168,000.00 504,000.00
Kepala Tukang L-2 OH 0.3000 188,000.00 56,400.00
Mandor L-1 OH 0.0500 205,000.00 10,250.00
Jumlah harga pekerjaan 335,693.54 702,650.00 1,038,343.54
Jumlah harga dibulatkan 1,038,343.00

12 1 M2 Daun Pintu Kayu Lapis (Plywood) Rangkap, Rangka Tertutup PU.G.12


Kayu Kelas II (Lebar Sampai 90 cm)
SNI 3434:2008
Papan Kayu Kelas II (Kayu Rahay) tebal = 2 Cm MC.6 M3 0.0250 4,839,477.15 120,986.93
Paku Campuran MD.16 KG 0.0300 19,506.30 585.19
Lem Kayu MN.1 KG 0.5000 51,934.00 25,967.00
Plywood - Tripleks (1,22 x 2,44) cm - tebal 4 mm MC.12 Lembar 1.0000 106,064.50 106,064.50
Pekerja Kayu L-4 OH 1.0000 132,000.00 132,000.00
Tukang Kayu L-3 OH 3.0000 168,000.00 504,000.00
Kepala Tukang L-2 OH 0.3000 188,000.00 56,400.00
Mandor L-1 OH 0.0500 205,000.00 10,250.00
Jumlah harga pekerjaan 253,603.62 702,650.00 956,253.62
Jumlah harga dibulatkan 956,253.00

13 1 M2 Pintu Plywood Rangkap Rangka Expose, Kayu Kelas I PU.G.13


SNI 3434:2008
Papan Kayu Kelas I (Kayu Besi) MC.8 M3 0.0256 10,157,579.70 260,034.04
Paku Campuran MD.16 KG 0.0300 19,506.30 585.19
Lem Kayu MN.1 KG 0.5000 51,934.00 25,967.00
Plywood - Tripleks (1,22 x 2,44) cm - tebal 4 mm MC.12 Lembar 1.0000 106,064.50 106,064.50
Pekerja Kayu L-4 OH 0.8000 132,000.00 105,600.00
Tukang Kayu L-3 OH 2.4000 168,000.00 403,200.00
Kepala Tukang L-2 OH 0.2400 188,000.00 45,120.00
Mandor L-1 OH 0.0400 205,000.00 8,200.00
Jumlah harga pekerjaan 392,650.73 562,120.00 954,770.73
Jumlah harga dibulatkan 954,770.00

14 1 M2 Pintu Plywood Rangkap Rangka Expose, Kayu Kelas II PU.G.14


SNI 3434:2008
Papan Kayu Kelas II (Kayu Rahay) tebal = 2 Cm MC.6 M3 0.0256 4,839,477.15 123,890.62
Paku Campuran MD.16 KG 0.0300 19,506.30 585.19
Lem Kayu MN.1 KG 0.5000 51,934.00 25,967.00
Plywood - Tripleks (1,22 x 2,44) cm - tebal 4 mm MC.12 Lembar 1.0000 106,064.50 106,064.50
Pekerja Kayu L-4 OH 0.8000 132,000.00 105,600.00
Tukang Kayu L-3 OH 2.4000 168,000.00 403,200.00
Kepala Tukang L-2 OH 0.2400 188,000.00 45,120.00
Mandor L-1 OH 0.0400 205,000.00 8,200.00
Jumlah harga pekerjaan 256,507.30 562,120.00 818,627.30
Jumlah harga dibulatkan 818,627.00
Analisa Harga Satuan Pekerjaan (AHSP) G. Pekerjaan Kayu

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

15 1 M2 Jalusi Kusen, Kayu Kelas I PU.G.15


SNI 3434:2008
Papan Kayu Kelas I (Kayu Besi) MC.8 M3 0.0600 10,157,579.70 609,454.78
Paku Campuran MD.16 KG 0.1500 19,506.30 2,925.95
Pekerja Kayu L-4 OH 0.6700 132,000.00 88,440.00
Tukang Kayu L-3 OH 2.0000 168,000.00 336,000.00
Kepala Tukang L-2 OH 0.2000 188,000.00 37,600.00
Mandor L-1 OH 0.3350 205,000.00 68,675.00
Jumlah harga pekerjaan 612,380.73 530,715.00 1,143,095.73
Jumlah harga dibulatkan 1,143,095.00

16 1 M2 Jalusi Kusen, Kayu Kelas II PU.G.16


SNI 3434:2008
Papan Kayu Kelas II (Kayu Rahay) tebal = 2 Cm MC.6 M3 0.0600 4,839,477.15 290,368.63
Paku Campuran MD.16 KG 0.1500 19,506.30 2,925.95
Pekerja Kayu L-4 OH 0.6700 132,000.00 88,440.00
Tukang Kayu L-3 OH 2.0000 168,000.00 336,000.00
Kepala Tukang L-2 OH 0.2000 188,000.00 37,600.00
Mandor L-1 OH 0.3350 205,000.00 68,675.00
Jumlah harga pekerjaan 293,294.57 530,715.00 824,009.57
Jumlah harga dibulatkan 824,009.00

17 1 M2 Teakwood Rangkap Rangka Expose, Kayu Kelas I PU.G.17


SNI 3434:2008
Papan Kayu Kelas I (Kayu Besi) MC.8 M3 0.0256 10,157,579.70 260,034.04
Paku Campuran MD.16 KG 0.0300 19,506.30 585.19
Lem Kayu MN.1 KG 0.5000 51,934.00 25,967.00
Teakwood tebal 4 mm, ukuran (90 x 220) cm MC.20 Lembar 1.0000 153,013.25 153,013.25
Pekerja Kayu L-4 OH 0.8000 132,000.00 105,600.00
Tukang Kayu L-3 OH 2.4000 168,000.00 403,200.00
Kepala Tukang L-2 OH 0.2400 188,000.00 45,120.00
Mandor L-1 OH 0.0400 205,000.00 8,200.00
Jumlah harga pekerjaan 439,599.48 562,120.00 1,001,719.48
Jumlah harga dibulatkan 1,001,719.00

18 1 M2 Teakwood Rangkap Lapis Formika Rangka Expose, Kayu Kelas II PU.G.18


SNI 3434:2008
Papan Kayu Kelas II (Kayu Rahay) tebal = 2 Cm MC.6 M3 0.0250 4,839,477.15 120,986.93
Paku Campuran MD.16 KG 0.0300 19,506.30 585.19
Lem Kayu MN.1 KG 0.8000 51,934.00 41,547.20
Teakwood tebal 4 mm, ukuran (90 x 220) cm MC.20 Lembar 1.0000 153,013.25 153,013.25
Formika MC.23 Lembar 0.5000 750,584.30 375,292.15
Pekerja Kayu L-4 OH 0.8000 132,000.00 105,600.00
Tukang Kayu L-3 OH 2.4000 168,000.00 403,200.00
Kepala Tukang L-2 OH 0.2400 188,000.00 45,120.00
Mandor L-1 OH 0.0400 205,000.00 8,200.00
Jumlah harga pekerjaan 691,424.72 562,120.00 1,253,544.72
Jumlah harga dibulatkan 1,253,544.00

19 1 M3 Konstruksi Kuda-Kuda Konvensional, Kayu Kelas I PU.G.19


SNI 3434:2008
Balok Kayu Kelas I (Kayu Besi) MC.3 M3 1.1000 9,496,329.70 10,445,962.67
Besi Strip Tebal 5 cm MD.51 KG 15.0000 8,802.00 132,030.00
Paku Campuran MD.16 KG 5.6000 19,506.30 109,235.28
Pekerja Kayu L-4 OH 4.0000 132,000.00 528,000.00
Tukang Kayu L-3 OH 12.0000 168,000.00 2,016,000.00
Kepala Tukang L-2 OH 1.2000 188,000.00 225,600.00
Mandor L-1 OH 0.2000 205,000.00 41,000.00
Jumlah harga pekerjaan 10,687,227.95 2,810,600.00 13,497,827.95
Jumlah harga dibulatkan 13,497,827.00

20 1 M3 Konstruksi Kuda-Kuda Konvensional, Kayu Kelas II PU.G.20


SNI 3434:2008
Balok Kayu Kelas II (Kayu Rahay) MC.2 M3 1.1000 4,729,266.90 5,202,193.59
Besi Strip Tebal 5 cm MD.51 KG 15.0000 8,802.00 132,030.00
Paku Campuran MD.16 KG 5.6000 19,506.30 109,235.28
Pekerja Kayu L-4 OH 4.0000 132,000.00 528,000.00
Tukang Kayu L-3 OH 12.0000 168,000.00 2,016,000.00
Kepala Tukang L-2 OH 1.2000 188,000.00 225,600.00
Mandor L-1 OH 0.2000 205,000.00 41,000.00
Jumlah harga pekerjaan 5,443,458.87 2,810,600.00 8,254,058.87
Jumlah harga dibulatkan 8,254,058.00

21 1 M3 Konstruksi Kuda-Kuda Konvensional, Kayu Kelas III PU.G.21


SNI 3434:2008
Balok Kayu Kelas III (Kayu Bus) MC.1 M3 1.1000 3,599,094.05 3,959,003.46
Besi Strip Tebal 5 cm MD.51 KG 15.0000 8,802.00 132,030.00
Paku Campuran MD.16 KG 5.6000 19,506.30 109,235.28
Pekerja Kayu L-4 OH 4.0000 132,000.00 528,000.00
Tukang Kayu L-3 OH 12.0000 168,000.00 2,016,000.00
Kepala Tukang L-2 OH 1.2000 188,000.00 225,600.00
Mandor L-1 OH 0.2000 205,000.00 41,000.00
Jumlah harga pekerjaan 4,200,268.74 2,810,600.00 7,010,868.74
Jumlah harga dibulatkan 7,010,868.00
Analisa Harga Satuan Pekerjaan (AHSP) G. Pekerjaan Kayu

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

22 1 M3 Konstruksi Kuda-Kuda Expose, Kayu Kelas I PU.G.22


SNI 3434:2008
Balok Kayu Kelas I (Kayu Besi) MC.3 M3 1.2000 9,496,329.70 11,395,595.64
Besi Strip Tebal 5 cm MD.51 KG 15.0000 8,802.00 132,030.00
Paku Campuran MD.16 KG 5.6000 19,506.30 109,235.28
Pekerja Kayu L-4 OH 6.7000 132,000.00 884,400.00
Tukang Kayu L-3 OH 20.1000 168,000.00 3,376,800.00
Kepala Tukang L-2 OH 2.0100 188,000.00 377,880.00
Mandor L-1 OH 0.3350 205,000.00 68,675.00
Jumlah harga pekerjaan 11,636,860.92 4,707,755.00 16,344,615.92
Jumlah harga dibulatkan 16,344,615.00

23 1 M3 Konstruksi Gordeng - Kayu Kelas II PU.G.23


SNI 3434:2008
Balok Kayu Kelas II (Kayu Rahay) MC.2 M3 1.1000 4,729,266.90 5,202,193.59
Besi Strip Tebal 5 cm MD.51 KG 15.0000 8,802.00 132,030.00
Paku Campuran MD.16 KG 3.0000 19,506.30 58,518.90
Pekerja Kayu L-4 OH 2.4000 132,000.00 316,800.00
Tukang Kayu L-3 OH 7.2000 168,000.00 1,209,600.00
Kepala Tukang L-2 OH 0.7200 188,000.00 135,360.00
Mandor L-1 OH 0.1200 205,000.00 24,600.00
Jumlah harga pekerjaan 5,392,742.49 1,686,360.00 7,079,102.49
Jumlah harga dibulatkan 7,079,102.00

24 1 M3 Konstruksi Gordeng - Kayu Kelas III PU.G.24


SNI 3434:2008
Balok Kayu Kelas III (Kayu Bus) MC.1 M3 1.1000 3,599,094.05 3,959,003.46
Besi Strip Tebal 5 cm MD.51 KG 15.0000 8,802.00 132,030.00
Paku Campuran MD.16 KG 3.0000 19,506.30 58,518.90
Pekerja Kayu L-4 OH 2.4000 132,000.00 316,800.00
Tukang Kayu L-3 OH 7.2000 168,000.00 1,209,600.00
Kepala Tukang L-2 OH 0.7200 188,000.00 135,360.00
Mandor L-1 OH 0.1200 205,000.00 24,600.00
Jumlah harga pekerjaan 4,149,552.36 1,686,360.00 5,835,912.36
Jumlah harga dibulatkan 5,835,912.00

25 1 M2 Rangka Atap Genteng Keramik, Kayu Kelas II PU.G.25


SNI 3434:2008
Balok Kayu Kelas II (Kayu Rahay) MC.2 M3 0.0140 4,729,266.90 66,209.74
Kayu Reng (2 x 3) cm, Kayu Rahay MC.10 M3 0.0036 13,957,645.83 50,247.53
Paku Campuran MD.16 KG 0.2500 19,506.30 4,876.58
Pekerja Kayu L-4 OH 0.1000 132,000.00 13,200.00
Tukang Kayu L-3 OH 0.1000 168,000.00 16,800.00
Kepala Tukang L-2 OH 0.0100 188,000.00 1,880.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
Jumlah harga pekerjaan 121,333.84 32,905.00 154,238.84
Jumlah harga dibulatkan 154,238.00

26 1 M2 Rangka Atap Genteng Beton, Kayu Kelas II PU.G.26


SNI 3434:2008
Balok Kayu Kelas II (Kayu Rahay) MC.2 M3 0.0140 4,729,266.90 66,209.74
Kayu Reng (2 x 3) cm, Kayu Rahay MC.10 M3 0.0072 13,957,645.83 100,495.05
Paku Campuran MD.16 KG 0.2500 19,506.30 4,876.58
Pekerja Kayu L-4 OH 0.1000 132,000.00 13,200.00
Tukang Kayu L-3 OH 0.1000 168,000.00 16,800.00
Kepala Tukang L-2 OH 0.0100 188,000.00 1,880.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
Jumlah harga pekerjaan 171,581.36 32,905.00 204,486.36
Jumlah harga dibulatkan 204,486.00

27 1 M2 Rangka Atap Genteng Sirap, Kayu Kelas II PU.G.27


SNI 3434:2008
Balok Kayu Kelas II (Kayu Rahay) MC.2 M3 0.1650 4,729,266.90 780,329.04
Paku Campuran MD.16 KG 0.2000 19,506.30 3,901.26
Pekerja Kayu L-4 OH 0.1200 132,000.00 15,840.00
Tukang Kayu L-3 OH 0.1200 168,000.00 20,160.00
Kepala Tukang L-2 OH 0.0120 188,000.00 2,256.00
Mandor L-1 OH 0.0060 205,000.00 1,230.00
Jumlah harga pekerjaan 784,230.30 39,486.00 823,716.30
Jumlah harga dibulatkan 823,716.00

28 1 M2 Rangka Plafond (50 x 100), Kayu Kelas II PU.G.28


SNI 3434:2008
Balok Kayu Kelas II (Kayu Rahay) MC.2 M3 0.0154 4,729,266.90 72,830.71
Paku Campuran MD.16 KG 0.2000 19,506.30 3,901.26
Pekerja Kayu L-4 OH 0.1500 132,000.00 19,800.00
Tukang Kayu L-3 OH 0.3000 168,000.00 50,400.00
Kepala Tukang L-2 OH 0.0300 188,000.00 5,640.00
Mandor L-1 OH 0.0750 205,000.00 15,375.00
Jumlah harga pekerjaan 76,731.97 91,215.00 167,946.97
Jumlah harga dibulatkan 167,946.00
Analisa Harga Satuan Pekerjaan (AHSP) G. Pekerjaan Kayu

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

29 1 M2 Rangka Plafond (50 x 100), Kayu Kelas III PU.G.29


SNI 3434:2008
Balok Kayu Kelas III (Kayu Bus) MC.1 M3 0.0154 3,599,094.05 55,426.05
Paku Campuran MD.16 KG 0.2000 19,506.30 3,901.26
Pekerja Kayu L-4 OH 0.1500 132,000.00 19,800.00
Tukang Kayu L-3 OH 0.3000 168,000.00 50,400.00
Kepala Tukang L-2 OH 0.0300 188,000.00 5,640.00
Mandor L-1 OH 0.0750 205,000.00 15,375.00
Jumlah harga pekerjaan 59,327.31 91,215.00 150,542.31
Jumlah harga dibulatkan 150,542.00

30 1 M2 Rangka Plafond (60 x 60), Kayu Kelas II PU.G.30


SNI 3434:2008
Balok Kayu Kelas II (Kayu Rahay) MC.2 M3 0.0163 4,729,266.90 77,087.05
Paku Campuran MD.16 KG 0.2500 19,506.30 4,876.58
Pekerja Kayu L-4 OH 0.2000 132,000.00 26,400.00
Tukang Kayu L-3 OH 0.3000 168,000.00 50,400.00
Kepala Tukang L-2 OH 0.0300 188,000.00 5,640.00
Mandor L-1 OH 0.0100 205,000.00 2,050.00
Jumlah harga pekerjaan 81,963.63 84,490.00 166,453.63
Jumlah harga dibulatkan 166,453.00

31 1 M2 Rangka Plafond (60 x 60), Kayu Kelas III PU.G.31


SNI 3434:2008
Balok Kayu Kelas III (Kayu Bus) MC.1 M3 0.0163 3,599,094.05 58,665.23
Paku Campuran MD.16 KG 0.2500 19,506.30 4,876.58
Pekerja Kayu L-4 OH 0.2000 132,000.00 26,400.00
Tukang Kayu L-3 OH 0.3000 168,000.00 50,400.00
Kepala Tukang L-2 OH 0.0300 188,000.00 5,640.00
Mandor L-1 OH 0.0100 205,000.00 2,050.00
Jumlah harga pekerjaan 63,541.81 84,490.00 148,031.81
Jumlah harga dibulatkan 148,031.00

32 1 M2 Rangka Plafond (100 x 100), Kayu Kelas II PU.G.32


HPS.PU. 2017
Balok Kayu Kelas II (Kayu Rahay) MC.2 M3 0.0120 4,729,266.90 56,751.20
Paku Campuran MD.16 KG 0.1000 19,506.30 1,950.63
Pekerja Kayu L-4 OH 0.1500 132,000.00 19,800.00
Tukang Kayu L-3 OH 0.2500 168,000.00 42,000.00
Kepala Tukang L-2 OH 0.0250 188,000.00 4,700.00
Mandor L-1 OH 0.0750 205,000.00 15,375.00
Jumlah harga pekerjaan 58,701.83 81,875.00 140,576.83
Jumlah harga dibulatkan 140,576.00

33 1 M2 Rangka Plafond (100 x 100), Kayu Kelas III PU.G.33


HPS.PU. 2017
Balok Kayu Kelas III (Kayu Bus) MC.1 M3 0.0120 3,599,094.05 43,189.13
Paku Campuran MD.16 KG 0.1000 19,506.30 1,950.63
Pekerja Kayu L-4 OH 0.1500 132,000.00 19,800.00
Tukang Kayu L-3 OH 0.2500 168,000.00 42,000.00
Kepala Tukang L-2 OH 0.0250 188,000.00 4,700.00
Mandor L-1 OH 0.0075 205,000.00 1,537.50
Jumlah harga pekerjaan 45,139.76 68,037.50 113,177.26
Jumlah harga dibulatkan 113,177.00

34 1 M2 Rangka Plafond (60 x 120), Kayu Kelas II PU.G.34


HPS.PU. 2017
Balok Kayu Kelas II (Kayu Rahay) MC.2 M3 0.0130 4,729,266.90 61,480.47
Paku Campuran MD.16 KG 0.1200 19,506.30 2,340.76
Pekerja Kayu L-4 OH 0.1700 132,000.00 22,440.00
Tukang Kayu L-3 OH 0.2700 168,000.00 45,360.00
Kepala Tukang L-2 OH 0.0270 188,000.00 5,076.00
Mandor L-1 OH 0.0085 205,000.00 1,742.50
Jumlah harga pekerjaan 63,821.23 74,618.50 138,439.73
Jumlah harga dibulatkan 138,439.00

35 1 M2 Rangka Plafond (60 x 120), Kayu Kelas III PU.G.35


HPS.PU. 2017
Balok Kayu Kelas III (Kayu Bus) MC.1 M3 0.0130 3,599,094.05 46,788.22
Paku Campuran MD.16 KG 0.1200 19,506.30 2,340.76
Pekerja Kayu L-4 OH 0.1700 132,000.00 22,440.00
Tukang Kayu L-3 OH 0.2700 168,000.00 45,360.00
Kepala Tukang L-2 OH 0.0270 188,000.00 5,076.00
Mandor L-1 OH 0.0085 205,000.00 1,742.50
Jumlah harga pekerjaan 49,128.98 74,618.50 123,747.48
Jumlah harga dibulatkan 123,747.00

36 1 M' Lisplank Ukuran (3 x 20) cm, Kayu Kelas I PU.G.36


SNI 3434:2008
Papan Kayu Kelas I (Kayu Besi) MC.8 M3 0.0108 10,157,579.70 109,701.86
Paku Campuran MD.16 KG 0.1000 19,506.30 1,950.63
Pekerja Kayu L-4 OH 0.1000 132,000.00 13,200.00
Tukang Kayu L-3 OH 0.2000 168,000.00 33,600.00
Kepala Tukang L-2 OH 0.0200 188,000.00 3,760.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
Jumlah harga pekerjaan 111,652.49 51,585.00 163,237.49
Jumlah harga dibulatkan 163,237.00
Analisa Harga Satuan Pekerjaan (AHSP) G. Pekerjaan Kayu

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

37 1 M' Lisplank Ukuran (3 x 20) cm, Kayu Kelas II PU.G.37


SNI 3434:2008
Papan Kayu Kelas II (Kayu Rahay) tebal = 2 Cm MC.6 M3 0.0108 4,839,477.15 52,266.35
Paku Campuran MD.16 KG 0.1000 19,506.30 1,950.63
Pekerja Kayu L-4 OH 0.1000 132,000.00 13,200.00
Tukang Kayu L-3 OH 0.2000 168,000.00 33,600.00
Kepala Tukang L-2 OH 0.0200 188,000.00 3,760.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
Jumlah harga pekerjaan 54,216.98 51,585.00 105,801.98
Jumlah harga dibulatkan 105,801.00

38 1 M' Lisplank Ukuran (3 x 30) cm, Kayu Kelas I PU.G.38


SNI 3434:2008
Papan Kayu Kelas I (Kayu Besi) MC.8 M3 0.0110 10,157,579.70 111,733.38
Paku Campuran MD.16 KG 0.0500 19,506.30 975.32
Pekerja Kayu L-4 OH 0.1000 132,000.00 13,200.00
Tukang Kayu L-3 OH 0.2000 168,000.00 33,600.00
Kepala Tukang L-2 OH 0.0200 188,000.00 3,760.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
Jumlah harga pekerjaan 112,708.69 51,585.00 164,293.69
Jumlah harga dibulatkan 164,293.00

39 1 M' Lisplank Ukuran (3 x 30) cm, Kayu Kelas II PU.G.39


SNI 3434:2008
Papan Kayu Kelas II (Kayu Rahay) tebal = 2 Cm MC.6 M3 0.0110 4,839,477.15 53,234.25
Paku Campuran MD.16 KG 0.0500 19,506.30 975.32
Pekerja Kayu L-4 OH 0.1000 132,000.00 13,200.00
Tukang Kayu L-3 OH 0.2000 168,000.00 33,600.00
Kepala Tukang L-2 OH 0.0200 188,000.00 3,760.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
Jumlah harga pekerjaan 54,209.56 51,585.00 105,794.56
Jumlah harga dibulatkan 105,794.00

40 1 M' Lisplank Ukuran (2 x 20) cm, Kayu Kelas I PU.G.40


HPS.PU. 2017
Papan Kayu Kelas I (Kayu Besi) MC.8 M3 0.0048 10,157,579.70 48,756.38
Paku Campuran MD.16 KG 0.0600 19,506.30 1,170.38
Pekerja Kayu L-4 OH 0.1000 132,000.00 13,200.00
Tukang Kayu L-3 OH 0.1000 168,000.00 16,800.00
Kepala Tukang L-2 OH 0.0100 188,000.00 1,880.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
Jumlah harga pekerjaan 49,926.76 32,905.00 82,831.76
Jumlah harga dibulatkan 82,831.00

41 1 M' Lisplank Ukuran (2 x 20) cm, Kayu Kelas II PU.G.41


HPS.PU. 2017
Papan Kayu Kelas II (Kayu Rahay) tebal = 2 Cm MC.6 M3 0.0048 4,839,477.15 23,229.49
Paku Campuran MD.16 KG 0.0600 19,506.30 1,170.38
Pekerja Kayu L-4 OH 0.1000 132,000.00 13,200.00
Tukang Kayu L-3 OH 0.1000 168,000.00 16,800.00
Kepala Tukang L-2 OH 0.0100 188,000.00 1,880.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
Jumlah harga pekerjaan 24,399.87 32,905.00 57,304.87
Jumlah harga dibulatkan 57,304.00

42 1 M' Lisplank Ukuran (2x25) cm, Kayu Kelas I PU.G.42


HPS.PU. 2017
Papan Kayu Kelas I (Kayu Besi) MC.8 M3 0.0060 10,157,579.70 60,945.48
Paku Campuran MD.16 KG 0.0600 19,506.30 1,170.38
Pekerja Kayu L-4 OH 0.1000 132,000.00 13,200.00
Tukang Kayu L-3 OH 0.1000 168,000.00 16,800.00
Kepala Tukang L-2 OH 0.0100 188,000.00 1,880.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
Jumlah harga pekerjaan 62,115.86 32,905.00 95,020.86
Jumlah harga dibulatkan 95,020.00

43 1 M' Lisplank Ukuran (2x25) cm, Kayu Kelas II PU.G.43


HPS.PU. 2017
Papan Kayu Kelas II (Kayu Rahay) tebal = 2 Cm MC.6 M3 0.0060 4,839,477.15 29,036.86
Paku Campuran MD.16 KG 0.0600 19,506.30 1,170.38
Pekerja Kayu L-4 OH 0.1000 132,000.00 13,200.00
Tukang Kayu L-3 OH 0.1000 168,000.00 16,800.00
Kepala Tukang L-2 OH 0.0100 188,000.00 1,880.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
Jumlah harga pekerjaan 30,207.24 32,905.00 63,112.24
Jumlah harga dibulatkan 63,112.00

44 1 M' Lisplank Ukuran 2 x (3x20) cm, Kayu Kelas I PU.G.44


HPS.PU. 2017
Papan Kayu Kelas I (Kayu Besi) MC.8 M3 0.0145 10,157,579.70 147,284.91
Paku Campuran MD.16 KG 0.0600 19,506.30 1,170.38
Pekerja Kayu L-4 OH 0.1500 132,000.00 19,800.00
Tukang Kayu L-3 OH 0.2500 168,000.00 42,000.00
Kepala Tukang L-2 OH 0.0250 188,000.00 4,700.00
Mandor L-1 OH 0.0075 205,000.00 1,537.50
Jumlah harga pekerjaan 148,455.28 68,037.50 216,492.78
Jumlah harga dibulatkan 216,492.00
Analisa Harga Satuan Pekerjaan (AHSP) G. Pekerjaan Kayu

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

45 1 M' Lisplank Ukuran 2 x (3x20) cm, Kayu Kelas II PU.G.45


HPS.PU. 2017
Papan Kayu Kelas II (Kayu Rahay) tebal = 2 Cm MC.6 M3 0.0145 4,839,477.15 70,172.42
Paku Campuran MD.16 KG 0.0600 19,506.30 1,170.38
Pekerja Kayu L-4 OH 0.1500 132,000.00 19,800.00
Tukang Kayu L-3 OH 0.2500 168,000.00 42,000.00
Kepala Tukang L-2 OH 0.0250 188,000.00 4,700.00
Mandor L-1 OH 0.0075 205,000.00 1,537.50
Jumlah harga pekerjaan 71,342.80 68,037.50 139,380.30
Jumlah harga dibulatkan 139,380.00

46 1 M' Lisplank Ukuran (2x20) cm, Kayu Kelas I PU.G.46


HPS.PU. 2017
Papan Kayu Kelas I (Kayu Besi) MC.8 M3 0.0086 10,157,579.70 87,355.19
Paku Campuran MD.16 KG 0.0600 19,506.30 1,170.38
Pekerja Kayu L-4 OH 0.1000 132,000.00 13,200.00
Tukang Kayu L-3 OH 0.1000 168,000.00 16,800.00
Kepala Tukang L-2 OH 0.0100 188,000.00 1,880.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
Jumlah harga pekerjaan 88,525.56 32,905.00 121,430.56
Jumlah harga dibulatkan 121,430.00

47 1 M' Lisplank Ukuran (2x20) cm, Kayu Kelas II PU.G.47


HPS.PU. 2017
Papan Kayu Kelas II (Kayu Rahay) tebal = 2 Cm MC.6 M3 0.0086 4,839,477.15 41,619.50
Paku Campuran MD.16 KG 0.0600 19,506.30 1,170.38
Pekerja Kayu L-4 OH 0.1000 132,000.00 13,200.00
Tukang Kayu L-3 OH 0.1000 168,000.00 16,800.00
Kepala Tukang L-2 OH 0.0100 188,000.00 1,880.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
Jumlah harga pekerjaan 42,789.88 32,905.00 75,694.88
Jumlah harga dibulatkan 75,694.00

48 1 M' Lisplank Ukuran (2x20) cm, Kayu Kelas III PU.G.48


HPS.PU. 2017
Papan Kayu Kelas III (Kayu Bus) MC.5 M3 0.0086 3,599,094.05 30,952.21
Paku Campuran MD.16 KG 0.0600 19,506.30 1,170.38
Pekerja Kayu L-4 OH 0.1000 132,000.00 13,200.00
Tukang Kayu L-3 OH 0.1000 168,000.00 16,800.00
Kepala Tukang L-2 OH 0.0100 188,000.00 1,880.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
Jumlah harga pekerjaan 32,122.59 32,905.00 65,027.59
Jumlah harga dibulatkan 65,027.00

49 1 M' Papan Ruiter, Kayu Kelas II PU.G.49


HPS.PU. 2017
Papan Kayu Kelas II (Kayu Rahay) tebal = 2 Cm MC.6 M3 0.0040 4,839,477.15 19,357.91
Paku Campuran MD.16 KG 0.0200 19,506.30 390.13
Pekerja Kayu L-4 OH 0.0280 132,000.00 3,696.00
Tukang Kayu L-3 OH 0.0800 168,000.00 13,440.00
Kepala Tukang L-2 OH 0.0080 188,000.00 1,504.00
Mandor L-1 OH 0.0014 205,000.00 287.00
Jumlah harga pekerjaan 19,748.03 18,927.00 38,675.03
Jumlah harga dibulatkan 38,675.00

50 1 M2 Dinding Bilik Bambu, Rangka Kayu Kelas III PU.G.50


SNI 3434:2008
Bilik Bambu M2 1.5000 250,000.00 375,000.00
Balok Kayu Kelas III (Kayu Bus) MC.1 M3 0.0140 3,599,094.05 50,387.32
List kayu MC.10 M3 0.0120 13,957,645.83 167,491.75
Paku Campuran MD.16 KG 0.0030 19,506.30 58.52
Pekerja Kayu L-4 OH 0.1000 132,000.00 13,200.00
Tukang Kayu L-3 OH 0.0500 168,000.00 8,400.00
Kepala Tukang L-2 OH 0.0050 188,000.00 940.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
Jumlah harga pekerjaan 592,937.59 23,565.00 616,502.59
Jumlah harga dibulatkan 616,502.00

51 1 M2 Dinding Bilik Bambu, Rangka Kayu Kelas IV PU.G.51


SNI 3434:2008
Bilik Bambu M2 1.5000 250,000.00 375,000.00
Balok Kayu Kelas IV MC.4 M3 0.0140 3,005,904.50 42,082.66
List kayu MC.10 M3 0.0120 13,957,645.83 167,491.75
Paku Campuran MD.16 KG 0.0030 19,506.30 58.52
Pekerja Kayu L-4 OH 0.1000 132,000.00 13,200.00
Tukang Kayu L-3 OH 0.0500 168,000.00 8,400.00
Kepala Tukang L-2 OH 0.0050 188,000.00 940.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
Jumlah harga pekerjaan 584,632.93 23,565.00 608,197.93
Jumlah harga dibulatkan 608,197.00
Analisa Harga Satuan Pekerjaan (AHSP) G. Pekerjaan Kayu

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

52 1 M2 Rangka Dinding Pemisah (60 x 120) cm, Kayu Kelas II PU.G.52


SNI 3434:2008
Balok Kayu Kelas II (Kayu Rahay) MC.2 M3 0.0280 4,729,266.90 132,419.47
Paku Campuran MD.16 KG 0.1500 19,506.30 2,925.95
Pekerja Kayu L-4 OH 0.1500 132,000.00 19,800.00
Tukang Kayu L-3 OH 0.4500 168,000.00 75,600.00
Kepala Tukang L-2 OH 0.0450 188,000.00 8,460.00
Mandor L-1 OH 0.0080 205,000.00 1,640.00
Jumlah harga pekerjaan 135,345.42 105,500.00 240,845.42
Jumlah harga dibulatkan 240,845.00

53 1 M2 Rangka Dinding Pemisah (60 x 120) cm, Kayu Kelas III PU.G.53
SNI 3434:2008
Balok Kayu Kelas III (Kayu Bus) MC.1 M3 0.0280 3,599,094.05 100,774.63
Paku Campuran MD.16 KG 0.1500 19,506.30 2,925.95
Pekerja Kayu L-4 OH 0.1500 132,000.00 19,800.00
Tukang Kayu L-3 OH 0.4500 168,000.00 75,600.00
Kepala Tukang L-2 OH 0.0450 188,000.00 8,460.00
Mandor L-1 OH 0.0080 205,000.00 1,640.00
Jumlah harga pekerjaan 103,700.58 105,500.00 209,200.58
Jumlah harga dibulatkan 209,200.00

54 1 M2 Rangka Dinding Pemisah Teakwood Rangkap, PU.G.54


SNI 3434:2008
Rangka Kayu Kelas II
Balok Kayu Kelas II (Kayu Rahay) MC.2 M3 0.0280 4,729,266.90 132,419.47
Paku Campuran MD.16 KG 0.1500 19,506.30 2,925.95
Teakwood tebal 4 mm, ukuran (90 x 220) cm MC.20 Lembar 0.8600 153,013.25 131,591.40
Lem Kayu MN.1 KG 0.5600 51,934.00 29,083.04
Pekerja Kayu L-4 OH 0.1500 132,000.00 19,800.00
Tukang Kayu L-3 OH 0.4500 168,000.00 75,600.00
Kepala Tukang L-2 OH 0.0450 188,000.00 8,460.00
Mandor L-1 OH 0.0080 205,000.00 1,640.00
Jumlah harga pekerjaan 296,019.85 105,500.00 401,519.85
Jumlah harga dibulatkan 401,519.00

55 1 M2 Rangka Dinding Pemisah Plywood Rangkap, PU.G.55


SNI 3434:2008
Rangka Kayu Kelas II
Balok Kayu Kelas II (Kayu Rahay) MC.2 M3 0.0280 4,729,266.90 132,419.47
Paku Campuran MD.16 KG 0.1500 19,506.30 2,925.95
Plywood - Tripleks (1,22 x 2,44) cm - tebal 4 mm MC.12 Lembar 0.8600 293,927.35 252,777.52
Lem kayu (putih) Fox MN.1 KG 0.5600 51,934.00 29,083.04
Pekerja Kayu L-4 OH 0.2000 132,000.00 26,400.00
Tukang Kayu L-3 OH 0.6000 168,000.00 100,800.00
Kepala Tukang L-2 OH 0.0600 188,000.00 11,280.00
Mandor L-1 OH 0.0100 205,000.00 2,050.00
Jumlah harga pekerjaan 417,205.98 140,530.00 557,735.98
Jumlah harga dibulatkan 557,735.00

56 1 M2 Lambriziring Dari Papan Kayu Kelas I PU.G.56


SNI 3434:2008
Papan Kayu Kelas I (Kayu Besi) MC.8 M3 0.0070 10,157,579.70 71,103.06
Paku Campuran MD.16 KG 0.1000 19,506.30 1,950.63
Paku Skrup 10 cm MD.22 KG 0.1500 46,617.55 6,992.63
Pekerja Kayu L-4 OH 0.6000 132,000.00 79,200.00
Tukang Kayu L-3 OH 1.8000 168,000.00 302,400.00
Kepala Tukang L-2 OH 0.1800 188,000.00 33,840.00
Mandor L-1 OH 0.0300 205,000.00 6,150.00
Jumlah harga pekerjaan 80,046.32 421,590.00 501,636.32
Jumlah harga dibulatkan 501,636.00

57 1 M2 Lambriziring dari Plywood Ukuran (120 x 240) cm PU.G.57


SNI 3434:2008
Plywood - Tripleks (1,22 x 2,44) cm - tebal 4 mm MC.12 Lembar 0.4000 293,927.35 117,570.94
Paku Campuran MD.16 KG 0.0500 19,506.30 975.32
Pekerja Kayu L-4 OH 0.0250 132,000.00 3,300.00
Tukang Kayu L-3 OH 0.0750 168,000.00 12,600.00
Kepala Tukang L-2 OH 0.0080 188,000.00 1,504.00
Mandor L-1 OH 0.0010 205,000.00 205.00
Jumlah harga pekerjaan 118,546.26 17,609.00 136,155.26
Jumlah harga dibulatkan 136,155.00

58 1 M3 Rangka/kolom dinding kayu - Kelas I PU.G.58


HPS.PU. 2017
Balok Kayu Kelas I (Kayu Besi) MC.3 M3 1.1000 9,496,329.70 10,445,962.67
Paku 2" MD.12 KG 6.0000 22,245.60 133,473.60
Paku 3" MD.13 KG 12.0000 22,245.60 266,947.20
Paku 4" MD.14 KG 2.0000 22,245.60 44,491.20
Mandor kayu L-1 OH 0.2000 205,000.00 41,000.00
Kepala tukang kayu L-2 OH 2.0000 188,000.00 376,000.00
Tukang kayu L-3 OH 20.0000 168,000.00 3,360,000.00
Pekerja kayu L-4 OH 4.0000 132,000.00 528,000.00
Jumlah harga pekerjaan 10,890,874.67 4,305,000.00 15,195,874.67
Jumlah harga dibulatkan 15,195,874.00
Analisa Harga Satuan Pekerjaan (AHSP) G. Pekerjaan Kayu

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

59 1 M3 Rangka/kolom dinding kayu - Kelas II PU.G.59


HPS.PU. 2017
Balok Kayu Kelas II (Kayu Rahay) MC.2 M3 1.1000 4,729,266.90 5,202,193.59
Paku 2" MD.12 KG 6.0000 22,245.60 133,473.60
Paku 3" MD.13 KG 12.0000 22,245.60 266,947.20
Paku 4" MD.14 KG 2.0000 22,245.60 44,491.20
Mandor kayu L-1 OH 0.2000 205,000.00 41,000.00
Kepala tukang kayu L-2 OH 2.0000 188,000.00 376,000.00
Tukang kayu L-3 OH 20.0000 168,000.00 3,360,000.00
Pekerja kayu L-4 OH 4.0000 132,000.00 528,000.00
Jumlah harga pekerjaan 5,647,105.59 4,305,000.00 9,952,105.59
Jumlah harga dibulatkan 9,952,105.00

60 1 M3 Rangka/kolom dinding kayu - Kelas III PU.G.60


HPS.PU. 2017
Balok Kayu Kelas III (Kayu Bus) MC.1 M3 1.1000 3,599,094.05 3,959,003.46
Paku 2" MD.12 KG 6.0000 22,245.60 133,473.60
Paku 3" MD.13 KG 12.0000 22,245.60 266,947.20
Paku 4" MD.14 KG 2.0000 22,245.60 44,491.20
Mandor kayu L-1 OH 0.2000 205,000.00 41,000.00
Kepala tukang kayu L-2 OH 2.0000 188,000.00 376,000.00
Tukang kayu L-3 OH 20.0000 168,000.00 3,360,000.00
Pekerja kayu L-4 OH 4.0000 132,000.00 528,000.00
Jumlah harga pekerjaan 4,403,915.46 4,305,000.00 8,708,915.46
Jumlah harga dibulatkan 8,708,915.00

61 1 M3 Gelagar bawah lantai - Kayu Kelas I PU.G.61


HPS.PU. 2017
Balok Kayu Kelas I (Kayu Besi) MC.3 M3 1.1000 9,496,329.70 10,445,962.67
Paku 5" MD.15 KG 2.0000 22,245.60 44,491.20
Mandor kayu L-1 OH 0.3000 205,000.00 61,500.00
Kepala tukang kayu L-2 OH 1.5000 188,000.00 282,000.00
Tukang kayu L-3 OH 15.0000 168,000.00 2,520,000.00
Pekerja kayu L-4 OH 6.0000 132,000.00 792,000.00
Jumlah harga pekerjaan 10,490,453.87 3,655,500.00 14,145,953.87
Jumlah harga dibulatkan 14,145,953.00

62 1 M3 Gelagar bawah lantai - Kayu Kelas II PU.G.62


HPS.PU. 2017
Balok Kayu Kelas II (Kayu Rahay) MC.2 M3 1.1000 4,729,266.90 5,202,193.59
Paku 5" MD.15 KG 2.0000 22,245.60 44,491.20
Mandor kayu L-1 OH 0.3000 205,000.00 61,500.00
Kepala tukang kayu L-2 OH 1.5000 188,000.00 282,000.00
Tukang kayu L-3 OH 15.0000 168,000.00 2,520,000.00
Pekerja kayu L-4 OH 6.0000 132,000.00 792,000.00
Jumlah harga pekerjaan 5,246,684.79 3,655,500.00 8,902,184.79
Jumlah harga dibulatkan 8,902,184.00

63 1 M3 Gelagar bawah lantai - Kayu Kelas III PU.G.63


HPS.PU. 2017
Balok Kayu Kelas III (Kayu Bus) MC.1 M3 1.1000 3,599,094.05 3,959,003.46
Paku 5" MD.15 KG 2.0000 22,245.60 44,491.20
Mandor kayu L-1 OH 0.3000 205,000.00 61,500.00
Kepala tukang kayu L-2 OH 1.5000 188,000.00 282,000.00
Tukang kayu L-3 OH 15.0000 168,000.00 2,520,000.00
Pekerja kayu L-4 OH 6.0000 132,000.00 792,000.00
Jumlah harga pekerjaan 4,003,494.66 3,655,500.00 7,658,994.66
Jumlah harga dibulatkan 7,658,994.00

64 1 M2 Lantai papan tebal 3,50 cm (bersih 3,00 cm) - Kayu Kelas I PU.G.64
HPS.PU. 2017
Papan Kayu Kelas I (Kayu Besi) MC.8 M3 0.0350 10,157,579.70 355,515.29
Paku 3" MD.13 KG 0.7500 22,245.60 16,684.20
Mandor kayu L-1 OH 0.0100 205,000.00 2,050.00
Kepala tukang kayu L-2 OH 0.2000 188,000.00 37,600.00
Tukang kayu L-3 OH 0.4000 168,000.00 67,200.00
Pekerja kayu L-4 OH 0.2000 132,000.00 26,400.00
Jumlah harga pekerjaan 372,199.49 133,250.00 505,449.49
Jumlah harga dibulatkan 505,449.00

65 1 M2 Lantai papan tebal 3,50 cm (bersih 3,00 cm) - Kayu Kelas II PU.G.65
HPS.PU. 2017
Papan Kayu Kelas II (Kayu Rahay) tebal = 3 Cm MC.7 M3 0.0350 5,059,891.90 177,096.22
Paku 3" MD.13 KG 0.7500 22,245.60 16,684.20
Mandor kayu L-1 OH 0.0100 205,000.00 2,050.00
Kepala tukang kayu L-2 OH 0.2000 188,000.00 37,600.00
Tukang kayu L-3 OH 0.4000 168,000.00 67,200.00
Pekerja kayu L-4 OH 0.2000 132,000.00 26,400.00
Jumlah harga pekerjaan 193,780.42 133,250.00 327,030.42
Jumlah harga dibulatkan 327,030.00
Analisa Harga Satuan Pekerjaan (AHSP) G. Pekerjaan Kayu

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

66 1 M2 Lantai papan tebal 3,50 cm (bersih 3,00 cm) - Kayu Kelas III PU.G.66
HPS.PU. 2017
Papan Kayu Kelas III (Kayu Bus) MC.5 M3 0.0350 3,599,094.05 125,968.29
Paku 3" MD.13 KG 0.7500 22,245.60 16,684.20
Mandor kayu L-1 OH 0.0100 205,000.00 2,050.00
Kepala tukang kayu L-2 OH 0.2000 188,000.00 37,600.00
Tukang kayu L-3 OH 0.4000 168,000.00 67,200.00
Pekerja kayu L-4 OH 0.2000 132,000.00 26,400.00
Jumlah harga pekerjaan 142,652.49 133,250.00 275,902.49
Jumlah harga dibulatkan 275,902.00

67 1 M2 Dinding papan (kayu gergajian) - Kayu Kelas I PU.G.67


HPS.PU. 2017
Papan Kayu Kelas I (Kayu Besi) MC.8 M3 0.0300 10,157,579.70 304,727.39
Paku 2" MD.12 KG 0.2000 22,245.60 4,449.12
Mandor kayu L-1 OH 0.1400 205,000.00 28,700.00
Kepala tukang kayu L-2 OH 0.0800 188,000.00 15,040.00
Tukang kayu L-3 OH 0.8000 168,000.00 134,400.00
Pekerja kayu L-4 OH 0.2800 132,000.00 36,960.00
Jumlah harga pekerjaan 309,176.51 215,100.00 524,276.51
Jumlah harga dibulatkan 524,276.00

68 1 M2 Dinding papan (kayu gergajian) - Kayu Kelas II PU.G.68


HPS.PU. 2017
Papan Kayu Kelas II (Kayu Rahay) tebal = 3 Cm MC.7 M3 0.0300 5,059,891.90 151,796.76
Paku 2" MD.12 KG 0.2000 22,245.60 4,449.12
Mandor kayu L-1 OH 0.1400 205,000.00 28,700.00
Kepala tukang kayu L-2 OH 0.0800 188,000.00 15,040.00
Tukang kayu L-3 OH 0.8000 168,000.00 134,400.00
Pekerja kayu L-4 OH 0.2800 132,000.00 36,960.00
Jumlah harga pekerjaan 156,245.88 215,100.00 371,345.88
Jumlah harga dibulatkan 371,345.00

69 1 M2 Dinding papan (kayu gergajian) - Kayu Kelas III PU.G.69


HPS.PU. 2017
Papan Kayu Kelas III (Kayu Bus) MC.5 M3 0.0300 3,599,094.05 107,972.82
Paku 2" MD.12 KG 0.2000 22,245.60 4,449.12
Mandor kayu L-1 OH 0.1400 205,000.00 28,700.00
Kepala tukang kayu L-2 OH 0.0800 188,000.00 15,040.00
Tukang kayu L-3 OH 0.8000 168,000.00 134,400.00
Pekerja kayu L-4 OH 0.2800 132,000.00 36,960.00
Jumlah harga pekerjaan 112,421.94 215,100.00 327,521.94
Jumlah harga dibulatkan 327,521.00

70 1 M2 Jalusi kayu kelas I + lapis has nyamuk PU.G.70


HPS.PU. 2017
Papan Kayu Kelas I (Kayu Besi) MC.8 M3 0.0336 10,157,579.70 341,294.68
Has Nyamuk Nylon MD.23 M2 1.0400 25,451.80 26,469.87
Paku 2" MD.12 KG 0.2000 22,245.60 4,449.12
Mandor kayu L-1 OH 0.0140 205,000.00 2,870.00
Kepala tukang kayu L-2 OH 0.0400 188,000.00 7,520.00
Tukang kayu L-3 OH 0.4000 168,000.00 67,200.00
Pekerja kayu L-4 OH 0.2800 132,000.00 36,960.00
Jumlah harga pekerjaan 372,213.67 114,550.00 486,763.67
Jumlah harga dibulatkan 486,763.00

71 1 M2 Jalusi kayu kelas II + lapis has nyamuk PU.G.71


HPS.PU. 2017
Papan Kayu Kelas II (Kayu Rahay) tebal = 2 Cm MC.6 M3 0.0336 4,839,477.15 162,606.43
Has Nyamuk Nylon MD.23 M2 1.0400 25,451.80 26,469.87
Paku 2" MD.12 KG 0.2000 22,245.60 4,449.12
Mandor kayu L-1 OH 0.0140 205,000.00 2,870.00
Kepala tukang kayu L-2 OH 0.0400 188,000.00 7,520.00
Tukang kayu L-3 OH 0.4000 168,000.00 67,200.00
Pekerja kayu L-4 OH 0.2800 132,000.00 36,960.00
Jumlah harga pekerjaan 193,525.42 114,550.00 308,075.42
Jumlah harga dibulatkan 308,075.00

72 1 M2 Jalusi kayu kelas III + lapis has nyamuk PU.G.72


HPS.PU. 2017
Papan Kayu Kelas III (Kayu Bus) MC.5 M3 0.0336 3,599,094.05 120,929.56
Has Nyamuk Nylon MD.23 M2 1.0400 25,451.80 26,469.87
Paku 2" MD.12 KG 0.2000 22,245.60 4,449.12
Mandor kayu L-1 OH 0.0140 205,000.00 2,870.00
Kepala tukang kayu L-2 OH 0.0400 188,000.00 7,520.00
Tukang kayu L-3 OH 0.4000 168,000.00 67,200.00
Pekerja kayu L-4 OH 0.2800 132,000.00 36,960.00
Jumlah harga pekerjaan 151,848.55 114,550.00 266,398.55
Jumlah harga dibulatkan 266,398.00

73 1 M2 Jalusi kayu kelas IV + lapis has nyamuk PU.G.73


HPS.PU. 2017
Papan Kayu Kelas IV MC.9 M3 0.0336 3,005,904.50 100,998.39
Has Nyamuk Nylon MD.23 M2 1.0400 25,451.80 26,469.87
Paku 2" MD.12 KG 0.2000 22,245.60 4,449.12
Mandor kayu L-1 OH 0.0140 205,000.00 2,870.00
Kepala tukang kayu L-2 OH 0.0400 188,000.00 7,520.00
Tukang kayu L-3 OH 0.4000 168,000.00 67,200.00
Pekerja kayu L-4 OH 0.2800 132,000.00 36,960.00
Jumlah harga pekerjaan 131,917.38 114,550.00 246,467.38
Jumlah harga dibulatkan 246,467.00
Analisa Harga Satuan Pekerjaan (AHSP) G. Pekerjaan Kayu

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

74 1 Btg Pancang Tiang Umpak Jembatan (Dia 25-30 cm, L=4-6 m) - Manual PU.G.74
HPS.PU. 2017
Tiang Umpak Jembatan (Dia 25-30 cm, L=4-6 m) MC.31 Batang - 266,007.65 -
Mandor kayu L-1 Jam 0.4333 29,286.00 12,690.60
Tukang kayu L-3 Jam 0.5167 24,000.00 12,400.00
Pekerja kayu L-4 Jam 2.4167 18,858.00 45,573.50
Mesin Pemotong Kayu L - 11 Jam 0.0833 18,858.00 1,571.50
Alat Pancang 1 - 2 Ton (Manual) Unit 0.4333 125,000.00 54,166.67
Alat Bantu Ls 1.0000 10,000.00 10,000.00
Jumlah harga pekerjaan - 136,402.27 136,402.27
Jumlah harga dibulatkan 136,402.00
75 1 Btg Pancang Tiang Turap Jembatan (Dia 20 cm, L=4-6 m) - Manual PU.G.75
HPS.PU. 2017
Tiang Umpak Jembatan (Dia 20 cm, L=4-6 m) MC.30 Batang - 158,871.35 -
Mandor kayu L-1 Jam 0.3650 29,286.00 10,689.39
Tukang kayu L-3 Jam 0.4483 24,000.00 10,760.00
Pekerja kayu L-4 Jam 2.0750 18,858.00 39,130.35
Mesin Pemotong Kayu L - 11 Jam 0.0833 18,858.00 1,571.50
Alat Pancang 1 - 2 Ton (Manual) Unit 0.3650 125,000.00 45,625.00
Alat Bantu Ls 1.0000 10,000.00 10,000.00
Jumlah harga pekerjaan - 117,776.24 117,776.24
Jumlah harga dibulatkan 117,776.00

76 1 Btg Pancang Tiang Umpak Jembatan (Dia 25-30 cm, L=4-6 m) - Mekanis PU.G.76
HPS.PU. 2017
Tiang Umpak Jembatan (Dia 25-30 cm, L=4-6 m) MC.31 Batang - 266,007.65 -
Mandor (F. Equipment) L-5 Jam 0.1667 32,858.00 5,476.33
Pekerja L-4 Jam 0.8333 18,858.00 15,715.00
Excavator E-2 Jam 0.1667 762,894.00 127,149.00
Alat Bantu Ls 1.0000 10,000.00 10,000.00
Jumlah harga pekerjaan - 158,340.33 158,340.33
Jumlah harga dibulatkan 158,340.00

77 1 Btg Pancang Tiang Turap Jembatan (Dia 20 cm, L=4-6 m) - Mekanis PU.G.77
HPS.PU. 2017
Tiang Umpak Jembatan (Dia 20 cm, L=4-6 m) MC.30 Batang - 158,871.35 -
Mandor (F. Equipment) L-5 Jam 0.1667 32,858.00 5,476.33
Pekerja L-4 Jam 0.5000 18,858.00 9,429.00
Excavator E-2 Jam 0.1667 762,894.00 127,149.00
Alat Bantu Ls 1.0000 10,000.00 10,000.00
Jumlah harga pekerjaan - 152,054.33 152,054.33
Jumlah harga dibulatkan 152,054.00
Analisa Harga Satuan Pekerjaan (AHSP) G. Pekerjaan Kayu

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

78 1 Btg Pancang Tiang Cerucuk Kayu (Excavator) PU.G.78


HPS.PU. 2017
Tiang Umpak Jembatan (Dia 20 cm, L=4-6 m) MC.30 Batang - 158,871.35 -
Mandor (F. Equipment) L-5 Jam 0.3333 32,858.00 10,952.67
Pekerja L-4 Jam 1.6667 18,858.00 31,430.00
Excavator E-2 Jam 0.3333 762,894.00 254,298.00
Alat Bantu LS 1.0000 10,000.00 10,000.00
Jumlah harga pekerjaan - 306,680.67 306,680.67
Jumlah harga dibulatkan 306,680.00
79 1 Btg Pancang Tiang Cerucuk Beton (Excavator) PU.G.79
HPS.PU. 2017
Tiang Pancang Beton 20x20; L=5 M Batang - - -
Mandor (F. Equipment) L-5 Jam 0.3333 32,858.00 10,952.67
Pekerja L-4 Jam 2.6667 18,858.00 50,288.00
Excavator E-2 Jam 0.3333 762,894.00 254,298.00
Alat Bantu Ls 1.0000 10,000.00 10,000.00
Jumlah harga pekerjaan - 325,538.67 325,538.67
Jumlah harga dibulatkan 325,538.00

80 1 Btg Pancang Tiang Umpak untuk Pondasi Rumah PU.G.80


HPS.PU. 2017
Tiang Umpak (Dia 25-30 cm, L=4-6 m) MC.31 Batang 0.2500 266,007.65 66,501.91
Mandor kayu L-1 Jam 0.2167 29,286.00 6,345.30
Tukang kayu L-3 Jam 0.2583 24,000.00 6,200.00
Pekerja kayu L-4 Jam 1.2083 18,858.00 22,786.75
Mesin Pemotong Kayu L - 11 Jam 0.0417 18,858.00 785.75
Alat Bantu Pemancangan Manual Unit 1.0000 10,000.00 10,000.00
Jumlah harga pekerjaan 66,501.91 46,117.80 112,619.71
Jumlah harga dibulatkan 112,619.00

81 1 M3 Gelagar Melintang Jembatan PU.G.81


HPS.PU. 2017
Kayu Bus (Balok) MC.1 M3 1.1000 3,599,094.05 3,959,003.46
Pasak Digunakan Baut MD.30 Buah 16.6667 13,555.05 225,917.50
Mandor kayu L-1 O/H 0.4000 205,000.00 82,000.00
Kepala tukang kayu L-2 O/H 2.4000 188,000.00 451,200.00
Tukang kayu L-3 O/H 24.0000 168,000.00 4,032,000.00
Pekerja kayu L-4 O/H 8.0000 132,000.00 1,056,000.00
Jumlah harga pekerjaan 4,184,920.96 5,621,200.00 9,806,120.96
Jumlah harga dibulatkan 9,806,120.00

82 1 M3 Gelagar Memanjang Jembatan PU.G.82


HPS.PU. 2017
Kayu Bus (Balok) MC.1 M3 1.1000 3,599,094.05 3,959,003.46
Pasak digunakan Paku MD.16 KG 7.5000 19,506.30 146,297.25
Mandor kayu L-1 O/H 0.4000 205,000.00 82,000.00
Kepala tukang kayu L-2 O/H 2.4000 188,000.00 451,200.00
Tukang kayu L-3 O/H 24.0000 168,000.00 4,032,000.00
Pekerja kayu L-4 O/H 8.0000 132,000.00 1,056,000.00
Jumlah harga pekerjaan 4,105,300.71 5,621,200.00 9,726,500.71
Jumlah harga dibulatkan 9,726,500.00

83 1 M2 Lantai dan Dinding Turap Jembatan PU.G.83


HPS.PU. 2017
Kayu Bus (Papan) MC.5 M3 0.0550 3,599,094.05 197,950.17
Pasak digunakan Paku MD.16 Kg 0.7500 19,506.30 14,629.73
Mandor L-1 O/H 0.0067 205,000.00 1,366.67
Kepala Tukang L-2 O/H 0.0333 188,000.00 6,266.67
Tukang L-3 O/H 0.3333 168,000.00 56,000.00
Pekerja L-4 O/H 0.1333 132,000.00 17,600.00
Menggergaji 1 M2 L-4 1.2000 132,000.00 158,400.00
Jumlah harga pekerjaan 212,579.90 239,633.33 452,213.23
Jumlah harga dibulatkan 452,213.00

84 1 M3 Sandaran dan Balok Pengikat Tiang Pancang Jembatan PU.G.84


HPS.PU. 2017
Kayu Bus (balok) MC.1 M3 1.1000 3,599,094.05 3,959,003.46
Pasak digunakan Paku MD.16 Kg 7.5000 19,506.30 146,297.25
Mandor L-1 O/H 0.4000 205,000.00 82,000.00
Kepala Tukang L-2 O/H 2.4000 188,000.00 451,200.00
Tukang L-3 O/H 24.0000 168,000.00 4,032,000.00
Pekerja L-4 O/H 8.0000 132,000.00 1,056,000.00
Jumlah harga pekerjaan 4,105,300.71 5,621,200.00 9,726,500.71
Jumlah harga dibulatkan 9,726,500.00
Analisa Harga Satuan Pekerjaan (AHSP) H. Pekerjaan Atap

H. PEKERJAAN ATAP
PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE
PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

1 1 M2 Penutup Atap Seng Gelombang BJLS 0,30 PU.H.1


SNI 03-3436-2002
Seng Gelombang BJLS 0,30 ME.1 Lembar 0.7000 86,835.35 60,784.75
Paku Seng MD.17 KG 0.0200 27,328.60 546.57
Pekerja L-4 OH 0.1200 132,000.00 15,840.00
Tukang Kayu L-3 OH 0.0600 168,000.00 10,080.00
Kepala Tukang L-2 OH 0.0060 188,000.00 1,128.00
Mandor L-1 OH 0.0060 205,000.00 1,230.00
Jumlah harga pekerjaan 61,331.32 28,278.00 89,609.32
Jumlah harga dibulatkan 89,609.00

2 1 M2 Penutup Atap Seng Gelombang BJLS 0,22 PU.H.2


SNI 03-3436-2002
Seng Gelombang BJLS 0,22 ME.2 Lembar 0.7000 79,482.25 55,637.58
Paku Seng MD.17 KG 0.0200 27,328.60 546.57
Pekerja L-4 OH 0.1200 132,000.00 15,840.00
Tukang Kayu L-3 OH 0.0600 168,000.00 10,080.00
Kepala Tukang L-2 OH 0.0060 188,000.00 1,128.00
Mandor L-1 OH 0.0060 205,000.00 1,230.00
Jumlah harga pekerjaan 56,184.15 28,278.00 84,462.15
Jumlah harga dibulatkan 84,462.00

3 1 M2 Penutup Atap Seng Gelombang BJLS 0,20 PU.H.3


SNI 03-3436-2002
Seng Gelombang BJLS 0,20 ME.3 Lembar 0.7000 57,980.70 40,586.49
Paku Seng MD.17 KG 0.0200 27,328.60 546.57
Pekerja L-4 OH 0.1200 132,000.00 15,840.00
Tukang Kayu L-3 OH 0.0600 168,000.00 10,080.00
Kepala Tukang L-2 OH 0.0060 188,000.00 1,128.00
Mandor L-1 OH 0.0060 205,000.00 1,230.00
Jumlah harga pekerjaan 41,133.06 28,278.00 69,411.06
Jumlah harga dibulatkan 69,411.00

4 1 M' Bubungan/Nok Atap Seng Gelombang BJLS 0,30 PU.H.4


SNI 03-3436-2002
Seng Plat BJLS 0,30 ME.6 Lembar 0.4000 53,772.85 21,509.14
Paku Campuran MD.16 KG 0.0600 19,506.30 1,170.38
Papan Kayu Kelas III (Kayu Bus) t = 2 - 5 cm MC.5 M3 0.0040 3,599,094.05 14,396.38
Pekerja L-4 OH 0.1250 132,000.00 16,500.00
Tukang Kayu L-3 OH 0.2500 168,000.00 42,000.00
Kepala Tukang L-2 OH 0.0250 188,000.00 4,700.00
Mandor L-1 OH 0.0060 205,000.00 1,230.00
Jumlah harga pekerjaan 37,075.89 64,430.00 101,505.89
Jumlah harga dibulatkan 101,505.00

5 1 M' Bubungan/Nok Atap Seng Gelombang BJLS 0,20 PU.H.5


SNI 03-3436-2002
Seng Plat BJLS 0,20 ME.7 Lembar 0.4000 59,992.05 23,996.82
Paku Campuran MD.16 KG 0.0600 19,506.30 1,170.38
Papan Kayu Kelas III (Kayu Bus) t = 2 - 5 cm MC.5 M3 0.0040 3,599,094.05 14,396.38
Pekerja L-4 OH 0.1250 132,000.00 16,500.00
Tukang Kayu L-3 OH 0.2500 168,000.00 42,000.00
Kepala Tukang L-2 OH 0.0250 188,000.00 4,700.00
Mandor L-1 OH 0.0060 205,000.00 1,230.00
Jumlah harga pekerjaan 39,563.57 64,430.00 103,993.57
Jumlah harga dibulatkan 103,993.00

6 1 M2 Penutup Atap Fiberglass Gelombang PU.H.6


SNI 03-3436-2002
Atap Seng Gelombang Besar Fiber Glass ME.5 Lembar 0.7600 91,034.00 69,185.84
Paku Seng MD.17 KG 0.0500 27,328.60 1,366.43
Pekerja L-4 OH 0.1400 132,000.00 18,480.00
Tukang Kayu L-3 OH 0.0670 168,000.00 11,256.00
Kepala Tukang L-2 OH 0.0070 188,000.00 1,316.00
Mandor L-1 OH 0.0070 205,000.00 1,435.00
Jumlah harga pekerjaan 70,552.27 32,487.00 103,039.27
Jumlah harga dibulatkan 103,039.00

7 1 M' Bubungan/Nok Atap Fiberglass Gelombang PU.H.7


SNI 03-3436-2002
Seng Plat BJLS 0,20 ME.7 Lembar 0.4000 59,992.05 23,996.82
Paku Campuran MD.16 KG 0.0600 19,506.30 1,170.38
Papan Kayu Kelas III (Kayu Bus) t = 2 - 5 cm MC.5 M3 0.0040 3,599,094.05 14,396.38
Pekerja L-4 OH 0.1250 132,000.00 16,500.00
Tukang Kayu L-3 OH 0.2500 168,000.00 42,000.00
Kepala Tukang L-2 OH 0.0250 188,000.00 4,700.00
Mandor L-1 OH 0.0060 205,000.00 1,230.00
Jumlah harga pekerjaan 39,563.57 64,430.00 103,993.57
Jumlah harga dibulatkan 103,993.00

8 1 M2 Penutup Atap Genteng Metal - Multiroof PU.H.8


SNI 03-3436-2002
Genteng Metal - Multiroof ME.8 Lembar 1.0500 73,441.30 77,113.37
Paku Campuran MD.16 KG 0.2000 19,506.30 3,901.26
Pekerja L-4 OH 0.2000 132,000.00 26,400.00
Tukang Kayu L-3 OH 0.1000 168,000.00 16,800.00
Kepala Tukang L-2 OH 0.0100 188,000.00 1,880.00
Mandor L-1 OH 0.0010 205,000.00 205.00
Jumlah harga pekerjaan 81,014.63 45,285.00 126,299.63
Jumlah harga dibulatkan 126,299.00
Analisa Harga Satuan Pekerjaan (AHSP) H. Pekerjaan Atap

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

9 1 M' Bubungan/Nok Atap Genteng Metal - Multiroof PU.H.9


SNI 03-3436-2002
Bubungan Genteng Metal - Multiroof ME.9 Buah 1.1000 55,148.25 60,663.08
Paku Campuran MD.16 KG 0.0500 19,506.30 975.32
Pekerja L-4 OH 0.2500 132,000.00 33,000.00
Tukang Kayu L-3 OH 0.1500 168,000.00 25,200.00
Kepala Tukang L-2 OH 0.0150 188,000.00 2,820.00
Mandor L-1 OH 0.0130 205,000.00 2,665.00
Jumlah harga pekerjaan 61,638.39 63,685.00 125,323.39
Jumlah harga dibulatkan 125,323.00

10 1 M2 Penutup Atap Alumunium Gelombang PU.H.10


SNI 03-3436-2002
Atap Allumunium Gelombang ME.10 M2 1.1000 80,605.80 88,666.38
Angker / Baut MD.33 Buah 2.0000 6,413.55 12,827.10
Pekerja L-4 OH 0.1200 132,000.00 15,840.00
Tukang Kayu L-3 OH 0.0600 168,000.00 10,080.00
Kepala Tukang L-2 OH 0.0060 188,000.00 1,128.00
Mandor L-1 OH 0.0060 205,000.00 1,230.00
Jumlah harga pekerjaan 101,493.48 28,278.00 129,771.48
Jumlah harga dibulatkan 129,771.00

11 1 M' Bubungan/Nok Atap Alumunium Gelombang PU.H.11


SNI 03-3436-2002
Nok Atap Allumunium ME.11 Buah 1.1000 55,148.25 60,663.08
Angker / Baut MD.33 Buah 4.0000 6,413.55 25,654.20
Pekerja L-4 OH 0.1000 132,000.00 13,200.00
Tukang Kayu L-3 OH 0.1000 168,000.00 16,800.00
Kepala Tukang L-2 OH 0.0100 188,000.00 1,880.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
Jumlah harga pekerjaan 86,317.28 32,905.00 119,222.28
Jumlah harga dibulatkan 119,222.00

12 1 M' Talang Datar / Jurai Seng BJLS Lebar 90 cm PU.H.12


SNI 7393-2008
Seng Plat BJLS ME.6 M 1.0500 53,772.85 56,461.49
Paku Campur MD.16 KG 0.0150 19,506.30 292.59
Papan Kayu Kelas III (Kayu Bus) t = 2 - 5 cm MC.5 M3 0.0190 3,599,094.05 68,382.79
Pekerja L-4 OH 0.2000 132,000.00 26,400.00
Tukang Kayu L-3 OH 0.4000 168,000.00 67,200.00
Kepala Tukang L-2 OH 0.0250 188,000.00 4,700.00
Mandor L-1 OH 0.0100 205,000.00 2,050.00
Jumlah harga pekerjaan 125,136.87 100,350.00 225,486.87
Jumlah harga dibulatkan 225,486.00

13 1 M' Talang ½ Lingkaran D-15 cm, Seng Plat BJLS 30 45 cm PU.H.13


SNI 7393-2008
Seng Plat BJLS 0.30 ME.6 M' 1.0500 3,889.83 4,084.33
Paku Campuran MD.16 KG 0.0100 19,506.30 195.06
Besi strip 2 x 3 MD.48 KG 0.5000 22,467.00 11,233.50
Pekerja L-4 OH 0.1500 132,000.00 19,800.00
Tukang kayu L-3 OH 0.3000 168,000.00 50,400.00
Kepala tukang L-2 OH 0.0300 188,000.00 5,640.00
Mandor L-1 OH 0.0075 205,000.00 1,537.50
Jumlah harga pekerjaan 15,512.89 77,377.50 92,890.39
Jumlah harga dibulatkan 92,890.00
Analisa Harga Satuan Pekerjaan (AHSP) I. Penutup Lantai-Dinding

I. PEKERJAAN PENUTUP LANTAI DAN DINDING

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

1 1 M2 Lantai Ubin PC Abu-abu Ukuran 20 x 20 cm PU.I.1


SNI 7395-2008
Ubin Abu-abu Ukuran 20 x 20 MF.1 Buah 26.5000 3,636.30 96,361.95
Semen Portland (PC) @ 50 Kg MB.11 KG 10.4000 2,778.84 28,899.90
Pasir Semen (lokal) MB.2 M3 0.0135 1,058,872.85 14,294.78
Pekerja L-4 OH 0.2700 132,000.00 35,640.00
Tukang batu L-3 OH 0.1350 168,000.00 22,680.00
Kepala tukang L-2 OH 0.0140 188,000.00 2,632.00
Mandor L-1 OH 0.0140 205,000.00 2,870.00
Jumlah harga pekerjaan 139,556.64 63,822.00 203,378.64
Jumlah harga dibulatkan 203,378.00
2 1 M2 Lantai Ubin PC Abu-abu Ukuran 30 x 30 cm PU.I.2
SNI 7395-2008
Ubin Abu-abu Ukuran 30 x 30 MF.2 Buah 11.8700 8,405.35 99,771.50
Semen Portland (PC) @ 50 Kg MB.11 KG 10.0000 2,778.84 27,788.37
Pasir Semen (lokal) MB.2 M3 0.0450 1,058,872.85 47,649.28
Pekerja L-4 OH 0.2600 132,000.00 34,320.00
Tukang batu L-3 OH 0.1300 168,000.00 21,840.00
Kepala tukang L-2 OH 0.0130 188,000.00 2,444.00
Mandor L-1 OH 0.0130 205,000.00 2,665.00
175,209.15 61,269.00 236,478.15
Jumlah harga dibulatkan 236,478.00

3 1 M2 Lantai Ubin PC Abu-abu Ukuran 40 x 40 cm PU.I.3


SNI 7395-2008
Ubin Abu-abu Ukuran 40 x 40 cm MF.3 Buah 6.6300 19,155.55 127,001.30
Semen Portland (PC) @ 50 Kg MB.11 KG 9.8000 2,778.84 27,232.60
Pasir Semen (lokal) MB.2 M3 0.0215 1,058,872.85 22,765.77
Pekerja L-4 OH 0.2500 132,000.00 33,000.00
Tukang batu L-3 OH 0.1200 168,000.00 20,160.00
Kepala tukang L-2 OH 0.0120 188,000.00 2,256.00
Mandor L-1 OH 0.0125 205,000.00 2,562.50
176,999.67 57,978.50 234,978.17
Jumlah harga dibulatkan 234,978.00

4 1 M2 Lantai Ubin PC Warna Ukuran 20 x 20 cm PU.I.4


SNI 7395-2008
Ubin Warna Ukuran 20 x 20 MF.4 Buah 26.5000 3,627.10 96,118.15
Semen Portland (PC) @ 50 Kg MB.11 KG 10.4000 2,778.84 28,899.90
Pasir Semen (lokal) MB.2 M3 0.0450 1,058,872.85 47,649.28
Semen Warna MB.12 KG 1.6200 8,848.16 14,334.02
Pekerja L-4 OH 0.2700 132,000.00 35,640.00
Tukang batu L-3 OH 0.1350 168,000.00 22,680.00
Kepala tukang L-2 OH 0.0140 188,000.00 2,632.00
Mandor L-1 OH 0.0140 205,000.00 2,870.00
187,001.35 63,822.00 250,823.35
Jumlah harga dibulatkan 250,823.00

5 1 M2 Lantai Ubin PC Warna Ukuran 30 x 30 cm PU.I.5


SNI 7395-2008
Ubin Warna Ukuran 30 x 30 MF.5 Buah 11.8700 8,396.15 99,662.30
Semen Portland (PC) @ 50 Kg MB.11 KG 10.0000 2,778.84 27,788.37
Pasir Semen (lokal) MB.2 M3 0.0450 1,058,872.85 47,649.28
Semen Warna MB.12 KG 1.5000 8,848.16 13,272.24
Pekerja L-4 OH 0.2600 132,000.00 34,320.00
Tukang batu L-3 OH 0.1300 168,000.00 21,840.00
Kepala tukang L-2 OH 0.0130 188,000.00 2,444.00
Mandor L-1 OH 0.0130 205,000.00 2,665.00
188,372.19 61,269.00 249,641.19
Jumlah harga dibulatkan 249,641.00

6 1 M2 Lantai Ubin PC Warna Ukuran 40 x 40 cm PU.I.6


SNI 7395-2008
Ubin Warna Ukuran 40 x 40 MF.6 Buah 6.6300 18,816.30 124,752.07
Semen Portland (PC) @ 50 Kg MB.11 KG 9.8000 2,778.84 27,232.60
Pasir Semen (lokal) MB.2 M3 0.0450 1,058,872.85 47,649.28
Semen Warna MB.12 KG 1.3000 8,848.16 11,502.60
Pekerja L-4 OH 0.2500 132,000.00 33,000.00
Tukang batu L-3 OH 0.1250 168,000.00 21,000.00
Kepala tukang L-2 OH 0.0130 188,000.00 2,444.00
Mandor L-1 OH 0.0130 205,000.00 2,665.00
211,136.55 59,109.00 270,245.55
Jumlah harga dibulatkan 270,245.00

7 1 M2 Lantai Ubin PC Teraso Ukuran 30 x 30 cm PU.I.7


SNI 7395-2008
Ubin Teraso Ukuran 30 x 30 cm MF.7 Buah 11.8700 8,606.60 102,160.34
Semen Portland (PC) @ 50 Kg MB.11 KG 10.0000 2,778.84 27,788.37
Pasir Semen (lokal) MB.2 M3 0.0450 1,058,872.85 47,649.28
Semen Warna MB.12 KG 1.5000 8,848.16 13,272.24
Pekerja L-4 OH 0.2600 132,000.00 34,320.00
Tukang batu L-3 OH 0.1300 168,000.00 21,840.00
Kepala tukang L-2 OH 0.0130 188,000.00 2,444.00
Mandor L-1 OH 0.0130 205,000.00 2,665.00
190,870.23 61,269.00 252,139.23
Jumlah harga dibulatkan 252,139.00
Analisa Harga Satuan Pekerjaan (AHSP) I. Penutup Lantai-Dinding

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

8 1 M2 Lantai Ubin PC Teraso Ukuran 40 x 40 cm PU.I.8


SNI 7395-2008
Ubin Teraso Ukuran 40 x 40 cm MF.8 Buah 6.6300 18,521.90 122,800.20
Semen Portland (PC) @ 50 Kg MB.11 KG 9.8000 2,778.84 27,232.60
Pasir Semen (Import) MB.2 M3 0.0450 1,541,578.45 69,371.03
Semen Warna MB.12 KG 1.3000 8,848.16 11,502.60
Pekerja L-4 OH 0.2500 132,000.00 33,000.00
Tukang batu L-3 OH 0.1250 168,000.00 21,000.00
Kepala tukang L-2 OH 0.0130 188,000.00 2,444.00
Mandor L-1 OH 0.0130 205,000.00 2,665.00
230,906.43 59,109.00 290,015.43
Jumlah harga dibulatkan 290,015.00
1 1 M2 Lantai Keramik Ukuran 60 x 60 cm PU.I.1
SNI 7395-2008
Keramik 60x60 MF.8 Buah 3.3333 89,323.95 297,746.50
Semen Portland (PC) @ 50 Kg MB.11 KG 19.6000 2,778.84 54,465.21
Pasir Semen (Import) MB.2 M3 0.0900 1,541,578.45 138,742.06
Semen Warna MB.12 KG 1.3000 8,848.16 11,502.60
Pekerja L-4 OH 0.2500 132,000.00 33,000.00
Tukang batu L-3 OH 0.1250 168,000.00 21,000.00
Kepala tukang L-2 OH 0.0130 188,000.00 2,444.00
Mandor L-1 OH 0.0130 205,000.00 2,665.00
502,456.37 59,109.00 561,565.37
Jumlah harga dibulatkan 561,565.00

9 1 M2 Lantai Ubin PC Granito Ukuran 30 x 30 cm PU.I.9


SNI 7395-2008
Ubin Granito Ukuran 30 x 30 cm MF.9 Buah 11.8700 8,335.20 98,938.82
Semen Portland (PC) @ 50 Kg MB.11 KG 10.0000 2,778.84 27,788.37
Pasir Semen (lokal) MB.2 M3 0.0450 1,058,872.85 47,649.28
Semen Warna MB.12 KG 1.5000 8,848.16 13,272.24
Pekerja L-4 OH 0.2600 132,000.00 34,320.00
Tukang batu L-3 OH 0.1300 168,000.00 21,840.00
Kepala tukang L-2 OH 0.0130 188,000.00 2,444.00
Mandor L-1 OH 0.0130 205,000.00 2,665.00
187,648.71 61,269.00 248,917.71
Jumlah harga dibulatkan 248,917.00

10 1 M2 Lantai Ubin PC Granito Ukuran 40 x 40 cm PU.I.10


SNI 7395-2008
Ubin Granito Ukuran 40 x 40 cm MF.10 Buah 6.6300 16,538.15 109,647.93
Semen Portland (PC) @ 50 Kg MB.11 KG 9.8000 2,778.84 27,232.60
Pasir Semen (lokal) MB.2 M3 0.0450 1,058,872.85 47,649.28
Semen Warna MB.12 KG 1.3000 8,848.16 11,502.60
Pekerja L-4 OH 0.2500 132,000.00 33,000.00
Tukang batu L-3 OH 0.1250 168,000.00 21,000.00
Kepala tukang L-2 OH 0.0130 188,000.00 2,444.00
Mandor L-1 OH 0.0130 205,000.00 2,665.00
196,032.42 59,109.00 255,141.42
Jumlah harga dibulatkan 255,141.00

11 1 M2 Lantai Ubin Teralux Kerang Ukuran 30 x 30 cm PU.I.11


SNI 7395-2008
Ubin Teralux Kerang Ukuran 30 x 30 cm MF.11 Buah 11.8700 9,117.20 108,221.16
Semen Portland (PC) @ 50 Kg MB.11 KG 10.0000 2,778.84 27,788.37
Pasir Semen (lokal) MB.2 M3 0.0450 1,058,872.85 47,649.28
Semen Warna MB.12 KG 1.5000 8,848.16 13,272.24
Pekerja L-4 OH 0.2600 132,000.00 34,320.00
Tukang batu L-3 OH 0.1300 168,000.00 21,840.00
Kepala tukang L-2 OH 0.0130 188,000.00 2,444.00
Mandor L-1 OH 0.0130 205,000.00 2,665.00
196,931.05 61,269.00 258,200.05
Jumlah harga dibulatkan 258,200.00

12 1 M2 Lantai Ubin Teralux Kerang Ukuran 40 x 40 cm PU.I.12


SNI 7395-2008
Ubin Teralux Kerang Ukuran 40 x 40 cm MF.12 Buah 6.6300 18,908.30 125,362.03
Semen Portland (PC) @ 50 Kg MB.11 KG 9.8000 2,778.84 27,232.60
Pasir Semen (lokal) MB.2 M3 0.0450 1,058,872.85 47,649.28
Semen Warna MB.12 KG 1.3000 8,848.16 11,502.60
Pekerja L-4 OH 0.2500 132,000.00 33,000.00
Tukang batu L-3 OH 0.1250 168,000.00 21,000.00
Kepala tukang L-2 OH 0.0130 188,000.00 2,444.00
Mandor L-1 OH 0.0130 205,000.00 2,665.00
211,746.51 59,109.00 270,855.51
Jumlah harga dibulatkan 270,855.00

13 1 M2 Lantai Ubin Teralux Marmer Ukuran 60 x 60 cm PU.I.13


SNI 7395-2008
Ubin Teralux Marmer Ukuran 60 x 60 cm MF.15 Buah 3.1000 89,323.95 276,904.25
Semen Portland (PC) @ 50 Kg MB.11 KG 9.6000 2,778.84 26,676.84
Pasir Semen (lokal) MB.2 M3 0.0450 1,058,872.85 47,649.28
Semen Warna MB.12 KG 1.5000 8,848.16 13,272.24
Pekerja L-4 OH 0.2400 132,000.00 31,680.00
Tukang batu L-3 OH 0.1200 168,000.00 20,160.00
Kepala tukang L-2 OH 0.0120 188,000.00 2,256.00
Mandor L-1 OH 0.0120 205,000.00 2,460.00
364,502.59 56,556.00 421,058.59
Jumlah harga dibulatkan 421,058.00
Analisa Harga Satuan Pekerjaan (AHSP) I. Penutup Lantai-Dinding

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

14 1 M2 Lantai Ubin Teralux Marmer Ukuran 40 x 40 cm PU.I.14


SNI 7395-2008
Ubin Teralux Marmer Ukuran 40 x 40 cm MF.14 Buah 6.6300 28,827.05 191,123.34
Semen Portland (PC) @ 50 Kg MB.11 KG 9.8000 2,778.84 27,232.60
Pasir Semen (lokal) MB.2 M3 0.0450 1,058,872.85 47,649.28
Semen Warna MB.12 KG 1.3000 8,848.16 11,502.60
Pekerja L-4 OH 0.2500 132,000.00 33,000.00
Tukang batu L-3 OH 0.1250 168,000.00 21,000.00
Kepala tukang L-2 OH 0.0130 188,000.00 2,444.00
Mandor L-1 OH 0.0130 205,000.00 2,665.00
277,507.83 59,109.00 336,616.83
Jumlah harga dibulatkan 336,616.00

15 1 M2 Lantai Ubin Teralux Marmer Ukuran 30 x 30 cm PU.I.15


SNI 7395-2008
Ubin Teralux Marmer Ukuran 30 x 30 cm MF.13 Buah 11.8700 11,823.15 140,340.79
Semen Portland (PC) @ 50 Kg MB.11 KG 10.0000 2,778.84 27,788.37
Pasir Semen (lokal) MB.2 M3 0.0450 1,058,872.85 47,649.28
Semen Warna MB.12 KG 1.5000 8,848.16 13,272.24
Pekerja L-4 OH 0.2600 132,000.00 34,320.00
Tukang batu L-3 OH 0.1300 168,000.00 21,840.00
Kepala tukang L-2 OH 0.0130 188,000.00 2,444.00
Mandor L-1 OH 0.0130 205,000.00 2,665.00
229,050.68 61,269.00 290,319.68
Jumlah harga dibulatkan 290,319.00

16 1 M2 Lantai Keramik Artistik Ukuran 10 x 20 cm PU.I.16


SNI 7395-2008
Keramik Artistik Ukuran 10 x 20 cm MF.26 Buah 53.0000 1,772.15 93,923.95
Semen Portland (PC) @ 50 Kg MB.11 KG 8.1900 2,778.84 22,758.68
Pasir Semen (lokal) MB.2 M3 0.0450 1,058,872.85 47,649.28
Semen Warna MB.12 KG 2.7500 8,848.16 24,332.43
Pekerja L-4 OH 0.7000 132,000.00 92,400.00
Tukang batu L-3 OH 0.3500 168,000.00 58,800.00
Kepala tukang L-2 OH 0.0350 188,000.00 6,580.00
Mandor L-1 OH 0.0350 205,000.00 7,175.00
188,664.34 164,955.00 353,619.34
Jumlah harga dibulatkan 353,619.00

17 1 M2 Lantai Keramik Ukuran 15 x 15 cm PU.I.17


HPS.PU. 2017
Ubin keramik 15 x 15 cm MF.26 Buah 44.0000 1,772.15 77,974.60
Semen Portland (PC) @ 50 Kg MB.11 KG 8.1900 2,778.84 22,758.68
Pasir Semen (lokal) MB.2 M3 0.0450 1,058,872.85 47,649.28
Semen Warna MB.12 KG 3.2000 8,848.16 28,314.10
Pekerja L-4 OH 0.7000 132,000.00 92,400.00
Tukang batu L-3 OH 0.3500 168,000.00 58,800.00
Kepala tukang L-2 OH 0.0350 188,000.00 6,580.00
Mandor L-1 OH 0.0350 205,000.00 7,175.00
176,696.66 164,955.00 341,651.66
Jumlah harga dibulatkan 341,651.00

18 1 M2 Lantai Keramik Artistik Uk. 10 x 10 cm atau 5 x 20 PU.I.18


SNI 7395-2008
Keramik Artistik Uk. 10 x 10 cm atau 5 x 20 cm MF.26 Buah 106.0000 1,772.15 187,847.90
Semen Portland (PC) @ 50 Kg MB.11 KG 8.1900 2,778.84 22,758.68
Pasir Semen (lokal) MB.2 M3 0.0450 1,058,872.85 47,649.28
Semen Warna MB.12 KG 3.2000 8,848.16 28,314.10
Pekerja L-4 OH 0.7000 132,000.00 92,400.00
Tukang batu L-3 OH 0.3500 168,000.00 58,800.00
Kepala tukang L-2 OH 0.0350 188,000.00 6,580.00
Mandor L-1 OH 0.0350 205,000.00 7,175.00
286,569.96 164,955.00 451,524.96
Jumlah harga dibulatkan 451,524.00

19 1 M2 Lantai Keramik Ukuran 33 x 33 cm PU.I.19


SNI 7395-2008
Ubin Keramik Ukuran 30 x 30 MF.20 Buah 10.0000 8,846.95 88,469.50
Semen Portland (PC) @ 50 Kg MB.11 KG 8.1900 2,778.84 22,758.68
Pasir Semen (lokal) MB.2 M3 0.0450 1,058,872.85 47,649.28
Semen Warna MB.12 KG 1.6200 8,848.16 14,334.02
Pekerja L-4 OH 0.7000 132,000.00 92,400.00
Tukang batu L-3 OH 0.3500 168,000.00 58,800.00
Kepala tukang L-2 OH 0.0350 188,000.00 6,580.00
Mandor L-1 OH 0.0350 205,000.00 7,175.00
173,211.47 164,955.00 338,166.47
Jumlah harga dibulatkan 338,166.00
Analisa Harga Satuan Pekerjaan (AHSP) I. Penutup Lantai-Dinding

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

20 1 M2 Lantai Keramik Ukuran 30 x 30 cm berglasir PU.I.20


SNI 7395-2008
Ubin Keramik Ukuran 30 x 30 berglasir MF.21 Buah 11.8700 8,064.95 95,730.96
Semen Portland (PC) @ 50 Kg MB.11 KG 10.0000 2,778.84 27,788.37
Pasir Semen (lokal) MB.2 M3 0.0450 1,058,872.85 47,649.28
Semen Warna MB.12 KG 1.5000 8,848.16 13,272.24
Pekerja L-4 OH 0.7000 132,000.00 92,400.00
Tukang batu L-3 OH 0.3500 168,000.00 58,800.00
Kepala tukang L-2 OH 0.0350 188,000.00 6,580.00
Mandor L-1 OH 0.0350 205,000.00 7,175.00
184,440.84 164,955.00 349,395.84
Jumlah harga dibulatkan 349,395.00

21 1 M2 Lantai Keramik Ukuran 40 x 40 cm PU.I.21


HPS.PU. 2017
Ubin Keramik Ukuran 40 x 40 MF.23 Buah 6.2500 17,530.60 109,566.25
Semen Portland (PC) @ 50 Kg MB.11 KG 10.0000 2,778.84 27,788.37
Pasir Semen (lmport) MB.2 M3 0.0450 1,541,578.45 69,371.03
Semen Warna MB.12 KG 1.6200 8,848.16 14,334.02
Pekerja L-4 OH 0.7000 132,000.00 92,400.00
Tukang batu L-3 OH 0.3500 168,000.00 58,800.00
Kepala tukang L-2 OH 0.0350 188,000.00 6,580.00
Mandor L-1 OH 0.0350 205,000.00 7,175.00
221,059.67 164,955.00 386,014.67
Jumlah harga dibulatkan 386,014.00

22 1 M2 Lantai Keramik Ukuran 25 x 25 cm PU.I.22


HPS.PU. 2017
Ubin Keramik Ukuran 25 x 25 MF.19 Buah 16.0000 5,569.45 89,111.20
Semen Portland (PC) @ 50 Kg MB.11 KG 10.4000 2,778.84 28,899.90
Pasir Semen (lokal) MB.2 M3 0.0450 1,058,872.85 47,649.28
Semen Warna MB.12 KG 1.5000 8,848.16 13,272.24
Pekerja L-4 OH 0.7000 132,000.00 92,400.00
Tukang batu L-3 OH 0.3500 168,000.00 58,800.00
Kepala tukang L-2 OH 0.0350 188,000.00 6,580.00
Mandor L-1 OH 0.0350 205,000.00 7,175.00
178,932.62 164,955.00 343,887.62
Jumlah harga dibulatkan 343,887.00

23 1 M2 Lantai Keramik Ukuran 20 x 25 cm PU.I.23


HPS.PU. 2017
Ubin Keramik Ukuran 20 x 25 MF.19 Buah 20.0000 5,569.45 111,389.00
Semen Portland (PC) @ 50 Kg MB.11 KG 8.1900 2,778.84 22,758.68
Pasir Semen (lokal) MB.2 M3 0.0450 1,058,872.85 47,649.28
Semen Warna MB.12 KG 3.2000 8,848.16 28,314.10
Pekerja L-4 OH 0.7000 132,000.00 92,400.00
Tukang batu L-3 OH 0.3500 168,000.00 58,800.00
Kepala tukang L-2 OH 0.0350 188,000.00 6,580.00
Mandor L-1 OH 0.0350 205,000.00 7,175.00
210,111.06 164,955.00 375,066.06
Jumlah harga dibulatkan 375,066.00

24 1 M2 Lantai Keramik Ukuran 20 x 20 PU.I.24


SNI 7395-2008
Ubin Keramik Ukuran 20 x 20 MF.18 Buah 26.5000 3,801.90 100,750.35
Semen Portland (PC) @ 50 Kg MB.11 KG 10.4000 2,778.84 28,899.90
Pasir Semen (lokal) MB.2 M3 0.0450 1,058,872.85 47,649.28
Semen Warna MB.12 KG 1.6200 8,848.16 14,334.02
Pekerja L-4 OH 0.7000 132,000.00 92,400.00
Tukang batu L-3 OH 0.3500 168,000.00 58,800.00
Kepala tukang L-2 OH 0.0350 188,000.00 6,580.00
Mandor L-1 OH 0.0350 205,000.00 7,175.00
191,633.55 164,955.00 356,588.55
Jumlah harga dibulatkan 356,588.00
Analisa Harga Satuan Pekerjaan (AHSP) I. Penutup Lantai-Dinding

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

25 1 M2 Lantai Mozaik Uk. 30 x 30 cm, Camp. 1PC : 3PS PU.I.25


SNI 7395-2008
Tegel keramik 30/30 berglasir (Mozaik) MF.22 Buah 11.8700 9,057.40 107,511.34
Semen Portland (PC) @ 50 Kg MB.11 KG 14.1500 2,778.84 39,320.54
Pasir Semen (lokal) MB.2 M3 0.0390 1,058,872.85 41,296.04
Semen Warna MB.12 KG 2.0000 8,848.16 17,696.32
Pekerja L-4 OH 0.7000 132,000.00 92,400.00
Tukang batu L-3 OH 0.3500 168,000.00 58,800.00
Kepala tukang L-2 OH 0.0350 188,000.00 6,580.00
Mandor L-1 OH 0.0350 205,000.00 7,175.00
205,824.24 164,955.00 370,779.24
Jumlah harga dibulatkan 370,779.00

26 1 M2 Lantai Marmer Ukuran 100 x 100 cm PU.I.26


SNI 7395-2008
Marmer Ukuran 100 x 100 cm MF.50 Buah 1.0600 472,594.80 500,950.49
Semen Portland (PC) @ 50 Kg MB.11 KG 8.1900 2,778.84 22,758.68
Pasir Semen (lokal) MB.2 M3 0.0450 1,058,872.85 47,649.28
Semen Warna MB.12 KG 0.6500 8,848.16 5,751.30
Pekerja L-4 OH 0.7000 132,000.00 92,400.00
Tukang batu L-3 OH 0.3500 168,000.00 58,800.00
Kepala tukang L-2 OH 0.0350 188,000.00 6,580.00
Mandor L-1 OH 0.0350 205,000.00 7,175.00
577,109.74 164,955.00 742,064.74
Jumlah harga dibulatkan 742,064.00

27 1 M' Plint Ubin PC Abu-abu Ukuran 10 x 30 cm PU.I.27


SNI 7395-2008
Plint Ubin Abu-Abu Ukuran 10 x 30 cm MF.32 Buah 3.5300 13,422.80 47,382.48
Semen Portland (PC) @ 50 Kg MB.11 KG 1.2400 2,778.84 3,445.76
Pasir Semen (lokal) MB.2 M3 0.0030 1,058,872.85 3,176.62
Pekerja L-4 OH 0.0900 132,000.00 11,880.00
Tukang batu L-3 OH 0.0900 168,000.00 15,120.00
Kepala tukang L-2 OH 0.0090 188,000.00 1,692.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
54,004.86 29,717.00 83,721.86
Jumlah harga dibulatkan 83,721.00

28 1 M' Plint Ubin PC Abu-abu Ukuran 10 x 40 cm PU.I.28


SNI 7395-2008
Plint Ubin Abu-Abu Ukuran 10 x 40 cm MF.33 Buah 2.6500 15,406.55 40,827.36
Semen Portland (PC) @ 50 Kg MB.11 KG 1.2400 2,778.84 3,445.76
Pasir Semen (lokal) MB.2 M3 0.0030 1,058,872.85 3,176.62
Pekerja L-4 OH 0.0900 132,000.00 11,880.00
Tukang batu L-3 OH 0.0900 168,000.00 15,120.00
Kepala tukang L-2 OH 0.0090 188,000.00 1,692.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
47,449.73 29,717.00 77,166.73
Jumlah harga dibulatkan 77,166.00

29 1 M' Plint Ubin PC Warna Ukuran 10 x 20 cm PU.I.29


SNI 7395-2008
Plint Ubin Warna Ukuran 10 x 20 cm MF.34 Buah 5.3000 6,730.95 35,674.04
Semen Portland (PC) @ 50 Kg MB.11 KG 1.1400 2,778.84 3,167.87
Pasir Semen (lokal) MB.2 M3 0.0030 1,058,872.85 3,176.62
Semen Warna MB.12 KG 0.1000 8,848.16 884.82
Pekerja L-4 OH 0.0900 132,000.00 11,880.00
Tukang batu L-3 OH 0.0900 168,000.00 15,120.00
Kepala tukang L-2 OH 0.0090 188,000.00 1,692.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
42,903.34 29,717.00 72,620.34
Jumlah harga dibulatkan 72,620.00

30 1 M' Plint Ubin PC Warna Ukuran 10 x 30 cm PU.I.30


SNI 7395-2008
Plint Ubin Warna Ukuran 10 x 30 cm MF.35 Buah 3.5300 10,116.55 35,711.42
Semen Portland (PC) @ 50 Kg MB.11 KG 1.1400 2,778.84 3,167.87
Pasir Semen (lokal) MB.2 M3 0.0030 1,058,872.85 3,176.62
Semen Warna MB.12 KG 0.1000 8,848.16 884.82
Pekerja L-4 OH 0.0900 132,000.00 11,880.00
Tukang batu L-3 OH 0.0900 168,000.00 15,120.00
Kepala tukang L-2 OH 0.0090 188,000.00 1,692.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
42,940.73 29,717.00 72,657.73
Jumlah harga dibulatkan 72,657.00

31 1 M' Plint Ubin PC Warna Ukuran 10 x 40 cm PU.I.31


SNI 7395-2008
Plint Ubin Warna Ukuran 10 x 40 cm MF.36 Buah 2.6500 10,116.55 26,808.86
Semen Portland (PC) @ 50 Kg MB.11 KG 1.1400 2,778.84 3,167.87
Pasir Semen (lokal) MB.2 M3 0.0030 1,058,872.85 3,176.62
Semen Warna MB.12 KG 0.1000 8,848.16 884.82
Pekerja L-4 OH 0.0900 132,000.00 11,880.00
Tukang batu L-3 OH 0.0900 168,000.00 15,120.00
Kepala tukang L-2 OH 0.0090 188,000.00 1,692.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
34,038.17 29,717.00 63,755.17
Jumlah harga dibulatkan 63,755.00
Analisa Harga Satuan Pekerjaan (AHSP) I. Penutup Lantai-Dinding

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

32 1 M' Plint Ubin Teraso Ukuran 10 x 30 cm PU.I.32


SNI 7395-2008
Plint Ubin Teraso Ukuran 10 x 30 cm MF.37 Buah 3.5300 10,116.55 35,711.42
Semen Portland (PC) @ 50 Kg MB.11 KG 1.1400 2,778.84 3,167.87
Pasir Semen (lokal) MB.2 M3 0.0030 1,058,872.85 3,176.62
Semen Warna MB.12 KG 0.1000 8,848.16 884.82
Pekerja L-4 OH 0.0900 132,000.00 11,880.00
Tukang batu L-3 OH 0.0900 168,000.00 15,120.00
Kepala tukang L-2 OH 0.0090 188,000.00 1,692.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
42,940.73 29,717.00 72,657.73
Jumlah harga dibulatkan 72,657.00

33 1 M' Plint Ubin Teraso Ukuran 10 x 40 cm PU.I.33


SNI 7395-2008
Plint Ubin Teraso Ukuran 10 x 40 cm MF.38 Buah 2.6500 16,729.05 44,331.98
Semen Portland (PC) @ 50 Kg MB.11 KG 1.1400 2,778.84 3,167.87
Pasir Semen (lokal) MB.2 M3 0.0030 1,058,872.85 3,176.62
Semen Warna MB.12 KG 0.1000 8,848.16 884.82
Pekerja L-4 OH 0.0900 132,000.00 11,880.00
Tukang batu L-3 OH 0.0900 168,000.00 15,120.00
Kepala tukang L-2 OH 0.0090 188,000.00 1,692.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
51,561.29 29,717.00 81,278.29
Jumlah harga dibulatkan 81,278.00

34 1 M' Plint Ubin Granito Ukuran 10 x 40 cm PU.I.34


HPS.PU. 2017
Plint Ubin Granito Ukuran 10 x 40 cm MF.39 Buah 2.6500 16,729.05 44,331.98
Semen Portland (PC) @ 50 Kg MB.11 KG 1.1400 2,778.84 3,167.87
Pasir Semen (lokal) MB.2 M3 0.0030 1,058,872.85 3,176.62
Semen Warna MB.12 KG 0.1000 8,848.16 884.82
Pekerja L-4 OH 0.0900 132,000.00 11,880.00
Tukang batu L-3 OH 0.0900 168,000.00 15,120.00
Kepala tukang L-2 OH 0.0090 188,000.00 1,692.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
51,561.29 29,717.00 81,278.29
Jumlah harga dibulatkan 81,278.00

35 1 M' Plint Ubin Granito Ukuran 10 x 30 cm PU.I.35


SNI 7395-2008
Plint Ubin Granito Ukuran 10 x 30 cm MF.40 Buah 3.5300 10,116.55 35,711.42
Semen Portland (PC) @ 50 Kg MB.11 KG 1.1400 2,778.84 3,167.87
Pasir Semen (lokal) MB.2 M3 0.0030 1,058,872.85 3,176.62
Semen Warna MB.12 KG 0.1000 8,848.16 884.82
Pekerja L-4 OH 0.0900 132,000.00 11,880.00
Tukang batu L-3 OH 0.0900 168,000.00 15,120.00
Kepala tukang L-2 OH 0.0090 188,000.00 1,692.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
42,940.73 29,717.00 72,657.73
Jumlah harga dibulatkan 72,657.00

36 1 M' Plint Ubin Teralux Kerang Ukuran 10 x 40 cm PU.I.36


SNI 7395-2008
Plint Ubin Teralux Kerang Ukuran 10 x 40 cm MF.41 Buah 2.6500 10,116.55 26,808.86
Semen Portland (PC) @ 50 Kg MB.11 KG 1.1400 2,778.84 3,167.87
Pasir Semen (lokal) MB.2 M3 0.0030 1,058,872.85 3,176.62
Semen Warna MB.12 KG 0.1000 8,848.16 884.82
Pekerja L-4 OH 0.0900 132,000.00 11,880.00
Tukang batu L-3 OH 0.0900 168,000.00 15,120.00
Kepala tukang L-2 OH 0.0090 188,000.00 1,692.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
34,038.17 29,717.00 63,755.17
Jumlah harga dibulatkan 63,755.00

37 1 M' Plint Ubin Teralux Kerang Ukuran 10 x 30 cm PU.I.37


SNI 7395-2008
Plint Ubin Teralux Kerang Ukuran 10 x 30 cm MF.42 Buah 3.5300 10,116.55 35,711.42
Semen Portland (PC) @ 50 Kg MB.11 KG 1.1400 2,778.84 3,167.87
Pasir Semen (lokal) MB.2 M3 0.0030 1,058,872.85 3,176.62
Semen Warna MB.12 KG 0.1000 8,848.16 884.82
Pekerja L-4 OH 0.0900 132,000.00 11,880.00
Tukang batu L-3 OH 0.0900 168,000.00 15,120.00
Kepala tukang L-2 OH 0.0090 188,000.00 1,692.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
42,940.73 29,717.00 72,657.73
Jumlah harga dibulatkan 72,657.00

38 1 M' Plint Ubin Teralux Marmer Ukuran 10 x 60 cm PU.I.38


SNI 7395-2008
Plint Ubin Teralux Marmer Ukuran 10 x 60 cm MF.43 Buah 1.7000 20,049.10 34,083.47
Semen Portland (PC) @ 50 Kg MB.11 KG 1.1400 2,778.84 3,167.87
Pasir Semen (lokal) MB.2 M3 0.0030 1,058,872.85 3,176.62
Semen Warna MB.12 KG 0.1000 8,848.16 884.82
Pekerja L-4 OH 0.0900 132,000.00 11,880.00
Tukang batu L-3 OH 0.0900 168,000.00 15,120.00
Kepala tukang L-2 OH 0.0090 188,000.00 1,692.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
41,312.78 29,717.00 71,029.78
Jumlah harga dibulatkan 71,029.00
Analisa Harga Satuan Pekerjaan (AHSP) I. Penutup Lantai-Dinding

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

39 1 M' Plint Ubin Teralux Marmer Ukuran 10 x 40 cm PU.I.39


SNI 7395-2008
Plint Ubin Teralux Marmer Ukuran 10 x 40 cm MF.44 Buah 2.6500 13,422.80 35,570.42
Semen Portland (PC) @ 50 Kg MB.11 KG 1.1400 2,778.84 3,167.87
Pasir Semen (lokal) MB.2 M3 0.0030 1,058,872.85 3,176.62
Semen Warna MB.12 KG 0.1000 8,848.16 884.82
Pekerja L-4 OH 0.0900 132,000.00 11,880.00
Tukang batu L-3 OH 0.0900 168,000.00 15,120.00
Kepala tukang L-2 OH 0.0090 188,000.00 1,692.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
42,799.73 29,717.00 72,516.73
Jumlah harga dibulatkan 72,516.00

40 1 M' Plint Ubin Teralux Marmer Ukuran 10 x 30 cm PU.I.40


HPS.PU. 2017
Plint Ubin Teralux Marmer Ukuran 10 x 30 cm MF.45 Buah 3.5300 10,116.55 35,711.42
Semen Portland (PC) @ 50 Kg MB.11 KG 1.1400 2,778.84 3,167.87
Pasir Semen (lokal) MB.2 M3 0.0030 1,058,872.85 3,176.62
Semen Warna MB.12 KG 0.1000 8,848.16 884.82
Pekerja L-4 OH 0.0900 132,000.00 11,880.00
Tukang batu L-3 OH 0.0900 168,000.00 15,120.00
Kepala tukang L-2 OH 0.0090 188,000.00 1,692.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
42,940.73 29,717.00 72,657.73
Jumlah harga dibulatkan 72,657.00

41 1 M' Plint Keramik Artistik Ukuran 10 x 20 cm PU.I.41


SNI 7395-2008
Plint Keramik Artistik Ukuran 10 x 20 cm MF.46 Buah 5.3000 6,400.90 33,924.77
Semen Portland (PC) @ 50 Kg MB.11 KG 1.1400 2,778.84 3,167.87
Pasir Semen (lokal) MB.2 M3 0.0030 1,058,872.85 3,176.62
Semen Warna MB.12 KG 0.0250 8,848.16 221.20
Pekerja L-4 OH 0.0900 132,000.00 11,880.00
Tukang batu L-3 OH 0.0900 168,000.00 15,120.00
Kepala tukang L-2 OH 0.0090 188,000.00 1,692.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
40,490.47 29,717.00 70,207.47
Jumlah harga dibulatkan 70,207.00

42 1 M' Plint Keramik Artistik Ukuran 10 x 10 cm PU.I.42


SNI 7395-2008
Plint Keramik Artistik Ukuran 10 x 10 cm MF.47 Buah 10.6000 6,069.70 64,338.82
Semen Portland (PC) @ 50 Kg MB.11 KG 1.1400 2,778.84 3,167.87
Pasir Semen (lokal) MB.2 M3 0.0030 1,058,872.85 3,176.62
Semen Warna MB.12 KG 0.0500 8,848.16 442.41
Pekerja L-4 OH 0.0900 132,000.00 11,880.00
Tukang batu L-3 OH 0.0900 168,000.00 15,120.00
Kepala tukang L-2 OH 0.0090 188,000.00 1,692.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
71,125.72 29,717.00 100,842.72
Jumlah harga dibulatkan 100,842.00

43 1 M' Plint Keramik Ukuran 5 x 20 cm PU.I.43


SNI 7395-2008
Plint Keramik Artistik Ukuran 5 x 20 cm MF.48 Buah 5.3000 5,408.45 28,664.79
Semen Portland (PC) @ 50 Kg MB.11 KG 0.5700 2,778.84 1,583.94
Pasir Semen (lokal) MB.2 M3 0.0015 1,058,872.85 1,588.31
Semen Warna MB.12 KG 0.0130 8,848.16 115.03
Pekerja L-4 OH 0.0900 132,000.00 11,880.00
Tukang batu L-3 OH 0.0900 168,000.00 15,120.00
Kepala tukang L-2 OH 0.0090 188,000.00 1,692.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
31,952.06 29,717.00 61,669.06
Jumlah harga dibulatkan 61,669.00

44 1 M' Plint Keramik Ukuran 10 x 30 CM PU.I.44


HPS.PU. 2017
Plint Keramik Artistik Ukuran 10 x 30 cm MF.49 Buah 3.3300 10,116.55 33,688.11
Semen Portland (PC) @ 50 Kg MB.11 KG 1.1400 2,778.84 3,167.87
Pasir Semen (lokal) MB.2 M3 0.0030 1,058,872.85 3,176.62
Semen Warna MB.12 KG 0.1000 8,848.16 884.82
Pekerja L-4 OH 0.0900 132,000.00 11,880.00
Tukang batu L-3 OH 0.0900 168,000.00 15,120.00
Kepala tukang L-2 OH 0.0090 188,000.00 1,692.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
40,917.42 29,717.00 70,634.42
Jumlah harga dibulatkan 70,634.00

45 1 M' Plint Kayu Klas II Tebal 2 cm, Lebar 10cm PU.I.45


SNI 7395-2008
Papan Kayu Kelas II MC.5 M3 0.0030 3,599,094.05 10,797.28
Paku/Skrup 5 cm MD.19 KG 0.0500 20,167.55 1,008.38
Pekerja L-4 OH 0.1200 132,000.00 15,840.00
Tukang batu L-3 OH 0.1200 168,000.00 20,160.00
Kepala tukang L-2 OH 0.0120 188,000.00 2,256.00
Mandor L-1 OH 0.0060 205,000.00 1,230.00
11,805.66 39,486.00 51,291.66
Jumlah harga dibulatkan 51,291.00
Analisa Harga Satuan Pekerjaan (AHSP) I. Penutup Lantai-Dinding

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

46 1 M2 Dinding Porselin Ukuran 11 x 11 cm, (putih/warna) PU.I.46


SNI 7395-2008
Porselin Ukuran 11 x 11 cm MF.28 Buah 86.0000 1,005.10 86,438.60
Semen Portland (PC) @ 50 Kg MB.11 KG 9.3000 2,778.84 25,843.18
Pasir Semen (lokal) MB.2 M3 0.0180 1,058,872.85 19,059.71
Semen Warna MB.12 KG 1.5000 8,848.16 13,272.24
Pekerja L-4 OH 1.0000 132,000.00 132,000.00
Tukang batu L-3 OH 0.5000 168,000.00 84,000.00
Kepala tukang L-2 OH 0.0500 188,000.00 9,400.00
Mandor L-1 OH 0.0500 205,000.00 10,250.00
144,613.73 235,650.00 380,263.73
Jumlah harga dibulatkan 380,263.00

47 1 M2 Dinding Porselin Ukuran 15 x 15 cm PU.I.47


HPS.PU. 2017
Porselin Ukuran 15 x 15 cm MF.29 Buah 45.0000 1,246.60 56,097.00
Semen Portland (PC) @ 50 Kg MB.11 KG 9.3000 2,778.84 25,843.18
Pasir Semen (lokal) MB.2 M3 0.0180 1,058,872.85 19,059.71
Semen Warna MB.12 KG 2.7500 8,848.16 24,332.43
Pekerja L-4 OH 0.9000 132,000.00 118,800.00
Tukang batu L-3 OH 0.4500 168,000.00 75,600.00
Kepala tukang L-2 OH 0.0450 188,000.00 8,460.00
Mandor L-1 OH 0.0450 205,000.00 9,225.00
125,332.33 212,085.00 337,417.33
Jumlah harga dibulatkan 337,417.00

48 1 M2 Dinding Porselin Ukuran 10 x 20 cm PU.I.48


SNI 7395-2008
Porselin Ukuran 10 x 20 cm MF.29 Buah 53.0000 1,246.60 66,069.80
Semen Portland (PC) @ 50 Kg MB.11 KG 9.3000 2,778.84 25,843.18
Pasir Semen (lokal) MB.2 M3 0.0180 1,058,872.85 19,059.71
Semen Warna MB.12 KG 2.7500 8,848.16 24,332.43
Pekerja L-4 OH 0.9000 132,000.00 118,800.00
Tukang batu L-3 OH 0.4500 168,000.00 75,600.00
Kepala tukang L-2 OH 0.0450 188,000.00 8,460.00
Mandor L-1 OH 0.0450 205,000.00 9,225.00
135,305.13 212,085.00 347,390.13
Jumlah harga dibulatkan 347,390.00

49 1 M2 Dinding Porselin Ukuran 20 x 20 cm PU.I.49


SNI 7395-2008
Porselin Ukuran 20 x 20 cm MF.30 Buah 26.5000 3,650.10 96,727.65
Semen Portland (PC) @ 50 Kg MB.11 KG 9.3000 2,778.84 25,843.18
Pasir Semen (lokal) MB.2 M3 0.0180 1,058,872.85 19,059.71
Semen Warna MB.12 KG 1.9400 8,848.16 17,165.43
Pekerja L-4 OH 0.9000 132,000.00 118,800.00
Tukang batu L-3 OH 0.4500 168,000.00 75,600.00
Kepala tukang L-2 OH 0.0450 188,000.00 8,460.00
Mandor L-1 OH 0.0450 205,000.00 9,225.00
158,795.97 212,085.00 370,880.97
Jumlah harga dibulatkan 370,880.00

50 1 M2 Dinding Keramik Artistik Ukuran 10 x 20 cm PU.I.50


SNI 7395-2008
Keramik Artistik 10 x 20 cm MF.16 Buah 53.0000 1,672.10 88,621.30
Semen Portland (PC) @ 50 Kg MB.11 KG 9.3000 2,778.84 25,843.18
Pasir Semen (lokal) MB.2 M3 0.0180 1,058,872.85 19,059.71
Semen Warna MB.12 KG 2.7500 8,848.16 24,332.43
Pekerja L-4 OH 0.9000 132,000.00 118,800.00
Tukang batu L-3 OH 0.4500 168,000.00 75,600.00
Kepala tukang L-2 OH 0.0450 188,000.00 8,460.00
Mandor L-1 OH 0.0450 205,000.00 9,225.00
157,856.63 212,085.00 369,941.63
Jumlah harga dibulatkan 369,941.00
Analisa Harga Satuan Pekerjaan (AHSP) I. Penutup Lantai-Dinding

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

51 1 M2 Dinding Keramik Artistik Ukuran 10x10 atau 5x20 PU.I.51


SNI 7395-2008
Keramik Artistik 5 x 20 cm MF.17 Buah 106.0000 978.65 103,736.90
Semen Portland (PC) @ 50 Kg MB.11 KG 9.3000 2,778.84 25,843.18
Pasir Semen (lokal) MB.2 M3 0.0180 1,058,872.85 19,059.71
Semen Warna MB.12 KG 2.9000 8,848.16 25,659.66
Pekerja L-4 OH 0.9000 132,000.00 118,800.00
Tukang batu L-3 OH 0.4500 168,000.00 75,600.00
Kepala tukang L-2 OH 0.0450 188,000.00 8,460.00
Mandor L-1 OH 0.0450 205,000.00 9,225.00
174,299.45 212,085.00 386,384.45
Jumlah harga dibulatkan 386,384.00

52 1 M2 Dinding Keramik Ukuran 10 x 20 cm PU.I.52


HPS.PU. 2017
Keramik Ukuran 10 x 20 cm MF.26 Buah 53.0000 1,772.15 93,923.95
Semen Portland (PC) @ 50 Kg MB.11 KG 9.3000 2,778.84 25,843.18
Pasir Semen (lokal) MB.2 M3 0.0180 1,058,872.85 19,059.71
Semen Warna MB.12 KG 2.7500 8,848.16 24,332.43
Pekerja L-4 OH 0.9000 132,000.00 118,800.00
Tukang batu L-3 OH 0.4500 168,000.00 75,600.00
Kepala tukang L-2 OH 0.0450 188,000.00 8,460.00
Mandor L-1 OH 0.0450 205,000.00 9,225.00
163,159.28 212,085.00 375,244.28
Jumlah harga dibulatkan 375,244.00

53 1 M2 Dinding Keramik Ukuran 20 x 20 cm PU.I.53


SNI 7395-2008
Keramik Ukuran 20 x 20 cm MF.18 Buah 26.5000 3,801.90 100,750.35
Semen Portland (PC) @ 50 Kg MB.11 KG 9.3000 2,778.84 25,843.18
Pasir Semen (lokal) MB.2 M3 0.0180 1,058,872.85 19,059.71
Semen Warna MB.12 KG 1.9400 8,848.16 17,165.43
Pekerja L-4 OH 0.9000 132,000.00 118,800.00
Tukang batu L-3 OH 0.4500 168,000.00 75,600.00
Kepala tukang L-2 OH 0.0450 188,000.00 8,460.00
Mandor L-1 OH 0.0450 205,000.00 9,225.00
162,818.67 212,085.00 374,903.67
Jumlah harga dibulatkan 374,903.00

54 1 M2 Dinding Keramik Ukuran 20 x 25 cm PU.I.54


HPS.PU. 2017
Keramik Ukuran 20 x 25 cm MF.27 Buah 20.0000 4,118.15 82,363.00
Semen Portland (PC) @ 50 Kg MB.11 KG 9.3000 2,778.84 25,843.18
Pasir Semen (lokal) MB.2 M3 0.0180 1,058,872.85 19,059.71
Semen Warna MB.12 KG 1.9400 8,848.16 17,165.43
Pekerja L-4 OH 0.9000 132,000.00 118,800.00
Tukang batu L-3 OH 0.4500 168,000.00 75,600.00
Kepala tukang L-2 OH 0.0450 188,000.00 8,460.00
Mandor L-1 OH 0.0450 205,000.00 9,225.00
144,431.32 212,085.00 356,516.32
Jumlah harga dibulatkan 356,516.00

55 1 M2 Dinding Batu Paras PU.I.55


SNI 7395-2008
Batu Paras MF.52 M2 1.1000 191,895.00 211,084.50
Semen Portland (PC) @ 50 Kg MB.11 KG 11.7500 2,778.84 32,651.33
Pasir Semen (lokal) MB.2 M3 0.0350 1,058,872.85 37,060.55
Pekerja L-4 OH 0.7000 132,000.00 92,400.00
Tukang batu L-3 OH 0.3500 168,000.00 58,800.00
Kepala tukang L-2 OH 0.0350 188,000.00 6,580.00
Mandor L-1 OH 0.0350 205,000.00 7,175.00
280,796.38 164,955.00 445,751.38
Jumlah harga dibulatkan 445,751.00

56 1 M2 Dinding Batu Tempel Hitam PU.I.56


SNI 7395-2008
Batu Tempel Hitam MF.53 M2 1.1000 191,895.00 211,084.50
Semen Portland (PC) @ 50 Kg MB.11 KG 11.7500 2,778.84 32,651.33
Pasir Semen (lokal) MB.2 M3 0.0350 1,058,872.85 37,060.55
Pekerja L-4 OH 0.7000 132,000.00 92,400.00
Tukang batu L-3 OH 0.3500 168,000.00 58,800.00
Kepala tukang L-2 OH 0.0350 188,000.00 6,580.00
Mandor L-1 OH 0.0350 205,000.00 7,175.00
280,796.38 164,955.00 445,751.38
Jumlah harga dibulatkan 445,751.00
Analisa Harga Satuan Pekerjaan (AHSP) I. Penutup Lantai-Dinding

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

57 1 M2 Dinding Marmer Ukuran 100 x 100 cm PU.I.57


SNI 7395-2008
Marmer Ukuran 100 x 100 cm MF.50 Buah 1.0600 472,594.80 500,950.49
Paku Campuran MD.16 KG 3.0030 19,506.30 58,577.42
Semen Portland (PC) @ 50 Kg MB.11 KG 12.4400 2,778.84 34,568.73
Pasir Semen (lokal) MB.2 M3 0.0250 1,058,872.85 26,471.82
Semen Warna MB.12 KG 0.6500 8,848.16 5,751.30
Pekerja L-4 OH 1.3000 132,000.00 171,600.00
Tukang batu L-3 OH 0.6500 168,000.00 109,200.00
Kepala tukang L-2 OH 0.0650 188,000.00 12,220.00
Mandor L-1 OH 0.0650 205,000.00 13,325.00
626,319.76 306,345.00 932,664.76
Jumlah harga dibulatkan 932,664.00

58 1 M2 Pasang Wallpaper Lebar 50 cm PU.I.58


SNI 7395-2008
Wall paper MF.51 M 2.2000 205,393.45 451,865.59
Lem Aica Aibon MN.1 KG 0.2500 51,934.00 12,983.50
Pekerja L-4 OH 0.3500 132,000.00 46,200.00
Tukang batu L-3 OH 0.1750 168,000.00 29,400.00
Kepala tukang L-2 OH 0.0170 188,000.00 3,196.00
Mandor L-1 OH 0.0020 205,000.00 410.00
464,849.09 79,206.00 544,055.09
Jumlah harga dibulatkan 544,055.00

59 1 M2 Pasang Paving Block PU.I.59


HPS.PU. 2017
Paving blok (10 x 20 cm) M2 1.0100 376,912.50 380,681.63
Pasir semen (lokal) MB.2 M3 0.1000 1,058,872.85 105,887.29
Pekerja L-4 OH 0.2000 132,000.00 26,400.00
Tukang batu L-3 OH 0.3000 168,000.00 50,400.00
Kepala tukang L-2 OH 0.0300 188,000.00 5,640.00
Mandor L-1 OH 0.0250 205,000.00 5,125.00
Peralatan LS 0.0500 10,000.00 500.00
486,568.91 88,065.00 574,633.91
Jumlah harga dibulatkan 574,633.00
Analisa Harga Satuan Pekerjaan (AHSP) J. Besi - Alumunium

J. PEKERJAAN BESI - ALUMUNIUM

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

1 1 KG Pasang Besi Profil PU.J.1


SNI 7393-2008
Besi profil MD.54 KG 1.1500 28,049.65 32,257.10
Pekerja L-4 OH 0.0600 132,000.00 7,920.00
Tukang las L-3 OH 0.0600 168,000.00 10,080.00
Kepala tukang L-2 OH 0.0060 188,000.00 1,128.00
Mandor L-1 OH 0.0030 205,000.00 615.00
Jumlah harga pekerjaan 32,257.10 19,743.00 52,000.10
Jumlah harga dibulatkan 52,000.00

2 1 KG Pasang Kuda-Kuda Baja IWF PU.J.2


SNI 7393-2008
Baja profil IWF MD.54 KG 1.1500 28,049.65 32,257.10
Pekerja L-4 OH 0.0600 132,000.00 7,920.00
Tukang las L-3 OH 0.0600 168,000.00 10,080.00
Kepala tukang L-2 OH 0.0060 188,000.00 1,128.00
Mandor L-1 OH 0.0030 205,000.00 615.00
Jumlah harga pekerjaan 32,257.10 19,743.00 52,000.10
Jumlah harga dibulatkan 52,000.00

3 1 KG Gording Baja PU.J.3


SNI 7393-2008
Besi gording canal MD.54 KG 1.1500 28,049.65 32,257.10
Pekerja L-4 OH 0.0600 132,000.00 7,920.00
Tukang besi L-3 OH 0.0600 168,000.00 10,080.00
Kepala Tukang L-2 OH 0.0060 188,000.00 1,128.00
Mandor L-1 OH 0.0030 205,000.00 615.00
Jumlah harga pekerjaan 32,257.10 19,743.00 52,000.10
Jumlah harga dibulatkan 52,000.00

4 100 KG Perakitan Besi Baja PU.J.4


SNI 7393-2008
Solar MA.2 Liter 1.0000 14,073.70 14,073.70
Min yak Pelumas MA.4 Liter 0.1000 40,117.75 4,011.78
Pekerja L-4 OH 0.1000 132,000.00 13,200.00
Tukang besi L-3 OH 0.1000 168,000.00 16,800.00
Kepala Tukang L-2 OH 0.0010 188,000.00 188.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
Sewa Alat Kerja Perakitan Jam 0.8000 750,000.00 600,000.00
Jumlah harga pekerjaan 18,085.48 631,213.00 649,298.48
Jumlah harga per 1 KG 6,492.98
Jumlah harga dibulatkan 6,492.00

5 1 M2 Pintu Besi Plat Baja Tbl 2 mm Rangkap, Rangka Baja Si PU.J.5


SNI 7393-2008
Besi Siku 30 . 30 . 3 - L = 6 Meter MD.37 KG 15.0000 10,496.00 157,440.00
Besi Plat baja t = 3 mm MD.46 KG 32.8000 15,103.00 495,378.40
Kawat las MD.28 DOS/KG 0.0500 228,078.35 11,403.92
Pekerja L-4 OH 1.0500 132,000.00 138,600.00
Tukang las L-3 OH 1.0500 168,000.00 176,400.00
Kepala tukang L-2 OH 0.1050 188,000.00 19,740.00
Mandor L-1 OH 0.0520 205,000.00 10,660.00
Jumlah harga pekerjaan 664,222.32 345,400.00 1,009,622.32
Jumlah harga dibulatkan 1,009,622.00

6 10 CM Pengelasan Dengan Las Listrik PU.J.6


SNI 7393-2008
Kawat Las Listrik MD.28 KG 0.4000 228,078.35 91,231.34
Solar MA.2 Liter 0.3000 14,073.70 4,222.11
Minyak pelumas MA.4 Liter 0.0400 40,117.75 1,604.71
Pekerja L-4 OH 0.0400 132,000.00 5,280.00
Tukang besi L-3 OH 0.0200 168,000.00 3,360.00
Kepala tukang L-2 OH 0.0020 188,000.00 376.00
Mandor L-1 OH 0.0020 205,000.00 410.00
Sewa alat las Jam 0.1700 0.00
Jumlah harga pekerjaan 97,058.16 9,426.00 106,484.16
Jumlah harga per 10 cm 10,648.42
Jumlah harga dibulatkan 10,648.00

7 1 M2 Pasang Sunscreen Alumunium PU.J.7


SNI 7393-2008
Sunscreen alumunium M2 1.0000 150,000.00 150,000.00
Pekerja L-4 OH 0.0800 132,000.00 10,560.00
Tukang besi L-3 OH 0.8000 168,000.00 134,400.00
Kepala tukang L-2 OH 0.0800 188,000.00 15,040.00
Mandor L-1 OH 0.0040 205,000.00 820.00
Jumlah harga pekerjaan 150,000.00 160,820.00 310,820.00
Jumlah harga dibulatkan 310,820.00

8 1 M2 Pasang Rolling Door Alumunium PU.J.8


SNI 7393-2008
Rolling door alumunium M2 1.0000 2,500,000.00 2,500,000.00
Pekerja L-4 OH 1.0000 132,000.00 132,000.00
Tukang khusus alumunium L-3 OH 1.0000 168,000.00 168,000.00
Kepala tukang L-2 OH 0.1000 188,000.00 18,800.00
Mandor L-1 OH 0.0500 205,000.00 10,250.00
Jumlah harga pekerjaan 2,500,000.00 329,050.00 2,829,050.00
Jumlah harga dibulatkan 2,829,050.00
Analisa Harga Satuan Pekerjaan (AHSP) J. Besi - Alumunium

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

9 1 M' Pasang Kusen Pintu Alumunium PU.J.9


SNI 7393-2008
Profil alumunium M' 1.1000 175,000.00 192,500.00
Skrup fixer Buah 2.0000 500.00 1,000.00
Sealent Tube 0.0600 100,000.00 6,000.00
Pekerja L-4 OH 0.0430 132,000.00 5,676.00
Tukang alumunium L-3 OH 0.0430 168,000.00 7,224.00
Kepala tukang L-2 OH 0.0043 188,000.00 808.40
Mandor L-1 OH 0.0021 205,000.00 430.50
Jumlah harga pekerjaan 199,500.00 14,138.90 213,638.90
Jumlah harga dibulatkan 213,638.00

10 1 M2 Pasang Pintu Kaca Rangka Alumunium PU.J.10


SNI 7393-2008
Pintu alumunium M' 4.4000 175,000.00 770,000.00
Profil Kaca M' 4.5000 500.00 2,250.00
Sealent Tube 0.2700 100,000.00 27,000.00
Pekerja L-4 OH 0.0850 132,000.00 11,220.00
Tukang alumunium L-3 OH 0.0850 168,000.00 14,280.00
Kepala tukang L-2 OH 0.0090 188,000.00 1,692.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
Jumlah harga pekerjaan 799,250.00 28,217.00 827,467.00
Jumlah harga dibulatkan 827,467.00

11 1 M2 Pasang Terali Besi Strip (2 x 3) mm PU.J.11


SNI 7393-2008
Besi strip 2 x 3 MD.48 KG 6.1770 22,467.00 138,778.66
Pengelasan PU.J.6 CM 27.0800 10,648.00 288,347.84
Pekerja L-4 OH 1.6700 132,000.00 220,440.00
Tukang las L-3 OH 1.6700 168,000.00 280,560.00
Kepala tukang L-2 OH 0.1670 188,000.00 31,396.00
Mandor L-1 OH 0.0830 205,000.00 17,015.00
Jumlah harga pekerjaan 427,126.50 549,411.00 976,537.50
Jumlah harga dibulatkan 976,537.00

12 1 M2 Pasang Kawat Nyamuk (Rangka Besi) PU.J.12


SNI 7393-2008
Kawat Kasa/Nyamuk MD.23 M2 1.1000 25,451.80 27,996.98
Pengelasan PU.J.6 CM 11.1100 10,648.00 118,299.28
Besi Strip 20.2 MD.48 KG 1.7160 22,467.00 38,553.37
Pekerja L-4 OH 0.1000 132,000.00 13,200.00
Tukang las L-3 OH 0.1000 168,000.00 16,800.00
Kepala tukang L-2 OH 0.0100 188,000.00 1,880.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
Jumlah harga pekerjaan 184,849.63 32,905.00 217,754.63
Jumlah harga dibulatkan 217,754.00

13 1 M2 Pasang Kawat Nyamuk (Rangka Kayu) PU.J.13


HPS.PU. 2017
Kawat Nyamuk (Plastik / Nylon) MD.23 M2 1.1000 25,451.80 27,996.98
Paku Campuran MD.16 KG 0.0200 19,506.30 390.13
Balok Kayu Kelas II (Kayu Rahay) MC.2 M3 0.0018 4,729,266.90 8,512.68
Pekerja L-4 OH 0.1000 132,000.00 13,200.00
Tukang kayu L-3 OH 0.1000 168,000.00 16,800.00
Kepala tukang L-2 OH 0.0100 188,000.00 1,880.00
Mandor L-1 OH 0.0005 205,000.00 102.50
Jumlah harga pekerjaan 36,899.79 31,982.50 68,882.29
Jumlah harga dibulatkan 68,882.00

14 1 M2 Pasang Kawat Harmonika PU.J.14


HPS.PU. 2017
Kawat Harmonika Has 40 x 40 Cm MD.25 M2 1.1000 57,782.90 63,561.19
Paku Campuran MD.16 KG 0.0200 19,506.30 390.13
Balok Kayu Kelas II (Kayu Rahay) MC.2 M3 0.0018 4,729,266.90 8,512.68
Pekerja L-4 OH 0.1000 132,000.00 13,200.00
Tukang kayu L-3 OH 0.1000 168,000.00 16,800.00
Kepala tukang L-2 OH 0.0100 188,000.00 1,880.00
Mandor L-1 OH 0.0005 205,000.00 102.50
Jumlah harga pekerjaan 72,464.00 31,982.50 104,446.50
Jumlah harga dibulatkan 104,446.00

15 1 M2 Pasang Kawat Kassa PU.J.15


HPS.PU. 2017
Kawat Kasa/Nyamuk MD.23 M2 1.1000 25,451.80 27,996.98
Paku Campuran MD.16 KG 0.0200 19,506.30 390.13
Balok Kayu Kelas II (Kayu Rahay) MC.2 M3 0.0018 4,729,266.90 8,512.68
Pekerja L-4 OH 0.1000 132,000.00 13,200.00
Tukang kayu L-3 OH 0.1000 168,000.00 16,800.00
Kepala tukang L-2 OH 0.0100 188,000.00 1,880.00
Mandor L-1 OH 0.0005 205,000.00 102.50
Jumlah harga pekerjaan 36,899.79 31,982.50 68,882.29
Jumlah harga dibulatkan 68,882.00
Analisa Harga Satuan Pekerjaan (AHSP) J. Besi - Alumunium

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

16 1 M2 Pasang Kawat Burung PU.J.16


HPS.PU. 2017
Kawat burung MD.24 M2 1.1000 46,501.40 51,151.54
Paku Campuran MD.16 KG 0.0200 19,506.30 390.13
Balok Kayu Kelas II (Kayu Rahay) MC.2 M3 0.0018 4,729,266.90 8,512.68
Pekerja L-4 OH 0.1000 132,000.00 13,200.00
Tukang kayu L-3 OH 0.1000 168,000.00 16,800.00
Kepala tukang L-2 OH 0.0100 188,000.00 1,880.00
Mandor L-1 OH 0.0005 205,000.00 102.50
Jumlah harga pekerjaan 60,054.35 31,982.50 92,036.85
Jumlah harga dibulatkan 92,036.00

17 1 M2 Jendela Nako dan Tralis PU.J.17


SNI 7393-2008
Jendela nako (Rangka + Kaca 5 mm) - 7 Klips MG.6 Set 1.000 172,731.15 172,731.15
Paku Skrup 1 - 2,5 cm MD.22 Buah 10.000 500.00 5,000.00
Besi Tralis (strip) MD.48 M 7.000 22,467.00 157,269.00
Pekerja L-4 OH 0.200 132,000.00 26,400.00
Tukang L-3 OH 0.200 168,000.00 33,600.00
Kepala Tukang L-2 OH 0.500 188,000.00 94,000.00
Mandor L-1 OH 0.020 205,000.00 4,100.00
Jumlah harga pekerjaan 335,000.15 158,100.00 493,100.15
Jumlah harga dibulatkan 493,100.00

18 1 KG Plat Besi Lembaran tebal : 1.0 mm - 120 x 240 Cm PU.J.18


HPS.PU. 2017
Besi Plat 1.0 mm - 120 x 240 Cm MD.43 KG 1.1500 17,194.00 19,773.10
Pekerja L-4 OH 0.0600 132,000.00 7,920.00
Tukang besi L-3 OH 0.0600 168,000.00 10,080.00
Kepala Tukang L-2 OH 0.0060 188,000.00 1,128.00
Mandor L-1 OH 0.0030 205,000.00 615.00
Jumlah harga pekerjaan 19,773.10 19,743.00 39,516.10
Jumlah harga dibulatkan 39,516.00

19 1 KG Plat Besi Lembaran tebal : 1.2 mm - 120 x 240 Cm PU.J.19


HPS.PU. 2017
Besi Plat 1.2 mm - 120 x 240 Cm MD.44 KG 1.1500 16,311.00 18,757.65
Pekerja L-4 OH 0.0600 132,000.00 7,920.00
Tukang besi L-3 OH 0.0600 168,000.00 10,080.00
Kepala Tukang L-2 OH 0.0060 188,000.00 1,128.00
Mandor L-1 OH 0.0030 205,000.00 615.00
Jumlah harga pekerjaan 18,757.65 19,743.00 38,500.65
Jumlah harga dibulatkan 38,500.00

20 1 KG Plat Besi Lembaran tebal : 2.0 mm - 120 x 240 Cm PU.J.20


HPS.PU. 2017
Besi Plat 2.0 mm - 120 x 240 Cm MD.45 KG 1.1500 14,489.00 16,662.35
Pekerja L-4 OH 0.0600 132,000.00 7,920.00
Tukang besi L-3 OH 0.0600 168,000.00 10,080.00
Kepala Tukang L-2 OH 0.0060 188,000.00 1,128.00
Mandor L-1 OH 0.0030 205,000.00 615.00
Jumlah harga pekerjaan 16,662.35 19,743.00 36,405.35
Jumlah harga dibulatkan 36,405.00

21 1 KG Plat Besi Lembaran tebal : 3.0 mm - 120 x 240 Cm PU.J.21


HPS.PU. 2017
Besi Plat 3.0 mm - 120 x 240 Cm MD.46 KG 1.1500 15,103.00 17,368.45
Pekerja L-4 OH 0.0600 132,000.00 7,920.00
Tukang besi L-3 OH 0.0600 168,000.00 10,080.00
Kepala Tukang L-2 OH 0.0060 188,000.00 1,128.00
Mandor L-1 OH 0.0030 205,000.00 615.00
Jumlah harga pekerjaan 17,368.45 19,743.00 37,111.45
Jumlah harga dibulatkan 37,111.00

1 M2 Pasang Kuda-Kuda Baja Ringan + Reng Untuk Atap Genteng Biasa/Mental


C-75,08 M 1.488 27,168.75 40,427.10
C-75,06 M 2.232 16,531.25 36,897.75
Bau (srew Driver) Bh 28.000 92,000.00 2,576,000.00
Dynabolt Bh 1.600 97,750.00 156,400.00
Reng M 5.400 16,531.25 89,268.75
Talang Jurai M 0.124 25,443.75 3,155.03
Pekerja L-4 OH 0.200 132,000.00 26,400.00
Tukang besi L-3 OH 0.450 168,000.00 75,600.00
Kepala Tukang L-2 OH 0.010 188,000.00 1,880.00
Mandor L-1 OH 0.050 205,000.00 10,250.00
Jumlah harga pekerjaan 2,902,148.63 114,130.00 3,016,278.63
Jumlah harga dibulatkan 3,016,278.00
Analisa Harga Satuan Pekerjaan (AHSP) K. Langit-langit

K. PEKERJAAN LANGIT - LANGIT

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

1 1 M2 Langit-langit Triplek Ukuran (120 x 240) tebal 3 mm PU.K.1


SNI 2839:2008
Triplek ukuran (120 x 240) cm tebal 3 mm MC.11 Lembar 0.3750 83,591.20 31,346.70
Paku Triplek MD.16 KG 0.0300 19,506.30 585.19
Pekerja Kayu L-4 OH 0.1000 132,000.00 13,200.00
Tukang Kayu L-3 OH 0.1000 168,000.00 16,800.00
Kepala Tukang L-2 OH 0.0100 188,000.00 1,880.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
Jumlah harga pekerjaan 31,931.89 32,905.00 64,836.89
Jumlah harga dibulatkan 64,836.00

2 1 M2 Langit-langit Triplek Ukuran (120 x 240) tebal 4 mm PU.K.2


SNI 2839:2008
Triplek ukuran (120 x 240) cm tebal 4 mm MC.12 Lembar 0.3750 106,064.50 39,774.19
Paku Triplek MD.16 KG 0.0300 19,506.30 585.19
Pekerja Kayu L-4 OH 0.1000 132,000.00 13,200.00
Tukang Kayu L-3 OH 0.1000 168,000.00 16,800.00
Kepala Tukang L-2 OH 0.0100 188,000.00 1,880.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
Jumlah harga pekerjaan 40,359.38 32,905.00 73,264.38
Jumlah harga dibulatkan 73,264.00

3 1 M2 Langit-langit Triplek Ukuran (120 x 240) tebal 6 mm PU.K.3


SNI 2839:2008
Triplek ukuran (120 x 240) cm tebal 6 mm MC.13 Lembar 0.3750 137,227.20 51,460.20
Paku Triplek MD.16 KG 0.0300 19,506.30 585.19
Pekerja Kayu L-4 OH 0.1000 132,000.00 13,200.00
Tukang Kayu L-3 OH 0.1000 168,000.00 16,800.00
Kepala Tukang L-2 OH 0.0100 188,000.00 1,880.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
Jumlah harga pekerjaan 52,045.39 32,905.00 84,950.39
Jumlah harga dibulatkan 84,950.00

4 1 M2 Langit-langit Lambriziring Kayu, Tebal 9 mm PU.K.4


SNI 2839:2008
Kayu Papan Kelas II MC.6 M3 0.0150 4,839,477.15 72,592.16
Paku Triplek MD.16 KG 0.0100 19,506.30 195.06
Pekerja Kayu L-4 OH 0.8000 132,000.00 105,600.00
Tukang Kayu L-3 OH 0.8000 168,000.00 134,400.00
Kepala Tukang L-2 OH 0.0800 188,000.00 15,040.00
Mandor L-1 OH 0.0400 205,000.00 8,200.00
Jumlah harga pekerjaan 72,787.22 263,240.00 336,027.22
Jumlah harga dibulatkan 336,027.00

5 1 M2 Langit-langit Gypsum Board Ukuran (1200 x 2400 x 9) m PU.K.5


SNI 2839:2008
Gypsum Board (1200 x 2400 x 9) mm MC.27 Lembar 0.3640 121,663.10 44,285.37
Paku Skrup MD.18 KG 0.1100 35,046.25 3,855.09
Pekerja L-4 OH 0.1000 132,000.00 13,200.00
Tukang L-3 OH 0.0500 168,000.00 8,400.00
Kepala Tukang L-2 OH 0.0050 188,000.00 940.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
Jumlah harga pekerjaan 48,140.46 23,565.00 71,705.46
Jumlah harga dibulatkan 71,705.00

6 1 M' Pasang list plafond gypsum profil PU.K.6


SNI 2839:2008
List profil Gypsum Lebar Sampai 5 cm MC.28 M' 1.0500 46,644.00 48,976.20
Tepung gypsum MB.13 KG 0.1500 6,548.33 982.25
Pekerja L-4 OH 0.0600 132,000.00 7,920.00
Tukang L-3 OH 0.0600 168,000.00 10,080.00
Kepala Tukang L-2 OH 0.0060 188,000.00 1,128.00
Mandor L-1 OH 0.0030 205,000.00 615.00
Jumlah harga pekerjaan 49,958.45 19,743.00 69,701.45
Jumlah harga dibulatkan 69,701.00

7 1 M' List Langit - langit Kayu lat/profil PU.K.7


SNI 2839:2008
List kayu profil MC.10 M' 1.0500 16,749.18 17,586.63
Paku Campuran MD.16 KG 0.0100 19,506.30 195.06
Pekerja L-4 OH 0.0500 132,000.00 6,600.00
Tukang Kayu L-3 OH 0.0500 168,000.00 8,400.00
Kepala Tukang L-2 OH 0.0050 188,000.00 940.00
Mandor L-1 OH 0.0030 205,000.00 615.00
Jumlah harga pekerjaan 17,781.70 16,555.00 34,336.70
Jumlah harga dibulatkan 34,336.00
Analisa Harga Satuan Pekerjaan (AHSP) l. Kunci, Penggantung dan Kaca

L. PEKERJAAN KUNCI, PENGGANTUNG DAN KACA

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

1 1 Buah Kunci Pintu Tanam Antik PU.L.1


Pt T-30-2000-C
Kunci Tanam Antik MH.2 Buah 1.000 166,687.90 166,687.90
Tukang L-3 OH 0.600 168,000.00 100,800.00
Kepala tukang L-2 OH 0.060 188,000.00 11,280.00
Jumlah harga pekerjaan 166,687.90 112,080.00 278,767.90
Jumlah harga dibulatkan 278,767.00

2 1 Buah Kunci Pintu Tanam Biasa PU.L.2


Pt T-30-2000-C
Kunci Tanam Biasa MH.1 Buah 1.000 98,082.35 98,082.35
Tukang L-3 OH 0.500 168,000.00 84,000.00
Kepala tukang L-2 OH 0.050 188,000.00 9,400.00
Jumlah harga pekerjaan 98,082.35 93,400.00 191,482.35
Jumlah harga dibulatkan 191,482.00

3 1 Buah Kunci Slot Untuk Kamar Mandi atau WC PU.L.3


Pt T-30-2000-C
Kunci Slot MH.5 Buah 1.000 73,583.90 73,583.90
Tukang L-3 OH 0.250 168,000.00 42,000.00
Kepala tukang L-2 OH 0.025 188,000.00 4,700.00
Jumlah harga pekerjaan 73,583.90 46,700.00 120,283.90
Jumlah harga dibulatkan 120,283.00

4 1 Buah Engsel Pintu PU.L.4


Pt T-30-2000-C
Engsel Pintu MH.6 Buah 1.000 35,892.65 35,892.65
Tukang L-3 OH 0.125 168,000.00 21,000.00
Kepala tukang L-2 OH 0.013 188,000.00 2,444.00
Jumlah harga pekerjaan 35,892.65 23,444.00 59,336.65
Jumlah harga dibulatkan 59,336.00

5 1 Buah Engsel Pintu Klamp PU.L.5


Pt T-30-2000-C
Engsel Pintu Klamp MH.6 Buah 1.000 35,892.65 35,892.65
Pekerja L-4 OH 0.250 132,000.00 33,000.00
Tukang L-3 OH 0.250 168,000.00 42,000.00
Kepala tukang L-2 OH 0.025 188,000.00 4,700.00
Mandor L-1 OH 0.013 205,000.00 2,665.00
Jumlah harga pekerjaan 35,892.65 82,365.00 118,257.65
Jumlah harga dibulatkan 118,257.00

6 1 Buah Engsel Jendela PU.L.6


Pt T-30-2000-C
Engsel Jendela MH.7 Buah 1.000 27,200.95 27,200.95
Tukang L-3 OH 0.100 168,000.00 16,800.00
Kepala tukang L-2 OH 0.010 188,000.00 1,880.00
Jumlah harga pekerjaan 27,200.95 18,680.00 45,880.95
Jumlah harga dibulatkan 45,880.00

7 1 Buah Kait Angin PU.L.7


Pt T-30-2000-C
Kait Angin MH.11 Buah 1.000 13,597.60 13,597.60
Tukang L-3 OH 0.100 168,000.00 16,800.00
Kepala tukang L-2 OH 0.010 188,000.00 1,880.00
Jumlah harga pekerjaan 13,597.60 18,680.00 32,277.60
Jumlah harga dibulatkan 32,277.00

8 1 Buah Grendel PU.L.8


Pt T-30-2000-C
Grendel MH.13 Buah 1.000 86,147.65 86,147.65
Tukang L-3 OH 0.100 168,000.00 16,800.00
Kepala tukang L-2 OH 0.010 188,000.00 1,880.00
Jumlah harga pekerjaan 86,147.65 18,680.00 104,827.65
Jumlah harga dibulatkan 104,827.00

9 1 M2 Kaca polos tebal 3 mm PU.L.9


Pt T-30-2000-C
Kaca polos tebal 3 mm MG.1 M2 1.100 200,623.25 220,685.58
Kayu Lat MC.10 Batang 0.000 33,498.35 0.00
Paku Campur MD.16 KG 0.000 19,506.30 0.00
Pekerja L-4 OH 0.160 132,000.00 21,120.00
Tukang L-3 OH 0.160 168,000.00 26,880.00
Kepala tukang L-2 OH 0.016 188,000.00 3,008.00
Mandor L-1 OH 0.008 205,000.00 1,640.00
Jumlah harga pekerjaan 220,685.58 52,648.00 273,333.58
Jumlah harga dibulatkan 273,333.00

10 1 M2 Kaca mati polos tebal 5 mm PU.L.10


Pt T-30-2000-C
Kaca polos tebal 5 mm MG.2 M2 1.100 241,474.70 265,622.17
Kayu Lat MC.10 Batang 0.000 33,498.35 0.00
Paku Campur MD.16 KG 0.000 19,506.30 0.00
Pekerja kayu L-4 OH 0.160 132,000.00 21,120.00
Tukang kayu L-3 OH 0.160 168,000.00 26,880.00
Kepala tukang L-2 OH 0.016 188,000.00 3,008.00
Mandor kayu L-1 OH 0.008 205,000.00 1,640.00
Jumlah harga pekerjaan 265,622.17 52,648.00 318,270.17
Jumlah harga dibulatkan 318,270.00
Analisa Harga Satuan Pekerjaan (AHSP) l. Kunci, Penggantung dan Kaca

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

11 1 M2 Kaca raiben tebal 5 mm PU.L.11


Pt T-30-2000-C
Kaca raiben tebal 5 mm MG.10 M2 1.100 19,030.20 20,933.22
Kayu Lat MC.10 Batang 0.000 33,498.35 0.00
Paku Campur MD.16 KG 0.000 19,506.30 0.00
Pekerja kayu L-4 OH 0.160 132,000.00 21,120.00
Tukang kayu L-3 OH 0.160 168,000.00 26,880.00
Kepala tukang L-2 OH 0.016 188,000.00 3,008.00
Mandor kayu L-1 OH 0.008 205,000.00 1,640.00
Jumlah harga pekerjaan 20,933.22 52,648.00 73,581.22
Jumlah harga dibulatkan 73,581.00

12 1 M2 Kaca buram tebal 3 mm PU.L.12


Pt T-30-2000-C
Kaca buram tebal 3 mm MG.3 M2 1.100 134,498.25 147,948.08
Kayu Lat MC.10 Batang 0.000 33,498.35 0.00
Paku Campur MD.16 KG 0.000 19,506.30 0.00
Pekerja kayu L-4 OH 0.160 132,000.00 21,120.00
Tukang kayu L-3 OH 0.160 168,000.00 26,880.00
Kepala tukang L-2 OH 0.016 188,000.00 3,008.00
Mandor kayu L-1 OH 0.008 205,000.00 1,640.00
Jumlah harga pekerjaan 147,948.08 52,648.00 200,596.08
Jumlah harga dibulatkan 200,596.00

13 1 M2 Kaca buram tebal 5 mm PU.L.13


Pt T-30-2000-C
Kaca buram tebal 5 mm MG.5 M2 1.100 284,852.70 313,337.97
Kayu Lat MC.10 Batang 0.000 33,498.35 0.00
Paku Campur MD.16 KG 0.000 19,506.30 0.00
Pekerja kayu L-4 OH 0.160 132,000.00 21,120.00
Tukang kayu L-3 OH 0.160 168,000.00 26,880.00
Kepala tukang L-2 OH 0.016 188,000.00 3,008.00
Mandor kayu L-1 OH 0.008 205,000.00 1,640.00
Jumlah harga pekerjaan 313,337.97 52,648.00 365,985.97
Jumlah harga dibulatkan 365,985.00

14 1 Unit Jendela Ungkit (75 x 115 cm), bingkai 3x8 cm, kaca polos 5 mm PU.L.14
HPS.PU. 2017
Balok kayu Rahay (Bingkai 3 x 8 cm + les) MC.2 M3 0.030 4,729,266.90 141,878.01
Kaca polos tebal 5 mm MG.2 M2 0.620 241,474.70 149,714.31
Tarikan jendela aluminium MH.16 Buah 2.000 18,038.90 36,077.80
Kait angin 6" MH.11 Buah 2.000 13,597.60 27,195.20
Grendel jendela MH.14 Buah 2.000 12,087.65 24,175.30
Paku Campur MD.16 KG 0.065 19,506.30 1,267.91
Mandor kayu L-1 OH 0.150 205,000.00 30,750.00
Kepala tukang kayu L-2 OH 0.150 188,000.00 28,200.00
Tukang kayu L-3 OH 1.500 168,000.00 252,000.00
Pekerja kayu L-4 OH 0.300 132,000.00 39,600.00
Jumlah harga pekerjaan 380,308.53 350,550.00 730,858.53
Jumlah harga dibulatkan 730,858.00

15 1 Unit Untuk Jendela gantung hanya 1 bh kait angin dan 1 grendel PU.L.15 1 730,858.00 730,858.00
HPS.PU. 2017 Jumlah harga pekerjaan - 730,858.00 730,858.00
Jumlah harga dibulatkan 730,858.00

16 1 Unit Jendela Jalusi 75 x 120 cm PU.L.16


HPS.PU. 2017
Balok kayu Rahay (Bingkai 3 x 8 cm + les) MC.2 M3 0.060 4,729,266.90 283,756.01
Engsel jendela 3" MH.10 Buah 2.000 17,266.10 34,532.20
Kait angin MH.11 Buah 1.000 13,597.60 13,597.60
Grendel jendela MH.14 Buah 1.000 12,087.65 12,087.65
Paku Campur MD.16 KG 0.850 19,506.30 16,580.36
Mandor kayu L-1 OH 0.500 205,000.00 102,500.00
Kepala tukang kayu L-2 OH 1.000 188,000.00 188,000.00
Tukang kayu L-3 OH 2.000 168,000.00 336,000.00
Pekerja kayu L-4 OH 1.000 132,000.00 132,000.00
Jumlah harga pekerjaan 360,553.82 758,500.00 1,119,053.82
Jumlah harga dibulatkan 1,119,053.00

17 1 Unit Pintu Panel 80 x 210 cm PU.L.17


HPS.PU. 2017
Papan kayu Rahay MC.7 M3 0.075 5,059,891.90 379,491.89
Engsel 4" Kuningan (untuk pintu) MH.6 Buah 1.500 35,892.65 53,838.98
Kait angin MH.11 Buah 1.000 13,597.60 13,597.60
Kunci tanam (setara kuda terbang) MH.1 Buah 1.000 98,082.35 98,082.35
Grendel besar MH.14 Buah 1.000 12,087.65 12,087.65
Paku Campur MD.16 KG 0.220 19,506.30 4,291.39
Mandor kayu L-1 OH 0.1133 205,000.00 23,226.50
Kepala tukang kayu L-2 OH 0.6972 188,000.00 131,073.60
Tukang kayu L-3 OH 6.972 168,000.00 1,171,296.00
Pekerja kayu L-4 OH 2.2659 132,000.00 299,098.80
Jumlah harga pekerjaan 561,389.85 1,624,694.90 2,186,084.75
Jumlah harga dibulatkan 2,186,084.00
Analisa Harga Satuan Pekerjaan (AHSP) l. Kunci, Penggantung dan Kaca

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

18 1 Unit Pintu double tripleks 80 x 210 cm, bingkai kayu 3,5 x 9 cm PU.L.18
HPS.PU. 2017
Balok kayu Rahay (Bingkai 3 x 8 cm + les) MC.2 M3 0.064 4,729,266.90 302,673.08
Tripleks (1,22 x 2,44) cm - tebal 3 mm MC.11 Lembar 1.800 83,591.20 150,464.16
Engsel 4" Kuningan (untuk pintu) MH.6 Buah 1.500 35,892.65 53,838.98
Kait angin MH.11 Buah 1.000 13,597.60 13,597.60
Kunci tanam 2 slangh MH.2 Buah 1.000 166,687.90 166,687.90
Grendel besar MH.14 Buah 1.000 12,087.65 12,087.65
Paku Campur MD.16 KG 0.200 19,506.30 3,901.26
Mandor kayu L-1 OH 0.0425 205,000.00 8,712.50
Kepala tukang kayu L-2 OH 0.260 188,000.00 48,880.00
Tukang kayu L-3 OH 2.600 168,000.00 436,800.00
Pekerja kayu L-4 OH 0.850 132,000.00 112,200.00
Jumlah harga pekerjaan 703,250.63 606,592.50 1,309,843.13
Jumlah harga dibulatkan 1,309,843.00

19 1 Unit Pintu double tripleks 80x210 cm, bingkai kayu 3,5x9 cm lapis seng plat PU.L.19
HPS.PU. 2017
Pintu double tripleks 80 x 210 cm, bingkai kayu 3,5 x 9 cm PU.L.18 Buah 1.000 1,309,843.13 1,309,843.13
Seng Plat BJLS 0.30 ME.6 Lembar 1.200 53,772.85 64,527.42
Paku Campur MD.16 KG 0.100 19,506.30 1,950.63
Jumlah harga pekerjaan 1,376,321.18 - 1,376,321.18
Jumlah harga dibulatkan 1,376,321.00

20 1 Unit Pintu double tripleks 70 x 210 cm, bingkai kayu 3,5 x 9 cm PU.L.20
HPS.PU. 2017
Balok kayu Rahay (Bingkai 3 x 8 cm + les) MC.2 M3 0.057 4,729,266.90 269,568.21
Tripleks (1,22 x 2,44) cm - tebal 3 mm MC.11 Lembar 1.800 83,591.20 150,464.16
Engsel 4" Kuningan (untuk pintu) MH.6 Buah 1.500 35,892.65 53,838.98
Kait angin 8" MH.11 Buah 1.000 13,597.60 13,597.60
Kunci tanam 2 slangh MH.2 Buah 1.000 166,687.90 166,687.90
Grendel besar MH.14 Buah 1.000 12,087.65 12,087.65
Paku Campur MD.16 KG 0.2 19506.3 3901.26
Mandor kayu L-1 OH 0.0425 205000 8,712.50
Kepala tukang kayu L-2 OH 0.260 188,000.00 48,880.00
Tukang kayu L-3 OH 2.600 168,000.00 436,800.00
Pekerja kayu L-4 OH 0.850 132,000.00 112,200.00
Jumlah harga pekerjaan 670,145.76 606,592.50 1,276,738.26
Jumlah harga dibulatkan 1,276,738.00

21 1 Unit Pintu double tripleks 70x210 cm, bingkai kayu 3,5x9 cm lapis seng plat PU.L.21
HPS.PU. 2017
Pintu double tripleks 70 x 210 cm, bingkai kayu 3,5 x 9 cm PU.L.20 Buah 1.000 1,276,738.26 1,276,738.26
Seng Plat BJLS 0.30 ME.6 Lembar 1.200 53,772.85 64,527.42
Paku Campur MD.16 KG 0.100 19,506.30 1,950.63
Jumlah harga pekerjaan 1,343,216.31 - 1,343,216.31
Jumlah harga dibulatkan 1,343,216.00

22 1 Unit Pintu double tekwood 80 x 210 cm, bingkai kayu 3,5 x 9 cm PU.L.22
HPS.PU. 2017
Pintu tanpa triplek PU.L.18 Buah 1.000 1,309,843.13 1,309,843.13
Teakwood MC.20 Lembar 1.800 153,013.25 275,423.85
Jumlah harga pekerjaan 1,585,266.98 - 1,585,266.98
Jumlah harga dibulatkan 1,585,266.00
Analisa Harga Satuan Pekerjaan (AHSP) l. Kunci, Penggantung dan Kaca

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

23 1 Unit Pintu kisi kaca kayu rahay 80 x 210 cm PU.L.23


HPS.PU. 2017
Balok kayu Rahay MC.2 M3 0.070 4,729,266.90 331,048.68
Kaca 5 mm ( 30 x 40 + upah potong ) MG.2 Lembar 8.000 28,976.96 231,815.71
Engsel pintu 4" (1 buah = 0,5 Pasang) MH.6 Buah 3.000 35,892.65 107,677.95
Kait angin besar MH.11 Buah 1.000 13,597.60 13,597.60
Kunci tanam 2 slangh MH.2 Buah 1.000 166,687.90 166,687.90
Grendel besar MH.14 Buah 1.000 12,087.65 12,087.65
Paku Campur MD.16 KG 0.300 19,506.30 5,851.89
Mandor kayu L-1 OH 0.100 205,000.00 20,500.00
Kepala tukang kayu L-2 OH 0.600 188,000.00 112,800.00
Tukang kayu L-3 OH 6.000 168,000.00 1,008,000.00
Pekerja kayu L-4 OH 2.000 132,000.00 264,000.00
Jumlah harga pekerjaan 868,767.39 1,405,300.00 2,274,067.39
Jumlah harga dibulatkan 2,274,067.00

24 1 Unit Pintu klam 80 x 210 cm ( tempel ) PU.L.24


HPS.PU. 2017
Balok kayu Rahay (diketam) MC.2 M3 0.103 4,729,266.90 487,114.49
Engsel pintu 4" (1 buah = 0,5 Pasang) MH.6 Buah 3.000 35,892.65 107,677.95
Kait angin besar MH.11 Buah 1.000 13,597.60 13,597.60
Kunci tanam 3 slangh MH.2 Buah 1.000 166,687.90 166,687.90
Grendel besar MH.14 Buah 1.000 12,087.65 12,087.65
Paku campuran MD.16 KG 0.100 19,506.30 1,950.63
Mandor kayu L-1 OH 0.250 205,000.00 51,250.00
Kepala tukang kayu L-2 OH 1.000 188,000.00 188,000.00
Tukang kayu L-3 OH 2.000 168,000.00 336,000.00
Pekerja kayu L-4 OH 2.500 132,000.00 330,000.00
Jumlah harga pekerjaan 789,116.22 905,250.00 1,694,366.22
Jumlah harga dibulatkan 1,694,366.00
Analisa Harga Satuan Pekerjaan (AHSP) M. Sanitair dan Pipa

M. PEKERJAAN SANITASI DAN AIR

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

1 1 BH Closet duduk / monoblok PU.M.1


RSNI T-15-2002
Closet duduk / monoblok MK.22 Buah 1.0000 2,043,791.50 2,043,791.50
Perlengkapan 6%xMK.22 Set 1.0000 122,627.49 122,627.49
Pekerja pasir/batu L-4 OH 3.3000 132,000.00 435,600.00
Tukang pasir/batu L-3 OH 1.1000 168,000.00 184,800.00
Kepala tukang pasir/batu L-2 OH 0.0010 188,000.00 188.00
Mandor pasir/batu L-1 OH 0.1600 205,000.00 32,800.00
Jumlah harga pekerjaan 2,043,791.50 776,015.49 2,819,806.99
Jumlah harga dibulatkan 2,819,806.00

2 1 BH Closet jongkok porselin PU.M.2


RSNI T-15-2002
Closet jongkok porselin MK.23 Buah 1.0000 722,985.45 722,985.45
Semen Portland (PC) @ 50 Kg MB.11 KG 6.0000 2,778.84 16,673.02
Pasir semen (lokal) MB.2 M3 0.0100 1,058,872.85 10,588.73
Pekerja pasir/batu L-4 OH 1.0000 132,000.00 132,000.00
Tukang pasir/batu L-3 OH 1.5000 168,000.00 252,000.00
Kepala tukang pasir/batu L-2 OH 0.1500 188,000.00 28,200.00
Mandor pasir/batu L-1 OH 0.1600 205,000.00 32,800.00
Jumlah harga pekerjaan 750,247.20 445,000.00 1,195,247.20
Jumlah harga dibulatkan 1,195,247.00

3 1 BH Closet jongkok plastik PU.M.3


RSNI T-15-2002
Closet jongkok plastik MK.25 Buah 1.0000 114,726.30 114,726.30
Sambungan L bough MK.38 Buah 1.0000 10,433.95 10,433.95
Pipa PVC dia 4" ( AW ) MK.10 Meter 2.0000 87,296.50 174,593.00
Mandor pasir/batu L-1 OH 0.1500 205,000.00 30,750.00
Kepala tukang pasir/batu L-2 OH 0.0100 188,000.00 1,880.00
Tukang pasir/batu L-3 OH 1.0000 168,000.00 168,000.00
Pekerja pasir/batu L-4 OH 1.5000 132,000.00 198,000.00
Jumlah harga pekerjaan 299,753.25 398,630.00 698,383.25
Jumlah harga dibulatkan 698,383.00

4 1 BH Memasang Urinoir PU.M.4


RSNI T-15-2002
Memasang Urinoir MK.26 Buah 1.0000 2,307,788.95 2,307,788.95
Perlengkapan 30%xMK.26 Set 1.0000 692,336.69 692,336.69
Semen Portland (PC) @ 50 Kg MB.11 KG 6.0000 2,778.84 16,673.02
Pasir semen (lokal) MB.2 M3 0.0100 1,058,872.85 10,588.73
Pekerja pasir/batu L-4 OH 1.0000 132,000.00 132,000.00
Tukang pasir/batu L-3 OH 1.0000 168,000.00 168,000.00
Kepala tukang pasir/batu L-2 OH 1.1000 188,000.00 206,800.00
Mandor pasir/batu L-1 OH 0.1000 205,000.00 20,500.00
Jumlah harga pekerjaan 2,335,050.70 1,219,636.69 3,554,687.39
Jumlah harga dibulatkan 3,554,687.00

5 1 BH Memasang Wastafel PU.M.5


RSNI T-15-2002
Memasang Wastafel MK.27 Buah 1.0000 642,100.20 642,100.20
Perlengkapan 12%xMK.27 Set 1.0000 77,052.02 77,052.02
Semen Portland (PC) @ 50 Kg MB.11 KG 6.0000 2,778.84 16,673.02
Pasir semen (lokal) MB.2 M3 0.0100 1,058,872.85 10,588.73
Pekerja pasir/batu L-4 OH 1.2000 132,000.00 158,400.00
Tukang pasir/batu L-3 OH 1.4500 168,000.00 243,600.00
Kepala tukang pasir/batu L-2 OH 0.1500 188,000.00 28,200.00
Mandor pasir/batu L-1 OH 0.1000 205,000.00 20,500.00
Jumlah harga pekerjaan 669,361.95 527,752.02 1,197,113.97
Jumlah harga dibulatkan 1,197,113.00

6 1 Buah Bak Mandi Fiberglass 0,3 M3 PU.M.6


RSNI T-15-2002
Bak Mandi Fiberglass 0,3 M3 MK.30 Buah 1.0000 369,771.00 369,771.00
Perlengkapan 18%xMK.30 Set 1.0000 66,558.78 66,558.78
Pekerja pasir/batu L-4 OH 1.8000 132,000.00 237,600.00
Tukang pasir/batu L-3 OH 2.7000 168,000.00 453,600.00
Kepala tukang pasir/batu L-2 OH 0.5400 188,000.00 101,520.00
Mandor pasir/batu L-1 OH 0.1100 205,000.00 22,550.00
Jumlah harga pekerjaan 369,771.00 881,828.78 1,251,599.78
Jumlah harga dibulatkan 1,251,599.00

7 1 Buah Bak Air Fiberglass 1 M3 PU.M.7


RSNI T-15-2002
Bak Air Fiberglass 1 M3 MK.28 Buah 1.0000 658,802.80 658,802.80
Perlengkapan 12%xMK.28 Set 1.0000 79,056.34 79,056.34
Pekerja pasir/batu L-4 OH 3.0000 132,000.00 396,000.00
Tukang pasir/batu L-3 OH 4.5000 168,000.00 756,000.00
Kepala tukang pasir/batu L-2 OH 0.9000 188,000.00 169,200.00
Mandor pasir/batu L-1 OH 0.9000 205,000.00 184,500.00
Jumlah harga pekerjaan 658,802.80 1,584,756.34 2,243,559.14
Jumlah harga dibulatkan 2,243,559.00
Analisa Harga Satuan Pekerjaan (AHSP) M. Sanitair dan Pipa

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

8 1 BH Bak Mandi Batu Bata Volume 0,3 M3 PU.M.8


RSNI T-15-2002
Batu Bata MB.8 Buah 400.0000 1,851.50 740,600.00
Semen Portland (PC) @ 50 Kg MB.11 KG 120.0000 2,778.84 333,460.44
Pasir semen (lokal) MB.2 M3 0.3000 1,058,872.85 317,661.86
Porselin (11x11) Cm MF.28 Buah 360.0000 1,005.10 361,836.00
Semen Nat MB.12 KG 6.0000 8,848.16 53,088.95
Pekerja pasir/batu L-4 OH 6.0000 132,000.00 792,000.00
Tukang pasir/batu L-3 OH 3.0000 168,000.00 504,000.00
Kepala tukang pasir/batu L-2 OH 0.3000 188,000.00 56,400.00
Mandor pasir/batu L-1 OH 0.3000 205,000.00 61,500.00
Jumlah harga pekerjaan 1,806,647.24 1,413,900.00 3,220,547.24
Jumlah harga dibulatkan 3,220,547.00

9 1 M Pipa penyalur air limbah jenis pipa tanah Dia. 15 cm PU.M.9


RSNI T-15-2002
Pipa PVC Dia. 5" - 4 Meter (AW) MK.9 Buah 1.6000 1,173,652.05 1,877,843.28
Semen Portland (PC) @ 50 Kg MB.11 KG 0.8700 2,778.84 2,417.59
Pasir semen (lokal) MB.2 M3 0.0140 1,058,872.85 14,824.22
Pasir urug MB.2 M3 0.0140 1,058,872.85 370,471.35
Mandor pasir/batu L-1 OH 0.0070 205,000.00 1,435.00
Kepala tukang pasir/batu L-2 OH 0.0040 188,000.00 752.00
Tukang pasir/batu L-3 OH 0.0400 168,000.00 6,720.00
Pekerja pasir/batu L-4 OH 0.0800 132,000.00 10,560.00
Jumlah harga pekerjaan 2,265,556.44 19,467.00 2,285,023.44
Jumlah harga dibulatkan 2,285,023.00

10 1 BH Bak Kontrol Pasangan Bata Ukuran (30 x 30) x 50 cm PU.M.10


RSNI T-15-2002
Batu Bata (0,145 M3) MB.8 Buah 145.0000 1,851.50 268,467.50
Semen Portland (PC) @ 50 Kg MB.11 KG 44.0000 2,778.84 122,268.83
Pasir semen (lokal) MB.2 M3 0.0700 1,058,872.85 74,121.10
Kerikil/batu pecah (import) MB.6 M3 0.0700 1,567,479.90 109,723.59
Besi tulangan beton dia. 10 mm MD.3 KG 1.6000 15,071.90 24,115.04
Pasir semen (import) MB.1 M3 0.0600 1,541,578.45 92,494.71
Pekerja pasir/batu L-4 OH 3.2000 132,000.00 422,400.00
Tukang pasir/batu L-3 OH 1.0150 168,000.00 170,520.00
Kepala tukang pasir/batu L-2 OH 0.0015 188,000.00 282.00
Mandor pasir/batu L-1 OH 0.0160 205,000.00 3,280.00
Jumlah harga pekerjaan 691,190.77 596,482.00 1,287,672.77
Jumlah harga dibulatkan 1,287,672.00

11 1 BH Bak Kontrol Pasangan Bata Ukuran (45 x 45) x 50 cm PU.M.11


RSNI T-15-2002
Batu Bata (0,25 M3) MB.8 M3 250.0000 1,851.50 462,875.00
Semen Portland (PC) @ 50 Kg MB.11 KG 77.0000 2,778.84 213,970.45
Pasir semen (lokal) MB.2 M3 0.1300 1,058,872.85 137,653.47
Kerikil/batu pecah (import) MB.6 M3 0.0200 1,567,479.90 31,349.60
Besi tulangan beton dia. 10 mm MD.3 KG 2.6000 15,071.90 39,186.94
Pasir semen (import) MB.1 M3 0.0900 1,541,578.45 138,742.06
Pekerja pasir/batu L-4 OH 1.4200 132,000.00 187,440.00 187,440.00
Tukang pasir/batu L-3 OH 0.4730 168,000.00 79,464.00 79,464.00
Kepala tukang pasir/batu L-2 OH 0.0470 188,000.00 8,836.00 8,836.00
Mandor pasir/batu L-1 OH 0.0710 205,000.00 14,555.00 14,555.00
Jumlah harga pekerjaan 1,314,072.52 290,295.00 1,604,367.52
Jumlah harga dibulatkan 1,604,367.00

12 1 BH Bak Kontrol Pasangan Bata Ukuran (60 x 60) x 65 cm PU.M.12


RSNI T-15-2002
Batu Bata (0,371 M3) MB.8 Buah 371.0000 1,851.50 686,906.50
Semen Portland (PC) @ 50 Kg MB.11 KG 114.0000 2,778.84 316,787.42
Pasir semen (lokal) MB.2 M3 0.1840 1,058,872.85 194,832.60
Kerikil/batu pecah (import) MB.6 M3 0.0330 1,567,479.90 51,726.84
Besi tulangan beton dia. 10 mm MD.3 KG 4.8500 15,071.90 73,098.72
Pasir semen (import) MB.1 M3 0.1200 1,541,578.45 184,989.41
Pekerja pasir/batu L-4 OH 2.1600 132,000.00 285,120.00
Tukang gali L-3 OH 0.1000 168,000.00 16,800.00
Tukang pasir/batu L-3 OH 0.7200 168,000.00 120,960.00
Kepala tukang pasir/batu L-2 OH 0.0720 188,000.00 13,536.00
Mandor pasir/batu L-1 OH 0.1080 205,000.00 22,140.00 22,140.00
Jumlah harga pekerjaan 1,530,481.49 458,556.00 1,989,037.49
Jumlah harga dibulatkan 1,989,037.00

13 1 M Memasang Pipa Galvanis Dia. 1/2" PU.M.13


RSNI T-15-2002
Pipa Galvanis Dia. 1/2" MK.1 M 1.2000 18,582.00 22,298.40
Perlengkapan 35%xMK.1 Set 1.0000 6,503.70 6,503.70
Pekerja L-4 OH 0.0540 132,000.00 7,128.00
Tukang pipa L-3 OH 0.0900 168,000.00 15,120.00
Kepala tukang L-2 OH 0.0090 188,000.00 1,692.00
Mandor L-1 OH 0.0270 205,000.00 5,535.00
Jumlah harga pekerjaan 22,298.40 35,978.70 58,277.10
Jumlah harga dibulatkan 58,277.00

14 1 M Memasang Pipa Galvanis Dia. 3/4" PU.M.14


RSNI T-15-2002
Pipa Galvanis Dia. 3/4" MK.2 M 1.2000 24,542.83 29,451.40
Perlengkapan 35%xMK.2 Set 1.0000 8,589.99 8,589.99
Pekerja L-4 OH 0.0540 132,000.00 7,128.00
Tukang pipa L-3 OH 0.0900 168,000.00 15,120.00
Kepala tukang L-2 OH 0.0090 188,000.00 1,692.00
Mandor L-1 OH 0.0270 205,000.00 5,535.00
Jumlah harga pekerjaan 29,451.40 38,064.99 67,516.39
Jumlah harga dibulatkan 67,516.00
Analisa Harga Satuan Pekerjaan (AHSP) M. Sanitair dan Pipa

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

15 1 M Memasang Pipa Galvanis Dia. 1" PU.M.15


RSNI T-15-2002
Pipa Galvanis Dia. 1" MK.3 M 1.2000 30,354.17 36,425.00
Perlengkapan 35%xMK.3 Set 1.0000 10,623.96 10,623.96
Pekerja L-4 OH 0.0540 132,000.00 7,128.00
Tukang pipa L-3 OH 0.0900 168,000.00 15,120.00
Kepala tukang L-2 OH 0.0090 188,000.00 1,692.00
Mandor L-1 OH 0.0027 205,000.00 553.50
Jumlah harga pekerjaan 36,425.00 35,117.46 71,542.46
Jumlah harga dibulatkan 71,542.00

16 1 M Memasang Pipa Galvanis Dia. 1,5" PU.M.16


RSNI T-15-2002
Pipa Galvanis Dia. 1,5" MK.5 M 1.2000 47,414.50 56,897.40
Perlengkapan 35%xMK.5 Set 1.0000 16,595.08 16,595.08
Pekerja L-4 OH 0.1080 132,000.00 14,256.00
Tukang pipa L-3 OH 0.1800 168,000.00 30,240.00
Kepala tukang L-2 OH 0.0180 188,000.00 3,384.00
Mandor L-1 OH 0.0054 205,000.00 1,107.00
Jumlah harga pekerjaan 56,897.40 65,582.08 122,479.48
Jumlah harga dibulatkan 122,479.00

17 1 M Memasang Pipa Galvanis Dia. 3" PU.M.17


RSNI T-15-2002
Pipa Galvanis Dia. 3" MK.7 M 1.2000 93,711.50 112,453.80
Perlengkapan 35%xMK.7 Set 1.0000 32,799.03 32,799.03
Pekerja L-4 OH 0.1080 132,000.00 14,256.00
Tukang pipa L-3 OH 0.1800 168,000.00 30,240.00
Kepala tukang L-2 OH 0.0180 188,000.00 3,384.00
Mandor L-1 OH 0.0054 205,000.00 1,107.00
Jumlah harga pekerjaan 112,453.80 81,786.03 194,239.83
Jumlah harga dibulatkan 194,239.00

18 1 M Memasang Pipa Galvanis Dia. 4" PU.M.18


RSNI T-15-2002
Pipa Galvanis Dia. 4" MK.8 M 1.2000 123,914.33 148,697.20
Perlengkapan 35%xMK.8 Set 1.0000 43,370.02 43,370.02
Pekerja L-4 OH 0.1350 132,000.00 17,820.00
Tukang pipa L-3 OH 0.2250 168,000.00 37,800.00
Kepala tukang L-2 OH 0.0225 188,000.00 4,230.00
Mandor L-1 OH 0.0068 205,000.00 1,394.00
Jumlah harga pekerjaan 148,697.20 104,614.02 253,311.22
Jumlah harga dibulatkan 253,311.00

19 1 M Memasang Pipa PVC Tipe AW Dia. 1/2" PU.M.19


RSNI T-15-2002
Pipa PVC Tipe AW Dia. 1/2" MK.15 M 1.2000 7,194.75 8,633.70
Perlengkapan 35%xMK.15 Set 1.0000 2,518.16 2,518.16
Pekerja L-4 OH 0.0360 132,000.00 4,752.00
Tukang pipa L-3 OH 0.0600 168,000.00 10,080.00
Kepala tukang L-2 OH 0.0060 188,000.00 1,128.00
Mandor L-1 OH 0.0018 205,000.00 369.00
Jumlah harga pekerjaan 8,633.70 18,847.16 27,480.86
Jumlah harga dibulatkan 27,480.00

20 1 M Memasang Pipa PVC Tipe AW Dia. 3/4" PU.M.20


RSNI T-15-2002
Pipa PVC Tipe AW Dia. 3/4" MK.16 M 1.2000 8,916.00 10,699.20
Perlengkapan 35%xMK.16 Set 1.0000 3,120.60 3,120.60
Pekerja L-4 OH 0.0360 132,000.00 4,752.00
Tukang pipa L-3 OH 0.0600 168,000.00 10,080.00
Kepala tukang L-2 OH 0.0060 188,000.00 1,128.00
Mandor L-1 OH 0.0018 205,000.00 369.00
Jumlah harga pekerjaan 10,699.20 19,449.60 30,148.80
Jumlah harga dibulatkan 30,148.00

21 1 M Memasang Pipa PVC Tipe AW Dia. 1" PU.M.21


RSNI T-15-2002
Pipa PVC Tipe AW Dia. 1" MK.14 M 1.2000 11,664.50 13,997.40
Perlengkapan 35%xMK.14 Set 1.0000 4,082.58 4,082.58
Pekerja L-4 OH 0.0360 132,000.00 4,752.00
Tukang pipa L-3 OH 0.0600 168,000.00 10,080.00
Kepala tukang L-2 OH 0.0060 188,000.00 1,128.00
Mandor L-1 OH 0.0018 205,000.00 369.00
Jumlah harga pekerjaan 13,997.40 20,411.58 34,408.98
Jumlah harga dibulatkan 34,408.00

22 1 M Memasang Pipa PVC Tipe AW Dia. 1,5" PU.M.22


RSNI T-15-2002
Pipa PVC Tipe AW Dia. 1,5" MK.13 M 1.2000 17,699.25 21,239.10
Perlengkapan 35%xMK.13 Set 1.0000 6,194.74 6,194.74
Pekerja L-4 OH 0.0360 132,000.00 4,752.00
Tukang pipa L-3 OH 0.0600 168,000.00 10,080.00
Kepala tukang L-2 OH 0.0060 188,000.00 1,128.00
Mandor L-1 OH 0.0018 205,000.00 369.00
Jumlah harga pekerjaan 21,239.10 22,523.74 43,762.84
Jumlah harga dibulatkan 43,762.00
Analisa Harga Satuan Pekerjaan (AHSP) M. Sanitair dan Pipa

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

23 1 M Memasang Pipa PVC Tipe AW Dia. 2" PU.M.23


RSNI T-15-2002
Pipa PVC Tipe AW Dia. 2" MK.13 M 1.2000 17,699.25 21,239.10
Perlengkapan 35%xMK.13 Set 1.0000 6,194.74 6,194.74
Pekerja L-4 OH 0.0540 132,000.00 7,128.00
Tukang pipa L-3 OH 0.0900 168,000.00 15,120.00
Kepala tukang L-2 OH 0.0090 188,000.00 1,692.00
Mandor L-1 OH 0.0027 205,000.00 553.50
Jumlah harga pekerjaan 21,239.10 30,688.24 51,927.34
Jumlah harga dibulatkan 51,927.00

24 1 M Memasang Pipa PVC Tipe AW Dia. 3" PU.M.24


RSNI T-15-2002
Pipa PVC Tipe AW Dia. 3" MK.12 M 1.2000 36,843.75 44,212.50
Perlengkapan 35%xMK.12 Set 1.0000 12,895.31 12,895.31
Pekerja L-4 OH 0.0810 132,000.00 10,692.00
Tukang pipa L-3 OH 0.1350 168,000.00 22,680.00
Kepala tukang L-2 OH 0.1350 188,000.00 25,380.00
Mandor L-1 OH 0.0041 205,000.00 840.50
Jumlah harga pekerjaan 44,212.50 72,487.81 116,700.31
Jumlah harga dibulatkan 116,700.00

25 1 M Memasang Pipa PVC Tipe AW Dia. 4" PU.M.25


RSNI T-15-2002
Pipa PVC Tipe AW Dia. 4" MK.11 M 1.2000 51,454.50 61,745.40
Perlengkapan 35%xMK.11 Set 1.0000 18,009.08 18,009.08
Pekerja L-4 OH 0.0810 132,000.00 10,692.00
Tukang pipa L-3 OH 0.1350 168,000.00 22,680.00
Kepala tukang L-2 OH 0.1350 188,000.00 25,380.00
Mandor L-1 OH 0.0041 205,000.00 840.50
Jumlah harga pekerjaan 61,745.40 77,601.58 139,346.98
Jumlah harga dibulatkan 139,346.00

26 1 BH Kran air Dia. 3/4" atau 1/2" PU.M.26


RSNI T-15-2002
Kran air Dia. 3/4" atau 1/2" MK.32 Buah 1.2000 28,712.05 34,454.46
Seal Tape Buah 0.0250 5,000.00 125.00
Pekerja L-4 OH - 132,000.00 0.00
Tukang pipa L-3 OH 0.1000 168,000.00 16,800.00
Kepala tukang L-2 OH 0.0100 188,000.00 1,880.00
Mandor L-1 OH - 205,000.00 0.00
Jumlah harga pekerjaan 34,454.46 18,805.00 53,259.46
Jumlah harga dibulatkan 53,259.00

27 1 Unit Bak air volume 1 m3 - (Pasir Import) PU.M.27


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 Zak 5.5000 138,941.85 764,180.18
Pasir semen (import) MB.1 M3 1.0000 1,541,578.45 1,541,578.45
Batu bata MB.8 Buah 600.0000 1,851.50 1,110,900.00
Mandor pasir/batu L-1 OH 0.1000 205,000.00 20,500.00
Kepala tukang pasir/batu L-2 OH 0.3000 188,000.00 56,400.00
Tukang pasir/batu L-3 OH 3.0000 168,000.00 504,000.00
Pekerja pasir/batu L-4 OH 2.0000 132,000.00 264,000.00
Jumlah harga pekerjaan 3,416,658.63 844,900.00 4,261,558.63
Jumlah harga dibulatkan 4,261,558.00

28 1 Unit Bak air volume 1 m3 - (Pasir Lokal) PU.M.28


HPS.PU. 2017
Semen Portland (PC) @ 50 Kg MB.11 Zak 5.5000 138,941.85 764,180.18
Pasir semen (lokal) MB.2 M3 1.0000 1,058,872.85 1,058,872.85
Batu bata MB.8 Buah 600.0000 1,851.50 1,110,900.00
Mandor pasir/batu L-1 OH 0.1000 205,000.00 20,500.00
Kepala tukang pasir/batu L-2 OH 0.3000 188,000.00 56,400.00
Tukang pasir/batu L-3 OH 3.0000 168,000.00 504,000.00
Pekerja pasir/batu L-4 OH 2.0000 132,000.00 264,000.00
Jumlah harga pekerjaan 2,933,953.03 844,900.00 3,778,853.03
Jumlah harga dibulatkan 3,778,853.00

29 1 M Talang air pvc 8" PU.M.29


HPS.PU. 2017
Talang Plastik PVC 8" -Oval (1 Btg = 4 Meter) MK.19 M 1.1000 136,158.85 149,774.74
Gantungan talang besi strip Buah 2.0000 20,000.00 40,000.00
Paku Campur MD.16 KG 0.0500 19,506.30 975.32
Mandor kayu L-1 OH 0.0100 205,000.00 2,050.00
Kepala tukang kayu L-2 OH 0.0300 188,000.00 5,640.00
Tukang kayu L-3 OH 0.3000 168,000.00 50,400.00
Pekerja kayu L-4 OH 0.2000 132,000.00 26,400.00
Jumlah harga pekerjaan 190,750.05 84,490.00 275,240.05
Jumlah harga dibulatkan 275,240.00

30 1 M Talang jurai/talang got PU.M.30


HPS.PU. 2017
Papan kayu Rahay MC.6 M3 0.0100 4,839,477.15 48,394.77
Seng Plat BJLS 0.30 ME.6 Lembar 0.5000 3,889.83 1,944.92
Paku Campur MD.16 KG 0.0500 19,506.30 975.32
Kepala tukang kayu L-2 OH 0.0200 188,000.00 3,760.00
Tukang kayu L-3 OH 0.2000 168,000.00 33,600.00
Pekerja kayu L-4 OH 0.1250 132,000.00 16,500.00
Jumlah harga pekerjaan 51,315.00 53,860.00 105,175.00
Jumlah harga dibulatkan 105,175.00
Analisa Harga Satuan Pekerjaan (AHSP) M. Sanitair dan Pipa

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

31 1 Unit Septictank (2x1x1,8cm), Pas. Bata 1PC:4PS, Pasir Impo PU.M.31


HPS.PU. 2017
Galian Tanah Biasa Sedalam 1 - 2 M #REF! M3 3.0000 128,025.00 384,075.00
Semen Portland (PC) @ 50 Kg MB.11 Zak 5.5000 138,941.85 764,180.18
Pasir semen (import) MB.1 M3 2.5000 1,541,578.45 3,853,946.13
Batu bata MB.8 Buah 1,216.0000 1,851.50 2,251,424.00
Besi beton dia 10 mm MD.3 KG 112.4000 15,071.90 1,694,081.56
Kawat ikat beton MD.9 KG 0.5000 25,028.60 12,514.30
Papan begisting kayu bus MC.5 M2 2.0000 89,977.35 179,954.70
Besi Pipa Dia 2" PVC MK.13 M 2.0000 17,699.25 35,398.50
Paku Campur MD.16 KG 0.1000 19,506.30 1,950.63
Mandor pasir/batu L-1 OH 0.2500 205,000.00 51,250.00
Kepala tukang pasir/batu L-2 OH 0.5000 188,000.00 94,000.00
Tukang pasir/batu L-3 OH 5.0000 168,000.00 840,000.00
Pekerja pasir/batu L-4 OH 2.5000 132,000.00 330,000.00
Jumlah harga pekerjaan 9,177,524.99 1,315,250.00 10,492,774.99
Jumlah harga dibulatkan 10,492,774.00

32 1 Unit Septictank (2x1x1,8m), Pas. Bata 1PC:4PS, Pasir Lokal PU.M.32


HPS.PU. 2017
Galian Tanah Biasa Sedalam 1 - 2 M #REF! M3 3.0000 128,025.00 384,075.00
Semen Portland (PC) @ 50 Kg MB.11 Zak 5.5000 138,941.85 764,180.18
Pasir semen (lokal) MB.2 M3 2.5000 1,058,872.85 2,647,182.13
Batu bata MB.8 Buah 1,216.0000 1,851.50 2,251,424.00
Besi beton dia 10 mm MD.3 KG 112.4000 15,071.90 1,694,081.56
Kawat ikat beton MD.9 KG 0.5000 25,028.60 12,514.30
Papan begisting kayu bus MC.5 M2 2.0000 89,977.35 179,954.70
Besi Pipa Dia 2" PVC MK.13 M 2.0000 17,699.25 35,398.50
Paku Campur MD.16 KG 0.1000 19,506.30 1,950.63
Mandor pasir/batu L-1 OH 0.2500 205,000.00 51,250.00
Kepala tukang pasir/batu L-2 OH 0.5000 188,000.00 94,000.00
Tukang pasir/batu L-3 OH 5.0000 168,000.00 840,000.00
Pekerja pasir/batu L-4 OH 2.5000 132,000.00 330,000.00
Jumlah harga pekerjaan 7,970,760.99 1,315,250.00 9,286,010.99
Jumlah harga dibulatkan 9,286,010.00

33 1 Unit Septictank 2x(75 x 75) cm, Dalam 1,5 m dan peresapan PU.M.33
HPS.PU. 2017
Galian Tanah Biasa Sedalam 1 - 2 M #REF! M3 1.6880 128,025.00 216,106.20
Batu bata MB.8 Buah 366.3000 1,851.50 678,204.45
Semen Portland (PC) @ 50 Kg MB.11 Zak 2.4070 138,941.85 334,433.03
Pasir semen (import) MB.1 M3 0.4570 1,541,578.45 704,501.35
Besi beton dia 10 mm MD.3 KG 5.0820 15,071.90 76,595.40
Kawat ikat beton MD.9 KG 0.1240 25,028.60 3,103.55
Papan begisting kayu bus MC.5 M2 0.2500 89,977.35 22,494.34
Patok kayu bus MC.4 M3 0.0250 3,005,904.50 75,147.61
Besi Pipa Dia 2" PVC MK.13 M 2.0000 17,699.25 35,398.50
Paku Campur MD.16 KG 0.1000 19,506.30 1,950.63
Pipa peresapan PVC dia 4" MK.10 M 2.0000 87,296.50 174,593.00
Mandor pasir/batu L-1 OH 0.2500 205,000.00 51,250.00
Kepala tukang pasir/batu L-2 OH 0.3400 188,000.00 63,920.00
Tukang pasir/batu L-3 OH 3.4000 168,000.00 571,200.00
Pekerja pasir/batu L-4 OH 2.4000 132,000.00 316,800.00
Jumlah harga pekerjaan 2,322,528.06 1,003,170.00 3,325,698.06
Jumlah harga dibulatkan 3,325,698.00

34 1 Unit Bak Peresapan Uk.1 x 1 m, jarak 2 m dari septictank PU.M.34


HPS.PU. 2017
Galian Tanah Biasa Sedalam 1 M #REF! M3 1.5000 128,025.00 192,037.50
Pipa PVC dia 2" diberi lobang MK.13 M 2.0000 17,699.25 35,398.50
Batu bata MB.8 Buah 500.0000 1,851.50 925,750.00
Pasir timbun (lokal) MB.4 M3 0.5000 370,471.35 185,235.68
Urugan tanah kembali #REF! M3 1.0000 34,708.00 34,708.00
Jumlah harga pekerjaan 1,373,129.68 - 1,373,129.68
Jumlah harga dibulatkan 1,373,129.00

35 1 Unit Bak air Uk. 60 x 60 x 80 PU.M.35


HPS.PU. 2017
Pasangan Batu Bata 1PC : 2 PS PU.C.1 M3 0.1440 3,328,344.00 479,281.54
Plesteran 1PC : 3PS, tebal 15 mm (import) #REF! M2 3.8700 127,759.00 494,427.33
Jumlah harga pekerjaan 973,708.87 - 973,708.87
Jumlah harga dibulatkan 973,708.00
Analisa Harga Satuan Pekerjaan (AHSP) M. Sanitair dan Pipa

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

36 1 Unit Pompa dragon/pompa tangan PU.M.36


HPS.PU. 2017
Pompa Dragon Buah 1.0000 650,000.00 650,000.00
Shock ulir Buah 1.0000 25,000.00 25,000.00
L Bough 2" MK.38 Buah 2.0000 10,433.95 20,867.90
Pipa PVC dia 1" ( D ) MK.14 Batang 2.0000 52,297.40 104,594.80
Lem PVC Buah 0.1000 5,000.00 500.00
Campuran 1PC : 3PS - import ( 0,4 x 0,4 x 0,4 ) Upah kerj #REF! M3 0.0640 4,461,548.00 285,539.07
Alat bantu LS 1.0000 25,000.00 25,000.00
Jumlah harga pekerjaan 1,086,501.77 25,000.00 1,111,501.77
Jumlah harga dibulatkan 1,111,501.00

37 1 M Memasang Pipa HDPE Ø 50 mm - 63 mm PU.M.37


PAHSP PU 2013
Pekerja L-4 OH 0.0350 132,000.00 4,620.00
Tukang Pipa L-3 OH 0.0170 168,000.00 2,856.00
Mandor L-1 OH 0.0030 205,000.00 615.00
Perlengkapan Pemasangan (Sewa Tripot/teckel dll) Hari 0.0190 750,000.00 14,250.00
Jumlah harga pekerjaan - 22,341.00 22,341.00
Jumlah harga dibulatkan 22,341.00

38 1 M Memasang Pipa HDPE Ø 75 mm PU.M.38


PAHSP PU 2013
Pekerja L-4 OH 0.0375 132,000.00 4,950.00
Tukang Pipa L-3 OH 0.0185 168,000.00 3,108.00
Mandor L-1 OH 0.0035 205,000.00 717.50
Perlengkapan Pemasangan (Sewa Tripot/teckel dll) Hari 0.0190 750,000.00 14,250.00
Jumlah harga pekerjaan - 23,025.50 23,025.50
Jumlah harga dibulatkan 23,025.00

39 1 M Memasang Pipa HDPE Ø 100 mm PU.M.39


PAHSP PU 2013
Pekerja L-4 OH 0.0400 132,000.00 5,280.00
Tukang Pipa L-3 OH 0.0200 168,000.00 3,360.00
Mandor L-1 OH 0.0040 205,000.00 820.00
Perlengkapan Pemasangan (Sewa Tripot/teckel dll) Hari 0.0190 750,000.00 14,250.00
Jumlah harga pekerjaan - 23,710.00 23,710.00
Jumlah harga dibulatkan 23,710.00

40 1 M Pengetesan Pipa PU.M.40


HPS.PU. 2017
Air Test (Air Bersih) Liter 18.0000 50.00 900.00
Mandor L-1 OH 0.0010 205,000.00 205.00
Kepala Tukang L-2 OH 0.0100 188,000.00 1,880.00
Tukang Pipa L-3 OH 0.0010 168,000.00 168.00
Pekerja L-4 OH 0.0170 132,000.00 2,244.00
Air Compressor E - 12 Jam 0.0100 198,056.00 1,980.56
Alat Bantu Set 1.0000 4,951.40 4,951.40
Jumlah harga pekerjaan 900.00 11,428.96 12,328.96
Jumlah harga dibulatkan 12,328.00

41 1 M Memasang PVC Water Stop Lebar 230 - 320 mm PU.M.41


HPS.PU. 2017
Water Stop Lebar 230 - 320 mm - M 1.0500 125,000.00 131,250.00
Mandor L-1 OH 0.0040 205,000.00 820.00
Kepala tukang L-2 OH 0.0040 188,000.00 752.00
Tukang pipa L-3 OH 0.0417 168,000.00 7,000.00
Pekerja L-4 OH 0.0833 132,000.00 11,000.00
Perlengkapan Set 1.0000 4,200.00 4,200.00
Jumlah harga pekerjaan 131,250.00 23,772.00 155,022.00
Jumlah harga dibulatkan 155,022.00
Analisa Harga Satuan Pekerjaan (AHSP) N. Pekerjaan Cat

N. PEKERJAAN CAT DAN RESIDU


PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE
PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

1 1 M2 Mengikis atau mengerok cat tembok lama (manual) PU.N.1


Pt.T-38-2000-C
Kapek Buah 0.050 5,000.00 250.00
Mandor L-1 OH 0.008 205,000.00 1,640.00
Pekerja L-4 OH 0.150 132,000.00 19,800.00
Jumlah harga pekerjaan 250.00 21,440.00 21,690.00
Jumlah harga dibulatkan 21,690.00

2 1 M2 Lapis Plamir PU.N.2


Pt.T-38-2000-C
Plamur MI.11 KG 0.100 11,126.00 1,112.60
Kertas amplas (kayu) MI.1 Lembar 0.500 5,722.40 2,861.20
Kapek Buah 0.050 5,000.00 250.00
Mandor cat L-1 OH 0.001 205,000.00 205.00
Kepala tukang cat L-2 OH 0.003 188,000.00 564.00
Tukang cat L-3 OH 0.030 168,000.00 5,040.00
Pekerja cat L-4 OH 0.020 132,000.00 2,640.00
Jumlah harga pekerjaan 4,223.80 8,449.00 12,672.80
Jumlah harga dibulatkan 12,672.00

3 1 M2 Cat bidang tembok lama (2 lapis dengan kuas) PU.N.3


Pt.T-38-2000-C
Cat tembok MI.12 KG 0.240 12,766.00 3,063.84
Kuas Buah 0.015 10,000.00 150.00
Mandor cat L-1 OH 0.0025 205,000.00 512.50
Kepala tukang cat L-2 OH 0.004 188,000.00 789.60
Tukang cat L-3 OH 0.042 168,000.00 7,056.00
Pekerja cat L-4 OH 0.028 132,000.00 3,696.00
Jumlah harga pekerjaan 3,213.84 12,054.10 15,267.94
Jumlah harga dibulatkan 15,267.00

4 1 M2 Cat bidang tembok lama (2 lapis dengan roll) PU.N.4


Pt.T-38-2000-C
Cat tembok MI.12 KG 0.470 12,766.00 6,000.02
Roll Buah 0.010 35,000.00 350.00
Mandor cat L-1 OH 0.002 205,000.00 410.00
Kepala tukang cat L-2 OH 0.004 188,000.00 752.00
Tukang cat L-3 OH 0.030 168,000.00 5,040.00
Pekerja cat L-4 OH 0.040 132,000.00 5,280.00
Jumlah harga pekerjaan 6,350.02 11,482.00 17,832.02
Jumlah harga dibulatkan 17,832.00

5 1 M2 Cat Plafond 2 Lapis dgn cat tembok menggunakan kuas PU.N.5


Pt.T-38-2000-C
Plamur MI.11 KG 0.100 11,126.00 1,112.60
Cat tembok MI.12 KG 0.240 12,766.00 3,063.84
Kertas amplas (kayu) MI.1 Lembar 0.500 5,722.40 2,861.20
Kuas Buah 0.015 10,000.00 150.00
Kapek Buah 0.050 5,000.00 250.00
Mandor cat L-1 OH 0.0040 205,000.00 820.00
Kepala tukang cat L-2 OH 0.006 188,000.00 1,128.00
Tukang cat L-3 OH 0.060 168,000.00 10,080.00
Pekerja cat L-4 OH 0.080 132,000.00 10,560.00
Jumlah harga pekerjaan 7,437.64 22,588.00 30,025.64
Jumlah harga dibulatkan 30,025.00

6 1 M2 Cat Plafond 2 Lapis dgn cat tembok menggunakan roll PU.N.6


Pt.T-38-2000-C
Plamur MI.11 KG 0.100 11,126.00 1,112.60
Cat tembok MI.12 KG 0.470 12,766.00 6,000.02
Kertas amplas (kayu) MI.1 Lembar 0.500 5,722.40 2,861.20
Kuas roll Buah 0.010 35,000.00 350.00
Kapek Buah 0.050 5,000.00 250.00
Mandor cat L-1 OH 0.0030 205,000.00 615.00
Kepala tukang cat L-2 OH 0.004 188,000.00 752.00
Tukang cat L-3 OH 0.040 168,000.00 6,720.00
Pekerja cat L-4 OH 0.060 132,000.00 7,920.00
Jumlah harga pekerjaan 10,573.82 16,007.00 26,580.82
Jumlah harga dibulatkan 26,580.00

7 1 M2 Pasang Wall Paper dengan perekat PU.N.7


Pt.T-38-2000-C
Wall Paper MF.51 M2 1.100 205,393.45 225,932.80
Perekat/Lem MN.1 KG 0.200 51,934.00 10,386.80
Mandor cat L-1 OH 0.0050 205,000.00 1,025.00
Kepala tukang cat L-2 OH 0.010 188,000.00 1,880.00
Tukang cat L-3 OH 0.100 168,000.00 16,800.00
Pekerja cat L-4 OH 0.010 132,000.00 1,320.00
Jumlah harga pekerjaan 236,319.60 21,025.00 257,344.60
Jumlah harga dibulatkan 257,344.00
Analisa Harga Satuan Pekerjaan (AHSP) N. Pekerjaan Cat

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

8 1 M2 Pelapisan Bidang Kayu Dengan Meny PU.N.8


Pt.T-38-2000-C
Cat meny kayu MI.4 KG 0.170 41,122.85 6,990.88
Minyak Cat MI.9 Liter 0.100 39,810.70 3,981.07
Kuas Buah 0.015 10,000.00 150.00
Mandor cat L-1 OH 0.004 205,000.00 820.00
Pekerja cat L-4 OH 0.075 132,000.00 9,900.00
Jumlah harga pekerjaan 11,121.95 10,720.00 21,841.95
Jumlah harga dibulatkan 21,841.00

9 1 M2 Mengecat Dasar 1 Lapis Pada Kayu PU.N.9


Pt.T-38-2000-C
Cat dasar/cat kayu MI.6 KG 0.170 73,755.25 12,538.39
Minyak Cat MH.2 Liter 0.100 39,810.70 3,981.07
Amplas MI.1 Buah 1.000 5,722.40 5,722.40
Kuas Buah 0.015 10,000.00 150.00
Mandor cat L-1 OH 0.000 205,000.00 0.00
Kepala tukang cat L-2 OH 0.008 188,000.00 1,504.00
Tukang cat L-3 OH 0.075 168,000.00 12,600.00
Pekerja cat L-4 OH 0.000 132,000.00 0.00
Jumlah harga pekerjaan 22,391.86 14,104.00 36,495.86
Jumlah harga dibulatkan 36,495.00

10 1 M2 Mengecat Penutup 2 Lapis Pada Kayu PU.N.10


Pt.T-38-2000-C
Cat tutup/cat kayu MI.6 KG 0.300 73,755.25 22,126.58
Minyak Cat MH.2 Liter 0.200 39,810.70 7,962.14
Kuas Buah 0.020 10,000.00 200.00
Mandor cat L-1 OH 0.008 205,000.00 1,640.00
Kepala tukang cat L-2 OH 0.015 188,000.00 2,820.00
Tukang cat L-3 OH 0.150 168,000.00 25,200.00
Pekerja cat L-4 OH 0.150 132,000.00 19,800.00
Jumlah harga pekerjaan 30,288.72 49,460.00 79,748.72
Jumlah harga dibulatkan 79,748.00

11 1 M2 Pelapisan Bidang Besi-Baja Dengan Meny PU.N.11


Pt.T-38-2000-C
Cat meny besi MI.5 KG 0.100 41,766.85 4,176.69
Minyak Cat MH.2 Liter 0.100 39,810.70 3,981.07
Amplas besi MI.2 Buah 0.050 5,639.60 281.98
Kuas Buah 0.015 10,000.00 150.00
Mandor cat L-1 OH 0.0040 205,000.00 820.00
Pekerja cat L-4 OH 0.075 132,000.00 9,900.00
Jumlah harga pekerjaan 8,589.74 10,720.00 19,309.74
Jumlah harga dibulatkan 19,309.00

12 1 M2 Mengecat Penutup 2 Lapis Pada Permukaan Besi (manual) PU.N.12


Pt.T-38-2000-C
Cat tutup/cat besi MI.7 KG 0.200 77,557.15 15,511.43
Minyak Cat MK.7 Liter 0.100 39,810.70 3,981.07
Kuas Buah 0.020 10,000.00 200.00
Mandor cat L-1 OH 0.008 205,000.00 1,640.00
Kepala tukang cat L-2 OH 0.015 188,000.00 2,820.00
Tukang cat L-3 OH 0.150 168,000.00 25,200.00
Pekerja cat L-4 OH 0.150 132,000.00 19,800.00
Jumlah harga pekerjaan 19,692.50 49,460.00 69,152.50
Jumlah harga dibulatkan 69,152.00

13 1 M2 Pelapisan Bidang Kayu Dengan Residu / ter PU.N.13


Pt.T-38-2000-C
Residu/ter MA.8 KG 0.350 28,799.45 10,079.81
Minyak Tanah MA.3 Liter 0.030 12,402.75 372.08
Kuas Buah 0.020 10,000.00 200.00
Kepala tukang cat L-2 OH 0.010 188,000.00 1,880.00
Tukang cat L-3 OH 0.100 168,000.00 16,800.00
Jumlah harga pekerjaan 10,651.89 18,680.00 29,331.89
Jumlah harga dibulatkan 29,331.00

14 1 M2 Cat tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) PU.N.14
HPS.PU. 2017
Plamur MI.11 KG 0.100 11,126.00 1,112.60
Cat dasar MI.12 KG 0.100 12,766.00 1,276.60
Cat penutup 2 kali MI.12 KG 0.260 12,766.00 3,319.16
Mandor cat L-1 OH 0.0025 205,000.00 512.50
Kepala tukang cat L-2 OH 0.006 188,000.00 1,184.40
Tukang cat L-3 OH 0.063 168,000.00 10,584.00
Pekerja cat L-4 OH 0.020 132,000.00 2,640.00
Jumlah harga pekerjaan 5,708.36 14,920.90 20,629.26
Jumlah harga dibulatkan 20,629.00

15 1 M2 Cat tembok lama (1 lapis cat dasar, 2 lapis cat penutup) PU.N.15
HPS.PU. 2017
Cat dasar MI.12 KG 0.120 12,766.00 1,531.92
Cat penutup 2 kali MI.12 KG 0.180 12,766.00 2,297.88
Mandor cat L-1 OH 0.0025 205,000.00 512.50
Kepala tukang cat L-2 OH 0.004 188,000.00 789.60
Tukang cat L-3 OH 0.042 168,000.00 7,056.00
Pekerja cat L-4 OH 0.028 132,000.00 3,696.00
Jumlah harga pekerjaan 3,829.80 12,054.10 15,883.90
Jumlah harga dibulatkan 15,883.00

16 1 M2 Cat ulang dinding/tembok PU.N.16


HPS.PU. 2017
Diambil : 2/3 x Cat Dinding ( warna sama ) PU.N.14 M2 0.6667 20,629.00 13,752.67
Jumlah harga pekerjaan - - 13,752.67
Jumlah harga dibulatkan 13,752.00
Analisa Harga Satuan Pekerjaan (AHSP) O. Instalasi Listrik

O. PEKERJAAN INSTALASI LISTRIK


PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE
PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

1 1 Titik Instalasi Lampu SL 18 - 23 VA+ Pitting PU.O.1


HPS.PU. 2017
Vetting lampu MJ.14 Buah 1.000 18,700.15 18,700.15
Kabel NYA 2x1,5 mm MJ.2 M 7.000 4,630.93 32,416.51
Lampu SL 23 VA MJ.17 Buah 1.000 60,787.85 60,787.85
Klem Kabel MJ.20 Dos 0.200 24,555.95 4,911.19
Isolasi MJ.21 Buah 0.100 13,220.40 1,322.04
Sekrup MJ.22 Dos 0.100 23,658.95 2,365.90
Upah Memasang LS 1.000 60,000.00 60,000.00
Jumlah harga pekerjaan 120,503.64 60,000.00 180,503.64
Jumlah harga dibulatkan 180,503.00

2 1 Titik Instalasi Lampu SL 8 - 14 VA+ Pitting PU.O.2


HPS.PU. 2017
Vetting lampu MJ.14 Buah 1.000 18,700.15 18,700.15
Kabel NYA 2x1,5 mm MJ.2 M 7.000 4,630.93 32,416.51
Lampu SL 14 VA MJ.18 Buah 1.000 49,050.95 49,050.95
Klem Kabel MJ.20 Dos 0.200 24,555.95 4,911.19
Isolasi MJ.21 Buah 0.100 13,220.40 1,322.04
Sekrup MJ.22 Dos 0.100 23,658.95 2,365.90
Upah Memasang LS 1.000 60,000.00 60,000.00
Jumlah harga pekerjaan 108,766.74 60,000.00 168,766.74
Jumlah harga dibulatkan 168,766.00

3 1 Titik Instalasi Stop Kontak PU.O.3


HPS.PU. 2017
Stop Kontak MJ.6 Buah 1.000 22,151.30 22,151.30
Kabel NYA 3x2.5 mm MJ.1 M 3.000 12,826.59 38,479.77
Klem Kabel MJ.20 Dos 0.200 24,555.95 4,911.19
Isolasi MJ.21 Buah 0.100 13,220.40 1,322.04
Sekrup MJ.22 Dos 0.100 23,658.95 2,365.90
Upah Memasang LS 1.000 60,000.00 60,000.00
Jumlah harga pekerjaan 69,230.20 60,000.00 129,230.20
Jumlah harga dibulatkan 129,230.00

4 1 Unit MCB PU.O.4


HPS.PU. 2017
MCB Buah 1.000 45,000.00 45,000.00
Box Buah 1.000 7,500.00 7,500.00
Kabel NYA 3x2.5 mm MJ.1 M 15.000 12,826.59 192,398.85
Klem Kabel MJ.20 Dos 0.400 24,555.95 9,822.38
Isolasi MJ.21 Buah 0.500 13,220.40 6,610.20
Sekrup MJ.22 Dos 0.100 23,658.95 2,365.90
Upah Memasang LS 1.000 60,000.00 60,000.00
Jumlah harga pekerjaan 263,697.33 60,000.00 323,697.33
Jumlah harga dibulatkan 323,697.00

5 1 Titik Saklar Ganda PU.O.5


HPS.PU. 2017
Saklar Ganda MJ.4 Buah 1.000 25,921.00 25,921.00
Upah Memasang 2xL-4 OH 1.000 264,000.00 264,000.00
Alat Bantu + Aksesoris LS 1.000 2,592.10 2,592.10
Jumlah harga pekerjaan 25,921.00 266,592.10 292,513.10
Jumlah harga dibulatkan 292,513.00

6 1 Titik Saklar Tunggal PU.O.6


HPS.PU. 2017
Saklar Tunggal MJ.5 Buah 1.000 20,432.05 20,432.05
Upah Memasang 2xL-4 OH 1.000 264,000.00 264,000.00
Alat Bantu + Aksesoris LS 1.000 2,043.21 2,043.21
Jumlah harga pekerjaan 20,432.05 266,043.21 286,475.26
Jumlah harga dibulatkan 286,475.00

7 1 Unit Panel Box PU.O.7


HPS.PU. 2017
Panel Box MJ.23 Buah 1.000 8,597,202.20 8,597,202.20
Upah Memasang 2,5 x L - 4 OH 1.000 330,000.00 330,000.00
Alat Bantu + Aksesoris LS 1.000 4,298,601.10 4,298,601.10
Jumlah harga pekerjaan 8,597,202.20 4,628,601.10 13,225,803.30
Jumlah harga dibulatkan 13,225,803.00

8 1 M' Kabel NYA 2.5 mm PU.O.8


HPS.PU. 2017
Kabel NYA 2.5 mm MJ.2 M 1.100 4,630.93 5,094.02
Pipa PVC Ø 1/2" MK.15 M' 1.050 7,194.75 7,554.49
Upah Memasang 0,1 x L - 4 OH 1.000 13,200.00 13,200.00
Alat Bantu + Aksesoris LS 1.000 231.55 231.55
Jumlah harga pekerjaan 12,648.51 13,431.55 26,080.06
Jumlah harga dibulatkan 26,080.00
Harga Satuan Bahan, Upah dan Alat

DAFTAR HARGA SATUAN BAHAN


LOKASI PEKERJAAN : KOTA MERAUKE - DISTRIK MERAUKE

PEKERJAAN : #REF!
LOKASI : KOTA MERAUKE - DISTRIK MERAUKE
### : #REF!

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


Kode Harga Satuan
No. Nama Bahan/Barang Barang Satuan on Site Project Keterangan
(Tanpa PPN)
1 2 3 4 5 6

A. BAHAN BAKAR DAN PENCAMPUR


1 Bensin Industri MA.1 Liter 11,113.60
2 Solar Industri MA.2 Liter 14,073.70
3 Minyak Tanah Industri MA.3 Liter 12,402.75
4 Minyak Pelumas / Olie MA.4 Liter 40,117.75
5 Minyak Bekisting / Oli Bekas MA.5 Buah 1,104.00
6 Polimer MA.6 Liter 23,771.65
7 Aspal MA.7 Kg 23,877.45 -
8 Residu / Teer MA.8 Liter 28,799.45 -
0.00
B. BAHAN PASIR, BATU DAN SEMEN 0.00
1 Pasir semen (Import) MB.1 M3 1,541,578.45
2 Pasir semen (Pasang-lokal) MB.2 M3 1,058,872.85
3 Pasir semen ayakan/ halus (lokal) MB.3 M3 0.00
4 Tanah timbun biasa/urug MB.4 M3 370,471.35
5 Tanah pilihan (Selmat) MB.5 M3 436,596.35
6 Batu kerikil/ koral beton (Import) MB.6 M3 1,567,479.90
7 Batu kali/Gunung - Import MB.7 M3 1,732,792.40
8 Batu bata merah MB.8 Buah 1,851.50
9 Batu cetak 10 x 20 x 30 Cm MB.9 Buah 3,213.10
10 Paving blok (tidak Warna) MB.10 Buah 7,538.25
11 Semen Portland (PC) @ 50 Kg MB.11 Zak 138,941.85 2,778.84
12 Semen PC Putih / Warna MB.12 Zak 176,963.15 8,848.16
13 Tepung Gypsum MB.13 Zak 130,966.60 6,548.33
0.00
C. BAHAN KAYU, TRIPLEKS DLL 0.00
1 Balok Kayu Kelas III (Kayu Bus) MC.1 M3 3,599,094.05
2 Balok Kayu Kelas II (Kayu Rahay) MC.2 M3 4,729,266.90
3 Balok Kayu Kelas I (Kayu Besi) MC.3 M3 9,496,329.70
4 Balok Kayu Kelas IV (Kayu Putih, Susu, dll) MC.4 M3 3,005,904.50
5 Papan Kayu Kelas III (Kayu Bus) t = 2-5 cm MC.5 M3 3,599,094.05
6 Papan Kayu Kelas II (Kayu Rahay) t = 2 cm MC.6 M3 4,839,477.15
7 Papan Kayu Kelas II (Kayu Rahay) t = 3 cm MC.7 M3 5,059,891.90
8 Papan Kayu Kelas I (Kayu Besi) t = 2 - 3 cm MC.8 M3 10,157,579.70
9 Papan Kayu Kelas IV (tebal = 2-5 cm) MC.9 M3 3,005,904.50
10 Kayu Lat/Reng/List, Kayu Kelas II MC.10 Batang 33,498.35 13,957,645.83
11 Tripleks (1,22 x 2,44) cm - tebal 3 mm MC.11 Lembar 83,591.20 24,448.00
12 Tripleks (1,22 x 2,44) cm - tebal 4 mm MC.12 Lembar 106,064.50 31,381.00
13 Tripleks (1,22 x 2,44) cm - tebal 6 mm MC.13 Lembar 137,227.20 40,901.00
14 Tripleks (1,22 x 2,44) cm - tebal 9 mm MC.14 Lembar 214,207.05 65,780.00
15 Tripleks (1,22 x 2,44) cm - tebal 12 mm MC.15 Lembar 293,927.35 84,510.00
16 Tripleks (1,22 x 2,44) cm - tebal 15 mm MC.16 Lembar 360,801.00 102,178.00
17 Tripleks (1,22 x 2,44) cm - tebal 18 mm MC.17 Lembar 408,392.60 115,228.00
18 Tripleks (1,22 x 2,44) cm - tebal 22 mm MC.18 Lembar 409,141.25 119,150.00
19 Teak - Wood (1.22 x 2.44 Cm) - 3 mm MC.19 Lembar 174,926.50 53,135.00
20 Teak - Wood (0.92 x 2.44 Cm) - 4 mm MC.20 Lembar 153,013.25 54,063.00
21 Plywood - Multiplex MC.21 Lembar 382,717.70
22 Melamin MC.22 Lembar 158,442.40
23 Formika Polos (122 x 244) Cm MC.23 Lembar 750,584.30
24 Pelat Asbes Tebal 6 mm MC.24 Lembar 96,092.85
25 Pelat Asbes Tebal 5 mm MC.25 Lembar 88,884.65
26 Pelat Asbes Tebal 4 mm MC.26 Lembar 82,272.15
27 Gypsum Board tebal 9 mm MC.27 Lembar 121,663.10
28 List profil Gypsum Lebar Sampai 5 cm MC.28 M' 46,644.00
29 Hard Board MC.29 Lembar 108,933.75
30 Tiang Kayu Bulat (Dia 20 cm, L=4-6 m) MC.30 Batang 158,871.35
31 Tiang Kayu Bulat (Dia 25-30 cm, L=4-6 m) MC.31 Batang 266,007.65
32 Kayu dolken Ø 8-10, L=4 M Kayu Bus MC.32 Batang 21,503.85
33 Patok kayu bulat (Dia = 3 cm, L= 1 m) MC.33 Batang 3,967.50
34 Patok kayu bulat (Dia = 5 cm, L= 5 m) MC.34 Batang 6,612.50
35 Kayu Bakar (Bus Campuran) MC.35 M3 529,000.00
0.00
Harga Satuan Bahan, Upah dan Alat

DAFTAR HARGA SATUAN BAHAN


LOKASI PEKERJAAN : KOTA MERAUKE - DISTRIK MERAUKE

PEKERJAAN : #REF!
LOKASI : KOTA MERAUKE - DISTRIK MERAUKE
### : #REF!

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


Kode Harga Satuan
No. Nama Bahan/Barang Barang Satuan on Site Project Keterangan
(Tanpa PPN)
1 2 3 4 5 6
D. BAHAN BESI, PAKU DAN KAWAT 0.00
1 Besi Beton Dia.6 mm (SNI) MD.1 Kg 16,423.15 33,333.33
2 Besi Beton Dia.8 mm (SNI) MD.2 Kg 14,947.70 51,500.00
3 Besi Beton Dia.10 mm (SNI) MD.3 Kg 15,071.90 79,875.00
4 Besi Beton Dia.12 mm (SNI) MD.4 Kg 15,364.00 114,000.00
5 Besi Beton Dia.14 mm (SNI) MD.5 Kg 12,988.10 160,000.00
6 Besi Beton Dia.16 mm (SNI) MD.6 Kg 14,725.75 211,500.00
7 Besi Beton Dia.19 mm (SNI) MD.7 Kg 14,154.20 310,000.00
8 Besi Beton Dia.22 mm (SNI) MD.8 Kg 13,674.65 425,000.00
9 Kawat Beton MD.9 Kg 25,028.60
10 Kawat beton / bindrat 4 mm MD.10 KG 24,281.10
11 Paku 1" MD.11 Kg 22,245.60
12 Paku 2" MD.12 Kg 22,245.60
13 Paku 3" MD.13 Kg 22,245.60
14 Paku 4" MD.14 Kg 22,245.60
15 Paku 5" MD.15 Kg 22,245.60
16 Paku Campur MD.16 Kg 19,506.30
17 Paku Seng MD.17 Kg 27,328.60
18 Paku Ardex Ulir MD.18 Kg 35,046.25
19 Paku Sirap MD.19 Buah 20,167.55
20 Paku Ondoline MD.20 Kg 26,780.05
21 Paku Tembok / Kecil 2/3 MD.21 Buah 859.05
22 Paku/Skrup 5 cm MD.22 KG 46,617.55
23 Kawat Nyamuk (Plastik / Nylon) MD.23 M 25,451.80
24 Kawat Has / Bankhas dia 12 mm MD.24 M2 46,501.40
25 Kawat Harmonika Has 40x40 mm MD.25 M 57,782.90
26 Kawat burung MN.26 M² 27,200.95
27 Kawat Duri Baja 30 M MD.27 KG 21,172.65
28 Kawat Las 0.26 MD.28 Dos 228,078.35
29 Timah Solder MD.29 Kg 79,468.45
30 Baut Jembatan Dia. 19 mm MD.30 Kg 13,555.05
31 Baut Dia, 3/8" - 17.5 + Mur - Ring MD.31 Buah 5,851.20
32 Baut Dia, 3/8" - 12.0/15.0 + Mur - Ring MD.32 Buah 4,859.90
33 Baut Dia, 3/8" - 20.0 + Mur - Ring MD.33 Buah 6,413.55
34 Baut Dia, 3/8" - 35.0 + Mur - Ring MD.34 Buah 8,265.05
35 Besi angkur dia. 8 mm MN.35 Buah 13,555.05
36 Kasa (Ram Ayam) Dia, 10 mm MD.36 M 27,126.20
37 Besi Siku 30 . 30 . 3 - L = 6 Meter MD.37 Batang 91,450.30 10,496.00
38 Besi Siku 50 . 50 . 5 - L = 6 Meter MD.38 Batang 236,833.30 8,135.00
39 Besi Siku 50 . 50 . 6 - L = 6 Meter MD.39 Batang 254,461.65 8,003.00
40 Besi Siku 40 . 40 . 4 - L = 6 Meter MD.40 Batang 154,811.85 10,134.00
41 Besi Siku 40 . 40 . 5 - L = 6 Meter MD.41 Batang 143,160.05 6,201.00
42 Besi Siku 20 . 20 . 3 - L = 6 Meter MD.42 Batang 110,732.35 14,075.00
43 Besi Plat 1.0 mm - 120 x 240 Cm MD.43 Lembar 412,632.65 17,194.00
44 Besi Plat 1.2 mm - 120 x 240 Cm MD.44 Lembar 485,463.30 16,311.00
45 Besi Plat 2.0 mm - 120 x 240 Cm MD.45 Lembar 730,852.60 14,489.00
46 Besi Plat 3.0 mm - 120 x 240 Cm MD.46 Lembar 1,119,852.75 15,103.00
47 Besi Plat 12 mm -120 x 240 cm MD.47 Lembar 583,989.55 1,864.00
48 Besi Strip 20.2 MD.48 Batang 44,377.35 22,467.00
49 Besi Strip 30.3 MD.49 Batang 71,309.20 14,506.00
50 Besi Strip 40.4 MD.50 Batang 70,475.45 9,530.00
51 Besi Strip 50.5 MD.51 Batang 111,711.00 8,802.00
52 Waltermur Dia 16 mm MD.52 Buah 26,912.30
53 Gording lips chanel 150.65.20.2,3 ( 6 N ) MD.53 Batang 963,573.50
54 Baja profil IWF MD.54 KG 28,049.65
55 Besi gording canal MD.55 KG 32,678.40
56 Water mur MD.56 KG 46,564.65
57 Sealent MD.57 Tube 30,033.40
58 C-75.80 SNI (panjang 6 Meter) MD.58 M1 27,168.75 29,885.63
59 C-75.60 SNI (panjang 6 Meter) MD.59 M1 16,531.25
60 Baut (srew Driver) MD.60 Buah 92,000.00
61 Dynabolt MD.61 Buah 97,750.00
62 Reng MD.62 M1 16,531.25
63 Talang Jurai MD.63 M1 25,443.75
0.00
Harga Satuan Bahan, Upah dan Alat

DAFTAR HARGA SATUAN BAHAN


LOKASI PEKERJAAN : KOTA MERAUKE - DISTRIK MERAUKE

PEKERJAAN : #REF!
LOKASI : KOTA MERAUKE - DISTRIK MERAUKE
### : #REF!

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


Kode Harga Satuan
No. Nama Bahan/Barang Barang Satuan on Site Project Keterangan
(Tanpa PPN)
1 2 3 4 5 6
E. BAHAN PENUTUP ATAP 0.00
1 Seng Gelombang BJLS 0,30 ME.1 Lembar 86,835.35
2 Seng Gelombang BJLS 0,22 ME.2 Lembar 79,482.25
3 Seng Gelombang BJLS 0,20 ME.3 Lembar 57,980.70
4 Atap Seng Plastik Gelombang Kecil ME.4 Lembar 77,087.95
5 Atap Seng Gelombang Besar Fiber Glass ME.5 Lembar 91,034.00
6 Seng Plat BJLS 0.30 ME.6 Lembar 53,772.85 3,889.83
7 Seng Plat BJLS 0.20 ME.7 Lembar 59,992.05 4,286.58
8 Genteng Metal - Multiroof ME.8 Lembar 73,441.30
9 Nok Genteng Metal - Multiroof ME.9 Bh 55,148.25
10 Atap Allumunium Gelombang ME.10 M2 80,605.80
11 Nok Atap Allumunium ME.11 M 55,148.25
12 Karet Talang ME.12 M1 13,251.45
0.00
F. BAHAN KERAMIK 0.00
1 Ubin Abu-Abu 20 x 20 Cm MF.1 Buah 3,636.30
2 Ubin Abu-Abu 30 x 30 Cm MF.2 Buah 8,405.35
3 Ubin Abu-Abu 40 x 40 Cm MF.3 Buah 19,155.55
4 Ubin Warna 20 x 20 Cm MF.4 Buah 3,627.10
5 Ubin Warna 30 x 30 Cm MF.5 Buah 8,396.15
6 Ubin Warna 40 x 40 Cm MF.6 Buah 18,816.30
7 Ubin Teraso Ukuran 30 x 30 cm MF.7 Buah 8,606.60
8 Ubin Teraso Ukuran 40 x 40 cm MF.8 Buah 18,521.90
9 Ubin Granito Ukuran 30 x 30 cm MF.9 Buah 8,335.20
10 Ubin Granito Ukuran 40 x 40 cm MF.10 Buah 16,538.15
11 Ubin Teralux Kerang Ukuran 30 x 30 cm MF.11 Buah 9,117.20
12 Ubin Teralux Kerang Ukuran 40 x 40 cm MF.12 Buah 18,908.30
13 Ubin Teralux Marmer Ukuran 30 x 30 cm MF.13 Buah 11,823.15
14 Ubin Teralux Marmer Ukuran 40 x 40 cm MF.14 Buah 28,827.05
15 Ubin Teralux Marmer Ukuran 60 x 60 cm MF.15 Buah 89,323.95
16 Keramik Artistik 10x20; 15x15 cm MF.16 Buah 1,672.10
17 Keramik Artistik 10x10 atau 5x20 cm MF.17 Buah 978.65
18 Keramik Lantai 20 x 20 cm MF.18 Buah 3,801.90
19 Keramik Lantai 20 x 30 cm MF.19 Buah 5,569.45
20 Keramik Lantai 30 x 30 cm MF.20 Buah 8,846.95
21 Keramik Lantai 30 x 30 berglasir MF.21 Buah 8,064.95
22 Keramik Lantai 30 x 30 berglasir (Mozaik) MF.22 Buah 9,057.40
23 Keramik Lantai 40 x 40 cm MF.23 Buah 17,530.60
24 Keramik Lantai 50 x 50 cm MF.24 Buah 32,228.75
25 Keramik Lantai 60 x 60 cm MF.25 Buah 75,362.95
26 Keramik Dinding 10 x 20 cm MF.26 Buah 1,772.15
27 Keramik Dinding 20x20 atau 20x25 cm MF.27 Buah 4,118.15
28 Ubin Dinding Porselin 11 x 11 MF.28 Buah 1,005.10
29 Ubin Dinding Porselin 10 x 20 cm MF.29 Buah 1,246.60
30 Ubin Dinding Porselin 20 x 20 MF.30 Buah 3,650.10
31 Plint Ubin Abu-Abu 15 x 20 cm MF.31 Buah 16,729.05
32 Plint Ubin Abu-Abu 10 x 30 cm MF.32 Buah 13,422.80
33 Plint Ubin Abu-Abu 10 x 40 cm MF.33 Buah 15,406.55
34 Plint Ubin Warna 10 x 20 cm MF.34 Buah 6,730.95
35 Plint Ubin Warna 10 x 30 cm MF.35 Buah 10,116.55
36 Plint Ubin Warna 10 x 40 cm MF.36 Buah 10,116.55
37 Plint Ubin Teraso 10 x 30 cm MF.37 Buah 10,116.55
38 Plint Ubin Teraso 10 x 40 cm MF.38 Buah 16,729.05
39 Plint Ubin Granito 10 x 40 cm MF.39 Buah 16,729.05
40 Plint Ubin Granito 10 x 30 cm MF.40 Buah 10,116.55
41 Plint Ubin Teralux Kerang 10 x 40 cm MF.41 Buah 10,116.55
42 Plint Ubin Teralux Kerang 10 x 30 cm MF.42 Buah 10,116.55
43 Plint Ubin Teralux Marmer 10 x 60 cm MF.43 Buah 20,049.10
44 Plint Ubin Teralux Marmer 10 x 40 cm MF.44 Buah 13,422.80
45 Plint Ubin Teralux Marmer 10 x 30 cm MF.45 Buah 10,116.55
46 Plint Keramik Artistik 10 x 20 cm MF.46 Buah 6,400.90
47 Plint Keramik Artistik 10 x 10 cm MF.47 Buah 6,069.70
48 Plint Keramik Artistik 5 x 20 cm MF.48 Buah 5,408.45
49 Plint Keramik Artistik 10 x 30 cm MF.49 Buah 10,116.55
50 Marmer Ukuran 100 x 100 cm MF.50 Buah 472,594.80
51 Wall paper (Lebar 50 cm) MF.51 M2 205,393.45
52 Batu Paras MF.52 Buah 29,705.65 191,895.00
53 Batu Tempel Hitam MF.53 Buah 36,919.60 191,895.00
Harga Satuan Bahan, Upah dan Alat

DAFTAR HARGA SATUAN BAHAN


LOKASI PEKERJAAN : KOTA MERAUKE - DISTRIK MERAUKE

PEKERJAAN : #REF!
LOKASI : KOTA MERAUKE - DISTRIK MERAUKE
### : #REF!

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


Kode Harga Satuan
No. Nama Bahan/Barang Barang Satuan on Site Project Keterangan
(Tanpa PPN)
1 2 3 4 5 6
0.00
G. BAHAN KACA 0.00
1 Kaca Polos 3 mm MG.1 M2 200,623.25
2 Kaca Polos 5 mm MG.2 M2 241,474.70
3 Kaca Buram 3 mm MG.3 M2 134,498.25
4 Kaca Buram 4 mm MG.4 M2 201,085.55
5 Kaca Buram 5 mm MG.5 M2 284,852.70
6 Kaca Naco / Louver - 7 Clips (polos) MG.6 Buah 172,731.15
7 Kaca Naco / Louver - 8 Clips (polos) MG.7 Buah 196,973.15
8 Kaca Naco / Louver - 9 Clips (polos) MG.8 Buah 218,238.95
9 Kaca Naco / Louver - 10 Clips (polos) MG.9 Buah 271,271.20
10 Kaca Rayban 25 % - tebal 5 mm MG.10 M2 19,030.20
11 Kaca Acrylic (Kaca Plastik) - 5 mm MG.11 Lembar 1,325,580.85
0.00
H. BAHAN/ALAT PENGGANTUNG 0.00
1 Kunci Tanam (Setara Cap Kuda Terbang) MH.1 Set 98,082.35
2 Kunci Tanam - 2 Slaagh MH.2 Set 166,687.90
3 Kunci Tanam - 1 Slaagh MH.3 Set 75,104.20
4 Kunci Tanam (Setara Cap Anchor / Yale) MH.4 Set 118,085.45
5 Kunci Gembok 1" MH.5 Set 73,583.90
6 Engsel 4" Kuningan (Untuk Pintu) MH.6 Pasang 35,892.65
7 Engsel 3" Kuningan (Untuk Jendela) MH.7 Pasang 27,200.95
8 Engsel Kupu-Kupu T MH.8 Pasang 20,966.80
9 Engsel Nylon Kuningan 4" MH.9 Pasang 15,393.90
10 Engsel Biasa 3" (Untuk Jendela) MH.10 Pasang 17,266.10
11 Hak Angin / Kait Angin MH.11 Buah 13,597.60
12 Espagnolet MH.12 Set 86,147.65
13 Grendel Tanam (Pintu) MH.13 Buah 86,147.65
14 Grendel Besar / Kecil MH.14 Buah 12,087.65
15 Tarikan Pintu MH.15 Buah 132,765.20
16 Tarikan Jendela MH.16 Buah 18,038.90
0.00
I. BAHAN CAT 0.00
1 Amplas Kertas (Amplas Kayu) MI.1 Lembar 5,722.40
2 Amplas Besi MI.2 Lembar 5,639.60
3 Dempul Kayu MI.3 Kg 42,109.55
4 Cat Meny Kayu MI.4 Kg 41,122.85
5 Cat Meny Besi MI.5 Kg 41,766.85
6 Cat Kayu MI.6 Kg 73,755.25
7 Cat Besi MI.7 Kg 77,557.15
8 Cat Kilat LN MI.8 Kg 74,416.50
9 Minyak Cat / Thinner (Setara Lauguer) MI.9 Kg 39,810.70
10 Minyak Cat / Thinner (Biasa) Afduner MI.10 Kg 37,122.00
11 Palmur Tembok MI.11 Zak 256,829.50 11,126.00
12 Cat Tembok (1 Klg @ 5 Kg) MI.12 Kaleng 250,000.00 12,766.00
13 Cat Besi Crom MI.13 Kg 60,434.80
14 Cat Besi (Setara Nippon Paint) MI.14 Kg 86,848.00
15 Politur Kaleng (Setara Apache) MI.15 Kg 77,248.95
16 Floor Hardener MI.16 KG 79,706.50
0.00
J. BAHAN LISTRIK DAN ELEKTRONIKA 0.00
1 Kabel Listrik NYM/NYA 3x2.5 mm MJ.1 Roll 1,645,805.25 12,826.59
2 Kabel Listrik NYM/NYA 2x1.5 mm MJ.2 Roll 939,040.55 4,630.93
3 Pipa Listrik dia, 5/8 MJ.3 Batang 10,930.75
4 Saklar Double - Tempel MJ.4 Buah 25,921.00
5 Saklar Tunggal / Engkel - Tempel MJ.5 Buah 20,432.05
6 Stop Kontak 500 Watt - Tempel MJ.6 Buah 22,151.30
7 Stop Kontak 1000 Watt - Tempel MJ.7 Buah 36,136.45
8 Home Saklar 1 Fase Komplit MJ.8 Buah 259,940.25
9 Lampu TL 1 x 40 Watt Komplit MJ.9 Buah 190,006.45
10 Lampu TL 1 x 20 Watt Komplit MJ.10 Buah 137,328.40
11 Lampu Pijar 40 Watt Komplit MJ.11 Buah 11,832.35
12 Lampu Pijar 60 Watt Komplit MJ.12 Buah 12,965.10
13 Lampu Pijar 100 Watt Komplit MJ.13 Buah 14,004.70
14 Vitting Lampu MJ.14 Buah 18,700.15
15 Lampu XL 40 Watt MJ.15 Set 133,029.70
16 Lampu XL 20 Watt MJ.16 Set 61,614.70
17 Lampu SL 23 Watt MJ.17 Set 60,787.85
18 Lampu SL 14 Watt MJ.18 Set 49,050.95
19 Sekring Kas 1 Group (Biasa) MJ.19 Buah 96,899.00
20 Klem Kabel MJ.20 Dus 24,555.95
21 Isolasi Listrik MJ.21 Buah 13,220.40
22 Sekrup MJ.22 Dus 23,658.95
23 Panil Distribusi MJ.23 Buah 8,597,202.20
Harga Satuan Bahan, Upah dan Alat

DAFTAR HARGA SATUAN BAHAN


LOKASI PEKERJAAN : KOTA MERAUKE - DISTRIK MERAUKE

PEKERJAAN : #REF!
LOKASI : KOTA MERAUKE - DISTRIK MERAUKE
### : #REF!

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


Kode Harga Satuan
No. Nama Bahan/Barang Barang Satuan on Site Project Keterangan
(Tanpa PPN)
1 2 3 4 5 6
0.00
K. BAHAN PIPA DAN SANITAIR 0.00
1 Pipa GIP (Leideng) Dia. 1/2" - 6 Meter MK.1 Batang 128,097.35 18,582.00
2 Pipa GIP (Leideng) Dia. 3/4" - 6 Meter MK.2 Batang 165,113.55 24,542.83
3 Pipa GIP (Leideng) Dia. 1" - 6 Meter MK.3 Batang 202,460.95 30,354.17
4 Pipa GIP (Leideng) Dia. 1.25" - 6 Meter MK.4 Batang 267,210.55 41,049.17
5 Pipa GIP (Leideng) Dia. 1.5" - 6 Meter MK.5 Batang 319,436.65 47,414.50
6 Pipa GIP (Leideng) Dia. 2" - 6 Meter MK.6 Batang 377,824.45 59,389.83
7 Pipa GIP (Leideng) Dia. 3" - 6 Meter MK.7 Batang 602,913.95 93,711.50
8 Pipa GIP (Leideng) Dia. 4" - 6 Meter MK.8 Batang 799,807.75 123,914.33
9 Pipa PVC Dia. 5" - 4 Meter (AW) MK.9 Batang 1,173,652.05 99,820.00
10 Pipa PVC Dia. 4" - 4 Meter (AW) MK.10 Batang 378,631.75 87,296.50
11 Pipa PVC Dia. 4" - 4 Meter (D) MK.11 Batang 215,820.50 51,454.50
12 Pipa PVC Dia. 3" - 4 Meter (D) MK.12 Batang 156,893.35 36,843.75
13 Pipa PVC Dia. 2" - 4 Meter (D) MK.13 Batang 77,782.55 17,699.25
14 Pipa PVC Dia. 1" - 4 Meter (D) MK.14 Batang 52,297.40 11,664.50
15 Pipa PVC Dia. 1/2" - 4 M MK.15 Batang 32,792.25 7,194.75
16 Pipa PVC Dia. 3/4" - 4 M MK.16 Batang 40,600.75 8,916.00
17 Pipa PVC Dia. 2,5" - 4 M MK.17 Batang 127,501.65 25,599.00
18 Talang PVC Oval 6" - 4 Meter MK.18 Batang 107,572.15
19 Talang PVC Oval 8" - 4 Meter MK.19 Batang 136,158.85
20 Talang PVC Kotak 4" - 6 Meter MK.20 Batang 162,447.85
21 Talang PVC Kotak 8" - 6 Meter MK.21 Batang 482,830.95
22 Closed Duduk Porselin Komplit MK.22 Buah 2,043,791.50
23 Closet duduk (siram) MK.23 Buah 722,985.45
24 Closed Jongkok Porselin (Standar) MK.24 Buah 249,771.95
25 Closed Jongkok Fiber Glass / Plastik MK.25 Buah 114,726.30
26 Urinoir MK.26 Buah 2,307,788.95
27 Wastafel Porselin MK.27 Buah 642,100.20
28 Bak Air / Fiber Glass 1 M3 MK.28 Buah 658,802.80
29 Bak Air / Fiber Glass 1/2 M3 MK.29 Buah 333,957.70
30 Bak Air / Fiber Glass 1/4 M3 MK.30 Buah 369,771.00
31 Tangki Air / Fiber Glass 1 M3 MK.31 Buah 2,445,050.65
32 Kran Air 3/4" MK.32 Buah 28,712.05
33 Kran Air 1/2" MK.33 Buah 22,382.45
34 Kran Air 1" MK.34 Buah 23,990.15
35 Stop Kran 1/2" MK.35 Buah 23,328.90
36 Doble Neple GIP 1/2" MK.36 Buah 30,821.15
37 Soccet 1/2" MK.37 Buah 8,450.20
38 Elbow GIP 90º x 1/2" ( PE ) MK.38 Buah 10,433.95
39 Tee 1/2" x 1/2" MK.39 Buah 12,087.65
40 Hand Kran 1/2" Besi MK.40 Buah 55,068.90
41 Dop GIP 1/2" MK.41 Buah 8,781.40
42 Water Meter 1/2" MK.42 Buah 596,513.05
43 Clamp Sadle 2" mm x 1/2" ( PE ) MK.43 Buah 107,188.05
44 Pengaman Box Meter MK.44 Buah 332,013.05
45 Pipa HDPE Ø 150 mm MK.45 M 528,774.60
46 Pipa HDPE Ø 100 mm MK.46 M 260,135.75
47 Pipa HDPE Ø 75 mm MK.47 M 141,930.70
48 Pipa HDPE Ø 50 mm MK.48 M 0.00
N. BAHAN BANGUNAN LAIN 0.00
1 Lem Aica Aibon MN.1 KG 51,934.00
2 Lem Fox MN.2 KG 40,581.20
3 Lem Vinyl MN.3 KG 26,806.50
4 Ijuk MN.4 KG 59,962.15
5 Pipa Plastik dia, 3" (AW) MN.5 Batang 224,946.90
6 Galvanies / Lysplank MN.6 Lembar 78,159.75
7 Mata bor MN.7 Buah 26,515.55
8 Mata gurinda MN.8 Buah 18,938.20
9 Gas elpiji (12 KG) MN.9 KG 20458.5
Harga Satuan Bahan, Upah dan Alat

DAFTAR HARGA SATUAN UPAH


#REF!

PEKERJAAN : #REF!
LOKASI : #REF!
### : #REF!
PERIODE : JANUARI - JUNI 2016

Harga Dasar Harga Satuan Harga Satuan


No. Uraian Tenaga Kode Tenaga on Site Project on Site Project
(per hari) (per hari) (per jam)
1 2 3 4 5 6

1 Mandor Bangunan / Lapangan L-1 178,000.00 205,000.00 29,286.00


2 Kepala Tukang (Batu, Pasir, Kayu, dsb) L-2 163,000.00 188,000.00 26,858.00
3 Tukang (Batu, Pasir, Kayu, dsb) L-3 146,000.00 168,000.00 24,000.00
4 Pekerja L-4 114,000.00 132,000.00 18,858.00
5 Mandor Alat Berat (F. Equipment) L-5 200,000.00 230,000.00 32,858.00
6 Operator Alat Berat L-6 163,000.00 188,000.00 26,858.00
7 Pembantu Operator L-7 114,000.00 132,000.00 18,858.00
8 Sopir / Driver L-8 146,000.00 168,000.00 24,000.00
9 Pembantu Sopir / Driver L-9 114,000.00 132,000.00 18,858.00
10 Mekanik L - 10 146,000.00 168,000.00 24,000.00
11 Pembantu Mekanik L - 11 114,000.00 132,000.00 18,858.00
12 Surveyor L - 12 163,000.00 188,000.00 26,858.00
13 Pembantu Surveyor L - 13 114,000.00 132,000.00 18,858.00

Jam kerja efektif per hari = 7.00 Jam


Jumlah hari per bulan = 25.00 Hari
Harga termasuk Overhead + profit = 15.00%
Analisa Harga Satuan Pekerjaan (AHSP) P. Aspal

P. PEKERJAAN ASPAL

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

1 1 M2 Lapis Resap Pengikat (Prime Coat) - Manual PU.P.1


HPS.PU. 2017
Aspal MA.7 Kg. 0.6294 23,877.45 15,029.53
Kerosene / M. Tanah MA.3 Liter 0.4889 12,402.75 6,063.57
Kayu bakar MC.35 M3 0.0100 529,000.00 5,290.00
Mandor (F. Equipment) L-5 Jam 0.0065 32,858.00 211.99
Pekerja L-4 Jam 0.0323 18,858.00 608.32
Alat Bantu Pembuatan dan Penghamparan Ls 1.0000 1,000.00 1,000.00
Jumlah harga pekerjaan 26,383.09 1,820.31 28,203.40
Jumlah harga dibulatkan 28,203.00

2 1 M2 Lapis Resap Pengikat (Prime Coat) - Mekanis PU.P.2


HPS.PU. 2017
Aspal MA.7 Kg. 0.6294 23,877.45 15,029.53
Kerosene / M. Tanah MA.3 Liter 0.4889 12,402.75 6,063.57
Mandor (F. Equipment) L-5 Jam 0.0030 32,858.00 98.97
Pekerja L-4 Jam 0.0301 18,858.00 568.01
Asphalt Sprayer E - 13 Jam 0.0030 91,787.00 276.47
Air Compressor E - 12 Jam 0.0031 198,056.00 618.93
Dump Truck E-1 Jam 0.0030 381,131.00 1,147.98
Alat Bantu Ls 1.0000 1,150.00 1,150.00
Jumlah harga pekerjaan 21,093.09 3,860.36 24,953.45
Jumlah harga dibulatkan 24,953.00

3 1 M2 Lapis Perekat (Tack Coat) - Manual PU.P.3


HPS.PU. 2017
Aspal MA.7 Kg. 0.8724 23,877.45 20,830.93
Kerosene / M. Tanah MA.3 Liter 0.2530 12,402.75 3,137.90
Kayu bakar MC.35 M3 0.0100 529,000.00 5,290.00
Mandor (F. Equipment) L-5 Jam 0.0065 32,858.00 211.99
Pekerja L-4 Jam 0.0323 18,858.00 608.32
Alat Bantu Pembuatan dan Penghamparan Ls 1.0000 1,000.00 1,000.00
Jumlah harga pekerjaan 29,258.82 1,820.31 31,079.13
Jumlah harga dibulatkan 31,079.00

4 1 M2 Lapis Perekat (Tack Coat) - Mekanis PU.P.4


HPS.PU. 2017
Aspal MA.7 Kg. 0.8724 23,877.45 20,830.93
Kerosene / M. Tanah MA.3 Liter 0.2530 12,402.75 3,137.90
Mandor (F. Equipment) L-5 Jam 0.0030 32,858.00 98.97
Pekerja L-4 Jam 0.0301 18,858.00 568.01
Asphalt Sprayer E - 13 Jam 0.0030 91,787.00 276.47
Air Compressor E - 12 Jam 0.0063 198,056.00 1,237.85
Dump Truck E-1 Jam 0.0030 381,131.00 1,147.98
Alat Bantu Ls 1.0000 1,150.00 1,150.00
Jumlah harga pekerjaan 23,968.82 4,479.28 28,448.11
Jumlah harga dibulatkan 28,448.00

5 1 M2 Latasir (SS) Kelas B (Pasir Import) tebal 2 cm PU.P.5


HPS.PU. 2017
Pasir (Import) MB.1 M3 0.0297 1,541,578.45 45,784.88
Aspal MA.7 Kg. 4.5320 23,877.45 108,212.60
Kayu bakar MC.35 M3 0.1250 529,000.00 66,125.00
Minyak tanah MA.3 Liter 0.0400 12,402.75 496.11
Mandor (F. Equipment) L-5 Jam 0.0447 32,858.00 1,470.12
Pekerja L-4 Jam 0.4474 18,858.00 8,437.35
Aspal Mixer Sederhana Jam 0.0447 100,000.00 4,474.15
Dump Truck E-1 Jam 0.0078 381,131.00 2,990.37
Pneumatic Tire Roller E-6 Jam 0.0281 670,190.00 18,837.77
Water Tanker E - 10 Jam 0.0046 379,191.00 1,751.28
Alat Bantu Ls 1.0000 1,150.00 1,150.00
Jumlah harga pekerjaan 220,618.59 39,111.04 259,729.63
Jumlah harga dibulatkan 259,729.00

6 1 M2 Latasir (SS) Kelas B (Pasir lokal) tebal 2 cm PU.P.6


HPS.PU. 2017
Pasir semen (lokal) MB.2 M3 0.0277 1,058,872.85 29,351.96
Aspal MA.7 Kg. 4.5320 23,877.45 108,212.60
Kayu bakar MC.35 M3 0.1250 529,000.00 66,125.00
Minyak tanah MA.3 Liter 0.0400 12,402.75 496.11
Mandor (F. Equipment) L-5 Jam 0.0389 32,858.00 1,278.36
Pekerja L-4 Jam 0.3891 18,858.00 7,336.82
Aspal Mixer Sederhana Jam 0.0389 100,000.00 3,890.56
Dump Truck E-1 Jam 0.0068 381,131.00 2,600.32
Pneumatic Tire Roller E-6 Jam 0.0244 670,190.00 16,380.67
Water Tanker E - 10 Jam 0.0040 379,191.00 1,522.86
Alat Bantu Ls 1.0000 1,150.00 1,150.00
Jumlah harga pekerjaan 204,185.67 34,159.60 238,345.27
Jumlah harga dibulatkan 238,345.00

7 1 M2 Latasir (SS) Kelas B (Pasir Import) tebal 1,5 cm PU.P.7


HPS.PU. 2017
Pasir (Import) MB.1 M3 0.0223 1,541,578.45 34,338.66
Aspal MA.7 Kg. 3.3990 23,877.45 81,159.45
Kayu bakar MC.35 M3 0.1250 529,000.00 66,125.00
Minyak tanah MA.3 Liter 0.0400 12,402.75 496.11
Mandor (F. Equipment) L-5 Jam 0.0282 32,858.00 927.84
Pekerja L-4 Jam 0.2824 18,858.00 5,325.11
Aspal Mixer Sederhana Jam 0.0282 100,000.00 2,823.80
Dump Truck E-1 Jam 0.0070 381,131.00 2,671.83
Pneumatic Tire Roller E-6 Jam 0.0113 670,190.00 7,560.31
Water Tanker E - 10 Jam 0.0040 379,191.00 1,522.86
Alat Bantu Ls 1.0000 1,150.00 1,150.00
Jumlah harga pekerjaan 182,119.22 21,981.75 204,100.97
Jumlah harga dibulatkan 204,100.00
Analisa Harga Satuan Pekerjaan (AHSP) P. Aspal

PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)

8 1 M2 Latasir (SS) Kelas B (Pasir lokal) tebal 1,5 cm PU.P.8


HPS.PU. 2017
Pasir semen (lokal) MB.2 M3 0.0208 1,058,872.85 22,013.97
Aspal MA.7 Kg. 3.3990 23,877.45 81,159.45
Kayu bakar MC.35 M3 0.1250 529,000.00 66,125.00
Minyak tanah MA.3 Liter 0.0400 12,402.75 496.11
Mandor (F. Equipment) L-5 Jam 0.0292 32,858.00 958.77
Pekerja L-4 Jam 0.2918 18,858.00 5,502.62
Aspal Mixer Sederhana Jam 0.0292 100,000.00 2,917.92
Dump Truck E-1 Jam 0.0051 381,131.00 1,950.24
Pneumatic Tire Roller E-6 Jam 0.0169 670,190.00 11,340.47
Water Tanker E - 10 Jam 0.0040 379,191.00 1,522.86
Alat Bantu Ls 1.0000 1,150.00 1,150.00
Jumlah harga pekerjaan 169,794.53 25,342.87 195,137.40
Jumlah harga dibulatkan 195,137.00

9 1 M2 Lapis Permukaan Lataston (Tebal 4 CM) PU.P.9


HPS.PU. 2017
Agregat Kasar 5-10 dan 10-15 MB.6 M3 0.0238 1,567,479.90 37,306.02
Agregat Kasar 0,5 MB.6 M3 0.0170 1,567,479.90 26,647.16
Agregat Halus 0,05 - 0,5 MB.1 M3 0.0238 1,541,578.45 36,689.57
Additive Liter 0.0233 300,000.00 6,990.00
Aspal MA.7 KG 7.7671 23,877.45 185,458.54
Mandor (F. Equipment) L-5 Jam 0.0026 32,858.00 85.43 85.43
Pekerja L-4 Jam 0.0179 18,858.00 337.56 337.56
Aspal Mixer Plant (AMP) E - 19 Jam 0.0026 9,697,886.00 25,214.50 25,214.50
Excavator E-2 Jam 0.0096 762,894.00 7,323.78 7,323.78
Dump Truck E-1 Jam 0.0302 381,131.00 11,510.16 11,510.16
Asphalt Finizher E - 17 Jam 0.0032 957,481.00 3,063.94 3,063.94
Tandem Roller E-7 Jam 0.0203 544,501.00 11,053.37 11,053.37
Pneumatic Tire Roller E-6 Jam 0.0058 670,190.00 3,887.10 3,887.10
Water Tanker E - 10 Jam 0.0302 379,191.00 11,451.57 11,451.57
Generator Zet E - 18 Jam 0.0026 164,364.00 427.35 427.35
Alat Bantu Ls 1.0000 100,000.00 100,000.00 100,000.00
Jumlah harga pekerjaan 467,446.05 174,354.76 641,800.80
Jumlah harga dibulatkan 641,800.00

Anda mungkin juga menyukai