F. BAHAN KERAMIK
1 Ubin Abu-Abu 20 x 20 Cm MF.1 Buah 2,640.00 0.00% 110.00 2,750.00 412.00 3,162.00
2 Ubin Abu-Abu 30 x 30 Cm MF.2 Buah 6,166.00 0.00% 190.00 6,356.00 953.00 7,309.00
3 Ubin Abu-Abu 40 x 40 Cm MF.3 Buah 14,145.00 0.00% 340.00 14,485.00 2,172.00 16,657.00
4 Ubin Warna 20 x 20 Cm MF.4 Buah 2,633.00 0.00% 110.00 2,743.00 411.00 3,154.00
5 Ubin Warna 30 x 30 Cm MF.5 Buah 6,159.00 0.00% 190.00 6,349.00 952.00 7,301.00
6 Ubin Warna 40 x 40 Cm MF.6 Buah 13,888.00 0.00% 340.00 14,228.00 2,134.00 16,362.00
7 Ubin Teraso Ukuran 30 x 30 cm MF.7 Buah 6,318.00 0.00% 190.00 6,508.00 976.00 7,484.00
8 Ubin Teraso Ukuran 40 x 40 cm MF.8 Buah 13,666.00 0.00% 340.00 14,006.00 2,100.00 16,106.00
9 Ubin Granito Ukuran 30 x 30 cm MF.9 Buah 6,113.00 0.00% 190.00 6,303.00 945.00 7,248.00
10 Ubin Granito Ukuran 40 x 40 cm MF.10 Buah 12,166.00 0.00% 340.00 12,506.00 1,875.00 14,381.00
11 Ubin Teralux Kerang Ukuran 30 x 30 cm MF.11 Buah 6,704.00 0.00% 190.00 6,894.00 1,034.00 7,928.00
12 Ubin Teralux Kerang Ukuran 40 x 40 cm MF.12 Buah 13,958.00 0.00% 340.00 14,298.00 2,144.00 16,442.00
13 Ubin Teralux Marmer Ukuran 30 x 30 c MF.13 Buah 8,750.00 0.00% 190.00 8,940.00 1,341.00 10,281.00
14 Ubin Teralux Marmer Ukuran 40 x 40 c MF.14 Buah 21,458.00 0.00% 340.00 21,798.00 3,269.00 25,067.00
15 Ubin Teralux Marmer Ukuran 60 x 60 c MF.15 Buah 66,222.00 0.00% 1,320.00 67,542.00 10,131.00 77,673.00
16 Keramik Artistik 10x20; 15x15 cm MF.16 Buah 1,175.00 0.00% 90.00 1,265.00 189.00 1,454.00
17 Keramik Artistik 10x10 atau 5x20 cm MF.17 Buah 650.00 0.00% 90.00 740.00 111.00 851.00
18 Keramik Lantai 20 x 20 cm MF.18 Buah 2,765.00 0.00% 110.00 2,875.00 431.00 3,306.00
19 Keramik Lantai 20 x 30 cm MF.19 Buah 4,062.00 0.00% 150.00 4,212.00 631.00 4,843.00
20 Keramik Lantai 30 x 30 cm MF.20 Buah 6,500.00 0.00% 190.00 6,690.00 1,003.00 7,693.00
Kode Harga Tingkat Ongkos Harga Dasar + Overhead Harga Satuan
No. Nama Bahan/Barang Barang Satuan Dasar Inflasi Angkut Inflasi + + on Site Project Ket.
( Rp. ) ( %. ) (Rp) Ongkos angkut Profit (Tanpa PPN)
1 2 3 4 5 6 7 8 9 10 11
21 Keramik Lantai 30 x 30 berglasir MF.21 Buah 5,909.00 0.00% 190.00 6,099.00 914.00 7,013.00
22 Keramik Lantai 30 x 30 berglasir (Mozai MF.22 Buah 6,659.00 0.00% 190.00 6,849.00 1,027.00 7,876.00
23 Keramik Lantai 40 x 40 cm MF.23 Buah 12,916.00 0.00% 340.00 13,256.00 1,988.00 15,244.00
24 Keramik Lantai 50 x 50 cm MF.24 Buah 23,700.00 0.00% 670.00 24,370.00 3,655.00 28,025.00
25 Keramik Lantai 60 x 60 cm MF.25 Buah 55,666.00 0.00% 1,320.00 56,986.00 8,547.00 65,533.00
26 Keramik Dinding 10 x 20 cm MF.26 Buah 1,250.00 0.00% 90.00 1,340.00 201.00 1,541.00
27 Keramik Dinding 20x20 atau 20x25 cm MF.27 Buah 3,004.00 0.00% 110.00 3,114.00 467.00 3,581.00
28 Ubin Dinding Porselin 11 x 11 MF.28 Buah 670.00 0.00% 90.00 760.00 114.00 874.00
29 Ubin Dinding Porselin 10 x 20 cm MF.29 Buah 853.00 0.00% 90.00 943.00 141.00 1,084.00
30 Ubin Dinding Porselin 20 x 20 MF.30 Buah 2,650.00 0.00% 110.00 2,760.00 414.00 3,174.00
31 Plint Ubin Abu-Abu 15 x 20 cm MF.31 Buah 12,500.00 0.00% 150.00 12,650.00 1,897.00 14,547.00
32 Plint Ubin Abu-Abu 10 x 30 cm MF.32 Buah 10,000.00 0.00% 150.00 10,150.00 1,522.00 11,672.00
33 Plint Ubin Abu-Abu 10 x 40 cm MF.33 Buah 11,500.00 0.00% 150.00 11,650.00 1,747.00 13,397.00
34 Plint Ubin Warna 10 x 20 cm MF.34 Buah 5,000.00 0.00% 90.00 5,090.00 763.00 5,853.00
35 Plint Ubin Warna 10 x 30 cm MF.35 Buah 7,500.00 0.00% 150.00 7,650.00 1,147.00 8,797.00
36 Plint Ubin Warna 10 x 40 cm MF.36 Buah 7,500.00 0.00% 150.00 7,650.00 1,147.00 8,797.00
37 Plint Ubin Teraso 10 x 30 cm MF.37 Buah 7,500.00 0.00% 150.00 7,650.00 1,147.00 8,797.00
38 Plint Ubin Teraso 10 x 40 cm MF.38 Buah 12,500.00 0.00% 150.00 12,650.00 1,897.00 14,547.00
39 Plint Ubin Granito 10 x 40 cm MF.39 Buah 12,500.00 0.00% 150.00 12,650.00 1,897.00 14,547.00
40 Plint Ubin Granito 10 x 30 cm MF.40 Buah 7,500.00 0.00% 150.00 7,650.00 1,147.00 8,797.00
41 Plint Ubin Teralux Kerang 10 x 40 cm MF.41 Buah 7,500.00 0.00% 150.00 7,650.00 1,147.00 8,797.00
42 Plint Ubin Teralux Kerang 10 x 30 cm MF.42 Buah 7,500.00 0.00% 150.00 7,650.00 1,147.00 8,797.00
43 Plint Ubin Teralux Marmer 10 x 60 cm MF.43 Buah 15,000.00 0.00% 160.00 15,160.00 2,274.00 17,434.00
44 Plint Ubin Teralux Marmer 10 x 40 cm MF.44 Buah 10,000.00 0.00% 150.00 10,150.00 1,522.00 11,672.00
45 Plint Ubin Teralux Marmer 10 x 30 cm MF.45 Buah 7,500.00 0.00% 150.00 7,650.00 1,147.00 8,797.00
46 Plint Keramik Artistik 10 x 20 cm MF.46 Buah 4,750.00 0.00% 90.00 4,840.00 726.00 5,566.00
47 Plint Keramik Artistik 10 x 10 cm MF.47 Buah 4,500.00 0.00% 90.00 4,590.00 688.00 5,278.00
48 Plint Keramik Artistik 5 x 20 cm MF.48 Buah 4,000.00 0.00% 90.00 4,090.00 613.00 4,703.00
49 Plint Keramik Artistik 10 x 30 cm MF.49 Buah 7,500.00 0.00% 150.00 7,650.00 1,147.00 8,797.00
50 Marmer Ukuran 100 x 100 cm MF.50 Buah 350,000.00 0.00% 7,350.00 357,350.00 53,602.00 410,952.00
51 Wall paper (Lebar 50 cm) MF.51 M2 155,000.00 0.00% 307.00 155,307.00 23,296.00 178,603.00
52 Batu Paras MF.52 Buah 22,272.00 0.00% 190.00 22,462.00 3,369.00 25,831.00
53 Batu Tempel Hitam MF.53 Buah 27,727.00 0.00% 190.00 27,917.00 4,187.00 32,104.00
G. BAHAN KACA
1 Kaca Polos 3 mm MG.1 M2 150,000.00 0.00% 1,700.00 151,700.00 22,755.00 174,455.00
2 Kaca Polos 5 mm MG.2 M2 180,200.00 0.00% 2,390.00 182,590.00 27,388.00 209,978.00
3 Kaca Buram 3 mm MG.3 M2 100,000.00 0.00% 1,700.00 101,700.00 15,255.00 116,955.00
4 Kaca Buram 4 mm MG.4 M2 150,000.00 0.00% 2,050.00 152,050.00 22,807.00 174,857.00
5 Kaca Buram 5 mm MG.5 M2 213,000.00 0.00% 2,390.00 215,390.00 32,308.00 247,698.00
6 Kaca Naco / Louver - 7 Clips (polos) MG.6 Buah 128,000.00 0.00% 2,610.00 130,610.00 19,591.00 150,201.00
7 Kaca Naco / Louver - 8 Clips (polos) MG.7 Buah 146,000.00 0.00% 2,940.00 148,940.00 22,341.00 171,281.00
8 Kaca Naco / Louver - 9 Clips (polos) MG.8 Buah 161,750.00 0.00% 3,270.00 165,020.00 24,753.00 189,773.00
9 Kaca Naco / Louver - 10 Clips (polos) MG.9 Buah 201,500.00 0.00% 3,620.00 205,120.00 30,768.00 235,888.00
10 Kaca Rayban 25 % - tebal 5 mm MG.10 M2 12,000.00 0.00% 2,390.00 14,390.00 2,158.00 16,548.00
11 Kaca Acrylic (Kaca Plastik) - 5 mm MG.11 Lembar ### 0.00% 2,330.00 1,002,330.00 150,349.00 1,152,679.00
H. BAHAN/ALAT PENGGANTUNG
1 Kunci Tanam (Setara Cap Kuda Terbang MH.1 Set 73,875.00 0.00% 290.00 74,165.00 11,124.00 85,289.00
2 Kunci Tanam - 2 Slaagh MH.2 Set 125,750.00 0.00% 290.00 126,040.00 18,906.00 144,946.00
3 Kunci Tanam - 1 Slaagh MH.3 Set 56,500.00 0.00% 290.00 56,790.00 8,518.00 65,308.00
4 Kunci Tanam (Setara Cap Anchor / Yale MH.4 Set 89,000.00 0.00% 290.00 89,290.00 13,393.00 102,683.00
5 Kunci Gembok 1" MH.5 Set 55,500.00 0.00% 140.00 55,640.00 8,346.00 63,986.00
6 Engsel 4" Kuningan (Untuk Pintu) MH.6 Pasang 27,000.00 0.00% 140.00 27,140.00 4,071.00 31,211.00
7 Engsel 3" Kuningan (Untuk Jendela) MH.7 Pasang 20,428.00 0.00% 140.00 20,568.00 3,085.00 23,653.00
8 Engsel Kupu-Kupu T MH.8 Pasang 15,714.00 0.00% 140.00 15,854.00 2,378.00 18,232.00
9 Engsel Nylon Kuningan 4" MH.9 Pasang 11,500.00 0.00% 140.00 11,640.00 1,746.00 13,386.00
10 Engsel Biasa 3" (Untuk Jendela) MH.10 Pasang 12,916.00 0.00% 140.00 13,056.00 1,958.00 15,014.00
11 Hak Angin / Kait Angin MH.11 Buah 10,142.00 0.00% 140.00 10,282.00 1,542.00 11,824.00
12 Espagnolet MH.12 Set 65,000.00 0.00% 140.00 65,140.00 9,771.00 74,911.00
13 Grendel Tanam (Pintu) MH.13 Buah 65,000.00 0.00% 140.00 65,140.00 9,771.00 74,911.00
14 Grendel Besar / Kecil MH.14 Buah 9,000.00 0.00% 140.00 9,140.00 1,371.00 10,511.00
15 Tarikan Pintu MH.15 Buah 100,250.00 0.00% 140.00 100,390.00 15,058.00 115,448.00
16 Tarikan Jendela MH.16 Buah 13,500.00 0.00% 140.00 13,640.00 2,046.00 15,686.00
I. BAHAN CAT
1 Amplas Kertas (Amplas Kayu) MI.1 Lembar 4,312.00 0.00% 15.00 4,327.00 649.00 4,976.00
2 Amplas Besi MI.2 Lembar 4,250.00 0.00% 15.00 4,265.00 639.00 4,904.00
3 Dempul Kayu MI.3 Kg 31,571.00 0.00% 270.00 31,841.00 4,776.00 36,617.00
4 Cat Meny Kayu MI.4 Kg 30,825.00 0.00% 270.00 31,095.00 4,664.00 35,759.00
5 Cat Meny Besi MI.5 Kg 31,312.00 0.00% 270.00 31,582.00 4,737.00 36,319.00
6 Cat Kayu MI.6 Kg 55,500.00 0.00% 270.00 55,770.00 8,365.00 64,135.00
7 Cat Besi MI.7 Kg 58,375.00 0.00% 270.00 58,645.00 8,796.00 67,441.00
8 Cat Kilat LN MI.8 Kg 56,000.00 0.00% 270.00 56,270.00 8,440.00 64,710.00
9 Minyak Cat / Thinner (Setara Lauguer) MI.9 Kg 29,833.00 0.00% 270.00 30,103.00 4,515.00 34,618.00
10 Minyak Cat / Thinner (Biasa) Afduner MI.10 Kg 27,800.00 0.00% 270.00 28,070.00 4,210.00 32,280.00
11 Palmur Tembok MI.11 Zak 186,700.00 0.00% 7,500.00 194,200.00 29,130.00 223,330.00
12 Cat Tembok (1 Klg @ 5 Kg) MI.12 Kaleng 89,125.00 0.00% 1,540.00 90,665.00 13,599.00 104,264.00
13 Cat Besi Crom MI.13 Kg 45,428.00 0.00% 270.00 45,698.00 6,854.00 52,552.00
14 Cat Besi (Setara Nippon Paint) MI.14 Kg 65,400.00 0.00% 270.00 65,670.00 9,850.00 75,520.00
15 Politur Kaleng (Setara Apache) MI.15 Kg 58,142.00 0.00% 270.00 58,412.00 8,761.00 67,173.00
16 Floor Hardener MI.16 KG 60,000.00 0.00% 270.00 60,270.00 9,040.00 69,310.00
Kode Harga Tingkat Ongkos Harga Dasar + Overhead Harga Satuan
No. Nama Bahan/Barang Barang Satuan Dasar Inflasi Angkut Inflasi + + on Site Project Ket.
( Rp. ) ( %. ) (Rp) Ongkos angkut Profit (Tanpa PPN)
1 2 3 4 5 6 7 8 9 10 11
J. BAHAN LISTRIK DAN ELEKTRONIKA
1 Kabel Listrik NYM/NYA 3x2.5 mm MJ.1 Roll ### 0.00% 20,800.00 1,244,466.00 186,669.00 1,431,135.00
2 Kabel Listrik NYM/NYA 2x1.5 mm MJ.2 Roll 689,250.00 0.00% 20,800.00 710,050.00 106,507.00 816,557.00
3 Pipa Listrik dia, 5/8 MJ.3 Batang 8,166.00 0.00% 100.00 8,266.00 1,239.00 9,505.00
4 Saklar Double - Tempel MJ.4 Buah 19,150.00 0.00% 450.00 19,600.00 2,940.00 22,540.00
5 Saklar Tunggal / Engkel - Tempel MJ.5 Buah 15,000.00 0.00% 450.00 15,450.00 2,317.00 17,767.00
6 Stop Kontak 500 Watt - Tempel MJ.6 Buah 16,300.00 0.00% 450.00 16,750.00 2,512.00 19,262.00
7 Stop Kontak 1000 Watt - Tempel MJ.7 Buah 26,875.00 0.00% 450.00 27,325.00 4,098.00 31,423.00
8 Home Saklar 1 Fase Komplit MJ.8 Buah 195,833.00 0.00% 720.00 196,553.00 29,482.00 226,035.00
9 Lampu TL 1 x 40 Watt Komplit MJ.9 Buah 143,583.00 0.00% 90.00 143,673.00 21,550.00 165,223.00
10 Lampu TL 1 x 20 Watt Komplit MJ.10 Buah 103,750.00 0.00% 90.00 103,840.00 15,576.00 119,416.00
11 Lampu Pijar 40 Watt Komplit MJ.11 Buah 8,857.00 0.00% 90.00 8,947.00 1,342.00 10,289.00
12 Lampu Pijar 60 Watt Komplit MJ.12 Buah 9,714.00 0.00% 90.00 9,804.00 1,470.00 11,274.00
13 Lampu Pijar 100 Watt Komplit MJ.13 Buah 10,500.00 0.00% 90.00 10,590.00 1,588.00 12,178.00
14 Vitting Lampu MJ.14 Buah 14,050.00 0.00% 90.00 14,140.00 2,121.00 16,261.00
15 Lampu XL 40 Watt MJ.15 Set 100,500.00 0.00% 90.00 100,590.00 15,088.00 115,678.00
16 Lampu XL 20 Watt MJ.16 Set 46,500.00 0.00% 90.00 46,590.00 6,988.00 53,578.00
17 Lampu SL 23 Watt MJ.17 Set 45,875.00 0.00% 90.00 45,965.00 6,894.00 52,859.00
18 Lampu SL 14 Watt MJ.18 Set 37,000.00 0.00% 90.00 37,090.00 5,563.00 42,653.00
19 Sekring Kas 1 Group (Biasa) MJ.19 Buah 73,000.00 0.00% 270.00 73,270.00 10,990.00 84,260.00
20 Klem Kabel MJ.20 Dus 18,428.00 0.00% 140.00 18,568.00 2,785.00 21,353.00
21 Isolasi Listrik MJ.21 Buah 9,857.00 0.00% 140.00 9,997.00 1,499.00 11,496.00
22 Sekrup MJ.22 Dus 17,750.00 0.00% 140.00 17,890.00 2,683.00 20,573.00
23 Panil Distribusi MJ.23 Buah ### 0.00% 720.00 6,500,720.00 975,108.00 7,475,828.00
M. BETON PRACETAK
1 Dwiker Sumur/Gorong2 Ø 1 m, H 60 cm MM.1 Buah 412,500.00 0.00% 39,310.00 451,810.00 67,771.00 519,581.00
2 Dwiker Sumur/Gorong2 Ø 0,8 m, H 60 c MM.2 Buah 362,500.00 0.00% 32,690.00 395,190.00 59,278.00 454,468.00
3 Dwiker Sumur/Gorong2 Ø 0,6 m, H 80 c MM.3 Buah 357,500.00 0.00% 34,430.00 391,930.00 58,789.00 450,719.00
4 Dwiker Sumur/Gorong2 Ø 0,4 m, H 80 c MM.4 Buah 332,500.00 0.00% 25,880.00 358,380.00 53,757.00 412,137.00
Mengetahui / menyetujui :
Kepala Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan
Kabupaten Merauke
KEGIATAN : HARGA SATUAN DINAS PEKERJAAN UMUM, PENATAAN RUANG DAN PERTANAHAN
PEKERJAAN : PERHITUNGAN HARGA SATUAN BAHAN, UPAH, PEKERJAAN DAN KEGIATAN
LOKASI : KOTA MERAUKE - DISTRIK MERAUKE
KABUPATEN / PROPINSI : MERAUKE - PAPUA
TAHUN ANGGARAN : 2017
SUMBER DANA : ---
1 DUMP TRUCK 3-4 M3 E-1 115.0 3.50 Ton 6.00 6.00 1,500.00 Rp E - 1 391,000,000.00
2 EXCAVATOR 80-140 HP E-2 135.0 0.90 M3 5.00 5.00 1,500.00 Rp E - 2 1,751,530,000.00
3 BULLDOZER 100-150 HP E-3 155.0 - - 5.00 5.00 1,500.00 Rp E - 3 3,315,180,000.00
4 MOTOR GRADER >100 HP E-4 135.0 - - 5.00 5.00 1,500.00 Rp E - 4 2,381,500,000.00
5 VIBRATOR ROLLER 5-8 T. E-5 100.0 8.00 Ton 5.00 5.00 1,500.00 Rp E - 5 1,240,000,000.00
6 PNEUMATIC T. ROLLER 8-15 T. E-6 129.0 8.00 Ton 5.00 5.00 1,500.00 Rp E - 6 1,423,300,000.00
7 TANDEM ROLER 6-8 T E-7 83.0 8.00 Ton 5.00 5.00 1,500.00 Rp E - 7 1,315,000,000.00
8 CONCRETE MIXER 0.3-0.6 M3 E-8 10.0 500.00 Liter 5.00 5.00 1,500.00 Rp E - 8 75,515,000.00
9 WATER PUMP 70-100 mm E-9 8.0 30.00 M3/hari 5.00 5.00 1,500.00 Rp E - 9 7,500,000.00
10 WATER TANKER 3000-4500 L. E - 10 115.0 4,000.00 Liter 5.00 5.00 1,500.00 Rp E - 10 350,000,000.00
11 CHAIN SAW (MESIN POTONG E - 11 10.0 - - 5.00 5.00 1,200.00 Rp E - 11 5,500,000.00
12 COMPRESSOR 4000-6500 L\M E - 12 80.0 - - 5.00 5.00 2,000.00 Rp E - 12 50,000,000.00
13 ASPHALT SPRAYER E - 13 15.0 800.00 Liter 5.00 5.00 1,200.00 Rp E - 13 45,000,000.00
14 FARM TRACTOR (ROTARI) M 5 E - 14 50.0 2.00 Ton 5.00 5.00 1,200.00 Rp E - 14 295,000,000.00
15 STAMPER E - 15 5.0 0.20 Ton 5.00 5.00 1,200.00 Rp E - 15 32,500,000.00
16 WHELL LOADER E - 16 95.0 1.50 M3 5.00 5.00 1,200.00 Rp E - 16 1,696,580,000.00
17 ASPHALT FINIZHER E - 17 144.0 - - 5.00 5.00 1,200.00 Rp E - 17 1,977,960,000.00
18 GENERATOR ZET E - 18 50.0 - - 5.00 5.00 1,200.00 Rp E - 18 35,000,000.00
19 ASPHAL MIXING PLANT (AMP) E - 19 150.0 30.00 Ton/Jam 10.00 10.00 1,200.00 Rp E - 19 3,220,525,000.00
20 MINI EXCAVATOR - COBELCO E - 20 50.0 - - 5.00 5.00 800.00 Rp E - 20 554,400,000.00
KETERANGAN :
1 Tingkat Suku Bunga i = 10.00 % per-tahun
2 Asuransi, Pajak, dll i = 0.0020
3 Jam kerja efektif per hari Tk = 7 Jam
4 Jarak Merauke ke lokasi Proyek L = 5.00 Kilo Meter
5 Upah Operator / Sopir / Mekanik L-6 = 26,858.00 Rupiah per-orang/jam
6 Upah Pembantu Operator/Sopir/Mekan L-7 = 18,858.00 Rupiah per-orang/jam
7 Harga Bahan Bakar Bensin MA.1 = 11,113.60 Rupiah per-liter
8 Harga Bahan Bakar Solar MA.2 = 14,073.70 Rupiah per-liter
9 Minyak Pelumas MA.4 = 40,117.75 Rupiah per-liter
10 Khusus AMP, biaya bahan bakar ditambah (untuk pemanasan material) sebesar : 12 Liter x (Kapasitas AMP Riil = 0.7 x Kapasitas AMP/Jam) x Harga BBM Solar
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan = DUMP TRUCK 3-4 M3 E-1
2. Tenaga Pw 115.0 HP
3. Kapasitas Cp 3.5 Ton
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 391,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam
c. Harga Alat (*) B' 391,000,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 202,309.44 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 46,135.41 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 32,583.33 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 26,858.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 18,858.00 Rupiah
F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 18,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 11,113.60 Liter
6 Bahan Bakar Solar MA.2 14,073.70 Liter
7 Minyak Pelumas MA.4 40,117.75 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan : EXCAVATOR 80-140 HP E-2
2. Tenaga Pw 135.0 HP
3. Kapasitas Cp 0.90 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 1,751,530,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam
c. Harga Alat (*) B' 1,751,530,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 237,493.69 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 54,158.96 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 145,960.83 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 26,858.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 18,858.00 Rupiah
F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 18,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 11,113.60 Liter
6 Bahan Bakar Solar MA.2 14,073.70 Liter
7 Minyak Pelumas MA.4 40,117.75 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan : BULLDOZER 100-150 HP E-3
2. Tenaga Pw 155.0 HP
3. Kapasitas Cp - -
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 3,315,180,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam
c. Harga Alat (*) B' 3,315,180,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 272,677.94 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 62,182.51 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 276,265.00 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 26,858.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 18,858.00 Rupiah
F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 18,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 11,113.60 Liter
6 Bahan Bakar Solar MA.2 14,073.70 Liter
7 Minyak Pelumas MA.4 40,117.75 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan : MOTOR GRADER >100 HP E-4
2. Tenaga Pw 135.0 HP
3. Kapasitas Cp -
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 2,381,500,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam
c. Harga Alat (*) B' 2,381,500,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 237,493.69 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 54,158.96 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 198,458.33 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 26,858.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 18,858.00 Rupiah
F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 18,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 11,113.60 Liter
6 Bahan Bakar Solar MA.2 14,073.70 Liter
7 Minyak Pelumas MA.4 40,117.75 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan : VIBRATOR ROLLER 5-8 T. E-5
2. Tenaga Pw 100.0 HP
3. Kapasitas Cp 8.00 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 1,240,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam
c. Harga Alat (*) B' 1,240,000,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 175,921.25 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 40,117.75 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 103,333.33 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 26,858.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 18,858.00 Rupiah
F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 18,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 11,113.60 Liter
6 Bahan Bakar Solar MA.2 14,073.70 Liter
7 Minyak Pelumas MA.4 40,117.75 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan : PNEUMATIC T. ROLLER 8-15 T. E-6
2. Tenaga Pw 129.0 HP
3. Kapasitas Cp 8.00 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 1,423,300,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam
c. Harga Alat (*) B' 1,423,300,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 226,938.41 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 51,751.90 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 118,608.33 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 26,858.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 18,858.00 Rupiah
F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 18,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 11,113.60 Liter
6 Bahan Bakar Solar MA.2 14,073.70 Liter
7 Minyak Pelumas MA.4 40,117.75 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan : TANDEM ROLER 6-8 T E-7
2. Tenaga Pw 83.0 HP
3. Kapasitas Cp 8.00 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 1,315,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam
c. Harga Alat (*) B' 1,315,000,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 146,014.64 Rupiah
= 12.50% x Ltr/HP/Jam x Pw x HDA-02
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 33,297.73 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 109,583.33 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 26,858.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 18,858.00 Rupiah
F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 18,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 11,113.60 Liter
6 Bahan Bakar Solar MA.2 14,073.70 Liter
7 Minyak Pelumas MA.4 40,117.75 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE MIXER 0.3-0.6 M3 E-8
2. Tenaga Pw 10.0 HP
3. Kapasitas Cp 500.0 Liter
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 75,515,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam
c. Harga Alat (*) B' 75,515,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 17,592.13 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 4,011.78 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 6,292.92 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 26,858.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 18,858.00 Rupiah
F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 18,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 11,113.60 Liter
6 Bahan Bakar Solar MA.2 14,073.70 Liter
7 Minyak Pelumas MA.4 40,117.75 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan WATER PUMP 70-100 mm E-9
2. Tenaga Pw 8.0 HP
3. Kapasitas Cp 30.0 M3/hari
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 7,500,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam
c. Harga Alat (*) B' 7,500,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Bensin H 11,113.60 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 3,209.42 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 625.00 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 26,858.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 18,858.00 Rupiah
F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 18,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 11,113.60 Liter
6 Bahan Bakar Solar MA.2 14,073.70 Liter
7 Minyak Pelumas MA.4 40,117.75 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan WATER TANKER 3000-4500 L. E - 10
2. Tenaga Pw 115.0 HP
3. Kapasitas Cp 4,000.0 Liter
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 350,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam
c. Harga Alat (*) B' 350,000,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 202,309.44 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 46,135.41 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 29,166.67 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 26,858.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 18,858.00 Rupiah
F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 18,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 11,113.60 Liter
6 Bahan Bakar Solar MA.2 14,073.70 Liter
7 Minyak Pelumas MA.4 40,117.75 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan : CHAIN SAW (MESIN POTONG KAYU) E - 11
2. Tenaga Pw 10.0 HP
3. Kapasitas Cp -
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200.0 Jam
c. Harga Alat B 5,500,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,200.0 Jam
c. Harga Alat (*) B' 5,500,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Bensin H 13,892.00 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 4,011.78 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 572.92 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 26,858.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 18,858.00 Rupiah
F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 18,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 11,113.60 Liter
6 Bahan Bakar Solar MA.2 14,073.70 Liter
7 Minyak Pelumas MA.4 40,117.75 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan COMPRESSOR 4000-6500 L\M E - 12
2. Tenaga Pw 80.0 HP
3. Kapasitas Cp - -
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 50,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam
c. Harga Alat (*) B' 50,000,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Bensin H 111,136.00 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 32,094.20 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 3,125.00 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 26,858.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 18,858.00 Rupiah
F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 18,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 11,113.60 Liter
6 Bahan Bakar Solar MA.2 14,073.70 Liter
7 Minyak Pelumas MA.4 40,117.75 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT SPRAYER E - 13
2. Tenaga Pw 15.0 HP
3. Kapasitas Cp 800.0 Liter
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200.0 Jam
c. Harga Alat B 45,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,200.0 Jam
c. Harga Alat (*) B' 45,000,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 26,388.19 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 6,017.66 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 4,687.50 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 26,858.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 18,858.00 Rupiah
F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 18,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 11,113.60 Liter
6 Bahan Bakar Solar MA.2 14,073.70 Liter
7 Minyak Pelumas MA.4 40,117.75 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan FARM TRACTOR (ROTARI) M 5000 E - 14
2. Tenaga Pw 50.0 HP
3. Kapasitas Cp 2.0 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200.0 Jam
c. Harga Alat B 295,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,200.0 Jam
c. Harga Alat (*) B' 295,000,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 87,960.63 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 20,058.88 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 30,729.17 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 26,858.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 18,858.00 Rupiah
F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 18,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 11,113.60 Liter
6 Bahan Bakar Solar MA.2 14,073.70 Liter
7 Minyak Pelumas MA.4 40,117.75 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan STAMPER E - 15
2. Tenaga Pw 5.0 HP
3. Kapasitas Cp 0.2 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200.0 Jam
c. Harga Alat B 32,500,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,200.0 Jam
c. Harga Alat (*) B' 32,500,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 6,946.00 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 2,005.89 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 3,385.42 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 26,858.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 18,858.00 Rupiah
F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 18,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 11,113.60 Liter
6 Bahan Bakar Solar MA.2 14,073.70 Liter
7 Minyak Pelumas MA.4 40,117.75 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan WHELL LOADER E - 16
2. Tenaga Pw 95.0 HP
3. Kapasitas Cp 1.5 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200.0 Jam
c. Harga Alat B 1,696,580,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,200.0 Jam
c. Harga Alat (*) B' 1,696,580,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 167,125.19 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 38,111.86 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 176,727.08 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 26,858.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 18,858.00 Rupiah
F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 18,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 11,113.60 Liter
6 Bahan Bakar Solar MA.2 14,073.70 Liter
7 Minyak Pelumas MA.4 40,117.75 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT FINIZHER E - 17
2. Tenaga Pw 144.0 HP
3. Kapasitas Cp - -
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200.0 Jam
c. Harga Alat B 1,977,960,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,200.0 Jam
c. Harga Alat (*) B' 1,977,960,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 253,326.60 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 57,769.56 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 206,037.50 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 26,858.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 18,858.00 Rupiah
F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 18,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 11,113.60 Liter
6 Bahan Bakar Solar MA.2 14,073.70 Liter
7 Minyak Pelumas MA.4 40,117.75 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan GENERATOR ZET E - 18
2. Tenaga Pw 50.0 HP
3. Kapasitas Cp - -
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200.0 Jam
c. Harga Alat B 35,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,200.0 Jam
c. Harga Alat (*) B' 35,000,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H 87,960.63 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 20,058.88 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 3,645.83 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 26,858.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 18,858.00 Rupiah
F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 18,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 11,113.60 Liter
6 Bahan Bakar Solar MA.2 14,073.70 Liter
7 Minyak Pelumas MA.4 40,117.75 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHAL MIXING PLANT (AMP) E - 19
2. Tenaga Pw 150.0 HP
3. Kapasitas Cp 30.0 Ton/Jam
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,200.0 Jam
c. Harga Alat B 3,220,525,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,200.0 Jam
c. Harga Alat (*) B' 3,220,525,000 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I 90,264.94 Rupiah
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K 402,565.63 Rupiah
W'
4. Operator = ( 1 Orang / Jam ) x L - 6 L 26,858.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x L - 7 M 18,858.00 Rupiah
F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 18,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 11,113.60 Liter
6 Bahan Bakar Solar MA.2 14,073.70 Liter
7 Minyak Pelumas MA.4 40,117.75 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan MINI EXCAVATOR - COBELCO E - 20
2. Tenaga Pw 50.0 HP
3. Kapasitas Cp - -
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 800.0 Jam
c. Harga Alat B 554,400,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 800.0 Jam
c. Harga Alat (*) B' 554,400,000 Rupiah
F. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00 % / Tahun
2 Jam kerja efektif per hari Tk 7.00 Jam
3 Upah Operator / Sopir L-6 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 18,858.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 11,113.60 Liter
6 Bahan Bakar Solar MA.2 14,073.70 Liter
7 Minyak Pelumas MA.4 40,117.75 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Harga Satuan Bahan, Upah dan Alat
1 DUMP TRUCK 3-4 M3 E-1 115 3.50 Ton 391,000,000.00 6 1500 391,000,000.00 39,100,000.00 0.22961 53,865.89 521.33 54,387.22 0.125 0.010 248,444.85 0.125 32,583.33 26,858.00 18,858.00 326,744.18 381,131.00 0
2 EXCAVATOR 80-140 HP E-2 135 0.90 M3 1,751,530,000.00 5 1500 1,751,530,000.00 175,153,000.00 0.26380 277,229.52 2,335.37 279,564.89 0.125 0.010 291,652.65 0.125 145,960.83 26,858.00 18,858.00 483,329.48 762,894.00 0
3 BULLDOZER 100-150 HP E-3 155 - - 3,315,180,000.00 5 1500 3,315,180,000.00 331,518,000.00 0.26380 524,721.68 4,420.24 529,141.92 0.125 0.010 334,860.45 0.125 276,265.00 26,858.00 18,858.00 656,841.45 1,185,983.00 0
4 MOTOR GRADER >100 HP E-4 135 - - 2,381,500,000.00 5 1500 2,381,500,000.00 238,150,000.00 0.26380 376,940.22 3,175.33 380,115.55 0.125 0.010 291,652.65 0.125 198,458.33 26,858.00 18,858.00 535,826.98 915,942.00 0
5 VIBRATOR ROLLER 5-8 T. E-5 100 8.00 Ton 1,240,000,000.00 5 1500 1,240,000,000.00 124,000,000.00 0.26380 196,265.33 1,653.33 197,918.66 0.125 0.010 216,039.00 0.125 103,333.33 26,858.00 18,858.00 365,088.33 563,006.00 0
6 PNEUMATIC T. ROLLER 8-15 T. E-6 129 8.00 Ton 1,423,300,000.00 5 1500 1,423,300,000.00 142,330,000.00 0.26380 225,277.77 1,897.73 227,175.51 0.125 0.010 278,690.31 0.125 118,608.33 26,858.00 18,858.00 443,014.64 670,190.00 0
7 TANDEM ROLER 6-8 T E-7 83 8.00 Ton 1,315,000,000.00 5 1500 1,315,000,000.00 131,500,000.00 0.26380 208,136.21 1,753.33 209,889.55 0.125 0.010 179,312.37 0.125 109,583.33 26,858.00 18,858.00 334,611.70 544,501.00 0
8 CONCRETE MIXER 0.3-0.6 M3 E-8 10 500.00 Liter 75,515,000.00 5 1500 75,515,000.00 7,551,500.00 0.26380 11,952.40 100.69 12,053.09 0.125 0.010 21,603.90 0.125 6,292.92 26,858.00 18,858.00 73,612.82 85,665.00 0
9 WATER PUMP 70-100 mm E-9 8 30.00M3/hari 7,500,000.00 5 1500 7,500,000.00 750,000.00 0.26380 1,187.09 10.00 1,197.09 0.125 0.010 14,323.02 0.125 625.00 26,858.00 18,858.00 60,664.02 61,861.00 0
10 WATER TANKER 3000-4500 L. E - 10 115 4000.00 Liter 350,000,000.00 5 1500 350,000,000.00 35,000,000.00 0.26380 55,397.47 466.67 55,864.14 0.125 0.010 248,444.85 0.125 29,166.67 26,858.00 18,858.00 323,327.52 379,191.00 0
11 CHAIN SAW (MESIN POTONG KAYU) E - 11 10 - - 5,500,000.00 5 1200 5,500,000.00 550,000.00 0.26380 1,088.16 9.17 1,097.33 0.125 0.010 17,903.78 0.125 572.92 26,858.00 18,858.00 64,192.69 65,290.00 0
12 COMPRESSOR 4000-6500 L\M E - 12 80 - - 50,000,000.00 5 2000 50,000,000.00 5,000,000.00 0.26380 5,935.44 50.00 5,985.44 0.125 0.010 143,230.20 0.125 3,125.00 26,858.00 18,858.00 192,071.20 198,056.00 0
13 ASPHALT SPRAYER E - 13 15 800.00 Liter 45,000,000.00 5 1200 45,000,000.00 4,500,000.00 0.26380 8,903.16 75.00 8,978.16 0.125 0.010 32,405.85 0.125 4,687.50 26,858.00 18,858.00 82,809.35 91,787.00 0
14 FARM TRACTOR (ROTARI) M 5000 E - 14 50 2.00 Ton 295,000,000.00 5 1200 295,000,000.00 29,500,000.00 0.26380 58,365.19 491.67 58,856.86 0.125 0.010 108,019.50 0.125 30,729.17 26,858.00 18,858.00 184,464.67 243,321.00 0
15 STAMPER E - 15 5 0.20 Ton 32,500,000.00 5 1200 32,500,000.00 3,250,000.00 0.26380 6,430.06 54.17 6,484.23 0.125 0.010 8,951.89 0.125 3,385.42 26,858.00 18,858.00 58,053.30 64,537.00 0
16 WHELL LOADER E - 16 95 1.50 M3 1,696,580,000.00 5 1200 1,696,580,000.00 169,658,000.00 0.26380 335,665.15 2,827.63 338,492.78 0.125 0.010 205,237.05 0.125 176,727.08 26,858.00 18,858.00 427,680.13 766,172.00 0
17 ASPHALT FINIZHER E - 17 144 - - 1,977,960,000.00 5 1200 1,977,960,000.00 197,796,000.00 0.26380 391,335.65 3,296.60 394,632.25 0.125 0.010 311,096.16 0.125 206,037.50 26,858.00 18,858.00 562,849.66 957,481.00 0
18 GENERATOR ZET E - 18 50 - - 35,000,000.00 5 1200 35,000,000.00 3,500,000.00 0.26380 6,924.68 58.33 6,983.02 0.125 0.010 108,019.50 0.125 3,645.83 26,858.00 18,858.00 157,381.33 164,364.00 0
19 ASPHAL MIXING PLANT (AMP) E - 19 150 30.00Ton/Jam 3,220,525,000.00 10 1200 3,220,525,000.00 322,052,500.00 0.16275 393,094.21 5,367.54 398,461.75 0.150 0.015 8,851,143.19 0.150 402,565.63 26,858.00 18,858.00 9,299,424.81 9,697,886.00 0
20 MINI EXCAVATOR - COBELCO E - 20 50 - - 554,400,000.00 5 800 554,400,000.00 55,440,000.00 0.26380 164,530.49 1,386.00 165,916.49 0.125 0.010 108,019.50 0.125 86,625.00 26,858.00 18,858.00 240,360.50 406,276.00 0
26 Kawat burung MN.26 M² #REF! #REF! AAL.D.26 13,620.00 M - - - - - - 540.00 M - - - - - - AAD.D.26 #REF! #REF! 0.0538 0.1023 1.0000 - 0.4838 - 14,988.72 - - 7,050.36 - 734.00 734.00 #REF! #REF! #REF!
27 Kawat Duri Baja 30 M MD.27 KG #REF! #REF! AAL.D.27 50,000.00 KG - - - - - - 2,000.00 KG - - - - - - AAD.D.27 #REF! #REF! 0.0006 0.0011 1.0000 - 0.0035 - 162.16 - - 50.85 - 210.00 210.00 #REF! #REF! #REF!
ANALISA ANGKUT BAHAN
HARGA ANALISA BIAYA MUAT DAN ANGKUTAN ----- L A U T ------- ANALISA BIAYA MUAT DAN ANGKUTAN ---- S U N G A I ------- ANALISIS BIAYA MUAT DAN ANGKUTAN ----- D A R A T -------- Jumlah Total Harga Dasar + OVERHEAD HARGA
URAIAN BAHAN/MATERIAL YANG DASAR TINGKAT Kode Jumlah Angkut 50.00 Perkiraan Biaya Jumlah Harga Jumlah Angkut 2.00 Perkiraan Biaya Jumlah Harga Kode Jarak Angkut Perkiraan Kuantitas Perkiraan Biaya Jumlah biaya Ongkos Inflasi + + SATUAN
No. KODE SATUAN
DIANGKUT BARANG INFLASI Analisa Maksimal Ton Packing Angkut/Ton-M3 Bongkar Muat Pikul Barang Jumlah Total per satu satuan Maksimal Ton Packing Angkut/Ton-M3Bongkar MuatPikul Barang Jumlah Total per satu satuan Analisa Truck Traktor Excavator Dump Tracktor Alat Mandor Pekerja Excavator Dump Tracktor Mandor Pekerja Biaya Biaya alat+tenaga Angkut Ongkos angkut PROFIT BAHAN
( Rp. ) Angkut Kapal Satuan (Rp) (Rp) (Rp) (Rp) (Rp) bahan/material Kapal Satuan (Rp) (Rp) (Rp) (Rp) (Rp) bahan/material Angkut (km) (km) Truck Bantu Truck Alat Bantu Lain-lain (Rupiah) (Rupiah) (Rupiah) (Rupiah) (Rupiah)
1 2 2 5 19 20 20 7 6 6 8 9 10 11 12 13 14 17 21 22 23
28 Kawat Las 0.26 MD.28 Dos #REF! #REF! AAL.D.28 25,000.00 Dus - - - - - - 1,000.00 Dus - - - - - - AAD.D.28 #REF! #REF! 0.0007 0.0013 1.0000 - 0.0039 - 182.29 - - 57.16 - 230.00 230.00 #REF! #REF! #REF!
29 Timah Solder MD.29 Kg #REF! #REF! AAL.D.29 50,000.00 KG - - - - - - 2,000.00 KG - - - - - - AAD.D.29 #REF! #REF! 0.0002 0.0004 1.0000 - 0.0010 - 66.93 - - 13.99 - 80.00 80.00 #REF! #REF! #REF!
30 Baut Jembatan Dia. 19 mm MD.30 Kg #REF! #REF! AAL.D.30 50,000.00 KG - - - - - - 2,000.00 KG - - - - - - AAD.D.30 #REF! #REF! 0.0006 0.0011 1.0000 - 0.0038 - 177.64 - - 55.70 - 230.00 230.00 #REF! #REF! #REF!
31 Baut Dia, 3/8" - 17.5 + Mur - Ring MD.31 Buah #REF! #REF! AAL.D.31 500,000.00 Buah - - - - - - 2,000.00 Buah - - - - - - AAD.D.31 #REF! #REF! 0.0006 0.0011 1.0000 - 0.0038 - 177.64 - - 55.70 - 230.00 230.00 #REF! #REF! #REF!
32 Baut Dia, 3/8" - 12.0/15.0 + Mur - Ring MD.32 Buah #REF! #REF! AAL.D.32 500,000.00 Buah - - - - - - 2,000.00 Buah - - - - - - AAD.D.32 #REF! #REF! 0.0006 0.0011 1.0000 - 0.0038 - 177.64 - - 55.70 - 230.00 230.00 #REF! #REF! #REF!
33 Baut Dia, 3/8" - 20.0 + Mur - Ring MD.33 Buah #REF! #REF! AAL.D.33 500,000.00 Buah - - - - - - 2,000.00 Buah - - - - - - AAD.D.33 #REF! #REF! 0.0006 0.0011 1.0000 - 0.0038 - 177.64 - - 55.70 - 230.00 230.00 #REF! #REF! #REF!
34 Baut Dia, 3/8" - 35.0 + Mur - Ring MD.34 Buah #REF! #REF! AAL.D.34 500,000.00 Buah - - - - - - 2,000.00 Buah - - - - - - AAD.D.34 #REF! #REF! 0.0006 0.0011 1.0000 - 0.0038 - 177.64 - - 55.70 - 230.00 230.00 #REF! #REF! #REF!
35 Besi angkur dia. 8 mm MN.35 Buah #REF! #REF! AAL.D.35 200,000.00 Buah - - - - - - 8,000.00 Buah - - - - - - AAD.D.35 #REF! #REF! 0.0006 0.0011 1.0000 - 0.0038 - 177.64 - - 55.70 - 230.00 230.00 #REF! #REF! #REF!
36 Kasa (Ram Ayam) Dia, 10 mm MD.36 M #REF! #REF! AAL.D.36 60,000.00 M - - - - - - 2,000.00 M - - - - - - AAD.D.36 #REF! #REF! 0.0277 0.0145 1.0000 - 0.1107 - 7,716.61 - - 1,613.21 - 310.00 310.00 #REF! #REF! #REF!
37 Besi Siku 30 . 30 . 3 - L = 6 Meter MD.37 Batang #REF! #REF! AAL.D.37 5,927.00 Batang - - - - - - 237.00 Batang - - - - - - AAD.D.37 #REF! #REF! 0.0064 0.0050 1.0000 - 0.0256 - 1,784.82 - - 373.13 - 2,150.00 2,150.00 #REF! #REF! #REF!
38 Besi Siku 50 . 50 . 5 - L = 6 Meter MD.38 Batang #REF! #REF! AAL.D.38 2,134.00 Batang - - - - - - 85.00 Batang - - - - - - AAD.D.38 #REF! #REF! 0.0189 0.0147 1.0000 - 0.0755 - 5,261.08 - - 1,099.87 - 6,360.00 6,360.00 #REF! #REF! #REF!
39 Besi Siku 50 . 50 . 6 - L = 6 Meter MD.39 Batang #REF! #REF! AAL.D.39 1,778.00 Batang - - - - - - 71.00 Batang - - - - - - AAD.D.39 #REF! #REF! 0.0198 0.0153 1.0000 - 0.0790 - 5,509.46 - - 1,151.79 - 6,660.00 6,660.00 #REF! #REF! #REF!
40 Besi Siku 40 . 40 . 4 - L = 6 Meter MD.40 Batang #REF! #REF! AAL.D.40 3,334.00 Batang - - - - - - 133.00 Batang - - - - - - AAD.D.40 #REF! #REF! 0.0100 0.0077 1.0000 - 0.0402 - 2,799.55 - - 585.27 - 3,380.00 3,380.00 #REF! #REF! #REF!
41 Besi Siku 40 . 40 . 5 - L = 6 Meter MD.41 Batang #REF! #REF! AAL.D.41 2,667.00 Batang - - - - - - 106.00 Batang - - - - - - AAD.D.41 #REF! #REF! 0.0180 0.0142 1.0000 - 0.0720 - 5,017.02 - - 1,048.84 - 6,060.00 6,060.00 #REF! #REF! #REF!
42 Besi Siku 20 . 20 . 3 - L = 6 Meter MD.42 Batang #REF! #REF! AAL.D.42 8,891.00 Batang - - - - - - 355.00 Batang - - - - - - AAD.D.42 #REF! #REF! 0.0039 0.0031 1.0000 - 0.0158 - 1,099.83 - - 229.93 - 1,320.00 1,320.00 #REF! #REF! #REF!
43 Besi Plat 1.0 mm - 120 x 240 Cm MD.43 Lembar #REF! #REF! AAL.D.43 2,222.00 Lembar - - - - - - 88.00 Lembar - - - - - - AAD.D.43 #REF! #REF! 0.0187 0.0171 1.0000 - 0.0747 - 5,209.52 - - 1,089.09 - 6,290.00 6,290.00 #REF! #REF! #REF!
44 Besi Plat 1.2 mm - 120 x 240 Cm MD.44 Lembar #REF! #REF! AAL.D.44 1,852.00 Lembar - - - - - - 74.00 Lembar - - - - - - AAD.D.44 #REF! #REF! 0.0195 0.0176 1.0000 - 0.0781 - 5,447.23 - - 1,138.78 - 6,580.00 6,580.00 #REF! #REF! #REF!
45 Besi Plat 2.0 mm - 120 x 240 Cm MD.45 Lembar #REF! #REF! AAL.D.45 1,111.00 Lembar - - - - - - 44.00 Lembar - - - - - - AAD.D.45 #REF! #REF! 0.0253 0.0197 1.0000 - 0.2023 - 7,051.72 - - 2,948.42 - 10,000.00 10,000.00 #REF! #REF! #REF!
46 Besi Plat 3.0 mm - 120 x 240 Cm MD.46 Lembar #REF! #REF! AAL.D.46 740.00 Lembar - - - - - - 29.00 Lembar - - - - - - AAD.D.46 #REF! #REF! 0.0296 0.0181 1.0000 - 0.2366 - 8,245.33 - - 3,447.48 - 11,690.00 11,690.00 #REF! #REF! #REF!
47 Besi Plat 12 mm -120 x 240 cm MD.47 Lembar #REF! #REF! AAL.D.47 185.00 Lembar - - - - - - 7.00 Lembar - - - - - - AAD.D.47 #REF! #REF! 0.0879 0.0435 1.0000 - 0.8793 - 24,515.83 - - 12,813.01 - 37,320.00 37,320.00 #REF! #REF! #REF!
48 Besi Strip 20.2 MD.48 Batang #REF! #REF! AAL.D.48 32,010.00 Batang - - - - - - 1,280.00 Batang - - - - - - AAD.D.48 #REF! #REF! 0.0011 0.0010 1.0000 - 0.0042 - 293.71 - - 61.40 - 350.00 350.00 #REF! #REF! #REF!
49 Besi Strip 30.3 MD.49 Batang #REF! #REF! AAL.D.49 14,226.00 Batang - - - - - - 569.00 Batang - - - - - - AAD.D.49 #REF! #REF! 0.0025 0.0024 1.0000 - 0.0099 - 687.47 - - 143.72 - 830.00 830.00 #REF! #REF! #REF!
50 Besi Strip 40.4 MD.50 Batang #REF! #REF! AAL.D.50 8,002.00 Batang - - - - - - 320.00 Batang - - - - - - AAD.D.50 #REF! #REF! 0.0048 0.0047 1.0000 - 0.0191 - 1,334.34 - - 278.95 - 1,610.00 1,610.00 #REF! #REF! #REF!
51 Besi Strip 50.5 MD.51 Batang #REF! #REF! AAL.D.51 5,121.00 Batang - - - - - - 204.00 Batang - - - - - - AAD.D.51 #REF! #REF! 0.0066 0.0065 1.0000 - 0.0264 - 1,842.33 - - 385.15 - 2,220.00 2,220.00 #REF! #REF! #REF!
52 Waltermur Dia 16 mm MD.52 Buah #REF! #REF! AAL.D.52 5,000.00 Buah - - - - - - 200.00 Buah - - - - - - AAD.D.52 #REF! #REF! 0.0096 0.0159 1.0000 - 0.0384 - 2,679.30 - - 560.13 - 3,230.00 3,230.00 #REF! #REF! #REF!
53 Gording lips chanel 150.65.20.2,3 ( 6 N ) MD.53 Batang #REF! #REF! AAL.D.53 5,000.00 Batang - - - - - - 200.00 Batang - - - - - - AAD.D.53 #REF! #REF! 0.0096 0.0159 1.0000 - 0.0384 - 2,679.30 - - 560.13 - 3,230.00 3,230.00 #REF! #REF! #REF!
54 Baja profil IWF MD.54 KG #REF! #REF! AAL.D.54 46,860.00 KG - - - - - - 2,000.00 KG - - - - - - AAD.D.54 #REF! #REF! 0.0006 0.0014 1.0000 - 0.0023 - 163.00 - - 34.08 - 190.00 190.00 #REF! #REF! #REF!
55 Besi gording canal MD.55 KG #REF! #REF! AAL.D.55 46,860.00 KG - - - - - - 2,000.00 KG - - - - - - AAD.D.55 #REF! #REF! 0.0006 0.0014 1.0000 - 0.0023 - 163.00 - - 34.08 - 190.00 190.00 #REF! #REF! #REF!
56 Water mur MD.56 KG #REF! #REF! AAL.D.56 46,860.00 KG - - - - - - 2,000.00 KG - - - - - - AAD.D.56 #REF! #REF! 0.0006 0.0014 1.0000 - 0.0023 - 163.00 - - 34.08 - 190.00 190.00 #REF! #REF! #REF!
57 Sealent MD.57 Tube #REF! #REF! AAL.D.57 46,860.00 Tube - - - - - - 2,000.00 Tube - - - - - - AAD.D.57 #REF! #REF! 0.0006 0.0014 1.0000 - 0.0023 - 163.00 - - 34.08 - 190.00 190.00 #REF! #REF! #REF!
F. BAHAN KERAMIK -
1 Ubin Abu-Abu 20 x 20 Cm MF.1 Buah #REF! #REF! AAL.F.1 125,000.00 Buah - - - - - - 5,000.00 Buah - - - - - - AAD.F.1 #REF! #REF! 0.0003 0.0004 1.0000 - 0.0013 - 88.22 - - 18.44 - 100.00 100.00 #REF! #REF! #REF!
2 Ubin Abu-Abu 30 x 30 Cm MF.2 Buah #REF! #REF! AAL.F.2 44,000.00 Buah - - - - - - 1,760.00 Buah - - - - - - AAD.F.2 #REF! #REF! 0.0005 0.0006 1.0000 - 0.0021 - 143.92 - - 30.09 - 170.00 170.00 #REF! #REF! #REF!
3 Ubin Abu-Abu 40 x 40 Cm MF.3 Buah #REF! #REF! AAL.F.3 18,181.00 Buah - - - - - - 727.00 Buah - - - - - - AAD.F.3 #REF! #REF! 0.0009 0.0009 1.0000 - 0.0037 - 255.22 - - 53.36 - 300.00 300.00 #REF! #REF! #REF!
4 Ubin Warna 20 x 20 Cm MF.4 Buah #REF! #REF! AAL.F.4 125,000.00 Buah - - - - - - 5,000.00 Buah - - - - - - AAD.F.4 #REF! #REF! 0.0003 0.0004 1.0000 - 0.0013 - 88.22 - - 18.44 - 100.00 100.00 #REF! #REF! #REF!
5 Ubin Warna 30 x 30 Cm MF.5 Buah #REF! #REF! AAL.F.5 44,000.00 Buah - - - - - - 1,760.00 Buah - - - - - - AAD.F.5 #REF! #REF! 0.0005 0.0006 1.0000 - 0.0021 - 143.92 - - 30.09 - 170.00 170.00 #REF! #REF! #REF!
6 Ubin Warna 40 x 40 Cm MF.6 Buah #REF! #REF! AAL.F.6 18,181.00 Buah - - - - - - 727.00 Buah - - - - - - AAD.F.6 #REF! #REF! 0.0009 0.0009 1.0000 - 0.0037 - 255.22 - - 53.36 - 300.00 300.00 #REF! #REF! #REF!
7 Ubin Teraso Ukuran 30 x 30 cm MF.7 Buah #REF! #REF! AAL.F.7 44,000.00 Buah - - - - - - 1,760.00 Buah - - - - - - AAD.F.7 #REF! #REF! 0.0005 0.0006 1.0000 - 0.0021 - 143.92 - - 30.09 - 170.00 170.00 #REF! #REF! #REF!
8 Ubin Teraso Ukuran 40 x 40 cm MF.8 Buah #REF! #REF! AAL.F.8 18,181.00 Buah - - - - - - 727.00 Buah - - - - - - AAD.F.8 #REF! #REF! 0.0009 0.0009 1.0000 - 0.0037 - 255.22 - - 53.36 - 300.00 300.00 #REF! #REF! #REF!
9 Ubin Granito Ukuran 30 x 30 cm MF.9 Buah #REF! #REF! AAL.F.9 44,000.00 Buah - - - - - - 1,760.00 Buah - - - - - - AAD.F.9 #REF! #REF! 0.0005 0.0006 1.0000 - 0.0021 - 143.92 - - 30.09 - 170.00 170.00 #REF! #REF! #REF!
10 Ubin Granito Ukuran 40 x 40 cm MF.10 Buah #REF! #REF! AAL.F.10 18,181.00 Buah - - - - - - 727.00 Buah - - - - - - AAD.F.10 #REF! #REF! 0.0009 0.0009 1.0000 - 0.0037 - 255.22 - - 53.36 - 300.00 300.00 #REF! #REF! #REF!
11 Ubin Teralux Kerang Ukuran 30 x 30 cm MF.11 Buah #REF! #REF! AAL.F.11 44,000.00 Buah - - - - - - 1,760.00 Buah - - - - - - AAD.F.11 #REF! #REF! 0.0005 0.0006 1.0000 - 0.0021 - 143.92 - - 30.09 - 170.00 170.00 #REF! #REF! #REF!
12 Ubin Teralux Kerang Ukuran 40 x 40 cm MF.12 Buah #REF! #REF! AAL.F.12 18,181.00 Buah - - - - - - 727.00 Buah - - - - - - AAD.F.12 #REF! #REF! 0.0009 0.0009 1.0000 - 0.0037 - 255.22 - - 53.36 - 300.00 300.00 #REF! #REF! #REF!
13 Ubin Teralux Marmer Ukuran 30 x 30 cm MF.13 Buah #REF! #REF! AAL.F.13 44,000.00 Buah - - - - - - 1,760.00 Buah - - - - - - AAD.F.13 #REF! #REF! 0.0005 0.0006 1.0000 - 0.0021 - 143.92 - - 30.09 - 170.00 170.00 #REF! #REF! #REF!
14 Ubin Teralux Marmer Ukuran 40 x 40 cm MF.14 Buah #REF! #REF! AAL.F.14 18,181.00 Buah - - - - - - 727.00 Buah - - - - - - AAD.F.14 #REF! #REF! 0.0009 0.0009 1.0000 - 0.0037 - 255.22 - - 53.36 - 300.00 300.00 #REF! #REF! #REF!
15 Ubin Teralux Marmer Ukuran 60 x 60 cm MF.15 Buah #REF! #REF! AAL.F.15 5,000.00 Buah - - - - - - 200.00 Buah - - - - - - AAD.F.15 #REF! #REF! 0.0035 0.0024 1.0000 - 0.0141 - 985.73 - - 206.07 - 1,190.00 1,190.00 #REF! #REF! #REF!
16 Keramik Artistik 10x20; 15x15 cm MF.16 Buah #REF! #REF! AAL.F.16 294,117.00 Buah - - - - - - 11,764.00 Buah - - - - - - AAD.F.16 #REF! #REF! 0.0003 0.0004 1.0000 - 0.0011 - 73.64 - - 15.39 - 80.00 80.00 #REF! #REF! #REF!
17 Keramik Artistik 10x10 atau 5x20 cm MF.17 Buah #REF! #REF! AAL.F.17 588,235.00 Buah - - - - - - 23,529.00 Buah - - - - - - AAD.F.17 #REF! #REF! 0.0003 0.0003 1.0000 - 0.0010 - 70.59 - - 14.76 - 80.00 80.00 #REF! #REF! #REF!
18 Keramik Lantai 20 x 20 cm MF.18 Buah #REF! #REF! AAL.F.18 125,000.00 Buah - - - - - - 5,000.00 Buah - - - - - - AAD.F.18 #REF! #REF! 0.0003 0.0004 1.0000 - 0.0013 - 88.22 - - 18.44 - 100.00 100.00 #REF! #REF! #REF!
19 Keramik Lantai 20 x 30 cm MF.19 Buah #REF! #REF! AAL.F.19 72,727.00 Buah - - - - - - 2,909.00 Buah - - - - - - AAD.F.19 #REF! #REF! 0.0004 0.0004 1.0000 - 0.0017 - 115.44 - - 24.13 - 130.00 130.00 #REF! #REF! #REF!
20 Keramik Lantai 30 x 30 cm MF.20 Buah #REF! #REF! AAL.F.20 44,000.00 Buah - - - - - - 1,760.00 Buah - - - - - - AAD.F.20 #REF! #REF! 0.0005 0.0006 1.0000 - 0.0021 - 143.92 - - 30.09 - 170.00 170.00 #REF! #REF! #REF!
21 Keramik Lantai 30 x 30 berglasir MF.21 Buah #REF! #REF! AAL.F.21 44,000.00 Buah - - - - - - 1,760.00 Buah - - - - - - AAD.F.21 #REF! #REF! 0.0005 0.0006 1.0000 - 0.0021 - 143.92 - - 30.09 - 170.00 170.00 #REF! #REF! #REF!
22 Keramik Lantai 30 x 30 berglasir (Mozaik) MF.22 Buah #REF! #REF! AAL.F.22 44,000.00 Buah - - - - - - 1,760.00 Buah - - - - - - AAD.F.22 #REF! #REF! 0.0005 0.0006 1.0000 - 0.0021 - 143.92 - - 30.09 - 170.00 170.00 #REF! #REF! #REF!
23 Keramik Lantai 40 x 40 cm MF.23 Buah #REF! #REF! AAL.F.23 18,181.00 Buah - - - - - - 727.00 Buah - - - - - - AAD.F.23 #REF! #REF! 0.0009 0.0009 1.0000 - 0.0037 - 255.22 - - 53.36 - 300.00 300.00 #REF! #REF! #REF!
24 Keramik Lantai 50 x 50 cm MF.24 Buah #REF! #REF! AAL.F.24 8,888.00 Buah - - - - - - 355.00 Buah - - - - - - AAD.F.24 #REF! #REF! 0.0018 0.0015 1.0000 - 0.0072 - 501.15 - - 104.77 - 600.00 600.00 #REF! #REF! #REF!
25 Keramik Lantai 60 x 60 cm MF.25 Buah #REF! #REF! AAL.F.25 5,000.00 Buah - - - - - - 200.00 Buah - - - - - - AAD.F.25 #REF! #REF! 0.0035 0.0024 1.0000 - 0.0141 - 985.73 - - 206.07 - 1,190.00 1,190.00 #REF! #REF! #REF!
26 Keramik Dinding 10 x 20 cm MF.26 Buah #REF! #REF! AAL.F.26 294,117.00 Buah - - - - - - 11,764.00 Buah - - - - - - AAD.F.26 #REF! #REF! 0.0003 0.0004 1.0000 - 0.0011 - 73.64 - - 15.39 - 80.00 80.00 #REF! #REF! #REF!
27 Keramik Dinding 20x20 atau 20x25 cm MF.27 Buah #REF! #REF! AAL.F.27 125,000.00 Buah - - - - - - 5,000.00 Buah - - - - - - AAD.F.27 #REF! #REF! 0.0003 0.0004 1.0000 - 0.0013 - 88.22 - - 18.44 - 100.00 100.00 #REF! #REF! #REF!
28 Ubin Dinding Porselin 11 x 11 MF.28 Buah #REF! #REF! AAL.F.28 410,000.00 Buah - - - - - - 16,400.00 Buah - - - - - - AAD.F.28 #REF! #REF! 0.0003 0.0003 1.0000 - 0.0010 - 70.59 - - 14.76 - 80.00 80.00 #REF! #REF! #REF!
29 Ubin Dinding Porselin 10 x 20 cm MF.29 Buah #REF! #REF! AAL.F.29 410,000.00 Buah - - - - - - 16,400.00 Buah - - - - - - AAD.F.29 #REF! #REF! 0.0003 0.0004 1.0000 - 0.0011 - 73.64 - - 15.39 - 80.00 80.00 #REF! #REF! #REF!
30 Ubin Dinding Porselin 20 x 20 MF.30 Buah #REF! #REF! AAL.F.30 125,000.00 Buah - - - - - - 5,000.00 Buah - - - - - - AAD.F.30 #REF! #REF! 0.0003 0.0004 1.0000 - 0.0013 - 88.22 - - 18.44 - 100.00 100.00 #REF! #REF! #REF!
31 Plint Ubin Abu-Abu 15 x 20 cm MF.31 Buah #REF! #REF! AAL.F.31 103,125.00 Buah - - - - - - 4,125.00 Buah - - - - - - AAD.F.31 #REF! #REF! 0.0004 0.0004 1.0000 - 0.0016 - 111.57 - - 23.32 - 130.00 130.00 #REF! #REF! #REF!
32 Plint Ubin Abu-Abu 10 x 30 cm MF.32 Buah #REF! #REF! AAL.F.32 128,571.00 Buah - - - - - - 5,142.00 Buah - - - - - - AAD.F.32 #REF! #REF! 0.0004 0.0004 1.0000 - 0.0016 - 114.46 - - 23.93 - 130.00 130.00 #REF! #REF! #REF!
33 Plint Ubin Abu-Abu 10 x 40 cm MF.33 Buah #REF! #REF! AAL.F.33 100,000.00 Buah - - - - - - 4,000.00 Buah - - - - - - AAD.F.33 #REF! #REF! 0.0004 0.0004 1.0000 - 0.0016 - 112.53 - - 23.52 - 130.00 130.00 #REF! #REF! #REF!
34 Plint Ubin Warna 10 x 20 cm MF.34 Buah #REF! #REF! AAL.F.34 175,000.00 Buah - - - - - - 7,000.00 Buah - - - - - - AAD.F.34 #REF! #REF! 0.0003 0.0004 1.0000 - 0.0011 - 73.64 - - 15.39 - 80.00 80.00 #REF! #REF! #REF!
35 Plint Ubin Warna 10 x 30 cm MF.35 Buah #REF! #REF! AAL.F.35 128,571.00 Buah - - - - - - 5,142.00 Buah - - - - - - AAD.F.35 #REF! #REF! 0.0004 0.0004 1.0000 - 0.0016 - 114.46 - - 23.93 - 130.00 130.00 #REF! #REF! #REF!
36 Plint Ubin Warna 10 x 40 cm MF.36 Buah #REF! #REF! AAL.F.36 100,000.00 Buah - - - - - - 4,000.00 Buah - - - - - - AAD.F.36 #REF! #REF! 0.0004 0.0004 1.0000 - 0.0016 - 112.53 - - 23.52 - 130.00 130.00 #REF! #REF! #REF!
37 Plint Ubin Teraso 10 x 30 cm MF.37 Buah #REF! #REF! AAL.F.37 128,571.00 Buah - - - - - - 5,142.00 Buah - - - - - - AAD.F.37 #REF! #REF! 0.0004 0.0004 1.0000 - 0.0016 - 114.46 - - 23.93 - 130.00 130.00 #REF! #REF! #REF!
38 Plint Ubin Teraso 10 x 40 cm MF.38 Buah #REF! #REF! AAL.F.38 100,000.00 Buah - - - - - - 4,000.00 Buah - - - - - - AAD.F.38 #REF! #REF! 0.0004 0.0004 1.0000 - 0.0016 - 112.53 - - 23.52 - 130.00 130.00 #REF! #REF! #REF!
39 Plint Ubin Granito 10 x 40 cm MF.39 Buah #REF! #REF! AAL.F.39 100,000.00 Buah - - - - - - 4,000.00 Buah - - - - - - AAD.F.39 #REF! #REF! 0.0004 0.0004 1.0000 - 0.0016 - 112.53 - - 23.52 - 130.00 130.00 #REF! #REF! #REF!
40 Plint Ubin Granito 10 x 30 cm MF.40 Buah #REF! #REF! AAL.F.40 94,285.00 Buah - - - - - - 3,771.00 Buah - - - - - - AAD.F.40 #REF! #REF! 0.0004 0.0004 1.0000 - 0.0016 - 114.46 - - 23.93 - 130.00 130.00 #REF! #REF! #REF!
41 Plint Ubin Teralux Kerang 10 x 40 cm MF.41 Buah #REF! #REF! AAL.F.41 100,000.00 Buah - - - - - - 4,000.00 Buah - - - - - - AAD.F.41 #REF! #REF! 0.0004 0.0004 1.0000 - 0.0016 - 112.53 - - 23.52 - 130.00 130.00 #REF! #REF! #REF!
42 Plint Ubin Teralux Kerang 10 x 30 cm MF.42 Buah #REF! #REF! AAL.F.42 128,571.00 Buah - - - - - - 5,142.00 Buah - - - - - - AAD.F.42 #REF! #REF! 0.0004 0.0004 1.0000 - 0.0016 - 114.46 - - 23.93 - 130.00 130.00 #REF! #REF! #REF!
43 Plint Ubin Teralux Marmer 10 x 60 cm MF.43 Buah #REF! #REF! AAL.F.43 98,000.00 Buah - - - - - - 3,920.00 Buah - - - - - - AAD.F.43 #REF! #REF! 0.0004 0.0004 1.0000 - 0.0018 - 122.15 - - 25.54 - 140.00 140.00 #REF! #REF! #REF!
44 Plint Ubin Teralux Marmer 10 x 40 cm MF.44 Buah #REF! #REF! AAL.F.44 100,000.00 Buah - - - - - - 4,000.00 Buah - - - - - - AAD.F.44 #REF! #REF! 0.0004 0.0004 1.0000 - 0.0016 - 112.53 - - 23.52 - 130.00 130.00 #REF! #REF! #REF!
45 Plint Ubin Teralux Marmer 10 x 30 cm MF.45 Buah #REF! #REF! AAL.F.45 128,571.00 Buah - - - - - - 5,142.00 Buah - - - - - - AAD.F.45 #REF! #REF! 0.0004 0.0004 1.0000 - 0.0016 - 114.46 - - 23.93 - 130.00 130.00 #REF! #REF! #REF!
46 Plint Keramik Artistik 10 x 20 cm MF.46 Buah #REF! #REF! AAL.F.46 175, R
K m A m M R
K m A m M R
K m A m M R
M m U m M R
W m M M M M R
M R
ANALISA ANGKUT BAHAN
HARGA ANALISA BIAYA MUAT DAN ANGKUTAN ----- L A U T ------- ANALISA BIAYA MUAT DAN ANGKUTAN ---- S U N G A I ------- ANALISIS BIAYA MUAT DAN ANGKUTAN ----- D A R A T -------- Jumlah Total Harga Dasar + OVERHEAD HARGA
URAIAN BAHAN/MATERIAL YANG DASAR TINGKAT Kode Jumlah Angkut 50.00 Perkiraan Biaya Jumlah Harga Jumlah Angkut 2.00 Perkiraan Biaya Jumlah Harga Kode Jarak Angkut Perkiraan Kuantitas Perkiraan Biaya Jumlah biaya Ongkos Inflasi + + SATUAN
No. KODE SATUAN
DIANGKUT BARANG INFLASI Analisa Maksimal Ton Packing Angkut/Ton-M3 Bongkar Muat Pikul Barang Jumlah Total per satu satuan Maksimal Ton Packing Angkut/Ton-M3Bongkar MuatPikul Barang Jumlah Total per satu satuan Analisa Truck Traktor Excavator Dump Tracktor Alat Mandor Pekerja Excavator Dump Tracktor Mandor Pekerja Biaya Biaya alat+tenaga Angkut Ongkos angkut PROFIT BAHAN
( Rp. ) Angkut Kapal Satuan (Rp) (Rp) (Rp) (Rp) (Rp) bahan/material Kapal Satuan (Rp) (Rp) (Rp) (Rp) (Rp) bahan/material Angkut (km) (km) Truck Bantu Truck Alat Bantu Lain-lain (Rupiah) (Rupiah) (Rupiah) (Rupiah) (Rupiah)
1 2 2 5 19 20 20 7 6 6 8 9 10 11 12 13 14 17 21 22 23
53 Batu Tempel Hitam MF.53 Buah #REF! #REF! AAL.F.53 44,000.00 Buah - - - - - - 1,760.00 Buah - - - - - - AAD.F.53 #REF! #REF! 0.0005 0.0006 1.0000 - 0.0021 - 143.92 - - 30.09 - 170.00 170.00 #REF! #REF! #REF!
ANALISA ANGKUT BAHAN
HARGA ANALISA BIAYA MUAT DAN ANGKUTAN ----- L A U T ------- ANALISA BIAYA MUAT DAN ANGKUTAN ---- S U N G A I ------- ANALISIS BIAYA MUAT DAN ANGKUTAN ----- D A R A T -------- Jumlah Total Harga Dasar + OVERHEAD HARGA
URAIAN BAHAN/MATERIAL YANG DASAR TINGKAT Kode Jumlah Angkut 50.00 Perkiraan Biaya Jumlah Harga Jumlah Angkut 2.00 Perkiraan Biaya Jumlah Harga Kode Jarak Angkut Perkiraan Kuantitas Perkiraan Biaya Jumlah biaya Ongkos Inflasi + + SATUAN
No. KODE SATUAN
DIANGKUT BARANG INFLASI Analisa Maksimal Ton Packing Angkut/Ton-M3 Bongkar Muat Pikul Barang Jumlah Total per satu satuan Maksimal Ton Packing Angkut/Ton-M3Bongkar MuatPikul Barang Jumlah Total per satu satuan Analisa Truck Traktor Excavator Dump Tracktor Alat Mandor Pekerja Excavator Dump Tracktor Mandor Pekerja Biaya Biaya alat+tenaga Angkut Ongkos angkut PROFIT BAHAN
( Rp. ) Angkut Kapal Satuan (Rp) (Rp) (Rp) (Rp) (Rp) bahan/material Kapal Satuan (Rp) (Rp) (Rp) (Rp) (Rp) bahan/material Angkut (km) (km) Truck Bantu Truck Alat Bantu Lain-lain (Rupiah) (Rupiah) (Rupiah) (Rupiah) (Rupiah)
1 2 2 5 19 20 20 7 6 6 8 9 10 11 12 13 14 17 21 22 23
G. BAHAN KACA
1 Kaca Polos 3 mm MG.1 M2 #REF! #REF! AAL.G.1 6,462.00 M2 - - - - - - 258.00 M2 - - - - - - AAD.G.1 #REF! #REF! 0.0039 0.0074 1.0000 - 0.0310 - 1,080.20 - - 451.65 - 1,530.00 1,530.00 #REF! #REF! #REF!
2 Kaca Polos 5 mm MG.2 M2 #REF! #REF! AAL.G.2 3,877.00 M2 - - - - - - 155.00 M2 - - - - - - AAD.G.2 #REF! #REF! 0.0054 0.0083 1.0000 - 0.0436 - 1,519.17 - - 635.19 - 2,150.00 2,150.00 #REF! #REF! #REF!
3 Kaca Buram 3 mm MG.3 M2 #REF! #REF! AAL.G.3 6,462.00 M2 - - - - - - 258.00 M2 - - - - - - AAD.G.3 #REF! #REF! 0.0039 0.0074 1.0000 - 0.0310 - 1,080.20 - - 451.65 - 1,530.00 1,530.00 #REF! #REF! #REF!
4 Kaca Buram 4 mm MG.4 M2 #REF! #REF! AAL.G.4 4,846.00 M2 - - - - - - 193.00 M2 - - - - - - AAD.G.4 #REF! #REF! 0.0047 0.0078 1.0000 - 0.0373 - 1,299.52 - - 543.35 - 1,840.00 1,840.00 #REF! #REF! #REF!
5 Kaca Buram 5 mm MG.5 M2 #REF! #REF! AAL.G.5 3,877.00 M2 - - - - - - 155.00 M2 - - - - - - AAD.G.5 #REF! #REF! 0.0054 0.0083 1.0000 - 0.0436 - 1,519.17 - - 635.19 - 2,150.00 2,150.00 #REF! #REF! #REF!
6 Kaca Naco / Louver - 7 Clips (polos) MG.6 Buah #REF! #REF! AAL.G.6 2,934.00 Buah - - - - - - 117.00 Buah - - - - - - AAD.G.6 #REF! #REF! 0.0059 0.0090 1.0000 - 0.0475 - 1,655.94 - - 692.37 - 2,340.00 2,340.00 #REF! #REF! #REF!
7 Kaca Naco / Louver - 8 Clips (polos) MG.7 Buah #REF! #REF! AAL.G.7 2,567.00 Buah - - - - - - 102.00 Buah - - - - - - AAD.G.7 #REF! #REF! 0.0067 0.0094 1.0000 - 0.0535 - 1,866.10 - - 780.24 - 2,640.00 2,640.00 #REF! #REF! #REF!
8 Kaca Naco / Louver - 9 Clips (polos) MG.8 Buah #REF! #REF! AAL.G.8 2,282.00 Buah - - - - - - 91.00 Buah - - - - - - AAD.G.8 #REF! #REF! 0.0074 0.0099 1.0000 - 0.0596 - 2,076.57 - - 868.24 - 2,940.00 2,940.00 #REF! #REF! #REF!
9 Kaca Naco / Louver - 10 Clips (polos) MG.9 Buah #REF! #REF! AAL.G.9 2,054.00 Buah - - - - - - 82.00 Buah - - - - - - AAD.G.9 #REF! #REF! 0.0082 0.0103 1.0000 - 0.0658 - 2,292.49 - - 958.52 - 3,250.00 3,250.00 #REF! #REF! #REF!
10 Kaca Rayban 25 % - tebal 5 mm MG.10 M2 #REF! #REF! AAL.G.10 3,877.00 M2 - - - - - - 155.00 M2 - - - - - - AAD.G.10 #REF! #REF! 0.0054 0.0083 1.0000 - 0.0436 - 1,519.17 - - 635.19 - 2,150.00 2,150.00 #REF! #REF! #REF!
11 Kaca Acrylic (Kaca Plastik) - 5 mm MG.11 Lembar #REF! #REF! AAL.G.11 4,761.00 Lembar - - - - - - 190.00 Lembar - - - - - - AAD.G.11 #REF! #REF! 0.0053 0.0079 1.0000 - 0.0424 - 1,478.58 - - 618.22 - 2,090.00 2,090.00 #REF! #REF! #REF!
H. BAHAN/ALAT PENGGANTUNG
1 Kunci Tanam (Setara Cap Kuda Terbang) MH.1 Set #REF! #REF! AAL.H.1 50,000.00 Set - - - - - - 2,000.00 Set - - - - - - AAD.H.1 #REF! #REF! 0.0007 0.0016 1.0000 - 0.0043 - 200.39 - - 62.84 - 260.00 260.00 #REF! #REF! #REF!
2 Kunci Tanam - 2 Slaagh MH.2 Set #REF! #REF! AAL.H.2 50,000.00 Set - - - - - - 2,000.00 Set - - - - - - AAD.H.2 #REF! #REF! 0.0007 0.0016 1.0000 - 0.0043 - 200.39 - - 62.84 - 260.00 260.00 #REF! #REF! #REF!
3 Kunci Tanam - 1 Slaagh MH.3 Set #REF! #REF! AAL.H.3 50,000.00 Set - - - - - - 2,000.00 Set - - - - - - AAD.H.3 #REF! #REF! 0.0007 0.0016 1.0000 - 0.0043 - 200.39 - - 62.84 - 260.00 260.00 #REF! #REF! #REF!
4 Kunci Tanam (Setara Cap Anchor / Yale) MH.4 Set #REF! #REF! AAL.H.4 50,000.00 Set - - - - - - 2,000.00 Set - - - - - - AAD.H.4 #REF! #REF! 0.0007 0.0016 1.0000 - 0.0043 - 200.39 - - 62.84 - 260.00 260.00 #REF! #REF! #REF!
5 Kunci Gembok 1" MH.5 Set #REF! #REF! AAL.H.5 100,000.00 Set - - - - - - 4,000.00 Set - - - - - - AAD.H.5 #REF! #REF! 0.0004 0.0008 1.0000 - 0.0022 - 100.19 - - 31.42 - 130.00 130.00 #REF! #REF! #REF!
6 Engsel 4" Kuningan (Untuk Pintu) MH.6 Pasang #REF! #REF! AAL.H.6 100,000.00 Pasang - - - - - - 4,000.00 Pasang - - - - - - AAD.H.6 #REF! #REF! 0.0004 0.0008 1.0000 - 0.0022 - 100.19 - - 31.42 - 130.00 130.00 #REF! #REF! #REF!
7 Engsel 3" Kuningan (Untuk Jendela) MH.7 Pasang #REF! #REF! AAL.H.7 100,000.00 Pasang - - - - - - 4,000.00 Pasang - - - - - - AAD.H.7 #REF! #REF! 0.0004 0.0008 1.0000 - 0.0022 - 100.19 - - 31.42 - 130.00 130.00 #REF! #REF! #REF!
8 Engsel Kupu-Kupu T MH.8 Pasang #REF! #REF! AAL.H.8 250,000.00 Pasang - - - - - - 10,000.00 Pasang - - - - - - AAD.H.8 #REF! #REF! 0.0004 0.0008 1.0000 - 0.0022 - 100.19 - - 31.42 - 130.00 130.00 #REF! #REF! #REF!
9 Engsel Nylon Kuningan 4" MH.9 Pasang #REF! #REF! AAL.H.9 250,000.00 Pasang - - - - - - 10,000.00 Pasang - - - - - - AAD.H.9 #REF! #REF! 0.0004 0.0008 1.0000 - 0.0022 - 100.19 - - 31.42 - 130.00 130.00 #REF! #REF! #REF!
10 Engsel Biasa 3" (Untuk Jendela) MH.10 Pasang #REF! #REF! AAL.H.10 250,000.00 Pasang - - - - - - 10,000.00 Pasang - - - - - - AAD.H.10 #REF! #REF! 0.0004 0.0008 1.0000 - 0.0022 - 100.19 - - 31.42 - 130.00 130.00 #REF! #REF! #REF!
11 Hak Angin / Kait Angin MH.11 Buah #REF! #REF! AAL.H.11 200,000.00 Buah - - - - - - 8,000.00 Buah - - - - - - AAD.H.11 #REF! #REF! 0.0004 0.0008 1.0000 - 0.0022 - 100.19 - - 31.42 - 130.00 130.00 #REF! #REF! #REF!
12 Espagnolet MH.12 Set #REF! #REF! AAL.H.12 200,000.00 Set - - - - - - 8,000.00 Set - - - - - - AAD.H.12 #REF! #REF! 0.0004 0.0008 1.0000 - 0.0022 - 100.19 - - 31.42 - 130.00 130.00 #REF! #REF! #REF!
13 Grendel Tanam (Pintu) MH.13 Buah #REF! #REF! AAL.H.13 200,000.00 Buah - - - - - - 8,000.00 Buah - - - - - - AAD.H.13 #REF! #REF! 0.0004 0.0008 1.0000 - 0.0022 - 100.19 - - 31.42 - 130.00 130.00 #REF! #REF! #REF!
14 Grendel Besar / Kecil MH.14 Buah #REF! #REF! AAL.H.14 200,000.00 Buah - - - - - - 8,000.00 Buah - - - - - - AAD.H.14 #REF! #REF! 0.0004 0.0008 1.0000 - 0.0022 - 100.19 - - 31.42 - 130.00 130.00 #REF! #REF! #REF!
15 Tarikan Pintu MH.15 Buah #REF! #REF! AAL.H.15 250,000.00 Buah - - - - - - 10,000.00 Buah - - - - - - AAD.H.15 #REF! #REF! 0.0004 0.0008 1.0000 - 0.0022 - 100.19 - - 31.42 - 130.00 130.00 #REF! #REF! #REF!
16 Tarikan Jendela MH.16 Buah #REF! #REF! AAL.H.16 250,000.00 Buah - - - - - - 10,000.00 Buah - - - - - - AAD.H.16 #REF! #REF! 0.0004 0.0008 1.0000 - 0.0022 - 100.19 - - 31.42 - 130.00 130.00 #REF! #REF! #REF!
I. BAHAN CAT
1 Amplas Kertas (Amplas Kayu) MI.1 Lembar #REF! #REF! AAL.I.1 1,250,000.00 Lembar - - - - - - 50,000.00 Lembar - - - - - - AAD.I.1 #REF! #REF! 0.0019 0.0032 1.0000 - 0.0077 - 535.51 - - 111.95 - 13.00 13.00 #REF! #REF! #REF!
2 Amplas Besi MI.2 Lembar #REF! #REF! AAL.I.2 1,250,000.00 Lembar - - - - - - 50,000.00 Lembar - - - - - - AAD.I.2 #REF! #REF! 0.0019 0.0032 1.0000 - 0.0077 - 535.51 - - 111.95 - 13.00 13.00 #REF! #REF! #REF!
3 Dempul Kayu MI.3 Kg #REF! #REF! AAL.I.3 50,000.00 Kg - - - - - - 2,000.00 Kg - - - - - - AAD.I.3 #REF! #REF! 0.0007 0.0018 1.0000 - 0.0030 - 207.26 - - 43.33 - 250.00 250.00 #REF! #REF! #REF!
4 Cat Meny Kayu MI.4 Kg #REF! #REF! AAL.I.4 50,000.00 Kg - - - - - - 2,000.00 Kg - - - - - - AAD.I.4 #REF! #REF! 0.0007 0.0018 1.0000 - 0.0030 - 207.26 - - 43.33 - 250.00 250.00 #REF! #REF! #REF!
5 Cat Meny Besi MI.5 Kg #REF! #REF! AAL.I.5 50,000.00 Kg - - - - - - 2,000.00 Kg - - - - - - AAD.I.5 #REF! #REF! 0.0007 0.0018 1.0000 - 0.0030 - 207.26 - - 43.33 - 250.00 250.00 #REF! #REF! #REF!
6 Cat Kayu MI.6 Kg #REF! #REF! AAL.I.6 50,000.00 Kg - - - - - - 2,000.00 Kg - - - - - - AAD.I.6 #REF! #REF! 0.0007 0.0018 1.0000 - 0.0030 - 207.26 - - 43.33 - 250.00 250.00 #REF! #REF! #REF!
7 Cat Besi MI.7 Kg #REF! #REF! AAL.I.7 50,000.00 Kg - - - - - - 2,000.00 Kg - - - - - - AAD.I.7 #REF! #REF! 0.0007 0.0018 1.0000 - 0.0030 - 207.26 - - 43.33 - 250.00 250.00 #REF! #REF! #REF!
8 Cat Kilat LN MI.8 Kg #REF! #REF! AAL.I.8 50,000.00 Kg - - - - - - 2,000.00 Kg - - - - - - AAD.I.8 #REF! #REF! 0.0007 0.0018 1.0000 - 0.0030 - 207.26 - - 43.33 - 250.00 250.00 #REF! #REF! #REF!
9 Minyak Cat / Thinner (Setara Lauguer) MI.9 Kg #REF! #REF! AAL.I.9 50,000.00 Kg - - - - - - 2,000.00 Kg - - - - - - AAD.I.9 #REF! #REF! 0.0007 0.0018 1.0000 - 0.0030 - 207.26 - - 43.33 - 250.00 250.00 #REF! #REF! #REF!
10 Minyak Cat / Thinner (Biasa) Afduner MI.10 Kg #REF! #REF! AAL.I.10 50,000.00 Kg - - - - - - 2,000.00 Kg - - - - - - AAD.I.10 #REF! #REF! 0.0007 0.0018 1.0000 - 0.0030 - 207.26 - - 43.33 - 250.00 250.00 #REF! #REF! #REF!
11 Palmur Tembok MI.11 Zak #REF! #REF! AAL.I.11 2,500.00 Zak - - - - - - 100.00 Zak - - - - - - AAD.I.11 #REF! #REF! 0.0219 0.0203 1.0000 - 0.0438 - 6,103.23 - - 637.96 - 6,740.00 6,740.00 #REF! #REF! #REF!
12 Cat Tembok (1 Klg @ 5 Kg) MI.12 Kaleng #REF! #REF! AAL.I.12 50,000.00 Kg - - - - - - 2,000.00 Kg - - - - - - AAD.I.12 #REF! #REF! 0.0041 0.0089 1.0000 - 0.0165 - 1,149.04 - - 240.22 - 1,380.00 1,380.00 #REF! #REF! #REF!
13 Cat Besi Crom MI.13 Kg #REF! #REF! AAL.I.13 50,000.00 Kg - - - - - - 2,000.00 Kg - - - - - - AAD.I.13 #REF! #REF! 0.0007 0.0018 1.0000 - 0.0030 - 207.26 - - 43.33 - 250.00 250.00 #REF! #REF! #REF!
14 Cat Besi (Setara Nippon Paint) MI.14 Kg #REF! #REF! AAL.I.14 50,000.00 Kg - - - - - - 2,000.00 Kg - - - - - - AAD.I.14 #REF! #REF! 0.0007 0.0018 1.0000 - 0.0030 - 207.26 - - 43.33 - 250.00 250.00 #REF! #REF! #REF!
15 Politur Kaleng (Setara Apache) MI.15 Kg #REF! #REF! AAL.I.15 50,000.00 Kg - - - - - - 2,000.00 Kg - - - - - - AAD.I.15 #REF! #REF! 0.0007 0.0018 1.0000 - 0.0030 - 207.26 - - 43.33 - 250.00 250.00 #REF! #REF! #REF!
16 Floor Hardener MI.16 KG #REF! #REF! AAL.I.16 50,000.00 KG - - - - - - 2,000.00 KG - - - - - - AAD.I.16 #REF! #REF! 0.0007 0.0018 1.0000 - 0.0030 - 207.26 - - 43.33 - 250.00 250.00 #REF! #REF! #REF!
24 Closed Jongkok Porselin (Standar) MK.24 Buah #REF! #REF! AAL.K.24 6,666.00 Buah - - - - - - 266.00 Buah - - - - - - AAD.K.24 #REF! #REF! 0.0084 0.0065 1.0000 - 0.0336 - 2,345.39 - - 490.32 - 2,830.00 2,830.00 #REF! #REF! #REF!
25 Closed Jongkok Fiber Glass / Plastik MK.25 Buah #REF! #REF! AAL.K.25 14,285.00 Buah - - - - - - 571.00 Buah - - - - - - AAD.K.25 #REF! #REF! 0.0041 0.0029 1.0000 - 0.0166 - 1,155.99 - - 241.67 - 1,390.00 1,390.00 #REF! #REF! #REF!
26 Urinoir MK.26 Buah #REF! #REF! AAL.K.26 8,333.00 Buah - - - - - - 333.00 Buah - - - - - - AAD.K.26 #REF! #REF! 0.0067 0.0062 1.0000 - 0.0269 - 1,875.93 - - 392.18 - 2,260.00 2,260.00 #REF! #REF! #REF!
27 Wastafel Porselin MK.27 Buah #REF! #REF! AAL.K.27 8,333.00 Buah - - - - - - 333.00 Buah - - - - - - AAD.K.27 #REF! #REF! 0.0067 0.0062 1.0000 - 0.0269 - 1,875.93 - - 392.18 - 2,260.00 2,260.00 #REF! #REF! #REF!
28 Bak Air / Fiber Glass 1 M3 MK.28 Buah #REF! #REF! AAL.K.28 6,666.00 Buah - - - - - - 266.00 Buah - - - - - - AAD.K.28 #REF! #REF! 0.0084 0.0065 1.0000 - 0.0336 - 2,345.39 - - 490.32 - 2,830.00 2,830.00 #REF! #REF! #REF!
29 Bak Air / Fiber Glass 1/2 M3 MK.29 Buah #REF! #REF! AAL.K.29 8,333.00 Buah - - - - - - 333.00 Buah - - - - - - AAD.K.29 #REF! #REF! 0.0067 0.0052 1.0000 - 0.0269 - 1,875.93 - - 392.18 - 2,260.00 2,260.00 #REF! #REF! #REF!
30 Bak Air / Fiber Glass 1/4 M3 MK.30 Buah #REF! #REF! AAL.K.30 10,000.00 Buah - - - - - - 400.00 Buah - - - - - - AAD.K.30 #REF! #REF! 0.0056 0.0043 1.0000 - 0.0224 - 1,563.60 - - 326.88 - 1,890.00 1,890.00 #REF! #REF! #REF!
31 Tangki Air / Fiber Glass 1 M3 MK.31 Buah #REF! #REF! AAL.K.31 3,333.00 Buah - - - - - - 133.00 Buah - - - - - - AAD.K.31 #REF! #REF! 0.0168 0.0130 1.0000 - 0.0673 - 4,690.79 - - 980.64 - 5,670.00 5,670.00 #REF! #REF! #REF!
32 Kran Air 3/4" MK.32 Buah #REF! #REF! AAL.K.32 142,857.00 Buah - - - - - - 5,714.00 Buah - - - - - - AAD.K.32 #REF! #REF! 0.0004 0.0006 1.0000 - 0.0016 - 110.14 - - 23.03 - 130.00 130.00 #REF! #REF! #REF!
33 Kran Air 1/2" MK.33 Buah #REF! #REF! AAL.K.33 142,857.00 Buah - - - - - - 5,714.00 Buah - - - - - - AAD.K.33 #REF! #REF! 0.0004 0.0006 1.0000 - 0.0016 - 110.14 - - 23.03 - 130.00 130.00 #REF! #REF! #REF!
34 Kran Air 1" MK.34 Buah #REF! #REF! AAL.K.34 142,857.00 Buah - - - - - - 5,714.00 Buah - - - - - - AAD.K.34 #REF! #REF! 0.0004 0.0006 1.0000 - 0.0016 - 110.14 - - 23.03 - 130.00 130.00 #REF! #REF! #REF!
35 Stop Kran 1/2" MK.35 Buah #REF! #REF! AAL.K.35 142,857.00 Buah - - - - - - 5,714.00 Buah - - - - - - AAD.K.35 #REF! #REF! 0.0004 0.0006 1.0000 - 0.0016 - 110.14 - - 23.03 - 130.00 130.00 #REF! #REF! #REF!
36 Doble Neple GIP 1/2" MK.36 Buah #REF! #REF! AAL.K.36 142,857.00 Buah - - - - - - 5,714.00 Buah - - - - - - AAD.K.36 #REF! #REF! 0.0004 0.0006 1.0000 - 0.0016 - 110.14 - - 23.03 - 130.00 130.00 #REF! #REF! #REF!
37 Soccet 1/2" MK.37 Buah #REF! #REF! AAL.K.37 142,857.00 Buah - - - - - - 5,714.00 Buah - - - - - - AAD.K.37 #REF! #REF! 0.0004 0.0006 1.0000 - 0.0016 - 110.14 - - 23.03 - 130.00 130.00 #REF! #REF! #REF!
38 Elbow GIP 90º x 1/2" ( PE ) MK.38 Buah #REF! #REF! AAL.K.38 142,857.00 Buah - - - - - - 5,714.00 Buah - - - - - - AAD.K.38 #REF! #REF! 0.0004 0.0006 1.0000 - 0.0016 - 110.14 - - 23.03 - 130.00 130.00 #REF! #REF! #REF!
39 Tee 1/2" x 1/2" MK.39 Buah #REF! #REF! AAL.K.39 142,857.00 Buah - - - - - - 5,714.00 Buah - - - - - - AAD.K.39 #REF! #REF! 0.0004 0.0006 1.0000 - 0.0016 - 110.14 - - 23.03 - 130.00 130.00 #REF! #REF! #REF!
40 Hand Kran 1/2" Besi MK.40 Buah #REF! #REF! AAL.K.40 142,857.00 Buah - - - - - - 5,714.00 Buah - - - - - - AAD.K.40 #REF! #REF! 0.0004 0.0006 1.0000 - 0.0016 - 110.14 - - 23.03 - 130.00 130.00 #REF! #REF! #REF!
41 Dop GIP 1/2" MK.41 Buah #REF! #REF! AAL.K.41 142,857.00 Buah - - - - - - 5,714.00 Buah - - - - - - AAD.K.41 #REF! #REF! 0.0004 0.0006 1.0000 - 0.0016 - 110.14 - - 23.03 - 130.00 130.00 #REF! #REF! #REF!
42 Water Meter 1/2" MK.42 Buah #REF! #REF! AAL.K.42 20,000.00 Buah - - - - - - 800.00 Buah - - - - - - AAD.K.42 #REF! #REF! 0.0028 0.0040 1.0000 - 0.0112 - 781.66 - - 163.41 - 940.00 940.00 #REF! #REF! #REF!
43 Clamp Sadle 2" mm x 1/2" ( PE ) MK.43 Buah #REF! #REF! AAL.K.43 20,000.00 Buah - - - - - - 800.00 Buah - - - - - - AAD.K.43 #REF! #REF! 0.0028 0.0040 1.0000 - 0.0112 - 781.66 - - 163.41 - 940.00 940.00 #REF! #REF! #REF!
44 Pengaman Box Meter MK.44 Buah #REF! #REF! AAL.K.44 20,000.00 Buah - - - - - - 800.00 Buah - - - - - - AAD.K.44 #REF! #REF! 0.0028 0.0040 1.0000 - 0.0112 - 781.66 - - 163.41 - 940.00 940.00 #REF! #REF! #REF!
45 Pipa HDPE Ø 150 mm MK.45 M #REF! #REF! AAL.K.45 10,660.00 M - - - - - - 426.00 M - - - - - - AAD.K.45 #REF! #REF! 0.0049 0.0048 1.0000 - 0.0196 - 1,363.37 - - 285.02 - 1,640.00 1,640.00 #REF! #REF! #REF!
46 Pipa HDPE Ø 100 mm MK.46 M #REF! #REF! AAL.K.46 22,421.00 M - - - - - - 896.00 M - - - - - - AAD.K.46 #REF! #REF! 0.0019 0.0024 1.0000 - 0.0076 - 526.28 - - 110.02 - 630.00 630.00 #REF! #REF! #REF!
47 Pipa HDPE Ø 75 mm MK.47 M #REF! #REF! AAL.K.47 48,076.00 M - - - - - - 1,923.00 M - - - - - - AAD.K.47 #REF! #REF! 0.0009 0.0011 1.0000 - 0.0035 - 244.59 - - 51.13 - 290.00 290.00 #REF! #REF! #REF!
48 Pipa HDPE Ø 50 mm MK.48 M #REF! #REF! AAL.K.48 106,382.00 M - - - - - - 4,255.00 M - - - - - - AAD.K.48 #REF! #REF! 0.0004 0.0005 1.0000 - 0.0014 - 98.40 - - 20.57 - 110.00 110.00 #REF! #REF! #REF!
49 Tee All Flange Ø 50 x 50 mm MK.49 Buah #REF! #REF! AAL.K.49 4,761.00 Buah - - - - - - 190.00 Buah - - - - - - AAD.K.49 #REF! #REF! 0.0130 0.0160 1.0000 - 0.0519 - 3,615.17 - - 755.78 - 4,370.00 4,370.00 #REF! #REF! #REF!
50 Tee All Flange Ø 75 x 50 mm MK.50 Buah #REF! #REF! AAL.K.50 4,291.00 Buah - - - - - - 171.00 Buah - - - - - - AAD.K.50 #REF! #REF! 0.0132 0.0162 1.0000 - 0.0528 - 3,678.98 - - 769.12 - 4,440.00 4,440.00 #REF! #REF! #REF!
51 Tee All Flange Ø 75 x 75 mm MK.51 Buah #REF! #REF! AAL.K.51 3,937.00 Buah - - - - - - 157.00 Buah - - - - - - AAD.K.51 #REF! #REF! 0.0134 0.0163 1.0000 - 0.0536 - 3,736.12 - - 781.06 - 4,510.00 4,510.00 #REF! #REF! #REF!
52 Tee All Flange Ø 100 x 75 mm MK.52 Buah #REF! #REF! AAL.K.52 3,617.00 Buah - - - - - - 144.00 Buah - - - - - - AAD.K.52 #REF! #REF! 0.0136 0.0165 1.0000 - 0.0545 - 3,801.06 - - 794.64 - 4,590.00 4,590.00 #REF! #REF! #REF!
53 Bend 90 All Flange Ø 50 mm MK.53 Buah #REF! #REF! AAL.K.53 12,500.00 Buah - - - - - - 500.00 Buah - - - - - - AAD.K.53 #REF! #REF! 0.0036 0.0054 1.0000 - 0.0142 - 991.80 - - 207.34 - 1,190.00 1,190.00 #REF! #REF! #REF!
54 Bend 90 All Flange Ø 75 mm MK.54 Buah #REF! #REF! AAL.K.54 4,901.00 Buah - - - - - - 196.00 Buah - - - - - - AAD.K.54 #REF! #REF! 0.0117 0.0143 1.0000 - 0.0468 - 3,260.45 - - 681.62 - 3,940.00 3,940.00 #REF! #REF! #REF!
55 Bend 90 All Flange Ø 100 mm MK.55 Buah #REF! #REF! AAL.K.55 4,166.00 Buah - - - - - - 166.00 Buah - - - - - - AAD.K.55 #REF! #REF! 0.0121 0.0146 1.0000 - 0.0482 - 3,361.04 - - 702.65 - 4,060.00 4,060.00 #REF! #REF! #REF!
56 Gate Valve Flange Ø 50 mm MK.56 Buah #REF! #REF! AAL.K.56 2,649.00 Buah - - - - - - 105.00 Buah - - - - - - AAD.K.56 #REF! #REF! 0.0303 0.0293 1.0000 - 0.1214 - 8,460.35 - - 1,768.70 - 10,220.00 10,220.00 #REF! #REF! #REF!
57 Gate Valve Flange Ø 75 mm MK.57 Buah #REF! #REF! AAL.K.57 1,851.00 Buah - - - - - - 74.00 Buah - - - - - - AAD.K.57 #REF! #REF! 0.0320 0.0304 1.0000 - 0.1279 - 8,917.48 - - 1,864.26 - 10,780.00 10,780.00 #REF! #REF! #REF!
58 Gate Valve Flange Ø 1/2" MK.58 Buah #REF! #REF! AAL.K.58 100,000.00 Buah - - - - - - 4,000.00 Buah - - - - - - AAD.K.58 #REF! #REF! 0.0004 0.0007 1.0000 - 0.0017 - 117.56 - - 24.58 - 140.00 140.00 #REF! #REF! #REF!
59 Stub Flange Ø 50 mm MK.59 Buah #REF! #REF! AAL.K.59 16,666.00 Buah - - - - - - 666.00 Buah - - - - - - AAD.K.59 #REF! #REF! 0.0025 0.0043 1.0000 - 0.0101 - 705.42 - - 147.47 - 850.00 850.00 #REF! #REF! #REF!
60 Stub Flange Ø 75 mm MK.60 Buah #REF! #REF! AAL.K.60 9,596.00 Buah - - - - - - 383.00 Buah - - - - - - AAD.K.60 #REF! #REF! 0.0049 0.0072 1.0000 - 0.0196 - 1,367.08 - - 285.80 - 1,650.00 1,650.00 #REF! #REF! #REF!
61 Stub Flange Ø 100 mm MK.61 Buah #REF! #REF! AAL.K.61 7,936.00 Buah - - - - - - 317.00 Buah - - - - - - AAD.K.61 #REF! #REF! 0.0061 0.0086 1.0000 - 0.0243 - 1,697.01 - - 354.77 - 2,050.00 2,050.00 #REF! #REF! #REF!
62 End Cap (Dop) Ø 50 mm MK.62 Buah #REF! #REF! AAL.K.62 66,666.00 Buah - - - - - - 2,666.00 Buah - - - - - - AAD.K.62 #REF! #REF! 0.0006 0.0011 1.0000 - 0.0025 - 176.34 - - 36.86 - 210.00 210.00 #REF! #REF! #REF!
63 End Cap (Dop) Ø 75 mm MK.63 Buah #REF! #REF! AAL.K.63 16,666.00 Buah - - - - - - 666.00 Buah - - - - - - AAD.K.63 #REF! #REF! 0.0025 0.0043 1.0000 - 0.0101 - 705.42 - - 147.47 - 850.00 850.00 #REF! #REF! #REF!
64 Stop Cock (PIT Kran) 1/2" MK.64 Buah #REF! #REF! AAL.K.64 50,000.00 Buah - - - - - - 2,000.00 Buah - - - - - - AAD.K.64 #REF! #REF! 0.0009 0.0016 1.0000 - 0.0037 - 257.57 - - 53.85 - 310.00 310.00 #REF! #REF! #REF!
65 Reducer All Flange Ø 75 x 75 mm MK.65 Buah #REF! #REF! AAL.K.65 5,555.00 Buah - - - - - - 222.00 Buah - - - - - - AAD.K.65 #REF! #REF! 0.0090 0.0122 1.0000 - 0.0362 - 2,520.78 - - 526.99 - 3,040.00 3,040.00 #REF! #REF! #REF!
66 Reducer All Flange Ø 75 x 50 mm MK.66 Buah #REF! #REF! AAL.K.66 5,952.00 Buah - - - - - - 238.00 Buah - - - - - - AAD.K.66 #REF! #REF! 0.0089 0.0121 1.0000 - 0.0357 - 2,487.76 - - 520.08 - 3,000.00 3,000.00 #REF! #REF! #REF!
67 Quil Elbow HDPE (adaptor) Ø 15 mm (1/2") MK.67 Buah #REF! #REF! AAL.K.67 12,500.00 Buah - - - - - - 500.00 Buah - - - - - - AAD.K.67 #REF! #REF! 0.0036 0.0054 1.0000 - 0.0142 - 991.80 - - 207.34 - 1,190.00 1,190.00 #REF! #REF! #REF!
68 Pipa Input HDPE Ø 1/2" MK.68 Buah #REF! #REF! AAL.K.68 12,500.00 Buah - - - - - - 500.00 Buah - - - - - - AAD.K.68 #REF! #REF! 0.0036 0.0054 1.0000 - 0.0142 - 991.80 - - 207.34 - 1,190.00 1,190.00 #REF! #REF! #REF!
M. BETON PRACETAK
1 Dwiker Sumur/Gorong2 Ø 1 m, H 60 cm MM.1 Buah #REF! #REF! AAL.M.1 110.00 Buah - - - - - - 4.00 Buah - - - - - - AAD.M.1 #REF! #REF! 0.1095 0.1268 1.0000 - 0.3286 - 30,539.52 - - 4,788.37 - 35,320.00 35,320.00 #REF! #REF! #REF!
2 Dwiker Sumur/Gorong2 Ø 0,8 m, H 60 cm MM.2 Buah #REF! #REF! AAL.M.2 138.00 Buah - - - - - - 5.00 Buah - - - - - - AAD.M.2 #REF! #REF! 0.0911 0.1130 1.0000 - 0.2733 - 25,399.20 - - 3,982.41 - 29,380.00 29,380.00 #REF! #REF! #REF!
3 Dwiker Sumur/Gorong2 Ø 0,6 m, H 80 cm MM.3 Buah #REF! #REF! AAL.M.3 138.00 Buah - - - - - - 5.00 Buah - - - - - - AAD.M.3 #REF! #REF! 0.0959 0.1130 1.0000 - 0.2878 - 26,746.13 - - 4,193.60 - 30,930.00 30,930.00 #REF! #REF! #REF!
4 Dwiker Sumur/Gorong2 Ø 0,4 m, H 80 cm MM.4 Buah #REF! #REF! AAL.M.4 276.00 Buah - - - - - - 11.00 Buah - - - - - - AAD.M.4 #REF! #REF! 0.0721 0.0855 1.0000 - 0.2164 - 20,107.70 - - 3,152.74 - 23,260.00 23,260.00 #REF! #REF! #REF!
A. PEKERJAAN PERSIAPAN
PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
1 2 3 4 5 6 7 8
1 1 M2 Membersihkan Lapangan dan Perataan
RSNI T-12-2002
Pekerja OH 0.1000 132,000.00 13,200.00
Mandor OH 0.0050 205,000.00 1,025.00
Jumlah harga pekerjaan - 14,225.00 14,225.00
Jumlah harga dibulatkan 14,225.00
3 1 M2 Pembongkaran Lantai
Pekerja OH 0.1000 132,000.00 13,200.00
Mandor OH 0.0100 205,000.00 2,050.00
Jumlah harga pekerjaan - 15,250.00 15,250.00
Jumlah harga dibulatkan 15,250.00
5 1 M2 Pembongkaran Atap
Pekerja OH 0.0100 132,000.00 1,320.00
Tukang OH 0.0500 168,000.00 8,400.00
Jumlah harga pekerjaan - 9,720.00 9,720.00
Jumlah harga dibulatkan 9,720.00
8 1 M2 Pembongkaran Gording
Mandor OH 0.0050 205,000.00 1,025.00
Kepala tukang OH 0.0250 188,000.00 4,700.00
Tukang OH 0.0025 168,000.00 420.00
Pekerja OH 0.1000 132,000.00 13,200.00
Jumlah harga pekerjaan - 19,345.00 19,345.00
Jumlah harga dibulatkan 19,345.00
10 1 M3 Pembongkaran Kusen
Kepala tukang OH 0.1000 188,000.00 18,800.00
Tukang OH 1.0000 168,000.00 168,000.00
Jumlah harga pekerjaan - 186,800.00 186,800.00
Jumlah harga dibulatkan 186,800.00
II PEKERJAAN TANAH
1 1 M3 Galian Tanah Biasa
SNI 2835:2008
Pekerja OH 0.7500 132,000.00 99,000.00
Mandor OH 0.0250 205,000.00 5,125.00
Jumlah harga pekerjaan - 104,125.00 104,125.00
Jumlah harga dibulatkan 104,125.00
IV PEKERJAAN KAYU
1 1 M2 Rangka Plafond (60 x 60), Kayu Kelas III
SNI 3434:2008
Balok Kayu Kelas III (Kayu Bus) M3 0.0163 3,599,094.05 58,665.23
Paku Campuran KG 0.2500 19,506.30 4,876.58
Pekerja Kayu OH 0.2000 132,000.00 26,400.00
Tukang Kayu OH 0.3000 168,000.00 50,400.00
Kepala Tukang OH 0.0300 188,000.00 5,640.00
Mandor OH 0.0100 205,000.00 2,050.00
Jumlah harga pekerjaan 63,541.81 84,490.00 148,031.81
Jumlah harga dibulatkan 148,031.00
4 1 Unit MCB
HPS.PU. 2017
MCB Buah 1.000 45,000.00 45,000.00
Box Buah 1.000 7,500.00 7,500.00
Kabel NYA 3x2.5 mm M 15.000 12,826.59 192,398.85
Klem Kabel Dos 0.400 24,555.95 9,822.38
Isolasi Buah 0.500 13,220.40 6,610.20
Sekrup Dos 0.100 23,658.95 2,365.90
Upah Memasang LS 1.000 60,000.00 60,000.00
Jumlah harga pekerjaan 263,697.33 60,000.00 323,697.33
Jumlah harga dibulatkan 323,697.00
IX NITAIR
1 1 Unit Septictank (2x1x1,8cm), Pas. Bata 1PC:4PS, Pasir
HPS.PU. 2017
Galian Tanah Biasa Sedalam 1 - 2 M M3 3.0000 128,025.00 384,075.00
Semen Portland (PC) @ 50 Kg Zak 5.5000 138,941.85 764,180.18
Pasir semen (import) M3 2.5000 1,541,578.45 3,853,946.13
Batu bata Buah 1,216.0000 1,851.50 2,251,424.00
Besi beton dia 10 mm KG 112.4000 15,071.90 1,694,081.56
Kawat ikat beton KG 0.5000 25,028.60 12,514.30
Papan begisting kayu bus M2 2.0000 89,977.35 179,954.70
Besi Pipa Dia 2" PVC M 2.0000 17,699.25 35,398.50
Paku Campur KG 0.1000 19,506.30 1,950.63
Mandor pasir/batu OH 0.2500 205,000.00 51,250.00
Kepala tukang pasir/batu OH 0.5000 188,000.00 94,000.00
Tukang pasir/batu OH 5.0000 168,000.00 840,000.00
Pekerja pasir/batu OH 2.5000 132,000.00 330,000.00
Jumlah harga pekerjaan 9,177,524.99 1,315,250.00 10,492,774.99
Jumlah harga dibulatkan 10,492,774.00
P. PEKERJAAN PEMBONGKARAN
3 1 M2 Pembongkaran Lantai
7 1 M2 Pembongkaran Gording
Mandor L-1 OH 0.0050 205,000.00 1,025.00
Kepala tukang L-2 OH 0.0250 188,000.00 4,700.00
Tukang L-3 OH 0.0025 168,000.00 420.00
Pekerja L-4 OH 0.1000 132,000.00 13,200.00
Jumlah harga pekerjaan - 19,345.00 19,345.00
Jumlah harga dibulatkan 19,345.00
10 1 M3 Pembongkaran Kusen
Kepala tukang L-2 OH 0.1000 188,000.00 18,800.00
Tukang L-3 OH 1.0000 168,000.00 168,000.00
Jumlah harga pekerjaan - 186,800.00 186,800.00
Jumlah harga dibulatkan 186,800.00
Analisa Harga Satuan Pekerjaan (AHSP) A. Pekerjaan Persiapan
### #REF!
### #REF!
### #REF!
A. PEKERJAAN PERSIAPAN
PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)
1 1 M2 Membersihkan Lapangan dan Perataan PU.A.1
RSNI T-12-2002
Pekerja L-4 OH 0.1000 132,000.00 13,200.00
Mandor L-1 OH 0.0050 205,000.00 1,025.00
Jumlah harga pekerjaan - 14,225.00 14,225.00
Jumlah harga dibulatkan 14,225.00
1 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/2 Bata, 1PC : 3PS - Pasir Lokal PU.1
HPS.PU. 2017
Bata merah (5 x 10 x 20) cm MB.8 Buah 70.0000 1,851.50 129,605.00
Semen Portland (PC) @ 50 Kg MB.11 Zak 0.4579 138,941.85 63,618.00
Pasir semen (Lokal) MB.1 M3 0.0491 1,058,872.85 51,946.22
Pekerja pasir/batu L-4 OH 0.0143 132,000.00 1,885.71
Tukang pasir/batu L-3 OH 0.0429 168,000.00 7,200.00
Kepala tukang pasir/batu L-2 OH 0.1286 188,000.00 24,171.43
Mandor pasir/batu L-1 OH 0.2857 205,000.00 58,571.43
Jumlah harga pekerjaan 245,169.22 91,828.57 336,997.79
Jumlah harga dibulatkan 336,997.00
14 1 Unit Jendela Ungkit (75 x 115 cm), bingkai 3x8 cm, kaca polos 5 mm PU.14
HPS.PU. 2017
Balok kayu Rahay (Bingkai 3 x 8 cm + les) MC.2 M3 0.030 4,729,266.90 141,878.01
Kaca polos tebal 5 mm MG.2 M2 0.620 241,474.70 149,714.31
Tarikan jendela aluminium MH.16 Buah 2.000 18,038.90 36,077.80
Kait angin 6" MH.11 Buah 2.000 13,597.60 27,195.20
Grendel jendela MH.14 Buah 2.000 12,087.65 24,175.30
Paku Campur MD.16 KG 0.065 19,506.30 1,267.91
Mandor kayu L-1 OH 0.150 205,000.00 30,750.00
Kepala tukang kayu L-2 OH 0.150 188,000.00 28,200.00
Tukang kayu L-3 OH 1.500 168,000.00 252,000.00
Pekerja kayu L-4 OH 0.300 132,000.00 39,600.00
Jumlah harga pekerjaan 380,308.53 350,550.00 730,858.53
Jumlah harga dibulatkan 730,858.00
15 1 Unit Untuk Jendela gantung hanya 1 bh kait angin dan 1 grendel PU.15 1 730,858.00 730,858.00
HPS.PU. 2017 Jumlah harga pekerjaan - 730,858.00 730,858.00
Jumlah harga dibulatkan 730,858.00
18 1 Unit Pintu double tripleks 80 x 210 cm, bingkai kayu 3,5 x 9 cm PU.18
HPS.PU. 2017
Balok kayu Rahay (Bingkai 3 x 8 cm + les) MC.2 M3 0.064 4,729,266.90 302,673.08
Tripleks (1,22 x 2,44) cm - tebal 3 mm MC.11 Lembar 1.800 83,591.20 150,464.16
Engsel 4" Kuningan (untuk pintu) MH.6 Buah 1.500 35,892.65 53,838.98
Kait angin MH.11 Buah 1.000 13,597.60 13,597.60
Kunci tanam 2 slangh MH.2 Buah 1.000 166,687.90 166,687.90
Grendel besar MH.14 Buah 1.000 12,087.65 12,087.65
Paku Campur MD.16 KG 0.200 19,506.30 3,901.26
Mandor kayu L-1 OH 0.0425 205,000.00 8,712.50
Kepala tukang kayu L-2 OH 0.260 188,000.00 48,880.00
Tukang kayu L-3 OH 2.600 168,000.00 436,800.00
Pekerja kayu L-4 OH 0.850 132,000.00 112,200.00
Jumlah harga pekerjaan 703,250.63 606,592.50 1,309,843.13
Jumlah harga dibulatkan 1,309,843.00
19 1 Unit Pintu double tripleks 80x210 cm, bingkai kayu 3,5x9 cm lapis seng pl PU.19
HPS.PU. 2017
Pintu double tripleks 80 x 210 cm, bingkai kayu 3,5 x 9 cm PU.18 Buah 1.000 1,309,843.13 1,309,843.13
Seng Plat BJLS 0.30 ME.6 Lembar 1.200 53,772.85 64,527.42
Paku Campur MD.16 KG 0.100 19,506.30 1,950.63
Jumlah harga pekerjaan 1,376,321.18 - 1,376,321.18
Jumlah harga dibulatkan 1,376,321.00
20 1 Unit Pintu double tripleks 70 x 210 cm, bingkai kayu 3,5 x 9 cm PU.20
HPS.PU. 2017
Balok kayu Rahay (Bingkai 3 x 8 cm + les) MC.2 M3 0.057 4,729,266.90 269,568.21
Tripleks (1,22 x 2,44) cm - tebal 3 mm MC.11 Lembar 1.800 83,591.20 150,464.16
Engsel 4" Kuningan (untuk pintu) MH.6 Buah 1.500 35,892.65 53,838.98
Kait angin 8" MH.11 Buah 1.000 13,597.60 13,597.60
Kunci tanam 2 slangh MH.2 Buah 1.000 166,687.90 166,687.90
Grendel besar MH.14 Buah 1.000 12,087.65 12,087.65
Paku Campur MD.16 KG 0.2 19506.3 3901.26
Mandor kayu L-1 OH 0.0425 205000 8,712.50
Kepala tukang kayu L-2 OH 0.260 188,000.00 48,880.00
Tukang kayu L-3 OH 2.600 168,000.00 436,800.00
Pekerja kayu L-4 OH 0.850 132,000.00 112,200.00
Jumlah harga pekerjaan 670,145.76 606,592.50 1,276,738.26
Jumlah harga dibulatkan 1,276,738.00
21 1 Unit Pintu double tripleks 70x210 cm, bingkai kayu 3,5x9 cm lapis seng pl PU.21
HPS.PU. 2017
Pintu double tripleks 70 x 210 cm, bingkai kayu 3,5 x 9 cm PU.20 Buah 1.000 1,276,738.26 1,276,738.26
Seng Plat BJLS 0.30 ME.6 Lembar 1.200 53,772.85 64,527.42
Paku Campur MD.16 KG 0.100 19,506.30 1,950.63
Jumlah harga pekerjaan 1,343,216.31 - 1,343,216.31
Jumlah harga dibulatkan 1,343,216.00
22 1 Unit Pintu double tekwood 80 x 210 cm, bingkai kayu 3,5 x 9 cm PU.22
HPS.PU. 2017
Pintu tanpa triplek PU.18 Buah 1.000 1,309,843.13 1,309,843.13
Teakwood MC.20 Lembar 1.800 153,013.25 275,423.85
Jumlah harga pekerjaan 1,585,266.98 - 1,585,266.98
Jumlah harga dibulatkan 1,585,266.00
33 1 Unit Septictank 2x(75 x 75) cm, Dalam 1,5 m dan peresapan PU.33
HPS.PU. 2017
Galian Tanah Biasa Sedalam 1 - 2 M #REF! M3 1.6880 - 0.00
Batu bata MB.8 Buah 366.3000 1,851.50 678,204.45
Semen Portland (PC) @ 50 Kg MB.11 Zak 2.4070 138,941.85 334,433.03
Pasir semen (import) MB.1 M3 0.4570 1,541,578.45 704,501.35
Besi beton dia 10 mm MD.3 KG 5.0820 15,071.90 76,595.40
Kawat ikat beton MD.9 KG 0.1240 25,028.60 3,103.55
Papan begisting kayu bus MC.5 M2 0.2500 89,977.35 22,494.34
Patok kayu bus MC.4 M3 0.0250 3,005,904.50 75,147.61
Besi Pipa Dia 2" PVC MK.13 M 2.0000 17,699.25 35,398.50
Paku Campur MD.16 KG 0.1000 19,506.30 1,950.63
Pipa peresapan PVC dia 4" MK.10 M 2.0000 87,296.50 174,593.00
Mandor pasir/batu L-1 OH 0.2500 205,000.00 51,250.00
Kepala tukang pasir/batu L-2 OH 0.3400 188,000.00 63,920.00
Tukang pasir/batu L-3 OH 3.4000 168,000.00 571,200.00
Pekerja pasir/batu L-4 OH 2.4000 132,000.00 316,800.00
Jumlah harga pekerjaan 2,106,421.86 1,003,170.00 3,109,591.86
Jumlah harga dibulatkan 3,109,591.00
26 1 M3 Timbunan dan pemadatan Tanah Biasa (Mekanis) - Mini Blade (Cobelco) PU.B.26
HPS.PU. 2017
Tanah Biasa Hasil Galian Setempat MB.4 M3 1.2000 370,471.35 444,565.62
Pekerja L-4 Jam 0.0313 18,858.00 590.93
Mandor (F. Equipment) L-5 Jam 0.0313 32,858.00 1,029.63
Mini Excavator + Blade (Cobelco) E - 20 Jam 0.0266 406,276.00 10,814.80
Vibrator Roller E-5 Jam 0.0313 563,006.00 17,642.18
Water Tank Truck E - 10 Jam 0.0187 379,191.00 7,078.23
Jumlah harga pekerjaan 444,565.62 37,155.77 481,721.39
Jumlah harga dibulatkan 481,721.00
28 1 M3 Beton mutu f’ = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,7 PU.D.28
SNI 7394:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 276.0000 2,778.84 766,959.01
Pasir semen (import) MB.1 M3 0.5914 1,541,578.45 911,733.54
Kerikil/batu pecah (import) MB.6 M3 0.7496 1,567,479.90 1,175,029.38
Air Liter 215.0000 50.00 10,750.00
Pekerja pasir/batu L-4 OH 1.6500 132,000.00 217,800.00
Tukang pasir/batu L-3 OH 0.2750 168,000.00 46,200.00
Kepala tukang pasir/batu L-2 OH 0.0275 188,000.00 5,170.00
Mandor pasir/batu L-1 OH 0.0825 205,000.00 16,912.50
Jumlah harga pekerjaan 2,864,471.93 286,082.50 3,150,554.43
Jumlah harga dibulatkan 3,150,554.00
29 1 M3 Beton mutu f’'c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = PU.D.29
SNI 7394:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 299.0000 2,778.84 830,872.26
Pasir semen (import) MB.1 M3 0.5707 1,541,578.45 879,800.84
Kerikil/batu pecah (import) MB.6 M3 0.7533 1,567,479.90 1,180,834.86
Air Liter 215.0000 50.00 10,750.00
Pekerja pasir/batu L-4 OH 1.6500 132,000.00 217,800.00
Tukang pasir/batu L-3 OH 0.2750 168,000.00 46,200.00
Kepala tukang pasir/batu L-2 OH 0.0275 188,000.00 5,170.00
Mandor pasir/batu L-1 OH 0.0825 205,000.00 16,912.50
Jumlah harga pekerjaan 2,902,257.96 286,082.50 3,188,340.46
Jumlah harga dibulatkan 3,188,340.00
30 1 M3 Lantai kerja Beton mutu f’'c = 7,4 MPa (K 100), slump (3-6) cm w/c = 0,8 PU.D.30
SNI 7394:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 230.0000 2,778.84 639,132.51
Pasir semen (import) MB.1 M3 0.6379 1,541,578.45 983,306.83
Kerikil/batu pecah (import) MB.6 M3 0.7607 1,567,479.90 1,192,445.82
Air Liter 200.0000 50.00 10,000.00
Pekerja pasir/batu L-4 OH 1.2000 132,000.00 158,400.00
Tukang pasir/batu L-3 OH 0.2000 168,000.00 33,600.00
Kepala tukang pasir/batu L-2 OH 0.0200 188,000.00 3,760.00
Mandor pasir/batu L-1 OH 0.0600 205,000.00 12,300.00
Jumlah harga pekerjaan 2,824,885.16 208,060.00 3,032,945.16
Jumlah harga dibulatkan 3,032,945.00
Analisa Harga Satuan Pekerjaan (AHSP) D. Pekerjaan Beton
31 1 M3 Beton mutu f’'c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = PU.D.31
SNI 7394:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 326.0000 2,778.84 905,900.86
Pasir semen (import) MB.1 M3 0.5429 1,541,578.45 836,856.87
Kerikil/batu pecah (import) MB.6 M3 0.7622 1,567,479.90 1,194,768.01
Air Liter 215.0000 50.00 10,750.00
Pekerja pasir/batu L-4 OH 1.6500 132,000.00 217,800.00
Tukang pasir/batu L-3 OH 0.2750 168,000.00 46,200.00
Kepala tukang pasir/batu L-2 OH 0.0275 188,000.00 5,170.00
Mandor pasir/batu L-1 OH 0.0825 205,000.00 16,912.50
Jumlah harga pekerjaan 2,948,275.75 286,082.50 3,234,358.25
Jumlah harga dibulatkan 3,234,358.00
32 1 M3 Beton mutu f’'c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = PU.D.32
SNI 7394:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 352.0000 2,778.84 978,150.62
Pasir semen (import) MB.1 M3 0.5221 1,541,578.45 804,924.18
Kerikil/batu pecah (import) MB.6 M3 0.7637 1,567,479.90 1,197,090.21
Air Liter 215.0000 50.00 10,750.00
Pekerja pasir/batu L-4 OH 1.6500 132,000.00 217,800.00
Tukang pasir/batu L-3 OH 0.2750 168,000.00 46,200.00
Kepala tukang pasir/batu L-2 OH 0.0275 188,000.00 5,170.00
Mandor pasir/batu L-1 OH 0.0825 205,000.00 16,912.50
Jumlah harga pekerjaan 2,990,915.01 286,082.50 3,276,997.51
Jumlah harga dibulatkan 3,276,997.00
33 1 M3 Beton mutu f’'c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = PU.D.33
SNI 7394:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 371.0000 2,778.84 1,030,948.53
Pasir semen (import) MB.1 M3 0.4986 1,541,578.45 768,586.97
Kerikil/batu pecah (import) MB.6 M3 0.7756 1,567,479.90 1,215,667.74
Air Liter 215.0000 50.00 10,750.00
Pekerja pasir/batu L-4 OH 1.6500 132,000.00 217,800.00
Tukang pasir/batu L-3 OH 0.2750 168,000.00 46,200.00
Kepala tukang pasir/batu L-2 OH 0.0275 188,000.00 5,170.00
Mandor pasir/batu L-1 OH 0.0825 205,000.00 16,912.50
Jumlah harga pekerjaan 3,025,953.24 286,082.50 3,312,035.74
Jumlah harga dibulatkan 3,312,035.00
Analisa Harga Satuan Pekerjaan (AHSP) D. Pekerjaan Beton
34 1 M3 Beton mutu f’'c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = PU.D.34
SNI 7394:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 384.0000 2,778.84 1,067,073.41
Pasir semen (import) MB.1 M3 0.4943 1,541,578.45 761,980.21
Kerikil/batu pecah (import) MB.6 M3 0.7696 1,567,479.90 1,206,378.97
Air Liter 215.0000 50.00 10,750.00
Pekerja pasir/batu L-4 OH 1.6500 132,000.00 217,800.00
Tukang pasir/batu L-3 OH 0.2750 168,000.00 46,200.00
Kepala tukang pasir/batu L-2 OH 0.0275 188,000.00 5,170.00
Mandor pasir/batu L-1 OH 0.0825 205,000.00 16,912.50
Jumlah harga pekerjaan 3,046,182.59 286,082.50 3,332,265.09
Jumlah harga dibulatkan 3,332,265.00
35 1 M3 Beton mutu f’'c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = PU.D.35
SNI 7394:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 406.0000 2,778.84 1,128,207.82
Pasir semen (import) MB.1 M3 0.4886 1,541,578.45 753,171.19
Kerikil/batu pecah (import) MB.6 M3 0.7600 1,567,479.90 1,191,284.72
Air Liter 215.0000 50.00 10,750.00
Pekerja pasir/batu L-4 OH 1.6500 132,000.00 217,800.00
Tukang pasir/batu L-3 OH 0.2750 168,000.00 46,200.00
Kepala tukang pasir/batu L-2 OH 0.0275 188,000.00 5,170.00
Mandor pasir/batu L-1 OH 0.0825 205,000.00 16,912.50
Jumlah harga pekerjaan 3,083,413.73 286,082.50 3,369,496.23
Jumlah harga dibulatkan 3,369,496.00
36 1 M3 Beton mutu f’'c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = PU.D.36
SNI 7394:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 413.0000 2,778.84 1,147,659.68
Pasir semen (import) MB.1 M3 0.4864 1,541,578.45 749,867.80
Kerikil/batu pecah (import) MB.6 M3 0.7563 1,567,479.90 1,185,479.24
Air Liter 215.0000 50.00 10,750.00
Pekerja pasir/batu L-4 OH 1.6500 132,000.00 217,800.00
Tukang pasir/batu L-3 OH 0.2750 168,000.00 46,200.00
Kepala tukang pasir/batu L-2 OH 0.0275 188,000.00 5,170.00
Mandor pasir/batu L-1 OH 0.0825 205,000.00 16,912.50
Jumlah harga pekerjaan 3,093,756.73 286,082.50 3,379,839.23
Jumlah harga dibulatkan 3,379,839.00
37 1 M3 Beton mutu f’'c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = PU.D.37
SNI 7394:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 439.0000 2,778.84 1,219,909.44
Pasir semen (import) MB.1 M3 0.4786 1,541,578.45 737,755.40
Kerikil/batu pecah (import) MB.6 M3 0.7452 1,567,479.90 1,168,062.80
Air Liter 215.0000 50.00 10,750.00
Pekerja pasir/batu L-4 OH 2.1000 132,000.00 277,200.00
Tukang pasir/batu L-3 OH 0.3500 168,000.00 58,800.00
Kepala tukang pasir/batu L-2 OH 0.0350 188,000.00 6,580.00
Mandor pasir/batu L-1 OH 0.1050 205,000.00 21,525.00
Jumlah harga pekerjaan 3,136,477.64 364,105.00 3,500,582.64
Jumlah harga dibulatkan 3,500,582.00
38 1 M3 Beton mutu f’'c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = PU.D.38
SNI 7394:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 448.0000 2,778.84 1,244,918.98
Pasir semen (import) MB.1 M3 0.4764 1,541,578.45 734,452.02
Kerikil/batu pecah (import) MB.6 M3 0.7407 1,567,479.90 1,161,096.22
Air Liter 215.0000 50.00 10,750.00
Pekerja pasir/batu L-4 OH 2.1000 132,000.00 277,200.00
Tukang pasir/batu L-3 OH 0.3500 168,000.00 58,800.00
Kepala tukang pasir/batu L-2 OH 0.0350 188,000.00 6,580.00
Mandor pasir/batu L-1 OH 0.1050 205,000.00 21,525.00
Jumlah harga pekerjaan 3,151,217.22 364,105.00 3,515,322.22
Jumlah harga dibulatkan 3,515,322.00
ANALISA PU.D.60 s/d PU.D.67 UNTUK GAMBAR RENCANA YANG BELUM MEMPUNYAI GAMBAR DETAIL
74 1 Btg Tiang Pancang Beton 20x20; L=5 M (1PC : 2PS : 3KR) PU.D.74
HPS.PU. 2017
Begisting beton (kolom) PU.D.49 M2 4.0000 555,413.00 2,221,652.00
Tulangan Sengkang (polos) Dia. 8 mm PU.D.40 KG 50.4916 18,384.00 928,238.24
Tulangan Utama (polos) Dia. 10 mm PU.D.41 KG 123.8496 18,514.00 2,292,951.49
Campuran Beton 1PC : 2PS : 3KR (import) PU.D.12 M3 0.2300 4,217,874.00 970,111.02
Jumlah harga pekerjaan per 1 M3 6,412,952.76 - 6,412,952.76
Jumlah harga dibulatkan 6,412,952.00
1 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1 Bata, 1PC : 2PS - Pasir Lokal PU.E.1
SNI 6897:2008
Bata merah (5 x 11 x 22) cm MB.8 Buah 140.0000 1,851.50 259,210.00
Semen Portland (PC) @ 50 Kg MB.11 KG 43.5000 2,778.84 120,879.41
Pasir semen (lokal) MB.2 M3 0.0800 1,058,872.85 84,709.83
Pekerja pasir/batu L-4 OH 0.6000 132,000.00 79,200.00
Tukang pasir/batu L-3 OH 0.2000 168,000.00 33,600.00
Kepala tukang pasir/batu L-2 OH 0.0200 188,000.00 3,760.00
Mandor pasir/batu L-1 OH 0.0300 205,000.00 6,150.00
Jumlah harga pekerjaan 464,799.24 122,710.00 587,509.24
Jumlah harga dibulatkan 587,509.00
2 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1 Bata, 1PC : 3PS - Pasir Lokal PU.E.2
SNI 6897:2008
Bata merah (5 x 11 x 22) cm MB.8 Buah 140.0000 1,851.50 259,210.00
Semen Portland (PC) @ 50 Kg MB.11 KG 32.9500 2,778.84 91,562.68
Pasir semen (lokal) MB.2 M3 0.0910 1,058,872.85 96,357.43
Pekerja pasir/batu L-4 OH 0.6000 132,000.00 79,200.00
Tukang pasir/batu L-3 OH 0.2000 168,000.00 33,600.00
Kepala tukang pasir/batu L-2 OH 0.0200 188,000.00 3,760.00
Mandor pasir/batu L-1 OH 0.0300 205,000.00 6,150.00
Jumlah harga pekerjaan 447,130.11 122,710.00 569,840.11
Jumlah harga dibulatkan 569,840.00
3 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1 Bata, 1PC : 4PS - Pasir Lokal PU.E.3
SNI 6897:2008
Bata merah (5 x 11 x 22) cm MB.8 Buah 140.0000 1,851.50 259,210.00
Semen Portland (PC) @ 50 Kg MB.11 KG 26.5500 2,778.84 73,778.12
Pasir semen (lokal) MB.2 M3 0.0930 1,058,872.85 98,475.18
Pekerja pasir/batu L-4 OH 0.6000 132,000.00 79,200.00
Tukang pasir/batu L-3 OH 0.2000 168,000.00 33,600.00
Kepala tukang pasir/batu L-2 OH 0.0200 188,000.00 3,760.00
Mandor pasir/batu L-1 OH 0.0300 205,000.00 6,150.00
Jumlah harga pekerjaan 431,463.30 122,710.00 554,173.30
Jumlah harga dibulatkan 554,173.00
4 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1 Bata, 1PC : 5PS - Pasir Lokal PU.E.4
SNI 6897:2008
Bata merah (5 x 11 x 22) cm MB.8 Buah 140.0000 1,851.50 259,210.00
Semen Portland (PC) @ 50 Kg MB.11 KG 22.2000 2,778.84 61,690.18
Pasir semen (lokal) MB.2 M3 0.1020 1,058,872.85 108,005.03
Pekerja pasir/batu L-4 OH 0.6000 132,000.00 79,200.00
Tukang pasir/batu L-3 OH 0.2000 168,000.00 33,600.00
Kepala tukang pasir/batu L-2 OH 0.0200 188,000.00 3,760.00
Mandor pasir/batu L-1 OH 0.0300 205,000.00 6,150.00
Jumlah harga pekerjaan 428,905.21 122,710.00 551,615.21
Jumlah harga dibulatkan 551,615.00
5 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1 Bata, 1PC : 6PS - Pasir Lokal PU.E.5
SNI 6897:2008
Bata merah (5 x 11 x 22) cm MB.8 Buah 140.0000 1,851.50 259,210.00
Semen Portland (PC) @ 50 Kg MB.11 KG 18.5000 2,778.84 51,408.48
Pasir semen (lokal) MB.2 M3 0.1220 1,058,872.85 129,182.49
Pekerja pasir/batu L-4 OH 0.6000 132,000.00 79,200.00
Tukang pasir/batu L-3 OH 0.2000 168,000.00 33,600.00
Kepala tukang pasir/batu L-2 OH 0.0200 188,000.00 3,760.00
Mandor pasir/batu L-1 OH 0.0300 205,000.00 6,150.00
Jumlah harga pekerjaan 439,800.97 122,710.00 562,510.97
Jumlah harga dibulatkan 562,510.00
6 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1/2 Bata, 1PC : 2PS - Pasir Lok PU.E.6
SNI 6897:2008
Bata merah (5 x 11 x 22) cm MB.8 Buah 70.0000 1,851.50 129,605.00
Semen Portland (PC) @ 50 Kg MB.11 KG 18.9500 2,778.84 52,658.96
Pasir semen (lokal) MB.2 M3 0.0380 1,058,872.85 40,237.17
Pekerja pasir/batu L-4 OH 0.3000 132,000.00 39,600.00
Tukang pasir/batu L-3 OH 0.1000 168,000.00 16,800.00
Kepala tukang pasir/batu L-2 OH 0.0100 188,000.00 1,880.00
Mandor pasir/batu L-1 OH 0.0150 205,000.00 3,075.00
Jumlah harga pekerjaan 222,501.13 61,355.00 283,856.13
Jumlah harga dibulatkan 283,856.00
7 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1/2 Bata, 1PC : 3PS - Pasir Lok PU.E.7
SNI 6897:2008
Bata merah (5 x 11 x 22) cm MB.8 Buah 70.0000 1,851.50 129,605.00
Semen Portland (PC) @ 50 Kg MB.11 KG 14.3700 2,778.84 39,931.89
Pasir semen (lokal) MB.2 M3 0.0400 1,058,872.85 42,354.91
Pekerja pasir/batu L-4 OH 0.3000 132,000.00 39,600.00
Tukang pasir/batu L-3 OH 0.1000 168,000.00 16,800.00
Kepala tukang pasir/batu L-2 OH 0.0100 188,000.00 1,880.00
Mandor pasir/batu L-1 OH 0.0150 205,000.00 3,075.00
Jumlah harga pekerjaan 211,891.80 61,355.00 273,246.80
Jumlah harga dibulatkan 273,246.00
8 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1/2 Bata, 1PC : 4PS - Pasir Lok PU.E.8
SNI 6897:2008
Bata merah (5 x 11 x 22) cm MB.8 Buah 70.0000 1,851.50 129,605.00
Semen Portland (PC) @ 50 Kg MB.11 KG 11.5000 2,778.84 31,956.63
Pasir semen (lokal) MB.2 M3 0.0430 1,058,872.85 45,531.53
Pekerja pasir/batu L-4 OH 0.3000 132,000.00 39,600.00
Tukang pasir/batu L-3 OH 0.1000 168,000.00 16,800.00
Kepala tukang pasir/batu L-2 OH 0.0100 188,000.00 1,880.00
Mandor pasir/batu L-1 OH 0.0150 205,000.00 3,075.00
Jumlah harga pekerjaan 207,093.16 61,355.00 268,448.16
Jumlah harga dibulatkan 268,448.00
Analisa Harga Satuan Pekerjaan (AHSP) E. Pekerjaan Dinding
PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE
PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)
9 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1/2 Bata, 1PC : 5PS - Pasir Lok PU.E.9
SNI 6897:2008
Bata merah (5 x 11 x 22) cm MB.8 Buah 70.0000 1,851.50 129,605.00
Semen Portland (PC) @ 50 Kg MB.11 KG 9.6800 2,778.84 26,899.14
Pasir semen (lokal) MB.2 M3 0.0450 1,058,872.85 47,649.28
Pekerja pasir/batu L-4 OH 0.3000 132,000.00 39,600.00
Tukang pasir/batu L-3 OH 0.1000 168,000.00 16,800.00
Kepala tukang pasir/batu L-2 OH 0.0100 188,000.00 1,880.00
Mandor pasir/batu L-1 OH 0.0150 205,000.00 3,075.00
Jumlah harga pekerjaan 204,153.42 61,355.00 265,508.42
Jumlah harga dibulatkan 265,508.00
10 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1/2 Bata, 1PC : 6PS - Pasir Lok PU.E.10
SNI 6897:2008
Bata merah (5 x 11 x 22) cm MB.8 Buah 70.0000 1,851.50 129,605.00
Semen Portland (PC) @ 50 Kg MB.11 KG 8.3200 2,778.84 23,119.92
Pasir semen (lokal) MB.2 M3 0.0490 1,058,872.85 51,884.77
Pekerja pasir/batu L-4 OH 0.3000 132,000.00 39,600.00
Tukang pasir/batu L-3 OH 0.1000 168,000.00 16,800.00
Kepala tukang pasir/batu L-2 OH 0.0100 188,000.00 1,880.00
Mandor pasir/batu L-1 OH 0.0150 205,000.00 3,075.00
Jumlah harga pekerjaan 204,609.69 61,355.00 265,964.69
Jumlah harga dibulatkan 265,964.00
11 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1/2 Bata, 1PC : 8PS - Pasir Lok PU.E.11
SNI 6897:2008
Bata merah (5 x 11 x 22) cm MB.8 Buah 70.0000 1,851.50 129,605.00
Semen Portland (PC) @ 50 Kg MB.11 KG 6.5000 2,778.84 18,062.44
Pasir semen (lokal) MB.2 M3 0.0500 1,058,872.85 52,943.64
Pekerja pasir/batu L-4 OH 0.3000 132,000.00 39,600.00
Tukang pasir/batu L-3 OH 0.1000 168,000.00 16,800.00
Kepala tukang pasir/batu L-2 OH 0.0100 188,000.00 1,880.00
Mandor pasir/batu L-1 OH 0.0150 205,000.00 3,075.00
Jumlah harga pekerjaan 200,611.08 61,355.00 261,966.08
Jumlah harga dibulatkan 261,966.00
13 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/2 Bata, 1PC : 3PS - Pasir Imp PU.E.13
HPS.PU. 2017
Bata merah (5 x 10 x 20) cm MB.8 Buah 70.0000 1,851.50 129,605.00
Semen Portland (PC) @ 50 Kg MB.11 Zak 0.4579 138,941.85 63,618.00
Pasir semen (import) MB.1 M3 0.0491 1,541,578.45 75,626.81
Pekerja pasir/batu L-4 OH 0.0143 132,000.00 1,885.71
Tukang pasir/batu L-3 OH 0.0429 168,000.00 7,200.00
Kepala tukang pasir/batu L-2 OH 0.1286 188,000.00 24,171.43
Mandor pasir/batu L-1 OH 0.2857 205,000.00 58,571.43
Jumlah harga pekerjaan 268,849.81 91,828.57 360,678.38
Jumlah harga dibulatkan 360,678.00
14 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/2 Bata, 1PC : 4PS - Pasir Imp PU.E.14
HPS.PU. 2017
Bata merah (5 x 10 x 20) cm MB.8 Buah 70.0000 1,851.50 129,605.00
Semen Portland (PC) @ 50 Kg MB.11 Zak 0.3663 138,941.85 50,894.40
Pasir semen (import) MB.1 M3 0.0523 1,541,578.45 80,668.60
Pekerja pasir/batu L-4 OH 0.0143 132,000.00 1,885.71
Tukang pasir/batu L-3 OH 0.0429 168,000.00 7,200.00
Kepala tukang pasir/batu L-2 OH 0.1286 188,000.00 24,171.43
Mandor pasir/batu L-1 OH 0.2857 205,000.00 58,571.43
Jumlah harga pekerjaan 261,168.00 91,828.57 352,996.57
Jumlah harga dibulatkan 352,996.00
15 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/2 Bata, 1PC : 2PS - Pasir Lok PU.E.15
HPS.PU. 2017
Bata merah (5 x 10 x 20) cm MB.8 Buah 70.0000 1,851.50 129,605.00
Semen Portland (PC) @ 50 Kg MB.11 Zak 0.6105 138,941.85 84,824.00
Pasir semen (lokal) MB.2 M3 0.0436 1,058,872.85 46,174.42
Pekerja pasir/batu L-4 OH 0.0143 132,000.00 1,885.71
Tukang pasir/batu L-3 OH 0.0429 168,000.00 7,200.00
Kepala tukang pasir/batu L-2 OH 0.1286 188,000.00 24,171.43
Mandor pasir/batu L-1 OH 0.2857 205,000.00 58,571.43
Jumlah harga pekerjaan 260,603.42 91,828.57 352,431.99
Jumlah harga dibulatkan 352,431.00
16 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/2 Bata, 1PC : 3PS - Pasir Lok PU.E.16
HPS.PU. 2017
Bata merah (5 x 10 x 20) cm MB.8 Buah 70.0000 1,851.50 129,605.00
Semen Portland (PC) @ 50 Kg MB.11 Zak 0.4579 138,941.85 63,618.00
Pasir semen (lokal) MB.2 M3 0.0491 1,058,872.85 51,946.22
Pekerja pasir/batu L-4 OH 0.0143 132,000.00 1,885.71
Tukang pasir/batu L-3 OH 0.0429 168,000.00 7,200.00
Kepala tukang pasir/batu L-2 OH 0.1286 188,000.00 24,171.43
Mandor pasir/batu L-1 OH 0.2857 205,000.00 58,571.43
Jumlah harga pekerjaan 245,169.22 91,828.57 336,997.79
Jumlah harga dibulatkan 336,997.00
Analisa Harga Satuan Pekerjaan (AHSP) E. Pekerjaan Dinding
PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE
PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)
17 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/2 Bata, 1PC : 4PS - Pasir Lok PU.E.17
HPS.PU. 2017
Bata merah (5 x 10 x 20) cm MB.8 Buah 70.0000 1,851.50 129,605.00
Semen Portland (PC) @ 50 Kg MB.11 Zak 0.3663 138,941.85 50,894.40
Pasir semen (lokal) MB.2 M3 0.0523 1,058,872.85 55,409.30
Pekerja pasir/batu L-4 OH 0.0143 132,000.00 1,885.71
Tukang pasir/batu L-3 OH 0.0429 168,000.00 7,200.00
Kepala tukang pasir/batu L-2 OH 0.1286 188,000.00 24,171.43
Mandor pasir/batu L-1 OH 0.2857 205,000.00 58,571.43
Jumlah harga pekerjaan 235,908.70 91,828.57 327,737.27
Jumlah harga dibulatkan 327,737.00
18 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/4 Bata, 1PC : 2PS - Pasir Imp PU.E.18
HPS.PU. 2017
Bata merah (5 x 10 x 20) cm MB.8 Buah 40.0000 1,851.50 74,060.00
Semen Portland (PC) @ 50 Kg MB.11 Zak 0.2516 138,941.85 34,961.24
Pasir semen (import) MB.1 M3 0.0180 1,541,578.45 27,707.12
Pekerja pasir/batu L-4 OH 0.0071 132,000.00 942.86
Tukang pasir/batu L-3 OH 0.0214 168,000.00 3,600.00
Kepala tukang pasir/batu L-2 OH 0.0643 188,000.00 12,085.71
Mandor pasir/batu L-1 OH 0.1429 205,000.00 29,285.71
Jumlah harga pekerjaan 136,728.36 45,914.29 182,642.65
Jumlah harga dibulatkan 182,642.00
19 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/4 Bata, 1PC : 3PS - Pasir Imp PU.E.19
HPS.PU. 2017
Bata merah (5 x 10 x 20) cm MB.8 Buah 40.0000 1,851.50 74,060.00
Semen Portland (PC) @ 50 Kg MB.11 Zak 0.1887 138,941.85 26,220.93
Pasir semen (import) MB.1 M3 0.0202 1,541,578.45 31,170.51
Pekerja pasir/batu L-4 OH 0.0071 132,000.00 942.86
Tukang pasir/batu L-3 OH 0.0214 168,000.00 3,600.00
Kepala tukang pasir/batu L-2 OH 0.0643 188,000.00 12,085.71
Mandor pasir/batu L-1 OH 0.1429 205,000.00 29,285.71
Jumlah harga pekerjaan 131,451.44 45,914.29 177,365.73
Jumlah harga dibulatkan 177,365.00
20 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/4 Bata, 1PC : 4PS - Pasir Imp PU.E.20
HPS.PU. 2017
Bata merah (5 x 10 x 20) cm MB.8 Buah 40.0000 1,851.50 74,060.00
Semen Portland (PC) @ 50 Kg MB.11 Zak 0.1510 138,941.85 20,976.75
Pasir semen (import) MB.1 M3 0.0216 1,541,578.45 33,248.54
Pekerja pasir/batu L-4 OH 0.0143 132,000.00 1,885.71
Tukang pasir/batu L-3 OH 0.0429 168,000.00 7,200.00
Kepala tukang pasir/batu L-2 OH 0.1286 188,000.00 24,171.43
Mandor pasir/batu L-1 OH 0.2857 205,000.00 58,571.43
Jumlah harga pekerjaan 128,285.29 91,828.57 220,113.86
Jumlah harga dibulatkan 220,113.00
21 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/4 Bata, 1PC : 2PS - Pasir Lok PU.E.21
HPS.PU. 2017
Bata merah (5 x 10 x 20) cm MB.8 Buah 40.0000 1,851.50 74,060.00
Semen Portland (PC) @ 50 Kg MB.11 Zak 0.2516 138,941.85 34,961.24
Pasir semen (lokal) MB.2 M3 0.0180 1,058,872.85 19,031.35
Pekerja pasir/batu L-4 OH 0.0071 132,000.00 942.86
Tukang pasir/batu L-3 OH 0.0214 168,000.00 3,600.00
Kepala tukang pasir/batu L-2 OH 0.0643 188,000.00 12,085.71
Mandor pasir/batu L-1 OH 0.1429 205,000.00 29,285.71
Jumlah harga pekerjaan 128,052.59 45,914.29 173,966.88
Jumlah harga dibulatkan 173,966.00
22 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/4 Bata, 1PC : 3PS - Pasir Lok PU.E.22
HPS.PU. 2017
Bata merah (5 x 10 x 20) cm MB.8 Buah 40.0000 1,851.50 74,060.00
Semen Portland (PC) @ 50 Kg MB.11 Zak 0.1887 138,941.85 26,220.93
Pasir semen (lokal) MB.2 M3 0.0202 1,058,872.85 21,410.27
Pekerja pasir/batu L-4 OH 0.0071 132,000.00 942.86
Tukang pasir/batu L-3 OH 0.0214 168,000.00 3,600.00
Kepala tukang pasir/batu L-2 OH 0.0643 188,000.00 12,085.71
Mandor pasir/batu L-1 OH 0.1429 205,000.00 29,285.71
Jumlah harga pekerjaan 121,691.20 45,914.29 167,605.49
Jumlah harga dibulatkan 167,605.00
23 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/4 Bata, 1PC : 4PS - Pasir Lok PU.E.23
HPS.PU. 2017
Bata merah (5 x 10 x 20) cm MB.8 Buah 40.0000 1,851.50 74,060.00
Semen Portland (PC) @ 50 Kg MB.11 Zak 0.1510 138,941.85 20,976.75
Pasir semen (lokal) MB.2 M3 0.0216 1,058,872.85 22,837.62
Pekerja pasir/batu L-4 OH 0.0143 132,000.00 1,885.71
Tukang pasir/batu L-3 OH 0.0429 168,000.00 7,200.00
Kepala tukang pasir/batu L-2 OH 0.1286 188,000.00 24,171.43
Mandor pasir/batu L-1 OH 0.2857 205,000.00 58,571.43
Jumlah harga pekerjaan 117,874.36 91,828.57 209,702.94
Jumlah harga dibulatkan 209,702.00
Analisa Harga Satuan Pekerjaan (AHSP) F. Pekerjaan Plesteran
F. PEKERJAAN PLESTERAN
47 1 M2 Acian PU.F.47
SNI 2837:2008
Semen Portland (PC) @ 50 Kg MB.11 KG 3.2500 2,778.84 9,031.22
Pekerja pasir/batu L-4 OH 0.2000 132,000.00 26,400.00
Tukang pasir/batu L-3 OH 0.1000 168,000.00 16,800.00
Kepala tukang pasir/batu L-2 OH 0.0100 188,000.00 1,880.00
Mandor pasir/batu L-1 OH 0.0100 205,000.00 2,050.00
Jumlah harga pekerjaan 9,031.22 47,130.00 56,161.22
Jumlah harga dibulatkan 56,161.00
G. PEKERJAAN KAYU
PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE
PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)
53 1 M2 Rangka Dinding Pemisah (60 x 120) cm, Kayu Kelas III PU.G.53
SNI 3434:2008
Balok Kayu Kelas III (Kayu Bus) MC.1 M3 0.0280 3,599,094.05 100,774.63
Paku Campuran MD.16 KG 0.1500 19,506.30 2,925.95
Pekerja Kayu L-4 OH 0.1500 132,000.00 19,800.00
Tukang Kayu L-3 OH 0.4500 168,000.00 75,600.00
Kepala Tukang L-2 OH 0.0450 188,000.00 8,460.00
Mandor L-1 OH 0.0080 205,000.00 1,640.00
Jumlah harga pekerjaan 103,700.58 105,500.00 209,200.58
Jumlah harga dibulatkan 209,200.00
64 1 M2 Lantai papan tebal 3,50 cm (bersih 3,00 cm) - Kayu Kelas I PU.G.64
HPS.PU. 2017
Papan Kayu Kelas I (Kayu Besi) MC.8 M3 0.0350 10,157,579.70 355,515.29
Paku 3" MD.13 KG 0.7500 22,245.60 16,684.20
Mandor kayu L-1 OH 0.0100 205,000.00 2,050.00
Kepala tukang kayu L-2 OH 0.2000 188,000.00 37,600.00
Tukang kayu L-3 OH 0.4000 168,000.00 67,200.00
Pekerja kayu L-4 OH 0.2000 132,000.00 26,400.00
Jumlah harga pekerjaan 372,199.49 133,250.00 505,449.49
Jumlah harga dibulatkan 505,449.00
65 1 M2 Lantai papan tebal 3,50 cm (bersih 3,00 cm) - Kayu Kelas II PU.G.65
HPS.PU. 2017
Papan Kayu Kelas II (Kayu Rahay) tebal = 3 Cm MC.7 M3 0.0350 5,059,891.90 177,096.22
Paku 3" MD.13 KG 0.7500 22,245.60 16,684.20
Mandor kayu L-1 OH 0.0100 205,000.00 2,050.00
Kepala tukang kayu L-2 OH 0.2000 188,000.00 37,600.00
Tukang kayu L-3 OH 0.4000 168,000.00 67,200.00
Pekerja kayu L-4 OH 0.2000 132,000.00 26,400.00
Jumlah harga pekerjaan 193,780.42 133,250.00 327,030.42
Jumlah harga dibulatkan 327,030.00
Analisa Harga Satuan Pekerjaan (AHSP) G. Pekerjaan Kayu
66 1 M2 Lantai papan tebal 3,50 cm (bersih 3,00 cm) - Kayu Kelas III PU.G.66
HPS.PU. 2017
Papan Kayu Kelas III (Kayu Bus) MC.5 M3 0.0350 3,599,094.05 125,968.29
Paku 3" MD.13 KG 0.7500 22,245.60 16,684.20
Mandor kayu L-1 OH 0.0100 205,000.00 2,050.00
Kepala tukang kayu L-2 OH 0.2000 188,000.00 37,600.00
Tukang kayu L-3 OH 0.4000 168,000.00 67,200.00
Pekerja kayu L-4 OH 0.2000 132,000.00 26,400.00
Jumlah harga pekerjaan 142,652.49 133,250.00 275,902.49
Jumlah harga dibulatkan 275,902.00
74 1 Btg Pancang Tiang Umpak Jembatan (Dia 25-30 cm, L=4-6 m) - Manual PU.G.74
HPS.PU. 2017
Tiang Umpak Jembatan (Dia 25-30 cm, L=4-6 m) MC.31 Batang - 266,007.65 -
Mandor kayu L-1 Jam 0.4333 29,286.00 12,690.60
Tukang kayu L-3 Jam 0.5167 24,000.00 12,400.00
Pekerja kayu L-4 Jam 2.4167 18,858.00 45,573.50
Mesin Pemotong Kayu L - 11 Jam 0.0833 18,858.00 1,571.50
Alat Pancang 1 - 2 Ton (Manual) Unit 0.4333 125,000.00 54,166.67
Alat Bantu Ls 1.0000 10,000.00 10,000.00
Jumlah harga pekerjaan - 136,402.27 136,402.27
Jumlah harga dibulatkan 136,402.00
75 1 Btg Pancang Tiang Turap Jembatan (Dia 20 cm, L=4-6 m) - Manual PU.G.75
HPS.PU. 2017
Tiang Umpak Jembatan (Dia 20 cm, L=4-6 m) MC.30 Batang - 158,871.35 -
Mandor kayu L-1 Jam 0.3650 29,286.00 10,689.39
Tukang kayu L-3 Jam 0.4483 24,000.00 10,760.00
Pekerja kayu L-4 Jam 2.0750 18,858.00 39,130.35
Mesin Pemotong Kayu L - 11 Jam 0.0833 18,858.00 1,571.50
Alat Pancang 1 - 2 Ton (Manual) Unit 0.3650 125,000.00 45,625.00
Alat Bantu Ls 1.0000 10,000.00 10,000.00
Jumlah harga pekerjaan - 117,776.24 117,776.24
Jumlah harga dibulatkan 117,776.00
76 1 Btg Pancang Tiang Umpak Jembatan (Dia 25-30 cm, L=4-6 m) - Mekanis PU.G.76
HPS.PU. 2017
Tiang Umpak Jembatan (Dia 25-30 cm, L=4-6 m) MC.31 Batang - 266,007.65 -
Mandor (F. Equipment) L-5 Jam 0.1667 32,858.00 5,476.33
Pekerja L-4 Jam 0.8333 18,858.00 15,715.00
Excavator E-2 Jam 0.1667 762,894.00 127,149.00
Alat Bantu Ls 1.0000 10,000.00 10,000.00
Jumlah harga pekerjaan - 158,340.33 158,340.33
Jumlah harga dibulatkan 158,340.00
77 1 Btg Pancang Tiang Turap Jembatan (Dia 20 cm, L=4-6 m) - Mekanis PU.G.77
HPS.PU. 2017
Tiang Umpak Jembatan (Dia 20 cm, L=4-6 m) MC.30 Batang - 158,871.35 -
Mandor (F. Equipment) L-5 Jam 0.1667 32,858.00 5,476.33
Pekerja L-4 Jam 0.5000 18,858.00 9,429.00
Excavator E-2 Jam 0.1667 762,894.00 127,149.00
Alat Bantu Ls 1.0000 10,000.00 10,000.00
Jumlah harga pekerjaan - 152,054.33 152,054.33
Jumlah harga dibulatkan 152,054.00
Analisa Harga Satuan Pekerjaan (AHSP) G. Pekerjaan Kayu
H. PEKERJAAN ATAP
PERIODE : 2017 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE
PERKIRAAN HARGA JUMLAH HARGA
NO. KOMPONEN KODE SATUAN KUANTITAS SATUAN BAHAN TENAGA/ALAT JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)
14 1 Unit Jendela Ungkit (75 x 115 cm), bingkai 3x8 cm, kaca polos 5 mm PU.L.14
HPS.PU. 2017
Balok kayu Rahay (Bingkai 3 x 8 cm + les) MC.2 M3 0.030 4,729,266.90 141,878.01
Kaca polos tebal 5 mm MG.2 M2 0.620 241,474.70 149,714.31
Tarikan jendela aluminium MH.16 Buah 2.000 18,038.90 36,077.80
Kait angin 6" MH.11 Buah 2.000 13,597.60 27,195.20
Grendel jendela MH.14 Buah 2.000 12,087.65 24,175.30
Paku Campur MD.16 KG 0.065 19,506.30 1,267.91
Mandor kayu L-1 OH 0.150 205,000.00 30,750.00
Kepala tukang kayu L-2 OH 0.150 188,000.00 28,200.00
Tukang kayu L-3 OH 1.500 168,000.00 252,000.00
Pekerja kayu L-4 OH 0.300 132,000.00 39,600.00
Jumlah harga pekerjaan 380,308.53 350,550.00 730,858.53
Jumlah harga dibulatkan 730,858.00
15 1 Unit Untuk Jendela gantung hanya 1 bh kait angin dan 1 grendel PU.L.15 1 730,858.00 730,858.00
HPS.PU. 2017 Jumlah harga pekerjaan - 730,858.00 730,858.00
Jumlah harga dibulatkan 730,858.00
18 1 Unit Pintu double tripleks 80 x 210 cm, bingkai kayu 3,5 x 9 cm PU.L.18
HPS.PU. 2017
Balok kayu Rahay (Bingkai 3 x 8 cm + les) MC.2 M3 0.064 4,729,266.90 302,673.08
Tripleks (1,22 x 2,44) cm - tebal 3 mm MC.11 Lembar 1.800 83,591.20 150,464.16
Engsel 4" Kuningan (untuk pintu) MH.6 Buah 1.500 35,892.65 53,838.98
Kait angin MH.11 Buah 1.000 13,597.60 13,597.60
Kunci tanam 2 slangh MH.2 Buah 1.000 166,687.90 166,687.90
Grendel besar MH.14 Buah 1.000 12,087.65 12,087.65
Paku Campur MD.16 KG 0.200 19,506.30 3,901.26
Mandor kayu L-1 OH 0.0425 205,000.00 8,712.50
Kepala tukang kayu L-2 OH 0.260 188,000.00 48,880.00
Tukang kayu L-3 OH 2.600 168,000.00 436,800.00
Pekerja kayu L-4 OH 0.850 132,000.00 112,200.00
Jumlah harga pekerjaan 703,250.63 606,592.50 1,309,843.13
Jumlah harga dibulatkan 1,309,843.00
19 1 Unit Pintu double tripleks 80x210 cm, bingkai kayu 3,5x9 cm lapis seng plat PU.L.19
HPS.PU. 2017
Pintu double tripleks 80 x 210 cm, bingkai kayu 3,5 x 9 cm PU.L.18 Buah 1.000 1,309,843.13 1,309,843.13
Seng Plat BJLS 0.30 ME.6 Lembar 1.200 53,772.85 64,527.42
Paku Campur MD.16 KG 0.100 19,506.30 1,950.63
Jumlah harga pekerjaan 1,376,321.18 - 1,376,321.18
Jumlah harga dibulatkan 1,376,321.00
20 1 Unit Pintu double tripleks 70 x 210 cm, bingkai kayu 3,5 x 9 cm PU.L.20
HPS.PU. 2017
Balok kayu Rahay (Bingkai 3 x 8 cm + les) MC.2 M3 0.057 4,729,266.90 269,568.21
Tripleks (1,22 x 2,44) cm - tebal 3 mm MC.11 Lembar 1.800 83,591.20 150,464.16
Engsel 4" Kuningan (untuk pintu) MH.6 Buah 1.500 35,892.65 53,838.98
Kait angin 8" MH.11 Buah 1.000 13,597.60 13,597.60
Kunci tanam 2 slangh MH.2 Buah 1.000 166,687.90 166,687.90
Grendel besar MH.14 Buah 1.000 12,087.65 12,087.65
Paku Campur MD.16 KG 0.2 19506.3 3901.26
Mandor kayu L-1 OH 0.0425 205000 8,712.50
Kepala tukang kayu L-2 OH 0.260 188,000.00 48,880.00
Tukang kayu L-3 OH 2.600 168,000.00 436,800.00
Pekerja kayu L-4 OH 0.850 132,000.00 112,200.00
Jumlah harga pekerjaan 670,145.76 606,592.50 1,276,738.26
Jumlah harga dibulatkan 1,276,738.00
21 1 Unit Pintu double tripleks 70x210 cm, bingkai kayu 3,5x9 cm lapis seng plat PU.L.21
HPS.PU. 2017
Pintu double tripleks 70 x 210 cm, bingkai kayu 3,5 x 9 cm PU.L.20 Buah 1.000 1,276,738.26 1,276,738.26
Seng Plat BJLS 0.30 ME.6 Lembar 1.200 53,772.85 64,527.42
Paku Campur MD.16 KG 0.100 19,506.30 1,950.63
Jumlah harga pekerjaan 1,343,216.31 - 1,343,216.31
Jumlah harga dibulatkan 1,343,216.00
22 1 Unit Pintu double tekwood 80 x 210 cm, bingkai kayu 3,5 x 9 cm PU.L.22
HPS.PU. 2017
Pintu tanpa triplek PU.L.18 Buah 1.000 1,309,843.13 1,309,843.13
Teakwood MC.20 Lembar 1.800 153,013.25 275,423.85
Jumlah harga pekerjaan 1,585,266.98 - 1,585,266.98
Jumlah harga dibulatkan 1,585,266.00
Analisa Harga Satuan Pekerjaan (AHSP) l. Kunci, Penggantung dan Kaca
33 1 Unit Septictank 2x(75 x 75) cm, Dalam 1,5 m dan peresapan PU.M.33
HPS.PU. 2017
Galian Tanah Biasa Sedalam 1 - 2 M #REF! M3 1.6880 128,025.00 216,106.20
Batu bata MB.8 Buah 366.3000 1,851.50 678,204.45
Semen Portland (PC) @ 50 Kg MB.11 Zak 2.4070 138,941.85 334,433.03
Pasir semen (import) MB.1 M3 0.4570 1,541,578.45 704,501.35
Besi beton dia 10 mm MD.3 KG 5.0820 15,071.90 76,595.40
Kawat ikat beton MD.9 KG 0.1240 25,028.60 3,103.55
Papan begisting kayu bus MC.5 M2 0.2500 89,977.35 22,494.34
Patok kayu bus MC.4 M3 0.0250 3,005,904.50 75,147.61
Besi Pipa Dia 2" PVC MK.13 M 2.0000 17,699.25 35,398.50
Paku Campur MD.16 KG 0.1000 19,506.30 1,950.63
Pipa peresapan PVC dia 4" MK.10 M 2.0000 87,296.50 174,593.00
Mandor pasir/batu L-1 OH 0.2500 205,000.00 51,250.00
Kepala tukang pasir/batu L-2 OH 0.3400 188,000.00 63,920.00
Tukang pasir/batu L-3 OH 3.4000 168,000.00 571,200.00
Pekerja pasir/batu L-4 OH 2.4000 132,000.00 316,800.00
Jumlah harga pekerjaan 2,322,528.06 1,003,170.00 3,325,698.06
Jumlah harga dibulatkan 3,325,698.00
14 1 M2 Cat tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) PU.N.14
HPS.PU. 2017
Plamur MI.11 KG 0.100 11,126.00 1,112.60
Cat dasar MI.12 KG 0.100 12,766.00 1,276.60
Cat penutup 2 kali MI.12 KG 0.260 12,766.00 3,319.16
Mandor cat L-1 OH 0.0025 205,000.00 512.50
Kepala tukang cat L-2 OH 0.006 188,000.00 1,184.40
Tukang cat L-3 OH 0.063 168,000.00 10,584.00
Pekerja cat L-4 OH 0.020 132,000.00 2,640.00
Jumlah harga pekerjaan 5,708.36 14,920.90 20,629.26
Jumlah harga dibulatkan 20,629.00
15 1 M2 Cat tembok lama (1 lapis cat dasar, 2 lapis cat penutup) PU.N.15
HPS.PU. 2017
Cat dasar MI.12 KG 0.120 12,766.00 1,531.92
Cat penutup 2 kali MI.12 KG 0.180 12,766.00 2,297.88
Mandor cat L-1 OH 0.0025 205,000.00 512.50
Kepala tukang cat L-2 OH 0.004 188,000.00 789.60
Tukang cat L-3 OH 0.042 168,000.00 7,056.00
Pekerja cat L-4 OH 0.028 132,000.00 3,696.00
Jumlah harga pekerjaan 3,829.80 12,054.10 15,883.90
Jumlah harga dibulatkan 15,883.00
PEKERJAAN : #REF!
LOKASI : KOTA MERAUKE - DISTRIK MERAUKE
### : #REF!
PEKERJAAN : #REF!
LOKASI : KOTA MERAUKE - DISTRIK MERAUKE
### : #REF!
PEKERJAAN : #REF!
LOKASI : KOTA MERAUKE - DISTRIK MERAUKE
### : #REF!
PEKERJAAN : #REF!
LOKASI : KOTA MERAUKE - DISTRIK MERAUKE
### : #REF!
PEKERJAAN : #REF!
LOKASI : KOTA MERAUKE - DISTRIK MERAUKE
### : #REF!
PEKERJAAN : #REF!
LOKASI : #REF!
### : #REF!
PERIODE : JANUARI - JUNI 2016
P. PEKERJAAN ASPAL