Anda di halaman 1dari 22

KETENTUAN PENGGUNA JASA

KANTOR PRESIDEN

KALIMANTAN TIMUR 2022

i
DAFTAR ISI

I. LATAR BELAKANG...........................................................................................................................7
II. MAKSUD, TUJUAN DAN SASARAN..................................................................................................7
A. MAKSUD..........................................................................................................................................7
B. TUJUAN............................................................................................................................................7
C. SASARAN..........................................................................................................................................7
III. SUMBER PENDANAAN....................................................................................................................7
IV. PAGU PEKERJAAN RANCANG DAN BANGUN...................................................................................7
V. WAKTU PELAKSANAAN...................................................................................................................7
VI. RANCANGAN AWAL........................................................................................................................7
VII. LINGKUP DAN KELUARAN PEKERJAAN............................................................................................7
A. LINGKUP PEKERJAAN.......................................................................................................................7
B. LINGKUP KEGIATAN PERENCANAAN................................................................................................7
1. PRA RANCANGAN........................................................................................................................7
2. PENGEMBANGAN RANCANGAN..................................................................................................7
3. RENCANA DETIL...........................................................................................................................7
4. PENGAWASAN BERKALA..............................................................................................................7
5. KRITERIA PERANCANGAN (DESIGN CRITERIA)..............................................................................7
a) KRITERIA UMUM ARSITEKTUR.................................................................................................7
(1) PERATURAN DAN STANDAR.............................................................................................7
(2) KRITERIA UMUM ARSITEKTUR.........................................................................................7
(3) PENAMPILAN ARSITEKTUR...............................................................................................7
(4) TATA RUANG DALAM.......................................................................................................7
(5) KESEIMBANGAN...............................................................................................................7
(6) KEANDALAN BANGUNAN.................................................................................................7
(7) TEKNOLOGI......................................................................................................................7
(8) INTERIOR..........................................................................................................................7
(9) SISTEM SIGNAGE..............................................................................................................7
b) LANSEKAP................................................................................................................................7
(1) VEGETASI (SOFTCAPE)......................................................................................................7
(2) AKSES, PERKERASAN JALAN.............................................................................................7

i
c) KRITERIAN UMUM STRUKTUR.................................................................................................7
(1) KRITERIA PERENCANAAN UMUM DAN PEMBEBANAN STRUKTUR...................................7
(2) SISTEM STRUKTUR PENAHAN GAYA ANGIN.....................................................................7
(3) SISTEM STRUKTUR TAHAN GEMPA..................................................................................7
(4) SISTEM STRUKTUR PONDASI............................................................................................7
(5) SISTEM STRUKTUR SEMI BASEMENT................................................................................8
(6) SISTEM STRUKTUR PILECAP, KOLOM, BALOK, PELAT LANTAI DAN DINDING GESER........8
(7) SISTEM STRUKTUR RANGKA ATAP DAN FASAD................................................................8
(8) SISTEM STRUKTUR TANGGA............................................................................................8
d) KRITERIA UMUM MEP..............................................................................................................8
(1) SISTEM TATA UDARA.......................................................................................................8
(2) SISTEM PLAMBBING.........................................................................................................8
(3) SISTEM SANITASI DAN LIMBAH........................................................................................8
(4) SISTEM PROTEKSI KEBAKARAN........................................................................................8
(5) SISTEM TRANSPORTASI DALAM.......................................................................................8
(6) SISTEM TENAGA LISTRIK..................................................................................................8
(7) SISTEM PENCAHAYAAN....................................................................................................8
(8) SISTEM PENTANAHAN......................................................................................................8
(9) SISTEM ELEKTRONIKA BUILDING MANAGEMENT SYSTEM...............................................8
e) KRITERIA KHUSUS / LAINNYA...................................................................................................8
f) KRITERIA BANGUNAN GEDUNG HIJAU.....................................................................................8
C. KRITERIA LINGKUP KEGIATAN PELAKSANAAN.................................................................................8
1. PEKERJAAN PERSIAPAN...............................................................................................................8
a) PEKERJAAN PERSIAPAN TERKAIT ADMINISTRASI.....................................................................8
b) PEKERJAAN PERSIAPAN TERKAIT TANAH.................................................................................8
(1) KRITERIA METODE PELAKSANAAN GALIAN TIMBUNAN...................................................8
(2) KRITERIA METODE PELAKSANAAN DINDING PENGAMAN TANAH...................................8
(3) KRITERIA UPGRADING......................................................................................................8
(4) KRITERIA PERKUATAN LERENG.........................................................................................8
c) PEKERJAAN PERSIAPAN TERKAIT LANSEKAP............................................................................8
2. PELAKSANAAN KONSTRUKSI........................................................................................................8
a) ARSITEKTUR.............................................................................................................................8
(1) KRITERIA PEKERJAAN LIST PLANK.....................................................................................8

ii
(2) KRITERIA PEKERJAAN PLAFOND.......................................................................................8
(3) KRITERIA PEKERJAAN PASANGAN DINDING, PINTU DAN JENDELA..................................8
(4) KRITERIA PEKERJAAN PRASARANA...................................................................................8
(5) KRITERIA PEKERJAAN PARKIR...........................................................................................8
(6) KRITERIA PEKERJAAN FINISHING......................................................................................8
(7) KRITERIA PEKERJAAN SIGNAGE DAN WAYFINDING LANSEKAP........................................8
(8) KRITERIA PEKERJAAN AKUISISI KOLEKSI...........................................................................8
b) LANSEKAP................................................................................................................................8
(1) VEGETASI (SOFTSCAPE)....................................................................................................8
(2) AKSE, PERKERASAN JALAN DAN PERKERASAN AREA (HARDSCAPE).................................9
c) STRUKTUR................................................................................................................................9
(1) KRITERIA PERENCANAAN UMUM DAN PEMBEBANAN STRUKTUR...................................9
(2) SISTEM STRUKTUR PENAHAN GAYA ANGIN.....................................................................9
(3) SISTEM STRUKTUR TAHAN GEMPA..................................................................................9
(4) SISTEM STRUKTUR PONDASI............................................................................................9
(5) SISTEM STRUKTUR SEMI BASEMENT................................................................................9
(6) SISTEM STRUKTUR PILECAP, KOLOM, BALOK, PELAT LANTAI DAN DINDING GESER........9
(7) SISTEM STRUKTUR RANGKA ATAP DAN FASAD................................................................9
(8) SISTEM STRUKTUR TANGGA............................................................................................9
d) MEKANIKAL ELEKTRIKAL PLAMBING (MEP).............................................................................9
(1) SISTEM TATA UDARA.......................................................................................................9
(2) SISTEM PLAMBBING.........................................................................................................9
(3) SISTEM SANITASI DAN LIMBAH........................................................................................9
(4) SISTEM PROTEKSI KEBAKARAN........................................................................................9
(5) SISTEM TRANSPORTASI DALAM.......................................................................................9
(6) SISTEM TENAGA LISTRIK..................................................................................................9
(7) SISTEM PENCAHAYAAN....................................................................................................9
(8) SISTEM PENTANAHAN......................................................................................................9
(9) SISTEM ELEKTRONIKA BUILDING MANAGEMENT SYSTEM...............................................9
e) KRITERIA KHUSUS / LAINNYA...................................................................................................9
f) KRITERIA BANGUNAN GEDUNG HIJAU.....................................................................................9
D. KRITERIA PENGUJIAN KELUARAN.....................................................................................................9
1. ARSITEKTUR.................................................................................................................................9

iii
a) KRITERIA PEKERJAAN LIST PLANK............................................................................................9
b) KRITERIA PEKERJAAN PLAFOND...............................................................................................9
c) KRITERIA PEKERJAAN PASANGAN DINDING, PINTU DAN JENDELA..........................................9
d) KRITERIA PEKERJAAN PRASARANA...........................................................................................9
e) KRITERIA PEKERJAAN PARKIR...................................................................................................9
f) KRITERIA PEKERJAAN FINISHING..............................................................................................9
g) KRITERIA PEKERJAAN SIGNAGE DAN WAYFINDING LANSEKAP................................................9
h) KRITERIA PEKERJAAN AKUISISI KOLEKSI...................................................................................9
2. LANSEKAP....................................................................................................................................9
(1) VEGETASI (SOFTSCAPE)....................................................................................................9
(2) AKSE, PERKERASAN JALAN DAN PERKERASAN AREA (HARDSCAPE).................................9
3. STRUKTUR....................................................................................................................................9
a) KRITERIA PERENCANAAN UMUM DAN PEMBEBANAN STRUKTUR........................................10
b) SISTEM STRUKTUR PENAHAN GAYA ANGIN...........................................................................10
c) SISTEM STRUKTUR TAHAN GEMPA........................................................................................10
d) SISTEM STRUKTUR PONDASI..................................................................................................10
e) SISTEM STRUKTUR SEMI BASEMENT.....................................................................................10
f) SISTEM STRUKTUR PILECAP, KOLOM, BALOK, PELAT LANTAI DAN DINDING GESER..............10
g) SISTEM STRUKTUR RANGKA ATAP DAN FASAD......................................................................10
h) SISTEM STRUKTUR TANGGA..................................................................................................10
4. MEKANIKAL ELEKTRIKAL PLAMBING (MEP)...............................................................................10
a) SISTEM TATA UDARA.............................................................................................................10
b) SISTEM PLAMBBING...............................................................................................................10
c) SISTEM SANITASI DAN LIMBAH..............................................................................................10
d) SISTEM PROTEKSI KEBAKARAN..............................................................................................10
e) SISTEM TRANSPORTASI DALAM.............................................................................................10
f) SISTEM TENAGA LISTRIK........................................................................................................10
g) SISTEM PENCAHAYAAN..........................................................................................................10
h) SISTEM PENTANAHAN...........................................................................................................10
i) SISTEM ELEKTRONIKA BUILDING MANAGEMENT SYSTEM....................................................10
5. KRITERIA KHUSUS / LAINNYA.....................................................................................................10
6. KRITERIA BANGUNAN GEDUNG HIJAU.......................................................................................10
E. KRITERIA PENERIMAAN KELUARAN...............................................................................................10

iv
1. PERENCANAAN..........................................................................................................................10
A) TAHAP PERENCANAAN..........................................................................................................10
B) TAHAP PENYUSUSNAN PRA RANCANGAN.............................................................................10
C) TAHAP PENYUSUSNAN PENGEMBANGAN RANCANGAN.......................................................10
D) TAHAP PENYUSUNAN RENCANA DETIL..................................................................................10
2. PELAKSANAAN...........................................................................................................................10
a) ARSITEKTUR...........................................................................................................................10
(1) KRITERIA PEKERJAAN LIST PLANK...................................................................................10
(2) KRITERIA PEKERJAAN PLAFOND.....................................................................................10
(3) KRITERIA PEKERJAAN PASANGAN DINDING, PINTU DAN JENDELA................................10
(4) KRITERIA PEKERJAAN PRASARANA.................................................................................10
(5) KRITERIA PEKERJAAN PARKIR.........................................................................................10
(6) KRITERIA PEKERJAAN FINISHING....................................................................................10
(7) KRITERIA PEKERJAAN SIGNAGE DAN WAYFINDING LANSEKAP......................................10
(8) KRITERIA PEKERJAAN AKUISISI KOLEKSI.........................................................................10
b) LANSEKAP..............................................................................................................................10
(1) VEGETASI (SOFTSCAPE)..................................................................................................10
(2) AKSE, PERKERASAN JALAN DAN PERKERASAN AREA (HARDSCAPE)...............................11
c) STRUKTUR..............................................................................................................................11
(1) KRITERIA PERENCANAAN UMUM DAN PEMBEBANAN STRUKTUR.................................11
(2) SISTEM STRUKTUR PENAHAN GAYA ANGIN...................................................................11
(3) SISTEM STRUKTUR TAHAN GEMPA................................................................................11
(4) SISTEM STRUKTUR PONDASI..........................................................................................11
(5) SISTEM STRUKTUR SEMI BASEMENT..............................................................................11
(6) SISTEM STRUKTUR PILECAP, KOLOM, BALOK, PELAT LANTAI DAN DINDING GESER......11
(7) SISTEM STRUKTUR RANGKA ATAP DAN FASAD..............................................................11
(8) SISTEM STRUKTUR TANGGA..........................................................................................11
d) MEKANIKAL ELEKTRIKAL PLAMBING (MEP)...........................................................................11
(1) SISTEM TATA UDARA.....................................................................................................11
(2) SISTEM PLAMBBING.......................................................................................................11
(3) SISTEM SANITASI DAN LIMBAH......................................................................................11
(4) SISTEM PROTEKSI KEBAKARAN......................................................................................11
(5) SISTEM TRANSPORTASI DALAM.....................................................................................11

v
(6) SISTEM TENAGA LISTRIK................................................................................................11
(7) SISTEM PENCAHAYAAN..................................................................................................11
(8) SISTEM PENTANAHAN....................................................................................................11
(9) SISTEM ELEKTRONIKA BUILDING MANAGEMENT SYSTEM.............................................11
e) KRITERIA KHUSUS / LAINNYA.................................................................................................11
f) KRITERIA BANGUNAN GEDUNG HIJAU...................................................................................11
F. STANDAR YANG DIGUNAKAN........................................................................................................11
1. PERATURAN PERUNDANG-UNDANGAN.....................................................................................11
2. STANDAR TEKNIS YANG BERLAKU..............................................................................................11
VIII. KEBUTUHAN TENAGA AHLI PERANCANG DAN PERSONEL MANAJERIAL.......................................11
A. TENAGA AHLI PERENCANAAN DAN PENGAWASAN BERKALA........................................................11
B. PERSONEL MANAJERIAL PELAKSANA KONSTRUKSI........................................................................11
IX. PERSYARATAN PERIZINAN............................................................................................................11
A. PERSETUJUAN BANGUNAN GEDUNG (PBG)...................................................................................11
B. SERTIFIKASI BANGUNAN GEDUNG HIJAU......................................................................................11
C. UKL/UPL.........................................................................................................................................11
D. IZIN GALIAN(BILA ADA)..................................................................................................................11
E. IZIN LAINNYA (BILA ADA)...............................................................................................................11
X. DAFTAR TARIF/SCHEDULE OF RATES.............................................................................................11
XI. LAIN-LAIN.....................................................................................................................................12
A. MANAJEMEN MUTU DAN SISTEM MANAJEMEN K3......................................................................12
B. KETENTUAN GAMBAR TEKNIS PELAKSANAAN...............................................................................12
C. DAFTAR KEBUTUHAN ALAT MINIMUM..........................................................................................12
D. KETERIKATAN DENGAN AREA PEKERJAAN LAIN.............................................................................12

vi
I. LATAR BELAKANG

1
II. MAKSUD, TUJUAN DAN SASARAN
A. MAKSUD
B. TUJUAN
C. SASARAN

2
III. SUMBER PENDANAAN

3
IV. PAGU PEKERJAAN RANCANG DAN BANGUN

4
V. WAKTU PELAKSANAAN

5
VI. RANCANGAN AWAL

6
VII. LINGKUP DAN KELUARAN PEKERJAAN
A. LINGKUP PEKERJAAN
B. LINGKUP KEGIATAN PERENCANAAN
1. PRA RANCANGAN
2. PENGEMBANGAN RANCANGAN
3. RENCANA DETIL
4. PENGAWASAN BERKALA
5. KRITERIA PERANCANGAN (DESIGN CRITERIA)
a) KRITERIA UMUM ARSITEKTUR
(1) PERATURAN DAN STANDAR
(2) KRITERIA UMUM ARSITEKTUR
(3) PENAMPILAN ARSITEKTUR
(4) TATA RUANG DALAM
(5) KESEIMBANGAN
(6) KEANDALAN BANGUNAN
(7) TEKNOLOGI
(8) INTERIOR
(9) SISTEM SIGNAGE
b) LANSEKAP
(1) VEGETASI (SOFTCAPE)
(2) AKSES, PERKERASAN JALAN
c) KRITERIAN UMUM STRUKTUR
(1) KRITERIA PERENCANAAN UMUM DAN PEMBEBANAN STRUKTUR
(2) SISTEM STRUKTUR PENAHAN GAYA ANGIN
(3) SISTEM STRUKTUR TAHAN GEMPA
(4) SISTEM STRUKTUR PONDASI
(5) SISTEM STRUKTUR SEMI BASEMENT
(6) SISTEM STRUKTUR PILECAP, KOLOM, BALOK, PELAT LANTAI DAN DINDING
GESER
(7) SISTEM STRUKTUR RANGKA ATAP DAN FASAD
(8) SISTEM STRUKTUR TANGGA
d) KRITERIA UMUM MEP
(1) SISTEM TATA UDARA
(2) SISTEM PLAMBBING
(3) SISTEM SANITASI DAN LIMBAH
(4) SISTEM PROTEKSI KEBAKARAN
(5) SISTEM TRANSPORTASI DALAM
(6) SISTEM TENAGA LISTRIK

7
(7) SISTEM PENCAHAYAAN
(8) SISTEM PENTANAHAN
(9) SISTEM ELEKTRONIKA BUILDING MANAGEMENT SYSTEM
e) KRITERIA KHUSUS / LAINNYA
f) KRITERIA BANGUNAN GEDUNG HIJAU
C. KRITERIA LINGKUP KEGIATAN PELAKSANAAN
1. PEKERJAAN PERSIAPAN
a) PEKERJAAN PERSIAPAN TERKAIT ADMINISTRASI
b) PEKERJAAN PERSIAPAN TERKAIT TANAH
(1) KRITERIA METODE PELAKSANAAN GALIAN TIMBUNAN
(2) KRITERIA METODE PELAKSANAAN DINDING PENGAMAN TANAH
(3) KRITERIA UPGRADING
(4) KRITERIA PERKUATAN LERENG
c) PEKERJAAN PERSIAPAN TERKAIT LANSEKAP
2. PELAKSANAAN KONSTRUKSI
a) ARSITEKTUR
(1) KRITERIA PEKERJAAN LIST PLANK
(2) KRITERIA PEKERJAAN PLAFOND
(3) KRITERIA PEKERJAAN PASANGAN DINDING, PINTU DAN JENDELA
(4) KRITERIA PEKERJAAN PRASARANA
(5) KRITERIA PEKERJAAN PARKIR
(6) KRITERIA PEKERJAAN FINISHING
(7) KRITERIA PEKERJAAN SIGNAGE DAN WAYFINDING LANSEKAP
(8) KRITERIA PEKERJAAN AKUISISI KOLEKSI
b) LANSEKAP
(1) VEGETASI (SOFTSCAPE)
(2) AKSE, PERKERASAN JALAN DAN PERKERASAN AREA (HARDSCAPE)
c) STRUKTUR
(1) KRITERIA PERENCANAAN UMUM DAN PEMBEBANAN STRUKTUR
(2) SISTEM STRUKTUR PENAHAN GAYA ANGIN
(3) SISTEM STRUKTUR TAHAN GEMPA
(4) SISTEM STRUKTUR PONDASI
(5) SISTEM STRUKTUR SEMI BASEMENT
(6) SISTEM STRUKTUR PILECAP, KOLOM, BALOK, PELAT LANTAI DAN DINDING
GESER
(7) SISTEM STRUKTUR RANGKA ATAP DAN FASAD
(8) SISTEM STRUKTUR TANGGA
d) MEKANIKAL ELEKTRIKAL PLAMBING (MEP)
(1) SISTEM TATA UDARA

8
(2) SISTEM PLAMBBING
(3) SISTEM SANITASI DAN LIMBAH
(4) SISTEM PROTEKSI KEBAKARAN
(5) SISTEM TRANSPORTASI DALAM
(6) SISTEM TENAGA LISTRIK
(7) SISTEM PENCAHAYAAN
(8) SISTEM PENTANAHAN
(9) SISTEM ELEKTRONIKA BUILDING MANAGEMENT SYSTEM
e) KRITERIA KHUSUS / LAINNYA
f) KRITERIA BANGUNAN GEDUNG HIJAU

D. KRITERIA PENGUJIAN KELUARAN


1. ARSITEKTUR
a) KRITERIA PEKERJAAN LIST PLANK
b) KRITERIA PEKERJAAN PLAFOND
c) KRITERIA PEKERJAAN PASANGAN DINDING, PINTU DAN JENDELA
d) KRITERIA PEKERJAAN PRASARANA
e) KRITERIA PEKERJAAN PARKIR
f) KRITERIA PEKERJAAN FINISHING
g) KRITERIA PEKERJAAN SIGNAGE DAN WAYFINDING LANSEKAP
h) KRITERIA PEKERJAAN AKUISISI KOLEKSI

2. LANSEKAP
a) VEGETASI (SOFTSCAPE)
b) AKSE, PERKERASAN JALAN DAN PERKERASAN AREA (HARDSCAPE)

3. STRUKTUR
a) KRITERIA PERENCANAAN UMUM DAN PEMBEBANAN STRUKTUR
b) SISTEM STRUKTUR PENAHAN GAYA ANGIN
c) SISTEM STRUKTUR TAHAN GEMPA
d) SISTEM STRUKTUR PONDASI
e) SISTEM STRUKTUR SEMI BASEMENT
f) SISTEM STRUKTUR PILECAP, KOLOM, BALOK, PELAT LANTAI DAN DINDING GESER
g) SISTEM STRUKTUR RANGKA ATAP DAN FASAD
h) SISTEM STRUKTUR TANGGA

9
4. MEKANIKAL ELEKTRIKAL PLAMBING (MEP)
a) SISTEM TATA UDARA
b) SISTEM PLAMBBING
c) SISTEM SANITASI DAN LIMBAH
d) SISTEM PROTEKSI KEBAKARAN
e) SISTEM TRANSPORTASI DALAM
f) SISTEM TENAGA LISTRIK
g) SISTEM PENCAHAYAAN
h) SISTEM PENTANAHAN
i) SISTEM ELEKTRONIKA BUILDING MANAGEMENT SYSTEM

5. KRITERIA KHUSUS / LAINNYA

6. KRITERIA BANGUNAN GEDUNG HIJAU

E. KRITERIA PENERIMAAN KELUARAN


1. PERENCANAAN
a) Tahap perencanaan
b) Tahap penyususnan pra rancangan
c) Tahap penyususnan pengembangan rancangan
d) Tahap penyusunan rencana detil

2. PELAKSANAAN
a) ARSITEKTUR
(1) KRITERIA PEKERJAAN LIST PLANK
(2) KRITERIA PEKERJAAN PLAFOND
(3) KRITERIA PEKERJAAN PASANGAN DINDING, PINTU DAN JENDELA
(4) KRITERIA PEKERJAAN PRASARANA
(5) KRITERIA PEKERJAAN PARKIR
(6) KRITERIA PEKERJAAN FINISHING
(7) KRITERIA PEKERJAAN SIGNAGE DAN WAYFINDING LANSEKAP
(8) KRITERIA PEKERJAAN AKUISISI KOLEKSI

b) LANSEKAP
(1) VEGETASI (SOFTSCAPE)
(2) AKSE, PERKERASAN JALAN DAN PERKERASAN AREA (HARDSCAPE)

10
c) STRUKTUR
(1) KRITERIA PERENCANAAN UMUM DAN PEMBEBANAN STRUKTUR
(2) SISTEM STRUKTUR PENAHAN GAYA ANGIN
(3) SISTEM STRUKTUR TAHAN GEMPA
(4) SISTEM STRUKTUR PONDASI
(5) SISTEM STRUKTUR SEMI BASEMENT
(6) SISTEM STRUKTUR PILECAP, KOLOM, BALOK, PELAT LANTAI DAN DINDING
GESER
(7) SISTEM STRUKTUR RANGKA ATAP DAN FASAD
(8) SISTEM STRUKTUR TANGGA

d) MEKANIKAL ELEKTRIKAL PLAMBING (MEP)


(1) SISTEM TATA UDARA
(2) SISTEM PLAMBBING
(3) SISTEM SANITASI DAN LIMBAH
(4) SISTEM PROTEKSI KEBAKARAN
(5) SISTEM TRANSPORTASI DALAM
(6) SISTEM TENAGA LISTRIK
(7) SISTEM PENCAHAYAAN
(8) SISTEM PENTANAHAN
(9) SISTEM ELEKTRONIKA BUILDING MANAGEMENT SYSTEM

e) KRITERIA KHUSUS / LAINNYA

f) KRITERIA BANGUNAN GEDUNG HIJAU

F. STANDAR YANG DIGUNAKAN


1. PERATURAN PERUNDANG-UNDANGAN
2. STANDAR TEKNIS YANG BERLAKU

11
VIII. KEBUTUHAN TENAGA AHLI PERANCANG DAN PERSONEL MANAJERIAL
A. TENAGA AHLI PERENCANAAN DAN PENGAWASAN BERKALA
B. PERSONEL MANAJERIAL PELAKSANA KONSTRUKSI

12
IX. PERSYARATAN PERIZINAN
A. PERSETUJUAN BANGUNAN GEDUNG (PBG)
B. SERTIFIKASI BANGUNAN GEDUNG HIJAU
C. UKL/UPL
D. IZIN GALIAN(BILA ADA)
E. IZIN LAINNYA (BILA ADA)

13
X. DAFTAR TARIF/SCHEDULE OF RATES

14
XI. LAIN-LAIN
A. MANAJEMEN MUTU DAN SISTEM MANAJEMEN K3
B. KETENTUAN GAMBAR TEKNIS PELAKSANAAN
C. DAFTAR KEBUTUHAN ALAT MINIMUM
D. KETERIKATAN DENGAN AREA PEKERJAAN LAIN

15