Summary Cross Audit 2022
Summary Cross Audit 2022
No Indicator Definition
Questionnaire - Road risk Oct-21
Sudah diajuin ke manajemen untuk shuttle bus , namun 80 80 Sudah di ajukan namun belum
menunggu feedback persetujuan ada feedback dari BOD
Updated data SIM karyawan 2021 80 100 Updated data SIM karyawan
2022
Apakah tindakan
Do control measures pengendalian untuk
for activities on the
8 roof systematically kegiatan di atap secara
prioritize collective sistematis
memprioritaskan
protection? perlindungan kolektif?
16
Are the skylights (on Apakah skylight (di
roof) protected? atas atap) terlindungi?
Memiliki semua atap,
Have all roofs, jalan setapak yang
elevated walkways, ditinggikan, dan
and platforms been platform dipelihara
17 maintained to prevent untuk mencegah
corrosion of structural korosi komponen
components (paint, struktural (cat,
leak repair, etc.)? perbaikan kebocoran,
dll.)?
Apakah peralatan
Is fall arrest penahan jatuh tersedia
equipment available
22 and used by all dan digunakan oleh
semua personil pada
personnel on mobile peralatan akses
access equipment? mobile?
Apakah semua
Have all personnel
working at height on personil yang bekerja
vehicles a safe pada ketinggian pada
29 kendaraan merupakan
operating procedure prosedur operasi yang
which includes safe
access? aman yang mencakup
akses yang aman?
U
C
T
I
O
SCORE SCORE N
LOTO - QUESTIONS 2021 2022 S ACTION PLAN ACTION PLAN 2 RECORDS & COMMUNICATIONS INTERVIEW QUESTIONS OBSERVATIONS
Has a person been nominated as being responsible for the
1 management overview of all plant and equipment isolations on Update SK related Permenaker 38 2016 and logo 126
site
100 100
Apakah seseorang telah dinominasikan untuk bertanggung jawab
atas tinjauan manajemen semua isolasi pabrik dan peralatan di
lokasi?
2
Has the nominated person sufficient information and training to Refresh Training Champion and Co Champion by Boost 240
enable them to manage their responsibilities competently.
100 100
Apakah orang yang dinominasikan memiliki informasi dan
pelatihan yang cukup untuk memungkinkan mereka mengelola
tanggung jawab mereka secara kompeten.
Is there a written procedure for the safe energy isolation of all SOP 04 Rev. 05 600
plant and equipment?
4 100 100
Apakah ada prosedur tertulis untuk isolasi energi yang aman dari
semua instalasi dan peralatan?
Have all relevant employees been trained and had supervised Refresh Training 9 June 2022
Need refresh / coaching training for authorized LOTO
practice at implementing the safe energy isolation of the hanya 1 orang yang lulus refresh training--> ganti
600
relevant plant and equipment? metode training to aplikasi lapangan
5 80 80
Apakah semua karyawan yang relevan telah dilatih dan memiliki
praktik yang diawasi dalam menerapkan isolasi energi yang aman
dari pabrik dan peralatan yang relevan?
Is their a list of trained personnel kept and updated on a regular Refresh Training for authorized person, and provide SK
12
basis for authorized person
6 80 80
Apakah daftar personel terlatih mereka disimpan dan diperbarui
secara teratur?
Are there appropriate suitable and sufficient LOTO devices (pad- 600
locks, LOTO tool kits, valve, covers, etc.) available.
7 60 60
Apakah tersedia perangkat LOTO yang sesuai dan memadai
(gembok, kit alat LOTO, katup, penutup, dll.)?
Is there a system and procedure to ensure that the locks of LOTO for authorized person
employees and others cannot be removed without a thorough Refer to 0ne person one Lock, One Key
600
search and investigation by the nominated responsible person.
8 100 100
Apakah ada sistem dan prosedur untuk memastikan bahwa kunci
karyawan dan lainnya tidak dapat dilepas tanpa pencarian dan
penyelidikan menyeluruh oleh orang yang bertanggung jawab
yang ditunjuk.
Has each installation been equipped with suitable and sufficient
energy isolating devices so that equipment can be effectively 600
locked out
9 60 60
Apakah setiap instalasi telah dilengkapi dengan perangkat isolasi
energi yang sesuai dan memadai sehingga peralatan dapat
dikunci secara efektif?
Have the procedures determined the type and number of safety 240
Lockout and Tag devices required,
13 60 60
Apakah prosedur menentukan jenis dan jumlah perangkat
Lockout dan Tag pengaman yang diperlukan,
Is there a procedure to ensure that all safety Lockout devices are
There is no regular checking of LOTO equipment at the
safely stored in designated locations and condition checked on a LOTO station yet 126
regular basis.
14 60 80
Apakah ada prosedur untuk memastikan bahwa semua
perangkat Pengunci pengaman disimpan dengan aman di lokasi
yang ditentukan dan diperiksa kondisinya secara teratur.
Do your procedures specifically require that stored or residual Complete all LOTO General Placard and Local Placard 600
energy is dissipated or restrained by an approved method?
15 60 80
Apakah prosedur Anda secara khusus mengharuskan energi yang
tersimpan atau energi sisa dihamburkan atau ditahan dengan
metode yang disetujui?
Do your procedures ensure that Lo/To is continuous for shift and 600
personnel changes
25 100 100
Apakah prosedur Anda memastikan bahwa Lo/To berkelanjutan
untuk pergantian shift dan personel?
Do you have a procedure for the safe removal of Lo/To devices in 240
the event of someone accidentally leaving them in place?
26 100 100
Apakah Anda memiliki prosedur untuk melepas perangkat Lo/To
dengan aman jika seseorang secara tidak sengaja
meninggalkannya di tempatnya?
Have you an audit and review procedure to ensure that all the
requirements of your Plant and Equipment Isolations are 126
effective?.
27 80 80
Sudahkah Anda mengaudit dan meninjau prosedur untuk
memastikan bahwa semua persyaratan Isolasi Pabrik dan
Peralatan Anda efektif?.
OVERALL CROSS AUDIT SCORE 84 87
Score 2021
Does the plant have an inventory list of all machines that may
4 80
require guarding?
85
Score 2022
80
Form machinery inventory list tersedia, namun
belum terupdate
80
inspeksi dilakukan rutin, inspeksi per mesin,
juga inspeksi berdasarkan CILT
100
80
Konsistensi tindakan perbaikan yang dilakukan
dari hasil review RA
80
Review risk assessment dilakukan melibatkan
operator, konsistensi pelaksanaan
80
100
RA Maintenance dilakukan review Mar-21,
RA Production dilakukan review Sep-21
80
Form bypass & WI tersedia (dokumen
menyusul)
80
Mesin dan panel telah dilengkapi protection
devices & guarding
80
Access panel disediakan kunci, mesin
disediakan guarding dan safety signage
100
Tidak ada penggunaan wingnut
80
semua panel & mesin pada area high hazard
dilengkapi pengaman (dokumen menyusul)
80
Tercakup di laporan daily checklist
80
List machine tersedia namun belum secara
keseluruhan terupdate
100
SA dilakukan september 2021, training
dilakukan agustus 2021
100
Review dalam P2K3 dan management review
89
Action Plan 2022
Follow up by E tag
E-Tag
SWP for all machine
Do FLT drivers know and follow the key safe actions described
20
in Section B8 (Drivers) of this standard? 100
Speed Limiter FLT rusak, belum ada perbaikan dari vendor dari 16
Maret 2022 dan belum ada perbaikan.
Minta jadwal maintenance dari vendor FLT, dan laporan Service dari vendor
tentukan lokasi parkir forklift, berikan sign parkir forklift & lengkapkan
dengan APAR
Refresh training untuk operator forklift dilengkapi dengan Post test dan
Praktik
Sosialisasi FLT golden rules via refresh training, Spanduk atau poster
1
Does the site have access to all legal and company
requirements about confined space management?
Does the site have access to (a) competent person(s) who can
2 assess the Confined Space safety status of the site to legal and
company requirements?
3
Has the site been surveyed by a competent person to identify
all potential confined spaces?
4
Does the site have an inventory list of all confined spaces
including permit and non permit required areas?
5
Has/have (a) competent Permit to Work Responsible Person(s)
been appointed?
6
Has/have (a) competent Permit to Work Issuer(s) been
appointed?
7
Have persons been nominated to enter Permit Required
Confined Spaces?
7
Have persons been nominated to enter Permit Required
Confined Spaces?
9
Have persons been trained to carry out the tasks of Confined
Space Attendant or Standby Person?
11
Do the gas testers know the SG gas limits and about the
requirement to ensure the whole confined space is safe?
12
Have all Permit Required Confined Spaces been suitably visibly
identified at all potential access points?
13
Has the site a suitable range of entry/rescue/ retrieval
equipment for Confined Space Entry?
14
Is the confined space entry/ rescue and retrieval equipment
stored in a suitable location?
Is there a robust communication system and procedure
15 between confined space entrants and the attendant/ standby
person?
17
Does the emergency response person know what the
Emergency Plans are and how and when to Initiate them?
18
Is there equipment available to ventilate confined spaces if
required?
19
Is there an Emergency Plan for every Permit Required
Confined Space?
20
Does the Confined Space Permit to Work meet all the
requirements of this standard?
21
Have all permits issued in the last 12 months been completed
and closed correctly?
22
Have there been any Confined Space Emergency plan practices
carried out in the last 12 months?
25
Is there a recorded annual review of all the safety
requirements of this standard and associated local legislation?
80
Apakah site mempunyai akses ke
orang yng mempunyai kompetensi
yang dapat mengakses status safety CS
ke legal dan kebutuhan perusahaan
80
Apakah site mempunyai list inventory
dari semua CS termasuk area yang
butuh permit maupun tidak.
100
Apakah ada orang yang bertanggung
jawab untuk mengeluarkan PTW
60
Apakah pengetes gas tahu batasan Gas
dan tentang kebutuhan yang
menyatakan CS tersebut aman
60
60
80
80
80
100
80
60
80
40
80
80
100
60
75
Action Plan
FINDINGS 2021
Confined Rescue tools masih digabung dengan alat Menyediakan lemari khusus alat rescue
emergency lain, perlu tempat atau lemari tersendiri confined space
Confined Rescue tools masih digabung dengan alat Menyediakan lemari khusus alat rescue
emergency lain, perlu tempat atau lemari tersendiri confined space
Komunikasi menggunakan HT, dan Peluit
Continous activities
Diperlukan internal training untuk semua pekerja Refresh training untuk semua pekerja yang
terkait CS awareness terlibat akan bahaya confined space
SCORE 2022 Action Plan
100
100
Continues activity
100 Review tahunan dilakukan MR, P2K3,
83
No
4
Does the plant have an inventory of all company vehicles and
are records kept of maintenance and safety checks?
23
Have all employee and contractor drivers been suitably
trained and do they hold appropriate licences ?
25 Are all vehicles fitted with suitable seating and seat belts?
26
Are all tipping operations subject to a risk assessment and all
appropriate safety control measures put in place?
* The gaps' scores automatically proposed in this table should be re-assessed through a related risk assessment to take
DAFTAR PERIKSA KENDARAAN & PEJALAN LEVEL OF COMPLIANCE Oct
KAKI 2021
ould be re-assessed through a related risk assessment to take into account the control measures effectively put in place, in particu
LEVEL OF COMPLIANCE Aug
Action Plan 2022
2022
80
80
80
100
100
100
100
60
100
100
89
he control measures effectively put in place, in particular when the percentages are 60% and 80%.
Action Plan 2021
S
o
l
e
h
Collision map telah diupdated ,
S
u
p
r
i
y
a
d
i
&
R
a
h
m
a
n
H
RA sudah diupdated untuk kegiatan
o Loading/ Unloading
o Tipping
o Coupling / Uncoupling trailers
o Sheeting/ Securing Loads
o Parking
o Mixing traffic with smaller vehicles.
###
###
already included at RA
D
i
a
n
A
y
u
entages are 60% and 80%.
SAINT-GOBAIN SAFETY STANDARD
CONTROL OF CONTRACTORS
Questionnaire
Are all work orders for contractors & externally based SG employees clearly defined with the
scope of the work (job, area time etc..) ?
Do all contractors agree in writing to abide by a defined set of mandatory rules they have to
2
follow when they work inside SG premises?
Within the contract are the EHS management responsibilities clearly defined for all relevant
personnel?
3
Do the contract requirements include a 'method of work/ prevention plan which specifies risks
4 and control measures to eliminate or reduce risk?
5 Have contractors & externally based SG employees been informed in writing of all relevant
site specific hazards and risks that may impact on their employees?
Is there a specific requirement in the contracts that all contract and sub contract employees
& externally based SG employees have sufficient training and experience to carry out their
work safely?
6
Is there a requirement that all tools, equipment and materials brought onto site will be used in
7
compliance with local legal and company requirements?
Is a there a named company representative who is responsible for monitoring and reviewing
8
the EHS arrangements of all contract work?
9 Does the company representative review the Method Statement/ Prevention plan (recorded)
before work on site is started?
10 Does your procedure require that the method statement/ Prevention plan must be reviewed
and approved by the local responsible manager?
11
Is a list of persons in charge of approving the method statement/ Prevention plan clearly
defined and are they trained?
Is an appropriate supervision plan defined according the risk analysis of the work and of the
contractors?
12
Does your procedure require specific supervision according to this standard concerning all
13 activities of work at height or excavation conducted by contractors or external SG
Employees?
14 Are there specific arrangements for the provision of first aid and any other emergency
response that may be required?
Does your procedure require that all significant incidents including personal injury, fire,
15 environmental incidents, exposure to asbestos, vehicle overturns and failures of lifting
equipment etc are reported?
Is there adequate control procedure to ensure that no-one can work on site without an
authorised site safety induction?
16
Are contractors and their employees & externally based SG employees informed (records
17 required) of the types of activities that are prohibited on site without a 'Permit to Work?
Is every contract employee who works on site given a recorded site safety induction by an
18 authorised company representative?
Are there procedures to ensure that temporary or agency staff do not work on contracts
without an appropriate site safety induction?
19
In case of plant equipment shared with a contractor, is there a written authorization with a
20
safety condition check before and after the work ?
22 Is there a system in place to record who of the contractors team & externally based SG
employees is on site on each day?
23
Is there a risk review of the contract to ensure that relevant SG employees are advised of the
presence of contractors & externally based SG employees and the nature of their work?
Are there records of the monitoring of the work of contractors & externally based SG
24 employees on site to ensure that EHS procedures and requirements are being followed?
(e.g. SMAT's)?
At the end of contract work is there a procedure to ensure that the area has been left in a
25 safe condition?
26 Is there a review of the success or otherwise of the control of contractors & externally based
SG employees procedure as part of the site safety management system?
CONTROL OF CONTRACTORS
COMPLIANCE SCORE %
COMPLIANCE COMPLIANCE
ACTION PLAN 2020
2019 2020
100 100
100 100
100 100
Will be confirmed to Bu Dian and Pak Rahman Hakim
80 80
Will be confirmed to Bu Dian and Pak Rahman Hakim
80 80
80 100
100 100
100 100
100 100
80 100
Please check visitor visit pass form. Plus self assessment
randomly sampling for contractors
100 100
100 100
Need to be checked to EHS and HRGA
100 100
PERCENTAGE %
PERCENTAGE %
85 94
COMPLIANCE
ACTION PLAN 2019 PIC
2021
Purchasing 100
EHS 40
100
Merubah flowchart SOP persetujuan method statement
terkait oleh responsible manager (PM) EHS 60
matriks PIC yang bisa menyetujui method statement
EHS 80
100
HRGA 100
Reinforce security untuk melaksanakan WI Penerimaan
Tamu dan kontraktor, agar sesuai dengan prosedur EHS
EHS 80
List contractor di EHS Permit board, update materi CSI
100
100
PTW form, untuk dimasukkan dalam WI security saat
100
kontraktor meninggalkan area kerja
PERCENTAGE %
86
CA 2022 ACTION PLAN 2022
100
100
100
100
ENTAGE %
94
ACTION PLAN 2021
Continues activity
Induction Contractor
Indicator Definition
82.22%
2021
update dan
Schedule SMATEE and - SMAT
melengkapi
SMATER, Area Not Rhesa Aug-21 Refreshment
schedule
Completed Training
SMATE
Melakukan
Refreshment Training Hakim Oct-21
training SMAT
Completed WI
WI unavailable Iman SMAT with 7 Oct-21
SMAT STEPS
There is no guarantor
SMAT to
signature to verifiy SMAT Iman Oct-21
eSMAT
Check
Yes Yes
SOP
pembuatan
100%
standar local
untuk ISO
next schedule
100% 15 agustus
2022
80% WI or SOP
pendampinga
n SMATER
100% oleh leader
SMARguarant
or
Tarikan data
manual
sinkron
80%
dengan
esuite, point
28
Di define
100% dalam SOP
(BOD)
Finding SMAT
di
intregasikan
ke dalam
80%
Annual EHS
action plan
(Singgle
Agenda)
temuan smat
2021
penyelesaian
2022 action
80% plan, smat
manual coba
diinput
menggunakan
account lain
Yes
1-agustus-22
90%
90.00%
Due Date Date
Findings
Dibuat list untuk SMATee Produksi, maintenance, Supply Rekap SMAT untuk Cibitung akan
chain, GA, Security dikonfirmasi ke Pak Rahman.
Refer to monthly Excomm report
put dalam form SMAT pada saat melakukan SMAT Sudah memberikan feedback melalui email,
verbal di SMAT Meeting tentang kualitas
SMAT. Namun Pelaporannya belum
terdistribusi ke 3 pihak terkait.
Untuk di buat papan SMAT di area tertentu Sudah dibuatkan papan SMAT, Updated
monthly basis oleh Champion dan Co
Champion SMAT
100
100
80
40
100
80
80
82.5
WAREHOUSE & LOADING - QUESTIONS Pic Date
1 Does the site have access to all legal and Dian Q3, 2019
company requirements on warehousing
and loading/unloading vehicles?
2 Does the site have access to a competent Dian / Ivan Q4, 2019
person who can assess the Warehousing
and Loading/Unloading safety status
against legal and company requirements? Dian / Rahman 30 June 2019
8 If any drivers have to climb onto their Supriyadi & Rahman Q3, 2019
vehicles and/or loads is provision made
for their safe access, and are
arrangements in place where required to
prevent or restrain falls from height, like
fall arrest equipment?
18 Are any storage equipment or areas that Supriyadi & Rahman 30-Jun-19
have limits by weight, dimension, quantity
and stability clearly identified to prevent
incorrect loading?
23 Is the air quality in the warehouse area Dian & Rahman 30-Jun-19
free from any harmful gases, vapours or
particulates? If not, is the atmosphere
monitored to ensure that it meets local
legal requirements?
27 Are all the documents and records Dian & Rahman Q3, 2019
required by this standard and local
legislation kept in a secure location for
inspection and auditing?
Finding
Evidence Needed (Document, Picture, SCORE Action Plan & Finding
Screen Shot) 2021
Screen Shot of share folder that can acces by 80 already have share folder
champion and co champion WHL
Screen Shot of Risk Assessment related hazard of 80 List Risk assessment belum lengkap,
perlu melengkapi RA terbaru sesuai
Battery Charging
dengan WHL Standard (memindahkan
dari format lama ke yang baru)
Document:
- Checklist Truck
80 WI / SWP sudah ada, tetapi belum
dilakukan update
- SOP related warehouse Loading Unloading
- WI/SWP Loading Finish Good
- WI/SWP Loading LB3
- WI/SWP Unloading Raw Material
Picture:
- Parking area
- loading and unloading place (FG, LB3, RM)
- Driver Waiting area
- Sign PPE Requirements
Picture of local safety rules for visiting driver 100 Sign sudah terpasang
in gate area, loading area, and unloading area.
List of recommendation for safety improvement in the 80 Belum ada hasil SMAT terhadap driver,
list high risk project warehouse belum
warehouse and loading unloading (SMAT, Incident,
Observation) ada.
Picture Loading Unloading Area, wheel Stopper or Chock. 80 Sudah terlaksana, monitoring marking cat
parkir
Training evidence (Absence and presentation) for TKBM 100 Sudah dilakukan training TKBM
latest update training evidence for Forklift driver 100 refresh training sudah terlaksana
Picture for pedestrian route regarding Warehouse 100 Jalur Pedestrian sudah dicat dengan jelas
mapping
Safe Storage Procedure and Picture of Raw Material 80 Beberapa material additive masih
tercampur, tidak dipisahkan berdasarkan
Storage.
karakteristik B3
Document report Inspection Storage Equipment 100 Pemeriksaan Rack, Forklift, dan Lifeline
Picture of refueling areas and charging station 80 APAR di area charging station diletakan
tidak pada tempatnya
Screen shot from Risk Assessment Document that
mention about manual handling
80 List Risk assessment belum lengkap,
perlu melengkapi RA terbaru sesuai
Screen shot from Risk Assessment Document that dengan WHL Standard (memindahkan
mention about high risk dari format lama ke yang baru)
Picture or screen shot list of required standard and 80 belum semua peraturan diupdate di share
folder
local legislation.
List of recommendation for safety improvement in the 80 Belum ada hasil SMAT terhadap driver
dan TKBM, list high risk project
warehouse and loading unloading (SMAT, Incident,
Observation) warehouse belum ada.
List Of Legal compliance relating warehouse loading 100 Hasil MOM pembahasan pemenuhan
legal terkait WHL
and unloading
88
2
Action Plan SCORE Action Plan & Finding
2022
Pastikan Semua share folder dan file dapat
diakses oleh pihak yang berkepentingan
100 SLF bangunan sudah ada
100
SK Champion & Co Champion sudah ada,
share evidence training untuk champion
dan co champion
Melakukan update WI/SWP yang ada. 80 WI & SWP sudah diupdated, perlu
dilakukan implementasi konsistensi
checklist truck terutama truk RMP
100 Sign sudah terpasang
warehouse
Melakukan update WI/SWP yang ada. 100 WI & SWP sudah diupdated
warehouse
90
SAINT-GOBAIN ENVIRONMENTAL STANDARD
Question
General questions
1
2
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
Wording
General questions
Koordinator metode telah ditunjuk di site.
Koordinator dan semua orang yang bertanggungjawab dalam penilaian risiko telah dilatih mengenai metode
penilaian risiko.
Tanggung jawab koordinator dan para manajer yang terlibat dalam penilaian telah terdefinisikan.
Penilaian risiko Kesehatan dan Keselamatan memperhitungkan aktivitas di dalam batasan site dan di luar
site yang masih terkait dengan tanggung jawab Saint-Gobain.
Terdapat jadwal penerapan & pembaruan, yang meliputi seluruh aktivitas yang diperhitungkan dalam
penilaian risiko.
Diagram JOB, work station dan tugas pekerjaan telah ditentukan di site, dengan memperhitungkan aktivitas
rutin dan non-rutin termasuk yang terkait dengan manajemen kecelakaan dan situasi darurat.
Karyawan berpartisipasi secara sistematis dalam analisis risiko yang melibatkan mereka.
Penginventarisasian bahaya di site memperhitungkan daftar bahaya yang tercantum di Lampiran 1 dokumen
ini.
Anggota staf dengan status kesehatan khusus telah diperhitungkan dalam penilaian risiko.
Untuk setiap bahaya yang teridentifikasi pada JOB / work station / Tugas, potensi dampak kecelakaannya
telah diperhitungkan.
Untuk setiap bahaya yang teridentifikasi pada JOB / work station / Tugas, potensi dampak kecelakaannya
akibat operasional normal (Risiko Kronis) telah diperhitungkan
Metode penilaian risiko referensi (Sisa Risiko Awal dan Risiko Kasar) telah dipilih dan terus digunakan
selama proses penilaian.
Site menggunakan metode penilaian risiko yang sesuai standar (P x G or f x P x G) untuk risiko dan
kecelakaan dan parameter Tingkatan/Pengukuran risiko untuk risiko kronis.
Dalam metode penilaian risikonya, site telah menentukan cara yang memperhitungkan metode pengendalian
yang dapat mengurangi probabilitas atau keparahan dari kasus Kesehatan dan Keselamatan.
Penilaian risiko telah dijalankan untuk semua aktivitas terkait manajemen situasi kecelakaan atau darurat.
Rencana kerja EHS tahunan telah memperhitungkan hasil risiko penilaian dan daftar prioritas risiko yang
telah teridentifikasi.
Karyawan memiliki akses terhadap hasil penilaian risiko EHS yang telah terdokumentasi dan diperbarui
dengan baik, serta mengetahui risiko dan cara pengendalian yang telah teridentifikasi pada JOBnya masing-
masing.
Penilaian risiko diperbarui paling tidak sekali setahun dan hasilnya disortir.
Penilaian risiko diperbarui jika perlu setiap terjadi kecelakaan, hampir kecelakaan dan situasi berbahaya
signifikan yang dilaporkan.
Penilaian risiko diperbarui setiap ada modifikasi yang dilakukan (lini, equipment, proses, pengorganisasian
kerja dll.)
Pemeriksaan teknis dan ilmiah yang sesuai dengan risiko Kesehatan dan Keselamatan yang ada di site telah
diterapkan oleh pihak manajemen.
Indikator performa seperti yang tercantum pada standar SG telah tersedia dan ditindaklanjuti selama review
manajemen di site.
60 80 80
60 60 80
60 80 80
80 80 80
80 80 60
80 80 100
80 80 100
80 80 80
80 100 80
100 100 80
100 100 80
80 80 80
80 80 100
100 80 100
80 80 100
80 80 80
80 100 80
80 80 80
60 80 80
60 80 80
80 100 80
0
81 86 86
Action Plan CA 2022
100
100
Alone device 80
100
100
100
100
100
100
100
100
100
100
100
100
93
Action Plan
Has your Risk assessment identified all high hazard situations where
1
a Permit to Work may be required? 80 80 80 80
If you have identified potentially hazardous Confined Spaces do you 100 100 100 100
3
have a suitable Permit to Work Procedure?
Do you have a Permit to Work procedure to cover complex energy 100 100 100 100
4
isolation systems. (Over 3 sources of energy isolation)?
60 80 60 NA
6 Do you have a Permit to Work for excavation work?
Do the Permits to Work and the Procedures meet the 15 key 100 80 100 100
11
elements listed on Page 3 of the Permit to Work Procedure?
Does the Permit to Work procedure require that the permit to work
for each work on the unsafe roof must be validated by the plant 100 100 100 100
12
manager or his Authorized deputy and the Authorized agent of the
contractors?
Are copies of old Permits to Work retained for at least 2 years to 100 100 100 100
13
enable audits of the system?
Are Permit Issuers suitably trained and authorised in writing that 80 60 80 100
14
they may issue permits?
Does the Permit to Work procedure require that the Permit Holder 100 80 100 100
15
is fully briefed about the requirements of the Permit?
Does the procedure require that all persons working under a permit 80 80 80 100
16
are fully briefed about the potential hazards and the control
measures they are required to follow whilst working under the
Permit?
20
Does the procedure require that the permit to work must be 80 80 80 100
updated for every change of condition and at least every day?
Is there a procedure to monitor and audit the use of the Permit to 100 100 100 100
22
Work System?
Does the Safety Management System require an annual review of 100 100 100 100
23
the effectiveness of the Permit to Work system?
90 89 89 95
SA 2022 Findings/Action Plan Cross Audit 2021 PIC Action Plan
80
Create SOP / WI Excavation
Done
80 Perlunya improve SOP terkait penjabaran secara jelas persyaratan
ijin kerja untuk pekerjaan galian
100
100
100
100
100 Tercantum dalam SOP-EHS-03 pada item kasus khusus
100
95
PROCEDURES & INSTRUCTIONS