Perhitungan Abutment
5.6.a.. Abutmen di Gombel
5.6.a.1. Spesifikasi Abutmen
- Tipe abutmen : Cantilever
- Tipe Pondasi : Pondasi sumuran
- Mutu beton : K-250 (fc’=20.75 Mpa)
- Mutu baja : U-24 (fy= 240 Mpa)
2. Pembebanan dan Gaya-Gaya yang Bekerja
a. Berat Sendiri Abutmen (Ga)
G Berat (T) Berat/m Lengan Momen
(m) (Tm)
G1 0.3 x 0.5 x 16 x 2.4 = 5.76 0.36 2.6 0.936
G2 1.8 x 0.5 x 16 x 2.4 = 34.56 2.16 2.7 5.832
G3 0.5 x 0.5 x 0.5 x 16 x 2.4 = 4.8 0.3 2.62 0.786
G4 2.5 x 0.9 x 16 x 2.4 = 86.4 5.4 2 10.8
G5 0.5 x 0.5 x 1.55 x 16 x 2.4 = 14.88 0.93 2.97 2.7621
G6 0.5 x 0.5 x 1.55 x 16 x 2.4 = 14.88 0.93 1.03 0.9579
G7 4 x 80 x 16 x 2.4 = 122.88 7.68 2 15.36
Ga 284.16 17.76 37.434
diketahui :
tanah : 1.8473
: 340
d. Kombinasi IV : M + TA + Gb ……………………..150 %
Muatan Bagian PV (T) PH (T) MV (Tm) MH (Tm)
M Ga 17.76 0 37.434 0
Gt 13.007 0 40.2429 0
M 35.80952 0 71.61904 0
Gb 0 9.3204 0 43.806
TA 0 9.9539 0 20.2205
Total 66.57652 19.2743 149.29594 64.0265
Penulangan Abutmen
Pada perhitungan penulangan abutmen, pembebanan yang digunakan adalah
kombinasi pembebanan yang paling kritis yaitu kombinasi IV (M + TA + Gb).
Mutu beton : K250 (f’c = 20.75)
Mutu baja : U-240 (fy = 240)
Tulangan geser
b : 1000 mm
h : 900 mm
d : 900-40-0.5 x 19 = 850.5 mm
Perhitungan tulangan
b = 1000 mm
d = 800 – 40 – 0.5 16 = 752 mm