Perhitungan Abutment
5.6.a.. Abutmen di Gombel
5.6.a.1. Spesifikasi Abutmen
- Tipe abutmen : Cantilever
- Tipe Pondasi : Pondasi sumuran
- Mutu beton : K-250 (fc’=20.75 Mpa)
- Mutu baja : U-24 (fy= 240 Mpa)
2. Pembebanan dan Gaya-Gaya yang Bekerja
a. Berat Sendiri Abutmen (Ga)
G Berat (T) Berat/m Lengan Momen
(m) (Tm)
G1 0.3 x 0.5 x 16 x 2.4 = 5.76 0.36 2.6 0.936
G2 1.8 x 0.5 x 16 x 2.4 = 34.56 2.16 2.7 5.832
G3 0.5 x 0.5 x 0.5 x 16 x 2.4 = 4.8 0.3 2.62 0.786
G4 2.5 x 0.9 x 16 x 2.4 = 86.4 5.4 2 10.8
G5 0.5 x 0.5 x 1.55 x 16 x 2.4 = 14.88 0.93 2.97 2.7621
G6 0.5 x 0.5 x 1.55 x 16 x 2.4 = 14.88 0.93 1.03 0.9579
G7 4 x 80 x 16 x 2.4 = 122.88 7.68 2 15.36
Ga 284.16 17.76 37.434

b. Beban Tanah (Gt)

 tanah = 1.8473 T/m


W Berat (T) Berat/m Lengan (m) Momen (Tm)
W1 0.5 x 1.25 x 16 x 1.8473 = 18.473 1.156 3.375 3.9015
W2 2.3 x 1.05 x 16 x 1.8473 = 71.38 4.461 3.475 15.502
W3 0.5 x 0.5 x 0.5 x 16 x 1.8473 = 3.695 0.231 2.783 3.014
W4 1.5 x 1.55 x 16 x 1.8473 = 68.72 4.295 3.225 13.8514
W5 0.5 x 0.5 x 1.55 x 16 x 1.8473 = 11.453 0.716 3.483 2.494
W6 0.5 x 1.55 x 16 x 1.8473 = 22.907 1.432 0.775 1.1098
W7 0.5 x 0.5 x 1.55 x 16 x 1.8473 = 11.453 0.716 0.517 0.3702
Gt 208.081 13.007 40.2429
c. Beban Mati (M)

Beban mati yang bekerja pada abutmen terdiri dari :


1. Lapisan perkerasan : 0.1 x 36 x 16 x 2.2 = 126.72 T
2. Plat lantai : 0.2 x 36 x 16 x 2.4 = 276.48 T
3. Air hujan : 0.05 x 36 x 16 x 1 = 28.8 T
4. Railling : 2 x ( 0.2 x 0.15 x 1 x 12 ) = 0.72 T
5. Berat gelagar (11 gelagar): 1.69188 x 36 x 11 = 669.9845 T
6. Berat diafragma : 0.864 x 5 x 10 = 43.2 T
Total berat : 1145.9045 T
Beban terhadap satu abutmen : 0.5 x 1145.9045 = 572.9523 T
Beban per meter = 35.80952 T
Lengan terhadap A = 2 m
Momen = 35.80952 x 2 = 71.61904 Tm
d. Beban Hidup (Hd)
Beban hidup ini terjadi pada struktur atas jalan layang yang bekerja
pada abutmen. Beban hidup ini terdiri dari :
1. Beban terpusat : 12 T
Koefisien kejut : 1.233
Beban P = {(12 / 2.75) x 5.5 x 100% + 2 x (12 / 2.75)x 2.75 x
50%} x 1.233 = 44.388 T
2. Beban merata : 2.2 T/m
Beban q ={(2.2 / 2.75) x 5.5 x 36 x 100% + 2 x (2.2 / 2.75) x
2.75 x 36 x 50%} x 1.233 = 292.9608 T
Beban hidup total : 44.388 + 292.9608 = 337.3488 T
Beban terhadap satu abutmen : 0.5 x 3373.3488 = 168.6744 T
Beban per meter = 168.6744 / 16 = 10.54215 T
Lengan terhadap A = 2 m
Momen beban hidup (H+K) = 10.54215 x 2 = 21.0843 Tm
e. Beban Rem dan Traksi (Rm)
Gaya rem dan traksi pada permukaan lantai jalan layang diambil 5 %
dari beban hidup (PPPJR SKBI – 1987) yang bekerja pada konstruksi

Gaya horisontal yang bekerja pada abutmen


Beban hidup = 337.3488 T
Rm = 5% x (beban hidup)
= 5% x 337.3488 = 16.86744 T
Beban terhadap satu abutmen = 16.86744 x 0.5 = 8.43372 T
Beban per meter = 8.43372 / 16 = 0.52711 T
Lengan terhadap A = 560 cm = 5.6 m
Momen Terhadap titik A = 0.52711 x 5.6 = 2.952 Tm
f. Beban Gempa (Gb)

Gb = E x Beban mati total


E = konstata gempa = 0.14 (zona gempa 2)
Beban mati total = 284.16 + 208.081+ 572.9523 = 1065.1933
Gb = 0.14 x 1065.1933 = 149.1271 T
Beban gempa per meter = 149.1271 / 16 = 9.3204 T
Lengan terhadap A = 4.7 m
Momen terhadap A = 9.3204 x 4.7 = 43.806 Tm
g. Beban Angin (A)
Beban angin pada muatan setinggi 2 m dari lantai jembatan
A1 = (1.8 + 2) x 36 x 0.15 = 20.52 T
A2 = 16 x (1.8 + 2) x 0.15 = 9.12 T
Beban total = 29.64 T
Beban untuk satu abutmen = 0.5 x 29.64 = 14.82 T
Beban untuk per meter = 11.82 / 16 = 0.9263 T
Lengan terhadap A = 4.7 m
Momen terhadap A = 0.9263 x 4.7 = 4.354 Tm
h. Beban Gesek pada tumpuan tumpuan bergerak (F)
Ditinjau akibat beban mati pada konstruksi atas, yang besarnya
tergantung dari koefisien gesek.
Besar gaya gesek , F = Fs x b
Dimana : F : gaya gesek antar dan balok
Fs : koefisien gesek = 0.156 (PPPJJR-SKBI-1987)
b : Beban mati konstruksi atas = 1145.9045 T

F = 0.15 x 1145.9045 = 171.8857 T


Beban terahadap satu abutmen : 0.5 x 171.8857 = 5.9429 T
Beban per meter = 5.9429 / 16 = 0.3714 T
Lengan terhadap A = 3.8 m
Momen = 0.3714 x 3.8 = 1.4113 Tm
i. Beban Tanah Aktif (TA)

diketahui :
 tanah : 1.8473
 : 340

beban merata q = 0.6 x 1.8473 = 1.1084 T/m2


Gaya tekanan tanah aktif :
P1 = q x Ka x h = 1.1084 x 0.283 x 5.6 = 1.7566 T
Lengan terhadap A : 2.8 m
MP1 = 1.7566 x 2.8 = 4.9185 Tm
P2 = 0.5 x  x Ka x H2 = 0.5 x 1.8473 x 0.283 x 5.62 = 8.1973 T
Lengan terhadap A : 1.8667
MP2 = 8.1973 x 1.8667 = 15.302 Tm
Beban Total Tanah Aktif = 1.7566 + 8.1973 = 9.9539 T
Total Momen Tanah Aktif = 4.9185 + 15.302 = 20.2205 Tm

Gaya-gaya Yang bekerja pada abutmen


Beban PV (T) PH (T) MV (Tm) MH (Tm)
Ga 17.76 0 37.434 0
Gt 13.007 0 40.2429 0
M 35.80952 0 71.61904 0
(H+K) 10.54215 0 21.0843 0
Rm 0 0.52711 0 2.952
Gb 0 9.3204 0 43.806
A 0 0.9263 0 4.354
F 0 0.3714 0 1.4113
TA 0 9.9539 0 20.2205
Kombinasi Pembebanan Struktur Abutmen
a. Kombinasi I : M + (H+K) + TA ……… (100 %)
Muatan Bagian PV (T) PH (T) MV (Tm) MH (Tm)
M Ga 17.76 0 37.434 0
Gt 13.007 0 40.2429 0
M 35.80952 0 71.61904 0
(H+K) 10.54215 0 21.0843 0
TA 0 9.9539 0 20.2205
Total 77.11867 9.9539 170.38024 20.2205
 = 34
SF = 1.5
b. Kombinasi II : M + TA + F + A ……………. 125 %
Muatan Bagian PV (T) PH (T) MV (Tm) MH (Tm)
M Ga 17.76 0 37.434 0
Gt 13.007 0 40.2429 0
M 35.80952 0 71.61904 0
A 0 0.9263 0 4.354
F 0 0.3714 0 1.4113
TA 0 9.9539 0 20.2205
Total 66.57652 11.2516 149.29594 25.9858

c. Kombinasi III : Kombinasi I + R + F + A ………….. 140 %


Muatan PV (T) PH (T) MV (Tm) MH (Tm)
Kombinasi I 77.11867 9.9539 170.38024 20.2205
Rm 0 0.52711 0 2.952
A 0 0.9263 0 4.354
F 0 0.3714 0 1.4113
Total 77.11867 11.77871 170.38024 28.9378

d. Kombinasi IV : M + TA + Gb ……………………..150 %
Muatan Bagian PV (T) PH (T) MV (Tm) MH (Tm)
M Ga 17.76 0 37.434 0
Gt 13.007 0 40.2429 0
M 35.80952 0 71.61904 0
Gb 0 9.3204 0 43.806
TA 0 9.9539 0 20.2205
Total 66.57652 19.2743 149.29594 64.0265

Penulangan Abutmen
Pada perhitungan penulangan abutmen, pembebanan yang digunakan adalah
kombinasi pembebanan yang paling kritis yaitu kombinasi IV (M + TA + Gb).
Mutu beton : K250 (f’c = 20.75)
Mutu baja : U-240 (fy = 240)

a. Penulangan kepala abutmen


Gaya-gaya yang bekerja pada kepala abutmen adalah : beban mati, beban
hidup dan beban tanah aktif dan beban gempa
Pembebanan Yang berpengaruh :
- Beban mati kepala abutmen : (1.8 x 0.5 + 0.3 x 0.5) x 2.4 = 2.52 T / m’
Lengan : 0.25
Momen = 2.52 x 0.25 = 0.63 Tm/m’ (MV)
- Beban hidup : q = 2.2 T/m2 dan P = 12 T
Total beban hidup = 2.2 x 0.5 + 12 = 13.1 T/m’
Lengan : 0.25
Momen : 13.1 x 0.25 = 3.275 Tm/m’(MV)
- Beban gempa : 0.14 x 2.52 = 0.3528 T/m’
Lengan : 1.15 m
Momen = 0.3528 x 1.15 = 0.406 Tm/m’ (MH)
- Beban Tanah Aktif
P1 = q x Ka x h = 1.1084 x 0.283 x 2.3 = 0.7215 T
Lengan : 1.15 m
MP1 = 0.7215 x 1.15 = 0.8297 Tm
P2 = 0.5 x  x Ka x H2 = 0.5 x 1.8473 x 0.283 x 2.32 = 1.383 T
Lengan : 0.7667
MP2 = 1.383 x 0.7667 = 1.0603 Tm
Beban Total Tanah Aktif = 0.7215 + 1.383 = 2.1045 T
Total Momen Tanah Aktif = 0.8297 + 1.0603 = 1.89 Tm (MH)
- Total MV = 0.63 + 3.275 = 3.905 Tm
- Total MH = 0.406 + 1.89 = 2.296 Tm
- Momen yang terjadi : 3.905 – 2.296 = 1.609 Tm
b : 1000 m (tiap 1 meter)
h : 500 mm
d : 500 – 40 – 0.5 x 19 = 450.5 mm
f’c : 20.75 Mpa
fy : 240 Mpa
Perhitungan tulangan
diambil tulangan 12 – 250 = 452 mm2
batasan

tinggi efektif sebenarnya

Tulangan geser

Vn < Vc, jadi tidak dibutuhkan tulangan geser


Digunakan tulangan geser praktis 8-250
Penulangan Badan Abutmen
Beban yang bekerja adalah beban gempa dan beban kombinasi III
Beban Vertikal : 77.11867T
Beban horisontal : 9.3204 + 11.77871= 21.09911 T
Momen vertikal : 170.38024Tm
Momen horisontal : 43.806 + 28.9378 = 72.7438 Tm
Momen Perencanaan, Mu = MV-MH = 170.38024 – 72.7438 = 97.63644 Tm

b : 1000 mm
h : 900 mm
d : 900-40-0.5 x 19 = 850.5 mm
Perhitungan tulangan

diambil tulangan 32 - 125 = 6434 mm2


batasan

tinggi efektif sebenarnya


Tulangan geser

Vn < Vc, jadi tidak dibutuhkan tulangan geser


Digunakan tulangan geser praktis 8-250
Perhitungan Pondasi Telapak
Beban vertikal = 77.11867 x 16 = 1233.898 T
Momen H = 72.7438 x 16 = 1163.901 Tm
Dimensi : B=4m L = 16 m
Df = 1.8 m
Daya Dukung Tanah
Fs = 3  = 340 c = 0.15 Kg/cm2 = 1.5 T/m2
 = 1.831 T/m3
Dari diagram faktor daya dukung Terzaghi didapat :
Nc = 50, Nq = 34, N = 40

qult = 1.5 x 50 + 1.831 x 1.8 x 34 + 0.5 x 1.831 x 4 x 40 = 333.54 T/m2


qall = qult / Fs = 333.54 / 3 = 111.18 T/m2
Reaksi Tanah

qmax = 19.28 + 27.28 = 46.56 T/m2 < qall …….. OK!!!


qmin = 19.28 – 27.28 = -8 T/m2 > 0, perlu tulangan rangkap
Penulangan Poer
Momen yang terjadi :

b = 1000 mm
d = 800 – 40 – 0.5 16 = 752 mm

diambil tulangan 16-100 = 2010 mm2


Tulangan ini dibuat rangkap untuk mengantisipasi adanya momwen yang
berlawanan, supaya konstruksi tidak pecah
Tulangan geser

Vn > Vc, jadi perlu tulangan geser


Digunakan tulangan geser 8 =50.26 mm2
Av = luasan kaki sengkang = 2 x 50.26 = 100.52 mm2
Jarak tulangan geser (S)
S = (Av.d.fy)/(Vn-Vc)
= (100.52 x 752 x 240)/( 771186.7 – 685104.61)
S = 210.75 mm
Digunakan tulangan sengkang 8-200