Anda di halaman 1dari 1

HSE OUTSTANDING ACTION LIST

Proyek : Pekerjaan Rancang Bangun terminal Kalibaru Tahap 1B Pelabuhan Tanjung Priok
Monthly Management Walk Through PSL, RHD & PP Periode Juli 2023
Date of Area or Picture if applicable (after) Person in Open / Comment / Remarks / Findings by
No Finding Finding Area or Picture if applicable (before) Charge Closed Location Due Date who

Welder Geotekindo terlihat


tanpa APD. Personel terebut
Geotekindo Laydown - HSE, One of Memastikan seluruh personel di area
bergegas mengambil helm
Geoteckindo welder was seen without kerja memakai APD (Alat Pelindung Diri)
1 safety/fice shiled tetapi 17-07-23 SOM Closed Laydown 03-08-23
PPE. He run to take safety hat, but still lengkap sesuai dengan ketentuan yang
personel tersebut tidak
wearing non prescribed PPE shoes. ada
memakai APD sepatu yang
baik dan benar

PP Laydown - HSE, plenty rejected Ada banyak material tidak


Penerapan target Housekeeping
2 bamboo poles was observed scattered terpakai seperti bambu reject 17-07-23 SOM Closed Laydown 03-08-23
Perusahaan pada seluruh area kerja
behind PP laydown area. dibelakang kantor Laydown

Diminta oleh tim untuk


Access beside Laydown to CY-1 - The
membarikade seluruh area
area where PP barricaded on one side
sebelah Laydown sampai area
where soft material is present. It was
CY-1 dengan pita peringatan Penerapan target Housekeeping
3 requested by the team to barricade the 17-07-23 SOM Closed Laydown 03-08-23
untuk menghindari seseorang Perusahaan pada seluruh area kerja
whole area with warning tape to avoid
berjalan melalui area tersebut
someone will walk through the area and
dan terjebak di tanah lunak /
get stuck on soft soil / slurry.
lumpur

Tim bertanya mengapa ada


banyak perbedaan pada
Vacuum System B - The team was asking penyelesaian pekerjaan,
Memastikan seluruh personel di area
why there is much difference on dimana di dekat akses
kerja memakai APD (Alat Pelindung Diri)
4 settlement, wherein near the access tampaknya penyelesaian lebih 17-07-23 Geotekindo Open Vacuum 03-08-23
lengkap sesuai dengan ketentuan yang
seems settling slower than the father lambat dari area lain.
ada
side. (mengenai penyelesaian proses
Vacuum pada area vacuum
system B)

Kegiatan penyimpanan bahan


Vacuum System B - It was observed that bakar yang ditempatkan
a makeshift fuel storage is placed nearby didekat Vacuum system B diisi
Evaluasi pada kegiatan penyimpanan
and was being filled by a vehicle. The dengan truck dan terlihat
bahan bakar serta memberi secondary
5 spill containment seem inadequate and penahan tumpahann bahan 17-07-23 Geotekindo Open Vacuum 03-08-23
econtainment pada bak Truck agar
traces of fuel dripping along the hose bakar pada truck tidak
menahan tetesan solar tercecer ke tanah
leading to memadai karena tetesan solar
the Generator. menetes disepanjang jalan
menuju generator

Best implementation! PP
Mempertahankan penerapan Best
PP Laydown - Kudos! PP added railings memasang pagar/railings
Good Impelmentatio Housekeeping,
6 for protection of Electrical junction box. untuk perlindungan kota 17-07-23 SOM Laydown 03-08-23
Finding Environment dan Safety yang sudah
Jobe well done. pentambung listrik, kerja yang
direalisasi dengan baik di lapangan
bagus!

Anda mungkin juga menyukai