1
1,43 m 1,5
9,27
gambar profil saluran pengambilan
Q = Cd . bp . H2 . V2
dimana : Q = 13,231 m3/dt
Cd = 0,9
h2 = 0,2
V2 = = = 1,98
H2 = 1,68 m
Q = Cd . bp . H2 . V2
13,84 = 0,9 x bp x 1,68 x 1,98
bp = 4,62 m
Ambang Pengambilan
Tinggi ambang (P) = 0,5m jika sungai hanya mengangkut lanau
=1m jika sungai juga mengangkut pasir & kerikil
= 1,5m j ka sungai juga mengangkut batu-batu bongkah
H effisien = H – 0,2
= 3,5 – 0,2
= 3,3 m
Q =Ax V
11,5362 = Bpbs x 3,3 x 0,9
Bpbs = 3,884 m
P = B + 2H
= 9,27 + (2 x 1,43)
= 14,426 m
R = A/P
= 16,323/14,426
= 1,131 m
C = = = 48,24
V = 0,41 x Q0,225
= 0,41 x 13,840,225
= 0,741 m/dt
V =C
0,741 = 48,28
I = 0,0002082
Kontrol aliran
q = = = 1,493
hkr = = = 0,534
R = A/P
= 5,534/10,464
= 0,529
C = 40 m/dt
V = C
2,5 = 40
I’ = 0,00739
Vd kantong lumpur
Qn = 13,84 m3/dt
T = 7 hari = 604800 dt
V = 0,0005 x T x Qn
= 0,0005 x 604800 x 13,84
= 4185,216 m/dt